DAFTAR PERINCIAN HARGA PEKERJAAN TAMBAH KURANG

PEKERJAAN LOKASI KONTRAK NOMOR : PEMBUATAN GEDUNG A2B : BANDAR UDARA CUT NYAK DIEN - NAGAN RAYA : PL.102/01/23/IX/2013 TANGGAL, 18 SEPTEMBER 2013
Volume No UraIan Vol. Satuan Analisa Harga Satuan (Rp.) Jumlah Harga (Rp.) Vol.Ter pasang tidak terpassang I II III A B C IV A B C D E F Pekerjaan Persiapan Pekerjaan Tanah dan Urugan Pekerjaan Struktur : Pek. Sub Struktur Pek. Upper Struktur Pek. Konstruksi Baja Pek. Arsitektur : Pek. Dinding Pek. Lantai Pek. Finishing Dinding Pek. Plafond Pek. Pengecatan Pek. Pintu Pek. Jendela G 1 2 3 4 5 6 7 Pek. Sanitair : Monoblok setara Toto lengkap Shower dinding Closet Jongkok Bak Air Fiber Glass uk. 80 x 80 cm Urinoir M57 toto Wastafe Gantung toto Jet washer 1 1 2 2 1 1 1 bh bh bh bh bh bh bh taksir taksir taksir taksir taksir taksir taksir 2,000,000 150,000 250,000 350,000 1,500,000 1,000,000 500,000 2,000,000 150,000 500,000 700,000 1,500,000 1,000,000 500,000 1 1 1 1 1 1 1 1 1 2,000,000 150,000 250,000 350,000 Tetap/tidak berubah Tetap/tidak berubah Tetap/tidak berubah Tetap/tidak berubah Tetap/tidak berubah Tetap/tidak berubah Tetap/tidak berubah Tetap/tidak berubah Tetap/tidak berubah Tetap/tidak berubah Tetap/tidak berubah Tetap/tidak berubah Total Harga Pengurangan (Rp.) Vol. Satuan Penambahan Harga Sat (Rp.) Jumlah Harga (Rp.)

8 9 10 11 12 13 H I 1 2 V

Pembatas urinoir frame alumu nium kaca 5 mm Kaca cermin uk. 80 x 100 cm Floor drain uk. 4" Zink Tap Toto Kitchen zink Kran Air acrilyc Pekerjaan Atap Pekerjaan Lain-Lain Meja Beton wastafel Lemari bawah meja wastafel Pek. Elektrikal Kabel Utama Kabel NYY 4 x 70 mm Panel 30 m' taksir 75,000 2,250,000 2 2 m' m' taksir taksir 3,500,000 2,000,000 7,000,000 2,000,000 1 2 3 1 1 4 bh bh bh bh bh bh taksir taksir taksir taksir taksir taksir Tetap/tidak berubah 500,000 750,000 25,000 2,000,000 1,500,000 150,000 500,000 1,500,000 75,000 2,000,000 1,500,000 600,000 4 1 1 1

` 1 2 1 1 750,000 50,000 2,000,000 1,500,000

1 bh wastafel -

1,000,000

1 2 3

MCB 16 AT, 3P MCB 6 AT, 1P MCB 10 AT, 3P Penerangan :

1 6 2

bh bh bh

taksir taksir taksir

175,000 75,000 150,000

175,000 75,000 150,000

1 2 3 4 5

TLD 2 x 36 w TLD 1 x 18 w Lampu Baret TL 20 w Lampu Donwlight PCL 2 x 18 w Lampu Baret pijar 60 w Saklar :

26 5 1 1 2

bh bh bh bh bh

taksir taksir taksir taksir taksir

125,000 100,000 175,000 75,000 200,000

3,250,000 500,000 175,000 75,000 400,000

22

2,750,000

1 2

Saklar tunggal 10 A Saklar ganda 10 A Stop Kontak :

5 7

bh bh

taksir taksir

50,000 75,000

250,000 525,000

Stop Kontak 10/200 W

10

bh

taksir

50,000

500,000

Instalasi : 1 2 3 4 Instalasi Penerangan Instalasi stop kontak Instalasi saklar tunggal Instalasi saklar ganda 35 10 5 7 ttk ttk ttk ttk taksir taksir taksir taksir 150,000 135,000 125,000 125,000 5,250,000 1,350,000 625,000 875,000

Pek. Tambahan :
1 2 3 4 5 6 7 Pembuatan Septiktank Pemasangan besi grill diatas salu ran depan gedung Pemasangan/penyambungan air bersih Pengadaan kabel NYY 4 x 70 mm Pengadaan panel listrik lengkap uk. 40 x 60 cm utk luar Pengadaan panel listrik lengkap uk. 30 x 40 cm utk di gedung Ongkos pemasangan kabel 10,800,000 1 1 unit pkt 750,000 1,500,000 750,000 1,500,000 10,800,000 1 unit 850,000 850,000 1 25 pkt m 1,300,000 75,000 1,300,000 1,875,000 8 mtr 350,000 2,800,000 1 unit 1,725,000 1,725,000

Menyetujui, Pejabat Pembuat Komitmen Bandara Cut Nyak Dien - Nagan Raya

Diperiksa Oleh : Direksi/Pengawas Bandara Cut Nyak Dien - Nagan Raya

Dibuat Oleh : Kontraktor Pelaksana CV. Nuansa Indah

ADITYA BRAMANDITA, SE Nip. 19800811 200502 1 001

ABDURRAHMAN 19581231 198103 1 027

NURUL AINI Direktris