Anda di halaman 1dari 1

TANGGA GAJI GRED DG 48( TIME BASED 2010)

GRED DG 44(P1)
2011
2012
SSM LAMA
0.13 SSM BARU
T1
4355.00
566.15
4921.15
T2
4558.16
592.56
5150.72
T3
4761.32
618.97
5380.29
T4
4964.48
645.38
5609.86
T5
5167.64
671.79
5839.43
T6
5370.80
698.20
6069.00
T7
5573.96
724.61
6298.57
T8
5777.12
751.03
6528.15
GRED DG 44(P2)
2011
2012
SSM LAMA
0.13 SSM BARU
T1
4786.37
622.23
5408.60
T2
5006.23
650.81
5657.04
T3
5226.09
679.39
5905.48
T4
5445.95
707.97
6153.92
T5
5665.81
736.56
6402.37
T6
5885.67
765.14
6650.81
T7
6105.53
793.72
6899.25
T8
6325.39
822.30
7147.69
Catatan :
KGT = kenaikan Gaji Tahunan
KGT 270.00 = Kenaikan Gaji Tahunan DG48
Gaji Minimum DG 48 = RM4922
Gaji Maksimun DG48- RM10560.00

2012
5191.15
5420.72
5650.29
5879.86
6109.43
6339.00
6568.57
6798.15
2012
5678.60
5927.04
6175.48
6423.92
6672.37
6920.81
7169.25
7417.69

GRED DG 48 (time based 6 tahun)


2013
2013/okt
2014
KGT270
5461.15 5731.15 6001.15
5690.72 5960.72 6230.72
5920.29 6190.29 6460.29
6149.86 6419.86 6689.86
6379.43 6649.43 6919.43
6609.00 6879.00 7149.00
6838.57 7108.57 7378.57
7068.15 7338.15 7608.15
GRED DG 48 (time based 6 tahun)
2013
2013/okt
2014
KGT270
5948.60 6218.60 6488.60
6197.04 6467.04 6737.04
6445.48 6715.48 6985.48
6693.92 6963.92 7233.92
6942.37 7212.37 7482.37
7190.81 7460.81 7730.81
7439.25 7709.25 7979.25
7687.69 7957.69 8227.69
Elaun
DG48

Elaun Perumahan
Elaun Keraian
COLA
JUMLAH

2015
6271.15
6500.72
6730.29
6959.86
7189.43
7419.00
7648.57
7878.15
2015
6758.60
7007.04
7255.48
7503.92
7752.37
8000.81
8249.25
8497.69
RM700
RM550
RM150
RM1400

Anda mungkin juga menyukai