DIR (50-100 ) x 2
RG SCRUBBER VENT
VENT
Increase in OP OPENS VENT
COLD SEPERATOR
Increase in OP UNLOADS
DIR
Increase in OP LOADS
DIR
PIC
PV
PT
PV
PIC
OP 0%- PV full CLOSE/HC full LOAD OP 70%- PV full CLOSE/HC UN-LOAD OP 100%- PV full OPEN
PIC
SP OP 0%- PV full OPEN/HC full UN-LOAD OP 15%- PV full CLOSE/HC UN-LOAD OP 50%- HC LOAD
PIC
OP 0%- PV full CLOSE/HC full LOAD OP 35%- PV full CLOSE/HC UN-LOAD OP 50%- PV full OPEN
(0-50 ) x 2
OP 50%- PV full CLOSE/HC full LOAD OP 85%- PV full CLOSE/HC UN-LOAD OP 100%- PV full OPEN
MUG-B HSS
SP
CALC
PIC
OP 0%- PV full CLOSE/HC full LOAD OP 70%- PV full CLOSE/HC UN-LOAD OP 100%- PV full OPEN 2
DIR (0-50 ) x
0-100
HSS
DIR (50-100) x 2
REV ( 0-50 ) x2
HSS
DIR 0-100
Increase in OP UNLOADS
HS
AUTO/MAN
DIR (50-100)X 2
DIR (0-50)X 2
0-100
LSS
SPLIT
SPLIT
LSS
0-100
HIC
1ST STG SUC VENT 1ST STAGE
RAMP??
HIC
2ND STAGE
RAMP??
LSS
FLARE FG SPILLBACK HYDROCOM HYDROCOM
LSS
SPILLBACK
# The control loops is designed to pump the Gas into the system, only if the Hydrogen header pressure(First)/then the inter-stage pressure is satisfied . HSS protects the system by always allowing the Opening/Unloading signal to win # Hydrocom is NOT designed to handle the N2 run, When N2 run is opted the Compressor is loaded to 100%.