1
2
ALLOWS THE EFFICIENT PLACEMENT AND CONNECTION OF REINFORCEMENT IN THE CRITICAL WALL / FLOOR JOINT,
PROVIDES FOR MORE REINFORCEMENT IN THE WALL / FLOOR JOINT THAN CURRENT PRACTICE, IDEAL IN SEISMIC AREAS. SITE BASED CASTING OPERATIONS USING FIBRE REINFORCED PLASTIC CASTING BEDS OPENS THE MARKET TO A LARGE NUMBER OF SUBCONTRACTORS COMBINED WITH SLABS IT PROVIDES A 100% IBS SOLUTION.
3 4
THE COMMERCIALIZATION OF PRE-CAST CONCRETE SHEAR WALL DESIGN. MARKET 1 HOUSING, and, 2 BUILDINGS IN SEISMIC ZONES
3
CONVENTIONAL CONSTRUCTION
FLOOR SLAB
PRE-CAST ONE WALLS
THEN
WALLS
THEN
FLOOR SLAB
PRE-CAST ONE
PRE-CAST ONE
MALAYSIAN COMMERCIALIZATION PROCESS THE USE OF SLAB FLOOR PANELS IN LIEU OF CONVETIONAL FORMWORK FLOOR CONSTRUCTION
7
QUALITY ASSURANCE
WATER LINES CHASED INTO WALL 1 Quality control for the pipe component, 2 Pre-cast wall can flex during lifting.
PRE-CAST ONE
WALL ERECTED IN 15 to 20 MIN. WALLS CHASED FOR WATER PIPES QUALITY ASSURANCE
ERECTION PROCESS
T
14
slab
ERECTION PROCESS
T
10 14
ERECTION PROCESS
T
11 14
12 14
= 2,400 kg
13 14
Floor slab
14 14
Floor slab
15 14
16 14
Starter bars, 2 no. per wall, Tolerance 12mm between bar and concrete
17 14
IBS CURRENT JOINT FIXING STARTER BAR WELDED TO PLATE CAST INTO WALL
18
14
= 2,400 kg
19 14
20 14
Upper wall with plates embedded in wall To be weld fixed to the starter bars.
21 14
Upper wall lowered onto floor slab Starter bars welded to plates embedded in walls
22 14
Floor slab
23 14
24 14
25
26
27
WATEREPROOFING
125mm
1 ERECT LOWER WALL 2 ERECT SLAB 3 ERECT UPPER WALL 4 STRUCTURAL TOPPING
UPPER WALL
15mm drop to the bottom of the wall
structural topping
slab
LOWER WALL
28
125 mm
WATEREPROOFING
Wall tiles
Elastomeric membrane
150 mm 50 mm
Floor tiles
Cementicous membrane
Concrete floor
FLOOR WASTE
30
SYSTEM DESCRIPTION
COST COMPARISON
119 m2.
RM /m2 135.68 RM /m2 149.26 RM 4,303.00 5%
Based on BRC
31
MODULE - planning Housing units Typical unit Storeys bedrooms Bathrooms Manufacture at rate of Erect at rate of Walls 1/2 slabs Wet area slabs (cast in-situ) Manufacturing crew Erection crew Crane (erection) Structural topping crew Crane for structure & finishes 200 no. 119 m2 no. 3 no. 2 no. 1 unit / day / crew 1 unit / day / crew no. 15 no. 3 no. 122 persons = 5 no. / bed 10 persons 1 no. 26 persons 1 no. 32
CAPITAL COST Based on a module of 200 units in 8 months = 1unit/day capital cost Casting beds, walls no. 26 slab no. 15 Storage racks Bearers for slab support. Supply BRC cut & tagged U bars cut, bent & tagged Formwork accessories Conduits, Metal door frames Metal window frames RM 950,000 RM 550,000 RM 190,000 RM 175,000 RM 7,500/ unit RM 5,500/ unit RM 2,000 RM 500 RM 750 RM 1,100 33
34
BUILDING MARGIN 100% IBS i.e. WALLS AND FLOORS, WITH CONDUITS, DOOR AND WINDOW FRAMES BUILT INTO THE PRE-CAST ELEMENTS, THE RISK TO THE CONTRACTOR IS LIMITED HIGH REPITITON FURTHER REDUCES CONTRACTORS RISK. MORE PROFIT ALLOCATED TO THE LABOR ONLY SUBCONTRACTORS PROVIDES INCENTIVE FOR THE EXPANSION OF A SKILLED LABOR FORCE IN DEVELOPING COUNTRIES AND THE DEVLOPMENT OF SMES.
35
EDGE BOARDS
REBAR TO STRUC. TOPPING ERECT WALLS & SLABS DAYS 0 1 2 3 4 5 6
36
37 14
38 14
39 14
40
42
OPERATIONS COMPLETE 43
44
CASTING OPERATIONS
45
47
TRAINING, MANUFACTURING,. LOGISTICS CENTRE (TMLC), set up for Housing Projects in Developing Countries for, a) MANUFACTURE OF WALLS, b) MANUFACTURE OF SLABS c) VOCATIONAL TRAINING 48
CURRENT IBS - FACTORY PRODUCED COMPONENTS 1 COLUMNS 2 no. 2 BEAMS 1 no. 3 FORM & POUR COLUMN and BEAM JOINT 3 EXTRUDED WALL PANELS (15 no.) 4 CEMENT RENDER, (quality of render never to specification).
49