SCALE 1:100
Casing top level
Ground floor level
Top level of the pile cap
Concreting level of pile
Cut off level
Bottom level of pile cap
75
Level
(-10.000)
GENERAL DATA
Casing top level
Existing ground level
Casing Length
Level
(-14.945)
(-0.245) m
(-1.290) m
10 m
23.58-02.05
07.08.13
22.00-23.20
07.08.13
7.10-10.40
07.08.13
14.20-21.45
06.08.13
11.55-12.45
06.08.13
Time
Date
Description
Casing installation (- Hr 28 min)
Pile Boring (5 Hr 13 min)
Pile Boring (2 Hr 44 min)
Pile Washing (1 Hr 20 min)
Pile Concreting (2 Hr 07 min)
Concrete
Concrete Volume / m3
Grade Theoritical Actual
Vary %
C - 35
38.79
45.00
16.00
24.70
42.57
6000
Level
(-19.245)
4803 mm/hr
Level
(-20.245)
Level
(-20.945)
1500 mm/hr
1050 mm/hr
Level
(-21.945)
2300
(-23.045)
(-23.245)
923 mm/hr
471 mm/hr
600 mm/hr
1500
NO : 17