P.

GOPALA KRISHNA
ADE/400KV/APTRANSCO
DOUBLE MAIN BUS & TRANSFER BUS SYSTEM
1. In This Two Main Buses Are Available.
2. They Are Called Bus-1 & Bus-2.
3. One More Bus Is Available. This is Not Main Bus.
4. We Call As Transfer Bus Or Auxiliary Bus Or Temporary Bus.
5. This is Useful only, When any Of the Circuit Breaker (only One) Is Out Of Service Or
Maintenance Or Trouble.
6. If One Of the Circuit Breaker in Trouble, This Is More Useful.
7. If Second Circuit Breaker is also in Trouble, then This Is Not Useful.
8. Most Of The Time, The Auxiliary Bus Is Kept Open.
9. Based On My Experience, Now a Days, this May Be Least Useful.
10. Note: Checking of Every Month, One Day, One Feeder is to be Kept On Transfer Bus and to
Ascertain Healthiness Of Transfer Bus. This is to be Followed Regularly, Then the Transfer
Bus is Available When Emergency Occurs.
11. But, this System is Not Useful For CT Troubles or any other Equipment Troubles.
12. The Tentative Substation Layout Is Shown In Next Slide.
13. This System is adopted When ABCBs, BOCBs, MOCBs Are Available.
14. The ABCBs, BOCBs, MOCBs Requires Regular Maintenance.
15. The reason behind for Adoption of Transfer Bus System is, During The Maintenance of
Circuit Breaker, the Consumer Should Not Suffer.
16. Now A Days SF6 CBs With Trouble Free Mechanisms are Coming and all Substations are
having Redundant or Alternative Source of supply is Available, Still Following This Concept is
Some What Unhappy.
17. The Location of CT is after Line Isolator and towards Line. This is also one more
Disadvantage.
18. For Maintenance Of CT, The Line is to be Taken LC and Remove the Jumpers And to Test.
19. This Type Of One More Unhappy System Is Available i.e. Double Bus With Bypass Isolator.
DOUBLE MAIN BUS & TRANSFER BUS SYSTEM

T/F-1 T/F-2

BUS-1

BUS COUPLER
BUS-2

TRANSFER BUS
COUPLER
BAY3 BAY4 BAY5
BAY1 BAY2 TRANSFER BUS BAY6 BAY7 BAY8

FEEDER1 FEEDER2 FEEDER3 FEEDER4


DOUBLE MAIN BUS & TRANSFER BUS SYSTEM
1. In this each Feeder / Transformer / Reactor is having one Circuit Breaker.
2. One Circuit Breaker for Bus Coupler.
3. One more Circuit Breaker for Transfer Bus Coupler.
4. The details are as follows based on layout.
5. CB designation is very specific.
6. First number will show voltage level. For 765 KV - 7, 550KV-5, 400KV -4, 220KV-2, 132KV -1.
7. Second number will show Bay number.
8. 52 is ANSI code for CB. Some of the locations it is called Q0.

BAY NO CIRCUIT CB DESIGNATION

BAY – 1 FEEDER – 1 2 – 1 – 52 CB
BAY – 2 FEEDER – 2 2 – 2 – 52 CB
BAY – 3 TRANSFORMER – 1 2 – 3 – 52 CB
BAY – 4 BUS COUPLER 2 – 4 – 52 CB
BAY – 5 TRANSFORMER – 2 2 – 5 – 52 CB
BAY – 6 TRANSFER BUS 2 – 6 – 52 CB
BAY – 7 FEEDER – 3 2 – 7 – 52 CB
BAY – 8 FEEDER – 4 2 – 8 – 52 CB
DOUBLE MAIN BUS & TRANSFER BUS SYSTEM

STANDARD PRACTICE
1. FOR BUS ISOLATON: EACH BUS HAVING BUS ISOLATOR FOR
EACH BAY.
2. FOR CB ISOLATION: CIRCUIT BREAKER HAVING BOTH SIDES
ISOLATORS.
3. FOR LINE/ICT ISOLATION: LINE / ICT HAVING LINE ISOLATOR.
4. FOR BUS MAINTANENCE: EACH BUS HAVING BUS EARTH
SWITCH.
5. FOR CB MAINTANENCE: EACH ISOLATOR HAVING EARTH
SWITCH TOWARDS CB SIDE.
6. FOR LINE / ICT MAINTANENCE: EACH LINE / ICT HAVING LINE
EARTH SWITCH.
DOUBLE MAIN BUS & TRANSFER BUS SYSTEM
1. In this each Feeder / Transformer / Reactor is having four Isolators.
2. One Isolator for Bus-1, one Isolator for Bus-2, one isolator for Transfer Bus and another
Isolator for Feeder / Transformer / Reactor.
3. In case of Bus Coupler only Bus-1 & Bus-2 Isolators will be available.
4. In case of Transfer Bus Coupler, Bus-1, Bus-2 & Transfer Bus isolators are available.
5. 89 represents Isolator. Bus-1 Isolator represents-A, Bus-2 Isolator represents-B, Transfer
Bus Isolator represents-C, Circuit Isolator represents-L/T/R based on circuit.

ISOLATORS DESIGNATION
BAY NO CIRCUIT
BUS-1 BUS-2 TR BUS CIRCUIT
BAY – 1 FEEDER – 1 2-1-89A 2-1-89B 2-1-89C 2-1-89L
BAY – 2 FEEDER – 2 2-2-89A 2-2-89B 2-2-89C 2-2-89L
BAY – 3 TRANSFORMER – 1 2-3-89A 2-3-89B 2-3-89C 2-3-89T
BAY – 4 BUS COUPLER 2-4-89A 2-4-89B - -
BAY – 5 TRANSFORMER – 2 2-5-89A 2-5-89B 2-5-89C 2-5-89T
BAY – 6 TRANSFER BUS 2-6-89A 2-6-89B 2-6-89C -
BAY – 7 FEEDER – 3 2-7-89A 2-7-89B 2-7-89C 2-7-89L
BAY – 8 FEEDER – 4 2-8-89A 2-8-89B 2-8-89C 2-8-89L
DOUBLE MAIN BUS & TRANSFER BUS SYSTEM
1. IN THIS EACH FEEDER / TRANSFORMER / REACTOR IS HAVING CT & LA/SA TOWARDS
CIRCUIT.
2. NORMAL APTRANSCO PRACTICE BUS COUPLER HAVING TWO SIDES CT. BUT MOST OF
THE UTILITIES HAVING ONE SIDE CT. BUS COUPLER NOT HAVING LA, CVT & WT/LT.
3. TRANSFER BUS COUPLER HAVING ONE CT. TRANSFER BUS COUPLER NOT HAVING LA,
CVT & WT/LT.
4. IN THIS EACH FEEDER IS HAVING CVT & WT/LT TOWARDS CIRCUIT.

ISOLATORS DESIGNATION
BAY NO CIRCUIT
CT LA/SA CVT WT/LT
BAY – 1 FEEDER – 1 2 – 1CT 2 – 1SA 2 - 1CVT 2 – 1LT
BAY – 2 FEEDER – 2 2 – 2CT 2 – 2SA 2 - 2CVT 2 – 2LT
BAY – 3 TRANSFORMER – 1 2 – 3CT 2 – 3SA - -
2–4
BAY – 4 BUS COUPLER 2 – 4SA - -
A/B CT
BAY – 5 TRANSFORMER – 2 2 – 5CT 2 – 5SA - -
BAY – 6 TRANSFER BUS 2 – 6CT 2 – 6SA - -
BAY – 7 FEEDER – 3 2 – 7CT 2 – 7SA 2 - 8CVT 2 – 8LT
BAY – 8 FEEDER – 4 2 – 8CT 2 – 8SA 2 - 8CVT 2 – 8LT
DOUBLE MAIN BUS & TRANSFER BUS SYSTEM
1. NORMALLY EACH FEEDER / TRANSFORMER / REACTOR IS TO BE CONNECTED TO EITHER
BUS-1 OR BUS-2, NOT BOTH.
2. THE CONCEPT BEHIND IS WHEN EITHER OF THE BUS BAR PROTECTION OPERATES
ATLEAST 50% CIRCUITS WILL BE IN SERVICE.
3. FOR MAINTANENCE POINT OF VIEW IT IS HAPPY THAT ALL CIRCUITS KEPT ON ONE BUS
AND ANOTHER BUS CAN BE TAKEN IN TO MAINTANENCE.
4. NORMALLY BUS-1 OR BUS-2 SELECTION IS TO BE DONE BEFORE CHARGING CIRCUIT.
5. APTRANSCO STANDARD PRACTICE, IN CASE OF DOUBLE CIRCUIT, ONE CIRCUIT ON BUS-
1 AND CIRCUIT -2 ON BUS-2.
6. FOR EXAMPLE VEMAGIRI-1 & 2 FEEDERS ARE AVAILABLE, VEMAGIRI -1CONNECTED ON
BUS-1 AND VEMAGIRI-2 CONNECTED ON BUS-2.
7. IN CASE OF TRANSFORMER ICT-1 CONNECTED ON BUS-1 AND ICT-2 CONNECTED ON
BUS-2.
8. THE BUS COUPLER BREAKER IS ALWAYS IN SERVICE. THE BUS-1 & 2 ISOLATORS BOTH
ARE CLOSSED POSITION.
9. DURING SERVICE, CHANGE OVER BUS IS NOT A PRACTICE, HOWEVER THIS IS POSSIBLE
WHEN BUS COUPLER IS CLOSSED CONDITION ONLY. PLEASE REFER THE INTERLOCK
CIRCUIT OF ANY FEEDER.
10. DURING SERVICE THE CHANGING OF BUS PROCEDURE IS AS FOLLOWS: IF THE CIRCUIT
IS CONNECTED ON BUS-1, CLOSE BUS-2 ISO AND OPEN BUS-1 ISO. SIMILARLY FOR BUS-2
TO BUS-1 CHANGE OVER. DONOT PRACTICE REGULARLY. THIS IS PURELY FOR
EMERGENCY AND WHEN BOTH ISOLATORS & CB OF BUS COUPLER IS CLOSSED
CONDITION ONLY.
11. THE ISOLATOR SELECTION IS GOING TO BUSBAR PROTECTION. i.e. IF BUS-1 ISO CLOSES
CT IS CONNECTED TO BUSBAR-1 PROTECTION OR BUS-2 ISO CLOSES CT IS CONNECTED
TO BUSBAR-2 PROTECTION.
12. DURING BUS BAR PROTECTION OPERATES, THE BAYS CONNECTED TO THAT BUS AND
BUSCOUPLER CBs ARE OPENED. THIS EXPLAINED IN BUSBAR PROTECTION IN NEXT
SLIDES.
DOUBLE MAIN BUS & TRANSFER BUS SYSTEM
1. NORMALLY TRANSFER BUS COUPLER CB & ISOs ARE ALWAYS IN OPEN CONDITION.
2. WHEN ANY OF THE CB TROUBLE COMES THAT WILL BE TRANSFERED TO AUXILIARY BUS
AND THAT CIRCUIT IS FED FROM AUX BUS.
3. THE OPERATION OF TRANSFER BUS WILL BE EXPLAINED IN NEXT SLIDES.
4. FROM THE SAMPLE LAYOUT WE ARE PRESUMED THAT FEEDER-1, ICT-1 & FEEDER-3 ARE
CONNECTED ON BUS-1 AND FEEDER-2, ICT-2 & FEEDER-4 ARE CONNECTED ON BUS-2.
5. BUS COUPLER CB & ISOLATORS ARE IN SERVICE.
6. DURING THIS CHANGE OVER TO TRANSFER BUS, THE TRIPPING CIRCUITS ARE
TRANSFERRED TO TRANSFER BUS COUPLER CB.
7. DURING THE CIRCUIT IS CONNECTED ON TRANSFER BUS COUPLER, IF FAULT OCCURS
ON CIRCUIT, THE PROTECTIVE RELAYS WILL GIVE TRIP SIGNAL TO CONCERNED CB AND
TRANSFER BUS CB.
8. THIS CAN BE AVOIDED BY USING SOME MORE LOGIC.
9. THE TBC CT ONE CORE IS CONNECTED TO SELECTION OF BUSBAR PROTECTION EITHER
BUS-1 & BUS-2 BASED ON ISOLATOR SELECTION.
10. ANOTHER CORE IS CONNECTED TO BUS-3 BUSBAR PROTECTION.
11. THIS IS EXPLAINED IN BUS BAR PROTECTION PRESENTATION.
12. IN TRANSFER BUS PANEL, AUTO RECLOSURE RELAY IS AVAILABLE. THIS IS USEFUL
WHEN ANY FEEDER IS CONNECTED TO TBC, THEN IT IS USEFUL.
13. IN TRANSFER BUS PANEL, TBC LBB RELAY IS ALSO AVAILABLE.
14. DURING THE OPERATION OF TRANSFERING THE CIRCUIT TO THE TBC, THE COMPLETE
SEQUENCE IS TO BE FOLLOWED. ANY THING WRONG, THEN ALARM WILL COME. THE
OPERATION COMPLETES PERFECTLY THE ALARM WILL DISAPPEAR.
15. NORMAL CONVENTIONAL SYSTEM WE ARE PROVIDING TTS SWITCH. THIS IS TRIP
TRANSFER SWITCH. IN NORMAL MODE TRIPING IS DONE FOR PARTICULAR CIRCUIT
BREAKER, IF IT IS TRANSFER MODE THE TRIP CIRCUIT IS PARALLED AND EXTENDED TO
TBC CIRCUIT BREAKER BAY.
16. IN AUTOMATION SYSTEM, THE LATCH RELAY MAY PROVIDE, FOR THIS OPERATION AND
THAT CAN BE OPERATED FROM BCU/ REMOTE.
DOUBLE MAIN BUS & TRANSFER BUS SYSTEM
CHANGING OVER OPERATION OF FEEDER-1 TO TBC CIRCUIT & TO NORMAL
NORMALLY FEEDER-1 IS CONNECTED BUS-1 & Feeder Protections are to be kept on Line CVT
THE SEQUENCE OF OPERATION STARTS AS FOLLOWS:
1. PUT ALL PROTECTIONS ON LINE CVT.
2. CLOSE TBC BAY BUS-1 ISOLATOR.
3. CLOSE TBC BAY BUS-3 ISOLATOR.
4. CLOSE FEEDER-1, BAY-3 ISOLATOR.
5. SO THE TBC CB BOTH SIDES HAVING VOLTAGE.
6. PUT TTS IN TRANSFER MODE OF FEEDER-1 PANEL.
7. CLOSE THE TBC CB.
8. THEN, THE FEEDER-1 IS PARALLED WITH TBC CB AND FEEDING TWO PARALLEL PATHS.
9. PATH1:FEEDER-1 CIRCUIT : FEEDER-1 BUS-1 ISO, FEEDER-1 CB, FEEDER-1 LINE ISO TO
FEEDER-1.
10. PATH2:TBC CIRCUIT : TBC BUS-1 ISO, TBC CB, TBC BUS-3 ISO AND FEEDER-1 BUS-3 ISO
TO FEEDER-1.
11. THEN OPEN FEEDER-1 CB.
12. NOW THE FEEDER-1 IS FEEDING FROM TBC CB.
13. OPEN THE FEEDER ISOLATORS i.e. BUS-1 ISO, LINE ISO. NOT BUS-3 ISO.
14. AFTER MAINTANENCE WORK IS OVER, THE REVERSE PROCEDURE MAY BE FOLLOWED.
TAKING TO NORMAL SYSTEM.
1. CLOSE FEEDER-1 BUS-1 ISOLATOR.
2. CLOSE FEEDER-1 LINE ISOLATOR.
3. PUT TTS IN NORMAL MODE.
4. CLOSE FEEDER-1 CIRCUIT BREAKER.
5. OPEN TBC CB.
6. OPEN TBC BAY BUS-1 ISOLATOR.
7. OPEN TBC BAY BUS-3 ISOLATOR.
8. OPEN FEEDER-1 BUS-3 ISOLATOR.
DOUBLE MAIN BUS & TRANSFER BUS SYSTEM
CHANGING OVER OPERATION OF ICT-2 TO TBC CIRCUIT & TO NORMAL
NORMALLY ICT-2 IS CONNECTED BUS-2.
THE SEQUENCE OF OPERATION STARTS AS FOLLOWS:
1. CLOSE TBC BAY BUS-2 ISOLATOR.
2. CLOSE TBC BAY BUS-3 ISOLATOR.
3. CLOSE ICT-2 BAY-3 ISOLATOR.
4. SO THE TBC CB BOTH SIDES HAVING VOLTAGE.
5. PUT TTS IN TRANSFER MODE IN ICT-2 PANEL.
6. CLOSE THE TBC CB.
7. THEN, THE ICT-2 IS PARALLED WITH TBC AND FEEDING TWO PARALLEL PATHS.
8. PATH1:ICT-2 CIRCUIT : ICT-2 BUS-2 ISO, ICT-2 CB, ICT-2 TRANSFORMER ISO TO ICT-2.
9. PATH2:TBC CIRCUIT : TBC BUS-2 ISO, TBC CB, TBC BUS-3 ISO AND ICT-2 BUS-3 ISO TO
ICT-2.
10. THEN OPEN ICT-2 CB.
11. NOW THE ICT-2 IS FEEDING FROM TBC CB.
12. OPEN THE ICT-2 ISOLATORS i.e. BUS-2 ISO, TRANSFORMER ISO. NOT BUS-3 ISO.
13. AFTER MAINTANENCE WORK IS OVER, THE REVERSE PROCEDURE MAY BE FOLLOWED.
TAKING TO NORMAL SYSTEM.
1. CLOSE ICT-2 BUS-2 ISOLATOR.
2. CLOSE ICT-2 TRANSFORMER ISOLATOR.
3. PUT TTS IN NORMAL MODE.
4. CLOSE ICT-2 CIRCUIT BREAKER.
5. OPEN TBC CB.
6. OPEN TBC BAY BUS-2 ISOLATOR.
7. OPEN TBC BAY BUS-3 ISOLATOR.
8. OPEN ICT-2 BUS-3 ISOLATOR.
DOUBLE MAIN BUS & TRANSFER BUS SYSTEM
THIS CONTAINS
1. INDIVIDUAL BAYS LIKE FEEDER/LINE, TRANSFORMER, REACTOR.
2. BUS COUPLER BAY.
3. TRANSFER BUS COUPLER BAY.

THIS CONTAINS
1. ENTIRE SUBSTATION CONTAINS 1. EACH FEEDER/LINE BAY CONTAINS
A. BUSBAR PROTECTION PANEL A. LINE CONTROL PANEL
B. COMMON ANNUNCIATION/CONTROL B. CB RELAY PANEL
PANEL C. LINE PROTECTION PANEL
2. BUS COUPLER BAY CONTAINS D. LINE REACTOR PROTECTION PANEL
A. BUS COUPLER CONTROL PANEL 2. EACH TRANSFORMER/ICT BAY
B. BUS COUPLER RELAY & PROTECTION CONTAINS
PANEL A. ICT HV CONTROL PANEL
3. BUS SECTIONALISER BAY CONTAINS B. HV CB RELAY PANEL
A. BUS COUPLER CONTROL PANEL C. ICT PROTECTION PANEL.
B. BUS COUPLER RELAY & PROTECTION D. LV CB RELAY PANEL.
PANEL E. ICT LV CONTROL PANEL
4. TRANSFER BUS COUPLER BAY 3. EACH BUS REACTOR BAY CONTAINS
CONTAINS
A. REACTOR CONTROL PANEL
A. TRANSFER BUS COUPLER CONTROL
PANEL B. CB RELAY PANEL
B. TRANSFER BUS COUPLER RELAY & C. REACTOR PROTECTION PANEL.
PROTECTION PANEL
BUSBAR PROTECTION PANEL
DISTRIBUTED ARCHITECTURE CENTRALISED ARCHITECTURE
S.NO DESCRIPTION QTY
2 RBB 2 RBB
3 Zone Numerical Bus Bar Protection
Relay for Double Bus and Transfer Bus
1 1 No
System of Either Distributed Architecture
or Centralised Architecture with test plug.
BCU1 BCU2 Incase of Distributed Architecture Bay/ BCU1 BCU2
2 Peripheral units are at respective CB set
Relay Panels.
Numerical Breaker Failure Relay.
BCU3 (BFR/CBF/LBB/ Stuck Breaker BCU3
3 --
Protection)
Inbuilt function of Bus Bar Protection
BUSBAR Selector Switch Bus IN / OUT for each BUSBAR-1
CENTRAL UNIT 4 3 No RELAY
Bus
DC
AE CMR

Bus
AE CMR
89BB1

89BB2

Bar -1 DC-1 & DC-2 Supply Monitoring


Aux DC 5 2 No
relays -2 /Supervision relays for Gr-A & Gr-B
BUSBAR-2
Bay Control Units for BUS-1, BUS-2 & RELAY
Transfer Bus equipment Control,
6 3 No
Operation, Monitoring, Synchronisation &
Interlocks with Mimic. TRANSFER BUS
RELAY
3-Ph High Speed Master Trip Relays with
Electrical Reset through BCU for
7 Set
96BB/50Z including Supervision. are at DC

AE CMR
Bus

AE CMR
89BB1

89BB2
Bar -1
respective CB Relay Panels. Aux DC
relays -2
Auxiliary Relays to Close Bus Isolators of
8 3 No
Particular Bus from BCU.
9 Bus Earth Switches Contact Multiplier 2 No
Transfer Bus Coupler Isolators Contact
10 2 No
multiplication
BUS COUPLER PANEL
CONVENTIONAL PANEL AUTOMATION PANEL
2RBC S.NO DESCRIPTION QTY 2RBC

Bay Control Units for BC CB Bay


Equipment Control, Operation,
1 1 No
Monitoring, Synchronisation &
Interlocks with Mimic.
BC BCU
Numerical Breaker Failure Relay.
50/51 (BFR/CBF/LBB/ Stuck Breaker
2 Set
A,B Protection). (Bus Coupler Having
LBB/ BU C,N Both Sides CTs.) (part of Busbar) LBB/ BU LBB/ BU
50Z 50Z 50Z

TRIP COIL Flag relays two element type for TRIP COIL
CB 1&2 3 Set CB 1&2
TROUBLES HEALTHY
Circuit Breaker Troubles TROUBLES HEALTHY
& ALARMS LEDS & ALARMS LEDS
4 Trip Coil Supervision Relays. 6 No

DC-1
DC-1

86 DC-1 & DC-2 Supply Monitoring 86


GR-A 5 2 No GR-A
/Supervision relays for Gr-A & Gr-B

DC-2
DC-2

86 3-Ph High Speed Master Trip Relays 86


GR-B with Electrical Reset through BCU for GR-B
CB 6 3 No
96 Contact 86Gr-A, 86Gr-B & 96BB/50Z 96
50Z Multiplier
Relay
including Supervision. 50Z
CB PB
IDMT Numerical Non Directional O/C
7 1 No
& E/F Relay 50/51
A,B
Auxiliary Relays to Close Circuit C,N
8 Breaker & Isolators of Particular Bay Set
from BCU.
Emergency Circuit Breaker TNC
9 Switch or Push Button for CB Open & 1 No
Close.
BUS SECTIONALISER PANEL
CONVENTIONAL PANEL AUTOMATION PANEL
2RBS S.NO DESCRIPTION QTY 2RBS

Bay Control Units for BC CB Bay


Equipment Control, Operation,
1 1 No
Monitoring, Synchronisation &
Interlocks with Mimic.
BC BCU
Numerical Breaker Failure Relay.
50/51 (BFR/CBF/LBB/ Stuck Breaker
2 Set
A,B Protection). (Bus Coupler Having
LBB/ BU C,N Both Sides CTs.) (part of Busbar) LBB/ BU LBB/ BU
50Z 50Z 50Z

TRIP COIL Flag relays two element type for TRIP COIL
CB 1&2 3 Set CB 1&2
TROUBLES HEALTHY
Circuit Breaker Troubles TROUBLES HEALTHY
& ALARMS LEDS & ALARMS LEDS
4 Trip Coil Supervision Relays. 6 No

DC-1
DC-1

86 DC-1 & DC-2 Supply Monitoring 86


GR-A 5 2 No GR-A
/Supervision relays for Gr-A & Gr-B

DC-2
DC-2

86 3-Ph High Speed Master Trip Relays 86


GR-B with Electrical Reset through BCU for GR-B
CB 6 3 No
96 Contact 86Gr-A, 86Gr-B & 96BB/50Z 96
50Z Multiplier
Relay
including Supervision. 50Z
CB PB
IDMT Numerical Non Directional O/C
7 1 No
& E/F Relay 50/51
A,B
Auxiliary Relays to Close Circuit C,N
8 Breaker & Isolators of Particular Bay Set
from BCU.
Emergency Circuit Breaker TNC
9 Switch or Push Button for CB Open & 1 No
Close.
TRANSFER BUS COUPLER PANEL
CONVENTIONAL PANEL AUTOMATION PANEL
2RTBC S.NO DESCRIPTION QTY 2RTBC

Bay Control Units for TBC CB Bay


Equipment Control, Operation,
1 1 No
Monitoring, Synchronisation & Interlocks
with Mimic.
TBC BCU
Numerical Breaker Failure Relay.
2 (BFR/CBF/LBB/ Stuck Breaker 1 No
Protection). (part of Busbar)
A/R+SC LBB/ BU A/R+SC LBB/ BU
79+25 50Z Numerical Auto Re-closure Relay 79+25 50Z

TRIP COIL 3 Scheme Complete Scheme with Check 1 No TRIP COIL


CB 1&2 CB 1&2
TROUBLES HEALTHY Synchronizing and Dead Line charging. TROUBLES HEALTHY
& ALARMS LEDS & ALARMS LEDS
186
Flag relays two element type for Circuit 186

DC-1
DC-1

86 R1,Y1,B1 4 Breaker Troubles for Alarms/ Event Set 86 R1,Y1,B1


GR-A R2,Y2,B2 Logger / Disturbance Recorder. GR-A R2,Y2,B2
286 286

DC-2
DC-2

86 R1,Y1,B1
5 Trip Coil Supervision Relays. 6 No 86 R1,Y1,B1
GR-B R2,Y2,B2 DC-1 & DC-2 Supply Monitoring GR-B R2,Y2,B2
CB 6 2 No Closing
96 Multiply /Supervision relays for Gr-A & Gr-B 96 Aux
50Z Relay 50Z relays
High Speed Single Phase Trip Relays CB PB
7 12 No
with self resetting & Flag indication.
3-Ph High Speed Master Trip Relays
with Electrical Reset through BCU for
8 3 No
86Gr-A, 86Gr-B & 96BB/50Z including
Supervision.
Auxiliary Relays to Close Circuit Breaker
9 Set
& Isolators of Particular Bay from BCU.
Emergency Circuit Breaker TNC Switch
10 1 No
or Push Button for CB Open & Close.
LINE CB RELAY PANEL
CONVENTIONAL PANEL AUTOMATION PANEL
2RLA S.NO DESCRIPTION QTY 2RLA

Bay Control Units for Line Main CB Bay


79 + 25 1 Equipment Control, Operation, Monitoring, 1 No
(AUTO RECLOSURE + Synchronisation & Interlocks with Mimic.
CHECK SYNC RELAY)
Numerical Auto Re-closure Relay Scheme
50 Z 2 Complete Scheme with Check Synchronizing 1 No BAY1 BCU
(LBB / BFR) and Dead Line charging.

CB TROUBLE ALARAM Numerical Breaker Failure Relay.


3 (BFR/CBF/LBB/ Stuck Breaker Protection)
1 No
AND TRIP RELAYS
A/R+SC LBB/ BU
Flag relays two element type for Circuit 79+25 50Z
TSR DC TSR 4 Breaker Troubles for Alarms/ Event Logger / SET
TC-1 I & II TC-1I TRIP COIL
Disturbance Recorder. CB 1&2
TROUBLES HEALTHY
1-PH TRIP & ALARMS LEDS
5 Trip Coil Supervision Relays. 6 No
86 GR -A RELAYS -6

DC-1
186
FOR 21L1 DC-1 & DC-2 Supply Monitoring /Supervision
6 2 No 86 R1,Y1,B1
1-PH TRIP relays for Gr-A & Gr-B GR-A R2,Y2,B2
86 GR -B RELAYS -6
3-Ph High Speed Master Trip Relays with 286

DC-2
FOR 21L2
7 Electrical Reset through BCU for 86Gr-A, 3 No 86 R1,Y1,B1
D/T CH-1 D/T CH-2 86Gr-B & 96BB/50Z including Supervision. GR-B R2,Y2,B2
RECEIVE RECEIVE
RELAYS RELAYS CB, ISO
High Speed Single Phase Trip Relays with 96 CLSOING
8 self resetting & Flag indication.
12 No
50Z AUX RLYS CB PB
UNDER BREAKER
VOLTAGE MULTIPLICA High Speed Auxiliary trip relays with flags D/T CH-1 D/T CH-2
RELAY TION RELAY RECEIVE RECEIVE
9 and self resetting for Direct Trip-1 & 2 2 No RELAYS RELAYS
Receive.
Auxiliary Relays to Close Circuit Breaker &
10 Isolators of Particular Bay from BCU.
SET

Emergency Circuit Breaker TNC Switch or


11 Push Button for CB Open & Close.
1 No

Under Voltage Relay for Line Isolator Earth


12 Switch Interlock circuit.
SET

3-Ph Energy Meter for Both Export & Import


13 with Test Terminal Blockwith RS232/485 with 1 No
Modbus/ DNP 3.0 Protocol
ICT HV or LV CB RELAY PANEL
CONVENTIONAL
CONVENTIONAL PANEL
PANEL AUTOMATION PANEL
2RTRA S.NO DESCRIPTION QTY 2RTRA

Bay Control Units for ICT Main CB Bay


Equipment Control, Operation,
1 1 No
Monitoring, Synchronisation & Interlocks
with Mimic.
50 Z BAY1 BCU
(LBB / BFR) Numerical Breaker Failure Relay.
2 (BFR/CBF/LBB/ Stuck Breaker 1 No
CB TROUBLE ALARAM Protection) (Part of Bus Bar Protection)
AND TRIP RELAYS
Flag relays two element type for Circuit LBB/ BU
50Z
TSR DC TSR
3 Breaker Troubles for Alarms/ Event Set
TC-1 I & II TC-1I Logger / Disturbance Recorder. TRIP COIL
CB 1&2
TROUBLES HEALTHY
4 Trip Coil Supervision Relays. 6 No & ALARMS LEDS
86 GR -A 86 GR -B

DC-1
DC-1 & DC-2 Supply Monitoring
5 2 No 86
/Supervision relays for Gr-A & Gr-B
GR-A
96 3-Ph High Speed Master Trip Relays

DC-2
50Z
with Electrical Reset through BCU for 86
6 3 No GR-B
INTER INTER 86Gr-A, 86Gr-B & 96BB/50Z including
TRIP TRIP Supervision. CB, ISO
RELAYS RELAYS 96 CLSOING
BREAKER High Speed Inter trip relays and self 50Z AUX RLYS CB PB
7 4 No
MULTIPLICA resetting INTER TRIP
TION RELAY RELAYS
Auxiliary Relays to Close Circuit Breaker
8 SET
& Isolators of Particular Bay from BCU.
Emergency Circuit Breaker TNC Switch
9 1 No
or Push Button for CB Open & Close.
Under Voltage Relay for Line Isolator
10 Set
Earth Switch Interlock circuit.
3-Ph Energy Meter for Both Export &
Import with Test Terminal Block with
11 1 No
RS232/485 with Modbus/ DNP 3.0
Protocol
REACTOR CB RELAY PANEL
CONVENTIONAL
CONVENTIONAL PANEL
PANEL AUTOMATION PANEL
S.NO DESCRIPTION QTY 2RBRA
2RBRA
Bay Control Units for Bus Reactor Main
CB Bay Equipment Control, Operation,
1 1 No
Monitoring, Synchronisation & Interlocks
with Mimic.
50 Z BAY1 BCU
(LBB / BFR) Numerical Breaker Failure Relay.
2 (BFR/CBF/LBB/ Stuck Breaker 1 No
CB TROUBLE ALARAM Protection) (Part of Bus Bar Protection)
AND TRIP RELAYS
Flag relays two element type for Circuit LBB/ BU
50Z
3 Breaker Troubles for Alarms/ Event Set
TSR DC TSR
TC-1 I & II TC-1I Logger / Disturbance Recorder. TRIP COIL
CB 1&2
TROUBLES HEALTHY
4 Trip Coil Supervision Relays. 6 No & ALARMS LEDS
86 GR -A 86 GR -B

DC-1
DC-1 & DC-2 Supply Monitoring
5 2 No 86
/Supervision relays for Gr-A & Gr-B GR-A
96
3-Ph High Speed Master Trip Relays

DC-2
50Z
with Electrical Reset through BCU for 86
6 3 No GR-B
86Gr-A, 86Gr-B & 96BB/50Z including
Supervision. CB, ISO
96 CLSOING
BREAKER Auxiliary Relays to Close Circuit Breaker 50Z AUX RLYS CB PB
MULTIPLICA 7 SET
& Isolators of Particular Bay from BCU.
TION RELAY
Emergency Circuit Breaker TNC Switch
8 1 No
or Push Button for CB Open & Close.
Under Voltage Relay for Line Isolator
9 Set
Earth Switch Interlock circuit.
CONVENTIONAL CONTROL PANELS
(THESE ARE REPLACED BY BCU’s IN AUTOMATION)
LINE + REACTOR PROTECTION PANEL
2RLB 2RLRC
LINE PROTECTION PANEL
S.NO DESCRIPTION QTY
75A 75A,B
75B 1 MAIN-1(21L1): Line Distance Protection 1 No
21L1 2 MAIN-2(21L2): Line Distance Protection 1 No 87R

Voltage Selection Relays for BUS-1 & BUS-2


3 2 No
based on isolator selection
Voltage Selector Switch for BUS PT or LINE
4 2 No
CVT for Main-1 & Main-2.
21L2 64R
DC-1 & DC-2 Supply Monitoring /Supervision
5 2 No
relays for Gr-A & Gr-B
Carrier Selector Switches for Main-1 &Main-2
6 2 No
for Auto reclosure and protection
Reactor Trouble
Alarms & Trips

LINE REACTOR PROTECTION PANEL 21R

S.NO DESCRIPTION QTY


MAIN-1(87R): Reactor Differential Protection
1 1 No
Scheme
MAIN-2(21R): Reactor Backup impedance
2 1 No
Protection Scheme
3 64R: Reactor REF Protection Scheme 1 No
4 Reactor Trouble Alarms & Trips. set
DC-1 & DC-2 Supply Monitoring /Supervision
5 2 No
relays for Gr-A & Gr-B
Voltage Selection Relays for BUS-1 & BUS-2
6 2 No
based on isolator selection
ICT + REACTOR PROTECTION PANEL
2RTRB 2RBRB
ICT PROTECTION PANEL
S.NO DESCRIPTION QTY
75A,B 75A,B
1 MAIN-1(87T1): ICT Differential Protection (LZ) 1 No
87T1 2 MAIN-2(87T2): ICT DifferentialProtection (HZ) 1 No 87R

Voltage Selection Relays for BUS-1 & BUS-2


3 2 No
based on isolator selection
4 Transformer Troubles Alarms & Trips Set
DC-1 & DC-2 Supply Monitoring /Supervision
87T2 5 2 No 64R
relays for Gr-A & Gr-B
6 Directional O/C + E/F Relays for HV & IV 2 No
7 Over Flux Relays for HV & IV 2 No
Transformer Trouble Reactor Trouble
Alarms & Trips Alarms & Trips

67HV 67IV BUS REACTOR PROTECTION PANEL 21R

S.NO DESCRIPTION QTY


99HV 99IV
MAIN-1(87R): Reactor Differential Protection
1 1 No
Scheme
50O/L 50STUB MAIN-2(21R): Reactor Backup impedance
2 1 No
Protection Scheme
3 64R: Reactor REF Protection Scheme 1 No
4 Reactor Trouble Alarms & Trips. set
DC-1 & DC-2 Supply Monitoring /Supervision
5 2 No
relays for Gr-A & Gr-B
Voltage Selection Relays for BUS-1 & BUS-2
6 2 No
based on isolator selection
CBIP Guidelines on Protection
GENERAL

¾ Some broad guidelines for Engineering of Protection


System are given below and could be refined if felt
necessary by the Utility according to its specific
needs and practices.
¾ Wherever two sets of DC sources are available, to
obtain redundancy and to be able to take protection
out for maintenance, while equipment.
¾ in service, the relays are electrically and physically
segregated into two groups.
¾ Interconnection between these two groups shall not
generally be attempted.
¾ Segregation of protections and trip circuits in two
groups may be considered by giving DC supplies
through separate fuses.
CBIP Guidelines on Protection
GR-A & GR-B TRIPPINGS

For 400kV stations there shall be two separate Battery Systems


available for Protection, Control & Tripping/ Closing operations.
To obtain Redundancy and to be able to take Protection out for
Maintenance, while equipment is in service, the Relays are
Electrically and Physically segregated in to Two groups.
Grouping is done to the extent possible in such a way that each
group can independently carryout Protective functions with near
equal redundancy. Inter connection of these two groups shall not
be generally be attempted.
Distribution of DC supply shall be done bay wise to feed the
following
1. Protection
2. CB control
3. Isolator / earth switch control
4. Annunciation / indication
CBIP Guidelines on Protection
GR-A & GR-B TRIPPINGS

a) Protection Function:
For each group of protection, separate DC sources
are recommended.
Example: Group-1: 21L1, 87T1, 67HV, 87R, 87BB1
Group-2: 21L2, 87T2, 67LV, 21R, 87BB2
b) CB Functions
Trip coil 1 & 2 shall be fed from separate sources.
Closing coil can be from either of these two sources.
c) Isolator / Earth switch
These associated with any one circuit shall be fed
from one of the two DC sources.
In the case of One and half (1 & ½) CB arrangement,
the Isolator / Earth switch associated with the tie CB
can be fed from either source 1 or 2.
CBIP Guidelines on Protection
GR-A & GR-B TRIPPINGS

d) Annunciation & Indication


For each bay, these functions can be fed from either
one of the two sources. Each function shall be fed
however through separate feeds.
e) Monitoring Functions
These shall be grouped in 3 groups
(i) Disturbance Recorders
(ii) Fault Locators
(iii) Event Loggers
All the three groups shall be fed through separate
feeds from either of the two sources.
Now days Numerical IEDs / Protective Relays are
Having above functions are offered as inbuilt. Most of
the Utilities are accepting this.
CBIP Guidelines on Protection
Cabling

It is recommended that:
(i) Separate cables are used for AC & DC circuit.
(ii) Separate cables are used for DC 1 & DC 2 circuits.
(iii) For different cores of CT & CVT separate cables
shall be used.
GROUP-A & GROUP-B TRIPPINGS
LINE TRANSFORMER REACTOR
PROTECTION PROTECTION PROTECTION
GROUP-A GROUP-A GROUP-A
MAIN-1 PROTECTION (21L1) T/F DIFFERENTIAL RELAY (87T1) REACTOR DIFFERENTIAL RELAY (87R)
M1 BUILT IN FUNCTIONS T/F B/U IMP RELAY (21T) REACTOR BACKUP RELAY (21 R)
TEED-1 PROTECTION (87 TEED-1) T/F HV BACKUP RELAY (67HV) OIL TEMP HIGH TRIP
OVER VOLTAGE STAGE-1 PROT (59-1) T/F HV OVERFLUX RELAY (99HV) PRESURE RELIEF TRIP
DIRECT TRIP CHANNEL-1 RECEIVED TERITIARY DELTA WNDG NDR PROT
OIL TEMP HIGH TRIP GROUP-B
GROUP-B PRESURE RELIEF TRIP REACTOR REF RELAY (64R)
MAIN-2 PROTCTION (21L2) GROUP-B BUCHHOLZ TRIP
M2 BUILT IN FUNCTIONS T/F HIGH Z DIFF RELAY (87T2) WINDING TEMP HIGH TRIP
TEED-2 PROTECTION (87 TEED-2) T/F NEUTRAL CURRENT RLY (51 NCT) LOW/ HIGH OIL LEVEL TRIP
OVER VOLTAGE STAGE-2 PROT (59-2) T/F LV BACKUP RELAY (67LV) FIRE PROTECTION TRIP
LBB/BFR RELAY (50Z) T/F LV OVERFLUX RELAY (99 LV)
DIRECT TRIP CHANNEL-2 RECEIVED OVER LOAD PROT (ALARM ONLY)
BUCHHOLZ TRIP
OLTC BUCHHOLZ TRIP
WINDING TEMP HIGH TRIP
LOW/ HIGH OIL LEVEL TRIP
PRINCIPLE OF Gr-A & Gr-B SEPERATION
BUS BAR PROT
CABLE

CABLE 96 BB
ABB Network Partner AG COM581

CT CABLE

BUS-1 BUS / LINE


BUS-1 ISOLATOR PT / CVT C
E

SELCTION SELCTION
MAIN-1 86 Gr-A
CABLE PROT

CABLE
PT
BUS-2
ISOLATOR
BUS-2
SELCTION

CABLE MAIN-2 86 Gr-B


PROT
CABLE

PT
TRIP TRIP
COIL-1 COIL-2

LINE

CABLE

CABLE

CVT
DC -1/2
DC SOURCE-1 SELCTION

CABLE

DC SOURCE-2
CABLE
LINE PROTECTIONS TRANSFORMER PROTECTIONS
21L1 21L2 87T1 87T2
CIRCUIT BREAKER ABB Network Partner AG COM581

RELYS OF TRANSFER
BUS COUPLER C
E

NORMAL

TRANSFER

GROUP-A GROUP-B GROUP-A GROUP-B GROUP-A GROUP-B


TRIP UNIT TRIP UNIT TRIP UNIT TRIP UNIT TRIP UNIT TRIP UNIT
86 Gr-A 86 Gr-B 86 Gr-A 86 Gr-B 86 Gr-A 86 Gr-B

A/R RELAY A/R RELAY


(79+25) (79+25)

A A A
B B B
AUTO RECLSOING FUNCTION
AUTO RECLOSING CIRCUITS:
Arrangement of Relays
When Line is Transferred to Transfer Bus, Auto Reclosing Facility for This CB can be
extended in Two Ways
* CB Oriented
1. Individual Auto reclosure and Synchro-check relay for each CB . Hence co-
operation between CB’s and Synchro-check relay etc., is straight forward.
2. Interconnection between Line relays and reclosure relays complicated.
* LINE Oriented
1. Interconnection between Line relays and reclosure relays Simpler.
2. Connections to CB Oriented equipments complicated.
Note: CB Oriented Arrangement is preferred.
MAIN-1 PROTECTION CARRIER INTER TRIPPING
NSD 50

G4AC V9LC 1
G4AC V9LC 6 LINE 21L1
IN OUT
CR
CARRIER RECEIVE
G4AC V9LC 5 -VE

CS
G4AC V9LC 2 CARRIER SEND

G4AA V9LB 5
ABB

G4AA V9LB 6 ALARM

PANEL-1
+VE -VE
NSD 50

G4AC V9LC 10
G4AC V9LC 13
THIS IS BACKUP FOR PERMISSIVE/ PROTECTION TRIP
G4AC V9LC 14 AND CONNECTED IN ANOTHER PANEL

G4AC V9LC 9
ABB

PANEL-2
MAIN-2 PROTECTION CARRIER INTER TRIPPING
NSD 50

G4AC V9LC 1
G4AC V9LC 6 LINE 21L2
IN OUT
CR
CARRIER RECEIVE
G4AC V9LC 5 -VE

CS
G4AC V9LC 2 CARRIER SEND

G4AA V9LB 5
ABB

G4AA V9LB 6 ALARM

PANEL-2
+VE -VE
NSD 50

G4AC V9LC 10
G4AC V9LC 13
THIS IS BACKUP FOR PERMISSIVE/ PROTECTION TRIP
G4AC V9LC 14 AND CONNECTED IN ANOTHER PANEL

G4AC V9LC 9
ABB

PANEL-1
DIRECT TRANSFER TRIP – Gr-A
96 BUSBAR PROT PANEL
PANEL-1
87 BUSBAR TRIP
ABB
M_CB CONTROL PANEL
N T T NC
NSD 50
DC +VE
FROM PANEL
MAIN CB

TBC_CB CONTROL PANEL


N T T NC

TBC CB G4AD V9LC 2


50 LBB/BFR FOR MAIN CB / RAICA G4AD V9LC 1
N T

DC –VE FROM PANEL

50 LBB/BFR FOR TBC CB / RAICA CONDITIONS FOR DIRECT TRIP


N T 1. TTS SWITCH IN NORMAL + MAIN CB REMOTE HAND TRIP GIVEN.
2. TTS SWITCH IN TRANSFER + TBC CB REMOTE HAND TRIP GIVEN.
3. 96 BUSBAR-1/2 OPERATED.
59L1 / OVER VOLTAGE STAGE-1 4. TTS SWITCH IN NORMAL + MAIN CB 50 LBB/BFR OPERATED.
5. TTS SWITCH IN TRANSFER + TBC CB 50 LBB/BFR OPERATED.
59L2 / OVER VOLTAGE STAGE-2 6. 59L1 OVER VOLTAGE STAGE-1 OPERATED.
7. 59L2 OVER VOLTAGE STAGE-2 OPERATED.
DIRECT TRANSFER TRIP – Gr-B
96 BUSBAR PROT PANEL
PANEL-1
87 BUSBAR TRIP
ABB
M_CB CONTROL PANEL
N T T NC
NSD 50
DC +VE
FROM PANEL
MAIN CB

TBC_CB CONTROL PANEL


N T T NC

TBC CB G4AD V9LC 2


50 LBB/BFR FOR MAIN CB / RAICA G4AD V9LC 1
N T

DC –VE FROM PANEL


CONDITIONS FOR DIRECT TRIP
50 LBB/BFR FOR TBC CB / RAICA
N T 1. TTS SWITCH IN NORMAL + MAIN CB REMOTE HAND TRIP GIVEN.
2. TTS SWITCH IN TRANSFER + TBC CB REMOTE HAND TRIP GIVEN.
3. 96 BUSBAR-1/2 OPERATED.
59L1 / OVER VOLTAGE STAGE-1 4. TTS SWITCH IN NORMAL + MAIN CB 50 LBB/BFR OPERATED.
5. TTS SWITCH IN TRANSFER + TBC CB 50 LBB/BFR OPERATED.
6. 59L1 OVER VOLTAGE STAGE-1 OPERATED.
59L2 / OVER VOLTAGE STAGE-2
7. 59L2 OVER VOLTAGE STAGE-2 OPERATED.
BASICS OF LBB/BFR PROTECTION
LOCAL BREAKER BACKUP PROTECTION

A PROTECTION WHICH IS DESIGNED TO CLEAR A


SYSTEM FAULTY BY INITIATING TRIPPING OTHER CIRCUIT
BREAKER(S) IN THE CASE OF FAILURE TO TRIP OF THE
APPROPRIATE CIRCUIT BREAKER.

BREAKER BACK-UP

BECAUSE OF THE HIGH COST OF HIGH VOLTAGE


CIRCUIT BREAKERS, IT IS NOT FEASIBLE TO DUPLICATE
THEM.
IN CASE OF A BREAKER FAILURE THE OTHER CIRCUIT
BREAKERS CONNECTED TO THE SAME BUS AS THE FAULTED
BREAKER MUST THERE FORE BE TRIPPED.
LBB/BFR FLOW CHART
MAIN TRIP
RESET
PROTECTION YES FAULT YES BREAKER
MAIN CLEARED
OPERATED BREAKER
FAILURE
SCHEME

NO
RETRIP

TRIP
YES WAIT FOR BACK-UP/
INITIATE FAULT AND
BFR Adjacent
CLEARENCE BREAKERS

The Breaker Failure Protection (LBB/BFR) can operate single-stage/two-


stage.
When used as single-stage protection, the Bus trip command is given to
the adjacent Circuit Breakers if the protected feeder Breaker fails.
When used as two-stage protection, the first stage can be used to
repeat the trip command to the relevant feeder Breaker, normally on a
different trip coil, if the initial trip command from the feeder protection
is not successful. The second stage will result in a Bus trip to the
adjacent Breakers, if the command of the first stage is not successful.
LBB Operation & Output
(MAIN BREAKER OF TRANSFER BUS SYSTEM)
INITIATION LBB / BFR
186 R
186 Y TIMER
186 B 50X
286 R +VE -VE
286 Y
286 B TO D/T CH-1
86 GR-A
TO D/T CH-2
86 GR-B TO ANNUN
96 BB
TO MAIN1 DR
TO MAIN2 DR
TO SER
TO 86 GR-A
In case of Feeder bay /
NT
Transformer Bay TO 86 GR-B
+VE TO 96 BB
TO BUSBAR
NT
+VE In case of Transfer bay / Bus Coupler Bay for Transfer Bus /
Bypass ISO System initiation to that LBB
LBB Operation & Output
(TBC BREAKER OF TRANSFER BUS SYSTEM)
INITIATION LBB / BFR
186 R
186 Y TIMER
186 B 50X
286 R +VE -VE
286 Y
286 B TO D/T CH-1
86 GR-A
TO D/T CH-2
86 GR-B TO ANNUN
96 BB
TO MAIN1 DR
TO MAIN2 DR
TO SER
TO 86 GR-A
In case of Feeder bay /
NT
Transformer Bay TO 86 GR-B
+VE TO 96 BB
TO BUSBAR
NT
+VE In case of Main Circuit Breaker of Transfer Bus System initiation to
that LBB
NUMERICAL BUSBAR PROTECTION

¾ In this two Models of BUSBAR Protections are available.


1. Centralised Architecture.
2. Distributed Architecture.
¾ The following are the advantages in this Numerical BUSBAR Protection
1. LBB, EFP and other Protections are inbuilt feature.
2. Ratio Matching Transformers are not required. They can be
programmable.
3. Isolator selection is required & selection relays are not required for zone
segregation.
4. One Unit is sufficient, for any no of Zones of BUSBAR Protection.
5. In Distributed Architecture Communication between Bay Unit to Central
Unit is Fiber Optic connection.
6. Check Zone feature like Over-all Differential Protection & Over Current
Starter Protection is in built function.
7. Current comparison, CT supervision, CT open circuit & CT Saturation
Detection is also inbuilt feature.
8. Disturbance recorder and event recorders are inbuilt feature.
9. BUSBAR Tripping Relays are Provided in each bay associated CB Relay
Panel and tripping through Bay Unit.
10. These can be configured either High or Low impedance BUSBAR
Protection.
Traditionally Two Distinctive Architectures
(CENTRALISED & DECENTRALISED)
Distributed Bus Protection Centralized Bus Protection

52 52 52 52 52 52

DAU DAU DAU

CU CU

copper
copper
fiber

• Fits better new installations • Fits better retrofit installations


• Perceived less reliable • Perceived more reliable
• Slower • Potentially faster
DOUBLE BUS WITH TB- NUMERIC(1)
BUS-1

BUS-2

UU
UU

UU
UU
AUX BUS

UU

UU
UU

UU

89A 89A 89A 89A 89A


89B 89B 89B 89B 89B
89C 89C ISOLATOR 89C 89C
ISOLATOR SELECTION ISOLATOR ISOLATOR
ISOLATOR
SELECTION SELECTION SELECTION SELECTION

INDIVIDUAL RELAYS FOR EACH BUSBAR


DOUBLE BUS WITH TB- NUMERIC(2)
BUS-1

BUS-2

UU
UU

UU
UU
AUX BUS

UU

UU
UU

UU

89C
89A
89B

89A
89B
89C
89C
89C

89A
89B
89A
89B
89A
89B

BAY BAY BAY BAY BAY BAY BAY BAY


UNIT UNIT UNIT UNIT UNIT UNIT UNIT UNIT

87BB DISTRIBUTED ARCHITECTURE


DOUBLE BUS WITH TB- NUMERIC(3)
BUS-1

BUS-2

UU
UU

UU
UU
AUX BUS

UU

UU
UU

UU

89C
89A
89B

89A
89B
89C
89C
89C

89A
89B
89A
89B
89A
89B

87BB CENTRALISED ARCHITECTURE