PIPELINE LOOPS FOR SHY-1 EXPANSION PHASE II

BI-10-00295
WEEKLY QUALITY REPORT
WEEK # 58
Date: 08 to 14 August 2009
NCR Summary (Engineering / Procurement)
Number of NCR Issued
NCR Issued By: This Week Cumulative
Issued Closed Pending Issued Closed Pending
Saudi ARAMCO (PID) 0 0 0 0 0 0
Suedrohrbau S.A. 0 0 0 1 1 0
NCR Summary (Construction)
Number of NCR Issued
NCR Issued By: This Week Cumulative
Issued Closed Pending Issued Closed Pending
Saudi ARAMCO (PID) 0 0 0 0 0 0
Suedrohrbau S.A. 0 0 0 14 14 0
RFI Summary
Number of RFI Issued
Discipline This Week Cumulative
Issued Accepted Rejected Issued Accepted Rejected
Civil & Structural 35 39 0 1296 1256 0
Mechanical (Welding/Coating) 23 25 0 999 943 0
Electrical / Instr/ telecom. 17 11 0 342 335 0
Weld Statistics
Weekly Overall Overall
Weekly No. of Welds Weekly No. of RT Weekly no. of Repairs RT Backlogs Weekly Total Welds Total Joints RT Total Joints Repair
Repair Repair Repair
Repair
Rate Rate Rate
rate (Joint
378 156 3 90 Basis)
(Linear
Basis) 23850 4814 85 (Joint
Basis)
(Linear
Basis)
Loop- Loop- Loop- Fab Loop- Loop- Loop- Fab Loop- Loop- Loop- Fab Loop- Loop- Loop- Fab Loop- Fab Loop- Loop- Loop- Fab Loop- Loop- Loop- Fab
Loop-2 Loop-3
1 2 3 Shop 1 2 3 Shop 1 2 3 Shop 1 2 3 Shop 1 Shop 1 2 3 Shop 1 2 3 Shop
1.92% 0.032% 1.77% 0.033%
5 33 215 125 0 83 61 12 0 1 1 1 5 22 22 41 8629 12703 1533 985 2142 2373 149 150 46 31 6 2

Project Quality Index


Latest(June 2009): 95.0 Previous (May 2009): 93.9