ITEM PEMBAYARAN NO.

JENIS PEKERJAAN

: 1.2 : MOBILISASI % HARGA SATUAN (Rp.) Lembar 1.2-1 JUMLAH HARGA (Rp.)

% TERHADAP TOTAL BIAYA PROYEK =

No.

URAIAN

SATUAN

VOL.

A.

Sewa Tanah

M2

B.

PERALATAN Periksa lembar 1.2-2

C. 1 2 3 4 5 6

FASILITAS KONTRAKTOR Base Camp Kantor Barak Bengkel Gudang, dan lain-lain ......................

M2 M2 M2 M2 M2 ....

D. 1 2 3 4 5

FASILITAS LABORATORIUM Pembuatan Job Mix Desain

Ls

1.00

E. E.I. 1 2 3 4 5 6 E.II. 1 2 3

MOBILISASI LAINNYA PEKERJAAN DARURAT ...................... ...................... ...................... ...................... ...................... ...................... LAIN-LAIN Pengukuran / Pemasangan Patok Pemeliharaan dan Pengaturan Lalu Lintas Papan Nama Proyek

Ls Ls Set

1.00

F.

DEMOBILISASI Total Biaya Mobilisasi

LS

1.00

ITEM PEMBAYARAN NO. JENIS PEKERJAAN

: 1.2 : MOBILISASI KODE ALAT HARGA SATUAN (Rp.) Lembar 1.2-2 JUMLAH HARGA (Rp.)

No.

JENIS ALAT

SATUAN

VOL.

B. 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38

PERALATAN ASPHALT MIXING PLANT ASPHALT FINISHER ASPHALT SPRAYER BULLDOZER 100-150 HP COMPRESSOR 4000-6500 L\M CONCRETE MIXER 0.3-0.6 M3 CRANE 10-15 TON DUMP TRUCK 3-4 M3 DUMP TRUCK EXCAVATOR 80-140 HP FLAT BED TRUCK 3-4 M3 GENERATOR SET MOTOR GRADER >100 HP TRACK LOADER 75-100 HP WHEEL LOADER 1.0-1.6 M3 THREE WHEEL ROLLER 6-8 T TANDEM ROLLER 6-8 T. TIRE ROLLER 8-10 T. VIBRATORY ROLLER 5-8 T. CONCRETE VIBRATOR STONE CRUSHER WATER PUMP 70-100 mm WATER TANKER 3000-4500 L. PEDESTRIAN ROLLER TAMPER JACK HAMMER FULVI MIXER CONCRETE PUMP TRAILER 20 TON PILE DRIVER + HAMMER CRANE ON TRACK 35 TON WELDING SET BORE PILE MACHINE ASPHALT LIQUID MIXER SCALE BRIDGE, 35 T. PICK UP TRUCK, 1 T. SURVEY EQUIPMENT TONGKANG E01 E02 E03 E04 E05 E06 E07 E08 E09 E10 E11 E12 E13 E14 E15 E16 E17 E18 E19 E20 E21 E22 E23 E24 E25 E26 E27 E28 E29 E30 E31 E32 E33 E34 Unit Unit Unit Unit Unit Unit Unit Unit Unit Unit Unit Unit Unit Unit Unit Unit Unit Unit Unit Unit Unit Unit Unit Unit Unit Unit Unit Unit Unit Unit Unit Unit Unit Unit SET Unit SET SET

1.00

Total untuk Item B pada Lembar 1