DAFTAR UPAH
DAFTAR HARGA BAHAN
REKAP ANALISA
PEKERJAAN PERSIAPAN
PEKERJAAN TANAH
PEKERJAAN PONDASI
PEKERJAAN DINDING
PEKERJAAN PLESTERAN
PEKERJAAN KAYU
PEKERJAAN BETON
PEKERJAAN ATAP
PEKERJAAN LANGIT-LANGIT
PEKERJAAN SANITASI
PEKERJAAN BESI & ALUMINIUM
PEKERJAAN PENGECATAN
PEKERJAAN BAJA
PEKERJAAN LISTRIK
PEKERJAAN PERPIPAAN
PEKERJAAN IRIGASI
PEKERJAAN LAIN-LAIN
START
TIDAK
CHECK
Basic Price
1. Upah (U)
2. Bahan (U)
TID
REKAPITULASI
1. Judul Proyek (E)
2. Jumlah Harga
3. Total Harga
CETAK
CHEC
O
SELESAI
kerjaan
E)
naan
atuan
& Harga
s (E)
TIDAK
SI
CETAK
CHECK
OK
SELESAI
MENU UTAMA
DAFTAR UPAH
TAHUN ANGGARAN 2010
KODE
URAIAN
UPAH
SATUAN
L01
Mandor
Org/hr
80,000.00
L02
Org/hr
70,000.00
L03
Org/hr
47,000.00
L04
Org/hr
47,000.00
L05
Org/hr
47,000.00
L06
Org/hr
47,000.00
L07
Tukang Batu
Org/hr
60,000.00
L08
Tukang Kayu
Org/hr
60,000.00
L09
Tukang Besi/Baja
Org/hr
60,000.00
L10
Tukang Cat
Org/hr
60,000.00
L11
Tukang Listrik
Org/hr
60,000.00
L12
Tukang Pipa
Org/hr
60,000.00
L13
Tukang Plitur
Org/hr
60,000.00
L14
Tukang Taman
Org/hr
60,000.00
L15
Tukang Aspal
Org/hr
60,000.00
L16
Pembantu Tukang
Org/hr
45,000.00
L17
Pekerja Biasa
Org/hr
45,000.00
L18
Penjaga Malam
Org/hr
35,000.00
L19
Sopir
Org/hr
42,500.00
L20
Operator
Org/hr
47,500.00
L21
Mekanik
Org/hr
47,500.00
L22
Pembantu Sopir
Org/hr
37,500.00
L23
Pembantu Operator
Org/hr
40,000.00
L24
Pembantu Mekanik
Org/hr
37,500.00
L25
Juru Ukur
Org/hr
135,000.00
L26
Ls
450,000.00
L27
Org/hr
575,000.00
L28
Org/hr
475,000.00
KETERANGAN
MALANG,
DAFTAR PERALATAN
TAHUN ANGGARAN 2010
KODE
URAIAN
SATUAN
HARGA
E01
hari
1,350,000.00
E02
Sewa Kompresor
hari
2,400,000.00
E03
Sewa Genset
hari
1,000,000.00
E04
hari
4,000,000.00
E05
hari
400,000.00
E06
hari
1,750,000.00
E07
hari
1,750,000.00
E08
Jam
60,000.00
E09
hari
1,100,000.00
E10
Sewa Excavator
hari
1,600,000.00
E11
hari
2,400,000.00
E12
hari
2,400,000.00
E13
hari
1,750,000.00
E14
hari
1,000,000.00
E15
Pesawat ukur
E16
Unit/hr
100,000.00
Meteran
bh
100,000.00
E17
Palu
bh
25,000.00
E18
Keranjang
bh
10,000.00
E19
Ganco
bh
75,000.00
E20
bh
25,000.00
E21
Palu besar/bodem
bh
100,000.00
E22
Timbris
Unit
30,000.00
E23
Kereta Dorong
Unit
100,000.00
E24
Jack Hammer
bh
100,000.00
E25
Molen
Unit/hr
100,000.00
E26
Ember
bh
5,000.00
E27
Kotak adukan
bh
25,000.00
E28
Cetok
bh
10,000.00
E29
Kuas
bh
10,000.00
E30
Kasut kayu
bh
10,000.00
E31
bh
50,000.00
E32
Viberator
Unit/hr
100,000.00
E33
Gergaji
bh
50,000.00
E34
bh
50,000.00
E35
bh
25,000.00
E36
Bor Besi
bh
100,000.00
E37
Stamper
Unit/hr
160,000.00
KETERANGAN
I.
1
2
3
4
5
6
7
8
9
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
2
3
4
5
6
7
1
1
1
1
1
1
1
1
1
m3
m3
m3
m3
m3
m3
m3
m3
m3
96,600.00
60,000.00
114,000.00
110,000.00
#REF!
50,000.00
103,400.00
62,500.00
45,000.00
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
bh
bh
bh
bh
bh
kg
kg
m2
m2
bh
bh
bh
bh
bh
bh
bh
bh
bh
99,500.00
115,700.00
110,800.00
164,450.00
156,975.00
141,910.00
129,375.00
207,900.00
182,160.00
100,000.00
157,500.00
144,900.00
250.00
#REF!
#REF!
#REF!
8,650.00
#REF!
#REF!
71,650.00
67,500.00
#REF!
#REF!
#REF!
895.00
1,075.00
1,450.00
1,700.00
1,225.00
1,450.00
1
1
1
1
1
1
1
1
kg
kg
kg
kg
kg
m3
kg
m3
900.00
#REF!
2,300.00
6,500.00
#REF!
1,300,000.00
840.00
165,000.00
1
1
1
1
1
1
1
1
1
1
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
32,500.00
40,890.00
51,000.00
67,500.00
91,840.00
157,540.00
183,780.00
207,460.00
30,000.00
35,000.00
BUIS BETON
M044
M045
M046
M047
M048
M049
M050
M051
M052
M053
VIII.
1
Pasir Urug
Pasir Pasang
Pasir Hitam
Pasir Cor
Pasir Silika
Tanah Urug
Sirtu
Tanah Urug Taman/Katel
Tanah Liat
SEMEN
M037
M037.a
M038
M039
M040
M041
M042
M043
V.
1
2
3
4
5
6
7
8
9
10
HARGA
III.
1
SATUAN
II.
1
2
3
4
5
6
7
8
9
10
11
12
13
BAHAN BANGUNAN
KODE
KAYU
M054
Kayu Borneo
Reng : 2/3, 3/5
3
1m
#REF!
2
3
4
5
6
M055
M056
M057
M058
M059
7
8
9
10
11
12
M060
M061
M062
M063
M064
M065
13
14
15
16
17
18
M066
M067
M068
M069
M070
M071
19
20
21
22
23
24
M072
M073
M074
M075
M076
M077
25
26
27
28
29
30
M078
M079
M080
M081
M082
M083
31
32
33
34
35
36
37
38
39
40
M084
M085
M086
M087
M088
M089
M090
M091
M092
M093
41
42
43
44
45
46
M094
M095
M096
M097
M098
M099
47
48
49
50
51
52
M100
M101
M102
M103
M104
M105
53
54
55
56
57
58
M106
M107
M108
M109
M110
M111
IV.
1
2
3
4
5
6
7
8
Usuk : 5/7
Balok
Papan (2x20) cm
Papan (3x20) cm
Papan (3x30) cm
Kayu Meranti
Reng : 2/3, 3/5
Usuk : 5/7
Balok
Papan (2x20) cm
Papan (3x20) cm
Papan (3x30) cm
Kayu Kruing
Reng : 2/3, 3/5
Usuk : 5/7
Balok
Papan (2x20) cm
Papan (3x20) cm
Papan (3x30) cm
Kayu Bengkirai
Reng : 2/3, 3/5
Usuk : 5/7
Balok
Papan (2x20) cm
Papan (3x20) cm
Papan (3x30) cm
Kayu Kamper
Reng : 2/3, 3/5
Usuk : 5/7
Balok
Papan (2x20) cm
Papan (3x20) cm
Papan (3x30) cm
Kayu Lain-lain
Balok Kayu Kelas III
Papan Kayu kelas III
Kayu Albasiah
Kayu Ramin
Bambu Dia 10 cm
Dolken Kayu Dia 8 cm
List Kayu Profil
List Kayu 2/4
Gedeg (2.00 x 3.00) m
Bilik Bambu
Kayu Jati Ex. Malang
Reng : 2/3, 3/5
Usuk : 5/7
Balok
Papan (2x20) cm
Papan (3x20) cm
Papan (3x30) cm
Kayu Jati Ex. Madiun/Ngawi
Reng : 2/3, 3/5
Usuk : 5/7
Balok
Papan (2x20) cm
Papan (3x20) cm
Papan (3x30) cm
Kayu Jati Ex. Bojonegoro
Reng : 2/3, 3/5
Usuk : 5/7
Balok
Papan (2x20) cm
Papan (3x20) cm
Papan (3x30) cm
1
1
1
1
1
m3
m3
m3
m3
m3
1
1
1
1
1
1
m3
m3
m3
m3
m3
m3
1
1
1
1
1
1
m3
m3
m3
m3
m3
m3
1
1
1
1
1
1
m3
m3
m3
m3
m3
m3
1
1
1
1
1
1
m3
m3
m3
m3
m3
m3
1
1
1
1
1
1
1
1
1
1
m3
m3
m3
m3
btg
btg
m1
m3
lbr
m2
1
1
1
1
1
1
m3
m3
m3
m3
m3
m3
1
1
1
1
1
1
m3
m3
m3
m3
m3
m3
1
1
1
1
1
1
m3
m3
m3
m3
m3
m3
4,500,000.00
4,500,000.00
5,040,000.00
6,030,000.00
6,030,000.00
6,030,000.00
5,400,000.00
5,400,000.00
5,400,000.00
6,120,000.00
6,120,000.00
6,120,000.00
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
1,450,000.00
1,450,000.00
9,000,000.00
10,800,000.00
10,800,000.00
10,800,000.00
3,000,000.00
1,100,000.00
#REF!
#REF!
20,700.00
25,000.00
6,900.00
3,105,000.00
34,500.00
69,000.00
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
1
1
1
1
1
1
1
1
1
kg
kg
kg
kg
kg
kg
kg
kg
m2
8,500.00
17,085.00
8,500.00
8,500.00
18,750.00
18,750.00
15,000.00
26,000.00
645,750.00
#REF!
#REF!
#REF!
#REF!
#REF!
9
10
11
12
13
14
15
16
17
18
19
20
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
41
42
43
44
45
XVI.
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
M120
M121
M122
M123
M124
M124.a
M124.b
M125
M126
M127
M128
M129
M130
M131
M132
M133
M134
M135
M136
M137
M138
M139
M140
M141
M142
M143
M144
M145
M146
M147
M148
M148.a
M148.b
M148.c
M148.d
M148.e
M148.f
M148.g
XV.
1
2
3
4
5
6
7
8
1
1
1
1
1
m2
m2
m2
m2
m2
m2
m2
1,775,810.00
1,452,930.00
1,076,250.00
538,120.00
618,840.00
282,510.00
361,616.00
78,020.00
93,670.00
269,060.00
300,000.00
88,150.00
86,100.00
26,900.00
35,175.00
37,660.00
62,420.00
7,500.00
8,500.00
17,000.00
15,660.00
9,680.00
17,500.00
20,000.00
460.00
710.00
510.00
410.00
16,750.00
2,660.00
18,500.00
15,000.00
25,000.00
15,000.00
10,000.00
500,000.00
99,550.00
96,860.00
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
lbr
lbr
bh
bh
bh
bh
1 bh
850.00
990.00
1,140.00
400.00
1,410.00
3,370.00
11,280.00
1,870.00
2,240.00
4,030.00
4,430.00
4,880.00
6,760.00
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
1 m'
1 m'
1 m'
lbr
1 lbr
lbr
2
1m
2
1m
30,100.00
34,300.00
43,100.00
#REF!
71,950.00
66,010.00
69,290.00
101,270.00
1m
1 m1
1
1
1
1
1
1
1
m1
m1
m2
Unit
m2
m2
m2
1 kg
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
kg
kg
kg
m2
kg
m2
m2
kg
kg
bh
bh
bh
bh
kg
bh
kg
1
1
1
1
1
1
1
kg
tube
m1
m1
m2
ATAP SENG/ASBES
M174
M175
M176
M177
M178
M179
M180
M181
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
M182
M183
M184
M185
M186
M187
M188
M189
M190
M191
M192
M193
M194
M195
M196
M197
M198
M199
M200
M201
M202
M203
M204
M205
M206
M207
M208
M209
M210
M211
M212
M213
IX.
1
2
3
4
5
6
7
8
9
10
11
12
13
13
14
15
XII.
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
lbr
lbr
lbr
lbr
lbr
lbr
lbr
lbr
lbr
lbr
lbr
lbr
lbr
lbr
lbr
lbr
lbr
lbr
lbr
lbr
lbr
lbr
lbr
lbr
lbr
lbr
lbr
lbr
m2
m'
lbr
lbr
99,700.00
92,000.00
79,700.00
70,500.00
53,600.00
101,200.00
87,600.00
77,600.00
59,000.00
119,600.00
110,400.00
84,700.00
64,400.00
40,000.00
44,000.00
42,840.00
41,000.00
37,310.00
40,180.00
40,000.00
34,640.00
16,500.00
15,600.00
15,000.00
14,400.00
#REF!
#REF!
#REF!
#REF!
18,040.00
#REF!
58,630.00
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
m2
m2
m2
m2
m2
m2
m2
lbr
lbr
lbr
lbr
lbr
lbr
lbr
lbr
lbr
47,970.00
63,960.00
76,670.00
117,260.00
133,250.00
165,230.00
229,190.00
79,950.00
6,350.00
9,020.00
21,010.00
25,010.00
85,000.00
6,860.00
24,490.00
82,610.00
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
Unit
Unit
Unit
Unit
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
Unit
Unit
bh
bh
bh
bh
KAYU OLAHAN
M214
M215
M216
M217
M218
M219
M220
M221
M222
M223
M224
M225
M226
M227
M228
M229
X.
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
ALAT-ALAT PENGGANTUNG
133,250.00
1,332,500.00
266,500.00
1,385,800.00
53,300.00
33,470.00
37,310.00
120,820.00
293,150.00
184,470.00
1,865,500.00
377,780.00
186,550.00
265,800.00
799,500.00
932,750.00
959,400.00
1,172,600.00
387,450.00
26,650.00
45,300.00
13,320.00
53,300.00
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
M253
M254
M255
M256
M257
M258
M259
M260
M261
M262
M263
M264
M265
M266
M267
M268
M269
VII
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
1
1
1
1
1
1
1
bh
bh
bh
bh
bh
bh
bh
1
1
1
1
1
1
1
1
1
bh
bh
bh
bh
bh
bh
bh
bh
bh
80,710.00
97,900.00
78,410.00
129,150.00
27,160.00
21,210.00
16,790.00
10,600.00
8,200.00
18,960.00
10,600.00
150,670.00
118,400.00
107,650.00
31,850.00
116,250.00
10,250.00
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
biji
m2
m2
m2
61,500.00
101,470.00
145,550.00
201,660.00
75,330.00
119,920.00
177,320.00
241,900.00
123,760.00
145,290.00
193,720.00
111,020.00
150,670.00
177,320.00
226,520.00
210,450.00
19,440.00
376,680.00
538,120.00
807,180.00
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
35,000.00
30,000.00
60,000.00
45,000.00
40,000.00
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
11,270.00
12,300.00
KACA
M270
M271
M272
M273
M274
M275
M276
M277
M278
M279
M280
M281
M282
M283
M284
M285
M286
M287
M288
M289
XI.
1
2
3
4
5
6
7
8
9
10
PERLENGKAPAN LANTAI
M290
M291
M292
M293
M294
M295
M296
M297
M298
M299
M299A
M299B
M299C
M299D
M299E
M300
M301
M302
M303
M304
M305
M306
M307
M308
M309
M310
M311
M312
M313
M314
M315
M316
M316.a
M317
M318
Ubin pc abu-abu 40 x 40 cm
Ubin pc abu-abu 30 x 30 cm
Ubin pc abu-abu 20 x 20 cm
Ubin pc warna 40 x 40 cm
Ubin pc warna 30 x 30 cm
Ubin pc warna 20 x 20 cm
Ubin Terasso 40 x 40 cm
Ubin Terasso 30 x 30 cm
Ubin Granito 40 x 40 cm
Ubin Granito 30 x 30 cm
Ubin Teralux kerang 40 x 40 cm
Ubin Teralux kerang30 x 30 cm
Ubin Teralux marmer 60 x 60 cm
Ubin Teralux marmer 40 x 40 cm
Ubin Teralux marmer 30 x 30 cm
Plint ubin pc abu-abu 15 x 20 cm
Plint ubin pc abu-abu 10 x 30 cm
Plint ubin pc abu-abu 10 x 40 cm
Plint ubin pc warna 10 x 20 cm
Plint ubin pc warna 10 x 30 cm
Plint ubin pc warna 10 x 40 cm
Plint Ubin Terasso 10 x 30 cm
Plint Ubin Terasso 10 x 40 cm
Plint Ubin Granito 10 x 40 cm
Plint Ubin Granito 10 x 30 cm
Lantai keramik artistik 10 x 20
Lantai keramik artistik 10 x 10
Lantai keramik artistik 5 x 20
Plint keramik artistik 10 x 20
Plint keramik artistik 10 x 10
Plint keramik artistik 5 x 20
Internal cove 5 x 5 x 20 cm
Bahan Teraso Cor
Keramik Lantai 40 x 40 cm putih
Keramik Lantai 40 x 40 cm warna/motif
1m
1 bh
1 bh
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
M319
M320
M321
M322
M323
M324
M325
M326
M327
M328
M329
M330
M331
M332
M333
M333.a
M333.b
M333.c
M333.d
M333.e
M333.f
XIII.
1
2
3
4
5
6
7
8
8
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
m2
m2
m2
m2
m2
m2
2
1m
4,610.00
5,120.00
1,380.00
1,530.00
1,790.00
4,100.00
7,680.00
14,350.00
3,580.00
2,560.00
820.00
920.00
870.00
1,790.00
205,000.00
#REF!
#REF!
#REF!
750.00
850.00
#REF!
PERPIPAAN
M334
M335
M336
M337
M338
M339
M340
M341
M342
M343
M344
M345
M346
M347
M348
M349
M350
M351
M352
M353
M354
M355
M356
M357
M358
M359
M360
M361
M362
M363
M364
M365
M366
M367
M368
M369
M370
M371
M372
M373
M374
M375
M376
M377
M378
M379
M380
M381
M382
M383
M384
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
Ljr
Ljr
Ljr
Ljr
Ljr
Ljr
Ljr
Ljr
Ljr
Ljr
Ljr
Ljr
Ljr
Ljr
Ljr
Ljr
Ljr
Ljr
Ljr
Ljr
Ljr
Ljr
Ljr
Ljr
Ljr
Ljr
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
Ljr
Ljr
Ljr
Ljr
Ljr
Ljr
Ljr
Ljr
bh
28,700.00
42,790.00
56,110.00
75,330.00
95,830.00
123,000.00
173,730.00
271,360.00
472,780.00
722,436.00
14,350.00
21,520.00
28,180.00
37,660.00
46,120.00
67,130.00
97,370.00
137,090.00
10,860.00
16,090.00
21,110.00
28,290.00
38,130.00
48,480.00
57,290.00
72,980.00
1,280.00
2,050.00
2,560.00
5,120.00
7,060.00
10,250.00
11,530.00
14,090.00
1,790.00
2,300.00
3,330.00
6,660.00
9,990.00
11,530.00
12,810.00
16,140.00
127,500.00
165,000.00
225,000.00
330,000.00
472,500.00
660,000.00
750,000.00
1,102,500.00
3,500.00
50
51
52
53
54
55
56
57
58
59
60
61
62
63
64
65
66
67
68
69
70
71
72
73
74
75
76
77
78
79
M385
M386
M387
M388
M389
M390
M391
M392
M393
M394
M395
M396
M397
M398
M399
M400
M400.a
M400.b
M400.c
M400.d
M400.e
M400.f
M400.g
M400.h
M400.i
M400.j
M400.k
M400.l
M400.m
M400.n
VI.
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
XVIII.
1
2
3
4
5
6
XX.
1
2
3
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
ljr
1
1
1
1
1
1
1
1
1
1
1
1
1
1
Ljr
Ljr
Ljr
Ljr
Ljr
Ljr
Ljr
Ljr
Ljr
Ljr
Ljr
Ljr
Ljr
Ljr
4,610.00
6,500.00
12,000.00
19,060.00
23,060.00
26,130.00
31,770.00
4,100.00
5,380.00
7,680.00
15,110.00
22,550.00
26,130.00
29,720.00
37,150.00
577,840.00
372,840.00
476,110.00
145,320.00
187,840.00
262,420.00
391,530.00
813,050.00
1,322,730.00
108,500.00
151,200.00
225,300.00
330,700.00
714,500.00
1,157,100.00
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
Lbr
kg
kg
Kg
kg
Ltr
Ltr
kg
kg
kg
kg
kg
kg
kg
kg
kg
kg
kg
Ltr
Ltr
bh
Ltr
kg
kg
Ltr
Ltr
kg
kg
kg
kg
kg
kg
ikat
10,000.00
16,760.00
45,000.00
30,350.00
28,700.00
16,100.00
10,310.00
144,240.00
20,840.00
27,920.00
28,700.00
4,190.00
33,880.00
64,570.00
17,500.00
68,160.00
10,000.00
128,890.00
28,700.00
64,570.00
10,760.00
25,040.00
28,700.00
50,220.00
24,600.00
1,790.00
7,170.00
3,920.00
21,520.00
28,700.00
#REF!
#REF!
#REF!
1
1
1
1
1
1
bh
bh
bh
bh
Unit
Unit
555,000.00
1,000,000.00
1,500,000.00
2,500,000.00
165,280.00
661,120.00
Kertas Gosok
Plamir Kayu
Plamir Tembok
Plamir Besi
Dempul Jadi
Minyak Cat
Spiritus
Sirlak
Cat meni kayu
Cat meni besi
Cat Dasar Kayu
Cat Dasar Tembok
Cat Dasar Besi
Cat Kayu
Cat Tembok
Cat Besi
Cat Genting
Waterproofing
Vernis
Politur Jadi
Kuas
Lem Kayu
Lem Pipa PVC
Lem vinyl
Residu atau Teer
Teak oli
Kalkarium
Kapur Sirih
Soda api
Sabun
Vinyl (30x30)cm
Batu Apung
Alang-Alang
PERALATAN AIR BERSIH
Tandon Air PVC V = 0.5 m3
Tandon Air PVC V = 1.0 m3
Tandon Air Stainless V = 0.5 m3
Tandon Air Stainless V = 1.0 m3
Sumur Pompa Tangan Lengkap
Pompa Air
INSTALASI LISTRIK
Kabel NYA 2.5 mm
Kabel NYA 4.0 mm
Stop Kontak
1
1m
1
1m
1 bh
3,650.00
6,175.00
23,060.00
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
XXII.
1
2
3
4
5
6
7
8
9
13
14
15
16
17
18
19
20
21
22
23
24
25
26
M440
M440.a
M441
M442
M443
M444
M445
M446
M447
M448
M449
M450
M451
M452
M453
M454
M455
M456
M457
M458
M459
M460
M460.a
M460.b
M460.c
M460.d
M473
M474
M475
M476
M477
M478
M479
M480
M481
M482
M483
M484
M485
M486
Elektroda
Minyak bekisting
Formika (90 x 120) cm
Strorox 100
Formtie
Batacote
Rapidrant
Puzzdith - 100 XR
Seal Tape / TBA
Bensin
Solar
Minyak Pelumas
Grease
Air Bersih
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
bh
bh
bh
m1
bh
Ljr
bh
Unit
Unit
Unit
bh
bh
bh
bh
bh
bh
bh
bh
bh
Ls
Ls
m'
bh
kg
1
m
bh
1
1
1
1
m2
m2
m2
btg
1 m2
1
1
1
1
1
kg
m3
m'
m'
m'
1
1
1
1
1
1
1
1
1
1
1
1
1
kg
ltr
lbr
kg
bh
kg
Gln
Ltr
bh
ltr
ltr
ltr
kg
1 ltr
28,180.00
32,280.00
400.00
550.00
700.00
7,360.00
7,680.00
56,370.00
82,000.00
112,750.00
53,810.00
79,690.00
24,080.00
24,080.00
26,650.00
29,210.00
30,230.00
15,370.00
25,620.00
2,306,250.00
2,818,750.00
92,250.00
64,570.00
365,920.00
37,660.00
1,610.00
18,830.00
16,140.00
10,760.00
161,430.00
16,140.00
16,140.00
129,150.00
26,900.00
48,430.00
56,500.00
75,000.00
2,690.00
53,810.00
69,950.00
5,910.00
5,380.00
26,900.00
53,810.00
2,150.00
5,421.00
5,151.00
35,000.00
13,450.00
25.00
BAHAN BANGUNAN
GGARAN 2005
MENU UTAMA
KET.
4800
24,000.00
35,000.00
48,000.00
134,000.00
195,000.00
35000
229,000.00
0.50
0.75
1
1.5
2.00
2.50
3.00
4.00
5.00
6.00
7.00
8.00
0.50
0.75
1
1.5
2.00
2.50
3.00
4.00
5.00
600,000.00
6.00
7.00
8.00
12,500.00
17,000.00
2200 watt
NO.
BAHAN BANGUNAN
KODE
I.
SATUAN
HARGA
KET.
M001
Pasir Urug
1 m
M002
Pasir Pasang
1 m
60,000.00
M003
Pasir Hitam
1 m
114,000.00
M004
Pasir Cor
1 m
110,000.00
50,000.00
96,600.00
M006
Tanah Urug
1 m
M007
Sirtu
1 m
103,400.00
M008
1 m3
62,500.00
M009
Tanah Liat
1 m3
45,000.00
II.
M010
1 m
99,500.00
M011
1 m
115,700.00
M012
Batu Kali
1 m
110,800.00
M013
1 m
164,450.00
M014
1 m
156,975.00
M015
1 m
141,910.00
129,375.00
M016
1 m
M017
1 m
207,900.00
M018
1 m3
182,160.00
10
M019
1 m3
100,000.00
157,500.00
144,900.00
11
M020
1 m
12
M021
1 m3
13
M022
Bata Merah
1 bh
250.00
17
M025
Rooster
1 bh
8,650.00
20
M028
Batu Palimanan
1 m
71,650.00
21
M029
1 m
67,500.00
25
M033
1 bh
895.00
26
M034
1 bh
1,075.00
27
M035
1 bh
1,450.00
28
M036.a
1 bh
1,700.00
29
M036.b
1 bh
1,225.00
30
M036.c
1 bh
1,450.00
III.
SEMEN
M037
1 kg
900.00
M038
1 kg
2,300.00
M039
1 kg
6,500.00
1,300,000.00
840.00
165,000.00
M041
Kapur
1 m
7
8
M042
M043
Gamping
Semen Merah
1 kg
3
1 m
NO.
BAHAN BANGUNAN
KODE
IV.
SATUAN
HARGA
BUIS BETON
M044
1 bh
32,500.00
M045
1 bh
40,890.00
M046
1 bh
51,000.00
M047
1 bh
67,500.00
M048
1 bh
91,840.00
M049
1 bh
157,540.00
M050
1 bh
183,780.00
M051
1 bh
207,460.00
M052
1 bh
30,000.00
10
M053
1 bh
35,000.00
V.
KAYU
Kayu Meranti
M060
1 m
4,500,000.00
M061
Usuk : 5/7
1 m
4,500,000.00
5,040,000.00
M062
Balok
1 m
10
M063
Papan (2x20) cm
1 m
6,030,000.00
11
M064
Papan (3x20) cm
1 m
6,030,000.00
12
M065
Papan (3x30) cm
1 m
6,030,000.00
13
M066
1 m3
5,400,000.00
14
M067
Usuk : 5/7
1 m3
5,400,000.00
15
M068
Balok
1 m3
5,400,000.00
6,120,000.00
Kayu Kruing
16
M069
Papan (2x20) cm
1 m
17
M070
Papan (3x20) cm
1 m
6,120,000.00
18
M071
Papan (3x30) cm
1 m
6,120,000.00
Kayu Kamper
25
M078
1 m
1,450,000.00
26
M079
Usuk : 5/7
1 m
1,450,000.00
27
M080
Balok
1 m3
9,000,000.00
28
M081
Papan (2x20) cm
1 m3
10,800,000.00
29
30
M082
M083
Papan (3x20) cm
Papan (3x30) cm
1 m3
3
1 m
10,800,000.00
10,800,000.00
31
M084
1 m3
3,000,000.00
32
M085
1 m3
1,100,000.00
35
M088
Bambu 10 cm
1 btg
20,700.00
36
M089
Dolken Kayu 8 cm
1 btg
25,000.00
37
M090
1 m1
6,900.00
38
M091
1 m3
3,105,000.00
39
40
M092
M093
1 lbr
2
1 m
34,500.00
69,000.00
Kayu Lain-lain
KET.
NO.
BAHAN BANGUNAN
KODE
VI.
SATUAN
HARGA
M112
1 kg
8,500.00
M113
1 kg
17,085.00
M114
Besi Strip
1 kg
8,500.00
M115
Besi Beugel/Kawel
1 kg
8,500.00
M116
Baja Profil
1 kg
18,750.00
M116.a
Plat Baja
1 kg
18,750.00
7
8
M117
M118
Angker Bar
Kabel prestressed
1 kg
1 kg
15,000.00
26,000.00
M119
1 m2
645,750.00
10
M120
1 m2
1,775,810.00
11
M121
Pintu Lipat
1 m2
1,452,930.00
1,076,250.00
12
M122
Rolling Door
1 m
13
M123
Pagar Besi
1 m
538,120.00
14
M124
1 m
618,840.00
15
M124.a
1 m
282,510.00
361,616.00
78,020.00
16
M124.b
1 m
17
M125
1 m
18
M126
1 m
93,670.00
19
M127
Sunscream Aluminium
1 m
269,060.00
20
M128
Pintu Fiber KM
1 Unit
300,000.00
21
M129
Atap Aluminium
1 m2
88,150.00
22
M130
1 m2
86,100.00
23
M131
Aluminium Foil/Sesalation
1 m2
26,900.00
24
M132
Baja Ringan
1 kg
35,175.00
25
M133
Kawat Galvanis 2 mm
1 kg
37,660.00
26
M134
Kawat Galvanis 3 mm
1 kg
62,420.00
27
M135
1 kg
7,500.00
8,500.00
28
M136
1 m
29
M137
Kawat Duri
1 kg
17,000.00
30
M138
Kawat Nyamuk
1 m2
15,660.00
31
M139
1 m2
9,680.00
32
M140
1 kg
17,500.00
33
M141
1 kg
20,000.00
34
M142
1 bh
460.00
35
M143
1 bh
710.00
36
M144
1 bh
510.00
37
38
M145
M146
1 bh
1 kg
410.00
16,750.00
KET.
BAHAN BANGUNAN
KODE
39
M147
Paku Keling
1 bh
2,660.00
40
M148
Paku Beton
1 kg
18,500.00
41
M148.a
Wire Mesh
1 kg
15,000.00
42
M148.b
Sealant
1 tube
25,000.00
43
M148.c
Aluminium Strip
1 m
44
M148.d
Profil Kaca
1 m
10,000.00
45
M148.e
1 m2
500,000.00
46
M148.f
1 m2
99,550.00
96,860.00
850.00
47
M148.g
VII.
SATUAN
HARGA
NO.
1 m
KET.
15,000.00
ATAP GENTENG
M149
1 bh
M150
1 bh
990.00
M151
1 bh
1,140.00
M152
1 bh
400.00
M153
1 bh
1,410.00
M154
Genteng Beton
1 bh
3,370.00
M155
Genteng Kaca
1 bh
11,280.00
M156
1 bh
1,870.00
M157
1 bh
2,240.00
10
M158
1 bh
4,030.00
11
M159
1 bh
4,430.00
12
M160
1 bh
4,880.00
13
M161
1 bh
6,760.00
VIII.
ATAP SENG/ASBES
M174
1 m'
30,100.00
M175
1 m'
34,300.00
M176
1 m'
43,100.00
M178
1 lbr
71,950.00
M179
1 lbr
66,010.00
M180
1 m2
69,290.00
M181
Atap Polycarbonat
1 m2
101,270.00
M182
1 lbr
99,700.00
10
M183
1 lbr
92,000.00
11
M184
1 lbr
79,700.00
12
M185
1 lbr
70,500.00
13
M186
1 lbr
53,600.00
14
M187
1 lbr
101,200.00
15
M188
1 lbr
87,600.00
16
M189
1 lbr
77,600.00
17
M190
1 lbr
59,000.00
18
M191
1 lbr
119,600.00
19
M192
1 lbr
110,400.00
20
21
M193
M194
1 lbr
1 lbr
84,700.00
64,400.00
3.00 m
BAHAN BANGUNAN
KODE
22
M195
1 lbr
40,000.00
23
M196
1 lbr
44,000.00
24
M197
1 lbr
42,840.00
25
M198
1 lbr
41,000.00
26
M199
1 lbr
37,310.00
27
M200
1 lbr
40,180.00
28
M201
1 lbr
40,000.00
29
M202
1 lbr
34,640.00
30
M203
1 lbr
16,500.00
31
M204
1 lbr
15,600.00
32
M205
1 lbr
15,000.00
33
M206
1 lbr
14,400.00
38
40
M211
M213
List Gypsum
Gypsum Board
1 m'
1 lbr
18,040.00
58,630.00
IX.
SATUAN
HARGA
NO.
KAYU OLAHAN
M214
Triplek 3 mm
1 m
47,970.00
M215
Triplek 4 mm
1 m
63,960.00
M216
Multiplek 6 mm
1 m
76,670.00
M217
Multiplek 9 mm
1 m
117,260.00
M218
Multiplek 10 mm
1 m2
133,250.00
M219
Multiplek 12 mm
1 m2
165,230.00
M220
Multiplek 18 mm
1 m2
229,190.00
M221
1 lbr
79,950.00
6,350.00
M222
1 lbr
10
M223
1 lbr
9,020.00
11
M224
1 lbr
21,010.00
12
M225
1 lbr
25,010.00
13
M226
1 lbr
85,000.00
13
M227
1 lbr
6,860.00
14
M228
1 lbr
24,490.00
15
M229
1 lbr
82,610.00
X.
M230
1 Unit
133,250.00
M231
1 Unit
1,332,500.00
M232
1 Unit
266,500.00
M233
1 Unit
1,385,800.00
M234
1 bh
53,300.00
M235
1 bh
33,470.00
M236
1 bh
37,310.00
M237
1 bh
120,820.00
M238
1 bh
293,150.00
10
M239
1 bh
184,470.00
11
M240
1 bh
1,865,500.00
12
M241
1 bh
377,780.00
13
M242
1 bh
186,550.00
14
M243
1 bh
265,800.00
15
M244
Badkip Porselen
1 bh
799,500.00
16
M245
Urinoir Porselin
1 bh
932,750.00
17
M246
Urinoir Keramik
1 bh
18
M247
1 Unit
1,172,600.00
19
M248
1 Unit
387,450.00
20
M249
1 bh
26,650.00
21
M250
Afor Stainless
1 bh
45,300.00
22
23
M251
M252
Afor Plastic
Kaca Wastafel
1 bh
1 bh
13,320.00
53,300.00
959,400.00
KET.
200,000.00
NO.
BAHAN BANGUNAN
KODE
XI.
SATUAN
HARGA
ALAT-ALAT PENGGANTUNG
M253
1 bh
80,710.00
M254
Kunci Tanam
1 bh
97,900.00
M255
1 bh
78,410.00
M256
Kunci Silinder
1 bh
129,150.00
5
6
M257
M258
Engsel Pintu
Engsel Jendela
1 bh
1 bh
27,160.00
21,210.00
M259
Hak Angin
1 bh
16,790.00
M260
Spring Knip
1 bh
10,600.00
M261
Kait Angin
1 bh
8,200.00
10
M262
Grendel Pintu
1 bh
18,960.00
11
M263
Grendel Jendela
1 bh
10,600.00
12
M264
Door Closer
1 bh
150,670.00
13
M265
Slot/Kunci Pintu
1 bh
118,400.00
14
M266
Door Holder
1 bh
107,650.00
15
M267
Door Stop
1 bh
31,850.00
16
M268
1 bh
116,250.00
17
M269
Kunci Lemari
1 bh
10,250.00
XII.
KACA
M270
1 m2
61,500.00
M271
1 m2
101,470.00
M272
1 m2
145,550.00
M273
1 m2
201,660.00
75,330.00
M274
1 m
M275
1 m
119,920.00
M276
1 m
177,320.00
M277
1 m
241,900.00
123,760.00
M278
1 m
10
M279
1 m
145,290.00
11
M280
1 m2
193,720.00
12
M281
1 m2
111,020.00
13
M282
1 m2
150,670.00
177,320.00
14
M283
1 m
15
M284
1 m2
226,520.00
16
M285
1 m2
210,450.00
17
M286
Glass Block
1 bh
19,440.00
376,680.00
18
M287
Painting Glass
1 m
19
M288
Kaca "Wireglass" 5 mm
1 m2
538,120.00
20
M289
Kaca Patri 5 mm
1 m2
807,180.00
XIII.
PERLENGKAPAN LANTAI
KET.
BAHAN BANGUNAN
KODE
29
M317
1 bh
11,270.00
30
M318
1 bh
12,300.00
31
M319
1 bh
4,610.00
32
M320
1 bh
5,120.00
33
M321
1 bh
1,380.00
34
M322
1 bh
1,530.00
35
M323
Keramik Lantai KM 20 x 20 cm
1 bh
1,790.00
36
M324
1 bh
4,100.00
37
M325
1 bh
7,680.00
38
M326
1 bh
14,350.00
39
M327
Keramik Dinding 20 x 25 cm
1 bh
3,580.00
40
M328
Keramik Dinding 20 x 20 cm
1 bh
2,560.00
41
M329
Porselin 15 x 15 cm putih
1 bh
820.00
42
M330
Porselin 15 x 15 cm warna
1 bh
920.00
43
M331
Porselin 10 x 20 cm warna
1 bh
870.00
44
M332
Porselin 20 x 20 cm warna
1 bh
1,790.00
45
M333
Gymflour
1 m
205,000.00
49
M333.d
Porselin 11 x 11 cm putih
1 m
750.00
50
M333.e
Porselin 11 x 11 cm warna
1 m
850.00
XIV.
SATUAN
HARGA
NO.
PERPIPAAN
M334
1 Ljr
28,700.00
M335
1 Ljr
42,790.00
M336
1 Ljr
56,110.00
M337
1 Ljr
75,330.00
M338
1 Ljr
95,830.00
M339
1 Ljr
123,000.00
M340
1 Ljr
173,730.00
M341
1 Ljr
271,360.00
M342
1 Ljr
472,780.00
M343
1 Ljr
722,436.00
M344
1 Ljr
14,350.00
10
M345
1 Ljr
21,520.00
11
M346
1 Ljr
28,180.00
12
M347
1 Ljr
37,660.00
13
M348
1 Ljr
46,120.00
14
M349
1 Ljr
67,130.00
15
16
M350
M351
1 Ljr
1 Ljr
97,370.00
137,090.00
17
M352
1 Ljr
10,860.00
18
19
M353
M354
1 Ljr
1 Ljr
16,090.00
21,110.00
KET.
BAHAN BANGUNAN
SATUAN
HARGA
NO.
KODE
20
M355
1 Ljr
28,290.00
21
M356
1 Ljr
38,130.00
22
M357
1 Ljr
48,480.00
23
M358
1 Ljr
57,290.00
24
M359
1 Ljr
72,980.00
25
M360
1 bh
1,280.00
26
M361
1 bh
2,050.00
27
M362
1 bh
2,560.00
28
M363
1 bh
5,120.00
29
M364
1 bh
7,060.00
30
M365
1 bh
10,250.00
31
M366
1 bh
11,530.00
32
M367
1 bh
14,090.00
33
M368
1 bh
1,790.00
34
M369
1 bh
2,300.00
35
M370
1 bh
3,330.00
36
M371
1 bh
6,660.00
37
M372
1 bh
9,990.00
38
M373
1 bh
11,530.00
39
M374
1 bh
12,810.00
40
M375
1 bh
16,140.00
41
M376
1 Ljr
127,500.00
42
M377
1 Ljr
165,000.00
43
M378
1 Ljr
225,000.00
44
M379
1 Ljr
330,000.00
45
M380
1 Ljr
472,500.00
46
M381
1 Ljr
660,000.00
47
M382
1 Ljr
750,000.00
48
M383
1 Ljr
1,102,500.00
49
M384
1 bh
3,500.00
50
M385
1 bh
4,610.00
51
M386
1 bh
6,500.00
52
M387
1 bh
12,000.00
53
M388
1 bh
19,060.00
54
M389
1 bh
23,060.00
55
M390
1 bh
26,130.00
56
M391
1 bh
31,770.00
57
M392
1 bh
4,100.00
58
M393
1 bh
5,380.00
59
M394
1 bh
7,680.00
60
M395
1 bh
15,110.00
61
M396
1 bh
22,550.00
62
M397
1 bh
26,130.00
63
M398
1 bh
29,720.00
64
65
M399
M400
1 bh
1 ljr
37,150.00
577,840.00
66
M400.a
1 Ljr
372,840.00
67
M400.b
1 Ljr
476,110.00
68
M400.c
1 Ljr
145,320.00
69
M400.d
1 Ljr
187,840.00
70
M400.e
1 Ljr
262,420.00
71
M400.f
1 Ljr
391,530.00
72
M400.g
1 Ljr
813,050.00
73
M400.h
1 Ljr
1,322,730.00
74
M400.i
1 Ljr
108,500.00
75
M400.j
1 Ljr
151,200.00
76
M400.k
1 Ljr
225,300.00
77
M400.l
1 Ljr
330,700.00
78
79
M400.m
M400.n
1 Ljr
1 Ljr
714,500.00
1,157,100.00
KET.
NO.
BAHAN BANGUNAN
KODE
XV.
SATUAN
HARGA
M401
Kertas Gosok
1 Lbr
10,000.00
M402
Plamir Kayu
1 kg
16,760.00
M403
Plamir Tembok
1 kg
45,000.00
M404
Plamir Besi
1 Kg
30,350.00
M405
Dempul Jadi
1 kg
28,700.00
M406
Minyak Cat
1 Ltr
16,100.00
M407
Spiritus
1 Ltr
10,310.00
M408
Sirlak
1 kg
144,240.00
M409
1 kg
20,840.00
10
M410
1 kg
27,920.00
11
M411
1 kg
28,700.00
12
M412
1 kg
4,190.00
13
M413
1 kg
33,880.00
14
M414
Cat Kayu
1 kg
64,570.00
15
M415
Cat Tembok
1 kg
17,500.00
16
M416
Cat Besi
1 kg
68,160.00
17
M417
Cat Genting
1 kg
10,000.00
18
M418
Waterproofing
1 kg
128,890.00
19
M419
Vernis
1 Ltr
28,700.00
20
M420
Politur Jadi
1 Ltr
64,570.00
21
M421
Kuas
1 bh
10,760.00
22
M422
Lem Kayu
1 Ltr
25,040.00
23
M423
1 kg
28,700.00
24
M424
Lem vinyl
1 kg
50,220.00
25
M425
1 Ltr
24,600.00
26
M426
Teak oli
1 Ltr
1,790.00
27
M427
Kalkarium
1 kg
7,170.00
28
M428
Kapur Sirih
1 kg
3,920.00
29
M429
Soda api
1 kg
21,520.00
30
M430
Sabun
1 kg
28,700.00
XVI.
M431
1 bh
555,000.00
M432
1 bh
1,000,000.00
M433
1 bh
1,500,000.00
M434
1 bh
2,500,000.00
M435
1 Unit
165,280.00
M436
Pompa Air
1 Unit
661,120.00
XVII.
INSTALASI LISTRIK
M437
1 m1
M438
1 m1
6,175.00
M439
Stop Kontak
1 bh
23,060.00
M440
1 bh
28,180.00
M440.a
1 bh
32,280.00
M441
Las doof
1 bh
400.00
M442
Isolator
1 m1
550.00
M443
T dos PVC
1 bh
700.00
9
10
M444
M445
1 Ljr
1 bh
7,360.00
7,680.00
3,650.00
KET.
BAHAN BANGUNAN
HARGA
NO.
KODE
11
M446
1 Unit
12
M447
1 Unit
82,000.00
13
M448
1 Unit
112,750.00
14
M449
1 bh
53,810.00
15
M450
1 bh
79,690.00
16
M451
1 bh
24,080.00
17
M452
1 bh
24,080.00
18
M453
1 bh
26,650.00
19
M454
1 bh
29,210.00
20
M455
1 bh
30,230.00
21
M456
1 bh
15,370.00
22
M457
1 bh
25,620.00
23
M458
1 Ls
2,306,250.00
24
M459
1 Ls
2,818,750.00
25
M460
Pipa Arde
1 m
92,250.00
26
M460.a
1 bh
64,570.00
27
M460.b
Timah
1 kg
365,920.00
28
M460.c
Kawat BC
1 m
37,660.00
29
M460.d
Klemp
1 bh
1,610.00
XVIII.
SATUAN
KET.
56,370.00
2200 watt
LAIN - LAIN
M461
Rumput Lamur
1 m2
18,830.00
M462
Rumput Manila
1 m2
16,140.00
M463
Semak Hias
1 m2
10,760.00
M464
Pohon Pelindung
1 btg
161,430.00
M464.a
Gebalan rumput
1 m
16,140.00
M465
Tali ijuk
1 kg
16,140.00
M466
Ijuk
1 m
129,150.00
M467
1 m
26,900.00
M468
1 m
48,430.00
10
M469
1 m1
56,500.00
11
M473
Elektroda
1 kg
75,000.00
12
M474
Minyak bekisting
1 ltr
2,690.00
13
M475
1 lbr
53,810.00
14
M476
Strorox 100
1 kg
69,950.00
15
M477
Formtie
1 bh
5,910.00
16
M478
Batacote
1 kg
5,380.00
17
M479
Rapidrant
1 Gln
26,900.00
18
M480
Puzzdith - 100 XR
1 Ltr
53,810.00
19
M481
1 bh
2,150.00
20
M482
Bensin Industri
1 ltr
5,421.00
21
M482.a
Bensin Umum
1 ltr
4,500.00
22
M483
Solar Industri
1 ltr
5,151.00
23
M483.a
Solar Umum
1 ltr
4,500.00
24
M484
Minyak Pelumas
1 ltr
35,000.00
25
M485
Grease
1 kg
13,450.00
26
M486
Air Bersih
1 ltr
25.00
MALANG,
KEPALA DINAS PEKERJAAN UMUM
KOTA MALANG
KODE
JENIS PEKERJAAN
ANALISA
1
I.
SATUAN
3
HARGA
(Rp.)
4
PEKERJAAN PERSIAPAN
A.001
A.002
m1
402,892.78
491,956.78
482,852.78
A.003
A.004
A.005
A.006
A.007
14,108.00
107,930.00
m2
1,491,325.00
1,528,734.25
1,364,093.75
A.008
A.009
m2
8,500.00
A.010
A.011
m
bh
1,544,518.00
A.012
78,598.75
304,100.00
A.013
573,000.00
A.014
m3
326,655.00
A.015
302,655.00
53,500.00
9,800.00
13,682.00
A.016
Bongkaran atap
A.017
Bongkaran lantai
A.018
II.
Bongkaran plafon
PEKERJAAN TANAH
B.001
m3
35,750.00
B.002
m3
44,100.00
B.003
52,610.00
B.004
47,560.00
B.005
m3
72,300.00
57,600.00
B.006
B.007
m2
2,650.00
B.008
15,650.00
B.009
Urugan kembali
m3
14,700.00
B.010
Pemadatan tanah
m3
26,500.00
B.011
Urugan pasir
130,220.00
B.012
m3
326,000.00
B.013
447,400.00
B.014
782,850.00
B.015
Urugan sirtu
m3
137,330.00
B.016
114,070.00
B.017
m3
B.018
92,697.33
230,660.62
m3
463,440.00
C.002
430,440.00
C.003
407,580.00
III.
C.001
PEKERJAAN PONDASI
m
m
C.004
391,500.00
C.005
m3
369,480.00
C.006
521,990.00
C.007
528,060.00
C.008
m3
491,120.00
244,921.20
C.009
C.010
m3
1,599,706.00
C.011
m3
441,385.00
KODE
JENIS PEKERJAAN
ANALISA
1
IV.
SATUAN
3
HARGA
(Rp.)
4
PEKERJAAN DINDING
2
121,750.00
112,915.00
107,275.00
103,900.00
101,770.00
128,172.00
58,235.00
54,233.00
51,830.00
50,312.00
49,328.00
47,750.00
65,450.00
66,350.00
D.001
D.002
D.003
D.004
D.005
D.006
D.007
D.008
m
m
m
D.009
D.010
D.011
D.012
D.013
D.014
D.015
m2
D.016
D.017
D.018
61,090.00
#REF!
#REF!
#REF!
D.019
#REF!
D.020
m2
#REF!
D.021
#REF!
295,420.00
292,900.00
D.023
D.024
D.025
V.
#REF!
PEKERJAAN PLESTERAN
E.001
Plesteran 1 Pc : 1 Ps tebal 15 mm
m2
34,763.60
E.002
Plesteran 1 Pc : 2 Ps tebal 15 mm
m2
30,251.60
E.003
Plesteran 1 Pc : 3 Ps tebal 15 mm
28,228.40
E.004
Plesteran 1 Pc : 4 Ps tebal 15 mm
26,906.00
E.005
Plesteran 1 Pc : 5 Ps tebal 15 mm
m2
26,075.60
E.006
Plesteran 1 Pc : 6 Ps tebal 15 mm
25,444.40
E.007
Plesteran 1 Pc : 7 Ps tebal 15 mm
m2
25,072.40
E.008
Plesteran 1 Pc : 8 Ps tebal 15 mm
24,700.40
E.009
28,684.00
E.010
Plesteran 1 Pc : 2 Kp : 8 Ps tebal 15 mm
m2
26,200.00
E.011
Plesteran 1 Kp : 1 Sm : 1 Ps tebal 15 mm
32,545.00
E.012
Plesteran 1 Kp : 1 Sm : 2 Ps tebal 15 mm
m2
29,975.00
E.013
Plesteran 1 Pc : 2 Ps tebal 20 mm
40,028.80
E.014
Plesteran 1 Pc : 3 Ps tebal 20 mm
37,331.20
E.015
Plesteran 1 Pc : 4 Ps tebal 20 mm
m2
35,548.00
E.016
Plesteran 1 Pc : 5 Ps tebal 20 mm
34,460.80
E.017
Plesteran 1 Pc : 6 Ps tebal 20 mm
m2
33,599.20
E.018
Plesteran 1 Kp : 1 Sm : 2 Ps tebal 20 mm
42,995.00
18,305.60
E.019
E.020
m2
E.021
#REF!
E.022
m2
#REF!
E.023
Plesteran ciprat 1 Pc : 2 Ps
29,495.00
23,238.00
E.024
30,506.00
E.025
Benangan
m1
14,310.00
E.026
Acian
17,015.00
KODE
JENIS PEKERJAAN
ANALISA
1
VI.
SATUAN
3
HARGA
(Rp.)
4
PEKERJAAN KAYU
3
F.001
F.002
F.003
m3
F.004
F.005
F.006
F.007
F.008
2
2
F.009
F.010
F.011
F.012
m2
F.013
F.014
m2
F.015
m2
F.016
2
2
2
2
F.017
F.018
2
2
F.019
F.020
m2
F.021
F.022
m2
F.023
F.024
m2
F.025
F.026
2
2
2
F.027
F.028
m2
F.029
F.030
m2
F.031
m2
F.032
m2
F.033
m2
F.034
m2
F.035
F.036
m2
#REF!
12,314,915.00
#REF!
7,562,915.00
#REF!
518,000.00
#REF!
327,200.00
#REF!
655,270.00
#REF!
464,470.00
#REF!
435,312.00
#REF!
320,832.00
#REF!
946,820.00
#REF!
641,540.00
#REF!
526,845.00
#REF!
407,595.00
#REF!
804,525.00
#REF!
518,325.00
#REF!
529,247.00
#REF!
409,997.00
#REF!
603,412.00
#REF!
484,162.00
F.037
#REF!
F.038
m2
#REF!
F.039
496,122.00
F.040
F.041
m3
F.042
m3
F.043
m3
F.044
7,137,900.00
F.045
m3
6,741,900.00
F.046
m3
F.047
12,613,500.00
F.048
m3
10,663,440.00
F.049
6,307,440.00
#REF!
11,097,900.00
#REF!
#REF!
#REF!
KODE
ANALISA
JENIS PEKERJAAN
2
1
F.050
SATUAN
3
2
HARGA
(Rp.)
4
#REF!
F.051
F.052
#REF!
F.053
m2
#REF!
88,245.00
F.054
F.055
F.056
F.057
m2
F.058
#REF!
F.059
#REF!
F.060
F.061
2
2
285,745.00
240,745.00
#REF!
88,245.00
285,745.00
240,745.00
F.062
F.063
2
2
#REF!
118,695.00
F.064
#REF!
F.065
m2
#REF!
F.066
399,145.00
F.067
F.068
F.069
m2
F.070
m2
#REF!
F.071
m2
#REF!
335,245.00
#REF!
41,069.00
106,244.00
91,394.00
F.072
F.073
F.074
F.075
F.076
#REF!
F.077
m2
#REF!
F.078
m2
115,585.00
F.079
101,725.00
#REF!
54,755.00
F.080
F.081
m1
F.082
#REF!
F.083
m1
#REF!
F.084
#REF!
136,465.00
85,921.00
F.085
F.086
m1
F.087
m1
F.088
m1
#REF!
F.089
m1
#REF!
84,949.00
#REF!
137,515.00
F.090
86,035.00
F.091
m1
85,045.00
F.092
F.093
m1
F.094
F.095
m1
F.096
m2
F.097
m2
F.098
F.099
F.100
F.101
m2
F.102
F.103
m2
F.104
m2
F.105
m2
#REF!
291,130.00
#REF!
180,250.00
#REF!
376,197.00
#REF!
265,317.00
#REF!
390,367.40
#REF!
279,487.40
#REF!
227,310.00
KODE
JENIS PEKERJAAN
ANALISA
1
VII.
SATUAN
3
HARGA
(Rp.)
4
PEKERJAAN BETON
3
469,303.57
493,145.11
511,936.90
430,813.36
534,061.51
555,331.08
571,023.41
599,867.86
581,659.39
605,561.77
653,986.38
661,406.22
703,090.00
G.001
Beton mutu fc'=7,4 Mpa (K100) slump (12 2) cm, w/c = 0,87
G.002
Beton mutu fc'=9,8 Mpa (K125) slump (12 2) cm, w/c = 0,78
G.003
Beton mutu fc'=12,2 Mpa (K150) slump (12 2) cm, w/c = 0,72
G.004
Lantai kerja beton mutu fc'=7,4 Mpa (K100) slump (3 - 6) cm, w/c = 0,87
G.005
Beton mutu fc'=14,5 Mpa (K175) slump (12 2) cm, w/c = 0,66
G.006
Beton mutu fc'=16,9 Mpa (K200) slump (12 2) cm, w/c = 0,61
G.007
Beton mutu fc'=19,3 Mpa (K225) slump (12 2) cm, w/c = 0,58
G.008
Beton mutu fc'=24,0 Mpa (K275) slump (12 2) cm, w/c = 0,53
m
m
m
G.009
Beton mutu fc'=21,7 Mpa (K250) slump (12 2) cm, w/c = 0,56
G.010
Beton mutu fc'=26,4 Mpa (K300) slump (12 2) cm, w/c = 0,52
G.011
Beton mutu fc'=28,8 Mpa (K325) slump (12 2) cm, w/c = 0,49
G.012
Beton mutu fc'=31,2 Mpa (K350) slump (12 2) cm, w/c = 0,48
G.013
G.014
33,195.00
G.015
m1
56,941.50
G.016
65,925.00
G.017
m
kg
G.018
kg
18,867.75
G.019
kg
27,959.00
G.020
kg
15,783.00
G.021
91,821.00
9,853.50
97,321.00
G.022
G.023
241,270.00
G.024
m2
250,270.00
G.025
341,270.00
G.026
293,910.00
230,135.50
G.027
G.028
m2
112,940.00
G.029
2,861,291.00
G.030
m3
3,077,514.00
G.031
m3
4,134,807.00
G.032
5,645,040.00
G.033
m3
4,344,932.00
G.034
3,966,597.00
4,197,778.00
G.035
G.036
m1
49,250.00
G.037
63,270.00
G.038
m1
62,280.00
m2
33,516.00
VIII.
H.001
H.002
37,016.00
H.003
m2
40,766.00
H.004
22,266.00
H.005
47,516.00
H.006
m1
49,570.00
H.007
51,420.00
60,370.00
62,370.00
H.008
H.009
m
m
m
H.010
H.011
m2
#REF!
64,620.00
H.012
m2
#REF!
#REF!
H.013
H.014
m2
H.015
#REF!
H.016
m2
#REF!
H.017
#REF!
53,865.00
KODE
JENIS PEKERJAAN
ANALISA
1
H.018
SATUAN
3
#REF!
#REF!
#REF!
H.021
#REF!
#REF!
#REF!
H.023
H.024
73,775.00
H.022
H.020
H.026
(Rp.)
H.019
H.025
HARGA
48,684.00
52,429.00
48,677.00
49,564.00
48,449.00
64,816.00
66,776.00
m
m
H.027
H.028
H.029
H.030
H.031
H.032
60,349.00
H.033
m2
58,039.00
H.034
97,329.00
55,561.00
55,112.00
H.035
H.036
H.037
50,317.00
H.038
m1
110,671.00
H.039
m1
107,071.00
H.040
102,493.00
H.041
63,871.00
59,443.00
62,887.00
58,671.00
H.042
H.043
H.044
H.045
52,775.00
H.046
m2
60,527.00
H.047
32,409.00
H.048
145,563.50
H.049
m2
169,890.00
38,870.00
H.050
H.051
m2
88,428.00
H.052
129,706.00
H.053
m2
157,533.50
H.054
m2
182,802.00
m2
24,364.00
I.002
23,374.00
I.003
m2
22,714.00
IX.
I.001
I.004
I.005
m2
#REF!
22,054.00
I.006
m2
#REF!
#REF!
I.007
I.008
m2
12,711.00
I.009
13,182.20
18,303.75
19,803.75
I.010
I.011
m
m
m
I.012
12,894.60
I.013
m2
19,608.75
KODE
JENIS PEKERJAAN
ANALISA
1
I.014
SATUAN
3
HARGA
(Rp.)
4
#REF!
#REF!
I.015
I.016
I.017
#REF!
I.018
m2
#REF!
I.019
#REF!
I.020
I.021
I.022
312,915.00
63,814.00
#REF!
#REF!
m
m
I.023
I.024
I.025
I.026
m2
I.027
#REF!
I.028
m2
#REF!
I.029
m2
197,510.00
I.030
176,810.00
2
2
111,214.00
100,414.00
#REF!
106,660.00
#REF!
#REF!
I.031
I.032
I.033
#REF!
I.034
m2
#REF!
I.035
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
I.036
I.037
I.038
I.039
I.040
I.041
#REF!
I.042
m2
#REF!
I.043
33,166.32
I.044
13,145.00
I.045
m1
26,821.00
X.
PEKERJAAN SANITASI
J.001
bh
225,850.00
J.002
bh
392,050.00
J.003
bh
525,300.00
J.004
bh
1,564,667.00
J.005
bh
1,618,158.88
J.006
bh
1,171,746.00
J.007
bh
558,529.28
J.008
bh
1,354,985.44
J.009
bh
34,200.00
J.010
bh
280,020.00
J.011
bh
592,248.06
J.012
bh
851,500.00
J.013
bh
J.014
bh
J.015
m1
133,439.27
J.016
202,465.00
876,500.00
#REF!
KODE
JENIS PEKERJAAN
ANALISA
1
J.017
SATUAN
3
59,543.90
100,770.12
120,038.16
146,335.20
181,256.24
269,820.32
306,831.36
341,026.40
56,793.90
J.020
J.021
J.022
J.023
J.019
J.025
(Rp.)
J.018
J.024
HARGA
m
m
m
J.026
m
bh
110,585.20
J.027
J.028
bh
241,614.50
J.029
bh
369,062.68
J.030
64,488.75
167,710.75
J.031
80,332.50
J.032
m1
105,682.50
J.033
156,777.00
216,983.25
296,202.00
J.034
J.035
J.036
334,227.00
J.037
m1
487,500.25
J.038
17,909.75
23,862.78
29,490.48
37,610.93
49,164.18
60,643.50
J.039
J.040
J.041
J.042
J.043
J.044
86,418.93
J.045
m1
127,667.60
J.046
m1
219,280.05
J.047
334,521.46
J.048
m1
11,846.88
J.049
14,876.20
J.050
m1
17,690.05
J.051
21,695.35
J.052
28,161.70
J.053
m1
37,038.43
J.054
54,156.83
J.055
m1
70,938.53
J.056
10,372.35
J.057
12,582.03
J.058
m1
14,702.98
J.059
17,736.53
J.060
m1
24,785.93
J.061
29,158.80
J.062
37,223.03
J.063
J.064
m1
bh
287,370.00
J.065
bh
222,500.00
J.066
bh
41,073.75
J.067
bh
44,913.75
J.068
bh
52,850.00
J.069
bh
20,870.00
43,852.05
J.070
146,921.00
J.071
m1
94,350.18
135,598.85
J.072
KODE
JENIS PEKERJAAN
ANALISA
1
XI.
SATUAN
HARGA
(Rp.)
K.001
kg
35,378.50
K.002
kg
35,378.50
K.003
kg
18,450.00
K.004
Ikatan Angin/Trekstang
kg
22,741.00
K.005
Plendes
kg
35,378.50
K.006
K.007
m
cm
1,019,345.00
K.008
1,910,690.00
K.009
1,587,810.00
K.010
K.011
K.012
K.013
11,679.93
324,740.00
1,189,950.00
m1
110,242.10
640,808.50
K.014
473,519.00
K.015
m2
539,835.00
K.016
468,684.50
173,176.02
K.017
K.018
317,575.00
K.019
m
Unit
K.020
m1
185,677.50
K.021
194,917.50
185,677.50
194,917.50
52,177.50
63,580.00
63,440.00
K.022
K.023
K.024
K.025
K.026
360,880.00
K.027
298,340.10
K.028
m1
193,017.60
K.029
526,628.20
K.030
602,925.63
K.031
m1
813,101.04
K.032
273,171.14
K.033
m1
246,407.75
XII.
L.001
bh
122,470.00
L.002
bh
129,220.00
L.003
bh
109,070.00
L.004
bh
159,630.00
L.005
bh
132,320.00
L.006
bh
27,650.00
L.007
bh
37,600.00
L.008
bh
28,170.00
L.009
bh
29,400.00
L.010
bh
17,560.00
L.011
bh
31,430.00
L.012
bh
21,040.00
L.013
bh
15,160.00
L.014
bh
185,470.00
L.015
bh
142,450.00
L.016
bh
137,515.00
L.017
bh
158,010.00
KODE
JENIS PEKERJAAN
ANALISA
1
L.018
SATUAN
3
78,090.00
122,057.00
170,545.00
232,266.00
100,263.00
149,312.00
213,502.00
284,540.00
146,576.00
170,259.00
224,574.00
132,562.00
176,177.00
206,534.00
L.021
L.022
L.023
L.024
L.020
L.026
(Rp.)
L.019
L.025
HARGA
m
m
m
L.027
L.028
L.029
L.030
L.031
L.032
260,654.00
L.033
m2
602,372.00
L.034
898,338.00
L.035
m
bh
L.036
424,788.00
XIII.
31,824.00
m2
#REF!
M.002
#REF!
M.003
#REF!
#REF!
#REF!
#REF!
M.001
M.004
M.005
M.006
M.007
#REF!
M.008
m2
#REF!
M.009
#REF!
#REF!
M.010
M.011
m2
272,720.00
M.012
398,700.00
M.013
m2
227,420.00
M.014
338,470.00
M.015
M.016
m1
#REF!
M.017
m1
#REF!
M.018
m1
#REF!
M.019
#REF!
576,750.00
M.020
#REF!
M.021
m1
#REF!
M.022
#REF!
M.023
m1
#REF!
M.024
#REF!
M.025
#REF!
M.026
m2
#REF!
M.027
#REF!
#REF!
#REF!
M.028
M.029
m
m
m
M.030
#REF!
M.031
m2
#REF!
M.032
#REF!
M.033
#REF!
M.034
m1
#REF!
#REF!
M.035
KODE
JENIS PEKERJAAN
ANALISA
1
M.036
Pasang gymflour
SATUAN
3
2
#REF!
M.039
112,910.00
116,885.00
121,012.00
130,700.70
136,754.40
146,161.10
M.040
M.041
M.042
300,722.00
#REF!
Pasang karpet
Pasang parquet
M.038
M.044
(Rp.)
M.037
M.043
HARGA
m
m
m
M.045
M.046
M.047
m1
33,578.50
M.048
74,791.40
M.049
85,092.00
153,299.00
#REF!
M.050
115,650.00
M.051
m2
147,500.00
M.052
156,100.00
120,150.00
132,985.00
M.053
M.054
M.055
129,045.00
M.056
m2
149,450.00
M.057
129,350.00
M.058
M.059
#REF!
M.060
Pasang wallpaper
m2
#REF!
M.061
M.062
#REF!
M.063
m2
#REF!
M.064
m2
#REF!
M.065
140,675.00
141,657.50
83,625.00
M.066
91,725.00
M.067
m2
83,950.00
M.068
90,950.00
M.069
m2
83,775.00
M.070
91,200.00
XIV.
PEKERJAAN PENGECATAN
N.001
m2
8,026.00
N.002
m2
8,385.00
N.003
8,385.00
N.004
N.005
m2
#REF!
N.006
m2
#REF!
N.007
m2
26,572.40
N.008
Pengecatan kayu baru (1 lapis plamir, 1 lapis cat dasar, 2 lapis cat penutup)
32,521.20
43,998.50
8,385.00
N.009
Pengecatan kayu baru (1 lapis plamir, 1 lapis cat dasar, 3 lapis cat penutup)
N.010
m2
9,585.40
N.011
60,065.50
N.012
m2
13,590.00
N.013
24,599.60
N.014
Pengecatan tembok baru (1 lapis plamir, 1 lapis cat dasar, 2 lapis cat penutup)
14,645.10
N.015
m2
7,830.20
N.016
4,894.40
N.017
N.018
m2
12,499.50
14,645.10
N.019
Pengecatan plafon (1 lapis plamir, 1 lapis cat dasar, 2 lapis cat penutup)
#REF!
KODE
JENIS PEKERJAAN
ANALISA
1
N.020
SATUAN
3
2
N.021
N.022
N.023
N.024
N.025
XVI.
HARGA
(Rp.)
4
17,539.60
#REF!
25,362.00
114,883.60
m2
95,564.00
Pekerjaan Waterproofing
51,576.50
P.001
Titik
125,094.00
P.002
Titik
115,214.00
P.003
Titik
134,314.00
P.004
Titik
91,975.00
P.005
Titik
102,225.00
P.006
Titik
122,735.00
P.007
Titik
148,615.00
P.008
Titik
100,685.00
P.009
Titik
100,685.00
P.010
Titik
103,255.00
P.011
Titik
105,815.00
P.012
Titik
106,835.00
P.013
Unit
120,812.00
P.014
Unit
195,776.50
P.015
Unit
275,797.50
P.016
Unit
2,780,530.00
XVII.
Q.001
Unit
3,300,000.00
Q.002
Geolistrik
Pemboran pilot hole 8 3/4" kedalaman 0 - 25 m
Ls
m1
3,475,000.00
Q.003
Q.004
m1
364,564.58
Q.005
437,477.50
Q.006
m1
546,846.88
Q.007
m1
729,129.17
Q.008
m1
1,093,693.75
Q.009
m1
1,458,258.33
Q.010
2,187,387.50
Q.011
m1
15,818.18
Q.012
Ls
m1
7,230,570.00
Q.013
Q.014
m1
258,318.33
Q.015
322,897.92
Q.016
m1
430,530.56
Q.017
m1
553,539.29
Q.018
m1
774,955.00
Q.019
m1
1,291,591.67
Q.020
m1
313,195.00
Q.021
m1
313,195.00
Q.022
m1
339,460.00
291,651.67
215,265.28
Q.023
267,210.00
Q.024
m1
267,210.00
Q.025
m1
293,027.50
Q.026
m1
45,750.00
Q.027
m1
29,027.50
Q.028
m3
374,940.00
Q.029
Beton Mortar 1 pc : 1 ps
587,332.14
Q.030
m3
Titik
Q.031
Titik
Jam
Q.032
8,353,750.00
13,107,500.00
309,458.91
KODE
JENIS PEKERJAAN
ANALISA
SATUAN
3
HARGA
(Rp.)
4
Q.033
m1
55,541.70
Q.034
m1
69,254.40
Q.035
m1
97,648.45
Q.036
m1
139,286.43
Q.037
m1
281,739.13
Q.038
m1
455,872.68
Q.039
m1
126,571.89
Q.040
m1
164,336.64
Q.041
m1
205,974.61
Q.042
m1
43,667.25
Q.043
m1
57,438.00
Q.044
m1
85,677.25
Q.045
m1
119,668.75
Q.046
m1
249,956.75
Q.047
m1
402,457.00
Q.048
m1
114,697.44
Q.049
m1
152,365.44
Q.050
m1
186,356.94
Q.051
Unit
767,838.00
Q.052
Unit
597,500.00
Q.053
Unit
1,183,750.00
Q.054
Unit
1,753,125.00
Q.055
Unit
2,920,000.00
bh
569,125.80
XVIII.
R.001
R.002
R.003
Km
bh
R.004
m2
69,315.00
R.005
128,380.40
R.006
m3
46,050.00
R.007
m3
55,800.00
804,125.80
104,841.80
R.008
85,460.00
R.009
m3
85,565.00
R.010
78,120.00
R.011
84,760.00
R.012
m3
34,820.00
R.013
15,225.00
R.014
m3
36,810.00
R.015
86,585.00
R.016
110,390.00
R.017
m3
430,440.00
30,506.00
R.018
R.019
m2
28,228.40
R.020
967,090.00
R.021
Beton K-125
m3
492,501.11
R.022
Beton K-175
m3
534,061.51
R.023
121,191.00
R.024
m
kg
R.025
kg
9,853.50
18,867.75
R.026
Kisi-Kisi
R.027
m
bh
62,926,000.00
567,700.74
R.028
bh
10,953,000.00
R.029
bh
7,132,000.00
R.030
bh
7,586,000.00
R.031
bh
9,372,000.00
R.032
bh
9,372,000.00
KODE
JENIS PEKERJAAN
ANALISA
1
XIX.
HARGA
SATUAN
(Rp.)
28,630.00
25,940.00
31,360.00
S.001
S.002
S.003
S.004
m
btg
S.005
S.006
26,740.00
S.007
m3
12,993,900.00
Catatan :
187,030.00
167,795.00
NO.
A.
1
2
3
4
: A.001
: Pagar sementara dari kayu tinggi 2 m
: m'
KOMPONEN
SATUAN
PERKIRAAN
KUANTITAS
HARGA
SATUAN
(Rp.)
TENAGA
Pekerja Biasa
Tukang Kayu
Kepala Tukang Kayu
Mandor
L17
L08
L03
L01
Org/hr
Org/hr
Org/hr
Org/hr
0.4000
0.2000
0.0200
0.0200
45,000.00
60,000.00
47,000.00
80,000.00
BAHAN
Dolken Kayu Dia 8 cm
Portland Cement (PC)
Pasir Cor
Stenslah/batu pecah tangan 2/3
Usuk : 5/7
Paku Kayu Segala Ukuran
Residu atau Teer
M089
M037
M004
M014
M061
M140
M425
btg
kg
m3
m3
m3
kg
Ltr
1.2500
2.5000
0.0050
0.0090
0.0720
0.0600
0.4000
25,000.00
900.00
110,000.00
156,975.00
4,500,000.00
17,500.00
24,600.00
31,250.00
2,250.00
550.00
1,412.78
324,000.00
1,050.00
9,840.00
370,352.78
PERALATAN
18,000.00
12,000.00
940.00
1,600.00
32,540.00
JUMLAH
HARGA
(Rp.)
402,892.78
NO.
A.
1
2
3
4
: A.002
: Pagar sementara dari seng gelombang tinggi 2 m
: m'
KOMPONEN
SATUAN
PERKIRAAN
KUANTITAS
HARGA
SATUAN
(Rp.)
TENAGA
Pekerja Biasa
Tukang Kayu
Kepala Tukang Kayu
Mandor
L17
L08
L03
L01
Org/hr
Org/hr
Org/hr
Org/hr
0.4000
0.2000
0.0200
0.0200
45,000.00
60,000.00
47,000.00
80,000.00
BAHAN
Dolken Kayu Dia 8 cm
Portland Cement (PC)
Atap Seng Gelombang
Pasir Cor
Stenslah/batu pecah tangan 2/3
Usuk : 5/7
Paku Kayu Segala Ukuran
Cat meni besi
M089
M037
M178
M004
M014
M061
M140
M410
btg
kg
lbr
m3
m3
m3
kg
kg
1.2500
2.5000
1.2000
0.0050
0.0090
0.0720
0.0600
0.4500
25,000.00
900.00
71,950.00
110,000.00
156,975.00
4,500,000.00
17,500.00
27,920.00
31,250.00
2,250.00
86,340.00
550.00
1,412.78
324,000.00
1,050.00
12,564.00
459,416.78
PERALATAN
18,000.00
12,000.00
940.00
1,600.00
32,540.00
JUMLAH
HARGA
(Rp.)
491,956.78
NO.
A.
1
2
3
4
: A.003
: Pagar sementara dari kawat duri tinggi 1.8 m
: m'
KOMPONEN
SATUAN
PERKIRAAN
KUANTITAS
HARGA
SATUAN
(Rp.)
TENAGA
Pekerja Biasa
Tukang Kayu
Kepala Tukang Kayu
Mandor
L17
L08
L03
L01
Org/hr
Org/hr
Org/hr
Org/hr
0.3000
0.2000
0.0200
0.0200
45,000.00
60,000.00
47,000.00
80,000.00
BAHAN
Dolken Kayu Dia 8 cm
Portland Cement (PC)
Kawat Duri
Pasir Cor
Stenslah/batu pecah tangan 2/3
Paku Kayu Segala Ukuran
M089
M037
M137
M004
M014
M140
btg
kg
kg
m3
m3
kg
1.0000
2.0000
25.0000
0.0050
0.0090
0.0600
25,000.00
900.00
17,000.00
110,000.00
156,975.00
17,500.00
25,000.00
1,800.00
425,000.00
550.00
1,412.78
1,050.00
454,812.78
PERALATAN
13,500.00
12,000.00
940.00
1,600.00
28,040.00
JUMLAH
HARGA
(Rp.)
482,852.78
NO.
A.
1
2
3
4
: A.004
: Pagar kawat jaring galvanis, tinggi 1,0 m
: m'
KOMPONEN
SATUAN
PERKIRAAN
KUANTITAS
HARGA
SATUAN
(Rp.)
TENAGA
Pekerja Biasa
Tukang Kayu
Kepala Tukang Kayu
Mandor
L17
L08
L03
L01
Org/hr
Org/hr
Org/hr
Org/hr
0.0420
0.0420
0.0040
0.0020
45,000.00
60,000.00
47,000.00
80,000.00
1,890.00
2,520.00
188.00
160.00
4,758.00
BAHAN
Kawat Harmonika Gas
M136
m2
1.1000
8,500.00
JUMLAH
HARGA
(Rp.)
9,350.00
9,350.00
PERALATAN
14,108.00
NO.
A.
1
2
3
4
: A.005
: Pengukuran dan pemasangan bouwplank
: m'
KOMPONEN
SATUAN
PERKIRAAN
KUANTITAS
HARGA
SATUAN
(Rp.)
TENAGA
Pekerja Biasa
Tukang Kayu
Kepala Tukang Kayu
Mandor
L17
L08
L03
L01
Org/hr
Org/hr
Org/hr
Org/hr
0.1000
0.1000
0.0100
0.0050
45,000.00
60,000.00
47,000.00
80,000.00
BAHAN
Usuk : 5/7
Paku Kayu Segala Ukuran
Papan (3x20) cm
M061
M140
M064
m3
kg
m3
0.0120
0.0200
0.0070
4,500,000.00
17,500.00
6,030,000.00
54,000.00
350.00
42,210.00
96,560.00
PERALATAN
4,500.00
6,000.00
470.00
400.00
11,370.00
JUMLAH
HARGA
(Rp.)
107,930.00
NO.
A.
1
2
3
4
5
: A.006
: Pembuatan kantor sementara, dengan lantai plesteran
: m2
KOMPONEN
SATUAN
PERKIRAAN
KUANTITAS
HARGA
SATUAN
(Rp.)
TENAGA
Pekerja Biasa
Tukang Kayu
Tukang Batu
Kepala Tukang Kayu
Mandor
L17
L08
L07
L03
L01
Org/hr
Org/hr
Org/hr
Org/hr
Org/hr
2.0000
1.0000
1.0000
0.3000
0.0500
45,000.00
60,000.00
60,000.00
47,000.00
80,000.00
BAHAN
Balok
Paku Kayu Segala Ukuran
Portland Cement (PC)
Pasir Pasang
Pasir Cor
Stenslah/batu pecah tangan 2/3
Bata Merah
Atap Seng Gelombang
Jendela Nako + accessories
Kaca Polos tebal 3 mm
Multiplek 6 mm
Grendel Pintu
Engsel Pintu
M062
M140
M037
M002
M004
M014
M022
M178
M285
M270
M216
M262
M257
m3
kg
kg
m3
m3
m3
bh
lbr
m2
m2
m2
bh
bh
0.1800
0.3000
35.0000
0.1500
0.1000
0.1500
30.0000
0.5000
0.0750
0.1500
1.5000
2.0000
2.0000
5,040,000.00
17,500.00
900.00
60,000.00
110,000.00
156,975.00
250.00
71,950.00
210,450.00
61,500.00
76,670.00
18,960.00
27,160.00
907,200.00
5,250.00
31,500.00
9,000.00
11,000.00
23,546.25
7,500.00
35,975.00
15,783.75
9,225.00
115,005.00
37,920.00
54,320.00
1,263,225.00
PERALATAN
90,000.00
60,000.00
60,000.00
14,100.00
4,000.00
228,100.00
JUMLAH
HARGA
(Rp.)
1,491,325.00
NO.
A.
1
2
3
4
5
: A.007
: Pembuatan gudang semen dan alat-alat
: m2
KOMPONEN
SATUAN
PERKIRAAN
KUANTITAS
HARGA
SATUAN
(Rp.)
TENAGA
Pekerja Biasa
Tukang Kayu
Tukang Batu
Kepala Tukang Kayu
Mandor
L17
L08
L07
L03
L01
Org/hr
Org/hr
Org/hr
Org/hr
Org/hr
2.0000
1.0000
1.0000
0.3000
0.0500
45,000.00
60,000.00
60,000.00
47,000.00
80,000.00
BAHAN
Balok
Paku Kayu Segala Ukuran
Portland Cement (PC)
Pasir Cor
Stenslah/batu pecah tangan 2/3
Atap Seng Gelombang
Multiplek 6 mm
Grendel Pintu
Engsel Pintu
M062
M140
M037
M004
M014
M178
M216
M262
M257
m3
kg
kg
m3
m3
lbr
m2
bh
bh
0.2100
0.3000
10.5000
0.0300
0.0500
0.5000
1.1500
2.0000
2.0000
5,040,000.00
17,500.00
900.00
110,000.00
156,975.00
71,950.00
76,670.00
18,960.00
27,160.00
1,058,400.00
5,250.00
9,450.00
3,300.00
7,848.75
35,975.00
88,170.50
37,920.00
54,320.00
1,300,634.25
PERALATAN
90,000.00
60,000.00
60,000.00
14,100.00
4,000.00
228,100.00
JUMLAH
HARGA
(Rp.)
1,528,734.25
NO.
A.
1
2
3
4
: A.008
: Pembuatan rumah jaga/konstruksi kayu
: m2
KOMPONEN
SATUAN
PERKIRAAN
KUANTITAS
HARGA
SATUAN
(Rp.)
TENAGA
Pekerja Biasa
Tukang Kayu
Kepala Tukang Kayu
Mandor
L17
L08
L03
L01
Org/hr
Org/hr
Org/hr
Org/hr
2.0000
1.0000
0.3000
0.0500
45,000.00
60,000.00
47,000.00
80,000.00
BAHAN
Balok
Paku Kayu Segala Ukuran
Portland Cement (PC)
Pasir Pasang
Pasir Cor
Stenslah/batu pecah tangan 2/3
Bata Merah
Atap Seng Gelombang
Jendela Nako + accessories
Kaca Polos tebal 3 mm
Multiplek 6 mm
M062
M140
M037
M002
M004
M014
M022
M178
M285
M270
M216
m3
kg
kg
m3
m3
m3
bh
lbr
m2
m2
m2
0.1800
0.3000
35.0000
0.1500
0.1000
0.1500
30.0000
0.5000
0.1500
0.3000
1.5000
5,040,000.00
17,500.00
900.00
60,000.00
110,000.00
156,975.00
250.00
71,950.00
210,450.00
61,500.00
76,670.00
907,200.00
5,250.00
31,500.00
9,000.00
11,000.00
23,546.25
7,500.00
35,975.00
31,567.50
18,450.00
115,005.00
1,195,993.75
PERALATAN
90,000.00
60,000.00
14,100.00
4,000.00
168,100.00
JUMLAH
HARGA
(Rp.)
1,364,093.75
NO.
A.
1
2
3
4
: A.009
: Membersihkan lapangan dan perataan
: m2
KOMPONEN
SATUAN
PERKIRAAN
KUANTITAS
Pekerja Biasa
Tukang Kayu
Kepala Tukang Kayu
Mandor
L17
L08
L03
L01
Org/hr
Org/hr
Org/hr
Org/hr
0.1000
0.0500
4,500.00
4,000.00
8,500.00
PERALATAN
45,000.00
60,000.00
47,000.00
80,000.00
BAHAN
JUMLAH
HARGA
(Rp.)
TENAGA
HARGA
SATUAN
(Rp.)
8,500.00
NO.
A.
1
2
3
4
5
: A.010
: Pembuatan bedeng buruh
: m2
KOMPONEN
SATUAN
PERKIRAAN
KUANTITAS
HARGA
SATUAN
(Rp.)
TENAGA
Pekerja Biasa
Tukang Kayu
Tukang Batu
Kepala Tukang Kayu
Mandor
L17
L08
L07
L03
L01
Org/hr
Org/hr
Org/hr
Org/hr
Org/hr
2.0000
1.0000
1.0000
0.3000
0.0500
45,000.00
60,000.00
60,000.00
47,000.00
80,000.00
BAHAN
Balok
Paku Kayu Segala Ukuran
Portland Cement (PC)
Pasir Cor
Stenslah/batu pecah tangan 2/3
Atap Seng Gelombang
Jendela Nako + accessories
Multiplek 6 mm
Grendel Pintu
Engsel Pintu
M062
M140
M037
M004
M014
M178
M285
M216
M262
M257
m3
kg
kg
m3
m3
lbr
m2
m2
bh
bh
0.2100
0.3000
10.5000
0.0300
0.0500
0.5000
0.0750
1.1500
2.0000
2.0000
5,040,000.00
17,500.00
900.00
110,000.00
156,975.00
71,950.00
210,450.00
76,670.00
18,960.00
27,160.00
1,058,400.00
5,250.00
9,450.00
3,300.00
7,848.75
35,975.00
15,783.75
88,170.50
37,920.00
54,320.00
1,316,418.00
PERALATAN
90,000.00
60,000.00
60,000.00
14,100.00
4,000.00
228,100.00
JUMLAH
HARGA
(Rp.)
1,544,518.00
NO.
A.
1
2
3
4
: A.011
: Pembuatan bak adukan ukuran (40 x 50 x 20) cm
: bh
KOMPONEN
SATUAN
PERKIRAAN
KUANTITAS
HARGA
SATUAN
(Rp.)
TENAGA
Pekerja Biasa
Tukang Kayu
Kepala Tukang Kayu
Mandor
L17
L08
L03
L01
Org/hr
Org/hr
Org/hr
Org/hr
0.3000
0.0015
45,000.00
60,000.00
47,000.00
80,000.00
18,000.00
120.00
18,120.00
BAHAN
Papan (2x20) cm
Paku Kayu Segala Ukuran
Usuk : 5/7
M063
M140
M061
m3
kg
m3
0.0360
0.0800
0.0150
6,030,000.00
17,500.00
4,500,000.00
JUMLAH
HARGA
(Rp.)
217,080.00
1,400.00
67,500.00
285,980.00
PERALATAN
304,100.00
NO.
A.
1
2
3
4
: A.012
: Pembuatan jalan sementara
: m2
KOMPONEN
SATUAN
PERKIRAAN
KUANTITAS
HARGA
SATUAN
(Rp.)
TENAGA
Pekerja Biasa
Tukang Kayu
Kepala Tukang Kayu
Mandor
L17
L08
L03
L01
Org/hr
Org/hr
Org/hr
Org/hr
1.0000
0.0500
45,000.00
60,000.00
47,000.00
80,000.00
BAHAN
Batu Belah Kali
M011
Stenslah/batu pecah tangan 4/6 - 5/7 M016
Pasir Pasang
M002
m3
m3
m3
0.1500
0.0900
0.0100
115,700.00
129,375.00
60,000.00
17,355.00
11,643.75
600.00
29,598.75
PERALATAN
45,000.00
4,000.00
49,000.00
JUMLAH
HARGA
(Rp.)
78,598.75
NO.
A.
1
2
3
4
: A.013
: Bongkar pasang kayu kuda-kuda / kusen / loteng
: m3
KOMPONEN
SATUAN
PERKIRAAN
KUANTITAS
HARGA
SATUAN
(Rp.)
TENAGA
Pekerja Biasa
Tukang Kayu
Kepala Tukang Kayu
Mandor
L17
L08
L03
L01
Org/hr
Org/hr
Org/hr
Org/hr
4.0000
6.0000
0.6000
0.0600
45,000.00
60,000.00
47,000.00
80,000.00
JUMLAH
HARGA
(Rp.)
180,000.00
360,000.00
28,200.00
4,800.00
573,000.00
BAHAN
PERALATAN
573,000.00
NO.
A.
1
2
3
4
: A.014
: Bongkaran beton bertulang
: m3
KOMPONEN
SATUAN
PERKIRAAN
KUANTITAS
JUMLAH
HARGA
(Rp.)
TENAGA
Pekerja Biasa
Tukang Kayu
Kepala Tukang Kayu
Mandor
L17
L08
L03
L01
Org/hr
Org/hr
Org/hr
Org/hr
6.6670
0.3330
HARGA
SATUAN
(Rp.)
45,000.00
60,000.00
47,000.00
80,000.00
300,015.00
26,640.00
326,655.00
BAHAN
PERALATAN
326,655.00
NO.
A.
1
2
3
4
: A.015
: Bongkaran tembok bata merah
: m3
KOMPONEN
SATUAN
PERKIRAAN
KUANTITAS
HARGA
SATUAN
(Rp.)
TENAGA
Pekerja Biasa
Tukang Kayu
Kepala Tukang Kayu
Mandor
L17
L08
L03
L01
Org/hr
Org/hr
Org/hr
Org/hr
6.6670
0.0330
45,000.00
60,000.00
47,000.00
80,000.00
JUMLAH
HARGA
(Rp.)
300,015.00
2,640.00
302,655.00
BAHAN
PERALATAN
302,655.00
NO.
A.
1
2
3
4
: A.016
: Bongkaran atap
: m2
KOMPONEN
SATUAN
PERKIRAAN
KUANTITAS
JUMLAH
HARGA
(Rp.)
TENAGA
Pekerja Biasa
Tukang Kayu
Kepala Tukang Kayu
Mandor
L17
L08
L03
L01
Org/hr
Org/hr
Org/hr
Org/hr
1.1000
0.0500
HARGA
SATUAN
(Rp.)
45,000.00
60,000.00
47,000.00
80,000.00
49,500.00
4,000.00
53,500.00
BAHAN
PERALATAN
53,500.00
NO.
A.
1
2
3
4
: A.017
: Bongkaran lantai
: m2
KOMPONEN
SATUAN
PERKIRAAN
KUANTITAS
HARGA
SATUAN
(Rp.)
TENAGA
Pekerja Biasa
Tukang Kayu
Kepala Tukang Kayu
Mandor
L17
L08
L03
L01
Org/hr
Org/hr
Org/hr
Org/hr
0.2000
0.0100
45,000.00
60,000.00
47,000.00
80,000.00
JUMLAH
HARGA
(Rp.)
9,000.00
800.00
9,800.00
BAHAN
PERALATAN
9,800.00
NO.
A.
1
2
3
4
: A.018
: Bongkaran plafon
: m2
KOMPONEN
SATUAN
PERKIRAAN
KUANTITAS
JUMLAH
HARGA
(Rp.)
TENAGA
Pekerja Biasa
Tukang Kayu
Kepala Tukang Kayu
Mandor
L17
L08
L03
L01
Org/hr
Org/hr
Org/hr
Org/hr
0.2000
0.0600
0.0060
0.0100
HARGA
SATUAN
(Rp.)
45,000.00
60,000.00
47,000.00
80,000.00
9,000.00
3,600.00
282.00
800.00
13,682.00
BAHAN
PERALATAN
13,682.00
NO.
A.
1
2
3
4
: B.001
: Galian tanah biasa sedalam 1 m
: m3
KOMPONEN
SATUAN
PERKIRAAN
KUANTITAS
HARGA
SATUAN
(Rp.)
TENAGA
Pekerja Biasa
Tukang Batu
Kepala Tukang Batu
Mandor
L17
L07
L02
L01
Org/hr
Org/hr
Org/hr
Org/hr
0.7500
0.0250
45,000.00
60,000.00
70,000.00
80,000.00
JUMLAH
HARGA
(Rp.)
33,750.00
2,000.00
35,750.00
BAHAN
PERALATAN
35,750.00
NO.
A.
1
2
3
4
: B.002
: Galian tanah biasa sedalam 2 m
: m3
KOMPONEN
SATUAN
PERKIRAAN
KUANTITAS
HARGA
SATUAN
(Rp.)
TENAGA
Pekerja Biasa
Tukang Batu
Kepala Tukang Batu
Mandor
L17
L07
L02
L01
Org/hr
Org/hr
Org/hr
Org/hr
0.9000
0.0450
JUMLAH
HARGA
(Rp.)
45,000.00
60,000.00
70,000.00
80,000.00
40,500.00
3,600.00
44,100.00
BAHAN
PERALATAN
44,100.00
NO.
A.
1
2
3
4
: B.003
: Galian tanah biasa sedalam 3 m
: m3
KOMPONEN
SATUAN
PERKIRAAN
KUANTITAS
HARGA
SATUAN
(Rp.)
TENAGA
Pekerja Biasa
Tukang Batu
Kepala Tukang Batu
Mandor
L17
L07
L02
L01
Org/hr
Org/hr
Org/hr
Org/hr
1.0500
0.0670
45,000.00
60,000.00
70,000.00
80,000.00
JUMLAH
HARGA
(Rp.)
47,250.00
5,360.00
52,610.00
BAHAN
PERALATAN
52,610.00
NO.
A.
1
2
3
4
: B.004
: Galian tanah keras sedalam 1 m
: m3
KOMPONEN
SATUAN
PERKIRAAN
KUANTITAS
HARGA
SATUAN
(Rp.)
TENAGA
Pekerja Biasa
Tukang Batu
Kepala Tukang Batu
Mandor
L17
L07
L02
L01
Org/hr
Org/hr
Org/hr
Org/hr
1.0000
0.0320
JUMLAH
HARGA
(Rp.)
45,000.00
60,000.00
70,000.00
80,000.00
45,000.00
2,560.00
47,560.00
BAHAN
PERALATAN
47,560.00
NO.
A.
1
2
3
4
: B.005
: Galian tanah cadas sedalam 1 m
: m3
KOMPONEN
SATUAN
PERKIRAAN
KUANTITAS
HARGA
SATUAN
(Rp.)
TENAGA
Pekerja Biasa
Tukang Batu
Kepala Tukang Batu
Mandor
L17
L07
L02
L01
Org/hr
Org/hr
Org/hr
Org/hr
1.5000
0.0600
45,000.00
60,000.00
70,000.00
80,000.00
JUMLAH
HARGA
(Rp.)
67,500.00
4,800.00
72,300.00
BAHAN
PERALATAN
72,300.00
NO.
A.
1
2
3
4
: B.006
: Galian tanah lumpur sedalam 1 m
: m3
KOMPONEN
SATUAN
PERKIRAAN
KUANTITAS
HARGA
SATUAN
(Rp.)
TENAGA
Pekerja Biasa
Tukang Batu
Kepala Tukang Batu
Mandor
L17
L07
L02
L01
Org/hr
Org/hr
Org/hr
Org/hr
1.2000
0.0450
JUMLAH
HARGA
(Rp.)
45,000.00
60,000.00
70,000.00
80,000.00
54,000.00
3,600.00
57,600.00
BAHAN
PERALATAN
57,600.00
NO.
A.
1
2
3
4
: B.007
: Pekerjaan stripping setinggi 1 m
: m2
KOMPONEN
SATUAN
PERKIRAAN
KUANTITAS
HARGA
SATUAN
(Rp.)
TENAGA
Pekerja Biasa
Tukang Batu
Kepala Tukang Batu
Mandor
L17
L07
L02
L01
Org/hr
Org/hr
Org/hr
Org/hr
0.0500
0.0050
45,000.00
60,000.00
70,000.00
80,000.00
JUMLAH
HARGA
(Rp.)
2,250.00
400.00
2,650.00
BAHAN
PERALATAN
2,650.00
NO.
A.
1
2
3
4
: B.008
: Pembuangan tanah sejauh 30 m
: m3
KOMPONEN
SATUAN
PERKIRAAN
KUANTITAS
HARGA
SATUAN
(Rp.)
TENAGA
Pekerja Biasa
Tukang Batu
Kepala Tukang Batu
Mandor
L17
L07
L02
L01
Org/hr
Org/hr
Org/hr
Org/hr
0.3300
0.0100
JUMLAH
HARGA
(Rp.)
45,000.00
60,000.00
70,000.00
80,000.00
14,850.00
800.00
15,650.00
BAHAN
PERALATAN
15,650.00
NO.
A.
1
2
3
4
: B.009
: Urugan kembali
: m3
KOMPONEN
SATUAN
PERKIRAAN
KUANTITAS
HARGA
SATUAN
(Rp.)
TENAGA
Pekerja Biasa
Tukang Batu
Kepala Tukang Batu
Mandor
L17
L07
L02
L01
Org/hr
Org/hr
Org/hr
Org/hr
0.3000
0.0150
45,000.00
60,000.00
70,000.00
80,000.00
JUMLAH
HARGA
(Rp.)
13,500.00
1,200.00
14,700.00
BAHAN
PERALATAN
14,700.00
NO.
A.
1
2
3
4
: B.010
: Pemadatan tanah (per 20 cm)
: m3
KOMPONEN
SATUAN
PERKIRAAN
KUANTITAS
HARGA
SATUAN
(Rp.)
TENAGA
Pekerja Biasa
Tukang Batu
Kepala Tukang Batu
Mandor
L17
L07
L02
L01
Org/hr
Org/hr
Org/hr
Org/hr
0.5000
0.0500
JUMLAH
HARGA
(Rp.)
45,000.00
60,000.00
70,000.00
80,000.00
22,500.00
4,000.00
26,500.00
BAHAN
PERALATAN
26,500.00
NO.
A.
1
2
3
4
: B.011
: Urugan pasir
: m3
KOMPONEN
SATUAN
PERKIRAAN
KUANTITAS
HARGA
SATUAN
(Rp.)
TENAGA
Pekerja Biasa
Tukang Batu
Kepala Tukang Batu
Mandor
L17
L07
L02
L01
Org/hr
Org/hr
Org/hr
Org/hr
0.3000
0.0100
45,000.00
60,000.00
70,000.00
80,000.00
13,500.00
800.00
14,300.00
BAHAN
Pasir Urug
M001
m3
1.2000
96,600.00
JUMLAH
HARGA
(Rp.)
115,920.00
115,920.00
PERALATAN
130,220.00
NO.
A.
1
2
3
4
: B.012
: Lapisan Pudel Campuran 1 Kp : 3 Ps : 7 TL
: m3
KOMPONEN
SATUAN
PERKIRAAN
KUANTITAS
HARGA
SATUAN
(Rp.)
TENAGA
Pekerja Biasa
Tukang Batu
Kepala Tukang Batu
Mandor
L17
L07
L02
L01
Org/hr
Org/hr
Org/hr
Org/hr
0.8000
0.4000
0.0400
0.0800
45,000.00
60,000.00
70,000.00
80,000.00
BAHAN
Pasir Urug
Kapur
Tanah Liat
M001
M041
M009
m3
m3
m3
0.4000
0.1350
0.9480
96,600.00
1,300,000.00
45,000.00
38,640.00
175,500.00
42,660.00
256,800.00
PERALATAN
36,000.00
24,000.00
2,800.00
6,400.00
69,200.00
JUMLAH
HARGA
(Rp.)
326,000.00
NO.
A.
1
2
3
4
: B.013
: Lapisan Pudel Campuran 1 Kp : 5 TL
: m3
KOMPONEN
SATUAN
PERKIRAAN
KUANTITAS
HARGA
SATUAN
(Rp.)
TENAGA
Pekerja Biasa
Tukang Batu
Kepala Tukang Batu
Mandor
L17
L07
L02
L01
Org/hr
Org/hr
Org/hr
Org/hr
0.8000
0.4000
0.0400
0.0800
45,000.00
60,000.00
70,000.00
80,000.00
36,000.00
24,000.00
2,800.00
6,400.00
69,200.00
BAHAN
Kapur
Tanah Liat
M041
M009
m3
m3
0.2480
1.2400
1,300,000.00
45,000.00
JUMLAH
HARGA
(Rp.)
322,400.00
55,800.00
378,200.00
PERALATAN
447,400.00
NO.
A.
1
2
3
4
: B.014
: Pemasangan lapisan ijuk (tebal 10 cm)
: m2
KOMPONEN
SATUAN
PERKIRAAN
KUANTITAS
HARGA
SATUAN
(Rp.)
TENAGA
Pekerja Biasa
Tukang Batu
Kepala Tukang Batu
Mandor
L17
L07
L02
L01
Org/hr
Org/hr
Org/hr
Org/hr
0.1500
0.0150
45,000.00
60,000.00
70,000.00
80,000.00
BAHAN
Ijuk
M466
kg
6.0000
129,150.00
774,900.00
774,900.00
PERALATAN
6,750.00
1,200.00
7,950.00
JUMLAH
HARGA
(Rp.)
782,850.00
NO.
A.
1
2
3
4
: B.015
: Urugan sirtu padat untuk peninggian lantai bangunan
: m3
KOMPONEN
SATUAN
PERKIRAAN
KUANTITAS
HARGA
SATUAN
(Rp.)
TENAGA
Pekerja Biasa
Tukang Batu
Kepala Tukang Batu
Mandor
L17
L07
L02
L01
Org/hr
Org/hr
Org/hr
Org/hr
0.2500
0.0250
45,000.00
60,000.00
70,000.00
80,000.00
11,250.00
2,000.00
13,250.00
BAHAN
Sirtu
M007
m3
1.2000
103,400.00
JUMLAH
HARGA
(Rp.)
124,080.00
124,080.00
PERALATAN
137,330.00
NO.
A.
1
2
3
4
: B.016
: Cut and fill
: m3
KOMPONEN
SATUAN
PERKIRAAN
KUANTITAS
HARGA
SATUAN
(Rp.)
TENAGA
Pekerja Biasa
Tukang Batu
Kepala Tukang Batu
Mandor
L17
L07
L02
L01
Org/hr
Org/hr
Org/hr
Org/hr
1.0500
0.0350
45,000.00
60,000.00
70,000.00
80,000.00
1
2
3
4
5
BAHAN
PERALATAN
Sewa Excavator
Sewa Whell Loader
Sewa Motor Grader
Sewa Vibro Roller
Sewa Water Tanker
E10
E11
E12
E13
E14
hari
hari
hari
hari
hari
0.0126
0.0075
0.0059
0.0064
0.0005
1,600,000.00
2,400,000.00
2,400,000.00
1,750,000.00
1,000,000.00
47,250.00
2,800.00
50,050.00
JUMLAH
HARGA
(Rp.)
20,160.00
18,000.00
14,160.00
11,200.00
500.00
64,020.00
114,070.00
NO.
A.
1
2
3
4
: B.017
: Galian tanah keras sedalam > 5 m
: m3
KOMPONEN
SATUAN
PERKIRAAN
KUANTITAS
HARGA
SATUAN
(Rp.)
TENAGA
Pekerja Biasa
Tukang Batu
Kepala Tukang Batu
Mandor
L17
L07
L02
L01
Org/hr
Org/hr
Org/hr
Org/hr
1.7490
0.1749
45,000.00
60,000.00
70,000.00
80,000.00
JUMLAH
HARGA
(Rp.)
78,705.28
13,992.05
92,697.33
BAHAN
PERALATAN
92,697.33
NO.
A.
1
2
3
4
: B.018
: Galian tanah keras sedalam > 10 m
: m3
KOMPONEN
SATUAN
PERKIRAAN
KUANTITAS
HARGA
SATUAN
(Rp.)
TENAGA
Pekerja Biasa
Tukang Batu
Kepala Tukang Batu
Mandor
L17
L07
L02
L01
Org/hr
Org/hr
Org/hr
Org/hr
4.3521
0.4352
JUMLAH
HARGA
(Rp.)
45,000.00
60,000.00
70,000.00
80,000.00
195,843.93
34,816.70
230,660.62
BAHAN
PERALATAN
230,660.62
NO.
A.
1
2
3
4
: C.001
: Pasang pondasi batu kali, 1 Pc : 3 Ps
: m3
KOMPONEN
SATUAN
PERKIRAAN
KUANTITAS
HARGA
SATUAN
(Rp.)
TENAGA
Pekerja Biasa
Tukang Batu
Kepala Tukang Batu
Mandor
L17
L07
L02
L01
Org/hr
Org/hr
Org/hr
Org/hr
1.5000
0.6000
0.0600
0.0750
45,000.00
60,000.00
70,000.00
80,000.00
67,500.00
36,000.00
4,200.00
6,000.00
113,700.00
BAHAN
Batu Belah Kali
Portland Cement (PC)
Pasir Pasang
M011
M037
M002
m3
kg
m3
1.2000
202.0000
0.4850
115,700.00
900.00
60,000.00
JUMLAH
HARGA
(Rp.)
138,840.00
181,800.00
29,100.00
349,740.00
PERALATAN
463,440.00
NO.
A.
1
2
3
4
: C.002
: Pasang pondasi batu kali, 1 Pc : 4 Ps
: m3
KOMPONEN
SATUAN
PERKIRAAN
KUANTITAS
HARGA
SATUAN
(Rp.)
TENAGA
Pekerja Biasa
Tukang Batu
Kepala Tukang Batu
Mandor
L17
L07
L02
L01
Org/hr
Org/hr
Org/hr
Org/hr
1.5000
0.6000
0.0600
0.0750
45,000.00
60,000.00
70,000.00
80,000.00
BAHAN
Batu Belah Kali
Portland Cement (PC)
Pasir Pasang
M011
M037
M002
m3
kg
m3
1.2000
163.0000
0.5200
115,700.00
900.00
60,000.00
138,840.00
146,700.00
31,200.00
316,740.00
PERALATAN
67,500.00
36,000.00
4,200.00
6,000.00
113,700.00
JUMLAH
HARGA
(Rp.)
430,440.00
NO.
A.
1
2
3
4
: C.003
: Pasang pondasi batu kali, 1 Pc : 5 Ps
: m3
KOMPONEN
SATUAN
PERKIRAAN
KUANTITAS
HARGA
SATUAN
(Rp.)
TENAGA
Pekerja Biasa
Tukang Batu
Kepala Tukang Batu
Mandor
L17
L07
L02
L01
Org/hr
Org/hr
Org/hr
Org/hr
1.5000
0.6000
0.0600
0.0750
45,000.00
60,000.00
70,000.00
80,000.00
67,500.00
36,000.00
4,200.00
6,000.00
113,700.00
BAHAN
Batu Belah Kali
Portland Cement (PC)
Pasir Pasang
M011
M037
M002
m3
kg
m3
1.2000
136.0000
0.5440
115,700.00
900.00
60,000.00
JUMLAH
HARGA
(Rp.)
138,840.00
122,400.00
32,640.00
293,880.00
PERALATAN
407,580.00
NO.
A.
1
2
3
4
: C.004
: Pasang pondasi batu kali, 1 Pc : 6 Ps
: m3
KOMPONEN
SATUAN
PERKIRAAN
KUANTITAS
HARGA
SATUAN
(Rp.)
TENAGA
Pekerja Biasa
Tukang Batu
Kepala Tukang Batu
Mandor
L17
L07
L02
L01
Org/hr
Org/hr
Org/hr
Org/hr
1.5000
0.6000
0.0600
0.0750
45,000.00
60,000.00
70,000.00
80,000.00
BAHAN
Batu Belah Kali
Portland Cement (PC)
Pasir Pasang
M011
M037
M002
m3
kg
m3
1.2000
117.0000
0.5610
115,700.00
900.00
60,000.00
138,840.00
105,300.00
33,660.00
277,800.00
PERALATAN
67,500.00
36,000.00
4,200.00
6,000.00
113,700.00
JUMLAH
HARGA
(Rp.)
391,500.00
NO.
A.
1
2
3
4
: C.005
: Pasang pondasi batu kali, 1 Pc : 8 Ps
: m3
KOMPONEN
SATUAN
PERKIRAAN
KUANTITAS
HARGA
SATUAN
(Rp.)
TENAGA
Pekerja Biasa
Tukang Batu
Kepala Tukang Batu
Mandor
L17
L07
L02
L01
Org/hr
Org/hr
Org/hr
Org/hr
1.5000
0.6000
0.0600
0.0750
45,000.00
60,000.00
70,000.00
80,000.00
67,500.00
36,000.00
4,200.00
6,000.00
113,700.00
BAHAN
Batu Belah Kali
Portland Cement (PC)
Pasir Pasang
M011
M037
M002
m3
kg
m3
1.2000
91.0000
0.5840
115,700.00
900.00
60,000.00
JUMLAH
HARGA
(Rp.)
138,840.00
81,900.00
35,040.00
255,780.00
PERALATAN
369,480.00
NO.
A.
1
2
3
4
: C.006
: Pasang pondasi batu kali, 1 Kp : 1 Sm : 2 Ps
: m3
KOMPONEN
SATUAN
PERKIRAAN
KUANTITAS
HARGA
SATUAN
(Rp.)
TENAGA
Pekerja Biasa
Tukang Batu
Kepala Tukang Batu
Mandor
L17
L07
L02
L01
Org/hr
Org/hr
Org/hr
Org/hr
1.5000
0.6000
0.0600
0.0750
45,000.00
60,000.00
70,000.00
80,000.00
BAHAN
Batu Belah Kali
Kapur
Semen Merah
Pasir Pasang
M011
M041
M043
M002
m3
m3
m3
m3
1.2000
0.1700
0.1700
0.3400
115,700.00
1,300,000.00
165,000.00
60,000.00
138,840.00
221,000.00
28,050.00
20,400.00
408,290.00
PERALATAN
67,500.00
36,000.00
4,200.00
6,000.00
113,700.00
JUMLAH
HARGA
(Rp.)
521,990.00
NO.
A.
1
2
3
4
: C.007
: Pasang pondasi batu kali, 1 Pc : 3 Kp : 10 Ps
: m3
KOMPONEN
SATUAN
PERKIRAAN
KUANTITAS
HARGA
SATUAN
(Rp.)
TENAGA
Pekerja Biasa
Tukang Batu
Kepala Tukang Batu
Mandor
L17
L07
L02
L01
Org/hr
Org/hr
Org/hr
Org/hr
1.5000
0.6000
0.0600
0.0750
45,000.00
60,000.00
70,000.00
80,000.00
67,500.00
36,000.00
4,200.00
6,000.00
113,700.00
BAHAN
Batu Belah Kali
Portland Cement (PC)
Kapur
Pasir Pasang
M011
M037
M041
M002
m3
kg
m3
m3
1.2000
61.0000
0.1470
0.4920
115,700.00
900.00
1,300,000.00
60,000.00
JUMLAH
HARGA
(Rp.)
138,840.00
54,900.00
191,100.00
29,520.00
414,360.00
PERALATAN
528,060.00
NO.
A.
1
2
3
4
: C.008
: Pasang pondasi batu kali, 1/4 Pc : 1 Kp : 4 Ps
: m3
KOMPONEN
SATUAN
PERKIRAAN
KUANTITAS
HARGA
SATUAN
(Rp.)
TENAGA
Pekerja Biasa
Tukang Batu
Kepala Tukang Batu
Mandor
L17
L07
L02
L01
Org/hr
Org/hr
Org/hr
Org/hr
1.5000
0.6000
0.0600
0.0750
45,000.00
60,000.00
70,000.00
80,000.00
BAHAN
Batu Belah Kali
Portland Cement (PC)
Kapur
Pasir Pasang
M011
M037
M041
M002
m3
kg
m3
m3
1.2000
41.0000
0.1310
0.5230
115,700.00
900.00
1,300,000.00
60,000.00
138,840.00
36,900.00
170,300.00
31,380.00
377,420.00
PERALATAN
67,500.00
36,000.00
4,200.00
6,000.00
113,700.00
JUMLAH
HARGA
(Rp.)
491,120.00
NO.
A.
1
2
3
4
: C.009
: Pasang pondasi batu kosong
: m3
KOMPONEN
SATUAN
PERKIRAAN
KUANTITAS
HARGA
SATUAN
(Rp.)
TENAGA
Pekerja Biasa
Tukang Batu
Kepala Tukang Batu
Mandor
L17
L07
L02
L01
Org/hr
Org/hr
Org/hr
Org/hr
0.7800
0.3900
0.0390
0.0390
45,000.00
60,000.00
70,000.00
80,000.00
35,100.00
23,400.00
2,730.00
3,120.00
64,350.00
BAHAN
Batu Belah Kali
Pasir Urug
M011
M001
m3
m3
1.2000
0.4320
115,700.00
96,600.00
JUMLAH
HARGA
(Rp.)
138,840.00
41,731.20
180,571.20
PERALATAN
244,921.20
NO.
A.
1
2
3
4
: C.010
: Pasang pondasi siklop, 60% beton campuran 1 PC : 2 PB : 3 KR
dan 40% batu kali
: m3
KOMPONEN
SATUAN
PERKIRAAN
KUANTITAS
HARGA
SATUAN
(Rp.)
TENAGA
Pekerja Biasa
Tukang Batu
Kepala Tukang Batu
Mandor
L17
L07
L02
L01
Org/hr
Org/hr
Org/hr
Org/hr
3.0000
0.8500
0.0850
0.1500
45,000.00
60,000.00
70,000.00
80,000.00
BAHAN
Besi Beton Polos
Portland Cement (PC)
Pasir Cor
Batu pecah mesin 2/3
Kawat Beton/Bendrat RRT
Batu belah 15 cm/20 cm
M112
M037
M004
M019
M135
M011
kg
kg
m3
m3
kg
m3
126.0000
194.0000
0.3120
0.4680
1.8000
0.4800
8,500.00
900.00
110,000.00
100,000.00
7,500.00
115,700.00
1,071,000.00
174,600.00
34,320.00
46,800.00
13,500.00
55,536.00
1,395,756.00
PERALATAN
135,000.00
51,000.00
5,950.00
12,000.00
203,950.00
JUMLAH
HARGA
(Rp.)
1,599,706.00
NO.
A.
1
2
3
4
: C.011
: Pasang pondasi sumuran diameter 100 cm
: m3
KOMPONEN
SATUAN
PERKIRAAN
KUANTITAS
HARGA
SATUAN
(Rp.)
TENAGA
Pekerja Biasa
Tukang Batu
Kepala Tukang Batu
Mandor
L17
L07
L02
L01
Org/hr
Org/hr
Org/hr
Org/hr
2.3800
0.3000
0.0300
0.0800
45,000.00
60,000.00
70,000.00
80,000.00
BAHAN
Batu Belah Kali
Portland Cement (PC)
Pasir Cor
Batu pecah mesin 2/3
M011
M037
M004
M019
m3
kg
m3
m3
0.4500
194.0000
0.3120
0.4680
115,700.00
900.00
110,000.00
100,000.00
52,065.00
174,600.00
34,320.00
46,800.00
307,785.00
PERALATAN
107,100.00
18,000.00
2,100.00
6,400.00
133,600.00
JUMLAH
HARGA
(Rp.)
441,385.00
NO.
A.
1
2
3
4
: D.001
: Pasangan bata merah tebal 1 bata, 1 Pc : 2 Ps
: m2
KOMPONEN
SATUAN
PERKIRAAN
KUANTITAS
HARGA
SATUAN
(Rp.)
TENAGA
Pekerja Biasa
Tukang Batu
Kepala Tukang Batu
Mandor
L17
L07
L02
L01
Org/hr
Org/hr
Org/hr
Org/hr
0.6000
0.2000
0.0200
0.0300
45,000.00
60,000.00
70,000.00
80,000.00
27,000.00
12,000.00
1,400.00
2,400.00
42,800.00
BAHAN
Bata Merah
Portland Cement (PC)
Pasir Pasang
M022
M037
M002
bh
kg
m3
140.0000
43.5000
0.0800
250.00
900.00
60,000.00
JUMLAH
HARGA
(Rp.)
35,000.00
39,150.00
4,800.00
78,950.00
PERALATAN
121,750.00
NO.
A.
1
2
3
4
: D.002
: Pasangan bata merah tebal 1 bata, 1 Pc : 3 Ps
: m2
KOMPONEN
SATUAN
PERKIRAAN
KUANTITAS
HARGA
SATUAN
(Rp.)
TENAGA
Pekerja Biasa
Tukang Batu
Kepala Tukang Batu
Mandor
L17
L07
L02
L01
Org/hr
Org/hr
Org/hr
Org/hr
0.6000
0.2000
0.0200
0.0300
45,000.00
60,000.00
70,000.00
80,000.00
BAHAN
Bata Merah
Portland Cement (PC)
Pasir Pasang
M022
M037
M002
bh
kg
m3
140.0000
32.9500
0.0910
250.00
900.00
60,000.00
35,000.00
29,655.00
5,460.00
70,115.00
PERALATAN
27,000.00
12,000.00
1,400.00
2,400.00
42,800.00
JUMLAH
HARGA
(Rp.)
112,915.00
NO.
A.
1
2
3
4
: D.003
: Pasangan bata merah tebal 1 bata, 1 Pc : 4 Ps
: m2
KOMPONEN
SATUAN
PERKIRAAN
KUANTITAS
HARGA
SATUAN
(Rp.)
TENAGA
Pekerja Biasa
Tukang Batu
Kepala Tukang Batu
Mandor
L17
L07
L02
L01
Org/hr
Org/hr
Org/hr
Org/hr
0.6000
0.2000
0.0200
0.0300
45,000.00
60,000.00
70,000.00
80,000.00
27,000.00
12,000.00
1,400.00
2,400.00
42,800.00
BAHAN
Bata Merah
Portland Cement (PC)
Pasir Pasang
M022
M037
M002
bh
kg
m3
140.0000
26.5500
0.0930
250.00
900.00
60,000.00
JUMLAH
HARGA
(Rp.)
35,000.00
23,895.00
5,580.00
64,475.00
PERALATAN
107,275.00
NO.
A.
1
2
3
4
: D.004
: Pasangan bata merah tebal 1 bata, 1 Pc : 5 Ps
: m2
KOMPONEN
SATUAN
PERKIRAAN
KUANTITAS
HARGA
SATUAN
(Rp.)
TENAGA
Pekerja Biasa
Tukang Batu
Kepala Tukang Batu
Mandor
L17
L07
L02
L01
Org/hr
Org/hr
Org/hr
Org/hr
0.6000
0.2000
0.0200
0.0300
45,000.00
60,000.00
70,000.00
80,000.00
BAHAN
Bata Merah
Portland Cement (PC)
Pasir Pasang
M022
M037
M002
bh
kg
m3
140.0000
22.2000
0.1020
250.00
900.00
60,000.00
35,000.00
19,980.00
6,120.00
61,100.00
PERALATAN
27,000.00
12,000.00
1,400.00
2,400.00
42,800.00
JUMLAH
HARGA
(Rp.)
103,900.00
NO.
A.
1
2
3
4
: D.005
: Pasangan bata merah tebal 1 bata, 1 Pc : 6 Ps
: m2
KOMPONEN
SATUAN
PERKIRAAN
KUANTITAS
HARGA
SATUAN
(Rp.)
JUMLAH
HARGA
(Rp.)
TENAGA
Pekerja Biasa
Tukang Batu
Kepala Tukang Batu
Mandor
L17
L07
L02
L01
Org/hr
Org/hr
Org/hr
Org/hr
0.6000
0.2000
0.0200
0.0300
45,000.00
60,000.00
70,000.00
80,000.00
27,000.00
12,000.00
1,400.00
2,400.00
42,800.00
BAHAN
Bata Merah
Portland Cement (PC)
Pasir Pasang
M022
M037
M002
bh
kg
m3
140.0000
18.5000
0.1220
250.00
900.00
60,000.00
35,000.00
16,650.00
7,320.00
58,970.00
PERALATAN
101,770.00
NO.
A.
1
2
3
4
: D.006
: Pasangan bata merah tebal 1 bata, 1 Pc : 3 Kp : 10 Ps
: m2
KOMPONEN
SATUAN
PERKIRAAN
KUANTITAS
HARGA
SATUAN
(Rp.)
TENAGA
Pekerja Biasa
Tukang Batu
Kepala Tukang Batu
Mandor
L17
L07
L02
L01
Org/hr
Org/hr
Org/hr
Org/hr
0.6000
0.2000
0.0200
0.0300
45,000.00
60,000.00
70,000.00
80,000.00
BAHAN
Bata Merah
Portland Cement (PC)
Pasir Pasang
Kapur
M022
M037
M002
M041
bh
kg
m3
m3
140.0000
10.0800
0.0925
0.0275
250.00
900.00
60,000.00
1,300,000.00
35,000.00
9,072.00
5,550.00
35,750.00
85,372.00
PERALATAN
27,000.00
12,000.00
1,400.00
2,400.00
42,800.00
JUMLAH
HARGA
(Rp.)
128,172.00
NO.
A.
1
2
3
4
: D.007
: Pasangan bata merah tebal 1/2 bata, 1 Pc : 2 Ps
: m2
KOMPONEN
SATUAN
PERKIRAAN
KUANTITAS
HARGA
SATUAN
(Rp.)
TENAGA
Pekerja Biasa
Tukang Batu
Kepala Tukang Batu
Mandor
L17
L07
L02
L01
Org/hr
Org/hr
Org/hr
Org/hr
0.3000
0.1000
0.0100
0.0150
45,000.00
60,000.00
70,000.00
80,000.00
13,500.00
6,000.00
700.00
1,200.00
21,400.00
BAHAN
Bata Merah
Portland Cement (PC)
Pasir Pasang
M022
M037
M002
bh
kg
m3
70.0000
18.9500
0.0380
250.00
900.00
60,000.00
JUMLAH
HARGA
(Rp.)
17,500.00
17,055.00
2,280.00
36,835.00
PERALATAN
58,235.00
NO.
A.
1
2
3
4
: D.008
: Pasangan bata merah tebal 1/2 bata, 1 Pc : 3 Ps
: m2
KOMPONEN
SATUAN
PERKIRAAN
KUANTITAS
HARGA
SATUAN
(Rp.)
TENAGA
Pekerja Biasa
Tukang Batu
Kepala Tukang Batu
Mandor
L17
L07
L02
L01
Org/hr
Org/hr
Org/hr
Org/hr
0.3000
0.1000
0.0100
0.0150
45,000.00
60,000.00
70,000.00
80,000.00
BAHAN
Bata Merah
Portland Cement (PC)
Pasir Pasang
M022
M037
M002
bh
kg
m3
70.0000
14.3700
0.0400
250.00
900.00
60,000.00
17,500.00
12,933.00
2,400.00
32,833.00
PERALATAN
13,500.00
6,000.00
700.00
1,200.00
21,400.00
JUMLAH
HARGA
(Rp.)
54,233.00
NO.
A.
1
2
3
4
: D.009
: Pasangan bata merah tebal 1/2 bata, 1 Pc : 4 Ps
: m2
KOMPONEN
SATUAN
PERKIRAAN
KUANTITAS
HARGA
SATUAN
(Rp.)
TENAGA
Pekerja Biasa
Tukang Batu
Kepala Tukang Batu
Mandor
L17
L07
L02
L01
Org/hr
Org/hr
Org/hr
Org/hr
0.3000
0.1000
0.0100
0.0150
45,000.00
60,000.00
70,000.00
80,000.00
13,500.00
6,000.00
700.00
1,200.00
21,400.00
BAHAN
Bata Merah
Portland Cement (PC)
Pasir Pasang
M022
M037
M002
bh
kg
m3
70.0000
11.5000
0.0430
250.00
900.00
60,000.00
JUMLAH
HARGA
(Rp.)
17,500.00
10,350.00
2,580.00
30,430.00
PERALATAN
51,830.00
NO.
A.
1
2
3
4
: D.010
: Pasangan bata merah tebal 1/2 bata, 1 Pc : 5 Ps
: m2
KOMPONEN
SATUAN
PERKIRAAN
KUANTITAS
HARGA
SATUAN
(Rp.)
TENAGA
Pekerja Biasa
Tukang Batu
Kepala Tukang Batu
Mandor
L17
L07
L02
L01
Org/hr
Org/hr
Org/hr
Org/hr
0.3000
0.1000
0.0100
0.0150
45,000.00
60,000.00
70,000.00
80,000.00
BAHAN
Bata Merah
Portland Cement (PC)
Pasir Pasang
M022
M037
M002
bh
kg
m3
70.0000
9.6800
0.0450
250.00
900.00
60,000.00
17,500.00
8,712.00
2,700.00
28,912.00
PERALATAN
13,500.00
6,000.00
700.00
1,200.00
21,400.00
JUMLAH
HARGA
(Rp.)
50,312.00
NO.
A.
1
2
3
4
: D.011
: Pasangan bata merah tebal 1/2 bata, 1 Pc : 6 Ps
: m2
KOMPONEN
SATUAN
PERKIRAAN
KUANTITAS
HARGA
SATUAN
(Rp.)
TENAGA
Pekerja Biasa
Tukang Batu
Kepala Tukang Batu
Mandor
L17
L07
L02
L01
Org/hr
Org/hr
Org/hr
Org/hr
0.3000
0.1000
0.0100
0.0150
45,000.00
60,000.00
70,000.00
80,000.00
13,500.00
6,000.00
700.00
1,200.00
21,400.00
BAHAN
Bata Merah
Portland Cement (PC)
Pasir Pasang
M022
M037
M002
bh
kg
m3
70.0000
8.3200
0.0490
250.00
900.00
60,000.00
JUMLAH
HARGA
(Rp.)
17,500.00
7,488.00
2,940.00
27,928.00
PERALATAN
49,328.00
NO.
A.
1
2
3
4
: D.012
: Pasangan bata merah tebal 1/2 bata, 1 Pc : 8 Ps
: m2
KOMPONEN
SATUAN
PERKIRAAN
KUANTITAS
HARGA
SATUAN
(Rp.)
TENAGA
Pekerja Biasa
Tukang Batu
Kepala Tukang Batu
Mandor
L17
L07
L02
L01
Org/hr
Org/hr
Org/hr
Org/hr
0.3000
0.1000
0.0100
0.0150
45,000.00
60,000.00
70,000.00
80,000.00
BAHAN
Bata Merah
Portland Cement (PC)
Pasir Pasang
M022
M037
M002
bh
kg
m3
70.0000
6.5000
0.0500
250.00
900.00
60,000.00
17,500.00
5,850.00
3,000.00
26,350.00
PERALATAN
13,500.00
6,000.00
700.00
1,200.00
21,400.00
JUMLAH
HARGA
(Rp.)
47,750.00
NO.
A.
1
2
3
4
: D.013
: Pasangan bata merah tebal 1/2 bata, 1 Pc : 3 Kp : 10 Ps
: m2
KOMPONEN
SATUAN
PERKIRAAN
KUANTITAS
HARGA
SATUAN
(Rp.)
JUMLAH
HARGA
(Rp.)
TENAGA
Pekerja Biasa
Tukang Batu
Kepala Tukang Batu
Mandor
L17
L07
L02
L01
Org/hr
Org/hr
Org/hr
Org/hr
0.3000
0.1000
0.0100
0.0150
45,000.00
60,000.00
70,000.00
80,000.00
13,500.00
6,000.00
700.00
1,200.00
21,400.00
BAHAN
Bata Merah
Portland Cement (PC)
Pasir Pasang
Kapur
M022
M037
M002
M041
bh
kg
m3
m3
70.0000
4.5000
0.0500
0.0150
250.00
900.00
60,000.00
1,300,000.00
17,500.00
4,050.00
3,000.00
19,500.00
44,050.00
PERALATAN
65,450.00
NO.
A.
1
2
3
4
: D.014
: Pasangan bata merah tebal 1/2 bata, 1 Kp : 1 Sm : 1 Ps
: m2
KOMPONEN
SATUAN
PERKIRAAN
KUANTITAS
HARGA
SATUAN
(Rp.)
TENAGA
Pekerja Biasa
Tukang Batu
Kepala Tukang Batu
Mandor
L17
L07
L02
L01
Org/hr
Org/hr
Org/hr
Org/hr
0.3000
0.1000
0.0100
0.0150
45,000.00
60,000.00
70,000.00
80,000.00
BAHAN
Bata Merah
Semen Merah
Pasir Pasang
Kapur
M022
M043
M002
M041
bh
m3
m3
m3
70.0000
0.0180
0.0180
0.0180
250.00
165,000.00
60,000.00
1,300,000.00
17,500.00
2,970.00
1,080.00
23,400.00
44,950.00
PERALATAN
13,500.00
6,000.00
700.00
1,200.00
21,400.00
JUMLAH
HARGA
(Rp.)
66,350.00
NO.
A.
1
2
3
4
: D.015
: Pasangan bata merah tebal 1/2 bata, 1 Kp : 1 Sm : 2 Ps
: m2
KOMPONEN
SATUAN
PERKIRAAN
KUANTITAS
HARGA
SATUAN
(Rp.)
TENAGA
Pekerja Biasa
Tukang Batu
Kepala Tukang Batu
Mandor
L17
L07
L02
L01
Org/hr
Org/hr
Org/hr
Org/hr
0.3000
0.1000
0.0100
0.0150
45,000.00
60,000.00
70,000.00
80,000.00
13,500.00
6,000.00
700.00
1,200.00
21,400.00
BAHAN
Bata Merah
Semen Merah
Pasir Pasang
Kapur
M022
M043
M002
M041
bh
m3
m3
m3
70.0000
0.0140
0.0280
0.0140
250.00
165,000.00
60,000.00
1,300,000.00
JUMLAH
HARGA
(Rp.)
17,500.00
2,310.00
1,680.00
18,200.00
39,690.00
PERALATAN
61,090.00
NO.
A.
1
2
3
4
: D.016
: Pasangan dinding hollowblock (HB. 20), Spesi 1 PC : 3 Ps
: m2
KOMPONEN
SATUAN
PERKIRAAN
KUANTITAS
HARGA
SATUAN
(Rp.)
TENAGA
Pekerja Biasa
Tukang Batu
Kepala Tukang Batu
Mandor
L17
L07
L02
L01
Org/hr
Org/hr
Org/hr
Org/hr
0.3000
0.1500
0.0150
0.0150
45,000.00
60,000.00
70,000.00
80,000.00
13,500.00
9,000.00
1,050.00
1,200.00
24,750.00
BAHAN
Hollow Block (HB. 20)
Portland Cement (PC)
Pasir Pasang
Besi Beton Polos
M030
M037
M002
M112
bh
kg
m3
kg
12.5000
30.3200
0.0728
0.2800
JUMLAH
HARGA
(Rp.)
#REF!
900.00
60,000.00
8,500.00
#REF!
27,288.00
4,368.00
2,380.00
#REF!
PERALATAN
#REF!
NO.
A.
1
2
3
4
: D.021
: Pasangan dinding hollowblock (HB. 10), Spesi 1 PC : 4 Ps
: m2
KOMPONEN
SATUAN
PERKIRAAN
KUANTITAS
HARGA
SATUAN
(Rp.)
TENAGA
Pekerja Biasa
Tukang Batu
Kepala Tukang Batu
Mandor
L17
L07
L02
L01
Org/hr
Org/hr
Org/hr
Org/hr
0.3000
0.1000
0.0100
0.0150
45,000.00
60,000.00
70,000.00
80,000.00
13,500.00
6,000.00
700.00
1,200.00
21,400.00
BAHAN
Hollow Block (HB. 10)
Portland Cement (PC)
Pasir Pasang
Besi Beton Polos
M032
M037
M002
M112
bh
kg
m3
kg
12.5000
12.1300
0.0388
0.2800
#REF!
900.00
60,000.00
8,500.00
JUMLAH
HARGA
(Rp.)
#REF!
10,917.00
2,328.00
2,380.00
#REF!
PERALATAN
#REF!
NO.
A.
1
2
4
5
: D.022
: Pasangan dinding roster/terawang (12 x 11 x 24) cm, Spesi 1 PC : 3 Ps
: m2
KOMPONEN
SATUAN
PERKIRAAN
KUANTITAS
HARGA
SATUAN
(Rp.)
TENAGA
Pekerja Biasa
Tukang Batu
Kepala Tukang Batu
Mandor
L17
L07
L02
L01
Org/hr
Org/hr
Org/hr
Org/hr
0.3000
0.1000
0.0100
0.0150
45,000.00
60,000.00
70,000.00
80,000.00
BAHAN
Rooster
Portland Cement (PC)
Pasir Pasang
M025
M037
M002
bh
kg
m3
30.0000
14.0000
0.0320
8,650.00
900.00
60,000.00
259,500.00
12,600.00
1,920.00
274,020.00
PERALATAN
13,500.00
6,000.00
700.00
1,200.00
21,400.00
JUMLAH
HARGA
(Rp.)
295,420.00
NO.
A.
1
2
4
5
: D.025
: Pasang Batu Bata Tahan Api
: m2
KOMPONEN
SATUAN
PERKIRAAN
KUANTITAS
HARGA
SATUAN
(Rp.)
TENAGA
Pekerja Biasa
Tukang Batu
Kepala Tukang Batu
Mandor
L17
L07
L02
L01
Org/hr
Org/hr
Org/hr
Org/hr
0.3000
0.1000
0.0100
0.0150
45,000.00
60,000.00
70,000.00
80,000.00
13,500.00
6,000.00
700.00
1,200.00
21,400.00
BAHAN
Batu Bata Tahan Api
M022.a
Portland Cement (PC) Tahan Api M037.a
Pasir Pasang
M002
bh
kg
m3
70.0000
11.5000
0.0430
JUMLAH
HARGA
(Rp.)
#REF!
#REF!
60,000.00
#REF!
#REF!
2,580.00
#REF!
PERALATAN
#REF!
NO.
A.
1
2
3
4
: D.017
: Pasangan dinding hollowblock (HB. 20), Spesi 1 PC : 4 Ps
: m2
KOMPONEN
SATUAN
PERKIRAAN
KUANTITAS
HARGA
SATUAN
(Rp.)
TENAGA
Pekerja Biasa
Tukang Batu
Kepala Tukang Batu
Mandor
L17
L07
L02
L01
Org/hr
Org/hr
Org/hr
Org/hr
0.3000
0.1500
0.0150
0.0150
45,000.00
60,000.00
70,000.00
80,000.00
13,500.00
9,000.00
1,050.00
1,200.00
24,750.00
BAHAN
Hollow Block (HB. 20)
Portland Cement (PC)
Pasir Pasang
Besi Beton Polos
M030
M037
M002
M112
bh
kg
m3
kg
12.5000
24.2600
0.0772
0.2800
#REF!
900.00
60,000.00
8,500.00
JUMLAH
HARGA
(Rp.)
#REF!
21,834.00
4,632.00
2,380.00
#REF!
PERALATAN
#REF!
NO.
A.
1
2
3
4
: D.018
: Pasangan dinding hollowblock (HB. 15), spesi 1 PC : 3 Ps
: m2
KOMPONEN
SATUAN
PERKIRAAN
KUANTITAS
HARGA
SATUAN
(Rp.)
TENAGA
Pekerja Biasa
Tukang Batu
Kepala Tukang Batu
Mandor
L17
L07
L02
L01
Org/hr
Org/hr
Org/hr
Org/hr
0.3600
0.1200
0.0120
0.0180
45,000.00
60,000.00
70,000.00
80,000.00
16,200.00
7,200.00
840.00
1,440.00
25,680.00
BAHAN
Hollow Block (HB. 15)
Portland Cement (PC)
Pasir Pasang
Besi Beton Polos
M031
M037
M002
M112
bh
kg
m3
kg
12.5000
22.7400
0.0550
0.2800
JUMLAH
HARGA
(Rp.)
#REF!
900.00
60,000.00
8,500.00
#REF!
20,466.00
3,300.00
2,380.00
#REF!
PERALATAN
#REF!
NO.
A.
1
2
3
4
: D.019
: Pasangan dinding hollowblock (HB. 15), spesi 1 PC : 4 Ps
: m2
KOMPONEN
SATUAN
PERKIRAAN
KUANTITAS
HARGA
SATUAN
(Rp.)
TENAGA
Pekerja Biasa
Tukang Batu
Kepala Tukang Batu
Mandor
L17
L07
L02
L01
Org/hr
Org/hr
Org/hr
Org/hr
0.3600
0.1200
0.0120
0.0180
45,000.00
60,000.00
70,000.00
80,000.00
16,200.00
7,200.00
840.00
1,440.00
25,680.00
BAHAN
Hollow Block (HB. 15)
Portland Cement (PC)
Pasir Pasang
Besi Beton Polos
M031
M037
M002
M112
bh
kg
m3
kg
12.5000
18.2000
0.0582
0.2800
#REF!
900.00
60,000.00
8,500.00
JUMLAH
HARGA
(Rp.)
#REF!
16,380.00
3,492.00
2,380.00
#REF!
PERALATAN
#REF!
NO.
A.
1
2
3
4
: D.020
: Pasangan dinding hollowblock (HB. 10), Spesi 1 PC : 3 Ps
: m2
KOMPONEN
SATUAN
PERKIRAAN
KUANTITAS
HARGA
SATUAN
(Rp.)
TENAGA
Pekerja Biasa
Tukang Batu
Kepala Tukang Batu
Mandor
L17
L07
L02
L01
Org/hr
Org/hr
Org/hr
Org/hr
0.3000
0.1000
0.0100
0.0150
45,000.00
60,000.00
70,000.00
80,000.00
13,500.00
6,000.00
700.00
1,200.00
21,400.00
BAHAN
Hollow Block (HB. 10)
Portland Cement (PC)
Pasir Pasang
Besi Beton Polos
M032
M037
M002
M112
bh
kg
m3
kg
12.5000
15.1600
0.0364
0.2800
JUMLAH
HARGA
(Rp.)
#REF!
900.00
60,000.00
8,500.00
#REF!
13,644.00
2,184.00
2,380.00
#REF!
PERALATAN
#REF!
NO.
A.
1
2
4
5
: D.023
: Pasangan dinding roster/terawang (12 x 11 x 24) cm, Spesi 1 PC : 4 Ps
: m2
KOMPONEN
SATUAN
PERKIRAAN
KUANTITAS
HARGA
SATUAN
(Rp.)
JUMLAH
HARGA
(Rp.)
TENAGA
Pekerja Biasa
Tukang Batu
Kepala Tukang Batu
Mandor
L17
L07
L02
L01
Org/hr
Org/hr
Org/hr
Org/hr
0.3000
0.1000
0.0100
0.0150
45,000.00
60,000.00
70,000.00
80,000.00
13,500.00
6,000.00
700.00
1,200.00
21,400.00
BAHAN
Rooster
Portland Cement (PC)
Pasir Pasang
M025
M037
M002
bh
kg
m3
30.0000
11.0000
0.0350
8,650.00
900.00
60,000.00
259,500.00
9,900.00
2,100.00
271,500.00
PERALATAN
292,900.00
NO.
A.
1
2
4
5
: D.024
: Pasang bata berongga (5 x 11 x 24) cm, Spesi 1PC:3Ps
: m2
KOMPONEN
SATUAN
PERKIRAAN
KUANTITAS
HARGA
SATUAN
(Rp.)
TENAGA
Pekerja Biasa
Tukang Batu
Kepala Tukang Batu
Mandor
L17
L07
L02
L01
Org/hr
Org/hr
Org/hr
Org/hr
0.3000
0.1500
0.0150
0.0150
45,000.00
60,000.00
70,000.00
80,000.00
13,500.00
9,000.00
1,050.00
1,200.00
24,750.00
BAHAN
Bata Berongga
Portland Cement (PC)
Pasir Pasang
M023
M037
M002
bh
kg
m3
70.0000
14.0000
0.0320
JUMLAH
HARGA
(Rp.)
#REF!
900.00
60,000.00
#REF!
12,600.00
1,920.00
#REF!
PERALATAN
#REF!
NO.
A.
1
2
3
4
: E.001
: Plesteran 1 Pc : 1 Ps, tebal 15 mm
: m2
KOMPONEN
SATUAN
PERKIRAAN
KUANTITAS
HARGA
SATUAN
(Rp.)
TENAGA
Pekerja Biasa
Tukang Batu
Kepala Tukang Batu
Mandor
L17
L07
L02
L01
Org/hr
Org/hr
Org/hr
Org/hr
0.2000
0.1500
0.0150
0.0100
45,000.00
60,000.00
70,000.00
80,000.00
9,000.00
9,000.00
1,050.00
800.00
19,850.00
BAHAN
Portland Cement (PC)
Pasir Pasang
M037
M002
kg
m3
15.5040
0.0160
900.00
60,000.00
JUMLAH
HARGA
(Rp.)
13,953.60
960.00
14,913.60
PERALATAN
34,763.60
NO.
A.
1
2
3
4
: E.002
: Plesteran 1 Pc : 2 Ps, tebal 15 mm
: m2
KOMPONEN
SATUAN
PERKIRAAN
KUANTITAS
HARGA
SATUAN
(Rp.)
TENAGA
Pekerja Biasa
Tukang Batu
Kepala Tukang Batu
Mandor
L17
L07
L02
L01
Org/hr
Org/hr
Org/hr
Org/hr
0.2000
0.1500
0.0150
0.0100
45,000.00
60,000.00
70,000.00
80,000.00
BAHAN
Portland Cement (PC)
Pasir Pasang
M037
M002
kg
m3
10.2240
0.0200
900.00
60,000.00
9,201.60
1,200.00
10,401.60
PERALATAN
9,000.00
9,000.00
1,050.00
800.00
19,850.00
JUMLAH
HARGA
(Rp.)
30,251.60
NO.
A.
1
2
3
4
: E.003
: Plesteran 1 Pc : 3 Ps, tebal 15 mm
: m2
KOMPONEN
SATUAN
PERKIRAAN
KUANTITAS
HARGA
SATUAN
(Rp.)
TENAGA
Pekerja Biasa
Tukang Batu
Kepala Tukang Batu
Mandor
L17
L07
L02
L01
Org/hr
Org/hr
Org/hr
Org/hr
0.2000
0.1500
0.0150
0.0100
45,000.00
60,000.00
70,000.00
80,000.00
9,000.00
9,000.00
1,050.00
800.00
19,850.00
BAHAN
Portland Cement (PC)
Pasir Pasang
M037
M002
kg
m3
7.7760
0.0230
900.00
60,000.00
JUMLAH
HARGA
(Rp.)
6,998.40
1,380.00
8,378.40
PERALATAN
28,228.40
NO.
A.
1
2
3
4
: E.004
: Plesteran 1 Pc : 4 Ps, tebal 15 mm
: m2
KOMPONEN
SATUAN
PERKIRAAN
KUANTITAS
HARGA
SATUAN
(Rp.)
TENAGA
Pekerja Biasa
Tukang Batu
Kepala Tukang Batu
Mandor
L17
L07
L02
L01
Org/hr
Org/hr
Org/hr
Org/hr
0.2000
0.1500
0.0150
0.0100
45,000.00
60,000.00
70,000.00
80,000.00
BAHAN
Portland Cement (PC)
Pasir Pasang
M037
M002
kg
m3
6.2400
0.0240
900.00
60,000.00
5,616.00
1,440.00
7,056.00
PERALATAN
9,000.00
9,000.00
1,050.00
800.00
19,850.00
JUMLAH
HARGA
(Rp.)
26,906.00
NO.
A.
1
2
3
4
: E.005
: Plesteran 1 Pc : 5 Ps, tebal 15 mm
: m2
KOMPONEN
SATUAN
PERKIRAAN
KUANTITAS
HARGA
SATUAN
(Rp.)
TENAGA
Pekerja Biasa
Tukang Batu
Kepala Tukang Batu
Mandor
L17
L07
L02
L01
Org/hr
Org/hr
Org/hr
Org/hr
0.2000
0.1500
0.0150
0.0100
45,000.00
60,000.00
70,000.00
80,000.00
9,000.00
9,000.00
1,050.00
800.00
19,850.00
BAHAN
Portland Cement (PC)
Pasir Pasang
M037
M002
kg
m3
5.1840
0.0260
900.00
60,000.00
JUMLAH
HARGA
(Rp.)
4,665.60
1,560.00
6,225.60
PERALATAN
26,075.60
NO.
A.
1
2
3
4
: E.006
: Plesteran 1 Pc : 6 Ps, tebal 15 mm
: m2
KOMPONEN
SATUAN
PERKIRAAN
KUANTITAS
HARGA
SATUAN
(Rp.)
TENAGA
Pekerja Biasa
Tukang Batu
Kepala Tukang Batu
Mandor
L17
L07
L02
L01
Org/hr
Org/hr
Org/hr
Org/hr
0.2000
0.1500
0.0150
0.0100
45,000.00
60,000.00
70,000.00
80,000.00
BAHAN
Portland Cement (PC)
Pasir Pasang
M037
M002
kg
m3
4.4160
0.0270
900.00
60,000.00
3,974.40
1,620.00
5,594.40
PERALATAN
9,000.00
9,000.00
1,050.00
800.00
19,850.00
JUMLAH
HARGA
(Rp.)
25,444.40
NO.
A.
1
2
3
4
: E.011
: Plesteran 1 Kp : 1 Sm : 1 Ps, tebal 15 mm
: m2
KOMPONEN
SATUAN
PERKIRAAN
KUANTITAS
HARGA
SATUAN
(Rp.)
TENAGA
Pekerja Biasa
Tukang Batu
Kepala Tukang Batu
Mandor
L17
L07
L02
L01
Org/hr
Org/hr
Org/hr
Org/hr
0.2200
0.1200
0.0120
0.0110
45,000.00
60,000.00
70,000.00
80,000.00
9,900.00
7,200.00
840.00
880.00
18,820.00
BAHAN
Semen Merah
Kapur
Pasir Pasang
M043
M041
M002
m3
m3
m3
0.0090
0.0090
0.0090
165,000.00
1,300,000.00
60,000.00
JUMLAH
HARGA
(Rp.)
1,485.00
11,700.00
540.00
13,725.00
PERALATAN
32,545.00
NO.
A.
1
2
3
4
: E.012
: Plesteran 1 Kp : 1 Sm : 2 Ps, tebal 15 mm
: m2
KOMPONEN
SATUAN
PERKIRAAN
KUANTITAS
HARGA
SATUAN
(Rp.)
TENAGA
Pekerja Biasa
Tukang Batu
Kepala Tukang Batu
Mandor
L17
L07
L02
L01
Org/hr
Org/hr
Org/hr
Org/hr
0.2200
0.1200
0.0120
0.0110
45,000.00
60,000.00
70,000.00
80,000.00
BAHAN
Semen Merah
Kapur
Pasir Pasang
M043
M041
M002
m3
m3
m3
0.0070
0.0070
0.0150
165,000.00
1,300,000.00
60,000.00
1,155.00
9,100.00
900.00
11,155.00
PERALATAN
9,900.00
7,200.00
840.00
880.00
18,820.00
JUMLAH
HARGA
(Rp.)
29,975.00
NO.
A.
1
2
3
4
: E.013
: Plesteran 1 Pc : 2 Ps, tebal 20 mm
: m2
KOMPONEN
SATUAN
PERKIRAAN
KUANTITAS
HARGA
SATUAN
(Rp.)
TENAGA
Pekerja Biasa
Tukang Batu
Kepala Tukang Batu
Mandor
L17
L07
L02
L01
Org/hr
Org/hr
Org/hr
Org/hr
0.2600
0.2000
0.0200
0.0130
45,000.00
60,000.00
70,000.00
80,000.00
11,700.00
12,000.00
1,400.00
1,040.00
26,140.00
BAHAN
Portland Cement (PC)
Pasir Pasang
M037
M002
kg
m3
13.6320
0.0270
900.00
60,000.00
JUMLAH
HARGA
(Rp.)
12,268.80
1,620.00
13,888.80
PERALATAN
40,028.80
NO.
A.
1
2
3
4
: E.014
: Plesteran 1 Pc : 3 Ps, tebal 20 mm
: m2
KOMPONEN
SATUAN
PERKIRAAN
KUANTITAS
HARGA
SATUAN
(Rp.)
TENAGA
Pekerja Biasa
Tukang Batu
Kepala Tukang Batu
Mandor
L17
L07
L02
L01
Org/hr
Org/hr
Org/hr
Org/hr
0.2600
0.2000
0.0200
0.0130
45,000.00
60,000.00
70,000.00
80,000.00
BAHAN
Portland Cement (PC)
Pasir Pasang
M037
M002
kg
m3
10.3680
0.0310
900.00
60,000.00
9,331.20
1,860.00
11,191.20
PERALATAN
11,700.00
12,000.00
1,400.00
1,040.00
26,140.00
JUMLAH
HARGA
(Rp.)
37,331.20
NO.
A.
1
2
3
4
: E.015
: Plesteran 1 Pc : 4 Ps, tebal 20 mm
: m2
KOMPONEN
SATUAN
PERKIRAAN
KUANTITAS
HARGA
SATUAN
(Rp.)
TENAGA
Pekerja Biasa
Tukang Batu
Kepala Tukang Batu
Mandor
L17
L07
L02
L01
Org/hr
Org/hr
Org/hr
Org/hr
0.2600
0.2000
0.0200
0.0130
45,000.00
60,000.00
70,000.00
80,000.00
11,700.00
12,000.00
1,400.00
1,040.00
26,140.00
BAHAN
Portland Cement (PC)
Pasir Pasang
M037
M002
kg
m3
8.3200
0.0320
900.00
60,000.00
JUMLAH
HARGA
(Rp.)
7,488.00
1,920.00
9,408.00
PERALATAN
35,548.00
NO.
A.
1
2
3
4
: E.016
: Plesteran 1 Pc : 5 Ps, tebal 20 mm
: m2
KOMPONEN
SATUAN
PERKIRAAN
KUANTITAS
HARGA
SATUAN
(Rp.)
TENAGA
Pekerja Biasa
Tukang Batu
Kepala Tukang Batu
Mandor
L17
L07
L02
L01
Org/hr
Org/hr
Org/hr
Org/hr
0.2600
0.2000
0.0200
0.0130
45,000.00
60,000.00
70,000.00
80,000.00
BAHAN
Portland Cement (PC)
Pasir Pasang
M037
M002
kg
m3
6.9120
0.0350
900.00
60,000.00
6,220.80
2,100.00
8,320.80
PERALATAN
11,700.00
12,000.00
1,400.00
1,040.00
26,140.00
JUMLAH
HARGA
(Rp.)
34,460.80
NO.
A.
1
2
3
4
: E.017
: Plesteran 1 Pc : 6 Ps, tebal 20 mm
: m2
KOMPONEN
SATUAN
PERKIRAAN
KUANTITAS
HARGA
SATUAN
(Rp.)
TENAGA
Pekerja Biasa
Tukang Batu
Kepala Tukang Batu
Mandor
L17
L07
L02
L01
Org/hr
Org/hr
Org/hr
Org/hr
0.2600
0.2000
0.0200
0.0130
45,000.00
60,000.00
70,000.00
80,000.00
11,700.00
12,000.00
1,400.00
1,040.00
26,140.00
BAHAN
Portland Cement (PC)
Pasir Pasang
M037
M002
kg
m3
5.8880
0.0360
900.00
60,000.00
JUMLAH
HARGA
(Rp.)
5,299.20
2,160.00
7,459.20
PERALATAN
33,599.20
NO.
A.
1
2
3
4
: E.018
: Plesteran 1 Kp : 1 Sm : 2 Ps, tebal 20 mm
: m2
KOMPONEN
SATUAN
PERKIRAAN
KUANTITAS
HARGA
SATUAN
(Rp.)
TENAGA
Pekerja Biasa
Tukang Batu
Kepala Tukang Batu
Mandor
L17
L07
L02
L01
Org/hr
Org/hr
Org/hr
Org/hr
0.2860
0.2200
0.0220
0.0140
45,000.00
60,000.00
70,000.00
80,000.00
BAHAN
Semen Merah
Kapur
Pasir Pasang
M043
M041
M002
m3
m3
m3
0.0090
0.0090
0.0180
165,000.00
1,300,000.00
60,000.00
1,485.00
11,700.00
1,080.00
14,265.00
PERALATAN
12,870.00
13,200.00
1,540.00
1,120.00
28,730.00
JUMLAH
HARGA
(Rp.)
42,995.00
NO.
A.
1
2
3
4
: E.019
: Berapen 1 Pc : 5 Ps, tebal 15 mm
: m2
KOMPONEN
SATUAN
PERKIRAAN
KUANTITAS
HARGA
SATUAN
(Rp.)
TENAGA
Pekerja Biasa
Tukang Batu
Kepala Tukang Batu
Mandor
L17
L07
L02
L01
Org/hr
Org/hr
Org/hr
Org/hr
0.1500
0.0700
0.0070
0.0080
45,000.00
60,000.00
70,000.00
80,000.00
6,750.00
4,200.00
490.00
640.00
12,080.00
BAHAN
Portland Cement (PC)
Pasir Pasang
M037
M002
kg
m3
5.1840
0.0260
900.00
60,000.00
JUMLAH
HARGA
(Rp.)
4,665.60
1,560.00
6,225.60
PERALATAN
18,305.60
NO.
A.
1
2
3
4
: E.020
: Plesteran skoning 1 Pc : 2 Ps, Lebar 10 mm
: m2
KOMPONEN
SATUAN
PERKIRAAN
KUANTITAS
HARGA
SATUAN
(Rp.)
TENAGA
Pekerja Biasa
Tukang Batu
Kepala Tukang Batu
Mandor
L17
L07
L02
L01
Org/hr
Org/hr
Org/hr
Org/hr
0.0570
0.3800
0.0380
0.0030
45,000.00
60,000.00
70,000.00
80,000.00
BAHAN
Portland Cement (PC)
Pasir Pasang
M037
M002
kg
m3
0.5000
0.0130
900.00
60,000.00
450.00
780.00
1,230.00
PERALATAN
2,565.00
22,800.00
2,660.00
240.00
28,265.00
JUMLAH
HARGA
(Rp.)
29,495.00
NO.
A.
1
2
3
4
: E.021
: Plesteran granito 1 Pc warna : 2 granito, tebal 10 mm
: m2
KOMPONEN
SATUAN
PERKIRAAN
KUANTITAS
HARGA
SATUAN
(Rp.)
TENAGA
Pekerja Biasa
Tukang Batu
Kepala Tukang Batu
Mandor
L17
L07
L02
L01
Org/hr
Org/hr
Org/hr
Org/hr
0.4500
0.2000
0.0200
0.0250
45,000.00
60,000.00
70,000.00
80,000.00
20,250.00
12,000.00
1,400.00
2,000.00
35,650.00
BAHAN
Portland Cement (PC) Warna
Batu Granito
M039
M026
kg
kg
10.0000
15.0000
6,500.00
#REF!
JUMLAH
HARGA
(Rp.)
65,000.00
#REF!
#REF!
PERALATAN
#REF!
NO.
A.
1
2
3
4
: E.022
: Plesteran Teraso, 1 Pc Warna : 2 Batu Teraso, tebal 10 mm
: m2
KOMPONEN
SATUAN
PERKIRAAN
KUANTITAS
HARGA
SATUAN
(Rp.)
TENAGA
Pekerja Biasa
Tukang Batu
Kepala Tukang Batu
Mandor
L17
L07
L02
L01
Org/hr
Org/hr
Org/hr
Org/hr
0.4500
0.2000
0.0200
0.0250
45,000.00
60,000.00
70,000.00
80,000.00
20,250.00
12,000.00
1,400.00
2,000.00
35,650.00
BAHAN
Portland Cement (PC) Warna
Batu Teraso
M039
M027
kg
kg
10.0000
15.0000
JUMLAH
HARGA
(Rp.)
6,500.00
#REF!
65,000.00
#REF!
#REF!
PERALATAN
#REF!
NO.
A.
1
2
3
4
: E.023
: Plesteran Ciprat 1 Pc : 2 Ps,
: m2
KOMPONEN
SATUAN
PERKIRAAN
KUANTITAS
HARGA
SATUAN
(Rp.)
TENAGA
Pekerja Biasa
Tukang Batu
Kepala Tukang Batu
Mandor
L17
L07
L02
L01
Org/hr
Org/hr
Org/hr
Org/hr
0.2500
0.1000
0.0100
0.0130
45,000.00
60,000.00
70,000.00
80,000.00
11,250.00
6,000.00
700.00
1,040.00
18,990.00
BAHAN
Portland Cement (PC)
Pasir Pasang
M037
M002
kg
m3
4.3200
0.0060
900.00
60,000.00
JUMLAH
HARGA
(Rp.)
3,888.00
360.00
4,248.00
PERALATAN
23,238.00
NO.
A.
1
2
3
4
: E.024
: Plesteran siar pasangan batu kali adukan 1 Pc : 2 Ps
: m2
KOMPONEN
SATUAN
PERKIRAAN
KUANTITAS
HARGA
SATUAN
(Rp.)
TENAGA
Pekerja Biasa
Tukang Batu
Kepala Tukang Batu
Mandor
L17
L07
L02
L01
Org/hr
Org/hr
Org/hr
Org/hr
0.3000
0.1400
0.0140
0.0150
45,000.00
60,000.00
70,000.00
80,000.00
BAHAN
Portland Cement (PC)
Pasir Pasang
M037
M002
kg
m3
6.3400
0.0120
900.00
60,000.00
5,706.00
720.00
6,426.00
PERALATAN
13,500.00
8,400.00
980.00
1,200.00
24,080.00
JUMLAH
HARGA
(Rp.)
30,506.00
NO.
A.
1
2
3
4
: E.007
: Plesteran 1 Pc : 7 Ps, tebal 15 mm
: m2
KOMPONEN
SATUAN
PERKIRAAN
KUANTITAS
HARGA
SATUAN
(Rp.)
TENAGA
Pekerja Biasa
Tukang Batu
Kepala Tukang Batu
Mandor
L17
L07
L02
L01
Org/hr
Org/hr
Org/hr
Org/hr
0.2000
0.1500
0.0150
0.0100
45,000.00
60,000.00
70,000.00
80,000.00
9,000.00
9,000.00
1,050.00
800.00
19,850.00
BAHAN
Portland Cement (PC)
Pasir Pasang
M037
M002
kg
m3
3.9360
0.0280
900.00
60,000.00
JUMLAH
HARGA
(Rp.)
3,542.40
1,680.00
5,222.40
PERALATAN
25,072.40
NO.
A.
1
2
3
4
: E.008
: Plesteran 1 Pc : 8 Ps, tebal 15 mm
: m2
KOMPONEN
SATUAN
PERKIRAAN
KUANTITAS
HARGA
SATUAN
(Rp.)
TENAGA
Pekerja Biasa
Tukang Batu
Kepala Tukang Batu
Mandor
L17
L07
L02
L01
Org/hr
Org/hr
Org/hr
Org/hr
0.2000
0.1500
0.0150
0.0100
45,000.00
60,000.00
70,000.00
80,000.00
BAHAN
Portland Cement (PC)
Pasir Pasang
M037
M002
kg
m3
3.4560
0.0290
900.00
60,000.00
3,110.40
1,740.00
4,850.40
PERALATAN
9,000.00
9,000.00
1,050.00
800.00
19,850.00
JUMLAH
HARGA
(Rp.)
24,700.40
NO.
A.
1
2
3
4
: E.009
: Plesteran 1 Pc : 0.5 Kp : 3 Ps, tebal 15 mm
: m2
KOMPONEN
SATUAN
PERKIRAAN
KUANTITAS
HARGA
SATUAN
(Rp.)
TENAGA
Pekerja Biasa
Tukang Batu
Kepala Tukang Batu
Mandor
L17
L07
L02
L01
Org/hr
Org/hr
Org/hr
Org/hr
0.2200
0.1200
0.0120
0.0110
45,000.00
60,000.00
70,000.00
80,000.00
9,900.00
7,200.00
840.00
880.00
18,820.00
BAHAN
Portland Cement (PC)
Kapur
Pasir Pasang
M037
M041
M002
kg
m3
m3
5.7600
0.0030
0.0130
900.00
1,300,000.00
60,000.00
JUMLAH
HARGA
(Rp.)
5,184.00
3,900.00
780.00
9,864.00
PERALATAN
28,684.00
NO.
A.
1
2
3
4
: E.010
: Plesteran 1 Pc : 2 Kp : 8 Ps, tebal 15 mm
: m2
KOMPONEN
SATUAN
PERKIRAAN
KUANTITAS
HARGA
SATUAN
(Rp.)
TENAGA
Pekerja Biasa
Tukang Batu
Kepala Tukang Batu
Mandor
L17
L07
L02
L01
Org/hr
Org/hr
Org/hr
Org/hr
0.2200
0.1200
0.0120
0.0110
45,000.00
60,000.00
70,000.00
80,000.00
BAHAN
Portland Cement (PC)
Kapur
Pasir Pasang
M037
M041
M002
kg
m3
m3
3.0000
0.0030
0.0130
900.00
1,300,000.00
60,000.00
2,700.00
3,900.00
780.00
7,380.00
PERALATAN
9,900.00
7,200.00
840.00
880.00
18,820.00
JUMLAH
HARGA
(Rp.)
26,200.00
NO.
A.
1
2
3
4
: E.025
: Benangan
: m1
KOMPONEN
SATUAN
PERKIRAAN
KUANTITAS
HARGA
SATUAN
(Rp.)
TENAGA
Pekerja Biasa
Tukang Batu
Kepala Tukang Batu
Mandor
L17
L07
L02
L01
Org/hr
Org/hr
Org/hr
Org/hr
0.1200
-
45,000.00
60,000.00
70,000.00
80,000.00
7,200.00
7,200.00
BAHAN
Portland Cement (PC)
Pasir Pasang
M037
M002
kg
m3
6.5000
0.0210
900.00
60,000.00
JUMLAH
HARGA
(Rp.)
5,850.00
1,260.00
7,110.00
PERALATAN
14,310.00
NO.
A.
1
2
3
4
: E.026
: Acian
: m2
KOMPONEN
SATUAN
PERKIRAAN
KUANTITAS
HARGA
SATUAN
(Rp.)
TENAGA
Pekerja Biasa
Tukang Batu
Kepala Tukang Batu
Mandor
L17
L07
L02
L01
Org/hr
Org/hr
Org/hr
Org/hr
0.1500
0.1000
0.0100
0.0080
45,000.00
60,000.00
70,000.00
80,000.00
BAHAN
Portland Cement (PC)
M037
kg
3.2500
900.00
2,925.00
2,925.00
PERALATAN
6,750.00
6,000.00
700.00
640.00
14,090.00
JUMLAH
HARGA
(Rp.)
17,015.00
NO.
A.
1
2
3
4
: F.001
: Pasang kusen pintu dan jendela kayu jati (kelas I)
: m3
KOMPONEN
SATUAN
PERKIRAAN
KUANTITAS
HARGA
SATUAN
(Rp.)
TENAGA
Pekerja Biasa
Tukang Kayu
Kepala Tukang Kayu
Mandor
L17
L08
L03
L01
Org/hr
Org/hr
Org/hr
Org/hr
6.0000
20.0000
2.0000
0.3000
45,000.00
60,000.00
47,000.00
80,000.00
270,000.00
1,200,000.00
94,000.00
24,000.00
1,588,000.00
BAHAN
Balok
Paku Kayu Segala Ukuran
Lem Kayu
M096
M140
M422
m3
kg
Ltr
1.1000
1.2500
1.0000
#REF!
17,500.00
25,040.00
JUMLAH
HARGA
(Rp.)
#REF!
21,875.00
25,040.00
#REF!
PERALATAN
#REF!
NO.
A.
1
2
3
4
: F.002
: Pasang kusen pintu dan jendela kayu kamper
: m3
KOMPONEN
SATUAN
PERKIRAAN
KUANTITAS
HARGA
SATUAN
(Rp.)
TENAGA
Pekerja Biasa
Tukang Kayu
Kepala Tukang Kayu
Mandor
L17
L08
L03
L01
Org/hr
Org/hr
Org/hr
Org/hr
6.0000
18.0000
2.0000
0.3000
45,000.00
60,000.00
47,000.00
80,000.00
BAHAN
Balok
Paku Kayu Segala Ukuran
Lem Kayu
M080
M140
M422
m3
kg
Ltr
1.2000
1.2500
1.0000
9,000,000.00
17,500.00
25,040.00
10,800,000.00
21,875.00
25,040.00
10,846,915.00
PERALATAN
270,000.00
1,080,000.00
94,000.00
24,000.00
1,468,000.00
JUMLAH
HARGA
(Rp.)
12,314,915.00
NO.
A.
1
2
3
4
: F.003
: Pasang kusen pintu dan jendela kayu borneo
: m3
KOMPONEN
SATUAN
PERKIRAAN
KUANTITAS
HARGA
SATUAN
(Rp.)
TENAGA
Pekerja Biasa
Tukang Kayu
Kepala Tukang Kayu
Mandor
L17
L08
L03
L01
Org/hr
Org/hr
Org/hr
Org/hr
6.0000
18.0000
2.0000
0.3000
45,000.00
60,000.00
47,000.00
80,000.00
270,000.00
1,080,000.00
94,000.00
24,000.00
1,468,000.00
BAHAN
Balok
Paku Kayu Segala Ukuran
Lem Kayu
M056
M140
M422
m3
kg
Ltr
1.2000
1.2500
1.0000
#REF!
17,500.00
25,040.00
JUMLAH
HARGA
(Rp.)
#REF!
21,875.00
25,040.00
#REF!
PERALATAN
#REF!
NO.
A.
1
2
3
4
: F.004
: Pasang kusen pintu dan jendela kayu meranti
: m3
KOMPONEN
SATUAN
PERKIRAAN
KUANTITAS
HARGA
SATUAN
(Rp.)
TENAGA
Pekerja Biasa
Tukang Kayu
Kepala Tukang Kayu
Mandor
L17
L08
L03
L01
Org/hr
Org/hr
Org/hr
Org/hr
6.0000
18.0000
2.0000
0.3000
45,000.00
60,000.00
47,000.00
80,000.00
BAHAN
Balok
Paku Kayu Segala Ukuran
Lem Kayu
M062
M140
M422
m3
kg
Ltr
1.2000
1.2500
1.0000
5,040,000.00
17,500.00
25,040.00
6,048,000.00
21,875.00
25,040.00
6,094,915.00
PERALATAN
270,000.00
1,080,000.00
94,000.00
24,000.00
1,468,000.00
JUMLAH
HARGA
(Rp.)
7,562,915.00
NO.
A.
1
2
3
4
: F.005
: Pasang pintu klamp kayu jati
: m2
KOMPONEN
SATUAN
PERKIRAAN
KUANTITAS
HARGA
SATUAN
(Rp.)
TENAGA
Pekerja Biasa
Tukang Kayu
Kepala Tukang Kayu
Mandor
L17
L08
L03
L01
Org/hr
Org/hr
Org/hr
Org/hr
0.3500
1.0500
0.1050
0.0180
45,000.00
60,000.00
47,000.00
80,000.00
15,750.00
63,000.00
4,935.00
1,440.00
85,125.00
BAHAN
Papan (3x30) cm
Paku Kayu Segala Ukuran
M099
M140
m3
kg
0.0400
0.0500
#REF!
17,500.00
JUMLAH
HARGA
(Rp.)
#REF!
875.00
#REF!
PERALATAN
#REF!
NO.
A.
1
2
3
4
: F.006
: Pasang pintu klamp kayu kamper
: m2
KOMPONEN
SATUAN
PERKIRAAN
KUANTITAS
HARGA
SATUAN
(Rp.)
TENAGA
Pekerja Biasa
Tukang Kayu
Kepala Tukang Kayu
Mandor
L17
L08
L03
L01
Org/hr
Org/hr
Org/hr
Org/hr
0.3500
1.0500
0.1050
0.0180
45,000.00
60,000.00
47,000.00
80,000.00
BAHAN
Papan (3x30) cm
Paku Kayu Segala Ukuran
M083
M140
m3
kg
0.0400
0.0500
10,800,000.00
17,500.00
432,000.00
875.00
432,875.00
PERALATAN
15,750.00
63,000.00
4,935.00
1,440.00
85,125.00
JUMLAH
HARGA
(Rp.)
518,000.00
NO.
A.
1
2
3
4
: F.007
: Pasang pintu klamp kayu borneo
: m2
KOMPONEN
SATUAN
PERKIRAAN
KUANTITAS
HARGA
SATUAN
(Rp.)
TENAGA
Pekerja Biasa
Tukang Kayu
Kepala Tukang Kayu
Mandor
L17
L08
L03
L01
Org/hr
Org/hr
Org/hr
Org/hr
0.3500
1.0500
0.1050
0.0180
45,000.00
60,000.00
47,000.00
80,000.00
15,750.00
63,000.00
4,935.00
1,440.00
85,125.00
BAHAN
Papan (3x30) cm
Paku Kayu Segala Ukuran
M059
M140
m3
kg
0.0400
0.0500
#REF!
17,500.00
JUMLAH
HARGA
(Rp.)
#REF!
875.00
#REF!
PERALATAN
#REF!
NO.
A.
1
2
3
4
: F.008
: Pasang pintu klamp kayu meranti
: m2
KOMPONEN
SATUAN
PERKIRAAN
KUANTITAS
HARGA
SATUAN
(Rp.)
TENAGA
Pekerja Biasa
Tukang Kayu
Kepala Tukang Kayu
Mandor
L17
L08
L03
L01
Org/hr
Org/hr
Org/hr
Org/hr
0.3500
1.0500
0.1050
0.0180
45,000.00
60,000.00
47,000.00
80,000.00
BAHAN
Papan (3x30) cm
Paku Kayu Segala Ukuran
M065
M140
m3
kg
0.0400
0.0500
6,030,000.00
17,500.00
241,200.00
875.00
242,075.00
PERALATAN
15,750.00
63,000.00
4,935.00
1,440.00
85,125.00
JUMLAH
HARGA
(Rp.)
327,200.00
NO.
A.
1
2
3
4
: F.009
: Pasang pintu panel kayu jati
: m2
KOMPONEN
SATUAN
PERKIRAAN
KUANTITAS
HARGA
SATUAN
(Rp.)
TENAGA
Pekerja Biasa
Tukang Kayu
Kepala Tukang Kayu
Mandor
L17
L08
L03
L01
Org/hr
Org/hr
Org/hr
Org/hr
1.0000
2.5000
0.2500
0.0500
45,000.00
60,000.00
47,000.00
80,000.00
45,000.00
150,000.00
11,750.00
4,000.00
210,750.00
BAHAN
Papan (3x30) cm
Lem Kayu
M099
M422
m3
Ltr
0.0400
0.5000
#REF!
25,040.00
JUMLAH
HARGA
(Rp.)
#REF!
12,520.00
#REF!
PERALATAN
#REF!
NO.
A.
1
2
3
4
: F.010
: Pasang pintu panel kayu kamper
: m2
KOMPONEN
SATUAN
PERKIRAAN
KUANTITAS
HARGA
SATUAN
(Rp.)
TENAGA
Pekerja Biasa
Tukang Kayu
Kepala Tukang Kayu
Mandor
L17
L08
L03
L01
Org/hr
Org/hr
Org/hr
Org/hr
1.0000
2.5000
0.2500
0.0500
45,000.00
60,000.00
47,000.00
80,000.00
BAHAN
Papan (3x30) cm
Lem Kayu
M083
M422
m3
Ltr
0.0400
0.5000
10,800,000.00
25,040.00
432,000.00
12,520.00
444,520.00
PERALATAN
45,000.00
150,000.00
11,750.00
4,000.00
210,750.00
JUMLAH
HARGA
(Rp.)
655,270.00
NO.
A.
1
2
3
4
: F.011
: Pasang pintu panel kayu borneo
: m2
KOMPONEN
SATUAN
PERKIRAAN
KUANTITAS
HARGA
SATUAN
(Rp.)
TENAGA
Pekerja Biasa
Tukang Kayu
Kepala Tukang Kayu
Mandor
L17
L08
L03
L01
Org/hr
Org/hr
Org/hr
Org/hr
1.0000
2.5000
0.2500
0.0500
45,000.00
60,000.00
47,000.00
80,000.00
45,000.00
150,000.00
11,750.00
4,000.00
210,750.00
BAHAN
Papan (3x30) cm
Lem Kayu
M059
M422
m3
Ltr
0.0400
0.5000
#REF!
25,040.00
JUMLAH
HARGA
(Rp.)
#REF!
12,520.00
#REF!
PERALATAN
#REF!
NO.
A.
1
2
3
4
: F.012
: Pasang pintu panel kayu meranti
: m2
KOMPONEN
SATUAN
PERKIRAAN
KUANTITAS
HARGA
SATUAN
(Rp.)
TENAGA
Pekerja Biasa
Tukang Kayu
Kepala Tukang Kayu
Mandor
L17
L08
L03
L01
Org/hr
Org/hr
Org/hr
Org/hr
1.0000
2.5000
0.2500
0.0500
45,000.00
60,000.00
47,000.00
80,000.00
BAHAN
Papan (3x30) cm
Lem Kayu
M065
M422
m3
Ltr
0.0400
0.5000
6,030,000.00
25,040.00
241,200.00
12,520.00
253,720.00
PERALATAN
45,000.00
150,000.00
11,750.00
4,000.00
210,750.00
JUMLAH
HARGA
(Rp.)
464,470.00
NO.
A.
1
2
3
4
: F.013
: Pasang pintu dan jendela kaca kayu jati
: m2
KOMPONEN
SATUAN
PERKIRAAN
KUANTITAS
HARGA
SATUAN
(Rp.)
TENAGA
Pekerja Biasa
Tukang Kayu
Kepala Tukang Kayu
Mandor
L17
L08
L03
L01
Org/hr
Org/hr
Org/hr
Org/hr
0.8000
2.0000
0.2000
0.0400
45,000.00
60,000.00
47,000.00
80,000.00
36,000.00
120,000.00
9,400.00
3,200.00
168,600.00
BAHAN
Papan (3x30) cm
Lem Kayu
M099
M422
m3
Ltr
0.0240
0.3000
#REF!
25,040.00
JUMLAH
HARGA
(Rp.)
#REF!
7,512.00
#REF!
PERALATAN
#REF!
NO.
A.
1
2
3
4
: F.014
: Pasang pintu dan jendela kaca kayu kamper
: m2
KOMPONEN
SATUAN
PERKIRAAN
KUANTITAS
HARGA
SATUAN
(Rp.)
TENAGA
Pekerja Biasa
Tukang Kayu
Kepala Tukang Kayu
Mandor
L17
L08
L03
L01
Org/hr
Org/hr
Org/hr
Org/hr
0.8000
2.0000
0.2000
0.0400
45,000.00
60,000.00
47,000.00
80,000.00
BAHAN
Papan (3x30) cm
Lem Kayu
M083
M422
m3
Ltr
0.0240
0.3000
10,800,000.00
25,040.00
259,200.00
7,512.00
266,712.00
PERALATAN
36,000.00
120,000.00
9,400.00
3,200.00
168,600.00
JUMLAH
HARGA
(Rp.)
435,312.00
NO.
A.
1
2
3
4
: F.015
: Pasang pintu dan jendela kaca kayu borneo
: m2
KOMPONEN
SATUAN
PERKIRAAN
KUANTITAS
HARGA
SATUAN
(Rp.)
TENAGA
Pekerja Biasa
Tukang Kayu
Kepala Tukang Kayu
Mandor
L17
L08
L03
L01
Org/hr
Org/hr
Org/hr
Org/hr
0.8000
2.0000
0.2000
0.0400
45,000.00
60,000.00
47,000.00
80,000.00
36,000.00
120,000.00
9,400.00
3,200.00
168,600.00
BAHAN
Papan (3x30) cm
Lem Kayu
M059
M422
m3
Ltr
0.0240
0.3000
#REF!
25,040.00
JUMLAH
HARGA
(Rp.)
#REF!
7,512.00
#REF!
PERALATAN
#REF!
NO.
A.
1
2
3
4
: F.016
: Pasang pintu dan jendela kaca kayu meranti
: m2
KOMPONEN
SATUAN
PERKIRAAN
KUANTITAS
HARGA
SATUAN
(Rp.)
TENAGA
Pekerja Biasa
Tukang Kayu
Kepala Tukang Kayu
Mandor
L17
L08
L03
L01
Org/hr
Org/hr
Org/hr
Org/hr
0.8000
2.0000
0.2000
0.0400
45,000.00
60,000.00
47,000.00
80,000.00
BAHAN
Papan (3x30) cm
Lem Kayu
M065
M422
m3
Ltr
0.0240
0.3000
6,030,000.00
25,040.00
144,720.000
7,512.00
152,232.00
PERALATAN
36,000.00
120,000.00
9,400.00
3,200.00
168,600.00
JUMLAH
HARGA
(Rp.)
320,832.00
NO.
A.
1
2
3
4
: F.017
: Pasang pintu dan jendela jalusi kayu jati
: m2
KOMPONEN
SATUAN
PERKIRAAN
KUANTITAS
HARGA
SATUAN
(Rp.)
TENAGA
Pekerja Biasa
Tukang Kayu
Kepala Tukang Kayu
Mandor
L17
L08
L03
L01
Org/hr
Org/hr
Org/hr
Org/hr
1.0000
3.0000
0.3000
0.0500
45,000.00
60,000.00
47,000.00
80,000.00
45,000.00
180,000.00
14,100.00
4,000.00
243,100.00
BAHAN
Papan (3x30) cm
Lem Kayu
M099
M422
m3
Ltr
0.0640
0.5000
#REF!
25,040.00
JUMLAH
HARGA
(Rp.)
#REF!
12,520.00
#REF!
PERALATAN
#REF!
NO.
A.
1
2
3
4
: F.018
: Pasang pintu dan jendela jalusi kayu kamper
: m2
KOMPONEN
SATUAN
PERKIRAAN
KUANTITAS
HARGA
SATUAN
(Rp.)
TENAGA
Pekerja Biasa
Tukang Kayu
Kepala Tukang Kayu
Mandor
L17
L08
L03
L01
Org/hr
Org/hr
Org/hr
Org/hr
1.0000
3.0000
0.3000
0.0500
45,000.00
60,000.00
47,000.00
80,000.00
BAHAN
Papan (3x30) cm
Lem Kayu
M083
M422
m3
Ltr
0.0640
0.5000
10,800,000.00
25,040.00
691,200.000
12,520.00
703,720.00
PERALATAN
45,000.00
180,000.00
14,100.00
4,000.00
243,100.00
JUMLAH
HARGA
(Rp.)
946,820.00
NO.
A.
1
2
3
4
: F.019
: Pasang pintu dan jendela jalusi kayu borneo
: m2
KOMPONEN
SATUAN
PERKIRAAN
KUANTITAS
HARGA
SATUAN
(Rp.)
TENAGA
Pekerja Biasa
Tukang Kayu
Kepala Tukang Kayu
Mandor
L17
L08
L03
L01
Org/hr
Org/hr
Org/hr
Org/hr
1.0000
3.0000
0.3000
0.0500
45,000.00
60,000.00
47,000.00
80,000.00
45,000.00
180,000.00
14,100.00
4,000.00
243,100.00
BAHAN
Papan (3x30) cm
Lem Kayu
M059
M422
m3
Ltr
0.0640
0.5000
#REF!
25,040.00
JUMLAH
HARGA
(Rp.)
#REF!
12,520.00
#REF!
PERALATAN
#REF!
NO.
A.
1
2
3
4
: F.020
: Pasang pintu dan jendela jalusi kayu meranti
: m2
KOMPONEN
SATUAN
PERKIRAAN
KUANTITAS
HARGA
SATUAN
(Rp.)
TENAGA
Pekerja Biasa
Tukang Kayu
Kepala Tukang Kayu
Mandor
L17
L08
L03
L01
Org/hr
Org/hr
Org/hr
Org/hr
1.0000
3.0000
0.3000
0.0500
45,000.00
60,000.00
47,000.00
80,000.00
BAHAN
Papan (3x30) cm
Lem Kayu
M065
M422
m3
Ltr
0.0640
0.5000
6,030,000.00
25,040.00
385,920.000
12,520.00
398,440.00
PERALATAN
45,000.00
180,000.00
14,100.00
4,000.00
243,100.00
JUMLAH
HARGA
(Rp.)
641,540.00
NO.
A.
1
2
3
4
: F.021
: Pasang pintu plywood rangkap, rangka kayu jati
: m2
KOMPONEN
SATUAN
PERKIRAAN
KUANTITAS
HARGA
SATUAN
(Rp.)
TENAGA
Pekerja Biasa
Tukang Kayu
Kepala Tukang Kayu
Mandor
L17
L08
L03
L01
Org/hr
Org/hr
Org/hr
Org/hr
0.6000
2.0000
0.2000
0.0300
45,000.00
60,000.00
47,000.00
80,000.00
27,000.00
120,000.00
9,400.00
2,400.00
158,800.00
BAHAN
Papan (3x30) cm
Paku Kayu Segala Ukuran
Lem Kayu
Plywood (120 x 240) cm x 4 mm
M099
M140
M422
M226
m3
kg
Ltr
lbr
0.0250
0.0300
0.5000
1.0000
#REF!
17,500.00
25,040.00
85,000.00
JUMLAH
HARGA
(Rp.)
#REF!
525.00
12,520.00
85,000.00
#REF!
PERALATAN
#REF!
NO.
A.
1
2
3
4
: F.022
: Pasang pintu plywood rangkap, rangka kayu kamper
: m2
KOMPONEN
SATUAN
PERKIRAAN
KUANTITAS
HARGA
SATUAN
(Rp.)
TENAGA
Pekerja Biasa
Tukang Kayu
Kepala Tukang Kayu
Mandor
L17
L08
L03
L01
Org/hr
Org/hr
Org/hr
Org/hr
0.6000
2.0000
0.2000
0.0300
45,000.00
60,000.00
47,000.00
80,000.00
BAHAN
Papan (3x30) cm
Paku Kayu Segala Ukuran
Lem Kayu
Plywood (120 x 240) cm x 4 mm
M083
M140
M422
M226
m3
kg
Ltr
lbr
0.0250
0.0300
0.5000
1.0000
10,800,000.00
17,500.00
25,040.00
85,000.00
270,000.00
525.00
12,520.00
85,000.00
368,045.00
PERALATAN
27,000.00
120,000.00
9,400.00
2,400.00
158,800.00
JUMLAH
HARGA
(Rp.)
526,845.00
NO.
A.
1
2
3
4
: F.023
: Pasang pintu plywood rangkap, rangka kayu borneo
: m2
KOMPONEN
SATUAN
PERKIRAAN
KUANTITAS
HARGA
SATUAN
(Rp.)
TENAGA
Pekerja Biasa
Tukang Kayu
Kepala Tukang Kayu
Mandor
L17
L08
L03
L01
Org/hr
Org/hr
Org/hr
Org/hr
0.6000
2.0000
0.2000
0.0300
45,000.00
60,000.00
47,000.00
80,000.00
27,000.00
120,000.00
9,400.00
2,400.00
158,800.00
BAHAN
Papan (3x30) cm
Paku Kayu Segala Ukuran
Lem Kayu
Plywood (120 x 240) cm x 4 mm
M059
M140
M422
M226
m3
kg
Ltr
lbr
0.0250
0.0300
0.5000
1.0000
#REF!
17,500.00
25,040.00
85,000.00
JUMLAH
HARGA
(Rp.)
#REF!
525.00
12,520.00
85,000.00
#REF!
PERALATAN
#REF!
NO.
A.
1
2
3
4
: F.024
: Pasang pintu plywood rangkap, rangka kayu meranti
: m2
KOMPONEN
SATUAN
PERKIRAAN
KUANTITAS
HARGA
SATUAN
(Rp.)
TENAGA
Pekerja Biasa
Tukang Kayu
Kepala Tukang Kayu
Mandor
L17
L08
L03
L01
Org/hr
Org/hr
Org/hr
Org/hr
0.6000
2.0000
0.2000
0.0300
45,000.00
60,000.00
47,000.00
80,000.00
BAHAN
Papan (3x30) cm
Paku Kayu Segala Ukuran
Lem Kayu
Plywood (120 x 240) cm x 4 mm
M065
M140
M422
M226
m3
kg
Ltr
lbr
0.0250
0.0300
0.5000
1.0000
6,030,000.00
17,500.00
25,040.00
85,000.00
150,750.00
525.00
12,520.00
85,000.00
248,795.00
PERALATAN
27,000.00
120,000.00
9,400.00
2,400.00
158,800.00
JUMLAH
HARGA
(Rp.)
407,595.00
NO.
A.
1
2
3
4
: F.025
: Pasang jalusi mati kusen kayu jati
: m2
KOMPONEN
SATUAN
PERKIRAAN
KUANTITAS
HARGA
SATUAN
(Rp.)
TENAGA
Pekerja Biasa
Tukang Kayu
Kepala Tukang Kayu
Mandor
L17
L08
L03
L01
Org/hr
Org/hr
Org/hr
Org/hr
0.8000
2.0000
0.2000
0.0250
45,000.00
60,000.00
47,000.00
80,000.00
36,000.00
120,000.00
9,400.00
2,000.00
167,400.00
BAHAN
Papan (3x30) cm
Paku Kayu Segala Ukuran
M099
M140
m3
kg
0.0600
0.1500
#REF!
17,500.00
JUMLAH
HARGA
(Rp.)
#REF!
2,625.00
#REF!
PERALATAN
#REF!
NO.
A.
1
2
3
4
: F.026
: Pasang jalusi mati kusen kayu kamper
: m2
KOMPONEN
SATUAN
PERKIRAAN
KUANTITAS
HARGA
SATUAN
(Rp.)
TENAGA
Pekerja Biasa
Tukang Kayu
Kepala Tukang Kayu
Mandor
L17
L08
L03
L01
Org/hr
Org/hr
Org/hr
Org/hr
0.5000
2.0000
0.2000
0.0250
45,000.00
60,000.00
47,000.00
80,000.00
BAHAN
Papan (3x30) cm
Paku Kayu Segala Ukuran
M083
M140
m3
kg
0.0600
0.1500
10,800,000.00
17,500.00
648,000.00
2,625.00
650,625.00
PERALATAN
22,500.00
120,000.00
9,400.00
2,000.00
153,900.00
JUMLAH
HARGA
(Rp.)
804,525.00
NO.
A.
1
2
3
4
: F.027
: Pasang jalusi mati kusen kayu borneo
: m2
KOMPONEN
SATUAN
PERKIRAAN
KUANTITAS
HARGA
SATUAN
(Rp.)
TENAGA
Pekerja Biasa
Tukang Kayu
Kepala Tukang Kayu
Mandor
L17
L08
L03
L01
Org/hr
Org/hr
Org/hr
Org/hr
0.5000
2.0000
0.2000
0.0250
45,000.00
60,000.00
47,000.00
80,000.00
22,500.00
120,000.00
9,400.00
2,000.00
153,900.00
BAHAN
Papan (3x30) cm
Paku Kayu Segala Ukuran
M059
M140
m3
kg
0.0600
0.1500
#REF!
17,500.00
JUMLAH
HARGA
(Rp.)
#REF!
2,625.00
#REF!
PERALATAN
#REF!
NO.
A.
1
2
3
4
: F.028
: Pasang jalusi mati kusen kayu meranti
: m2
KOMPONEN
SATUAN
PERKIRAAN
KUANTITAS
HARGA
SATUAN
(Rp.)
TENAGA
Pekerja Biasa
Tukang Kayu
Kepala Tukang Kayu
Mandor
L17
L08
L03
L01
Org/hr
Org/hr
Org/hr
Org/hr
0.5000
2.0000
0.2000
0.0250
45,000.00
60,000.00
47,000.00
80,000.00
BAHAN
Papan (3x30) cm
Paku Kayu Segala Ukuran
M065
M140
m3
kg
0.0600
0.1500
6,030,000.00
17,500.00
361,800.00
2,625.00
364,425.00
PERALATAN
22,500.00
120,000.00
9,400.00
2,000.00
153,900.00
JUMLAH
HARGA
(Rp.)
518,325.00
NO.
A.
1
2
3
4
: F.029
: Pasang pintu teakwood rangkap, rangka kayu jati
: m2
KOMPONEN
SATUAN
PERKIRAAN
KUANTITAS
HARGA
SATUAN
(Rp.)
TENAGA
Pekerja Biasa
Tukang Kayu
Kepala Tukang Kayu
Mandor
L17
L08
L03
L01
Org/hr
Org/hr
Org/hr
Org/hr
0.8000
2.0000
0.2000
0.0400
45,000.00
60,000.00
47,000.00
80,000.00
36,000.00
120,000.00
9,400.00
3,200.00
168,600.00
BAHAN
Papan (3x30) cm
M099
Paku Kayu Segala Ukuran
M140
Lem Kayu
M422
Teakwood (120 x 240) cm x 4 mmM229
m3
kg
Ltr
lbr
0.0250
0.0300
0.3000
1.0000
#REF!
17,500.00
25,040.00
82,610.00
JUMLAH
HARGA
(Rp.)
#REF!
525.00
7,512.00
82,610.00
#REF!
PERALATAN
#REF!
NO.
A.
1
2
3
4
: F.030
: Pasang pintu teakwood rangkap, rangka kayu kamper
: m2
KOMPONEN
SATUAN
PERKIRAAN
KUANTITAS
HARGA
SATUAN
(Rp.)
TENAGA
Pekerja Biasa
Tukang Kayu
Kepala Tukang Kayu
Mandor
L17
L08
L03
L01
Org/hr
Org/hr
Org/hr
Org/hr
0.8000
2.0000
0.2000
0.0400
45,000.00
60,000.00
47,000.00
80,000.00
BAHAN
Papan (3x30) cm
M083
Paku Kayu Segala Ukuran
M140
Lem Kayu
M422
Teakwood (120 x 240) cm x 4 mmM229
m3
kg
Ltr
lbr
0.0250
0.0300
0.3000
1.0000
10,800,000.00
17,500.00
25,040.00
82,610.00
270,000.00
525.00
7,512.00
82,610.00
360,647.00
PERALATAN
36,000.00
120,000.00
9,400.00
3,200.00
168,600.00
JUMLAH
HARGA
(Rp.)
529,247.00
NO.
A.
1
2
3
4
: F.031
: Pasang pintu teakwood rangkap, rangka kayu borneo
: m2
KOMPONEN
SATUAN
PERKIRAAN
KUANTITAS
HARGA
SATUAN
(Rp.)
TENAGA
Pekerja Biasa
Tukang Kayu
Kepala Tukang Kayu
Mandor
L17
L08
L03
L01
Org/hr
Org/hr
Org/hr
Org/hr
0.8000
2.0000
0.2000
0.0400
45,000.00
60,000.00
47,000.00
80,000.00
36,000.00
120,000.00
9,400.00
3,200.00
168,600.00
BAHAN
Papan (3x30) cm
M059
Paku Kayu Segala Ukuran
M140
Lem Kayu
M422
Teakwood (120 x 240) cm x 4 mmM229
m3
kg
Ltr
lbr
0.0250
0.0300
0.3000
1.0000
#REF!
17,500.00
25,040.00
82,610.00
JUMLAH
HARGA
(Rp.)
#REF!
525.00
7,512.00
82,610.00
#REF!
PERALATAN
#REF!
NO.
A.
1
2
3
4
: F.032
: Pasang pintu teakwood rangkap, rangka kayu meranti
: m2
KOMPONEN
SATUAN
PERKIRAAN
KUANTITAS
HARGA
SATUAN
(Rp.)
TENAGA
Pekerja Biasa
Tukang Kayu
Kepala Tukang Kayu
Mandor
L17
L08
L03
L01
Org/hr
Org/hr
Org/hr
Org/hr
0.8000
2.0000
0.2000
0.0400
45,000.00
60,000.00
47,000.00
80,000.00
BAHAN
Papan (3x30) cm
M065
Paku Kayu Segala Ukuran
M140
Lem Kayu
M422
Teakwood (120 x 240) cm x 4 mmM229
m3
kg
Ltr
lbr
0.0250
0.0300
0.3000
1.0000
6,030,000.00
17,500.00
25,040.00
82,610.00
150,750.00
525.00
7,512.00
82,610.00
241,397.00
PERALATAN
36,000.00
120,000.00
9,400.00
3,200.00
168,600.00
JUMLAH
HARGA
(Rp.)
409,997.00
NO.
A.
1
2
3
4
: F.033
: Pasang pintu plywood & formika, rangka kayu jati
: m2
KOMPONEN
SATUAN
PERKIRAAN
KUANTITAS
HARGA
SATUAN
(Rp.)
TENAGA
Pekerja Biasa
Tukang Kayu
Kepala Tukang Kayu
Mandor
L17
L08
L03
L01
Org/hr
Org/hr
Org/hr
Org/hr
0.8000
2.5000
0.2500
0.0400
45,000.00
60,000.00
47,000.00
80,000.00
36,000.00
150,000.00
11,750.00
3,200.00
200,950.00
BAHAN
Papan (3x30) cm
Paku Kayu Segala Ukuran
Lem Kayu
Plywood (120 x 240) cm x 4 mm
Formika (90 x 120) cm
M099
M140
M422
M226
M475
m3
kg
Ltr
lbr
lbr
0.0250
0.0300
0.8000
1.0000
0.5000
#REF!
17,500.00
25,040.00
85,000.00
53,810.00
JUMLAH
HARGA
(Rp.)
#REF!
525.00
20,032.00
85,000.00
26,905.00
#REF!
PERALATAN
#REF!
NO.
A.
1
2
3
4
: F.034
: Pasang pintu plywood & formika, rangka kayu kamper
: m2
KOMPONEN
SATUAN
PERKIRAAN
KUANTITAS
HARGA
SATUAN
(Rp.)
TENAGA
Pekerja Biasa
Tukang Kayu
Kepala Tukang Kayu
Mandor
L17
L08
L03
L01
Org/hr
Org/hr
Org/hr
Org/hr
0.8000
2.5000
0.2500
0.0400
45,000.00
60,000.00
47,000.00
80,000.00
BAHAN
Papan (3x30) cm
Paku Kayu Segala Ukuran
Lem Kayu
Plywood (120 x 240) cm x 4 mm
Formika (90 x 120) cm
M083
M140
M422
M226
M475
m3
kg
Ltr
lbr
lbr
0.0250
0.0300
0.8000
1.0000
0.5000
10,800,000.00
17,500.00
25,040.00
85,000.00
53,810.00
270,000.00
525.00
20,032.00
85,000.00
26,905.00
402,462.00
PERALATAN
36,000.00
150,000.00
11,750.00
3,200.00
200,950.00
JUMLAH
HARGA
(Rp.)
603,412.00
NO.
A.
1
2
3
4
: F.035
: Pasang pintu plywood & formika, rangka kayu borneo
: m2
KOMPONEN
SATUAN
PERKIRAAN
KUANTITAS
HARGA
SATUAN
(Rp.)
TENAGA
Pekerja Biasa
Tukang Kayu
Kepala Tukang Kayu
Mandor
L17
L08
L03
L01
Org/hr
Org/hr
Org/hr
Org/hr
0.8000
2.5000
0.2500
0.0400
45,000.00
60,000.00
47,000.00
80,000.00
36,000.00
150,000.00
11,750.00
3,200.00
200,950.00
BAHAN
Papan (3x30) cm
Paku Kayu Segala Ukuran
Lem Kayu
Plywood (120 x 240) cm x 4 mm
Formika (90 x 120) cm
M059
M140
M422
M226
M475
m3
kg
Ltr
lbr
lbr
0.0250
0.0300
0.8000
1.0000
0.5000
#REF!
17,500.00
25,040.00
85,000.00
53,810.00
JUMLAH
HARGA
(Rp.)
#REF!
525.00
20,032.00
85,000.00
26,905.00
#REF!
PERALATAN
#REF!
NO.
A.
1
2
3
4
: F.036
: Pasang pintu plywood & formika, rangka kayu meranti
: m2
KOMPONEN
SATUAN
PERKIRAAN
KUANTITAS
HARGA
SATUAN
(Rp.)
TENAGA
Pekerja Biasa
Tukang Kayu
Kepala Tukang Kayu
Mandor
L17
L08
L03
L01
Org/hr
Org/hr
Org/hr
Org/hr
0.8000
2.5000
0.2500
0.0400
45,000.00
60,000.00
47,000.00
80,000.00
BAHAN
Papan (3x30) cm
Paku Kayu Segala Ukuran
Lem Kayu
Plywood (120 x 240) cm x 4 mm
Formika (90 x 120) cm
M065
M140
M422
M226
M475
m3
kg
Ltr
lbr
lbr
0.0250
0.0300
0.8000
1.0000
0.5000
6,030,000.00
17,500.00
25,040.00
85,000.00
53,810.00
150,750.00
525.00
20,032.00
85,000.00
26,905.00
283,212.00
PERALATAN
36,000.00
150,000.00
11,750.00
3,200.00
200,950.00
JUMLAH
HARGA
(Rp.)
484,162.00
NO.
A.
1
2
3
4
: F.037
: Pasang pintu teakwood & formika, rangka kayu jati
: m2
KOMPONEN
SATUAN
PERKIRAAN
KUANTITAS
HARGA
SATUAN
(Rp.)
TENAGA
Pekerja Biasa
Tukang Kayu
Kepala Tukang Kayu
Mandor
L17
L08
L03
L01
Org/hr
Org/hr
Org/hr
Org/hr
0.8000
2.5000
0.2500
0.0400
45,000.00
60,000.00
47,000.00
80,000.00
36,000.00
150,000.00
11,750.00
3,200.00
200,950.00
BAHAN
Papan (3x30) cm
M099
Paku Kayu Segala Ukuran
M140
Lem Kayu
M422
Teakwood (120 x 240) cm x 4 mmM229
Formika (90 x 120) cm
M475
m3
kg
Ltr
lbr
lbr
0.0250
0.0300
0.8000
1.0000
0.5000
#REF!
17,500.00
25,040.00
82,610.00
53,810.00
JUMLAH
HARGA
(Rp.)
#REF!
525.00
20,032.00
82,610.00
26,905.00
#REF!
PERALATAN
#REF!
NO.
A.
1
2
3
4
: F.038
: Pasang pintu teakwood & formika, rangka kayu borneo (divernis)
: m2
KOMPONEN
SATUAN
PERKIRAAN
KUANTITAS
HARGA
SATUAN
(Rp.)
TENAGA
Pekerja Biasa
Tukang Kayu
Kepala Tukang Kayu
Mandor
L17
L08
L03
L01
Org/hr
Org/hr
Org/hr
Org/hr
0.8000
2.5000
0.2500
0.0400
45,000.00
60,000.00
47,000.00
80,000.00
36,000.00
150,000.00
11,750.00
3,200.00
200,950.00
BAHAN
Papan (3x30) cm
M059
Paku Kayu Segala Ukuran
M140
Lem Kayu
M422
Teakwood (120 x 240) cm x 4 mmM229
Vernis
M419
Formika (90 x 120) cm
M475
m3
kg
Ltr
lbr
Ltr
lbr
0.0250
0.0300
0.8000
1.0000
0.5000
0.5000
JUMLAH
HARGA
(Rp.)
#REF!
17,500.00
25,040.00
82,610.00
28,700.00
53,810.00
#REF!
525.00
20,032.00
82,610.00
14,350.00
26,905.00
#REF!
PERALATAN
#REF!
NO.
A.
1
2
3
4
: F.039
: Pasang pintu teakwood & formika, rangka kayu meranti (divernis)
: m2
KOMPONEN
SATUAN
PERKIRAAN
KUANTITAS
HARGA
SATUAN
(Rp.)
TENAGA
Pekerja Biasa
Tukang Kayu
Kepala Tukang Kayu
Mandor
L17
L08
L03
L01
Org/hr
Org/hr
Org/hr
Org/hr
0.8000
2.5000
0.2500
0.0400
45,000.00
60,000.00
47,000.00
80,000.00
36,000.00
150,000.00
11,750.00
3,200.00
200,950.00
BAHAN
Papan (3x30) cm
M065
Paku Kayu Segala Ukuran
M140
Lem Kayu
M422
Teakwood (120 x 240) cm x 4 mmM229
Vernis
M419
Formika (90 x 120) cm
M475
m3
kg
Ltr
lbr
Ltr
lbr
0.0250
0.0300
0.8000
1.0000
0.5000
0.5000
6,030,000.00
17,500.00
25,040.00
82,610.00
28,700.00
53,810.00
JUMLAH
HARGA
(Rp.)
150,750.00
525.00
20,032.00
82,610.00
14,350.00
26,905.00
295,172.00
PERALATAN
496,122.00
NO.
A.
1
2
3
4
: F.040
: Pasang konstruksi kuda-kuda kayu jati
: m3
KOMPONEN
SATUAN
PERKIRAAN
KUANTITAS
HARGA
SATUAN
(Rp.)
TENAGA
Pekerja Biasa
Tukang Kayu
Kepala Tukang Kayu
Mandor
L17
L08
L03
L01
Org/hr
Org/hr
Org/hr
Org/hr
4.0000
12.0000
1.2000
0.2000
45,000.00
60,000.00
47,000.00
80,000.00
180,000.00
720,000.00
56,400.00
16,000.00
972,400.00
BAHAN
Balok
Besi Strip
Paku Kayu Segala Ukuran
M096
M114
M140
m3
kg
kg
1.1000
15.0000
5.6000
JUMLAH
HARGA
(Rp.)
#REF!
8,500.00
17,500.00
#REF!
127,500.00
98,000.00
#REF!
PERALATAN
#REF!
NO.
A.
1
2
3
4
: F.041
: Pasang konstruksi kuda-kuda kayu kamper
: m3
KOMPONEN
SATUAN
PERKIRAAN
KUANTITAS
HARGA
SATUAN
(Rp.)
TENAGA
Pekerja Biasa
Tukang Kayu
Kepala Tukang Kayu
Mandor
L17
L08
L03
L01
Org/hr
Org/hr
Org/hr
Org/hr
4.0000
12.0000
1.2000
0.2000
45,000.00
60,000.00
47,000.00
80,000.00
180,000.00
720,000.00
56,400.00
16,000.00
972,400.00
BAHAN
Balok
Besi Strip
Paku Kayu Segala Ukuran
M080
M114
M140
m3
kg
kg
1.1000
15.0000
5.6000
9,000,000.00
8,500.00
17,500.00
JUMLAH
HARGA
(Rp.)
9,900,000.00
127,500.00
98,000.00
10,125,500.00
PERALATAN
11,097,900.00
NO.
A.
1
2
3
4
: F.042
: Pasang konstruksi kuda-kuda kayu borneo
: m3
KOMPONEN
SATUAN
PERKIRAAN
KUANTITAS
HARGA
SATUAN
(Rp.)
TENAGA
Pekerja Biasa
Tukang Kayu
Kepala Tukang Kayu
Mandor
L17
L08
L03
L01
Org/hr
Org/hr
Org/hr
Org/hr
4.0000
12.0000
1.2000
0.2000
45,000.00
60,000.00
47,000.00
80,000.00
180,000.00
720,000.00
56,400.00
16,000.00
972,400.00
BAHAN
Balok
Besi Strip
Paku Kayu Segala Ukuran
M056
M114
M140
m3
kg
kg
1.1000
15.0000
5.6000
JUMLAH
HARGA
(Rp.)
#REF!
8,500.00
17,500.00
#REF!
127,500.00
98,000.00
#REF!
PERALATAN
#REF!
NO.
A.
1
2
3
4
: F.043
: Pasang konstruksi kuda-kuda kayu bengkirai
: m3
KOMPONEN
SATUAN
PERKIRAAN
KUANTITAS
HARGA
SATUAN
(Rp.)
TENAGA
Pekerja Biasa
Tukang Kayu
Kepala Tukang Kayu
Mandor
L17
L08
L03
L01
Org/hr
Org/hr
Org/hr
Org/hr
4.0000
12.0000
1.2000
0.2000
45,000.00
60,000.00
47,000.00
80,000.00
180,000.00
720,000.00
56,400.00
16,000.00
972,400.00
BAHAN
Balok
Besi Strip
Paku Kayu Segala Ukuran
M074
M114
M140
m3
kg
kg
1.1000
15.0000
5.6000
#REF!
8,500.00
17,500.00
JUMLAH
HARGA
(Rp.)
#REF!
127,500.00
98,000.00
#REF!
PERALATAN
#REF!
NO.
A.
1
2
3
4
: F.044
: Pasang konstruksi kuda-kuda kayu kruing
: m3
KOMPONEN
SATUAN
PERKIRAAN
KUANTITAS
HARGA
SATUAN
(Rp.)
TENAGA
Pekerja Biasa
Tukang Kayu
Kepala Tukang Kayu
Mandor
L17
L08
L03
L01
Org/hr
Org/hr
Org/hr
Org/hr
4.0000
12.0000
1.2000
0.2000
45,000.00
60,000.00
47,000.00
80,000.00
BAHAN
Balok
Besi Strip
Paku Kayu Segala Ukuran
M068
M114
M140
m3
kg
kg
1.1000
15.0000
5.6000
5,400,000.00
8,500.00
17,500.00
5,940,000.00
127,500.00
98,000.00
6,165,500.00
PERALATAN
180,000.00
720,000.00
56,400.00
16,000.00
972,400.00
JUMLAH
HARGA
(Rp.)
7,137,900.00
NO.
A.
1
2
3
4
: F.051
: Pasang kaso + reng genteng biasa kayu kamper
: m2
KOMPONEN
SATUAN
PERKIRAAN
KUANTITAS
HARGA
SATUAN
(Rp.)
TENAGA
Pekerja Biasa
Tukang Kayu
Kepala Tukang Kayu
Mandor
L17
L08
L03
L01
Org/hr
Org/hr
Org/hr
Org/hr
0.1000
0.1000
0.0100
0.0050
45,000.00
60,000.00
47,000.00
80,000.00
4,500.00
6,000.00
470.00
400.00
11,370.00
BAHAN
Usuk : 5/7
Paku Kayu Segala Ukuran
Reng : 2/3, 3/5
M079
M140
M078
m3
kg
m3
0.0140
0.2500
0.0360
1,450,000.00
17,500.00
1,450,000.00
JUMLAH
HARGA
(Rp.)
20,300.00
4,375.00
52,200.00
76,875.00
PERALATAN
88,245.00
NO.
A.
1
2
3
4
: F.052
: Pasang kaso + reng genteng biasa kayu borneo
: m2
KOMPONEN
SATUAN
PERKIRAAN
KUANTITAS
HARGA
SATUAN
(Rp.)
TENAGA
Pekerja Biasa
Tukang Kayu
Kepala Tukang Kayu
Mandor
L17
L08
L03
L01
Org/hr
Org/hr
Org/hr
Org/hr
0.1000
0.1000
0.0100
0.0050
45,000.00
60,000.00
47,000.00
80,000.00
4,500.00
6,000.00
470.00
400.00
11,370.00
BAHAN
Usuk : 5/7
Paku Kayu Segala Ukuran
Reng : 2/3, 3/5
M055
M140
M054
m3
kg
m3
0.0140
0.2500
0.0360
JUMLAH
HARGA
(Rp.)
#REF!
17,500.00
#REF!
#REF!
4,375.00
#REF!
#REF!
PERALATAN
#REF!
NO.
A.
1
2
3
4
: F.053
: Pasang kaso + reng genteng biasa kayu bengkirai
: m2
KOMPONEN
SATUAN
PERKIRAAN
KUANTITAS
HARGA
SATUAN
(Rp.)
TENAGA
Pekerja Biasa
Tukang Kayu
Kepala Tukang Kayu
Mandor
L17
L08
L03
L01
Org/hr
Org/hr
Org/hr
Org/hr
0.1000
0.1000
0.0100
0.0050
45,000.00
60,000.00
47,000.00
80,000.00
4,500.00
6,000.00
470.00
400.00
11,370.00
BAHAN
Usuk : 5/7
Paku Kayu Segala Ukuran
Reng : 2/3, 3/5
M073
M140
M072
m3
kg
m3
0.0140
0.2500
0.0360
#REF!
17,500.00
#REF!
JUMLAH
HARGA
(Rp.)
#REF!
4,375.00
#REF!
#REF!
PERALATAN
#REF!
NO.
A.
1
2
3
4
: F.054
: Pasang kaso + reng genteng biasa kayu kruing
: m2
KOMPONEN
SATUAN
PERKIRAAN
KUANTITAS
HARGA
SATUAN
(Rp.)
TENAGA
Pekerja Biasa
Tukang Kayu
Kepala Tukang Kayu
Mandor
L17
L08
L03
L01
Org/hr
Org/hr
Org/hr
Org/hr
0.1000
0.1000
0.0100
0.0050
45,000.00
60,000.00
47,000.00
80,000.00
BAHAN
Usuk : 5/7
Paku Kayu Segala Ukuran
Reng : 2/3, 3/5
M067
M140
M066
m3
kg
m3
0.0140
0.2500
0.0360
5,400,000.00
17,500.00
5,400,000.00
75,600.00
4,375.00
194,400.00
274,375.00
PERALATAN
4,500.00
6,000.00
470.00
400.00
11,370.00
JUMLAH
HARGA
(Rp.)
285,745.00
NO.
A.
1
2
3
4
: F.055
: Pasang kaso + reng genteng biasa kayu meranti
: m2
KOMPONEN
SATUAN
PERKIRAAN
KUANTITAS
HARGA
SATUAN
(Rp.)
TENAGA
Pekerja Biasa
Tukang Kayu
Kepala Tukang Kayu
Mandor
L17
L08
L03
L01
Org/hr
Org/hr
Org/hr
Org/hr
0.1000
0.1000
0.0100
0.0050
45,000.00
60,000.00
47,000.00
80,000.00
4,500.00
6,000.00
470.00
400.00
11,370.00
BAHAN
Usuk : 5/7
Paku Kayu Segala Ukuran
Reng : 2/3, 3/5
M061
M140
M060
m3
kg
m3
0.0140
0.2500
0.0360
4,500,000.00
17,500.00
4,500,000.00
JUMLAH
HARGA
(Rp.)
63,000.00
4,375.00
162,000.00
229,375.00
PERALATAN
240,745.00
NO.
A.
1
2
3
4
: F.056
: Pasang kaso + reng genteng karangpilang kayu jati
: m2
KOMPONEN
SATUAN
PERKIRAAN
KUANTITAS
HARGA
SATUAN
(Rp.)
TENAGA
Pekerja Biasa
Tukang Kayu
Kepala Tukang Kayu
Mandor
L17
L08
L03
L01
Org/hr
Org/hr
Org/hr
Org/hr
0.1000
0.1000
0.0100
0.0050
45,000.00
60,000.00
47,000.00
80,000.00
4,500.00
6,000.00
470.00
400.00
11,370.00
BAHAN
Usuk : 5/7
Paku Kayu Segala Ukuran
Reng : 2/3, 3/5
M095
M140
M094
m3
kg
m3
0.0140
0.2500
0.0360
JUMLAH
HARGA
(Rp.)
#REF!
17,500.00
#REF!
#REF!
4,375.00
#REF!
#REF!
PERALATAN
#REF!
NO.
A.
1
2
3
4
: F.057
: Pasang kaso + reng genteng karangpilang kayu kamper
: m2
KOMPONEN
SATUAN
PERKIRAAN
KUANTITAS
HARGA
SATUAN
(Rp.)
JUMLAH
HARGA
(Rp.)
TENAGA
Pekerja Biasa
Tukang Kayu
Kepala Tukang Kayu
Mandor
L17
L08
L03
L01
Org/hr
Org/hr
Org/hr
Org/hr
0.1000
0.1000
0.0100
0.0050
45,000.00
60,000.00
47,000.00
80,000.00
4,500.00
6,000.00
470.00
400.00
11,370.00
BAHAN
Usuk : 5/7
Paku Kayu Segala Ukuran
Reng : 2/3, 3/5
M079
M140
M078
m3
kg
m3
0.0140
0.2500
0.0360
1,450,000.00
17,500.00
1,450,000.00
20,300.00
4,375.00
52,200.00
76,875.00
PERALATAN
88,245.00
NO.
A.
1
2
3
4
: F.058
: Pasang kaso + reng genteng karangpilang kayu borneo
: m2
KOMPONEN
SATUAN
PERKIRAAN
KUANTITAS
HARGA
SATUAN
(Rp.)
TENAGA
Pekerja Biasa
Tukang Kayu
Kepala Tukang Kayu
Mandor
L17
L08
L03
L01
Org/hr
Org/hr
Org/hr
Org/hr
0.1000
0.1000
0.0100
0.0050
45,000.00
60,000.00
47,000.00
80,000.00
4,500.00
6,000.00
470.00
400.00
11,370.00
BAHAN
Usuk : 5/7
Paku Kayu Segala Ukuran
Reng : 2/3, 3/5
M055
M140
M054
m3
kg
m3
0.0140
0.2500
0.0360
JUMLAH
HARGA
(Rp.)
#REF!
17,500.00
#REF!
#REF!
4,375.00
#REF!
#REF!
PERALATAN
#REF!
NO.
A.
1
2
3
4
: F.059
: Pasang kaso + reng genteng karangpilang kayu bengkirai
: m2
KOMPONEN
SATUAN
PERKIRAAN
KUANTITAS
HARGA
SATUAN
(Rp.)
JUMLAH
HARGA
(Rp.)
TENAGA
Pekerja Biasa
Tukang Kayu
Kepala Tukang Kayu
Mandor
L17
L08
L03
L01
Org/hr
Org/hr
Org/hr
Org/hr
0.1000
0.1000
0.0100
0.0050
45,000.00
60,000.00
47,000.00
80,000.00
4,500.00
6,000.00
470.00
400.00
11,370.00
BAHAN
Usuk : 5/7
Paku Kayu Segala Ukuran
Reng : 2/3, 3/5
M073
M140
M072
m3
kg
m3
0.0140
0.2500
0.0360
#REF!
17,500.00
#REF!
#REF!
4,375.00
#REF!
#REF!
PERALATAN
#REF!
NO.
A.
1
2
3
4
: F.060
: Pasang kaso + reng genteng karangpilang kayu kruing
: m2
KOMPONEN
SATUAN
PERKIRAAN
KUANTITAS
HARGA
SATUAN
(Rp.)
TENAGA
Pekerja Biasa
Tukang Kayu
Kepala Tukang Kayu
Mandor
L17
L08
L03
L01
Org/hr
Org/hr
Org/hr
Org/hr
0.1000
0.1000
0.0100
0.0050
45,000.00
60,000.00
47,000.00
80,000.00
BAHAN
Usuk : 5/7
Paku Kayu Segala Ukuran
Reng : 2/3, 3/5
M067
M140
M066
m3
kg
m3
0.0140
0.2500
0.0360
5,400,000.00
17,500.00
5,400,000.00
75,600.00
4,375.00
194,400.00
274,375.00
PERALATAN
4,500.00
6,000.00
470.00
400.00
11,370.00
JUMLAH
HARGA
(Rp.)
285,745.00
NO.
A.
1
2
3
4
: F.061
: Pasang kaso + reng genteng karangpilang kayu meranti
: m2
KOMPONEN
SATUAN
PERKIRAAN
KUANTITAS
HARGA
SATUAN
(Rp.)
TENAGA
Pekerja Biasa
Tukang Kayu
Kepala Tukang Kayu
Mandor
L17
L08
L03
L01
Org/hr
Org/hr
Org/hr
Org/hr
0.1000
0.1000
0.0100
0.0050
45,000.00
60,000.00
47,000.00
80,000.00
4,500.00
6,000.00
470.00
400.00
11,370.00
BAHAN
Usuk : 5/7
Paku Kayu Segala Ukuran
Reng : 2/3, 3/5
M061
M140
M060
m3
kg
m3
0.0140
0.2500
0.0360
4,500,000.00
17,500.00
4,500,000.00
JUMLAH
HARGA
(Rp.)
63,000.00
4,375.00
162,000.00
229,375.00
PERALATAN
240,745.00
NO.
A.
1
2
3
4
: F.062
: Pasang kaso + reng genteng beton kayu jati
: m2
KOMPONEN
SATUAN
PERKIRAAN
KUANTITAS
HARGA
SATUAN
(Rp.)
TENAGA
Pekerja Biasa
Tukang Kayu
Kepala Tukang Kayu
Mandor
L17
L08
L03
L01
Org/hr
Org/hr
Org/hr
Org/hr
0.1000
0.1000
0.0100
0.0050
45,000.00
60,000.00
47,000.00
80,000.00
4,500.00
6,000.00
470.00
400.00
11,370.00
BAHAN
Usuk : 5/7
Paku Kayu Segala Ukuran
Reng : 2/3, 3/5
M095
M140
M094
m3
kg
m3
0.0140
0.2500
0.0570
JUMLAH
HARGA
(Rp.)
#REF!
17,500.00
#REF!
#REF!
4,375.00
#REF!
#REF!
PERALATAN
#REF!
NO.
A.
1
2
3
4
: F.063
: Pasang kaso + reng genteng beton kayu kamper
: m2
KOMPONEN
SATUAN
PERKIRAAN
KUANTITAS
HARGA
SATUAN
(Rp.)
TENAGA
Pekerja Biasa
Tukang Kayu
Kepala Tukang Kayu
Mandor
L17
L08
L03
L01
Org/hr
Org/hr
Org/hr
Org/hr
0.1000
0.1000
0.0100
0.0050
45,000.00
60,000.00
47,000.00
80,000.00
4,500.00
6,000.00
470.00
400.00
11,370.00
BAHAN
Usuk : 5/7
Paku Kayu Segala Ukuran
Reng : 2/3, 3/5
M079
M140
M078
m3
kg
m3
0.0140
0.2500
0.0570
1,450,000.00
17,500.00
1,450,000.00
JUMLAH
HARGA
(Rp.)
20,300.00
4,375.00
82,650.00
107,325.00
PERALATAN
118,695.00
NO.
A.
1
2
3
4
: F.064
: Pasang kaso + reng genteng beton kayu borneo
: m2
KOMPONEN
SATUAN
PERKIRAAN
KUANTITAS
HARGA
SATUAN
(Rp.)
TENAGA
Pekerja Biasa
Tukang Kayu
Kepala Tukang Kayu
Mandor
L17
L08
L03
L01
Org/hr
Org/hr
Org/hr
Org/hr
0.1000
0.1000
0.0100
0.0050
45,000.00
60,000.00
47,000.00
80,000.00
4,500.00
6,000.00
470.00
400.00
11,370.00
BAHAN
Usuk : 5/7
Paku Kayu Segala Ukuran
Reng : 2/3, 3/5
M055
M140
M054
m3
kg
m3
0.0140
0.2500
0.0570
JUMLAH
HARGA
(Rp.)
#REF!
17,500.00
#REF!
#REF!
4,375.00
#REF!
#REF!
PERALATAN
#REF!
NO.
A.
1
2
3
4
: F.065
: Pasang kaso + reng genteng beton kayu bengkirai
: m2
KOMPONEN
SATUAN
PERKIRAAN
KUANTITAS
HARGA
SATUAN
(Rp.)
TENAGA
Pekerja Biasa
Tukang Kayu
Kepala Tukang Kayu
Mandor
L17
L08
L03
L01
Org/hr
Org/hr
Org/hr
Org/hr
0.1000
0.1000
0.0100
0.0050
45,000.00
60,000.00
47,000.00
80,000.00
4,500.00
6,000.00
470.00
400.00
11,370.00
BAHAN
Usuk : 5/7
Paku Kayu Segala Ukuran
Reng : 2/3, 3/5
M073
M140
M072
m3
kg
m3
0.0140
0.2500
0.0570
#REF!
17,500.00
#REF!
JUMLAH
HARGA
(Rp.)
#REF!
4,375.00
#REF!
#REF!
PERALATAN
#REF!
NO.
A.
1
2
3
4
: F.066
: Pasang kaso + reng genteng beton kayu kruing
: m2
KOMPONEN
SATUAN
PERKIRAAN
KUANTITAS
HARGA
SATUAN
(Rp.)
TENAGA
Pekerja Biasa
Tukang Kayu
Kepala Tukang Kayu
Mandor
L17
L08
L03
L01
Org/hr
Org/hr
Org/hr
Org/hr
0.1000
0.1000
0.0100
0.0050
45,000.00
60,000.00
47,000.00
80,000.00
BAHAN
Usuk : 5/7
Paku Kayu Segala Ukuran
Reng : 2/3, 3/5
M067
M140
M066
m3
kg
m3
0.0140
0.2500
0.0570
5,400,000.00
17,500.00
5,400,000.00
75,600.00
4,375.00
307,800.00
387,775.00
PERALATAN
4,500.00
6,000.00
470.00
400.00
11,370.00
JUMLAH
HARGA
(Rp.)
399,145.00
NO.
A.
1
2
3
4
: F.067
: Pasang kaso + reng genteng beton kayu meranti
: m2
KOMPONEN
SATUAN
PERKIRAAN
KUANTITAS
HARGA
SATUAN
(Rp.)
TENAGA
Pekerja Biasa
Tukang Kayu
Kepala Tukang Kayu
Mandor
L17
L08
L03
L01
Org/hr
Org/hr
Org/hr
Org/hr
0.1000
0.1000
0.0100
0.0050
45,000.00
60,000.00
47,000.00
80,000.00
4,500.00
6,000.00
470.00
400.00
11,370.00
BAHAN
Usuk : 5/7
Paku Kayu Segala Ukuran
Reng : 2/3, 3/5
M061
M140
M060
m3
kg
m3
0.0140
0.2500
0.0570
4,500,000.00
17,500.00
4,500,000.00
JUMLAH
HARGA
(Rp.)
63,000.00
4,375.00
256,500.00
323,875.00
PERALATAN
335,245.00
NO.
A.
1
2
3
4
: F.068
: Pasang kaso + reng atap sirap kayu jati
: m2
KOMPONEN
SATUAN
PERKIRAAN
KUANTITAS
HARGA
SATUAN
(Rp.)
TENAGA
Pekerja Biasa
Tukang Kayu
Kepala Tukang Kayu
Mandor
L17
L08
L03
L01
Org/hr
Org/hr
Org/hr
Org/hr
0.1200
0.1200
0.0120
0.0060
45,000.00
60,000.00
47,000.00
80,000.00
5,400.00
7,200.00
564.00
480.00
13,644.00
BAHAN
Usuk : 5/7
Paku Kayu Segala Ukuran
M095
M140
m3
kg
0.0165
0.2000
JUMLAH
HARGA
(Rp.)
#REF!
17,500.00
#REF!
3,500.00
#REF!
PERALATAN
#REF!
NO.
A.
1
2
3
4
: F.069
: Pasang kaso + reng atap sirap kayu kamper
: m2
KOMPONEN
SATUAN
PERKIRAAN
KUANTITAS
HARGA
SATUAN
(Rp.)
TENAGA
Pekerja Biasa
Tukang Kayu
Kepala Tukang Kayu
Mandor
L17
L08
L03
L01
Org/hr
Org/hr
Org/hr
Org/hr
0.1200
0.1200
0.0120
0.0060
45,000.00
60,000.00
47,000.00
80,000.00
5,400.00
7,200.00
564.00
480.00
13,644.00
BAHAN
Usuk : 5/7
Paku Kayu Segala Ukuran
M079
M140
m3
kg
0.0165
0.2000
1,450,000.00
17,500.00
JUMLAH
HARGA
(Rp.)
23,925.00
3,500.00
27,425.00
PERALATAN
41,069.00
NO.
A.
1
2
3
4
: F.070
: Pasang kaso + reng atap sirap kayu borneo
: m2
KOMPONEN
SATUAN
PERKIRAAN
KUANTITAS
HARGA
SATUAN
(Rp.)
TENAGA
Pekerja Biasa
Tukang Kayu
Kepala Tukang Kayu
Mandor
L17
L08
L03
L01
Org/hr
Org/hr
Org/hr
Org/hr
0.1200
0.1200
0.0120
0.0060
45,000.00
60,000.00
47,000.00
80,000.00
5,400.00
7,200.00
564.00
480.00
13,644.00
BAHAN
Usuk : 5/7
Paku Kayu Segala Ukuran
M055
M140
m3
kg
0.0165
0.2000
JUMLAH
HARGA
(Rp.)
#REF!
17,500.00
#REF!
3,500.00
#REF!
PERALATAN
#REF!
NO.
A.
1
2
3
4
: F.071
: Pasang kaso + reng atap sirap kayu bengkirai
: m2
KOMPONEN
SATUAN
PERKIRAAN
KUANTITAS
HARGA
SATUAN
(Rp.)
TENAGA
Pekerja Biasa
Tukang Kayu
Kepala Tukang Kayu
Mandor
L17
L08
L03
L01
Org/hr
Org/hr
Org/hr
Org/hr
0.1200
0.1200
0.0120
0.0060
45,000.00
60,000.00
47,000.00
80,000.00
5,400.00
7,200.00
564.00
480.00
13,644.00
BAHAN
Usuk : 5/7
Paku Kayu Segala Ukuran
M073
M140
m3
kg
0.0165
0.2000
#REF!
17,500.00
JUMLAH
HARGA
(Rp.)
#REF!
3,500.00
#REF!
PERALATAN
#REF!
NO.
A.
1
2
3
4
: F.072
: Pasang kaso + reng atap sirap kayu kruing
: m2
KOMPONEN
SATUAN
PERKIRAAN
KUANTITAS
HARGA
SATUAN
(Rp.)
TENAGA
Pekerja Biasa
Tukang Kayu
Kepala Tukang Kayu
Mandor
L17
L08
L03
L01
Org/hr
Org/hr
Org/hr
Org/hr
0.1200
0.1200
0.0120
0.0060
45,000.00
60,000.00
47,000.00
80,000.00
BAHAN
Usuk : 5/7
Paku Kayu Segala Ukuran
M067
M140
m3
kg
0.0165
0.2000
5,400,000.00
17,500.00
89,100.00
3,500.00
92,600.00
PERALATAN
5,400.00
7,200.00
564.00
480.00
13,644.00
JUMLAH
HARGA
(Rp.)
106,244.00
NO.
A.
1
2
3
4
: F.081
: Pasang lisplang ukuran (3 x 20) cm, kayu kamper
: m1
KOMPONEN
SATUAN
PERKIRAAN
KUANTITAS
HARGA
SATUAN
(Rp.)
TENAGA
Pekerja Biasa
Tukang Kayu
Kepala Tukang Kayu
Mandor
L17
L08
L03
L01
Org/hr
Org/hr
Org/hr
Org/hr
0.1000
0.2000
0.0250
0.0050
45,000.00
60,000.00
47,000.00
80,000.00
4,500.00
12,000.00
1,175.00
400.00
18,075.00
BAHAN
Papan (3x20) cm
Paku Kayu Segala Ukuran
M082
M140
m3
kg
0.0108
0.1000
10,800,000.00
17,500.00
JUMLAH
HARGA
(Rp.)
116,640.00
1,750.00
118,390.00
PERALATAN
136,465.00
NO.
A.
1
2
3
4
: F.082
: Pasang lisplang ukuran (3 x 20) cm, kayu borneo
: m1
KOMPONEN
SATUAN
PERKIRAAN
KUANTITAS
HARGA
SATUAN
(Rp.)
TENAGA
Pekerja Biasa
Tukang Kayu
Kepala Tukang Kayu
Mandor
L17
L08
L03
L01
Org/hr
Org/hr
Org/hr
Org/hr
0.1000
0.2000
0.0250
0.0050
45,000.00
60,000.00
47,000.00
80,000.00
4,500.00
12,000.00
1,175.00
400.00
18,075.00
BAHAN
Papan (3x20) cm
Paku Kayu Segala Ukuran
M058
M140
m3
kg
0.0108
0.1000
JUMLAH
HARGA
(Rp.)
#REF!
17,500.00
#REF!
1,750.00
#REF!
PERALATAN
#REF!
NO.
A.
1
2
3
4
: F.083
: Pasang lisplang ukuran (3 x 20) cm, kayu bengkirai
: m1
KOMPONEN
SATUAN
PERKIRAAN
KUANTITAS
HARGA
SATUAN
(Rp.)
TENAGA
Pekerja Biasa
Tukang Kayu
Kepala Tukang Kayu
Mandor
L17
L08
L03
L01
Org/hr
Org/hr
Org/hr
Org/hr
0.1000
0.2000
0.0250
0.0050
45,000.00
60,000.00
47,000.00
80,000.00
4,500.00
12,000.00
1,175.00
400.00
18,075.00
BAHAN
Papan (3x20) cm
Paku Kayu Segala Ukuran
M076
M140
m3
kg
0.0108
0.1000
#REF!
17,500.00
JUMLAH
HARGA
(Rp.)
#REF!
1,750.00
#REF!
PERALATAN
#REF!
NO.
A.
1
2
3
4
: F.084
: Pasang lisplang ukuran (3 x 20) cm, kayu kruing
: m1
KOMPONEN
SATUAN
PERKIRAAN
KUANTITAS
HARGA
SATUAN
(Rp.)
TENAGA
Pekerja Biasa
Tukang Kayu
Kepala Tukang Kayu
Mandor
L17
L08
L03
L01
Org/hr
Org/hr
Org/hr
Org/hr
0.1000
0.2000
0.0250
0.0050
45,000.00
60,000.00
47,000.00
80,000.00
BAHAN
Papan (3x20) cm
Paku Kayu Segala Ukuran
M070
M140
m3
kg
0.0108
0.1000
6,120,000.00
17,500.00
66,096.00
1,750.00
67,846.00
PERALATAN
4,500.00
12,000.00
1,175.00
400.00
18,075.00
JUMLAH
HARGA
(Rp.)
85,921.00
NO.
A.
1
2
3
4
: F.085
: Pasang lisplang ukuran (3 x 20) cm, kayu meranti
: m1
KOMPONEN
SATUAN
PERKIRAAN
KUANTITAS
HARGA
SATUAN
(Rp.)
TENAGA
Pekerja Biasa
Tukang Kayu
Kepala Tukang Kayu
Mandor
L17
L08
L03
L01
Org/hr
Org/hr
Org/hr
Org/hr
0.1000
0.2000
0.0250
0.0050
45,000.00
60,000.00
47,000.00
80,000.00
4,500.00
12,000.00
1,175.00
400.00
18,075.00
BAHAN
Papan (3x20) cm
Paku Kayu Segala Ukuran
M064
M140
m3
kg
0.0108
0.1000
6,030,000.00
17,500.00
JUMLAH
HARGA
(Rp.)
65,124.00
1,750.00
66,874.00
PERALATAN
84,949.00
NO.
A.
1
2
3
4
: F.086
: Pasang lisplang ukuran (3 x 30) cm, kayu jati
: m1
KOMPONEN
SATUAN
PERKIRAAN
KUANTITAS
HARGA
SATUAN
(Rp.)
TENAGA
Pekerja Biasa
Tukang Kayu
Kepala Tukang Kayu
Mandor
L17
L08
L03
L01
Org/hr
Org/hr
Org/hr
Org/hr
0.1000
0.2000
0.0200
0.0050
45,000.00
60,000.00
47,000.00
80,000.00
4,500.00
12,000.00
940.00
400.00
17,840.00
BAHAN
Papan (3x30) cm
Paku Kayu Segala Ukuran
M099
M140
m3
kg
0.0110
0.0500
JUMLAH
HARGA
(Rp.)
#REF!
17,500.00
#REF!
875.00
#REF!
PERALATAN
#REF!
NO.
A.
1
2
3
4
: F.087
: Pasang lisplang ukuran (3 x 30) cm, kayu kamper
: m1
KOMPONEN
SATUAN
PERKIRAAN
KUANTITAS
HARGA
SATUAN
(Rp.)
TENAGA
Pekerja Biasa
Tukang Kayu
Kepala Tukang Kayu
Mandor
L17
L08
L03
L01
Org/hr
Org/hr
Org/hr
Org/hr
0.1000
0.2000
0.0200
0.0050
45,000.00
60,000.00
47,000.00
80,000.00
4,500.00
12,000.00
940.00
400.00
17,840.00
BAHAN
Papan (3x30) cm
Paku Kayu Segala Ukuran
M083
M140
m3
kg
0.0110
0.0500
10,800,000.00
17,500.00
JUMLAH
HARGA
(Rp.)
118,800.00
875.00
119,675.00
PERALATAN
137,515.00
NO.
A.
1
2
3
4
: F.088
: Pasang lisplang ukuran (3 x 30) cm, kayu borneo
: m1
KOMPONEN
SATUAN
PERKIRAAN
KUANTITAS
HARGA
SATUAN
(Rp.)
TENAGA
Pekerja Biasa
Tukang Kayu
Kepala Tukang Kayu
Mandor
L17
L08
L03
L01
Org/hr
Org/hr
Org/hr
Org/hr
0.1000
0.2000
0.0200
0.0050
45,000.00
60,000.00
47,000.00
80,000.00
4,500.00
12,000.00
940.00
400.00
17,840.00
BAHAN
Papan (3x30) cm
Paku Kayu Segala Ukuran
M059
M140
m3
kg
0.0110
0.0500
JUMLAH
HARGA
(Rp.)
#REF!
17,500.00
#REF!
875.00
#REF!
PERALATAN
#REF!
NO.
A.
1
2
3
4
: F.089
: Pasang lisplang ukuran (3 x 30) cm, kayu bengkirai
: m1
KOMPONEN
SATUAN
PERKIRAAN
KUANTITAS
HARGA
SATUAN
(Rp.)
TENAGA
Pekerja Biasa
Tukang Kayu
Kepala Tukang Kayu
Mandor
L17
L08
L03
L01
Org/hr
Org/hr
Org/hr
Org/hr
0.1000
0.2000
0.0200
0.0050
45,000.00
60,000.00
47,000.00
80,000.00
4,500.00
12,000.00
940.00
400.00
17,840.00
BAHAN
Papan (3x30) cm
Paku Kayu Segala Ukuran
M077
M140
m3
kg
0.0110
0.0500
#REF!
17,500.00
JUMLAH
HARGA
(Rp.)
#REF!
875.00
#REF!
PERALATAN
#REF!
NO.
A.
1
2
3
4
: F.090
: Pasang lisplang ukuran (3 x 30) cm, kayu kruing
: m1
KOMPONEN
SATUAN
PERKIRAAN
KUANTITAS
HARGA
SATUAN
(Rp.)
TENAGA
Pekerja Biasa
Tukang Kayu
Kepala Tukang Kayu
Mandor
L17
L08
L03
L01
Org/hr
Org/hr
Org/hr
Org/hr
0.1000
0.2000
0.0200
0.0050
45,000.00
60,000.00
47,000.00
80,000.00
BAHAN
Papan (3x30) cm
Paku Kayu Segala Ukuran
M071
M140
m3
kg
0.0110
0.0500
6,120,000.00
17,500.00
67,320.00
875.00
68,195.00
PERALATAN
4,500.00
12,000.00
940.00
400.00
17,840.00
JUMLAH
HARGA
(Rp.)
86,035.00
NO.
A.
1
2
3
4
: F.091
: Pasang lisplang ukuran (3 x 30) cm, kayu meranti
: m1
KOMPONEN
SATUAN
PERKIRAAN
KUANTITAS
HARGA
SATUAN
(Rp.)
TENAGA
Pekerja Biasa
Tukang Kayu
Kepala Tukang Kayu
Mandor
L17
L08
L03
L01
Org/hr
Org/hr
Org/hr
Org/hr
0.1000
0.2000
0.0200
0.0050
45,000.00
60,000.00
47,000.00
80,000.00
4,500.00
12,000.00
940.00
400.00
17,840.00
BAHAN
Papan (3x30) cm
Paku Kayu Segala Ukuran
M065
M140
m3
kg
0.0110
0.0500
6,030,000.00
17,500.00
JUMLAH
HARGA
(Rp.)
66,330.00
875.00
67,205.00
PERALATAN
85,045.00
NO.
A.
1
2
3
4
: F.092
: Pasang rangka dinding pemisah kayu jati
: m2
KOMPONEN
SATUAN
PERKIRAAN
KUANTITAS
HARGA
SATUAN
(Rp.)
TENAGA
Pekerja Biasa
Tukang Kayu
Kepala Tukang Kayu
Mandor
L17
L08
L03
L01
Org/hr
Org/hr
Org/hr
Org/hr
0.1500
0.4500
0.0450
0.0080
45,000.00
60,000.00
47,000.00
80,000.00
6,750.00
27,000.00
2,115.00
640.00
36,505.00
BAHAN
Balok
Paku Kayu Segala Ukuran
M096
M140
m3
kg
0.0280
0.1500
JUMLAH
HARGA
(Rp.)
#REF!
17,500.00
#REF!
2,625.00
#REF!
PERALATAN
#REF!
NO.
A.
1
2
3
4
: F.093
: Pasang rangka dinding pemisah kayu kamper
: m2
KOMPONEN
SATUAN
PERKIRAAN
KUANTITAS
HARGA
SATUAN
(Rp.)
TENAGA
Pekerja Biasa
Tukang Kayu
Kepala Tukang Kayu
Mandor
L17
L08
L03
L01
Org/hr
Org/hr
Org/hr
Org/hr
0.1500
0.4500
0.0450
0.0080
45,000.00
60,000.00
47,000.00
80,000.00
6,750.00
27,000.00
2,115.00
640.00
36,505.00
BAHAN
Balok
Paku Kayu Segala Ukuran
M080
M140
m3
kg
0.0280
0.1500
9,000,000.00
17,500.00
JUMLAH
HARGA
(Rp.)
252,000.00
2,625.00
254,625.00
PERALATAN
291,130.00
NO.
A.
1
2
3
4
: F.094
: Pasang rangka dinding pemisah kayu borneo
: m2
KOMPONEN
SATUAN
PERKIRAAN
KUANTITAS
HARGA
SATUAN
(Rp.)
TENAGA
Pekerja Biasa
Tukang Kayu
Kepala Tukang Kayu
Mandor
L17
L08
L03
L01
Org/hr
Org/hr
Org/hr
Org/hr
0.1500
0.4500
0.0450
0.0080
45,000.00
60,000.00
47,000.00
80,000.00
6,750.00
27,000.00
2,115.00
640.00
36,505.00
BAHAN
Balok
Paku Kayu Segala Ukuran
M056
M140
m3
kg
0.0280
0.1500
JUMLAH
HARGA
(Rp.)
#REF!
17,500.00
#REF!
2,625.00
#REF!
PERALATAN
#REF!
NO.
A.
1
2
3
4
: F.095
: Pasang rangka dinding pemisah kayu meranti
: m2
KOMPONEN
SATUAN
PERKIRAAN
KUANTITAS
HARGA
SATUAN
(Rp.)
TENAGA
Pekerja Biasa
Tukang Kayu
Kepala Tukang Kayu
Mandor
L17
L08
L03
L01
Org/hr
Org/hr
Org/hr
Org/hr
0.1500
0.4500
0.0450
0.0080
45,000.00
60,000.00
47,000.00
80,000.00
6,750.00
27,000.00
2,115.00
640.00
36,505.00
BAHAN
Balok
Paku Kayu Segala Ukuran
M062
M140
m3
kg
0.0280
0.1500
5,040,000.00
17,500.00
JUMLAH
HARGA
(Rp.)
141,120.00
2,625.00
143,745.00
PERALATAN
180,250.00
NO.
A.
1
2
3
4
: F.096
: Pasang rangka dinding pemisah teakwood rangkap, rangka kayu jati
: m2
KOMPONEN
SATUAN
PERKIRAAN
KUANTITAS
HARGA
SATUAN
(Rp.)
TENAGA
Pekerja Biasa
Tukang Kayu
Kepala Tukang Kayu
Mandor
L17
L08
L03
L01
Org/hr
Org/hr
Org/hr
Org/hr
0.1500
0.4500
0.0450
0.0080
45,000.00
60,000.00
47,000.00
80,000.00
6,750.00
27,000.00
2,115.00
640.00
36,505.00
BAHAN
Balok
M096
Paku Kayu Segala Ukuran
M140
Lem Kayu
M422
Teakwood (120 x 240) cm x 4 mmM229
m3
kg
bh
lbr
0.0280
0.1500
0.5600
0.8600
JUMLAH
HARGA
(Rp.)
#REF!
17,500.00
25,040.00
82,610.00
#REF!
2,625.00
14,022.40
71,044.60
#REF!
PERALATAN
#REF!
NO.
A.
1
2
3
4
: F.097
: Pasang rangka dinding pemisah teakwood rangkap, rangka kayu kamper
: m2
KOMPONEN
SATUAN
PERKIRAAN
KUANTITAS
HARGA
SATUAN
(Rp.)
TENAGA
Pekerja Biasa
Tukang Kayu
Kepala Tukang Kayu
Mandor
L17
L08
L03
L01
Org/hr
Org/hr
Org/hr
Org/hr
0.1500
0.4500
0.0450
0.0080
45,000.00
60,000.00
47,000.00
80,000.00
6,750.00
27,000.00
2,115.00
640.00
36,505.00
BAHAN
Balok
M080
Paku Kayu Segala Ukuran
M140
Lem Kayu
M422
Teakwood (120 x 240) cm x 4 mmM229
m3
kg
bh
lbr
0.0280
0.1500
0.5600
0.8600
9,000,000.00
17,500.00
25,040.00
82,610.00
JUMLAH
HARGA
(Rp.)
252,000.00
2,625.00
14,022.40
71,044.60
339,692.00
PERALATAN
376,197.00
NO.
A.
1
2
3
4
: F.098
: Pasang rangka dinding pemisah teakwood rangkap, rangka kayu borneo
: m2
KOMPONEN
SATUAN
PERKIRAAN
KUANTITAS
HARGA
SATUAN
(Rp.)
TENAGA
Pekerja Biasa
Tukang Kayu
Kepala Tukang Kayu
Mandor
L17
L08
L03
L01
Org/hr
Org/hr
Org/hr
Org/hr
0.1500
0.4500
0.0450
0.0080
45,000.00
60,000.00
47,000.00
80,000.00
6,750.00
27,000.00
2,115.00
640.00
36,505.00
BAHAN
Balok
M056
Paku Kayu Segala Ukuran
M140
Lem Kayu
M422
Teakwood (120 x 240) cm x 4 mmM229
m3
kg
bh
lbr
0.0280
0.1500
0.5600
0.8600
JUMLAH
HARGA
(Rp.)
#REF!
17,500.00
25,040.00
82,610.00
#REF!
2,625.00
14,022.40
71,044.60
#REF!
PERALATAN
#REF!
NO.
A.
1
2
3
4
: F.099
: Pasang rangka dinding pemisah teakwood rangkap, rangka kayu meranti
: m2
KOMPONEN
SATUAN
PERKIRAAN
KUANTITAS
HARGA
SATUAN
(Rp.)
TENAGA
Pekerja Biasa
Tukang Kayu
Kepala Tukang Kayu
Mandor
L17
L08
L03
L01
Org/hr
Org/hr
Org/hr
Org/hr
0.1500
0.4500
0.0450
0.0080
45,000.00
60,000.00
47,000.00
80,000.00
6,750.00
27,000.00
2,115.00
640.00
36,505.00
BAHAN
Balok
M062
Paku Kayu Segala Ukuran
M140
Lem Kayu
M422
Teakwood (120 x 240) cm x 4 mmM229
m3
kg
bh
lbr
0.0280
0.1500
0.5600
0.8600
5,040,000.00
17,500.00
25,040.00
82,610.00
JUMLAH
HARGA
(Rp.)
141,120.00
2,625.00
14,022.40
71,044.60
228,812.00
PERALATAN
265,317.00
NO.
A.
1
2
3
4
: F.100
: Pasang rangka dinding pemisah plywood rangkap, rangka kayu jati
: m2
KOMPONEN
SATUAN
PERKIRAAN
KUANTITAS
HARGA
SATUAN
(Rp.)
TENAGA
Pekerja Biasa
Tukang Kayu
Kepala Tukang Kayu
Mandor
L17
L08
L03
L01
Org/hr
Org/hr
Org/hr
Org/hr
0.2000
0.6000
0.0600
0.0100
45,000.00
60,000.00
47,000.00
80,000.00
9,000.00
36,000.00
2,820.00
800.00
48,620.00
BAHAN
Balok
Paku Kayu Segala Ukuran
Lem Kayu
Plywood (120 x 240) cm x 4 mm
M096
M140
M422
M226
m3
kg
bh
lbr
0.0280
0.1500
0.5600
0.8600
JUMLAH
HARGA
(Rp.)
#REF!
17,500.00
25,040.00
85,000.00
#REF!
2,625.00
14,022.40
73,100.00
#REF!
PERALATAN
#REF!
NO.
A.
1
2
3
4
: F.101
: Pasang rangka dinding pemisah plywood rangkap, rangka kayu kamper
: m2
KOMPONEN
SATUAN
PERKIRAAN
KUANTITAS
HARGA
SATUAN
(Rp.)
TENAGA
Pekerja Biasa
Tukang Kayu
Kepala Tukang Kayu
Mandor
L17
L08
L03
L01
Org/hr
Org/hr
Org/hr
Org/hr
0.2000
0.6000
0.0600
0.0100
45,000.00
60,000.00
47,000.00
80,000.00
9,000.00
36,000.00
2,820.00
800.00
48,620.00
BAHAN
Balok
Paku Kayu Segala Ukuran
Lem Kayu
Plywood (120 x 240) cm x 4 mm
M080
M140
M422
M226
m3
kg
bh
lbr
0.0280
0.1500
0.5600
0.8600
9,000,000.00
17,500.00
25,040.00
85,000.00
JUMLAH
HARGA
(Rp.)
252,000.00
2,625.00
14,022.40
73,100.00
341,747.40
PERALATAN
390,367.40
NO.
A.
1
2
3
4
: F.102
: Pasang rangka dinding pemisah plywood rangkap, rangka kayu borneo
: m2
KOMPONEN
SATUAN
PERKIRAAN
KUANTITAS
HARGA
SATUAN
(Rp.)
TENAGA
Pekerja Biasa
Tukang Kayu
Kepala Tukang Kayu
Mandor
L17
L08
L03
L01
Org/hr
Org/hr
Org/hr
Org/hr
0.2000
0.6000
0.0600
0.0100
45,000.00
60,000.00
47,000.00
80,000.00
9,000.00
36,000.00
2,820.00
800.00
48,620.00
BAHAN
Balok
Paku Kayu Segala Ukuran
Lem Kayu
Plywood (120 x 240) cm x 4 mm
M056
M140
M422
M226
m3
kg
bh
lbr
0.0280
0.1500
0.5600
0.8600
JUMLAH
HARGA
(Rp.)
#REF!
17,500.00
25,040.00
85,000.00
#REF!
2,625.00
14,022.40
73,100.00
#REF!
PERALATAN
#REF!
NO.
A.
1
2
3
4
: F.103
: Pasang rangka dinding pemisah plywood rangkap, rangka kayu meranti
: m2
KOMPONEN
SATUAN
PERKIRAAN
KUANTITAS
HARGA
SATUAN
(Rp.)
TENAGA
Pekerja Biasa
Tukang Kayu
Kepala Tukang Kayu
Mandor
L17
L08
L03
L01
Org/hr
Org/hr
Org/hr
Org/hr
0.2000
0.6000
0.0600
0.0100
45,000.00
60,000.00
47,000.00
80,000.00
9,000.00
36,000.00
2,820.00
800.00
48,620.00
BAHAN
Balok
Paku Kayu Segala Ukuran
Lem Kayu
Plywood (120 x 240) cm x 4 mm
M062
M140
M422
M226
m3
kg
bh
lbr
0.0280
0.1500
0.5600
0.8600
5,040,000.00
17,500.00
25,040.00
85,000.00
JUMLAH
HARGA
(Rp.)
141,120.00
2,625.00
14,022.40
73,100.00
230,867.40
PERALATAN
279,487.40
NO.
A.
1
2
3
4
: F.104
: Pasang dinding lambriziring dari papan jati
: m2
KOMPONEN
SATUAN
PERKIRAAN
KUANTITAS
HARGA
SATUAN
(Rp.)
TENAGA
Pekerja Biasa
Tukang Kayu
Kepala Tukang Kayu
Mandor
L17
L08
L03
L01
Org/hr
Org/hr
Org/hr
Org/hr
0.6000
1.8000
0.1800
0.0300
45,000.00
60,000.00
47,000.00
80,000.00
27,000.00
108,000.00
8,460.00
2,400.00
145,860.00
BAHAN
Papan (3x30) cm
Paku Kayu Segala Ukuran
Sekrup Segala Ukuran
M099
M140
M145
m3
kg
bh
0.0070
0.1000
10.0000
JUMLAH
HARGA
(Rp.)
#REF!
17,500.00
410.00
#REF!
1,750.00
4,100.00
#REF!
PERALATAN
#REF!
NO.
A.
1
2
3
4
: F.073
: Pasang kaso + reng atap sirap kayu meranti
: m2
KOMPONEN
SATUAN
PERKIRAAN
KUANTITAS
HARGA
SATUAN
(Rp.)
TENAGA
Pekerja Biasa
Tukang Kayu
Kepala Tukang Kayu
Mandor
L17
L08
L03
L01
Org/hr
Org/hr
Org/hr
Org/hr
0.1200
0.1200
0.0120
0.0060
45,000.00
60,000.00
47,000.00
80,000.00
5,400.00
7,200.00
564.00
480.00
13,644.00
BAHAN
Usuk : 5/7
Paku Kayu Segala Ukuran
M061
M140
m3
kg
0.0165
0.2000
4,500,000.00
17,500.00
JUMLAH
HARGA
(Rp.)
74,250.00
3,500.00
77,750.00
PERALATAN
91,394.00
NO.
A.
1
2
3
4
: F.074
: Pasang rangka langit-langit (0.5 x 1.0) m, kayu jati
: m2
KOMPONEN
SATUAN
PERKIRAAN
KUANTITAS
HARGA
SATUAN
(Rp.)
TENAGA
Pekerja Biasa
Tukang Kayu
Kepala Tukang Kayu
Mandor
L17
L08
L03
L01
Org/hr
Org/hr
Org/hr
Org/hr
0.1500
0.2500
0.0250
0.0750
45,000.00
60,000.00
47,000.00
80,000.00
6,750.00
15,000.00
1,175.00
6,000.00
28,925.00
BAHAN
Usuk : 5/7
Paku Kayu Segala Ukuran
M095
M140
m3
kg
0.0154
0.2000
JUMLAH
HARGA
(Rp.)
#REF!
17,500.00
#REF!
3,500.00
#REF!
PERALATAN
#REF!
NO.
A.
1
2
3
4
: F.075
: Pasang rangka langit-langit (0.5 x 1.0) m, kayu kamper
: m2
KOMPONEN
SATUAN
PERKIRAAN
KUANTITAS
HARGA
SATUAN
(Rp.)
TENAGA
Pekerja Biasa
Tukang Kayu
Kepala Tukang Kayu
Mandor
L17
L08
L03
L01
Org/hr
Org/hr
Org/hr
Org/hr
0.1500
0.2500
0.0250
0.0750
45,000.00
60,000.00
47,000.00
80,000.00
6,750.00
15,000.00
1,175.00
6,000.00
28,925.00
BAHAN
Usuk : 5/7
Paku Kayu Segala Ukuran
M079
M140
m3
kg
0.0154
0.2000
1,450,000.00
17,500.00
JUMLAH
HARGA
(Rp.)
22,330.00
3,500.00
25,830.00
PERALATAN
54,755.00
NO.
A.
1
2
3
4
: F.076
: Pasang rangka langit-langit (0.5 x 1.0) m, kayu borneo
: m2
KOMPONEN
SATUAN
PERKIRAAN
KUANTITAS
HARGA
SATUAN
(Rp.)
TENAGA
Pekerja Biasa
Tukang Kayu
Kepala Tukang Kayu
Mandor
L17
L08
L03
L01
Org/hr
Org/hr
Org/hr
Org/hr
0.1500
0.2500
0.0250
0.0750
45,000.00
60,000.00
47,000.00
80,000.00
6,750.00
15,000.00
1,175.00
6,000.00
28,925.00
BAHAN
Usuk : 5/7
Paku Kayu Segala Ukuran
M055
M140
m3
kg
0.0154
0.2000
JUMLAH
HARGA
(Rp.)
#REF!
17,500.00
#REF!
3,500.00
#REF!
PERALATAN
#REF!
NO.
A.
1
2
3
4
: F.077
: Pasang rangka langit-langit (0.5 x 1.0) m, kayu bengkirai
: m2
KOMPONEN
SATUAN
PERKIRAAN
KUANTITAS
HARGA
SATUAN
(Rp.)
TENAGA
Pekerja Biasa
Tukang Kayu
Kepala Tukang Kayu
Mandor
L17
L08
L03
L01
Org/hr
Org/hr
Org/hr
Org/hr
0.1500
0.2500
0.0250
0.0750
45,000.00
60,000.00
47,000.00
80,000.00
6,750.00
15,000.00
1,175.00
6,000.00
28,925.00
BAHAN
Usuk : 5/7
Paku Kayu Segala Ukuran
M073
M140
m3
kg
0.0154
0.2000
#REF!
17,500.00
JUMLAH
HARGA
(Rp.)
#REF!
3,500.00
#REF!
PERALATAN
#REF!
NO.
A.
1
2
3
4
: F.078
: Pasang rangka langit-langit (0.5 x 1.0) m, kayu kruing
: m2
KOMPONEN
SATUAN
PERKIRAAN
KUANTITAS
HARGA
SATUAN
(Rp.)
TENAGA
Pekerja Biasa
Tukang Kayu
Kepala Tukang Kayu
Mandor
L17
L08
L03
L01
Org/hr
Org/hr
Org/hr
Org/hr
0.1500
0.2500
0.0250
0.0750
45,000.00
60,000.00
47,000.00
80,000.00
BAHAN
Usuk : 5/7
Paku Kayu Segala Ukuran
M067
M140
m3
kg
0.0154
0.2000
5,400,000.00
17,500.00
83,160.00
3,500.00
86,660.00
PERALATAN
6,750.00
15,000.00
1,175.00
6,000.00
28,925.00
JUMLAH
HARGA
(Rp.)
115,585.00
NO.
A.
1
2
3
4
: F.079
: Pasang rangka langit-langit (0.5 x 1.0) m, kayu meranti
: m2
KOMPONEN
SATUAN
PERKIRAAN
KUANTITAS
HARGA
SATUAN
(Rp.)
TENAGA
Pekerja Biasa
Tukang Kayu
Kepala Tukang Kayu
Mandor
L17
L08
L03
L01
Org/hr
Org/hr
Org/hr
Org/hr
0.1500
0.2500
0.0250
0.0750
45,000.00
60,000.00
47,000.00
80,000.00
6,750.00
15,000.00
1,175.00
6,000.00
28,925.00
BAHAN
Usuk : 5/7
Paku Kayu Segala Ukuran
M061
M140
m3
kg
0.0154
0.2000
4,500,000.00
17,500.00
JUMLAH
HARGA
(Rp.)
69,300.00
3,500.00
72,800.00
PERALATAN
101,725.00
NO.
A.
1
2
3
4
: F.080
: Pasang lisplang ukuran (3 x 20) cm, kayu jati
: m1
KOMPONEN
SATUAN
PERKIRAAN
KUANTITAS
HARGA
SATUAN
(Rp.)
TENAGA
Pekerja Biasa
Tukang Kayu
Kepala Tukang Kayu
Mandor
L17
L08
L03
L01
Org/hr
Org/hr
Org/hr
Org/hr
0.1000
0.2000
0.0250
0.0050
45,000.00
60,000.00
47,000.00
80,000.00
4,500.00
12,000.00
1,175.00
400.00
18,075.00
BAHAN
Papan (3x20) cm
Paku Kayu Segala Ukuran
M098
M140
m3
kg
0.0108
0.1000
JUMLAH
HARGA
(Rp.)
#REF!
17,500.00
#REF!
1,750.00
#REF!
PERALATAN
#REF!
NO.
A.
1
2
3
4
: F.045
: Pasang konstruksi kuda-kuda kayu meranti
: m3
KOMPONEN
SATUAN
PERKIRAAN
KUANTITAS
HARGA
SATUAN
(Rp.)
TENAGA
Pekerja Biasa
Tukang Kayu
Kepala Tukang Kayu
Mandor
L17
L08
L03
L01
Org/hr
Org/hr
Org/hr
Org/hr
4.0000
12.0000
1.2000
0.2000
45,000.00
60,000.00
47,000.00
80,000.00
180,000.00
720,000.00
56,400.00
16,000.00
972,400.00
BAHAN
Balok
Besi Strip
Paku Kayu Segala Ukuran
M062
M114
M140
m3
kg
kg
1.1000
15.0000
5.6000
5,040,000.00
8,500.00
17,500.00
JUMLAH
HARGA
(Rp.)
5,544,000.00
127,500.00
98,000.00
5,769,500.00
PERALATAN
6,741,900.00
NO.
A.
1
2
3
4
: F.046
: Pasang konstruksi kuda-kuda ekspose kayu jati
: m3
KOMPONEN
SATUAN
PERKIRAAN
KUANTITAS
HARGA
SATUAN
(Rp.)
TENAGA
Pekerja Biasa
Tukang Kayu
Kepala Tukang Kayu
Mandor
L17
L08
L03
L01
Org/hr
Org/hr
Org/hr
Org/hr
6.0000
20.0000
2.0000
0.3000
45,000.00
60,000.00
47,000.00
80,000.00
270,000.00
1,200,000.00
94,000.00
24,000.00
1,588,000.00
BAHAN
Balok
Besi Strip
Paku Kayu Segala Ukuran
M096
M114
M140
m3
kg
kg
1.2000
15.0000
5.6000
JUMLAH
HARGA
(Rp.)
#REF!
8,500.00
17,500.00
#REF!
127,500.00
98,000.00
#REF!
PERALATAN
#REF!
NO.
A.
1
2
3
4
: F.047
: Pasang konstruksi kuda-kuda ekspose kayu kamper
: m3
KOMPONEN
SATUAN
PERKIRAAN
KUANTITAS
HARGA
SATUAN
(Rp.)
TENAGA
Pekerja Biasa
Tukang Kayu
Kepala Tukang Kayu
Mandor
L17
L08
L03
L01
Org/hr
Org/hr
Org/hr
Org/hr
6.0000
20.0000
2.0000
0.3000
45,000.00
60,000.00
47,000.00
80,000.00
270,000.00
1,200,000.00
94,000.00
24,000.00
1,588,000.00
BAHAN
Balok
Besi Strip
Paku Kayu Segala Ukuran
M080
M114
M140
m3
kg
kg
1.2000
15.0000
5.6000
9,000,000.00
8,500.00
17,500.00
JUMLAH
HARGA
(Rp.)
10,800,000.00
127,500.00
98,000.00
11,025,500.00
PERALATAN
12,613,500.00
NO.
A.
1
2
3
4
: F.048
: Pasang konstruksi gording kayu kamper
: m3
KOMPONEN
SATUAN
PERKIRAAN
KUANTITAS
HARGA
SATUAN
(Rp.)
TENAGA
Pekerja Biasa
Tukang Kayu
Kepala Tukang Kayu
Mandor
L17
L08
L03
L01
Org/hr
Org/hr
Org/hr
Org/hr
2.4000
7.2000
0.7200
0.1200
45,000.00
60,000.00
47,000.00
80,000.00
BAHAN
Balok
Besi Strip
Paku Kayu Segala Ukuran
M080
M114
M140
m3
kg
kg
1.1000
15.0000
3.0000
9,000,000.00
8,500.00
17,500.00
9,900,000.00
127,500.00
52,500.00
10,080,000.00
PERALATAN
108,000.00
432,000.00
33,840.00
9,600.00
583,440.00
JUMLAH
HARGA
(Rp.)
10,663,440.00
NO.
A.
1
2
3
4
: F.049
: Pasang konstruksi gording kayu meranti
: m3
KOMPONEN
SATUAN
PERKIRAAN
KUANTITAS
HARGA
SATUAN
(Rp.)
TENAGA
Pekerja Biasa
Tukang Kayu
Kepala Tukang Kayu
Mandor
L17
L08
L03
L01
Org/hr
Org/hr
Org/hr
Org/hr
2.4000
7.2000
0.7200
0.1200
45,000.00
60,000.00
47,000.00
80,000.00
108,000.00
432,000.00
33,840.00
9,600.00
583,440.00
BAHAN
Balok
Besi Strip
Paku Kayu Segala Ukuran
M062
M114
M140
m3
kg
kg
1.1000
15.0000
3.0000
5,040,000.00
8,500.00
17,500.00
JUMLAH
HARGA
(Rp.)
5,544,000.00
127,500.00
52,500.00
5,724,000.00
PERALATAN
6,307,440.00
NO.
A.
1
2
3
4
: F.050
: Pasang kaso + reng genteng biasa kayu jati
: m2
KOMPONEN
SATUAN
PERKIRAAN
KUANTITAS
HARGA
SATUAN
(Rp.)
TENAGA
Pekerja Biasa
Tukang Kayu
Kepala Tukang Kayu
Mandor
L17
L08
L03
L01
Org/hr
Org/hr
Org/hr
Org/hr
0.1000
0.1000
0.0100
0.0050
45,000.00
60,000.00
47,000.00
80,000.00
4,500.00
6,000.00
470.00
400.00
11,370.00
BAHAN
Usuk : 5/7
Paku Kayu Segala Ukuran
Reng : 2/3, 3/5
M095
M140
M094
m3
kg
m3
0.0140
0.2500
0.0360
JUMLAH
HARGA
(Rp.)
#REF!
17,500.00
#REF!
#REF!
4,375.00
#REF!
#REF!
PERALATAN
#REF!
NO.
A.
1
2
3
4
: F.105
: Pasang dinding lambriziring dari papan kamper
: m2
KOMPONEN
SATUAN
PERKIRAAN
KUANTITAS
HARGA
SATUAN
(Rp.)
TENAGA
Pekerja Biasa
Tukang Kayu
Kepala Tukang Kayu
Mandor
L17
L08
L03
L01
Org/hr
Org/hr
Org/hr
Org/hr
0.6000
1.8000
0.1800
0.0300
45,000.00
60,000.00
47,000.00
80,000.00
BAHAN
Papan (3x30) cm
Paku Kayu Segala Ukuran
Sekrup Segala Ukuran
M083
M140
M145
m3
kg
bh
0.0070
0.1000
10.0000
10,800,000.00
17,500.00
410.00
75,600.00
1,750.00
4,100.00
81,450.00
PERALATAN
27,000.00
108,000.00
8,460.00
2,400.00
145,860.00
JUMLAH
HARGA
(Rp.)
227,310.00
NO.
A.
1
2
3
4
: G.001
: Beton mutu fc'=7,4 Mpa (K100) slump (12 2) cm, w/c = 0,87
: m3
KOMPONEN
SATUAN
PERKIRAAN
KUANTITAS
HARGA
SATUAN
(Rp.)
TENAGA
Pekerja Biasa
Tukang Batu
Kepala Tukang Batu
Mandor
L17
L07
L02
L01
Org/hr
Org/hr
Org/hr
Org/hr
1.6500
0.2750
0.0280
0.0830
45,000.00
60,000.00
70,000.00
80,000.00
74,250.00
16,500.00
1,960.00
6,640.00
99,350.00
BAHAN
Portland Cement (PC)
Pasir Cor
Batu pecah mesin 2/3
Air Bersih
M037
M004
M019
M486
kg
m3
m3
ltr
247.0000
0.6207
0.7400
215.000
900.00
110,000.00
100,000.00
25.00
JUMLAH
HARGA
(Rp.)
222,300.00
68,278.57
74,000.00
5,375.00
369,953.57
PERALATAN
469,303.57
NO.
A.
1
2
3
4
: G.002
: Beton mutu fc'=9,8 Mpa (K125) slump (12 2) cm, w/c = 0,78
: m3
KOMPONEN
SATUAN
PERKIRAAN
KUANTITAS
HARGA
SATUAN
(Rp.)
TENAGA
Pekerja Biasa
Tukang Batu
Kepala Tukang Batu
Mandor
L17
L07
L02
L01
Org/hr
Org/hr
Org/hr
Org/hr
1.6500
0.2750
0.0280
0.0830
45,000.00
60,000.00
70,000.00
80,000.00
BAHAN
Portland Cement (PC)
Pasir Cor
Batu pecah mesin 2/3
Air Bersih
M037
M004
M019
M486
kg
m3
m3
ltr
276.0000
0.5914
0.7496
215.000
900.00
110,000.00
100,000.00
25.00
248,400.00
65,057.14
74,962.96
5,375.00
393,795.11
PERALATAN
74,250.00
16,500.00
1,960.00
6,640.00
99,350.00
JUMLAH
HARGA
(Rp.)
493,145.11
NO.
A.
1
2
3
4
: G.003
: Beton mutu fc'=12,2 Mpa (K150) slump (12 2) cm, w/c = 0,72
: m3
KOMPONEN
SATUAN
PERKIRAAN
KUANTITAS
HARGA
SATUAN
(Rp.)
TENAGA
Pekerja Biasa
Tukang Batu
Kepala Tukang Batu
Mandor
L17
L07
L02
L01
Org/hr
Org/hr
Org/hr
Org/hr
1.6500
0.2750
0.0280
0.0830
45,000.00
60,000.00
70,000.00
80,000.00
74,250.00
16,500.00
1,960.00
6,640.00
99,350.00
BAHAN
Portland Cement (PC)
Pasir Cor
Batu pecah mesin 2/3
Air Bersih
M037
M004
M019
M486
kg
m3
m3
ltr
299.0000
0.5707
0.7533
215.000
900.00
110,000.00
100,000.00
25.00
JUMLAH
HARGA
(Rp.)
269,100.00
62,778.57
75,333.33
5,375.00
412,586.90
PERALATAN
511,936.90
NO.
A.
1
2
3
4
: G.004
: Lantai kerja beton mutu fc'=7,4 Mpa (K100) slump (3 - 6) cm, w/c
: m3
KOMPONEN
SATUAN
PERKIRAAN
KUANTITAS
HARGA
SATUAN
(Rp.)
TENAGA
Pekerja Biasa
Tukang Batu
Kepala Tukang Batu
Mandor
L17
L07
L02
L01
Org/hr
Org/hr
Org/hr
Org/hr
1.2000
0.2000
0.0200
0.0600
45,000.00
60,000.00
70,000.00
80,000.00
BAHAN
Portland Cement (PC)
Pasir Cor
Batu pecah mesin 2/3
Air Bersih
M037
M004
M019
M486
kg
m3
m3
ltr
230.0000
0.6379
0.7607
215.000
900.00
110,000.00
100,000.00
25.00
207,000.00
70,164.29
76,074.07
5,375.00
358,613.36
PERALATAN
54,000.00
12,000.00
1,400.00
4,800.00
72,200.00
JUMLAH
HARGA
(Rp.)
430,813.36
NO.
A.
1
2
3
4
: G.005
: Beton mutu fc'=14,5 Mpa (K175) slump (12 2) cm, w/c = 0,66
: m3
KOMPONEN
SATUAN
PERKIRAAN
KUANTITAS
HARGA
SATUAN
(Rp.)
TENAGA
Pekerja Biasa
Tukang Batu
Kepala Tukang Batu
Mandor
L17
L07
L02
L01
Org/hr
Org/hr
Org/hr
Org/hr
1.6500
0.2750
0.0280
0.0830
45,000.00
60,000.00
70,000.00
80,000.00
74,250.00
16,500.00
1,960.00
6,640.00
99,350.00
BAHAN
Portland Cement (PC)
Pasir Cor
Batu pecah mesin 2/3
Air Bersih
M037
M004
M019
M486
kg
m3
m3
ltr
326.0000
0.5429
0.7622
215.000
900.00
110,000.00
100,000.00
25.00
JUMLAH
HARGA
(Rp.)
293,400.00
59,714.29
76,222.22
5,375.00
434,711.51
PERALATAN
534,061.51
NO.
A.
1
2
3
4
: G.006
: Beton mutu fc'=16,9 Mpa (K200) slump (12 2) cm, w/c = 0,61
: m3
KOMPONEN
SATUAN
PERKIRAAN
KUANTITAS
HARGA
SATUAN
(Rp.)
TENAGA
Pekerja Biasa
Tukang Batu
Kepala Tukang Batu
Mandor
L17
L07
L02
L01
Org/hr
Org/hr
Org/hr
Org/hr
1.6500
0.2750
0.0280
0.0830
45,000.00
60,000.00
70,000.00
80,000.00
BAHAN
Portland Cement (PC)
Pasir Cor
Batu pecah mesin 2/3
Air Bersih
M037
M004
M019
M486
kg
m3
m3
ltr
352.0000
0.5221
0.7637
215.000
900.00
110,000.00
100,000.00
25.00
316,800.00
57,435.71
76,370.37
5,375.00
455,981.08
PERALATAN
74,250.00
16,500.00
1,960.00
6,640.00
99,350.00
JUMLAH
HARGA
(Rp.)
555,331.08
NO.
A.
1
2
3
4
: G.007
: Beton mutu fc'=19,3 Mpa (K225) slump (12 2) cm, w/c = 0,58
: m3
KOMPONEN
SATUAN
PERKIRAAN
KUANTITAS
HARGA
SATUAN
(Rp.)
TENAGA
Pekerja Biasa
Tukang Batu
Kepala Tukang Batu
Mandor
L17
L07
L02
L01
Org/hr
Org/hr
Org/hr
Org/hr
1.6500
0.2750
0.0280
0.0830
45,000.00
60,000.00
70,000.00
80,000.00
74,250.00
16,500.00
1,960.00
6,640.00
99,350.00
BAHAN
Portland Cement (PC)
Pasir Cor
Batu pecah mesin 2/3
Air Bersih
M037
M004
M019
M486
kg
m3
m3
ltr
371.0000
0.4986
0.7756
215.000
900.00
110,000.00
100,000.00
25.00
JUMLAH
HARGA
(Rp.)
333,900.00
54,842.86
77,555.56
5,375.00
471,673.41
PERALATAN
571,023.41
NO.
A.
1
2
3
4
: G.008
: Beton mutu fc'=24,0 Mpa (K275) slump (12 2) cm, w/c = 0,53
: m3
KOMPONEN
SATUAN
PERKIRAAN
KUANTITAS
HARGA
SATUAN
(Rp.)
TENAGA
Pekerja Biasa
Tukang Batu
Kepala Tukang Batu
Mandor
L17
L07
L02
L01
Org/hr
Org/hr
Org/hr
Org/hr
1.6500
0.2750
0.0280
0.0830
45,000.00
60,000.00
70,000.00
80,000.00
BAHAN
Portland Cement (PC)
Pasir Cor
Batu pecah mesin 2/3
Air Bersih
M037
M004
M019
M486
kg
m3
m3
ltr
406.0000
0.4886
0.7600
215.000
900.00
110,000.00
100,000.00
25.00
365,400.00
53,742.86
76,000.00
5,375.00
500,517.86
PERALATAN
74,250.00
16,500.00
1,960.00
6,640.00
99,350.00
JUMLAH
HARGA
(Rp.)
599,867.86
NO.
A.
1
2
3
4
: G.009
: Beton mutu fc'=21,7 Mpa (K250) slump (12 2) cm, w/c = 0,56
: m3
KOMPONEN
SATUAN
PERKIRAAN
KUANTITAS
HARGA
SATUAN
(Rp.)
TENAGA
Pekerja Biasa
Tukang Batu
Kepala Tukang Batu
Mandor
L17
L07
L02
L01
Org/hr
Org/hr
Org/hr
Org/hr
1.6500
0.2750
0.0280
0.0830
45,000.00
60,000.00
70,000.00
80,000.00
74,250.00
16,500.00
1,960.00
6,640.00
99,350.00
BAHAN
Portland Cement (PC)
Pasir Cor
Batu pecah mesin 2/3
Air Bersih
M037
M004
M019
M486
kg
m3
m3
ltr
384.0000
0.4943
0.7696
215.000
900.00
110,000.00
100,000.00
25.00
JUMLAH
HARGA
(Rp.)
345,600.00
54,371.43
76,962.96
5,375.00
482,309.39
PERALATAN
581,659.39
NO.
A.
1
2
3
4
: G.010
: Beton mutu fc'=26,4 Mpa (K300) slump (12 2) cm, w/c = 0,52
: m3
KOMPONEN
SATUAN
PERKIRAAN
KUANTITAS
HARGA
SATUAN
(Rp.)
TENAGA
Pekerja Biasa
Tukang Batu
Kepala Tukang Batu
Mandor
L17
L07
L02
L01
Org/hr
Org/hr
Org/hr
Org/hr
1.6500
0.2750
0.0280
0.0830
45,000.00
60,000.00
70,000.00
80,000.00
BAHAN
Portland Cement (PC)
Pasir Cor
Batu pecah mesin 2/3
Air Bersih
M037
M004
M019
M486
kg
m3
m3
ltr
413.0000
0.4864
0.7563
215.000
900.00
110,000.00
100,000.00
25.00
371,700.00
53,507.14
75,629.63
5,375.00
506,211.77
PERALATAN
74,250.00
16,500.00
1,960.00
6,640.00
99,350.00
JUMLAH
HARGA
(Rp.)
605,561.77
NO.
A.
1
2
3
4
: G.011
: Beton mutu fc'=28,8 Mpa (K325) slump (12 2) cm, w/c = 0,49
: m3
KOMPONEN
SATUAN
PERKIRAAN
KUANTITAS
HARGA
SATUAN
(Rp.)
TENAGA
Pekerja Biasa
Tukang Batu
Kepala Tukang Batu
Mandor
L17
L07
L02
L01
Org/hr
Org/hr
Org/hr
Org/hr
2.1000
0.3500
0.0350
0.1050
45,000.00
60,000.00
70,000.00
80,000.00
94,500.00
21,000.00
2,450.00
8,400.00
126,350.00
BAHAN
Portland Cement (PC)
Pasir Cor
Batu pecah mesin 2/3
Air Bersih
M037
M004
M019
M486
kg
m3
m3
ltr
439.0000
0.4786
0.7452
215.000
900.00
110,000.00
100,000.00
25.00
JUMLAH
HARGA
(Rp.)
395,100.00
52,642.86
74,518.52
5,375.00
527,636.38
PERALATAN
653,986.38
NO.
A.
1
2
3
4
: G.012
: Beton mutu fc'=31,2 Mpa (K350) slump (12 2) cm, w/c = 0,48
: m3
KOMPONEN
SATUAN
PERKIRAAN
KUANTITAS
HARGA
SATUAN
(Rp.)
TENAGA
Pekerja Biasa
Tukang Batu
Kepala Tukang Batu
Mandor
L17
L07
L02
L01
Org/hr
Org/hr
Org/hr
Org/hr
2.1000
0.3500
0.0350
0.1050
45,000.00
60,000.00
70,000.00
80,000.00
BAHAN
Portland Cement (PC)
Pasir Cor
Batu pecah mesin 2/3
Air Bersih
M037
M004
M019
M486
kg
m3
m3
ltr
448.0000
0.4764
0.7407
215.000
900.00
110,000.00
100,000.00
25.00
403,200.00
52,407.14
74,074.07
5,375.00
535,056.22
PERALATAN
94,500.00
21,000.00
2,450.00
8,400.00
126,350.00
JUMLAH
HARGA
(Rp.)
661,406.22
NO.
A.
1
2
3
4
: G.013
: Beton kedap air dengan strorox - 100
: m3
KOMPONEN
SATUAN
PERKIRAAN
KUANTITAS
HARGA
SATUAN
(Rp.)
TENAGA
Pekerja Biasa
Tukang Batu
Kepala Tukang Batu
Mandor
L17
L07
L02
L01
Org/hr
Org/hr
Org/hr
Org/hr
2.1000
0.3500
0.0350
0.1050
45,000.00
60,000.00
70,000.00
80,000.00
94,500.00
21,000.00
2,450.00
8,400.00
126,350.00
BAHAN
Portland Cement (PC)
Pasir Cor
Batu pecah mesin 2/3
Strorox 100
M037
M004
M019
M476
kg
m3
m3
kg
400.0000
0.4800
0.8000
1.2000
900.00
110,000.00
100,000.00
69,950.00
JUMLAH
HARGA
(Rp.)
360,000.00
52,800.00
80,000.00
83,940.00
576,740.00
PERALATAN
703,090.00
NO.
A.
1
2
3
4
: G.014
: Pasang PVC Waterstop lebar 150 mm
: m1
KOMPONEN
SATUAN
PERKIRAAN
KUANTITAS
HARGA
SATUAN
(Rp.)
TENAGA
Pekerja Biasa
Tukang Batu
Kepala Tukang Batu
Mandor
L17
L07
L02
L01
Org/hr
Org/hr
Org/hr
Org/hr
0.0600
0.0300
0.0030
0.0030
45,000.00
60,000.00
70,000.00
80,000.00
BAHAN
Waterstop Lebar 150 mm
M467
m'
1.0500
26,900.00
28,245.00
28,245.00
PERALATAN
2,700.00
1,800.00
210.00
240.00
4,950.00
JUMLAH
HARGA
(Rp.)
33,195.00
NO.
A.
1
2
3
4
: G.015
: Pasang PVC Waterstop lebar 200 mm
: m1
KOMPONEN
SATUAN
PERKIRAAN
KUANTITAS
HARGA
SATUAN
(Rp.)
TENAGA
Pekerja Biasa
Tukang Batu
Kepala Tukang Batu
Mandor
L17
L07
L02
L01
Org/hr
Org/hr
Org/hr
Org/hr
0.0700
0.0350
0.0040
0.0070
45,000.00
60,000.00
70,000.00
80,000.00
3,150.00
2,100.00
280.00
560.00
6,090.00
BAHAN
Waterstop Lebar 200 mm
M468
m'
1.0500
48,430.00
JUMLAH
HARGA
(Rp.)
50,851.50
50,851.50
PERALATAN
56,941.50
NO.
A.
1
2
3
4
: G.016
: Pasang PVC Waterstop lebar 230 mm - 320 mm
: m1
KOMPONEN
SATUAN
PERKIRAAN
KUANTITAS
HARGA
SATUAN
(Rp.)
TENAGA
Pekerja Biasa
Tukang Batu
Kepala Tukang Batu
Mandor
L17
L07
L02
L01
Org/hr
Org/hr
Org/hr
Org/hr
0.0800
0.0400
0.0040
0.0040
45,000.00
60,000.00
70,000.00
80,000.00
BAHAN
Waterstop Lebar 230 mm
M469
m'
1.0500
56,500.00
59,325.00
59,325.00
PERALATAN
3,600.00
2,400.00
280.00
320.00
6,600.00
JUMLAH
HARGA
(Rp.)
65,925.00
NO.
A.
1
2
3
4
: G.017
: Pembesian dengan besi polos
: kg
KOMPONEN
SATUAN
PERKIRAAN
KUANTITAS
HARGA
SATUAN
(Rp.)
TENAGA
Pekerja Biasa
Tukang Batu
Kepala Tukang Batu
Mandor
L17
L07
L02
L01
Org/hr
Org/hr
Org/hr
Org/hr
0.0070
0.0070
0.0007
0.0004
45,000.00
60,000.00
70,000.00
80,000.00
315.00
420.00
49.00
32.00
816.00
BAHAN
Besi Beton Polos
Kawat Beton/Bendrat RRT
M112
M135
kg
kg
1.0500
0.0150
8,500.00
7,500.00
JUMLAH
HARGA
(Rp.)
8,925.00
112.50
9,037.50
PERALATAN
9,853.50
NO.
A.
1
2
3
4
: G.018
: Pembesian dengan besi ulir
: kg
KOMPONEN
SATUAN
PERKIRAAN
KUANTITAS
HARGA
SATUAN
(Rp.)
TENAGA
Pekerja Biasa
Tukang Batu
Kepala Tukang Batu
Mandor
L17
L07
L02
L01
Org/hr
Org/hr
Org/hr
Org/hr
0.0070
0.0070
0.0007
0.0004
45,000.00
60,000.00
70,000.00
80,000.00
BAHAN
Besi Beton Ulir
Kawat Beton/Bendrat RRT
M113
M135
kg
kg
1.0500
0.0150
17,085.00
7,500.00
17,939.25
112.50
18,051.75
PERALATAN
315.00
420.00
49.00
32.00
816.00
JUMLAH
HARGA
(Rp.)
18,867.75
NO.
A.
1
2
3
4
: G.019
: Kabel prestressed polos/strands
: kg
KOMPONEN
SATUAN
PERKIRAAN
KUANTITAS
HARGA
SATUAN
(Rp.)
TENAGA
Pekerja Biasa
Tukang Besi/Baja
Kepala Tukang Batu
Mandor
L17
L09
L02
L01
Org/hr
Org/hr
Org/hr
Org/hr
0.0050
0.0050
0.0005
0.0003
45,000.00
60,000.00
70,000.00
80,000.00
225.00
300.00
35.00
24.00
584.00
BAHAN
Kabel prestressed
Kawat Beton/Bendrat RRT
M118
M135
kg
kg
1.0500
0.0100
26,000.00
7,500.00
JUMLAH
HARGA
(Rp.)
27,300.00
75.00
27,375.00
PERALATAN
27,959.00
NO.
A.
1
2
3
4
: G.020
: Memasang 1 kg jaring kawat baja / wire mesh
: kg
KOMPONEN
SATUAN
PERKIRAAN
KUANTITAS
HARGA
SATUAN
(Rp.)
TENAGA
Pekerja Biasa
Tukang Besi/Baja
Kepala Tukang Batu
Mandor
L17
L09
L02
L01
Org/hr
Org/hr
Org/hr
Org/hr
0.0025
0.0025
0.0025
0.0001
45,000.00
60,000.00
70,000.00
80,000.00
BAHAN
Wire Mesh
Kawat Beton/Bendrat RRT
M148.a
M135
kg
kg
1.0200
0.0050
15,000.00
7,500.00
15,300.00
37.50
15,337.50
PERALATAN
112.50
150.00
175.00
8.00
445.50
JUMLAH
HARGA
(Rp.)
15,783.00
NO.
A.
1
2
3
4
: G.021
: Pasang bekisting untuk pondasi
: m2
KOMPONEN
SATUAN
PERKIRAAN
KUANTITAS
HARGA
SATUAN
(Rp.)
TENAGA
Pekerja Biasa
Tukang Kayu
Kepala Tukang Kayu
Mandor
L17
L08
L03
L01
Org/hr
Org/hr
Org/hr
Org/hr
0.5200
0.2600
0.0260
0.0260
45,000.00
60,000.00
47,000.00
80,000.00
23,400.00
15,600.00
1,222.00
2,080.00
42,302.00
BAHAN
Papan Kayu kelas III
Paku Kayu Segala Ukuran
Minyak bekisting
M085
M140
M474
m3
kg
ltr
0.0400
0.3000
0.1000
1,100,000.00
17,500.00
2,690.00
JUMLAH
HARGA
(Rp.)
44,000.000
5,250.000
269.000
49,519.00
PERALATAN
91,821.00
NO.
A.
1
2
3
4
: G.022
: Pasang bekisting untuk sloof
: m2
KOMPONEN
SATUAN
PERKIRAAN
KUANTITAS
HARGA
SATUAN
(Rp.)
TENAGA
Pekerja Biasa
Tukang Kayu
Kepala Tukang Kayu
Mandor
L17
L08
L03
L01
Org/hr
Org/hr
Org/hr
Org/hr
0.5200
0.2600
0.0260
0.0260
45,000.00
60,000.00
47,000.00
80,000.00
BAHAN
Papan Kayu kelas III
Paku Kayu Segala Ukuran
Minyak bekisting
M085
M140
M474
m3
kg
ltr
0.0450
0.3000
0.1000
1,100,000.00
17,500.00
2,690.00
49,500.00
5,250.00
269.00
55,019.00
PERALATAN
23,400.00
15,600.00
1,222.00
2,080.00
42,302.00
JUMLAH
HARGA
(Rp.)
97,321.00
NO.
A.
1
2
3
4
: G.023
: Pasang bekisting untuk kolom
: m2
KOMPONEN
SATUAN
PERKIRAAN
KUANTITAS
HARGA
SATUAN
(Rp.)
TENAGA
Pekerja Biasa
Tukang Kayu
Kepala Tukang Kayu
Mandor
L17
L08
L03
L01
Org/hr
Org/hr
Org/hr
Org/hr
0.6600
0.3300
0.0330
0.0330
45,000.00
60,000.00
47,000.00
80,000.00
29,700.00
19,800.00
1,551.00
2,640.00
53,691.00
BAHAN
Papan Kayu kelas III
Paku Kayu Segala Ukuran
Minyak bekisting
Balok Kayu Kelas III
Multiplek 9 mm
Dolken Kayu Dia 8 cm
M085
M140
M474
M084
M217
M089
m3
kg
ltr
m3
m2
btg
0.0400
0.4000
0.2000
0.0150
0.3500
2.0000
1,100,000.00
17,500.00
2,690.00
3,000,000.00
117,260.00
25,000.00
JUMLAH
HARGA
(Rp.)
44,000.00
7,000.00
538.00
45,000.00
41,041.00
50,000.00
187,579.00
PERALATAN
241,270.00
NO.
A.
1
2
3
4
: G.024
: Pasang bekisting untuk balok
: m2
KOMPONEN
SATUAN
PERKIRAAN
KUANTITAS
HARGA
SATUAN
(Rp.)
TENAGA
Pekerja Biasa
Tukang Kayu
Kepala Tukang Kayu
Mandor
L17
L08
L03
L01
Org/hr
Org/hr
Org/hr
Org/hr
0.6600
0.3300
0.0330
0.0330
45,000.00
60,000.00
47,000.00
80,000.00
BAHAN
Papan Kayu kelas III
Paku Kayu Segala Ukuran
Minyak bekisting
Balok Kayu Kelas III
Multiplek 9 mm
Dolken Kayu Dia 8 cm
M085
M140
M474
M084
M217
M089
m3
kg
ltr
m3
m2
btg
0.0400
0.4000
0.2000
0.0180
0.3500
2.0000
1,100,000.00
17,500.00
2,690.00
3,000,000.00
117,260.00
25,000.00
44,000.00
7,000.00
538.00
54,000.00
41,041.00
50,000.00
196,579.00
PERALATAN
29,700.00
19,800.00
1,551.00
2,640.00
53,691.00
JUMLAH
HARGA
(Rp.)
250,270.00
NO.
A.
1
2
3
4
: G.025
: Pasang bekisting untuk plat lantai
: m2
KOMPONEN
SATUAN
PERKIRAAN
KUANTITAS
HARGA
SATUAN
(Rp.)
TENAGA
Pekerja Biasa
Tukang Kayu
Kepala Tukang Kayu
Mandor
L17
L08
L03
L01
Org/hr
Org/hr
Org/hr
Org/hr
0.6600
0.3300
0.0330
0.0330
45,000.00
60,000.00
47,000.00
80,000.00
29,700.00
19,800.00
1,551.00
2,640.00
53,691.00
BAHAN
Papan Kayu kelas III
Paku Kayu Segala Ukuran
Minyak bekisting
Balok Kayu Kelas III
Multiplek 9 mm
Dolken Kayu Dia 8 cm
M085
M140
M474
M084
M217
M089
m3
kg
ltr
m3
m2
btg
0.0400
0.4000
0.2000
0.0150
0.3500
6.0000
1,100,000.00
17,500.00
2,690.00
3,000,000.00
117,260.00
25,000.00
JUMLAH
HARGA
(Rp.)
44,000.00
7,000.00
538.00
45,000.00
41,041.00
150,000.00
287,579.00
PERALATAN
341,270.00
NO.
A.
1
2
3
4
: G.026
: Pasang bekisting untuk dinding
: m2
KOMPONEN
SATUAN
PERKIRAAN
KUANTITAS
HARGA
SATUAN
(Rp.)
TENAGA
Pekerja Biasa
Tukang Kayu
Kepala Tukang Kayu
Mandor
L17
L08
L03
L01
Org/hr
Org/hr
Org/hr
Org/hr
0.6600
0.3300
0.0330
0.0330
45,000.00
60,000.00
47,000.00
80,000.00
BAHAN
Papan Kayu kelas III
Paku Kayu Segala Ukuran
Minyak bekisting
Balok Kayu Kelas III
Multiplek 9 mm
Dolken Kayu Dia 8 cm
Formtie
M085
M140
M474
M084
M217
M089
M477
m3
kg
ltr
m3
m2
btg
bh
0.0300
0.4000
0.2000
0.0200
0.3500
3.0000
4.0000
1,100,000.00
17,500.00
2,690.00
3,000,000.00
117,260.00
25,000.00
5,910.00
33,000.00
7,000.00
538.00
60,000.00
41,041.00
75,000.00
23,640.00
240,219.00
PERALATAN
29,700.00
19,800.00
1,551.00
2,640.00
53,691.00
JUMLAH
HARGA
(Rp.)
293,910.00
NO.
A.
1
2
3
4
: G.027
: Pasang bekisting untuk tangga
: m2
KOMPONEN
SATUAN
PERKIRAAN
KUANTITAS
HARGA
SATUAN
(Rp.)
TENAGA
Pekerja Biasa
Tukang Kayu
Kepala Tukang Kayu
Mandor
L17
L08
L03
L01
Org/hr
Org/hr
Org/hr
Org/hr
0.6600
0.3300
0.0330
0.0330
45,000.00
60,000.00
47,000.00
80,000.00
29,700.00
19,800.00
1,551.00
2,640.00
53,691.00
BAHAN
Papan Kayu kelas III
Paku Kayu Segala Ukuran
Minyak bekisting
Balok Kayu Kelas III
Multiplek 9 mm
Dolken Kayu Dia 8 cm
M085
M140
M474
M084
M217
M089
m3
kg
ltr
m3
m2
btg
0.0300
0.4000
0.1500
0.0150
0.3500
2.0000
1,100,000.00
17,500.00
2,690.00
3,000,000.00
117,260.00
25,000.00
JUMLAH
HARGA
(Rp.)
33,000.00
7,000.00
403.50
45,000.00
41,041.00
50,000.00
176,444.50
PERALATAN
230,135.50
NO.
A.
1
2
3
4
: G.028
: Pasang jembatan untuk pengecoran
: m2
KOMPONEN
SATUAN
PERKIRAAN
KUANTITAS
HARGA
SATUAN
(Rp.)
TENAGA
Pekerja Biasa
Tukang Batu
Kepala Tukang Batu
Mandor
L17
L07
L02
L01
Org/hr
Org/hr
Org/hr
Org/hr
0.1500
0.0500
0.0050
0.0080
45,000.00
60,000.00
70,000.00
80,000.00
BAHAN
Balok Kayu Kelas III
Paku Kayu Segala Ukuran
Dolken Kayu Dia 8 cm
M084
M140
M089
m3
kg
btg
0.0264
0.6000
0.5000
3,000,000.00
17,500.00
25,000.00
79,200.00
10,500.00
12,500.00
102,200.00
PERALATAN
6,750.00
3,000.00
350.00
640.00
10,740.00
JUMLAH
HARGA
(Rp.)
112,940.00
NO.
A.
1
2
3
4
5
6
: G.029
: Pondasi beton bertulang (150 kg besi + bekisting)
: m3
KOMPONEN
SATUAN
PERKIRAAN
KUANTITAS
HARGA
SATUAN
(Rp.)
TENAGA
Pekerja Biasa
Tukang Batu
Tukang Kayu
Tukang Besi/Baja
Kepala Tukang Batu
Mandor
L17
L07
L08
L09
L02
L01
Org/hr
Org/hr
Org/hr
Org/hr
Org/hr
Org/hr
5.3000
0.2750
1.3000
1.0500
0.2620
0.2650
45,000.00
60,000.00
60,000.00
60,000.00
70,000.00
80,000.00
BAHAN
Balok Kayu Kelas III
Paku Kayu Segala Ukuran
Minyak bekisting
Besi Beton Polos
Kawat Beton/Bendrat RRT
Portland Cement (PC)
Pasir Cor
Batu pecah mesin 2/3
M084
M140
M474
M112
M135
M037
M004
M019
m3
kg
ltr
kg
kg
kg
m3
m3
0.2000
1.5000
0.4000
157.5000
2.2500
336.0000
0.5400
0.8100
3,000,000.00
17,500.00
2,690.00
8,500.00
7,500.00
900.00
110,000.00
100,000.00
600,000.00
26,250.00
1,076.00
1,338,750.00
16,875.00
302,400.00
59,400.00
81,000.00
2,425,751.00
PERALATAN
238,500.00
16,500.00
78,000.00
63,000.00
18,340.00
21,200.00
435,540.00
JUMLAH
HARGA
(Rp.)
2,861,291.00
NO.
A.
1
2
3
4
5
6
: G.030
: Sloof beton bertulang (200 kg besi + bekisting)
: m3
KOMPONEN
SATUAN
PERKIRAAN
KUANTITAS
HARGA
SATUAN
(Rp.)
TENAGA
Pekerja Biasa
Tukang Batu
Tukang Kayu
Tukang Besi/Baja
Kepala Tukang Batu
Mandor
L17
L07
L08
L09
L02
L01
Org/hr
Org/hr
Org/hr
Org/hr
Org/hr
Org/hr
5.6500
0.2750
1.5600
1.4000
0.3230
0.2830
45,000.00
60,000.00
60,000.00
60,000.00
70,000.00
80,000.00
BAHAN
Papan Kayu kelas III
Paku Kayu Segala Ukuran
Minyak bekisting
Besi Beton Polos
Kawat Beton/Bendrat RRT
Portland Cement (PC)
Pasir Cor
Batu pecah mesin 2/3
M085
M140
M474
M112
M135
M037
M004
M019
m3
kg
ltr
kg
kg
kg
m3
m3
0.2700
2.0000
0.6000
210.0000
3.0000
336.0000
0.5400
0.8100
1,100,000.00
17,500.00
2,690.00
8,500.00
7,500.00
900.00
110,000.00
100,000.00
297,000.00
35,000.00
1,614.00
1,785,000.00
22,500.00
302,400.00
59,400.00
81,000.00
2,583,914.00
PERALATAN
254,250.00
16,500.00
93,600.00
84,000.00
22,610.00
22,640.00
493,600.00
JUMLAH
HARGA
(Rp.)
3,077,514.00
NO.
A.
1
2
3
4
5
6
: G.031
: Kolom beton bertulang (150 kg besi + bekisting)
: m3
KOMPONEN
SATUAN
PERKIRAAN
KUANTITAS
HARGA
SATUAN
(Rp.)
TENAGA
Pekerja Biasa
Tukang Batu
Tukang Kayu
Tukang Besi/Baja
Kepala Tukang Batu
Mandor
L17
L07
L08
L09
L02
L01
Org/hr
Org/hr
Org/hr
Org/hr
Org/hr
Org/hr
5.3000
0.2750
1.3000
1.0500
0.2650
0.2650
45,000.00
60,000.00
60,000.00
60,000.00
70,000.00
80,000.00
BAHAN
Papan Kayu kelas III
Paku Kayu Segala Ukuran
Minyak bekisting
Besi Beton Polos
Kawat Beton/Bendrat RRT
Portland Cement (PC)
Pasir Cor
Batu pecah mesin 2/3
Balok Kayu Kelas III
Multiplek 9 mm
Dolken Kayu Dia 8 cm
M085
M140
M474
M112
M135
M037
M004
M019
M084
M217
M089
m3
kg
ltr
kg
kg
kg
m3
m3
m3
m2
btg
0.3200
3.2000
1.6000
157.5000
2.2500
336.0000
0.5400
0.8100
0.1200
2.8000
32.0000
1,100,000.00
17,500.00
2,690.00
8,500.00
7,500.00
900.00
110,000.00
100,000.00
3,000,000.00
117,260.00
25,000.00
352,000.00
56,000.00
4,304.00
1,338,750.00
16,875.00
302,400.00
59,400.00
81,000.00
360,000.00
328,328.00
800,000.00
3,699,057.00
PERALATAN
238,500.00
16,500.00
78,000.00
63,000.00
18,550.00
21,200.00
435,750.00
JUMLAH
HARGA
(Rp.)
4,134,807.00
NO.
A.
1
2
3
4
5
6
: G.032
: Kolom beton bertulang (300 kg besi + bekisting)
: m3
KOMPONEN
SATUAN
PERKIRAAN
KUANTITAS
HARGA
SATUAN
(Rp.)
TENAGA
Pekerja Biasa
Tukang Batu
Tukang Kayu
Tukang Besi/Baja
Kepala Tukang Batu
Mandor
L17
L07
L08
L09
L02
L01
Org/hr
Org/hr
Org/hr
Org/hr
Org/hr
Org/hr
7.0500
0.2750
1.6500
2.1000
0.4030
0.3530
45,000.00
60,000.00
60,000.00
60,000.00
70,000.00
80,000.00
BAHAN
Papan Kayu kelas III
Paku Kayu Segala Ukuran
Minyak bekisting
Besi Beton Polos
Kawat Beton/Bendrat RRT
Portland Cement (PC)
Pasir Cor
Batu pecah mesin 2/3
Balok Kayu Kelas III
Multiplek 9 mm
Dolken Kayu Dia 8 cm
M085
M140
M474
M112
M135
M037
M004
M019
M084
M217
M089
m3
kg
ltr
kg
kg
kg
m3
m3
m3
m2
btg
0.4000
4.0000
2.0000
315.0000
4.5000
336.0000
0.5400
0.8100
0.1500
3.5000
20.0000
1,100,000.00
17,500.00
2,690.00
8,500.00
7,500.00
900.00
110,000.00
100,000.00
3,000,000.00
117,260.00
25,000.00
440,000.00
70,000.00
5,380.00
2,677,500.00
33,750.00
302,400.00
59,400.00
81,000.00
450,000.00
410,410.00
500,000.00
5,029,840.00
PERALATAN
317,250.00
16,500.00
99,000.00
126,000.00
28,210.00
28,240.00
615,200.00
JUMLAH
HARGA
(Rp.)
5,645,040.00
NO.
A.
1
2
3
4
5
6
: G.033
: Balok beton bertulang (200 kg besi + bekisting)
: m3
KOMPONEN
SATUAN
PERKIRAAN
KUANTITAS
HARGA
SATUAN
(Rp.)
TENAGA
Pekerja Biasa
Tukang Batu
Tukang Kayu
Tukang Besi/Baja
Kepala Tukang Batu
Mandor
L17
L07
L08
L09
L02
L01
Org/hr
Org/hr
Org/hr
Org/hr
Org/hr
Org/hr
6.3500
0.2750
1.6500
1.4000
0.3330
0.3180
45,000.00
60,000.00
60,000.00
60,000.00
70,000.00
80,000.00
BAHAN
Papan Kayu kelas III
Paku Kayu Segala Ukuran
Minyak bekisting
Besi Beton Polos
Kawat Beton/Bendrat RRT
Portland Cement (PC)
Pasir Cor
Batu pecah mesin 2/3
Balok Kayu Kelas III
Multiplek 9 mm
Dolken Kayu Dia 8 cm
M085
M140
M474
M112
M135
M037
M004
M019
M084
M217
M089
m3
kg
ltr
kg
kg
kg
m3
m3
m3
m2
btg
0.3200
3.2000
1.6000
210.0000
3.0000
336.0000
0.5400
0.8100
0.1400
2.8000
16.0000
1,100,000.00
17,500.00
2,690.00
8,500.00
7,500.00
900.00
110,000.00
100,000.00
3,000,000.00
117,260.00
25,000.00
352,000.00
56,000.00
4,304.00
1,785,000.00
22,500.00
302,400.00
59,400.00
81,000.00
420,000.00
328,328.00
400,000.00
3,810,932.00
PERALATAN
285,750.00
16,500.00
99,000.00
84,000.00
23,310.00
25,440.00
534,000.00
JUMLAH
HARGA
(Rp.)
4,344,932.00
NO.
A.
1
2
3
4
5
6
: G.034
: Dinding beton bertulang (150 kg besi + bekisting)
: m3
KOMPONEN
SATUAN
PERKIRAAN
KUANTITAS
HARGA
SATUAN
(Rp.)
TENAGA
Pekerja Biasa
Tukang Batu
Tukang Kayu
Tukang Besi/Baja
Kepala Tukang Batu
Mandor
L17
L07
L08
L09
L02
L01
Org/hr
Org/hr
Org/hr
Org/hr
Org/hr
Org/hr
5.3000
0.2750
1.3000
1.0500
0.2620
0.2650
45,000.00
60,000.00
60,000.00
60,000.00
70,000.00
80,000.00
BAHAN
Papan Kayu kelas III
Paku Kayu Segala Ukuran
Minyak bekisting
Besi Beton Polos
Kawat Beton/Bendrat RRT
Portland Cement (PC)
Pasir Cor
Batu pecah mesin 2/3
Balok Kayu Kelas III
Multiplek 9 mm
Dolken Kayu Dia 8 cm
M085
M140
M474
M112
M135
M037
M004
M019
M084
M217
M089
m3
kg
ltr
kg
kg
kg
m3
m3
m3
m2
btg
0.2400
3.2000
1.6000
157.5000
2.2500
336.0000
0.5400
0.8100
0.1600
2.8000
24.0000
1,100,000.00
17,500.00
2,690.00
8,500.00
7,500.00
900.00
110,000.00
100,000.00
3,000,000.00
117,260.00
25,000.00
264,000.00
56,000.00
4,304.00
1,338,750.00
16,875.00
302,400.00
59,400.00
81,000.00
480,000.00
328,328.00
600,000.00
3,531,057.00
PERALATAN
238,500.00
16,500.00
78,000.00
63,000.00
18,340.00
21,200.00
435,540.00
JUMLAH
HARGA
(Rp.)
3,966,597.00
NO.
A.
1
2
3
4
5
6
: G.035
: Dinding beton bertulang (200 kg besi + bekisting)
: m3
KOMPONEN
SATUAN
PERKIRAAN
KUANTITAS
HARGA
SATUAN
(Rp.)
TENAGA
Pekerja Biasa
Tukang Batu
Tukang Kayu
Tukang Besi/Baja
Kepala Tukang Batu
Mandor
L17
L07
L08
L09
L02
L01
Org/hr
Org/hr
Org/hr
Org/hr
Org/hr
Org/hr
5.6500
0.2750
1.5600
1.4000
0.3230
0.2830
45,000.00
60,000.00
60,000.00
60,000.00
70,000.00
80,000.00
BAHAN
Papan Kayu kelas III
Paku Kayu Segala Ukuran
Minyak bekisting
Besi Beton Polos
Kawat Beton/Bendrat RRT
Portland Cement (PC)
Pasir Cor
Batu pecah mesin 2/3
Balok Kayu Kelas III
Multiplek 9 mm
Dolken Kayu Dia 8 cm
M085
M140
M474
M112
M135
M037
M004
M019
M084
M217
M089
m3
kg
ltr
kg
kg
kg
m3
m3
m3
m2
btg
0.2500
3.0000
1.2000
210.0000
3.0000
336.0000
0.5400
0.8100
0.1600
2.5000
14.0000
1,100,000.00
17,500.00
2,690.00
8,500.00
7,500.00
900.00
110,000.00
100,000.00
3,000,000.00
117,260.00
25,000.00
275,000.00
52,500.00
3,228.00
1,785,000.00
22,500.00
302,400.00
59,400.00
81,000.00
480,000.00
293,150.00
350,000.00
3,704,178.00
PERALATAN
254,250.00
16,500.00
93,600.00
84,000.00
22,610.00
22,640.00
493,600.00
JUMLAH
HARGA
(Rp.)
4,197,778.00
NO.
A.
1
2
3
4
5
6
: G.036
: Kolom penguat beton bertulang (11 x 11) cm
: m1
KOMPONEN
SATUAN
PERKIRAAN
KUANTITAS
HARGA
SATUAN
(Rp.)
TENAGA
Pekerja Biasa
Tukang Batu
Tukang Kayu
Tukang Besi/Baja
Kepala Tukang Batu
Mandor
L17
L07
L08
L09
L02
L01
Org/hr
Org/hr
Org/hr
Org/hr
Org/hr
Org/hr
0.1800
0.0200
0.0200
0.0200
0.0060
0.0090
45,000.00
60,000.00
60,000.00
60,000.00
70,000.00
80,000.00
BAHAN
Papan Kayu kelas III
Paku Kayu Segala Ukuran
Besi Beton Polos
Kawat Beton/Bendrat RRT
Portland Cement (PC)
Pasir Cor
Batu pecah mesin 2/3
M085
M140
M112
M135
M037
M004
M019
m3
kg
kg
kg
kg
m3
m3
0.0020
0.0100
3.0000
0.4500
4.0000
0.0060
0.0090
1,100,000.00
17,500.00
8,500.00
7,500.00
900.00
110,000.00
100,000.00
2,200.00
175.00
25,500.00
3,375.00
3,600.00
660.00
900.00
36,410.00
PERALATAN
8,100.00
1,200.00
1,200.00
1,200.00
420.00
720.00
12,840.00
JUMLAH
HARGA
(Rp.)
49,250.00
NO.
A.
1
2
3
4
5
6
: G.037
: Ring balok beton bertulang (10 x 15) cm
: m1
KOMPONEN
SATUAN
PERKIRAAN
KUANTITAS
HARGA
SATUAN
(Rp.)
TENAGA
Pekerja Biasa
Tukang Batu
Tukang Kayu
Tukang Besi/Baja
Kepala Tukang Batu
Mandor
L17
L07
L08
L09
L02
L01
Org/hr
Org/hr
Org/hr
Org/hr
Org/hr
Org/hr
0.297
0.033
0.033
0.033
0.010
0.015
45,000.00
60,000.00
60,000.00
60,000.00
70,000.00
80,000.00
BAHAN
Papan Kayu kelas III
Paku Kayu Segala Ukuran
Besi Beton Polos
Kawat Beton/Bendrat RRT
Portland Cement (PC)
Pasir Cor
Batu pecah mesin 2/3
M085
M140
M112
M135
M037
M004
M019
m3
kg
kg
kg
kg
m3
m3
0.0030
0.0200
3.6000
0.0500
5.5000
0.0090
0.0150
1,100,000.00
17,500.00
8,500.00
7,500.00
900.00
110,000.00
100,000.00
3,300.00
350.00
30,600.00
375.00
4,950.00
990.00
1,500.00
42,065.00
PERALATAN
13,365.00
1,980.00
1,980.00
1,980.00
700.00
1,200.00
21,205.00
JUMLAH
HARGA
(Rp.)
63,270.00
NO.
A.
1
2
3
4
5
6
: G.038
: Sloof beton bertulang (10 x 15) cm
: m1
KOMPONEN
SATUAN
PERKIRAAN
KUANTITAS
HARGA
SATUAN
(Rp.)
TENAGA
Pekerja Biasa
Tukang Batu
Tukang Kayu
Tukang Besi/Baja
Kepala Tukang Batu
Mandor
L17
L07
L08
L09
L02
L01
Org/hr
Org/hr
Org/hr
Org/hr
Org/hr
Org/hr
0.275
0.033
0.033
0.033
0.010
0.015
45,000.00
60,000.00
60,000.00
60,000.00
70,000.00
80,000.00
BAHAN
Papan Kayu kelas III
Paku Kayu Segala Ukuran
Besi Beton Polos
Kawat Beton/Bendrat RRT
Portland Cement (PC)
Pasir Cor
Batu pecah mesin 2/3
M085
M140
M112
M135
M037
M004
M019
m3
kg
kg
kg
kg
m3
m3
0.0030
0.0200
3.6000
0.0500
5.5000
0.0090
0.0150
1,100,000.00
17,500.00
8,500.00
7,500.00
900.00
110,000.00
100,000.00
3,300.00
350.00
30,600.00
375.00
4,950.00
990.00
1,500.00
42,065.00
PERALATAN
12,375.00
1,980.00
1,980.00
1,980.00
700.00
1,200.00
20,215.00
JUMLAH
HARGA
(Rp.)
62,280.00
NO.
A.
1
2
3
4
: H.001
: Pasang atap genteng biasa ex. Malang
2
:m
KOMPONEN
SATUAN
PERKIRAAN
KUANTITAS
HARGA
SATUAN
(Rp.)
TENAGA
Pekerja Biasa
Tukang Kayu
Kepala Tukang Kayu
Mandor
L17
L08
L03
L01
Org/hr
Org/hr
Org/hr
Org/hr
0.1500
0.0750
0.0080
0.0080
45,000.00
60,000.00
47,000.00
80,000.00
6,750.00
4,500.00
376.00
640.00
12,266.00
BAHAN
Genteng Biasa ex. Malang
M149
bh
25.0000
850.00
JUMLAH
HARGA
(Rp.)
21,250.00
21,250.00
PERALATAN
33,516.00
NO.
A.
1
2
3
4
: H.002
: Pasang atap genteng press ex.Trenggalek
: m2
KOMPONEN
SATUAN
PERKIRAAN
KUANTITAS
HARGA
SATUAN
(Rp.)
TENAGA
Pekerja Biasa
Tukang Kayu
Kepala Tukang Kayu
Mandor
L17
L08
L03
L01
Org/hr
Org/hr
Org/hr
Org/hr
0.1500
0.0750
0.0080
0.0080
45,000.00
60,000.00
47,000.00
80,000.00
BAHAN
Genteng Press ex. Trenggalek
M150
bh
25.0000
990.00
24,750.00
24,750.00
PERALATAN
6,750.00
4,500.00
376.00
640.00
12,266.00
JUMLAH
HARGA
(Rp.)
37,016.00
NO.
A.
1
2
3
4
: H.003
: Pasang atap genteng karangpilang ex. Malang
2
:m
KOMPONEN
SATUAN
PERKIRAAN
KUANTITAS
HARGA
SATUAN
(Rp.)
TENAGA
Pekerja Biasa
Tukang Kayu
Kepala Tukang Kayu
Mandor
L17
L08
L03
L01
Org/hr
Org/hr
Org/hr
Org/hr
0.1500
0.0750
0.0080
0.0080
45,000.00
60,000.00
47,000.00
80,000.00
6,750.00
4,500.00
376.00
640.00
12,266.00
BAHAN
Genteng Karang Pilang ex. Malang
M151
bh
25.0000
1,140.00
JUMLAH
HARGA
(Rp.)
28,500.00
28,500.00
PERALATAN
40,766.00
NO.
A.
1
2
3
4
: H.004
: Pasang atap genteng karangpilang ex. Trenggalek
: m2
KOMPONEN
SATUAN
PERKIRAAN
KUANTITAS
HARGA
SATUAN
(Rp.)
TENAGA
Pekerja Biasa
Tukang Kayu
Kepala Tukang Kayu
Mandor
L17
L08
L03
L01
Org/hr
Org/hr
Org/hr
Org/hr
0.1500
0.0750
0.0080
0.0080
45,000.00
60,000.00
47,000.00
80,000.00
BAHAN
Genteng Karang Pilang ex.
Trenggalek
M152
bh
25.0000
400.00
10,000.00
10,000.00
PERALATAN
6,750.00
4,500.00
376.00
640.00
12,266.00
JUMLAH
HARGA
(Rp.)
22,266.00
NO.
A.
1
2
3
4
: H.005
: Pasang atap genteng karangpilang ex. Surabaya
2
:m
KOMPONEN
SATUAN
PERKIRAAN
KUANTITAS
HARGA
SATUAN
(Rp.)
TENAGA
Pekerja Biasa
Tukang Kayu
Kepala Tukang Kayu
Mandor
L17
L08
L03
L01
Org/hr
Org/hr
Org/hr
Org/hr
0.1500
0.0750
0.0080
0.0080
45,000.00
60,000.00
47,000.00
80,000.00
6,750.00
4,500.00
376.00
640.00
12,266.00
BAHAN
Genteng Karang Pilang ex.
Surabaya
M153
bh
25.0000
1,410.00
JUMLAH
HARGA
(Rp.)
35,250.00
35,250.00
PERALATAN
47,516.00
NO.
A.
1
2
3
4
: H.006
: Pasang bubung genteng biasa ex. Malang
: m1
KOMPONEN
SATUAN
PERKIRAAN
KUANTITAS
HARGA
SATUAN
(Rp.)
TENAGA
Pekerja Biasa
Tukang Kayu
Kepala Tukang Kayu
Mandor
L17
L08
L03
L01
Org/hr
Org/hr
Org/hr
Org/hr
0.4000
0.2000
0.0200
0.0020
45,000.00
60,000.00
47,000.00
80,000.00
BAHAN
Bubung Genteng Biasa ex. Malang
Portland Cement (PC)
Pasir Pasang
M156
M037
M002
bh
kg
m3
5.0000
8.0000
0.0320
1,870.00
900.00
60,000.00
9,350.00
7,200.00
1,920.00
18,470.00
PERALATAN
18,000.00
12,000.00
940.00
160.00
31,100.00
JUMLAH
HARGA
(Rp.)
49,570.00
NO.
A.
1
2
3
4
: H.007
: Pasang bubung genteng press ex. Trenggalek
1
:m
KOMPONEN
SATUAN
PERKIRAAN
KUANTITAS
HARGA
SATUAN
(Rp.)
TENAGA
Pekerja Biasa
Tukang Kayu
Kepala Tukang Kayu
Mandor
L17
L08
L03
L01
Org/hr
Org/hr
Org/hr
Org/hr
0.4000
0.2000
0.0200
0.0020
45,000.00
60,000.00
47,000.00
80,000.00
18,000.00
12,000.00
940.00
160.00
31,100.00
BAHAN
Bubung Genteng Press ex.
Trenggalek
Portland Cement (PC)
Pasir Pasang
M157
bh
5.0000
2,240.00
11,200.00
M037
M002
kg
m3
8.0000
0.0320
900.00
60,000.00
7,200.00
1,920.00
JUMLAH
HARGA
(Rp.)
20,320.00
PERALATAN
51,420.00
NO.
A.
1
2
3
4
: H.008
: Pasang bubung genteng karangpilang ex. Malang
: m1
KOMPONEN
SATUAN
PERKIRAAN
KUANTITAS
HARGA
SATUAN
(Rp.)
TENAGA
Pekerja Biasa
Tukang Kayu
Kepala Tukang Kayu
Mandor
L17
L08
L03
L01
Org/hr
Org/hr
Org/hr
Org/hr
0.4000
0.2000
0.0200
0.0020
45,000.00
60,000.00
47,000.00
80,000.00
BAHAN
Bubung Genteng Karang Pilang ex.
M158
Malang
Portland Cement (PC)
M037
Pasir Pasang
M002
bh
5.0000
4,030.00
20,150.00
kg
m3
8.0000
0.0320
900.00
60,000.00
7,200.00
1,920.00
29,270.00
PERALATAN
18,000.00
12,000.00
940.00
160.00
31,100.00
JUMLAH
HARGA
(Rp.)
60,370.00
NO.
A.
1
2
3
4
: H.009
: Pasang bubung genteng karangpilang ex. Trenggalek
1
:m
KOMPONEN
SATUAN
PERKIRAAN
KUANTITAS
HARGA
SATUAN
(Rp.)
TENAGA
Pekerja Biasa
Tukang Kayu
Kepala Tukang Kayu
Mandor
L17
L08
L03
L01
Org/hr
Org/hr
Org/hr
Org/hr
0.4000
0.2000
0.0200
0.0020
45,000.00
60,000.00
47,000.00
80,000.00
18,000.00
12,000.00
940.00
160.00
31,100.00
BAHAN
Bubung Genteng Karang Pilang ex.
M159
Trenggalek
Portland Cement (PC)
M037
Pasir Pasang
M002
bh
5.0000
4,430.00
22,150.00
kg
m3
8.0000
0.0320
900.00
60,000.00
7,200.00
1,920.00
JUMLAH
HARGA
(Rp.)
31,270.00
PERALATAN
62,370.00
NO.
A.
1
2
3
4
: H.010
: Pasang bubung genteng karangpilang ex. Surabaya
: m1
KOMPONEN
SATUAN
PERKIRAAN
KUANTITAS
HARGA
SATUAN
(Rp.)
TENAGA
Pekerja Biasa
Tukang Kayu
Kepala Tukang Kayu
Mandor
L17
L08
L03
L01
Org/hr
Org/hr
Org/hr
Org/hr
0.4000
0.2000
0.0200
0.0020
45,000.00
60,000.00
47,000.00
80,000.00
BAHAN
Bubung Genteng Karang Pilang ex.
M160
Surabaya
Portland Cement (PC)
M037
Pasir Pasang
M002
bh
5.0000
4,880.00
24,400.00
kg
m3
8.0000
0.0320
900.00
60,000.00
7,200.00
1,920.00
33,520.00
PERALATAN
18,000.00
12,000.00
940.00
160.00
31,100.00
JUMLAH
HARGA
(Rp.)
64,620.00
NO.
A.
1
2
3
4
: H.011
: Pasang atap genteng palentong kecil
2
:m
KOMPONEN
SATUAN
PERKIRAAN
KUANTITAS
HARGA
SATUAN
(Rp.)
TENAGA
Pekerja Biasa
Tukang Kayu
Kepala Tukang Kayu
Mandor
L17
L08
L03
L01
Org/hr
Org/hr
Org/hr
Org/hr
0.1500
0.0750
0.0080
0.0080
45,000.00
60,000.00
47,000.00
80,000.00
6,750.00
4,500.00
376.00
640.00
12,266.00
BAHAN
Genteng Palentong Kecil
M162
bh
25.000
#REF!
JUMLAH
HARGA
(Rp.)
#REF!
#REF!
PERALATAN
#REF!
NO.
A.
1
2
3
4
: H.012
: Pasang atap genteng kodok glazuur
: m2
KOMPONEN
SATUAN
PERKIRAAN
KUANTITAS
HARGA
SATUAN
(Rp.)
TENAGA
Pekerja Biasa
Tukang Kayu
Kepala Tukang Kayu
Mandor
L17
L08
L03
L01
Org/hr
Org/hr
Org/hr
Org/hr
0.1500
0.0750
0.0080
0.0080
45,000.00
60,000.00
47,000.00
80,000.00
6,750.00
4,500.00
376.00
640.00
12,266.00
BAHAN
Genteng Kodok Glazuur
M163
bh
25.0000
JUMLAH
HARGA
(Rp.)
#REF!
#REF!
#REF!
PERALATAN
#REF!
NO.
A.
1
2
3
4
: H.013
: Pasang atap genteng palentong super / besar
2
:m
KOMPONEN
SATUAN
PERKIRAAN
KUANTITAS
HARGA
SATUAN
(Rp.)
TENAGA
Pekerja Biasa
Tukang Kayu
Kepala Tukang Kayu
Mandor
L17
L08
L03
L01
Org/hr
Org/hr
Org/hr
Org/hr
0.1500
0.0600
0.0060
0.0060
45,000.00
60,000.00
47,000.00
80,000.00
6,750.00
3,600.00
282.00
480.00
11,112.00
BAHAN
Genteng Palentong Super/Besar
M164
bh
12.0000
#REF!
JUMLAH
HARGA
(Rp.)
#REF!
#REF!
PERALATAN
#REF!
NO.
A.
1
2
3
4
: H.014
: Pasang atap genteng beton
: m2
KOMPONEN
SATUAN
PERKIRAAN
KUANTITAS
HARGA
SATUAN
(Rp.)
TENAGA
Pekerja Biasa
Tukang Kayu
Kepala Tukang Kayu
Mandor
L17
L08
L03
L01
Org/hr
Org/hr
Org/hr
Org/hr
0.2000
0.1000
0.0100
0.0100
45,000.00
60,000.00
47,000.00
80,000.00
BAHAN
Genteng Beton
Paku Kayu Segala Ukuran
M154
M140
bh
kg
11.0000
0.0300
3,370.00
17,500.00
37,070.00
525.00
37,595.00
PERALATAN
9,000.00
6,000.00
470.00
800.00
16,270.00
JUMLAH
HARGA
(Rp.)
53,865.00
NO.
A.
1
2
3
4
: H.015
: Pasang atap genteng aspal
2
:m
KOMPONEN
SATUAN
PERKIRAAN
KUANTITAS
HARGA
SATUAN
(Rp.)
TENAGA
Pekerja Biasa
Tukang Kayu
Kepala Tukang Kayu
Mandor
L17
L08
L03
L01
Org/hr
Org/hr
Org/hr
Org/hr
0.2000
0.3000
0.0030
0.0100
45,000.00
60,000.00
47,000.00
80,000.00
9,000.00
18,000.00
141.00
800.00
27,941.00
BAHAN
Genteng Aspal
Multiplek 6 mm
Paku Kayu Segala Ukuran
Plastik Aerator
M168
M216
M140
M173.a
lbr
m2
kg
bh
6.9000
0.3500
0.0300
0.5000
#REF!
76,670.00
17,500.00
#REF!
JUMLAH
HARGA
(Rp.)
#REF!
26,834.50
525.00
#REF!
#REF!
PERALATAN
#REF!
NO.
A.
1
2
3
4
: H.016
: Pasang atap genteng metal
: m2
KOMPONEN
SATUAN
PERKIRAAN
KUANTITAS
HARGA
SATUAN
(Rp.)
TENAGA
Pekerja Biasa
Tukang Kayu
Kepala Tukang Kayu
Mandor
L17
L08
L03
L01
Org/hr
Org/hr
Org/hr
Org/hr
0.2000
0.1000
0.0100
0.0010
45,000.00
60,000.00
47,000.00
80,000.00
9,000.00
6,000.00
470.00
80.00
15,550.00
BAHAN
Genteng Metal
Paku Kayu Segala Ukuran
M169
M140
lbr
kg
1.0200
0.2000
JUMLAH
HARGA
(Rp.)
#REF!
17,500.00
#REF!
3,500.00
#REF!
PERALATAN
#REF!
NO.
A.
1
2
3
4
: H.017
: Pasang atap sirap
2
:m
KOMPONEN
SATUAN
PERKIRAAN
KUANTITAS
HARGA
SATUAN
(Rp.)
TENAGA
Pekerja Biasa
Tukang Kayu
Kepala Tukang Kayu
Mandor
L17
L08
L03
L01
Org/hr
Org/hr
Org/hr
Org/hr
0.1660
0.2500
0.0250
0.0080
45,000.00
60,000.00
47,000.00
80,000.00
7,470.00
15,000.00
1,175.00
640.00
24,285.00
BAHAN
Atap Sirap
Paku Kayu Segala Ukuran
M170
M140
bh
kg
60.0000
0.2000
#REF!
17,500.00
JUMLAH
HARGA
(Rp.)
#REF!
3,500.00
#REF!
PERALATAN
#REF!
NO.
A.
1
2
3
4
: H.018
: Pasang bubung genteng palentong kecil
: m1
KOMPONEN
SATUAN
PERKIRAAN
KUANTITAS
HARGA
SATUAN
(Rp.)
TENAGA
Pekerja Biasa
Tukang Kayu
Kepala Tukang Kayu
Mandor
L17
L08
L03
L01
Org/hr
Org/hr
Org/hr
Org/hr
0.4000
0.2000
0.0200
0.0020
45,000.00
60,000.00
47,000.00
80,000.00
18,000.00
12,000.00
940.00
160.00
31,100.00
BAHAN
Bubung Genteng Palentong Kecil
Portland Cement (PC)
Pasir Pasang
M165
M037
M002
bh
kg
m3
5.0000
8.0000
0.0320
JUMLAH
HARGA
(Rp.)
#REF!
900.00
60,000.00
#REF!
7,200.00
1,920.00
#REF!
PERALATAN
#REF!
NO.
A.
1
2
3
4
: H.019
: Pasang bubung genteng kodok / glazuur
1
:m
KOMPONEN
SATUAN
PERKIRAAN
KUANTITAS
HARGA
SATUAN
(Rp.)
TENAGA
Pekerja Biasa
Tukang Kayu
Kepala Tukang Kayu
Mandor
L17
L08
L03
L01
Org/hr
Org/hr
Org/hr
Org/hr
0.4000
0.2000
0.0200
0.0020
45,000.00
60,000.00
47,000.00
80,000.00
18,000.00
12,000.00
940.00
160.00
31,100.00
BAHAN
Bubung Genteng Kodok Glazuur
Portland Cement (PC)
Pasir Pasang
M166
M037
M002
bh
kg
m3
5.0000
8.0000
0.0320
#REF!
900.00
60,000.00
JUMLAH
HARGA
(Rp.)
#REF!
7,200.00
1,920.00
#REF!
PERALATAN
#REF!
NO.
A.
1
2
3
4
: H.020
: Pasang bubung genteng palentong super / besar
: m1
KOMPONEN
SATUAN
PERKIRAAN
KUANTITAS
HARGA
SATUAN
(Rp.)
TENAGA
Pekerja Biasa
Tukang Kayu
Kepala Tukang Kayu
Mandor
L17
L08
L03
L01
Org/hr
Org/hr
Org/hr
Org/hr
0.4000
0.2000
0.0200
0.0020
45,000.00
60,000.00
47,000.00
80,000.00
18,000.00
12,000.00
940.00
160.00
31,100.00
BAHAN
Bubung Genteng Palentong
Super/Besar
Portland Cement (PC)
Pasir Pasang
M167
bh
4.0000
#REF!
#REF!
M037
M002
kg
m3
8.0000
0.0320
900.00
60,000.00
7,200.000
1,920.000
JUMLAH
HARGA
(Rp.)
#REF!
PERALATAN
#REF!
NO.
A.
1
2
3
4
: H.021
: Pasang bubung genteng beton
1
:m
KOMPONEN
SATUAN
PERKIRAAN
KUANTITAS
HARGA
SATUAN
(Rp.)
TENAGA
Pekerja Biasa
Tukang Kayu
Kepala Tukang Kayu
Mandor
L17
L08
L03
L01
Org/hr
Org/hr
Org/hr
Org/hr
0.4000
0.2000
0.0200
0.0020
45,000.00
60,000.00
47,000.00
80,000.00
18,000.00
12,000.00
940.00
160.00
31,100.00
BAHAN
Bubung Genteng Beton
Paku Kayu Segala Ukuran
Portland Cement (PC)
Pasir Pasang
Portland Cement (PC) Warna
M161
M140
M037
M002
M039
bh
kg
kg
m3
kg
3.5000
0.0500
10.8000
0.0320
1.0000
6,760.00
17,500.00
900.00
60,000.00
6,500.00
JUMLAH
HARGA
(Rp.)
23,660.00
875.00
9,720.00
1,920.00
6,500.00
42,675.00
PERALATAN
73,775.00
NO.
A.
1
2
3
4
: H.022
: Pasang bubung genteng aspal
: m1
KOMPONEN
SATUAN
PERKIRAAN
KUANTITAS
HARGA
SATUAN
(Rp.)
TENAGA
Pekerja Biasa
Tukang Kayu
Kepala Tukang Kayu
Mandor
L17
L08
L03
L01
Org/hr
Org/hr
Org/hr
Org/hr
0.1250
0.2500
0.0250
0.0060
45,000.00
60,000.00
47,000.00
80,000.00
5,625.00
15,000.00
1,175.00
480.00
22,280.00
BAHAN
Bubung Genteng Aspal
Paku Kayu Segala Ukuran
Balok
M171
M140
M056
bh
kg
m3
2.0000
0.0500
0.0035
JUMLAH
HARGA
(Rp.)
#REF!
17,500.00
#REF!
#REF!
875.00
#REF!
#REF!
PERALATAN
#REF!
NO.
A.
1
2
3
4
: H.023
: Pasang bubung genteng metal
1
:m
KOMPONEN
SATUAN
PERKIRAAN
KUANTITAS
HARGA
SATUAN
(Rp.)
TENAGA
Pekerja Biasa
Tukang Kayu
Kepala Tukang Kayu
Mandor
L17
L08
L03
L01
Org/hr
Org/hr
Org/hr
Org/hr
0.2500
0.1500
0.0150
0.0130
45,000.00
60,000.00
47,000.00
80,000.00
11,250.00
9,000.00
705.00
1,040.00
21,995.00
BAHAN
Bubung Genteng Metal
Paku Kayu Segala Ukuran
M172
M140
bh
kg
1.1000
0.0500
#REF!
17,500.00
JUMLAH
HARGA
(Rp.)
#REF!
875.00
#REF!
PERALATAN
#REF!
NO.
A.
1
2
3
4
: H.024
: Pasang bubung atap sirap
: m1
KOMPONEN
SATUAN
PERKIRAAN
KUANTITAS
HARGA
SATUAN
(Rp.)
TENAGA
Pekerja Biasa
Tukang Kayu
Kepala Tukang Kayu
Mandor
L17
L08
L03
L01
Org/hr
Org/hr
Org/hr
Org/hr
0.1250
0.2500
0.0250
0.0060
45,000.00
60,000.00
47,000.00
80,000.00
5,625.00
15,000.00
1,175.00
480.00
22,280.00
BAHAN
Seng plat BJLS 28 (90 x 180) cm
Paku Kayu Segala Ukuran
Papan (3x30) cm
M177
M140
M065
lbr
kg
m3
0.4000
0.1100
0.0040
JUMLAH
HARGA
(Rp.)
#REF!
17,500.00
6,030,000.00
#REF!
1,925.00
24,120.00
#REF!
PERALATAN
#REF!
NO.
A.
1
2
3
4
: H.025
: Pasang atap asbes gelombang (3,00 x 1,05) m x 4 mm
2
:m
KOMPONEN
SATUAN
PERKIRAAN
KUANTITAS
HARGA
SATUAN
(Rp.)
TENAGA
Pekerja Biasa
Tukang Kayu
Kepala Tukang Kayu
Mandor
L17
L08
L03
L01
Org/hr
Org/hr
Org/hr
Org/hr
0.1400
0.0700
0.0070
0.0070
45,000.00
60,000.00
47,000.00
80,000.00
6,300.00
4,200.00
329.00
560.00
11,389.00
BAHAN
Asbes Gelombang (3.00 x 1.05) m x
M182
4 mm
Paku Seng Segala Ukuran
M141
lbr
0.3500
99,700.00
34,895.00
kg
0.1200
20,000.00
2,400.00
JUMLAH
HARGA
(Rp.)
37,295.00
PERALATAN
48,684.00
NO.
A.
1
2
3
4
: H.026
: Pasang atap asbes gelombang (2,70 x 1,05) m x 4 mm
: m2
KOMPONEN
SATUAN
PERKIRAAN
KUANTITAS
HARGA
SATUAN
(Rp.)
TENAGA
Pekerja Biasa
Tukang Kayu
Kepala Tukang Kayu
Mandor
L17
L08
L03
L01
Org/hr
Org/hr
Org/hr
Org/hr
0.1400
0.0700
0.0070
0.0070
45,000.00
60,000.00
47,000.00
80,000.00
BAHAN
Asbes Gelombang (2.70 x 1.05) m x
M183
4 mm
Paku Seng Segala Ukuran
M141
lbr
0.4200
92,000.00
38,640.00
kg
0.1200
20,000.00
2,400.00
41,040.00
PERALATAN
6,300.00
4,200.00
329.00
560.00
11,389.00
JUMLAH
HARGA
(Rp.)
52,429.00
NO.
A.
1
2
3
4
: H.027
: Pasang atap asbes gelombang (2,40 x 1,05) m x 4 mm
2
:m
KOMPONEN
SATUAN
PERKIRAAN
KUANTITAS
HARGA
SATUAN
(Rp.)
TENAGA
Pekerja Biasa
Tukang Kayu
Kepala Tukang Kayu
Mandor
L17
L08
L03
L01
Org/hr
Org/hr
Org/hr
Org/hr
0.1400
0.0670
0.0070
0.0070
45,000.00
60,000.00
47,000.00
80,000.00
6,300.00
4,020.00
329.00
560.00
11,209.00
BAHAN
Asbes Gelombang (2.40 x 1.05) m x
M184
4 mm
Paku Seng Segala Ukuran
M141
lbr
0.4400
79,700.00
35,068.00
kg
0.1200
20,000.00
2,400.00
JUMLAH
HARGA
(Rp.)
37,468.00
PERALATAN
48,677.00
NO.
A.
1
2
3
4
: H.028
: Pasang atap asbes gelombang (2,10 x 1,05) m x 4 mm
: m2
KOMPONEN
SATUAN
PERKIRAAN
KUANTITAS
HARGA
SATUAN
(Rp.)
TENAGA
Pekerja Biasa
Tukang Kayu
Kepala Tukang Kayu
Mandor
L17
L08
L03
L01
Org/hr
Org/hr
Org/hr
Org/hr
0.1400
0.0670
0.0070
0.0070
45,000.00
60,000.00
47,000.00
80,000.00
BAHAN
Asbes Gelombang (2.10 x 1.05) m x
M185
4 mm
Paku Seng Segala Ukuran
M141
lbr
0.5100
70,500.00
35,955.00
kg
0.1200
20,000.00
2,400.00
38,355.00
PERALATAN
6,300.00
4,020.00
329.00
560.00
11,209.00
JUMLAH
HARGA
(Rp.)
49,564.00
NO.
A.
1
2
3
4
: H.029
: Pasang atap asbes gelombang (1,50 x 1,05) m x 4 mm
2
:m
KOMPONEN
SATUAN
PERKIRAAN
KUANTITAS
HARGA
SATUAN
(Rp.)
TENAGA
Pekerja Biasa
Tukang Kayu
Kepala Tukang Kayu
Mandor
L17
L08
L03
L01
Org/hr
Org/hr
Org/hr
Org/hr
0.1400
0.0670
0.0070
0.0070
45,000.00
60,000.00
47,000.00
80,000.00
6,300.00
4,020.00
329.00
560.00
11,209.00
BAHAN
Asbes Gelombang (1.50 x 1.05) m x
M186
4 mm
Paku Seng Segala Ukuran
M141
lbr
0.6500
53,600.00
34,840.00
kg
0.1200
20,000.00
2,400.00
JUMLAH
HARGA
(Rp.)
37,240.00
PERALATAN
48,449.00
NO.
A.
1
2
3
4
: H.030
: Pasang atap asbes gelombang (2,50 x 0,92) m x 5 mm
: m2
KOMPONEN
SATUAN
PERKIRAAN
KUANTITAS
HARGA
SATUAN
(Rp.)
TENAGA
Pekerja Biasa
Tukang Kayu
Kepala Tukang Kayu
Mandor
L17
L08
L03
L01
Org/hr
Org/hr
Org/hr
Org/hr
0.1400
0.0750
0.0080
0.0080
45,000.00
60,000.00
47,000.00
80,000.00
BAHAN
Asbes Gelombang (2.50 x 0.92) m x
M187
5 mm
Paku Seng Segala Ukuran
M141
lbr
0.5000
101,200.00
50,600.00
kg
0.1200
20,000.00
2,400.00
53,000.00
PERALATAN
6,300.00
4,500.00
376.00
640.00
11,816.00
JUMLAH
HARGA
(Rp.)
64,816.00
NO.
A.
1
2
3
4
: H.031
: Pasang atap asbes gelombang (2,25 x 0,92) m x 5 mm
2
:m
KOMPONEN
SATUAN
PERKIRAAN
KUANTITAS
HARGA
SATUAN
(Rp.)
TENAGA
Pekerja Biasa
Tukang Kayu
Kepala Tukang Kayu
Mandor
L17
L08
L03
L01
Org/hr
Org/hr
Org/hr
Org/hr
0.1400
0.0750
0.0080
0.0080
45,000.00
60,000.00
47,000.00
80,000.00
6,300.00
4,500.00
376.00
640.00
11,816.00
BAHAN
Asbes Gelombang (2.25 x 0.92) m x
M188
5 mm
Paku Seng Segala Ukuran
M141
lbr
0.6000
87,600.00
52,560.00
kg
0.1200
20,000.00
2,400.00
JUMLAH
HARGA
(Rp.)
54,960.00
PERALATAN
66,776.00
NO.
A.
1
2
3
4
: H.032
: Pasang atap asbes gelombang (2,00 x 0,92) m x 5 mm
: m2
KOMPONEN
SATUAN
PERKIRAAN
KUANTITAS
HARGA
SATUAN
(Rp.)
TENAGA
Pekerja Biasa
Tukang Kayu
Kepala Tukang Kayu
Mandor
L17
L08
L03
L01
Org/hr
Org/hr
Org/hr
Org/hr
0.1400
0.0700
0.0070
0.0070
45,000.00
60,000.00
47,000.00
80,000.00
BAHAN
Asbes Gelombang (2.00 x 0.92) m x
M189
5 mm
Paku Seng Segala Ukuran
M141
lbr
0.6000
77,600.00
46,560.00
kg
0.1200
20,000.00
2,400.00
48,960.00
PERALATAN
6,300.00
4,200.00
329.00
560.00
11,389.00
JUMLAH
HARGA
(Rp.)
60,349.00
NO.
A.
1
2
3
4
: H.033
: Pasang atap asbes gelombang (1,80 x 0,92) m x 5 mm
2
:m
KOMPONEN
SATUAN
PERKIRAAN
KUANTITAS
HARGA
SATUAN
(Rp.)
TENAGA
Pekerja Biasa
Tukang Kayu
Kepala Tukang Kayu
Mandor
L17
L08
L03
L01
Org/hr
Org/hr
Org/hr
Org/hr
0.1400
0.0700
0.0070
0.0070
45,000.00
60,000.00
47,000.00
80,000.00
6,300.00
4,200.00
329.00
560.00
11,389.00
BAHAN
Asbes Gelombang (1.80 x 0.92) m x
M190
5 mm
Paku Seng Segala Ukuran
M141
lbr
0.7500
59,000.00
44,250.00
kg
0.1200
20,000.00
2,400.00
JUMLAH
HARGA
(Rp.)
46,650.00
PERALATAN
58,039.00
NO.
A.
1
2
3
4
: H.034
: Pasang atap asbes gelombang (3,00 x 1,08) m x 6 mm
: m2
KOMPONEN
SATUAN
PERKIRAAN
KUANTITAS
HARGA
SATUAN
(Rp.)
TENAGA
Pekerja Biasa
Tukang Kayu
Kepala Tukang Kayu
Mandor
L17
L08
L03
L01
Org/hr
Org/hr
Org/hr
Org/hr
0.1400
0.0670
0.0070
0.0070
45,000.00
60,000.00
47,000.00
80,000.00
BAHAN
Asbes Gelombang (3.00 x 1.08) m x
M191
6 mm
Paku Seng Segala Ukuran
M141
lbr
0.7000
119,600.00
83,720.00
kg
0.1200
20,000.00
2,400.00
86,120.00
PERALATAN
6,300.00
4,020.00
329.00
560.00
11,209.00
JUMLAH
HARGA
(Rp.)
97,329.00
NO.
A.
1
2
3
4
: H.035
: Pasang atap asbes gelombang (2,70 x 1,08) m x 6 mm
2
:m
KOMPONEN
SATUAN
PERKIRAAN
KUANTITAS
HARGA
SATUAN
(Rp.)
TENAGA
Pekerja Biasa
Tukang Kayu
Kepala Tukang Kayu
Mandor
L17
L08
L03
L01
Org/hr
Org/hr
Org/hr
Org/hr
0.1400
0.0670
0.0070
0.0070
45,000.00
60,000.00
47,000.00
80,000.00
6,300.00
4,020.00
329.00
560.00
11,209.00
BAHAN
Asbes Gelombang (2.70 x 1.08) m x
M192
6 mm
Paku Seng Segala Ukuran
M141
lbr
0.3800
110,400.00
41,952.00
kg
0.1200
20,000.00
2,400.00
JUMLAH
HARGA
(Rp.)
44,352.00
PERALATAN
55,561.00
NO.
A.
1
2
3
4
: H.036
: Pasang atap asbes gelombang (2,10 x 1,08) m x 6 mm
: m2
KOMPONEN
SATUAN
PERKIRAAN
KUANTITAS
HARGA
SATUAN
(Rp.)
TENAGA
Pekerja Biasa
Tukang Kayu
Kepala Tukang Kayu
Mandor
L17
L08
L03
L01
Org/hr
Org/hr
Org/hr
Org/hr
0.1400
0.0670
0.0070
0.0070
45,000.00
60,000.00
47,000.00
80,000.00
BAHAN
Asbes Gelombang (2.10 x 1.08) m x
M193
6 mm
Paku Seng Segala Ukuran
M141
lbr
0.4900
84,700.00
41,503.00
kg
0.1200
20,000.00
2,400.00
43,903.00
PERALATAN
6,300.00
4,020.00
329.00
560.00
11,209.00
JUMLAH
HARGA
(Rp.)
55,112.00
NO.
A.
1
2
3
4
: H.037
: Pasang atap asbes gelombang (1.80 x 1,08) m x 6 mm
2
:m
KOMPONEN
SATUAN
PERKIRAAN
KUANTITAS
HARGA
SATUAN
(Rp.)
TENAGA
Pekerja Biasa
Tukang Kayu
Kepala Tukang Kayu
Mandor
L17
L08
L03
L01
Org/hr
Org/hr
Org/hr
Org/hr
0.1400
0.0670
0.0070
0.0070
45,000.00
60,000.00
47,000.00
80,000.00
6,300.00
4,020.00
329.00
560.00
11,209.00
BAHAN
Asbes Gelombang (1.80 x 1.08) m x
M194
6 mm
Paku Seng Segala Ukuran
M141
lbr
0.5700
64,400.00
36,708.00
kg
0.1200
20,000.00
2,400.00
JUMLAH
HARGA
(Rp.)
39,108.00
PERALATAN
50,317.00
NO.
A.
1
2
3
4
: H.038
: Pasang bubung stel gelombang 0,92 m
: m1
KOMPONEN
SATUAN
PERKIRAAN
KUANTITAS
HARGA
SATUAN
(Rp.)
TENAGA
Pekerja Biasa
Tukang Kayu
Kepala Tukang Kayu
Mandor
L17
L08
L03
L01
Org/hr
Org/hr
Org/hr
Org/hr
0.0840
0.1250
0.0130
0.0040
45,000.00
60,000.00
47,000.00
80,000.00
BAHAN
Bubung Stel Gelombang 0.92 m
Sekrup Segala Ukuran
M195
M145
lbr
bh
2.4000
6.0000
40,000.00
410.00
96,000.00
2,460.00
98,460.00
PERALATAN
3,780.00
7,500.00
611.00
320.00
12,211.00
JUMLAH
HARGA
(Rp.)
110,671.00
NO.
A.
1
2
3
4
: H.039
: Pasang bubung stel gelombang 1,05 m
1
:m
KOMPONEN
SATUAN
PERKIRAAN
KUANTITAS
HARGA
SATUAN
(Rp.)
TENAGA
Pekerja Biasa
Tukang Kayu
Kepala Tukang Kayu
Mandor
L17
L08
L03
L01
Org/hr
Org/hr
Org/hr
Org/hr
0.0840
0.1250
0.0130
0.0040
45,000.00
60,000.00
47,000.00
80,000.00
3,780.00
7,500.00
611.00
320.00
12,211.00
BAHAN
Bubung Stel Gelombang 1.05 m
Sekrup Segala Ukuran
M196
M145
lbr
bh
2.1000
6.0000
44,000.00
410.00
JUMLAH
HARGA
(Rp.)
92,400.00
2,460.00
94,860.00
PERALATAN
107,071.00
NO.
A.
1
2
3
4
: H.040
: Pasang bubung stel gelombang 1,08 m
: m1
KOMPONEN
SATUAN
PERKIRAAN
KUANTITAS
HARGA
SATUAN
(Rp.)
TENAGA
Pekerja Biasa
Tukang Kayu
Kepala Tukang Kayu
Mandor
L17
L08
L03
L01
Org/hr
Org/hr
Org/hr
Org/hr
0.0840
0.1250
0.0130
0.0040
45,000.00
60,000.00
47,000.00
80,000.00
BAHAN
Bubung Stel Gelombang 1.08 m
Sekrup Segala Ukuran
M197
M145
lbr
bh
2.0500
6.0000
42,840.00
410.00
87,822.00
2,460.00
90,282.00
PERALATAN
3,780.00
7,500.00
611.00
320.00
12,211.00
JUMLAH
HARGA
(Rp.)
102,493.00
NO.
A.
1
2
3
4
: H.041
: Pasang nok paten 0,92 m
1
:m
KOMPONEN
SATUAN
PERKIRAAN
KUANTITAS
HARGA
SATUAN
(Rp.)
TENAGA
Pekerja Biasa
Tukang Kayu
Kepala Tukang Kayu
Mandor
L17
L08
L03
L01
Org/hr
Org/hr
Org/hr
Org/hr
0.0840
0.1250
0.0130
0.0040
45,000.00
60,000.00
47,000.00
80,000.00
3,780.00
7,500.00
611.00
320.00
12,211.00
BAHAN
Bubung Paten 0.92 m
Sekrup Segala Ukuran
M198
M145
lbr
bh
1.2000
6.0000
41,000.00
410.00
JUMLAH
HARGA
(Rp.)
49,200.00
2,460.00
51,660.00
PERALATAN
63,871.00
NO.
A.
1
2
3
4
: H.042
: Pasang nok paten 1,05 m
: m1
KOMPONEN
SATUAN
PERKIRAAN
KUANTITAS
HARGA
SATUAN
(Rp.)
TENAGA
Pekerja Biasa
Tukang Kayu
Kepala Tukang Kayu
Mandor
L17
L08
L03
L01
Org/hr
Org/hr
Org/hr
Org/hr
0.0840
0.1250
0.0130
0.0040
45,000.00
60,000.00
47,000.00
80,000.00
BAHAN
Bubung Paten 1.05 m
Sekrup Segala Ukuran
M199
M145
lbr
bh
1.2000
6.0000
37,310.00
410.00
44,772.00
2,460.00
47,232.00
PERALATAN
3,780.00
7,500.00
611.00
320.00
12,211.00
JUMLAH
HARGA
(Rp.)
59,443.00
NO.
A.
1
2
3
4
: H.043
: Pasang nok paten 1,08 m
1
:m
KOMPONEN
SATUAN
PERKIRAAN
KUANTITAS
HARGA
SATUAN
(Rp.)
TENAGA
Pekerja Biasa
Tukang Kayu
Kepala Tukang Kayu
Mandor
L17
L08
L03
L01
Org/hr
Org/hr
Org/hr
Org/hr
0.0840
0.1250
0.0130
0.0040
45,000.00
60,000.00
47,000.00
80,000.00
3,780.00
7,500.00
611.00
320.00
12,211.00
BAHAN
Bubung Paten 1.08 m
Sekrup Segala Ukuran
M200
M145
lbr
bh
1.2000
6.0000
40,180.00
410.00
JUMLAH
HARGA
(Rp.)
48,216.00
2,460.00
50,676.00
PERALATAN
62,887.00
NO.
A.
1
2
3
4
: H.044
: Pasang nok stel rata 0,92 m
: m1
KOMPONEN
SATUAN
PERKIRAAN
KUANTITAS
HARGA
SATUAN
(Rp.)
TENAGA
Pekerja Biasa
Tukang Kayu
Kepala Tukang Kayu
Mandor
L17
L08
L03
L01
Org/hr
Org/hr
Org/hr
Org/hr
0.0840
0.1250
0.0130
0.0040
45,000.00
60,000.00
47,000.00
80,000.00
BAHAN
Bubung Stel Rata 0.92 m
Sekrup Segala Ukuran
M201
M145
lbr
bh
1.1000
6.0000
40,000.00
410.00
44,000.00
2,460.00
46,460.00
PERALATAN
3,780.00
7,500.00
611.00
320.00
12,211.00
JUMLAH
HARGA
(Rp.)
58,671.00
NO.
A.
1
2
3
4
: H.045
: Pasang nok stel rata 1,05 m
1
:m
KOMPONEN
SATUAN
PERKIRAAN
KUANTITAS
HARGA
SATUAN
(Rp.)
TENAGA
Pekerja Biasa
Tukang Kayu
Kepala Tukang Kayu
Mandor
L17
L08
L03
L01
Org/hr
Org/hr
Org/hr
Org/hr
0.0840
0.1250
0.0130
0.0040
45,000.00
60,000.00
47,000.00
80,000.00
3,780.00
7,500.00
611.00
320.00
12,211.00
BAHAN
Bubung Stel Rata 1.05 m
Sekrup Segala Ukuran
M202
M145
lbr
bh
1.1000
6.0000
34,640.00
410.00
JUMLAH
HARGA
(Rp.)
38,104.00
2,460.00
40,564.00
PERALATAN
52,775.00
NO.
: H.046
: Pasang atap seng gelombang
: m2
KOMPONEN
A.
TENAGA
1
2
3
4
Pekerja Biasa
Tukang Kayu
Kepala Tukang Kayu
Mandor
SATUAN
L17
L08
L03
L01
PERKIRAAN
KUANTITAS
Org/hr
Org/hr
Org/hr
Org/hr
0.1200
0.0600
0.0060
0.0060
HARGA
SATUAN
(Rp.)
45,000.00
60,000.00
47,000.00
80,000.00
BAHAN
Atap Seng Gelombang
Paku Seng Segala Ukuran
M178
M141
lbr
kg
0.7000
0.0200
71,950.00
20,000.00
50,365.000
400.000
50,765.00
PERALATAN
5,400.00
3,600.00
282.00
480.00
9,762.00
JUMLAH
HARGA
(Rp.)
60,527.00
NO.
A.
1
2
3
4
: H.047
: Pasang bubung seng gelombang
1
:m
KOMPONEN
SATUAN
PERKIRAAN
KUANTITAS
HARGA
SATUAN
(Rp.)
TENAGA
Pekerja Biasa
Tukang Kayu
Kepala Tukang Kayu
Mandor
L17
L08
L03
L01
Org/hr
Org/hr
Org/hr
Org/hr
0.1500
0.0700
0.0080
0.0060
45,000.00
60,000.00
47,000.00
80,000.00
6,750.00
4,200.00
376.00
480.00
11,806.00
BAHAN
Bubung Seng Gelombang
Paku Seng Segala Ukuran
M179
M141
lbr
kg
0.3000
0.0400
66,010.00
20,000.00
JUMLAH
HARGA
(Rp.)
19,803.000
800.000
20,603.00
PERALATAN
32,409.00
NO.
A.
1
2
3
4
: H.048
: Pasang atap aluminium
: m2
KOMPONEN
SATUAN
PERKIRAAN
KUANTITAS
HARGA
SATUAN
(Rp.)
TENAGA
Pekerja Biasa
Tukang Kayu
Kepala Tukang Kayu
Mandor
L17
L08
L03
L01
Org/hr
Org/hr
Org/hr
Org/hr
0.1500
0.7500
0.0080
0.0060
45,000.00
60,000.00
47,000.00
80,000.00
BAHAN
Atap Aluminium
Paku Seng Segala Ukuran
M129
M141
m2
kg
1.0500
0.0200
88,150.00
20,000.00
92,557.50
400.00
92,957.50
PERALATAN
6,750.00
45,000.00
376.00
480.00
52,606.00
JUMLAH
HARGA
(Rp.)
145,563.50
NO.
A.
1
2
3
4
: H.049
: Pasang bubung atap aluminium
2
:m
KOMPONEN
SATUAN
PERKIRAAN
KUANTITAS
HARGA
SATUAN
(Rp.)
TENAGA
Pekerja Biasa
Tukang Kayu
Kepala Tukang Kayu
Mandor
L17
L08
L03
L01
Org/hr
Org/hr
Org/hr
Org/hr
0.1000
1.0000
0.0100
0.0100
45,000.00
60,000.00
47,000.00
80,000.00
4,500.00
60,000.00
470.00
800.00
65,770.00
BAHAN
Bubung Atap Aluminium
Paku Seng Segala Ukuran
M130
M141
m2
kg
1.2000
0.0400
86,100.00
20,000.00
JUMLAH
HARGA
(Rp.)
103,320.00
800.00
104,120.00
PERALATAN
169,890.00
NO.
A.
1
2
3
4
: H.050
: Pasang lapisan aluminium foil / sesalation
: m2
KOMPONEN
SATUAN
PERKIRAAN
KUANTITAS
HARGA
SATUAN
(Rp.)
TENAGA
Pekerja Biasa
Tukang Kayu
Kepala Tukang Kayu
Mandor
L17
L08
L03
L01
Org/hr
Org/hr
Org/hr
Org/hr
0.1500
0.0500
0.0050
0.0080
45,000.00
60,000.00
47,000.00
80,000.00
BAHAN
Aluminium Foil/Sesalation
M131
m2
1.0500
26,900.00
28,245.00
28,245.00
PERALATAN
6,750.00
3,000.00
235.00
640.00
10,625.00
JUMLAH
HARGA
(Rp.)
38,870.00
NO.
A.
1
2
3
4
: H.051
: Pasang roof light fibreglass
2
:m
KOMPONEN
SATUAN
PERKIRAAN
KUANTITAS
HARGA
SATUAN
(Rp.)
TENAGA
Pekerja Biasa
Tukang Kayu
Kepala Tukang Kayu
Mandor
L17
L08
L03
L01
Org/hr
Org/hr
Org/hr
Org/hr
0.1400
0.0670
0.0070
0.0070
45,000.00
60,000.00
47,000.00
80,000.00
6,300.00
4,020.00
329.00
560.00
11,209.00
BAHAN
Roof Light Fibreglass
Paku Seng Segala Ukuran
M180
M141
m2
kg
1.100
0.050
69,290.00
20,000.00
JUMLAH
HARGA
(Rp.)
76,219.000
1,000.000
77,219.00
PERALATAN
88,428.00
NO.
A.
1
2
3
4
: H.052
: Pasang atap polycarbonat
: m2
KOMPONEN
SATUAN
PERKIRAAN
KUANTITAS
HARGA
SATUAN
(Rp.)
TENAGA
Pekerja Biasa
Tukang Kayu
Kepala Tukang Kayu
Mandor
L17
L08
L03
L01
Org/hr
Org/hr
Org/hr
Org/hr
0.1400
0.0670
0.0070
0.0070
45,000.00
60,000.00
47,000.00
80,000.00
BAHAN
Atap Polycarbonat
Paku Sumbat Segala Ukuran
M181
M143
m2
bh
1.100
10.000
101,270.00
710.00
111,397.000
7,100.000
118,497.00
PERALATAN
6,300.00
4,020.00
329.00
560.00
11,209.00
JUMLAH
HARGA
(Rp.)
129,706.00
NO.
A.
1
2
3
4
: H.053
: Pasang atap seng galvalum
2
:m
KOMPONEN
SATUAN
PERKIRAAN
KUANTITAS
HARGA
SATUAN
(Rp.)
TENAGA
Pekerja Biasa
Tukang Kayu
Kepala Tukang Kayu
Mandor
L17
L08
L03
L01
Org/hr
Org/hr
Org/hr
Org/hr
0.1500
0.7500
0.0080
0.0060
45,000.00
60,000.00
47,000.00
80,000.00
6,750.00
45,000.00
376.00
480.00
52,606.00
BAHAN
Atap Seng Galvalum
Paku Seng Segala Ukuran
M148.f
M141
m2
kg
1.0500
0.0200
99,550.00
20,000.00
JUMLAH
HARGA
(Rp.)
104,527.50
400.00
104,927.50
PERALATAN
157,533.50
NO.
A.
1
2
3
4
: H.054
: Pasang bubung atap seng galvalum
: m2
KOMPONEN
SATUAN
PERKIRAAN
KUANTITAS
HARGA
SATUAN
(Rp.)
TENAGA
Pekerja Biasa
Tukang Kayu
Kepala Tukang Kayu
Mandor
L17
L08
L03
L01
Org/hr
Org/hr
Org/hr
Org/hr
0.1000
1.0000
0.0100
0.0100
45,000.00
60,000.00
47,000.00
80,000.00
BAHAN
Bubung Atap Seng Galvalum
Paku Seng Segala Ukuran
M148.g
M141
m2
kg
1.2000
0.0400
96,860.00
20,000.00
116,232.00
800.00
117,032.00
PERALATAN
4,500.00
60,000.00
470.00
800.00
65,770.00
JUMLAH
HARGA
(Rp.)
182,802.00
NO.
A.
1
2
3
4
: I.001
: Langit-langit asbes (1,0 x 1,0) m, tebal 6 mm
2
:m
KOMPONEN
SATUAN
PERKIRAAN
KUANTITAS
HARGA
SATUAN
(Rp.)
TENAGA
Pekerja Biasa
Tukang Kayu
Kepala Tukang Kayu
Mandor
L17
L08
L03
L01
Org/hr
Org/hr
Org/hr
Org/hr
0.0300
0.0700
0.0070
0.0020
45,000.00
60,000.00
47,000.00
80,000.00
1,350.00
4,200.00
329.00
160.00
6,039.00
BAHAN
Asbes (1,00 x 1,00) m x 6 mm
Paku Kayu Segala Ukuran
M203
M140
lbr
kg
1.1000
0.0100
16,500.00
17,500.00
JUMLAH
HARGA
(Rp.)
18,150.00
175.00
18,325.00
PERALATAN
24,364.00
NO.
A.
1
2
3
4
: I.002
: Langit-langit asbes (1,0 x 1,0) m, tebal 5 mm
: m2
KOMPONEN
SATUAN
PERKIRAAN
KUANTITAS
HARGA
SATUAN
(Rp.)
TENAGA
Pekerja Biasa
Tukang Kayu
Kepala Tukang Kayu
Mandor
L17
L08
L03
L01
Org/hr
Org/hr
Org/hr
Org/hr
0.0300
0.0700
0.0070
0.0020
45,000.00
60,000.00
47,000.00
80,000.00
BAHAN
Asbes (1,00 x 1,00) m x 5 mm
Paku Kayu Segala Ukuran
M204
M140
lbr
kg
1.1000
0.0100
15,600.00
17,500.00
17,160.00
175.00
17,335.00
PERALATAN
1,350.00
4,200.00
329.00
160.00
6,039.00
JUMLAH
HARGA
(Rp.)
23,374.00
NO.
A.
1
2
3
4
: I.003
: Langit-langit asbes (1,0 x 1,0) m, tebal 4 mm
2
:m
KOMPONEN
SATUAN
PERKIRAAN
KUANTITAS
HARGA
SATUAN
(Rp.)
TENAGA
Pekerja Biasa
Tukang Kayu
Kepala Tukang Kayu
Mandor
L17
L08
L03
L01
Org/hr
Org/hr
Org/hr
Org/hr
0.0300
0.0700
0.0070
0.0020
45,000.00
60,000.00
47,000.00
80,000.00
1,350.00
4,200.00
329.00
160.00
6,039.00
BAHAN
Asbes (1,00 x 1,00) m x 4 mm
Paku Kayu Segala Ukuran
M205
M140
lbr
kg
1.1000
0.0100
15,000.00
17,500.00
JUMLAH
HARGA
(Rp.)
16,500.00
175.00
16,675.00
PERALATAN
22,714.00
NO.
A.
1
2
3
4
: I.004
: Langit-langit asbes (1,0 x 1,0) m, tebal 3,50 mm
: m2
KOMPONEN
SATUAN
PERKIRAAN
KUANTITAS
HARGA
SATUAN
(Rp.)
TENAGA
Pekerja Biasa
Tukang Kayu
Kepala Tukang Kayu
Mandor
L17
L08
L03
L01
Org/hr
Org/hr
Org/hr
Org/hr
0.0300
0.0700
0.0070
0.0020
45,000.00
60,000.00
47,000.00
80,000.00
BAHAN
Asbes (1,00 x 1,00) m x 3,5 mm
Paku Kayu Segala Ukuran
M206
M140
lbr
kg
1.1000
0.0100
14,400.00
17,500.00
15,840.00
175.00
16,015.00
PERALATAN
1,350.00
4,200.00
329.00
160.00
6,039.00
JUMLAH
HARGA
(Rp.)
22,054.00
NO.
A.
1
2
3
4
: I.005
: Langit-langit akustik (30 x 30) cm
2
:m
KOMPONEN
SATUAN
PERKIRAAN
KUANTITAS
HARGA
SATUAN
(Rp.)
TENAGA
Pekerja Biasa
Tukang Kayu
Kepala Tukang Kayu
Mandor
L17
L08
L03
L01
Org/hr
Org/hr
Org/hr
Org/hr
0.0600
0.1200
0.0120
0.0030
45,000.00
60,000.00
47,000.00
80,000.00
2,700.00
7,200.00
564.00
240.00
10,704.00
BAHAN
Akustik (30 x 30) cm
Paku Kayu Segala Ukuran
M207
M140
lbr
kg
12.0000
0.0500
#REF!
17,500.00
JUMLAH
HARGA
(Rp.)
#REF!
875.00
#REF!
PERALATAN
#REF!
NO.
A.
1
2
3
4
: I.006
: Langit-langit akustik (30 x 60) cm
: m2
KOMPONEN
SATUAN
PERKIRAAN
KUANTITAS
HARGA
SATUAN
(Rp.)
TENAGA
Pekerja Biasa
Tukang Kayu
Kepala Tukang Kayu
Mandor
L17
L08
L03
L01
Org/hr
Org/hr
Org/hr
Org/hr
0.0600
0.1000
0.0100
0.0030
45,000.00
60,000.00
47,000.00
80,000.00
2,700.00
6,000.00
470.00
240.00
9,410.00
BAHAN
Akustik (30 x 60) cm
Paku Kayu Segala Ukuran
M208
M140
lbr
kg
5.8000
0.0500
JUMLAH
HARGA
(Rp.)
#REF!
17,500.00
#REF!
875.00
#REF!
PERALATAN
#REF!
NO.
A.
1
2
3
4
: I.007
: Langit-langit akustik (60 x 120) cm
2
:m
KOMPONEN
SATUAN
PERKIRAAN
KUANTITAS
HARGA
SATUAN
(Rp.)
TENAGA
Pekerja Biasa
Tukang Kayu
Kepala Tukang Kayu
Mandor
L17
L08
L03
L01
Org/hr
Org/hr
Org/hr
Org/hr
0.0600
0.1000
0.0100
0.0030
45,000.00
60,000.00
47,000.00
80,000.00
2,700.00
6,000.00
470.00
240.00
9,410.00
BAHAN
Akustik (60 x 120) cm
Paku Kayu Segala Ukuran
M209
M140
lbr
kg
1.5000
0.0500
#REF!
17,500.00
JUMLAH
HARGA
(Rp.)
#REF!
875.00
#REF!
PERALATAN
#REF!
NO.
A.
1
2
3
4
: I.008
: Langit-langit plywood (30 x 60) cm, tebal 4 mm
: m2
KOMPONEN
SATUAN
PERKIRAAN
KUANTITAS
HARGA
SATUAN
(Rp.)
TENAGA
Pekerja Biasa
Tukang Kayu
Kepala Tukang Kayu
Mandor
L17
L08
L03
L01
Org/hr
Org/hr
Org/hr
Org/hr
0.0700
0.1000
0.0100
0.0035
45,000.00
60,000.00
47,000.00
80,000.00
BAHAN
Plywood (30 x 60) cm x 4 mm
Paku Kayu Segala Ukuran
M222
M140
lbr
kg
0.3600
0.0300
6,350.00
17,500.00
2,286.00
525.00
2,811.00
PERALATAN
3,150.00
6,000.00
470.00
280.00
9,900.00
JUMLAH
HARGA
(Rp.)
12,711.00
NO.
A.
1
2
3
4
: I.009
: Langit-langit plywood (30 x 60) cm, tebal 6 mm
2
:m
KOMPONEN
SATUAN
PERKIRAAN
KUANTITAS
HARGA
SATUAN
(Rp.)
TENAGA
Pekerja Biasa
Tukang Kayu
Kepala Tukang Kayu
Mandor
L17
L08
L03
L01
Org/hr
Org/hr
Org/hr
Org/hr
0.0600
0.1000
0.0100
0.0030
45,000.00
60,000.00
47,000.00
80,000.00
2,700.00
6,000.00
470.00
240.00
9,410.00
BAHAN
Plywood (30 x 60) cm x 6 mm
Paku Kayu Segala Ukuran
M223
M140
lbr
kg
0.3600
0.0300
9,020.00
17,500.00
JUMLAH
HARGA
(Rp.)
3,247.20
525.00
3,772.20
PERALATAN
13,182.20
NO.
A.
1
2
3
4
: I.010
: Langit-langit plywood (60 x 120) cm, tebal 4 mm
: m2
KOMPONEN
SATUAN
PERKIRAAN
KUANTITAS
HARGA
SATUAN
(Rp.)
TENAGA
Pekerja Biasa
Tukang Kayu
Kepala Tukang Kayu
Mandor
L17
L08
L03
L01
Org/hr
Org/hr
Org/hr
Org/hr
0.0700
0.1000
0.0100
0.0035
45,000.00
60,000.00
47,000.00
80,000.00
BAHAN
Plywood (60 x 120) cm x 4 mm
Paku Kayu Segala Ukuran
M224
M140
lbr
kg
0.3750
0.0300
21,010.00
17,500.00
7,878.75
525.00
8,403.75
PERALATAN
3,150.00
6,000.00
470.00
280.00
9,900.00
JUMLAH
HARGA
(Rp.)
18,303.75
NO.
A.
1
2
3
4
: I.011
: Langit-langit plywood (60 x 120) cm, tebal 6 mm
2
:m
KOMPONEN
SATUAN
PERKIRAAN
KUANTITAS
HARGA
SATUAN
(Rp.)
TENAGA
Pekerja Biasa
Tukang Kayu
Kepala Tukang Kayu
Mandor
L17
L08
L03
L01
Org/hr
Org/hr
Org/hr
Org/hr
0.0700
0.1000
0.0100
0.0035
45,000.00
60,000.00
47,000.00
80,000.00
3,150.00
6,000.00
470.00
280.00
9,900.00
BAHAN
Plywood (60 x 120) cm x 6 mm
Paku Kayu Segala Ukuran
M225
M140
lbr
kg
0.3750
0.0300
25,010.00
17,500.00
JUMLAH
HARGA
(Rp.)
9,378.75
525.00
9,903.75
PERALATAN
19,803.75
NO.
A.
1
2
3
4
: I.012
: Langit-langit teakwood (30 x 60) cm, tebal 4 mm
: m2
KOMPONEN
SATUAN
PERKIRAAN
KUANTITAS
HARGA
SATUAN
(Rp.)
TENAGA
Pekerja Biasa
Tukang Kayu
Kepala Tukang Kayu
Mandor
L17
L08
L03
L01
Org/hr
Org/hr
Org/hr
Org/hr
0.0700
0.1000
0.0100
0.0035
45,000.00
60,000.00
47,000.00
80,000.00
BAHAN
Teakwood (30 x 60) cm x 4 mm
Paku Kayu Segala Ukuran
M227
M140
lbr
kg
0.3600
0.0300
6,860.00
17,500.00
2,469.60
525.00
2,994.60
PERALATAN
3,150.00
6,000.00
470.00
280.00
9,900.00
JUMLAH
HARGA
(Rp.)
12,894.60
NO.
A.
1
2
3
4
: I.013
: Langit-langit teakwood (60 x 120) cm, tebal 4 mm
2
:m
KOMPONEN
SATUAN
PERKIRAAN
KUANTITAS
HARGA
SATUAN
(Rp.)
TENAGA
Pekerja Biasa
Tukang Kayu
Kepala Tukang Kayu
Mandor
L17
L08
L03
L01
Org/hr
Org/hr
Org/hr
Org/hr
0.0700
0.1000
0.0100
0.0035
45,000.00
60,000.00
47,000.00
80,000.00
3,150.00
6,000.00
470.00
280.00
9,900.00
BAHAN
Teakwood (60 x 120) cm x 4 mm
Paku Kayu Segala Ukuran
M228
M140
lbr
kg
0.3750
0.0300
24,490.00
17,500.00
JUMLAH
HARGA
(Rp.)
9,183.75
525.00
9,708.75
PERALATAN
19,608.75
NO.
A.
1
2
3
4
: I.014
: Langit-langit lat kayu jati
: m2
KOMPONEN
SATUAN
PERKIRAAN
KUANTITAS
HARGA
SATUAN
(Rp.)
TENAGA
Pekerja Biasa
Tukang Kayu
Kepala Tukang Kayu
Mandor
L17
L08
L03
L01
Org/hr
Org/hr
Org/hr
Org/hr
0.2000
0.6000
0.0600
0.0100
45,000.00
60,000.00
47,000.00
80,000.00
9,000.00
36,000.00
2,820.00
800.00
48,620.00
BAHAN
Papan (2x20) cm
Paku Kayu Segala Ukuran
Sekrup Segala Ukuran
M097
M140
M145
m3
kg
bh
0.0240
0.0100
12.0000
JUMLAH
HARGA
(Rp.)
#REF!
17,500.00
410.00
#REF!
175.00
4,920.00
#REF!
PERALATAN
#REF!
NO.
A.
1
2
3
4
: I.015
: Langit-langit lat kayu ramin
2
:m
KOMPONEN
SATUAN
PERKIRAAN
KUANTITAS
HARGA
SATUAN
(Rp.)
TENAGA
Pekerja Biasa
Tukang Kayu
Kepala Tukang Kayu
Mandor
L17
L08
L03
L01
Org/hr
Org/hr
Org/hr
Org/hr
0.2000
0.6000
0.0600
0.0100
45,000.00
60,000.00
47,000.00
80,000.00
9,000.00
36,000.00
2,820.00
800.00
48,620.00
BAHAN
Kayu Ramin
Paku Kayu Segala Ukuran
Sekrup Segala Ukuran
M087
M140
M145
m3
kg
bh
0.0240
0.0100
12.0000
#REF!
17,500.00
410.00
JUMLAH
HARGA
(Rp.)
#REF!
175.00
4,920.00
#REF!
PERALATAN
#REF!
NO.
A.
1
2
3
4
: I.016
: Langit-langit lat kayu kamper
: m2
KOMPONEN
SATUAN
PERKIRAAN
KUANTITAS
HARGA
SATUAN
(Rp.)
TENAGA
Pekerja Biasa
Tukang Kayu
Kepala Tukang Kayu
Mandor
L17
L08
L03
L01
Org/hr
Org/hr
Org/hr
Org/hr
0.2000
0.6000
0.0600
0.0100
45,000.00
60,000.00
47,000.00
80,000.00
BAHAN
Papan (2x20) cm
Paku Kayu Segala Ukuran
Sekrup Segala Ukuran
M081
M140
M145
m3
kg
bh
0.0240
0.0100
12.0000
10,800,000.00
17,500.00
410.00
259,200.00
175.00
4,920.00
264,295.00
PERALATAN
9,000.00
36,000.00
2,820.00
800.00
48,620.00
JUMLAH
HARGA
(Rp.)
312,915.00
NO.
A.
1
2
3
4
: I.017
: Langit-langit soft board
2
:m
KOMPONEN
SATUAN
PERKIRAAN
KUANTITAS
HARGA
SATUAN
(Rp.)
JUMLAH
HARGA
(Rp.)
TENAGA
Pekerja Biasa
Tukang Kayu
Kepala Tukang Kayu
Mandor
L17
L08
L03
L01
Org/hr
Org/hr
Org/hr
Org/hr
0.6000
0.1000
0.0100
0.0030
45,000.00
60,000.00
47,000.00
80,000.00
27,000.00
6,000.00
470.00
240.00
33,710.00
BAHAN
Soft Board
Paku Kayu Segala Ukuran
M212
M140
lbr
kg
0.3500
0.0300
#REF!
17,500.00
#REF!
525.00
#REF!
PERALATAN
#REF!
NO.
A.
1
2
3
4
: I.018
: Langit-langit akustik (60 x 120) cm + rangka aluminium
: m2
KOMPONEN
SATUAN
PERKIRAAN
KUANTITAS
HARGA
SATUAN
(Rp.)
TENAGA
Pekerja Biasa
Tukang Kayu
Kepala Tukang Kayu
Mandor
L17
L08
L03
L01
Org/hr
Org/hr
Org/hr
Org/hr
0.1500
0.5000
0.0500
0.0080
45,000.00
60,000.00
47,000.00
80,000.00
6,750.00
30,000.00
2,350.00
640.00
39,740.00
BAHAN
Baja Ringan
Kawat Beton/Bendrat RRT
Paku Keling
Akustik (60 x 120) cm
M132
M135
M147
M209
kg
kg
bh
lbr
3.6000
0.1500
1.0500
1.5000
JUMLAH
HARGA
(Rp.)
35,175.00
7,500.00
2,660.00
#REF!
126,630.00
1,125.00
#REF!
#REF!
PERALATAN
#REF!
NO.
A.
1
2
3
4
: I.019
: Langit-langit asbes (1,00 x 1,00) m x 3,5 mm + rangka kayu jati
2
:m
KOMPONEN
SATUAN
PERKIRAAN
KUANTITAS
HARGA
SATUAN
(Rp.)
TENAGA
Pekerja Biasa
Tukang Kayu
Kepala Tukang Kayu
Mandor
L17
L08
L03
L01
Org/hr
Org/hr
Org/hr
Org/hr
0.1800
0.3200
0.0320
0.0090
45,000.00
60,000.00
47,000.00
80,000.00
8,100.00
19,200.00
1,504.00
720.00
29,524.00
BAHAN
Usuk : 5/7
Paku Kayu Segala Ukuran
Asbes (1,00 x 1,00) m x 3,5 mm
M095
M140
M206
m3
kg
lbr
0.0120
0.0600
1.1000
#REF!
17,500.00
14,400.00
JUMLAH
HARGA
(Rp.)
#REF!
1,050.00
15,840.00
#REF!
PERALATAN
#REF!
NO.
A.
1
2
3
4
: I.020
: Langit-langit asbes (1,00 x 1,00) m x 3,5 mm + rangka kayu kamper
: m2
KOMPONEN
SATUAN
PERKIRAAN
KUANTITAS
HARGA
SATUAN
(Rp.)
TENAGA
Pekerja Biasa
Tukang Kayu
Kepala Tukang Kayu
Mandor
L17
L08
L03
L01
Org/hr
Org/hr
Org/hr
Org/hr
0.1800
0.3200
0.0320
0.0090
45,000.00
60,000.00
47,000.00
80,000.00
BAHAN
Usuk : 5/7
Paku Kayu Segala Ukuran
Asbes (1,00 x 1,00) m x 3,5 mm
M079
M140
M206
m3
kg
lbr
0.0120
0.0600
1.1000
1,450,000.00
17,500.00
14,400.00
17,400.00
1,050.00
15,840.00
34,290.00
PERALATAN
8,100.00
19,200.00
1,504.00
720.00
29,524.00
JUMLAH
HARGA
(Rp.)
63,814.00
NO.
A.
1
2
3
4
: I.021
: Langit-langit asbes (1,00 x 1,00) m x 3,5 mm + rangka kayu borneo
2
:m
KOMPONEN
SATUAN
PERKIRAAN
KUANTITAS
HARGA
SATUAN
(Rp.)
TENAGA
Pekerja Biasa
Tukang Kayu
Kepala Tukang Kayu
Mandor
L17
L08
L03
L01
Org/hr
Org/hr
Org/hr
Org/hr
0.1800
0.3200
0.0320
0.0090
45,000.00
60,000.00
47,000.00
80,000.00
8,100.00
19,200.00
1,504.00
720.00
29,524.00
BAHAN
Usuk : 5/7
Paku Kayu Segala Ukuran
Asbes (1,00 x 1,00) m x 3,5 mm
M055
M140
M206
m3
kg
lbr
0.0120
0.0600
1.1000
#REF!
17,500.00
14,400.00
JUMLAH
HARGA
(Rp.)
#REF!
1,050.00
15,840.00
#REF!
PERALATAN
#REF!
NO.
A.
1
2
3
4
: I.022
: Langit-langit asbes (1,00 x 1,00) m x 3,5 mm + rangka kayu bengkirai
: m2
KOMPONEN
SATUAN
PERKIRAAN
KUANTITAS
HARGA
SATUAN
(Rp.)
TENAGA
Pekerja Biasa
Tukang Kayu
Kepala Tukang Kayu
Mandor
L17
L08
L03
L01
Org/hr
Org/hr
Org/hr
Org/hr
0.1800
0.3200
0.0320
0.0090
45,000.00
60,000.00
47,000.00
80,000.00
8,100.00
19,200.00
1,504.00
720.00
29,524.00
BAHAN
Usuk : 5/7
Paku Kayu Segala Ukuran
Asbes (1,00 x 1,00) m x 3,5 mm
M073
M140
M206
m3
kg
lbr
0.0120
0.0600
1.1000
JUMLAH
HARGA
(Rp.)
#REF!
17,500.00
14,400.00
#REF!
1,050.00
15,840.00
#REF!
PERALATAN
#REF!
NO.
A.
1
2
3
4
: I.023
: Langit-langit asbes (1,00 x 1,00) m x 3,5 mm + rangka kayu kruing
2
:m
KOMPONEN
SATUAN
PERKIRAAN
KUANTITAS
HARGA
SATUAN
(Rp.)
TENAGA
Pekerja Biasa
Tukang Kayu
Kepala Tukang Kayu
Mandor
L17
L08
L03
L01
Org/hr
Org/hr
Org/hr
Org/hr
0.1800
0.3200
0.0320
0.0090
45,000.00
60,000.00
47,000.00
80,000.00
8,100.00
19,200.00
1,504.00
720.00
29,524.00
BAHAN
Usuk : 5/7
Paku Kayu Segala Ukuran
Asbes (1,00 x 1,00) m x 3,5 mm
M067
M140
M206
m3
kg
lbr
0.0120
0.0600
1.1000
5,400,000.00
17,500.00
14,400.00
JUMLAH
HARGA
(Rp.)
64,800.00
1,050.00
15,840.00
81,690.00
PERALATAN
111,214.00
NO.
A.
1
2
3
4
: I.024
: Langit-langit asbes (1,00 x 1,00) m x 3,5 mm + rangka kayu meranti
: m2
KOMPONEN
SATUAN
PERKIRAAN
KUANTITAS
HARGA
SATUAN
(Rp.)
TENAGA
Pekerja Biasa
Tukang Kayu
Kepala Tukang Kayu
Mandor
L17
L08
L03
L01
Org/hr
Org/hr
Org/hr
Org/hr
0.1800
0.3200
0.0320
0.0090
45,000.00
60,000.00
47,000.00
80,000.00
BAHAN
Usuk : 5/7
Paku Kayu Segala Ukuran
Asbes (1,00 x 1,00) m x 3,5 mm
M061
M140
M206
m3
kg
lbr
0.0120
0.0600
1.1000
4,500,000.00
17,500.00
14,400.00
54,000.00
1,050.00
15,840.00
70,890.00
PERALATAN
8,100.00
19,200.00
1,504.00
720.00
29,524.00
JUMLAH
HARGA
(Rp.)
100,414.00
NO.
A.
1
2
3
4
: I.025
: Langit-langit plywood 4 mm + rangka kayu jati
2
:m
KOMPONEN
SATUAN
PERKIRAAN
KUANTITAS
HARGA
SATUAN
(Rp.)
TENAGA
Pekerja Biasa
Tukang Kayu
Kepala Tukang Kayu
Mandor
L17
L08
L03
L01
Org/hr
Org/hr
Org/hr
Org/hr
0.2700
0.4000
0.0400
0.0135
45,000.00
60,000.00
47,000.00
80,000.00
12,150.00
24,000.00
1,880.00
1,080.00
39,110.00
BAHAN
Usuk : 5/7
Paku Kayu Segala Ukuran
Plywood (120 x 240) cm x 4 mm
M095
M140
M226
m3
kg
lbr
0.0230
0.0600
0.3900
#REF!
17,500.00
85,000.00
JUMLAH
HARGA
(Rp.)
#REF!
1,050.00
33,150.00
#REF!
PERALATAN
#REF!
NO.
A.
1
2
3
4
: I.026
: Langit-langit plywood 4 mm + rangka kayu kamper
: m2
KOMPONEN
SATUAN
PERKIRAAN
KUANTITAS
HARGA
SATUAN
(Rp.)
TENAGA
Pekerja Biasa
Tukang Kayu
Kepala Tukang Kayu
Mandor
L17
L08
L03
L01
Org/hr
Org/hr
Org/hr
Org/hr
0.2700
0.4000
0.0400
0.0135
45,000.00
60,000.00
47,000.00
80,000.00
BAHAN
Usuk : 5/7
Paku Kayu Segala Ukuran
Plywood (120 x 240) cm x 4 mm
M079
M140
M226
m3
kg
lbr
0.0230
0.0600
0.3900
1,450,000.00
17,500.00
85,000.00
33,350.00
1,050.00
33,150.00
67,550.00
PERALATAN
12,150.00
24,000.00
1,880.00
1,080.00
39,110.00
JUMLAH
HARGA
(Rp.)
106,660.00
NO.
A.
1
2
3
4
: I.027
: Langit-langit plywood 4 mm + rangka kayu borneo
2
:m
KOMPONEN
SATUAN
PERKIRAAN
KUANTITAS
HARGA
SATUAN
(Rp.)
TENAGA
Pekerja Biasa
Tukang Kayu
Kepala Tukang Kayu
Mandor
L17
L08
L03
L01
Org/hr
Org/hr
Org/hr
Org/hr
0.2700
0.4000
0.0400
0.0135
45,000.00
60,000.00
47,000.00
80,000.00
12,150.00
24,000.00
1,880.00
1,080.00
39,110.00
BAHAN
Usuk : 5/7
Paku Kayu Segala Ukuran
Plywood (120 x 240) cm x 4 mm
M055
M140
M226
m3
kg
lbr
0.0230
0.0600
0.3900
#REF!
17,500.00
85,000.00
JUMLAH
HARGA
(Rp.)
#REF!
1,050.00
33,150.00
#REF!
PERALATAN
#REF!
NO.
A.
1
2
3
4
: I.028
: Langit-langit plywood 4 mm + rangka kayu bengkirai
: m2
KOMPONEN
SATUAN
PERKIRAAN
KUANTITAS
HARGA
SATUAN
(Rp.)
TENAGA
Pekerja Biasa
Tukang Kayu
Kepala Tukang Kayu
Mandor
L17
L08
L03
L01
Org/hr
Org/hr
Org/hr
Org/hr
0.2700
0.4000
0.0400
0.0135
45,000.00
60,000.00
47,000.00
80,000.00
12,150.00
24,000.00
1,880.00
1,080.00
39,110.00
BAHAN
Usuk : 5/7
Paku Kayu Segala Ukuran
Plywood (120 x 240) cm x 4 mm
M073
M140
M226
m3
kg
lbr
0.0230
0.0600
0.3900
JUMLAH
HARGA
(Rp.)
#REF!
17,500.00
85,000.00
#REF!
1,050.00
33,150.00
#REF!
PERALATAN
#REF!
NO.
A.
1
2
3
4
: I.029
: Langit-langit plywood 4 mm + rangka kayu kruing
2
:m
KOMPONEN
SATUAN
PERKIRAAN
KUANTITAS
HARGA
SATUAN
(Rp.)
TENAGA
Pekerja Biasa
Tukang Kayu
Kepala Tukang Kayu
Mandor
L17
L08
L03
L01
Org/hr
Org/hr
Org/hr
Org/hr
0.2700
0.4000
0.0400
0.0135
45,000.00
60,000.00
47,000.00
80,000.00
12,150.00
24,000.00
1,880.00
1,080.00
39,110.00
BAHAN
Usuk : 5/7
Paku Kayu Segala Ukuran
Plywood (120 x 240) cm x 4 mm
M067
M140
M226
m3
kg
lbr
0.0230
0.0600
0.3900
5,400,000.00
17,500.00
85,000.00
JUMLAH
HARGA
(Rp.)
124,200.00
1,050.00
33,150.00
158,400.00
PERALATAN
197,510.00
NO.
A.
1
2
3
4
: I.030
: Langit-langit plywood 4 mm + rangka kayu meranti
: m2
KOMPONEN
SATUAN
PERKIRAAN
KUANTITAS
HARGA
SATUAN
(Rp.)
TENAGA
Pekerja Biasa
Tukang Kayu
Kepala Tukang Kayu
Mandor
L17
L08
L03
L01
Org/hr
Org/hr
Org/hr
Org/hr
0.2700
0.4000
0.0400
0.0135
45,000.00
60,000.00
47,000.00
80,000.00
BAHAN
Usuk : 5/7
Paku Kayu Segala Ukuran
Plywood (120 x 240) cm x 4 mm
M061
M140
M226
m3
kg
lbr
0.0230
0.0600
0.3900
4,500,000.00
17,500.00
85,000.00
103,500.00
1,050.00
33,150.00
137,700.00
PERALATAN
12,150.00
24,000.00
1,880.00
1,080.00
39,110.00
JUMLAH
HARGA
(Rp.)
176,810.00
NO.
A.
1
2
3
4
: I.031
: Langit-langit akustik (30 x 60) cm + rangka kayu jati
2
:m
KOMPONEN
SATUAN
PERKIRAAN
KUANTITAS
HARGA
SATUAN
(Rp.)
JUMLAH
HARGA
(Rp.)
TENAGA
Pekerja Biasa
Tukang Kayu
Kepala Tukang Kayu
Mandor
L17
L08
L03
L01
Org/hr
Org/hr
Org/hr
Org/hr
0.2600
0.4000
0.0400
0.0130
45,000.00
60,000.00
47,000.00
80,000.00
11,700.00
24,000.00
1,880.00
1,040.00
38,620.00
BAHAN
Usuk : 5/7
Paku Kayu Segala Ukuran
Akustik (30 x 60) cm
M095
M140
M208
m3
kg
lbr
0.0230
0.0600
5.8000
#REF!
17,500.00
#REF!
#REF!
1,050.000
#REF!
#REF!
PERALATAN
#REF!
NO.
A.
1
2
3
4
: I.032
: Langit-langit akustik (30 x 60) cm + rangka kayu kamper
: m2
KOMPONEN
SATUAN
PERKIRAAN
KUANTITAS
HARGA
SATUAN
(Rp.)
TENAGA
Pekerja Biasa
Tukang Kayu
Kepala Tukang Kayu
Mandor
L17
L08
L03
L01
Org/hr
Org/hr
Org/hr
Org/hr
0.2600
0.4000
0.0400
0.0130
45,000.00
60,000.00
47,000.00
80,000.00
11,700.00
24,000.00
1,880.00
1,040.00
38,620.00
BAHAN
Usuk : 5/7
Paku Kayu Segala Ukuran
Akustik (30 x 60) cm
M079
M140
M208
m3
kg
lbr
0.0230
0.0600
5.8000
JUMLAH
HARGA
(Rp.)
1,450,000.00
17,500.00
#REF!
33,350.00
1,050.00
#REF!
#REF!
PERALATAN
#REF!
NO.
A.
1
2
3
4
: I.033
: Langit-langit akustik (30 x 60) cm + rangka kayu borneo
2
:m
KOMPONEN
SATUAN
PERKIRAAN
KUANTITAS
HARGA
SATUAN
(Rp.)
TENAGA
Pekerja Biasa
Tukang Kayu
Kepala Tukang Kayu
Mandor
L17
L08
L03
L01
Org/hr
Org/hr
Org/hr
Org/hr
0.2600
0.4000
0.0400
0.0130
45,000.00
60,000.00
47,000.00
80,000.00
11,700.00
24,000.00
1,880.00
1,040.00
38,620.00
BAHAN
Usuk : 5/7
Paku Kayu Segala Ukuran
Akustik (30 x 60) cm
M055
M140
M208
m3
kg
lbr
0.0230
0.0600
5.8000
#REF!
17,500.00
#REF!
JUMLAH
HARGA
(Rp.)
#REF!
1,050.000
#REF!
#REF!
PERALATAN
#REF!
NO.
A.
1
2
3
4
: I.034
: Langit-langit akustik (30 x 60) cm + rangka kayu bengkirai
: m2
KOMPONEN
SATUAN
PERKIRAAN
KUANTITAS
HARGA
SATUAN
(Rp.)
TENAGA
Pekerja Biasa
Tukang Kayu
Kepala Tukang Kayu
Mandor
L17
L08
L03
L01
Org/hr
Org/hr
Org/hr
Org/hr
0.2600
0.4000
0.0400
0.0130
45,000.00
60,000.00
47,000.00
80,000.00
11,700.00
24,000.00
1,880.00
1,040.00
38,620.00
BAHAN
Usuk : 5/7
Paku Kayu Segala Ukuran
Akustik (30 x 60) cm
M073
M140
M208
m3
kg
lbr
0.0230
0.0600
5.8000
JUMLAH
HARGA
(Rp.)
#REF!
17,500.00
#REF!
#REF!
1,050.000
#REF!
#REF!
PERALATAN
#REF!
NO.
A.
1
2
3
4
: I.035
: Langit-langit akustik (30 x 60) cm + rangka kayu kruing
2
:m
KOMPONEN
SATUAN
PERKIRAAN
KUANTITAS
HARGA
SATUAN
(Rp.)
JUMLAH
HARGA
(Rp.)
TENAGA
Pekerja Biasa
Tukang Kayu
Kepala Tukang Kayu
Mandor
L17
L08
L03
L01
Org/hr
Org/hr
Org/hr
Org/hr
0.2600
0.4000
0.0400
0.0130
45,000.00
60,000.00
47,000.00
80,000.00
11,700.00
24,000.00
1,880.00
1,040.00
38,620.00
BAHAN
Usuk : 5/7
Paku Kayu Segala Ukuran
Akustik (30 x 60) cm
M067
M140
M208
m3
kg
lbr
0.0230
0.0600
5.8000
5,400,000.00
17,500.00
#REF!
124,200.000
1,050.000
#REF!
#REF!
PERALATAN
#REF!
NO.
A.
1
2
3
4
: I.036
: Langit-langit akustik (30 x 60) cm + rangka kayu meranti
: m2
KOMPONEN
SATUAN
PERKIRAAN
KUANTITAS
HARGA
SATUAN
(Rp.)
TENAGA
Pekerja Biasa
Tukang Kayu
Kepala Tukang Kayu
Mandor
L17
L08
L03
L01
Org/hr
Org/hr
Org/hr
Org/hr
0.2600
0.4000
0.0400
0.0130
45,000.00
60,000.00
47,000.00
80,000.00
11,700.00
24,000.00
1,880.00
1,040.00
38,620.00
BAHAN
Usuk : 5/7
Paku Kayu Segala Ukuran
Akustik (30 x 60) cm
M061
M140
M208
m3
kg
lbr
0.0230
0.0600
5.8000
JUMLAH
HARGA
(Rp.)
4,500,000.00
17,500.00
#REF!
103,500.00
1,050.00
#REF!
#REF!
PERALATAN
#REF!
NO.
A.
1
2
3
4
: I.037
: Langit-langit akustik (30 x 30) cm + rangka kayu jati
2
:m
KOMPONEN
SATUAN
PERKIRAAN
KUANTITAS
HARGA
SATUAN
(Rp.)
JUMLAH
HARGA
(Rp.)
TENAGA
Pekerja Biasa
Tukang Kayu
Kepala Tukang Kayu
Mandor
L17
L08
L03
L01
Org/hr
Org/hr
Org/hr
Org/hr
0.3100
0.4700
0.0470
0.0155
45,000.00
60,000.00
47,000.00
80,000.00
13,950.00
28,200.00
2,209.00
1,240.00
45,599.00
BAHAN
Usuk : 5/7
Paku Kayu Segala Ukuran
Akustik (30 x 30) cm
M095
M140
M207
m3
kg
lbr
0.0270
0.0600
11.5000
#REF!
17,500.00
#REF!
#REF!
1,050.00
#REF!
#REF!
PERALATAN
#REF!
NO.
A.
1
2
3
4
: I.038
: Langit-langit akustik (30 x 30) cm + rangka kayu kamper
: m2
KOMPONEN
SATUAN
PERKIRAAN
KUANTITAS
HARGA
SATUAN
(Rp.)
TENAGA
Pekerja Biasa
Tukang Kayu
Kepala Tukang Kayu
Mandor
L17
L08
L03
L01
Org/hr
Org/hr
Org/hr
Org/hr
0.3100
0.4700
0.0470
0.0155
45,000.00
60,000.00
47,000.00
80,000.00
13,950.00
28,200.00
2,209.00
1,240.00
45,599.00
BAHAN
Usuk : 5/7
Paku Kayu Segala Ukuran
Akustik (30 x 30) cm
M079
M140
M207
m3
kg
lbr
0.0270
0.0600
11.5000
JUMLAH
HARGA
(Rp.)
1,450,000.00
17,500.00
#REF!
39,150.00
1,050.00
#REF!
#REF!
PERALATAN
#REF!
NO.
A.
1
2
3
4
: I.039
: Langit-langit akustik (30 x 30) cm + rangka kayu borneo
2
:m
KOMPONEN
SATUAN
PERKIRAAN
KUANTITAS
HARGA
SATUAN
(Rp.)
TENAGA
Pekerja Biasa
Tukang Kayu
Kepala Tukang Kayu
Mandor
L17
L08
L03
L01
Org/hr
Org/hr
Org/hr
Org/hr
0.3100
0.4700
0.0470
0.0155
45,000.00
60,000.00
47,000.00
80,000.00
13,950.00
28,200.00
2,209.00
1,240.00
45,599.00
BAHAN
Usuk : 5/7
Paku Kayu Segala Ukuran
Akustik (30 x 30) cm
M055
M140
M207
m3
kg
lbr
0.0270
0.0600
11.5000
#REF!
17,500.00
#REF!
JUMLAH
HARGA
(Rp.)
#REF!
1,050.00
#REF!
#REF!
PERALATAN
#REF!
NO.
A.
1
2
3
4
: I.040
: Langit-langit akustik (30 x 30) cm + rangka kayu bengkirai
: m2
KOMPONEN
SATUAN
PERKIRAAN
KUANTITAS
HARGA
SATUAN
(Rp.)
TENAGA
Pekerja Biasa
Tukang Kayu
Kepala Tukang Kayu
Mandor
L17
L08
L03
L01
Org/hr
Org/hr
Org/hr
Org/hr
0.3100
0.4700
0.0470
0.0155
45,000.00
60,000.00
47,000.00
80,000.00
13,950.00
28,200.00
2,209.00
1,240.00
45,599.00
BAHAN
Usuk : 5/7
Paku Kayu Segala Ukuran
Akustik (30 x 30) cm
M073
M140
M207
m3
kg
lbr
0.0270
0.0600
11.5000
JUMLAH
HARGA
(Rp.)
#REF!
17,500.00
#REF!
#REF!
1,050.00
#REF!
#REF!
PERALATAN
#REF!
NO.
A.
1
2
3
4
: I.041
: Langit-langit akustik (30 x 30) cm + rangka kayu kruing
2
:m
KOMPONEN
SATUAN
PERKIRAAN
KUANTITAS
HARGA
SATUAN
(Rp.)
JUMLAH
HARGA
(Rp.)
TENAGA
Pekerja Biasa
Tukang Kayu
Kepala Tukang Kayu
Mandor
L17
L08
L03
L01
Org/hr
Org/hr
Org/hr
Org/hr
0.3100
0.4700
0.0470
0.0155
45,000.00
60,000.00
47,000.00
80,000.00
13,950.00
28,200.00
2,209.00
1,240.00
45,599.00
BAHAN
Usuk : 5/7
Paku Kayu Segala Ukuran
Akustik (30 x 30) cm
M067
M140
M207
m3
kg
lbr
0.0270
0.0600
11.5000
5,400,000.00
17,500.00
#REF!
145,800.00
1,050.00
#REF!
#REF!
PERALATAN
#REF!
NO.
A.
1
2
3
4
: I.042
: Langit-langit akustik (30 x 30) cm + rangka kayu meranti
: m2
KOMPONEN
SATUAN
PERKIRAAN
KUANTITAS
HARGA
SATUAN
(Rp.)
TENAGA
Pekerja Biasa
Tukang Kayu
Kepala Tukang Kayu
Mandor
L17
L08
L03
L01
Org/hr
Org/hr
Org/hr
Org/hr
0.3100
0.4700
0.0470
0.0155
45,000.00
60,000.00
47,000.00
80,000.00
13,950.00
28,200.00
2,209.00
1,240.00
45,599.00
BAHAN
Usuk : 5/7
Paku Kayu Segala Ukuran
Akustik (30 x 30) cm
M055
M140
M207
m3
kg
lbr
0.0270
0.0600
11.5000
JUMLAH
HARGA
(Rp.)
#REF!
17,500.00
#REF!
#REF!
1,050.00
#REF!
#REF!
PERALATAN
#REF!
NO.
A.
1
2
3
4
: I.043
: Langit-langit gypsum board (120x240x9) mm, tebal 9 mm
2
:m
KOMPONEN
SATUAN
PERKIRAAN
KUANTITAS
HARGA
SATUAN
(Rp.)
TENAGA
Pekerja Biasa
Tukang Kayu
Kepala Tukang Kayu
Mandor
L17
L08
L03
L01
Org/hr
Org/hr
Org/hr
Org/hr
0.1000
0.0500
0.0050
0.0050
45,000.00
60,000.00
47,000.00
80,000.00
4,500.00
3,000.00
235.00
400.00
8,135.00
BAHAN
Gypsum Board
Sekrup Segala Ukuran
M213
M145
lbr
bh
0.3640
9.0000
58,630.00
410.00
JUMLAH
HARGA
(Rp.)
21,341.320
3,690.000
25,031.32
PERALATAN
33,166.32
NO.
A.
1
2
3
4
: I.044
: List langit-langit kayu profil
: m1
KOMPONEN
SATUAN
PERKIRAAN
KUANTITAS
HARGA
SATUAN
(Rp.)
TENAGA
Pekerja Biasa
Tukang Kayu
Kepala Tukang Kayu
Mandor
L17
L08
L03
L01
Org/hr
Org/hr
Org/hr
Org/hr
0.0500
0.0500
0.0050
0.0030
45,000.00
60,000.00
47,000.00
80,000.00
BAHAN
List Kayu Profil
Paku Kayu Segala Ukuran
M090
M140
m1
kg
1.0500
0.0100
6,900.00
17,500.00
7,245.00
175.00
7,420.00
PERALATAN
2,250.00
3,000.00
235.00
240.00
5,725.00
JUMLAH
HARGA
(Rp.)
13,145.00
NO.
A.
1
2
3
4
: I.045
: List langit-langit gypsum
1
:m
KOMPONEN
SATUAN
PERKIRAAN
KUANTITAS
HARGA
SATUAN
(Rp.)
TENAGA
Pekerja Biasa
Tukang Kayu
Kepala Tukang Kayu
Mandor
L17
L08
L03
L01
Org/hr
Org/hr
Org/hr
Org/hr
0.0500
0.0500
0.0050
0.0030
45,000.00
60,000.00
47,000.00
80,000.00
BAHAN
List Gypsum
Lem Kayu
M211
M422
m'
Ltr
1.1000
0.0500
18,040.00
25,040.00
19,844.00
1,252.00
21,096.00
PERALATAN
2,250.00
3,000.00
235.00
240.00
5,725.00
JUMLAH
HARGA
(Rp.)
26,821.00
NO.
A.
1
2
3
4
: J.001
: Pasang kloset jongkok teraso
: bh
KOMPONEN
SATUAN
PERKIRAAN
KUANTITAS
HARGA
SATUAN
(Rp.)
TENAGA
Pekerja Biasa
Tukang Batu
Kepala Tukang Batu
Mandor
L17
L07
L02
L01
Org/hr
Org/hr
Org/hr
Org/hr
1.0000
1.5000
0.3000
0.1100
45,000.00
60,000.00
70,000.00
80,000.00
45,000.00
90,000.00
21,000.00
8,800.00
164,800.00
BAHAN
Kloset Jongkok Teraso
Bata Merah
Portland Cement (PC)
Pasir Pasang
M234
M022
M037
M002
bh
bh
kg
m3
1.0000
7.0000
6.0000
0.0100
53,300.00
250.00
900.00
60,000.00
JUMLAH
HARGA
(Rp.)
53,300.00
1,750.00
5,400.00
600.00
61,050.00
PERALATAN
225,850.00
NO.
A.
1
2
3
4
: J.002
: Pasang kloset jongkok porselin kw. A
: bh
KOMPONEN
SATUAN
PERKIRAAN
KUANTITAS
HARGA
SATUAN
(Rp.)
TENAGA
Pekerja Biasa
Tukang Batu
Kepala Tukang Batu
Mandor
L17
L07
L02
L01
Org/hr
Org/hr
Org/hr
Org/hr
1.0000
1.5000
1.5000
0.1600
45,000.00
60,000.00
70,000.00
80,000.00
BAHAN
Kloset Jongkok Porselin Kw. A
Portland Cement (PC)
Pasir Pasang
M230
M037
M002
Unit
kg
m3
1.0000
6.0000
0.0100
133,250.00
900.00
60,000.00
133,250.00
5,400.00
600.00
139,250.00
PERALATAN
45,000.00
90,000.00
105,000.00
12,800.00
252,800.00
JUMLAH
HARGA
(Rp.)
392,050.00
NO.
A.
1
2
3
4
: J.003
: Pasang kloset jongkok lux
: bh
KOMPONEN
SATUAN
PERKIRAAN
KUANTITAS
HARGA
SATUAN
(Rp.)
TENAGA
Pekerja Biasa
Tukang Batu
Kepala Tukang Batu
Mandor
L17
L07
L02
L01
Org/hr
Org/hr
Org/hr
Org/hr
1.0000
1.5000
1.5000
0.1600
45,000.00
60,000.00
70,000.00
80,000.00
45,000.00
90,000.00
105,000.00
12,800.00
252,800.00
BAHAN
Kloset Jongkok Lux
Portland Cement (PC)
Pasir Pasang
M232
M037
M002
Unit
kg
m3
1.0000
6.0000
0.0100
266,500.00
900.00
60,000.00
JUMLAH
HARGA
(Rp.)
266,500.00
5,400.00
600.00
272,500.00
PERALATAN
525,300.00
NO.
A.
1
2
3
4
: J.004
: Pasang kloset duduk porselin kw. A
: bh
KOMPONEN
SATUAN
PERKIRAAN
KUANTITAS
HARGA
SATUAN
(Rp.)
TENAGA
Pekerja Biasa
Tukang Batu
Kepala Tukang Batu
Mandor
L17
L07
L02
L01
Org/hr
Org/hr
Org/hr
Org/hr
3.3000
1.1000
0.0010
0.1600
45,000.00
60,000.00
70,000.00
80,000.00
BAHAN
Kloset Duduk Porselin Kw. A
Perlengkapan
M231
Unit
1.0000
0.0600
1,332,500.00
79,950.00
1,332,500.00
4,797.00
1,337,297.00
PERALATAN
148,500.00
66,000.00
70.00
12,800.00
227,370.00
JUMLAH
HARGA
(Rp.)
1,564,667.00
NO.
A.
1
2
3
4
: J.005
: Pasang kloset duduk lux
: bh
KOMPONEN
SATUAN
PERKIRAAN
KUANTITAS
HARGA
SATUAN
(Rp.)
TENAGA
Pekerja Biasa
Tukang Batu
Kepala Tukang Batu
Mandor
L17
L07
L02
L01
Org/hr
Org/hr
Org/hr
Org/hr
3.3000
1.1000
0.0010
0.1600
45,000.00
60,000.00
70,000.00
80,000.00
148,500.00
66,000.00
70.00
12,800.00
227,370.00
BAHAN
Kloset Duduk Lux
Perlengkapan
M233
Unit
1.0000
0.0600
1,385,800.00
83,148.00
JUMLAH
HARGA
(Rp.)
1,385,800.00
4,988.88
1,390,788.88
PERALATAN
1,618,158.88
NO.
A.
1
2
3
4
: J.006
: Pasang urinoir
: bh
KOMPONEN
SATUAN
PERKIRAAN
KUANTITAS
HARGA
SATUAN
(Rp.)
TENAGA
Pekerja Biasa
Tukang Batu
Kepala Tukang Batu
Mandor
L17
L07
L02
L01
Org/hr
Org/hr
Org/hr
Org/hr
1.0000
1.0000
0.1000
0.1000
45,000.00
60,000.00
70,000.00
80,000.00
BAHAN
Urinoir Keramik
Perlengkapan
Portland Cement (PC)
Pasir Pasang
M246
bh
M037
M002
kg
m3
1.0000
0.3000
6.0000
0.0100
959,400.00
287,820.00
900.00
60,000.00
959,400.00
86,346.00
5,400.00
600.00
1,051,746.00
PERALATAN
45,000.00
60,000.00
7,000.00
8,000.00
120,000.00
JUMLAH
HARGA
(Rp.)
1,171,746.00
NO.
A.
1
2
3
4
: J.007
: Pasang wastafel kw. A
: bh
KOMPONEN
SATUAN
PERKIRAAN
KUANTITAS
HARGA
SATUAN
(Rp.)
TENAGA
Pekerja Biasa
Tukang Batu
Kepala Tukang Batu
Mandor
L17
L07
L02
L01
Org/hr
Org/hr
Org/hr
Org/hr
1.2000
1.4500
0.1500
0.1000
45,000.00
60,000.00
70,000.00
80,000.00
54,000.00
87,000.00
10,500.00
8,000.00
159,500.00
BAHAN
Wastafel Komplit (Kran + Sipon ) Kw.M248
A
Perlengkapan
Portland Cement (PC)
M037
Pasir Pasang
M002
Unit
1.0000
0.1200
6.0000
0.0100
kg
m3
387,450.00
46,494.00
900.00
60,000.00
JUMLAH
HARGA
(Rp.)
387,450.00
5,579.28
5,400.00
600.00
399,029.28
PERALATAN
558,529.28
NO.
A.
1
2
3
4
: J.008
: Pasang wastafel lux
: bh
KOMPONEN
SATUAN
PERKIRAAN
KUANTITAS
HARGA
SATUAN
(Rp.)
TENAGA
Pekerja Biasa
Tukang Batu
Kepala Tukang Batu
Mandor
L17
L07
L02
L01
Org/hr
Org/hr
Org/hr
Org/hr
1.2000
1.4500
0.1500
0.1000
45,000.00
60,000.00
70,000.00
80,000.00
BAHAN
Wastafel Komplit (Kran + Sipon ) LuxM247
Perlengkapan
Portland Cement (PC)
M037
Pasir Pasang
M002
Unit
kg
m3
1.0000
0.1200
6.0000
0.0100
1,172,600.00
140,712.00
900.00
60,000.00
1,172,600.00
16,885.44
5,400.00
600.00
1,195,485.44
PERALATAN
54,000.00
87,000.00
10,500.00
8,000.00
159,500.00
JUMLAH
HARGA
(Rp.)
1,354,985.44
NO.
A.
1
2
3
4
: J.009
: Pasang tempat sabun keramik
: bh
KOMPONEN
SATUAN
PERKIRAAN
KUANTITAS
HARGA
SATUAN
(Rp.)
TENAGA
Pekerja Biasa
Tukang Batu
Kepala Tukang Batu
Mandor
L17
L07
L02
L01
Org/hr
Org/hr
Org/hr
Org/hr
0.0100
0.1000
0.0100
0.0050
45,000.00
60,000.00
70,000.00
80,000.00
450.00
6,000.00
700.00
400.00
7,550.00
BAHAN
Tempat Sabun Keramik
M249
bh
1.0000
26,650.00
JUMLAH
HARGA
(Rp.)
26,650.00
26,650.00
PERALATAN
34,200.00
NO.
A.
1
2
3
4
: J.010
: Pasang bak mandi teraso volume 0.3 m3
: bh
KOMPONEN
SATUAN
PERKIRAAN
KUANTITAS
HARGA
SATUAN
(Rp.)
TENAGA
Pekerja Biasa
Tukang Batu
Kepala Tukang Batu
Mandor
L17
L07
L02
L01
Org/hr
Org/hr
Org/hr
Org/hr
2.1000
0.7500
0.0700
0.1100
45,000.00
60,000.00
70,000.00
80,000.00
BAHAN
Bak Mandi Teraso
Portland Cement (PC)
Pasir Pasang
M237
M037
M002
bh
kg
m3
1.0000
6.0000
0.0100
120,820.00
900.00
60,000.00
120,820.00
5,400.00
600.00
126,820.00
PERALATAN
94,500.00
45,000.00
4,900.00
8,800.00
153,200.00
JUMLAH
HARGA
(Rp.)
280,020.00
NO.
A.
1
2
3
4
: J.011
: Pasang bak mandi fibreglass volume 0.3 m3
: bh
KOMPONEN
SATUAN
PERKIRAAN
KUANTITAS
HARGA
SATUAN
(Rp.)
TENAGA
Pekerja Biasa
Tukang Batu
Kepala Tukang Batu
Mandor
L17
L07
L02
L01
Org/hr
Org/hr
Org/hr
Org/hr
1.8000
2.7000
0.5400
0.1100
45,000.00
60,000.00
70,000.00
80,000.00
81,000.00
162,000.00
37,800.00
8,800.00
289,600.00
BAHAN
Bak Mandi Fibre
Perlengkapan
M238
bh
1.0000
0.1800
293,150.00
52,767.00
JUMLAH
HARGA
(Rp.)
293,150.00
9,498.06
302,648.06
PERALATAN
592,248.06
NO.
A.
1
2
3
4
: J.012
: Pasang bak mandi batu bata volume 0.3 m3
: bh
KOMPONEN
SATUAN
PERKIRAAN
KUANTITAS
HARGA
SATUAN
(Rp.)
TENAGA
Pekerja Biasa
Tukang Batu
Kepala Tukang Batu
Mandor
L17
L07
L02
L01
Org/hr
Org/hr
Org/hr
Org/hr
6.0000
3.0000
0.3000
0.3000
45,000.00
60,000.00
70,000.00
80,000.00
BAHAN
Bata Merah
Portland Cement (PC)
Pasir Pasang
Porselin 10 x 20 cm warna
Portland Cement (PC) Warna
M022
M037
M002
M331
M039
bh
kg
m3
bh
kg
0.4000
120.0000
0.3000
220.0000
6.0000
250.00
900.00
60,000.00
870.00
6,500.00
100.00
108,000.00
18,000.00
191,400.00
39,000.00
356,500.00
PERALATAN
270,000.00
180,000.00
21,000.00
24,000.00
495,000.00
JUMLAH
HARGA
(Rp.)
851,500.00
NO.
A.
1
2
3
4
: J.013
: Pasang badkip porselen
: bh
KOMPONEN
SATUAN
PERKIRAAN
KUANTITAS
HARGA
SATUAN
(Rp.)
TENAGA
Pekerja Biasa
Tukang Batu
Kepala Tukang Batu
Mandor
L17
L07
L02
L01
Org/hr
Org/hr
Org/hr
Org/hr
0.0750
0.7500
0.2500
45,000.00
60,000.00
70,000.00
80,000.00
4,500.00
52,500.00
20,000.00
77,000.00
BAHAN
Badkip Porselen
M244
bh
1.0000
799,500.00
JUMLAH
HARGA
(Rp.)
799,500.00
799,500.00
PERALATAN
876,500.00
NO.
A.
1
2
3
4
: J.014
: Pasang bak beton volume 1.0 m3, head 2.5 m
: bh
KOMPONEN
SATUAN
PERKIRAAN
KUANTITAS
HARGA
SATUAN
(Rp.)
TENAGA
Pekerja Biasa
Tukang Batu
Kepala Tukang Batu
Mandor
L17
L07
L02
L01
Org/hr
Org/hr
Org/hr
Org/hr
3.5000
4.5000
0.9000
0.9000
45,000.00
60,000.00
70,000.00
80,000.00
157,500.00
270,000.00
63,000.00
72,000.00
562,500.00
BAHAN
Beton bertulang 1 pc : 1.5 ps : 2.5 kr
Besi Beton Polos
M112
Papan (2x20) cm
M057
Porselin 10 x 20 cm warna
M331
Perlengkapan
m3
kg
m3
bh
0.9000
180.0000
0.8000
250.0000
0.1000
JUMLAH
HARGA
(Rp.)
8,500.00
#REF!
820.00
#REF!
1,530,000.00
#REF!
205,000.00
#REF!
#REF!
PERALATAN
#REF!
NO.
A.
1
2
3
4
: J.015
: Pasang pipa penyalur air limbah jenis pipa tanah, diameter 15 cm
1
:m
KOMPONEN
SATUAN
PERKIRAAN
KUANTITAS
HARGA
SATUAN
(Rp.)
TENAGA
Pekerja Biasa
Tukang Batu
Kepala Tukang Batu
Mandor
L17
L07
L02
L01
Org/hr
Org/hr
Org/hr
Org/hr
0.0600
0.0300
0.0030
0.0025
45,000.00
60,000.00
70,000.00
80,000.00
2,700.00
1,800.00
210.00
200.00
4,910.00
BAHAN
Pipa PVC tipe AW Dia 6 "
Portland Cement (PC)
Pasir Pasang
Pasir Urug
M342
M037
M002
M001
Ljr
kg
m3
m3
0.2667
0.6800
0.0130
0.0110
472,780.00
900.00
60,000.00
96,600.00
JUMLAH
HARGA
(Rp.)
126,074.67
612.00
780.00
1,062.60
128,529.27
PERALATAN
133,439.27
NO.
A.
1
2
3
4
: J.016
: Pasang pipa penyalur air limbah jenis pipa tanah, diameter 20 cm
: m1
KOMPONEN
SATUAN
PERKIRAAN
KUANTITAS
HARGA
SATUAN
(Rp.)
TENAGA
Pekerja Biasa
Tukang Batu
Kepala Tukang Batu
Mandor
L17
L07
L02
L01
Org/hr
Org/hr
Org/hr
Org/hr
0.0800
0.0400
0.0040
0.0070
45,000.00
60,000.00
70,000.00
80,000.00
BAHAN
Pipa PVC tipe AW Dia 8 "
Portland Cement (PC)
Pasir Pasang
Pasir Urug
M343
M037
M002
M001
Ljr
kg
m3
m3
0.2667
0.8700
0.0140
0.0140
722,436.00
900.00
60,000.00
96,600.00
192,649.60
783.00
840.00
1,352.40
195,625.00
PERALATAN
3,600.00
2,400.00
280.00
560.00
6,840.00
JUMLAH
HARGA
(Rp.)
202,465.00
NO.
A.
1
2
3
4
: J.017
: Pasang pipa beton, diameter 20 cm
1
:m
KOMPONEN
SATUAN
PERKIRAAN
KUANTITAS
HARGA
SATUAN
(Rp.)
TENAGA
Pekerja Biasa
Tukang Batu
Kepala Tukang Batu
Mandor
L17
L07
L02
L01
Org/hr
Org/hr
Org/hr
Org/hr
0.1400
0.0700
0.0070
0.0070
45,000.00
60,000.00
70,000.00
80,000.00
6,300.00
4,200.00
490.00
560.00
11,550.00
BAHAN
Buis Beton Dia 0.20 m
Bata Merah
Portland Cement (PC)
Pasir Pasang
Pasir Urug
M044
M022
M037
M002
M001
bh
bh
kg
m3
m3
1.1000
12.1500
3.9200
0.0560
0.0240
32,500.00
250.00
900.00
60,000.00
96,600.00
JUMLAH
HARGA
(Rp.)
35,750.00
3,037.50
3,528.00
3,360.00
2,318.40
47,993.90
PERALATAN
59,543.90
NO.
A.
1
2
3
4
: J.018
: Pasang pipa beton, diameter 30 cm
: m1
KOMPONEN
SATUAN
PERKIRAAN
KUANTITAS
HARGA
SATUAN
(Rp.)
TENAGA
Pekerja Biasa
Tukang Batu
Kepala Tukang Batu
Mandor
L17
L07
L02
L01
Org/hr
Org/hr
Org/hr
Org/hr
0.3800
0.1900
0.0190
0.0190
45,000.00
60,000.00
70,000.00
80,000.00
BAHAN
Buis Beton Dia 0.30 m
Bata Merah
Portland Cement (PC)
Pasir Pasang
Pasir Urug
M045
M022
M037
M002
M001
bh
bh
kg
m3
m3
1.100
74.250
3.090
0.018
0.021
40,890.00
250.00
900.00
60,000.00
96,600.00
44,979.000
18,562.500
2,781.000
1,098.000
1,999.620
69,420.12
PERALATAN
17,100.00
11,400.00
1,330.00
1,520.00
31,350.00
JUMLAH
HARGA
(Rp.)
100,770.12
NO.
A.
1
2
3
4
: J.019
: Pasang pipa beton, diameter 40 cm
1
:m
KOMPONEN
SATUAN
PERKIRAAN
KUANTITAS
HARGA
SATUAN
(Rp.)
TENAGA
Pekerja Biasa
Tukang Batu
Kepala Tukang Batu
Mandor
L17
L07
L02
L01
Org/hr
Org/hr
Org/hr
Org/hr
0.3800
0.1900
0.0190
0.0190
45,000.00
60,000.00
70,000.00
80,000.00
17,100.00
11,400.00
1,330.00
1,520.00
31,350.00
BAHAN
Buis Beton Dia 0.40 m
Bata Merah
Portland Cement (PC)
Pasir Pasang
Pasir Urug
M046
M022
M037
M002
M001
bh
bh
kg
m3
m3
1.100
99.000
4.120
0.024
0.028
51,000.00
250.00
900.00
60,000.00
96,600.00
JUMLAH
HARGA
(Rp.)
56,100.000
24,750.000
3,708.000
1,464.000
2,666.160
88,688.16
PERALATAN
120,038.16
NO.
A.
1
2
3
4
: J.020
: Pasang pipa beton, diameter 50 cm
: m1
KOMPONEN
SATUAN
PERKIRAAN
KUANTITAS
HARGA
SATUAN
(Rp.)
TENAGA
Pekerja Biasa
Tukang Batu
Kepala Tukang Batu
Mandor
L17
L07
L02
L01
Org/hr
Org/hr
Org/hr
Org/hr
0.3800
0.1900
0.0190
0.0190
45,000.00
60,000.00
70,000.00
80,000.00
BAHAN
Buis Beton Dia 0.50 m
Bata Merah
Portland Cement (PC)
Pasir Pasang
Pasir Urug
M047
M022
M037
M002
M001
bh
bh
kg
m3
m3
1.100
123.750
5.150
0.031
0.035
67,500.00
250.00
900.00
60,000.00
96,600.00
74,250.000
30,937.500
4,635.000
1,830.000
3,332.700
114,985.20
PERALATAN
17,100.00
11,400.00
1,330.00
1,520.00
31,350.00
JUMLAH
HARGA
(Rp.)
146,335.20
NO.
A.
1
2
3
4
: J.021
: Pasang pipa beton, diameter 60 cm
1
:m
KOMPONEN
SATUAN
PERKIRAAN
KUANTITAS
HARGA
SATUAN
(Rp.)
TENAGA
Pekerja Biasa
Tukang Batu
Kepala Tukang Batu
Mandor
L17
L07
L02
L01
Org/hr
Org/hr
Org/hr
Org/hr
0.3800
0.1900
0.0190
0.0190
45,000.00
60,000.00
70,000.00
80,000.00
17,100.00
11,400.00
1,330.00
1,520.00
31,350.00
BAHAN
Buis Beton Dia 0.60 m
Bata Merah
Portland Cement (PC)
Pasir Pasang
Pasir Urug
M048
M022
M037
M002
M001
bh
bh
kg
m3
m3
1.100
148.500
6.180
0.037
0.041
91,840.00
250.00
900.00
60,000.00
96,600.00
JUMLAH
HARGA
(Rp.)
101,024.000
37,125.000
5,562.000
2,196.000
3,999.240
149,906.24
PERALATAN
181,256.24
NO.
A.
1
2
3
4
: J.022
: Pasang pipa beton, diameter 80 cm
: m1
KOMPONEN
SATUAN
PERKIRAAN
KUANTITAS
HARGA
SATUAN
(Rp.)
TENAGA
Pekerja Biasa
Tukang Batu
Kepala Tukang Batu
Mandor
L17
L07
L02
L01
Org/hr
Org/hr
Org/hr
Org/hr
0.3800
0.1900
0.0190
0.0190
45,000.00
60,000.00
70,000.00
80,000.00
BAHAN
Buis Beton Dia 0.80 m
Bata Merah
Portland Cement (PC)
Pasir Pasang
Pasir Urug
M049
M022
M037
M002
M001
bh
bh
kg
m3
m3
1.100
198.000
8.240
0.049
0.055
157,540.00
250.00
900.00
60,000.00
96,600.00
173,294.000
49,500.000
7,416.000
2,928.000
5,332.320
238,470.32
PERALATAN
17,100.00
11,400.00
1,330.00
1,520.00
31,350.00
JUMLAH
HARGA
(Rp.)
269,820.32
NO.
A.
1
2
3
4
: J.023
: Pasang pipa beton, diameter 90 cm
1
:m
KOMPONEN
SATUAN
PERKIRAAN
KUANTITAS
HARGA
SATUAN
(Rp.)
TENAGA
Pekerja Biasa
Tukang Batu
Kepala Tukang Batu
Mandor
L17
L07
L02
L01
Org/hr
Org/hr
Org/hr
Org/hr
0.3800
0.1900
0.0190
0.0190
45,000.00
60,000.00
70,000.00
80,000.00
17,100.00
11,400.00
1,330.00
1,520.00
31,350.00
BAHAN
Buis Beton Dia 0.90 m
Bata Merah
Portland Cement (PC)
Pasir Pasang
Pasir Urug
M050
M022
M037
M002
M001
bh
bh
kg
m3
m3
1.100
222.750
9.270
0.055
0.062
183,780.00
250.00
900.00
60,000.00
96,600.00
JUMLAH
HARGA
(Rp.)
202,158.000
55,687.500
8,343.000
3,294.000
5,998.860
275,481.36
PERALATAN
306,831.36
NO.
A.
1
2
3
4
: J.024
: Pasang pipa beton, diameter 100 cm
: m1
KOMPONEN
SATUAN
PERKIRAAN
KUANTITAS
HARGA
SATUAN
(Rp.)
TENAGA
Pekerja Biasa
Tukang Batu
Kepala Tukang Batu
Mandor
L17
L07
L02
L01
Org/hr
Org/hr
Org/hr
Org/hr
0.3800
0.1900
0.0190
0.0190
45,000.00
60,000.00
70,000.00
80,000.00
BAHAN
Buis Beton Dia 1.00 m
Bata Merah
Portland Cement (PC)
Pasir Pasang
Pasir Urug
M051
M022
M037
M002
M001
bh
bh
kg
m3
m3
1.100
247.500
10.300
0.061
0.069
207,460.00
250.00
900.00
60,000.00
96,600.00
228,206.000
61,875.000
9,270.000
3,660.000
6,665.400
309,676.40
PERALATAN
17,100.00
11,400.00
1,330.00
1,520.00
31,350.00
JUMLAH
HARGA
(Rp.)
341,026.40
NO.
A.
1
2
3
4
: J.025
: Pasang pipa beton U, diameter 20
: m1
KOMPONEN
SATUAN
PERKIRAAN
KUANTITAS
HARGA
SATUAN
(Rp.)
TENAGA
Pekerja Biasa
Tukang Batu
Kepala Tukang Batu
Mandor
L17
L07
L02
L01
Org/hr
Org/hr
Org/hr
Org/hr
0.1400
0.0700
0.0070
0.0070
45,000.00
60,000.00
70,000.00
80,000.00
6,300.00
4,200.00
490.00
560.00
11,550.00
BAHAN
Buis Beton U Dia 0.20 m
Bata Merah
Portland Cement (PC)
Pasir Pasang
Pasir Urug
M052
M022
M037
M002
M001
bh
bh
kg
m3
m3
1.1000
12.1500
3.9200
0.0560
0.0240
30,000.00
250.00
900.00
60,000.00
96,600.00
JUMLAH
HARGA
(Rp.)
33,000.00
3,037.50
3,528.00
3,360.00
2,318.40
45,243.90
PERALATAN
JUMLAH HARGA PERALATAN
56,793.90
NO.
A.
1
2
3
4
: J.026
: Pasang pipa beton U, diameter 30
: m1
KOMPONEN
SATUAN
PERKIRAAN
KUANTITAS
HARGA
SATUAN
(Rp.)
TENAGA
Pekerja Biasa
Tukang Batu
Kepala Tukang Batu
Mandor
L17
L07
L02
L01
Org/hr
Org/hr
Org/hr
Org/hr
0.3800
0.1900
0.0190
0.0190
45,000.00
60,000.00
70,000.00
80,000.00
BAHAN
Buis Beton U Dia 0.30 m
Bata Merah
Portland Cement (PC)
Pasir Pasang
Pasir Urug
M053
M022
M037
M002
M001
bh
bh
kg
m3
m3
1.1000
123.7500
5.1500
0.0305
0.0345
35,000.00
250.00
900.00
60,000.00
96,600.00
38,500.00
30,937.50
4,635.00
1,830.00
3,332.70
79,235.20
PERALATAN
JUMLAH HARGA PERALATAN
17,100.00
11,400.00
1,330.00
1,520.00
31,350.00
JUMLAH
HARGA
(Rp.)
110,585.20
: J.027
: Pasang bak kontrol pasangan batu bata
ukuran (30 x 30) tinggi 35 cm
: bh
SATUAN PEMBAYARAN
NO.
A.
1
2
3
4
KOMPONEN
SATUAN
PERKIRAAN
KUANTITAS
HARGA
SATUAN
(Rp.)
TENAGA
Pekerja Biasa
Tukang Batu
Kepala Tukang Batu
Mandor
L17
L07
L02
L01
Org/hr
Org/hr
Org/hr
Org/hr
1.2200
0.2730
0.0270
0.0405
45,000.00
60,000.00
70,000.00
80,000.00
54,900.00
16,380.00
1,890.00
3,240.00
76,410.00
BAHAN
Bata Merah
Portland Cement (PC)
Pasir Pasang
Stenslah/batu pecah tangan 2/3
Besi Beton Polos
Pasir Cor
M022
M037
M002
M014
M112
M004
bh
kg
m3
m3
kg
m3
65.2500
44.0000
0.0700
0.0700
1.6000
0.0600
250.00
900.00
60,000.00
156,975.00
8,500.00
110,000.00
JUMLAH
HARGA
(Rp.)
16,312.50
39,600.00
4,200.00
10,988.25
13,600.00
6,600.00
91,300.75
PERALATAN
JUMLAH HARGA PERALATAN
167,710.75
: J.028
: Pasang bak kontrol pasangan batu bata
ukuran (45 x 45) tinggi 50 cm
: bh
SATUAN PEMBAYARAN
NO.
A.
1
2
3
4
KOMPONEN
SATUAN
PERKIRAAN
KUANTITAS
HARGA
SATUAN
(Rp.)
TENAGA
Pekerja Biasa
Tukang Batu
Kepala Tukang Batu
Mandor
L17
L07
L02
L01
Org/hr
Org/hr
Org/hr
Org/hr
1.4200
0.4730
0.0470
0.0710
45,000.00
60,000.00
70,000.00
80,000.00
BAHAN
Bata Merah
Portland Cement (PC)
Pasir Pasang
Stenslah/batu pecah tangan 2/3
Besi Beton Polos
Pasir Cor
M022
M037
M002
M014
M112
M004
bh
kg
m3
m3
kg
m3
112.5000
77.0000
0.1300
0.0200
2.6000
0.0900
250.00
900.00
60,000.00
156,975.00
8,500.00
110,000.00
28,125.00
69,300.00
7,800.00
3,139.50
22,100.00
9,900.00
140,364.50
PERALATAN
JUMLAH HARGA PERALATAN
63,900.00
28,380.00
3,290.00
5,680.00
101,250.00
JUMLAH
HARGA
(Rp.)
241,614.50
: J.029
: Pasang bak kontrol pasangan batu bata
ukuran (60 x 60) tinggi 65 cm
: bh
SATUAN PEMBAYARAN
NO.
A.
1
2
3
4
KOMPONEN
SATUAN
PERKIRAAN
KUANTITAS
HARGA
SATUAN
(Rp.)
TENAGA
Pekerja Biasa
Tukang Batu
Kepala Tukang Batu
Mandor
L17
L07
L02
L01
Org/hr
Org/hr
Org/hr
Org/hr
2.1600
0.7200
0.0720
0.1080
45,000.00
60,000.00
70,000.00
80,000.00
97,200.00
43,200.00
5,040.00
8,640.00
154,080.00
BAHAN
Bata Merah
Portland Cement (PC)
Pasir Pasang
Stenslah/batu pecah tangan 2/3
Besi Beton Polos
Pasir Cor
M022
M037
M002
M014
M112
M004
bh
kg
m3
m3
kg
m3
166.9500
114.0000
0.1840
0.0330
4.8500
0.1200
250.00
900.00
60,000.00
156,975.00
8,500.00
110,000.00
JUMLAH
HARGA
(Rp.)
41,737.50
102,600.00
11,040.00
5,180.18
41,225.00
13,200.00
214,982.68
PERALATAN
369,062.68
NO.
A.
1
2
3
4
: J.030
: Pasang pipa galvanis, diameter 1/2"
: m1
KOMPONEN
SATUAN
PERKIRAAN
KUANTITAS
HARGA
SATUAN
(Rp.)
TENAGA
Pekerja Biasa
Tukang Batu
Kepala Tukang Batu
Mandor
L17
L07
L02
L01
Org/hr
Org/hr
Org/hr
Org/hr
0.0540
0.0900
0.0090
0.0270
45,000.00
60,000.00
70,000.00
80,000.00
BAHAN
Pipa Galvanis 1/2 ", tebal 1.8 mm M376
Perlengkapan
Ljr
0.3000
0.3500
127,500.00
44,625.00
38,250.00
15,618.75
53,868.75
PERALATAN
2,430.00
5,400.00
630.00
2,160.00
10,620.00
JUMLAH
HARGA
(Rp.)
64,488.75
NO.
A.
1
2
3
4
: J.031
: Pasang pipa galvanis, diameter 3/4"
1
:m
KOMPONEN
SATUAN
PERKIRAAN
KUANTITAS
HARGA
SATUAN
(Rp.)
TENAGA
Pekerja Biasa
Tukang Batu
Kepala Tukang Batu
Mandor
L17
L07
L02
L01
Org/hr
Org/hr
Org/hr
Org/hr
0.0540
0.0900
0.0090
0.0270
45,000.00
60,000.00
70,000.00
80,000.00
2,430.00
5,400.00
630.00
2,160.00
10,620.00
BAHAN
Pipa Galvanis 3/4 ", tebal 1.8 mm M377
Perlengkapan
Ljr
0.300
0.350
165,000.00
57,750.00
JUMLAH
HARGA
(Rp.)
49,500.00
20,212.50
69,712.50
PERALATAN
80,332.50
NO.
A.
1
2
3
4
: J.032
: Pasang pipa galvanis, diameter 1"
: m1
KOMPONEN
SATUAN
PERKIRAAN
KUANTITAS
HARGA
SATUAN
(Rp.)
TENAGA
Pekerja Biasa
Tukang Batu
Kepala Tukang Batu
Mandor
L17
L07
L02
L01
Org/hr
Org/hr
Org/hr
Org/hr
0.0540
0.0900
0.0090
0.0270
45,000.00
60,000.00
70,000.00
80,000.00
BAHAN
Pipa Galvanis 1", tebal 2 mm
Perlengkapan
M378
Ljr
0.300
0.350
225,000.00
78,750.00
67,500.00
27,562.50
95,062.50
PERALATAN
2,430.00
5,400.00
630.00
2,160.00
10,620.00
JUMLAH
HARGA
(Rp.)
105,682.50
NO.
A.
1
2
3
4
: J.033
: Pasang pipa galvanis, diameter 1 1/2"
1
:m
KOMPONEN
SATUAN
PERKIRAAN
KUANTITAS
HARGA
SATUAN
(Rp.)
TENAGA
Pekerja Biasa
Tukang Batu
Kepala Tukang Batu
Mandor
L17
L07
L02
L01
Org/hr
Org/hr
Org/hr
Org/hr
0.1080
0.1800
0.0180
0.0054
45,000.00
60,000.00
70,000.00
80,000.00
4,860.00
10,800.00
1,260.00
432.00
17,352.00
BAHAN
Pipa Galvanis 1.5 ", tebal 2 mm
Perlengkapan
M379
Ljr
0.3000
0.3500
330,000.00
115,500.00
JUMLAH
HARGA
(Rp.)
99,000.00
40,425.000
139,425.00
PERALATAN
156,777.00
NO.
A.
1
2
3
4
: J.034
: Pasang pipa galvanis, diameter 2"
: m1
KOMPONEN
SATUAN
PERKIRAAN
KUANTITAS
HARGA
SATUAN
(Rp.)
TENAGA
Pekerja Biasa
Tukang Batu
Kepala Tukang Batu
Mandor
L17
L07
L02
L01
Org/hr
Org/hr
Org/hr
Org/hr
0.1080
0.1800
0.0180
0.0054
45,000.00
60,000.00
70,000.00
80,000.00
BAHAN
Pipa Galvanis 2 ", tebal 2.3 mm
Perlengkapan
M380
Ljr
0.3000
0.3500
472,500.00
165,375.00
141,750.00
57,881.25
199,631.25
PERALATAN
4,860.00
10,800.00
1,260.00
432.00
17,352.00
JUMLAH
HARGA
(Rp.)
216,983.25
NO.
A.
1
2
3
4
: J.035
: Pasang pipa galvanis, diameter 2 1/2"
1
:m
KOMPONEN
SATUAN
PERKIRAAN
KUANTITAS
HARGA
SATUAN
(Rp.)
TENAGA
Pekerja Biasa
Tukang Batu
Kepala Tukang Batu
Mandor
L17
L07
L02
L01
Org/hr
Org/hr
Org/hr
Org/hr
0.1080
0.1800
0.0180
0.0054
45,000.00
60,000.00
70,000.00
80,000.00
4,860.00
10,800.00
1,260.00
432.00
17,352.00
BAHAN
Pipa Galvanis 2.5 ", tebal 2.5 mm M381
Perlengkapan
Ljr
0.300
0.350
660,000.00
231,000.00
JUMLAH
HARGA
(Rp.)
198,000.00
80,850.00
278,850.00
PERALATAN
296,202.00
NO.
A.
1
2
3
4
: J.036
: Pasang pipa galvanis, diameter 3"
: m1
KOMPONEN
SATUAN
PERKIRAAN
KUANTITAS
HARGA
SATUAN
(Rp.)
TENAGA
Pekerja Biasa
Tukang Batu
Kepala Tukang Batu
Mandor
L17
L07
L02
L01
Org/hr
Org/hr
Org/hr
Org/hr
0.1080
0.1800
0.0180
0.0054
45,000.00
60,000.00
70,000.00
80,000.00
BAHAN
Pipa Galvanis 3 ", tebal 2.5 mm
Perlengkapan
M382
Ljr
0.3000
0.3500
750,000.00
262,500.00
225,000.00
91,875.00
316,875.00
PERALATAN
4,860.00
10,800.00
1,260.00
432.00
17,352.00
JUMLAH
HARGA
(Rp.)
334,227.00
NO.
A.
1
2
3
4
: J.037
: Pasang pipa galvanis, diameter 4"
1
:m
KOMPONEN
SATUAN
PERKIRAAN
KUANTITAS
HARGA
SATUAN
(Rp.)
TENAGA
Pekerja Biasa
Tukang Batu
Kepala Tukang Batu
Mandor
L17
L07
L02
L01
Org/hr
Org/hr
Org/hr
Org/hr
0.1350
0.2250
0.0225
0.0068
45,000.00
60,000.00
70,000.00
80,000.00
6,075.00
13,500.00
1,575.00
544.00
21,694.00
BAHAN
Pipa Galvanis 4 ", tebal 2.8 mm
Perlengkapan
M383
Ljr
0.3000
0.3500
1,102,500.00
385,875.00
JUMLAH
HARGA
(Rp.)
330,750.00
135,056.25
465,806.25
PERALATAN
487,500.25
NO.
A.
1
2
3
4
: J.038
: Pasang pipa PVC tipe AW, diameter 1/2"
: m1
KOMPONEN
SATUAN
PERKIRAAN
KUANTITAS
HARGA
SATUAN
(Rp.)
TENAGA
Pekerja Biasa
Tukang Batu
Kepala Tukang Batu
Mandor
L17
L07
L02
L01
Org/hr
Org/hr
Org/hr
Org/hr
0.0360
0.0600
0.0060
0.0018
45,000.00
60,000.00
70,000.00
80,000.00
BAHAN
Pipa PVC tipe AW Dia 1/2 "
Perlengkapan
M334
Ljr
0.3000
0.3500
28,700.00
10,045.00
8,610.00
3,515.75
12,125.75
PERALATAN
1,620.00
3,600.00
420.00
144.00
5,784.00
JUMLAH
HARGA
(Rp.)
17,909.75
NO.
A.
1
2
3
4
: J.039
: Pasang pipa PVC tipe AW, diameter 3/4"
1
:m
KOMPONEN
SATUAN
PERKIRAAN
KUANTITAS
HARGA
SATUAN
(Rp.)
TENAGA
Pekerja Biasa
Tukang Batu
Kepala Tukang Batu
Mandor
L17
L07
L02
L01
Org/hr
Org/hr
Org/hr
Org/hr
0.0360
0.0600
0.0060
0.0018
45,000.00
60,000.00
70,000.00
80,000.00
1,620.00
3,600.00
420.00
144.00
5,784.00
BAHAN
Pipa PVC tipe AW Dia 3/4 "
Perlengkapan
M335
Ljr
0.3000
0.3500
42,790.00
14,976.50
JUMLAH
HARGA
(Rp.)
12,837.00
5,241.78
18,078.78
PERALATAN
23,862.78
NO.
A.
1
2
3
4
: J.040
: Pasang pipa PVC tipe AW, diameter 1"
: m1
KOMPONEN
SATUAN
PERKIRAAN
KUANTITAS
HARGA
SATUAN
(Rp.)
TENAGA
Pekerja Biasa
Tukang Batu
Kepala Tukang Batu
Mandor
L17
L07
L02
L01
Org/hr
Org/hr
Org/hr
Org/hr
0.0360
0.0600
0.0060
0.0018
45,000.00
60,000.00
70,000.00
80,000.00
BAHAN
Pipa PVC tipe AW Dia 1"
Perlengkapan
M336
Ljr
0.300
0.350
56,110.00
19,638.50
16,833.00
6,873.48
23,706.48
PERALATAN
1,620.00
3,600.00
420.00
144.00
5,784.00
JUMLAH
HARGA
(Rp.)
29,490.48
NO.
A.
1
2
3
4
: J.041
: Pasang pipa PVC tipe AW, diameter 1 1/2"
1
:m
KOMPONEN
SATUAN
PERKIRAAN
KUANTITAS
HARGA
SATUAN
(Rp.)
TENAGA
Pekerja Biasa
Tukang Batu
Kepala Tukang Batu
Mandor
L17
L07
L02
L01
Org/hr
Org/hr
Org/hr
Org/hr
0.0360
0.0600
0.0060
0.0018
45,000.00
60,000.00
70,000.00
80,000.00
1,620.00
3,600.00
420.00
144.00
5,784.00
BAHAN
Pipa PVC tipe AW Dia 1.5 "
Perlengkapan
M337
Ljr
0.3000
0.3500
75,330.00
26,365.50
JUMLAH
HARGA
(Rp.)
22,599.00
9,227.93
31,826.93
PERALATAN
37,610.93
NO.
A.
1
2
3
4
: J.042
: Pasang pipa PVC tipe AW, diameter 2"
: m1
KOMPONEN
SATUAN
PERKIRAAN
KUANTITAS
HARGA
SATUAN
(Rp.)
TENAGA
Pekerja Biasa
Tukang Batu
Kepala Tukang Batu
Mandor
L17
L07
L02
L01
Org/hr
Org/hr
Org/hr
Org/hr
0.0540
0.0900
0.0090
0.0027
45,000.00
60,000.00
70,000.00
80,000.00
BAHAN
Pipa PVC tipe AW Dia 2 "
Perlengkapan
M338
Ljr
0.3000
0.3500
95,830.00
33,540.50
28,749.00
11,739.18
40,488.18
PERALATAN
2,430.00
5,400.00
630.00
216.00
8,676.00
JUMLAH
HARGA
(Rp.)
49,164.18
NO.
A.
1
2
3
4
: J.043
: Pasang pipa PVC tipe AW, diameter 2.5"
1
:m
KOMPONEN
SATUAN
PERKIRAAN
KUANTITAS
HARGA
SATUAN
(Rp.)
TENAGA
Pekerja Biasa
Tukang Batu
Kepala Tukang Batu
Mandor
L17
L07
L02
L01
Org/hr
Org/hr
Org/hr
Org/hr
0.0540
0.0900
0.0090
0.0027
45,000.00
60,000.00
70,000.00
80,000.00
2,430.00
5,400.00
630.00
216.00
8,676.00
BAHAN
Pipa PVC tipe AW Dia 2.5 "
Perlengkapan
M339
Ljr
0.3000
0.3500
123,000.00
43,050.00
JUMLAH
HARGA
(Rp.)
36,900.00
15,067.50
51,967.50
PERALATAN
60,643.50
NO.
A.
1
2
3
4
: J.044
: Pasang pipa PVC tipe AW, diameter 3"
: m1
KOMPONEN
SATUAN
PERKIRAAN
KUANTITAS
HARGA
SATUAN
(Rp.)
TENAGA
Pekerja Biasa
Tukang Batu
Kepala Tukang Batu
Mandor
L17
L07
L02
L01
Org/hr
Org/hr
Org/hr
Org/hr
0.0810
0.1350
0.0135
0.0041
45,000.00
60,000.00
70,000.00
80,000.00
BAHAN
Pipa PVC tipe AW Dia 3 "
Perlengkapan
M340
Ljr
0.3000
0.3500
173,730.00
60,805.50
52,119.00
21,281.93
73,400.93
PERALATAN
3,645.00
8,100.00
945.00
328.00
13,018.00
JUMLAH
HARGA
(Rp.)
86,418.93
NO.
A.
1
2
3
4
: J.045
: Pasang pipa PVC tipe AW, diameter 4"
1
:m
KOMPONEN
SATUAN
PERKIRAAN
KUANTITAS
HARGA
SATUAN
(Rp.)
TENAGA
Pekerja Biasa
Tukang Batu
Kepala Tukang Batu
Mandor
L17
L07
L02
L01
Org/hr
Org/hr
Org/hr
Org/hr
0.0810
0.1350
0.0135
0.0041
45,000.00
60,000.00
70,000.00
80,000.00
3,645.00
8,100.00
945.00
328.00
13,018.00
BAHAN
Pipa PVC tipe AW Dia 4 "
Perlengkapan
M341
Ljr
0.3000
0.3500
271,360.00
94,976.00
JUMLAH
HARGA
(Rp.)
81,408.00
33,241.60
114,649.60
PERALATAN
127,667.60
NO.
A.
1
2
3
4
: J.046
: Pasang pipa PVC tipe AW, diameter 6"
: m1
KOMPONEN
SATUAN
PERKIRAAN
KUANTITAS
HARGA
SATUAN
(Rp.)
TENAGA
Pekerja Biasa
Tukang Batu
Kepala Tukang Batu
Mandor
L17
L07
L02
L01
Org/hr
Org/hr
Org/hr
Org/hr
0.1215
0.2025
0.0203
0.0062
45,000.00
60,000.00
70,000.00
80,000.00
BAHAN
Pipa PVC tipe AW Dia 6 "
Perlengkapan
M342
Ljr
0.3000
0.3500
472,780.00
165,473.00
141,834.00
57,915.55
199,749.55
PERALATAN
5,467.50
12,150.00
1,421.00
492.00
19,530.50
JUMLAH
HARGA
(Rp.)
219,280.05
NO.
A.
1
2
3
4
: J.047
: Pasang pipa PVC tipe AW, diameter 8"
1
:m
KOMPONEN
SATUAN
PERKIRAAN
KUANTITAS
HARGA
SATUAN
(Rp.)
TENAGA
Pekerja Biasa
Tukang Batu
Kepala Tukang Batu
Mandor
L17
L07
L02
L01
Org/hr
Org/hr
Org/hr
Org/hr
0.1823
0.3038
0.0304
0.0092
45,000.00
60,000.00
70,000.00
80,000.00
8,201.25
18,225.00
2,128.00
738.00
29,292.25
BAHAN
Pipa PVC tipe AW Dia 8 "
Perlengkapan
M343
Ljr
0.3000
0.3500
722,436.00
252,852.60
JUMLAH
HARGA
(Rp.)
216,730.80
88,498.41
305,229.21
PERALATAN
334,521.46
NO.
A.
1
2
3
4
: J.048
: Pasang pipa PVC tipe D, diameter 1/2"
: m1
KOMPONEN
SATUAN
PERKIRAAN
KUANTITAS
HARGA
SATUAN
(Rp.)
TENAGA
Pekerja Biasa
Tukang Batu
Kepala Tukang Batu
Mandor
L17
L07
L02
L01
Org/hr
Org/hr
Org/hr
Org/hr
0.0360
0.0600
0.0060
0.0018
45,000.00
60,000.00
70,000.00
80,000.00
BAHAN
Pipa PVC tipe D Dia 1/2 "
Perlengkapan
M344
Ljr
0.3000
0.3500
14,350.00
5,022.50
4,305.00
1,757.88
6,062.88
PERALATAN
1,620.00
3,600.00
420.00
144.00
5,784.00
JUMLAH
HARGA
(Rp.)
11,846.88
NO.
A.
1
2
3
4
: J.049
: Pasang pipa PVC tipe D, diameter 3/4"
1
:m
KOMPONEN
SATUAN
PERKIRAAN
KUANTITAS
HARGA
SATUAN
(Rp.)
TENAGA
Pekerja Biasa
Tukang Batu
Kepala Tukang Batu
Mandor
L17
L07
L02
L01
Org/hr
Org/hr
Org/hr
Org/hr
0.0360
0.0600
0.0060
0.0018
45,000.00
60,000.00
70,000.00
80,000.00
1,620.00
3,600.00
420.00
144.00
5,784.00
BAHAN
Pipa PVC tipe D Dia 3/4 "
Perlengkapan
M345
Ljr
0.3000
0.3500
21,520.00
7,532.00
JUMLAH
HARGA
(Rp.)
6,456.00
2,636.20
9,092.20
PERALATAN
14,876.20
NO.
A.
1
2
3
4
: J.050
: Pasang pipa PVC tipe D, diameter 1"
: m1
KOMPONEN
SATUAN
PERKIRAAN
KUANTITAS
HARGA
SATUAN
(Rp.)
TENAGA
Pekerja Biasa
Tukang Batu
Kepala Tukang Batu
Mandor
L17
L07
L02
L01
Org/hr
Org/hr
Org/hr
Org/hr
0.0360
0.0600
0.0060
0.0018
45,000.00
60,000.00
70,000.00
80,000.00
BAHAN
Pipa PVC tipe D Dia 1"
Perlengkapan
M346
Ljr
0.300
0.350
28,180.00
9,863.00
8,454.00
3,452.05
11,906.05
PERALATAN
1,620.00
3,600.00
420.00
144.00
5,784.00
JUMLAH
HARGA
(Rp.)
17,690.05
NO.
A.
1
2
3
4
: J.051
: Pasang pipa PVC tipe D, diameter 1 1/2"
1
:m
KOMPONEN
SATUAN
PERKIRAAN
KUANTITAS
HARGA
SATUAN
(Rp.)
TENAGA
Pekerja Biasa
Tukang Batu
Kepala Tukang Batu
Mandor
L17
L07
L02
L01
Org/hr
Org/hr
Org/hr
Org/hr
0.0360
0.0600
0.0060
0.0018
45,000.00
60,000.00
70,000.00
80,000.00
1,620.00
3,600.00
420.00
144.00
5,784.00
BAHAN
Pipa PVC tipe D Dia 1.5 "
Perlengkapan
M347
Ljr
0.3000
0.3500
37,660.00
13,181.00
JUMLAH
HARGA
(Rp.)
11,298.00
4,613.35
15,911.35
PERALATAN
21,695.35
NO.
A.
1
2
3
4
: J.052
: Pasang pipa PVC tipe D, diameter 2"
: m1
KOMPONEN
SATUAN
PERKIRAAN
KUANTITAS
HARGA
SATUAN
(Rp.)
TENAGA
Pekerja Biasa
Tukang Batu
Kepala Tukang Batu
Mandor
L17
L07
L02
L01
Org/hr
Org/hr
Org/hr
Org/hr
0.0540
0.0900
0.0090
0.0027
45,000.00
60,000.00
70,000.00
80,000.00
BAHAN
Pipa PVC tipe D Dia 2 "
Perlengkapan
M348
Ljr
0.3000
0.3500
46,120.00
16,142.00
13,836.00
5,649.70
19,485.70
PERALATAN
2,430.00
5,400.00
630.00
216.00
8,676.00
JUMLAH
HARGA
(Rp.)
28,161.70
NO.
A.
1
2
3
4
: J.053
: Pasang pipa PVC tipe D, diameter 2.5"
1
:m
KOMPONEN
SATUAN
PERKIRAAN
KUANTITAS
HARGA
SATUAN
(Rp.)
TENAGA
Pekerja Biasa
Tukang Batu
Kepala Tukang Batu
Mandor
L17
L07
L02
L01
Org/hr
Org/hr
Org/hr
Org/hr
0.0540
0.0900
0.0090
0.0027
45,000.00
60,000.00
70,000.00
80,000.00
2,430.00
5,400.00
630.00
216.00
8,676.00
BAHAN
Pipa PVC tipe D Dia 2.5 "
Perlengkapan
M349
Ljr
0.3000
0.3500
67,130.00
23,495.50
JUMLAH
HARGA
(Rp.)
20,139.00
8,223.43
28,362.43
PERALATAN
37,038.43
NO.
A.
1
2
3
4
: J.054
: Pasang pipa PVC tipe D, diameter 3"
: m1
KOMPONEN
SATUAN
PERKIRAAN
KUANTITAS
HARGA
SATUAN
(Rp.)
TENAGA
Pekerja Biasa
Tukang Batu
Kepala Tukang Batu
Mandor
L17
L07
L02
L01
Org/hr
Org/hr
Org/hr
Org/hr
0.0810
0.1350
0.0135
0.0041
45,000.00
60,000.00
70,000.00
80,000.00
BAHAN
Pipa PVC tipe D Dia 3 "
Perlengkapan
M350
Ljr
0.3000
0.3500
97,370.00
34,079.50
29,211.00
11,927.83
41,138.83
PERALATAN
3,645.00
8,100.00
945.00
328.00
13,018.00
JUMLAH
HARGA
(Rp.)
54,156.83
NO.
A.
1
2
3
4
: J.055
: Pasang pipa PVC tipe D, diameter 4"
1
:m
KOMPONEN
SATUAN
PERKIRAAN
KUANTITAS
HARGA
SATUAN
(Rp.)
TENAGA
Pekerja Biasa
Tukang Batu
Kepala Tukang Batu
Mandor
L17
L07
L02
L01
Org/hr
Org/hr
Org/hr
Org/hr
0.0810
0.1350
0.0135
0.0041
45,000.00
60,000.00
70,000.00
80,000.00
3,645.00
8,100.00
945.00
328.00
13,018.00
BAHAN
Pipa PVC tipe D Dia 4 "
Perlengkapan
M351
Ljr
0.3000
0.3500
137,090.00
47,981.50
JUMLAH
HARGA
(Rp.)
41,127.00
16,793.53
57,920.53
PERALATAN
70,938.53
NO.
A.
1
2
3
4
: J.056
: Pasang pipa PVC tipe C, diameter 1/2"
: m1
KOMPONEN
SATUAN
PERKIRAAN
KUANTITAS
HARGA
SATUAN
(Rp.)
TENAGA
Pekerja Biasa
Tukang Batu
Kepala Tukang Batu
Mandor
L17
L07
L02
L01
Org/hr
Org/hr
Org/hr
Org/hr
0.0360
0.0600
0.0060
0.0018
45,000.00
60,000.00
70,000.00
80,000.00
BAHAN
Pipa PVC tipe C Dia 1/2 "
Perlengkapan
M352
Ljr
0.3000
0.3500
10,860.00
3,801.00
3,258.00
1,330.35
4,588.35
PERALATAN
1,620.00
3,600.00
420.00
144.00
5,784.00
JUMLAH
HARGA
(Rp.)
10,372.35
NO.
A.
1
2
3
4
: J.057
: Pasang pipa PVC tipe C, diameter 3/4"
1
:m
KOMPONEN
SATUAN
PERKIRAAN
KUANTITAS
HARGA
SATUAN
(Rp.)
TENAGA
Pekerja Biasa
Tukang Batu
Kepala Tukang Batu
Mandor
L17
L07
L02
L01
Org/hr
Org/hr
Org/hr
Org/hr
0.0360
0.0600
0.0060
0.0018
45,000.00
60,000.00
70,000.00
80,000.00
1,620.00
3,600.00
420.00
144.00
5,784.00
BAHAN
Pipa PVC tipe C Dia 3/4 "
Perlengkapan
M353
Ljr
0.3000
0.3500
16,090.00
5,631.50
JUMLAH
HARGA
(Rp.)
4,827.00
1,971.03
6,798.03
PERALATAN
12,582.03
NO.
A.
1
2
3
4
: J.058
: Pasang pipa PVC tipe C, diameter 1"
: m1
KOMPONEN
SATUAN
PERKIRAAN
KUANTITAS
HARGA
SATUAN
(Rp.)
TENAGA
Pekerja Biasa
Tukang Batu
Kepala Tukang Batu
Mandor
L17
L07
L02
L01
Org/hr
Org/hr
Org/hr
Org/hr
0.0360
0.0600
0.0060
0.0018
45,000.00
60,000.00
70,000.00
80,000.00
BAHAN
Pipa PVC tipe C Dia 1"
Perlengkapan
M354
Ljr
0.300
0.350
21,110.00
7,388.50
6,333.00
2,585.98
8,918.98
PERALATAN
1,620.00
3,600.00
420.00
144.00
5,784.00
JUMLAH
HARGA
(Rp.)
14,702.98
NO.
A.
1
2
3
4
: J.059
: Pasang pipa PVC tipe C, diameter 1 1/2"
1
:m
KOMPONEN
SATUAN
PERKIRAAN
KUANTITAS
HARGA
SATUAN
(Rp.)
TENAGA
Pekerja Biasa
Tukang Batu
Kepala Tukang Batu
Mandor
L17
L07
L02
L01
Org/hr
Org/hr
Org/hr
Org/hr
0.0360
0.0600
0.0060
0.0018
45,000.00
60,000.00
70,000.00
80,000.00
1,620.00
3,600.00
420.00
144.00
5,784.00
BAHAN
Pipa PVC tipe C Dia 1.5 "
Perlengkapan
M355
Ljr
0.3000
0.3500
28,290.00
9,901.50
JUMLAH
HARGA
(Rp.)
8,487.00
3,465.53
11,952.53
PERALATAN
17,736.53
NO.
A.
1
2
3
4
: J.060
: Pasang pipa PVC tipe C, diameter 2"
: m1
KOMPONEN
SATUAN
PERKIRAAN
KUANTITAS
HARGA
SATUAN
(Rp.)
TENAGA
Pekerja Biasa
Tukang Batu
Kepala Tukang Batu
Mandor
L17
L07
L02
L01
Org/hr
Org/hr
Org/hr
Org/hr
0.0540
0.0900
0.0090
0.0027
45,000.00
60,000.00
70,000.00
80,000.00
BAHAN
Pipa PVC tipe C Dia 2 "
Perlengkapan
M356
Ljr
0.3000
0.3500
38,130.00
13,345.50
11,439.00
4,670.93
16,109.93
PERALATAN
2,430.00
5,400.00
630.00
216.00
8,676.00
JUMLAH
HARGA
(Rp.)
24,785.93
NO.
A.
1
2
3
4
: J.061
: Pasang pipa PVC tipe C, diameter 2.5"
1
:m
KOMPONEN
SATUAN
PERKIRAAN
KUANTITAS
HARGA
SATUAN
(Rp.)
TENAGA
Pekerja Biasa
Tukang Batu
Kepala Tukang Batu
Mandor
L17
L07
L02
L01
Org/hr
Org/hr
Org/hr
Org/hr
0.0540
0.0900
0.0090
0.0027
45,000.00
60,000.00
70,000.00
80,000.00
2,430.00
5,400.00
630.00
216.00
8,676.00
BAHAN
Pipa PVC tipe C Dia 2.5 "
Perlengkapan
M357
Ljr
0.3000
0.3500
48,480.00
16,968.00
JUMLAH
HARGA
(Rp.)
14,544.00
5,938.80
20,482.80
PERALATAN
29,158.80
NO.
A.
1
2
3
4
: J.062
: Pasang pipa PVC tipe C, diameter 3"
: m1
KOMPONEN
SATUAN
PERKIRAAN
KUANTITAS
HARGA
SATUAN
(Rp.)
TENAGA
Pekerja Biasa
Tukang Batu
Kepala Tukang Batu
Mandor
L17
L07
L02
L01
Org/hr
Org/hr
Org/hr
Org/hr
0.0810
0.1350
0.0135
0.0041
45,000.00
60,000.00
70,000.00
80,000.00
BAHAN
Pipa PVC tipe C Dia 3 "
Perlengkapan
M358
Ljr
0.3000
0.3500
57,290.00
20,051.50
17,187.00
7,018.03
24,205.03
PERALATAN
3,645.00
8,100.00
945.00
328.00
13,018.00
JUMLAH
HARGA
(Rp.)
37,223.03
NO.
A.
1
2
3
4
: J.063
: Pasang pipa PVC tipe C, diameter 4"
1
:m
KOMPONEN
SATUAN
PERKIRAAN
KUANTITAS
HARGA
SATUAN
(Rp.)
TENAGA
Pekerja Biasa
Tukang Batu
Kepala Tukang Batu
Mandor
L17
L07
L02
L01
Org/hr
Org/hr
Org/hr
Org/hr
0.0810
0.1350
0.0135
0.0041
45,000.00
60,000.00
70,000.00
80,000.00
3,645.00
8,100.00
945.00
328.00
13,018.00
BAHAN
Pipa PVC tipe C Dia 4 "
Perlengkapan
M359
Ljr
0.3000
0.3500
72,980.00
25,543.00
JUMLAH
HARGA
(Rp.)
21,894.00
8,940.05
30,834.05
PERALATAN
43,852.05
NO.
A.
1
2
3
4
: J.064
: Pasang bak cuci piring stainles steel
: bh
KOMPONEN
SATUAN
PERKIRAAN
KUANTITAS
HARGA
SATUAN
(Rp.)
TENAGA
Pekerja Biasa
Tukang Batu
Kepala Tukang Batu
Mandor
L17
L07
L02
L01
Org/hr
Org/hr
Org/hr
Org/hr
0.0300
0.3000
0.0300
0.0015
45,000.00
60,000.00
70,000.00
80,000.00
BAHAN
Bak Cuci Piring Stainless
M243
bh
1.0000
265,800.00
265,800.00
265,800.00
PERALATAN
1,350.00
18,000.00
2,100.00
120.00
21,570.00
JUMLAH
HARGA
(Rp.)
287,370.00
NO.
A.
1
2
3
4
: J.065
: Pasang bak cuci piring teraso
: bh
KOMPONEN
SATUAN
PERKIRAAN
KUANTITAS
HARGA
SATUAN
(Rp.)
TENAGA
Pekerja Biasa
Tukang Batu
Kepala Tukang Batu
Mandor
L17
L07
L02
L01
Org/hr
Org/hr
Org/hr
Org/hr
0.0500
0.5000
0.0500
0.0025
45,000.00
60,000.00
70,000.00
80,000.00
2,250.00
30,000.00
3,500.00
200.00
35,950.00
BAHAN
Bak Cuci Piring Teraso
M242
bh
1.0000
186,550.00
JUMLAH
HARGA
(Rp.)
186,550.00
186,550.00
PERALATAN
222,500.00
NO.
A.
1
2
3
4
: J.066
: Pasang kran diameter 1/2"
: bh
KOMPONEN
SATUAN
PERKIRAAN
KUANTITAS
HARGA
SATUAN
(Rp.)
TENAGA
Pekerja Biasa
Tukang Batu
Kepala Tukang Batu
Mandor
L17
L07
L02
L01
Org/hr
Org/hr
Org/hr
Org/hr
0.0100
0.1000
0.0100
0.0050
45,000.00
60,000.00
70,000.00
80,000.00
BAHAN
Kran Air 1/2 "
Seal Tape / TBA
M235
M481
bh
bh
1.0000
0.0250
33,470.00
2,150.00
33,470.00
53.75
33,523.75
PERALATAN
450.00
6,000.00
700.00
400.00
7,550.00
JUMLAH
HARGA
(Rp.)
41,073.75
NO.
A.
1
2
3
4
: J.067
: Pasang kran diameter 3/4"
: bh
KOMPONEN
SATUAN
PERKIRAAN
KUANTITAS
HARGA
SATUAN
(Rp.)
TENAGA
Pekerja Biasa
Tukang Batu
Kepala Tukang Batu
Mandor
L17
L07
L02
L01
Org/hr
Org/hr
Org/hr
Org/hr
0.0100
0.1000
0.0100
0.0050
45,000.00
60,000.00
70,000.00
80,000.00
450.00
6,000.00
700.00
400.00
7,550.00
BAHAN
Kran Air 3/4 "
Seal Tape / TBA
M236
M481
bh
bh
1.0000
0.0250
37,310.00
2,150.00
JUMLAH
HARGA
(Rp.)
37,310.00
53.75
37,363.75
PERALATAN
44,913.75
NO.
A.
1
2
3
4
: J.068
: Pasang Afor Stainless Steel
: bh
KOMPONEN
SATUAN
PERKIRAAN
KUANTITAS
HARGA
SATUAN
(Rp.)
TENAGA
Pekerja Biasa
Tukang Batu
Kepala Tukang Batu
Mandor
L17
L07
L02
L01
Org/hr
Org/hr
Org/hr
Org/hr
0.0100
0.1000
0.0100
0.0050
45,000.00
60,000.00
70,000.00
80,000.00
BAHAN
Afor Stainless
M250
bh
1.0000
45,300.00
45,300.00
45,300.00
PERALATAN
450.00
6,000.00
700.00
400.00
7,550.00
JUMLAH
HARGA
(Rp.)
52,850.00
NO.
A.
1
2
3
4
: J.069
: Pasang Afor Plastik
: bh
KOMPONEN
SATUAN
PERKIRAAN
KUANTITAS
HARGA
SATUAN
(Rp.)
TENAGA
Pekerja Biasa
Tukang Batu
Kepala Tukang Batu
Mandor
L17
L07
L02
L01
Org/hr
Org/hr
Org/hr
Org/hr
0.0100
0.1000
0.0100
0.0050
45,000.00
60,000.00
70,000.00
80,000.00
450.00
6,000.00
700.00
400.00
7,550.00
BAHAN
Afor Plastic
M251
bh
1.0000
13,320.00
JUMLAH
HARGA
(Rp.)
13,320.00
13,320.00
PERALATAN
20,870.00
NO.
A.
1
2
3
4
: J.070
: Pasang kaca wastafel
2
:m
KOMPONEN
SATUAN
PERKIRAAN
KUANTITAS
HARGA
SATUAN
(Rp.)
TENAGA
Pekerja Biasa
Tukang Batu
Kepala Tukang Batu
Mandor
L17
L07
L02
L01
Org/hr
Org/hr
Org/hr
Org/hr
0.0150
0.1500
0.0150
0.0008
45,000.00
60,000.00
70,000.00
80,000.00
BAHAN
Kaca Cermin tebal 5 mm
Perlengkapan
M278
m2
1.0000
0.1000
123,760.00
123,760.00
123,760.00
12,376.00
136,136.00
PERALATAN
675.00
9,000.00
1,050.00
60.00
10,785.00
JUMLAH
HARGA
(Rp.)
146,921.00
NO.
A.
1
2
3
4
: J.071
: Pasang pipa screen PVC tipe AW, diameter 3"
1
:m
KOMPONEN
SATUAN
PERKIRAAN
KUANTITAS
HARGA
SATUAN
(Rp.)
TENAGA
Pekerja Biasa
Tukang Batu
Kepala Tukang Batu
Mandor
L17
L07
L02
L01
Org/hr
Org/hr
Org/hr
Org/hr
0.1620
0.2025
0.0169
0.0041
45,000.00
60,000.00
70,000.00
80,000.00
7,290.00
12,150.00
1,181.25
328.00
20,949.25
BAHAN
Pipa PVC tipe AW Dia 3 "
Perlengkapan
M340
Ljr
0.3000
0.3500
173,730.00
60,805.50
JUMLAH
HARGA
(Rp.)
52,119.00
21,281.93
73,400.93
PERALATAN
94,350.18
NO.
A.
1
2
3
4
: J.072
: Pasang pipa screen PVC tipe AW, diameter 4"
1
:m
KOMPONEN
SATUAN
PERKIRAAN
KUANTITAS
HARGA
SATUAN
(Rp.)
TENAGA
Pekerja Biasa
Tukang Batu
Kepala Tukang Batu
Mandor
L17
L07
L02
L01
Org/hr
Org/hr
Org/hr
Org/hr
0.1620
0.2025
0.0169
0.0041
45,000.00
60,000.00
70,000.00
80,000.00
BAHAN
Pipa PVC tipe AW Dia 4 "
Perlengkapan
M341
Ljr
0.3000
0.3500
271,360.00
94,976.00
81,408.00
33,241.60
114,649.60
PERALATAN
7,290.00
12,150.00
1,181.25
328.00
20,949.25
JUMLAH
HARGA
(Rp.)
135,598.85
NO.
A.
1
2
3
4
: K.001
: Pasang besi profil
: kg
KOMPONEN
SATUAN
PERKIRAAN
KUANTITAS
HARGA
SATUAN
(Rp.)
TENAGA
Pekerja Biasa
Tukang Besi/Baja
Kepala Tukang Besi
Mandor
L17
L09
L04
L01
Org/hr
Org/hr
Org/hr
Org/hr
0.0600
0.0060
0.0060
0.0003
45,000.00
60,000.00
47,000.00
80,000.00
BAHAN
Baja Profil
Elektroda
M116
M473
kg
kg
1.1500
0.0220
18,750.00
75,000.00
21,562.50
1,650.00
23,212.50
PERALATAN
Sewa Mesin Las
E05
hari
0.0220
400,000.00
2,700.00
360.00
282.00
24.00
3,366.00
JUMLAH
HARGA
(Rp.)
8,800.00
8,800.00
35,378.50
NO.
A.
1
2
3
4
: K.002
: Pasang rangka kuda-kuda baja WF
: kg
KOMPONEN
SATUAN
PERKIRAAN
KUANTITAS
HARGA
SATUAN
(Rp.)
TENAGA
Pekerja Biasa
Tukang Besi/Baja
Kepala Tukang Besi
Mandor
L17
L09
L04
L01
Org/hr
Org/hr
Org/hr
Org/hr
0.0600
0.0060
0.0060
0.0003
45,000.00
60,000.00
47,000.00
80,000.00
BAHAN
Baja Profil
Elektroda
M116
M473
kg
kg
1.1500
0.0220
18,750.00
75,000.00
21,562.50
1,650.00
23,212.50
PERALATAN
Sewa Mesin Las
E05
hari
0.0220
2,700.00
360.00
282.00
24.00
3,366.00
JUMLAH
HARGA
(Rp.)
400,000.00
8,800.00
8,800.00
35,378.50
NO.
A.
1
2
3
4
: K.003
: Pemasangan baut anker baja
: kg
KOMPONEN
SATUAN
PERKIRAAN
KUANTITAS
HARGA
SATUAN
(Rp.)
TENAGA
Pekerja Biasa
Tukang Besi/Baja
Kepala Tukang Besi
Mandor
L17
L09
L04
L01
Org/hr
Org/hr
Org/hr
Org/hr
0.0200
0.0300
45,000.00
60,000.00
47,000.00
80,000.00
900.00
1,800.00
2,700.00
BAHAN
Angker Bar
M117
kg
1.0500
15,000.00
JUMLAH
HARGA
(Rp.)
15,750.00
15,750.00
PERALATAN
18,450.00
NO.
A.
1
2
3
4
: K.004
: Ikatan angin/Trekstang
: kg
KOMPONEN
SATUAN
PERKIRAAN
KUANTITAS
HARGA
SATUAN
(Rp.)
TENAGA
Pekerja Biasa
Tukang Besi/Baja
Kepala Tukang Besi
Mandor
L17
L09
L04
L01
Org/hr
Org/hr
Org/hr
Org/hr
0.0600
0.0060
0.0060
0.0003
45,000.00
60,000.00
47,000.00
80,000.00
BAHAN
Besi Beton Polos
Elektroda
M112
M473
kg
kg
1.0500
0.0220
8,500.00
75,000.00
8,925.00
1,650.00
10,575.00
PERALATAN
Sewa Mesin Las
E05
hari
0.0220
2,700.00
360.00
282.00
24.00
3,366.00
JUMLAH
HARGA
(Rp.)
400,000.00
8,800.00
8,800.00
22,741.00
NO.
A.
1
2
3
4
: K.005
: Plendes
: kg
KOMPONEN
SATUAN
PERKIRAAN
KUANTITAS
HARGA
SATUAN
(Rp.)
TENAGA
Pekerja Biasa
Tukang Besi/Baja
Kepala Tukang Besi
Mandor
L17
L09
L04
L01
Org/hr
Org/hr
Org/hr
Org/hr
0.0600
0.0060
0.0060
0.0003
45,000.00
60,000.00
47,000.00
80,000.00
BAHAN
Baja Profil
Elektroda
M116
M473
kg
kg
1.1500
0.0220
18,750.00
75,000.00
21,562.50
1,650.00
23,212.50
PERALATAN
Sewa Mesin Las
E05
hari
0.0220
400,000.00
2,700.00
360.00
282.00
24.00
3,366.00
JUMLAH
HARGA
(Rp.)
8,800.00
8,800.00
35,378.50
NO.
A.
1
2
3
4
: K.006
: Pasang pintu plat baja tebal 2 mm rangkap, rangka baja siku
: m2
KOMPONEN
SATUAN
PERKIRAAN
KUANTITAS
HARGA
SATUAN
(Rp.)
TENAGA
Pekerja Biasa
Tukang Besi/Baja
Kepala Tukang Besi
Mandor
L17
L09
L04
L01
Org/hr
Org/hr
Org/hr
Org/hr
1.0500
1.0500
0.1050
0.0520
45,000.00
60,000.00
47,000.00
80,000.00
BAHAN
Baja Profil
Plat Baja
Elektroda
M116
M116.a
M473
kg
kg
kg
15.0000
32.8000
0.0500
18,750.00
18,750.00
75,000.00
281,250.00
615,000.00
3,750.00
900,000.00
PERALATAN
47,250.00
63,000.00
4,935.00
4,160.00
119,345.00
JUMLAH
HARGA
(Rp.)
1,019,345.00
NO.
A.
1
2
3
4
: K.007
: pengelasan dengan las listrik
: cm
KOMPONEN
SATUAN
PERKIRAAN
KUANTITAS
HARGA
SATUAN
(Rp.)
TENAGA
Pekerja Biasa
Tukang Besi/Baja
Kepala Tukang Besi
Mandor
L17
L09
L04
L01
Org/hr
Org/hr
Org/hr
Org/hr
0.0040
0.0020
0.0002
0.0002
45,000.00
60,000.00
47,000.00
80,000.00
BAHAN
Elektroda
Solar
Minyak Pelumas
M473
M483
M484
kg
ltr
ltr
0.0400
0.0300
0.0400
75,000.00
5,151.00
35,000.00
3,000.00
154.53
1,400.00
4,554.53
PERALATAN
Sewa Mesin Las
E05
hari
0.0170
400,000.00
180.00
120.00
9.40
16.00
325.40
JUMLAH
HARGA
(Rp.)
6,800.00
6,800.00
11,679.93
NO.
A.
1
2
3
4
: K.008
: Pasang pintu gulung besi (rolling door)
: m2
KOMPONEN
SATUAN
PERKIRAAN
KUANTITAS
HARGA
SATUAN
(Rp.)
TENAGA
Pekerja Biasa
Tukang Batu
Kepala Tukang Batu
Mandor
L17
L07
L02
L01
Org/hr
Org/hr
Org/hr
Org/hr
1.2000
1.2000
0.1200
0.0060
45,000.00
60,000.00
70,000.00
80,000.00
BAHAN
Pintu Gulung Besi
M120
m2
1.0000
1,775,810.00
1,775,810.00
1,775,810.00
PERALATAN
54,000.00
72,000.00
8,400.00
480.00
134,880.00
JUMLAH
HARGA
(Rp.)
1,910,690.00
NO.
A.
1
2
3
4
: K.009
: Pasang pintu lipat (folding door)
2
:m
KOMPONEN
SATUAN
PERKIRAAN
KUANTITAS
HARGA
SATUAN
(Rp.)
TENAGA
Pekerja Biasa
Tukang Batu
Kepala Tukang Batu
Mandor
L17
L07
L02
L01
Org/hr
Org/hr
Org/hr
Org/hr
1.2000
1.2000
0.1200
0.0060
45,000.00
60,000.00
70,000.00
80,000.00
54,000.00
72,000.00
8,400.00
480.00
134,880.00
BAHAN
Pintu Lipat
M121
m2
1.0000
1,452,930.00
JUMLAH
HARGA
(Rp.)
1,452,930.00
1,452,930.00
PERALATAN
1,587,810.00
NO.
A.
1
2
3
4
: K.010
: Pasang sunscream alluminium
: m2
KOMPONEN
SATUAN
PERKIRAAN
KUANTITAS
HARGA
SATUAN
(Rp.)
TENAGA
Pekerja Biasa
Tukang Besi/Baja
Kepala Tukang Besi
Mandor
L17
L09
L04
L01
Org/hr
Org/hr
Org/hr
Org/hr
0.0800
0.8000
0.0800
0.0040
45,000.00
60,000.00
47,000.00
80,000.00
BAHAN
Sunscream Aluminium
M127
m2
1.0000
269,060.00
269,060.00
269,060.00
PERALATAN
3,600.00
48,000.00
3,760.00
320.00
55,680.00
JUMLAH
HARGA
(Rp.)
324,740.00
NO.
A.
1
2
3
4
: K.011
: Pasang Rolling door Aluminium
2
:m
KOMPONEN
SATUAN
PERKIRAAN
KUANTITAS
HARGA
SATUAN
(Rp.)
TENAGA
Pekerja Biasa
Tukang Besi/Baja
Kepala Tukang Besi
Mandor
L17
L09
L04
L01
Org/hr
Org/hr
Org/hr
Org/hr
1.0000
1.0000
0.1000
0.0500
45,000.00
60,000.00
47,000.00
80,000.00
45,000.00
60,000.00
4,700.00
4,000.00
113,700.00
BAHAN
Rolling Door
M122
m2
1.0000
1,076,250.00
JUMLAH
HARGA
(Rp.)
1,076,250.00
1,076,250.00
PERALATAN
1,189,950.00
NO.
A.
1
2
3
4
: K.012
: Pasang Kusen Alluminium Coklat
: m1
KOMPONEN
SATUAN
PERKIRAAN
KUANTITAS
HARGA
SATUAN
(Rp.)
TENAGA
Pekerja Biasa
Tukang Besi/Baja
Kepala Tukang Besi
Mandor
L17
L09
L04
L01
Org/hr
Org/hr
Org/hr
Org/hr
0.0430
0.0430
0.0043
0.0021
45,000.00
60,000.00
47,000.00
80,000.00
BAHAN
Profil Aluminium Coklat
Sekrup Segala Ukuran
Sealant
M126
M145
M148.b
m1
bh
tube
1.1000
2.0000
0.0600
93,670.00
410.00
25,000.00
103,037.00
820.00
1,500.00
105,357.00
PERALATAN
1,935.00
2,580.00
202.10
168.00
4,885.10
JUMLAH
HARGA
(Rp.)
110,242.10
NO.
A.
1
2
3
4
: K.013
: Pasang pintu Alluminium coklat strip lebar 8 cm
2
:m
KOMPONEN
SATUAN
PERKIRAAN
KUANTITAS
HARGA
SATUAN
(Rp.)
TENAGA
Pekerja Biasa
Tukang Besi/Baja
Kepala Tukang Besi
Mandor
L17
L09
L04
L01
Org/hr
Org/hr
Org/hr
Org/hr
0.0850
0.0850
0.0085
0.0042
45,000.00
60,000.00
47,000.00
80,000.00
3,825.00
5,100.00
399.50
336.00
9,660.50
BAHAN
Profil Aluminium Coklat
Aluminium Strip
M126
M148.c
m1
m1
4.4000
14.6000
93,670.00
15,000.00
JUMLAH
HARGA
(Rp.)
412,148.00
219,000.00
631,148.00
PERALATAN
640,808.50
NO.
A.
1
2
3
4
: K.014
: Pasang Pintu Kaca Rangka Aluminium Coklat
: m2
KOMPONEN
SATUAN
PERKIRAAN
KUANTITAS
HARGA
SATUAN
(Rp.)
TENAGA
Pekerja Biasa
Tukang Besi/Baja
Kepala Tukang Besi
Mandor
L17
L09
L04
L01
Org/hr
Org/hr
Org/hr
Org/hr
0.0850
0.0850
0.0080
0.0040
45,000.00
60,000.00
47,000.00
80,000.00
BAHAN
Profil Aluminium Coklat
Profil Kaca
Sealant
M126
M148.d
M148.b
m1
m1
tube
4.4000
4.5000
0.2700
93,670.00
10,000.00
25,000.00
412,148.00
45,000.00
6,750.00
463,898.00
PERALATAN
3,825.00
5,100.00
376.00
320.00
9,621.00
JUMLAH
HARGA
(Rp.)
473,519.00
NO.
A.
1
2
3
4
: K.015
: Pasang venetion blinds dan vertical blinds (tirai)
2
:m
KOMPONEN
SATUAN
PERKIRAAN
KUANTITAS
HARGA
SATUAN
(Rp.)
TENAGA
Pekerja Biasa
Tukang Besi/Baja
Kepala Tukang Besi
Mandor
L17
L09
L04
L01
Org/hr
Org/hr
Org/hr
Org/hr
0.3500
0.3500
0.0350
0.0180
45,000.00
60,000.00
47,000.00
80,000.00
BAHAN
M148.e
15,750.00
21,000.00
1,645.00
1,440.00
39,835.00
m2
1.0000
500,000.00
JUMLAH
HARGA
(Rp.)
500,000.00
500,000.00
PERALATAN
539,835.00
NO.
A.
1
2
3
4
: K.016
: Pasang teralis besi (2 x 3) mm
: m2
KOMPONEN
SATUAN
PERKIRAAN
KUANTITAS
HARGA
SATUAN
(Rp.)
TENAGA
Pekerja Biasa
Tukang Batu
Kepala Tukang Batu
Mandor
L17
L07
L02
L01
Org/hr
Org/hr
Org/hr
Org/hr
1.6700
1.6700
0.1670
0.0830
45,000.00
60,000.00
70,000.00
80,000.00
BAHAN
Besi Strip
Elektroda
M114
M473
kg
kg
6.1770
0.3000
8,500.00
75,000.00
52,504.50
22,500.00
75,004.50
PERALATAN
Sewa Mesin Las
E05
hari
0.5000
75,150.00
100,200.00
11,690.00
6,640.00
193,680.00
JUMLAH
HARGA
(Rp.)
400,000.00
200,000.00
200,000.00
468,684.50
NO.
A.
1
2
3
4
: K.017
: Pasang kawat nyamuk
2
:m
KOMPONEN
SATUAN
PERKIRAAN
KUANTITAS
HARGA
SATUAN
(Rp.)
TENAGA
Pekerja Biasa
Tukang Batu
Kepala Tukang Batu
Mandor
L17
L07
L02
L01
Org/hr
Org/hr
Org/hr
Org/hr
0.1000
0.1000
0.0100
0.0050
45,000.00
60,000.00
70,000.00
80,000.00
4,500.00
6,000.00
700.00
400.00
11,600.00
BAHAN
Kawat Nyamuk
Pengelasan dengan las listrik
Besi Strip
M138
M114
m2
cm
kg
1.1000
11.1100
1.7160
15,660.00
11,679.93
8,500.00
JUMLAH
HARGA
(Rp.)
17,226.00
129,764.02
14,586.00
161,576.02
PERALATAN
173,176.02
NO.
A.
1
2
3
4
: K.018
: Pasang jendela nako & trails
: m2
KOMPONEN
SATUAN
PERKIRAAN
KUANTITAS
HARGA
SATUAN
(Rp.)
TENAGA
Pekerja Biasa
Tukang Batu
Kepala Tukang Batu
Mandor
L17
L07
L02
L01
Org/hr
Org/hr
Org/hr
Org/hr
0.2000
0.2000
0.0200
0.0010
45,000.00
60,000.00
70,000.00
80,000.00
BAHAN
Jendela Nako + accessories
Sekrup Segala Ukuran
Besi Strip
M285
M145
M114
m2
bh
kg
1.1000
10.0000
7.0000
210,450.00
410.00
8,500.00
231,495.00
4,100.00
59,500.00
295,095.00
PERALATAN
9,000.00
12,000.00
1,400.00
80.00
22,480.00
JUMLAH
HARGA
(Rp.)
317,575.00
NO.
A.
1
2
3
4
: K.019
: Pasang pintu fiber KM
: Unit
KOMPONEN
SATUAN
PERKIRAAN
KUANTITAS
HARGA
SATUAN
(Rp.)
TENAGA
Pekerja Biasa
Tukang Batu
Kepala Tukang Batu
Mandor
L17
L07
L02
L01
Org/hr
Org/hr
Org/hr
Org/hr
0.5250
0.5250
0.0525
0.0260
45,000.00
60,000.00
70,000.00
80,000.00
23,625.00
31,500.00
3,675.00
2,080.00
60,880.00
BAHAN
Pintu Fiber KM
M128
Unit
1.0000
300,000.00
JUMLAH
HARGA
(Rp.)
300,000.00
300,000.00
PERALATAN
360,880.00
NO.
A.
1
2
3
4
: K.020
: Pasang talang datar, seng bjls 30 L = 0.60 m
: m1
KOMPONEN
SATUAN
PERKIRAAN
KUANTITAS
HARGA
SATUAN
(Rp.)
TENAGA
Pekerja Biasa
Tukang Batu
Kepala Tukang Batu
Mandor
L17
L07
L02
L01
Org/hr
Org/hr
Org/hr
Org/hr
0.2000
0.4000
0.0250
0.0010
45,000.00
60,000.00
70,000.00
80,000.00
BAHAN
Seng plat BJLS 30 L = 0.60 M
Paku Kayu Segala Ukuran
Papan (2x20) cm
M175
M140
M063
m'
kg
m3
1.0500
0.0150
0.0190
34,300.00
17,500.00
6,030,000.00
36,015.00
262.50
114,570.00
150,847.50
PERALATAN
9,000.00
24,000.00
1,750.00
80.00
34,830.00
JUMLAH
HARGA
(Rp.)
185,677.50
NO.
A.
1
2
3
4
: K.021
: Pasang talang datar, seng bjls 30 L = 0.90 m
1
:m
KOMPONEN
SATUAN
PERKIRAAN
KUANTITAS
HARGA
SATUAN
(Rp.)
TENAGA
Pekerja Biasa
Tukang Batu
Kepala Tukang Batu
Mandor
L17
L07
L02
L01
Org/hr
Org/hr
Org/hr
Org/hr
0.2000
0.4000
0.0250
0.0010
45,000.00
60,000.00
70,000.00
80,000.00
9,000.00
24,000.00
1,750.00
80.00
34,830.00
BAHAN
Seng plat BJLS 30 L = 0.90 M
Paku Kayu Segala Ukuran
Papan (2x20) cm
M176
M140
M063
m'
kg
m3
1.0500
0.0150
0.0190
43,100.00
17,500.00
6,030,000.00
JUMLAH
HARGA
(Rp.)
45,255.00
262.50
114,570.00
160,087.50
PERALATAN
194,917.50
NO.
A.
1
2
3
4
: K.022
: Pasang talang miring, seng bjls 30 L = 0.60 m
: m1
KOMPONEN
SATUAN
PERKIRAAN
KUANTITAS
HARGA
SATUAN
(Rp.)
TENAGA
Pekerja Biasa
Tukang Batu
Kepala Tukang Batu
Mandor
L17
L07
L02
L01
Org/hr
Org/hr
Org/hr
Org/hr
0.2000
0.4000
0.0250
0.0010
45,000.00
60,000.00
70,000.00
80,000.00
BAHAN
Seng plat BJLS 30 L = 0.60 M
Paku Kayu Segala Ukuran
Papan (2x20) cm
M175
M140
M063
m'
kg
m3
1.0500
0.0150
0.0190
34,300.00
17,500.00
6,030,000.00
36,015.00
262.50
114,570.00
150,847.50
PERALATAN
9,000.00
24,000.00
1,750.00
80.00
34,830.00
JUMLAH
HARGA
(Rp.)
185,677.50
NO.
A.
1
2
3
4
: K.023
: Pasang talang miring, seng bjls 30 L = 0.90 m
1
:m
KOMPONEN
SATUAN
PERKIRAAN
KUANTITAS
HARGA
SATUAN
(Rp.)
TENAGA
Pekerja Biasa
Tukang Batu
Kepala Tukang Batu
Mandor
L17
L07
L02
L01
Org/hr
Org/hr
Org/hr
Org/hr
0.2000
0.4000
0.0250
0.0010
45,000.00
60,000.00
70,000.00
80,000.00
9,000.00
24,000.00
1,750.00
80.00
34,830.00
BAHAN
Seng plat BJLS 30 L = 0.90 M
Paku Kayu Segala Ukuran
Papan (2x20) cm
M176
M140
M063
m'
kg
m3
1.0500
0.0150
0.0190
43,100.00
17,500.00
6,030,000.00
JUMLAH
HARGA
(Rp.)
45,255.00
262.50
114,570.00
160,087.50
PERALATAN
194,917.50
NO.
A.
1
2
3
4
: K.024
: Pasang talang tegak pipa PVC f 3"
: m1
KOMPONEN
SATUAN
PERKIRAAN
KUANTITAS
HARGA
SATUAN
(Rp.)
TENAGA
Pekerja Biasa
Tukang Batu
Kepala Tukang Batu
Mandor
L17
L07
L02
L01
Org/hr
Org/hr
Org/hr
Org/hr
0.1200
0.2000
0.0200
0.0010
45,000.00
60,000.00
70,000.00
80,000.00
BAHAN
Pipa PVC tipe D Dia 3 "
Lem Pipa PVC
Knee PVC Dia 3 "
Shock PVC Dia 3 "
M350
M423
M374
M366
Ljr
kg
bh
bh
0.2500
0.1000
0.2500
0.2500
97,370.00
28,700.00
12,810.00
11,530.00
24,342.50
2,870.00
3,202.50
2,882.50
33,297.50
PERALATAN
5,400.00
12,000.00
1,400.00
80.00
18,880.00
JUMLAH
HARGA
(Rp.)
52,177.50
NO.
A.
1
2
3
4
: K.025
: Pasang talang tegak pipa PVC f 4"
1
:m
KOMPONEN
SATUAN
PERKIRAAN
KUANTITAS
HARGA
SATUAN
(Rp.)
TENAGA
Pekerja Biasa
Tukang Batu
Kepala Tukang Batu
Mandor
L17
L07
L02
L01
Org/hr
Org/hr
Org/hr
Org/hr
0.1200
0.2000
0.0200
0.0010
45,000.00
60,000.00
70,000.00
80,000.00
5,400.00
12,000.00
1,400.00
80.00
18,880.00
BAHAN
Pipa PVC tipe D Dia 4 "
Lem Pipa PVC
Knee PVC Dia 4 "
Shock PVC Dia 4 "
M351
M423
M375
M367
Ljr
kg
bh
bh
0.2500
0.1000
0.2500
0.2500
137,090.00
28,700.00
16,140.00
14,090.00
JUMLAH
HARGA
(Rp.)
34,272.50
2,870.00
4,035.00
3,522.50
44,700.00
PERALATAN
63,580.00
NO.
A.
1
2
3
4
: K.026
: Pasang talang 1/2 lingkaran D-15 cm bjls 30, L = 45 cm
: m1
KOMPONEN
SATUAN
PERKIRAAN
KUANTITAS
HARGA
SATUAN
(Rp.)
TENAGA
Pekerja Biasa
Tukang Batu
Kepala Tukang Batu
Mandor
L17
L07
L02
L01
Org/hr
Org/hr
Org/hr
Org/hr
0.1500
0.3000
0.0300
0.0070
45,000.00
60,000.00
70,000.00
80,000.00
BAHAN
Seng plat BJLS 30 L = 0.45 M
Paku Kayu Segala Ukuran
Besi Strip
M174
M140
M114
m'
kg
kg
1.0500
0.0100
0.5000
30,100.00
17,500.00
8,500.00
31,605.000
175.000
4,250.000
36,030.00
PERALATAN
6,750.00
18,000.00
2,100.00
560.00
27,410.00
JUMLAH
HARGA
(Rp.)
63,440.00
NO.
A.
1
2
3
4
: K.027
: Pasang pagar BRC tinggi 1 m
: m1
KOMPONEN
SATUAN
PERKIRAAN
KUANTITAS
HARGA
SATUAN
(Rp.)
TENAGA
Pekerja Biasa
Tukang Besi/Baja
Kepala Tukang Besi
Mandor
L17
L09
L04
L01
Org/hr
Org/hr
Org/hr
Org/hr
0.2500
0.0630
0.0063
0.0063
45,000.00
60,000.00
47,000.00
80,000.00
11,250.00
3,780.00
296.10
504.00
15,830.10
BAHAN
Pagar Model BRC tinggi 1 m
M124.a
m2
1.0000
282,510.00
JUMLAH
HARGA
(Rp.)
282,510.00
282,510.00
PERALATAN
298,340.10
NO.
A.
1
2
3
4
: K.028
: Pasang tiang pagar BRC Dia 2" tinggi 1 m
: bh
KOMPONEN
SATUAN
PERKIRAAN
KUANTITAS
HARGA
SATUAN
(Rp.)
TENAGA
Pekerja Biasa
Tukang Besi/Baja
Kepala Tukang Besi
Mandor
L17
L09
L04
L01
Org/hr
Org/hr
Org/hr
Org/hr
0.2500
0.0630
0.0063
0.0063
45,000.00
60,000.00
47,000.00
80,000.00
BAHAN
Pipa Galvanis 2 ", tebal 2.3 mm
M380
Ljr
0.3750
472,500.00
177,187.50
177,187.50
PERALATAN
11,250.00
3,780.00
296.10
504.00
15,830.10
JUMLAH
HARGA
(Rp.)
193,017.60
NO.
A.
1
2
3
4
5
: K.029
: Pasang pintu pagar BRC tinggi 1 m
: m1
KOMPONEN
SATUAN
PERKIRAAN
KUANTITAS
HARGA
SATUAN
(Rp.)
TENAGA
Pekerja Biasa
Tukang Batu
Tukang Besi/Baja
Kepala Tukang Besi
Mandor
L17
L07
L09
L04
L01
Org/hr
Org/hr
Org/hr
Org/hr
Org/hr
0.2780
0.0690
0.0170
0.0086
0.0086
45,000.00
60,000.00
60,000.00
47,000.00
80,000.00
12,510.00
4,140.00
1,020.00
404.20
688.00
18,762.20
BAHAN
Pintu Pagar Model BRC tinggi 1 m
Baja Profil
M124.b
M116
m1
kg
1.0000
7.8000
361,616.00
18,750.00
JUMLAH
HARGA
(Rp.)
361,616.00
146,250.00
507,866.00
PERALATAN
526,628.20
NO.
A.
1
2
3
4
: K.030
: Pasang pagar besi
: m2
KOMPONEN
SATUAN
PERKIRAAN
KUANTITAS
HARGA
SATUAN
(Rp.)
TENAGA
Pekerja Biasa
Tukang Besi/Baja
Kepala Tukang Besi
Mandor
L17
L09
L04
L01
Org/hr
Org/hr
Org/hr
Org/hr
0.7500
0.5000
0.0500
0.0500
45,000.00
60,000.00
47,000.00
80,000.00
BAHAN
Baja Profil
Pipa Galvanis 2 ", tebal 2.3 mm
M116
M380
kg
Ljr
10.1907
0.3000
18,750.00
472,500.00
191,075.63
141,750.00
332,825.63
PERALATAN
Sewa Mesin Las
E05
hari
0.5000
33,750.00
30,000.00
2,350.00
4,000.00
70,100.00
JUMLAH
HARGA
(Rp.)
400,000.00
200,000.00
200,000.00
602,925.63
NO.
A.
1
2
3
4
: K.031
: Pasang pintu pagar besi
: m2
KOMPONEN
SATUAN
PERKIRAAN
KUANTITAS
HARGA
SATUAN
(Rp.)
JUMLAH
HARGA
(Rp.)
TENAGA
Pekerja Biasa
Tukang Besi/Baja
Kepala Tukang Besi
Mandor
L17
L09
L04
L01
Org/hr
Org/hr
Org/hr
Org/hr
0.8500
0.5500
0.0550
0.0550
45,000.00
60,000.00
47,000.00
80,000.00
38,250.00
33,000.00
2,585.00
4,400.00
78,235.00
BAHAN
Baja Profil
M116
kg
28.5262
18,750.00
534,866.04
534,866.04
PERALATAN
Sewa Mesin Las
E05
hari
0.5000
400,000.00
200,000.00
200,000.00
813,101.04
NO.
A.
1
2
3
4
: K.032
: Pasang Atap Baja Ringan untuk Penutup Atap Genteng
: m2
KOMPONEN
SATUAN
PERKIRAAN
KUANTITAS
HARGA
SATUAN
(Rp.)
TENAGA
Pekerja Biasa
Tukang Besi/Baja
Kepala Tukang Besi
Mandor
L17
L09
L04
L01
Org/hr
Org/hr
Org/hr
Org/hr
0.7500
0.5000
0.0500
0.0500
45,000.00
60,000.00
47,000.00
80,000.00
BAHAN
Baja Ringan
Besi Strip / Plat Plendes
Baut Segala Ukuran
Angker Bar / Dynabolt
M132
M114
M146
M117
kg
kg
kg
kg
5.4912
0.4212
0.2521
0.1411
35,175.00
8,500.00
16,750.00
15,000.00
193,152.96
3,580.20
4,221.87
2,116.11
203,071.14
PERALATAN
33,750.00
30,000.00
2,350.00
4,000.00
70,100.00
JUMLAH
HARGA
(Rp.)
273,171.14
NO.
A.
1
2
3
4
: K.033
: Pasang Atap Baja Ringan untuk Penutup Atap Asbes Gelombang
: m2
KOMPONEN
SATUAN
PERKIRAAN
KUANTITAS
HARGA
SATUAN
(Rp.)
TENAGA
Pekerja Biasa
Tukang Besi/Baja
Kepala Tukang Besi
Mandor
L17
L09
L04
L01
Org/hr
Org/hr
Org/hr
Org/hr
0.7500
0.5000
0.0500
0.0500
45,000.00
60,000.00
47,000.00
80,000.00
BAHAN
Baja Ringan
Besi Strip / Plat Plendes
Baut Segala Ukuran
Angker Bar / Dynabolt
M132
M114
M146
M117
kg
kg
kg
kg
4.7303
0.4212
0.2521
0.1411
35,175.00
8,500.00
16,750.00
15,000.00
166,389.57
3,580.20
4,221.87
2,116.11
176,307.75
PERALATAN
33,750.00
30,000.00
2,350.00
4,000.00
70,100.00
JUMLAH
HARGA
(Rp.)
246,407.75
NO.
A.
1
2
3
4
: L.001
: Pasang kunci tanam antik
: bh
KOMPONEN
SATUAN
PERKIRAAN
KUANTITAS
HARGA
SATUAN
(Rp.)
TENAGA
Pekerja Biasa
Tukang Kayu
Kepala Tukang Kayu
Mandor
L17
L08
L03
L01
Org/hr
Org/hr
Org/hr
Org/hr
0.0600
0.6000
0.0600
0.0030
45,000.00
60,000.00
47,000.00
80,000.00
2,700.00
36,000.00
2,820.00
240.00
41,760.00
BAHAN
Kunci Tanam Antik
M253
bh
1.0000
80,710.00
JUMLAH
HARGA
(Rp.)
80,710.00
80,710.00
PERALATAN
122,470.00
NO.
A.
1
2
3
4
: L.002
: Pasang kunci tanam biasa
: bh
KOMPONEN
SATUAN
PERKIRAAN
KUANTITAS
HARGA
SATUAN
(Rp.)
TENAGA
Pekerja Biasa
Tukang Kayu
Kepala Tukang Kayu
Mandor
L17
L08
L03
L01
Org/hr
Org/hr
Org/hr
Org/hr
0.0100
0.5000
0.0100
0.0050
45,000.00
60,000.00
47,000.00
80,000.00
BAHAN
Kunci Tanam
M254
bh
1.0000
97,900.00
97,900.00
97,900.00
PERALATAN
450.00
30,000.00
470.00
400.00
31,320.00
JUMLAH
HARGA
(Rp.)
129,220.00
NO.
A.
1
2
3
4
: L.003
: Pasang kunci tanam kamar mandi
: bh
KOMPONEN
SATUAN
PERKIRAAN
KUANTITAS
HARGA
SATUAN
(Rp.)
TENAGA
Pekerja Biasa
Tukang Kayu
Kepala Tukang Kayu
Mandor
L17
L08
L03
L01
Org/hr
Org/hr
Org/hr
Org/hr
0.0050
0.5000
0.0050
0.0025
45,000.00
60,000.00
47,000.00
80,000.00
225.00
30,000.00
235.00
200.00
30,660.00
BAHAN
Kunci Pintu Kamar Mandi
M255
bh
1.0000
78,410.00
JUMLAH
HARGA
(Rp.)
78,410.00
78,410.00
PERALATAN
109,070.00
NO.
A.
1
2
3
4
: L.004
: Pasang kunci silinder
: bh
KOMPONEN
SATUAN
PERKIRAAN
KUANTITAS
HARGA
SATUAN
(Rp.)
TENAGA
Pekerja Biasa
Tukang Kayu
Kepala Tukang Kayu
Mandor
L17
L08
L03
L01
Org/hr
Org/hr
Org/hr
Org/hr
0.0050
0.5000
0.0050
0.0003
45,000.00
60,000.00
47,000.00
80,000.00
BAHAN
Kunci Silinder
M256
bh
1.0000
129,150.00
129,150.00
129,150.00
PERALATAN
225.00
30,000.00
235.00
20.00
30,480.00
JUMLAH
HARGA
(Rp.)
159,630.00
NO.
A.
1
2
3
4
: L.005
: Pasang kunci selot
: bh
KOMPONEN
SATUAN
PERKIRAAN
KUANTITAS
HARGA
SATUAN
(Rp.)
TENAGA
Pekerja Biasa
Tukang Kayu
Kepala Tukang Kayu
Mandor
L17
L08
L03
L01
Org/hr
Org/hr
Org/hr
Org/hr
0.0200
0.2000
0.0200
0.0010
45,000.00
60,000.00
47,000.00
80,000.00
900.00
12,000.00
940.00
80.00
13,920.00
BAHAN
Slot/Kunci Pintu
M265
bh
1.0000
118,400.00
JUMLAH
HARGA
(Rp.)
118,400.00
118,400.00
PERALATAN
132,320.00
NO.
A.
1
2
3
4
: L.006
: Pasang kunci lemari
: bh
KOMPONEN
SATUAN
PERKIRAAN
KUANTITAS
HARGA
SATUAN
(Rp.)
TENAGA
Pekerja Biasa
Tukang Kayu
Kepala Tukang Kayu
Mandor
L17
L08
L03
L01
Org/hr
Org/hr
Org/hr
Org/hr
0.0250
0.2500
0.0250
0.0013
45,000.00
60,000.00
47,000.00
80,000.00
BAHAN
Kunci Lemari
M269
bh
1.0000
10,250.00
10,250.00
10,250.00
PERALATAN
1,125.00
15,000.00
1,175.00
100.00
17,400.00
JUMLAH
HARGA
(Rp.)
27,650.00
NO.
A.
1
2
3
4
: L.007
: Pasang engsel pintu
: bh
KOMPONEN
SATUAN
PERKIRAAN
KUANTITAS
HARGA
SATUAN
(Rp.)
TENAGA
Pekerja Biasa
Tukang Kayu
Kepala Tukang Kayu
Mandor
L17
L08
L03
L01
Org/hr
Org/hr
Org/hr
Org/hr
0.0150
0.1500
0.0150
0.0008
45,000.00
60,000.00
47,000.00
80,000.00
675.00
9,000.00
705.00
60.00
10,440.00
BAHAN
Engsel Pintu
M257
bh
1.0000
27,160.00
JUMLAH
HARGA
(Rp.)
27,160.00
27,160.00
PERALATAN
37,600.00
NO.
A.
1
2
3
4
: L.008
: Pasang engsel jendela
: bh
KOMPONEN
SATUAN
PERKIRAAN
KUANTITAS
HARGA
SATUAN
(Rp.)
TENAGA
Pekerja Biasa
Tukang Kayu
Kepala Tukang Kayu
Mandor
L17
L08
L03
L01
Org/hr
Org/hr
Org/hr
Org/hr
0.0100
0.1000
0.0100
0.0005
45,000.00
60,000.00
47,000.00
80,000.00
BAHAN
Engsel Jendela
M258
bh
1.0000
21,210.00
21,210.00
21,210.00
PERALATAN
450.00
6,000.00
470.00
40.00
6,960.00
JUMLAH
HARGA
(Rp.)
28,170.00
NO.
A.
1
2
3
4
: L.009
: Pasang grendel pintu
: bh
KOMPONEN
SATUAN
PERKIRAAN
KUANTITAS
HARGA
SATUAN
(Rp.)
TENAGA
Pekerja Biasa
Tukang Kayu
Kepala Tukang Kayu
Mandor
L17
L08
L03
L01
Org/hr
Org/hr
Org/hr
Org/hr
0.0150
0.1500
0.0150
0.0008
45,000.00
60,000.00
47,000.00
80,000.00
675.00
9,000.00
705.00
60.00
10,440.00
BAHAN
Grendel Pintu
M262
bh
1.0000
18,960.00
JUMLAH
HARGA
(Rp.)
18,960.00
18,960.00
PERALATAN
29,400.00
NO.
A.
1
2
3
4
: L.010
: Pasang grendel jendela
: bh
KOMPONEN
SATUAN
PERKIRAAN
KUANTITAS
HARGA
SATUAN
(Rp.)
TENAGA
Pekerja Biasa
Tukang Kayu
Kepala Tukang Kayu
Mandor
L17
L08
L03
L01
Org/hr
Org/hr
Org/hr
Org/hr
0.0100
0.1000
0.0100
0.0005
45,000.00
60,000.00
47,000.00
80,000.00
BAHAN
Grendel Jendela
M263
bh
1.0000
10,600.00
10,600.00
10,600.00
PERALATAN
450.00
6,000.00
470.00
40.00
6,960.00
JUMLAH
HARGA
(Rp.)
17,560.00
NO.
A.
1
2
3
4
: L.011
: Pasang hak angin
: bh
KOMPONEN
SATUAN
PERKIRAAN
KUANTITAS
HARGA
SATUAN
(Rp.)
TENAGA
Pekerja Biasa
Tukang Kayu
Kepala Tukang Kayu
Mandor
L17
L08
L03
L01
Org/hr
Org/hr
Org/hr
Org/hr
0.0200
0.2000
0.0200
0.0100
45,000.00
60,000.00
47,000.00
80,000.00
900.00
12,000.00
940.00
800.00
14,640.00
BAHAN
Hak Angin
M259
bh
1.0000
16,790.00
JUMLAH
HARGA
(Rp.)
16,790.00
16,790.00
PERALATAN
31,430.00
NO.
A.
1
2
3
4
: L.012
: Pasang spring knip
: bh
KOMPONEN
SATUAN
PERKIRAAN
KUANTITAS
HARGA
SATUAN
(Rp.)
TENAGA
Pekerja Biasa
Tukang Kayu
Kepala Tukang Kayu
Mandor
L17
L08
L03
L01
Org/hr
Org/hr
Org/hr
Org/hr
0.0150
0.1500
0.0150
0.0008
45,000.00
60,000.00
47,000.00
80,000.00
BAHAN
Spring Knip
M260
1.0000
10,600.00
10,600.00
10,600.00
PERALATAN
675.00
9,000.00
705.00
60.00
10,440.00
JUMLAH
HARGA
(Rp.)
21,040.00
NO.
A.
1
2
3
4
: L.013
: Pasang kait angin
: bh
KOMPONEN
SATUAN
PERKIRAAN
KUANTITAS
HARGA
SATUAN
(Rp.)
TENAGA
Pekerja Biasa
Tukang Kayu
Kepala Tukang Kayu
Mandor
L17
L08
L03
L01
Org/hr
Org/hr
Org/hr
Org/hr
0.0100
0.1000
0.0100
0.0005
45,000.00
60,000.00
47,000.00
80,000.00
450.00
6,000.00
470.00
40.00
6,960.00
BAHAN
Kait Angin
M261
bh
1.0000
8,200.00
JUMLAH
HARGA
(Rp.)
8,200.00
8,200.00
PERALATAN
15,160.00
NO.
A.
1
2
3
4
: L.014
: Pasang door closer
: bh
KOMPONEN
SATUAN
PERKIRAAN
KUANTITAS
HARGA
SATUAN
(Rp.)
TENAGA
Pekerja Biasa
Tukang Kayu
Kepala Tukang Kayu
Mandor
L17
L08
L03
L01
Org/hr
Org/hr
Org/hr
Org/hr
0.0500
0.5000
0.0500
0.0025
45,000.00
60,000.00
47,000.00
80,000.00
BAHAN
Door Closer
M264
bh
1.0000
150,670.00
150,670.00
150,670.00
PERALATAN
2,250.00
30,000.00
2,350.00
200.00
34,800.00
JUMLAH
HARGA
(Rp.)
185,470.00
NO.
A.
1
2
3
4
: L.015
: Pasang pegangan pintu/door holder
: bh
KOMPONEN
SATUAN
PERKIRAAN
KUANTITAS
HARGA
SATUAN
(Rp.)
TENAGA
Pekerja Biasa
Tukang Kayu
Kepala Tukang Kayu
Mandor
L17
L08
L03
L01
Org/hr
Org/hr
Org/hr
Org/hr
0.0500
0.5000
0.0500
0.0025
45,000.00
60,000.00
47,000.00
80,000.00
2,250.00
30,000.00
2,350.00
200.00
34,800.00
BAHAN
Door Holder
M266
bh
1.0000
107,650.00
JUMLAH
HARGA
(Rp.)
107,650.00
107,650.00
PERALATAN
142,450.00
NO.
A.
1
2
3
4
: L.016
: Pasang door stop
: bh
KOMPONEN
SATUAN
PERKIRAAN
KUANTITAS
HARGA
SATUAN
(Rp.)
TENAGA
Pekerja Biasa
Tukang Kayu
Kepala Tukang Kayu
Mandor
L17
L08
L03
L01
Org/hr
Org/hr
Org/hr
Org/hr
0.0100
0.1000
0.0100
0.0005
45,000.00
60,000.00
47,000.00
80,000.00
BAHAN
Door Stop
M267
bh
1.0000
31,850.00
31,850.00
31,850.00
PERALATAN
450.00
6,000.00
470.00
40.00
6,960.00
JUMLAH
HARGA
(Rp.)
38,810.00
NO.
A.
1
2
3
4
: L.017
: Pasang rel pintu dorong
: bh
KOMPONEN
SATUAN
PERKIRAAN
KUANTITAS
HARGA
SATUAN
(Rp.)
TENAGA
Pekerja Biasa
Tukang Kayu
Kepala Tukang Kayu
Mandor
L17
L08
L03
L01
Org/hr
Org/hr
Org/hr
Org/hr
0.0600
0.6000
0.0600
0.0030
45,000.00
60,000.00
47,000.00
80,000.00
2,700.00
36,000.00
2,820.00
240.00
41,760.00
BAHAN
Rel Pintu Dorong
M268
bh
1.0000
116,250.00
JUMLAH
HARGA
(Rp.)
116,250.00
116,250.00
PERALATAN
158,010.00
NO.
A.
1
2
3
4
: L.018
: Pasang kaca polos, tebal 3 mm
: m2
KOMPONEN
SATUAN
PERKIRAAN
KUANTITAS
HARGA
SATUAN
(Rp.)
TENAGA
Pekerja Biasa
Tukang Kayu
Kepala Tukang Kayu
Mandor
L17
L08
L03
L01
Org/hr
Org/hr
Org/hr
Org/hr
0.0150
0.1500
0.0150
0.0008
45,000.00
60,000.00
47,000.00
80,000.00
BAHAN
Kaca Polos tebal 3 mm
M270
m2
1.1000
61,500.00
67,650.00
67,650.00
PERALATAN
675.00
9,000.00
705.00
60.00
10,440.00
JUMLAH
HARGA
(Rp.)
78,090.00
NO.
A.
1
2
3
4
: L.019
: Pasang kaca polos, tebal 5 mm
: m2
KOMPONEN
SATUAN
PERKIRAAN
KUANTITAS
HARGA
SATUAN
(Rp.)
TENAGA
Pekerja Biasa
Tukang Kayu
Kepala Tukang Kayu
Mandor
L17
L08
L03
L01
Org/hr
Org/hr
Org/hr
Org/hr
0.0150
0.1500
0.0150
0.0008
45,000.00
60,000.00
47,000.00
80,000.00
675.00
9,000.00
705.00
60.00
10,440.00
BAHAN
Kaca Polos tebal 5 mm
M271
m2
1.1000
101,470.00
JUMLAH
HARGA
(Rp.)
111,617.00
111,617.00
PERALATAN
122,057.00
NO.
A.
1
2
3
4
: L.020
: Pasang kaca polos, tebal 8 mm
: m2
KOMPONEN
SATUAN
PERKIRAAN
KUANTITAS
HARGA
SATUAN
(Rp.)
TENAGA
Pekerja Biasa
Tukang Kayu
Kepala Tukang Kayu
Mandor
L17
L08
L03
L01
Org/hr
Org/hr
Org/hr
Org/hr
0.0150
0.1500
0.0150
0.0008
45,000.00
60,000.00
47,000.00
80,000.00
BAHAN
Kaca Polos tebal 8 mm
M272
m2
1.1000
145,550.00
160,105.00
160,105.00
PERALATAN
675.00
9,000.00
705.00
60.00
10,440.00
JUMLAH
HARGA
(Rp.)
170,545.00
NO.
A.
1
2
3
4
: L.021
: Pasang kaca polos, tebal 12 mm
: m2
KOMPONEN
SATUAN
PERKIRAAN
KUANTITAS
HARGA
SATUAN
(Rp.)
TENAGA
Pekerja Biasa
Tukang Kayu
Kepala Tukang Kayu
Mandor
L17
L08
L03
L01
Org/hr
Org/hr
Org/hr
Org/hr
0.0150
0.1500
0.0150
0.0008
45,000.00
60,000.00
47,000.00
80,000.00
675.00
9,000.00
705.00
60.00
10,440.00
BAHAN
Kaca Polos tebal 12 mm
M273
m2
1.1000
201,660.00
JUMLAH
HARGA
(Rp.)
221,826.00
221,826.00
PERALATAN
232,266.00
NO.
A.
1
2
3
4
: L.022
: Pasang kaca buram, tebal 3 mm
: m2
KOMPONEN
SATUAN
PERKIRAAN
KUANTITAS
HARGA
SATUAN
(Rp.)
TENAGA
Pekerja Biasa
Tukang Kayu
Kepala Tukang Kayu
Mandor
L17
L08
L03
L01
Org/hr
Org/hr
Org/hr
Org/hr
0.0250
0.2500
0.0250
0.0013
45,000.00
60,000.00
47,000.00
80,000.00
BAHAN
Kaca Buram tebal 3 mm
M274
m2
1.1000
75,330.00
82,863.00
82,863.00
PERALATAN
1,125.00
15,000.00
1,175.00
100.00
17,400.00
JUMLAH
HARGA
(Rp.)
100,263.00
NO.
A.
1
2
3
4
: L.023
: Pasang kaca buram, tebal 5 mm
: m2
KOMPONEN
SATUAN
PERKIRAAN
KUANTITAS
HARGA
SATUAN
(Rp.)
TENAGA
Pekerja Biasa
Tukang Kayu
Kepala Tukang Kayu
Mandor
L17
L08
L03
L01
Org/hr
Org/hr
Org/hr
Org/hr
0.0250
0.2500
0.0250
0.0013
45,000.00
60,000.00
47,000.00
80,000.00
1,125.00
15,000.00
1,175.00
100.00
17,400.00
BAHAN
Kaca Buram tebal 5 mm
M275
m2
1.1000
119,920.00
JUMLAH
HARGA
(Rp.)
131,912.00
131,912.00
PERALATAN
149,312.00
NO.
A.
1
2
3
4
: L.024
: Pasang kaca buram, tebal 8 mm
: m2
KOMPONEN
SATUAN
PERKIRAAN
KUANTITAS
HARGA
SATUAN
(Rp.)
TENAGA
Pekerja Biasa
Tukang Kayu
Kepala Tukang Kayu
Mandor
L17
L08
L03
L01
Org/hr
Org/hr
Org/hr
Org/hr
0.0265
0.2650
0.0265
0.0014
45,000.00
60,000.00
47,000.00
80,000.00
BAHAN
Kaca Buram tebal 8 mm
M276
m2
1.1000
177,320.00
195,052.00
195,052.00
PERALATAN
1,192.50
15,900.00
1,245.50
112.00
18,450.00
JUMLAH
HARGA
(Rp.)
213,502.00
NO.
A.
1
2
3
4
: L.025
: Pasang kaca buram, tebal 12 mm
: m2
KOMPONEN
SATUAN
PERKIRAAN
KUANTITAS
HARGA
SATUAN
(Rp.)
TENAGA
Pekerja Biasa
Tukang Kayu
Kepala Tukang Kayu
Mandor
L17
L08
L03
L01
Org/hr
Org/hr
Org/hr
Org/hr
0.0265
0.2650
0.0265
0.0014
45,000.00
60,000.00
47,000.00
80,000.00
1,192.50
15,900.00
1,245.50
112.00
18,450.00
BAHAN
Kaca Buram tebal 12 mm
M277
m2
1.1000
241,900.00
JUMLAH
HARGA
(Rp.)
266,090.00
266,090.00
PERALATAN
284,540.00
NO.
A.
1
2
3
4
: L.026
: Pasang kaca cermin, tebal 5 mm
: m2
KOMPONEN
SATUAN
PERKIRAAN
KUANTITAS
HARGA
SATUAN
(Rp.)
TENAGA
Pekerja Biasa
Tukang Kayu
Kepala Tukang Kayu
Mandor
L17
L08
L03
L01
Org/hr
Org/hr
Org/hr
Org/hr
0.0150
0.1500
0.0150
0.0008
45,000.00
60,000.00
47,000.00
80,000.00
BAHAN
Kaca Cermin tebal 5 mm
M278
m2
1.1000
123,760.00
136,136.00
136,136.00
PERALATAN
675.00
9,000.00
705.00
60.00
10,440.00
JUMLAH
HARGA
(Rp.)
146,576.00
NO.
A.
1
2
3
4
: L.027
: Pasang kaca cermin, tebal 6 mm
: m2
KOMPONEN
SATUAN
PERKIRAAN
KUANTITAS
HARGA
SATUAN
(Rp.)
TENAGA
Pekerja Biasa
Tukang Kayu
Kepala Tukang Kayu
Mandor
L17
L08
L03
L01
Org/hr
Org/hr
Org/hr
Org/hr
0.0150
0.1500
0.0150
0.0008
45,000.00
60,000.00
47,000.00
80,000.00
675.00
9,000.00
705.00
60.00
10,440.00
BAHAN
Kaca Cermin tebal 6 mm
M279
m2
1.1000
145,290.00
JUMLAH
HARGA
(Rp.)
159,819.00
159,819.00
PERALATAN
170,259.00
NO.
A.
1
2
3
4
: L.028
: Pasang kaca cermin, tebal 8 mm
: m2
KOMPONEN
SATUAN
PERKIRAAN
KUANTITAS
HARGA
SATUAN
(Rp.)
TENAGA
Pekerja Biasa
Tukang Kayu
Kepala Tukang Kayu
Mandor
L17
L08
L03
L01
Org/hr
Org/hr
Org/hr
Org/hr
0.0165
0.1650
0.0165
0.0008
45,000.00
60,000.00
47,000.00
80,000.00
BAHAN
Kaca Cermin tebal 8 mm
M280
m2
1.1000
193,720.00
213,092.00
213,092.00
PERALATAN
742.50
9,900.00
775.50
64.00
11,482.00
JUMLAH
HARGA
(Rp.)
224,574.00
NO.
A.
1
2
3
4
: L.029
: Pasang kaca rayben, tebal 3 mm
: m2
KOMPONEN
SATUAN
PERKIRAAN
KUANTITAS
HARGA
SATUAN
(Rp.)
TENAGA
Pekerja Biasa
Tukang Kayu
Kepala Tukang Kayu
Mandor
L17
L08
L03
L01
Org/hr
Org/hr
Org/hr
Org/hr
0.0150
0.1500
0.0150
0.0008
45,000.00
60,000.00
47,000.00
80,000.00
675.00
9,000.00
705.00
60.00
10,440.00
BAHAN
Kaca Rayben tebal 3 mm
M281
m2
1.1000
111,020.00
JUMLAH
HARGA
(Rp.)
122,122.00
122,122.00
PERALATAN
132,562.00
NO.
A.
1
2
3
4
: L.030
: Pasang kaca rayben, tebal 5 mm
: m2
KOMPONEN
SATUAN
PERKIRAAN
KUANTITAS
HARGA
SATUAN
(Rp.)
TENAGA
Pekerja Biasa
Tukang Kayu
Kepala Tukang Kayu
Mandor
L17
L08
L03
L01
Org/hr
Org/hr
Org/hr
Org/hr
0.0150
0.1500
0.0150
0.0008
45,000.00
60,000.00
47,000.00
80,000.00
BAHAN
Kaca Rayben tebal 5 mm
M282
m2
1.100
150,670.00
165,737.00
165,737.00
PERALATAN
675.00
9,000.00
705.00
60.00
10,440.00
JUMLAH
HARGA
(Rp.)
176,177.00
NO.
A.
1
2
3
4
: L.031
: Pasang kaca rayben, tebal 8 mm
: m2
KOMPONEN
SATUAN
PERKIRAAN
KUANTITAS
HARGA
SATUAN
(Rp.)
TENAGA
Pekerja Biasa
Tukang Kayu
Kepala Tukang Kayu
Mandor
L17
L08
L03
L01
Org/hr
Org/hr
Org/hr
Org/hr
0.0165
0.1650
0.0165
0.0008
45,000.00
60,000.00
47,000.00
80,000.00
742.50
9,900.00
775.50
64.00
11,482.00
BAHAN
Kaca Rayben tebal 8 mm
M283
m2
1.1000
177,320.00
JUMLAH
HARGA
(Rp.)
195,052.00
195,052.00
PERALATAN
206,534.00
NO.
A.
1
2
3
4
: L.032
: Pasang kaca rayben, tebal 12 mm
: m2
KOMPONEN
SATUAN
PERKIRAAN
KUANTITAS
HARGA
SATUAN
(Rp.)
TENAGA
Pekerja Biasa
Tukang Kayu
Kepala Tukang Kayu
Mandor
L17
L08
L03
L01
Org/hr
Org/hr
Org/hr
Org/hr
0.0165
0.1650
0.0165
0.0008
45,000.00
60,000.00
47,000.00
80,000.00
BAHAN
Kaca Rayben tebal 12 mm
M284
m2
1.1000
226,520.00
249,172.00
249,172.00
PERALATAN
742.50
9,900.00
775.50
64.00
11,482.00
JUMLAH
HARGA
(Rp.)
260,654.00
NO.
A.
1
2
3
4
: L.033
: Pasang kaca " wireglass", tebal 5 mm
: m2
KOMPONEN
SATUAN
PERKIRAAN
KUANTITAS
HARGA
SATUAN
(Rp.)
TENAGA
Pekerja Biasa
Tukang Kayu
Kepala Tukang Kayu
Mandor
L17
L08
L03
L01
Org/hr
Org/hr
Org/hr
Org/hr
0.0150
0.1500
0.0150
0.0008
45,000.00
60,000.00
47,000.00
80,000.00
675.00
9,000.00
705.00
60.00
10,440.00
BAHAN
Kaca "Wireglass" 5 mm
M288
m2
1.1000
538,120.00
JUMLAH
HARGA
(Rp.)
591,932.00
591,932.00
PERALATAN
602,372.00
NO.
A.
1
2
3
4
: L.034
: Pasang kaca patri, tebal 5 mm
: m2
KOMPONEN
SATUAN
PERKIRAAN
KUANTITAS
HARGA
SATUAN
(Rp.)
TENAGA
Pekerja Biasa
Tukang Kayu
Kepala Tukang Kayu
Mandor
L17
L08
L03
L01
Org/hr
Org/hr
Org/hr
Org/hr
0.0150
0.1500
0.0150
0.0008
45,000.00
60,000.00
47,000.00
80,000.00
BAHAN
Kaca Patri 5 mm
M289
m2
1.1000
807,180.00
887,898.00
887,898.00
PERALATAN
675.00
9,000.00
705.00
60.00
10,440.00
JUMLAH
HARGA
(Rp.)
898,338.00
NO.
A.
1
2
3
4
: L.035
: Pasang glass block
: bh
KOMPONEN
SATUAN
PERKIRAAN
KUANTITAS
HARGA
SATUAN
(Rp.)
TENAGA
Pekerja Biasa
Tukang Kayu
Kepala Tukang Kayu
Mandor
L17
L08
L03
L01
Org/hr
Org/hr
Org/hr
Org/hr
0.0150
0.1500
0.0150
0.0008
45,000.00
60,000.00
47,000.00
80,000.00
675.00
9,000.00
705.00
60.00
10,440.00
BAHAN
Glass Block
M286
biji
1.1000
19,440.00
JUMLAH
HARGA
(Rp.)
21,384.00
21,384.00
PERALATAN
31,824.00
NO.
A.
1
2
3
4
: L.036
: Pasang kaca painting glass
: m2
KOMPONEN
SATUAN
PERKIRAAN
KUANTITAS
HARGA
SATUAN
(Rp.)
TENAGA
Pekerja Biasa
Tukang Kayu
Kepala Tukang Kayu
Mandor
L17
L08
L03
L01
Org/hr
Org/hr
Org/hr
Org/hr
0.0150
0.1500
0.0150
0.0008
45,000.00
60,000.00
47,000.00
80,000.00
BAHAN
Painting Glass
M287
m2
1.1000
376,680.00
414,348.00
414,348.00
PERALATAN
675.00
9,000.00
705.00
60.00
10,440.00
JUMLAH
HARGA
(Rp.)
424,788.00
NO.
A.
1
2
3
4
: M.001
: Pasang lantai ubin pc abu-abu ukuran 40 x 40 cm
2
:m
KOMPONEN
SATUAN
PERKIRAAN
KUANTITAS
HARGA
SATUAN
(Rp.)
TENAGA
Pekerja Biasa
Tukang Batu
Kepala Tukang Batu
Mandor
L17
L07
L02
L01
Org/hr
Org/hr
Org/hr
Org/hr
0.2500
0.1200
0.0120
0.0130
45,000.00
60,000.00
70,000.00
80,000.00
11,250.00
7,200.00
840.00
1,040.00
20,330.00
BAHAN
Ubin pc abu-abu 40 x 40 cm
Portland Cement (PC)
Pasir Pasang
M290
M037
M002
bh
kg
m3
6.6300
9.8000
0.0450
#REF!
900.00
60,000.00
JUMLAH
HARGA
(Rp.)
#REF!
8,820.00
2,700.00
#REF!
PERALATAN
#REF!
NO.
A.
1
2
3
4
: M.002
: Pasang lantai ubin pc abu-abu ukuran 30 x 30 cm
: m2
KOMPONEN
SATUAN
PERKIRAAN
KUANTITAS
HARGA
SATUAN
(Rp.)
TENAGA
Pekerja Biasa
Tukang Batu
Kepala Tukang Batu
Mandor
L17
L07
L02
L01
Org/hr
Org/hr
Org/hr
Org/hr
0.2600
0.1250
0.0130
0.0130
45,000.00
60,000.00
70,000.00
80,000.00
11,700.00
7,500.00
910.00
1,040.00
21,150.00
BAHAN
Ubin pc abu-abu 30 x 30 cm
Portland Cement (PC)
Pasir Pasang
M291
M037
M002
bh
kg
m3
11.8700
10.0000
0.0450
JUMLAH
HARGA
(Rp.)
#REF!
900.00
60,000.00
#REF!
9,000.00
2,700.00
#REF!
PERALATAN
#REF!
NO.
A.
1
2
3
4
: M.003
: Pasang lantai ubin pc abu-abu ukuran 20 x 20 cm
2
:m
KOMPONEN
SATUAN
PERKIRAAN
KUANTITAS
HARGA
SATUAN
(Rp.)
TENAGA
Pekerja Biasa
Tukang Batu
Kepala Tukang Batu
Mandor
L17
L07
L02
L01
Org/hr
Org/hr
Org/hr
Org/hr
0.2700
0.1300
0.0130
0.0140
45,000.00
60,000.00
70,000.00
80,000.00
12,150.00
7,800.00
910.00
1,120.00
21,980.00
BAHAN
Ubin pc abu-abu 20 x 20 cm
Portland Cement (PC)
Pasir Pasang
M292
M037
M002
bh
kg
m3
26.5000
10.4000
0.0450
#REF!
900.00
60,000.00
JUMLAH
HARGA
(Rp.)
#REF!
9,360.00
2,700.00
#REF!
PERALATAN
#REF!
NO.
A.
1
2
3
4
: M.004
: Pasang lantai ubin pc warna ukuran 40 x 40 cm
: m2
KOMPONEN
SATUAN
PERKIRAAN
KUANTITAS
HARGA
SATUAN
(Rp.)
TENAGA
Pekerja Biasa
Tukang Batu
Kepala Tukang Batu
Mandor
L17
L07
L02
L01
Org/hr
Org/hr
Org/hr
Org/hr
0.2500
0.1200
0.0120
0.0130
45,000.00
60,000.00
70,000.00
80,000.00
11,250.00
7,200.00
840.00
1,040.00
20,330.00
BAHAN
Ubin pc warna 40 x 40 cm
Portland Cement (PC)
Pasir Pasang
Portland Cement (PC) Warna
M293
M037
M002
M039
bh
kg
m3
kg
6.6300
9.8000
0.0450
1.3000
JUMLAH
HARGA
(Rp.)
#REF!
900.00
60,000.00
6,500.00
#REF!
8,820.00
2,700.00
8,450.00
#REF!
PERALATAN
#REF!
NO.
A.
1
2
3
4
: M.005
: Pasang lantai ubin pc warna ukuran 30 x 30 cm
2
:m
KOMPONEN
SATUAN
PERKIRAAN
KUANTITAS
HARGA
SATUAN
(Rp.)
TENAGA
Pekerja Biasa
Tukang Batu
Kepala Tukang Batu
Mandor
L17
L07
L02
L01
Org/hr
Org/hr
Org/hr
Org/hr
0.2600
0.1250
0.0130
0.0130
45,000.00
60,000.00
70,000.00
80,000.00
11,700.00
7,500.00
910.00
1,040.00
21,150.00
BAHAN
Ubin pc warna 30 x 30 cm
Portland Cement (PC)
Pasir Pasang
Portland Cement (PC) Warna
M294
M037
M002
M039
bh
kg
m3
kg
11.8700
10.0000
0.0450
1.5000
#REF!
900.00
60,000.00
6,500.00
JUMLAH
HARGA
(Rp.)
#REF!
9,000.00
2,700.00
9,750.00
#REF!
PERALATAN
#REF!
NO.
A.
1
2
3
4
: M.006
: Pasang lantai ubin pc warna ukuran 20 x 20 cm
: m2
KOMPONEN
SATUAN
PERKIRAAN
KUANTITAS
HARGA
SATUAN
(Rp.)
TENAGA
Pekerja Biasa
Tukang Batu
Kepala Tukang Batu
Mandor
L17
L07
L02
L01
Org/hr
Org/hr
Org/hr
Org/hr
0.2700
0.1300
0.0130
0.0140
45,000.00
60,000.00
70,000.00
80,000.00
12,150.00
7,800.00
910.00
1,120.00
21,980.00
BAHAN
Ubin pc warna 20 x 20 cm
Portland Cement (PC)
Pasir Pasang
Portland Cement (PC) Warna
M295
M037
M002
M039
bh
kg
m3
kg
26.5000
10.4000
0.0450
1.6200
JUMLAH
HARGA
(Rp.)
#REF!
900.00
60,000.00
6,500.00
#REF!
9,360.00
2,700.00
10,530.00
#REF!
PERALATAN
#REF!
NO.
A.
1
2
3
4
: M.007
: Pasang lantai ubin teraso ukuran 40 x 40 cm
2
:m
KOMPONEN
SATUAN
PERKIRAAN
KUANTITAS
HARGA
SATUAN
(Rp.)
TENAGA
Pekerja Biasa
Tukang Batu
Kepala Tukang Batu
Mandor
L17
L07
L02
L01
Org/hr
Org/hr
Org/hr
Org/hr
0.2500
0.1200
0.0120
0.0130
45,000.00
60,000.00
70,000.00
80,000.00
11,250.00
7,200.00
840.00
1,040.00
20,330.00
BAHAN
Ubin Terasso 40 x 40 cm
Portland Cement (PC)
Pasir Pasang
Portland Cement (PC) Warna
M296
M037
M002
M039
bh
kg
m3
kg
6.6300
9.8000
0.0450
1.3000
#REF!
900.00
60,000.00
6,500.00
JUMLAH
HARGA
(Rp.)
#REF!
8,820.00
2,700.00
8,450.00
#REF!
PERALATAN
#REF!
NO.
A.
1
2
3
4
: M.008
: Pasang lantai ubin teraso ukuran 30 x 30 cm
: m2
KOMPONEN
SATUAN
PERKIRAAN
KUANTITAS
HARGA
SATUAN
(Rp.)
TENAGA
Pekerja Biasa
Tukang Batu
Kepala Tukang Batu
Mandor
L17
L07
L02
L01
Org/hr
Org/hr
Org/hr
Org/hr
0.2600
0.1250
0.0130
0.0130
45,000.00
60,000.00
70,000.00
80,000.00
11,700.00
7,500.00
910.00
1,040.00
21,150.00
BAHAN
Ubin Terasso 30 x 30 cm
Portland Cement (PC)
Pasir Pasang
Portland Cement (PC) Warna
M297
M037
M002
M039
bh
kg
m3
kg
11.8700
10.0000
0.0450
1.5000
JUMLAH
HARGA
(Rp.)
#REF!
900.00
60,000.00
6,500.00
#REF!
9,000.00
2,700.00
9,750.00
#REF!
PERALATAN
#REF!
NO.
A.
1
2
3
4
: M.009
: Pasang lantai ubin granito ukuran 40 x 40 cm
2
:m
KOMPONEN
SATUAN
PERKIRAAN
KUANTITAS
HARGA
SATUAN
(Rp.)
TENAGA
Pekerja Biasa
Tukang Batu
Kepala Tukang Batu
Mandor
L17
L07
L02
L01
Org/hr
Org/hr
Org/hr
Org/hr
0.2500
0.1200
0.0120
0.0130
45,000.00
60,000.00
70,000.00
80,000.00
11,250.00
7,200.00
840.00
1,040.00
20,330.00
BAHAN
Ubin Granito 40 x 40 cm
Portland Cement (PC)
Pasir Pasang
Portland Cement (PC) Warna
M298
M037
M002
M039
bh
kg
m3
kg
6.6300
9.8000
0.0450
1.3000
#REF!
900.00
60,000.00
6,500.00
JUMLAH
HARGA
(Rp.)
#REF!
8,820.00
2,700.00
8,450.00
#REF!
PERALATAN
#REF!
NO.
A.
1
2
3
4
: M.010
: Pasang lantai ubin granito ukuran 30 x 30 cm
: m2
KOMPONEN
SATUAN
PERKIRAAN
KUANTITAS
HARGA
SATUAN
(Rp.)
TENAGA
Pekerja Biasa
Tukang Batu
Kepala Tukang Batu
Mandor
L17
L07
L02
L01
Org/hr
Org/hr
Org/hr
Org/hr
0.2600
0.1250
0.0130
0.0130
45,000.00
60,000.00
70,000.00
80,000.00
11,700.00
7,500.00
910.00
1,040.00
21,150.00
BAHAN
Ubin Granito 30 x 30 cm
Portland Cement (PC)
Pasir Pasang
Portland Cement (PC) Warna
M299
M037
M002
M039
bh
kg
m3
kg
11.8700
10.0000
0.0450
1.5000
JUMLAH
HARGA
(Rp.)
#REF!
900.00
60,000.00
6,500.00
#REF!
9,000.00
2,700.00
9,750.00
#REF!
PERALATAN
#REF!
NO.
A.
1
2
3
4
: M.011
: Pasang lantai ubin teralux kerang ukuran 40 x 40 cm
2
:m
KOMPONEN
SATUAN
PERKIRAAN
KUANTITAS
HARGA
SATUAN
(Rp.)
TENAGA
Pekerja Biasa
Tukang Batu
Kepala Tukang Batu
Mandor
L17
L07
L02
L01
Org/hr
Org/hr
Org/hr
Org/hr
0.2500
0.1250
0.0130
0.0130
45,000.00
60,000.00
70,000.00
80,000.00
11,250.00
7,500.00
910.00
1,040.00
20,700.00
BAHAN
Ubin Teralux kerang 40 x 40 cm
Portland Cement (PC)
Pasir Pasang
Portland Cement (PC) Warna
M299A
M037
M002
M039
bh
kg
m3
kg
6.6300
9.8000
0.0450
1.3000
35,000.00
900.00
60,000.00
6,500.00
JUMLAH
HARGA
(Rp.)
232,050.00
8,820.00
2,700.00
8,450.00
252,020.00
PERALATAN
272,720.00
NO.
A.
1
2
3
4
: M.012
: Pasang lantai ubin teralux kerang ukuran 30 x 30 cm
: m2
KOMPONEN
SATUAN
PERKIRAAN
KUANTITAS
HARGA
SATUAN
(Rp.)
TENAGA
Pekerja Biasa
Tukang Batu
Kepala Tukang Batu
Mandor
L17
L07
L02
L01
Org/hr
Org/hr
Org/hr
Org/hr
0.2600
0.1250
0.0130
0.0130
45,000.00
60,000.00
70,000.00
80,000.00
BAHAN
Ubin Teralux kerang30 x 30 cm
Portland Cement (PC)
Pasir Pasang
Portland Cement (PC) Warna
M299B
M037
M002
M039
bh
kg
m3
kg
11.8700
10.0000
0.0450
1.5000
30,000.00
900.00
60,000.00
6,500.00
356,100.00
9,000.00
2,700.00
9,750.00
377,550.00
PERALATAN
11,700.00
7,500.00
910.00
1,040.00
21,150.00
JUMLAH
HARGA
(Rp.)
398,700.00
NO.
A.
1
2
3
4
: M.013
: Pasang lantai ubin teralux marmer ukuran 60 x 60 cm
2
:m
KOMPONEN
SATUAN
PERKIRAAN
KUANTITAS
HARGA
SATUAN
(Rp.)
JUMLAH
HARGA
(Rp.)
TENAGA
Pekerja Biasa
Tukang Batu
Kepala Tukang Batu
Mandor
L17
L07
L02
L01
Org/hr
Org/hr
Org/hr
Org/hr
0.2500
0.1200
0.0120
0.0130
45,000.00
60,000.00
70,000.00
80,000.00
11,250.00
7,200.00
840.00
1,040.00
20,330.00
BAHAN
Ubin Teralux marmer 60 x 60 cm
Portland Cement (PC)
Pasir Pasang
Portland Cement (PC) Warna
M299C
M037
M002
M039
bh
kg
m3
kg
3.1000
9.6000
0.0450
1.5000
60,000.00
900.00
60,000.00
6,500.00
186,000.00
8,640.00
2,700.00
9,750.00
207,090.00
PERALATAN
227,420.00
NO.
A.
1
2
3
4
: M.014
: Pasang lantai ubin teralux marmer ukuran 40 x 40 cm
: m2
KOMPONEN
SATUAN
PERKIRAAN
KUANTITAS
HARGA
SATUAN
(Rp.)
TENAGA
Pekerja Biasa
Tukang Batu
Kepala Tukang Batu
Mandor
L17
L07
L02
L01
Org/hr
Org/hr
Org/hr
Org/hr
0.2500
0.1200
0.0120
0.0130
45,000.00
60,000.00
70,000.00
80,000.00
BAHAN
Ubin Teralux marmer 40 x 40 cm
Portland Cement (PC)
Pasir Pasang
Portland Cement (PC) Warna
M299D
M037
M002
M039
bh
kg
m3
kg
6.6300
9.6000
0.0450
1.3000
45,000.00
900.00
60,000.00
6,500.00
298,350.00
8,640.00
2,700.00
8,450.00
318,140.00
PERALATAN
11,250.00
7,200.00
840.00
1,040.00
20,330.00
JUMLAH
HARGA
(Rp.)
338,470.00
NO.
A.
1
2
3
4
: M.015
: Pasang lantai ubin teralux marmer ukuran 30 x 30 cm
2
:m
KOMPONEN
SATUAN
PERKIRAAN
KUANTITAS
HARGA
SATUAN
(Rp.)
TENAGA
Pekerja Biasa
Tukang Batu
Kepala Tukang Batu
Mandor
L17
L07
L02
L01
Org/hr
Org/hr
Org/hr
Org/hr
0.2600
0.1250
0.0130
0.0130
45,000.00
60,000.00
70,000.00
80,000.00
11,700.00
7,500.00
910.00
1,040.00
21,150.00
BAHAN
Ubin Teralux marmer 40 x 40 cm
Portland Cement (PC)
Pasir Pasang
Portland Cement (PC) Warna
M299D
M037
M002
M039
bh
kg
m3
kg
11.8700
10.0000
0.0450
1.5000
45,000.00
900.00
60,000.00
6,500.00
JUMLAH
HARGA
(Rp.)
534,150.00
9,000.00
2,700.00
9,750.00
555,600.00
PERALATAN
576,750.00
NO.
A.
1
2
3
4
: M.016
: Pasang plint ubin pc abu-abu ukuran 15 x 20 cm
: m1
KOMPONEN
SATUAN
PERKIRAAN
KUANTITAS
HARGA
SATUAN
(Rp.)
TENAGA
Pekerja Biasa
Tukang Batu
Kepala Tukang Batu
Mandor
L17
L07
L02
L01
Org/hr
Org/hr
Org/hr
Org/hr
0.0900
0.0900
0.0090
0.0070
45,000.00
60,000.00
70,000.00
80,000.00
4,050.00
5,400.00
630.00
560.00
10,640.00
BAHAN
Plint ubin pc abu-abu 15 x 20 cm
Portland Cement (PC)
Pasir Pasang
M300
M037
M002
bh
kg
m3
5.3000
1.6500
0.0040
JUMLAH
HARGA
(Rp.)
#REF!
900.00
60,000.00
#REF!
1,485.00
240.00
#REF!
PERALATAN
#REF!
NO.
A.
1
2
3
4
: M.017
: Pasang plint ubin pc abu-abu ukuran 10 x 30 cm
1
:m
KOMPONEN
SATUAN
PERKIRAAN
KUANTITAS
HARGA
SATUAN
(Rp.)
TENAGA
Pekerja Biasa
Tukang Batu
Kepala Tukang Batu
Mandor
L17
L07
L02
L01
Org/hr
Org/hr
Org/hr
Org/hr
0.0900
0.0900
0.0090
0.0050
45,000.00
60,000.00
70,000.00
80,000.00
4,050.00
5,400.00
630.00
400.00
10,480.00
BAHAN
Plint ubin pc abu-abu 10 x 30 cm
Portland Cement (PC)
Pasir Pasang
M301
M037
M002
bh
kg
m3
3.5300
1.2400
0.0030
#REF!
900.00
60,000.00
JUMLAH
HARGA
(Rp.)
#REF!
1,116.00
180.00
#REF!
PERALATAN
#REF!
NO.
A.
1
2
3
4
: M.018
: Pasang plint ubin pc abu-abu ukuran 10 x 40 cm
: m1
KOMPONEN
SATUAN
PERKIRAAN
KUANTITAS
HARGA
SATUAN
(Rp.)
TENAGA
Pekerja Biasa
Tukang Batu
Kepala Tukang Batu
Mandor
L17
L07
L02
L01
Org/hr
Org/hr
Org/hr
Org/hr
0.0900
0.0900
0.0090
0.0050
45,000.00
60,000.00
70,000.00
80,000.00
4,050.00
5,400.00
630.00
400.00
10,480.00
BAHAN
Plint ubin pc abu-abu 10 x 40 cm
Portland Cement (PC)
Pasir Pasang
M302
M037
M002
bh
kg
m3
2.6500
1.2400
0.0030
JUMLAH
HARGA
(Rp.)
#REF!
900.00
60,000.00
#REF!
1,116.00
180.00
#REF!
PERALATAN
#REF!
NO.
A.
1
2
3
4
: M.019
: Pasang plint ubin pc warna ukuran 10 x 20 cm
1
:m
KOMPONEN
SATUAN
PERKIRAAN
KUANTITAS
HARGA
SATUAN
(Rp.)
TENAGA
Pekerja Biasa
Tukang Batu
Kepala Tukang Batu
Mandor
L17
L07
L02
L01
Org/hr
Org/hr
Org/hr
Org/hr
0.0900
0.0900
0.0090
0.0050
45,000.00
60,000.00
70,000.00
80,000.00
4,050.00
5,400.00
630.00
400.00
10,480.00
BAHAN
Plint ubin pc warna 10 x 20 cm
Portland Cement (PC)
Pasir Pasang
Portland Cement (PC) Warna
M303
M037
M002
M039
bh
kg
m3
kg
5.3000
1.1400
0.0030
0.1000
#REF!
900.00
60,000.00
6,500.00
JUMLAH
HARGA
(Rp.)
#REF!
1,026.00
180.00
650.00
#REF!
PERALATAN
#REF!
NO.
A.
1
2
3
4
: M.020
: Pasang plint ubin pc warna ukuran 10 x 30 cm
: m1
KOMPONEN
SATUAN
PERKIRAAN
KUANTITAS
HARGA
SATUAN
(Rp.)
TENAGA
Pekerja Biasa
Tukang Batu
Kepala Tukang Batu
Mandor
L17
L07
L02
L01
Org/hr
Org/hr
Org/hr
Org/hr
0.0900
0.0900
0.0090
0.0050
45,000.00
60,000.00
70,000.00
80,000.00
4,050.00
5,400.00
630.00
400.00
10,480.00
BAHAN
Plint ubin pc warna 10 x 30 cm
Portland Cement (PC)
Pasir Pasang
Portland Cement (PC) Warna
M304
M037
M002
M039
bh
kg
m3
kg
3.5300
1.1400
0.0030
0.1000
JUMLAH
HARGA
(Rp.)
#REF!
900.00
60,000.00
6,500.00
#REF!
1,026.00
180.00
650.00
#REF!
PERALATAN
#REF!
NO.
A.
1
2
3
4
: M.021
: Pasang plint ubin pc warna ukuran 10 x 40 cm
1
:m
KOMPONEN
SATUAN
PERKIRAAN
KUANTITAS
HARGA
SATUAN
(Rp.)
TENAGA
Pekerja Biasa
Tukang Batu
Kepala Tukang Batu
Mandor
L17
L07
L02
L01
Org/hr
Org/hr
Org/hr
Org/hr
0.0900
0.0900
0.0090
0.0050
45,000.00
60,000.00
70,000.00
80,000.00
4,050.00
5,400.00
630.00
400.00
10,480.00
BAHAN
Plint ubin pc warna 10 x 40 cm
Portland Cement (PC)
Pasir Pasang
Portland Cement (PC) Warna
M305
M037
M002
M039
bh
kg
m3
kg
2.6500
1.1400
0.0030
0.1000
#REF!
900.00
60,000.00
6,500.00
JUMLAH
HARGA
(Rp.)
#REF!
1,026.00
180.00
650.00
#REF!
PERALATAN
#REF!
NO.
A.
1
2
3
4
: M.022
: Pasang plint ubin teraso ukuran 10 x 30 cm
: m1
KOMPONEN
SATUAN
PERKIRAAN
KUANTITAS
HARGA
SATUAN
(Rp.)
TENAGA
Pekerja Biasa
Tukang Batu
Kepala Tukang Batu
Mandor
L17
L07
L02
L01
Org/hr
Org/hr
Org/hr
Org/hr
0.0900
0.0900
0.0090
0.0050
45,000.00
60,000.00
70,000.00
80,000.00
4,050.00
5,400.00
630.00
400.00
10,480.00
BAHAN
Plint Ubin Terasso 10 x 30 cm
Portland Cement (PC)
Pasir Pasang
Portland Cement (PC) Warna
M306
M037
M002
M039
bh
kg
m3
kg
3.5300
1.1400
0.0030
0.1000
JUMLAH
HARGA
(Rp.)
#REF!
900.00
60,000.00
6,500.00
#REF!
1,026.00
180.00
650.00
#REF!
PERALATAN
#REF!
NO.
A.
1
2
3
4
: M.023
: Pasang plint ubin teraso ukuran 10 x 40 cm
1
:m
KOMPONEN
SATUAN
PERKIRAAN
KUANTITAS
HARGA
SATUAN
(Rp.)
TENAGA
Pekerja Biasa
Tukang Batu
Kepala Tukang Batu
Mandor
L17
L07
L02
L01
Org/hr
Org/hr
Org/hr
Org/hr
0.0900
0.0900
0.0090
0.0050
45,000.00
60,000.00
70,000.00
80,000.00
4,050.00
5,400.00
630.00
400.00
10,480.00
BAHAN
Plint Ubin Terasso 10 x 40 cm
Portland Cement (PC)
Pasir Pasang
Portland Cement (PC) Warna
M307
M037
M002
M039
bh
kg
m3
kg
2.6500
1.1400
0.0030
0.1000
#REF!
900.00
60,000.00
6,500.00
JUMLAH
HARGA
(Rp.)
#REF!
1,026.00
180.00
650.00
#REF!
PERALATAN
#REF!
NO.
A.
1
2
3
4
: M.024
: Pasang plint ubin granito ukuran 10 x 40 cm
: m1
KOMPONEN
SATUAN
PERKIRAAN
KUANTITAS
HARGA
SATUAN
(Rp.)
TENAGA
Pekerja Biasa
Tukang Batu
Kepala Tukang Batu
Mandor
L17
L07
L02
L01
Org/hr
Org/hr
Org/hr
Org/hr
0.0900
0.0900
0.0090
0.0050
45,000.00
60,000.00
70,000.00
80,000.00
4,050.00
5,400.00
630.00
400.00
10,480.00
BAHAN
Plint Ubin Granito 10 x 40 cm
Portland Cement (PC)
Pasir Pasang
Portland Cement (PC) Warna
M308
M037
M002
M039
bh
kg
m3
kg
2.6500
1.1400
0.0030
0.1000
JUMLAH
HARGA
(Rp.)
#REF!
900.00
60,000.00
6,500.00
#REF!
1,026.00
180.00
650.00
#REF!
PERALATAN
#REF!
NO.
A.
1
2
3
4
: M.025
: Pasang plint ubin granito ukuran 10 x 30 cm
1
:m
KOMPONEN
SATUAN
PERKIRAAN
KUANTITAS
HARGA
SATUAN
(Rp.)
TENAGA
Pekerja Biasa
Tukang Batu
Kepala Tukang Batu
Mandor
L17
L07
L02
L01
Org/hr
Org/hr
Org/hr
Org/hr
0.0900
0.0900
0.0090
0.0050
45,000.00
60,000.00
70,000.00
80,000.00
4,050.00
5,400.00
630.00
400.00
10,480.00
BAHAN
Plint Ubin Granito 10 x 30 cm
Portland Cement (PC)
Pasir Pasang
Portland Cement (PC) Warna
M309
M037
M002
M039
bh
kg
m3
kg
3.5300
1.1400
0.0030
0.1000
#REF!
900.00
60,000.00
6,500.00
JUMLAH
HARGA
(Rp.)
#REF!
1,026.00
180.00
650.00
#REF!
PERALATAN
#REF!
NO.
A.
1
2
3
4
: M.026
: Pasang teraso cor di tempat, tebal 3 cm
: m2
KOMPONEN
SATUAN
PERKIRAAN
KUANTITAS
HARGA
SATUAN
(Rp.)
TENAGA
Pekerja Biasa
Tukang Batu
Kepala Tukang Batu
Mandor
L17
L07
L02
L01
Org/hr
Org/hr
Org/hr
Org/hr
0.3600
0.1800
0.0180
0.0180
45,000.00
60,000.00
70,000.00
80,000.00
16,200.00
10,800.00
1,260.00
1,440.00
29,700.00
BAHAN
Bahan Teraso Cor
M316.a
m3
0.0360
JUMLAH
HARGA
(Rp.)
#REF!
#REF!
#REF!
PERALATAN
#REF!
NO.
A.
1
2
3
4
: M.027
: Pasang lantai keramik artistik 10 x 20 cm
2
:m
KOMPONEN
SATUAN
PERKIRAAN
KUANTITAS
HARGA
SATUAN
(Rp.)
TENAGA
Pekerja Biasa
Tukang Batu
Kepala Tukang Batu
Mandor
L17
L07
L02
L01
Org/hr
Org/hr
Org/hr
Org/hr
0.6200
0.3500
0.0350
0.0300
45,000.00
60,000.00
70,000.00
80,000.00
27,900.00
21,000.00
2,450.00
2,400.00
53,750.00
BAHAN
Lantai keramik artistik 10 x 20
Portland Cement (PC)
Pasir Pasang
Portland Cement (PC) Warna
M310
M037
M002
M039
bh
kg
m3
kg
50.0000
8.1900
0.0450
2.7500
#REF!
900.00
60,000.00
6,500.00
JUMLAH
HARGA
(Rp.)
#REF!
7,371.00
2,700.00
17,875.00
#REF!
PERALATAN
#REF!
NO.
A.
1
2
3
4
: M.028
: Pasang lantai keramik artistik 10 x 10 cm
: m2
KOMPONEN
SATUAN
PERKIRAAN
KUANTITAS
HARGA
SATUAN
(Rp.)
TENAGA
Pekerja Biasa
Tukang Batu
Kepala Tukang Batu
Mandor
L17
L07
L02
L01
Org/hr
Org/hr
Org/hr
Org/hr
0.6200
0.3500
0.0350
0.0300
45,000.00
60,000.00
70,000.00
80,000.00
27,900.00
21,000.00
2,450.00
2,400.00
53,750.00
BAHAN
Lantai keramik artistik 10 x 10
Portland Cement (PC)
Pasir Pasang
Portland Cement (PC) Warna
M311
M037
M002
M039
bh
kg
m3
kg
106.0000
8.1900
0.0450
3.2000
JUMLAH
HARGA
(Rp.)
#REF!
900.00
60,000.00
6,500.00
#REF!
7,371.00
2,700.00
20,800.00
#REF!
PERALATAN
#REF!
NO.
A.
1
2
3
4
: M.029
: Pasang lantai keramik artistik 5 x 20 cm
2
:m
KOMPONEN
SATUAN
PERKIRAAN
KUANTITAS
HARGA
SATUAN
(Rp.)
TENAGA
Pekerja Biasa
Tukang Batu
Kepala Tukang Batu
Mandor
L17
L07
L02
L01
Org/hr
Org/hr
Org/hr
Org/hr
0.6200
0.3500
0.0350
0.0300
45,000.00
60,000.00
70,000.00
80,000.00
27,900.00
21,000.00
2,450.00
2,400.00
53,750.00
BAHAN
Lantai keramik artistik 5 x 20
Portland Cement (PC)
Pasir Pasang
Portland Cement (PC) Warna
M312
M037
M002
M039
bh
kg
m3
kg
106.0000
8.1900
0.0450
3.2000
#REF!
900.00
60,000.00
6,500.00
JUMLAH
HARGA
(Rp.)
#REF!
7,371.00
2,700.00
20,800.00
#REF!
PERALATAN
#REF!
NO.
A.
1
2
3
4
: M.030
: Pasang dinding keramik artistik 10 x 20 cm
: m2
KOMPONEN
SATUAN
PERKIRAAN
KUANTITAS
HARGA
SATUAN
(Rp.)
TENAGA
Pekerja Biasa
Tukang Batu
Kepala Tukang Batu
Mandor
L17
L07
L02
L01
Org/hr
Org/hr
Org/hr
Org/hr
0.6000
0.4500
0.0450
0.0300
45,000.00
60,000.00
70,000.00
80,000.00
27,000.00
27,000.00
3,150.00
2,400.00
59,550.00
BAHAN
Lantai keramik artistik 10 x 20
Portland Cement (PC)
Pasir Pasang
Portland Cement (PC) Warna
M310
M037
M002
M039
bh
kg
m3
kg
53.0000
9.3000
0.0180
2.7500
JUMLAH
HARGA
(Rp.)
#REF!
900.00
60,000.00
6,500.00
#REF!
8,370.00
1,080.00
17,875.00
#REF!
PERALATAN
#REF!
NO.
A.
1
2
3
4
: M.031
: Pasang dinding keramik artistik 5 x 20 cm
2
:m
KOMPONEN
SATUAN
PERKIRAAN
KUANTITAS
HARGA
SATUAN
(Rp.)
TENAGA
Pekerja Biasa
Tukang Batu
Kepala Tukang Batu
Mandor
L17
L07
L02
L01
Org/hr
Org/hr
Org/hr
Org/hr
0.6000
0.4500
0.0450
0.0300
45,000.00
60,000.00
70,000.00
80,000.00
27,000.00
27,000.00
3,150.00
2,400.00
59,550.00
BAHAN
Lantai keramik artistik 5 x 20
Portland Cement (PC)
Pasir Pasang
Portland Cement (PC) Warna
M312
M037
M002
M039
bh
kg
m3
kg
106.0000
9.3000
0.0180
2.9000
#REF!
900.00
60,000.00
6,500.00
JUMLAH
HARGA
(Rp.)
#REF!
8,370.00
1,080.00
18,850.00
#REF!
PERALATAN
#REF!
NO.
A.
1
2
3
4
: M.032
: Pasang plint keramik artistik 10 x 20 cm
: m1
KOMPONEN
SATUAN
PERKIRAAN
KUANTITAS
HARGA
SATUAN
(Rp.)
TENAGA
Pekerja Biasa
Tukang Batu
Kepala Tukang Batu
Mandor
L17
L07
L02
L01
Org/hr
Org/hr
Org/hr
Org/hr
0.0900
0.0900
0.0090
0.0045
45,000.00
60,000.00
70,000.00
80,000.00
4,050.00
5,400.00
630.00
360.00
10,440.00
BAHAN
Plint keramik artistik 10 x 20
Portland Cement (PC)
Pasir Pasang
Portland Cement (PC) Warna
M313
M037
M002
M039
bh
kg
m3
kg
5.0000
1.6500
0.0032
0.1000
JUMLAH
HARGA
(Rp.)
#REF!
900.00
60,000.00
6,500.00
#REF!
1,485.00
192.00
650.00
#REF!
PERALATAN
#REF!
NO.
A.
1
2
3
4
: M.033
: Pasang plint keramik artistik 10 x 10 cm
1
:m
KOMPONEN
SATUAN
PERKIRAAN
KUANTITAS
HARGA
SATUAN
(Rp.)
TENAGA
Pekerja Biasa
Tukang Batu
Kepala Tukang Batu
Mandor
L17
L07
L02
L01
Org/hr
Org/hr
Org/hr
Org/hr
0.0900
0.0900
0.0090
0.0045
45,000.00
60,000.00
70,000.00
80,000.00
4,050.00
5,400.00
630.00
360.00
10,440.00
BAHAN
Plint keramik artistik 10 x 10
Portland Cement (PC)
Pasir Pasang
Portland Cement (PC) Warna
M314
M037
M002
M039
bh
kg
m3
kg
10.0000
1.6500
0.0032
0.1200
#REF!
900.00
60,000.00
6,500.00
JUMLAH
HARGA
(Rp.)
#REF!
1,485.00
192.00
780.00
#REF!
PERALATAN
#REF!
NO.
A.
1
2
3
4
: M.034
: Pasang plint keramik artistik 5 x 20 cm
: m1
KOMPONEN
SATUAN
PERKIRAAN
KUANTITAS
HARGA
SATUAN
(Rp.)
TENAGA
Pekerja Biasa
Tukang Batu
Kepala Tukang Batu
Mandor
L17
L07
L02
L01
Org/hr
Org/hr
Org/hr
Org/hr
0.0900
0.0900
0.0090
0.0045
45,000.00
60,000.00
70,000.00
80,000.00
4,050.00
5,400.00
630.00
360.00
10,440.00
BAHAN
Plint keramik artistik 5 x 20
Portland Cement (PC)
Pasir Pasang
Portland Cement (PC) Warna
M315
M037
M002
M039
bh
kg
m3
kg
5.0000
0.8500
0.0022
0.0800
JUMLAH
HARGA
(Rp.)
#REF!
900.00
60,000.00
6,500.00
#REF!
765.00
132.00
520.00
#REF!
PERALATAN
#REF!
NO.
A.
1
2
3
4
: M.035
: Pasang internal cove artistik (5 x 5 x 20) cm
2
:m
KOMPONEN
SATUAN
PERKIRAAN
KUANTITAS
HARGA
SATUAN
(Rp.)
TENAGA
Pekerja Biasa
Tukang Batu
Kepala Tukang Batu
Mandor
L17
L07
L02
L01
Org/hr
Org/hr
Org/hr
Org/hr
0.7500
0.4500
0.0450
0.0380
45,000.00
60,000.00
70,000.00
80,000.00
33,750.00
27,000.00
3,150.00
3,040.00
66,940.00
BAHAN
Internal cove 5 x 5 x 20 cm
Portland Cement (PC)
Pasir Pasang
Portland Cement (PC) Warna
M316
M037
M002
M039
bh
kg
m3
kg
5.3000
1.1400
0.0030
0.1000
#REF!
900.00
60,000.00
6,500.00
JUMLAH
HARGA
(Rp.)
#REF!
1,026.00
180.00
650.00
#REF!
PERALATAN
#REF!
NO.
A.
1
2
3
4
: M.036
: Pasang gymflour
: m2
KOMPONEN
SATUAN
PERKIRAAN
KUANTITAS
HARGA
SATUAN
(Rp.)
TENAGA
Pekerja Biasa
Tukang Batu
Kepala Tukang Batu
Mandor
L17
L07
L02
L01
Org/hr
Org/hr
Org/hr
Org/hr
0.6500
0.3500
0.0350
0.0330
45,000.00
60,000.00
70,000.00
80,000.00
BAHAN
Gymflour
Lem vinyl
M333
M424
m2
kg
1.0500
0.6000
205,000.00
50,220.00
215,250.00
30,132.00
245,382.00
PERALATAN
29,250.00
21,000.00
2,450.00
2,640.00
55,340.00
JUMLAH
HARGA
(Rp.)
300,722.00
NO.
A.
1
2
3
4
: M.037
: Pasang lantai parquet
2
:m
KOMPONEN
SATUAN
PERKIRAAN
KUANTITAS
HARGA
SATUAN
(Rp.)
TENAGA
Pekerja Biasa
Tukang Batu
Kepala Tukang Batu
Mandor
L17
L07
L02
L01
Org/hr
Org/hr
Org/hr
Org/hr
0.6500
0.3500
0.0350
0.0330
45,000.00
60,000.00
70,000.00
80,000.00
29,250.00
21,000.00
2,450.00
2,640.00
55,340.00
BAHAN
Wall Paper
Lem vinyl
M333A
M424
m2
kg
1.0500
0.6000
#REF!
50,220.00
JUMLAH
HARGA
(Rp.)
#REF!
30,132.00
#REF!
PERALATAN
#REF!
NO.
A.
1
2
3
4
: M.038
: Pasang lantai karpet
: m2
KOMPONEN
SATUAN
PERKIRAAN
KUANTITAS
HARGA
SATUAN
(Rp.)
TENAGA
Pekerja Biasa
Tukang Batu
Kepala Tukang Batu
Mandor
L17
L07
L02
L01
Org/hr
Org/hr
Org/hr
Org/hr
0.1700
0.1700
0.0170
0.0090
45,000.00
60,000.00
70,000.00
80,000.00
7,650.00
10,200.00
1,190.00
720.00
19,760.00
BAHAN
Wall Paper
Lem vinyl
M333B
M424
m2
kg
1.0500
0.3500
JUMLAH
HARGA
(Rp.)
#REF!
50,220.00
#REF!
17,577.00
#REF!
PERALATAN
#REF!
NO.
A.
1
2
3
4
: M.039
: Pasang lantai keramik ukuran 20 x 20 cm putih
2
:m
KOMPONEN
SATUAN
PERKIRAAN
KUANTITAS
HARGA
SATUAN
(Rp.)
JUMLAH
HARGA
(Rp.)
TENAGA
Pekerja Biasa
Tukang Batu
Kepala Tukang Batu
Mandor
L17
L07
L02
L01
Org/hr
Org/hr
Org/hr
Org/hr
0.6200
0.3500
0.0350
0.0300
45,000.00
60,000.00
70,000.00
80,000.00
27,900.00
21,000.00
2,450.00
2,400.00
53,750.00
BAHAN
Keramik Lantai 20 x 20 cm putih
Portland Cement (PC)
Pasir Pasang
Portland Cement (PC) Warna
M321
M037
M002
M039
bh
kg
m3
kg
26.5000
10.4000
0.0450
1.6200
1,380.00
900.00
60,000.00
6,500.00
36,570.00
9,360.00
2,700.00
10,530.00
59,160.00
PERALATAN
112,910.00
NO.
A.
1
2
3
4
: M.040
: Pasang lantai keramik ukuran 20 x 20 cm warna/motif
: m2
KOMPONEN
SATUAN
PERKIRAAN
KUANTITAS
HARGA
SATUAN
(Rp.)
TENAGA
Pekerja Biasa
Tukang Batu
Kepala Tukang Batu
Mandor
L17
L07
L02
L01
Org/hr
Org/hr
Org/hr
Org/hr
0.6200
0.3500
0.0350
0.0300
45,000.00
60,000.00
70,000.00
80,000.00
BAHAN
Keramik Lantai 20 x 20 cm warna/motif
M322
Portland Cement (PC)
M037
Pasir Pasang
M002
Portland Cement (PC) Warna
M039
bh
kg
m3
kg
26.5000
10.4000
0.0450
1.6200
1,530.00
900.00
60,000.00
6,500.00
40,545.00
9,360.00
2,700.00
10,530.00
63,135.00
PERALATAN
27,900.00
21,000.00
2,450.00
2,400.00
53,750.00
JUMLAH
HARGA
(Rp.)
116,885.00
NO.
A.
1
2
3
4
: M.041
: Pasang lantai keramik KM ukuran 20 x 20 cm
2
:m
KOMPONEN
SATUAN
PERKIRAAN
KUANTITAS
HARGA
SATUAN
(Rp.)
TENAGA
Pekerja Biasa
Tukang Batu
Kepala Tukang Batu
Mandor
L17
L07
L02
L01
Org/hr
Org/hr
Org/hr
Org/hr
0.6200
0.3500
0.0350
0.0300
45,000.00
60,000.00
70,000.00
80,000.00
27,900.00
21,000.00
2,450.00
2,400.00
53,750.00
BAHAN
Keramik Lantai KM 20 x 20 cm
Portland Cement (PC)
Pasir Pasang
Portland Cement (PC) Warna
M323
M037
M002
M039
bh
kg
m3
kg
25.0000
11.3800
0.0420
1.5000
1,790.00
900.00
60,000.00
6,500.00
JUMLAH
HARGA
(Rp.)
44,750.00
10,242.00
2,520.00
9,750.00
67,262.00
PERALATAN
121,012.00
NO.
A.
1
2
3
4
: M.042
: Pasang lantai keramik ukuran 30 x 30 cm putih
: m2
KOMPONEN
SATUAN
PERKIRAAN
KUANTITAS
HARGA
SATUAN
(Rp.)
TENAGA
Pekerja Biasa
Tukang Batu
Kepala Tukang Batu
Mandor
L17
L07
L02
L01
Org/hr
Org/hr
Org/hr
Org/hr
0.6200
0.3500
0.0350
0.0300
45,000.00
60,000.00
70,000.00
80,000.00
BAHAN
Keramik Lantai 30 x 30 cm putih
Portland Cement (PC)
Pasir Pasang
Portland Cement (PC) Warna
M319
M037
M002
M039
bh
kg
m3
kg
11.8700
10.0000
0.0450
1.6200
4,610.00
900.00
60,000.00
6,500.00
54,720.70
9,000.00
2,700.00
10,530.00
76,950.70
PERALATAN
27,900.00
21,000.00
2,450.00
2,400.00
53,750.00
JUMLAH
HARGA
(Rp.)
130,700.70
NO.
A.
1
2
3
4
: M.043
: Pasang lantai keramik ukuran 30 x 30 cm warna/motif
2
:m
KOMPONEN
SATUAN
PERKIRAAN
KUANTITAS
HARGA
SATUAN
(Rp.)
TENAGA
Pekerja Biasa
Tukang Batu
Kepala Tukang Batu
Mandor
L17
L07
L02
L01
Org/hr
Org/hr
Org/hr
Org/hr
0.6200
0.3500
0.0350
0.0300
45,000.00
60,000.00
70,000.00
80,000.00
27,900.00
21,000.00
2,450.00
2,400.00
53,750.00
BAHAN
Keramik Lantai 30 x 30 cm warna/motif
M320
Portland Cement (PC)
M037
Pasir Pasang
M002
Portland Cement (PC) Warna
M039
bh
kg
m3
kg
11.8700
10.0000
0.0450
1.6200
5,120.00
900.00
60,000.00
6,500.00
JUMLAH
HARGA
(Rp.)
60,774.40
9,000.00
2,700.00
10,530.00
83,004.40
PERALATAN
136,754.40
NO.
A.
1
2
3
4
: M.044
: Pasang lantai keramik ukuran 40 x 40 cm putih
: m2
KOMPONEN
SATUAN
PERKIRAAN
KUANTITAS
HARGA
SATUAN
(Rp.)
TENAGA
Pekerja Biasa
Tukang Batu
Kepala Tukang Batu
Mandor
L17
L07
L02
L01
Org/hr
Org/hr
Org/hr
Org/hr
0.6000
0.3000
0.0300
0.0300
45,000.00
60,000.00
70,000.00
80,000.00
BAHAN
Keramik Lantai 40 x 40 cm putih
Portland Cement (PC)
Pasir Pasang
Portland Cement (PC) Warna
M317
M037
M002
M039
bh
kg
m3
kg
6.9300
9.8000
0.0215
1.3000
11,270.00
900.00
60,000.00
6,500.00
78,101.10
8,820.00
1,290.00
8,450.00
96,661.10
PERALATAN
27,000.00
18,000.00
2,100.00
2,400.00
49,500.00
JUMLAH
HARGA
(Rp.)
146,161.10
NO.
A.
1
2
3
4
: M.045
: Pasang lantai keramik ukuran 40 x 40 cm warna/motif
2
:m
KOMPONEN
SATUAN
PERKIRAAN
KUANTITAS
HARGA
SATUAN
(Rp.)
TENAGA
Pekerja Biasa
Tukang Batu
Kepala Tukang Batu
Mandor
L17
L07
L02
L01
Org/hr
Org/hr
Org/hr
Org/hr
0.6000
0.3000
0.0300
0.0300
45,000.00
60,000.00
70,000.00
80,000.00
27,000.00
18,000.00
2,100.00
2,400.00
49,500.00
BAHAN
Keramik Lantai 40 x 40 cm warna/motif
M318
Portland Cement (PC)
M037
Pasir Pasang
M002
Portland Cement (PC) Warna
M039
bh
kg
m3
kg
6.9300
9.8000
0.0215
1.3000
12,300.00
900.00
60,000.00
6,500.00
JUMLAH
HARGA
(Rp.)
85,239.00
8,820.00
1,290.00
8,450.00
103,799.00
PERALATAN
153,299.00
NO.
A.
1
2
3
4
: M.046
: Pasang lantai marmer ukuran 100 x 100 cm
: m2
KOMPONEN
SATUAN
PERKIRAAN
KUANTITAS
HARGA
SATUAN
(Rp.)
TENAGA
Pekerja Biasa
Tukang Batu
Kepala Tukang Batu
Mandor
L17
L07
L02
L01
Org/hr
Org/hr
Org/hr
Org/hr
0.6200
0.3500
0.0350
0.0300
45,000.00
60,000.00
70,000.00
80,000.00
27,900.00
21,000.00
2,450.00
2,400.00
53,750.00
BAHAN
Wall Paper
Portland Cement (PC)
Pasir Pasang
Portland Cement (PC) Warna
M333C
M037
M002
M039
m2
kg
m3
kg
1.0600
8.1900
0.0450
0.6500
JUMLAH
HARGA
(Rp.)
#REF!
900.00
60,000.00
6,500.00
#REF!
7,371.00
2,700.00
4,225.00
#REF!
PERALATAN
#REF!
NO.
A.
1
2
3
4
: M.047
: Pasang plint keramik lantai ukuran 10 x 20 cm
1
:m
KOMPONEN
SATUAN
PERKIRAAN
KUANTITAS
HARGA
SATUAN
(Rp.)
TENAGA
Pekerja Biasa
Tukang Batu
Kepala Tukang Batu
Mandor
L17
L07
L02
L01
Org/hr
Org/hr
Org/hr
Org/hr
0.0900
0.0900
0.0090
0.0050
45,000.00
60,000.00
70,000.00
80,000.00
4,050.00
5,400.00
630.00
400.00
10,480.00
BAHAN
Plint Keramik Lantai 10 x 20 cm
Portland Cement (PC)
Pasir Pasang
Portland Cement (PC) Warna
M324
M037
M002
M039
bh
kg
m3
kg
5.3000
1.1400
0.0030
0.0250
4,100.00
900.00
60,000.00
6,500.00
JUMLAH
HARGA
(Rp.)
21,730.00
1,026.00
180.00
162.50
23,098.50
PERALATAN
33,578.50
NO.
A.
1
2
3
4
: M.048
: Pasang plint keramik lantai ukuran 10 x 30 cm
: m1
KOMPONEN
SATUAN
PERKIRAAN
KUANTITAS
HARGA
SATUAN
(Rp.)
TENAGA
Pekerja Biasa
Tukang Batu
Kepala Tukang Batu
Mandor
L17
L07
L02
L01
Org/hr
Org/hr
Org/hr
Org/hr
0.9000
0.0900
0.0090
0.0045
45,000.00
60,000.00
70,000.00
80,000.00
BAHAN
Plint Keramik Lantai 10 x 30 cm
Portland Cement (PC)
Pasir Pasang
Portland Cement (PC) Warna
M325
M037
M002
M039
bh
kg
m3
kg
3.3300
1.6500
0.0032
0.1000
7,680.00
900.00
60,000.00
6,500.00
25,574.40
1,485.00
192.00
650.00
27,901.40
PERALATAN
40,500.00
5,400.00
630.00
360.00
46,890.00
JUMLAH
HARGA
(Rp.)
74,791.40
NO.
A.
1
2
3
4
: M.049
: Pasang plint keramik lantai ukuran 10 x 40 cm
1
:m
KOMPONEN
SATUAN
PERKIRAAN
KUANTITAS
HARGA
SATUAN
(Rp.)
TENAGA
Pekerja Biasa
Tukang Batu
Kepala Tukang Batu
Mandor
L17
L07
L02
L01
Org/hr
Org/hr
Org/hr
Org/hr
0.9000
0.0900
0.0090
0.0045
45,000.00
60,000.00
70,000.00
80,000.00
40,500.00
5,400.00
630.00
360.00
46,890.00
BAHAN
Plint Keramik Lantai 10 x 40 cm
Portland Cement (PC)
Pasir Pasang
Portland Cement (PC) Warna
M326
M037
M002
M039
bh
kg
m3
kg
2.5000
1.6500
0.0032
0.1000
14,350.00
900.00
60,000.00
6,500.00
JUMLAH
HARGA
(Rp.)
35,875.00
1,485.00
192.00
650.00
38,202.00
PERALATAN
85,092.00
NO.
A.
1
2
3
4
: M.050
: Pasang dinding porselin ukuran 15 x 15 cm, putih
: m2
KOMPONEN
SATUAN
PERKIRAAN
KUANTITAS
HARGA
SATUAN
(Rp.)
TENAGA
Pekerja Biasa
Tukang Batu
Kepala Tukang Batu
Mandor
L17
L07
L02
L01
Org/hr
Org/hr
Org/hr
Org/hr
0.6000
0.4500
0.0450
0.0300
45,000.00
60,000.00
70,000.00
80,000.00
BAHAN
Porselin 15 x 15 cm putih
Portland Cement (PC)
Pasir Pasang
Portland Cement (PC) Warna
M329
M037
M002
M039
bh
kg
m3
kg
45.0000
9.3000
0.0180
1.5000
820.00
900.00
60,000.00
6,500.00
36,900.00
8,370.00
1,080.00
9,750.00
56,100.00
PERALATAN
27,000.00
27,000.00
3,150.00
2,400.00
59,550.00
JUMLAH
HARGA
(Rp.)
115,650.00
NO.
A.
1
2
3
4
: M.051
: Pasang dinding porselin ukuran 11 x 11 cm, putih
2
:m
KOMPONEN
SATUAN
PERKIRAAN
KUANTITAS
HARGA
SATUAN
(Rp.)
TENAGA
Pekerja Biasa
Tukang Batu
Kepala Tukang Batu
Mandor
L17
L07
L02
L01
Org/hr
Org/hr
Org/hr
Org/hr
0.6200
0.5000
0.0500
0.0300
45,000.00
60,000.00
70,000.00
80,000.00
27,900.00
30,000.00
3,500.00
2,400.00
63,800.00
BAHAN
Porselin 11 x 11 cm putih
Portland Cement (PC)
Pasir Pasang
Portland Cement (PC) Warna
M333.d
M037
M002
M039
m2
kg
m3
kg
86.0000
9.3000
0.0180
1.5000
750.00
900.00
60,000.00
6,500.00
JUMLAH
HARGA
(Rp.)
64,500.00
8,370.00
1,080.00
9,750.00
83,700.00
PERALATAN
147,500.00
NO.
A.
1
2
3
4
: M.052
: Pasang dinding porselin ukuran 11 x 11 cm, warna
: m2
KOMPONEN
SATUAN
PERKIRAAN
KUANTITAS
HARGA
SATUAN
(Rp.)
TENAGA
Pekerja Biasa
Tukang Batu
Kepala Tukang Batu
Mandor
L17
L07
L02
L01
Org/hr
Org/hr
Org/hr
Org/hr
0.6200
0.5000
0.0500
0.0300
45,000.00
60,000.00
70,000.00
80,000.00
BAHAN
Porselin 11x 11 cm warna
Portland Cement (PC)
Pasir Pasang
Portland Cement (PC) Warna
M333.e
M037
M002
M039
m2
kg
m3
kg
86.0000
9.3000
0.0180
1.5000
850.00
900.00
60,000.00
6,500.00
73,100.00
8,370.00
1,080.00
9,750.00
92,300.00
PERALATAN
27,900.00
30,000.00
3,500.00
2,400.00
63,800.00
JUMLAH
HARGA
(Rp.)
156,100.00
NO.
A.
1
2
3
4
: M.053
: Pasang dinding porselin ukuran 15 x 15 cm, warna
2
:m
KOMPONEN
SATUAN
PERKIRAAN
KUANTITAS
HARGA
SATUAN
(Rp.)
TENAGA
Pekerja Biasa
Tukang Batu
Kepala Tukang Batu
Mandor
L17
L07
L02
L01
Org/hr
Org/hr
Org/hr
Org/hr
0.6000
0.4500
0.0450
0.0300
45,000.00
60,000.00
70,000.00
80,000.00
27,000.00
27,000.00
3,150.00
2,400.00
59,550.00
BAHAN
Porselin 15 x 15 cm warna
Portland Cement (PC)
Pasir Pasang
Portland Cement (PC) Warna
M330
M037
M002
M039
bh
kg
m3
kg
45.0000
9.3000
0.0180
1.5000
920.00
900.00
60,000.00
6,500.00
JUMLAH
HARGA
(Rp.)
41,400.00
8,370.00
1,080.00
9,750.00
60,600.00
PERALATAN
120,150.00
NO.
A.
1
2
3
4
: M.054
: Pasang dinding porselin ukuran 10 x 20 cm, warna
: m2
KOMPONEN
SATUAN
PERKIRAAN
KUANTITAS
HARGA
SATUAN
(Rp.)
TENAGA
Pekerja Biasa
Tukang Batu
Kepala Tukang Batu
Mandor
L17
L07
L02
L01
Org/hr
Org/hr
Org/hr
Org/hr
0.6000
0.4500
0.0450
0.0300
45,000.00
60,000.00
70,000.00
80,000.00
BAHAN
Porselin 10 x 20 cm warna
Portland Cement (PC)
Pasir Pasang
Portland Cement (PC) Warna
M331
M037
M002
M039
bh
kg
m3
kg
53.0000
9.3000
0.0180
2.7500
870.00
900.00
60,000.00
6,500.00
46,110.00
8,370.00
1,080.00
17,875.00
73,435.00
PERALATAN
27,000.00
27,000.00
3,150.00
2,400.00
59,550.00
JUMLAH
HARGA
(Rp.)
132,985.00
NO.
A.
1
2
3
4
: M.055
: Pasang dinding porselin ukuran 20 x 20 cm, warna
2
:m
KOMPONEN
SATUAN
PERKIRAAN
KUANTITAS
HARGA
SATUAN
(Rp.)
TENAGA
Pekerja Biasa
Tukang Batu
Kepala Tukang Batu
Mandor
L17
L07
L02
L01
Org/hr
Org/hr
Org/hr
Org/hr
0.6000
0.4500
0.0450
0.0300
45,000.00
60,000.00
70,000.00
80,000.00
27,000.00
27,000.00
3,150.00
2,400.00
59,550.00
BAHAN
Porselin 20 x 20 cm warna
Portland Cement (PC)
Pasir Pasang
Portland Cement (PC) Warna
M332
M037
M002
M039
bh
kg
m3
kg
26.5000
9.3000
0.0180
1.9400
1,790.00
900.00
60,000.00
6,500.00
JUMLAH
HARGA
(Rp.)
47,435.00
8,370.00
1,080.00
12,610.00
69,495.00
PERALATAN
129,045.00
NO.
A.
1
2
3
4
: M.056
: Pasang dinding keramik ukuran 20 x 20 cm
: m2
KOMPONEN
SATUAN
PERKIRAAN
KUANTITAS
HARGA
SATUAN
(Rp.)
TENAGA
Pekerja Biasa
Tukang Batu
Kepala Tukang Batu
Mandor
L17
L07
L02
L01
Org/hr
Org/hr
Org/hr
Org/hr
0.6000
0.4500
0.0450
0.0300
45,000.00
60,000.00
70,000.00
80,000.00
BAHAN
Keramik Dinding 20 x 20 cm
Portland Cement (PC)
Pasir Pasang
Portland Cement (PC) Warna
M328
M037
M002
M039
bh
kg
m3
kg
26.5000
9.3000
0.0180
1.9400
2,560.00
900.00
60,000.00
6,500.00
67,840.00
8,370.00
1,080.00
12,610.00
89,900.00
PERALATAN
27,000.00
27,000.00
3,150.00
2,400.00
59,550.00
JUMLAH
HARGA
(Rp.)
149,450.00
NO.
A.
1
2
3
4
: M.057
: Pasang dinding keramik ukuran 20 x 25 cm
2
:m
KOMPONEN
SATUAN
PERKIRAAN
KUANTITAS
HARGA
SATUAN
(Rp.)
TENAGA
Pekerja Biasa
Tukang Batu
Kepala Tukang Batu
Mandor
L17
L07
L02
L01
Org/hr
Org/hr
Org/hr
Org/hr
0.6000
0.1000
0.0450
0.0300
45,000.00
60,000.00
70,000.00
80,000.00
27,000.00
6,000.00
3,150.00
2,400.00
38,550.00
BAHAN
Keramik Dinding 20 x 25 cm
Portland Cement (PC)
Pasir Pasang
Portland Cement (PC) Warna
M327
M037
M002
M039
bh
kg
m3
kg
20.0000
9.3000
0.0180
1.5000
3,580.00
900.00
60,000.00
6,500.00
JUMLAH
HARGA
(Rp.)
71,600.00
8,370.00
1,080.00
9,750.00
90,800.00
PERALATAN
129,350.00
NO.
A.
1
2
3
4
: M.058
: Pasang dinding batu tempel hitam
: m2
KOMPONEN
SATUAN
PERKIRAAN
KUANTITAS
HARGA
SATUAN
(Rp.)
TENAGA
Pekerja Biasa
Tukang Batu
Kepala Tukang Batu
Mandor
L17
L07
L02
L01
Org/hr
Org/hr
Org/hr
Org/hr
0.6200
0.3500
0.0350
0.0300
45,000.00
60,000.00
70,000.00
80,000.00
BAHAN
Batu Tempel Hitam
Portland Cement (PC)
Pasir Pasang
M029
M037
M002
m2
kg
m3
1.1000
11.7500
0.0350
67,500.00
900.00
60,000.00
74,250.00
10,575.00
2,100.00
86,925.00
PERALATAN
27,900.00
21,000.00
2,450.00
2,400.00
53,750.00
JUMLAH
HARGA
(Rp.)
140,675.00
NO.
A.
1
2
3
4
: M.059
: Pasang lantai vinyl ukuran (30x30)cm KL I
2
:m
KOMPONEN
SATUAN
PERKIRAAN
KUANTITAS
HARGA
SATUAN
(Rp.)
TENAGA
Pekerja Biasa
Tukang Batu
Kepala Tukang Batu
Mandor
L17
L07
L02
L01
Org/hr
Org/hr
Org/hr
Org/hr
0.1500
0.1500
0.0150
0.0080
45,000.00
60,000.00
70,000.00
80,000.00
6,750.00
9,000.00
1,050.00
640.00
17,440.00
BAHAN
Vinyl (30x30)cm
Lem vinyl
M430.a
M424
kg
kg
1.1000
11.7500
#REF!
50,220.00
JUMLAH
HARGA
(Rp.)
#REF!
590,085.00
#REF!
PERALATAN
#REF!
NO.
A.
1
2
3
4
: M.060
: Pasang wallpaper, lebar 50 cm
: m2
KOMPONEN
SATUAN
PERKIRAAN
KUANTITAS
HARGA
SATUAN
(Rp.)
TENAGA
Pekerja Biasa
Tukang Batu
Kepala Tukang Batu
Mandor
L17
L07
L02
L01
Org/hr
Org/hr
Org/hr
Org/hr
0.7500
0.1700
0.0170
0.0040
45,000.00
60,000.00
70,000.00
80,000.00
33,750.00
10,200.00
1,190.00
320.00
45,460.00
BAHAN
Wall Paper
Lem vinyl
M333.f
M424
m2
kg
1.1000
0.2500
JUMLAH
HARGA
(Rp.)
#REF!
50,220.00
#REF!
12,555.00
#REF!
PERALATAN
#REF!
NO.
A.
1
2
3
4
: M.061
: Pasang dinding batu palimanan
2
:m
KOMPONEN
SATUAN
PERKIRAAN
KUANTITAS
HARGA
SATUAN
(Rp.)
TENAGA
Pekerja Biasa
Tukang Batu
Kepala Tukang Batu
Mandor
L17
L07
L02
L01
Org/hr
Org/hr
Org/hr
Org/hr
0.6200
0.3500
0.0350
0.0300
45,000.00
60,000.00
70,000.00
80,000.00
27,900.00
21,000.00
2,450.00
2,400.00
53,750.00
BAHAN
Batu Palimanan
Portland Cement (PC)
Pasir Pasang
M028
M037
M002
m2
kg
m3
1.0500
11.7500
0.0350
71,650.00
900.00
60,000.00
JUMLAH
HARGA
(Rp.)
75,232.50
10,575.00
2,100.00
87,907.50
PERALATAN
141,657.50
NO.
A.
1
2
3
4
: M.062
: Pasang dinding granito
: m2
KOMPONEN
SATUAN
PERKIRAAN
KUANTITAS
HARGA
SATUAN
(Rp.)
TENAGA
Pekerja Biasa
Tukang Batu
Kepala Tukang Batu
Mandor
L17
L07
L02
L01
Org/hr
Org/hr
Org/hr
Org/hr
0.6200
0.3500
0.0350
0.0300
45,000.00
60,000.00
70,000.00
80,000.00
27,900.00
21,000.00
2,450.00
2,400.00
53,750.00
BAHAN
Ubin Granito 30 x 30 cm
Portland Cement (PC)
Pasir Pasang
M299
M037
M002
bh
kg
m3
1.0500
11.7500
0.0350
JUMLAH
HARGA
(Rp.)
#REF!
900.00
60,000.00
#REF!
10,575.00
2,100.00
#REF!
PERALATAN
#REF!
NO.
A.
1
2
3
4
: M.063
: Pasang dinding marmer ukuran 100 x 100 cm
2
:m
KOMPONEN
SATUAN
PERKIRAAN
KUANTITAS
HARGA
SATUAN
(Rp.)
TENAGA
Pekerja Biasa
Tukang Batu
Kepala Tukang Batu
Mandor
L17
L07
L02
L01
Org/hr
Org/hr
Org/hr
Org/hr
0.7200
0.6500
0.0650
0.0350
45,000.00
60,000.00
70,000.00
80,000.00
32,400.00
39,000.00
4,550.00
2,800.00
78,750.00
BAHAN
Wall Paper
Portland Cement (PC)
Pasir Pasang
M333C
M037
M002
m2
kg
m3
1.0200
12.4400
0.0250
#REF!
900.00
60,000.00
JUMLAH
HARGA
(Rp.)
#REF!
11,196.00
1,500.00
#REF!
PERALATAN
#REF!
NO.
A.
1
2
3
4
: M.064
: Pasang dinding teraso
: m2
KOMPONEN
SATUAN
PERKIRAAN
KUANTITAS
HARGA
SATUAN
(Rp.)
TENAGA
Pekerja Biasa
Tukang Batu
Kepala Tukang Batu
Mandor
L17
L07
L02
L01
Org/hr
Org/hr
Org/hr
Org/hr
0.6200
0.3500
0.0350
0.0300
45,000.00
60,000.00
70,000.00
80,000.00
27,900.00
21,000.00
2,450.00
2,400.00
53,750.00
BAHAN
Ubin Terasso 30 x 30 cm
Portland Cement (PC)
Pasir Pasang
M297
M037
M002
bh
kg
m3
1.0500
11.7500
0.0350
JUMLAH
HARGA
(Rp.)
#REF!
900.00
60,000.00
#REF!
10,575.00
2,100.00
#REF!
PERALATAN
#REF!
NO.
A.
1
2
3
4
: M.065
: Pasang paving stone (blok) segi empat biasa
2
:m
KOMPONEN
SATUAN
PERKIRAAN
KUANTITAS
HARGA
SATUAN
(Rp.)
TENAGA
Pekerja Biasa
Tukang Batu
Kepala Tukang Batu
Mandor
L17
L07
L02
L01
Org/hr
Org/hr
Org/hr
Org/hr
0.5000
0.2500
0.0250
0.0250
45,000.00
60,000.00
70,000.00
80,000.00
22,500.00
15,000.00
1,750.00
2,000.00
41,250.00
BAHAN
Paving Block Segi Empat biasa
Pasir Pasang
M033
M002
bh
m3
45.0000
0.0350
895.00
60,000.00
JUMLAH
HARGA
(Rp.)
40,275.00
2,100.00
42,375.00
PERALATAN
83,625.00
NO.
A.
1
2
3
4
: M.066
: Pasang paving stone (blok) segi empat warna
: m2
KOMPONEN
SATUAN
PERKIRAAN
KUANTITAS
HARGA
SATUAN
(Rp.)
TENAGA
Pekerja Biasa
Tukang Batu
Kepala Tukang Batu
Mandor
L17
L07
L02
L01
Org/hr
Org/hr
Org/hr
Org/hr
0.5000
0.2500
0.0250
0.0250
45,000.00
60,000.00
70,000.00
80,000.00
BAHAN
Paving Block Segi Empat warna
Pasir Pasang
M034
M002
bh
m3
45.0000
0.0350
1,075.00
60,000.00
48,375.00
2,100.00
50,475.00
PERALATAN
22,500.00
15,000.00
1,750.00
2,000.00
41,250.00
JUMLAH
HARGA
(Rp.)
91,725.00
NO.
A.
1
2
3
4
: M.067
: Pasang paving stone (blok) Segi Enam biasa
2
:m
KOMPONEN
SATUAN
PERKIRAAN
KUANTITAS
HARGA
SATUAN
(Rp.)
TENAGA
Pekerja Biasa
Tukang Batu
Kepala Tukang Batu
Mandor
L17
L07
L02
L01
Org/hr
Org/hr
Org/hr
Org/hr
0.5000
0.2500
0.0250
0.0250
45,000.00
60,000.00
70,000.00
80,000.00
22,500.00
15,000.00
1,750.00
2,000.00
41,250.00
BAHAN
Paving Block Segi Enam biasa
Pasir Pasang
M035
M002
bh
m3
28.0000
0.0350
1,450.00
60,000.00
JUMLAH
HARGA
(Rp.)
40,600.00
2,100.00
42,700.00
PERALATAN
83,950.00
NO.
A.
1
2
3
4
: M.068
: Pasang paving stone (blok) Segi Enam Warna
: m2
KOMPONEN
SATUAN
PERKIRAAN
KUANTITAS
HARGA
SATUAN
(Rp.)
TENAGA
Pekerja Biasa
Tukang Batu
Kepala Tukang Batu
Mandor
L17
L07
L02
L01
Org/hr
Org/hr
Org/hr
Org/hr
0.5000
0.2500
0.0250
0.0250
45,000.00
60,000.00
70,000.00
80,000.00
BAHAN
Paving Block Segi Enam warna
Pasir Pasang
M036.a
M002
bh
m3
28.0000
0.0350
1,700.00
60,000.00
47,600.00
2,100.00
49,700.00
PERALATAN
22,500.00
15,000.00
1,750.00
2,000.00
41,250.00
JUMLAH
HARGA
(Rp.)
90,950.00
NO.
A.
1
2
3
4
: M.069
: Pasang paving stone (blok) Tiga Berlian biasa
2
:m
KOMPONEN
SATUAN
PERKIRAAN
KUANTITAS
HARGA
SATUAN
(Rp.)
TENAGA
Pekerja Biasa
Tukang Batu
Kepala Tukang Batu
Mandor
L17
L07
L02
L01
Org/hr
Org/hr
Org/hr
Org/hr
0.5000
0.2500
0.0250
0.0250
45,000.00
60,000.00
70,000.00
80,000.00
22,500.00
15,000.00
1,750.00
2,000.00
41,250.00
BAHAN
Paving Block Tiga Berlian biasa
Pasir Pasang
M036.b
M002
bh
m3
33.0000
0.0350
1,225.00
60,000.00
JUMLAH
HARGA
(Rp.)
40,425.00
2,100.00
42,525.00
PERALATAN
83,775.00
NO.
A.
1
2
3
4
: M.070
: Pasang paving stone (blok) Tiga Berlian warna
: m2
KOMPONEN
SATUAN
PERKIRAAN
KUANTITAS
HARGA
SATUAN
(Rp.)
TENAGA
Pekerja Biasa
Tukang Batu
Kepala Tukang Batu
Mandor
L17
L07
L02
L01
Org/hr
Org/hr
Org/hr
Org/hr
0.5000
0.2500
0.0250
0.0250
45,000.00
60,000.00
70,000.00
80,000.00
BAHAN
Paving Block Tiga Berlian warna
Pasir Pasang
M036.c
M002
bh
m3
33.0000
0.0350
1,450.00
60,000.00
47,850.00
2,100.00
49,950.00
PERALATAN
22,500.00
15,000.00
1,750.00
2,000.00
41,250.00
JUMLAH
HARGA
(Rp.)
91,200.00
NO.
A.
1
2
3
4
: N.001
: Mengikis/mengerok permukaan cat lama
: m2
KOMPONEN
SATUAN
PERKIRAAN
KUANTITAS
HARGA
SATUAN
(Rp.)
TENAGA
Pekerja Biasa
Tukang Cat
Kepala Tukang Cat
Mandor
L17
L10
L05
L01
Org/hr
Org/hr
Org/hr
Org/hr
0.1500
0.0025
45,000.00
60,000.00
47,000.00
80,000.00
6,750.00
200.00
6,950.00
BAHAN
Soda api
M429
kg
0.0500
21,520.00
JUMLAH
HARGA
(Rp.)
1,076.00
1,076.00
PERALATAN
8,026.00
NO.
A.
1
2
3
4
: N.002
: Mencuci bidang permukaan cat tembok lama
: m2
KOMPONEN
SATUAN
PERKIRAAN
KUANTITAS
HARGA
SATUAN
(Rp.)
TENAGA
Pekerja Biasa
Tukang Cat
Kepala Tukang Cat
Mandor
L17
L10
L05
L01
Org/hr
Org/hr
Org/hr
Org/hr
0.1500
0.0025
45,000.00
60,000.00
47,000.00
80,000.00
BAHAN
Sabun
M430
kg
0.0500
28,700.00
1,435.00
1,435.00
PERALATAN
6,750.00
200.00
6,950.00
JUMLAH
HARGA
(Rp.)
8,385.00
NO.
A.
1
2
3
4
: N.003
: mengerok karat cat lama permukaan baja dengan cara manual
: m2
KOMPONEN
SATUAN
PERKIRAAN
KUANTITAS
HARGA
SATUAN
(Rp.)
TENAGA
Pekerja Biasa
Tukang Cat
Kepala Tukang Cat
Mandor
L17
L10
L05
L01
Org/hr
Org/hr
Org/hr
Org/hr
0.1500
0.0025
45,000.00
60,000.00
47,000.00
80,000.00
BAHAN
Sabun
M430
6,750.00
200.00
6,950.00
kg
0.0500
28,700.00
JUMLAH
HARGA
(Rp.)
1,435.00
1,435.00
PERALATAN
8,385.00
NO.
A.
1
2
3
4
: N.004
: menyabun permukaan tembok lama
: m2
KOMPONEN
SATUAN
PERKIRAAN
KUANTITAS
HARGA
SATUAN
(Rp.)
TENAGA
Pekerja Biasa
Tukang Cat
Kepala Tukang Cat
Mandor
L17
L10
L05
L01
Org/hr
Org/hr
Org/hr
Org/hr
0.1500
0.0025
45,000.00
60,000.00
47,000.00
80,000.00
BAHAN
Sabun
M430
kg
0.0500
28,700.00
1,435.00
1,435.00
PERALATAN
6,750.00
200.00
6,950.00
JUMLAH
HARGA
(Rp.)
8,385.00
NO.
A.
1
2
3
4
: N.005
: mengerok karat/cat lama permukaan baja dengan pancar pasir
(sandblasting) dengan tingkat kebersihan Sa 2,5
: m2
KOMPONEN
SATUAN
PERKIRAAN
KUANTITAS
HARGA
SATUAN
(Rp.)
TENAGA
Pekerja Biasa
Tukang Cat
Kepala Tukang Cat
Mandor
L17
L10
L05
L01
Org/hr
Org/hr
Org/hr
Org/hr
1.6000
1.6000
0.8000
0.5000
45,000.00
60,000.00
47,000.00
80,000.00
72,000.00
96,000.00
37,600.00
40,000.00
245,600.00
BAHAN
Pasir Silika
Bensin
M005
M482
m3
ltr
40.0000
10.0000
#REF!
5,421.00
JUMLAH
HARGA
(Rp.)
#REF!
54,210.00
#REF!
PERALATAN
Air Bersih
M494
ltr
1.0000
25.00
25.00
#REF!
NO.
A.
1
2
3
4
: N.006
: Mendempul dan menggosok kayu
: m2
KOMPONEN
SATUAN
PERKIRAAN
KUANTITAS
HARGA
SATUAN
(Rp.)
TENAGA
Pekerja Biasa
Tukang Cat
Kepala Tukang Cat
Mandor
L17
L10
L05
L01
Org/hr
Org/hr
Org/hr
Org/hr
0.0400
0.0400
0.0040
0.0025
45,000.00
60,000.00
47,000.00
80,000.00
1,800.00
2,400.00
188.00
200.00
4,588.00
BAHAN
Dempul Jadi
Minyak Cat
Batu Apung
M405
M406
M430.b
kg
Ltr
kg
0.0800
0.0200
0.0100
JUMLAH
HARGA
(Rp.)
28,700.00
16,100.00
#REF!
2,296.00
322.00
#REF!
#REF!
PERALATAN
#REF!
NO.
A.
1
2
3
4
: N.007
: Pengecatan kayu lama
: m2
KOMPONEN
SATUAN
PERKIRAAN
KUANTITAS
HARGA
SATUAN
(Rp.)
JUMLAH
HARGA
(Rp.)
TENAGA
Pekerja Biasa
Tukang Cat
Kepala Tukang Cat
Mandor
L17
L10
L05
L01
Org/hr
Org/hr
Org/hr
Org/hr
0.0700
0.0750
0.0075
0.0025
45,000.00
60,000.00
47,000.00
80,000.00
3,150.00
4,500.00
352.50
200.00
8,202.50
BAHAN
Plamir Kayu
Cat Dasar Kayu
Cat Kayu
M402
M411
M414
kg
kg
kg
0.1500
0.1700
0.1700
16,760.00
28,700.00
64,570.00
2,514.00
4,879.00
10,976.90
18,369.90
PERALATAN
26,572.40
NO.
A.
1
2
3
4
: N.008
: Pengecatan kayu baru (1 lapis plamir, 1 lapis cat dasar,
2 lapis cat penutup)
: m2
KOMPONEN
SATUAN
PERKIRAAN
KUANTITAS
HARGA
SATUAN
(Rp.)
TENAGA
Pekerja Biasa
Tukang Cat
Kepala Tukang Cat
Mandor
L17
L10
L05
L01
Org/hr
Org/hr
Org/hr
Org/hr
0.0700
0.0090
0.0060
0.0025
45,000.00
60,000.00
47,000.00
80,000.00
BAHAN
Cat meni kayu
Plamir Kayu
Cat Dasar Kayu
Cat Kayu
M409
M402
M411
M414
kg
kg
kg
kg
0.2000
0.1500
0.1700
0.2600
20,840.00
16,760.00
28,700.00
64,570.00
4,168.00
2,514.00
4,879.00
16,788.20
28,349.20
PERALATAN
3,150.00
540.00
282.00
200.00
4,172.00
JUMLAH
HARGA
(Rp.)
32,521.20
NO.
A.
1
2
3
4
: N.009
: Pengecatan kayu baru (1 lapis plamir, 1 lapis cat dasar,
3 lapis cat penutup)
: m2
KOMPONEN
SATUAN
PERKIRAAN
KUANTITAS
HARGA
SATUAN
(Rp.)
TENAGA
Pekerja Biasa
Tukang Cat
Kepala Tukang Cat
Mandor
L17
L10
L05
L01
Org/hr
Org/hr
Org/hr
Org/hr
0.0700
0.1050
0.0040
0.0025
45,000.00
60,000.00
47,000.00
80,000.00
3,150.00
6,300.00
188.00
200.00
9,838.00
BAHAN
Cat meni kayu
Plamir Kayu
Cat Dasar Kayu
Cat Kayu
M409
M402
M411
M414
kg
kg
kg
kg
0.2000
0.1500
0.1700
0.3500
20,840.00
16,760.00
28,700.00
64,570.00
JUMLAH
HARGA
(Rp.)
4,168.00
2,514.00
4,879.00
22,599.50
34,160.50
PERALATAN
43,998.50
NO.
A.
1
2
3
4
: N.010
: Pelaburan kayu dengan teak oil
: m2
KOMPONEN
SATUAN
PERKIRAAN
KUANTITAS
HARGA
SATUAN
(Rp.)
TENAGA
Pekerja Biasa
Tukang Cat
Kepala Tukang Cat
Mandor
L17
L10
L05
L01
Org/hr
Org/hr
Org/hr
Org/hr
0.0400
0.0630
0.0630
0.0050
45,000.00
60,000.00
47,000.00
80,000.00
BAHAN
Teak oli
JUMLAH
HARGA
(Rp.)
M426
Ltr
1,800.00
3,780.00
2,961.00
400.00
8,941.00
0.3600
1,790.00
644.40
644.40
PERALATAN
9,585.40
NO.
A.
1
2
3
4
: N.011
: Pelaburan kayu dengan politur
: m2
KOMPONEN
SATUAN
PERKIRAAN
KUANTITAS
HARGA
SATUAN
(Rp.)
TENAGA
Pekerja Biasa
Tukang Cat
Kepala Tukang Cat
Mandor
L17
L10
L05
L01
Org/hr
Org/hr
Org/hr
Org/hr
0.0600
0.0160
0.0025
45,000.00
60,000.00
47,000.00
80,000.00
3,600.00
752.00
200.00
4,552.00
BAHAN
Politur Jadi
Kertas Gosok
M420
M401
Ltr
Lbr
0.5500
2.0000
64,570.00
10,000.00
JUMLAH
HARGA
(Rp.)
35,513.50
20,000.00
55,513.50
PERALATAN
60,065.50
NO.
A.
1
2
3
4
: N.012
: Pelaburan kayu dengan cat residu dan ter
: m2
KOMPONEN
SATUAN
PERKIRAAN
KUANTITAS
HARGA
SATUAN
(Rp.)
TENAGA
Pekerja Biasa
Tukang Cat
Kepala Tukang Cat
Mandor
L17
L10
L05
L01
Org/hr
Org/hr
Org/hr
Org/hr
0.1000
0.0060
45,000.00
60,000.00
47,000.00
80,000.00
BAHAN
Residu atau Teer
M425
Ltr
0.3500
24,600.00
8,610.00
8,610.00
PERALATAN
4,500.00
480.00
4,980.00
JUMLAH
HARGA
(Rp.)
13,590.00
NO.
A.
1
2
3
4
: N.013
: Pelaburan kayu dengan vernis
: m2
KOMPONEN
SATUAN
PERKIRAAN
KUANTITAS
HARGA
SATUAN
(Rp.)
TENAGA
Pekerja Biasa
Tukang Cat
Kepala Tukang Cat
Mandor
L17
L10
L05
L01
Org/hr
Org/hr
Org/hr
Org/hr
0.1600
0.1600
0.0160
0.0025
45,000.00
60,000.00
47,000.00
80,000.00
JUMLAH
HARGA
(Rp.)
7,200.00
9,600.00
752.00
200.00
17,752.00
BAHAN
Vernis
Dempul Jadi
Kertas Gosok
Kuas
M419
M405
M401
M421
Ltr
kg
Lbr
bh
0.1500
0.0500
0.1000
0.0100
28,700.00
28,700.00
10,000.00
10,760.00
4,305.00
1,435.00
1,000.00
107.60
6,847.60
PERALATAN
24,599.60
NO.
A.
1
2
3
4
: N.014
: Pengecatan tembok baru (1 lapis plamir, 1 lapis cat dasar,
2 lapis cat penutup)
: m2
KOMPONEN
SATUAN
PERKIRAAN
KUANTITAS
HARGA
SATUAN
(Rp.)
TENAGA
Pekerja Biasa
Tukang Cat
Kepala Tukang Cat
Mandor
L17
L10
L05
L01
Org/hr
Org/hr
Org/hr
Org/hr
0.0200
0.0630
0.0063
0.0025
45,000.00
60,000.00
47,000.00
80,000.00
BAHAN
Plamir Tembok
Cat Dasar Tembok
Cat Tembok
M403
M412
M415
kg
kg
kg
0.1000
0.1000
0.2600
45,000.00
4,190.00
17,500.00
4,500.00
419.00
4,550.00
9,469.00
PERALATAN
900.00
3,780.00
296.10
200.00
5,176.10
JUMLAH
HARGA
(Rp.)
14,645.10
NO.
A.
1
2
3
4
: N.015
: Pengecatan tembok lama (1 lapis cat dasar, 2 lapis cat penutup)
: m2
KOMPONEN
SATUAN
PERKIRAAN
KUANTITAS
HARGA
SATUAN
(Rp.)
TENAGA
Pekerja Biasa
Tukang Cat
Kepala Tukang Cat
Mandor
L17
L10
L05
L01
Org/hr
Org/hr
Org/hr
Org/hr
0.0280
0.0420
0.0042
0.0025
45,000.00
60,000.00
47,000.00
80,000.00
1,260.00
2,520.00
197.40
200.00
4,177.40
BAHAN
Cat Dasar Tembok
Cat Tembok
M412
M415
kg
kg
0.1200
0.1800
4,190.00
17,500.00
JUMLAH
HARGA
(Rp.)
502.80
3,150.00
3,652.80
PERALATAN
7,830.20
NO.
A.
1
2
3
4
: N.016
: Melabur tembok dengan kalkarium
: m2
KOMPONEN
SATUAN
PERKIRAAN
KUANTITAS
HARGA
SATUAN
(Rp.)
TENAGA
Pekerja Biasa
Tukang Cat
Kepala Tukang Cat
Mandor
L17
L10
L05
L01
Org/hr
Org/hr
Org/hr
Org/hr
0.0280
0.0420
0.0042
0.0025
45,000.00
60,000.00
47,000.00
80,000.00
JUMLAH
HARGA
(Rp.)
1,260.00
2,520.00
197.40
200.00
4,177.40
BAHAN
Kalkarium
M427
kg
0.1000
7,170.00
717.00
717.00
PERALATAN
4,894.40
NO.
A.
1
2
3
4
: N.017
: Melabur tembok dengan kapur sirih
: m2
KOMPONEN
SATUAN
PERKIRAAN
KUANTITAS
HARGA
SATUAN
(Rp.)
TENAGA
Pekerja Biasa
Tukang Cat
Kepala Tukang Cat
Mandor
L17
L10
L05
L01
Org/hr
Org/hr
Org/hr
Org/hr
0.1000
0.0010
0.0001
0.0025
45,000.00
60,000.00
47,000.00
80,000.00
4,500.00
60.00
4.70
200.00
4,764.70
BAHAN
Kertas Gosok
Alang-Alang
Usuk : 5/7
Kapur Sirih
M401
M430.c
M061
M428
Lbr
ikat
m3
kg
0.1000
0.2500
0.0020
0.1500
10,000.00
#REF!
4,500,000.00
3,920.00
JUMLAH
HARGA
(Rp.)
1,000.00
#REF!
9,000.00
588.00
#REF!
PERALATAN
#REF!
NO.
A.
1
2
3
4
: N.018
: Melabur tembok lama dengan kapur sirih (untuk pemeliharaan)
: m2
KOMPONEN
SATUAN
PERKIRAAN
KUANTITAS
HARGA
SATUAN
(Rp.)
TENAGA
Pekerja Biasa
Tukang Cat
Kepala Tukang Cat
Mandor
L17
L10
L05
L01
Org/hr
Org/hr
Org/hr
Org/hr
0.0400
0.0050
0.0005
0.0025
45,000.00
60,000.00
47,000.00
80,000.00
BAHAN
Usuk : 5/7
Kapur Sirih
M061
M428
m3
kg
0.0020
0.3000
4,500,000.00
3,920.00
9,000.00
1,176.00
10,176.00
PERALATAN
1,800.00
300.00
23.50
200.00
2,323.50
JUMLAH
HARGA
(Rp.)
12,499.50
NO.
A.
1
2
3
4
: N.019
: Pengecatan plafon (1 lapis plamir, 1 lapis cat dasar,
2 lapis cat penutup)
: m2
KOMPONEN
SATUAN
PERKIRAAN
KUANTITAS
HARGA
SATUAN
(Rp.)
TENAGA
Pekerja Biasa
Tukang Cat
Kepala Tukang Cat
Mandor
L17
L10
L05
L01
Org/hr
Org/hr
Org/hr
Org/hr
0.0200
0.0630
0.0063
0.0025
45,000.00
60,000.00
47,000.00
80,000.00
900.00
3,780.00
296.10
200.00
5,176.10
BAHAN
Plamir Tembok
Cat Dasar Tembok
Cat Tembok
M403
M412
M415
kg
kg
kg
0.1000
0.1000
0.2600
45,000.00
4,190.00
17,500.00
JUMLAH
HARGA
(Rp.)
4,500.00
419.00
4,550.00
9,469.00
PERALATAN
JUMLAH HARGA PERALATAN
14,645.10
NO.
A.
1
2
3
4
: N.020
: Pengecatan permukaan baja dengan meni besi
: m2
KOMPONEN
SATUAN
PERKIRAAN
KUANTITAS
HARGA
SATUAN
(Rp.)
TENAGA
Pekerja Biasa
Tukang Cat
Kepala Tukang Cat
Mandor
L17
L10
L05
L01
Org/hr
Org/hr
Org/hr
Org/hr
0.0200
0.2000
0.0200
0.0100
45,000.00
60,000.00
47,000.00
80,000.00
BAHAN
Cat meni besi
Kuas
M410
M421
kg
bh
0.1000
0.0100
27,920.00
10,760.00
2,792.00
107.60
2,899.60
PERALATAN
900.00
12,000.00
940.00
800.00
14,640.00
JUMLAH
HARGA
(Rp.)
17,539.60
NO.
A.
1
2
3
4
: N.021
: Pengecatan permukaan baja dengan meni besi dan perancah
: m2
KOMPONEN
SATUAN
PERKIRAAN
KUANTITAS
HARGA
SATUAN
(Rp.)
TENAGA
Pekerja Biasa
Tukang Cat
Kepala Tukang Cat
Mandor
L17
L10
L05
L01
Org/hr
Org/hr
Org/hr
Org/hr
0.2500
0.2250
0.0225
0.0075
45,000.00
60,000.00
47,000.00
80,000.00
11,250.00
13,500.00
1,057.50
600.00
26,407.50
BAHAN
Cat meni besi
Kuas
Usuk : 5/7
M410
M421
M055
kg
bh
m3
0.1000
0.0100
0.0020
27,920.00
10,760.00
#REF!
JUMLAH
HARGA
(Rp.)
2,792.00
107.60
#REF!
#REF!
PERALATAN
#REF!
NO.
A.
1
2
3
4
: N.022
: Pengecatan permukaan baja lapis seng (galbani) secara manual
sistem 1 lapis cat mutakhir tebal 0.20 mm
: m2
KOMPONEN
SATUAN
PERKIRAAN
KUANTITAS
HARGA
SATUAN
(Rp.)
TENAGA
Pekerja Biasa
Tukang Cat
Kepala Tukang Cat
Mandor
L17
L10
L05
L01
Org/hr
Org/hr
Org/hr
Org/hr
0.0060
0.0600
0.0120
0.0060
45,000.00
60,000.00
47,000.00
80,000.00
BAHAN
Cat Besi
M416
kg
0.3000
68,160.00
20,448.00
20,448.00
PERALATAN
270.00
3,600.00
564.00
480.00
4,914.00
JUMLAH
HARGA
(Rp.)
25,362.00
NO.
A.
1
2
3
4
: N.023
: Pengecatan permukaan baja lapis seng (galbani) secara manual
sistem 3 lapis cat konvensional tebal 0.20 mm
: m2
KOMPONEN
SATUAN
PERKIRAAN
KUANTITAS
HARGA
SATUAN
(Rp.)
TENAGA
Pekerja Biasa
Tukang Cat
Kepala Tukang Cat
Mandor
L17
L10
L05
L01
Org/hr
Org/hr
Org/hr
Org/hr
0.5000
0.8000
0.3000
0.2000
45,000.00
60,000.00
47,000.00
80,000.00
22,500.00
48,000.00
14,100.00
16,000.00
100,600.00
BAHAN
Cat meni besi
Cat Dasar Besi
Cat Besi
M410
M413
M416
kg
kg
kg
0.1100
0.1700
0.0800
27,920.00
33,880.00
68,160.00
JUMLAH
HARGA
(Rp.)
3,071.20
5,759.60
5,452.80
14,283.60
PERALATAN
114,883.60
NO.
A.
1
2
3
4
: N.024
: Pengecatan permukaan baja lapis seng (galbani) secara semprot
(airless spray) sistem 1 lapis cat mutakhir tebal 0.20 mm
: m2
KOMPONEN
SATUAN
PERKIRAAN
KUANTITAS
HARGA
SATUAN
(Rp.)
TENAGA
Pekerja Biasa
Tukang Cat
Kepala Tukang Cat
Mandor
L17
L10
L05
L01
Org/hr
Org/hr
Org/hr
Org/hr
0.4000
0.7000
0.2000
0.2000
45,000.00
60,000.00
47,000.00
80,000.00
BAHAN
Cat Dasar Besi
M413
kg
0.3000
33,880.00
10,164.00
10,164.00
PERALATAN
18,000.00
42,000.00
9,400.00
16,000.00
85,400.00
JUMLAH
HARGA
(Rp.)
95,564.00
NO.
A.
1
2
3
4
: N.025
: Pekerjaan waterproofing
: m2
KOMPONEN
SATUAN
PERKIRAAN
KUANTITAS
HARGA
SATUAN
(Rp.)
TENAGA
Pekerja Biasa
Tukang Cat
Kepala Tukang Cat
Mandor
L17
L10
L05
L01
Org/hr
Org/hr
Org/hr
Org/hr
0.0200
0.0630
0.0063
0.0025
45,000.00
60,000.00
47,000.00
80,000.00
BAHAN
Waterproofing
M418
kg
0.3600
128,890.00
46,400.40
46,400.40
PERALATAN
900.00
3,780.00
296.10
200.00
5,176.10
JUMLAH
HARGA
(Rp.)
51,576.50
NO.
A.
1
2
3
4
: P.001
: Pemasangan stop kontak
: Titik
KOMPONEN
SATUAN
PERKIRAAN
KUANTITAS
HARGA
SATUAN
(Rp.)
TENAGA
Pekerja Biasa
Tukang Listrik
Kepala Tukang Listrik
Mandor
L17
L11
L06
L01
Org/hr
Org/hr
Org/hr
Org/hr
0.5000
0.5000
0.0500
0.0500
45,000.00
60,000.00
47,000.00
80,000.00
22,500.00
30,000.00
2,350.00
4,000.00
58,850.00
BAHAN
Kabel NYA 2.5 mm
Stop Kontak
T dos PVC
Pipa PVC 5/8"
Las doof
M437
M439
M443
M444
M441
m1
bh
bh
Ljr
bh
10.0000
1.0000
1.0000
0.6500
3.0000
3,650.00
23,060.00
700.00
7,360.00
400.00
JUMLAH
HARGA
(Rp.)
36,500.00
23,060.00
700.00
4,784.00
1,200.00
66,244.00
PERALATAN
125,094.00
NO.
A.
1
2
3
4
: P.002
: Pemasangan saklar tunggal
: Titik
KOMPONEN
SATUAN
PERKIRAAN
KUANTITAS
HARGA
SATUAN
(Rp.)
TENAGA
Pekerja Biasa
Tukang Listrik
Kepala Tukang Listrik
Mandor
L17
L11
L06
L01
Org/hr
Org/hr
Org/hr
Org/hr
0.5000
0.5000
0.0500
0.0500
45,000.00
60,000.00
47,000.00
80,000.00
BAHAN
Kabel NYA 2.5 mm
Saklar Broco Tunggal
T dos PVC
Pipa PVC 5/8"
Las doof
M437
M440
M443
M444
M441
m1
bh
bh
Ljr
bh
6.0000
1.0000
1.0000
0.6500
2.0000
3,650.00
28,180.00
700.00
7,360.00
400.00
21,900.00
28,180.00
700.00
4,784.00
800.00
56,364.00
PERALATAN
22,500.00
30,000.00
2,350.00
4,000.00
58,850.00
JUMLAH
HARGA
(Rp.)
115,214.00
NO.
A.
1
2
3
4
: P.003
: Pemasangan saklar ganda
: Titik
KOMPONEN
SATUAN
PERKIRAAN
KUANTITAS
HARGA
SATUAN
(Rp.)
TENAGA
Pekerja Biasa
Tukang Listrik
Kepala Tukang Listrik
Mandor
L17
L11
L06
L01
Org/hr
Org/hr
Org/hr
Org/hr
0.5000
0.5000
0.0500
0.0500
45,000.00
60,000.00
47,000.00
80,000.00
22,500.00
30,000.00
2,350.00
4,000.00
58,850.00
BAHAN
Kabel NYA 2.5 mm
Saklar Broco Ganda
T dos PVC
Pipa PVC 5/8"
Las doof
M437
M440.a
M443
M444
M441
m1
bh
bh
Ljr
bh
10.0000
1.0000
1.0000
0.6500
3.0000
3,650.00
32,280.00
700.00
7,360.00
400.00
JUMLAH
HARGA
(Rp.)
36,500.00
32,280.00
700.00
4,784.00
1,200.00
75,464.00
PERALATAN
134,314.00
NO.
A.
1
2
3
4
: P.004
: Pemasangan titik lampu pijar 5 - 40 watt
: Titik
KOMPONEN
SATUAN
PERKIRAAN
KUANTITAS
HARGA
SATUAN
(Rp.)
TENAGA
Pekerja Biasa
Tukang Listrik
Kepala Tukang Listrik
Mandor
L17
L11
L06
L01
Org/hr
Org/hr
Org/hr
Org/hr
0.2500
0.2500
0.0250
0.0250
45,000.00
60,000.00
47,000.00
80,000.00
BAHAN
Lampu Pijar 5 - 40 Watt
Kabel NYA 2.5 mm
Isolator
Fiting Flafond
Las doof
M456
M437
M442
M445
M441
bh
m1
m1
bh
bh
1.0000
10.0000
4.0000
1.0000
2.0000
15,370.00
3,650.00
550.00
7,680.00
400.00
15,370.00
36,500.00
2,200.00
7,680.00
800.00
62,550.00
PERALATAN
11,250.00
15,000.00
1,175.00
2,000.00
29,425.00
JUMLAH
HARGA
(Rp.)
91,975.00
NO.
A.
1
2
3
4
: P.005
: Pemasangan titik lampu pijar 50 - 100 watt
: Titik
KOMPONEN
SATUAN
PERKIRAAN
KUANTITAS
HARGA
SATUAN
(Rp.)
TENAGA
Pekerja Biasa
Tukang Listrik
Kepala Tukang Listrik
Mandor
L17
L11
L06
L01
Org/hr
Org/hr
Org/hr
Org/hr
0.2500
0.2500
0.0250
0.0250
45,000.00
60,000.00
47,000.00
80,000.00
11,250.00
15,000.00
1,175.00
2,000.00
29,425.00
BAHAN
Lampu Pijar 50 - 100 Watt
Kabel NYA 2.5 mm
Isolator
Fiting Flafond
Las doof
M457
M437
M442
M445
M441
bh
m1
m1
bh
bh
1.0000
10.0000
4.0000
1.0000
2.0000
25,620.00
3,650.00
550.00
7,680.00
400.00
JUMLAH
HARGA
(Rp.)
25,620.00
36,500.00
2,200.00
7,680.00
800.00
72,800.00
PERALATAN
102,225.00
NO.
A.
1
2
3
4
: P.006
: Pemasangan titik lampu TL 20 Watt (komplit)
: Titik
KOMPONEN
SATUAN
PERKIRAAN
KUANTITAS
HARGA
SATUAN
(Rp.)
TENAGA
Pekerja Biasa
Tukang Listrik
Kepala Tukang Listrik
Mandor
L17
L11
L06
L01
Org/hr
Org/hr
Org/hr
Org/hr
0.2500
0.2500
0.0250
0.0250
45,000.00
60,000.00
47,000.00
80,000.00
BAHAN
Lampu TL Komplit 20 Watt
Kabel NYA 2.5 mm
Isolator
Las doof
M449
M437
M442
M441
Ljr
Ljr
Ljr
bh
1.0000
10.0000
4.0000
2.0000
53,810.00
3,650.00
550.00
400.00
53,810.00
36,500.00
2,200.00
800.00
93,310.00
PERALATAN
11,250.00
15,000.00
1,175.00
2,000.00
29,425.00
JUMLAH
HARGA
(Rp.)
122,735.00
NO.
A.
1
2
3
4
: P.007
: Pemasangan titik lampu TL 40 Watt (komplit) + saklar
: Titik
KOMPONEN
SATUAN
PERKIRAAN
KUANTITAS
HARGA
SATUAN
(Rp.)
TENAGA
Pekerja Biasa
Tukang Listrik
Kepala Tukang Listrik
Mandor
L17
L11
L06
L01
Org/hr
Org/hr
Org/hr
Org/hr
0.2500
0.2500
0.0250
0.0250
45,000.00
60,000.00
47,000.00
80,000.00
11,250.00
15,000.00
1,175.00
2,000.00
29,425.00
BAHAN
Lampu TL Komplit 40 Watt
Kabel NYA 2.5 mm
Isolator
Las doof
M450
M437
M442
M441
Ljr
Ljr
Ljr
bh
1.0000
10.0000
4.0000
2.0000
79,690.00
3,650.00
550.00
400.00
JUMLAH
HARGA
(Rp.)
79,690.00
36,500.00
2,200.00
800.00
119,190.00
PERALATAN
148,615.00
NO.
A.
1
2
3
4
: P.008
: Pemasangan titik lampu XL 5 Watt
: Titik
KOMPONEN
SATUAN
PERKIRAAN
KUANTITAS
HARGA
SATUAN
(Rp.)
TENAGA
Pekerja Biasa
Tukang Listrik
Kepala Tukang Listrik
Mandor
L17
L11
L06
L01
Org/hr
Org/hr
Org/hr
Org/hr
0.2500
0.2500
0.0250
0.0250
45,000.00
60,000.00
47,000.00
80,000.00
BAHAN
Lampu XL (Lilin) 5 Watt
Kabel NYA 2.5 mm
Isolator
Fiting Flafond
Las doof
M451
M437
M442
M445
M441
bh
m1
m1
bh
bh
1.0000
10.0000
4.0000
1.0000
2.0000
24,080.00
3,650.00
550.00
7,680.00
400.00
24,080.00
36,500.00
2,200.00
7,680.00
800.00
71,260.00
PERALATAN
11,250.00
15,000.00
1,175.00
2,000.00
29,425.00
JUMLAH
HARGA
(Rp.)
100,685.00
NO.
A.
1
2
3
4
: P.009
: Pemasangan titik lampu XL 8 Watt + saklar
: Titik
KOMPONEN
SATUAN
PERKIRAAN
KUANTITAS
HARGA
SATUAN
(Rp.)
TENAGA
Pekerja Biasa
Tukang Listrik
Kepala Tukang Listrik
Mandor
L17
L11
L06
L01
Org/hr
Org/hr
Org/hr
Org/hr
0.2500
0.2500
0.0250
0.0250
45,000.00
60,000.00
47,000.00
80,000.00
11,250.00
15,000.00
1,175.00
2,000.00
29,425.00
BAHAN
Lampu XL (Lilin) 8 Watt
Kabel NYA 2.5 mm
Isolator
Fiting Flafond
Las doof
M452
M437
M442
M445
M441
bh
m1
m1
bh
bh
1.0000
10.0000
4.0000
1.0000
2.0000
24,080.00
3,650.00
550.00
7,680.00
400.00
JUMLAH
HARGA
(Rp.)
24,080.00
36,500.00
2,200.00
7,680.00
800.00
71,260.00
PERALATAN
100,685.00
NO.
A.
1
2
3
4
: P.010
: Pemasangan titik lampu XL 14 Watt + saklar
: Titik
KOMPONEN
SATUAN
PERKIRAAN
KUANTITAS
HARGA
SATUAN
(Rp.)
TENAGA
Pekerja Biasa
Tukang Listrik
Kepala Tukang Listrik
Mandor
L17
L11
L06
L01
Org/hr
Org/hr
Org/hr
Org/hr
0.2500
0.2500
0.0250
0.0250
45,000.00
60,000.00
47,000.00
80,000.00
BAHAN
Lampu XL (Lilin) 14 Watt
Kabel NYA 2.5 mm
Isolator
Fiting Flafond
Las doof
M453
M437
M442
M445
M441
bh
m1
m1
bh
bh
1.0000
10.0000
4.0000
1.0000
2.0000
26,650.00
3,650.00
550.00
7,680.00
400.00
26,650.00
36,500.00
2,200.00
7,680.00
800.00
73,830.00
PERALATAN
11,250.00
15,000.00
1,175.00
2,000.00
29,425.00
JUMLAH
HARGA
(Rp.)
103,255.00
NO.
A.
1
2
3
4
: P.011
: Pemasangan titik lampu XL 18 Watt + saklar
: Titik
KOMPONEN
SATUAN
PERKIRAAN
KUANTITAS
HARGA
SATUAN
(Rp.)
TENAGA
Pekerja Biasa
Tukang Listrik
Kepala Tukang Listrik
Mandor
L17
L11
L06
L01
Org/hr
Org/hr
Org/hr
Org/hr
0.2500
0.2500
0.0250
0.0250
45,000.00
60,000.00
47,000.00
80,000.00
11,250.00
15,000.00
1,175.00
2,000.00
29,425.00
BAHAN
Lampu XL (Lilin) 18 Watt
Kabel NYA 2.5 mm
Isolator
Fiting Flafond
Las doof
M454
M437
M442
M445
M441
bh
m1
m1
bh
bh
1.0000
10.0000
4.0000
1.0000
2.0000
29,210.00
3,650.00
550.00
7,680.00
400.00
JUMLAH
HARGA
(Rp.)
29,210.00
36,500.00
2,200.00
7,680.00
800.00
76,390.00
PERALATAN
105,815.00
NO.
A.
1
2
3
4
: P.012
: Pemasangan titik lampu XL 23 Watt + saklar
: Titik
KOMPONEN
SATUAN
PERKIRAAN
KUANTITAS
HARGA
SATUAN
(Rp.)
TENAGA
Pekerja Biasa
Tukang Listrik
Kepala Tukang Listrik
Mandor
L17
L11
L06
L01
Org/hr
Org/hr
Org/hr
Org/hr
0.2500
0.2500
0.0250
0.0250
45,000.00
60,000.00
47,000.00
80,000.00
BAHAN
Lampu XL (Lilin) 23 Watt
Kabel NYA 2.5 mm
Isolator
Fiting Flafond
Las doof
M455
M437
M442
M445
M441
bh
m1
m1
bh
bh
1.0000
10.0000
4.0000
1.0000
2.0000
30,230.00
3,650.00
550.00
7,680.00
400.00
30,230.00
36,500.00
2,200.00
7,680.00
800.00
77,410.00
PERALATAN
11,250.00
15,000.00
1,175.00
2,000.00
29,425.00
JUMLAH
HARGA
(Rp.)
106,835.00
NO.
A.
1
2
3
4
: P.013
: Pemasangan sekering 1 group
: Unit
KOMPONEN
SATUAN
PERKIRAAN
KUANTITAS
HARGA
SATUAN
(Rp.)
TENAGA
Pekerja Biasa
Tukang Listrik
Kepala Tukang Listrik
Mandor
L17
L11
L06
L01
Org/hr
Org/hr
Org/hr
Org/hr
0.6200
0.0620
0.0060
0.0060
45,000.00
60,000.00
47,000.00
80,000.00
27,900.00
3,720.00
282.00
480.00
32,382.00
BAHAN
Zekering Kast Lokal 1 Group
Kabel NYA 4.0 mm
Pipa PVC 5/8"
M446
M438
M444
Unit
m1
Ljr
1.0000
4.0000
1.0000
56,370.00
6,175.00
7,360.00
JUMLAH
HARGA
(Rp.)
56,370.00
24,700.00
7,360.00
88,430.00
PERALATAN
120,812.00
NO.
A.
1
2
3
4
: P.014
: Pemasangan sekering 2 group
: Unit
KOMPONEN
SATUAN
PERKIRAAN
KUANTITAS
HARGA
SATUAN
(Rp.)
TENAGA
Pekerja Biasa
Tukang Listrik
Kepala Tukang Listrik
Mandor
L17
L11
L06
L01
Org/hr
Org/hr
Org/hr
Org/hr
0.9500
0.0950
0.0095
0.0095
45,000.00
60,000.00
47,000.00
80,000.00
BAHAN
Zekering Kast Lokal 2 Group
Kabel NYA 4.0 mm
Pipa PVC 5/8"
M447
M438
M444
Unit
m1
Ljr
1.0000
8.0000
2.0000
82,000.00
6,175.00
7,360.00
82,000.00
49,400.00
14,720.00
146,120.00
PERALATAN
42,750.00
5,700.00
446.50
760.00
49,656.50
JUMLAH
HARGA
(Rp.)
195,776.50
NO.
A.
1
2
3
4
: P.015
: Pemasangan sekering 3 group
: Unit
KOMPONEN
SATUAN
PERKIRAAN
KUANTITAS
HARGA
SATUAN
(Rp.)
TENAGA
Pekerja Biasa
Tukang Listrik
Kepala Tukang Listrik
Mandor
L17
L11
L06
L01
Org/hr
Org/hr
Org/hr
Org/hr
1.2800
0.1280
0.0125
0.0125
45,000.00
60,000.00
47,000.00
80,000.00
57,600.00
7,680.00
587.50
1,000.00
66,867.50
BAHAN
Zekering Kast Lokal 3 Group
Kabel NYA 4.0 mm
Pipa PVC 5/8"
M448
M438
M444
Unit
m1
Ljr
1.0000
12.0000
3.0000
112,750.00
6,175.00
7,360.00
JUMLAH
HARGA
(Rp.)
112,750.00
74,100.00
22,080.00
208,930.00
PERALATAN
275,797.50
NO.
A.
1
2
3
4
: P.016
: Pemasangan penangkal petir
: Unit
KOMPONEN
SATUAN
PERKIRAAN
KUANTITAS
HARGA
SATUAN
(Rp.)
TENAGA
Pekerja Biasa
Tukang Listrik
Kepala Tukang Listrik
Mandor
L17
L11
L06
L01
Org/hr
Org/hr
Org/hr
Org/hr
2.0000
0.5000
0.0500
0.0500
45,000.00
60,000.00
47,000.00
80,000.00
BAHAN
Pipa Arde
Pipa PVC tipe AW Dia 1/2 "
Shock Galvanis Dia 1/2 "
Pipa Galvanis 1", tebal 2 mm
Splits Dia 1 "
Timah
Kawat BC
M460
M334
M384
M378
M460.a
M460.b
M460.c
m'
Ljr
bh
Ljr
bh
kg
m1
6.0000
10.0000
1.0000
0.2500
1.0000
0.5000
40.0000
92,250.00
28,700.00
3,500.00
225,000.00
64,570.00
365,920.00
37,660.00
553,500.00
287,000.00
3,500.00
56,250.00
64,570.00
182,960.00
1,506,400.00
2,654,180.00
PERALATAN
90,000.00
30,000.00
2,350.00
4,000.00
126,350.00
JUMLAH
HARGA
(Rp.)
2,780,530.00
: Q.001
: Penyetelan mesin bor dan buat bak sirkulasi
: Unit
NO.
A.
KOMPONEN
SATUAN
PERKIRAAN
KUANTITAS
HARGA
SATUAN
(Rp.)
JUMLAH
HARGA
(Rp.)
TENAGA
BAHAN
Kayu untuk landasan
Kayu untuk dinding spul bak sirkulasi
Ls
Ls
1.0000
1.0000
1,100,000.00
350,000.00
1,100,000.00
350,000.00
1,450,000.00
PERALATAN
1,450,000.00
NO.
A.
KOMPONEN
SATUAN
PERKIRAAN
KUANTITAS
HARGA
SATUAN
(Rp.)
TENAGA
BAHAN
Pembuatan bak sirkulasi
Pembersihan lokasi
Pengerasan jalan masuk
Ls
Ls
Ls
1.0000
1.0000
1.0000
JUMLAH
HARGA
(Rp.)
900,000.00
250,000.00
700,000.00
900,000.00
250,000.00
700,000.00
1,850,000.00
PERALATAN
1,850,000.00
3,300,000.00
NO.
A.
1
2
: Q.002
: Geolistrik
: Ls
KOMPONEN
SATUAN
PERKIRAAN
KUANTITAS
HARGA
SATUAN
(Rp.)
TENAGA
Engineer dan Crew
Tenaga Ahli Geolistrik
L26
L27
Ls
Org/hr
1.0000
1.0000
450,000.00
575,000.00
JUMLAH
HARGA
(Rp.)
450,000.00
575,000.00
1,025,000.00
BAHAN
PERALATAN
Sewa Alat Geolistrik
Transportasi Alat dan Personil
Biaya Pembuatan Laporan
E06
hari
Ls
Ls
1.0000
1.0000
1.0000
1,750,000.00
500,000.00
200,000.00
1,750,000.00
500,000.00
200,000.00
2,450,000.00
3,475,000.00
NO.
A.
1
: Q.003
: Pemboran pilot hole 8 3/4" kedalaman 0 - 25 m
kecepatan pemboran 15 m'/hr
: m1
KOMPONEN
SATUAN
PERKIRAAN
KUANTITAS
HARGA
SATUAN
(Rp.)
TENAGA
Engineer dan Crew
L26
Ls
1.0000
450,000.00
1
2
BAHAN
Solar
Minyak Pelumas
Grease
M483
M484
M485
ltr
ltr
kg
75.0000
5.0000
1.0000
5,151.00
35,000.00
13,450.00
386,325.00
175,000.00
13,450.00
574,775.00
PERALATAN
Sewa Mesin Bor
Penyusutan Mata Bor
E01
hari
Ls
1.0000
0.2500
1,350,000.00
8,000,000.00
450,000.00
450,000.00
JUMLAH
HARGA
(Rp.)
1,350,000.00
2,000,000.00
3,350,000.00
4,374,775.00
291,651.67
NO.
A.
1
: Q.004
: Pemboran pilot hole 8 3/4" kedalaman 25 - 50 m
kecepatan pemboran 12 m'/hr
: m1
KOMPONEN
SATUAN
PERKIRAAN
KUANTITAS
HARGA
SATUAN
(Rp.)
TENAGA
Engineer dan Crew
L26
Ls
1.0000
450,000.00
1
2
BAHAN
Solar
Minyak Pelumas
Grease
M483
M484
M485
ltr
ltr
kg
75.0000
5.0000
1.0000
5,151.00
35,000.00
13,450.00
386,325.00
175,000.00
13,450.00
574,775.00
PERALATAN
Sewa Mesin Bor
Penyusutan Mata Bor
E01
hari
Ls
1.0000
0.2500
1,350,000.00
8,000,000.00
450,000.00
450,000.00
JUMLAH
HARGA
(Rp.)
1,350,000.00
2,000,000.00
3,350,000.00
4,374,775.00
364,564.58
NO.
A.
1
: Q.005
: Pemboran pilot hole 8 3/4" kedalaman 50 - 75 m
kecepatan pemboran 10 m'/hr
: m1
KOMPONEN
SATUAN
PERKIRAAN
KUANTITAS
HARGA
SATUAN
(Rp.)
TENAGA
Engineer dan Crew
L26
Ls
1.0000
450,000.00
1
2
BAHAN
Solar
Minyak Pelumas
Grease
M483
M484
M485
ltr
ltr
kg
75.0000
5.0000
1.0000
5,151.00
35,000.00
13,450.00
386,325.00
175,000.00
13,450.00
574,775.00
PERALATAN
Sewa Mesin Bor
Penyusutan Mata Bor
E01
hari
Ls
1.0000
0.2500
1,350,000.00
8,000,000.00
450,000.00
450,000.00
JUMLAH
HARGA
(Rp.)
1,350,000.00
2,000,000.00
3,350,000.00
4,374,775.00
437,477.50
NO.
A.
1
: Q.006
: Pemboran pilot hole 8 3/4" kedalaman 75 - 100 m
kecepatan pemboran 8 m'/hr
: m1
KOMPONEN
SATUAN
PERKIRAAN
KUANTITAS
HARGA
SATUAN
(Rp.)
TENAGA
Engineer dan Crew
L26
Ls
1.0000
450,000.00
1
2
BAHAN
Solar
Minyak Pelumas
Grease
M483
M484
M485
ltr
ltr
kg
75.0000
5.0000
1.0000
5,151.00
35,000.00
13,450.00
386,325.00
175,000.00
13,450.00
574,775.00
PERALATAN
Sewa Mesin Bor
Penyusutan Mata Bor
E01
hari
Ls
1.0000
0.2500
1,350,000.00
8,000,000.00
450,000.00
450,000.00
JUMLAH
HARGA
(Rp.)
1,350,000.00
2,000,000.00
3,350,000.00
4,374,775.00
546,846.88
NO.
A.
1
: Q.007
: Pemboran pilot hole 8 3/4" kedalaman 100 - 125 m
kecepatan pemboran 6 m'/hr
: m1
KOMPONEN
SATUAN
PERKIRAAN
KUANTITAS
HARGA
SATUAN
(Rp.)
TENAGA
Engineer dan Crew
L26
Ls
1.0000
450,000.00
1
2
BAHAN
Solar
Minyak Pelumas
Grease
M483
M484
M485
ltr
ltr
kg
75.0000
5.0000
1.0000
5,151.00
35,000.00
13,450.00
386,325.00
175,000.00
13,450.00
574,775.00
PERALATAN
Sewa Mesin Bor
Penyusutan Mata Bor
E01
hari
Ls
1.0000
0.2500
1,350,000.00
8,000,000.00
450,000.00
450,000.00
JUMLAH
HARGA
(Rp.)
1,350,000.00
2,000,000.00
3,350,000.00
4,374,775.00
729,129.17
NO.
A.
1
: Q.008
: Pemboran pilot hole 8 3/4" kedalaman 125 - 175 m
kecepatan pemboran 4 m'/hr
: m1
KOMPONEN
SATUAN
PERKIRAAN
KUANTITAS
HARGA
SATUAN
(Rp.)
TENAGA
Engineer dan Crew
L26
Ls
1.0000
450,000.00
1
2
BAHAN
Solar
Minyak Pelumas
Grease
M483
M484
M485
ltr
ltr
kg
75.0000
5.0000
1.0000
5,151.00
35,000.00
13,450.00
386,325.00
175,000.00
13,450.00
574,775.00
PERALATAN
Sewa Mesin Bor
Penyusutan Mata Bor
E01
hari
Ls
1.0000
0.2500
1,350,000.00
8,000,000.00
450,000.00
450,000.00
JUMLAH
HARGA
(Rp.)
1,350,000.00
2,000,000.00
3,350,000.00
4,374,775.00
1,093,693.75
NO.
A.
1
: Q.009
: Pemboran pilot hole 8 3/4" kedalaman 175 - 225 m
kecepatan pemboran 3 m'/hr
: m1
KOMPONEN
SATUAN
PERKIRAAN
KUANTITAS
HARGA
SATUAN
(Rp.)
TENAGA
Engineer dan Crew
L26
Ls
1.0000
450,000.00
1
2
BAHAN
Solar
Minyak Pelumas
Grease
M483
M484
M485
ltr
ltr
kg
75.0000
5.0000
1.0000
5,151.00
35,000.00
13,450.00
386,325.00
175,000.00
13,450.00
574,775.00
PERALATAN
Sewa Mesin Bor
Penyusutan Mata Bor
E01
hari
Ls
1.0000
0.2500
1,350,000.00
8,000,000.00
450,000.00
450,000.00
JUMLAH
HARGA
(Rp.)
1,350,000.00
2,000,000.00
3,350,000.00
4,374,775.00
1,458,258.33
: Q.010
: Pemboran pilot hole 8 3/4" kedalaman 225 - 275 m
kecepatan pemboran 2 m'/hr
: m1
SATUAN PEMBAYARAN
NO.
A.
1
KOMPONEN
SATUAN
PERKIRAAN
KUANTITAS
HARGA
SATUAN
(Rp.)
TENAGA
Engineer dan Crew
L26
Ls
1.0000
450,000.00
1
2
BAHAN
Solar
Minyak Pelumas
Grease
M483
M484
M485
ltr
ltr
kg
75.0000
5.0000
1.0000
5,151.00
35,000.00
13,450.00
386,325.00
175,000.00
13,450.00
574,775.00
PERALATAN
Sewa Mesin Bor
Penyusutan Mata Bor
E01
hari
Ls
1.0000
0.2500
1,350,000.00
8,000,000.00
450,000.00
450,000.00
JUMLAH
HARGA
(Rp.)
1,350,000.00
2,000,000.00
3,350,000.00
4,374,775.00
2,187,387.50
NO.
A.
1
: Q.011
: Geofisikal, Elektrikal, Logging
: m1
KOMPONEN
SATUAN
PERKIRAAN
KUANTITAS
HARGA
SATUAN
(Rp.)
TENAGA
Tenaga Ahli Geofisika
L28
Org/hr
4.0000
475,000.00
1
2
3
BAHAN
PERALATAN
Sewa Alat Geofisikal, Elektrikal,
Logging
Transportasi Alat dan Personil
Pengadaan barang habis pakai
E07
hari
1.0000
1,750,000.00
1,750,000.00
Ls
Ls
1.0000
1.0000
500,000.00
200,000.00
500,000.00
200,000.00
1,900,000.00
1,900,000.00
JUMLAH
HARGA
(Rp.)
2,450,000.00
4,350,000.00
15,818.18
NO.
A.
1
: Q.012
: Pumping test open hole
: Ls
KOMPONEN
SATUAN
PERKIRAAN
KUANTITAS
HARGA
SATUAN
(Rp.)
TENAGA
Engineer dan Crew
L26
Ls
1.0000
450,000.00
1
2
3
BAHAN
Solar
Minyak Pelumas
M483
M484
ltr
ltr
70.0000
2.0000
5,151.00
35,000.00
360,570.00
70,000.00
430,570.00
PERALATAN
Sewa Pompa Tes
Sewa Mesin Bor
Sewa Genset
E04
E01
E03
hari
hari
hari
1.0000
1.0000
1.0000
4,000,000.00
1,350,000.00
1,000,000.00
450,000.00
450,000.00
JUMLAH
HARGA
(Rp.)
4,000,000.00
1,350,000.00
1,000,000.00
6,350,000.00
7,230,570.00
NO.
A.
1
: Q.013
: Pembesaran lubang (Reaming) lubang bor 8 3/4" - 12"
kedalaman 0 - 25 m kecepatan pemboran 18 m'/hr
: m1
KOMPONEN
SATUAN
PERKIRAAN
KUANTITAS
HARGA
SATUAN
(Rp.)
TENAGA
Engineer dan Crew
L26
Ls
1.0000
450,000.00
1
2
BAHAN
Solar
Minyak Pelumas
Grease
M483
M484
M485
ltr
ltr
kg
75.0000
5.0000
1.0000
5,151.00
35,000.00
13,450.00
386,325.00
175,000.00
13,450.00
574,775.00
PERALATAN
Sewa Mesin Bor
Penyusutan Mata Bor
E01
hari
Ls
1.0000
0.2500
1,350,000.00
6,000,000.00
450,000.00
450,000.00
JUMLAH
HARGA
(Rp.)
1,350,000.00
1,500,000.00
2,850,000.00
3,874,775.00
215,265.28
NO.
A.
1
: Q.014
: Pembesaran lubang (Reaming) lubang bor 8 3/4" - 12"
kedalaman 25 - 50 m kecepatan pemboran 15 m'/hr
: m1
KOMPONEN
SATUAN
PERKIRAAN
KUANTITAS
HARGA
SATUAN
(Rp.)
TENAGA
Engineer dan Crew
L26
Ls
1.0000
450,000.00
1
2
BAHAN
Solar
Minyak Pelumas
Grease
M483
M484
M485
ltr
ltr
kg
75.0000
5.0000
1.0000
5,151.00
35,000.00
13,450.00
386,325.00
175,000.00
13,450.00
574,775.00
PERALATAN
Sewa Mesin Bor
Penyusutan Mata Bor
E01
hari
Ls
1.0000
0.2500
1,350,000.00
6,000,000.00
450,000.00
450,000.00
JUMLAH
HARGA
(Rp.)
1,350,000.00
1,500,000.00
2,850,000.00
3,874,775.00
258,318.33
NO.
A.
1
: Q.015
: Pembesaran lubang (Reaming) lubang bor 8 3/4" - 12"
kedalaman 50 - 75 m kecepatan pemboran 12 m'/hr
: m1
KOMPONEN
SATUAN
PERKIRAAN
KUANTITAS
HARGA
SATUAN
(Rp.)
TENAGA
Engineer dan Crew
L26
Ls
1.0000
450,000.00
1
2
BAHAN
Solar
Minyak Pelumas
Grease
M483
M484
M485
ltr
ltr
kg
75.0000
5.0000
1.0000
5,151.00
35,000.00
13,450.00
386,325.00
175,000.00
13,450.00
574,775.00
PERALATAN
Sewa Mesin Bor
Penyusutan Mata Bor
E01
hari
Ls
1.0000
0.2500
1,350,000.00
6,000,000.00
450,000.00
450,000.00
JUMLAH
HARGA
(Rp.)
1,350,000.00
1,500,000.00
2,850,000.00
3,874,775.00
322,897.92
NO.
A.
1
: Q.016
: Pembesaran lubang (Reaming) lubang bor 8 3/4" - 12"
kedalaman 75 - 100 m kecepatan pemboran 9 m'/hr
: m1
KOMPONEN
SATUAN
PERKIRAAN
KUANTITAS
HARGA
SATUAN
(Rp.)
TENAGA
Engineer dan Crew
L26
Ls
1.0000
450,000.00
1
2
BAHAN
Solar
Minyak Pelumas
Grease
M483
M484
M485
ltr
ltr
kg
75.0000
5.0000
1.0000
5,151.00
35,000.00
13,450.00
386,325.00
175,000.00
13,450.00
574,775.00
PERALATAN
Sewa Mesin Bor
Penyusutan Mata Bor
E01
hari
Ls
1.0000
0.2500
1,350,000.00
6,000,000.00
450,000.00
450,000.00
JUMLAH
HARGA
(Rp.)
1,350,000.00
1,500,000.00
2,850,000.00
3,874,775.00
430,530.56
NO.
A.
1
: Q.017
: Pembesaran lubang (Reaming) lubang bor 8 3/4" - 12"
kedalaman 100 - 125 m kecepatan pemboran 7 m'/hr
: m1
KOMPONEN
SATUAN
PERKIRAAN
KUANTITAS
HARGA
SATUAN
(Rp.)
TENAGA
Engineer dan Crew
L26
Ls
1.0000
450,000.00
1
2
BAHAN
Solar
Minyak Pelumas
Grease
M483
M484
M485
ltr
ltr
kg
75.0000
5.0000
1.0000
5,151.00
35,000.00
13,450.00
386,325.00
175,000.00
13,450.00
574,775.00
PERALATAN
Sewa Mesin Bor
Penyusutan Mata Bor
E01
hari
Ls
1.0000
0.2500
1,350,000.00
6,000,000.00
450,000.00
450,000.00
JUMLAH
HARGA
(Rp.)
1,350,000.00
1,500,000.00
2,850,000.00
3,874,775.00
553,539.29
NO.
A.
1
: Q.018
: Pembesaran lubang (Reaming) lubang bor 8 3/4" - 12"
kedalaman 125 - 175 m kecepatan pemboran 5 m'/hr
: m1
KOMPONEN
SATUAN
PERKIRAAN
KUANTITAS
HARGA
SATUAN
(Rp.)
TENAGA
Engineer dan Crew
L26
Ls
1.0000
450,000.00
1
2
BAHAN
Solar
Minyak Pelumas
Grease
M483
M484
M485
ltr
ltr
kg
75.0000
5.0000
1.0000
5,151.00
35,000.00
13,450.00
386,325.00
175,000.00
13,450.00
574,775.00
PERALATAN
Sewa Mesin Bor
Penyusutan Mata Bor
E01
hari
Ls
1.0000
0.2500
1,350,000.00
6,000,000.00
450,000.00
450,000.00
JUMLAH
HARGA
(Rp.)
1,350,000.00
1,500,000.00
2,850,000.00
3,874,775.00
774,955.00
NO.
A.
1
: Q.019
: Pembesaran lubang (Reaming) lubang bor 8 3/4" - 12"
kedalaman 175 - 225 m kecepatan pemboran 3 m'/hr
: m1
KOMPONEN
SATUAN
PERKIRAAN
KUANTITAS
HARGA
SATUAN
(Rp.)
TENAGA
Engineer dan Crew
L26
Ls
1.0000
450,000.00
1
2
BAHAN
Solar
Minyak Pelumas
Grease
M483
M484
M485
ltr
ltr
kg
75.0000
5.0000
1.0000
5,151.00
35,000.00
13,450.00
386,325.00
175,000.00
13,450.00
574,775.00
PERALATAN
Sewa Mesin Bor
Penyusutan Mata Bor
E01
hari
Ls
1.0000
0.2500
1,350,000.00
6,000,000.00
450,000.00
450,000.00
JUMLAH
HARGA
(Rp.)
1,350,000.00
1,500,000.00
2,850,000.00
3,874,775.00
1,291,591.67
NO.
A.
1
2
: Q.020
: Pengadaan dan pemasangan pipa jambang PVC-AW 150 mm
: m1
KOMPONEN
SATUAN
PERKIRAAN
KUANTITAS
HARGA
SATUAN
(Rp.)
TENAGA
Pekerja Biasa
Tukang Pipa
L17
L12
Org/hr
Org/hr
3.0000
1.0000
45,000.00
60,000.00
135,000.00
60,000.00
195,000.00
BAHAN
Pipa PVC tipe AW Dia 6 "
M342
Ljr
0.2500
472,780.00
JUMLAH
HARGA
(Rp.)
118,195.00
118,195.00
PERALATAN
313,195.00
NO.
A.
1
2
: Q.021
: Pengadaan dan pemasangan pipa buta PVC-AW 150 mm
: m1
KOMPONEN
SATUAN
PERKIRAAN
KUANTITAS
HARGA
SATUAN
(Rp.)
TENAGA
Pekerja Biasa
Tukang Pipa
L17
L12
Org/hr
Org/hr
3.0000
1.0000
45,000.00
60,000.00
BAHAN
Pipa PVC tipe AW Dia 6 "
M342
Ljr
0.2500
472,780.00
118,195.00
118,195.00
PERALATAN
135,000.00
60,000.00
195,000.00
JUMLAH
HARGA
(Rp.)
313,195.00
NO.
A.
1
2
: Q.022
: Pengadaan dan pemasangan pipa screen PVC-AW 150 mm
: m1
KOMPONEN
SATUAN
PERKIRAAN
KUANTITAS
HARGA
SATUAN
(Rp.)
TENAGA
Pekerja Biasa
Tukang Pipa
L17
L12
Org/hr
Org/hr
3.0000
1.0000
45,000.00
60,000.00
135,000.00
60,000.00
195,000.00
BAHAN
Pipa Screen PVC tipe AW Dia 6 " M400
ljr
0.2500
577,840.00
JUMLAH
HARGA
(Rp.)
144,460.00
144,460.00
PERALATAN
339,460.00
NO.
A.
1
2
: Q.023
: Pengadaan dan pemasangan pipa jambang PVC-AW 125 mm
: m1
KOMPONEN
SATUAN
PERKIRAAN
KUANTITAS
HARGA
SATUAN
(Rp.)
TENAGA
Pekerja Biasa
Tukang Pipa
L17
L12
Org/hr
Org/hr
2.8000
0.8000
45,000.00
60,000.00
BAHAN
Pipa PVC tipe AW 5 "
M400.a
Ljr
0.2500
372,840.00
93,210.00
93,210.00
PERALATAN
126,000.00
48,000.00
174,000.00
JUMLAH
HARGA
(Rp.)
267,210.00
NO.
A.
1
2
: Q.024
: Pengadaan dan pemasangan pipa buta PVC-AW 125 mm
: m1
KOMPONEN
SATUAN
PERKIRAAN
KUANTITAS
HARGA
SATUAN
(Rp.)
TENAGA
Pekerja Biasa
Tukang Pipa
L17
L12
Org/hr
Org/hr
2.8000
0.8000
45,000.00
60,000.00
126,000.00
48,000.00
174,000.00
BAHAN
Pipa PVC tipe AW 5 "
M400.a
Ljr
0.2500
372,840.00
JUMLAH
HARGA
(Rp.)
93,210.00
93,210.00
PERALATAN
267,210.00
NO.
A.
1
2
: Q.025
: Pengadaan dan pemasangan pipa screen PVC-AW 125 mm
: m1
KOMPONEN
SATUAN
PERKIRAAN
KUANTITAS
HARGA
SATUAN
(Rp.)
TENAGA
Pekerja Biasa
Tukang Pipa
L17
L12
Org/hr
Org/hr
2.8000
0.8000
45,000.00
60,000.00
BAHAN
Pipa Screen PVC tipe AW 5 "
M400.b
Ljr
0.2500
476,110.00
119,027.50
119,027.50
PERALATAN
126,000.00
48,000.00
174,000.00
JUMLAH
HARGA
(Rp.)
293,027.50
NO.
A.
1
2
: Q.026
: Pengadaan dan pemasangan pipa sounding PVC-AW 2.50"
: m1
KOMPONEN
SATUAN
PERKIRAAN
KUANTITAS
HARGA
SATUAN
(Rp.)
TENAGA
Pekerja Biasa
Tukang Pipa
L17
L12
Org/hr
Org/hr
0.2000
0.1000
45,000.00
60,000.00
9,000.00
6,000.00
15,000.00
BAHAN
Pipa PVC tipe AW Dia 2.5 "
M339
Ljr
0.2500
123,000.00
JUMLAH
HARGA
(Rp.)
30,750.00
30,750.00
PERALATAN
45,750.00
NO.
A.
1
2
: Q.027
: Pengadaan dan pemasangan pipa sounding SWL PVC-AW 1"
: m1
KOMPONEN
SATUAN
PERKIRAAN
KUANTITAS
HARGA
SATUAN
(Rp.)
TENAGA
Pekerja Biasa
Tukang Pipa
L17
L12
Org/hr
Org/hr
0.2000
0.1000
45,000.00
60,000.00
BAHAN
Pipa PVC tipe AW Dia 1"
M336
Ljr
0.2500
56,110.00
14,027.50
14,027.50
PERALATAN
9,000.00
6,000.00
15,000.00
JUMLAH
HARGA
(Rp.)
29,027.50
NO.
A.
1
2
: Q.028
: Pengisian gravel pack Dia 5 mm - 10 mm
: m3
KOMPONEN
SATUAN
PERKIRAAN
KUANTITAS
HARGA
SATUAN
(Rp.)
TENAGA
Pekerja Biasa
Tukang Pipa
L17
L12
Org/hr
Org/hr
2.2500
0.7500
45,000.00
60,000.00
101,250.00
45,000.00
146,250.00
BAHAN
Batu pecah mesin 1/1
M017
m3
1.1000
207,900.00
JUMLAH
HARGA
(Rp.)
228,690.00
228,690.00
PERALATAN
Sewa Mud Pump
E08
Jam
1.6000
60,000.00
96,000.00
374,940.00
NO.
A.
1
2
3
4
: Q.029
: Beton Mortar 1 pc : 1 ps
3
:m
KOMPONEN
SATUAN
PERKIRAAN
KUANTITAS
HARGA
SATUAN
(Rp.)
TENAGA
Pekerja Biasa
Tukang Batu
Kepala Tukang Batu
Mandor
L17
L07
L02
L01
Org/hr
Org/hr
Org/hr
Org/hr
2.1000
0.3500
0.0350
0.1050
45,000.00
60,000.00
70,000.00
80,000.00
BAHAN
Portland Cement (PC)
Pasir Cor
Air Bersih
M037
M004
M486
kg
m3
ltr
448.0000
0.4764
215.0000
900.00
110,000.00
25.00
403,200.00
52,407.14
5,375.00
460,982.14
PERALATAN
94,500.00
21,000.00
2,450.00
8,400.00
126,350.00
JUMLAH
HARGA
(Rp.)
587,332.14
: Q.030
: Pencucian sumur bor dengan kedalaman < 200 m
: Titik
NO.
A.
1
KOMPONEN
SATUAN
PERKIRAAN
KUANTITAS
HARGA
SATUAN
(Rp.)
TENAGA
Engineer dan Crew
L26
Ls
1.0000
450,000.00
BAHAN
Solar
Minyak Pelumas
Grease
M483
M484
M485
ltr
ltr
kg
150.0000
2.7857
0.5000
5,151.00
35,000.00
13,450.00
772,650.00
97,500.00
6,725.00
876,875.00
PERALATAN
Sewa Mesin Bor
E01
hari
1.0000
1,350,000.00
450,000.00
450,000.00
JUMLAH
HARGA
(Rp.)
1,350,000.00
1,350,000.00
2,676,875.00
NO.
A.
1
KOMPONEN
SATUAN
PERKIRAAN
KUANTITAS
HARGA
SATUAN
(Rp.)
TENAGA
Engineer dan Crew
L26
Ls
1.0000
450,000.00
1
2
BAHAN
Solar
Minyak Pelumas
Grease
M483
M484
M485
ltr
ltr
kg
150.0000
2.7857
0.5000
5,151.00
35,000.00
13,450.00
772,650.00
97,500.00
6,725.00
876,875.00
PERALATAN
Sewa Mesin Bor
Sewa Kompresor
E01
E02
hari
hari
1.0000
1.2500
450,000.00
450,000.00
JUMLAH
HARGA
(Rp.)
1,350,000.00
2,400,000.00
1,350,000.00
3,000,000.00
4,350,000.00
5,676,875.00
8,353,750.00
: Q.031
: Pencucian sumur bor dengan kedalaman > 200 m
: Titik
NO.
A.
1
KOMPONEN
SATUAN
PERKIRAAN
KUANTITAS
HARGA
SATUAN
(Rp.)
TENAGA
Engineer dan Crew
L26
Ls
1.0000
450,000.00
BAHAN
Solar
Minyak Pelumas
Grease
M483
M484
M485
ltr
ltr
kg
300.0000
5.5714
1.0000
5,151.00
35,000.00
13,450.00
1,545,300.00
195,000.00
13,450.00
1,753,750.00
PERALATAN
Sewa Mesin Bor
E01
hari
1.0000
1,350,000.00
450,000.00
450,000.00
JUMLAH
HARGA
(Rp.)
1,350,000.00
1,350,000.00
3,553,750.00
NO.
A.
1
KOMPONEN
SATUAN
PERKIRAAN
KUANTITAS
HARGA
SATUAN
(Rp.)
TENAGA
Engineer dan Crew
L26
Ls
1.0000
450,000.00
1
2
BAHAN
Solar
Minyak Pelumas
Grease
M483
M484
M485
ltr
ltr
kg
300.0000
5.5714
1.0000
5,151.00
35,000.00
13,450.00
1,545,300.00
195,000.00
13,450.00
1,753,750.00
PERALATAN
Sewa Mesin Bor
Sewa Kompresor
E01
E02
hari
hari
1.0000
2.5000
450,000.00
450,000.00
JUMLAH
HARGA
(Rp.)
1,350,000.00
2,400,000.00
1,350,000.00
6,000,000.00
7,350,000.00
9,553,750.00
13,107,500.00
NO.
A.
1
: Q.032
: Pumping test dan test nonstop 24 jam
: Jam
KOMPONEN
SATUAN
PERKIRAAN
KUANTITAS
HARGA
SATUAN
(Rp.)
TENAGA
Engineer dan Crew
L26
Ls
0.0417
450,000.00
1
2
3
BAHAN
Solar
Minyak Pelumas
M483
M484
ltr
ltr
4.7500
0.0474
5,151.00
35,000.00
24,467.25
1,658.33
26,125.58
PERALATAN
Sewa Pompa Tes
Sewa Mesin Bor
Sewa Genset
E04
E01
E03
hari
hari
hari
0.0417
0.0417
0.0417
4,000,000.00
1,350,000.00
1,000,000.00
18,750.00
18,750.00
JUMLAH
HARGA
(Rp.)
166,666.67
56,250.00
41,666.67
264,583.33
309,458.91
NO.
A.
1
2
3
4
: Q.033
: Pasang pipa PVC RRJ 6 m S-10 2"
: m1
KOMPONEN
SATUAN
PERKIRAAN
KUANTITAS
HARGA
SATUAN
(Rp.)
TENAGA
Pekerja Biasa
Tukang Batu
Kepala Tukang Batu
Mandor
L17
L07
L02
L01
Org/hr
Org/hr
Org/hr
Org/hr
0.0540
0.0900
0.0090
0.0027
45,000.00
60,000.00
70,000.00
80,000.00
2,430.00
5,400.00
630.00
216.00
8,676.00
BAHAN
Pipa PVC RRJ 6 m S - 10 2"
Perlengkapan
M400.c
Ljr
0.2000
0.3500
JUMLAH
HARGA
(Rp.)
145,320.00
50,862.00
29,064.00
17,801.70
46,865.70
PERALATAN
55,541.70
NO.
A.
1
2
3
4
: Q.034
: Pasang pipa PVC RRJ 6 m S-10 2.5"
1
:m
KOMPONEN
SATUAN
PERKIRAAN
KUANTITAS
HARGA
SATUAN
(Rp.)
TENAGA
Pekerja Biasa
Tukang Batu
Kepala Tukang Batu
Mandor
L17
L07
L02
L01
Org/hr
Org/hr
Org/hr
Org/hr
0.0540
0.0900
0.0090
0.0027
45,000.00
60,000.00
70,000.00
80,000.00
2,430.00
5,400.00
630.00
216.00
8,676.00
BAHAN
Pipa PVC RRJ 6 m S - 10 2,5" M400.d
Perlengkapan
Ljr
0.2000
0.3500
187,840.00
65,744.00
JUMLAH
HARGA
(Rp.)
37,568.00
23,010.40
60,578.40
PERALATAN
69,254.40
NO.
A.
1
2
3
4
: Q.035
: Pasang pipa PVC RRJ 6 m S-10 3"
: m1
KOMPONEN
SATUAN
PERKIRAAN
KUANTITAS
HARGA
SATUAN
(Rp.)
TENAGA
Pekerja Biasa
Tukang Batu
Kepala Tukang Batu
Mandor
L17
L07
L02
L01
Org/hr
Org/hr
Org/hr
Org/hr
0.0810
0.1350
0.0135
0.0041
45,000.00
60,000.00
70,000.00
80,000.00
3,645.00
8,100.00
945.00
328.00
13,018.00
BAHAN
Pipa PVC RRJ 6 m S - 10 3"
Perlengkapan
M400.e
Ljr
0.2000
0.3500
JUMLAH
HARGA
(Rp.)
262,420.00
91,847.00
52,484.00
32,146.45
84,630.45
PERALATAN
97,648.45
NO.
A.
1
2
3
4
: Q.036
: Pasang pipa PVC RRJ 6 m S-10 4"
1
:m
KOMPONEN
SATUAN
PERKIRAAN
KUANTITAS
HARGA
SATUAN
(Rp.)
TENAGA
Pekerja Biasa
Tukang Batu
Kepala Tukang Batu
Mandor
L17
L07
L02
L01
Org/hr
Org/hr
Org/hr
Org/hr
0.0810
0.1350
0.0135
0.0041
45,000.00
60,000.00
70,000.00
80,000.00
3,645.00
8,100.00
945.00
328.00
13,018.00
BAHAN
Pipa PVC RRJ 6 m S - 10 4"
Perlengkapan
M400.f
Ljr
0.2000
0.3500
391,530.00
137,035.50
JUMLAH
HARGA
(Rp.)
78,306.00
47,962.43
126,268.43
PERALATAN
139,286.43
NO.
A.
1
2
3
4
: Q.037
: Pasang pipa PVC RRJ 6 m S-10 6"
: m1
KOMPONEN
SATUAN
PERKIRAAN
KUANTITAS
HARGA
SATUAN
(Rp.)
TENAGA
Pekerja Biasa
Tukang Batu
Kepala Tukang Batu
Mandor
L17
L07
L02
L01
Org/hr
Org/hr
Org/hr
Org/hr
0.1215
0.2025
0.0203
0.0062
45,000.00
60,000.00
70,000.00
80,000.00
5,467.50
12,150.00
1,421.00
492.00
19,530.50
BAHAN
Pipa PVC RRJ 6 m S - 10 6"
Perlengkapan
M400.g
Ljr
0.2000
0.3500
JUMLAH
HARGA
(Rp.)
813,050.00
284,567.50
162,610.00
99,598.63
262,208.63
PERALATAN
281,739.13
NO.
A.
1
2
3
4
: Q.038
: Pasang pipa PVC RRJ 6 m S-10 8"
1
:m
KOMPONEN
SATUAN
PERKIRAAN
KUANTITAS
HARGA
SATUAN
(Rp.)
TENAGA
Pekerja Biasa
Tukang Batu
Kepala Tukang Batu
Mandor
L17
L07
L02
L01
Org/hr
Org/hr
Org/hr
Org/hr
0.1823
0.3038
0.0304
0.0092
45,000.00
60,000.00
70,000.00
80,000.00
8,201.25
18,225.00
2,128.00
738.00
29,292.25
BAHAN
Pipa PVC RRJ 6 m S - 10 8"
Perlengkapan
M400.h
Ljr
0.2000
0.3500
1,322,730.00
462,955.50
JUMLAH
HARGA
(Rp.)
264,546.00
162,034.43
426,580.43
PERALATAN
455,872.68
NO.
A.
1
2
3
4
: Q.039
: Pasang pipa RRJ S-10 2" lintas jalan
1
:m
KOMPONEN
SATUAN
PERKIRAAN
KUANTITAS
HARGA
SATUAN
(Rp.)
TENAGA
Pekerja Biasa
Tukang Batu
Kepala Tukang Batu
Mandor
L17
L07
L02
L01
Org/hr
Org/hr
Org/hr
Org/hr
0.7895
0.0900
0.0090
0.0763
45,000.00
60,000.00
70,000.00
80,000.00
BAHAN
Pipa PVC RRJ 6 m S - 10 2"
Perlengkapan
Pasir Cor
Batu pecah mesin 1/2
Aspal
M400.c
Ljr
M004
M018
m3
m3
kg
0.2000
0.3500
0.0033
0.0477
1.9855
145,320.00
50,862.00
110,000.00
182,160.00
8,709.68
29,064.00
17,801.70
363.00
8,681.02
17,292.67
73,202.39
PERALATAN
Stamper
E37
Unit/hr
0.0357
35,527.50
5,400.00
630.00
6,100.00
47,657.50
JUMLAH
HARGA
(Rp.)
160,000.00
5,712.00
5,712.00
126,571.89
NO.
A.
1
2
3
4
B
1
2
3
4
5
C
1
: Q.040
: Pasang pipa RRJ S-10 3" lintas jalan
1
:m
KOMPONEN
SATUAN
PERKIRAAN
KUANTITAS
HARGA
SATUAN
(Rp.)
TENAGA
Pekerja Biasa
Tukang Batu
Kepala Tukang Batu
Mandor
L17
Org/hr
L07
Org/hr
L02
Org/hr
L01
Org/hr
JUMLAH HARGA TENAGA
0.7895
0.0900
0.0090
0.0763
45,000.00
60,000.00
70,000.00
80,000.00
35,527.50
5,400.00
630.00
6,100.00
47,657.50
0.2000
0.3500
0.0033
0.0477
1.9855
262,420.00
91,847.00
110,000.00
182,160.00
8,709.68
52,484.00
32,146.45
363.00
8,681.02
17,292.67
110,967.14
0.0357
160,000.00
5,712.00
BAHAN
Pipa PVC RRJ 6 m S - 10 3" M400.e
Ljr
Perlengkapan
Pasir Cor
M004
m3
Batu pecah mesin 1/2
M018
m3
Aspal
kg
JUMLAH HARGA BAHAN
PERALATAN
Stamper
E37
Unit/hr
JUMLAH
HARGA
(Rp.)
5,712.00
164,336.64
NO.
A.
1
2
3
4
B
1
2
3
4
5
C
1
: Q.041
: Pasang pipa RRJ S-10 4" lintas jalan
: m1
KOMPONEN
SATUAN
PERKIRAAN
KUANTITAS
JUMLAH
HARGA
(Rp.)
TENAGA
Pekerja Biasa
Tukang Batu
Kepala Tukang Batu
Mandor
L17
Org/hr
L07
Org/hr
L02
Org/hr
L01
Org/hr
JUMLAH HARGA TENAGA
0.7895
0.0900
0.0090
0.0763
45,000.00
60,000.00
70,000.00
80,000.00
35,527.50
5,400.00
630.00
6,100.00
47,657.50
0.2000
0.3500
0.0033
0.0477
1.9855
391,530.00
137,035.50
110,000.00
182,160.00
8,709.68
78,306.00
47,962.43
363.00
8,681.02
17,292.67
152,605.11
0.0357
160,000.00
5,712.00
BAHAN
Pipa PVC RRJ 6 m S - 10 4" M400.f
Ljr
Perlengkapan
Pasir Cor
M004
m3
Batu pecah mesin 1/2
M018
m3
Aspal
kg
JUMLAH HARGA BAHAN
PERALATAN
Stamper
E37
Unit/hr
HARGA
SATUAN
(Rp.)
5,712.00
205,974.61
NO.
A.
1
2
3
4
: Q.042
: Pasang pipa PVC moof 6 m S-12,5 2"
1
:m
KOMPONEN
SATUAN
PERKIRAAN
KUANTITAS
HARGA
SATUAN
(Rp.)
TENAGA
Pekerja Biasa
Tukang Pipa
Kepala Tukang Batu
Mandor
L17
L12
L02
L01
Org/hr
Org/hr
Org/hr
Org/hr
0.0540
0.0900
0.0090
0.0027
45,000.00
60,000.00
70,000.00
80,000.00
2,430.00
5,400.00
630.00
216.00
8,676.00
BAHAN
Pipa PVC moof 6 m S - 12,5 2" M400.i
Perlengkapan
Ljr
0.2000
0.3500
108,500.00
37,975.00
JUMLAH
HARGA
(Rp.)
21,700.00
13,291.25
34,991.25
PERALATAN
43,667.25
NO.
A.
1
2
3
4
: Q.043
: Pasang pipa PVC moof 6 m S-12,5 2.5"
: m1
KOMPONEN
SATUAN
PERKIRAAN
KUANTITAS
HARGA
SATUAN
(Rp.)
TENAGA
Pekerja Biasa
Tukang Pipa
Kepala Tukang Batu
Mandor
L17
L12
L02
L01
Org/hr
Org/hr
Org/hr
Org/hr
0.0540
0.0900
0.0090
0.0027
45,000.00
60,000.00
70,000.00
80,000.00
2,430.00
5,400.00
630.00
216.00
8,676.00
BAHAN
Pipa PVC moof 6 m S - 12,5 2,5"
M400.j
Perlengkapan
Ljr
0.2000
0.3500
JUMLAH
HARGA
(Rp.)
151,200.00
52,920.00
30,240.00
18,522.00
48,762.00
PERALATAN
57,438.00
NO.
A.
1
2
3
4
: Q.044
: Pasang pipa PVC moof 6 m S-12,5 3"
1
:m
KOMPONEN
SATUAN
PERKIRAAN
KUANTITAS
HARGA
SATUAN
(Rp.)
TENAGA
Pekerja Biasa
Tukang Pipa
Kepala Tukang Batu
Mandor
L17
L12
L02
L01
Org/hr
Org/hr
Org/hr
Org/hr
0.0810
0.1350
0.0135
0.0041
45,000.00
60,000.00
70,000.00
80,000.00
3,645.00
8,100.00
945.00
328.00
13,018.00
BAHAN
Pipa PVC moof 6 m S - 12,5 3" M400.k
Perlengkapan
Ljr
0.2000
0.3500
225,300.00
78,855.00
JUMLAH
HARGA
(Rp.)
45,060.00
27,599.25
72,659.25
PERALATAN
85,677.25
NO.
A.
1
2
3
4
: Q.045
: Pasang pipa PVC moof 6 m S-12,5 4"
: m1
KOMPONEN
SATUAN
PERKIRAAN
KUANTITAS
HARGA
SATUAN
(Rp.)
TENAGA
Pekerja Biasa
Tukang Pipa
Kepala Tukang Batu
Mandor
L17
L12
L02
L01
Org/hr
Org/hr
Org/hr
Org/hr
0.0810
0.1350
0.0135
0.0041
45,000.00
60,000.00
70,000.00
80,000.00
3,645.00
8,100.00
945.00
328.00
13,018.00
BAHAN
Pipa PVC moof 6 m S - 12,5 4" M400.l
Perlengkapan
Ljr
0.2000
0.3500
JUMLAH
HARGA
(Rp.)
330,700.00
115,745.00
66,140.00
40,510.75
106,650.75
PERALATAN
119,668.75
NO.
A.
1
2
3
4
: Q.046
: Pasang pipa PVC moof 6 m S-12,5 6"
1
:m
KOMPONEN
SATUAN
PERKIRAAN
KUANTITAS
HARGA
SATUAN
(Rp.)
TENAGA
Pekerja Biasa
Tukang Pipa
Kepala Tukang Batu
Mandor
L17
L12
L02
L01
Org/hr
Org/hr
Org/hr
Org/hr
0.1215
0.2025
0.0203
0.0062
45,000.00
60,000.00
70,000.00
80,000.00
5,467.50
12,150.00
1,421.00
492.00
19,530.50
BAHAN
Pipa PVC moof 6 m S - 12,5 6" M400.m
Perlengkapan
Ljr
0.2000
0.3500
714,500.00
250,075.00
JUMLAH
HARGA
(Rp.)
142,900.00
87,526.25
230,426.25
PERALATAN
249,956.75
NO.
A.
1
2
3
4
: Q.047
: Pasang pipa PVC moof 6 m S-12,5 8"
: m1
KOMPONEN
SATUAN
PERKIRAAN
KUANTITAS
HARGA
SATUAN
(Rp.)
TENAGA
Pekerja Biasa
Tukang Pipa
Kepala Tukang Batu
Mandor
L17
L12
L02
L01
Org/hr
Org/hr
Org/hr
Org/hr
0.1823
0.3038
0.0304
0.0092
45,000.00
60,000.00
70,000.00
80,000.00
8,201.25
18,225.00
2,128.00
738.00
29,292.25
BAHAN
Pipa PVC moof 6 m S - 12,5 8" M400.n
Perlengkapan
Ljr
0.2000
0.3500
JUMLAH
HARGA
(Rp.)
1,157,100.00
404,985.00
231,420.00
141,744.75
373,164.75
PERALATAN
402,457.00
NO.
A.
1
2
3
4
B
1
2
3
4
5
C
1
: Q.048
: Pasang pipa PVC moof S-12,5 2" lintas jalan
1
:m
KOMPONEN
SATUAN
PERKIRAAN
KUANTITAS
HARGA
SATUAN
(Rp.)
TENAGA
Pekerja Biasa
Tukang Pipa
Kepala Tukang Batu
Mandor
L17
Org/hr
L12
Org/hr
L02
Org/hr
L01
Org/hr
JUMLAH HARGA TENAGA
0.7895
0.0900
0.0090
0.0763
45,000.00
60,000.00
70,000.00
80,000.00
35,527.50
5,400.00
630.00
6,100.00
47,657.50
0.2000
0.3500
0.0033
0.0477
1.9855
108,500.00
37,975.00
110,000.00
182,160.00
8,709.68
21,700.00
13,291.25
363.00
8,681.02
17,292.67
61,327.94
0.0357
160,000.00
5,712.00
BAHAN
Pipa PVC moof 6 m S - 12,5 2" M400.i
Ljr
Perlengkapan
Pasir Cor
M004
m3
Batu pecah mesin 1/2
M018
m3
Aspal
kg
JUMLAH HARGA BAHAN
PERALATAN
Stamper
E37
Unit/hr
JUMLAH
HARGA
(Rp.)
5,712.00
114,697.44
NO.
A.
1
2
3
4
B
1
2
3
4
5
C
1
: Q.049
: Pasang pipa PVC moof S-12,5 3" lintas jalan
: m1
KOMPONEN
SATUAN
PERKIRAAN
KUANTITAS
JUMLAH
HARGA
(Rp.)
TENAGA
Pekerja Biasa
Tukang Pipa
Kepala Tukang Batu
Mandor
L17
Org/hr
L12
Org/hr
L02
Org/hr
L01
Org/hr
JUMLAH HARGA TENAGA
0.7895
0.0900
0.0090
0.0763
45,000.00
60,000.00
70,000.00
80,000.00
35,527.50
5,400.00
630.00
6,100.00
47,657.50
0.2000
0.3500
0.0033
0.0477
1.9855
225,300.00
78,855.00
110,000.00
182,160.00
8,709.68
45,060.00
27,599.25
363.00
8,681.02
17,292.67
98,995.94
0.0357
160,000.00
5,712.00
BAHAN
Pipa PVC moof 6 m S - 12,5 3" M400.k
Ljr
Perlengkapan
Pasir Cor
M004
m3
Batu pecah mesin 1/2
M018
m3
Aspal
kg
JUMLAH HARGA BAHAN
PERALATAN
Stamper
E37
Unit/hr
HARGA
SATUAN
(Rp.)
5,712.00
152,365.44
NO.
A.
1
2
3
4
: Q.050
: Pasang pipa PVC moof S-12,5 4" lintas jalan
1
:m
KOMPONEN
SATUAN
PERKIRAAN
KUANTITAS
HARGA
SATUAN
(Rp.)
TENAGA
Pekerja Biasa
Tukang Pipa
Kepala Tukang Batu
Mandor
L17
L12
L02
L01
Org/hr
Org/hr
Org/hr
Org/hr
0.7895
0.0900
0.0090
0.0763
45,000.00
60,000.00
70,000.00
80,000.00
BAHAN
Pipa PVC moof 6 m S - 12,5 4" M400.l
Perlengkapan
Pasir Cor
M004
Batu pecah mesin 1/2
M018
Aspal
Ljr
0.2000
0.3500
0.0033
0.0477
1.9855
m3
m3
kg
330,700.00
115,745.00
110,000.00
182,160.00
8,709.68
66,140.00
40,510.75
363.00
8,681.02
17,292.67
132,987.44
PERALATAN
Stamper
E37
Unit/hr
0.0357
160,000.00
35,527.50
5,400.00
630.00
6,100.00
47,657.50
JUMLAH
HARGA
(Rp.)
5,712.00
5,712.00
186,356.94
NO.
A.
1
2
3
4
: Q.051
: Pasang pompa air
: Unit
KOMPONEN
SATUAN
PERKIRAAN
KUANTITAS
HARGA
SATUAN
(Rp.)
TENAGA
Pekerja Biasa
Tukang Batu
Kepala Tukang Batu
Mandor
L17
L07
L02
L01
Org/hr
Org/hr
Org/hr
Org/hr
0.0100
0.1000
0.0100
0.0050
45,000.00
60,000.00
70,000.00
80,000.00
450.00
6,000.00
700.00
400.00
7,550.00
BAHAN
Pompa Air
Perlengkapan
M436
Unit
1.0000
0.1500
JUMLAH
HARGA
(Rp.)
661,120.00
661,120.00
661,120.00
99,168.00
760,288.00
PERALATAN
767,838.00
NO.
A.
1
2
3
4
: Q.052
3
: Pasang tandon air PVC V = 0.50 m
: Unit
KOMPONEN
SATUAN
PERKIRAAN
KUANTITAS
HARGA
SATUAN
(Rp.)
TENAGA
Pekerja Biasa
Tukang Pipa
Kepala Tukang Batu
Mandor
L17
L12
L02
L01
Org/hr
Org/hr
Org/hr
Org/hr
0.2000
0.2000
0.0100
0.0100
45,000.00
60,000.00
70,000.00
80,000.00
9,000.00
12,000.00
700.00
800.00
22,500.00
BAHAN
Tandon Air PVC V = 0.5 m3
Perlengkapan
M431
bh
1.0000
0.1500
500,000.00
500,000.00
JUMLAH
HARGA
(Rp.)
500,000.00
75,000.00
575,000.00
PERALATAN
597,500.00
NO.
A.
1
2
3
4
: Q.053
3
: Pasang tandon air PVC V = 1.0 m
: Unit
KOMPONEN
SATUAN
PERKIRAAN
KUANTITAS
HARGA
SATUAN
(Rp.)
TENAGA
Pekerja Biasa
Tukang Pipa
Kepala Tukang Batu
Mandor
L17
L12
L02
L01
Org/hr
Org/hr
Org/hr
Org/hr
0.3000
0.3000
0.0150
0.0150
45,000.00
60,000.00
70,000.00
80,000.00
13,500.00
18,000.00
1,050.00
1,200.00
33,750.00
BAHAN
Tandon Air PVC V = 1.0 m3
Perlengkapan
M432
bh
1.0000
0.1500
JUMLAH
HARGA
(Rp.)
1,000,000.00
1,000,000.00
1,000,000.00
150,000.00
1,150,000.00
PERALATAN
1,183,750.00
NO.
A.
1
2
3
4
: Q.054
3
: Pasang tandon air stainless V = 0.5 m
: Unit
KOMPONEN
SATUAN
PERKIRAAN
KUANTITAS
HARGA
SATUAN
(Rp.)
TENAGA
Pekerja Biasa
Tukang Pipa
Kepala Tukang Batu
Mandor
L17
L12
L02
L01
Org/hr
Org/hr
Org/hr
Org/hr
0.2500
0.2500
0.0125
0.0125
45,000.00
60,000.00
70,000.00
80,000.00
11,250.00
15,000.00
875.00
1,000.00
28,125.00
BAHAN
Tandon Air Stainless V = 0.5 m3 M433
Perlengkapan
bh
1.0000
0.1500
1,500,000.00
1,500,000.00
JUMLAH
HARGA
(Rp.)
1,500,000.00
225,000.00
1,725,000.00
PERALATAN
1,753,125.00
NO.
A.
1
2
3
4
: Q.055
3
: Pasang tandon air stainless V = 1.0 m
: Unit
KOMPONEN
SATUAN
PERKIRAAN
KUANTITAS
HARGA
SATUAN
(Rp.)
TENAGA
Pekerja Biasa
Tukang Pipa
Kepala Tukang Batu
Mandor
L17
L12
L02
L01
Org/hr
Org/hr
Org/hr
Org/hr
0.4000
0.4000
0.0200
0.0200
45,000.00
60,000.00
70,000.00
80,000.00
18,000.00
24,000.00
1,400.00
1,600.00
45,000.00
BAHAN
Tandon Air Stainless V = 1.0 m3 M434
Perlengkapan
bh
1.0000
0.1500
JUMLAH
HARGA
(Rp.)
2,500,000.00
2,500,000.00
2,500,000.00
375,000.00
2,875,000.00
PERALATAN
2,920,000.00
NO.
A.
1
2
: R.001
: Pengukuran bendung untuk MC
: bh
KOMPONEN
SATUAN
PERKIRAAN
KUANTITAS
HARGA
SATUAN
(Rp.)
TENAGA
Juru Ukur
Pekerja Biasa
L25
L17
Org/hr
Org/hr
1.5000
4.5000
135,000.00
45,000.00
1
2
3
BAHAN
Cat meni kayu
Paku Kayu Segala Ukuran
Usuk : 5/7
M409
M140
M061
kg
kg
m3
0.1200
0.0500
0.0120
20,840.00
17,500.00
4,500,000.00
2,500.80
875.00
54,000.00
57,375.80
PERALATAN
Pesawat ukur
Meteran
Palu
E15
E16
E17
Unit/hr
bh
bh
1.0000
0.0450
0.0900
100,000.00
100,000.00
25,000.00
202,500.00
202,500.00
405,000.00
JUMLAH
HARGA
(Rp.)
100,000.00
4,500.00
2,250.00
106,750.00
569,125.80
NO.
A.
1
2
: R.002
: Pengukuran saluran untuk MC
: km1
KOMPONEN
SATUAN
PERKIRAAN
KUANTITAS
HARGA
SATUAN
(Rp.)
TENAGA
Juru Ukur
Pekerja Biasa
L25
L17
Org/hr
Org/hr
2.0000
6.0000
135,000.00
45,000.00
1
2
3
BAHAN
Cat meni kayu
Paku Kayu Segala Ukuran
Usuk : 5/7
M409
M140
M061
kg
kg
m3
0.1200
0.0500
0.0120
20,840.00
17,500.00
4,500,000.00
2,500.80
875.00
54,000.00
57,375.80
PERALATAN
Pesawat ukur
Meteran
Palu
E15
E16
E17
Unit/hr
bh
bh
2.0000
0.0450
0.0900
270,000.00
270,000.00
540,000.00
JUMLAH
HARGA
(Rp.)
100,000.00
100,000.00
25,000.00
200,000.00
4,500.00
2,250.00
206,750.00
804,125.80
NO.
A.
1
2
: R.003
: Pengukuran bangunan untuk MC
: bh
KOMPONEN
SATUAN
PERKIRAAN
KUANTITAS
HARGA
SATUAN
(Rp.)
TENAGA
Juru Ukur
Pekerja Biasa
L25
L17
Org/hr
Org/hr
0.2500
0.7500
135,000.00
45,000.00
1
2
3
BAHAN
Cat meni kayu
Paku Kayu Segala Ukuran
Usuk : 5/7
M409
M140
M061
kg
kg
m3
0.0200
0.0100
0.0020
20,840.00
17,500.00
4,500,000.00
416.80
175.00
9,000.00
9,591.80
PERALATAN
Pesawat ukur
Meteran
Palu
E15
E16
E17
Unit/hr
bh
bh
0.2500
0.0200
0.0300
100,000.00
100,000.00
25,000.00
33,750.00
33,750.00
67,500.00
JUMLAH
HARGA
(Rp.)
25,000.00
2,000.00
750.00
27,750.00
104,841.80
NO.
A.
1
2
: R.004
: Pendongkelan rumpun bambu
: m2
KOMPONEN
SATUAN
PERKIRAAN
KUANTITAS
HARGA
SATUAN
(Rp.)
TENAGA
Pekerja Biasa
Mandor
L17
L01
Org/hr
Org/hr
1.3270
0.0450
45,000.00
80,000.00
1
2
BAHAN
PERALATAN
Keranjang
Ganco
E18
E19
bh
bh
0.2250
0.0500
59,715.00
3,600.00
63,315.00
JUMLAH
HARGA
(Rp.)
10,000.00
75,000.00
2,250.00
3,750.00
6,000.00
69,315.00
NO.
A.
1
2
3
4
: R.005
: Pembuatan dan pembongkaran kisdam > 1 m
: m3
KOMPONEN
SATUAN
PERKIRAAN
KUANTITAS
HARGA
SATUAN
(Rp.)
TENAGA
Pekerja Biasa
Tukang Batu
Kepala Tukang Batu
Mandor
L17
L07
L02
L01
Org/hr
Org/hr
Org/hr
Org/hr
1.0370
0.0460
0.0050
0.0380
45,000.00
60,000.00
70,000.00
80,000.00
1
2
3
BAHAN
Gedeg (2.00 x 3.00) m
Bambu Dia 10 cm
Kawat Galvanis 3 mm
M092
M088
M134
lbr
btg
kg
0.4000
1.6000
0.3700
34,500.00
20,700.00
62,420.00
13,800.00
33,120.00
23,095.40
70,015.40
PERALATAN
Keranjang
Alat pelancip/pisau besar
Palu besar/bodem
E18
E20
E21
bh
bh
bh
0.0800
0.0300
0.0400
10,000.00
25,000.00
100,000.00
46,665.00
2,760.00
350.00
3,040.00
52,815.00
JUMLAH
HARGA
(Rp.)
800.00
750.00
4,000.00
5,550.00
128,380.40
NO.
A.
1
2
: R.006
: Galian tanah biasa diangkut > 1 m dibuang
: m3
KOMPONEN
SATUAN
PERKIRAAN
KUANTITAS
HARGA
SATUAN
(Rp.)
TENAGA
Pekerja Biasa
Mandor
L17
L01
Org/hr
Org/hr
0.9500
0.0350
45,000.00
80,000.00
BAHAN
PERALATAN
Keranjang
E18
bh
0.0500
42,750.00
2,800.00
45,550.00
JUMLAH
HARGA
(Rp.)
10,000.00
500.00
500.00
46,050.00
NO.
A.
1
2
: R.007
: Galian tanah biasa diangkut > 50 m dibuang
: m3
KOMPONEN
SATUAN
PERKIRAAN
KUANTITAS
HARGA
SATUAN
(Rp.)
TENAGA
Pekerja Biasa
Mandor
L17
L01
Org/hr
Org/hr
1.0440
0.0340
45,000.00
80,000.00
JUMLAH
HARGA
(Rp.)
46,980.00
2,720.00
49,700.00
BAHAN
PERALATAN
Keranjang
Kereta Dorong
E18
E23
bh
Unit
0.0500
0.0560
10,000.00
100,000.00
500.00
5,600.00
6,100.00
55,800.00
NO.
A.
1
2
: R.008
: Galian tanah berbatu diangkut > 1 m dibuang
: m3
KOMPONEN
SATUAN
PERKIRAAN
KUANTITAS
HARGA
SATUAN
(Rp.)
TENAGA
Pekerja Biasa
Mandor
L17
L01
Org/hr
Org/hr
1.5840
0.0460
45,000.00
80,000.00
1
2
BAHAN
PERALATAN
Keranjang
Kereta Dorong
E18
E23
bh
Unit
0.0500
0.1000
71,280.00
3,680.00
74,960.00
JUMLAH
HARGA
(Rp.)
10,000.00
100,000.00
500.00
10,000.00
10,500.00
85,460.00
NO.
A.
1
2
: R.009
: Galian tanah berbatu diangkut > 50 m dibuang
: m3
KOMPONEN
SATUAN
PERKIRAAN
KUANTITAS
HARGA
SATUAN
(Rp.)
TENAGA
Pekerja Biasa
Mandor
L17
L01
Org/hr
Org/hr
1.5650
0.0580
45,000.00
80,000.00
JUMLAH
HARGA
(Rp.)
70,425.00
4,640.00
75,065.00
BAHAN
PERALATAN
Keranjang
Kereta Dorong
E18
E23
bh
Unit
0.0500
0.1000
10,000.00
100,000.00
500.00
10,000.00
10,500.00
85,565.00
NO.
A.
1
2
: R.010
: Galian tanah keras/cadas diangkut > 1 m dibuang
: m3
KOMPONEN
SATUAN
PERKIRAAN
KUANTITAS
HARGA
SATUAN
(Rp.)
TENAGA
Pekerja Biasa
Mandor
L17
L01
Org/hr
Org/hr
1.3200
0.0590
45,000.00
80,000.00
1
2
3
BAHAN
PERALATAN
Keranjang
Kereta Dorong
Jack Hammer
E18
E23
E24
bh
Unit
bh
0.0500
0.1110
0.0240
59,400.00
4,720.00
64,120.00
JUMLAH
HARGA
(Rp.)
10,000.00
100,000.00
100,000.00
500.00
11,100.00
2,400.00
14,000.00
78,120.00
NO.
A.
1
2
: R.011
: Galian tanah keras/cadas diangkut > 50 m dibuang
: m3
KOMPONEN
SATUAN
PERKIRAAN
KUANTITAS
HARGA
SATUAN
(Rp.)
TENAGA
Pekerja Biasa
Mandor
L17
L01
Org/hr
Org/hr
1.4640
0.0610
45,000.00
80,000.00
JUMLAH
HARGA
(Rp.)
65,880.00
4,880.00
70,760.00
BAHAN
PERALATAN
Keranjang
Kereta Dorong
Jack Hammer
E18
E23
E24
bh
Unit
bh
0.0500
0.1110
0.0240
10,000.00
100,000.00
100,000.00
500.00
11,100.00
2,400.00
14,000.00
84,760.00
NO.
A.
1
2
: R.012
: Galian tanah biasa langsung untuk timbunan / dibuang
: m3
KOMPONEN
SATUAN
PERKIRAAN
KUANTITAS
HARGA
SATUAN
(Rp.)
TENAGA
Pekerja Biasa
Mandor
L17
L01
Org/hr
Org/hr
0.7200
0.0240
45,000.00
80,000.00
BAHAN
PERALATAN
Keranjang
E18
bh
0.0500
32,400.00
1,920.00
34,320.00
JUMLAH
HARGA
(Rp.)
10,000.00
500.00
500.00
34,820.00
NO.
A.
1
2
: R.013
: Pemadatan tanah timbunan & dirapikan
: m3
KOMPONEN
SATUAN
PERKIRAAN
KUANTITAS
HARGA
SATUAN
(Rp.)
TENAGA
Pekerja Biasa
Mandor
L17
L01
Org/hr
Org/hr
0.2110
0.0090
45,000.00
80,000.00
JUMLAH
HARGA
(Rp.)
9,495.00
720.00
10,215.00
BAHAN
PERALATAN
Timbris
E22
Unit
0.1670
30,000.00
5,010.00
5,010.00
15,225.00
NO.
A.
1
2
: R.014
: Timbunan tanah kembali dipadatkan dan dirapikan (manual)
: m3
KOMPONEN
SATUAN
PERKIRAAN
KUANTITAS
HARGA
SATUAN
(Rp.)
TENAGA
Pekerja Biasa
Mandor
L17
L01
Org/hr
Org/hr
0.6380
0.0230
45,000.00
80,000.00
1
2
BAHAN
PERALATAN
Timbris
Keranjang
E22
E18
Unit
bh
0.1670
0.1250
28,710.00
1,840.00
30,550.00
JUMLAH
HARGA
(Rp.)
30,000.00
10,000.00
5,010.00
1,250.00
6,260.00
36,810.00
NO.
A.
1
2
3
4
: R.015
: Timbunan tanah dari luar dipadatkan dan dirapikan (manual)
: m3
KOMPONEN
SATUAN
PERKIRAAN
KUANTITAS
HARGA
SATUAN
(Rp.)
TENAGA
Pekerja Biasa
Tukang Kayu
Kepala Tukang Kayu
Mandor
L17
L08
L03
L01
Org/hr
Org/hr
Org/hr
Org/hr
0.3250
0.0120
45,000.00
60,000.00
47,000.00
80,000.00
1
2
3
BAHAN
Tanah Urug
M006
m3
1.2000
50,000.00
60,000.00
60,000.00
PERALATAN
Timbris
Keranjang
Kereta Dorong
E22
E18
E23
Unit
bh
Unit
0.1500
0.1100
0.0540
30,000.00
10,000.00
100,000.00
14,625.00
960.00
15,585.00
JUMLAH
HARGA
(Rp.)
4,500.00
1,100.00
5,400.00
11,000.00
86,585.00
NO.
A.
1
2
: R.016
: Bongkaran pasangan batu kali
: m3
KOMPONEN
SATUAN
PERKIRAAN
KUANTITAS
HARGA
SATUAN
(Rp.)
TENAGA
Pekerja Biasa
Mandor
L17
L01
Org/hr
Org/hr
2.0480
0.2050
45,000.00
80,000.00
1
2
BAHAN
-
PERALATAN
Keranjang
Palu besar/bodem
E18
E21
bh
bh
0.0830
0.0100
92,160.00
16,400.00
108,560.00
JUMLAH
HARGA
(Rp.)
10,000.00
100,000.00
830.00
1,000.00
1,830.00
110,390.00
NO.
A.
1
2
3
4
: R.017
: Pasangan batu kali dengan spesi 1 pc ; 4 ps
: m3
KOMPONEN
SATUAN
PERKIRAAN
KUANTITAS
HARGA
SATUAN
(Rp.)
TENAGA
Pekerja Biasa
Tukang Batu
Kepala Tukang Batu
Mandor
L17
L07
L02
L01
Org/hr
Org/hr
Org/hr
Org/hr
1.5000
0.6000
0.0600
0.0750
45,000.00
60,000.00
70,000.00
80,000.00
67,500.00
36,000.00
4,200.00
6,000.00
113,700.00
BAHAN
Batu Belah Kali
Portland Cement (PC)
Pasir Pasang
M011
M037
M002
m3
kg
m3
1.2000
163.0000
0.5200
115,700.00
900.00
60,000.00
JUMLAH
HARGA
(Rp.)
138,840.00
146,700.00
31,200.00
316,740.00
PERALATAN
430,440.00
NO.
A.
1
2
3
4
: R.018
: Siaran dengan spesi 1 pc ; 2 ps
: m2
KOMPONEN
SATUAN
PERKIRAAN
KUANTITAS
HARGA
SATUAN
(Rp.)
TENAGA
Pekerja Biasa
Tukang Batu
Kepala Tukang Batu
Mandor
L17
L07
L02
L01
Org/hr
Org/hr
Org/hr
Org/hr
0.3000
0.1400
0.0140
0.0150
45,000.00
60,000.00
70,000.00
80,000.00
BAHAN
Portland Cement (PC)
Pasir Pasang
M037
M002
kg
m3
6.3400
0.0120
900.00
60,000.00
5,706.00
720.00
6,426.00
PERALATAN
13,500.00
8,400.00
980.00
1,200.00
24,080.00
JUMLAH
HARGA
(Rp.)
30,506.00
NO.
A.
1
2
3
4
: R.019
: Plesteran tebal 1,5 cm dengan spesi 1 pc ; 3 ps
: m2
KOMPONEN
SATUAN
PERKIRAAN
KUANTITAS
HARGA
SATUAN
(Rp.)
TENAGA
Pekerja Biasa
Tukang Batu
Kepala Tukang Batu
Mandor
L17
L07
L02
L01
Org/hr
Org/hr
Org/hr
Org/hr
0.2000
0.1500
0.0150
0.0100
45,000.00
60,000.00
70,000.00
80,000.00
9,000.00
9,000.00
1,050.00
800.00
19,850.00
BAHAN
Portland Cement (PC)
Pasir Pasang
M037
M002
kg
m3
7.7760
0.0230
900.00
60,000.00
JUMLAH
HARGA
(Rp.)
6,998.40
1,380.00
8,378.40
PERALATAN
28,228.40
NO.
A.
1
2
3
4
5
: R.020
: Bronjong kawat galvanis d = 4 mm (0.50 x 1.00 x 2.00)
: m3
KOMPONEN
SATUAN
PERKIRAAN
KUANTITAS
HARGA
SATUAN
(Rp.)
TENAGA
Pekerja Penganyam
Pekerja Pengisi
Tukang Penganyam
Mandor Penganyam
Mandor Pengisi
L17
L17
L07
L01
L01
Org/hr
Org/hr
Org/hr
Org/hr
Org/hr
0.5760
1.3820
0.7040
0.0260
0.0240
45,000.00
45,000.00
60,000.00
80,000.00
80,000.00
1
2
BAHAN
Batu Belah Kali
Kawat Galvanis 2 mm
M011
M133
m3
kg
1.0000
19.0000
115,700.00
37,660.00
115,700.00
715,540.00
831,240.00
PERALATAN
Tang Pemotong Kawat
Palu besar/bodem
E31
E21
bh
bh
0.0100
0.0100
25,920.00
62,190.00
42,240.00
2,080.00
1,920.00
134,350.00
JUMLAH
HARGA
(Rp.)
50,000.00
100,000.00
500.00
1,000.00
1,500.00
967,090.00
NO.
A.
1
2
3
4
: R.021
: Beton K-125
: m3
KOMPONEN
SATUAN
PERKIRAAN
KUANTITAS
HARGA
SATUAN
(Rp.)
TENAGA
Pekerja Biasa
Tukang Kayu
Kepala Tukang Kayu
Mandor
L17
L08
L03
L01
Org/hr
Org/hr
Org/hr
Org/hr
1.6500
0.2750
0.0280
0.0830
45,000.00
60,000.00
47,000.00
80,000.00
74,250.00
16,500.00
1,316.00
6,640.00
98,706.00
BAHAN
Portland Cement (PC)
Pasir Cor
Batu pecah mesin 2/3
Air Bersih
M037
M004
M019
M486
kg
m3
m3
ltr
276.0000
0.5914
0.7496
215.000
900.00
110,000.00
100,000.00
25.00
JUMLAH
HARGA
(Rp.)
248,400.00
65,057.14
74,962.96
5,375.00
393,795.11
PERALATAN
492,501.11
NO.
A.
1
2
3
4
: R.022
: Beton K-175
: m3
KOMPONEN
SATUAN
PERKIRAAN
KUANTITAS
HARGA
SATUAN
(Rp.)
TENAGA
Pekerja Biasa
Tukang Batu
Kepala Tukang Batu
Mandor
L17
L07
L02
L01
Org/hr
Org/hr
Org/hr
Org/hr
1.6500
0.2750
0.0280
0.0830
45,000.00
60,000.00
70,000.00
80,000.00
BAHAN
Portland Cement (PC)
Pasir Cor
Batu pecah mesin 2/3
Air Bersih
M037
M004
M019
M486
kg
m3
m3
ltr
326.0000
0.5429
0.7622
215.000
900.00
110,000.00
100,000.00
25.00
293,400.00
59,714.29
76,222.22
5,375.00
434,711.51
PERALATAN
74,250.00
16,500.00
1,960.00
6,640.00
99,350.00
JUMLAH
HARGA
(Rp.)
534,061.51
NO.
A.
1
2
3
4
: R.023
: Bekisting kayu termasuk pembongkaran
: m2
KOMPONEN
SATUAN
PERKIRAAN
KUANTITAS
HARGA
SATUAN
(Rp.)
TENAGA
Pekerja Biasa
Tukang Kayu
Kepala Tukang Kayu
Mandor
L17
L08
L03
L01
Org/hr
Org/hr
Org/hr
Org/hr
0.6600
0.3300
0.0330
0.0330
45,000.00
60,000.00
47,000.00
80,000.00
29,700.00
19,800.00
1,551.00
2,640.00
53,691.00
BAHAN
Papan Kayu kelas III
Paku Kayu Segala Ukuran
M085
M140
m3
kg
0.0550
0.4000
1,100,000.00
17,500.00
JUMLAH
HARGA
(Rp.)
60,500.00
7,000.00
67,500.00
PERALATAN
121,191.00
NO.
A.
1
2
3
4
: R.024
: Besi Tulangan Ulir
: kg
KOMPONEN
SATUAN
PERKIRAAN
KUANTITAS
HARGA
SATUAN
(Rp.)
TENAGA
Pekerja Biasa
Tukang Batu
Kepala Tukang Batu
Mandor
L17
L07
L02
L01
Org/hr
Org/hr
Org/hr
Org/hr
0.0070
0.0070
0.0007
0.0004
45,000.00
60,000.00
70,000.00
80,000.00
BAHAN
Besi Beton Ulir
Kawat Beton/Bendrat RRT
M113
M135
kg
kg
1.0500
0.0150
17,085.00
7,500.00
17,939.25
112.50
18,051.75
PERALATAN
315.00
420.00
49.00
32.00
816.00
JUMLAH
HARGA
(Rp.)
18,867.75
NO.
A.
1
2
3
4
: R.025
: Besi Tulangan Polos
: kg
KOMPONEN
SATUAN
PERKIRAAN
KUANTITAS
HARGA
SATUAN
(Rp.)
TENAGA
Pekerja Biasa
Tukang Batu
Kepala Tukang Batu
Mandor
L17
L07
L02
L01
Org/hr
Org/hr
Org/hr
Org/hr
0.0070
0.0070
0.0007
0.0004
45,000.00
60,000.00
70,000.00
80,000.00
315.00
420.00
49.00
32.00
816.00
BAHAN
Besi Beton Polos
Kawat Beton/Bendrat RRT
M112
M135
kg
kg
1.0500
0.0150
8,500.00
7,500.00
JUMLAH
HARGA
(Rp.)
8,925.00
112.50
9,037.50
PERALATAN
9,853.50
NO.
A.
1
2
3
: R.026
: Kisi-Kisi
: m2
KOMPONEN
SATUAN
PERKIRAAN
KUANTITAS
HARGA
SATUAN
(Rp.)
TENAGA
Pekerja Biasa
Tukang Besi/Baja
Mandor
L17
L09
L01
Org/hr
Org/hr
Org/hr
0.1100
0.1100
0.0200
45,000.00
60,000.00
80,000.00
1
2
BAHAN
Besi Beton Polos
Baja Profil
M112
M116
kg
kg
24.1500
18.0147
8,500.00
18,750.00
205,275.00
337,775.74
543,050.74
PERALATAN
Tang Pemotong Kawat
Kunci pembengkok tulangan
E31
E36
bh
bh
0.0100
0.4400
4,950.00
6,600.00
1,600.00
13,150.00
JUMLAH
HARGA
(Rp.)
50,000.00
25,000.00
500.00
11,000.00
11,500.00
567,700.74
NO.
I.
1
: R.027
: Pintu Air Type A Plat
: Buah
MACAM PEKERJAAN
SATUAN
B = 2.000 mm
H = 1.900 mm
H' = 4.200 mm
PERKIRAAN
KUANTITAS
HARGA
SATUAN
(Rp.)
JUMLAH
HARGA
(Rp.)
BAHAN
Bahan konstruksi
- Besi siku
- Besi kanal
- Plat Bronz
- Besi plate
- Besi plate strip
- Besi beton
- pipa
kg
kg
kg
kg
kg
kg
kg
22.95
905.80
24.64
541.61
195.78
57.92
18,750.00
18,750.00
18,750.00
18,750.00
18,750.00
8,500.00
9,250.00
430,312.50
16,983,750.00
462,000.00
10,155,187.50
3,670,875.00
492,320.00
32,194,445.00
0.10
32,194,445.00
3,219,444.50
kg
kg
kg
Ps
217.11
96.00
186.00
3.00
8,500.00
41,250.00
8,500.00
1,850,000.00
1,845,435.00
3,960,000.00
1,581,000.00
5,550,000.00
12,936,435.00
kg
bh
m
bh
bh
bh
bh
20.00
7.00
6.67
6.00
1.00
1.00
4.00
12,900.00
17,500.00
30,000.00
3,000.00
31,300.00
12,900.00
423,500.00
258,000.00
122,500.00
200,100.00
18,000.00
31,300.00
12,900.00
1,694,000.00
2,336,800.00
II.
ONGKOS KERJA
- Ongkos kerja konst.
- Ongkos kerja mesin
- Sandblasting dan cat
kg
kg
m2
1,748.70
499.11
51.76
1,300.00
6,400.00
57,000.00
2,273,310.00
3,194,304.00
2,950,320.00
8,417,934.00
2,247.81
1,100.00
2,472,591.00
2,247.81
600.00
1,348,686.00
3,821,277.00
III.
PEMASANGAN
kg
IV.
PEMBONGKARAN
kg
V.
TRANSPORT
kg
Sub Total
VI.
VII.
VIII.
62,926,335.50
10
62,926,335.50
62,926,000.00
NO.
I.
1
: R.028
: Pintu Air Type C - 2
: Buah
MACAM PEKERJAAN
SATUAN
B = 1.000 mm
H = 1.100 mm
H' = 2.100 mm
PERKIRAAN
KUANTITAS
HARGA
SATUAN
(Rp.)
JUMLAH
HARGA
(Rp.)
BAHAN
Bahan konstruksi
- Besi siku
- Besi plate
- Besi plate strip
- Besi beton
- pipa
kg
kg
kg
kg
kg
226.00
50.00
34.00
12.00
1.00
18,750.00
18,750.00
18,750.00
8,500.00
9,250.00
4,237,500.00
937,500.00
637,500.00
102,000.00
9,250.00
5,923,750.00
0.10
5,923,750.00
592,375.00
kg
kg
kg
28.00
16.00
36.00
8,500.00
41,250.00
8,500.00
238,000.00
660,000.00
306,000.00
1,204,000.00
kg
kg
bh
bh
bh
bh
bh
5.00
11.00
1.00
2.00
2.00
1.00
1.00
12,900.00
9,800.00
3,000.00
31,300.00
12,900.00
423,500.00
110,000.00
64,500.00
107,800.00
3,000.00
62,600.00
25,800.00
423,500.00
110,000.00
797,200.00
kg
kg
m2
322.00
107.00
10.58
1,300.00
6,400.00
57,000.00
418,600.00
684,800.00
603,060.00
1,706,460.00
429.00
1,100.00
471,900.00
429.00
600.00
257,400.00
729,300.00
II.
ONGKOS KERJA
- Ongkos kerja konst.
- Ongkos kerja mesin
- Sandblasting dan cat
III.
PEMASANGAN
kg
IV.
PEMBONGKARAN
kg
V.
TRANSPORT
kg
Sub Total
VI.
VII.
VIII.
10,953,085.00
10
10,953,085.00
10,953,000.00
NO.
I.
1
: R.029
: Pintu Air Type C - 3
: Buah
MACAM PEKERJAAN
SATUAN
B = 600 mm
H = 550 mm
H' = 850 mm
PERKIRAAN
KUANTITAS
HARGA
SATUAN
(Rp.)
JUMLAH
HARGA
(Rp.)
BAHAN
Bahan konstruksi
- Besi siku
- Besi plate
- Besi plate strip
- Besi beton
- pipa
kg
kg
kg
kg
kg
115.00
39.00
26.00
6.00
1.00
18,750.00
18,750.00
18,750.00
8,500.00
9,250.00
2,156,250.00
731,250.00
487,500.00
51,000.00
9,250.00
3,435,250.00
0.10
3,435,250.00
343,525.00
kg
kg
kg
22.00
16.00
36.00
8,500.00
41,250.00
8,500.00
187,000.00
660,000.00
306,000.00
1,153,000.00
kg
kg
bh
bh
bh
bh
bh
5.00
11.00
1.00
2.00
2.00
1.00
1.00
12,900.00
9,800.00
3,000.00
31,300.00
12,900.00
423,500.00
110,000.00
64,500.00
107,800.00
3,000.00
62,600.00
25,800.00
423,500.00
110,000.00
797,200.00
kg
kg
m2
186.00
74.00
5.00
1,300.00
6,400.00
57,000.00
241,800.00
473,600.00
285,000.00
1,000,400.00
237.00
1,100.00
260,700.00
237.00
600.00
142,200.00
402,900.00
II.
ONGKOS KERJA
- Ongkos kerja konst.
- Ongkos kerja mesin
- Sandblasting dan cat
III.
PEMASANGAN
kg
IV.
PEMBONGKARAN
kg
V.
TRANSPORT
kg
Sub Total
VI.
VII.
VIII.
7,132,275.00
10
7,132,275.00
7,132,000.00
NO.
I.
1
: R.030
: Pintu Air Type C - 3
: Buah
MACAM PEKERJAAN
SATUAN
B = 600 mm
H = 450 mm
H' = 1400 mm
PERKIRAAN
KUANTITAS
HARGA
SATUAN
(Rp.)
JUMLAH
HARGA
(Rp.)
BAHAN
Bahan konstruksi
- Besi siku
- Besi plate
- Besi plate strip
- Besi beton
- pipa
kg
kg
kg
kg
kg
138.00
21.00
31.00
9.00
1.00
18,750.00
18,750.00
18,750.00
8,500.00
9,250.00
2,587,500.00
393,750.00
581,250.00
76,500.00
9,250.00
3,648,250.00
0.10
3,648,250.00
364,825.00
kg
kg
kg
33.00
16.00
36.00
8,500.00
41,250.00
8,500.00
280,500.00
660,000.00
306,000.00
1,246,500.00
kg
kg
bh
bh
bh
bh
bh
5.00
11.00
1.00
2.00
2.00
1.00
1.00
12,900.00
9,800.00
3,000.00
31,300.00
12,900.00
423,500.00
110,000.00
64,500.00
107,800.00
3,000.00
62,600.00
25,800.00
423,500.00
110,000.00
797,200.00
kg
kg
m2
200.00
85.00
5.00
1,300.00
6,400.00
57,000.00
260,000.00
544,000.00
285,000.00
1,089,000.00
259.00
1,100.00
284,900.00
259.00
600.00
155,400.00
440,300.00
II.
ONGKOS KERJA
- Ongkos kerja konst.
- Ongkos kerja mesin
- Sandblasting dan cat
III.
PEMASANGAN
kg
IV.
PEMBONGKARAN
kg
V.
TRANSPORT
kg
Sub Total
VI.
VII.
VIII.
7,586,075.00
10
7,586,075.00
7,586,000.00
NO.
I.
1
: R.031
: Pintu Air Type C - 3
: Buah
MACAM PEKERJAAN
SATUAN
B = 550 mm
H = 1.450 mm
H' = 2.000 mm
PERKIRAAN
KUANTITAS
HARGA
SATUAN
(Rp.)
JUMLAH
HARGA
(Rp.)
BAHAN
Bahan konstruksi
- Besi siku
- Besi plate
- Besi plate strip
- Besi beton
- pipa
kg
kg
kg
kg
kg
161.00
62.00
36.00
12.00
1.00
18,750.00
18,750.00
18,750.00
8,500.00
9,250.00
3,018,750.00
1,162,500.00
675,000.00
102,000.00
9,250.00
4,967,500.00
0.10
4,967,500.00
496,750.00
kg
kg
kg
34.00
16.00
36.00
8,500.00
41,250.00
8,500.00
289,000.00
660,000.00
306,000.00
1,255,000.00
kg
kg
bh
bh
bh
bh
bh
5.00
11.00
1.00
2.00
2.00
1.00
1.00
12,900.00
9,800.00
3,000.00
31,300.00
12,900.00
423,500.00
110,000.00
64,500.00
107,800.00
3,000.00
62,600.00
25,800.00
423,500.00
110,000.00
797,200.00
kg
kg
m2
272.00
86.00
7.00
1,300.00
6,400.00
57,000.00
353,600.00
550,400.00
399,000.00
1,303,000.00
325.00
1,100.00
357,500.00
325.00
600.00
195,000.00
552,500.00
II.
ONGKOS KERJA
- Ongkos kerja konst.
- Ongkos kerja mesin
- Sandblasting dan cat
III.
PEMASANGAN
kg
IV.
PEMBONGKARAN
kg
V.
TRANSPORT
kg
Sub Total
VI.
VII.
VIII.
9,371,950.00
10
9,371,950.00
9,372,000.00
NO.
I.
1
: R.032
: Pintu Air Type C - 5
: Buah
MACAM PEKERJAAN
SATUAN
B = 550 mm
H = 1.450 mm
H' = 2.000 mm
PERKIRAAN
KUANTITAS
HARGA
SATUAN
(Rp.)
JUMLAH
HARGA
(Rp.)
BAHAN
Bahan konstruksi
- Besi siku
- Besi plate
- Besi plate strip
- Besi beton
- pipa
kg
kg
kg
kg
kg
161.00
62.00
36.00
12.00
1.00
18,750.00
18,750.00
18,750.00
8,500.00
9,250.00
3,018,750.00
1,162,500.00
675,000.00
102,000.00
9,250.00
4,967,500.00
0.10
4,967,500.00
496,750.00
kg
kg
kg
34.00
16.00
36.00
8,500.00
41,250.00
8,500.00
289,000.00
660,000.00
306,000.00
1,255,000.00
kg
kg
bh
bh
bh
bh
bh
5.00
11.00
1.00
2.00
2.00
1.00
1.00
12,900.00
9,800.00
3,000.00
31,300.00
12,900.00
423,500.00
110,000.00
64,500.00
107,800.00
3,000.00
62,600.00
25,800.00
423,500.00
110,000.00
797,200.00
kg
kg
m2
272.00
86.00
7.00
1,300.00
6,400.00
57,000.00
353,600.00
550,400.00
399,000.00
1,303,000.00
325.00
1,100.00
357,500.00
325.00
600.00
195,000.00
552,500.00
II.
ONGKOS KERJA
- Ongkos kerja konst.
- Ongkos kerja mesin
- Sandblasting dan cat
III.
PEMASANGAN
kg
IV.
PEMBONGKARAN
kg
V.
TRANSPORT
kg
Sub Total
VI.
VII.
VIII.
9,371,950.00
10
9,371,950.00
9,372,000.00
NO.
A.
1
2
3
: S.001
: Menanam rumput lamur
: m2
KOMPONEN
SATUAN
PERKIRAAN
KUANTITAS
HARGA
SATUAN
(Rp.)
TENAGA
Pekerja Biasa
Tukang Taman
Mandor
L17
L14
L01
Org/hr
Org/hr
Org/hr
0.1500
0.0100
45,000.00
60,000.00
80,000.00
9,000.00
800.00
9,800.00
BAHAN
Rumput Lamur
M461
m2
1.0000
18,830.00
JUMLAH
HARGA
(Rp.)
18,830.00
18,830.00
PERALATAN
28,630.00
NO.
A.
1
2
3
: S.002
: Menanam rumput manila
: m2
KOMPONEN
SATUAN
PERKIRAAN
KUANTITAS
HARGA
SATUAN
(Rp.)
TENAGA
Pekerja Biasa
Tukang Taman
Mandor
L17
L14
L01
Org/hr
Org/hr
Org/hr
0.1500
0.0100
45,000.00
60,000.00
80,000.00
BAHAN
Rumput Manila
M462
m2
1.0000
16,140.00
16,140.00
16,140.00
PERALATAN
9,000.00
800.00
9,800.00
JUMLAH
HARGA
(Rp.)
25,940.00
NO.
A.
1
2
3
: S.003
: Menanam semak hias
: m2
KOMPONEN
SATUAN
PERKIRAAN
KUANTITAS
HARGA
SATUAN
(Rp.)
TENAGA
Pekerja Biasa
Tukang Taman
Mandor
L17
L14
L01
Org/hr
Org/hr
Org/hr
0.3300
0.0100
45,000.00
60,000.00
80,000.00
19,800.00
800.00
20,600.00
BAHAN
Semak Hias
M463
m2
1.0000
10,760.00
JUMLAH
HARGA
(Rp.)
10,760.00
10,760.00
PERALATAN
31,360.00
NO.
A.
1
2
3
: S.004
: Menanam pohon pelindung
: btg
KOMPONEN
SATUAN
PERKIRAAN
KUANTITAS
HARGA
SATUAN
(Rp.)
TENAGA
Pekerja Biasa
Tukang Taman
Mandor
L17
L14
L01
Org/hr
Org/hr
Org/hr
0.4000
0.0200
45,000.00
60,000.00
80,000.00
BAHAN
Pohon Pelindung
M464
btg
1.0000
161,430.00
161,430.00
161,430.00
PERALATAN
24,000.00
1,600.00
25,600.00
JUMLAH
HARGA
(Rp.)
187,030.00
NO.
A.
1
2
3
3
: S.005
: Pengisian koral sumur resapan
: m3
KOMPONEN
SATUAN
PERKIRAAN
KUANTITAS
HARGA
SATUAN
(Rp.)
TENAGA
Pekerja Biasa
Tukang Batu
Kepala Tukang Batu
Mandor
L17
L07
L02
L01
Org/hr
Org/hr
Org/hr
Org/hr
0.2000
0.0200
0.0020
0.0060
45,000.00
60,000.00
70,000.00
80,000.00
9,000.00
1,200.00
140.00
480.00
10,820.00
BAHAN
Stenslah/batu pecah tangan 2/3
M014
m3
1.0000
156,975.00
JUMLAH
HARGA
(Rp.)
156,975.00
156,975.00
PERALATAN
167,795.00
NO.
A.
1
2
3
3
: S.006
: Menanam gebalan rumput
: m3
KOMPONEN
SATUAN
PERKIRAAN
KUANTITAS
HARGA
SATUAN
(Rp.)
TENAGA
Pekerja Biasa
Tukang Batu
Kepala Tukang Batu
Mandor
L17
L07
L02
L01
Org/hr
Org/hr
Org/hr
Org/hr
0.2000
0.0200
45,000.00
60,000.00
70,000.00
80,000.00
BAHAN
Gebalan rumput
M464.a
m2
1.0000
16,140.00
16,140.00
16,140.00
PERALATAN
9,000.00
1,600.00
10,600.00
JUMLAH
HARGA
(Rp.)
26,740.00
NO.
A.
1
2
3
4
: S.007
: Pasang papan kayu jembatan gantung, kayu kamper
: m3
KOMPONEN
SATUAN
PERKIRAAN
KUANTITAS
HARGA
SATUAN
(Rp.)
TENAGA
Pekerja Biasa
Tukang Kayu
Kepala Tukang Kayu
Mandor
L17
L08
L03
L01
Org/hr
Org/hr
Org/hr
Org/hr
4.0000
12.0000
1.2000
0.2000
45,000.00
60,000.00
47,000.00
80,000.00
BAHAN
Papan (3x30) cm
Besi Strip
Paku Kayu Segala Ukuran
M083
M114
M140
m3
kg
kg
1.1000
15.0000
0.8000
10,800,000.00
8,500.00
17,500.00
11,880,000.00
127,500.00
14,000.00
12,021,500.00
PERALATAN
180,000.00
720,000.00
56,400.00
16,000.00
972,400.00
JUMLAH
HARGA
(Rp.)
12,993,900.00
A.001
m1
402,892.78
A.002
m1
491,956.78
A.003
m1
482,852.78
A.004
m1
14,108.00
A.005
m1
107,930.00
A.006
m2
1,491,325.00
A.007
m2
1,528,734.25
A.008
m2
1,364,093.75
A.009
m2
8,500.00
A.010
m2
1,544,518.00
A.011
bh
304,100.00
A.012
m2
78,598.75
A.013
m3
573,000.00
A.014
m3
326,655.00
A.015
m3
302,655.00
A.016
Bongkaran atap
m2
53,500.00
A.017
Bongkaran lantai
m2
9,800.00
A.018
Bongkaran plafon
m2
13,682.00
B.001
m3
35,750.00
B.002
m3
44,100.00
B.003
m3
52,610.00
B.004
m3
47,560.00
B.005
m3
72,300.00
B.006
m3
57,600.00
B.007
m2
2,650.00
B.008
m3
15,650.00
B.009
Urugan kembali
m3
14,700.00
B.010
Pemadatan tanah
m3
26,500.00
B.011
Urugan pasir
m3
130,220.00
B.012
m3
326,000.00
B.013
m3
447,400.00
B.014
m3
782,850.00
B.015
Urugan sirtu
m3
137,330.00
B.016
m3
114,070.00
B.017
m3
92,697.33
B.018
m3
230,660.62
C.001
m3
#REF!
C.002
m3
#REF!
C.003
m3
#REF!
C.004
m3
463,440.00
C.005
m3
430,440.00
C.006
m3
407,580.00
C.007
m3
391,500.00
C.008
m3
369,480.00
C.009
m3
#REF!
C.010
m3
521,990.00
C.011
m3
#REF!
C.012
m3
528,060.00
C.013
m3
491,120.00
C.014
m3
244,921.20
C.015
m3
1,599,706.00
C.016
m3
441,385.00
C.017
m1
#REF!
C.018
m1
#REF!
D.001
m2
#REF!
D.002
m2
121,750.00
D.003
m2
112,915.00
D.004
m2
107,275.00
D.005
m2
103,900.00
D.006
m2
101,770.00
D.007
m2
128,172.00
D.008
m2
#REF!
D.009
m2
58,235.00
D.010
m2
54,233.00
D.011
m2
51,830.00
D.012
m2
50,312.00
D.013
m2
49,328.00
D.014
m2
47,750.00
D.015
m2
65,450.00
D.016
m2
66,350.00
D.017
m2
D.018
m2
#REF!
D.019
m2
#REF!
D.020
m2
#REF!
D.021
m2
#REF!
D.022
m2
#REF!
D.023
m2
#REF!
61,090.00
D.024
m2
D.025
m2
295,420.00
D.026
m2
#REF!
D.027
m2
#REF!
D.028
m2
#REF!
E.001
Plesteran 1 Pc : 1 Ps tebal 15 mm
m2
34,763.60
E.002
Plesteran 1 Pc : 2 Ps tebal 15 mm
m2
30,251.60
E.003
Plesteran 1 Pc : 3 Ps tebal 15 mm
m2
28,228.40
E.004
Plesteran 1 Pc : 4 Ps tebal 15 mm
m2
26,906.00
E.005
Plesteran 1 Pc : 5 Ps tebal 15 mm
m2
26,075.60
E.006
Plesteran 1 Pc : 6 Ps tebal 15 mm
m2
25,444.40
E.007
Plesteran 1 Pc : 8 Ps tebal 15 mm
m2
24,700.40
E.008
m2
E.009
Plesteran 1 Pc : 3 Kp : 10 Ps tebal 15 mm
m2
#REF!
E.010
m2
#REF!
E.011
Plesteran 1 Kp : 1 Sm : 1 Ps tebal 15 mm
m2
32,545.00
E.012
Plesteran 1 Kp : 1 Sm : 2 Ps tebal 15 mm
m2
29,975.00
E.013
Plesteran 1 Pc : 2 Ps tebal 20 mm
m2
40,028.80
E.014
Plesteran 1 Pc : 3 Ps tebal 20 mm
m2
37,331.20
E.015
Plesteran 1 Pc : 4 Ps tebal 20 mm
m2
35,548.00
E.016
Plesteran 1 Pc : 5 Ps tebal 20 mm
m2
34,460.80
E.017
Plesteran 1 Pc : 6 Ps tebal 20 mm
m2
33,599.20
E.018
Plesteran 1 Kp : 1 Sm : 2 Ps tebal 20 mm
m2
E.019
Plesteran 1 Pc : 2 Ps tebal 25 mm
m2
#REF!
E.020
Plesteran 1 Pc : 3 Ps tebal 25 mm
m2
#REF!
E.021
Plesteran 1 Pc : 4 Ps tebal 25 mm
m2
#REF!
E.022
Plesteran 1 Pc : 5 Ps tebal 25 mm
m2
#REF!
E.023
Plesteran 1 Pc : 2 Ps tebal 30 mm
m2
#REF!
E.024
Plesteran 1 Pc : 3 Ps tebal 30 mm
m2
#REF!
E.025
Plesteran 1 Pc : 4 Ps tebal 30 mm
m2
#REF!
E.026
Plesteran 1 Pc : 5 Ps tebal 30 mm
m2
#REF!
E.027
m2
#REF!
E.028
m2
E.029
m2
#REF!
E.030
m2
#REF!
E.031
Plesteran skoning 1 Pc : 2 Ps
m2
E.032
m2
#REF!
E.033
m2
#REF!
E.034
Plesteran ciprat 1 Pc : 2 Ps
m2
E.035
m2
E.036
m2
E.037
Benangan
m1
F.001
m3
F.002
m3
F.003
m3
F.004
m3
F.005
m2
F.006
m2
518,000.00
F.007
m2
#REF!
F.008
m2
327,200.00
F.009
m2
#REF!
F.010
m2
655,270.00
F.011
m2
#REF!
F.012
m2
464,470.00
F.013
m2
#REF!
F.014
m2
435,312.00
F.015
m2
#REF!
F.016
m2
320,832.00
F.017
m2
#REF!
F.018
m2
946,820.00
F.019
m2
#REF!
F.020
m2
641,540.00
F.021
m2
#REF!
F.022
m2
526,845.00
F.023
m2
#REF!
F.024
m2
407,595.00
F.025
m2
#REF!
F.026
m2
804,525.00
F.027
m2
#REF!
F.028
m2
518,325.00
F.029
m2
#REF!
F.030
m2
529,247.00
F.031
m2
#REF!
F.032
m2
409,997.00
F.033
m2
#REF!
F.034
m2
603,412.00
F.035
m2
#REF!
#REF!
28,684.00
42,995.00
18,305.60
29,495.00
23,238.00
30,506.00
#REF!
14,310.00
#REF!
12,314,915.00
#REF!
7,562,915.00
#REF!
F.036
m2
484,162.00
F.037
m2
#REF!
F.038
m2
#REF!
F.039
m2
#REF!
F.040
m2
496,122.00
F.041
m2
#REF!
F.042
m2
#REF!
F.043
m2
#REF!
F.044
m2
#REF!
F.045
m3
F.046
m3
F.047
m3
F.048
m3
F.049
m3
7,137,900.00
F.050
m3
6,741,900.00
F.051
m2
F.052
m2
F.053
m2
#REF!
F.054
m2
#REF!
F.055
m2
285,745.00
F.056
m2
240,745.00
F.057
m2
#REF!
F.058
m2
F.059
m2
#REF!
F.060
m2
#REF!
F.061
m2
285,745.00
F.062
m2
240,745.00
F.063
m2
#REF!
F.064
m2
118,695.00
F.065
m2
#REF!
F.066
m2
#REF!
F.067
m2
399,145.00
F.068
m2
335,245.00
F.069
Pasang kaso 5/7 + reng 3/5 genteng palentong kecil kayu jati
m2
#REF!
F.070
Pasang kaso 5/7 + reng 3/5 genteng palentong kecil kayu kamper
m2
#REF!
F.071
Pasang kaso 5/7 + reng 3/5 genteng palentong kecil kayu borneo
m2
#REF!
F.072
Pasang kaso 5/7 + reng 3/5 genteng palentong kecil kayu bengkirai
m2
#REF!
F.073
Pasang kaso 5/7 + reng 3/5 genteng palentong kecil kayu kruing
m2
#REF!
F.074
Pasang kaso 5/7 + reng 3/5 genteng palentong kecil kayu meranti
m2
#REF!
F.075
Pasang kaso 5/7 + reng 3/5 genteng kodok glazuur kayu jati
m2
#REF!
F.076
Pasang kaso 5/7 + reng 3/5 genteng kodok glazuur kayu kamper
m2
#REF!
F.077
Pasang kaso 5/7 + reng 3/5 genteng kodok glazuur kayu borneo
m2
#REF!
F.078
Pasang kaso 5/7 + reng 3/5 genteng kodok glazuur kayu bengkirai
m2
#REF!
F.079
Pasang kaso 5/7 + reng 3/5 genteng kodok glazuur kayu kruing
m2
#REF!
F.080
Pasang kaso 5/7 + reng 3/5 genteng kodok glazuur kayu meranti
m2
#REF!
F.081
Pasang kaso 5/7 + reng 3/5 genteng palentong super/besar kayu jati
m2
#REF!
F.082
Pasang kaso 5/7 + reng 3/5 genteng palentong super/besar kayu kamper
m2
#REF!
F.083
Pasang kaso 5/7 + reng 3/5 genteng palentong super/besar kayu borneo
m2
#REF!
F.084
Pasang kaso 5/7 + reng 3/5 genteng palentong super/besar kayu bengkirai
m2
#REF!
F.085
Pasang kaso 5/7 + reng 3/5 genteng palentong super/besar kayu kruing
m2
#REF!
F.086
Pasang kaso 5/7 + reng 3/5 genteng palentong super/besar kayu meranti
m2
#REF!
F.087
m2
#REF!
F.088
m2
#REF!
F.089
m2
#REF!
F.090
m2
#REF!
F.091
m2
#REF!
F.092
m2
#REF!
F.093
m2
#REF!
F.094
m2
#REF!
F.095
m2
#REF!
F.096
m2
#REF!
F.097
m2
#REF!
F.098
m2
#REF!
F.099
m2
#REF!
F.100
m2
F.101
m2
#REF!
F.102
m2
#REF!
F.103
m2
106,244.00
F.104
m2
F.105
m2
#REF!
F.106
m2
#REF!
F.107
m2
#REF!
F.108
m2
#REF!
F.109
m2
#REF!
F.110
m2
#REF!
F.111
m2
#REF!
F.112
m2
#REF!
#REF!
11,097,900.00
#REF!
#REF!
#REF!
88,245.00
88,245.00
41,069.00
91,394.00
F.113
m2
#REF!
F.114
m2
#REF!
F.115
m2
#REF!
F.116
m2
#REF!
F.117
m2
#REF!
F.118
m2
#REF!
F.119
m2
#REF!
F.120
m2
#REF!
F.121
m2
#REF!
F.122
m2
#REF!
F.123
m1
#REF!
F.124
m1
136,465.00
F.125
m1
#REF!
F.126
m1
#REF!
F.127
m1
F.128
m1
F.129
m1
F.130
m1
137,515.00
F.131
m1
#REF!
F.132
m1
#REF!
F.133
m1
F.134
m1
F.135
m1
#REF!
F.136
m1
#REF!
F.137
m1
#REF!
F.138
m1
#REF!
F.139
m1
#REF!
F.140
m1
#REF!
F.141
m1
#REF!
F.142
m1
#REF!
F.143
m1
#REF!
F.144
m1
#REF!
F.145
m1
#REF!
F.146
m1
#REF!
F.147
m1
#REF!
F.148
m1
291,130.00
F.149
m1
#REF!
F.150
m1
180,250.00
F.151
m2
#REF!
F.152
m2
376,197.00
F.153
m2
#REF!
F.154
m2
265,317.00
F.155
m2
#REF!
F.156
m2
390,367.40
F.157
m2
#REF!
F.158
m2
279,487.40
F.159
m2
#REF!
F.160
m2
227,310.00
F.161
m2
#REF!
F.162
m1
#REF!
G.001
Beton tumbuk 1 Pc : 3 Ps : 5 Kr
m3
G.002
Beton tumbuk 1 Pc : 3 Ps : 6 Kr
m3
G.003
Beton tumbuk 1 Pc : 4 Ps : 6 Kr
m3
G.004
m3
G.005
m3
G.006
m3
G.007
Beton campuran 1 Pc : 2 Ps : 3 Kr
m3
G.008
Beton campuran 1 Pc : 2 Ps : 4 Kr
m3
G.009
m3
G.010
m3
G.011
Beton campuran 1 Pc : 1 Ps : 1 Kr
m3
G.012
m3
703,090.00
G.013
m1
33,195.00
G.014
m1
56,941.50
G.015
m1
G.016
m1
#REF!
G.017
m1
#REF!
G.018
m1
#REF!
G.019
kg
9,853.50
G.020
kg
18,867.75
G.021
kg
27,959.00
G.022
m2
91,821.00
G.023
m2
97,321.00
G.024
m2
241,270.00
G.025
m2
250,270.00
G.026
m2
341,270.00
G.027
m2
293,910.00
85,921.00
84,949.00
#REF!
86,035.00
85,045.00
493,145.11
65,925.00
G.028
m2
230,135.50
G.029
m3
#REF!
G.030
m3
#REF!
G.031
m2
112,940.00
G.032
m3
2,861,291.00
G.033
m3
G.034
m3
3,077,514.00
G.035
m3
4,134,807.00
G.036
m3
G.037
m3
G.038
m3
G.039
m3
5,645,040.00
#REF!
G.040
m3
4,344,932.00
G.041
m3
G.042
m3
G.043
m3
G.044
m3
G.045
m1
49,250.00
G.046
m1
63,270.00
G.047
m1
62,280.00
H.001
m2
33,516.00
H.002
m2
37,016.00
H.003
m2
40,766.00
H.004
m2
22,266.00
H.005
m2
47,516.00
H.006
m1
49,570.00
H.007
m1
51,420.00
H.008
m1
60,370.00
H.009
m1
62,370.00
H.010
m1
H.011
m2
#REF!
H.012
m2
#REF!
H.013
m2
#REF!
H.014
m2
H.015
m2
#REF!
H.016
m2
#REF!
H.017
m2
#REF!
H.018
m1
#REF!
H.019
m1
#REF!
H.020
m1
#REF!
H.021
m1
H.022
m1
#REF!
H.023
m1
#REF!
H.024
m1
#REF!
H.025
m2
48,684.00
H.026
m2
52,429.00
H.027
m2
48,677.00
H.028
m2
49,564.00
H.029
m2
48,449.00
H.030
m2
64,816.00
H.031
m2
66,776.00
H.032
m2
60,349.00
H.033
m2
58,039.00
H.034
m2
97,329.00
H.035
m2
55,561.00
H.036
m2
55,112.00
H.037
m2
50,317.00
H.038
m1
110,671.00
H.039
m1
107,071.00
H.040
m1
102,493.00
H.041
m1
63,871.00
H.042
m1
59,443.00
H.043
m1
62,887.00
H.044
m1
58,671.00
H.045
m1
52,775.00
H.046
m2
60,527.00
H.047
m1
32,409.00
H.048
m2
145,563.50
H.049
m2
169,890.00
H.050
m2
38,870.00
H.051
m2
88,428.00
H.052
m2
129,706.00
H.053
m2
157,533.50
H.054
m2
182,802.00
I.001
m2
24,364.00
I.002
m2
23,374.00
I.003
m2
22,714.00
#REF!
#REF!
#REF!
#REF!
#REF!
3,966,597.00
#REF!
64,620.00
53,865.00
73,775.00
I.004
m2
I.005
m2
#REF!
I.006
m2
#REF!
I.007
m2
#REF!
I.008
m2
12,711.00
I.009
m2
13,182.20
I.010
m2
18,303.75
I.011
m2
19,803.75
I.012
m2
12,894.60
I.013
m2
I.014
m2
#REF!
I.015
m2
#REF!
I.016
m2
312,915.00
I.017
m2
#REF!
I.018
m2
#REF!
I.019
m2
#REF!
I.020
m2
I.021
m2
#REF!
I.022
m2
#REF!
I.023
m2
111,214.00
I.024
m2
100,414.00
I.025
m2
#REF!
I.026
m2
106,660.00
I.027
m2
#REF!
I.028
m2
#REF!
I.029
m2
197,510.00
I.030
m2
176,810.00
I.031
m2
#REF!
I.032
m2
#REF!
I.033
m2
#REF!
I.034
m2
#REF!
I.035
m2
#REF!
I.036
m2
#REF!
I.037
m2
#REF!
I.038
m2
#REF!
I.039
m2
#REF!
I.040
m2
#REF!
I.041
m2
#REF!
I.042
m2
#REF!
I.043
m2
33,166.32
I.044
m1
13,145.00
I.045
m1
26,821.00
J.001
bh
225,850.00
J.002
bh
392,050.00
J.003
bh
525,300.00
J.004
bh
1,564,667.00
J.005
bh
1,618,158.88
J.006
bh
1,171,746.00
J.007
bh
558,529.28
J.008
bh
1,354,985.44
J.009
bh
34,200.00
J.010
bh
280,020.00
J.011
bh
592,248.06
J.012
bh
851,500.00
J.013
bh
876,500.00
J.014
bh
#REF!
J.015
m1
133,439.27
J.016
m1
202,465.00
J.017
m1
59,543.90
J.018
m1
100,770.12
J.019
m1
120,038.16
J.020
m1
146,335.20
J.021
m1
181,256.24
J.022
m1
269,820.32
J.023
m1
306,831.36
J.024
m1
341,026.40
J.025
m1
56,793.90
J.026
m1
110,585.20
J.027
bh
167,710.75
J.028
bh
241,614.50
J.029
bh
369,062.68
J.030
m1
64,488.75
J.031
m1
80,332.50
J.032
m1
105,682.50
J.033
m1
156,777.00
J.034
m1
216,983.25
J.035
m1
296,202.00
22,054.00
19,608.75
63,814.00
J.036
m1
334,227.00
J.037
m1
487,500.25
J.038
m1
17,909.75
J.039
m1
23,862.78
J.040
m1
29,490.48
J.041
m1
37,610.93
J.042
m1
49,164.18
J.043
m1
60,643.50
J.044
m1
86,418.93
J.045
m1
127,667.60
J.046
m1
219,280.05
J.047
m1
334,521.46
J.048
m1
11,846.88
J.049
m1
14,876.20
J.050
m1
17,690.05
J.051
m1
21,695.35
J.052
m1
28,161.70
J.053
m1
37,038.43
J.054
m1
54,156.83
J.055
m1
70,938.53
J.056
m1
10,372.35
J.057
m1
12,582.03
J.058
m1
14,702.98
J.059
m1
17,736.53
J.060
m1
24,785.93
J.061
m1
29,158.80
J.062
m1
37,223.03
J.063
m1
43,852.05
J.064
bh
287,370.00
J.065
bh
222,500.00
J.066
bh
41,073.75
J.067
bh
44,913.75
J.068
bh
52,850.00
J.069
bh
20,870.00
J.070
m2
146,921.00
J.071
m1
94,350.18
J.072
m1
135,598.85
K.001
kg
#REF!
K.002
m2
K.003
m2
1,910,690.00
K.004
m2
1,587,810.00
K.005
m2
324,740.00
K.006
m2
1,189,950.00
K.007
m2
#REF!
K.008
m1
#REF!
K.009
m1
#REF!
K.010
m1
#REF!
K.011
m1
#REF!
K.012
m2
360,880.00
K.013
m2
#REF!
K.014
m2
#REF!
K.015
m2
#REF!
K.016
m2
#REF!
K.017
m2
#REF!
K.018
m2
#REF!
K.019
m2
#REF!
K.020
m2
#REF!
K.021
m1
#REF!
K.022
m1
185,677.50
K.023
m1
194,917.50
K.024
m1
#REF!
K.025
m1
185,677.50
K.026
m1
194,917.50
K.027
m1
#REF!
K.028
m1
#REF!
K.029
m1
52,177.50
K.030
m1
63,580.00
K.031
m1
K.032
m1
#REF!
K.033
m1
298,340.10
K.034
bh
193,017.60
K.035
m1
526,628.20
K.036
m2
602,925.63
K.037
m2
813,101.04
K.038
m2
273,171.14
L.001
bh
122,470.00
L.002
bh
129,220.00
#REF!
63,440.00
L.003
bh
109,070.00
L.004
bh
159,630.00
L.005
bh
132,320.00
L.006
bh
27,650.00
L.007
bh
37,600.00
L.008
bh
28,170.00
L.009
bh
29,400.00
L.010
bh
17,560.00
L.011
bh
31,430.00
L.012
bh
21,040.00
L.013
bh
15,160.00
L.014
bh
185,470.00
L.015
bh
142,450.00
L.016
bh
137,515.00
L.017
bh
158,010.00
L.018
m2
78,090.00
L.019
m2
122,057.00
L.020
m2
170,545.00
L.021
m2
232,266.00
L.022
m2
100,263.00
L.023
m2
149,312.00
L.024
m2
213,502.00
L.025
m2
284,540.00
L.026
m2
146,576.00
L.027
m2
170,259.00
L.028
m2
224,574.00
L.029
m2
132,562.00
L.030
m2
176,177.00
L.031
m2
206,534.00
L.032
m2
260,654.00
L.033
m2
602,372.00
L.034
m2
898,338.00
L.035
bh
31,824.00
L.036
m2
424,788.00
M.001
m2
#REF!
M.002
m2
#REF!
M.003
m2
#REF!
M.004
m2
#REF!
M.005
m2
#REF!
M.006
m2
#REF!
M.007
m2
#REF!
M.008
m2
#REF!
M.009
m2
#REF!
M.010
m2
#REF!
M.011
m1
#REF!
M.012
m1
#REF!
M.013
m1
#REF!
M.014
m1
#REF!
M.015
m1
#REF!
M.016
m1
#REF!
M.017
m1
#REF!
M.018
m1
#REF!
M.019
m1
#REF!
M.020
m1
#REF!
M.021
m2
#REF!
M.022
m2
#REF!
M.023
m2
#REF!
M.024
m2
#REF!
M.025
m1
#REF!
M.026
m1
#REF!
M.027
m1
#REF!
M.028
m2
#REF!
M.029
Pasang gymflour
m2
300,722.00
M.030
m2
112,910.00
M.031
m2
116,885.00
M.032
m2
121,012.00
M.033
m2
130,700.70
M.034
m2
136,754.40
M.035
m2
146,161.10
M.036
m2
153,299.00
M.037
m1
33,578.50
M.038
m1
74,791.40
M.039
m1
85,092.00
M.040
m2
115,650.00
M.041
m2
120,150.00
M.042
m2
132,985.00
M.043
m2
129,045.00
M.044
m2
149,450.00
M.045
m2
129,350.00
M.046
m2
140,675.00
M.047
m2
141,657.50
M.048
m2
#REF!
M.049
m2
#REF!
M.050
m2
83,625.00
M.051
m2
91,725.00
M.052
m2
83,950.00
M.053
m2
90,950.00
M.054
m2
83,775.00
M.055
m2
91,200.00
N.001
m2
8,026.00
N.002
m2
8,385.00
N.003
m2
8,385.00
N.004
m2
N.005
m2
#REF!
N.006
m2
#REF!
N.007
m2
26,572.40
N.008
Pengecatan kayu baru (1 lapis plamir, 1 lapis cat dasar, 2 lapis cat penutup)
m2
32,521.20
N.009
Pengecatan kayu baru (1 lapis plamir, 1 lapis cat dasar, 3 lapis cat penutup)
m2
43,998.50
N.010
m2
9,585.40
N.011
m2
60,065.50
N.012
m2
13,590.00
N.013
m2
24,599.60
N.014
Pengecatan tembok baru (1 lapis plamir, 1 lapis cat dasar, 2 lapis cat penutup)
m2
14,645.10
N.015
m2
7,830.20
N.016
m2
N.017
m2
N.018
m2
N.019
Pengecatan plafon (1 lapis plamir, 1 lapis cat dasar, 2 lapis cat penutup)
m2
N.020
m2
N.021
m2
N.022
m2
N.023
m2
25,362.00
N.024
m2
114,883.60
N.025
m2
95,564.00
N.026
Pekerjaan Waterproofing
m2
O.001
kg
#REF!
O.002
kg
#REF!
O.003
kg
#REF!
O.004
Ikatan Angin/Trekstang
kg
#REF!
O.005
Plendes
kg
P.001
Titik
#REF!
125,094.00
P.002
Titik
115,214.00
P.003
Titik
134,314.00
P.004
Titik
91,975.00
P.005
Titik
102,225.00
P.006
Titik
122,735.00
P.007
Titik
148,615.00
P.008
Titik
100,685.00
P.009
Titik
100,685.00
P.010
Titik
103,255.00
8,385.00
4,894.40
#REF!
12,499.50
14,645.10
#REF!
17,539.60
#REF!
51,576.50
P.011
Titik
105,815.00
P.012
Titik
106,835.00
P.013
Unit
120,812.00
P.014
Unit
195,776.50
P.015
Unit
275,797.50
P.016
Q.001
Unit
Unit
2,780,530.00
3,300,000.00
Q.002
Geolistrik
Ls
Q.003
m1
Q.004
m1
Q.005
m1
Q.006
m1
Q.007
m1
Q.008
m1
Q.009
m1
Q.010
m1
Q.011
m1
Q.012
Ls
Q.013
m1
Q.014
m1
Q.015
m1
Q.016
m1
Q.017
m1
Q.018
m1
Q.019
m1
Q.020
m1
Q.021
m1
Q.022
m1
Q.023
m1
Q.024
m1
Q.025
m1
Q.026
m1
Q.027
m1
Q.028
m1
Q.029
m1
Q.030
m1
Q.031
m1
Q.032
m1
Q.033
m1
1,350,000.00
Q.034
m3
1,658.33
Q.035
Grouting cor
Q.036
m1
Titik
8,100.00
Q.037
Jam
8,100.00
Q.038
m1
12,150.00
Q.039
m1
18,225.00
Q.040
m1
630.00
Q.041
m1
Q.042
m1
Q.043
m1
Q.044
m1
Q.045
m1
Q.046
m1
66,140.00
Q.047
Unit
142,900.00
Q.048
Unit
Q.049
Unit
Q.050
Unit
Q.051
Unit
6,100.00
R.001
Km1
569,125.80
R.002
m3
R.003
m3
R.004
m3
R.005
m3
R.006
m3
R.007
m3
R.008
m2
R.009
m2
R.010
Beton K-175
m3
R.011
m2
R.012
Besi Tulangan
kg
5,010.00
R.013
bh
15,585.00
S.001
m2
28,630.00
S.002
m2
25,940.00
S.003
m2
31,360.00
S.004
btg
187,030.00
S.005
m3
167,795.00
S.006
m2
26,740.00
S.007
m3
12,993,900.00
5,676,875.00
-
104,841.80
5,550.00
59,400.00
-