Anda di halaman 1dari 1

CGHT MAKE UP GAS COMPRESSOR PRESSURE CONTROL

N2 / H2 MODE NORMAL UNLOAD EMERGEN UNLOAD HYDROCOM MBS

DIR (50-100 ) x 2

RG SCRUBBER VENT

VENT
Increase in OP OPENS VENT

1ST STG SUCTION


REV
Increase in OP UNLOADS

2ND STG SUCTION


Increase in OP UNLOADS

COLD SEPERATOR
Increase in OP UNLOADS

DIR

Increase in OP LOADS

DIR

PIC

PV

PT

PV

PIC
OP 0%- PV full CLOSE/HC full LOAD OP 70%- PV full CLOSE/HC UN-LOAD OP 100%- PV full OPEN

PIC
SP OP 0%- PV full OPEN/HC full UN-LOAD OP 15%- PV full CLOSE/HC UN-LOAD OP 50%- HC LOAD

PIC
OP 0%- PV full CLOSE/HC full LOAD OP 35%- PV full CLOSE/HC UN-LOAD OP 50%- PV full OPEN

(0-50 ) x 2
OP 50%- PV full CLOSE/HC full LOAD OP 85%- PV full CLOSE/HC UN-LOAD OP 100%- PV full OPEN

MUG-B HSS

2ND STG DISCHARGE


DIR

SP
CALC

PIC

OP 0%- PV full CLOSE/HC full LOAD OP 70%- PV full CLOSE/HC UN-LOAD OP 100%- PV full OPEN 2

DIR (0-50 ) x

0-100

HSS

DIR (50-100) x 2

REV ( 0-50 ) x2

HSS
DIR 0-100
Increase in OP UNLOADS

ONLY MODE CHANGE SIGNAL

HS
AUTO/MAN

DIR (50-100)X 2

DIR (0-50)X 2

0-100

LSS

DIR (70-100) x 3.3

SPLIT

REV (0-70) x 1.43

REV (0-70) x 1.43

SPLIT

DIR (70-100) x 3.3

LSS

0-100

HIC
1ST STG SUC VENT 1ST STAGE
RAMP??

HIC
2ND STAGE
RAMP??

LSS
FLARE FG SPILLBACK HYDROCOM HYDROCOM

LSS
SPILLBACK

# The control loops is designed to pump the Gas into the system, only if the Hydrogen header pressure(First)/then the inter-stage pressure is satisfied . HSS protects the system by always allowing the Opening/Unloading signal to win # Hydrocom is NOT designed to handle the N2 run, When N2 run is opted the Compressor is loaded to 100%.

Anda mungkin juga menyukai