Anda di halaman 1dari 11

RENCANA ANGGARAN BIAYA

PEKERJAAN
LOKASI

No

: BANGUNAN GEDUNG PENGOLAHAN SAMPAH


: DINAS KEHUTANAN DAN LINGKUNGAN HIDUP

URAIAN PEKERJAAN

I
1
2
3

PEKERJAAN PERSIAPAN
Pembersihan Lokasi
Pengukuran dan Pemasangan Bouwplank
Direksi keet

II
1
2
3

PEKERJAAN TANAH
Galian Tanah Pondasi
Urugan Tanah Kembali
Urugan Pasir Bawah Lantai

III
1
2
3
4

PEKERJAAN PASANGAN
Pas. Aanstamping
Pas. Pondasi Batu Kali 1 Pc : 6 Ps
Pas, Bata Merah Tebal 1/2 Bata 1 Pc : 4 Ps
Plesteran Dinding 1 Pc : 4 Ps

IV
1
2
3
4

V
1

VOLUME

SAT

260.00
52.50
12.00

m2
m'
m2

51.08
12.77
15.56

m3
m3
m3

6.80
11.88
144.52
21.00

m3
m3
m2
m2

PEKERJAAN BETON
Kolom 15/15
Sloof 15/20
Ring Balk
Rabat beton 1 : 3 : 5
Jumlah

1.17
1.28
2.13
7.35
4.58

m3
m3
m3
m3

PEKERJAAN LANTAI
Keramik Polos 30/30

35.00

m3

HARGA
SATUAN (Rp.)

JUMLAH HARGA
(Rp.)

DAFTAR ANALISA
HARGA SATUAN PEKERJAAN
No.
1

URAIAN
1 m2 Pembersihan Lokasi
tenaga :
0.0500 Org/hr
0.0050 Org/hr

1 m' Pengukuran dan Pemasangan Bouwplank


bahan :
0.0060
m3
Papan meranti 2/20
0.0040
m3
Kayu Meranti 5/7
0.0200
kg
Paku
tenaga :
0.0000 Org/hr Pekerja
0.8000 Org/hr Tukang Kayu
0.0800 Org/hr Kepala Tukang Kayu
0.0000 Org/hr Mandor

JUMLAH
HARGA

25,000.00
48,000.00

1,250
240
1,490

2,325,000.00
2,125,000.00
8,000.00

13,950
8,500
160

25,000.00
38,000.00
43,000.00
48,000.00

30,400
3,440
56,450

120,000.00

120,000
120,000

1 m2 Direksi Keet
1.0000

Pekerja
Mandor

HARGA
SATUAN

1 m3 Galian Tanah
tenaga :
0.6250
0.0625

m2

Harga ditaksir

Org/hr
Org/hr

Pekerja
Mandor

25,000.00
48,000.00

15,625
3,000
18,625

1 m3 Urugan Kembali
tenaga :
0.1920 Org/hr
0.0192 Org/hr

Pekerja
Mandor

25,000.00
48,000.00

4,800
922
5,722

Pasir Urug

34,000.00

40,800

Pekerja
Mandor

25,000.00
48,000.00

7,500
480
48,780

60,000.00
34,000.00

72,000
10,200

25,000.00

19,500

1 m3 Urugan Pasir
bahan :
1.2000
tenaga :
0.3000
0.0100

m3
Org/hr
Org/hr

1 m3 Pasangan Batu Kosong / Aanstampang


bahan :
1.2000
m3
Batu Kali
0.3000
m3
Pasir Urug
tenaga :
0.7800 Org/hr Pekerja

0.3900
0.0390
0.0390

10

11

Org/hr
Org/hr
Org/hr

Tukang Batu
Kepala Tukang Batu
Mandor

1 m3 Pasangan Batu Kali 1Pc : 6 Ps


bahan :
1.1000
m3
Batu Kali
124.0000
kg
Portland Cement (PC)
0.7300
m3
Pasir Pasang
tenaga :
1.6000 Org/hr Pekerja
1.2000 Org/hr Tukang Batu
0.1200 Org/hr Kepala Tukang Batu
0.1800 Org/hr Mandor

1 m2 Pasangan Bata Merah Tebal 1/2 Bata 1 Pc : 4 Ps


bahan :
85.0000
bh
Bata Merah
18.8000
kg
Portland Cement (PC)
0.0750
m3
Pasir Pasang
tenaga :
0.5250 Org/hr Pekerja
0.1750 Org/hr Tukang Batu
0.0175 Org/hr Kepala Tukang Batu
0.0263 Org/hr Mandor

1 m2 Plesteran Dinding 1 Pc : 4 Ps
bahan :
4.3400
kg
Portland Cement (PC)
0.0139
m3
Pasir Pasang
tenaga :
0.4000 Org/hr Pekerja
0.2000 Org/hr Tukang Batu
0.0200 Org/hr Kepala Tukang Batu
0.0200 Org/hr Mandor

1 m3 Beton Bertulang (1Pc : 1,5Ps : 3Kr)


Untuk pekerjaan pondasi, kolom, sloof, balok
bahan :
0.2000
m3
Papan meranti 2/20
1.5000
Kg
Paku
0.4000
Ltr
Minyak Begisting
150.0000
Kg
Besi Beton Polos
2.2500
Kg
Kawat Beton
0.7800
m3
Batu Pecah Mesin 2/3
0.5200
m3
Pasir Beton
323.0000
Kg
Portland Cement (PC)
tenaga :
3.9000 Org/hr Pekerja
1.0500 Org/hr Tukang Besi
1.0400 Org/hr Tukang Kayu
0.3500 Org/hr Tukang Batu

36,000.00
40,000.00
48,000.00

14,040
1,560
1,872
119,172

60,000.00
885.00
50,000.00

66,000
109,740
36,500

25,000.00
36,000.00
40,000.00
48,000.00

40,000
43,200
4,800
8,640
308,880

190.00
885.00
50,000.00

16,150
16,638
3,750

25,000.00
36,000.00
40,000.00
48,000.00

13,125
6,300
700
1,262
57,925

885.00
50,000.00

3,841
697

25,000.00
36,000.00
40,000.00
48,000.00

10,000
7,200
800
960
23,497

2,325,000.00
8,000.00
5,000.00
3,500.00
8,000.00
105,000.00
45,000.00
885.00

465,000
12,000
2,000
525,000
18,000
81,900
23,400
285,855

25,000.00
36,000.00
38,000.00
36,000.00

97,500
37,800
39,520
12,600

0.2450
0.1650

12

13

Org/hr
Org/hr

Kepala Tukang Batu


Mandor

1 m3 Beton Rabat 1 Pc : 3 Ps : 5 Kr
bahan :
218
kg
Portland Cement (PC)
0.52
m3
Pasir Beton
0.87
m3
Batu Pecah Mesin 2/3
tenaga :
1.65 Org/hr Pekerja
0.25 Org/hr Tukang Batu
0.025 Org/hr Kepala Tukang Batu
0.08 Org/hr Mandor

1 m2 Lantai Keramik Ukuran 30x30 cm Polos


bahan :
12.2500
bh
Keramik Lantai 30 x 30
14.1600
kg
Portland Cement (PC)
0.0390
m3
Pasir Pasang
tenaga :
0.3200 Org/hr Pekerja
0.2500 Org/hr Tukang Batu
0.2500 Org/hr Kepala Tukang Batu
0.0150 Org/hr Mandor

40,000.00
48,000.00

9,800
7,920
1,618,295

885.00
45,000.00
105,000.00

192,930
23,400
91,350

25,000.00
36,000.00
40,000.00
48,000.00

41,250
9,000
1,000
3,840
362,770

2,150.00
885.00
50,000.00

26,338
12,532
1,950

25,000.00
36,000.00
40,000.00
48,000.00

8,000
9,000
10,000
720
68,539

vol

Kebutuhan SD
260.00

13 orang pekerja bisa membereskan 250m2 per hari


13 orang pekerja bisa membereskan 250m2 per hari

13.00
1.30

52.50

Durasi
SD per hari Satuan
4.00
3.25
0.33

7.00
0.32
0.21
1.05

0.05
0.03
0.15
2.00

42.00
4.20

21.00
2.10

2.00
12.00

6.00
12.00

51.08

5.00
31.93
3.19

12.77

6.39
0.64

2.00
2.45
0.25

15.56

1.23
0.12

4.00
18.67

4.67

4.67
0.16

1.17
0.04

6.80

2.00
8.16
2.04

4.08
1.02

5.30

2.65

2.65
0.27
0.27

11.88

1.33
0.13
0.13

4.00
13.07
1473.12
8.67

3.27
368.28
2.17

19.01
14.26
1.43
2.14

4.75
3.56
0.36
0.53

144.52

11.00
12284.20
2716.98
10.84

1116.75
247.00
0.99

75.87
25.29
2.53
3.80

6.90
2.30
0.23
0.35

21.00

2.00
91.14
0.29

45.57
0.15

8.40
4.20
0.42
0.42

4.20
2.10
0.21
0.21

4.58

4.00
0.92
6.87
1.83
687.00
10.31
3.57
2.38
1479.34

0.23
1.72
0.46
2.58
2.58
0.89
0.60
369.84

17.86
4.81
4.76
1.60

4.47
1.20
1.19
0.40

1.12
0.76

7.35

0.28
0.19

2.00
1602.30
3.82
6.39

801.15
1.91
3.20

12.13
1.84
0.18
0.59

6.06
0.92
0.09
0.29

35.00

3.00
428.75
495.60
1.37

142.92
165.20
0.46

11.20
8.75
8.75
0.53

3.73
2.92
2.92
0.18

DAFTAR HARGA BAHAN


NO

1
2
3
4
5
6
7
8
9
10
11
12
13
14
15

JENIS BAHAN

Bata Merah
Batu Kali
Batu Pecah Mesin 2/3
Besi Beton Polos
Kawat Beton
Paku
Pasir Beton
Pasir Pasang
Pasir Urug
Portland Cement (PC)
Minyak Bekesting
Kayu Meranti 5/7
Kayu Meranti 6/12
Papan meranti 2/20
Keramik Lantai 30 x 30

SATUAN

Buah
m3
m3
Kg
Kg
Kg
m3
m3
m3
Kg
Ltr
m3
m3
m3
bh

HARGA
(Rp.)
190
60,000
105,000
3,500
8,000
8,000
45,000
50,000
34,000
885
5,000
2,125,000
2,125,000
2,325,000
2,150

DAFTAR UPAH KERJA


NO.

1
2
3
4
5
6
7

JENIS PEKERJAAN

Mandor
Kepala Tukang Kayu
Tukang Kayu
Kepala Tukang Batu
Tukang Batu
Tukang Besi
Pekerja

SATUAN

Org/hr
Org/hr
Org/hr
Org/hr
Org/hr
Org/hr
Org/hr

HARGA
(Rp.)
48,000
43,000
38,000
40,000
36,000
36,000
25,000

PEKERJAAN

VOLUME

KEBUTUHAN SUMBER DAYA

DURASI

Anda mungkin juga menyukai