Analysis of Rate

Item 1

Conduction of 100 mm Hand wash boring through all type of clayey,


sandy, sandy clay, silty sand, silty clay soil, etc., excluding transportation
charges.
Analysis
A: Materials
Name
Cost
1) Tripod
40000.00
2)Pulley
6960.00
3) Wire/Manila rope
10440.00
4) Monkey hammer
3500.00
5)Drilling Rod AW
5400.00
6) Sampler
3000.00
7) Liner
2000.00
8) side Wrench
700.00
9) Chain Wrench
3200.00
10) Pipe Wrench
1800.00
Total=Rs
77000.00
Considering one years (average) of life span of apparatus and
240 working days per year.
Rate Per day=Rs
32.08
8m boring can be done per day
Rate per meter =Rs
4.01
B: Services
Name
Cost
1) AE/Supervisor (1/4 no)
233.00
2) JE/RA/Sc Asstt (1 no)
500.00
3) Boring Mistri(14 nos) )@220 per head
3080.00
Total=Rs
3813.00
8m boring can be done per day
Rate per meter = Rs
476.63
Total Cost per meter run on A+B =Rs
480.64
3% contingencies on (A+B )= Rs
Total Cost per meter =Rs
Rupees Four hundred ninety five and five paise only.

Asstt. Director, Soil-Survey Section,


Road Research Lab, PWD (Rds)
Ambari Fatashil, Guwahati-25.

Research Officer
Road Research Lab, PWD (Rds)
Ambari Fatashil, Guwahati-25.

14.42
495.05

Director
Road Research Lab.,PWD (Rds)
Ambari Fatashil, Guwahati-25

Analysis of Rate
Item 2

Conduction of 100 mm Machine boring ( Drilling ) through all type of clayey, sandy,
sandy clay, silty sand, silty clay soil, excluding transportation charges.
Analysis
A: Machinery/Apparatus
Name
1) Drilling Rig
2) Water Pump
3) Swivel
4) Pulley/Double pulley
5) Operation pipe
5) Suction pipe
6) Wire rope/ Manila rope ( heavy duty)
7) Drilling Beat AW/AX
8) drilling beat NW/NX
9) Cashing shoe/ bit
10) Drilling rod AW (30m)
11) Drilling rod NW
13) Cashing 4" (10 Ft)
14) Cashing Clamp (4")
15) Drilling Rod Clamp (AX,NW)
16) Tools/wrench etc.

Cost (Rs)
739500.00
6960.00
10440.00
3500.00
5400.00
2200.00
3500.00
4200.00
5540.00
4200.00
42000.00
90000.00
46000.00
6400.00
4800.00
12400.00
Total=Rs
987040.00
Considering ten years (average) of life span of apparatus and 240 working days per year.
Rate Per day=Rs
411.27
10m boring can be done per day
Rate per meter =Rs
41.13
B: Materials
Name
1) Diesel Lit Per Day
a) Drilling machine
b) Pump
2) Mobil 1lit per day
3) Grease 2kg per day
4) Gear Oil 1/2 lit per day
5) Hydraulic Oil 2 lit per day

Cost (Rs)

Total=Rs

668.00
334.00
80.00
120.00
45.00
300.00
1547.00

Rate Per Meter=Rs

154.70

10m boring can be done per day

C: Services
Name
1) AE/AD ( 1nos)
Asstt. Director, Soil-Survey Section,
Road Research Lab, PWD (Rds)
Ambari Fatashil, Guwahati-25.

Cost (Rs)
932.00
Research Officer
Road Research Lab, PWD (Rds)
Ambari Fatashil, Guwahati-25.

Director
Road Research Lab.,PWD (Rds)
Ambari Fatashil, Guwahati-25

2) JE/RA/Sc Asstt (2nos)


3) Rigman (1nos)
4) Boring Mistri (6 nos) )@220 per head
Total=Rs

1000.00
460.00
1320.00
3712.00

Rate per meter = Rs


Total Cost per meter run on A+B+C=Rs

371.20
567.03

3% contingencies on (A+B+C)= Rs
Total Cost per meter =Rs
Sundries and other Machineries=Rs
Gross total per m run = Rs
Rupees Six hundred thirty and four paise only.

17.01
584.04
46.00
630.04

10m boring can be done per day

Analysis of Rate
Item 3

Conduction of 100 mm Machine boring (Drilling) through all type of gravel, sandy gravel,
etc., excluding transportation charges
Asstt. Director, Soil-Survey Section,
Research Officer
Director
Road Research Lab, PWD (Rds)
Road Research Lab, PWD (Rds)
Road Research Lab.,PWD (Rds)
Ambari Fatashil, Guwahati-25.
Ambari Fatashil, Guwahati-25.
Ambari Fatashil, Guwahati-25

Analysis
A: Machinery/Apparatus
Name
1) Drilling Rig
2) Water Pump
3) Swivel
4) Pulley/Double pulley
5) Operation pipe
5) Suction pipe
6) Wire rope/ Manila rope ( heavy duty)
7) Drilling Beat AW/AX
8) Drilling beat NW/NX
9) Cashing shoe/ bit
10) Drilling rod AW (30m)
11) Drilling rod NW
13) Cashing 4" (10 Ft)
14) Cashing Clamp (4")
15) Drilling Rod Clamp (AX,NW)
16) Tools/wrench etc.

Cost (Rs)
739500.00
6960.00
10440.00
3500.00
5400.00
2200.00
3500.00
4200.00
5540.00
4200.00
42000.00
90000.00
46000.00
6400.00
4800.00
12400.00
Total=Rs
987040.00
Considering ten years (average) of life span of apparatus and 240 working days per year.
Rate Per day=Rs
411.27
2m boring can be done per day
Rate per meter =Rs
205.63
B: Materials
Name
Cost
1) Diesel Lit Per Day
a) Drilling machine
267.00
b) Pump
208.75
2) Mobil 1lit per day
80.00
3) Grease 2kg per day
120.00
4) Gear Oil 1/2 lit per day
45.00
5) Hydraulic Oil 2 lit per day
300.00
Total=Rs
1020.75
2m boring can be done per day
Rate Per Meter=Rs
510.38

C: Services
Name
1) AE/AD ( 1/2nos)
2) JE/RA/Sc Asstt (1 nos)
Asstt. Director, Soil-Survey Section,
Road Research Lab, PWD (Rds)
Ambari Fatashil, Guwahati-25.

Cost
466.00
500.00
Research Officer
Road Research Lab, PWD (Rds)
Ambari Fatashil, Guwahati-25.

Director
Road Research Lab.,PWD (Rds)
Ambari Fatashil, Guwahati-25

3) Rigman (1 nos)
4) Boring Mistri (6 nos) )@220 per head

460.00
1320.00
2746.00

Total=Rs
2m boring can be done per day
Rate per meter = Rs
Total Cost per meter run on A+B+C=Rs
3% contingencies on (A+B+C)= Rs
Total Cost per meter =Rs
Sundries and other Machineries=Rs
Gross total per m run = Rs
Rupees Two thousand three hundred sixty one and sixty eight paise only.

1373.00
2089.01
62.67
2151.68
210.00
2361.68

Analysis of Rate
Item 4

Conduction of 100 mm Machine boring (Drilling) for rock layer , excluding


transportation charges
Analysis
A: Machinery/Apparatus

Asstt. Director, Soil-Survey Section,


Road Research Lab, PWD (Rds)
Ambari Fatashil, Guwahati-25.

Research Officer
Road Research Lab, PWD (Rds)
Ambari Fatashil, Guwahati-25.

Director
Road Research Lab.,PWD (Rds)
Ambari Fatashil, Guwahati-25

Name
1) Drilling Rig
2) Water Pump
3) Swivel
4) Pulley/Double pulley
5) Operation pipe
5) Suction pipe
6) Wire rope/ Manila rope ( heavy duty)
7) Drilling Beat AW/AX
8) Drilling beat NW/NX
9) Cashing shoe/ bit
10) Drilling rod AW (30m)
11) Drilling rod NW
13) Cashing 4" (10 Ft)
14) Cashing Clamp (4")
15) Drilling Rod Clamp (AX,NW)
16) Tools/wrench etc.
Total=Rs

Cost
739500.00
6960.00
10440.00
3500.00
5400.00
2200.00
3500.00
4200.00
5540.00
4200.00
42000.00
90000.00
46000.00
6400.00
4800.00
12400.00
987040.00

Considering ten years (average) of life span of apparatus and 240 working days per year.
Rate Per day=Rs
411.27
1.5m boring can be done per day
Rate per meter =Rs
274.18
B: Materials
Name
Cost
1) Diesel Lit Per Day
a) Drilling machine
668.00
b) Pump
334.00
2) Mobil 1lit per day
80.00
3) Grease 2kg per day
120.00
4) Gear Oil 1/2 lit per day
45.00
5) Hydraulic Oil 2 lit per day
300.00
Total=Rs
1547.00
1.5m boring can be done per day
Rate Per Meter=Rs
1031.33

C: Services
Name
1) AE/AD ( 1/2 nos)
2) JE/RA/Sc Asstt (1 nos)
3) Rigman (1 nos)
4) Boring Mistri (6 nos) )@220 per head

Cost

Total=Rs
Asstt. Director, Soil-Survey Section,
Road Research Lab, PWD (Rds)
Ambari Fatashil, Guwahati-25.

Research Officer
Road Research Lab, PWD (Rds)
Ambari Fatashil, Guwahati-25.

466.00
500.00
460.00
1320.00
2746.00
Director
Road Research Lab.,PWD (Rds)
Ambari Fatashil, Guwahati-25

1.5m boring can be done per day


Rate per meter = Rs
Total Cost per meter run on A+B+C=Rs
3% contingencies on (A+B+C)= Rs
Total Cost per meter =Rs
Sundries and other Machineries=Rs
Gross total per m run = Rs
Rupees Three thousand five hundred fifty and twenty six paise only.

1830.67
3136.18
94.09
3230.26
320.00
3550.26

Analysis of Rate
Item 5

Conducting SPT at equal interval of 1.5m or change of Strata whichever is earlier


and collection of disturbed soil sample from SPT sampler including proper airtight
sealing, labeling.
Analysis
A: Materials

Asstt. Director, Soil-Survey Section,


Road Research Lab, PWD (Rds)
Ambari Fatashil, Guwahati-25.

Research Officer
Road Research Lab, PWD (Rds)
Ambari Fatashil, Guwahati-25.

Director
Road Research Lab.,PWD (Rds)
Ambari Fatashil, Guwahati-25

Name
1) Split Spoon Sampler/day
2) Monkey Hammer/day
3) Guide/day

Cost (Rs)
8900.00
16000.00
1800.00

Considering 1 year (average) of life span of Split spoon sampler and 240 working days
per year.
Rate for Split spoon sampler per day = Rs
37.08
Considering 10years (average) of life span of Monkey hamme and 240 working days per
year.
Rate for Monkey hammer per day = Rs
6.67
Considering 1 year (average) of life span of Guide and 240 working days per year.
Rate for Guide per day = Rs
Total=Rs
B: Services
Name
Cost (Rs)
1) Boring Mistri (6 nos) for 1/4 day )@220 per head
Total=Rs
Rate per test = Rs
Total Cost per meter run on A+B=Rs
3% contingencies on (A+B)= Rs
Total Cost per SPT (1.5m) =Rs
Rupees One hundred twenty two and ten paise only

7.50
51.25

660.00
660.00
660.00
711.25
21.34
122.10

Analysis of Rate
Item 6

Conduction of SPT by DCPT (Method Dry ) excluding transportation charges


Analysis
A: Machinery/Apparatus
Name
Cost
1) Tripod
22000.00
2Pulley
6960.00
3) Wire/Manila rope
10440.00
4) Monkey hammer
3500.00

Asstt. Director, Soil-Survey Section,


Road Research Lab, PWD (Rds)
Ambari Fatashil, Guwahati-25.

Research Officer
Road Research Lab, PWD (Rds)
Ambari Fatashil, Guwahati-25.

Director
Road Research Lab.,PWD (Rds)
Ambari Fatashil, Guwahati-25

5)Drilling Rod AW

5400.00
48300.00

Total=Rs

Considering ten years (average) of life span of apparatus and 240 working days per year.
Rate Per day=Rs
20.13
6m boring can be done per day
Rate per meter =Rs
3.35
B: Materials
Name
1) Cone (made of steel) with nipple

Cost
Total=Rs

1600.00
1600.00

Rate Per Meter=Rs

53.33

6m boring can be done per day


C: Services
Name

Cost

1) JE/RA/Sc Asstt (1 nos)


2) Boring Mistri (3 nos) )@220 per head
Total=Rs

500.00
660.00
1160.00

6m boring can be done per day


Rate per meter = Rs
Total Cost per meter run on A+B+C=Rs
3% contingencies on (A+B+C)= Rs
Total Cost per meter =Rs
Rupees Two hundred fifty seven and fifty two paise only.

193.33
250.02
7.50
257.52

Analysis of Rate
Item 7

Conduction of SPT by DCPT (Method Wet ) excluding transportation charges


Analysis
A: Machinery/Apparatus
Name
Cost
1) Tripod
22000.00
2Pulley
6960.00
3) Wire/Menika rope
10440.00
4) Monkey hammer
3500.00

Asstt. Director, Soil-Survey Section,


Road Research Lab, PWD (Rds)
Ambari Fatashil, Guwahati-25.

Research Officer
Road Research Lab, PWD (Rds)
Ambari Fatashil, Guwahati-25.

Director
Road Research Lab.,PWD (Rds)
Ambari Fatashil, Guwahati-25

5)Drilling Rod AW

5400.00
Total=Rs
48300.00
Considering ten years (average) of life span of apparatus and 240 working days per year.
Rate Per day=Rs
20.13
6m boring can be done per day
Rate per meter =Rs
3.35
B: Materials
Name
Cost
1) Cone (made of steel) with nipple
1600.00
Total=Rs
1600.00
6m boring can be done per day
Rate Per Meter=Rs
53.33
C: Services
Name
1) JE/RA/Sc Asstt (1 nos)
2) Boring Mistri (4 nos)@220 per head

Cost

Total=Rs

500.00
880.00
1380.00

6m boring can be done per day


Rate per meter = Rs
Total Cost per meter run on( A+B+C)=Rs
3% contingencies on (A+B+C)= Rs
Total Cost per meter =Rs
Rupees Two hundred ninety five and twenty nine paise only.

Asstt. Director, Soil-Survey Section,


Road Research Lab, PWD (Rds)
Ambari Fatashil, Guwahati-25.

Research Officer
Road Research Lab, PWD (Rds)
Ambari Fatashil, Guwahati-25.

230.00
286.69
8.60
295.29

Director
Road Research Lab.,PWD (Rds)
Ambari Fatashil, Guwahati-25

Anda mungkin juga menyukai