Anda di halaman 1dari 34

Datos iniciales

Caudal medio de aguas residuales


Tasa de infiltracion
Factor e mayoracion de aguas residuales
Coeficiente de Manning

Tramos

500
f(diametro y longitud de la red)
Fair
0.013

Inicio-Fin

Pozo

Pozo

1
2
3

2
3
4

Area de aporte

Longitud

Densidad

(m2)

(m)

(hab/ha)

1250
1875
625

100
100
50

100
250
250

Poblacin
Atrs

0
13
60

l/hab*dia
0.0018

Aguas residuales

Infiltracin

Poblacin

Caudal medio de aguas


residuales
Propios

Acumulados

13
47
16

13
60
76

l/s

Factor de
mayoracin

l/s

0.18
0.18
0.09

Caudale de aguas
residuales
l/s

0.08
0.35
0.44

7.39
6.63
6.52

0.59
2.32
2.87

Valores reales de diseo

Caudal total q

l/s

Vel. real m/s

0.77 0.31135202
2.50 0.49436095
2.96 0.44027575

Tirante Y (Cm) Fza Tr. Kg/m

3.68
5.24
6.49

0.10
0.22
0.16

Pend. (%)

0.5
0.8
0.5

Diam (")

4
6
6

Diseo a tubo lleno


Diam interno
(m)

0.099
0.145
0.145

Capacidad
Caudal Q l/s

Vel (m/s)

3.5559 0.46194661
12.4442
0.753599
9.8380 0.59577232

Cotas (m)
Fza Tr. Kg/m

0.12
0.29
0.18

Rasante
Inicial

1500
1499.5
1498.7

Batea
Final

1499.5
1498.7
1498.5

Inicial

1498.70
1498.19
1497.38

m)
q/Q<1

Batea

Altura a clave
inicial (m)

q/Q

Altura a clave
final (m)

RELACION

RELACION

v/V

d/D

Final

1498.20
1497.39
1497.13

Ok
Ok
Ok

0.22
0.20
0.30

1.20
1.16
1.17

1.20
1.16
1.22

0.67
0.66
0.74

0.36
0.34
0.43

RELACION
t/T

0.79
0.76
0.90

0.5
0.8
0.4

RELACIONES HIDRAULICAS PARA TUBERIAS


PARCIALMENTE LLENAS EN FUNCION DE q/Q
q/Q

v/V
0
0.01
0.02
0.03
0.04
0.05
0.06
0.08
0.09
0.1
0.11
0.12
0.13
0.14
0.15
0.16
0.17
0.18
0.19
0.2
0.21
0.22
0.23
0.24
0.25
0.26
0.27
0.28
0.29
0.3
0.31
0.32
0.33
0.34
0.35
0.36
0.37
0.38
0.39
0.4
0.41
0.42

0
0.29
0.344
0.386
0.419
0.445
0.468
0.506
0.523
0.539
0.553
0.567
0.579
0.591
0.602
0.614
0.625
0.636
0.646
0.656
0.665
0.674
0.683
0.692
0.7
0.708
0.716
0.724
0.732
0.739
0.747
0.754
0.761
0.768
0.775
0.782
0.788
0.795
0.801
0.807
0.813
0.819

d/D
0
0.076
0.108
0.131
0.152
0.169
0.186
0.215
0.228
0.241
0.253
0.265
0.276
0.287
0.297
0.307
0.317
0.326
0.335
0.344
0.353
0.362
0.37
0.379
0.387
0.395
0.403
0.411
0.418
0.426
0.433
0.44
0.448
0.455
0.462
0.469
0.476
0.483
0.49
0.497
0.503
0.51

t/T
0
0.195
0.273
0.328
0.375
0.315
0.452
0.515
0.542
0.568
0.592
0.615
0.637
0.658
0.678
0.697
0.715
0.732
0.748
0.764
0.779
0.794
0.809
0.822
0.836
0.849
0.862
0.874
0.885
0.897
0.908
0.918
0.929
0.939
0.949
0.959
0.968
0.978
0.987
0.996
1.004
1.013

0.43
0.44
0.45
0.46
0.47
0.48
0.49
0.5
0.51
0.52
0.53
0.54
0.55
0.56
0.57
0.58
0.59
0.6
0.61
0.62
0.63
0.64
0.65
0.66
0.67
0.68
0.69
0.7
0.71
0.72
0.73
0.74
0.75
0.76
0.77
0.78
0.79
0.8
0.81
0.82
0.83
0.84
0.85
0.86
0.87
0.88
0.89

0.825
0.83
0.836
0.841
0.847
0.852
0.857
0.862
0.857
0.872
0.877
0.882
0.887
0.891
0.896
0.9
0.904
0.909
0.913
0.917
0.921
0.925
0.929
0.933
0.937
0.941
0.944
0.948
0.951
0.955
0.959
0.963
0.967
0.97
0.974
0.977
0.981
0.984
0.988
0.991
0.994
0.997
1
1.003
1.007
1.012
1.016

0.517
0.523
0.53
0.537
0.543
0.55
0.556
0.563
0.569
0.576
0.582
0.589
0.595
0.602
0.608
0.614
0.621
0.627
0.634
0.64
0.646
0.653
0.659
0.666
0.672
0.679
0.689
0.692
0.699
0.705
0.712
0.718
0.724
0.731
0.738
0.744
0.751
0.758
0.764
0.771
0.778
0.785
0.792
0.8
0.806
0.812
0.818

1.021
1.029
1.037
1.045
1.052
1.059
1.067
1.074
1.08
1.087
1.093
1.1
1.106
1.112
1.118
1.124
1.129
1.135
1.14
1.145
1.15
1.155
1.159
1.164
1.168
1.173
1.177
1.181
1.184
1.188
1.191
1.194
1.197
1.2
1.202
1.205
1.207
1.209
1.211
1.213
1.214
1.215
1.216
1.217
1.217
1.217
1.217

0.9
0.91
0.92
0.93
0.94
0.95
0.96
0.97
0.98
0.99
1
1.01
1.02
1.03

1.02
1.024
1.028
1.032
1.036
1.04
1.043
1.047
1.05
1.053
1.056
1.059
1.061
1.063

0.825
0.831
0.838
0.845
0.852
0.859
0.866
0.874
0.881
0.89
0.898
0.908
0.918
0.93

1.217
1.216
1.215
1.214
1.213
1.211
1.209
1.206
1.202
1.198
1.193
1.187
1.179
1.168

DIAMETROS INTERNOS - NOVAFORT Y NOVALOC


"
NOMINAL
Interno en m Exter en m
Ancho Zanja
4
110
0.099
6
160
0.145
8
200
0.182
0.2
0.8
10
250
0.227
0.25
0.8
12
315
0.284
0.315
0.8
15
0.33
0.36
0.8
16
400
0.362
0.4
0.8
18
450
0.407
0.45
0.9
20
500
0.452
0.5
0.9
21
0.48
0.55
1
24
24
0.595
0.625
1.1
27
27
0.671
0.71
1.1
30
30
0.747
0.786
1.1
33
33
0.823
0.86
1.2
36
36
0.899
0.95
1.3
39
39
0.974
1.025
1.4
42
42
1.05
1.101
1.4
45
45
1.127
1.18
1.5
48
48
1.202
1.271
1.6
51
51
1.295
1.363
1.7
54
54
1.355
1.423
1.8
60
60
1.507
1.575
1.9

Fair
Mara

f(tamao de la red)
f(material de la red) Pvc
f(material de la red) Concreto
f(diametro y longitud de la red)
Fair, Geyer, Okun

FACTOR DE MAYORACION
FAIR
MARA
TCHOBANOGLOUS

Pvc
Concreto

4.2479384

10.24
10
20
0.0018
0.045

m3/ha*dia
m3/ha*dia
m3/ha*dia
l/s/m
L/d/m/cm

Anda mungkin juga menyukai