Anda di halaman 1dari 1

4.

3 Mengira kos bahan, kos upah dan kos overhead


KOS BAHAN MENTAH
Bil

Bahan

1
2
3.
4.
5.
6.
7.
8.
9.
10.

Kayu berketam
Kayu berketam
Kayu berketam
Kayu berketam
Kayu berketam
Kayu berketam berlurah
Kayu berketam berlurah
Perspek bewarna
Bod MDF
Paip PVC bewarna

Saiz

Kuantiti

10 x 70 x 120
110 x 10 x 160
10 x 20 x 40
10 x 20 x 180
10 x 20 x 90
10 x 50 x 180
10 x 50 x 120
2 x 60 x 100
3 x 180 x 300
1 x 65

200
100
200
100
300
100
200
100
100
100

Harga seunit
(RM)
1.60
0.40
0.60
1.10
1.20
0.90
1.60
1.50
2.70
0.50
JUMLAH

Jumlah (RM)
320.00
400.00
120.00
110.00
360.00
90.00
320.00
150.00
270.00
50.00
RM 1210.00

KOS UPAH
Kos upah = Bilangan pekerja x jam x Kadar upah sejam
= 3 orang x 20 jam x RM 20.00
= RM 120.00
KOS OVERHEAD
Air = RM 10.00
Elektrik = RM 20.00
JUMLAH = RM 30.00
KOS PENGELUARAN
JUMLAH KOS PENGELUARAN = Kos Bahan + Kos Upah + kos Overhead
= RM 1210.00 + RM 120.00 + RM 30.00
= RM 1360.00
KOS PENGELUARAN (SEUNIT) = JUMLAH KOS PENGELUARAN / JUMLAH PENGELUARAN
= RM 1360.00 / 100
= RM 13.60 SEUNIT

Anda mungkin juga menyukai