IV-9 Joint Cost Allocation
IV-9 Joint Cost Allocation
PENDAHULUAN
MASALAH PADA PROYEK-PROYEK KHUSUS (MUTUALLY EXCLUSIVE): DIBUTUHKAN DISAIN YANG OPTIMUM UNTUK PROYEK SERBA GUNA KECENDERUNGAN PEMILIHAN PROYEK SERBA GUNA : MASING-MASING FUNGSI MENGGUNAKAN FASILITAS YANG SAMA SEHINGGA BIAYA LEBIH RENDAH KELEMAHAN PROYEK SERBA GUNA:
MEMERLUKAN PEMBANGUNAN TAMBAHAN UNTUK MASINGMASING MANFAAT MASING-MASING MANFAAT HARUS DINILAI SECARA HATIHATI MANFAAT KESELURUHAN HARUS DAPAT MENGAMBIL ALIH MANFAAT YANG TIDAK MEMADAI
MERUPAKAN SUATU PROSEDUR UNTUK DISTRIBUSI BIAYA PADA PROYEK SERBAGUNA (DISTRIBUSI MERATA PADA SELURUH MANFAAT PROYEK YANG DIHASILKAN) SECARA GARIS BESAR DIPEROLEH DENGAN : SETIAP MANFAAT DIBERIKAN BIAYA TERPISAH (SEPARABLE COST) SETIAP MANFAAT DIBERIKAN ANDIL DARI SISA BIAYA BERSAMA (JOINT COST) PADA SISA KEUNTUNGAN MANFAAT (DARI BIAYA ALTERNATIF) LEBIH KECIL DARIPADA BIAYA TERPISAH (SEPARABLE COST)
PERSYARATAN YANG HARUS TERCAPAI : SELURUH NILAI SEKARANG (NPV) POSITIF BIAYA UNTUK MENAMBAH SATU MANFAAT TIDAK MELEBIHI KEUNTUNGAN YANG TIMBUL KEMUDIAN PRINSIP UTAMA : BIAYA YANG TERJADI PADA SATU FUNGSI HANYA DIALOKASIKAN UNTUK FUNGSI TERSEBUT BIAYA SETIAP FUNGSI TIDAK LEBIH BESAR PADA ALTERNATIF PROYEK TUNGGAL (SINGLE PURPOSE PROJECT) TIDAK ADA SUBSIDI SILANG ANTAR FUNGSI/TUJUAN PROYEK
BEBERAPA ISTILAH
A. BIAYA ALTERNATIF
BIAYA TERENDAH UNTUK MENCAPAI BENEFIT YANG SAMA ATAU EKUIVALEN PADA STRUKTUR PROYEK TUNGGAL B. BIAYA TERPISAH PERBEDAAN ANTARA BIAYA STRUKTUR MULTI GUNA DENGAN APABILA FUNGSI YANG BERSANGKUTAN DIABAIKAN C. BIAYA KHUSUS MERUPAKAN BIAYA DAN FASILITAS YANG SECARA KHUSUS MELAYANI SATU FUNGSI PROYEK SAJA D. BIAYA GABUNGAN (JOINT COST) PERBEDAAN ANTARA BIAYA DARI STRUKTUR MULTIGUNA DENGAN JUMLAH DARI BIAYA TERPISAH UNTUK TIAP FUNGSI DAPAT DIANGGAP SEBAGAI PERBEDAAN ANTARA BIAYA MULTI FUNGSI DENGAN JUMLAH DARI BIAYA KHUSUS DARI TIAP FUNGSI
1. 2. 3.
4. 5. 6.
1.
8.
MENENTUKAN KEUNTUNGAN DARI TIAP FUNGSI DAN MENGHITUNG NILAI DISCOUNTEDNYA MENENTUKAN BIAYA ALTERNATIF DARI PENCAPAIAN KEUNTUNGAN (PADA LANGKAH 2 TERSEBUT) MENENTUKAN ALTERNATIF MAKSIMUM PENGELUARAN UNTUK PENCAPAIAN KEUNTUNGAN (NILAI TERKECIL DARI LANGKAH 2 DAN 3) MENGHITUNG BIAYA TERPISAH UNTUK TIAP FUNGSI MENENTUKAN KEUNTUNGAN TERSISA (SELISIH LANGKAH 4 DAN 5) MENENTUKAN BIAYA GABUNGAN (JOINT COST) (SELISIH ANTARA BIAYA TOTAL PROYEK MULTIGUNA DENGAN TOTAL BIAYA TERPISAH DARI SELURUH FUNGSI PROYEK) BIAYA GABUNGAN SELANJUTNYA DIALOKASIKAN PADA TIAP TUJUAN DENGAN PROPORSI SAMA MENENTUKAN BIAYA TOTAL DARI STRUKTUR MULTIGUNA TERMASUK KAPITALISASI OPERASI DAN PEMELIHARAAN MENENTUKAN TOTAL BIAYA TERALOKASI UNTUK TIAP FUNGSI (DENGAN MENAMBAHKAN BIAYA TERPISAH PADA BIAYA GABUNGAN TERALOKASI)
7
NO
KETERANGAN
IRIGASI
REKREA SI
TOTAL
A B C
TOTAL BIAYA INSTALASI TOTAL BIAYA OPERASI & PEMELIHARAAN (o&m) KEUNTUNGAN ALTERNATIF BIAYA INSTALASI (ditentukan oleh perencanaan) Alternatif biaya o & m Biaya instalasi terpisah Biaya o & m terpisah 30.000 100.000 50.000
117.000 43.000
25.000
95.000
45.000
E F G