Pekerjaan
Lokasi
Pemilik
Kontraktor
NO
URAIAN
(1)
(2)
A. PEKERJAAN RUTIN & PERSIAPAN
I
PEKERJAAN PERSIAPAN
1. Mob/demob peralatan dan tenaga kerja
2. Pengukuran/Bouwplank
SUB TOTAL I
II
PEKERJAAN RUTIN
1. Penyediaan listrik kerja
2. Penyediaan air kerja
3. Pembersihan lokasi selama proyek
SUB TOTAL II
III
PEKERJAAN TANAH
Urugan Tanah setinggi 50 cm'
SUB TOTAL III
B. PEKERJAAN STRUKTUR
I
PEKERJAAN STRUKTUR BAWAH
1.1 SLOOF
a. Sloof beton ukuran
b. Besi
c. Bekisting
VOL
(4)
SAT
(5)
1.00
19.50
ls
m'
500,000.00
36,973.00
1.00
ls
ls
ls
1,000,000.00
Tanah Merah
HARGA SAT
(6)
m3
121,000.00
0.59
93.29
3.90
m3
kg
m2
715,000.00
12,600.00
62,133.50
manual
Pasir pasang t = 5 cm
Batu kosong
1:5
manual
8.19
1.56
4.97
2.05
m3
m3
m3
m3
m3
26,070.00
198,000.00
364,430.00
618,464.00
11,770.00
1.42
377.14
28.35
m3
kg
m2
850,000.00
12,600.00
62,133.50
0.09
25.17
0.72
m3
kg
m2
715,000.00
12,600.00
62,133.50
SUB TOTAL I
PEKERJAAN STRUKTUR ATAS
2.1 BALOK DAN PELAT
a. Balok
B1 uk 15/20
Beton Balok
Besi
Bekisting
Stootwerk
0.89
194.97
8.18
2.23
m3
kg
m2
m2
850,000.00
12,600.00
62,133.50
152,868.00
1.87
167.70
9.33
9.33
m3
m2
m2
m2
850,000.00
12,600.00
110,000.00
152,868.00
0.16
8.39
1.61
0.81
m3
m2
m2
m2
715,000.00
12,600.00
110,000.00
152,868.00
d. Ringbalk 15x20
Beton Balok
Besi
Bekisting
0.47
55.33
8.55
m3
kg
m2
715,000.00
12,600.00
62,133.50
e. Ringbalk 12x12
Beton Balok
Besi
Bekisting
0.47
55.33
4.28
m3
kg
m2
715,000.00
12,600.00
62,133.50
pc : psr = 1 : 5
pc : psr = 1 : 3
20x25
79.63
130.26
3.84
m2
m2
m2
66,000.00
58,300.00
95,600.00
II
SPESIFIKASI
(3)
SUB TOTAL II
C. PEKERJAAN ARSITEKTUR
I
PEKERJAAN DINDING
1.1 PEKERJAAN DINDING BAWAH
a. Dinding pasangan bataton
b. Plesteran + acian dinding dan kolom
c. Pasang keramik dinding dapur
NO
(1)
URAIAN
(2)
II
III
IV
SUB TOTAL I
PEKERJAAN LANTAI
a. Urugan pasir bawah lantai
b. Pasang keramik lantai
c. Pasang keramik Meja Dapur
d. Pasang keramik lantai teras
SUB TOTAL II
PEKERJAAN PLAFOND
a. Pasang acian beton ekspose
b. Pasang rangka + penutup plafond
c. Pengecatan plafond
SUB TOTAL III
PEKERJAAN KUSEN
1
KUSEN TYPE PJ1
a. Kusen Kayu
b. Pengecatan kayu dan daun jendela
c. Daun Pintu
d. Daun Jendela
e. Kaca 5 mm
f. Engsel Jendela
g. kait angin
h. Selot/Gerendel
i. Engsel Pintu
j. Kunci Tanam
2
a.
b.
c.
d.
e.
f.
KUSEN TYPE P1
Kusen Kayu
Pengecatan kayu dan daun jendela
Daun Pintu
Kaca S 5 mm
Engsel Pintu
Kunci Tanam
a.
b.
c.
d.
e.
f.
g.
KUSEN TYPE J1
Kusen Kayu
Pengecatan kayu dan daun jendela
Daun Jendela
Kaca 5 mm
Engsel Jendela
kait angin
Selot/Gerendel
a.
b.
c.
d.
Pintu Besi
Kusen Besi
Pengecatan besi
Kunci Tanam
Engsel Pintu
SUB TOTAL IV
PEKERJAAN ATAP
1. Pasang rangka atap baja ringan
2. Pasang genteng
3. Pasang bubungan genteng
4. Pasang listplank
5. Pasang Teralis pengaman
6. Pasang atap Polycarbonate+ Rangka Hollow
SUB TOTAL V
VI
PEKERJAAN FINISHING
1. Pengecatan dinding dalam + kolom
2. Pasang Water Proofing Coating
3. Pengecatan Listplank
Pemasangan Keramik Corak Bata Ekspose utk
4. Fasade
SUB TOTAL VI
VII
PEKERJAAN UTILITAS
7.1 INSTALASI PENERANGAN
1. Instalasi titik lampu
2. Instalasi stop kontak
3. Pasang lampu
4. Pasang saklar tunggal
5. Pasang saklar double
6. Pasang stop kontak
SPESIFIKASI
(3)
VOL
(4)
SAT
(5)
pc : psr = 1 : 5
pc : psr = 1 : 5
12.37
12.37
m2
m2
66,000.00
58,300.00
pasir pasang t = 5 cm
40x40, Hercules
20x20
30x30
1.50
30.80
1.20
9.40
m3
m2
m2
m2
198,000.00
81,200.00
84,250.00
84,250.00
pc : psr = 1 : 5
Plafond GRC, tebal 4 mm + rangka kayu
vinilex/setara
3.00
39.88
39.88
m2
m2
m2
22,100.00
62,750.00
44,000.00
Kayu mahoni
Avian/setara
Kayu mahoni
Kayu mahoni
0.06
5.28
1.68
0.96
0.68
2.00
2.00
2.00
3.00
1.00
m3
m2
m2
m2
m2
bh
bh
bh
bh
bh
4,420,000.00
43,300.00
365,500.00
270,000.00
95,000.00
35,000.00
25,000.00
25,000.00
35,000.00
75,000.00
0.11
6.30
5.04
0.90
9.00
3.00
m3
m2
m2
m2
bh
bh
4,420,000.00
43,300.00
365,500.00
95,000.00
35,000.00
75,000.00
paloma
paloma
paloma
0.10
9.38
1.92
1.21
6.00
6.00
6.00
m3
m2
m2
m2
bh
bh
bh
4,420,000.00
43,300.00
270,000.00
95,000.00
35,000.00
25,000.00
25,000.00
Besi Hollow 4 x 4
Avian/setara
paloma
paloma
2.00
2.10
1.00
3.00
m2
m2
m2
bh
385,000.00
43,300.00
75,000.00
35,000.00
genteng plentong
genteng plentong
GRC 20cm
Besi Hollow 4 x 4
Besi Hollow 4 x 4
31.53
31.53
4.30
23.27
2.50
11.00
m2
m2
m
m'
m2
m2
160,000.00
48,850.00
77,000.00
60,600.00
385,000.00
358,900.00
vinilex/setara
aquaproof
vinilex/setara
142.63
32.00
6.98
m2
m2
m2
44,000.00
98,500.00
44,000.00
m2
52,795.00
7.00
5.00
7.00
4.00
2.00
5.00
ttk
ttk
bh
bh
bh
bh
215,000.00
240,000.00
70,000.00
25,000.00
25,000.00
25,000.00
1.00
1.00
ttk
ttk
280,000.00
280,000.00
paloma
paloma
paloma
paloma
paloma
Kayu mahoni
Avian/setara
Kayu mahoni
paloma
paloma
Kayu mahoni
Avian/setara
Kayu mahoni
HARGA SAT
(6)
NO
URAIAN
(1)
(2)
7.3 PEKERJAAN SANITAIR
1. Pas Roof drain
2. Zink
3. Kran zink
4. Pas Kran air 1/2"
SPESIFIKASI
(3)
VOL
(4)
SAT
(5)
ex. ONDA
ex. ONDA
ex. ONDA
ex. ONDA
2.00
1.00
1.00
4.00
bh
bh
bh
bh
42,000.00
385,000.00
165,000.00
38,500.00
Wafin/setara
Wafin/setara
Wafin/setara
4.00
32.00
16.00
m'
m'
m'
29,000.00
17,500.00
15,000.00
AW Vinilon /setara
30.00
m'
37,000.00
Besi Hollow 4 x 4
15.00
m2
385,000.00
VIII
JUMLAH
T OT AL
DIBULATKAN
HARGA SAT
(6)
BIAYA
(7)
500,000.00
720,973.50
1,220,973.50
1,000,000.00
1,000,000.00
-
418,275.00
1,175,428.80
242,320.65
1,836,024.45
213,513.30
308,880.00
3,075,312.24
24,099.08
3,621,804.62
1,204,875.00
4,751,991.36
1,761,484.73
7,718,351.09
61,776.00
317,179.80
44,736.12
423,691.92
13,599,872.07
758,625.000
2,456,659.800
508,329.697
341,086.725
4,064,701.222
1,585,250.00
2,113,020.00
1,025,750.00
1,425,494.10
6,149,514.10
115,293.75
105,651.00
177,375.00
123,249.83
521,569.58
333,547.500
697,118.940
531,396.759
1,562,063.199
333,547.500
697,118.940
265,698.379
1,296,364.819
13,594,212.915
5,255,580.00
7,594,158.00
367,104.00
BIAYA
(7)
13,216,842.00
816,420.00
721,171.00
1,537,591.00
14,754,433.00
297,000.00
2,500,960.00
101,100.00
791,950.00
3,691,010.00
3,691,010.00
66,300.00
2,502,219.00
1,754,544.00
4,323,063.00
4,323,063.00
265,200.00
228,624.00
614,040.00
259,200.00
64,837.50
70,000.00
50,000.00
50,000.00
105,000.00
75,000.00
1,781,901.50
497,250.00
272,790.00
1,842,120.00
85,500.00
315,000.00
225,000.00
3,237,660.00
437,580.00
406,327.20
518,400.00
114,712.50
210,000.00
150,000.00
150,000.00
1,987,019.70
770,000.00
90,930.00
75,000.00
105,000.00
1,040,930.00
8,047,511.20
5,044,803.70
1,540,241.63
331,100.00
1,409,866.70
962,500.00
3,947,900.00
13,236,412.02
6,275,720.00
3,152,000.00
307,099.68
9,734,819.68
1,505,000.00
1,200,000.00
490,000.00
100,000.00
50,000.00
125,000.00
3,470,000.00
280,000.00
280,000.00
560,000.00
BIAYA
(7)
84,000.00
385,000.00
165,000.00
154,000.00
788,000.00
116,000.00
560,000.00
240,000.00
916,000.00
1,110,000.00
1,110,000.00
6,844,000.00
5,775,000.00
5,775,000.00
95,821,307.38
95,821,307.38
95,821,000.00
PERHITUNGAN VOLU
RUMAH Bp. PUSAK
LANTAI 1
Total Panjang Bangunan/Dinding/Sloof
Bowplank
M'
19.50 M'
19.50
PEKERJAAN TANAH
1. Galian Pondasi Batu Kali
pondasi tepi
pondasi tengah
Lebar
0.60
0.60
Tinggi
0.70
0.70
Volume
8.19
1/4-nya
Panjang
19.50
Lbr. Ats
0.25
0.25
lantai
pondasi tepi
pondasi tengah
Panjang
58.50
19.50
Lebar
1.00
0.60
0.80
pondasi tepi
pondasi tengah
Lebar
0.60
0.80
Tinggi
0.15
0.15
Lebar
0.15
buah
4.00
111.43
Tinggi
0.20
Panjang
19.50
0.55
Lebar
0.15
Tinggi
0.15
4 Pasir urug
5 Aanstamping
0.25
Besi
a. batang 12
b. Cincin 8-175
VOLUME BESI
b. Kolom 12/12 lt. 2 badan
VOLUME BETON
Besi
a. batang 12
b. Cincin 8-175
VOLUME BESI
5. BALOK LANTAI DAK ATAP
a. Balok 15/20
VOLUME BETON
Besi
a. batang 12
c. Cincin 8-175
VOLUME BESI
Stootwerk
b. Ring Balok 15/20
VOLUME BETON
Besi
a. batang 10
b. Cincin 8-200
VOLUME BESI
Stootwerk
c. Ring Balok 12/12 gunungan
VOLUME BETON
Besi
a. batang 10
b. Cincin 8-200
VOLUME BESI
Stootwerk
6 PELAT BETON
Pelat Lantai dak atap
VOLUME BETON
Besi
a. batang 8 arah x
b. batang 8 arah y
a. batang 8 arah x
b. batang 8 arah y
buah
4.00
473.14
Panjang
82.80
0.45
Lebar
0.12
buah
4.00
30.00
Tinggi
0.12
Panjang
6.00
0.33
Lebar
0.15
buah
6.00
170.00
Tinggi
0.20
Panjang
29.750
0.55
0.15
Lebar
0.15
buah
4.00
77.75
Tinggi
0.20
Panjang
15.55
0.55
Lebar
0.12
buah
4.00
90.47
Tinggi
0.12
Panjang
18.09
0.33
Luas
18.65
buah
36.00
43.00
14.00
43.00
Tebal
0.10
Panjang
4.30
3.60
4.30
1.40
Stootwerk
VOLUME BETON
Besi
a. batang 8 arah x
b. batang 8 arah y
Luas
1.61
buah
14.33
5.00
Tebal
0.10
Panjang
0.75
2.15
Stootwerk
Meja Dapur
Pintu P1
pjg
lbr kayu
pjg kayu
Volume
Luas
Pengecatan kayu
Daun Pintu
Kaca S 5mm
Engsel pintu
Kunci tanam
Lbr
Tgg
1.75
8.00
1.30
2.10
0.05
0.15
0.06 M3
3.04 M2
0.42
8.00
0.80
2.10
0.80
1.20
0.65
1.05
2.00
1.00
2.00
1.00
2.00
1.00
3.00
1.00
1.00
1.00
Lbr
Tgg
0.90
5.00
2.10
2.10
0.05
0.15
0.11 M3
5.67 M2
0.42
5.00
0.80
2.10
0.30
1.00
3.00
1.00
1.00
1.00
Jendela J1
pjg
lbr kayu
pjg kayu
Volume
Luas
Pengecatan kayu
Daun jendela
Kaca polos 5mm
Gerendel
Kait angin
Engsel jendela
Lbr
Tgg
0.60
1.70
4.40
1.60
0.05
0.15
0.10 M3
3.06 M2
0.42
4.40
0.40
1.60
0.35
1.15
2.00
1.00
2.00
1.00
2.00
1.00
Pintu Besi
pjg
lbr kayu
pjg kayu
Volume
Luas
Pengecatan kayu
Daun Pintu
Engsel pintu
Kunci tanam
Lbr
Tgg
0.90
2.15
5.00
2.10
0.05
0.15
0.04 M3
1.94 M2
0.42
5.00
0.80
2.10
3.00
1.00
1.00
1.00
BV
pjg
lbr kayu
pjg kayu
Volume
Luas
Pengecatan kayu
Kaca 5 mm
Lbr
Tgg
0.70
0.50
2.20
0.70
0.05
0.15
0.02 M3
0.35 M2
0.42
2.20
0.40
0.60
PEKERJAAN PASANGAN
LANTAI 1
BANGUNAN
Pas. Bata 1 : 5 untuk as tengah
badan
dikurangi kusen
Panjang
19.50
11.77
Tinggi
3.20
Plesteran 1 : 5
badan
Pas. Bata 1 : 5 untuk as tepi
badan
dikurangi kusen
Plesteran 1 : 5
Luas
50.63
Jumlah
2.00
Panjang
Tinggi
7.25
4.00
- m2
Luas
29.00
Jumlah
1.00
Panjang
5.15
3.10
Tinggi
1.80
1.00
badan
Luas
12.37
Jumlah
1.00
31.53
pjg
lbr miring
total
4.30
7.33
badan
GUNUNGAN/AMPIG
Pas. Bata 1 : 5
Plesteran 1 : 5
PEKERJAAN ATAP
Rangka atap + Penutup atap
Bubungan genteng
4.30 M
31.53 M2
Listplank
23.27 M1
Pengecatan listplang
6.98 M2
PEKERJAAN PLAFOND
Plafond + rangka
Luasan 1
28.50 M2
atap
11.38 M2
39.88
34.00 M
Lantai 1
20.00
14.00
atap
40.32
Lantai 1
Listprofil
PEKERJAAN LANTAI
lantai keramik 30/30
M2
Lantai dalam
30.80
Lantai teras
9.40
1.20 M2
3.84 M2
0.24 M3
PEKERJAAN PENGECATAN
Pengecatan tembok luar & dalam
142.63 M2
24
4
4 bh
0 bh
22.00
8.00
PERHITUNGAN VOLUME
RUMAH Bp. PUSAKA
Panjang
19.50
Volume
- M3
8.19 M3
8.19 M3
total
Volume
2.05 M3
2.05 M3
total
Lbr. Bwh
0.50
0.60
Tinggi
0.60
0.60
Volume
- M3
4.97 M3
4.97 M3
total
Tinggi
0.05
0.10
0.10
Panjang
19.50
Volume
2.93
1.56
4.49
M3
M3
M3
M3
total
Volume
- M3
2.34 M3
2.34 M3
Panjang
19.500
berat besi m/kg
0.89
0.39
total
Volume
0.59
Volume
69.26
24.02
93.29
Panjang
3.50
Bekisting
M3
Tinggi
0.20
Jumlah
2.00
Bekisting
jmlh
Tinggi
0.30
kg
kg
kg
buah Vol
18.00
1.42 M3
Volume
294.11 kg
83.04 kg
377.14 kg
Panjang
1.00
berat besi m/kg
0.89
0.39
total
buah
6.00
Volume
21.31
3.86
25.17
Panjang
29.750
berat besi m/kg
0.89
0.39
total
29.75
Volume
0.89
Volume
158.51
36.47
194.97
4.46
Panjang
15.55
berat besi m/kg
0.62
0.39
total
-
Volume
0.47
Volume
38.56
16.76
55.33
-
Panjang
18.09
berat besi m/kg
0.62
0.39
total
-
Volume
0.26
Volume
44.87
11.70
56.58
-
Vol
0.39
0.39
0.39
0.39
total
Bekisting
jmlh
6.00
Tinggi
0.12
Bekisting
Lebar
0.15
Tinggi
0.20
Bekisting
Lebar
0.15
Tinggi
0.20
Bekisting
Lebar
0.12
Tinggi
0.12
Bekisting
Luas
18.65
Tinggi
-
0.09 M3
kg
kg
kg
M3
kg
kg
kg
M2
M3
kg
kg
kg
M2
M3
kg
kg
kg
M2
Volume
1.87 M3
Jumlah
1.00
1.00
1.00
1.00
Koef.
18.00
Volume
60.37
60.37
23.48
23.48
167.70
kg
kg
kg
kg
kg
18.65 M2
Jumlah
1.00
Volume
0.16 M3
Jumlah
1.00
1.00
Koef.
0.39
0.39
total
Bekisting
Luas
1.61
Volume
4.19 kg
4.19 kg
8.39 kg
1.61 M2
Lbr
Tgg
bh
0.90
2.10
0.85
1.20
1.00
1.75
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
5.28
1.68
0.96
0.68
2.00
2.00
2.00
3.00
1.00
=
=
=
=
=
=
=
=
=
Lbr
Tgg
bh
2.10
0.80
3.00
-
3.00
3.00
3.00
3.00
3.00
=
=
=
=
=
6.30
5.04
0.90
9.00
3.00
0.85
M2
M2
M2
M2
bh
bh
bh
bh
bh
M2
M2
M2
bh
bh
Tinggi
0.10
1.60
3.00
3.00
3.00
3.00
3.00
3.00
0.60
=
=
=
=
=
=
bh
1.00
2.10
1.00
1.00
1.00
1.00
9.38
1.92
1.21
6.00
6.00
6.00
M2
M2
M2
bh
bh
bh
2.10
1.68
3.00
1.00
M2
M2
bh
bh
0.80
=
=
=
=
bh
1.00
0.70
1.00
1.00
bh
3.00
0.60
0.40
0.40
=
=
0.92 M2
0.24 M2
=
=
62.40 M2
11.77 M2
total
50.63
M2
101.26 M2
=
=
total
29.00 M2
- M2
29.00 M2
29.00 M2
2.00 =
1.00 =
total
9.27 M2
3.10 M2
12.37 M2
12.37 M2
M2
34.00
40.32
74.32
24.00
8.00
- M
30.00 M
Panjang
19.50
Jumlah
2.00
Volume
7.80 M2
Panjang
3.50
Volume
2.10 M2
37.80 M2
Jumlah
2.00
Panjang
1.00
jumlah
2.00
Volume
0.55 M2
16.36 M2
jumlah
2.00
Volume
0.55 M2
8.55 M2
jumlah
2.00
Volume
0.36 M2
6.51 M2
Panjang
-
Volume
18.65 M2
total
total
total
Volume
0.24 M2
1.44 M2
Panjang
-
Volume
1.61 M2
M
M