LOAD

GALVANIZED FRAMING SUPPORT, UNISTRUT SERIES


P-5500, GRINNELL/POWER-STRUT SERIES PS-150

LOAD

GALVANIZED FRAMING SUPPORT UNISTRUT SERIES P-5500, GRINNELL/POWER-STRUT SERIES PS-150, OR EQUAL AT 1524 O.C. MAX UNLESS OTHERWISE SHOWN Z FITTING UNISTRUT SERIES P-1479, LOAD 8

LOAD

DIMENSIONS IN MILLIMETERS
SUPPORTING PIPE SIZE A B C D E F 115 125
150

OR EQUAL AT 1524 OC MAX UNLESS OTHERWISE SHOWN PIPE CLAMP GRINNELL/POWER-STRUT SERIES 3126, UNISTRUT 2558 OR EQUAL. WHEN USED WITH PVC OR FIBERGLASS PIPE, PROVIDE
900 MAX

MINISTRY OF MUNICIPALITIES
FLANGE G H 400 400 400 500 530 600 600 650 700
750

PIPE G 150 200


230

GRINNELL/POWER-STRUT NO PS-756, OR EQUAL. (TYPICAL) MAXIMUM LENGTH = 600 PIPE CLAMP UNISTRUT SERIES P-2558, GRINNELL/POWER-STRUT SERIES PS-3126 OR EQUAL (TYP). WHEN USED WITH PVC OR FIBERGLASS PIPE, PROVIDE STEEL SHIELD WITH LOOSE FIT AROUND PIPE AT CLAMP. WRAP COPPER TUBING WITH 50 WIDE STRIP OF RUBBER FABRIC WHERE LENGTH EXCEEDS 900 PROVIDE INTERMEDIATE SUPPORTS AT MAX 900 O.C., UNISTRUT SERIES P-1479, GRINNELL/
900 MAX

H 300 330 380 430 430 480 500 530 600


600

J 330 350 380 400 430 450 480

& PUBLIC WORKS

PL 6x200x200 MINIMUM U BOLT GRINNELL FIG 137, TOLCO FIG 110 OR EQUAL (TYP). WHEN J (APPROX) 8 USED WITH PVC OR FIBERGLASS PIPE, PROVIDE STEEL SHIELD WITH LOOSE FIT AROUND PIPE AT
U BOLT. WRAP COPPER TUBING

STEEL SHIELD WITH LOOSE FIT AROUND PIPE AT CLAMP. FOR COPPER TUBING, WRAP WITH
900 MAX

PI

PE

OR

A FL

GE

OD

ONE LAYER OF 8 NEOPRENE EXPANSION JOINT FILLER D DIAMETER GALVANIZED ANCHOR BOLT W/ TWO HEX NUTS AND PLAIN
WASHERS FOR

150 200 E
250

100 300 1015 150 100 300 1015 150


100 300 1015 150

250 150 280 190 300 330 350 380 400 430 450
480

230 230 280 380 400 450 480 530 580


600

230 250 280 300 330 380 400


400

LENGTH TO SUIT

50 WIDE STRIP OF RUBBER FABRIC

90
0

300 A 350 400 450


300

100 300 1015 150

175

280

100 300 1015 150 200 300 100 300 1015 150 230 330 100 300 1015 150 250 350 100 300 1015 150 250 380
100 300 1015 150 300 450

LENGTH TO SUIT

WHERE LENGTH EXCEEDS 900, PROVIDE INTERMEDIATE SUPPORTS AT MAX 900 OC UNISTRUT NO P-5547, GRINNELL/POWER-STRUT NO PS-2648 OR EQUAL (TYPICAL)

TYP 20 C PLATE 100

LEVELING AFTER INSTALLATION (TYPICAL OF 4)

40

THICK RUBBER FABRIC

ADDITIONAL 15 PLATE STIFFENERS AT BOTH


ENDS FOR PIPE 1100

550

550
580

U FITTING UNISTRUT NO P-5547, GRINNELL POWER-STRUT NO PS-2648 OR EQUAL (TYP)

POWER-STRUT NO PS-756 OR EQUAL

600 660 20 RADIUS 750 850 SEE NOTE 7


115

100 300 1015 150 330 480 100 300 10 20 150 350 530 100 300 10 20 150 400 580 150 300 10 20 150 450 660 150 300 10 20 150 480 680 150 450 15 25 200 530 790 150 450 15 25 200 600 900

150

(MIN)

DIAMETER AND LARGER F NON-SHRINK GROUT, G H SEE NOTE 3 20 CHAMFER SEE NOTE 7 (TYPICAL) 15mm DOWELS AT 300 EACH FACE CONCRETE PIER STRUCTURAL FLOOR (TYPICAL)

680 700 800 800 900

500 550 600 635 700

450 500 550 600 685


750

650 740 840

800 860 990

600 650 740

15 GALVANIZED CONCRETE ANCHOR, WITH NUT AND LOCKWASHER (TYPICAL) SEE SPECIFICATIONS 900 MAX NOTES: 1. 2. FOR FLANGED PIPES, USE EXTENDED PIPE SUPPORT AS SHOWN ON DETAIL M-103. THIS PIPE SUPPORT IS LIMITED FOR PIPES UP TO 50 DIAMETER, INCLUSIVE. 3. FOR ADDITIONAL REQUIREMENTS SEE
SPECIFICATION SECTION PIPE SUPPORTS.

C4 X 7.25 LENGTH TO SUIT SPACE AT 1520 OC MAXIMUM UNLESS OTHERWISE SHOWN

(MAX)

900

900
1050

860 1000 750 990 1140 840

B 1200 1350 1500 1650 1800

1050 790

1120 1270 940

NOTES : (typ) 8 FACE OF WALL 100 MAX 1. 2. THIS PIPE SUPPORT IS LIMITED FOR PIPES UP TO 100 DIAMETER, INCLUSIVE FOR ADDITIONAL REQUIREMENTS SEE
SPECIFICATION SECTION PIPE SUPPORTS

150 450 15 25 200 700 1020 1170

860

860 1200 1420 1000 900 1400 1500 1120

NOTES:

150 450 15 30 200 800 1040 1320 940

1. 2. 3.

FOR ADDITIONAL REQUIREMENTS SEE SPECIFICATION SECTION PIPE SUPPORTS. THIS PIPE SUPPORT IS LIMITED TO PIPE SIZES 15 THRU 300 DIAMETER. GALVANIZE ALL PARTS AFTER FABRICATION.

NOTES: 1. 2.
WHEN SUPPORTING PIPE AND FLANGE ALTERNATELY ON THE SAME LINE, CONCRETE PIERS FOR

150 450 15 30 200 840 1250 1420 1000 1000 1500 1680 1190 150 450 15 30 200 900 1350 1500 1090 1120 1600 1780 1270

PIPE SUPPORTS SHALL ALL HAVE THE SAME DIMENSION H FOR FLANGE SUPPORT PIPE SUPPORTS SHALL BE LOCATED IN PLAN AT POINTS MARKED THUS: (X) WHERE DIFFERENTIAL SETTLEMENT IS LIKELY TO OCCUR, OMIT GROUT AS DIRECTED BY THE ENGINEER GALVANIZE ALL PARTS AFTER FABRICATION WHERE DIRECTED BY THE STRUCTURAL ENGINEER, BOTTOM OF PIERS SHALL EXTEND BELOW BOTTOM OF SLAB WHERE PIPE SUPPORT OCCURS ON GRADE REFER TO STRUCTURAL DRAWINGS FOR DETAILS GALVANIZED ANCHOR BOLT OR CONCRETE ANCHOR WITH TWO NUTS AND ONE LOCKWASHER. PROVIDE BAR 100x15x100 WELDED TO BOLT. (TYP OF 4) SEE SPECIFICATIONS 3. 4. 5,

FACE OF WALL

FLUSH MOUNTED PIPE SUPPORT


M-102 (FOR PIPE 100 DIAMETER AND SMALLER) REV 042202

EXTENDED PIPE SUPPORT


M-103 (FOR PIPE 100 DIAMETER AND SMALLER) REV 042202

OVERHEAD PIPE SUPPORT


M-105 (FOR PIPE 300 DIAMETER AND SMALLER) REV 072501

PIPE SUPPORT PLINTH


M-109 (FOR PIPE 1800 DIAMETER AND SMALLER) REV 011402

6.
7.

LOAD

BOLT W/ LOCKWASHER (LENGTH AS

80 (TYPICAL)
POLYURETHANE SEALANT

OR CEILING

POWER-STRUT NO 2601 OR EQUAL (TYPICAL) PIPE CLAMP, GRINNELL/POWER-STRUT SERIES

LOAD D FLAT BAR WITH 2 BOLTS AND HEX NUTS. GALVANIZE AFTER FABRICATION PIPE
DIAMETER B C

REQUIRED) 80 (MINIMUM) LENGTH


3126, UNISTRUT 2558 OR EQUAL. WHEN USED

SEE NOTE 3 BELOW

HOLE DIAMETER 11 11 11 11 11 11 11 11
14

D FLAT BAR SIZE

RATING KG

FINISHED FLOOR

W/PVC OR FIBERGLASS PIPE, PROVIDE STEEL


32 (MINIMUM) TO SUIT

SHIELD WITH LOOSE FIT AROUND PIPE AT CLAMP. FOR COPPER TUBING, WRAP WITH 50 mm
WIDE STRIP OF RUBBER FABRIC (TYPICAL) GALVANIZED FRAMING SUPPORT , UNISTRUT SERIES

PROGRAM

25

20 25 32 5 40
B

150 158 170 178 210 225 230 250


266

63 65 70 80 81 87 95 100
108

5 X 32 5 X 32 5 X 32 5 X 32 8 X 32 8 X 32 8 X 32 8 X 32
8 X 32

86 86 86 86 190 190 190 190


276

(TYPICAL)

32 PROJECTION

P-5500, GRINNELL/POWER-STRUT SERIES PS-150 OR EQUAL AT 1525mm OC MAXIMUM UNLESS OTHERWISE NOTED (TYPICAL)

General Notes

1.

All dimensions in millimeters and all levels in


meters (GTS) unless shown otherwise.

50 65 80 90

25 THICK (MIN) PUMP BASE PLATE LEVELING PLATE 50 NON-SHRINK DRILL AND TAP TO OF PUMP BASE
PLATE

13mm DIAMETER GALVANIZED CONCRETE ANCHOR W/ NUT AND LOCKWASHER


(TYPICAL)

FACE OF WALL OR CEILING 101.6mm (MAXIMUM)


AS REQUIRED

FFL

GROUT 200 (MIN)

FLUSH MOUNT

SEE SPECIFICATIONS

MATCH BOLT SIZE WALL FLANGE. 8 THICK STEEL. MATERIAL SAME AS PIPE SLEEVE 25 CLEARANCE A 150 PIPE SLEEVE 8 THICK STEEL, MINIMUM. FOR PAINTING AND COATING SEE SPECIFICATIONS PIPE THRU FLOOR. FOR LINING AND COATING SEE SPECIFICATION GALVANIZED CONCRETE ANCHOR WITH HEX NUT AND LOCKWASHER (TYPICAL) SEE SPECIFICATIONS. 10 DIAMETER FOR 20 TO 90 DIAMETER PIPE
NOTE: 15 DIAMETER FOR 100 TO 200 DIAMETER PIPE 100

GALVANIZED FRAMING SUPPORT, UNISTRUT SERIES PS-150 OR EQUAL AT 1524mm OC


MAX UNLESS OTHERWISE NOTED (TYP) TO SUIT

C HOLE DIAMETER

100 (MINIMUM) BASE

130

298 360 420

120 135 160

14 14 14

8 X 32 10 X 40 10 X 40

276 394 394 OPENING REQUIRED TO ALLOW FOR REMOVAL OF PUMP COLUMN AND BOWLS,
SEE STRUCTUAL

13mm DIAMETER GALVANIZED CONCRETE

200 NOTES: 1. 2.

ANCHOR W/NUT AND LOCKWASHER (TYP) EMBEDMENT AS REQD


TO DEVELOP MAX BOLT Z FITTING, UNISTRUT SERIES P-1479,

WHERE SUBMERGED, PIPE CLAMP, ANCHORS, SHIELD, NUTS AND LOCKWASHER TO BE TYPE 316S31. WHEN USED WITH PVC OR FIBERGLASS PIPE, PROVIDE STEEL SHIELD WITH LOOSE FIT AROUND PIPE AT CLAMP. WRAP COPPER TUBING WITH 50 WIDE STRIP OF RUBBER AT CLAMP.

DRAWINGS 25 (MIN) TYPE 316S31


ANCHOR BOLT W/TWO

CAPACITY UNLESS OTHERWISE INDICATED

LENGTH

SERIES P-5500, GRINNELL/POWER-STRUT

GRINNELL/POWER-STRUT NO PS-3060 OR EQUAL (TYPICAL)


NOTES:

Sheet Notes

EXTENDED

THIS SLEEVE IS TO BE USED BETWEEN DRY SPACES ONLY


3.

TYPE 316S31 HEX NUTS AND LOCKWASHERS FOR LEVELING (MIN 4 REQD) SEE SPECS TYPE 316S31 NUT

1. TYPE 316S31 BAR 4 X 15 X 100 (MIN) TACK WELD TO BOLT

THIS PIPE SUPPORT IS LIMITED TO PIPES UP TO AND INCLUDING 150mm DIAMETER

MOUNT

FOR FLANGED PIPING, INCREASE B DIMENSION AS REQUIRED.

2. FOR ADDITIONAL REQUIREMENTS SEE


SPECIFICATION SECTION PIPE SUPPORTS.

4.

FOR PIPES SMALLER THAN 20 SEE STANDARD.

FLOOR PIPE SLEEVE


M-130 REV 061101

PIPE CLAMP FOR INDIVIDUAL PIPES


M-131 (FOR PIPE 200 DIAMETER AND SMALLER) REV 011502

VERTICAL PUMP SUPPORT PLINTH


M-135 REV 042202

PIPE SUPPORT FOR INDIVIDUAL


M-139

PIPES

REV 042202

Abbreviations

(FOR PIPE 150 DIAMETER AND SMALLER)

HANDCRANK OPERATED

50mm SQUARE OPERATING

INSULATING WASHER (TYPICAL FOR ALL BOLTS) STEEL WASHER


(TYPICAL FOR ALL BOLTS)

FLOOR STAND OR 50
SQUARE OPERATING

COMBINATION AIR VACUUM AND AIR RELEASE VALVE AS SPECIFIED (SEE NOTE)

DNXX GALVANIZED STEEL NIPPLES PN 16 BLIND FLANGE. DRILL AND TAP TO MATCH VALVE INLET, (SEE NOTE) PN 16 FLANGED

NUT. PROVIDE T WRENCH CAST IRON FLOOR BOX, WHERE SHOWN, INSTEAD OF FLOOR STAND FFL

NUT IN FLOOR BOX, STEEL TIE-BOLT, DOUBLE JAM NUTS MECHANICAL COUPLING AND WASHERS (TYPICAL) SEE NOTE 1 BELOW
AS SHOWN FOR ELEVATIONS

SEE DRAWINGS

INSULATING SLEEVE, LENGTH DESIGNED TO


EXTEND TO NUT FACE

OUTLET (SEE NOTE)


(LINING AND COATING SHALL

PN 16 STEEL BALL PVC PIPE SLEEVE TYPE 316S31 STAINLESS VALVE WITH SCREWED ENDS (SEE NOTE) STEEL GATE STEM ALTERNATIVE ACTUATION

MATCH MAIN PIPE). 50 SIZE AND SMALLER MAY HAVE HALF COUPLING INSTEAD OF FLANGED OUTLET DNX GALVANIZED

ON EACH SIDE OF FLANGE


PIPE OD

FULL FACE INSULATING GASKET

Current Issue Information

ADJUSTABLE STEM GUIDE. 3 METER OC (MAXIMUM) PIPELINE OR FITTING


ANCHOR BOLTS

150

STEEL PIPE, TO WETWELL THROUGH SLEEVED OPENING IN FLOOR AND PROVIDE PIPE SUPPORT AS REQUIRED THREADED COUPLING

CAST IRON WALL THIMBLE F SECTION DEPTH AS SHOWN

FLANGED X PLAIN END PIPE FLANGE (TYPICAL) MATING FLANGE OR FITTING SLUICE GATE, FLAT AS REQUIRED NOTES: 1.
2.

MAIN (LINING AND COATING AS SPECIFIED) INVERT, SEE DRAWINGS DNX PVC PIPING

FRAME OR FLANGED
FRAME SEE DRAWING

M-130

FLOOR PIPE SLEEVE

ABOVE GRADE INSULATING FLANGE INSTALLATION SHOWN


FOR BURIED INSULATING FLANGE INSTALLATION, DO NOT INSTALL

FOR SIZE

TYPE 441
NOTES: 1. 2.
SIZE AND NUMBER OF TIE-RODS ARE TO BE DETERMINED BY PUMP SHUTOFF PRESSURE

INSULATING WASHER ON PROTECTED SIDE OF INSULATING FLANGE 3. AFTER ASSEMBLING JOINT, COAT BURIED INSULATING FLANGES WITH COLD APPLIED, COAL TAR MASTIC AND WRAP WITH A BUTYL RUBBER ADHESIVE BACKED POLYETHYLENE TAPE
WALL MOUNTED FLAT FRAME OR FLANGED FRAME SLUICE GATE, DESCRIPTION:

NOTE:

TO WET WELL

FOR PIPING SYSTEM WITH SERVICE PRESSURE CLASS GREATER THAN PN 16 RATING. ALL COMPONENTS FURNISHED SHALL BE SUITABLE FOR THE HIGHER PRESSURE WITH FLOOR STAND OR 50 SQUARE NUT IN FLOOR BOX, DOWNWARD
CLOSING.

WHERE BURIED TIE-BOLTS, HEX NUTS AND WASHERS SHALL BE TYPE 316S 31 STAINLESS STEEL. MANUFACTURERS RECOMMENDED VALUE.

3. FOR COUPLING AT PUMP DISCHARGE, TOTAL ROD AREA SHALL BE INCREASED BY 2 TIMES THE

INSULATING FLANGE HARNESSED JOINT


M-156 REV 062801 M-160

PENSTOCK
M-210 REV 061401

AIR-VACUUM AND AIR-RELEASE


M-804

VALVE ASSEMBLY 80 AND SMALLER

REV 061801

19.04.06

CH

TA

AB

Tender Stage

28.03.06

CH

TA

AB

Tender Stage

SLEEVE OR

PIPE SLEEVE, MINIMUM 8 THICK STEEL PLATE, GALVANIZE AFTER FABRICATION(TYPICAL) SEE NOTE 2

ZUBEDIAH

CP1 516654.924 CP2 515883.917

3624969.785 3622755.221

8 THICK PLATE WALL FLANGE, SAME MATERIAL AS SLEEVE (TYPICAL)

1000 m3/hr

WASSIT
SLEEVE OR

ZUBEDIAH
1. SLEEVES ARE NOT REQUIRED IN CORE DRILLED WALLS, PENETRATIONS THROUGH EXISTING WALLS, OR FLOORS

STANDARD MECHANICAL 410_00375

DETAILS

MWH/UoB CONSULTING ENGINEERING BUREAU

01-203-5000

File:

N/A

A1

User:

STANDARD DESIGNS

tayva

DIMENSIONS IN MILLIMETERS

TYPE 316S31 STAINLESS STEEL HEX HEAD

FACE OF WALL

Z FITTING, UNISTRUT SERIES P-5545, GRINNELL/

Plot Date:

360^ WITH 50 WIDE STRIP OF 6

500

530

M-103
1200 x 1200 Roof Hatch Above Pump (Typ 4) Pipe Support

(Typ 23 Places)
28660

FLOW DIRECTION

50 NB Galvanized Steel Air Cleaning Pipeline (Typ 4) to Pier

MINISTRY OF MUNICIPALITIES & PUBLIC WORKS

RIVER

50 NB Galvanized Steel Air Cleaning Pipeline (Typ 4) from Pier

JIB Crane

Overhead Crane Travel

Pumphouse/Wet Wells

8017

A
2500

4337

Intake Screens

A
User: tayva User: tayva
C-302

50 NB Galvanized Steel Air Cleaning Pipe See Detail A Drawing 01-203-5004

STANDARD DESIGNS
Compressors and Receiver for

PROGRAM

Air-Cleaning System

General Notes

9191

OPERATORS ROOM

1.

All dimensions in millimeters and all levels in


meters (GTS) unless shown otherwise.

632

N 3,624,968.815 E 516,684.153 Surge Tank 1. There shall be an air cleaning pipelne for
Sheet Notes

each screen.

PLAN

EL.

25.4

Abbreviations

EL = Elevation

N 3,624,940.010 E 516,664.955
Motorized Hoist

F.F. EL = Finished Floor Level NB = Nomial Bore IL = Invert Level

6096 JIB Crane


Roof Hatch 2.0 tonne Traveling Bridge Crane (Over Each Pump) DETAIL

STANDARD DETAIL IDENTIFICATION


DETAIL NUMBER

Pump House

High Hook EL 31.39 M-103


4521

C-302

STANDARD

DETAILS

ARE

LOCATED

ON

01-203-5000

Current Issue Information

Pipe Support (Typ) High Hook EL 28.81


Pumphouse Details See Pier

See Note 1

Drawing 01-203-5002 & 5003 5300

PUMP HOUSE

EL 27.80

F.F. EL 25.4

Max River

Water Level Operating


Max Wet Well

Operating Water Level


Elevation 24.0M Air-Cleaning

Pipeline 50 NB 316S31 Air Cleaning Pipe


19.04.06 GW PH JW 1 Tender Stage

Elevation

24.0M

28.03.06 19.04.06

GW CH

PH TA

JW AB

0 1

Tender Stage Tender Stage

Concrete

Wet Well
28.03.06
CH TA AB

Tender Stage

10900

Min Wet Well


Operating Water Level
Water Level Operating

Min River

ZUBEDIAH

Elevation 18.27M

Elevation 18.5M

ZUBEDIAH

M-210

CP2 515883.917 1000 m3/hr

3622755.221

1000 m3/hr 600 x 600


Penstock

Low Hook EL 15.5

WASSIT

EL 14.50

IL 15.00

WASSIT

INTAKE AND RAW WATER

Low Hook EL 13.50

PUMPING STATION GENERAL ARRANGEMENT

Submersible Dewatering Pump


See Drawing 01-203-5003

MWH/UoB CONSULTING ENGINEERING BUREAU


400 NB Unseating Pennstock

See Drawing 01-203-5003

SECTION A-A
1 : 100
0m

A1

2m

4m

6m

8m

01-203-5001

File: 410_00375 File: 410_00375

ZUBEDIAH

File:

CP1 516654.924

3624969.785

410_00375

User:

tayva

Plot Date: Plot Date:

1137

Plot Date:

MINISTRY OF MUNICIPALITIES & PUBLIC WORKS

400 K14 DI (Typ) See Drawing


Plot Date: 50 NB Galvanized Steel Air Cleaning M-905 01-203-5003

M-103

Pipe Support (Typ 5 Plcs) M-905 Flapper Valve (Typ 2) 100 NB Sleeved Pipe Opening
20-V-36 20-V-35 50 NB Solenoid or Motor 203-44 Actuated Ball Valve (Typ 4)

Pipeline (Typ 4)
See Detail C DWG 01-203-5003

50 NB Sleeved Pipe Opening 150 150 (Typ 4 Plcs) Similar (Typ 2 Plcs) Similar

560

203-44

862.5

100 NB DI 20-SDG-02 20-SDG-05 (Note 3)


20-SDG-03

20-SDG-04

PSH/L
50 NB Galvanized 20-SDG-01 203-43

PI

1000 673 738

1000

Steel

230

203-43
Submersible

1321

(Note 2)

RW.CMP-20.1000

Dewatering Pump (Typ) RW.P-20.1001


1675 1675

Dewatering Pump (Typ) RW.P-20.1002

PROGRAM

General Notes

750-1000 Hatch See Detail B


Drawing 01-203-5003

OPERATORS ROOM

1.

All dimensions in millimeters and all levels in


meters (GTS) unless shown otherwise.

Sump Wall Sealed 914-914 Belco Type K


or Approved Equal Hatch (Typ)

Below (Typ)

M-210

Wet Well Walls

600 x 600 Pennstock with Operating Nut

Below (TYP)

In Floor Box.

Sheet Notes

1. For pipe schedule see drawing 01-203-5005


1637 787 1775 787 787 1775 788 See Note 4

2. Sluice gates 20-SDG-01,02,03 and 04 shall be handcrank operated floor stand.


3. Sluice gate 20-SDG-05 shall have an operating nut in the floor.

Suspended Bowl Pumps (Vertical Turbine Pumps)

4. See structural drawings for wet well wall details. 5. The pump lineshaft bearing lubrication flush line

RW.P-20.1020

RW.P-20.1030

RW.P-20.1010

RW.P-20.1040

is not shown for clarity. Please see P&IDs for more information.
Abbreviations

M-135

EL = Elevation NB = Nominal Bore


Vertical Pump Support Plinth (Typ)

356

Air Vacuum & Air Release 203-01 203-02 550 Valve Vent Piping to Wet Well (Typ 4) Connection for flush

STANDARD DETAIL IDENTIFICATION

water piping (not shown) typ


(See Note 5)

DETAIL NUMBER
DETAIL
C-302 C-302

203-03

M-156 300 NB DI 3840

1200 x 1200 Roof Hatch (Above each pump)

203-04
350

Pressure Switch Harnessed Joint (Typ)

STANDARD DETAILS ARE LOCATED ON 01-203-5000 20-V-20 (Below) 20-V-11 (Below)


PSH/L PI 1030

and Indicator (Typ 4) PSH/L 1040


PI

203-05

20-V-06 (Below)
432

PUMP ROOM

Current Issue Information

20-V-03 (Below)

1040

1030 PSH/L
1010

PI 1010 PSH/L
1020

PI 1020
20-AR-33

203-06 20-V-31 (base of 20-AR-31)


700

20-AR-34
20-V-34 (base of

20-AR-31

20-AR-32 20-V-32 20-V-04 (base of 20-AR-32)

20-V-33 (base of 20-AR-33) 20-V-09


M-109

50 NB Air Vacuum & Air Release Valve Vent Piping to Wet Well
RW-MOV-20.1000

20-AR-34) 20-V-12 M-804 Pipe Support Plinth (Typ 4 Plcs)


50 NB Air Vacuum

20-V-01

400 NB Cone Valve

M-804

w/ Actuator 20-V-15 (Sample) 20-AR-40


80 NB Air Vacuum & Air Release Valve (Typ)

546

& Air Release Valve (Typ)

M-160

203-07

1328

500 NB DI

203-16

20-V-40 (base of 20-AR-40) 203-18

203-19

Insulating Flange In Vertical


To Surge Tank For Continuation See Drawing 01-203-5005
04.19.06
TA TA AB

20-V-02

203

203-15 20-V-05 20-V-10 20-V-13

Tender Stage

03.04.06

TA

TA

AB

Add drain valve to discharge piping

03.04.06

TA

TA

AB

Rev pipe nos. & RW.CMP dimension

203-08

28.03.06

CH

TA

AB

Tender Stage

203-10
1137

203-14 203-11 987 1208

PIT 1000
PI

203-13 903

203-45

C 45%%d L

203-40

C 45%%d L

915

1001
838 924 1060 508 362 579 1505 375 203-19

ZUBEDIAH

CP1 516654.924 CP2 515883.917

3624969.785 3622755.221

203-09 (Typ 4)
2188 M-109

203-12 832
203-17

Valve Support Plinth

A
20-V-25
(Below - drain to soak

per manufacturers recommendation

M-130

1000 m3/hr

Floor Pipe
Sleeve

Pipe Support Plinth (Typ 6)

away outside of building)

WASSIT

ZUBEDIAH
RAW WATER PUMPING STATION 410_00375

PLAN

PLAN

EL.

25.4

MWH/UoB CONSULTING ENGINEERING BUREAU

0m

1m

2m

01-203-5002

File:

1 : 25

A1

User:

Submersible

Compressors and Receiver

STANDARD DESIGNS

tayva

MINISTRY OF MUNICIPALITIES & PUBLIC WORKS


Roof Hatch (Over Each Pump)

Anchor Bolts
Plot Date: 750 220

Thrust Flange

400 NB DI Pipe Spool

RW.CRN-20.1101 2.0 tonne Traveling Bridge Crane

PIPE IL.15.28

High Hook El 28.81 RW.CRN-20.1100 Bridge Crane Hoist

5300

220

600

3700

20-AR-33 203-02
PSH/L 1030 M-804 203-06 50 NB Air Vacuum 203-05 203-04 RW.P-20.1030 Suspended Bowl Pump (Vertical Turbine Pump)

DETAIL A
50 NB Galvanized Steel

PROGRAM
150 Dia hole for 1000 dewatering pump
General Notes

PI
1030

NTS

203-01

Air Cleaning Pipeline

discharge piping

1.

All dimensions in millimeters and all levels in


meters (GTS) unless shown otherwise.

150

& Air Release Valve 20-V-33

M-103 1370

Pipe Support

203-14

20-V-10
203-07

100 NB DI 203-43
26.04 26.01

Pump Discharge C L 500


750x1000 Dewatering

Dewatering Submersible Pump Access Hatch, Double leaf cover, 6.35 mm aluminum plate
reinforced for 735 kg/m2 live load

Sheet Notes

1.

For pipe schedule see drawing 01-203-5005

Pump Hatch
20-V-09

203-03

2. Standard sluice gate detail M-210 applies except that the "F" wall thimble should be replaced by the mechanical joint bell thimble for the

See Detail B

203-44

F.F. EL 25.4

connection to the ductle iron pipe. Lock and Handle 3.


Dimensions as recommended by pump manufacturer.

M-109

M-109
20-V-11 (Below) Pipe Support

Abbreviations

M-156

EL = Elevatoin
100 NB DI Dewatering Automatic Hold

Pipe Support Plinth

Pump Discharge Harnessed


50 NB PVC Air Vacuum & Joint

Open Arm

Guide Rail

NB = Nominal Bore
IL = Invert Level

Plinth

Maximum Wet Well Operating Water Elevation 24.00

F.F. EL = Finished Floor Elevation

Air Release Valve Vent Piping to Wet Well M-135 M-905 203-42
STANDARD DETAIL IDENTIFICATION

DETAIL NUMBER
Vertical Pump Support Plinth Sleeved Pipe Opening for Concrete Wet Walls (Method "C")

Dewatering Pump Hatch


C-302

DETAIL
C-302

203-46
XXX

10900

50

DETAIL B
01-203-5002
To Pier

STANDARD DETAILS ARE LOCATED ON 01-203-5000

Note 3 203-47
(One Air Cleaning Pipeline for Each
50

NTS

Current Issue Information

Screen)

Wall Spool

50

50

M-103

See Detail A Submersible Pump Guide Rails


1240

Pipe Support (typ) 50 NB Solenoid or Motor Actuated Ball Valve (typ)

Note 3

XXX

20-SDG-05

M-210
Opening For 600 x 600 Penstock

19.04.06

TA

TA

AB

Tender Stage

03.04.06

TA

TA

AB

Add drain valve to discharge piping

400 NB Unseating Penstock (Note 2)


150

150

03.04.06

TA

TA

AB

Renumbered Dewatering Piping

EL 14.50

Inlet Sill El 15.00

28.03.06
150 150

CH

TA

AB

Tender stage

150

228

1000

PSH/L 1000

PI

400

ZUBEDIAH

1000
CP1 516654.924 CP2 515883.917
150

Low Hook El. 13.50

250

150

3624969.785 3622755.221

15

50

1000 m3/hr

From Compressor
Submersible 1220

150

WASSIT
150

Dewatering Pump

295

ZUBEDIAH
RAW WATER PUMPING STATION

Air Cleaning Piping

SECTION A-A
01-203-5002

DETAIL C
01-203-5002 NTS

MWH/UoB CONSULTING ENGINEERING BUREAU

0m

1m

2m

01-203-5003

File:

1 : 25

A1

410_00375

SECTIONS & DETAILS

User:

STANDARD DESIGNS

tayva

MINISTRY OF MUNICIPALITIES & PUBLIC WORKS

50 NB 316S31 Air Cleaning Pipe Plot Date: M-103 (Typ 4) Note 1

723

50 NB Galvanized Steel Air Cleaning Pipe


Pipe Support 1775

(Typ 4) Note 1
tayva
C-302

630

480

M-103

M-160

Pipe Support (Typ 4 Places)

Insulating Flange

PROGRAM

50 NB Galvanized Steel Air Cleaning Pipe (Typ)

RW.JC-20.1110 JIB Crane


4500

General Notes

1.

All dimensions in millimeters and all levels in


meters (GTS) unless shown otherwise.

M-139 2175

Pipe Support
6096 (Typ 3 Plcs) 12070 U-Bolt

Sheet Notes

1. There shall be one air cleaning pipe for each screen. L 76x76x6x150 Long 2. Air cleaning connection varies between screen

(Typ 3 Plcs)

manufactures

A
Abbreviations

NB - Nominal Bore
Wire Rope 316S31

1775

50 NB 316S31
JIB Crane Hook Air Cleaning Pipe

STANDARD DETAIL IDENTIFICATION

DETAIL NUMBER DETAIL


C-302

Handling Link (Typ)

Dogging Link (Typ)

STANDARD DETAILS ARE LOCATED ON 01-203-5000

(Typ)

Current Issue Information

3M

316S31 S.S. Bolt (Typ)

(Typ)

3M

Intake Screen

3 Chain Links Between

Handling And Dogging


Links (Typ)

340 See Note 2 Chain & Links

As Reqd

19.04.06

CH

TA

AB

Tender Stage

28.03.06

CH

TA

AB

Tender Stage

SECTION A-A DETAIL A


01-203-5001

ZUBEDIAH

Wire Rope Sling

CP1 516654.924 CP2 515883.917

3624969.785 3622755.221

1000 m3/hr

Screen Section Copper Nickle

WASSIT

ZUBEDIAH
RAW WATER PUMPING STATION 410_00375

AIR CLEANING PIPE DETAILS & SECTIONS

MWH/UoB CONSULTING ENGINEERING BUREAU

SCREEN LIFTING CHAIN 316S31


0m 1m 2m

01-203-5004

File:

1 : 25

A1

User:

STANDARD DESIGNS

See Structural Details For Sizing and Rebar


General Dimensions Only Specific Dimensions Shall Be Details

Generator Packaged To Be

See Electrical Sheets For

Fill Pipe For Road Side Tank Filling.


Provide Scaffolding For Accessability

Secured To Pad Per Mfgs


Recommendations

Conduit And Connections Details, Enclosure Shall


Require Connections For Portable Loadbank To Be Used For Load Testing

Diesel Generator Notes:

MINISTRY OF MUNICIPALITIES
B
1. The Generator, Fuel Storage, and Fuel Supply System Shall Be Supplied By a

& PUBLIC WORKS

Coordinated With Mfg

Single Vendor To Work As a Packaged Unit. See Structural Details For 3000 Slab Sizing

2.

All Components Of The System Shall Be


Sized And Intergrated To Work As One. Components Shall Include Slab Sizing,

Equipment Tie Down System, Fuel Piping System, Operating Controls and Interlocks. 1000
3. Generator Enclosure Shall Be a N 3,624,930,802.53

Overflow Fuel Tank


195 3000 Diesel Generator 100

Vent Pipe

3000

E 516,653,832.75 Plot Date:

Manufacturers Packaged System, Sized Double Wall Fuel Tank With Leak Detection (Typ)
And Designed Foe Site Condition.

From Pumphouse For Continuation See drawing 01-203-5002

3165

Fuel to Day Tank


650

100

950

203-20

203-23
203-22

203-25

203-12 203-24

150

B
6000

203-12

203-21 1500 1750

For Detailed Pipeline Construction See Drawing 01-231-2019

For Additional Pumphouse Information see drawing 01-203-2204

Fuel Transfer Pump


DIESEL GENERATOR FUEL PIPING PLAN

See Specifications For


Other Enclosure Requirements Generator Enclosure

Transfer Pump And Fuel


Controls As Per Mfg Recommendations, Include Manual Pump For 632

Vent Pipe As Required 6607 By Codes

Piping Insulation and Heattrace, If Required By Site Condition

25 NB Pipe 150

Fuel Tank Components And


Appurtenances As Per Mfgr Requirements And Specifications

PROGRAM

Piping Supports as Mfg Recommendations Manway


General Notes

Subbase Day Tank Double Walled With Leak Detection 725


1450 Coordinated Fuel Pipe Sizing And Connections

600 Overflow Fuel Suction With

1.

All dimensions in millimeters and all levels in


meters (GTS) unless shown otherwise.

Concrete Pad
Diesel Generator

900

2. EL 25.55
RW.TR-20.1000

All coordinates in National Grid System which differs from WGS84 by shift DE=-287m, DN=283m

Double Poppet Valve And


Anti-syphon Valve

Surge Tank 150

SECTION B - B

Double Walled Fuel Piping With Containment Drain To Subbase Day Tank Leak Detection

PIPE SCHEDULE (continued)


203-33 Item no. 203-41

203-27
203-28 203-30 203-29
Sheet Notes

Dia.
300 NB

Material DI

Rating PN16

Description Flanged 90%%d Bend


Adapter Flanged Pipe 832 Long

Qty. Remarks

203-32

PIPE SCHEDULE

203-35

Standard

203-31

203-26 1

Item no. 203-01

Dia.

Material

Rating

Description

Qty. Remarks

203-36

300 NB

DI

PN16

Standard

(Flange Rotated 3%%d) 203-37


300 NB DI PN16 Single Flanged Spigot Pipe 375 Long 1 Cut to Suit

300 NB

DI

PN16

Flanged 250-300 Ecc Taper

Pump Discharge

203-02

300 NB

DI

PN16

Double Flanged Pipe 250 Long

---

203-38

300 NB

DI

PN16

Dresser Style 441 Harnessed Joint

Standard 203-34

203-34 N 3,624,921.396

203-03

300 NB

DI

PN16

Single Flanged Spigot Pipe 300 Long

Cut to Suit

203-39

300 NB

DI

PN16

Single Flanged Spigot Pipe 472 Long

Cut to Suit

(2) 25 ball valves (for level gauge)

E 516,658.453

Abbreviations

203-04

300 NB

DI

PN16

Dresser Style 441 Harnessed Joint

Standard

203-40

500 NB

DI

PN16

Double Flanged Pipe 2500 Long

---

NB - Nominal Bore FGL - Finished Ground Level

203-05

300 NB

DI

PN16

Single Flanged Spigot Pipe 350 Long

Cut to Suit

203-41

300 NB

DI

PN16

Flanged 45%%d Bend

Standard

203-06

300 NB

DI

PN16

Double Flanged Pipe 431 Long

---

203-42

100 NB

DI

PN16

Double Flanged Pipe 4000 Long

---

203-07

300 NB

DI

PN16

Double Flanged Pipe 546 Long

---

203-43

100 NB

DI

PN16

Flanged

Standard

203-08

500 NB

DI

PN16

Blind Flange

Standard

203-44

100 NB

DI

PN16

Double Flanged Pipe 1200 Long

---

203-09

500 NB

DI

PN16

All Flanged 500-500-300 Tee

Standard

203-45

500 NB

DI

PN16

Double Flanged Pipe 363 Long

Stanard
Manway 2500

203-10

500 NB

DI

PN16

Double Flanged Pipe 915 Long

---

203-46

100 NB

DI

PN16

Double Flanged Pipe 4000 Long

Stanard

203-11

500 NB

DI

PN16

Single Flanged Spigot Pipe 545 Long

Cut to Suit

203-47

100 NB

DI

PN16

Double Flanged Pipe 4000 Long

Stanard

Current Issue Information

A
203-12 500 NB DI PN16 Dresser Style 441 Harnessed Joint 4 Standard

VALVE SCHEDULE
203-13 500 NB DI PN16 Single Flanged Spigot Pipe 770 Long 1 Cut to Suit Item no.

6840

Dia.
300 NB

Material

Rating

Description
Swing Check Valve

Qty. Remarks Level Gauge 4 Standard

20-V-01,04 203-14 500 NB DI PN16 Double Flanged Pipe 914 Long 1 --09,12 20-V-02,05
203-15 500 NB DI PN16 Single Flanged Spigot Pipe 415 Long 1 Cut to Suit 10,13 20-V-03,06 11,20

DI

PN16 Flanged

300 NB

DI DI

PN16 Flanged PN16 Flanged

Butterfly Valve

Standard

50 NB

Gate Valve (Discharge pipe drain)

Standard

203-16

500 NB

DI

PN16

Single Flanged Spigot Pipe 415 Long

Cut to Suit

Manway

SURGE

TANK

PLAN

Manway

203-17

500 NB

DI DI

PN16 PN16

Flanged 500-400 Taper

20-V-15 Standard
20-V-14

25 NB

DI

PN16 Flanged

Gate Valve

Standard

203-18

500 NB

Flanged 500-400 Taper

Standard

300 NB

DI

PN16 Flanged

Butterfly Valve (manual)

Standard

30000 Litre Surge Tank

203-19

500 NB

DI

PN16

Flanged 45%%d Bend

Standard

20-V-16

50 NB

DI

PN16 Flanged

Gate Valve

Standard

203-20

500 NB

DI

PN16

Double Flanged Pipe 2637 Long

2140

---

20-V-25

50 NB

DI

PN16 Flanged

Gate Valve

Standard

20-V-16

19.04.06

TA

TA

AB

Tender Stage

203-21

500 NB

DI

PN16

Single Flanged Spigot Pipe 500 Long

Cut to Suit

20-V-31

50 NB

DI

PN16 Flanged

Gate Valve (at base of ARV)

Standard

03.04.06

TA

TA

AB

Add discharge pipe drain valves

03.04.06

TA

TA

AB

Add dewatering pump piping

203-22

500 NB

Single Flanged Spigot Pipe 500 Long

Cut to Suit

20-V-32

50 NB

DI

PN16 Flanged

Gate Valve (at base of ARV)

Standard

Concrete Pad
20-V-14

590

DI

PN16

Drain

EL 25.55

28.03.06

CH

TA

AB

Tender Stage

203-23

500 NB

DI

PN16

Double Flanged Pipe 2050 Long

---

20-V-33

50 NB

DI

PN16 Flanged

Gate Valve (at base of ARV)

Standard 203-39

203-24

500 NB

DI

PN16

Single Flanged Spigot Pipe 500 Long

Cut to Suit

20-V-34

50 NB

DI
DI

PN16 Flanged PN16 Flanged

Gate Valve (at base of ARV)

Standard

203-38
203-25 500 NB

1076

Tank Supports Shall Be Centered on Structural Pad.

ZUBEDIAH

DI

PN16

Single Flanged Spigot Pipe 500 Long

Cut to Suit

20-V-35

100 NB

Flapper Valve

Standard

203-37
203-36

CP1 516654.924 CP2 515883.917

3624969.785 3622755.221

203-26

500 NB

DI

PN16

Flanged 500x500x300 45%%d Wye

Standard

20-V-36

100 NB

DI

PN16 Flanged

Flapper Valve

Standard

203-27

300 NB

DI

PN16

Double Flanged Pipe 663 Long

---

20-V-40

80 NB

DI

PN16 Flanged

Gate Valve (at base of ARV)

Standard

203-35

1000 m3/hr

203-28

300 NB

DI

PN16

Single Flanged Spigot Pipe 500 Long

Cut to Suit

20-AR-31

50 NB

DI

PN16 Flanged

Air Vacuum / Air Release Valve

Standard

SECTION A - A

WASSIT

203-29

300 NB

DI

PN16

Single Flanged Spigot Pipe 500 Long

Cut to Suit

20-AR-32

50 NB

DI

PN16 Flanged

Air Vacuum / Air Release Valve

Standard

203-30

300 NB

DI

PN16

Double Flanged Pipe 3350 Long

---

20-AR-33

50 NB

DI

PN16 Flanged

Air Vacuum / Air Release Valve

Standard

ZUBEDIAH
RAW WATER PUMPING STATION

203-31

300 NB

Single Flanged Spigot Pipe 500 Long

DI

PN16 Flanged

203-32

300 NB

DI

PN16

Single Flanged Spigot Pipe 500 Long

Cut to Suit

20-AR-40 20-SDG-01

80 NB

DI ---

PN16 Flanged
11.4 Meters of Head

Air Vacuum / Air Release Valve

Standard Standard

MWH/UoB CONSULTING ENGINEERING BUREAU

---

203-33

300 NB

DI

PN16

Double Flanged Pipe 1329 Long

---

400 dia Unseating Penstock

20-SDG-02 20-SDG-03 ----11.4 Meters of Head


400 dia Unseating Penstock

203-34

300 NB

DI

PN16

Dresser Style 441 Harnessed Joint

Standard

20-SDG-04 20-SDG-05
-----

Standard

0m

2m

4m

11.4 Meters of Head

600x600 Unseating Penstock

Standard

01-203-5005

File:

1 : 50

A1

410_00375

DI

PN16

Cut to Suit

20-AR-34

50 NB

Air Vacuum / Air Release Valve

Standard

MISC PLANS & SECTIONS