PEKERJAAN PASANGAN BATU BATA
1. RENCANA POSISI PASANGAN BATA 2. BUAT TIANG KAYU / PROFILAN PADA
SESUAI SHOP DRAWINGS KOLOM-KOLOM STRUKTUR DENGAN
POSISI SEPERTI GAMBAR DI BAWAH INI
KOLOM
PROFIL KAYU
POSISI BENANG
.
PROFIL KAYU
KOLOM A
D
A
BENANG NILON
H
I
K
A
A
TAMPAK R
As Y
Tiang kayu Benang nylon
A
DENAH As bangunan
4. BILA BENTANG ANTAR KOLOM > 4 M HAL – HAL YANG HARUS DIPERHATIKAN :
DIUSAHAKAN DITENGAH – TENGAH
BENTANG TERSEBUT DI PASANG 1. SEBELUM DI PASANG BATA HARUS DIRENDAM
KOLOM PRAKTIS SAMPAI JENUH AIR
5. PENGECORAN KOLOM PRAKTIS 2. PASIR YANG DIGUNAKAN DI AYAK DAHULU
DILAKSANAKAN SETIAP KETINGGIAN UNTUK MENDAPATKAN GRADASI MATERIAL
1 – 1.5 M YANG SERAGAM
6. PASANGAN BATA HANYA BISA DILAKSANAKAN 3. AIR YANG DIGUNAKAN HARUS BEBAS DARI
SETELAH KOLOM PRAKTIS SELESAI DI COR PENGARUH ASAM
4. POSISI PASANGAN BATA ANTAR LAPISAN
HARUS ZIG – ZAG
START
PEKERJAAN PENGUKURAN
DAN
PEMASANGAN PROFIL
CATATAN.
SEBELUM DIPASANG BATA HARUS
PASANG BATA DICELUP ATAU DIRENDAM DALAM
AIR
LO > 4
PASANG KOLOM PRAKTIS
BENTANG
ILO
LO < 4
FINISH
I
Y
K
A
A
R
A
D
H
PEKERJAAN KUSEN
A
1. Installing ready frame 2. Checking frame with wall 3. Drilled at concrete frame D
H
I
K
A
R
Y
4. Fill Fischer into drill hole 5. Install window 6. Fill sealant & mortar A
PEKERJAAN PLESTERAN DAN ACI
1
1M
PAKU BESAR
KEPALAN
PAKU BESAR TITIK KEPALAN A B
METERAN
A
BENANG LOT
LOTAN
C D A
D
BENANG LOT
H
DINDING TEMBOK
GAMBAR 1 GAMBAR 3
1
1M
I
K
BIDANG PLESTERAN
A B
A=C
1
JIDAR PENGGESEK
A
N JID
AR R
METERAN KA
Y
C RA
GE
AH
AR
D
LOTAN
A
C
GAMBAR 4
POTONGAN 1-1 GAMBAR 2
BIDANG PLESTERAN
KETERANGAN HAL-HAL YANG PERLU DIPERHATIKAN
START
A
HUBUNGKAN 2 TITIK
KEPALAAN TERSEBUT KAMPROTKAN ADUKAN
DENGAN BENANG LOT SPESI PADA DINDING
ANTARA DUA KEPALAAN
A
I
Y
K
A
A
R
A
D
H
PEKERJAAN LANTAI
PEKERJAAN LANTAI TILE
( LANTAI KERAMIK, LANTAI GRANITO, VINIL DAN LAIN-LAIN)
4. PASANG KERAMIK MENURUT SALAH SATU ARAH
4. CHECK KONDISI REAL DILAPANGAN DAN BUAT
SUMBU KEPALAAN
SHOP DRAWING
3. PEMASANGAN BERIKUTNYA DILAKSANAKAN DENGAN
2. TENTUKAN POSISI START POINT DALAM SHOP
CARA MENGGESER BENANG NYLON SEJAJAR DENGAN
DRAWING DAN MINTALAH PERSETUJUAN DARI
SALAH SATU SUMBU KEPALAAN
PENGAWAS / MK
9. TERAPKAN POSISI START POINT YANG SUDAH
DISETUJUI DI LAPANGAN SEBAGAI CONTOH LIHAT
GAMBAR DIBAWAH INI.
A
BENANG NYLON
BENANG NYLON
DI GESER
BENANG NYLON
D
DI GESER
H
I
.
BENANG NYLON BENANG NYLON
K
ARAH KEPALAAN
A
STRAT POINT
R
Y
A
CONTOH DENAH CONTOH DENAH
HAL – HAL YANG PERLU DIPERHATIKAN :
START
PASANG KERAMIK
BERIKUTNYA DILAKUKAN
DENGAN CARA
MENGGESER BENANG
SEJAJAR DENGAN ARAH
KEPALAAN LAPIS DEMI
LAPIS
FINISH
I
Y
K
A
A
R
A
D
H
PEKERJAAN PLAFOND
1. Marking ceiling elevation 2. Determine pattern of frame after fixing wall angle 3. Fix hanger at the frame pattern that
A
have determined D
H
I
K
A
R
Y
4. Fix frame and hanger 5. Adjust the frames to flat the elevation 6. Fix ceiling panel
A
PEKERJAAN CLADDING / CURTAIN WALL
1. Start point
Start point
LUBANG TITIK PINJAMAN 2. 3.
LANTAI DASAR
Start point
Start point POSISI HARUS
TEGAK LURUS
• CHECK DAN UKUR KONDISI TIAP • TERAPKAN DAN PLOTKAN POSISI • PASANG PROFIL MULLION YANG
LANTAI DI LAPANGAN DARI TITIK-TITIK UNTUK PEGANGAN MENGHUBUNGKAN TITIK TERSEBUT
• TENTUKAN POSISI START POINT PROFIL MULLION PADA BAGIAN TEPI DARI LANTAI KE LANTAI
•
TIAP LANTAI
BUAT SHOP DRAWING DAN •
BANGUNAN
TIAP LANTAI CHECK KELURUSANNYA
• CHECK KETEGAKANNYA
PROSES BERLANGSUNG
SELAMA
A
MINTAKAN PERSETUJUANNYA
PADA PENGAWAS ATAU MK •
POSISI TITIK-TITIK MULLION
YANG SAMA DARI LANTAI ATAS s/d D
BAWAH DAN SEBALIKNYA
CATATAN :
H
2. PANEL-PANEL PENUTUP EXTERIOR
I
4. 5. SUDAH DISIAPKAN DI WORKSHOP
3. SISTEM SAMBUNGAN TERGANTUNG
PERSETUJUAN DARI PENGAWAS K
4. PELAKSANAAN PEMASANGN DIDING
PENUTUP SEBAIKNYA DENGAN A
BANTUAN ALAT GONDOLA
R
Y
A
•PASANG PROFIL TRANNSOM SECARA • PASANG PANEL DIDING EXTERIOR
TEGAK LURUS/MENYILANG TERHADAP BILA : -TERBUAT DARI KACA ( CURTAIN WALL )
PROFIL MULLION SESUAI SHOP DRAWING -TERBUAT DARI ALUMUNIUM ( CLADDING )
• PASANG SEALENT PADA NAAT PANEL DIDING EXTERIOR
• BUKA LAPISAN PENUTUP CLADDING BILA DIDING TERBUAT DARI
ALUMUNIUM