Item 1
Research Officer
Road Research Lab, PWD (Rds)
Ambari Fatashil, Guwahati-25.
14.42
495.05
Director
Road Research Lab.,PWD (Rds)
Ambari Fatashil, Guwahati-25
Analysis of Rate
Item 2
Conduction of 100 mm Machine boring ( Drilling ) through all type of clayey, sandy,
sandy clay, silty sand, silty clay soil, excluding transportation charges.
Analysis
A: Machinery/Apparatus
Name
1) Drilling Rig
2) Water Pump
3) Swivel
4) Pulley/Double pulley
5) Operation pipe
5) Suction pipe
6) Wire rope/ Manila rope ( heavy duty)
7) Drilling Beat AW/AX
8) drilling beat NW/NX
9) Cashing shoe/ bit
10) Drilling rod AW (30m)
11) Drilling rod NW
13) Cashing 4" (10 Ft)
14) Cashing Clamp (4")
15) Drilling Rod Clamp (AX,NW)
16) Tools/wrench etc.
Cost (Rs)
739500.00
6960.00
10440.00
3500.00
5400.00
2200.00
3500.00
4200.00
5540.00
4200.00
42000.00
90000.00
46000.00
6400.00
4800.00
12400.00
Total=Rs
987040.00
Considering ten years (average) of life span of apparatus and 240 working days per year.
Rate Per day=Rs
411.27
10m boring can be done per day
Rate per meter =Rs
41.13
B: Materials
Name
1) Diesel Lit Per Day
a) Drilling machine
b) Pump
2) Mobil 1lit per day
3) Grease 2kg per day
4) Gear Oil 1/2 lit per day
5) Hydraulic Oil 2 lit per day
Cost (Rs)
Total=Rs
668.00
334.00
80.00
120.00
45.00
300.00
1547.00
154.70
C: Services
Name
1) AE/AD ( 1nos)
Asstt. Director, Soil-Survey Section,
Road Research Lab, PWD (Rds)
Ambari Fatashil, Guwahati-25.
Cost (Rs)
932.00
Research Officer
Road Research Lab, PWD (Rds)
Ambari Fatashil, Guwahati-25.
Director
Road Research Lab.,PWD (Rds)
Ambari Fatashil, Guwahati-25
1000.00
460.00
1320.00
3712.00
371.20
567.03
3% contingencies on (A+B+C)= Rs
Total Cost per meter =Rs
Sundries and other Machineries=Rs
Gross total per m run = Rs
Rupees Six hundred thirty and four paise only.
17.01
584.04
46.00
630.04
Analysis of Rate
Item 3
Conduction of 100 mm Machine boring (Drilling) through all type of gravel, sandy gravel,
etc., excluding transportation charges
Asstt. Director, Soil-Survey Section,
Research Officer
Director
Road Research Lab, PWD (Rds)
Road Research Lab, PWD (Rds)
Road Research Lab.,PWD (Rds)
Ambari Fatashil, Guwahati-25.
Ambari Fatashil, Guwahati-25.
Ambari Fatashil, Guwahati-25
Analysis
A: Machinery/Apparatus
Name
1) Drilling Rig
2) Water Pump
3) Swivel
4) Pulley/Double pulley
5) Operation pipe
5) Suction pipe
6) Wire rope/ Manila rope ( heavy duty)
7) Drilling Beat AW/AX
8) Drilling beat NW/NX
9) Cashing shoe/ bit
10) Drilling rod AW (30m)
11) Drilling rod NW
13) Cashing 4" (10 Ft)
14) Cashing Clamp (4")
15) Drilling Rod Clamp (AX,NW)
16) Tools/wrench etc.
Cost (Rs)
739500.00
6960.00
10440.00
3500.00
5400.00
2200.00
3500.00
4200.00
5540.00
4200.00
42000.00
90000.00
46000.00
6400.00
4800.00
12400.00
Total=Rs
987040.00
Considering ten years (average) of life span of apparatus and 240 working days per year.
Rate Per day=Rs
411.27
2m boring can be done per day
Rate per meter =Rs
205.63
B: Materials
Name
Cost
1) Diesel Lit Per Day
a) Drilling machine
267.00
b) Pump
208.75
2) Mobil 1lit per day
80.00
3) Grease 2kg per day
120.00
4) Gear Oil 1/2 lit per day
45.00
5) Hydraulic Oil 2 lit per day
300.00
Total=Rs
1020.75
2m boring can be done per day
Rate Per Meter=Rs
510.38
C: Services
Name
1) AE/AD ( 1/2nos)
2) JE/RA/Sc Asstt (1 nos)
Asstt. Director, Soil-Survey Section,
Road Research Lab, PWD (Rds)
Ambari Fatashil, Guwahati-25.
Cost
466.00
500.00
Research Officer
Road Research Lab, PWD (Rds)
Ambari Fatashil, Guwahati-25.
Director
Road Research Lab.,PWD (Rds)
Ambari Fatashil, Guwahati-25
3) Rigman (1 nos)
4) Boring Mistri (6 nos) )@220 per head
460.00
1320.00
2746.00
Total=Rs
2m boring can be done per day
Rate per meter = Rs
Total Cost per meter run on A+B+C=Rs
3% contingencies on (A+B+C)= Rs
Total Cost per meter =Rs
Sundries and other Machineries=Rs
Gross total per m run = Rs
Rupees Two thousand three hundred sixty one and sixty eight paise only.
1373.00
2089.01
62.67
2151.68
210.00
2361.68
Analysis of Rate
Item 4
Research Officer
Road Research Lab, PWD (Rds)
Ambari Fatashil, Guwahati-25.
Director
Road Research Lab.,PWD (Rds)
Ambari Fatashil, Guwahati-25
Name
1) Drilling Rig
2) Water Pump
3) Swivel
4) Pulley/Double pulley
5) Operation pipe
5) Suction pipe
6) Wire rope/ Manila rope ( heavy duty)
7) Drilling Beat AW/AX
8) Drilling beat NW/NX
9) Cashing shoe/ bit
10) Drilling rod AW (30m)
11) Drilling rod NW
13) Cashing 4" (10 Ft)
14) Cashing Clamp (4")
15) Drilling Rod Clamp (AX,NW)
16) Tools/wrench etc.
Total=Rs
Cost
739500.00
6960.00
10440.00
3500.00
5400.00
2200.00
3500.00
4200.00
5540.00
4200.00
42000.00
90000.00
46000.00
6400.00
4800.00
12400.00
987040.00
Considering ten years (average) of life span of apparatus and 240 working days per year.
Rate Per day=Rs
411.27
1.5m boring can be done per day
Rate per meter =Rs
274.18
B: Materials
Name
Cost
1) Diesel Lit Per Day
a) Drilling machine
668.00
b) Pump
334.00
2) Mobil 1lit per day
80.00
3) Grease 2kg per day
120.00
4) Gear Oil 1/2 lit per day
45.00
5) Hydraulic Oil 2 lit per day
300.00
Total=Rs
1547.00
1.5m boring can be done per day
Rate Per Meter=Rs
1031.33
C: Services
Name
1) AE/AD ( 1/2 nos)
2) JE/RA/Sc Asstt (1 nos)
3) Rigman (1 nos)
4) Boring Mistri (6 nos) )@220 per head
Cost
Total=Rs
Asstt. Director, Soil-Survey Section,
Road Research Lab, PWD (Rds)
Ambari Fatashil, Guwahati-25.
Research Officer
Road Research Lab, PWD (Rds)
Ambari Fatashil, Guwahati-25.
466.00
500.00
460.00
1320.00
2746.00
Director
Road Research Lab.,PWD (Rds)
Ambari Fatashil, Guwahati-25
1830.67
3136.18
94.09
3230.26
320.00
3550.26
Analysis of Rate
Item 5
Research Officer
Road Research Lab, PWD (Rds)
Ambari Fatashil, Guwahati-25.
Director
Road Research Lab.,PWD (Rds)
Ambari Fatashil, Guwahati-25
Name
1) Split Spoon Sampler/day
2) Monkey Hammer/day
3) Guide/day
Cost (Rs)
8900.00
16000.00
1800.00
Considering 1 year (average) of life span of Split spoon sampler and 240 working days
per year.
Rate for Split spoon sampler per day = Rs
37.08
Considering 10years (average) of life span of Monkey hamme and 240 working days per
year.
Rate for Monkey hammer per day = Rs
6.67
Considering 1 year (average) of life span of Guide and 240 working days per year.
Rate for Guide per day = Rs
Total=Rs
B: Services
Name
Cost (Rs)
1) Boring Mistri (6 nos) for 1/4 day )@220 per head
Total=Rs
Rate per test = Rs
Total Cost per meter run on A+B=Rs
3% contingencies on (A+B)= Rs
Total Cost per SPT (1.5m) =Rs
Rupees One hundred twenty two and ten paise only
7.50
51.25
660.00
660.00
660.00
711.25
21.34
122.10
Analysis of Rate
Item 6
Research Officer
Road Research Lab, PWD (Rds)
Ambari Fatashil, Guwahati-25.
Director
Road Research Lab.,PWD (Rds)
Ambari Fatashil, Guwahati-25
5)Drilling Rod AW
5400.00
48300.00
Total=Rs
Considering ten years (average) of life span of apparatus and 240 working days per year.
Rate Per day=Rs
20.13
6m boring can be done per day
Rate per meter =Rs
3.35
B: Materials
Name
1) Cone (made of steel) with nipple
Cost
Total=Rs
1600.00
1600.00
53.33
Cost
500.00
660.00
1160.00
193.33
250.02
7.50
257.52
Analysis of Rate
Item 7
Research Officer
Road Research Lab, PWD (Rds)
Ambari Fatashil, Guwahati-25.
Director
Road Research Lab.,PWD (Rds)
Ambari Fatashil, Guwahati-25
5)Drilling Rod AW
5400.00
Total=Rs
48300.00
Considering ten years (average) of life span of apparatus and 240 working days per year.
Rate Per day=Rs
20.13
6m boring can be done per day
Rate per meter =Rs
3.35
B: Materials
Name
Cost
1) Cone (made of steel) with nipple
1600.00
Total=Rs
1600.00
6m boring can be done per day
Rate Per Meter=Rs
53.33
C: Services
Name
1) JE/RA/Sc Asstt (1 nos)
2) Boring Mistri (4 nos)@220 per head
Cost
Total=Rs
500.00
880.00
1380.00
Research Officer
Road Research Lab, PWD (Rds)
Ambari Fatashil, Guwahati-25.
230.00
286.69
8.60
295.29
Director
Road Research Lab.,PWD (Rds)
Ambari Fatashil, Guwahati-25