Dagupan City
Detailed Estimate of Site Location of Plan of Rowhouses @
Sitio Korea Bonuan, Binloc, D.C.
(COMPUTATION SHEET)
I.
II.
ITEM
EXCAVATION
CONCRETE WORKS
DIMENSIONS
TOTAL LENGTH WIDT HEIGH
No.
H
T
CLAS
S
CEMEN
T BAGS
F1
12
0.6
0.6
0.2
C1
12
0.2
0.2
3.9
17
WF
73.2
0.3
0.2
40
FLOORIN
G
CR WF
20.0
6.0
.20
216
5.4
0.2
0.3
1.5
1.2
0.2
16
CR
Flooring
III.
ITEM
SAN
D
(cu
m)
0.43
2
0.93
6
2.19
6
12
GRAV
EL
(cum)
0.16
2
0.90
0.324
0.864
1.872
4.392
24.00
1.80
STEEL WORKS
Footing
5 B.W.
Column
4 Bars
Lateral
Ties
Wall footing
CHB WALL
DIVIDER. WALL
Kitchen Area
RSB(m)
6mx 12mm
12 pcs.
TIEWI
RE
1.7 KG
48 pcs.
6mx10mm
30 pcs.
4.1 KG
48 pcs.
4.5 KG
171 pcs.
8.9 KG
10 pcs
0.5 KG
10 pcs
0.5 KG
CR wall
CR WF
ITEM
Main Wall
Divider Wall
Wall- CR
Total
length=(13.92x2.13)+(13.12x2.15)
= 60m/6m = 10 pcs.
#16 GI tw= 13.92 x 0.0375= 0.52
Area=59.4-(2.2x.7x5)= 51.7
Total
length=(51.7x2.13)+(51.7x2.15)
= 221.3/6m bar = 37
#16 GI tw= 51.7 x 0.0375 = 1.9 or
2
Longitudinal bars:
3 bars x (5.4)5/6 = 4.5 pcs
Transverse bars = 27/(.3x24) = 4
pcs.
#16 GI tw = 96 x 3 x .3/53 = 1.6 kg
IV.
MASONRY
AREA
239 x 12.5 = 2987.5 or 2988
13.12 x 12.5= 164
51.7 x 12.5 = 646.3
Kitchen area
37 pcs
2 KG
9 pcs
1.6 KG
PCS
2988 pcs.
(10x20x40cm)
164 pcs.
(10x20x40cm)
647 pcs.
(10x20x40cm)
174 pcs.
(10x20x40cm)
[(0.6x0.8)+(1.5x0.8)]x5 x 12.5 =
174
MORTAR AND PLASTERING
Sand and Cement for CHB Mortar
Class B Mortar for Plastering
Total area =
635.5 x 0.192 = 122 bags
(239+13.12+51.7+13.92)x2 = 635.5
635.5 x 0.016 = 10 cum.
Total area = 635.5 x 0.522 = 332 bags
635.5 x 0.0435 = 28 cum.
V.
WOOD FORMS
P = 2(0.4)+0.2= 1m; Area= 12 x 1x 3.9 = 46.8/2.88 = 16.25 or 17 pcs. Plywood (
x 4 x 8)
17 plywood x 29.67 = 504.4 or 505 bdft. 2x2 wd. Frame
ASSORTED CW NAILS = 6 KILOS
VI.
ROOFING FRAMING AND ROOFING MATERIALS
ITEM
LENGTH (m)
TOTAL NO.
TRUSS:
CHORDS
TOP
BOTTOM
CHORD
MEMBERS
3.0
and
5.7
10
6.0
10
10
WOOD PURLINS
GIRTS
10 & 6
FASCHIA
12
ESTIMATED
QUANTITIES
REQUIRED
10 pcs. - 2 x 4 x
20
10 pcs. - 2 x 4 x
10
10 pcs. - 2 x 4 x
20
10 pcs. - 2 x 4 x
20
3 pcs. - 2 x 4 x
10
24 pcs. - 2 x 2 x
20
36 pcs. - 2 x 2 x
14
10 pcs. - 2 x 4 x
14
6 pcs. - 2 x 4 x
20
BOARD
COMMON WIRE
NAILS
BOLTS
CORRUGATED
ROOF SHEETS
ROOF NAILS
3 kilos (51/2)
10
10
200 bolts
GA. 26 G.I. Corr.
Sheets
267 pcs. - 10
22 nails x 267 =
5874/120 = 49 kg
5874/75 = 78 kg
LEAD WASHERS
SEPTIC VAULT
1X 1.5 = 1.5 sqm: perimeter = 5m
CONCRETE:
Flooring /slab(U & L):
0.15 x 2 x 9 = 2.7 or 3 bags cement
.30 x .5 = .15 cum sand and 0.30 cum gravel
Wall footing:
Perimeter= 5; 5 x .20 x.30= 0.3
.3 x 9 =3bags cement; .15 cum sand
and.30cum gravel
Steel works:
CHB WF: Longitudinal- 3x5/6 = 2.5 or 3 pcs
(10mm)
Transverse- 5/(.3x24)= 0.7 or 1
pc.
Bars flooring: Lower- 3 pcs.
Upper - 7pcs
CHB wall bars: Horizontal 7.5 x 2 = 15
Vertical
- 7.5 x 2.875 =
21.56;
(15+21.6)/6= 6 pcs.
I.
EXCAVATION
II.
CONCRETE WORKS
1. 8+17+40+216+3+16
of Cement
2. 0.432+0.936+2.196+12+0.162+0.9
Sand
3. 0.864+1.872+4.392+24+0.324+1.80
gravel
III.
STEEL WORKS
1. 12+48
6mx12mm
2. 30+48+171+10+10+37+9
6mx10mm
300 bags
17 cum
33.5 cum
60 pcs
=
315 pcs
3. 1.7+4.1+4.5+8.9+0.5+0.5+2+1.6
GI Tiewire
IV.
MASONRY WORKS
1. 2988+164+647+174
2. 332+122
Cement
3. 10+28
24 kg #16
=
=
38 cum sand
V.
WOOD FORMS
17 cs. Plywood ( x 4 x 8)
505 bdft. 2x2 wd. Frame
VI.