1-403-845-252
SHALE DATA
Gamma Ray clean line Gamma Ray shale line SP clean line SP shale line Neutron shale line Density shale line Sonic shale line Photoelectric shale line Resistivity shale line GR0 GR100 SP0 SP100 PHINSH PHIDSH DTCSH PESH RSH 30 145 -55 -50 0.18 -0.03 200 3.5 100 API units API units mv mv frac frac usec/m cu ohm-m
INSTRUCTIONS
Type into BLACK cells Read answer in RED cells Change DEFAULTS as needed Do NOT type in shaded cells
WATER DATA
Calculate Water Resistivity from Water Zone
Electrical Properties Resistivity of Water Zone Neutron Porosity of Water Zone Density Porosity of Water Zone A= 0.62 M= RO = PHINwtr= PHIDwtr= 2.15 0.9 0.17 0.15 PHIwtr = RW_1 = N= ohm-m frac frac 0.160 0.028 2.00 unitless
1. GRAD = (BHT - SUFT) / BHTDEPTH 2: FT = SUFT + GRAD * ZONEDEPTH 3: RW@FT = RW@TRW * (TRW + KT1) / (FT + KT1)
RW =
LAYER 1
2054.5 2056.0 40.0 0.130 0.080
LAYER 2
2056.0 2058.0 30.0 0.185 0.165
LAYER 3
2058.0 2060.0 30.0 0.140 0.090
LAYER 4
Sonic Travel Time DTC Gamma Ray GR Spontaneous Potential SP Photoelectric PE Caliper CAL
usec/m API mv cu mm
CALCULATED RESULTS
LAYER 1
0.04 1.00 0.24 0.04 656
LAYER 2
0.00 1.00 0.10 0.00 DTCMA = 0.185 0.165 0.175 0.173 0.175
LAYER 3
0.00 1.00 0.24 0.00 165 usec/m 0.140 0.090 0.115 0.112 0.115
LAYER 4
SHALE VOLUME 1: Vshg = (GR - GR0) / (GR100 - GR0) 2: Vshs = (SP - SP0) / (SP100 - SP0) 3: Vshx = (PHIN - PHID) / (PHINSH - PHIDSH) 4: Vsh = Minimum of above in each zone POROSITY DTCW =
1: PHInc = PHIN - (Vsh * PHINSH) PHInc = 0.122 2: PHIdc = PHID - (Vsh * PHIDSH) PHIdc = 0.081 3: PHIxdn = (PHInc + PHIdc) / 2 PHIzdn= 0.102 4: PHIsc = (DTC - ((1 - Vsh)*DTCMA) - (Vsh*DTCSH)) PHIsc = / 0.109 (DTCW - DTCMA) 5: PHIe = PHIxdn PHIe = 0.102 ARCHIE WATER SATURATION 1: PHIt = (PHID + PHIN) / 2 2: Rwa = (PHIt ^ M) * RESD / A 3: SWa = (RW@FT / Rwa) ^ (1 / N)
SIMANDOUX WATER SATURATION 1: C = (1 - Vsh) * A * RW@FT / (PHIe ^ M) C = 2: D = C * Vsh / (2 * RSH) D= 3: E = C / RESD E= 4: SWs = ((D ^ 2 + E) ^ 0.5 - D) ^ (2 / N) SWs = 5: Sw = SWs Sw = IRREDUCIBLE WATER SATURATION 1: KBUCKL = PHIe * Sw (for best Oil/Gas zone 2: SWir = Min (Sw, KBUCKL / PHIe) SWir =
KBUCKL = 0.223
0.0258 0.147
<<== Put Data for BEST ZONE HERE 0.224 6.0 4.6 EPERM =
PERMEABILITY CPERM = 100000 1: PERMw = CPERM * (PHIe ^ DPERM) / (SWir ^ EPERM) Perm = 2.2 PAY ZONE SUMMARY Enter THICK = 0.0 if zone fails cutoffs 0: THICK = BASE - TOP 1: PV = PHIe * THICK 2: HPV = PHIe * (1 - Sw) * THICK 3: KH = Perm * THICK 4: NetPay = THICK
DPERM = 6 132.4
LAYER 3
KV3 = 36207
LAYER 4
1.0
2: Roil(bbl) = 6.29 * Roil(m3) OIL PRODUCTIVITY PF-PS = Set KV1 = 0.0 if this is gas zone 3: Qo(m3/d) = KV1 * KH * (PF - PS) / VIS 4: Qo(bbl/d) = 6.29 * Qo(m3/d) 20000
GAS
GAS RESERVES PF = TF = RF =
LAYER 1
22000 72 0.94
LAYER 2
KPa degC m2
LAYER 3
ZF = KT2 = KV4 = 0.9 273 1.0
LAYER 4
degC
Set KV4 = 0.0 if this is oil zone 1: Bg = (PS * (TF + KT2)) / (PF * (TS + KT2)) * ZF 2: Rgas = RF * KV4 * HPV * AREA / Bg 3: Rgas(mmcf) = 35.3 * Rgas(e3m3) GAS PRODUCTIVITY Set KV2 = 0.0 if this is oil zone 4: Qg = KV2 * KH * ((PF - PS)^2) / (FT + KT2) 5: Qg(mmcf/d) = 0.0353 * Qg(e3m3/d)
14537.94 513.2
0.507 0.018
40.134 1.417
TAR
LAYER 1
DENSSH 0.079 0.115 2.265 0.023 2.482 0.032 3.18 75879.56
LAYER 2
2650 DENSMA 0.149 0.000 2.186 0.026 2.361 0.063 6.32 191001.4
LAYER 3
2650 DENSW 0.088 0.000 2.345 0.027 2.460 0.036 3.59 113145.7
LAYER 4
1000
TAR RESERVES DENSHY 1000 Delete this section if not tar sand 1: WTtar = PHIe * (1 - Sw) * DENSHY / 1000 2: WTsh = Vsh * DENSSH / 1000 3: WTsnd = (1 - Vsh - PHIe) * DENSMA / 1000 4: WTwtr = PHIe * Sw * DENSW / 1000 5: WTrock = WTtar + WTsh + WTsnd + WTwtr 6: TARfrac = WTtar / WTrock 7: TARwt% = 100 * WTtar / WTrock 8: Rtar = WTtar * THICK * AREA
s needed
Temperature
21.5
Temperature
Temperature
AYER 4
#N/A #N/A #N/A #N/A #N/A
AYER 4
#N/A #N/A #N/A #N/A
m mD-m m m m
AYER 4
#N/A
m3
bbl
m3/d bbl/d
AYER 4
#N/A #N/A
e3m3 mmcf
#N/A #N/A
e3m3/d mmcf/d
AYER 4
Kg/m3 #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A frac frac frac frac frac frac % Tonnes