PEKERJAAN
LOKASI
No
URAIAN PEKERJAAN
I
1
2
3
PEKERJAAN PERSIAPAN
Pembersihan Lokasi
Pengukuran dan Pemasangan Bouwplank
Direksi keet
II
1
2
3
PEKERJAAN TANAH
Galian Tanah Pondasi
Urugan Tanah Kembali
Urugan Pasir Bawah Lantai
III
1
2
3
4
PEKERJAAN PASANGAN
Pas. Aanstamping
Pas. Pondasi Batu Kali 1 Pc : 6 Ps
Pas, Bata Merah Tebal 1/2 Bata 1 Pc : 4 Ps
Plesteran Dinding 1 Pc : 4 Ps
IV
1
2
3
4
V
1
VOLUME
SAT
260.00
52.50
12.00
m2
m'
m2
51.08
12.77
15.56
m3
m3
m3
6.80
11.88
144.52
21.00
m3
m3
m2
m2
PEKERJAAN BETON
Kolom 15/15
Sloof 15/20
Ring Balk
Rabat beton 1 : 3 : 5
Jumlah
1.17
1.28
2.13
7.35
4.58
m3
m3
m3
m3
PEKERJAAN LANTAI
Keramik Polos 30/30
35.00
m3
HARGA
SATUAN (Rp.)
JUMLAH HARGA
(Rp.)
DAFTAR ANALISA
HARGA SATUAN PEKERJAAN
No.
1
URAIAN
1 m2 Pembersihan Lokasi
tenaga :
0.0500 Org/hr
0.0050 Org/hr
JUMLAH
HARGA
25,000.00
48,000.00
1,250
240
1,490
2,325,000.00
2,125,000.00
8,000.00
13,950
8,500
160
25,000.00
38,000.00
43,000.00
48,000.00
30,400
3,440
56,450
120,000.00
120,000
120,000
1 m2 Direksi Keet
1.0000
Pekerja
Mandor
HARGA
SATUAN
1 m3 Galian Tanah
tenaga :
0.6250
0.0625
m2
Harga ditaksir
Org/hr
Org/hr
Pekerja
Mandor
25,000.00
48,000.00
15,625
3,000
18,625
1 m3 Urugan Kembali
tenaga :
0.1920 Org/hr
0.0192 Org/hr
Pekerja
Mandor
25,000.00
48,000.00
4,800
922
5,722
Pasir Urug
34,000.00
40,800
Pekerja
Mandor
25,000.00
48,000.00
7,500
480
48,780
60,000.00
34,000.00
72,000
10,200
25,000.00
19,500
1 m3 Urugan Pasir
bahan :
1.2000
tenaga :
0.3000
0.0100
m3
Org/hr
Org/hr
0.3900
0.0390
0.0390
10
11
Org/hr
Org/hr
Org/hr
Tukang Batu
Kepala Tukang Batu
Mandor
1 m2 Plesteran Dinding 1 Pc : 4 Ps
bahan :
4.3400
kg
Portland Cement (PC)
0.0139
m3
Pasir Pasang
tenaga :
0.4000 Org/hr Pekerja
0.2000 Org/hr Tukang Batu
0.0200 Org/hr Kepala Tukang Batu
0.0200 Org/hr Mandor
36,000.00
40,000.00
48,000.00
14,040
1,560
1,872
119,172
60,000.00
885.00
50,000.00
66,000
109,740
36,500
25,000.00
36,000.00
40,000.00
48,000.00
40,000
43,200
4,800
8,640
308,880
190.00
885.00
50,000.00
16,150
16,638
3,750
25,000.00
36,000.00
40,000.00
48,000.00
13,125
6,300
700
1,262
57,925
885.00
50,000.00
3,841
697
25,000.00
36,000.00
40,000.00
48,000.00
10,000
7,200
800
960
23,497
2,325,000.00
8,000.00
5,000.00
3,500.00
8,000.00
105,000.00
45,000.00
885.00
465,000
12,000
2,000
525,000
18,000
81,900
23,400
285,855
25,000.00
36,000.00
38,000.00
36,000.00
97,500
37,800
39,520
12,600
0.2450
0.1650
12
13
Org/hr
Org/hr
1 m3 Beton Rabat 1 Pc : 3 Ps : 5 Kr
bahan :
218
kg
Portland Cement (PC)
0.52
m3
Pasir Beton
0.87
m3
Batu Pecah Mesin 2/3
tenaga :
1.65 Org/hr Pekerja
0.25 Org/hr Tukang Batu
0.025 Org/hr Kepala Tukang Batu
0.08 Org/hr Mandor
40,000.00
48,000.00
9,800
7,920
1,618,295
885.00
45,000.00
105,000.00
192,930
23,400
91,350
25,000.00
36,000.00
40,000.00
48,000.00
41,250
9,000
1,000
3,840
362,770
2,150.00
885.00
50,000.00
26,338
12,532
1,950
25,000.00
36,000.00
40,000.00
48,000.00
8,000
9,000
10,000
720
68,539
vol
Kebutuhan SD
260.00
13.00
1.30
52.50
Durasi
SD per hari Satuan
4.00
3.25
0.33
7.00
0.32
0.21
1.05
0.05
0.03
0.15
2.00
42.00
4.20
21.00
2.10
2.00
12.00
6.00
12.00
51.08
5.00
31.93
3.19
12.77
6.39
0.64
2.00
2.45
0.25
15.56
1.23
0.12
4.00
18.67
4.67
4.67
0.16
1.17
0.04
6.80
2.00
8.16
2.04
4.08
1.02
5.30
2.65
2.65
0.27
0.27
11.88
1.33
0.13
0.13
4.00
13.07
1473.12
8.67
3.27
368.28
2.17
19.01
14.26
1.43
2.14
4.75
3.56
0.36
0.53
144.52
11.00
12284.20
2716.98
10.84
1116.75
247.00
0.99
75.87
25.29
2.53
3.80
6.90
2.30
0.23
0.35
21.00
2.00
91.14
0.29
45.57
0.15
8.40
4.20
0.42
0.42
4.20
2.10
0.21
0.21
4.58
4.00
0.92
6.87
1.83
687.00
10.31
3.57
2.38
1479.34
0.23
1.72
0.46
2.58
2.58
0.89
0.60
369.84
17.86
4.81
4.76
1.60
4.47
1.20
1.19
0.40
1.12
0.76
7.35
0.28
0.19
2.00
1602.30
3.82
6.39
801.15
1.91
3.20
12.13
1.84
0.18
0.59
6.06
0.92
0.09
0.29
35.00
3.00
428.75
495.60
1.37
142.92
165.20
0.46
11.20
8.75
8.75
0.53
3.73
2.92
2.92
0.18
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
JENIS BAHAN
Bata Merah
Batu Kali
Batu Pecah Mesin 2/3
Besi Beton Polos
Kawat Beton
Paku
Pasir Beton
Pasir Pasang
Pasir Urug
Portland Cement (PC)
Minyak Bekesting
Kayu Meranti 5/7
Kayu Meranti 6/12
Papan meranti 2/20
Keramik Lantai 30 x 30
SATUAN
Buah
m3
m3
Kg
Kg
Kg
m3
m3
m3
Kg
Ltr
m3
m3
m3
bh
HARGA
(Rp.)
190
60,000
105,000
3,500
8,000
8,000
45,000
50,000
34,000
885
5,000
2,125,000
2,125,000
2,325,000
2,150
1
2
3
4
5
6
7
JENIS PEKERJAAN
Mandor
Kepala Tukang Kayu
Tukang Kayu
Kepala Tukang Batu
Tukang Batu
Tukang Besi
Pekerja
SATUAN
Org/hr
Org/hr
Org/hr
Org/hr
Org/hr
Org/hr
Org/hr
HARGA
(Rp.)
48,000
43,000
38,000
40,000
36,000
36,000
25,000
PEKERJAAN
VOLUME
DURASI