Anda di halaman 1dari 23

PERHITUNGAN GALIAN DAN TIMBUNAN

KOORDINAT

STA

TITIK

15+600

1
2
3
4
1
3
5
6
3

X
0.60
1.10
4.30
2.70
0.60
4.30
6.30
6.70
4.30

Y
5.50
4.20
4.40
5.90
5.50
4.40
4.40
3.50
4.40

1
2
3
4
1

0.30
1.80
6.30
7.20
0.30

1.90
4.90
4.90
2.80
1.90

1
2
3
4
5
6
7
8
9
10
1

1.80
1.30
2.30
3.70
8.40
9.80
10.80
11.40
4.90
3.80
1.80

2.90
3.70
3.60
6.60
6.50
3.50
3.60
2.00
1.90
2.80
2.90

1
2
3
4
1
4
5
6
4

1.52
11.83
7.52
2.46
1.52
2.46
5.80
6.40
2.46

0.83
0.74
0.96
1.12
0.83
1.12
4.50
9.40
1.12

1
2
3
4
5
6
7
8
9
10
1

0.90
1.80
2.70
3.40
7.20
7.80
9.60
10.70
11.50
7.40
0.90

6.40
4.50
4.50
4.60
4.00
4.00
7.80
7.80
9.40
9.40
6.40

1
2
3
4
5
6
7
8
9
10
11
12
1

1.50
1.20
2.20
3.70
4.70
5.50
8.60
9.20
9.80
11.30
8.50
6.00
1.50

6.00
5.10
5.10
1.90
2.00
2.10
0.50
1.40
1.40
4.80
6.10
5.50
6.00

PERKALIAN
2LUAS
LUAS
GALIAN
TIMBUNAN
KEKANAN KEKIRI KEKANAN KEKIRI GALIAN TIMBUNAN GALIAN TIMBUNAN
2.52
4.84
25.37
14.85

47.58
15+625

15+650

15+675

15+700

15+725

6.05
18.06
11.88
3.54

39.53

8.05

18.92
22.05
29.48
70.45

27.72
29.48
15.05
72.25

1.47
8.82
17.64
13.68
41.61

3.42
30.87
35.28
0.84
70.41

0.00

6.66
4.68
15.18
24.05
29.40
35.28
21.60
21.66
13.72
11.02
183.25

3.77
8.51
13.32
55.44
63.70
37.80
41.04
9.80
7.22
5.04
245.64

0.00

1.12
11.36
8.42
2.04

9.82
5.56
2.36
1.70

14.34

22.95

19.45

11.07
54.52
7.17
72.76

6.50
28.80
23.12
58.42

4.05
8.10
12.42
13.60
28.80
60.84
74.88
100.58
108.10
47.36
458.73

11.52
12.15
15.30
33.12
31.20
38.40
83.46
89.70
69.56
8.46
392.87

65.86

7.65
6.12
4.18
7.40
9.87
2.75
12.04
12.88
47.04
68.93
46.75
36.00
261.61

7.20
11.22
18.87
8.93
11.00
18.06
4.60
13.72
15.82
40.80
36.60
8.25
195.07

66.54

1.80

28.80

62.39

3.50

0.00

0.00

4.03

0.90

4.03

0.90

0.00

14.40

0.00

14.40

0.00

31.20

0.00

31.20

7.17

1.75

7.17

1.75

32.93

0.00

32.93

0.00

33.27

0.00

33.27

0.00

15+750

15+775

15+800

15+825

15+850

15+875

15+900

15+925

15+950

1
2
3
4
5
6
7
8
9
1

0.30
0.80
1.80
2.50
6.30
6.80
7.90
6.80
3.80
0.30

3.50
2.50
2.50
2.60
2.00
2.00
4.10
4.70
3.60
3.50

1
2
3
1

0.70
0.60
5.00
0.70

3.70
3.40
3.50
3.70

1
2
3
4
1

0.60
0.70
5.30
5.40
0.60

3.80
4.10
4.10
3.90
3.80

1
2
3
1
3
4
5
3

0.60
0.70
2.00
0.60
2.00
5.90
6.20
2.00

4.10
4.50
4.50
4.10
4.50
4.40
5.10
4.50

1
2
3
1
3
4
5
3

0.40
0.60
3.60
0.40
3.60
5.90
6.20
3.60

4.20
5.00
5.00
4.20
5.00
5.00
5.80
5.00

1
2
3
4
1

0.30
0.70
5.30
5.70
0.30

2.60
3.70
3.80
2.90
2.60

1
2
3
1
3
4
5
3

0.90
1.20
3.60
0.90
3.60
6.30
6.50
0.90

3.90
3.00
3.10
3.90
3.10
3.50
3.00
3.10

1
2
3
4
5
6
7
8
1

0.60
2.20
7.30
8.10
9.80
10.90
12.20
5.00
0.60

5.40
2.00
2.40
2.40
5.80
5.80
8.50
8.50
5.40

1
2
3

1.10
2.20
7.30

5.20
2.90
3.20

0.75
2.00
4.68
5.00
12.60
27.88
37.13
24.48
13.30
127.82

8.80
30.09
27.90
66.79

34.22
31.00
65.22

2.70
3.72
14.04

2.80
4.50
6.25
16.38
13.60
15.80
27.88
17.86
1.08
106.15

26.55
27.28
10.20
64.03

31.00
20.88
51.88

21.67

2.38
2.10
18.50
22.98

2.22
17.00
2.45
21.67

0.00

2.46
2.87
20.67
20.52
46.52

2.66
21.73
22.14
2.34
48.87

0.00

2.70
3.15
8.20

2.87
9.00
2.70

2.76

14.05

14.57

2.00
3.00
15.12
2.00

2.52
18.00
2.00
15.12

22.12

37.64

1.11
2.66
15.37

1.82
19.61
21.66

19.14

43.09

4.68
10.80
2.79

20.46

18.27

1.20
5.28
17.52
46.98
56.84
92.65
103.70
27.00
351.17

11.88
14.60
19.44
23.52
63.22
70.76
42.50
5.10
251.02

3.19
7.04

11.44
21.17

13.34

0.00

2.19

2.79
12.60
18.90
34.29

0.00

1.31

2.35

0.52

15.52

23.95

10.69

19.53
22.75
2.70
44.98
100.15

72.93

0.00

10.84

0.00

10.84

0.00

0.00

0.66

0.00

0.66

0.00

1.18

0.00

1.18

1.38

0.26

1.38

0.26

6.67

7.76

6.67

7.76

0.00

11.98

0.00

11.98

1.10

5.35

1.10

5.35

50.08

50.08

0.00

36.47

0.00

15+975

16+000

16+025

16+050

16+075

16+100

16+125

16+150

16+175

16+200

4
5
6
7
8
1

8.20
9.80
10.90
12.20
5.00
1.10

3.20
6.50
6.50
10.00
7.00
5.20

1
2
3
4
5
1

1.00
6.30
7.80
8.90
9.50
1.00

4.70
5.20
8.30
8.30
9.60
4.70

1
2
3
4
5
6
7
8
1

0.80
1.20
2.30
3.80
8.40
9.70
10.80
6.00
0.80

2.40
3.50
3.50
6.50
7.00
4.00
4.00
2.90
2.40

1
2
3
1

1.20
5.30
5.90
1.20

3.50
3.90
3.20
4.30

1
2
3
4
1

0.40
1.00
7.00
7.30
0.40

4.00
2.50
2.50
3.50
4.00

1
2
3
4
1

1.20
2.00
7.90
8.30
1.20

4.10
2.20
2.20
3.20
4.10

1
2
3
4
1

0.50
0.90
6.80
7.20
0.50

4.00
3.20
3.00
4.10
4.00

1
2
3
1

0.80
5.80
6.20
0.80

4.20
3.90
5.00
4.20

1
2
3
1
3
4
5
3

0.30
0.80
3.00
0.30
3.00
5.70
6.20
3.00

4.00
5.00
4.80
4.00
4.80
4.40
5.50
4.80

1
2
3
4
1

0.90
1.80
6.30
6.40
0.90

4.00
5.60
5.00
4.50
4.00

0.20

3.00

23.36
53.30
63.70
109.00
85.40
26.00
370.99

26.24
31.36
70.85
79.30
50.00
7.70
298.06

5.20
52.29
64.74
85.44

29.61
40.56
73.87
78.85

207.67

222.89

15.22

2.80
4.20
14.95
26.60
33.60
38.80
31.32
14.40
166.67

2.88
8.05
13.30
54.60
67.90
43.20
24.00
2.32
216.25

0.00

4.68
16.96
25.37
47.01

18.55
23.01
3.84
45.40

0.00

1.00
2.50
24.50
29.20
57.20

4.00
17.50
18.25
1.40
41.15

16.05

2.64
4.40
25.28
34.03
66.35

8.20
17.38
18.26
3.84
47.68

18.67

1.60
2.70
27.88
28.80
60.98

3.60
21.76
21.60
2.05
49.01

11.97

3.12
29.00
26.04
58.16

24.36
24.18
4.00
52.54

5.62

13.20
31.35
29.76
74.31

27.36
27.28
16.50
71.14

1.50
3.84
12.00

3.20
15.00
1.44

17.34

19.64

5.04
9.00
28.35
25.60
67.99

7.20
35.28
32.00
4.05
78.53

3.17

0.00

0.00

49.58

1.61

0.00

0.00

0.00

0.00

2.30

10.54

36.47

0.00

7.61

0.00

7.61

0.00

0.00

24.79

0.00

24.79

0.00

0.81

0.00

0.81

8.03

0.00

8.03

0.00

9.33

0.00

9.33

0.00

5.98

0.00

5.98

0.00

2.81

0.00

2.81

0.00

1.59

1.15

1.59

1.15

0.00

5.27

0.00

5.27

2
3
4
1

1.70
6.30
7.20
0.20

6.00
5.70
3.50
5.50

1.20
9.69
22.05
39.60
72.54

5.10
37.80
41.04
0.70
84.64

12.10

0.00

6.05

0.00

6.05

PERHITUNGAN GALIAN DAN TIMBUNAN


STA
15+600

LUAS PENAMPANG (M2)


GALIAN
TIMBUNAN
4.03
0.90

15+625

0.00

14.40

15+650

0.00

31.20

15+675

7.17

1.75

15+700

32.93

0.00

15+725

33.27

0.00

15+750

10.84

0.00

15+775

0.00

0.66

15+800

0.00

1.18

15+825

1.38

0.26

15+850

6.67

7.76

15+875

0.00

11.98

15+900

1.10

5.35

15+925

50.08

0.00

15+950

36.47

0.00

15+975

7.61

0.00

16+000

0.00

24.79

16+025

0.00

0.81

16+050

8.03

0.00

16+075

9.33

0.00

16+100

5.98

0.00

16+125

2.81

0.00

16+150

1.59

1.15

16+175

0.00

5.27

16+200

0.00

6.05

16+225

0.00

0.00

RATA - RATA
GALIAN TIMBUNAN

JARAK ( M )
VOLUME (M3)
GALIAN TIMBUNAN GALIAN TIMBUNAN

2.01

7.65

5.21

19.79

10.48

151.42

0.00

22.80

0.00

25.00

0.00

569.94

3.58

16.47

4.47

20.53

0.00

338.20

20.05

0.87

23.96

1.04

480.29

0.91

33.10

0.00

25.00

0.00

827.50

0.00

22.05

0.00

25.00

0.00

551.31

0.00

5.42

0.33

23.57

1.43

127.72

0.47

0.00

0.92

0.00

25.00

0.00

22.88

0.69

0.72

12.26

12.74

8.46

9.14

4.03

4.01

12.52

12.48

12.52

50.03

3.34

9.87

6.32

18.68

6.32

184.37

0.55

8.66

1.49

23.51

0.81

203.63

25.59

2.67

22.64

2.36

579.13

6.32

43.27

0.00

25.00

0.00

1,081.75

0.00

22.04

0.00

25.00

0.00

550.94

0.00

3.81

12.40

5.87

19.13

22.34

237.09

0.00

12.80

0.00

25.00

0.00

319.94

4.01

0.40

22.72

2.28

91.17

0.92

8.68

0.00

25.00

0.00

217.00

0.00

7.66

0.00

25.00

0.00

191.50

0.00

4.40

0.00

25.00

0.00

109.94

0.00

2.20

0.58

19.82

5.18

43.54

2.98

0.79

3.21

4.95

20.05

3.92

64.36

0.00

5.66

0.00

25.00

0.00

141.50

0.00

3.03

0.00

25.00

0.00

75.63

4,916.64

2,379.72

TOTAL

15+600

PANJANG
(M)
14

15+625

16

15+650

24

15+675

14

15+700

24

15+725

23

15+750

16

15+775

15

15+800

15

15+825

12

15+850

15

15+875

12

15+900

14

15+925

26

15+950

26

15+975

20

16+000

22

16+025

13

16+050

16

16+075

16

16+100

16

16+125

16

16+150

14

16+175

13

16+200

19

STA

RATA - RATA
(M)

JUMLAH
( M2 )

15

375

20

500

19

475

19

475

23.5

587.5

19.5

487.5

15.5

387.5

15

375

13.5

337.5

13.5

337.5

13.5

337.5

13

325

20

500

26

650

23

575

21

525

17.5

437.5

14.5

362.5

16

400

16

400

16

400

15

375

13.5

337.5

16

400

9.5
JUMLAH

237.5
10600

PERHITUNGAN VOLUME LAPIS PERMUKAAN


LEBAR
(M)
6.00

TEBAL
(M)
0.10

LUAS
(M2)
0.60

PANJANG
(M)
600.00

VOLUME
(M3)
360.00

TOTAL

360.00

PERHITUNGAN VOLUME LAPIS PONDASI ATAS (LPA)


LEBAR
(M)
6.00

TEBAL
(M)
0.15

LUAS
(M2)
0.90

PANJANG
(M)
600.00

VOLUME
(M3)
540.00

TOTAL

540.00

PERHITUNGAN VOLUME LAPIS PONDASI BAWAH (LPB)


LEBAR
(M)
6.00

TEBAL
(M)
0.30

LUAS
(M2)
1.80

PANJANG
(M)
600.00

VOLUME
(M3)
1,080.00

TOTAL

1,080.00

PERHITUNGAN VOLUME BAHU JALAN


L
1.25

DIMENSI (M)
T1
T2
0.45
0.30
TOTAL

PENYIAPAN BADAN JALAN


Lebar jalan
6.50 m
Lebar bahu jalan
2.50 m
Panjang jalan
600.00 m2
Luas badan jalan
5400

VOLUME
Kiri + Kanan (M3)
600.00
562.50
562.50

VOLUME PARIT
JARAK
STA

KIRI

DIMENSI PARIT

KANAN

LB

LA

VOLUME

LUAS PARIT

KIRI

KANAN

15+600
12.5

0.5

0.8

0.5

0.325

4.0625

0.5

0.8

0.5

0.325

0.5

0.8

0.5

0.325

12.5

25

0.5

0.8

0.5

0.325

4.0625

8.125

25

25

0.5

0.8

0.5

0.325

8.125

8.125

25

25

0.5

0.8

0.5

0.325

8.125

8.125

12.5

12.5

0.5

0.8

0.5

0.325

4.0625

4.0625

0.5

0.8

0.5

0.325

12.5

0.5

0.8

0.5

0.325

4.0625

25

0.5

0.8

0.5

0.325

8.125

12.5

0.5

0.8

0.5

0.325

4.0625

12.5

0.5

0.8

0.5

0.325

4.0625

25

12.5

0.5

0.8

0.5

0.325

8.125

4.0625

25

25

0.5

0.8

0.5

0.325

8.125

8.125

25

25

0.5

0.8

0.5

0.325

8.125

8.125

12.5

12.5

0.5

0.8

0.5

0.325

4.0625

4.0625

12.5

0.5

0.8

0.5

0.325

4.0625

25

12.5

0.5

0.8

0.5

0.325

8.125

4.0625

25

25

0.5

0.8

0.5

0.325

8.125

8.125

25

25

0.5

0.8

0.5

0.325

8.125

8.125

25

25

0.5

0.8

0.5

0.325

8.125

8.125

12.5

25

0.5

0.8

0.5

0.325

4.0625

8.125

12.5

0.5

0.8

0.5

0.325

4.0625

0.5

0.8

0.5

0.325

101.563

109.69

15+625
15+650
15+675
15+700
15+725
15+750
15+775
15+800
15+825
15+850
15+875
15+900
15+925
15+950
15+975
16+000
16+025
16+050
16+075
16+100
16+125
16+150
16+175
16+200
VOLUME PARIT

BAGIAN PROYEK

PEKERJAAN
PROVINSI
ITEM PEMBAYARAN NO.
JENIS PEKERJAAN
SATUAN PEMBAYARAN

:
:
: 8.2 (3)
: LAPIS PONDASI JALAN KELAS C1
: M3

NO.

KOMPONEN

A.

TENAGA

1.
2.
3.

Pekeja
mandor

Analisa E-521

PERKIRAAN KUANTITAS
TOTAL HARGA (Rp)
% THD.BIAYA PROYEK

SATUAN

jam
jam

PERKIRAAN
KUANTITAS

0.0000
0.0000

HARGA
SATUAN
(Rp.)

6,858.00
11,572.00

JUMLAH HARGA TENAGA


B.
1.
2.
3.

1.
2.
3
4
5

D.
E.
F.
Note :

JUMLAH
HARGA
(Rp.)

0.00
0.00

0.00

BAHAN
Agregat kelas c1

M3

1.2000

205,000.00

JUMLAH HARGA BAHAN


C.

:
:
:

246,000.00

246,000.00

PERALATAN
DUMP TRUCK
WHEEL LOADER
WATER TANKER
PNEUMATIC ROLLER
ALAT BANTU

JAM
JAM
JAM
JAM

0.3111
190,825.42
0.0178
377,716.53
0.0211
150,397.53
0.0043
218,826.96
1.0000
200.00
JUMLAH HARGA PERALATAN

JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C)


OVERHEAD & PROFIT 10% x D
HARGA SATUAN PEKERJAAN (D + E)

59,374.29
6,741.93
3,171.03
937.41
200.00
70,424.67
316,424.67
31,642.47
348,067.13

1 Satuan dapat berdasarkan atas jam operasi untuk Tenaga Kerja dan Peralatan, Volume dan / atau ukuran berat untuk
bahan-bahan.
2 Kuantitas satuan adalah kuantitas setiap komponen untuk menyelesaikan satu satuan pekerjaan dari nomor mata
pembayaran.
3 Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis dipakai dan operator.
4 Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berkaitan (tetapi tidak termasuk PPN yang dibayar
dari Kontrak) dan biaya-biaya lainnya.

DAFTAR
HARGA DASAR SATUAN ALAT
BAGIAN PROYEK

PEKERJAAN
PROVINSI

:
:

No.

1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20

JENIS

ALAT

ASPHALT MIXING PLANT


ASPHALT FINISHER
ASPHALT SPRAYER
BULLDOZER 100 - 150 HP
AIR COMPRESSOR
CONCRETE MIXER 0.3 - 0.6 M3
DUMP TRUCK 3 - 4 M3
DUMP TRUCK
EXCAVATOR 80 - 180 HP
PLAT BED TRUCK 3 - 4 M3
GENERATOR SET
MOTOR GRADER > 100 HP
WHEEL LOADER 1.0 - 1.6 M3
TANDEM ROLLER 6 - 8 T
PNEUMATIC TIRE ROLLER 8 - 10 T
VIBRATORY ROLLER 5 - 8 T
CONCRETE VIBRATOR
WATER PUMP 70 - 100 mm
WATER TANKER 3000 - 4500 L
JACK HAMMER

E01
E02
E03
E04
E05
E06
E08
E09
E10
E11
E12
E13
E15
E17
E18
E19
E20
E22
E23
E26

TENAGA
(HP)

UMUR
(TAHUN)

150.0
47.0
15.0
150.0
80.0
28.0
100.0
125.0
80.0
100.0
175.0
125.0
105.0
50.0
60.0
75.0
10.0
18.0
100.0
3.0

10.0
10.0
5.0
5.0
3.0
3.0
3.0
3.0
5.0
3.0
5.0
5.0
5.0
5.0
5.0
4.0
4.0
3.0
5.0
2.0

OPERASI
PER TAHUN
(JAM)

1,500.00
2,000.00
2,000.00
2,000.00
2,000.00
1,500.00
2,000.00
2,000.00
2,000.00
2,000.00
2,000.00
2,000.00
2,000.00
2,000.00
1,800.00
2,000.00
2,000.00
1,200.00
2,000.00
1,000.00

HARGA ALAT
(Rp.)

2,700,000,000.00
310,000,000.00
220,000,000.00
1,800,000,000.00
180,000,000.00
80,000,000.00
250,000,000.00
320,000,000.00
1,350,000,000.00
230,000,000.00
250,000,000.00
1,300,000,000.00
1,300,000,000.00
650,000,000.00
650,000,000.00
900,000,000.00
35,000,000.00
40,000,000.00
60,000,000.00
36,000,000.00

HARGA SATUAN
(Rp.) / JAM

PERHITUNGAN BIAYA PERALATAN


BAGIAN PROYEK

PEKERJAAN
PROVINSI

:
:

SATUAN PEMBAYARAN

Rp. / Jam

A. URAIAN PERALATAN
1
2
3
4
5

Jenis Peralatan
Kapasitas / Tenaga ( dalam HP )
Umur ( dalam Tahun ) ( A )
Waktu Operasi 1 tahun ( dalam jam )
Harga Setempat
(B)

(W)

=
=
=
=
= Rp.

JACK HAMMER
3.00
2.00
1,000.00
36,000,000.00

B. BIAYA PASTI PERJAM


1

Nilai Sisa Alat

(C)

10 % x ( B )

= Rp.

Faktor Angsuran Modal ( D )


I ( bunga )
10.0 %

i(1+i)^A
((1+i)^A)-1

Biaya Pasti Per Jam

(E)

( B - C ) D + ( 0.125 x C )
W

3,600,000.00
0.58

= Rp.

18,218.57

C. BIAYA OPERASIONAL PERJAM KERJA ( BIAYA LANGSUNG )

Bahan Bakar

(F)

( 12.5 s/d 17.5 % ) x HP x Ms

= Rp.

2,772.00

Pelumas

(G)

( 1 s/d 2 % ) x HP x Mp

= Rp.

600.00

Perawatan dan
(H)
Perbaikan ( Spare Part )

( 12.5 s/d 17.5 % ) x B


W

= Rp.

5,400.00

Operator / Driver

(J)

Rp.

70,000.00 per hari

= Rp.

10,000.00

Pembantu Opr. / Driver ( K )

Rp.

42,000.00 per hari

= Rp.

6,000.00

Biaya Langsung

(F)+(G)+(H)+(J)+(K)

= Rp.

24,772.00

= Rp.

42,990.57

Koefisien :
BBM
Pelumas
Perawatan

(T)

=
=
=

14.00 %
1.00 %
15.00 %

Harga BBM ( Solar )


Rp.
6,600.00
Harga Pelumas
Rp. 20,000.00

BIAYA OPERASIONAL TOTAL PER JAM = ( E + T )

ANALISA HARGA MATERIAL ON SITE ( MOS )


Bagian Proyek

: PERENCANAAN JALAN PERBATASAN KECAMATAN KRAYAN

Pekerjaan

: PERENCANAAN DED TEKNIS JALAN LONG BAWAN - P' PANI

Material

: Kayu Ulin
: M3

KABUPATEN NUNUKAN PROPINSI KALIMANTAN TIMUR

Satuan

No.

U R A I A N

Harga Setempat

Penanganan / perawatan

Angkutan ke lapangan

Bongkar muat, penyimpanan dll

Material :

Rp.

/ SATUAN

Lokal
JUMLAH
HARGA
(Rp.)

2,800,000.00 / M3

2,800,000.00

40,000.00 / M3

40,000.00

160,000.00 / M3

160,000.00

50,000.00 / M3

50,000.00

JUMLAH

3,050,000.00

ANALISA HARGA MATERIAL ON SITE ( MOS )


Bagian Proyek

: PERENCANAAN JALAN PERBATASAN KECAMATAN KRAYAN

Pekerjaan

: PERENCANAAN DED TEKNIS JALAN LONG BAWAN - P' PANI

Material

: Agregat
Kayu Ulin
Kelas C1
: M3

KABUPATEN NUNUKAN PROPINSI KALIMANTAN TIMUR

Satuan

No.

U R A I A N

Harga Setempat

Material :

Rp.

/ SATUAN

Lokal
JUMLAH
HARGA
(Rp.)

175,000.00 / M3

175,000.00

Penanganan / perawatan

10,000.00 / M3

10,000.00

Angkutan ke lapangan

15,000.00 / M3

15,000.00

Bongkar muat, penyimpanan dll

5,000.00 / M3

5,000.00

JUMLAH

205,000.00

DAFTAR
HARGA DASAR SATUAN BAHAN
Bagian Proyek

Pekerjaan

Propinsi

No.

1.
2.
3.
4.
5.
6.
7.
8.
9.
10.
11.
12.
13.
14.
15.
16.
17.
18.
19.
20.
21.
22.
23.
24.
25.
26.
27.
28.
29.
30.
31

U R A I A N

Pasir Pasang
Pasir Cor
Batu Kali / Batu Gunung
Agregat Kasar utk Pondasi Kelas A, B
Agregat Kasar utk ATB, AC
Agregat Kasar utk Beton
Agregat Halus utk Pondasi Kelas A
Agregat Halus utk Pondasi Kelas B
Agregat Halus utk ATB, AC
Filler
Material Tanah Timbunan Biasa
Material Timbunan Pilihan
Aspal Cement
Kerosen
Semen
Besi Beton
Kawat Beton
Kawat Bronjong
Cat Marka Jalan
Paku
Kayu Perancah
Bensin
Solar
Minyak Pelumas / Oli
Pipa Galvanis Diameter 1.6"
Thinner
Glass Bit
Pelat Rambu
Rel Pengaman (Guard Rail)
Kayu Ulin 10/10 - 400 m3
agregat kelas c1

KODE

SATUAN

M01
M01
M02
M03
M03
M03
M04
M04
M04
M05
M08
M09
M10
M11
M12
M13
M14
M15
M17
M18
M19
M20
M21
M22
M24
M33
M34
M35
M36
M28

m3
m3
m3
m3
m3
m3
m3
m3
m3
kg
m3
m3
kg
ltr
zak
kg
kg
kg
kg
kg
m3
ltr
ltr
ltr
batang
ltr
kg
bh
m'
m3
m3

HARGA
SATUAN (Rp.)

85,000.00
236,175.00
272,000.00
242,550.00
189,000.00
289,800.00
263,550.00
256,125.00
266,700.00
1,150.00
38,400.00
45,000.00
5,650.00
6,300.00
73,500.00
14,000.00
20,000.00
29,200.00
88,000.00
16,000.00
1,358,500.00
8,100.00
8,400.00
37,200.00
170,000.00
11,000.00
16,000.00
200,000.00
450,000.00
2,800,000.00
175,000.00

KET.

ITEM PEKERJAAN
JENIS PEKERJAAN
SATUAN PEMBAYARAN

No.

5.

Analisa EI - 813

: 5.1 (2)
: LAPIS PONDASI AGREGAT KELAS A
: M3

URAIAN

ANALISA HARGA SATUAN PEKERJAAN


Lihat perhitungan dalam FORMULIR STANDAR UNTUK
PEREKAMAN MASING-MASING HARGA SATUAN.
Didapat Harga Satuan Pekerjaan :
Rp.

452,129.68 / m3

6.

WAKTU PELAKSANAAN YANG DIPERLUKAN


Masa Pelaksanaan : . . . . . . . . . .
bulan

7.

VOLUME PEKERJAAN YANG DIPERLUKAN


4,110.00 m3
Volume Pekerjaan :

URAIAN ANALISA HARGA SATUAN


Lanjutan
KODE

KOEF.

SATUAN

KETERANGAN

RENCANA ANGGARAN BIAYA


( RAB )
No.
I
1.1
1.2
1.3
1.4
1.5
II
2.1
2.2
2.3
2.4
2.5
III
3.1
3.2
3.3
3.4
3.5

URAIAN
PEKERJAAN PERSIAPAN
Papan Nama Proyek
Pengukuran Ulang
Direksi Keet
Barak Kerja + Gudang
Mobilisasi & Demobilisasi
Jumlah
PEKERJAAN TANAH
Land Clearing
Galian Tanah
Timbunan Tanah
Penyiapan Badan Jalan
Parit Galian Tanah
Jumlah
PEKERJAAN KONSTRUKSI JALAN
Lapis Pondasi Bawah (Sirtu B)
Lapis Pondasi Atas (Stabilitas Tanah Semen)
Bahu Jalan Lapis Pondasi klas A
Lapis permukaan (Laston)
Lapis Perekat
Jumlah

KODE
-

KUANTITAS SATUAN

HARGA SATUAN

JUMLAH

1.00
2.40
24.00
24.00
1.00

bh
km
m2
m2
Ls

Rp
Rp
Rp
Rp
Rp

750,000.00
1,000,000.00
10,000,000.00
5,000,000.00
65,850,000.00

Rp
Rp
Rp
Rp
Rp
Rp

750,000.00
2,400,000.00
240,000,000.00
120,000,000.00
65,850,000.00
429,000,000.00

E-33
E-311
E-321
E-33
E-21

25,137.75
82,437.43
110,284.09
25,137.75
558.73

m2
m3
m3
m3
m3

Rp
Rp
Rp
Rp
Rp

953.75
4,930.83
11,336.27
953.75
5,591.17

Rp
23,975,129.06
Rp
406,484,952.97
Rp 1,250,210,220.94
Rp
23,975,129.06
Rp
3,123,954.41
Rp 1,707,769,386.45

E-512
E-542
E-521
E-634
E-612

6,923.10
3,461.55
3,600.00
1,730.755
13,440.00

m3
m3
M3
M3
Liter

Rp
Rp
Rp
Rp
Rp

42,142.72
14,875.18
26,652.78
9,052.46
940.77

Rp
Rp
Rp
Rp
Rp
Rp

291,758,264.83
51,491,179.33
95,950,008.00
15,667,590.41
12,643,948.80
467,510,991.37

REKAPITULASI
No.

Uraian

Total Biaya

PEKERJAAN PERSIAPAN

Rp

429,000,000.00

II

PEKERJAAN TANAH

Rp

1,707,769,386.45

III

PEKERJAAN KONSTRUKSI JALAN

Rp

467,510,991.37

Total

Rp

2,604,280,377.82

PPN 10 %

Rp

260,428,037.78

Total

Rp

2,864,708,415.60

Dibulatkan

Rp

2,864,709,000.00

Terbilang :
Dua miliyar delapan ratus enam puluh empat juta tujuh ratus sembilan ribu rupiah