ANALISA HARGA SATUAN

PROGRAM

: PENDIDIKAN MENENGAH

KEGIATAN

: PENYEDIAAN SARANA BELAJAR SMA/MA DAN SMK

PEKERJAAN

: PEMBANGUNAN SBI SMA KOTA xxxxxxxxx (Lanjutan)

LOKASI

: SMA KOTA xxxxxxxxx, Provinsi xxxxxxxxxxx

THN.ANGGARAN

: 20xx

JENIS PEKERJAAN

: PEMBONGKARAN BETON

SATUAN

: M3

NO
A.

URAIAN

SATUAN KUANTITAS

BAHAN

HARGA SATUAN
(Rp.)

HARGA PEKERJAAN
(Rp.)

60,000.00
49,500.00
52,000.00
B

12,000.00
396,000.00
5,200.00
413,200.00

Sub Total A

B.

UPAH
Tukang
Pekerja
Mandor

O/H
O/H
O/H

C.

ALAT

D.

Jumlah Harga ( A + B + C )

0.2000
8.0000
0.1000
Sub Total

Sub Total C

JENIS PEKERJAAN

: PEMBONGKARAN DINDING BATA

SATUAN

: M3

NO
A.

URAIAN

HARGA SATUAN
(Rp.)

HARGA PEKERJAAN
(Rp.)

2.0000
60,000.00
0.1000
49,500.00
Sub Total B

120,000.00
4,950.00
124,950.00

SATUAN KUANTITAS

BAHAN

413,200.00

Sub Total A

B.

UPAH
Tukang
Pekerja

C.

ALAT

D.

Jumlah Harga ( A + B + C )

O/H
O/H

Sub Total C

124,950.00

JENIS PEKERJAAN

: GALIAN TANAH

SATUAN

: M3

NO
A.

URAIAN

HARGA SATUAN
(Rp.)

HARGA PEKERJAAN
(Rp.)

0.4000
49,500.00
0.0400
52,000.00
Sub Total B

19,800.00
2,080.00
21,880.00

SATUAN KUANTITAS

BAHAN

Sub Total A

B.

UPAH
Pekerja
Mandor

O/H
O/H

C.

ALAT

D.

Jumlah Harga ( A + B + C )

Sub Total C

JENIS PEKERJAAN
SATUAN
NO
A.

21,880.00

: URUGAN TANAH KEMBALI


: M3

URAIAN

HARGA SATUAN
(Rp.)

HARGA PEKERJAAN
(Rp.)

0.1920
49,500.00
0.0192
52,000.00
Sub Total B

9,504.00
998.40
10,502.40

SATUAN KUANTITAS

BAHAN

Sub Total A

B.

UPAH
Pekerja
Mandor

C.

ALAT

D.

Jumlah Harga ( A + B + C )

O/H
O/H

Sub Total C

10,502.40

JENIS PEKERJAAN
SATUAN

: URUGAN PASIR DIBAWAH LANTAI & PONDASI


: M3
HARGA SATUAN
URAIAN
SATUAN KUANTITAS
(Rp.)

NO
A.

BAHAN
Pasir Urug

M3

1.0000

35,000.00

Sub Total A
B.

UPAH
Pekerja
Mandor

O/H
O/H

C.

ALAT

D.

Jumlah Harga ( A + B + C )

0.3000
49,500.00
0.0100
52,000.00
Sub Total B

Sub Total C

JENIS PEKERJAAN
SATUAN
NO
A.

B.

HARGA PEKERJAAN
(Rp.)

35,000.00
35,000

14,850.00
520.00
15,370.00

50,370.00

: PEK. URUGAN TANAH


: M3

URAIAN

SATUAN KUANTITAS

HARGA SATUAN
(Rp.)

HARGA PEKERJAAN
(Rp.)

BAHAN
Tanah Urug

M3

1.2000
35,000.00
Sub Total A

42,000.00
42,000.00

UPAH
Pekerja
Mandor

O/H
O/H

0.3000
49,500.00
0.0100
52,000.00
Sub Total B

14,850.00
520.00
15,370.00

C.

ALAT

D.

Jumlah Harga ( A + B + C )

Sub Total C

57,370.00

JENIS PEKERJAAN
SATUAN
NO

: PASANGAN BATU KOSONG


: M3

URAIAN

SATUAN KUANTITAS

HARGA SATUAN
(Rp.)

HARGA PEKERJAAN
(Rp.)

A.
1

BAHAN
Batu Belah / Kali

M3

1.2000
110,000.00
Sub Total A

132,000.00
132,000

B.
1
2

UPAH
Pekerja
Mandor

O/H
O/H

0.8000
49,500.00
0.1500
52,000.00
Sub Total B

39,600.00
7,800.00
47,400.00

C.

ALAT

D.

Jumlah Harga ( A + B + C )

Sub Total C

JENIS PEKERJAAN
SATUAN
NO
A.

B.

179,400.00

: PAS. BATU KALI SP. 1 Pc : 5 Ps


: M3

URAIAN
BAHAN
Batu Belah / Kali
Pasir Pasangan
Semen

M3
M3
Kg

UPAH
Tukang
Kepala Tukang
Pekerja
Mandor

O/H
O/H
O/H
O/H

C.

ALAT

D.

Jumlah Harga ( A + B + C )

HARGA SATUAN
(Rp.)

HARGA PEKERJAAN
(Rp.)

1.1000
110,000.00
0.5440
50,000.00
136.0000
1,200.00
Sub Total A

121,000.00
27,200.00
163,200.00
311,400.00

SATUAN KUANTITAS

0.6000
0.0600
1.5000
0.0750
Sub Total

60,000.00
75,000.00
49,500.00
52,000.00
B

Sub Total C

36,000.00
4,500.00
74,250.00
3,900.00
118,650.00

430,050.00

JENIS PEKERJAAN
SATUAN
NO
A.

B.

: BETON TUMBUK 1 : 3 : 5
: M3

URAIAN
BAHAN
Kerikil
Pasir Pasangan
Semen

M3
M3
Kg

UPAH
Tukang
Kepala Tukang
Pekerja
Mandor

O/H
O/H
O/H
O/H

C.

ALAT

D.

Jumlah Harga ( A + B + C )

HARGA SATUAN
(Rp.)

HARGA PEKERJAAN
(Rp.)

0.8700
90,000.00
0.5200
50,000.00
218.0000
1,200.00
Sub Total A

78,300.00
26,000.00
261,600.00
365,900

SATUAN KUANTITAS

0.2500
0.0250
1.6500
0.0800
Sub Total

60,000.00
75,000.00
49,500.00
52,000.00
B

Sub Total C

JENIS PEKERJAAN
SATUAN
NO
A.

15,000.00
1,875.00
81,675.00
4,160.00
102,710.00

468,610.00

: COR BETON BERTULANG 1 : 2 : 3


: M3

URAIAN
BAHAN
Kerikil
Pasir Pasangan
Semen

M3
M3
Kg

UPAH
Tukang
Kepala Tukang
Pekerja
Mandor

O/H
O/H
O/H
O/H

C.

ALAT

D.

Jumlah Harga ( A + B + C )

HARGA SATUAN
(Rp.)

HARGA PEKERJAAN
(Rp.)

0.7000
90,000.00
0.3900
50,000.00
319.0000
1,200.00
Sub Total A

63,000.00
19,500.00
382,800.00
465,300

SATUAN KUANTITAS

0.2500
0.0250
1.6500
0.0800
Sub Total

60,000.00
75,000.00
49,500.00
52,000.00
B

Sub Total C

15,000.00
1,875.00
81,675.00
4,160.00
102,710.00

568,010.00

JENIS PEKERJAAN
SATUAN
NO
A.

B.

: PEMBESIAN
: Kg

URAIAN
BAHAN
Besi beton
Kawat Beton

Kg
Kg

UPAH
Tukang
Kepala Tukang
Pekerja
Mandor

C.

ALAT

Jumlah Harga ( A + B + C )

HARGA SATUAN
(Rp.)

HARGA PEKERJAAN
(Rp.)

1.0500
10,000.00
0.0150
17,000.00
Sub Total A

10,500.00
255.00
10,755

SATUAN KUANTITAS

O/H
O/H
O/H
O/H

0.0070
0.0007
0.0070
0.0010
Sub Total

60,000.00
75,000.00
49,500.00
52,000.00
B

Sub Total C

JENIS PEKERJAAN
SATUAN
NO
A.

B.

C.

11,626.00

: BEKISTING
: M2

URAIAN

SATUAN KUANTITAS

HARGA SATUAN
(Rp.)

HARGA PEKERJAAN
(Rp.)

BAHAN
Kayu Bekisting
Paku campuran
Minyak Bekisting

M3
Kg
Ltr

0.0400
1,750,000.00
0.3000
17,000.00
0.1000
10,000.00
Sub Total A

69,984.25
5,100.00
1,000.00
76,084.25

UPAH
Tukang
Kepala Tukang
Pekerja
Mandor

O/H
O/H
O/H
O/H

0.2600
0.0260
0.3000
0.0050
Sub Total

15,600.00
1,950.00
14,850.00
260.00
32,660.00

60,000.00
75,000.00
49,500.00
52,000.00
B

ALAT
Sub Total C

420.00
52.50
346.50
52.00
871.00

Jumlah Harga ( A + B + C )

108,744.25

JENIS PEKERJAAN
SATUAN
NO
A.
B.
C.
D.

: BETON FOOT PLAT 1 : 2 : 3 PEMBESIAN 218 KG


: M3
HARGA SATUAN
URAIAN
SATUAN KUANTITAS
(Rp.)

Beton Bertulang 1 : 2 : 3
Pembesian
Cetakan Bekisting
Jumlah Harga ( A + B + C )

M
Kg
M

1.0000
218.0000
2.5000

568,010.00
11,626.00
108,744.25

568,010.00
2,534,468.00
271,860.63
3,374,338.63

JENIS PEKERJAAN
SATUAN
NO
A.
B.
C.
D.

: SLOOF BETON 15/20 1 : 2 : 3 PEMBESIAN 218 KG


: M3
HARGA SATUAN
URAIAN
SATUAN KUANTITAS
(Rp.)

HARGA PEKERJAAN
(Rp.)

Beton Bertulang 1 : 2 : 3
Pembesian
Cetakan Bekisting
Jumlah Harga ( A + B + C )

M
Kg
M

1.0000
218.0000
5.8333

568,010.00
11,626.00
108,744.25

568,010.00
2,534,468.00
634,337.83
3,736,815.83

JENIS PEKERJAAN
SATUAN
NO
A.
B.
C.
D.

: SLOOF BETON 20/30 1 : 2 : 3 PEMBESIAN 218 KG


: M3
HARGA SATUAN
URAIAN
SATUAN KUANTITAS
(Rp.)

HARGA PEKERJAAN
(Rp.)

Beton Bertulang 1 : 2 : 3
Pembesian
Cetakan Bekisting
Jumlah Harga ( A + B + C )

M
Kg
M

1.0000
218.0000
4.1667

568,010.00
11,626.00
108,744.25

568,010.00
2,534,468.00
453,104.67
3,555,582.67

JENIS PEKERJAAN
SATUAN
NO
A.
B.
C.
D.

: KOLOM BETON 30/40 1 : 2 : 3 PEMBESIAN 239 KG


: M3
HARGA SATUAN
URAIAN
SATUAN KUANTITAS
(Rp.)

HARGA PEKERJAAN
(Rp.)

Beton Bertulang 1 : 2 : 3
Pembesian
Cetakan Bekisting
Jumlah Harga ( A + B + C )

M
Kg
M

1.0000
239.0000
2.9167

568,010.00
11,626.00
108,744.25

568,010.00
2,778,614.00
317,174.35
3,663,798.35

JENIS PEKERJAAN
SATUAN
NO
A.
B.
C.
D.

: BALOK 30/55 1 : 2 : 3 PEMBESIAN 239 KG


: M3
HARGA SATUAN
URAIAN
SATUAN KUANTITAS
(Rp.)

HARGA PEKERJAAN
(Rp.)

Beton Bertulang 1 : 2 : 3
Pembesian
Cetakan Bekisting
Jumlah Harga ( A + B + C )

M
Kg
M

1.0000
239.0000
2.5758

568,010.00
11,626.00
108,744.25

HARGA PEKERJAAN
(Rp.)
568,010.00
2,778,614.00
280,103.44
3,626,727.44

JENIS PEKERJAAN
SATUAN
NO
A.
B.
C.
D.

: BALOK 30/45 1 : 2 : 3 PEMBESIAN 239 KG


: M3
HARGA SATUAN
URAIAN
SATUAN KUANTITAS
(Rp.)

Beton Bertulang 1 : 2 : 3
Pembesian
Cetakan Bekisting
Jumlah Harga ( A + B + C )

M
Kg
M

1.0000
239.0000
2.7780

568,010.00
11,626.00
108,744.25

568,010.00
2,778,614.00
302,091.53
3,648,715.53

JENIS PEKERJAAN
SATUAN
NO
A.
B.
C.
D.

: BALOK ANAK 25/40 1 : 2 : 3 PEMBESIAN 239 KG


: M3
HARGA SATUAN
URAIAN
SATUAN KUANTITAS
(Rp.)

HARGA PEKERJAAN
(Rp.)

Beton Bertulang 1 : 2 : 3
Pembesian
Cetakan Bekisting
Jumlah Harga ( A + B + C )

M
Kg
M

1.0000
239.0000
3.2500

568,010.00
11,626.00
108,744.25

568,010.00
2,778,614.00
353,418.81
3,700,042.81

JENIS PEKERJAAN
SATUAN
NO
A.
B.
C.
D.

: KOLOM PRAKTIS 11/11 1 : 2 : 3 PEMBESIAN 65 KG


: M3
HARGA SATUAN
URAIAN
SATUAN KUANTITAS
(Rp.)

HARGA PEKERJAAN
(Rp.)

Beton Bertulang 1 : 2 : 3
Pembesian
Cetakan Bekisting
Jumlah Harga ( A + B + C )

M
Kg
M

1.0000
65.0000
9.0909

568,010.00
11,626.00
108,744.25

568,010.00
755,690.00
988,583.10
2,312,283.10

JENIS PEKERJAAN
SATUAN
NO
A.
B.
C.
D.

: PLAT LANTAI 1 : 2 : 3 PEMBESIAN 85 KG


: M3
HARGA SATUAN
URAIAN
SATUAN KUANTITAS
(Rp.)

HARGA PEKERJAAN
(Rp.)

Beton Bertulang 1 : 2 : 3
Pembesian
Cetakan Bekisting
Jumlah Harga ( A + B + C )

M
Kg
M

1.0000
85.0000
10.0000

568,010.00
11,626.00
108,744.25

568,010.00
988,210.00
1,087,442.50
2,643,662.50

JENIS PEKERJAAN
SATUAN
NO
A.
B.
C.
D.

: PLAT PENUTUP SEPTICTANK 1 : 2 : 3 PEMBESIAN 85 KG


: M3
HARGA SATUAN
URAIAN
SATUAN KUANTITAS
(Rp.)

HARGA PEKERJAAN
(Rp.)

Beton Bertulang 1 : 2 : 3
Pembesian
Cetakan Bekisting
Jumlah Harga ( A + B + C )

M
Kg
M

1.0000
85.0000
10.0000

568,010.00
11,626.00
108,744.25

HARGA PEKERJAAN
(Rp.)
568,010.00
988,210.00
1,087,442.50
2,643,662.50

JENIS PEKERJAAN
SATUAN

: RING BALOK 11/25 1 : 2 : 3 PEMBESIAN 218 KG


: M3
HARGA SATUAN
URAIAN
SATUAN KUANTITAS
(Rp.)

NO
A.
B.
C.
D.

Beton Bertulang 1 : 2 : 3
Pembesian
Cetakan Bekisting
Jumlah Harga ( A + B + C )

M
Kg
M

1.0000
218.0000
6.5455

568,010.00
11,626.00
108,744.25

: RING BALOK 11/20 1 : 2 : 3 PEMBESIAN 218 KG


: M3
HARGA SATUAN
URAIAN
SATUAN KUANTITAS
(Rp.)

HARGA PEKERJAAN
(Rp.)
568,010.00
2,534,468.00
711,785.49
3,814,263.49

JENIS PEKERJAAN
SATUAN
NO
A.
B.
C.
D.

Beton Bertulang 1 : 2 : 3
Pembesian
Cetakan Bekisting
Jumlah Harga ( A + B + C )

M
Kg
M

1.0000
218.0000
7.7500

568,010.00
11,626.00
108,744.25

: LIST PLANK BETON 1 : 2 : 3 PEMBESIAN 85 KG


: M3
HARGA SATUAN
URAIAN
SATUAN KUANTITAS
(Rp.)

HARGA PEKERJAAN
(Rp.)
568,010.00
2,534,468.00
842,767.94
3,945,245.94

JENIS PEKERJAAN
SATUAN
NO
A.
B.
C.
D.

Beton Bertulang 1 : 2 : 3
Pembesian
Cetakan Bekisting
Jumlah Harga ( A + B + C )

JENIS PEKERJAAN
SATUAN
NO

M
Kg
M

1.0000
85.0000
10.0000

HARGA PEKERJAAN
(Rp.)

568,010.00
11,626.00
108,744.25

568,010.00
988,210.00
1,087,442.50
2,643,662.50

HARGA SATUAN
(Rp.)

HARGA PEKERJAAN
(Rp.)

70.0000
625.00
0.0040
50,000.00
14.3700
1,200.00
Sub Total A

43,750.00
200.00
17,244.00
61,194.00

: PAS. BATU BATA CAMP. 1 : 3


: M2

URAIAN

SATUAN KUANTITAS

A.
1
2
3

BAHAN
Batu Bata
Pasir Pasangan
Semen

Bh
M3
Kg

B.
1
2
3
4

UPAH
Tukang
Kepala Tukang
Pekerja
Mandor

O/H
O/H
O/H
O/H

C.

ALAT

D.

Jumlah Harga ( A + B + C )

0.1000
0.0100
0.3200
0.0150
Sub Total

60,000.00
75,000.00
49,500.00
52,000.00
B

Sub Total C

6,000.00
750.00
15,840.00
780.00
23,370.00

84,564.00

JENIS PEKERJAAN
SATUAN
NO

: PAS. BATU BATA CAMP. 1 : 5


: M2

URAIAN

HARGA SATUAN
(Rp.)

HARGA PEKERJAAN
(Rp.)

70.0000
625.00
0.0450
50,000.00
9.6800
1,200.00
Sub Total A

43,750.00
2,250.00
11,616.00
57,616.00

SATUAN KUANTITAS

A.
1
2
3

BAHAN
Batu Bata
Pasir Pasangan
Semen

Bh
M3
Kg

B.
1
2
3
4

UPAH
Tukang
Kepala Tukang
Pekerja
Mandor

O/H
O/H
O/H
O/H

C.

ALAT

D.

Jumlah Harga ( A + B + C )

0.1000
0.0100
0.3200
0.0150
Sub Total

60,000.00
75,000.00
49,500.00
52,000.00
B

Sub Total C

JENIS PEKERJAAN
SATUAN
NO

6,000.00
750.00
15,840.00
780.00
23,370.00

80,986.00

: PLESTERAN Sp. 1 : 3
: M2

URAIAN

SATUAN KUANTITAS

HARGA SATUAN
(Rp.)

HARGA PEKERJAAN
(Rp.)

950.00
7,776.00
8,726.00

A.
1
2

BAHAN
Pasir Pasangan
Semen

M3
Kg

0.0190
50,000.00
6.4800
1,200.00
Sub Total A

B.
1
2
3
4

UPAH
Tukang
Kepala Tukang
Pekerja
Mandor

O/H
O/H
O/H
O/H

0.1500
0.0150
0.2000
0.0100
Sub Total

C.

ALAT

D.

Jumlah Harga ( A + B + C )

60,000.00
75,000.00
49,500.00
52,000.00
B

Sub Total C

9,000.00
1,125.00
9,900.00
520.00
20,545.00

29,271.00

10

JENIS PEKERJAAN
SATUAN
NO

: PLESTERAN Sp. 1 : 5
: M2

URAIAN

SATUAN KUANTITAS

HARGA SATUAN
(Rp.)

HARGA PEKERJAAN
(Rp.)

1,000.00
5,184.00
6,184.00

A.
1
2

BAHAN
Pasir Pasangan
Semen

M3
Kg

0.0200
50,000.00
4.3200
1,200.00
Sub Total A

B.
1
2
3
4

UPAH
Tukang
Kepala Tukang
Pekerja
Mandor

O/H
O/H
O/H
O/H

0.1500
0.0150
0.2000
0.0100
Sub Total

C.

ALAT

D.

Jumlah Harga ( A + B + C )

60,000.00
75,000.00
49,500.00
52,000.00
B

Sub Total C

: MEMASANG DINDING KERAMIK 20x25 CM


: M2
HARGA SATUAN
URAIAN
SATUAN KUANTITAS
(Rp.)

9,000.00
1,125.00
9,900.00
520.00
20,545.00

26,729.00

JENIS PEKERJAAN
SATUAN
NO

HARGA PEKERJAAN
(Rp.)

A.
1
2
3
4

BAHAN
Keramik 20 x 25
Semen
Pasir Pasang
Semen Warna

Dos
Kg
M3
Kg

1.0000
40,000.00
9.3000
1,200.00
0.0180
50,000.00
1.5000
3,000.00
Sub Total A

40,000.00
11,160.00
900.00
4,500.00
56,560.00

B.
1
2
3
4

UPAH
Tukang
Kepala Tukang
Pekerja
Mandor

O/H
O/H
O/H
O/H

0.1000
0.0450
0.6000
0.0300
Sub Total

6,000.00
3,375.00
29,700.00
1,560.00
40,635.00

C.

ALAT

D.

Jumlah Harga ( A + B + C )

60,000.00
75,000.00
49,500.00
52,000.00
B

Sub Total C

97,195.00

11

JENIS PEKERJAAN
SATUAN

: MEMASANG LANTAI KERAMIK 20x20 CM


: M2
HARGA SATUAN
URAIAN
SATUAN KUANTITAS
(Rp.)

NO

A.
1
2
3
4

BAHAN
Keramik 20 x 20
Semen
Pasir Pasang
Semen Warna

Dos
Kg
M3
Kg

B.
1
2
3
4

UPAH
Tukang
Kepala Tukang
Pekerja
Mandor

O/H
O/H
O/H
O/H

C.

ALAT

D.

Jumlah Harga ( A + B + C )

1.0000
35,000.00
11.3800
1,200.00
0.0420
50,000.00
1.5000
3,000.00
Sub Total A

0.3500
0.0350
0.6200
0.0300
Sub Total

60,000.00
75,000.00
49,500.00
52,000.00
B

Sub Total C

: MEMASANG LANTAI KERAMIK 40x40 CM


: M2
HARGA SATUAN
URAIAN
SATUAN KUANTITAS
(Rp.)

HARGA PEKERJAAN
(Rp.)

35,000.00
13,656.00
2,100.00
4,500.00
55,256.00

21,000.00
2,625.00
30,690.00
1,560.00
55,875.00

111,131.00

JENIS PEKERJAAN
SATUAN
NO

HARGA PEKERJAAN
(Rp.)

A.
1
2
3
4

BAHAN
Keramik 40 x 40
Semen
Pasir Pasang
Semen Warna

Dos
Kg
M3
Kg

1.0000
70,000.00
9.8000
1,200.00
0.0215
50,000.00
1.3000
3,000.00
Sub Total A

70,000.00
11,760.00
1,075.00
3,900.00
86,735.00

B.
1
2
3
4

UPAH
Tukang
Kepala Tukang
Pekerja
Mandor

O/H
O/H
O/H
O/H

0.1200
0.0120
0.2500
0.0125
Sub Total

7,200.00
900.00
12,375.00
650.00
21,125.00

C.

ALAT

D.

Jumlah Harga ( A + B + C )

60,000.00
75,000.00
49,500.00
52,000.00
B

Sub Total C

107,860.00

12

JENIS PEKERJAAN
SATUAN
NO
A.

B.

: KUSEN PINTU /JENDELA KAYU KELAS I


: M3

URAIAN
BAHAN
Kayu Kls. I
Paku

M3
Kg

UPAH
Tukang
Kepala Tukang
Pekerja
Mandor

O/H
O/H
O/H
O/H

C.

ALAT

D.

Jumlah Harga ( A + B + C )

HARGA SATUAN
(Rp.)

HARGA PEKERJAAN
(Rp.)

1.2000
2,700,000.00
4.5000
17,000.00
Sub Total A

3,240,000.00
76,500.00
3,316,500.00

SATUAN KUANTITAS

18.0000
2.0000
6.0000
0.3000
Sub Total

60,000.00
75,000.00
49,500.00
52,000.00
B

Sub Total C

JENIS PEKERJAAN
SATUAN
NO
A.

4,859,100.00

: DAUN PINTU PANEL KAYU KELAS II


: M2

URAIAN
BAHAN
Kayu Kls. II

SATUAN KUANTITAS

M3

0.0400

HARGA SATUAN
(Rp.)

HARGA PEKERJAAN
(Rp.)

2,000,000.00

80,000.00

Sub Total A
B.

1,080,000.00
150,000.00
297,000.00
15,600.00
1,542,600.00

UPAH
Tukang
Kepala Tukang
Pekerja
Mandor

C.

ALAT

D.

Jumlah Harga ( A + B + C )

O/H
O/H
O/H
O/H

2.5000
0.2500
1.0000
0.0500
Sub Total

60,000.00
75,000.00
49,500.00
52,000.00
B

Sub Total C

80,000.00

150,000.00
18,750.00
49,500.00
2,600.00
220,850.00

300,850.00

13

JENIS PEKERJAAN
SATUAN

: DAUN JENDELA PANEL KACA KAYU KELAS II


: M2
HARGA SATUAN
URAIAN
SATUAN KUANTITAS
(Rp.)

NO
A.

BAHAN
Kayu Kls. II

M3

0.0350

2,000,000.00

Sub Total A
B.

UPAH
Tukang
Kepala Tukang
Pekerja
Mandor

C.

ALAT

D.

Jumlah Harga ( A + B + C )

O/H
O/H
O/H
O/H

2.0000
0.2000
0.8000
0.0400
Sub Total

60,000.00
75,000.00
49,500.00
52,000.00
B

Sub Total C

JENIS PEKERJAAN
SATUAN
NO
A.

HARGA PEKERJAAN
(Rp.)

70,000.00
70,000.00

120,000.00
15,000.00
39,600.00
2,080.00
176,680.00

246,680.00

: PAPAN JALUSI KAYU KELAS II


: M'

URAIAN

SATUAN KUANTITAS

HARGA SATUAN
(Rp.)

HARGA PEKERJAAN
(Rp.)

BAHAN
Kayu Kelas II
Paku Campuran

M3
Kg

0.0200
2,000,000.00
0.1250
17,000.00
Sub Total A

40,000.00
2,125.00
42,125.00

UPAH
Tukang
Kepala Tukang
Pekerja
Mandor

O/H
O/H
O/H
O/H

0.7800
0.2000
0.3000
0.0020
Sub Total

46,800.00
15,000.00
14,850.00
104.00
76,754.00

C.

ALAT

D.

Jumlah Harga ( A + B + C )

60,000.00
75,000.00
49,500.00
52,000.00
B

Sub Total C

118,879.00

14

JENIS PEKERJAAN
SATUAN
NO
A.

: KUDA-KUDA & GORDING KAYU KLS. II


: M3

URAIAN

SATUAN KUANTITAS

HARGA SATUAN
(Rp.)

HARGA PEKERJAAN
(Rp.)

BAHAN
Kayu klas II
Paku biasa
Besi strip

M3
Kg
Kg

1.1000
2,000,000.00
0.8000
17,000.00
15.0000
10,000.00
Sub Total A

2,200,000.00
13,600.00
150,000.00
2,363,600.00

UPAH
Tukang
Kepala Tukang
Pekerja
Mandor

O/H
O/H
O/H
O/H

12.0000
1.2000
4.0000
0.2000
Sub Total

720,000.00
90,000.00
198,000.00
10,400.00
1,018,400.00

C.

ALAT

D.

Jumlah Harga ( A + B + C )

60,000.00
75,000.00
49,500.00
52,000.00
B

Sub Total C

JENIS PEKERJAAN
SATUAN
NO

3,382,000.00

: PEK. RANGKA ATAP KAYU KELAS II


: M2

URAIAN

SATUAN KUANTITAS

HARGA SATUAN
(Rp.)

HARGA PEKERJAAN
(Rp.)

A.
1
2

BAHAN
Kayu klas II
Paku biasa

M3
Kg

0.0120
2,000,000.00
0.1500
17,000.00
Sub Total A

24,000.00
2,550.00
26,550.00

B
1
2
3
4

UPAH
Tukang
Kepala Tukang
Pekerja
Mandor

O/H
O/H
O/H
O/H

0.1000
0.0100
0.1000
0.0050
Sub Total

6,000.00
750.00
4,950.00
260.00
11,960.00

C.

ALAT

D.

Jumlah Harga ( A + B + C )

60,000.00
75,000.00
49,500.00
52,000.00
B

Sub Total C

38,510.00

15

JENIS PEKERJAAN

: PAS. ATAP SAKURA ROOF

SATUAN

: M2

NO

URAIAN

SATUAN KUANTITAS

HARGA SATUAN
(Rp.)

HARGA PEKERJAAN
(Rp.)

A.
1
2

BAHAN
Sakura Roof
Paku Genteng

Lbr
Kg

1.2000
36,000.00
0.0200
21,500.00
Sub Total A

43,200.00
430.00
43,630.00

B.
1
2
3
4

UPAH
Tukang
Kepala Tukang
Pekerja
Mandor

O/H
O/H
O/H
O/H

0.0600
0.0060
0.1200
0.0060
Sub Total

3,600.00
450.00
5,940.00
312.00
10,302.00

C.

ALAT

D.

Jumlah Harga ( A + B + C )

60,000.00
75,000.00
49,500.00
52,000.00
B

Sub Total C

JENIS PEKERJAAN
SATUAN
NO

53,932.00

: PAS. BUBUNGAN SAKURA ROOF


: M'

URAIAN

A.
1
2

BAHAN
Bubungan Sakura Roofl
Paku Genteng

B.
1
2
3
4

UPAH
Tukang
Kepala Tukang
Pekerja
Mandor

C.

ALAT

D.

Jumlah Harga ( A + B + C )

HARGA SATUAN
(Rp.)

HARGA PEKERJAAN
(Rp.)

1.2000
10,000.00
0.0500
21,500.00
Sub Total A

12,000.00
1,075.00
13,075.00

0.1000
0.0100
0.2500
0.0130
Sub Total

6,000.00
750.00
12,375.00
676.00
19,801.00

SATUAN KUANTITAS

M'
Kg

O/H
O/H
O/H
O/H

60,000.00
75,000.00
49,500.00
52,000.00
B

Sub Total C

32,876.00

16

JENIS PEKERJAAN
SATUAN
NO

: PAS. LIST PLANK PAPAN


: M'

URAIAN

SATUAN KUANTITAS

HARGA SATUAN
(Rp.)

HARGA PEKERJAAN
(Rp.)

150,000.00
1,020.00
151,020.00

A.
1
2

BAHAN
Kayu Kelas II
Paku Campuran

M3
Kg

0.0750
2,000,000.00
0.0600
17,000.00
Sub Total A

B.
1
2
3
4

UPAH
Tukang
Kepala Tukang
Pekerja
Mandor

O/H
O/H
O/H
O/H

0.2200
0.0220
0.1100
0.0050
Sub Total

C.

ALAT

D.

Jumlah Harga ( A + B + C )

60,000.00
75,000.00
49,500.00
52,000.00
B

Sub Total C

JENIS PEKERJAAN
SATUAN
NO

13,200.00
1,650.00
5,445.00
260.00
20,555.00

171,575.00

: RANGKA PALFOND
: M2

URAIAN

SATUAN KUANTITAS

HARGA SATUAN
(Rp.)

HARGA PEKERJAAN
(Rp.)

A.
1

BAHAN
Kayu klas II
Paku Campuran

M3
Kg

0.0110
2,000,000.00
0.0550
17,000.00
Sub Total A

22,000.00
935.00
22,935.00

B
1
2
3
4

UPAH
Tukang
Kepala Tukang
Pekerja
Mandor

O/H
O/H
O/H
O/H

0.1000
0.0100
0.1200
0.0060
Sub Total

6,000.00
750.00
5,940.00
312.00
13,002.00

C.

ALAT

D.

Jumlah Harga ( A + B + C )

60,000.00
75,000.00
49,500.00
52,000.00
B

Sub Total C

35,937.00

17

JENIS PEKERJAAN
SATUAN
NO

: PLAFOND TRIPLEKS
: M2

URAIAN

SATUAN KUANTITAS

HARGA SATUAN
(Rp.)

HARGA PEKERJAAN
(Rp.)

A.
1

BAHAN
Tripleks 3 mm
Paku Tripleks

Lbr
Kg

0.3472
39,000.00
0.0300
21,500.00
Sub Total A

13,541.67
645.00
14,186.67

B
1
2
3
4

UPAH
Tukang
Kepala Tukang
Pekerja
Mandor

O/H
O/H
O/H
O/H

0.1000
0.0100
0.0700
0.0030
Sub Total

6,000.00
750.00
3,465.00
156.00
10,371.00

C.

ALAT

D.

Jumlah Harga ( A + B + C )

60,000.00
75,000.00
49,500.00
52,000.00
B

Sub Total C

JENIS PEKERJAAN
SATUAN
NO

24,557.67

: LIST PLAFOND SP. 5


: M'

URAIAN

A.
1

BAHAN
Kayu Profil Sp. 5
Paku Campuran

B
1
2
3
4

UPAH
Tukang
Kepala Tukang
Pekerja
Mandor

C.

ALAT

D.

Jumlah Harga ( A + B + C )

HARGA SATUAN
(Rp.)

HARGA PEKERJAAN
(Rp.)

1.0500
3,500.00
0.1000
17,000.00
Sub Total A

3,675.00
1,700.00
5,375.00

0.0210
0.0020
0.0210
0.0010
Sub Total

1,260.00
150.00
1,039.50
52.00
2,501.50

SATUAN KUANTITAS

M'
Kg

O/H
O/H
O/H
O/H

60,000.00
75,000.00
49,500.00
52,000.00
B

Sub Total C

7,876.50

18

JENIS PEKERJAAN
SATUAN
NO
A.

: PAS. KUNCI PINTU


: Bh

URAIAN
BAHAN
Kunci Pintu

SATUAN KUANTITAS

Bh

HARGA SATUAN
(Rp.)

HARGA PEKERJAAN
(Rp.)

90,000.00

90,000.00

1.0000

Sub Total A
B.

UPAH
Tukang
Kepala Tukang
Pekerja
Mandor

C.

ALAT

D.

Jumlah Harga ( A + B + C )

O/H
O/H
O/H
O/H

0.2250
0.0225
0.0100
0.0050
Sub Total

90,000.00

60,000.00
75,000.00
49,500.00
52,000.00
B

Sub Total C

JENIS PEKERJAAN
SATUAN
NO
A.
1

13,500.00
1,687.50
495.00
260.00
15,942.50

105,942.50

: PAS. GRENDEL JENDELA


: Bh

URAIAN
BAHAN
Grendel Jendela

SATUAN KUANTITAS

Bh

HARGA SATUAN
(Rp.)

HARGA PEKERJAAN
(Rp.)

6,000.00

6,000.00

1.0000
Sub Total A

B.
1
2
3
4

UPAH
Tukang
Kepala Tukang
Pekerja
Mandor

C.

ALAT

D.

Jumlah Harga ( A + B + C )

O/H
O/H
O/H
O/H

0.1500
0.0150
0.0150
0.0008
Sub Total

60,000.00
75,000.00
49,500.00
52,000.00
B

Sub Total C

6,000.00

9,000.00
1,125.00
742.50
41.60
10,909.10

16,909.10

19

JENIS PEKERJAAN
SATUAN
NO
A.
1

: PAS. KAIT ANGIN


: Bh

URAIAN
BAHAN
Kait Angin

SATUAN KUANTITAS

Bh

HARGA SATUAN
(Rp.)

HARGA PEKERJAAN
(Rp.)

5,000.00

5,000.00

1.0000
Sub Total A

B.
1
2
3
4

UPAH
Tukang
Kepala Tukang
Pekerja
Mandor

C.

ALAT

D.

Jumlah Harga ( A + B + C )

O/H
O/H
O/H
O/H

0.1500
0.0150
0.0150
0.0008
Sub Total

60,000.00
75,000.00
49,500.00
52,000.00
B

Sub Total C

JENIS PEKERJAAN
SATUAN
NO
A.
1

5,000.00

9,000.00
1,125.00
742.50
41.60
10,909.10

15,909.10

: PAS. EXPANYOLET TANAM


: Bh

URAIAN
BAHAN
Expanyolet Tanam

SATUAN KUANTITAS

Bh

HARGA SATUAN
(Rp.)

HARGA PEKERJAAN
(Rp.)

45,000.00

45,000.00

1.0000

Sub Total A
B.
1
2
3
4

UPAH
Tukang
Kepala Tukang
Pekerja
Mandor

C.

ALAT

D.

Jumlah Harga ( A + B + C )

O/H
O/H
O/H
O/H

0.1500
0.0150
0.0150
0.0008
Sub Total

60,000.00
75,000.00
49,500.00
52,000.00
B

Sub Total C

45,000.00

9,000.00
1,125.00
742.50
41.60
10,909.10

55,909.10

20

JENIS PEKERJAAN
SATUAN
NO
A.
1

: PAS. ENGSEL PINTU PANEL


: Bh

URAIAN
BAHAN
Engsel Pintu

SATUAN KUANTITAS

Bh

HARGA SATUAN
(Rp.)

HARGA PEKERJAAN
(Rp.)

12,500.00

12,500.00

1.0000

Sub Total A
B.
1
2
3
4

UPAH
Tukang
Kepala Tukang
Pekerja
Mandor

C.

ALAT

D.

Jumlah Harga ( A + B + C )

O/H
O/H
O/H
O/H

0.1500
0.0150
0.0150
0.0008
Sub Total

60,000.00
75,000.00
49,500.00
52,000.00
B

Sub Total C

JENIS PEKERJAAN
SATUAN
NO
A.
1

12,500.00

9,000.00
1,125.00
742.50
41.60
10,909.10

23,409.10

: PAS. ENGSEL JENDELA


: Bh

URAIAN
BAHAN
Engsel Jendela

SATUAN KUANTITAS

Bh

HARGA SATUAN
(Rp.)

HARGA PEKERJAAN
(Rp.)

10,000.00

10,000.00

1.0000

Sub Total A
B.
1
2
3
4

UPAH
Tukang
Kepala Tukang
Pekerja
Mandor

C.

ALAT

D.

Jumlah Harga ( A + B + C )

O/H
O/H
O/H
O/H

0.1500
0.0150
0.0150
0.0008
Sub Total

60,000.00
75,000.00
49,500.00
52,000.00
B

Sub Total C

10,000.00

9,000.00
1,125.00
742.50
41.60
10,909.10

20,909.10

21

JENIS PEKERJAAN
SATUAN
NO

: PAS. PIPA PVC Dia. 4"


: M'

URAIAN

A.
1
2

BAHAN
Pipa PVC Dia. 4"
Perlengkapan

B.
1
2
3
4

UPAH
Tukang
Kepala Tukang
Pekerja
Mandor

C.

ALAT

D.

Jumlah Harga ( A + B + C )

HARGA SATUAN
(Rp.)

HARGA PEKERJAAN
(Rp.)

1.2000
35,000.00
35 % Harga Pipa
Sub Total A

42,000.00
12,250.00
54,250.00

SATUAN KUANTITAS

M'

O/H
O/H
O/H
O/H

0.1350
0.0135
0.0810
0.0041
Sub Total

60,000.00
75,000.00
49,500.00
52,000.00
B

Sub Total C

JENIS PEKERJAAN
SATUAN
NO

8,100.00
1,012.50
4,009.50
213.20
13,335.20

67,585.20

: PAS. PIPA PVC Dia. 3"


: M'

URAIAN

A.
1
2

BAHAN
Pipa PVC Dia. 3"
Perlengkapan

B.
1
2
3
4

UPAH
Tukang
Kepala Tukang
Pekerja
Mandor

C.

ALAT

D.

Jumlah Harga ( A + B + C )

HARGA SATUAN
(Rp.)

HARGA PEKERJAAN
(Rp.)

1.2000
25,000.00
35 % Harga Pipa
Sub Total A

30,000.00
8,750.00
38,750.00

SATUAN KUANTITAS

M'

O/H
O/H
O/H
O/H

0.1350
0.0135
0.0810
0.0041
Sub Total

60,000.00
75,000.00
49,500.00
52,000.00
B

Sub Total C

8,100.00
1,012.50
4,009.50
213.20
13,335.20

52,085.20

22

JENIS PEKERJAAN
SATUAN
NO

: PAS. PIPA PVC. 1/2"


: M'

URAIAN

A.
1
2

BAHAN
Pipa PVC Dia. 1/2"
Perlengkapan

B.
1
2
3
4

UPAH
Tukang
Kepala Tukang
Pekerja
Mandor

C.

ALAT

D.

Jumlah Harga ( A + B + C )

HARGA SATUAN
(Rp.)

HARGA PEKERJAAN
(Rp.)

1.2000
7,000.00
35 % Harga Pipa
Sub Total A

8,400.00
2,450.00
10,850.00

SATUAN KUANTITAS

M'

O/H
O/H
O/H
O/H

0.1350
0.0135
0.0810
0.0041
Sub Total

60,000.00
75,000.00
49,500.00
52,000.00
B

Sub Total C

JENIS PEKERJAAN
SATUAN
NO

8,100.00
1,012.50
4,009.50
213.20
13,335.20

24,185.20

: PAS. PIPA PVC. 3/4"


: M'

URAIAN

A.
1
2

BAHAN
Pipa PVC Dia. 3/4"
Perlengkapan

B.
1
2
3
4

UPAH
Tukang
Kepala Tukang
Pekerja
Mandor

C.

ALAT

D.

Jumlah Harga ( A + B + C )

HARGA SATUAN
(Rp.)

HARGA PEKERJAAN
(Rp.)

1.2000
9,000.00
35 % Harga Pipa
Sub Total A

10,800.00
3,150.00
13,950.00

SATUAN KUANTITAS

M'

O/H
O/H
O/H
O/H

0.1350
0.0135
0.0810
0.0041
Sub Total

60,000.00
75,000.00
49,500.00
52,000.00
B

Sub Total C

8,100.00
1,012.50
4,009.50
213.20
13,335.20

27,285.20

23

JENIS PEKERJAAN
SATUAN

: PAS. PIPA PVC. 1 1/2"


: M'

NO

URAIAN

A.
1
2

BAHAN
Pipa PVC Dia. 1/12"
Perlengkapan

B.
1
2
3
4

UPAH
Tukang
Kepala Tukang
Pekerja
Mandor

C.

ALAT

D.

Jumlah Harga ( A + B + C )

HARGA SATUAN
(Rp.)

HARGA PEKERJAAN
(Rp.)

1.2000
15,000.00
35 % Harga Pipa
Sub Total A

18,000.00
5,250.00
23,250.00

SATUAN KUANTITAS

M'

O/H
O/H
O/H
O/H

0.1350
0.0135
0.0810
0.0041
Sub Total

60,000.00
75,000.00
49,500.00
52,000.00
B

Sub Total C

JENIS PEKERJAAN
SATUAN
NO
A.
1

8,100.00
1,012.50
4,009.50
213.20
13,335.20

36,585.20

: PAS. MATA KRAN AIR


: Bh

URAIAN
BAHAN
Mata Kran

SATUAN KUANTITAS

Bh

HARGA SATUAN
(Rp.)

HARGA PEKERJAAN
(Rp.)

25,000.00

25,000.00

1.0000

Sub Total A
B.
1
2
3
4

UPAH
Tukang
Kepala Tukang
Pekerja
Mandor

C.

ALAT

D.

Jumlah Harga ( A + B + C )

O/H
O/H
O/H
O/H

0.1000
0.0100
0.0100
0.0050
Sub Total

60,000.00
75,000.00
49,500.00
52,000.00
B

Sub Total C

25,000.00

6,000.00
750.00
495.00
260.00
7,505.00

32,505.00

24

JENIS PEKERJAAN
SATUAN
NO
A.
1

: PAS. FLOOR DRAIN


: Bh

URAIAN
BAHAN
Floor Drain

SATUAN KUANTITAS

Bh

HARGA SATUAN
(Rp.)

HARGA PEKERJAAN
(Rp.)

12,000.00

12,000.00

1.0000

Sub Total A
B.
1
2
3
4

UPAH
Tukang
Kepala Tukang
Pekerja
Mandor

C.

ALAT

D.

Jumlah Harga ( A + B + C )

O/H
O/H
O/H
O/H

0.1000
0.0100
0.0100
0.0050
Sub Total

60,000.00
75,000.00
49,500.00
52,000.00
B

Sub Total C

JENIS PEKERJAAN
SATUAN
NO
A.
1
2

12,000.00

6,000.00
750.00
495.00
260.00
7,505.00

19,505.00

: PAS. KLOSET DUDUK


: Set

URAIAN
BAHAN
Kloset Duduk
Perlengkapan

SATUAN KUANTITAS

Set

1.0000

HARGA SATUAN
(Rp.)

HARGA PEKERJAAN
(Rp.)

1,750,000.00

1,750,000.00
105,000.00

Sub Total A
B.
1
2
3
4

UPAH
Tukang
Kepala Tukang
Pekerja
Mandor

C.

ALAT

D.

Jumlah Harga ( A + B + C )

O/H
O/H
O/H
O/H

1.1000
0.0010
3.3000
0.1600
Sub Total

60,000.00
75,000.00
49,500.00
52,000.00
B

Sub Total C

1,855,000.00

66,000.00
75.00
163,350.00
8,320.00
237,745.00

2,092,745.00

25

JENIS PEKERJAAN
SATUAN
NO
A.
1
2
3
4

: PAS. WASTAFEL
: Bh

URAIAN
BAHAN
Wastafel
Perlengkapan
Semen
Pasir Pasang

SATUAN KUANTITAS

HARGA SATUAN
(Rp.)

HARGA PEKERJAAN
(Rp.)

250,000.00
25,000.00
7,200.00
500.00

Bh

1.0000

250,000.00

Kg
M3

6.0000
0.0100

1,200.00
50,000.00

Sub Total A
B.
1
2
3
4

UPAH
Tukang
Kepala Tukang
Pekerja
Mandor

C.

ALAT

D.

Jumlah Harga ( A + B + C )

O/H
O/H
O/H
O/H

1.4500
0.1500
1.2000
0.1600
Sub Total

60,000.00
75,000.00
49,500.00
52,000.00
B

Sub Total C

JENIS PEKERJAAN
SATUAN
NO
A.
1
2
3
4
5
6

282,700.00

87,000.00
11,250.00
59,400.00
8,320.00
165,970.00

448,670.00

: MEMASANG INSTALASI LISTRIK


: TTK

URAIAN
BAHAN
Kawat NYYM 3 x 2.5 mm
Pipa PVC 5/8"
Klem PVC 1/2"
T.Dos PVC
Bok PVC
Isolatip

SATUAN KUANTITAS

M'
Ujg
Lot
Bh
Bh
Bh

HARGA SATUAN
(Rp.)

HARGA PEKERJAAN
(Rp.)

6,000.00
12,500.00
1,500.00
2,000.00
1,000.00
4,000.00

72,000.00
25,000.00
750.00
8,000.00
2,000.00
8,000.00

12.0000
2.0000
0.5000
4.0000
2.0000
2.0000

Sub Total A
B.
1
2
3
4

UPAH
Tukang
Kepala Tukang
Pekerja
Mandor

C.

ALAT

D.

Jumlah Harga ( A + B + C )

O/H
O/H
O/H
O/H

0.7500
0.0750
0.4000
Sub Total

60,000.00
75,000.00
49,500.00
52,000.00
B

Sub Total C

115,750.00

45,000.00
5,625.00
19,800.00
70,425.00

186,175.00

26

JENIS PEKERJAAN
SATUAN
NO
A.
1

: MEMASANG SAKLAR GANDA


: Bh

URAIAN
BAHAN
Saklar Ganda

SATUAN KUANTITAS

Bh

HARGA SATUAN
(Rp.)

HARGA PEKERJAAN
(Rp.)

20,000.00

20,000.00

1.0000

Sub Total A
B.
1
2
3
4

UPAH
Tukang
Kepala Tukang
Pekerja
Mandor

C.

ALAT

D.

Jumlah Harga ( A + B + C )

O/H
O/H
O/H
O/H

0.1500
0.0150
0.1000
Sub Total

60,000.00
75,000.00
49,500.00
52,000.00
B

Sub Total C

JENIS PEKERJAAN
SATUAN
NO
A.
1

20,000.00

9,000.00
1,125.00
4,950.00
15,075.00

35,075.00

: MEMASANG SAKLAR TUNGGAL


: Bh

URAIAN
BAHAN
Saklar Tunggal

SATUAN KUANTITAS

Bh

HARGA SATUAN
(Rp.)

HARGA PEKERJAAN
(Rp.)

15,000.00

15,000.00

1.0000

Sub Total A
B.
1
2
3
4

UPAH
Tukang
Kepala Tukang
Pekerja
Mandor

C.

ALAT

D.

Jumlah Harga ( A + B + C )

O/H
O/H
O/H
O/H

0.1500
0.0150
0.1000
Sub Total

60,000.00
75,000.00
49,500.00
52,000.00
B

Sub Total C

15,000.00

9,000.00
1,125.00
4,950.00
15,075.00

30,075.00

27

JENIS PEKERJAAN
SATUAN
NO
A.
1

: MEMASANG STOP KONTAK


: Bh

URAIAN
BAHAN
Stop Kontak

SATUAN KUANTITAS

Bh

HARGA SATUAN
(Rp.)

HARGA PEKERJAAN
(Rp.)

15,000.00

15,000.00

1.0000

Sub Total A
B.
1
2
3
4

UPAH
Tukang
Kepala Tukang
Pekerja
Mandor

C.

ALAT

D.

Jumlah Harga ( A + B + C )

O/H
O/H
O/H
O/H

0.1500
0.0150
0.1000
Sub Total

60,000.00
75,000.00
49,500.00
52,000.00
B

Sub Total C

JENIS PEKERJAAN
SATUAN
NO
A.
1

15,000.00

9,000.00
1,125.00
4,950.00
15,075.00

30,075.00

: MEMASANG LAMPU TL 20 WATT


: TTK

URAIAN
BAHAN
Lampu TL 20 Watt

SATUAN KUANTITAS

Bh

HARGA SATUAN
(Rp.)

HARGA PEKERJAAN
(Rp.)

45,000.00

45,000.00

1.0000

Sub Total A
B.
1
2
3
4

UPAH
Tukang
Kepala Tukang
Pekerja
Mandor

C.

ALAT

D.

Jumlah Harga ( A + B + C )

O/H
O/H
O/H
O/H

0.1500
0.0150
0.1000
Sub Total

60,000.00
75,000.00
49,500.00
52,000.00
B

Sub Total C

45,000.00

9,000.00
1,125.00
4,950.00
15,075.00

60,075.00

28

JENIS PEKERJAAN
SATUAN

: MEMASANG LAMPU PIJAR 15 WATT


: TTK

NO

URAIAN

A.
1

BAHAN
Lampu Pijar 15 Watt

SATUAN KUANTITAS

Bh

HARGA SATUAN
(Rp.)

HARGA PEKERJAAN
(Rp.)

10,000.00

10,000.00

1.0000

Sub Total A
B.
1
2
3
4

UPAH
Tukang
Kepala Tukang
Pekerja
Mandor

C.

ALAT

D.

Jumlah Harga ( A + B + C )

O/H
O/H
O/H
O/H

0.1500
0.0150
0.1000
Sub Total

60,000.00
75,000.00
49,500.00
52,000.00
B

Sub Total C

JENIS PEKERJAAN
SATUAN
NO
A.
1

10,000.00

9,000.00
1,125.00
4,950.00
15,075.00

25,075.00

: MEMASANG PANEL BOX


: Bh

URAIAN
BAHAN
Panel Box

SATUAN KUANTITAS

Bh

HARGA SATUAN
(Rp.)

HARGA PEKERJAAN
(Rp.)

100,000.00

100,000.00

1.0000

Sub Total A
B.
1
2
3
4

UPAH
Tukang
Kepala Tukang
Pekerja
Mandor

C.

ALAT

D.

Jumlah Harga ( A + B + C )

O/H
O/H
O/H
O/H

0.3750
0.0375
0.2500
Sub Total

60,000.00
75,000.00
49,500.00
52,000.00
B

Sub Total C

100,000.00

22,500.00
2,812.50
12,375.00
37,687.50

137,687.50

29

JENIS PEKERJAAN
SATUAN
NO
A.

B.

: PENGECATAN DINDING & PLAFOND


: M2

URAIAN
BAHAN
Plamir Dinding
Cat Dasar
Cat Penutup 2x

Kg
Kg
Kg

Upah
Tukang
Kepala Tukang
Pekerja
Mandor

O/H
O/H
O/H
O/H

C.

ALAT

D.

Jumlah Harga ( A + B + C )

HARGA SATUAN
(Rp.)

HARGA PEKERJAAN
(Rp.)

0.1000
7,000.00
0.1000
15,000.00
0.2600
15,000.00
Sub Total A

700.00
1,500.00
3,900.00
6,100.00

0.0630
0.0063
0.0200
0.0025
Sub Total

3,780.00
472.50
990.00
130.00
5,372.50

SATUAN KUANTITAS

60,000.00
75,000.00
49,500.00
52,000.00
B

Sub Total C

JENIS PEKERJAAN
SATUAN
NO
A.

B.

11,472.50

: MENGECAT MENGKILAP
: M2

URAIAN
BAHAN
Plamir kayu
Cat dasar
Cat Penutup 2x

Kg
Kg
Kg

UPAH
Tukang
Kepala Tukang
Pekerja
Mandor

O/H
O/H
O/H
O/H

C.

ALAT

D.

Jumlah Harga ( A + B + C )

HARGA SATUAN
(Rp.)

HARGA PEKERJAAN
(Rp.)

0.1500
7,000.00
0.1700
32,500.00
0.2800
32,500.00
Sub Total A

1,050.00
5,525.00
9,100.00
15,675.00

0.1050
0.0040
0.0700
0.0025
Sub Total

6,300.00
300.00
3,465.00
130.00
10,195.00

SATUAN KUANTITAS

60,000.00
75,000.00
49,500.00
52,000.00
B

Sub Total C

25,870.00
xxxxxxx, 16 Juni 20xx

Mengetahui,
CV.xxxxxxxx

Dibuat Oleh,
CV.xxxxxxxx

xxxxxxxxx
Direktur

xxxxxxxxx
Pimpinan Teknik

30

#REF!
#REF!
#REF!
#REF!

31

#REF!

#REF!

376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00

10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04

376,486,000.00

10.04

376,486,000.00

10.04

376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00

10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04

32

#REF!

376,486,000.00

10.04

376,486,000.00

10.04

376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00

10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04

33

376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00

10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04

#REF!

34

376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00

10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04

35

376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00

10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04 Bj (Kg/m3)
10.04
1,800
10.04
1,800
10.04
1,400
10.04
2,250
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04

Koef.
13.18
13.18
463.06

1.05
0.63
5.85

36

0.4
1.00

376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00

10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04

37

376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00

10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04

0.0144 M2
69.44 M1
Pjg besi
277.78

Bj bs/m1
Berat besi /1m3
0.887
246.39

0.0144 M2
69.44 M1
Pjg besi
277.78

Bj bs/m1
Berat besi /1m3
0.887
246.39

0.0144 M2
69.44 M1
Pjg besi
277.78

Bj bs/m1
Berat besi /1m3
0.887
246.39

0.0144 M2
69.44 M1
Pjg besi
277.78

Bj bs/m1
Berat besi /1m3
0.887
246.39

0.0144 M2
69.44 M1
Pjg besi
277.78

Bj bs/m1
Berat besi /1m3
0.887
246.39

38

376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00

10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04

0.0144 M2
69.44 M1
Pjg besi
277.78

Bj bs/m1
Berat besi /1m3
0.887
246.39

0.0144 M2
69.44 M1
Pjg besi
277.78

Bj bs/m1
Berat besi /1m3
0.887
246.39

0.0144 M2
69.44 M1
Pjg besi
277.78

Bj bs/m1
Berat besi /1m3
0.887
246.39

0.0144 M2
69.44 M1
Pjg besi
277.78

Bj bs/m1
Berat besi /1m3
0.887
246.39

0.0144 M2
69.44 M1
Pjg besi
277.78

Bj bs/m1
Berat besi /1m3
0.887
246.39

39

376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
luas din dlm 1M3
376,486,000.00
376,486,000.00
Luas bt bata +376,486,000.00
spesi
Jmlh bt
376,486,000.00
Spesi :
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00

10.04
10.04
10.04
10.04
10.04
0.0144 M2
10.04
69.44 M1
10.04
10.04
Pjg besi
Bj bs/m1
Berat besi /1m3
10.04
277.78
0.887
246.39
10.04
10.04
10.04
10.04
10.04
10.04
0.0144 M2
10.04
69.44 M1
10.04
10.04
Pjg besi
Bj bs/m1
Berat besi /1m3
10.04
277.78
0.887
246.39
10.04
10.04
10.04
10.04
10.04
10.04
0.0144 M2
10.04
69.44 M1
10.04
10.04
Pjg besi
Bj bs/m1
Berat besi /1m3
10.04
277.78
0.887
246.39
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04 bata
spesi
10.04
0.0115
376486000
10.04
10.04
% thdp pasangan bata
10.04 Zak
1.00000
10.04
10.04 M3
1.00000
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04

40

376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
luas din dlm 1M3
376,486,000.00
376,486,000.00
Luas bt bata +376,486,000.00
spesi
Jmlh bt
376,486,000.00
Spesi :
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00

10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04 bata
spesi
10.04
0.0115
376486000
10.04
10.04
% thdp pasangan bata
10.04 Zak
1.00000
10.04
10.04 M3
1.00000
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04

41

376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00

10.04
10.04
10.04
10.04
10.04

376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00

10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04

376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00

10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04

42

376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00

10.04
10.04
10.04
10.04
10.04

376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00

10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04

376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00

10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04

43

376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00

10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04

44

376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00

10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04

45

376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00

10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04

46

376,486,000.00

10.04

376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00

10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04

1.0200

47

376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00

10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04

48

376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00

10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04

49

376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00

10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04

50

376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00

10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04

51

376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00

10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04

52

376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00

10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04

53

376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00

10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04

54

376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00

10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04

55

376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00

10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04

56

376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00

10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04

57

376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00

10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04

58

376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00

10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04

59

376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00

10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04

60

376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
376,486,000.00
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!

10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
10.04
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!

61

#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!

#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!

62

DAFTAR HARGA SATUAN BAHAN


PROGRAM
KEGIATAN
PEKERJAAN
LOKASI
THN.ANGGARAN
NO.
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29

:
:
:
:
:

PENDIDIKAN MENENGAH
PENYEDIAAN SARANA BELAJAR SMA/MA DAN SMK
PEMBANGUNAN SBI SMA KOTA xxxxxxxxx (Lanjutan)
SMA KOTA xxxxxxxxx, Provinsi xxxxxxxxxxx
20xx

U R A I A N
Kayu Kls. I
Kayu Kls II
Kayu Bekisting
Batu Kali / Batu Belah
Batu Bata
Kerikil
Pasir Pasang
Pasir Urug
Tanah Urug
Semen
Semen Warna
Lantai Keramik 20 x 20 Cm
Dinding Keramik 20 x 25 Cm
Keramik Lantai 40 x 40 cm
Besi Beton
Kawat Beton
Sakura Roof
Bubungan Sakura Roof
Tripleks 3 mm
Besi Strip
Profil Sp. 5
Paku campuran
Paku Tripleks
Paku Genteng
Pipa PVC 1/2"
Pipa PVC 3/4"
Pipa PVC 1 1/2"
Pipa PVC 3"
Pipa PVC 4"

SATUAN
M3
M3
M3
M3
Bh
M3
M3
M3
M3
Kg
Kg
Dos
Dos
Dos
Kg
Kg
Lbr
M'
Lbr
Kg
M'
Kg
Kg
Kg
M'
M'
M'
M'
M'

HARGA SATUAN
(Rp.)
2,700,000.00
2,000,000.00
1,750,000.00
110,000.00
625.00
90,000.00
50,000.00
35,000.00
35,000.00
1,200.00
3,000.00
35,000.00
40,000.00
70,000.00
10,000.00
17,000.00
36,000.00
10,000.00
39,000.00
10,000.00
3,500.00
17,000.00
21,500.00
21,500.00
7,000.00
9,000.00
15,000.00
25,000.00
35,000.00

KET.

NO.
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
51
52
53
54
55
56

U R A I A N
Wastafel
Kloset Duduk
Mata Kran
Floor Drain
Minyak Bekisting
Plamir Dinding
Plamir Kayu
Cat tembok
Cat Mengkilap
Kunci Tanam
Grendel Jendela
Kait Angin
Expanyolet Tanam
Engsel Pintu Lengkap 4"
Engsel Jendela Lengkap 3"
Saklar Ganda
Saklar Tunggal
Stop Kontak
Lampu TL 20 Watt
Lampu Pijar 15 Watt
Panel Box
Kawat NYYM 3 x 2.5 mm
Pipa PVC 5/8"
Klem PVC 1/2"
T.Dos PVC
Bok PVC
Isolatip

SATUAN
Set
Set
Bh
Bh
Liter
Kg
Kg
Kg
Kg
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
M'
Ujg
Lot
Bh
Bh
Bh

HARGA SATUAN
(Rp.)
250,000.00
1,750,000.00
25,000.00
12,000.00
10,000.00
7,000.00
7,000.00
15,000.00
32,500.00
90,000.00
6,000.00
5,000.00
45,000.00
12,500.00
10,000.00
20,000.00
15,000.00
15,000.00
45,000.00
10,000.00
100,000.00
6,000.00
12,500.00
1,500.00
2,000.00
1,000.00
4,000.00

xxxxxxx, 16 Juni 20xx


Mengetahui,
CV.xxxxxxxx

Dibuat Oleh,
CV.xxxxxxxx

xxxxxxxxx
Direktur

xxxxxxxxx
Pimpinan Teknik

KET.

DAFTAR HARGA SATUAN UPAH


PROGRAM
KEGIATAN
PEKERJAAN
LOKASI
THN.ANGGARAN
NO.

:
:
:
:
:

PENDIDIKAN MENENGAH
PENYEDIAAN SARANA BELAJAR SMA/MA DAN SMK
PEMBANGUNAN SBI SMA KOTA xxxxxxxxx (Lanjutan)
SMA KOTA xxxxxxxxx, Provinsi xxxxxxxxxxx
20xx

U R A I A N

SATUAN

HARGA
(Rp.)

Tukang

O/H

60,000.00

Kepala Tukang

O/H

75,000.00

Pekerja

O/H

49,500.00

Mandor

O/H

52,000.00

xxxxxxx, 16 Juni 20xx


Mengetahui,
CV.xxxxxxxx

Dibuat Oleh,
CV.xxxxxxxx

xxxxxxxxx
Direktur

xxxxxxxxx
Pimpinan Teknik

KET.

DAFTAR HARGA SATUAN PERALATAN

PROGRAM
KEGIATAN
PEKERJAAN
LOKASI
THN.ANGGARAN

NO.

:
:
:
:
:

PENDIDIKAN MENENGAH
PENYEDIAAN SARANA BELAJAR SMA/MA DAN SMK
PEMBANGUNAN SBI SMA KOTA xxxxxxxxx (Lanjutan)
SMA KOTA xxxxxxxxx, Provinsi xxxxxxxxxxx
20xx

U R A I A N

SATUAN

HARGA
(Rp.)

Beton Mollen

Hari

250,000.00

Dump Truck

Hari

450,000.00

Stamper

Hari

200,000.00

Pompa Air

Hari

100,000.00

xxxxxxx, 16 Juni 20xx


Mengetahui,
CV.xxxxxxxx

Dibuat Oleh,
CV.xxxxxxxx

xxxxxxxxx
Direktur

xxxxxxxxx
Pimpinan Teknik

KET.

SKEMA PENGGUNAAN BAHAN


PROGRAM
KEGIATAN
PEKERJAAN
LOKASI
THN.ANGGARAN

:
:
:
:
:

PENDIDIKAN MENENGAH
PENYEDIAAN SARANA BELAJAR SMA/MA DAN SMK
PEMBANGUNAN SBI SMA KOTA xxxxxxxxx (Lanjutan)
SMA KOTA xxxxxxxxx, Provinsi xxxxxxxxxxx
20xx
B U L A N

NO.

U R A I A N
1

KAYU KELAS I

KAYU KELAS II

KAYU KELAS III

BATU KALI

BATU BATA

PASIR PASANG

PASIR URUG & TANAH URUG

SEMEN

II
3

III
3

IV
3

Keterangan
3

Jangka Waktu
Pelaksanaan 120
(Seratus Dua Puluh)
Hari Kalender

BESI BETON, KAWAT BETON, MINYAK BEKEISTING

10

ATAP SAKURA ROOF & BUBUNGAN

11

PAKU

12

PLAMIR, CAT DINDING, CAT MINYAK

13

TRIPLEKS

14

PROFIL

15

PENGGANTUNG PINTU & JENDELA

xxxxxxx, 16 Juni 20xx


Mengetahui,
CV.xxxxxxxx

Dibuat Oleh,
CV.xxxxxxxx

xxxxxxxxx

xxxxxxxxx

Direktur

Pimpinan Teknik

SKEMA PENGGUNAAN TENAGA


PROGRAM

PENDIDIKAN MENENGAH

KEGIATAN

PENYEDIAAN SARANA BELAJAR SMA/MA DAN SMK

PEKERJAAN

PEMBANGUNAN SBI SMA KOTA xxxxxxxxx (Lanjutan)

LOKASI

SMA KOTA xxxxxxxxx, Provinsi xxxxxxxxxxx

THN.ANGGARAN

20xx

B U L A N
NO.

U R A I A N
1

PEKERJA

TUKANG

KEPALA TUKANG

MANDOR

II
3

III
3

IV
3

Keterangan
3

Jangka Waktu
Pelaksanaan 120
(Seratus Dua Puluh)
Hari Kalender

xxxxxxx, 16 Juni 20xx


Mengetahui,
CV.xxxxxxxx

Dibuat Oleh,
CV.xxxxxxxx

xxxxxxxxx
Direktur

xxxxxxxxx
Pimpinan Teknik

SKEMA PENGGUNAAN ALAT


PROGRAM

PENDIDIKAN MENENGAH

KEGIATAN

PENYEDIAAN SARANA BELAJAR SMA/MA DAN SMK

PEKERJAAN

PEMBANGUNAN SBI SMA KOTA xxxxxxxxx (Lanjutan)

LOKASI

SMA KOTA xxxxxxxxx, Provinsi xxxxxxxxxxx

THN.ANGGARAN

20xx

B U L A N
NO.

U R A I A N
1

BETON MOLEN

DUMP TRUCK

STAMPER

POMPA AIR

II
3

III
3

IV
3

Keterangan
3

Jangka Waktu
Pelaksanaan 120
(Seratus Dua Puluh)
Hari Kalender

xxxxxxx, 16 Juni 20xx


Mengetahui,
CV.xxxxxxxx

Dibuat Oleh,
CV.xxxxxxxx

xxxxxxxxx
Direktur

xxxxxxxxx
Pimpinan Teknik

48,770.00

#REF!

573,064.00

#REF!

35,255.00

#REF!

#REF!

#REF!

4,124,400.00

#REF!

#REF!
#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

JADWAL WAKTU PELAKSANAAN (KURVA "S")


PROGRAM

PENDIDIKAN MENENGAH

KEGIATAN

PENYEDIAAN SARANA BELAJAR SMA/MA DAN SMK

PEKERJAAN

PEMBANGUNAN SBI SMA KOTA xxxxxxxxx (Lanjutan)

LOKASI

SMA KOTA xxxxxxxxx, Provinsi xxxxxxxxxxx

THN.ANGGARAN

20xx
BOBOT
(%)

NO.
A.

PEKERJAAN PERSIAPAN

1.99

B U L A N
I

II

0.10

0.20

0.40

B.

PEKERJAAN TANAH

0.80

0.80

C.

PEKERJAAN PASANGAN DAN PLESTERAN

16.14

0.81

D.

PEKERJAAN BETON

41.08

E.

PEKERJAAN LANTAI DAN KERAMIK

9.09

F.

PEKERJAAN KOSEN, PINTU JENDELA KACA DAN ASESORIS

8.13

G.

PEKERJAAN ATAP

H.

PEKERJAAN PLAFOND

I.

III
3

1.00

IV
3

0.20

Keterangan
3

100

0.10

90

1.61

3.23

2.05

4.11

8.22

12.32

4.84

3.23

1.61

8.22

4.11

2.05

0.81

70

4.54
0.41

0.81

4.06

1.63

0.81

80

4.54

60

Jangka Waktu
Pelaksanaan 120
(Seratus Dua Puluh)
Hari Kalender

0.41
50

10.88

0.54

4.35

5.44

0.54

3.24

1.62

1.62

PEKERJAAN PENGECATAN

3.05

0.31

1.83

J.

PEKERJAAN LISTRIK DAN INSTALASI

3.91

K.

PEKERJAAN INSTALASI AIR

1.33

L.

PEKERJAAN LAIN-LAIN

0.37

40

I
II

RENCANA KEMAJUAN MINGGUAN


RENCANA KUMULATIF MINGGUAN

1.96

0.04

0.18

30

20

1.96
0.53

0.02

0.92

10

0.80

0.07

0.04

0.02

100.00

0.10

0.22

2.00

3.67

7.78

9.03

17.38

14.87

8.15

6.03

7.58

5.62

5.15

7.40

4.09

0.93

0.10

0.32

2.32

5.99

13.77

22.80

40.18

55.05

63.20

69.23

76.80

82.4

87.58

94.97

99.07

100.0

xxxxxxx, 16 Juni 20xx


Mengetahui,
CV.xxxxxxxx

xxxxxxxxx
Direktur

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

Dibuat Oleh,
CV.xxxxxxxx

xxxxxxxxx
Pimpinan Teknik

1.99
0.80
16.14
41.08
9.09
8.13
10.88
3.24
3.05
3.91
1.33
0.37

1.99
0.80
16.14
41.08
9.09
8.13
10.88
3.24
3.05
3.91
1.33
0.37

100.00

100.00

0.166666667

#REF!

#REF!

#REF!

#REF!

#REF!
#REF!

ANALISA TEKNIK
PROGRAM

: PENDIDIKAN MENENGAH

KEGIATAN

: PENYEDIAAN SARANA BELAJAR SMA/MA DAN SMK

PEKERJAAN

: PEMBANGUNAN SBI SMA KOTA xxxxxxxxx (Lanjutan)

LOKASI

: SMA KOTA xxxxxxxxx, Provinsi xxxxxxxxxxx

THN.ANGGARAN

: 20xx

* Pekerjaan Bongkaran Beton


- Volume Pekerjaan
- Tenaga yang dibutuhkan
- Tukang
- Pekerja
- Mandor
- Kapasitas rata - rata 1 regu
- Waktu yang dibutuhkan

0.29
0.75

- Dibulatkan

* Pekerjaan Bongkaran Dinding Bata Merah


- Volume Pekerjaan
- Tenaga yang dibutuhkan
- Tukang
- Pekerja
- Kapasitas rata - rata 1 regu
- Waktu yang dibutuhkan
- Dibulatkan

21.60
60.00

0.29

M3

=
=
=

3.00
6.00
1.00

Org
Org
Org

0.75

M / Hari

0.39

Hari

1.00
0.14

Hari
Minggu

21.60

M3

=
=

3.00
6.00

Org
Org

60.00

0.36

Hari

1.00
0.14

Hari
Minggu

M3/ Hari

* Galian Tanah
- Volume Pekerjaan
- Tenaga yang dibutuhkan
- Pekerja
- Mandor
- Kapasitas rata - rata 1 regu
- Waktu yang dibutuhkan

28.77
15.00

- Dibulatkan

* Urugan Kembali Bekas Galian


- Volume Pekerjaan
- Tenaga yang dibutuhkan
- Pekerja
- Mandor
- Kapasitas rata - rata 1 regu
- Waktu yang dibutuhkan

0.39
31.25

- Dibulatkan

* Urugan Pasir Dibawah Pondasi dan Lantai


- Volume Pekerjaan
- Kebutuhan bahan
- Pasir Urug
1.00 x

8.57

28.77

=
=

6.00
1.00

15.00

1.92

Hari

2.00
0.29

Hari
Minggu

0.39

M3

=
=

6.00
1.00

Org
Org

31.25

0.01

Hari

1.00
0.14

Hari
Minggu

8.57

M3

8.57

M3

=
=

6.00
1.00

Org
Org

20.00

0.43

Hari

1.00
0.14

Hari
Minggu

Org
Org
M3/ Hari

M3/ Hari

- Tenaga yang dibutuhkan


- Pekerja
- Mandor
- Kapasitas rata - rata 1 regu
- Waktu yang dibutuhkan
- Dibulatkan

8.57
20.00

M / Hari

* Urugan Tanah
- Volume Pekerjaan
- Kebutuhan bahan
- Tanah Urug

29.07

34.88

M3

=
=

6.00
1.00

Org
Org

20.00

1.45

Hari

2.00
0.29

Hari
Minggu

3.23

M3

3.88

M3

- Tenaga yang dibutuhkan


- Pekerja
- Mandor

=
=

6.00
1.00

Org
Org

- Kapasitas rata - rata 1 regu

7.50

M3/ Hari

0.43

Hari

1.00
0.14

Hari
Minggu

1.20

29.07

- Tenaga yang dibutuhkan


- Pekerja
- Mandor
- Kapasitas rata - rata 1 regu
- Waktu yang dibutuhkan

29.07
20.00

- Dibulatkan

* Pasangan Batu Kosong


- Volume Pekerjaan
- Kebutuhan bahan
- Batu

- Waktu yang dibutuhkan


- Dibulatkan

1.200 x

3.23

3.23
7.50

M3/ Hari

* Pasangan Batu Kali


- Volume Pekerjaan
- Kebutuhan bahan
- Semen
- Pasir
- Batu

24.08

=
=
=

3,274.88
13.10
26.49

- Tenaga yang dibutuhkan


- Tukang
- Pekerja
- Mandor
- Kepala Tukang

=
=
=
=

4.00
8.00
1.00
1.00

Org
Org
Org
Org

- Kapasitas rata - rata 1 regu

6.67

M3/ Hari

6.67

Hari

7.00
1.00

Hari
Minggu

43.63

M3

- Tenaga yang dibutuhkan


- Tukang
- Pekerja
- Mandor
- Kepala Tukang

=
=
=
=

4.00
8.00
1.00
1.00

Org
Org
Org
Org

- Kapasitas rata - rata 1 regu

1.00

M / Hari

43.63

Hari

44.00
6.29

Hari
Minggu

- Waktu yang dibutuhkan

136.00
0.54
1.10

x
x
x

24.08
24.08
24.08

24.08
6.67

- Dibulatkan

* Pek.Beton Bertulang
- Volume Pekerjaan
- Kebutuhan bahan
- Semen
- Pasir
- Kerikil
- Besi Beton
- Kawat Beton
- Kayu Bekisting
- Paku

- Waktu yang dibutuhkan


- Dibulatkan

43.63
1.00

Kg
3
M
3
M

* Pas. Batu Bata 1 : 3


- Volume Pekerjaan
- Kebutuhan bahan
- Batu Bata
- Pasir Pasang
- Semen

14.85

M2

=
=
=

1,039.50
0.06
213.39

Bh
3
M
Kg

- Tenaga yang dibutuhkan


- Tukang
- Pekerja
- Mandor
- Kepala Tukang

=
=
=
=

4.00
8.00
1.00
1.00

- Kapasitas rata - rata 1 regu

40.00

0.37

Hari

1.00
0.14

Hari
Minggu

253.51

M2

=
=
=

17,745.70
11.41
2,453.98

Bh
M3
Kg

- Tenaga yang dibutuhkan


- Tukang
- Pekerja
- Mandor
- Kepala Tukang

=
=
=
=

4.00
8.00
1.00
1.00

- Kapasitas rata - rata 1 regu

40.00

6.34

Hari

7.00
1.00

Hari
Minggu

70.00
0.00
14.37

x
x
x

- Waktu yang dibutuhkan

14.85
14.85
14.85

14.85
40.00

- Dibulatkan

* Pas. Batu Bata 1 : 5


- Volume Pekerjaan
- Kebutuhan bahan
- Batu Bata
- Pasir Pasang
- Semen

- Waktu yang dibutuhkan


- Dibulatkan

70.00
0.05
9.68

x
x
x

253.51
253.51
253.51

253.51
40.00

Org
Org
Org
Org
M3/ Hari

Org
Org
Org
Org
M3/ Hari

* Plesteran 1 : 3
- Volume Pekerjaan
- Kebutuhan bahan
- Pasir Pasang
- Semen

341.88

=
=

6.50
2,215.38

- Tenaga yang dibutuhkan


- Tukang
- Pekerja
- Mandor
- Kepala Tukang

=
=
=
=

4.00
8.00
1.00
1.00

- Kapasitas rata - rata 1 regu

26.67

M / Hari

12.82

Hari

13.00
1.86

Hari
Minggu

468.57

M2

=
=

9.37
2,024.22

Kg
M3

- Tenaga yang dibutuhkan


- Tukang
- Pekerja
- Mandor
- Kepala Tukang

=
=
=
=

4.00
8.00
1.00
1.00

- Kapasitas rata - rata 1 regu

26.67

M2/ Hari

17.57

Hari

18.00
2.57

Hari
Minggu

0.019
6.48

x
x

- Waktu yang dibutuhkan

341.88
341.88

341.88
26.67

- Dibulatkan

* Plesteran 1 : 5
- Volume Pekerjaan
- Kebutuhan bahan
- Pasir Pasang
- Semen

- Waktu yang dibutuhkan


- Dibulatkan

0.02
4.32

x
x

468.57
468.57

468.57
26.67

Kg
3
M

Org
Org
Org
Org
2

Org
Org
Org
Org

* Kusen Pintu dan Jendela Kayu Kelas I


- Volume Pekerjaan
- Kebutuhan bahan
- Kayu Kelas I
1.20
- Paku
4.50

1.41

=
=

1.69
6.35

M3
Kg

- Tenaga yang dibutuhkan


- Tukang
- Pekerja
- Mandor
- Kepala Tukang

=
=
=
=

4.00
8.00
1.00
1.00

Org
Org
Org
Org

- Kapasitas rata - rata 1 regu

0.22

M / Hari

6.35

Hari

7.00
1.00

Hari
Minggu

13.66

M2

0.55

M3

- Tenaga yang dibutuhkan


- Tukang
- Pekerja
- Mandor
- Kepala Tukang

=
=
=
=

4.00
8.00
1.00
1.00

Org
Org
Org
Org

- Kapasitas rata - rata 1 regu

1.60

M2/ Hari

8.54

Hari

9.00
1.29

Hari
Minggu

x
x

- Waktu yang dibutuhkan

1.41
1.41

1.41
0.22

- Dibulatkan

* Daun Pintu Panel


- Volume Pekerjaan
- Kebutuhan bahan
- Kayu Kelas II

- Waktu yang dibutuhkan


- Dibulatkan

0.04

13.66

13.66
1.60

* Daun Jendela Panel


- Volume Pekerjaan
- Kebutuhan bahan
- Kayu Kelas II

15.18

M2

0.53

M3

- Tenaga yang dibutuhkan


- Tukang
- Pekerja
- Mandor
- Kepala Tukang

=
=
=
=

4.00
8.00
1.00
1.00

Org
Org
Org
Org

- Kapasitas rata - rata 1 regu

2.00

M / Hari

7.59

Hari

8.00
1.14

Hari
Minggu

77.76

M'

1.56

M3

- Tenaga yang dibutuhkan


- Tukang
- Pekerja
- Mandor
- Kepala Tukang

=
=
=
=

4.00
8.00
1.00
1.00

Org
Org
Org
Org

- Kapasitas rata - rata 1 regu

5.13

M'/ Hari

15.16

Hari

16.00
2.29

Hari
Minggu

0.035

- Waktu yang dibutuhkan

15.18

15.18
2.00

- Dibulatkan

* Jalusi
- Volume Pekerjaan
- Kebutuhan bahan
- Kayu Kelas II

- Waktu yang dibutuhkan


- Dibulatkan

0.02

77.76

77.76
5.13

* Kuda-Kuda Kayu Kelas II


- Volume Pekerjaan
- Kebutuhan bahan
- Kayu Klas II
- Paku
- Besi Strip

2.40

=
=
=

2.64
1.92
36.00

M3
Kg
Kg

- Tenaga yang dibutuhkan


- Tukang
- Pekerja
- Mandor
- Kepala Tukang

=
=
=
=

4.00
8.00
1.00
1.00

Org
Org
Org
Org

- Kapasitas rata - rata 1 regu

0.33

M3/ Hari

7.20

Hari

8.00
1.14

Hari
Minggu

228.62

M2

=
=

2.74
34.29

M3
Kg

- Tenaga yang dibutuhkan


- Tukang
- Pekerja
- Mandor
- Kepala Tukang

=
=
=
=

4.00
8.00
1.00
1.00

Org
Org
Org
Org

- Kapasitas rata - rata 1 regu

40.00

5.72

Hari

6.00
0.86

Hari
Minggu

1.10
0.80
15.00

x
x
x

- Waktu yang dibutuhkan

2.40
2.40
2.40

2.40
0.33

- Dibulatkan

* Rangka Atap
- Volume Pekerjaan
- Kebutuhan bahan
- Kayu Klas II
- Paku

- Waktu yang dibutuhkan


- Dibulatkan

0.01
0.15

x
x

228.62
228.62

228.62
40.00

M2/ Hari

* Listplank Papan
- Volume Pekerjaan
- Kebutuhan bahan
- Kayu Klas II
- Paku

39.74

M'

=
=

2.98
2.38

M3
Kg

- Tenaga yang dibutuhkan


- Tukang
- Pekerja
- Mandor
- Kepala Tukang

=
=
=
=

4.00
8.00
1.00
1.00

Org
Org
Org
Org

- Kapasitas rata - rata 1 regu

18.18

2.19

Hari

3.00
0.43

Hari
Minggu

228.62

M2

=
=

274.34
4.57

Lbr
Kg

- Tenaga yang dibutuhkan


- Tukang
- Pekerja
- Mandor
- Kepala Tukang

=
=
=
=

4.00
8.00
1.00
1.00

- Kapasitas rata - rata 1 regu

66.67

3.43

Hari

4.00
0.57

Hari
Minggu

0.08
0.06

x
x

- Waktu yang dibutuhkan

39.74
39.74

39.74
18.18

- Dibulatkan

* Penutup Atap Sakura Roof


- Volume Pekerjaan
- Kebutuhan bahan
- Genteng Metal
- Paku Genteng

- Waktu yang dibutuhkan


- Dibulatkan

1.20 X
0.02 X

228.62
228.62

228.62
66.67

M''/ Hari

Org
Org
Org
Org
M2/ Hari

* Bubungan
- Volume Pekerjaan
- Kebutuhan bahan
- Bubungan Genteng Metal
- Paku

27.66

M'

=
=

33.19
1.38

M'
Kg

- Tenaga yang dibutuhkan


- Tukang
- Pekerja
- Mandor
- Kepala Tukang

=
=
=
=

4.00
8.00
1.00
1.00

Org
Org
Org
Org

- Kapasitas rata - rata 1 regu

40.00

0.69

Hari

1.00
0.14

Hari
Minggu

165.54

M2

=
=

1.82
9.10

M3
Kg

- Tenaga yang dibutuhkan


- Tukang
- Pekerja
- Mandor
- Kepala Tukang

=
=
=
=

4.00
8.00
1.00
1.00

Org
Org
Org
Org

- Kapasitas rata - rata 1 regu

40.00

4.14

Hari

5.00
0.71

Hari
Minggu

1.20 X
0.05 X

- Waktu yang dibutuhkan

27.66
27.66

27.66
40.00

- Dibulatkan
* Rangka Plafond
- Volume Pekerjaan
- Kebutuhan bahan
- Kayu Kls. II
- Paku

- Waktu yang dibutuhkan


- Dibulatkan

0.01 X
0.06 X

165.54
165.54

165.54
40.00

'

M / Hari

M / Hari

* Plafond Tripleks
- Volume Pekerjaan
- Kebutuhan bahan
- Tripleks
- Paku Tripleks

165.54

M2

57.48
4.97

Lbr
Kg

- Tenaga yang dibutuhkan


- Tukang
- Pekerja
- Mandor
- Kepala Tukang

=
=
=
=

4.00
8.00
1.00
1.00

Org
Org
Org
Org

- Kapasitas rata - rata 1 regu

40.00

4.14

Hari

5.00
0.71

Hari
Minggu

135.00

M'

=
=

141.75
13.50

M'
Kg

- Tenaga yang dibutuhkan


- Tukang
- Pekerja
- Mandor
- Kepala Tukang

=
=
=
=

4.00
8.00
1.00
1.00

- Kapasitas rata - rata 1 regu

190.48

0.71

Hari

1.00
0.14

Hari
Minggu

0.35 X
0.03

- Waktu yang dibutuhkan

165.54
165.54

165.54
40.00

- Dibulatkan

* List Plafond
- Volume Pekerjaan
- Kebutuhan bahan
- Profil Sp. 5
- Paku

- Waktu yang dibutuhkan


- Dibulatkan

1.05 X
0.10 X

135.00
135.00

135.00
190.48

'

M / Hari

Org
Org
Org
Org
M'/ Hari

* Pek.Beton Tumbuk 1 : 3 : 5
- Volume Pekerjaan
- Kebutuhan bahan
- Kerikil
- Pasir
- Semen

6.51

=
=
=

5.66
3.39
1,419.18

- Tenaga yang dibutuhkan


- Tukang
- Pekerja
- Mandor
- Kepala Tukang

=
=
=
=

4.00
8.00
1.00
1.00

Org
Org
Org
Org

- Kapasitas rata - rata 1 regu

2.50

M3/ Hari

2.60

Hari

3.00
0.43

Hari
Minggu

237.00

=
=
=
=

237.00
2,322.60
5.10
308.10

Dos
Kg
M3
Kg

- Tenaga yang dibutuhkan


- Tukang
- Pekerja
- Mandor
- Kepala Tukang

=
=
=
=

4.00
8.00
1.00
1.00

Org
Org
Org
Org

- Kapasitas rata - rata 1 regu

33.33

7.11

Hari

8.00
1.14

Hari
Minggu

0.87 X
0.52 X
218.00 X

- Waktu yang dibutuhkan

6.51
6.51
6.51

6.51
2.50

- Dibulatkan

* Lantai Keramik 40 x 40
- Volume Pekerjaan
- Kebutuhan bahan
- Kerarmik 40 x 40
- Semen
- Pasir Pasang
- Semen Warna

- Waktu yang dibutuhkan


- Dibulatkan

1.00 X
9.80 X
0.02
1.30

237.00
237.00
237.00
237.00

237.00
33.33

M3
M3
Kg

M2

M2/ Hari

* Lantai Keramik 20 x 20 (KM/WC)


- Volume Pekerjaan
- Kebutuhan bahan
- Kerarmik 20 x 20
- Semen
- Pasir Pasang
- Semen Warna

5.25

M2

=
=
=
=

1.84
0.18
3.26
0.16

Dos
Kg
M3
Kg

- Tenaga yang dibutuhkan


- Tukang
- Pekerja
- Mandor
- Kepala Tukang

=
=
=
=

4.00
8.00
1.00
1.00

Org
Org
Org
Org

- Kapasitas rata - rata 1 regu

11.43

0.46

Hari

1.00
0.14

Hari
Minggu

19.55

M2

=
=
=
=

19.55
181.82
0.35
29.33

Dos
Kg
M3
Kg

- Tenaga yang dibutuhkan


- Tukang
- Pekerja
- Mandor
- Kepala Tukang

=
=
=
=

4.00
8.00
1.00
1.00

Org
Org
Org
Org

- Kapasitas rata - rata 1 regu

40.00

0.49

Hari

1.00
0.14

Hari
Minggu

0.35 X
0.04 X
0.62
0.03

- Waktu yang dibutuhkan

5.25
5.25
5.25
5.25

5.25
11.43

- Dibulatkan

* Dinding Keramik 20 x 25 (KM/WC)


- Volume Pekerjaan
- Kebutuhan bahan
- Kerarmik 20 x 20
- Semen
- Pasir Pasang
- Semen Warna

- Waktu yang dibutuhkan


- Dibulatkan

1.00 X
9.30 X
0.02
1.50

19.55
19.55
19.55
19.55

19.55
40.00

M2/ Hari

M2/ Hari

* Pek. Pengecatan Dinding dan Plafond


- Volume Pekerjaan
- Kebutuhan bahan
- Plamur Dinding
0.10 X
- Cat Dasar
0.10 X
- Cat Penutup
0.26 X

698.65

M2

=
=
=

69.87
69.87
181.65

Kg
Kg
Kg

- Tenaga yang dibutuhkan


- Tukang
- Pekerja
- Mandor
- Kepala Tukang

=
=
=
=

4.00
8.00
1.00
1.00

- Kapasitas rata - rata 1 regu

63.49

M2/ Hari

11.00

Hari

12.00
1.71

Hari
Minggu

93.87

M2

=
=
=

14.08
15.96
26.28

Kg
Kg
Kg

- Tenaga yang dibutuhkan


- Tukang
- Pekerja
- Mandor
- Kepala Tukang

=
=
=
=

4.00
8.00
1.00
1.00

Org
Org
Org
Org

- Kapasitas rata - rata 1 regu

38.10

2.46

Hari

3.00
0.43

Hari
Minggu

- Waktu yang dibutuhkan

698.65
698.65
698.65

698.65
63.49

- Dibulatkan

* Pek. Pengecatan Kayu


- Volume Pekerjaan
- Kebutuhan bahan
- Plamur Kayu
- Cat Dasar
- Cat Penutup

- Waktu yang dibutuhkan


- Dibulatkan
* Pek. Instalasi Listrik dan Asesoris
- Volume Pekerjaan
- Waktu yang dibutuhkan
- Dibulatkan

0.15 X
0.17 X
0.28 X

93.87
93.87
93.87

93.87
38.10

=
=
=

Org
Org
Org
Org

M2/ Hari

14.00

Hari

14.00
2.00

Hari
Minggu

* Pek. Instalasi Air dan Asesoris


- Volume Pekerjaan
- Waktu yang dibutuhkan
- Dibulatkan

=
=

14.00

Hari

14.00
Hari
2.00
Minggu
Demikian analisa teknik ini dibuat sebagai pedoman pada pelaksanaan pekerjaan.

xxxxxxx, 16 Juni 20xx


Mengetahui,
CV.xxxxxxxx

xxxxxxxxx
Direktur

Dibuat Oleh,
CV.xxxxxxxx

xxxxxxxxx
Pimpinan Teknik

DAFTAR KUANTITAS DAN HARGA


PROGRAM
KEGIATAN
PEKERJAAN
LOKASI
THN.ANGGARAN

:
:
:
:
:

PENDIDIKAN MENENGAH
PENYEDIAAN SARANA BELAJAR SMA/MA DAN SMK
PEMBANGUNAN SBI SMA KOTA xxxxxxxxx (Lanjutan)
SMA KOTA xxxxxxxxx, Provinsi xxxxxxxxxxx
20xx

NO URAIAN PEKERJAAN

VOLUME

HARGA
SATUAN
(RP)
413,200.00
124,950.00
750,000.00
1,000,000.00
500,000.00
750,000.00
1,000,000.00

119,828.00
2,698,920.00
750,000.00
1,000,000.00
500,000.00
750,000.00
1,000,000.00

JUMLAH
(RP)
6,818,748.00
119,828.00
2,698,920.00
750,000.00
1,000,000.00
500,000.00
750,000.00
1,000,000.00

M3
M3
M3
M3
M3
M3
M3

21,880.00
21,880.00
21,880.00
50,370.00
10,502.40
50,370.00
57,370.00

247,025.20
132,374.00
250,088.40
108,799.20
4,095.94
322,871.70
1,667,745.90

2,733,000.34
247,025.20
132,374.00
250,088.40
108,799.20
4,095.94
322,871.70
1,667,745.90

3.23
24.08
234.29
14.85
19.22
468.57
108.35
11.93
4.75
184.95
31.90

M3
M3
M2
M2
M2
M2
M2
M2
M2
M2
M'

179,400.00
430,050.00
80,986.00
84,564.00
80,986.00
26,729.00
29,271.00
29,271.00
29,271.00
29,271.00
29,271.00

579,462.00
10,355,604.00
18,974,209.94
1,255,775.40
1,556,550.92
12,524,407.53
3,171,512.85
349,203.03
139,037.25
5,413,671.45
933,744.90

55,253,179.27
579,462.00
10,355,604.00
18,974,209.94
1,255,775.40
1,556,550.92
12,524,407.53
3,171,512.85
349,203.03
139,037.25
5,413,671.45
933,744.90

0.44
2.20
0.51
3.54
9.58
1.27
7.35
0.88
0.39
14.46
0.94
1.18
0.14
0.75

M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3

568,010.00
3,374,338.63
3,736,815.83
3,555,582.67
3,663,798.35
3,626,727.44
3,648,715.53
3,700,042.81
2,312,283.10
2,643,662.50
2,643,662.50
3,814,263.49
3,945,245.94
2,643,662.50

249,924.40
7,423,544.98
1,905,776.08
12,586,762.64
35,099,188.23
4,605,943.85
26,818,059.12
3,256,037.68
901,790.41
38,227,359.75
2,485,042.75
4,500,830.92
552,334.43
1,982,746.88

140,595,342.10
249,924.40
7,423,544.98
1,905,776.08
12,586,762.64
35,099,188.23
4,605,943.85
26,818,059.12
3,256,037.68
901,790.41
38,227,359.75
2,485,042.75
4,500,830.92
552,334.43
1,982,746.88

PEKERJAAN LANTAI DAN KERAMIK


Pek. Cor beton tumbuk 1:3:5 - t = 5 cm, lantai dasar keramik 6.51 M3
Pek. Lantai Keramik 40/40 cm tidak termasuk lantai balkon 237.00 M2
Pek. Lantai Keramik KM 20/20 cm
5.25 M2
Pek. Dinding Keramik KM 20/25 cm
19.55 M2

468,610.00
107,860.00
111,131.00
97,195.00

3,050,651.10
25,562,820.00
583,437.75
1,900,162.25

31,097,071.10
3,050,651.10
25,562,820.00
583,437.75
1,900,162.25

A
1
2
3
4
5
6
7

PEKERJAAN PERSIAPAN
Pembongkaran Beton
Pembongkaran Dinding Bata merah
Pembongkaran Atap Lama
Pengukuran / Pasangan bouwplank
Papan Nama Proyek
Air Kerja
Listrik Kerja

0.29 M3
21.60 M3
Ls
1
Ls
1
Ls
1
Ls
1
Ls
1

B
1
2
3
4
5
6
7

PEKERJAAN TANAH
Pek. Galian Tanah Pondasi
Pek. Galian Tanah Pondasi Setapak
Pek. Galian Tanah Septitank
Pek. Urugan Pasir Dibawah Pondasi
Pek. Urugan Kembali Bekas Galian
Pek. Urugan Pasir Dibawah Lantai
Pek. Urugan Tanah

11.29
6.05
11.43
2.16
0.39
6.41
29.07

C
1
2
3
4
5
6
7
8
9
10
11

PEKERJAAN PASANGAN DAN PLESTERAN


Pek. Pondasi Batu Kosong
Pek. Pondasi Batu Kali/gunung 1:5
Pek. Pasangan Dinding 1/2 bata 1 : 5 ( Lantai 1 dan 2 )
Pek. Pasangan 1/2 bata 1 : 3
Pek. Pasangan 1/2 bata 1 : 5 Septitank
Pek. Plesteran Dinding 1 : 5 + Acian ( Lantai 1 dan 2 )
Pek. Plesteran Dinding, Trasraam dan Kolom 1 : 3 + Acian
Pek. Plesteran Dalam Septitank 1 : 3 + Acian
Pek. Plesteran Pondasi 1 : 3 + Acian
Pek. Plesteran Balok dan Plat Beton 1 : 3 + Acian
Pek. Profill Beton 1 : 3 + Acian

D
1
2
3
4
5
6
7
8
9
10
11
12
13
14

PEKERJAAN BETON
Pek. Beton Lantai Kerja 1:2:3
Pek. Beton Foot Plat 1:2:3 besi 218 kg
Pek. Sloof Beton 15/20 1:2:3 besi 218 kg
Pek. Sloof Beton 20/30 1:2:3 besi 218 kg
Pek. Kolom Beton 30/40 1:2:3 besi 239 kg
Pek. Balok 30/55 1:2:3 besi 239 kg
Pek. Balok 30/45 1:2:3 besi 239 kg
Pek. Balok Anak 25/40 1:2:3 besi 239 kg
Pek. Kolom Praktis 11/11 1:2:3 Besi 65 kg
Pek.Plat Lantai 1:2:3 Besi 85 kg Tebal 12 cm
Pek.Plat Penutup Septitank 1:2:3 Besi 85 kg
Pek. Ring Balok 11/25 1:2:3 besi 218 kg
Pek. Ring Balok 11/20 1:2:3 besi 218 kg
Pek.Lisplank Beton 1:2:3 Besi 85 kg

E
1
2
3
4

SUB TOTAL
(RP)

HARGA
SATUAN
(RP)

NO URAIAN PEKERJAAN

VOLUME

F
1
2
3
4
5
6
7
8
9
10

PEKERJAAN KOSEN, PINTU JENDELA KACA DAN ASESORIS


Pek Kosen Pintu/Jendela Kayu Kelas I
Pek Daun Pintu Panel Kayu Kelas II
Pek Daun Jendela Panel Kaca Kayu Kelas II
Pek. Papan Jalusi kayu kelas II
Engsel Pintu Panel - Tiap Daun Pintu 3 Buah Engsel
Engsel Jendela Panel Kaca
Kunci pintu
Espanyolet
Grendel jendela
Kait Angin - Tiap Daun Jendela 2 Buah Kait Angin

1.41
13.66
15.18
77.76
33.00
48.00
6.00
5.00
24.00
48.00

M3
M2
M2
M'
Bh
Bh
Bh
Bh
Bh
Bh

4,859,100.00
300,850.00
246,680.00
118,879.00
23,409.10
20,909.10
105,942.50
55,909.10
16,909.10
15,909.10

6,851,331.00
4,109,611.00
3,744,602.40
9,244,031.04
772,500.30
1,003,636.80
635,655.00
279,545.50
405,818.40
763,636.80

JUMLAH
(RP)
27,810,368.24
6,851,331.00
4,109,611.00
3,744,602.40
9,244,031.04
772,500.30
1,003,636.80
635,655.00
279,545.50
405,818.40
763,636.80

G
1
2
3
4
5
6

PEKERJAAN ATAP
Pek. Kuda-kuda kayu kls II
Pek. Rangka Atap Sakura Roof, Kayu kls. II
Pek. Atap Sakura Roof
Pek. Angker/bout begel
Pek. Listplank papan tebal 3 cm lebar 25 cm
Pas. Penutup Nok/bubungan Sakura Roof

2.40
228.62
228.62
Ls
39.74
27.66

M3
M2
M2

3,382,000.00
38,510.00
53,932.00
250,000.00
171,575.00
32,876.00

8,116,800.00
8,804,156.20
12,329,933.84
250,000.00
6,818,390.50
909,350.16

37,228,630.70
8,116,800.00
8,804,156.20
12,329,933.84
250,000.00
6,818,390.50
909,350.16

H
1
2
3

PEKERJAAN PLAFOND
Rangka Plafond kayu kelas II ukuran 5/7 cm
Pas. Plafond Triplex 3 mm
Profil Sudut Plafond Ruang dan Teras SP 5

165.54 M2
165.54 M2
135.00 M'

35,937.00
24,557.67
7,876.50

5,949,010.98
4,065,276.14
1,063,327.50

11,077,614.62
5,949,010.98
4,065,276.14
1,063,327.50

1
M'
M'

I PEKERJAAN PENGECATAN
1 Pek. Cat dinding, Plapond , kolom dan Pondasi Setara Catilag Warna Menyesuaikan Bangunan Yang Ada,tidak termasuk cat
ruang dalam atas dan plafond
698.65 M2
2 Cat mengkilap kayu
93.87 M2
J
1
2
3
4
5
6
7
8
9

PEKERJAAN LISTRIK DAN INSTALASI


Biaya Penyambungan antar gedung
Biaya instalasi listrik penerangan
Panel Box Untuk 4 MCB
Lampu TL 20 Watt
Lampu Pijar 15 Watt
Saklar Double
Saklar Tunggal
Stop Kontak Ruangan
Asesoris instalasi

K
1
2
3
4
5
6
7
8
9
10
11
12

PEKERJAAN INSTALASI AIR


Pek. Pipa PVC 1/2 " AW Air Bersih
Pek. Pipa PVC 3/4 " AW Air Bersih
Pek. Pipa PVC 1 1/2 " AW Air Kotor
Pek. Pipa PVC 3 " AW Air Kotor
Pek. Pipa PVC 3 " AW Air Hujan
Pek. Pipa PVC 4 " AW Air Kotoran
Pek. Wastafel setara Toto
Pek.Closet Duduk setara Toto
Pek. Kran 1/2 "
Pek. Floor Drain
Pek. Pipa Penguapan 1"
Asesoris instalasi

Ls
51.00
1.00
18.00
11.00
6.00
2.00
21.00
Ls

8.89
8.00
1.08
7.19
8.57
5.24
1.00
1.00
1.00
2.00
Ls
Ls

SUB TOTAL
(RP)

10,443,679.03

11,472.50
25,870.00

8,015,262.13
2,428,416.90

8,015,262.13
2,428,416.90

1,000,000.00
186,175.00
137,687.50
60,075.00
25,075.00
35,075.00
30,075.00
30,075.00
500,000.00

1,000,000.00
9,494,925.00
137,687.50
1,081,350.00
275,825.00
210,450.00
60,150.00
631,575.00
500,000.00

13,391,962.50
1,000,000.00
9,494,925.00
137,687.50
1,081,350.00
275,825.00
210,450.00
60,150.00
631,575.00
500,000.00

1
1

24,185.20
27,285.20
36,585.20
52,085.20
52,085.20
67,585.20
448,670.00
2,092,745.00
32,505.00
19,505.00
150,000.00
150,000.00

215,006.43
218,281.60
39,512.02
374,492.59
446,370.16
354,146.45
448,670.00
2,092,745.00
32,505.00
39,010.00
150,000.00
150,000.00

4,560,739.24
215,006.43
218,281.60
39,512.02
374,492.59
446,370.16
354,146.45
448,670.00
2,092,745.00
32,505.00
39,010.00
150,000.00
150,000.00

1
Ttk
Bh
Ttk
Ttk
Ttk
Ttk
Ttk

M'
M'
M'
M'
M'
M'
Set
Set
Bh
Bh

NO URAIAN PEKERJAAN
L PEKERJAAN LAIN-LAIN
1 Administrasi & Dokumentasi
2 Pembersihan Akhir

HARGA
SATUAN
(RP)

VOLUME

Ls
Ls

1
1

1,000,000.00
250,000.00

SUB TOTAL
(RP)
1,000,000.00
250,000.00

xxxxxxx, 16 Juni 20xx


Mengetahui,
CV.xxxxxxxx

Dibuat Oleh,
CV.xxxxxxxx

xxxxxxxxx
Direktur

xxxxxxxxx
Pimpinan Teknik

JUMLAH
(RP)
1,250,000.00
1,000,000.00
250,000.00

REKA PITULASI
DAFTAR KUANTITAS DAN HARGA
PROGRAM
KEGIATAN
PEKERJAAN
LOKASI
THN.ANGGARAN

PENDIDIKAN MENENGAH
PENYEDIAAN SARANA BELAJAR SMA/MA DAN SMK
PEMBANGUNAN SBI SMA KOTA xxxxxxxxx (Lanjutan)
SMA KOTA xxxxxxxxx, Provinsi xxxxxxxxxxx
20xx
URAIAN PEKERJAAN

NO
A
B
C
D
E
F
G
H
I
J
K
L

:
:
:
:
:

JUMLAH

PEKERJAAN PERSIAPAN
PEKERJAAN TANAH
PEKERJAAN PASANGAN DAN PLESTERAN
PEKERJAAN BETON
PEKERJAAN LANTAI DAN KERAMIK
PEKERJAAN KOSEN, PINTU JENDELA KACA DAN ASESORIS
PEKERJAAN ATAP
PEKERJAAN PLAFOND
PEKERJAAN PENGECATAN
PEKERJAAN LISTRIK DAN INSTALASI
PEKERJAAN INSTALASI AIR
PEKERJAAN LAIN-LAIN
JUMLAH
PPN 10%
JUMLAH TOTAL
DIBULATKAN

6,818,748.00
2,733,000.34
55,253,179.27
140,595,342.10
31,097,071.10
27,810,368.24
37,228,630.70
11,077,614.62
10,443,679.03
13,391,962.50
4,560,739.24
1,250,000.00
342,260,335.13
34,226,033.51
376,486,368.64
376,486,000.00

Terbilang : Tiga Ratus Tujuh Puluh Enam Juta Empat Ratus Delapan Puluh Enam Ribu Rupiah

xxxxxxx, 16 Juni 20xx


Mengetahui,
CV.xxxxxxxx

Dibuat Oleh,
CV.xxxxxxxx

xxxxxxxxx
Direktur

xxxxxxxxx
Pimpinan Teknik

418,500,000
90

42,014,000.00

33,480,000
385,020,000
91
8.586
108
382567000
3,542,287
425,074
3,117,213
623,443
2,493,770
2160000000
53,244,000

10.03919

Anda mungkin juga menyukai