Anda di halaman 1dari 1

PILE - M07

SCALE 1:100
Casing top level
Ground floor level
Top level of the pile cap
Concreting level of pile
Cut off level
Bottom level of pile cap

Rock - RQD < 70% CR < 80%


Rock - RQD > 70% CR > 80%

75

Level
(-10.000)

GENERAL DATA
Casing top level
Existing ground level
Casing Length

Level
(-14.945)

(-0.245) m
(-1.290) m
10 m

23.58-02.05

07.08.13

22.00-23.20

07.08.13

7.10-10.40

07.08.13

14.20-21.45

06.08.13

11.55-12.45

06.08.13

Time

Date

Description
Casing installation (- Hr 28 min)
Pile Boring (5 Hr 13 min)
Pile Boring (2 Hr 44 min)
Pile Washing (1 Hr 20 min)
Pile Concreting (2 Hr 07 min)

Concrete
Concrete Volume / m3
Grade Theoritical Actual
Vary %
C - 35

38.79

45.00

Cube Strength / N/mm2


7 Days
28 Days

16.00

24.70

42.57

6000

Level
(-19.245)

4803 mm/hr

Level
(-20.245)
Level
(-20.945)

1500 mm/hr
1050 mm/hr

Level
(-21.945)
2300

(-23.045)
(-23.245)

923 mm/hr
471 mm/hr

600 mm/hr

1500

NO : 17