PRE-CAST CONCRETE SHEAR WALL DESIGN


1

PRE-CAST CONCRETE SHEAR WALL DESIGN THE METHOD OF CONSTRUCTION,

1
2

ALLOWS THE EFFICIENT PLACEMENT AND CONNECTION OF REINFORCEMENT IN THE CRITICAL WALL / FLOOR JOINT,
PROVIDES FOR MORE REINFORCEMENT IN THE WALL / FLOOR JOINT THAN CURRENT PRACTICE, IDEAL IN SEISMIC AREAS. SITE BASED CASTING OPERATIONS USING FIBRE REINFORCED PLASTIC CASTING BEDS OPENS THE MARKET TO A LARGE NUMBER OF SUBCONTRACTORS COMBINED WITH SLABS IT PROVIDES A 100% IBS SOLUTION.

3 4

IT IS MORE COST EFFECTIVE THAN CONVENTIONAL CONSTRUCTION

THE COMMERCIALIZATION OF PRE-CAST CONCRETE SHEAR WALL DESIGN. MARKET 1 HOUSING, and, 2 BUILDINGS IN SEISMIC ZONES
3

CONVENTIONAL CONSTRUCTION

FLOOR SLAB
PRE-CAST ONE WALLS

THEN

WALLS

THEN

FLOOR SLAB

MORE REINFORCEMENT IN THE WALL / FLOOR JOINT

PRE-CAST ONE

UPPER WALL TEMPORARILY SUPPORTED ON STEEL PLATES CAST INTO WALLS 5

WALLS TEMPORARILY SUPPORTED PRIOR TO POURINJG CONCRETE

PRE-CAST ONE

MALAYSIAN COMMERCIALIZATION PROCESS THE USE OF SLAB FLOOR PANELS IN LIEU OF CONVETIONAL FORMWORK FLOOR CONSTRUCTION
7

QUALITY ASSURANCE

WATER LINES CHASED INTO WALL 1 Quality control for the pipe component, 2 Pre-cast wall can flex during lifting.

PRE-CAST ONE

WALL ERECTED IN 15 to 20 MIN. WALLS CHASED FOR WATER PIPES QUALITY ASSURANCE

2 no. bolts with leveling plates U bars

ERECTION PROCESS
T

14

2 no. bolts with leveling plates to receive Upper walls

slab

ERECTION PROCESS
T

10 14

Structural topping slab slab

ERECTION PROCESS
T

11 14

IBS CURRENT JOINT TECHNOLOGY PIN & GROUT

12 14

Starter bars, 2 no. per wall

Wall 3.6m long x 3.3m high x 125mm thick


T

= 2,400 kg

13 14

Floor slab

PIN & GROUT JOINT

14 14

Upper wall being lowered onto floor slab

Circular tubes for starter bars

Floor slab

PIN & GROUT JOINT

15 14

Upper wall in position Floor slab

PIN & GROUT JOINT

16 14

Starter bars, 2 no. per wall, Tolerance 12mm between bar and concrete

PIN & GROUT JOINT

17 14

IBS CURRENT JOINT FIXING STARTER BAR WELDED TO PLATE CAST INTO WALL

18

14

Starter bars 2 no. per wall

Wall 3.6m long x 3.3m high x 125mm thick


T

= 2,400 kg

19 14

Floor slab poured

Pre-cast wall with Starter bars


T

20 14

Upper wall with plates embedded in wall To be weld fixed to the starter bars.

Pre-cast wall with Starter bars


T

21 14

Upper wall lowered onto floor slab Starter bars welded to plates embedded in walls

Pre-cast wall with Starter bars


T

22 14

Plate embedded in wall

Starter bar welded to plate

Floor slab

SECTION THROUGH WALL


T

23 14

MORTAR BED AT BASE OF WALL ,

Difficult quality control

24 14

DIFFICULT TO ALIGN WALLS AND CONNECTIONS

25

26

PLATES IN WALLS WELDED CONNECTION

27

WATEREPROOFING
125mm

1 ERECT LOWER WALL 2 ERECT SLAB 3 ERECT UPPER WALL 4 STRUCTURAL TOPPING

UPPER WALL
15mm drop to the bottom of the wall
structural topping

slab

LOWER WALL

28

125 mm

WATEREPROOFING

Pre-cast Concrete wall

Wall tiles

Mortar bed 150 mm

Elastomeric membrane
150 mm 50 mm

Floor tiles

Cementicous membrane
Concrete floor

WATERPROOF WET AREAS 29

WATERPOOF DETAILS by PRE-CAST ONE

CONCRETE TO BATHROOMS CAST IN-SITU

FLOOR WASTE

30

SYSTEM DESCRIPTION

COST COMPARISON

3 Bedroom, 2 bathroom unit =


Walls Pre-cast Concrete Shear Wall Conventional construction Concrete frame, brick & render Savings on walls per unit

119 m2.
RM /m2 135.68 RM /m2 149.26 RM 4,303.00 5%

Based on BRC

31

MODULE - planning Housing units Typical unit Storeys bedrooms Bathrooms Manufacture at rate of Erect at rate of Walls 1/2 slabs Wet area slabs (cast in-situ) Manufacturing crew Erection crew Crane (erection) Structural topping crew Crane for structure & finishes 200 no. 119 m2 no. 3 no. 2 no. 1 unit / day / crew 1 unit / day / crew no. 15 no. 3 no. 122 persons = 5 no. / bed 10 persons 1 no. 26 persons 1 no. 32

CAPITAL COST Based on a module of 200 units in 8 months = 1unit/day capital cost Casting beds, walls no. 26 slab no. 15 Storage racks Bearers for slab support. Supply BRC cut & tagged U bars cut, bent & tagged Formwork accessories Conduits, Metal door frames Metal window frames RM 950,000 RM 550,000 RM 190,000 RM 175,000 RM 7,500/ unit RM 5,500/ unit RM 2,000 RM 500 RM 750 RM 1,100 33

LABOR MANAGEMENT LABOR ONLY SUBCONTRACTORS TO MANUFACTURE

LABOR ONLY SUBCONTRACTORS TO ERECT


MANUFACTURE AND ERECTION OF PRE-CAST CONCFRETE ELEMENTS IS, BASED ON INCENTIVE PERFORMANCE, i.e.. A FIXED AMOUNT PER ELEMENT FOR TIME & QUALITY.

34

BUILDING MARGIN 100% IBS i.e. WALLS AND FLOORS, WITH CONDUITS, DOOR AND WINDOW FRAMES BUILT INTO THE PRE-CAST ELEMENTS, THE RISK TO THE CONTRACTOR IS LIMITED HIGH REPITITON FURTHER REDUCES CONTRACTORS RISK. MORE PROFIT ALLOCATED TO THE LABOR ONLY SUBCONTRACTORS PROVIDES INCENTIVE FOR THE EXPANSION OF A SKILLED LABOR FORCE IN DEVELOPING COUNTRIES AND THE DEVLOPMENT OF SMES.

35

PROGRAM TYPICAL FLOOR HAND OVER 300 - 500 UNITS AT A TIME

PRE-LOAD FLOOR FLOAT STRUC TOPPING

EDGE BOARDS
REBAR TO STRUC. TOPPING ERECT WALLS & SLABS DAYS 0 1 2 3 4 5 6
36

CASTING BED Fibre reinforced plastic


T

37 14

CASTING BED Fibre reinforced plastic


T

38 14

CASTING BED Fibre reinforced plastic


T

39 14

FORM BOXES FOR STACK CAST SITE OPERATION

40

CONCRETE OPERATIONS TO PRE-CAST WALLS 41

LEVEL CONCRETE SURFACE

42

OPERATIONS COMPLETE 43

FORMS BEING REMOVED

44

CASTING OPERATIONS

PANELS CAST ON SITE, STORED ADJACENT TO BUILDING

45

SITE CASTING ON MOBILE CASTING BEDS WALLS AND SLABS

QUALITY CONTROL SIMPLE VISUAL INSPECTION 46

SITE CASTING ON MOBILE CASTING BEDS

MOBILE CASTING BEDS HINGED, SLABS

47

TRAINING, MANUFACTURING,. LOGISTICS CENTRE (TMLC), set up for Housing Projects in Developing Countries for, a) MANUFACTURE OF WALLS, b) MANUFACTURE OF SLABS c) VOCATIONAL TRAINING 48

CURRENT IBS - FACTORY PRODUCED COMPONENTS 1 COLUMNS 2 no. 2 BEAMS 1 no. 3 FORM & POUR COLUMN and BEAM JOINT 3 EXTRUDED WALL PANELS (15 no.) 4 CEMENT RENDER, (quality of render never to specification).

49