Conceptual Study as Owners Engineer to investigate: The gas pre-treatment on board of the LNG vessel for various raw gas specifications. LNG regasification on board of the LNG vessel using intermediate Fluid Ambient Air Vaporizers Transfer of feed gas using Torp Hi-Load Technology Ship to Ship LNG Transfer using flexible hoses Safety Analysis / Safety Review incl. HAZID & HAZOP HYSYS Simulations for all relevant Processes including Boil Off Gas Equipment Sizing and Selection Equipment Arrangement and Lay-out
Source: Torp
Client: Period: