Anda di halaman 1dari 2

UT Wall Thickness Inspection Report Location Line No. / Tag No. Description Surface Temp.

Measurement in Last Inspection: NO 1 2 3 4 5


6 7 8 9 Part Line TUBE (OUTLET) Post. No. 12

: HP SUPERHEATER TUBE : 1 - 10 : Tube (OUTLET) : Ambient : Ambient Date of Inspection:


Point Of Measurement 03 06

Report No Equip. Model Probe Cal. Block Couplant Nov 1, 2013


Minimum 09 Reading

: 12/UTG/DU/X/13 : Olympus : EPOCH 4 : SMTC 5-5 : Step Wadge & V2 : CMC


Surface Cond. Remarks

10

1 1 2 2 1 1 2 1 1 2

3 3 3 3 4 4 4 5 5 5

3.29 3.07 3.07 3.00 3.29 3.12 3.37 3.17 3.08 3.19

3.11 3.16 3.02 3.02 3.27 3.39 3.21 3.24 3.24 3.21

3.29 3.22 3.24 3.16 3.28 3.17 3.30 3.27 3.12 3.27

3.12 3.19 3.05 3.09 3.29 3.20 3.27 3.21 3.12 3.11

3.11 3.07 3.02 3.00 3.27 3.12 3.21 3.17 3.08 3.11

Smooth Smooth Smooth Smooth Smooth Smooth Smooth Smooth Smooth Smooth

Orientasi 12 9 6 3

Note:
Sm: Smooth Ro: Rough Ins : Insulated Pnt : Painted Br: Buried Ug: Underground MIC: Med. Int. Corr HIC: Heavy. Int. Corr RDM: Random SEC: Slight Ext. Corr MEC: Medium Ext. Corr HEC: Heavy Ext. Corr

DRAWING

HP SUPERHEATER

Sketch

Picture

AREA UT

= Area UT G

Anda mungkin juga menyukai