Keterangan
URAIAN BAHAN
MATERIAL SEMEN
Semen PC / 50 kg
Semen Putih 40 kg (ex Tiga Roda)
Semen warna
Semen Merah
MATERIAL MORTAR UTAMA (MU)
Plester premium (MU 100)
Plester trasraam (MU 101)
Acian plesteran / beton expose (MU 200)
Acian plesteran (MU 250)
Acian profil (MU 260)
Acian putih (MU 270)
Finish plester (MU 290)
Pasangan bata (MU 300)
Pasangan & plesteran bata (MU 301)
Perekat bata ringan (MU 380)
Perekat keramik dinding (MU 400)
Pengisi naad keramik (MU 408)
Perata lantai (MU 440)
Perata lantai premium (MU 445)
Perekat keramik lantai (MU450)
Perekat keramik daerah basah (MU 460)
Perekat keramik diatas keramik (MU 480)
Multi Purpose Tile Adhesive (MU 485)
Fast Setting Tile Adhesive (MU 490)
Perekat mortar & beton / Bonding Agent (MU L-500)
Pelapis kedap air (MU 600)
Floor Hardener (MU 700)
Non shrink grout (MU 800)
Perbaikan permukaan beton (MU 830)
Pengisi celah beton / Finish Coat Repair (MU 840)
MATERIAL PASIR, BATU & BATA
Pasir beton
Pasir extra beton
Pasir Putih (Bangka)
Pasir Pasang
Kapur Padam
Pasir Urug darat
Sirtu
Batu pecah / Split ukuran 1-2 cm
Batu pecah / Split ukuran 2-3 cm
Koral beton
Batu kali belah
Makadam / batu pecah 5-7 cm
Abu batu 5 mm
Sreening 5-13 mm
Batu bata press mesin
Batu bata uk. 5 x 11 x 23 cm (ukuran besar) proses tangan
Batu bata uk. 4 x 9.5 x 20 cm (ukuran kecil) proses tangan
Batu bata ringan (ex Hebel), 10x16x60 cm
Batu bata ringan (ex Hebel), 7x16x60 cm
Batu bata ringan (ex Broco), 10x16x60 cm
Batu bata ringan (ex Broco), 7x16x60 cm
Batako Semen (semen, pasir, abu batu) 9x19x39 cm
Batako Semen (semen, batu apung, pumis) 9x19x39 cm
Glassblock 20/20
Rooster beton 20x20x7 cm
Rooster bata merah 12x11,5x24 cm
Lempengan garis uk. 9x19x39 cm
Tanah merah
I j u k
MATERIAL BESI
Besi beton polos
Besi beton ulir
Besi plat strip
Baja profil siku
Baja WF
Baja H Beam
Baja Kanal C (Channal)
RAB - 01
/zak
/zak
/Kg
/M3
/zak 40Kg
/zak 40Kg
/zak 40Kg
/zak 40Kg
/zak 25Kg
/zak 25Kg
/zak 40Kg
/zak 40Kg
/zak 40Kg
/zak 40Kg
/zak 25Kg
/Kg
/zak 40Kg
/zak 40Kg
/zak 40Kg
/zak 25Kg
/zak 25Kg
/40Kg set
/zak 25Kg
/ 2Kg
/30Kg set
/zak 25Kg
/zak 40Kg
/zak 40Kg
/ 25Kg set
/M3
/M3
/M3
/M3
/M3
/M3
/M3
/M3
/M3
/M3
/M3
/M3
/M3
/M3
/bh
/bh
/bh
/M3
/bh
/M3
/bh
/M3
/bh
/M3
/bh
/bh
/bh
/bh
/bh
/bh
/bh
/M3
/kg
/kg
/kg
/kg
/kg
/kg
/kg
/kg
Rgk plafond/Partisi
Rgk plafond/Partisi
Rgk plafond/Partisi
Rgk plafond/Partisi
Rgk plafond/Partisi
Rgk. Pintu besi/konstruksi
Rgk. Pintu besi/konstruksi
Rgk. Pintu besi/konstruksi
Rgk. Pintu besi/konstruksi
15,750.00
14,595.00
26,512.50
70,612.50
84,525.00
73,500.00
85,050.00
83,737.50
105,000.00
115,500.00
105,000.00
131,250.00
162,750.00
52,550.09
40,235.37
29,562.13
20,776.02
15,382.04
20,212.50
31,500.00
165,375.00
19,950.00
18,637.50
15,356.25
15,356.25
47,250.00
64,050.00
31,500.00
36,750.00
26,250.00
5,250.00
5,250.00
6,300.00
4,725.00
9,450.00
219,450.00
110,250.00
225,750.00
115,500.00
/kg
/kg
/kg
/M'
/M'
/M'
/M'
/M'
/M'
/M'
/M'
/M'
/M'
/M2
/M2
/M2
/M2
/M2
/kg
/m
/roll
/kg
/kg
/kg
/kg
/lmbr
/lmbr
/M'
/M'
/kg
/M'
/M'
/M'
/M'
/M'
/btg/6m
/btg/6m
/btg/6m
/btg/6m
336,000.00
357,000.00
367,500.00
372,750.00
393,750.00
414,750.00
/m2
/m2
/m2
/m2
/m2
/m2
241,500.00 /m2
294,000.00 /m2
336,000.00 /m2
567,541.00
434,542.00
319,271.00
224,381.00
166,126.00
MATERIAL KAYU
Kayu Meranti basah
- Balok Meranti basah (8/15,8/12,6/15,6/12, 5/10x400 cm)
- Kasau Meranti basah (5/7x400, 4/6x400 cm)
- Reng (3/4x400, 2/3x400)
- Papan Meranti basah (3/30, 3/20 & 2/30x400 cm)
Kayu Rimba Campuran (KRC) basah
- Balok (8/15,8/12,6/15,6/12, 5/10x400 cm)
- Kasau (5/7x400, 4/6x400 cm)
- Reng (3/4x400, 2/3x400)
- Papan (3/30, 3/20 & 2/30x400 cm)
- Kayu Dolken (kayu Galam 8-10cm, L=4m)
- Plastik cor
Kayu Terentang
- Papan uk. 3/30x400, 3/20x400 & 2/30x400 cm
Kayu Kamper Samarinda basah
- Balok (8/15,8/12,6/15,6/12, 5/10x400 cm)
- Kasau (5/7x400, 4/6x400 cm)
- Reng (3/4x400)
- Papan (3/20 & 2/30x400 cm)
Kayu Borneo/Meranti Super
- Balok Borneo/Meranti Super, kelas-3
- Kasau Borneo/Meranti Super
Kayu Kruing
- Balok (8/15,8/12,6/15,6/12, 5/10x400 cm)
- Kasau (5/7x400, 4/6x400 cm)
- Papan (3/20 & 2/30x400 cm)
RAB - 02
/lembar
/lembar
/lembar
/lembar
/lembar
naik 5%
3,360,000.00
2,730,000.00
2,625,000.00
4,200,000.00
/M3
/M3
/M3
/M3
( u/. Bekisting )
( u/. Bekisting )
( u/. Bekisting )
2,415,000.00
1,995,000.00
1,890,000.00
3,045,000.00
36,750.00
6,300.00
/M3
/M3
/M3
/M3
/btg
/M2
( u/. Bekisting )
2,835,000.00 /M3
(u/. Rngk.Atap)
(u/. Rngk.Atap)
(u/. Rngk.Atap)
(u/. Rngk.Atap)
7,350,000.00
6,825,000.00
5,250,000.00
8,505,000.00
(u/. Rngk.Atap)
(u/. Rngk.Atap)
4,725,000.00 /M3
4,462,500.00 /M3
(u/. Rngk.Atap)
(u/. Rngk.Atap)
(u/. Rngk.Atap)
5,040,000.00 /M3
4,725,000.00 /M3
6,825,000.00 /M3
/M3
/M3
/M3
/M3
(u/. Rngk.Atap)
(u/. Rngk.Atap)
(u/. Rngk.Atap)
5,775,000.00 /M3
5,512,500.00 /M3
6,037,500.00 /M3
(u/. Rngk.Atap)
(u/. Rngk.Atap)
(u/. Rngk.Atap)
7,350,000.00 /M3
7,140,000.00 /M3
7,612,500.00 /M3
(u/. Rngk.Atap)
(u/. Rngk.Atap)
7,350,000.00 /M3
7,140,000.00 /M3
(u/. Kosen/pintu)
(u/. Kosen/pintu)
(u/. Kosen/pintu)
(u/. Kosen/pintu)
57,750,000.00
60,375,000.00
68,250,000.00
70,875,000.00
/M3
/M3
/M3
/M3
38,850,000.00
47,250,000.00
52,500,000.00
52,500,000.00
63,000,000.00
/M3
/M3
/M3
/M3
/M3
(u/. Kosen/pintu)
(u/. Kosen/pintu)
6,300,000.00 /M3
6,300,000.00 /M3
(u/. Kosen/pintu)
(u/. Kosen/pintu)
7,875,000.00 /M3
8,137,500.00 /M3
(u/. Kosen)
(u/. Pintu)
(u/. Kosen/pintu)
(u/. Kosen/pintu)
(u/. Kosen/pintu)
9,975,000.00
9,240,000.00
7,140,000.00
10,395,000.00
10,395,000.00
10,500,000.00
11,025,000.00
6,300,000.00
/M3
/M3
/M3
/M3
/M3
/M3
/M3
/M3
(u/. Kosen/pintu)
(u/. Kosen/pintu)
7,875,000.00 /M3
8,137,500.00 /M3
(u/. Kosen/pintu)
(u/. Kosen/pintu)
10,500,000.00 /M3
10,762,500.00 /M3
MATERIAL MULTIPLEKS
naik 5%
Multipleks, 1220x2440x25 mm
Multipleks, 1220x2440x22 mm
Multipleks, 1220x2440x20 mm
Multipleks, 1220x2440x18 mm
Multipleks, 1220x2440x15 mm
Multipleks, 1220x2440x12 mm
Multipleks, 1220x2440x9 mm
Multipleks, 1220x2440x6 mm
Multipleks, 1220x2440x4 mm
Teakwood 1220x2440x3 mm
Plywood Sungkai, uk. 1220x2440x3 mm
Plywood Sungkai, uk. 1220x2440x4 mm
Plywood Sungkai, uk. 1220x2440x18 mm (1 muka)
Plywood Sungkai, uk. 1220x2440x18 mm (2 muka)
Bloktik, uk. 1220x2440x18 mm (1 muka)
Melamin, uk. 1220x2440x3 mm (mengkilap)
Formika, 92 x 212 mm
HPL 4' x 8'
MATERIAL GYPSUM, CALSIUM, GRC
Gypsum board 9 mm (water resistants)
Gypsum board 9 mm
Gypsum board 12 mm
Calcium Silikat 6 mm
Gypsum Tile 600x1200x9mm
AcousticTile 600x1200x15 mm
Profil allumunium Main Tee (p. 3,6m)
Profil allumunium Cross Tee (p. 1,2 m)
Profil allumunium Cross Tee (p. 0,60 m)
Gypsum bubuk (compound)
Paku skrup gypsum
Textile tape
List gypsum profil 5-10 cm
List plafond allumunium (Wall angle)
Ex Armstrong
RAB - 03
299,250.00
278,250.00
252,000.00
207,900.00
187,950.00
156,450.00
110,250.00
80,850.00
57,750.00
105,000.00
105,000.00
110,250.00
232,575.00
269,850.00
248,587.50
82,425.00
89,250.00
183,750.00
naik 5%
102,500.00
59,000.00
78,750.00
106,365.00
18,375.00
37,800.00
7,291.67
6,562.50
8,750.00
4,725.00
42,000.00
18,375.00
5,250.00
6,825.00
/lmbr
/lmbr
/lmbr
/lmbr
/lmbr
/lmbr
/lmbr
/lmbr
/lmbr
/lmbr
/lmbr
/lmbr
/lmbr
/lmbr
/lmbr
/lmbr
/lmbr
/lmbr
/lmbr
/lmbr
/lmbr
/lmbr
/lmbr
/lmbr
/m'
/m'
/m'
/kg
/Kg
/roll
/m'
/m'
RAB - 04
73,500.00
84,000.00
115,500.00
136,500.00
183,750.00
210,000.00
262,500.00
60,375.00
47,250.00
42,000.00
naik 5%
619,500.00
813,750.00
672,000.00
866,250.00
558,600.00
446,250.00
393,750.00
236,250.00
404,250.00
262,500.00
393,750.00
215,000.00
168,000.00
183,750.00
147,000.00
420,000.00
708,750.00
1,076,250.00
naik 5%
94,500.00
115,500.00
105,000.00
89,250.00
115,500.00
157,500.00
147,000.00
105,000.00
147,000.00
168,000.00
161,700.00
126,000.00
52,500.00
68,250.00
63,000.00
52,500.00
68,250.00
78,750.00
73,500.00
63,000.00
136,500.00
168,000.00
157,500.00
126,000.00
8,531.25
2,887.50
129,675.00
192,675.00
162,225.00
240,975.00
752,325.00
1,128,225.00
naik 5%
4,462.50
7,875.00
3,675.00
6,300.00
12,285.00
13,125.00
13,125.00
26,565.00
12,600.00
26,250.00
3,675.00
4,200.00
/lmbr
/lmbr
/lmbr
/lmbr
/lmbr
/lmbr
/lmbr
/kg
/M2
/Kg
/ M2
/ M2
/ M2
/ M2
/ M2
/ M2
/ M2
/ M2
/ M2
/ M2
/ M2
/ M2
/ M2
/ M2
/ M2
/ M2
/ M2
/ M2
/ M'
/ M'
/ M'
/ M'
/ M'
/ M'
/ M'
/ M'
/ M'
/ M'
/ M'
/ M'
/ M'
/ M'
/ M'
/ M'
/ M'
/ M'
/ M'
/ M'
/ M'
/ M'
/ M'
/ M'
/ M'
/ M'
/lmbr
/lmbr
/lmbr
/lmbr
/lmbr
/lmbr
/bh
/bh
/bh
/bh
/bh
/bh
/bh
/bh
/bh
/bh
/bh
/bh
RAB - 05
10,500.00
12,600.00
26,250.00
141,750.00
126,000.00
94,500.00
472.50
236,250.00
31,500.00
177,975.00
91,875.00
210,000.00
121,800.00
/bh
/bh
/bh
/Lbr
/Lbr
/Lbr
/bh
/M2
/Kg
/M2
/M2
/M2
/M2
18,375.00
157,500.00
141,750.00
52,500.00
/M2
/M2
/M2
/Kg
577,500.00 /M2
1,023,750.00 /M2
257,250.00
231,000.00
210,000.00
168,000.00
/M2
/M2
/M2
/M2
255,255.00
313,005.00
272,580.00
331,485.00
301,455.00
371,910.00
259,875.00
307,461.00
248,325.00
358,050.00
310,695.00
257,565.00
269,115.00
307,461.00
170,940.00
197,505.00
225,750.00
192,885.00
157,080.00
136,500.00
/M2
/M2
/M2
/M2
/M2
/M2
/M2
/M2
/M2
/M2
/M2
/M2
/M2
/M2
/M2
/M2
/M2
/M2
/M2
/M2
102,375.00 /M2
144,900.00 /M2
132,300.00
146,265.00
169,575.00
214,987.50
159,075.00
214,987.50
/M2
/M2
/M2
/M2
/M2
/M2
157,500.00
183,750.00
173,712.00
198,660.00
288,750.00
300,646.50
243,936.00
/M2
/M2
/M2
/M2
/M2
/M2
/M2
178,500.00 /M2
131,250.00 /M2
236,250.00 /M2
682,500.00
682,500.00
997,500.00
1,365,000.00
630,000.00
/M2
/M2
/M2
/M2
/M2
RAB - 06
Jenis slab
Jenis slab
420,000.00
498,750.00
609,000.00
170,625.00
275,625.00
367,500.00
/M2
/M2
/M2
/M2
/M2
/M2
9,450.00 /kg
12,600.00 /kg
Wall tile
Gol. D
Gol. B
57,750.00
68,250.00
57,750.00
86,100.00
79,800.00
73,500.00
97,650.00
134,925.00
84,000.00
82,500.00
96,600.00
176,400.00
/M2
/M2
/M2
/M2
/M2
/M2
/M2
/M2
/M2
/M2
/M2
/M2
121,380.00
110,775.00
145,923.75
156,187.50
103,635.00
107,730.00
174,510.00
188,685.00
189,000.00
189,000.00
31,500.00
52,500.00
236,250.00
157,500.00
78,750.00
/M2
/M2
/M2
/M2
/M2
/M2
/M2
/M2
/M2
/M2
/M2
/M2
/M2
/M2
/M2
133,000.35
156,187.50
157,500.00
147,000.00
110,250.00
110,250.00
110,250.00
136,500.00
168,000.00
178,500.00
189,000.00
99,750.00
115,500.00
/M2
/M2
/M2
/M2
/M2
/M2
/M2
/M2
/M2
/M2
/M2
/M2
/M2
99,750.00
131,250.00
141,750.00
136,500.00
147,000.00
157,500.00
124,110.00
143,010.00
157,500.00
144,900.00
163,800.00
181,440.00
143,010.00
117,810.00
39,900.00
/M2
/M2
/M2
/M2
/M2
/M2
/M2
/M2
/M2
/M2
/M2
/M2
/M2
/M2
/Bh
63,525.00
88,935.00
38,115.00
53,130.00
/Bh
/Bh
/Bh
/Bh
88,725.00
49,875.00
36,750.00
28,875.00
/Kg
/Kg
/Kg
/Kg
26,250.00
44,257.50
51,292.50
47,250.00
60,375.00
80,398.50
86,992.50
45,596.25
39,375.00
57,750.00
60,000.00
20,000.00
18,375.00
57,750.00
52,500.00
47,250.00
26,250.00
52,500.00
63,000.00
52,500.00
55,125.00
52,500.00
23,625.00
18,375.00
36,750.00
15,750.00
2,887.50
/Kg
/Kg
/Kg
/Kg
/Kg
/Kg
/Kg
/Kg
/Kg
/Kg
/Kg
/Kg
/Kg
/Kg
/Kg
/Kg
/Kg
/Kg
/Kg
/Kg
/Kg
/Kg
/Kg
/Kg
/Bh
/Bh
/Bh
DAFTAR PEKERJA
BIDANG PEKERJAAN
Mandor
110,000.00 /org/hari
105,000.00
90,000.00
95,000.00
100,000.00
100,000.00 /org/hari
90,000.00 /org/hari
95,000.00 /org/hari
Finishing pengecatan
UPAH
/org/hari
/org/hari
/org/hari
/org/hari
95,000.00 /org/hari
90,000.00 /org/hari
90,000.00 /org/hari
85,000.00 /org/hari
100,000.00 /org/hari
90,000.00 /org/hari
109,960.00 /org/hari
90,000.00 /org/hari
100,000.00 /org/hari
100,000.00 /org/hari
90,000.00 /org/hari
100,000.00 /org/hari
90,000.00 /org/hari
109,960.00 /org/hari
Pekerja
RAB - 07
75,000.00 /org/hari
URAIAN PEKERJAAN
I.
1.1.
1.2.
Pekerja
Mandor
1.6.
1.5.
1.4.
1.3.
SNI
kfsn
HARGA SATUAN
PEKERJAAN
BOW
0.007
0.010
0.020
0.010
0.100
0.100
0.005
2.500
0.005
0.009
1.200
1.250
0.014
0.060
0.450
0.020
0.200
0.400
0.020
0.150
0.090
0.010
1.000
0.050
1.250
0.018
0.850
1.100
35.000
0.150
0.100
0.150
30.000
0.250
7.000
0.080
0.150
0.060
0.300
2.000
1.000
1.000
0.050
1.700
0.021
0.300
10.500
0.030
0.050
1.500
0.200
2.000
1.000
0.050
6.750
2.000
0.005
0.009
0.060
0.050
RAB - 08
M3
4,200,000.00
M3
2,730,000.00
Kg
15,356.25
Sub - Bahan
Org
105,000.00
Org
90,000.00
Org
75,000.00
Org
110,000.00
Sub - Upah
27,720.00
26,276.25
307.13
54,303.38 Rp
1,050.00
9,000.00
7,500.00
550.00
18,100.00 Rp
TOTAL Rp
zak
1,300.00
M3
270,375.00
M3
269,500.35
lbr
47,250.00
btg
36,750.00
M3
2,730,000.00
Kg
15,356.25
Kg
23,625.00
Sub - Bahan
Org
105,000.00
Org
90,000.00
Org
75,000.00
Org
110,000.00
Sub - Upah
3,250.00
1,351.88
2,425.50
56,700.00
45,937.50
38,220.00
921.38
10,631.25
159,437.50 Rp
2,100.00
18,000.00
30,000.00
2,200.00
52,300.00 Rp
TOTAL Rp
M3
257,250.00
M3
262,500.00
M3
265,125.00
Sub - Bahan
Org
75,000.00
Org
110,000.00
Sub - Upah
38,587.50
23,625.00
2,651.25
64,863.75 Rp
75,000.00
5,500.00
80,500.00 Rp
TOTAL Rp
btg
36,750.00
m
2,730,000.00
kg
15,356.25
kg
14,542.50
kg
1,300.00
m
265,125.00
m
270,375.00
m
269,500.35
bh
630.00
Lbr
47,250.00
daun
15,000.00
m
75,000.00
bh
60,000.00
lbr
105,000.00
Sub - Bahan
Org
105,000.00
Org
90,000.00
Org
90,000.00
Org
75,000.00
Org
110,000.00
Sub - Upah
45,937.50
49,140.00
13,052.81
15,996.75
45,500.00
39,768.75
27,037.50
40,425.05
18,900.00
11,812.50
105,000.00
6,000.00
9,000.00
6,300.00
433,870.87 Rp
31,500.00
180,000.00
90,000.00
75,000.00
5,500.00
382,000.00 Rp
TOTAL Rp
btg
36,750.00
m
2,730,000.00
kg
15,356.25
kg
1,300.00
m
270,375.00
m
269,500.35
Lbr
47,250.00
Sub - Bahan
Org
105,000.00
Org
90,000.00
Org
75,000.00
Org
110,000.00
Sub - Upah
62,475.00
57,330.00
4,606.88
13,650.00
8,111.25
13,475.02
70,875.00
230,523.14 Rp
21,000.00
180,000.00
75,000.00
5,500.00
281,500.00 Rp
TOTAL Rp
kg
14,455.35
kg
1,300.00
m
270,375.00
m
269,500.35
kg
15,356.25
kg
16,537.50
Sub - Bahan
97,573.61
2,600.00
1,351.88
2,425.50
921.38
826.88
105,699.24
Rp
54,303.38
18,100.00
72,403.38
159,437.50
52,300.00
211,737.50
64,863.75
80,500.00
145,363.75
433,870.87
382,000.00
815,870.87
230,523.14
281,500.00
512,023.14
105,699.24
URAIAN PEKERJAAN
Upah
1.7.
1
10
11
12
13
SNI
SNI
SNI
SNI
SNI
SNI
SNI
SNI
SNI
Pekerja
Mandor
Rp
13,000.00
Org
75,000.00
Org
110,000.00
Sub - Upah
18,750.00
1,320.00
20,070.00
Rp
20,070.00
Org
75,000.00
Org
110,000.00
Sub - Upah
56,250.00
2,750.00
59,000.00
Rp
59,000.00
Org
75,000.00
Org
110,000.00
Sub - Upah
67,500.00
4,950.00
72,450.00
Rp
72,450.00
1.050
0.067
Org
75,000.00
Org
110,000.00
Sub - Upah
78,750.00
7,370.00
86,120.00
Rp
86,120.00
1.000
0.032
Org
75,000.00
Org
110,000.00
Sub - Upah
75,000.00
3,520.00
78,520.00
Rp
78,520.00
Org
75,000.00
Org
110,000.00
Sub - Upah
112,500.00
6,600.00
119,100.00
Rp
119,100.00
Org
75,000.00
Org
110,000.00
Sub - Upah
90,000.00
4,950.00
94,950.00
Rp
94,950.00
Org
75,000.00
Org
110,000.00
Sub - Upah
3,750.00
550.00
4,300.00
Rp
4,300.00
0.516
0.050
Org
75,000.00
Org
110,000.00
Sub - Upah
38,700.00
5,500.00
44,200.00
Rp
44,200.00
0.250
0.008
Org
75,000.00
Org
110,000.00
Sub - Upah
18,750.00
880.00
19,630.00
Rp
19,630.00
Org
75,000.00
Org
110,000.00
Sub - Upah
37,500.00
5,500.00
43,000.00
Rp
43,000.00
M3
262,500.00
M3
25,000.00
Sub - Bahan
315,000.00
30,000.00
345,000.00
Rp
345,000.00
Org
75,000.00
Org
110,000.00
Sub - Upah
15,000.00
1,100.00
16,100.00 Rp
TOTAL Rp
16,100.00
361,100.00
Org
75,000.00
Org
110,000.00
Sub - Upah
8,175.00
5,940.00
14,115.00
1.500
0.060
1.200
0.045
0.050
0.005
0.500
0.050
44,800.00
150,499.24
BOW
1.200
1.200
0.200
0.010
SNI
0.109
0.054
15
7,500.00
5,500.00
13,000.00
0.900
0.045
Org
75,000.00
Org
110,000.00
Sub - Upah
0.750
0.025
HARGA SATUAN
PEKERJAAN
2,100.00
18,000.00
22,500.00
2,200.00
44,800.00 Rp
TOTAL Rp
0.250
0.012
0.100
0.050
kfsn
0.020
0.200
0.300
0.020
Upah
14
SNI
0.054
0.100
1.000
jam
469,389.80
jam
242,640.20
ls
10,000.00
Sub - Sewa Peralatan
Rp
14,115.00
25,347.05
24,264.02
10,000.00
59,611.07 Rp
TOTAL Rp
59,611.07
73,726.07
SNI
1.200
0.250
0.025
0.020
0.331
0.007
0.011
RAB - 09
M3
262,500.00
Sub - Bahan
Org
75,000.00
Org
110,000.00
Sub - Upah
jam
jam
jam
jam
267,270.30
242,640.20
288,512.40
247,328.40
315,000.00
315,000.00
18,750.00
2,750.00
21,500.00
5,345.41
80,313.91
2,019.59
2,720.61
Rp
315,000.00
Rp
21,500.00
URAIAN PEKERJAAN
SNI
kfsn
1.8.
1.9.
1.10.
0.250
0.025
Pekerja
Mandor
1,164.24
10,000.00
101,563.75 Rp
TOTAL Rp
M3
291,375.00
Sub - Bahan
Org
75,000.00
Org
110,000.00
Sub - Upah
349,650.00
349,650.00 Rp
22,500.00
1,100.00
23,600.00 Rp
TOTAL Rp
M3
256,200.00
Sub - Bahan
Org
75,000.00
Org
110,000.00
Sub - Upah
307,440.00
307,440.00 Rp
18,750.00
2,750.00
21,500.00 Rp
TOTAL Rp
M3
273,000.00
Sub - Bahan
Org
75,000.00
Org
110,000.00
Sub - Upah
327,600.00
327,600.00 Rp
18,750.00
2,750.00
21,500.00 Rp
TOTAL Rp
M3
269,500.35
Sub - Bahan
Org
75,000.00
Org
110,000.00
Sub - Upah
323,400.42
323,400.42 Rp
18,750.00
2,750.00
21,500.00 Rp
TOTAL Rp
M3
257,250.00
Sub - Bahan
Org
75,000.00
Org
110,000.00
Sub - Upah
308,700.00
308,700.00 Rp
18,750.00
2,750.00
21,500.00 Rp
TOTAL Rp
M3
262,500.00
Sub - Bahan
Org
75,000.00
Org
110,000.00
Sub - Upah
315,000.00
315,000.00 Rp
18,750.00
2,750.00
21,500.00 Rp
TOTAL Rp
kg
31,500.00
Sub - Bahan
Org
75,000.00
Org
110,000.00
Sub - Upah
189,000.00
189,000.00 Rp
11,250.00
1,650.00
12,900.00 Rp
TOTAL Rp
Org
75,000.00
Org
110,000.00
Sub - Upah
500,025.00
36,630.00
536,655.00 Rp
TOTAL Rp
536,655.00
536,655.00
Org
75,000.00
Org
110,000.00
Sub - Upah
50,025.00
3,630.00
53,655.00 Rp
TOTAL Rp
53,655.00
53,655.00
Org
75,000.00
Org
110,000.00
Sub - Upah
5,475.00
440.00
5,915.00 Rp
TOTAL Rp
5,915.00
5,915.00
Org
75,000.00
Org
110,000.00
Sub - Upah
60,000.00
4,400.00
64,400.00 Rp
TOTAL Rp
64,400.00
64,400.00
Org
75,000.00
Org
110,000.00
Sub - Upah
112,500.00
8,250.00
120,750.00 Rp
TOTAL Rp
120,750.00
120,750.00
Org
75,000.00
Org
110,000.00
Sub - Upah
225,000.00
16,500.00
241,500.00
241,500.00
101,563.75
438,063.75
349,650.00
23,600.00
373,250.00
307,440.00
21,500.00
328,940.00
SNI-2008
1.200
0.250
0.025
327,600.00
21,500.00
349,100.00
SNI-2008
1.200
0.250
0.025
323,400.42
21,500.00
344,900.42
SNI-2008
1.200
0.250
0.025
308,700.00
21,500.00
330,200.00
SNI-2008
1.200
Pekerja
Mandor
1.15.
1.200
Pekerja
Mandor
1.14.
jam
145,530.00
ls
10,000.00
Sub - Sewa Peralatan
SNI-2008
Pekerja
Mandor
1.13.
0.300
0.010
Pekerja
Mandor
1.12.
1.200
Pekerja
Mandor
1.11.
HARGA SATUAN
PEKERJAAN
SNI-2008
Pekerja
Mandor
0.008
1.000
0.250
0.025
315,000.00
21,500.00
336,500.00
SNI-2008
6.000
0.150
0.015
189,000.00
12,900.00
201,900.00
PEKERJAAN BONGKARAN
Pek. Bongkar beton bertulang / M3
Upah : Pekerja
Mandor
6.667
0.333
0.667
0.033
0.073
0.004
0.800
0.040
1.500
0.075
3.000
0.150
RAB - 010
Rp
URAIAN PEKERJAAN
10
11
12
13
14
15
16
17
18
III.
SNI
kfsn
0.100
0.010
0.100
0.005
0.075
0.005
0.020
0.010
0.060
0.015
0.050
0.025
0.100
0.025
0.003
0.005
0.100
0.005
Pek. Bongkar kuda2 & loteng kayu (kayu akan dipakai lagi) / M3
Upah : Pekerja
Tukang kayu
Kepala Tukang
Mandor
2.666
4.000
0.400
0.133
Pek. Bongkar kuda2 & loteng kayu (kayu tidak dipakai lagi) / M3
Upah : Pekerja
Mandor
4.000
0.400
0.100
0.005
0.030
0.003
HARGA SATUAN
PEKERJAAN
TOTAL Rp
241,500.00
Org
75,000.00
Org
110,000.00
Sub - Upah
7,500.00
1,100.00
8,600.00 Rp
TOTAL Rp
8,600.00
8,600.00
Org
75,000.00
Org
110,000.00
Sub - Upah
7,500.00
550.00
8,050.00 Rp
TOTAL Rp
8,050.00
8,050.00
Org
75,000.00
Org
110,000.00
Sub - Upah
5,625.00
550.00
6,175.00 Rp
TOTAL Rp
6,175.00
6,175.00
Org
75,000.00
Org
110,000.00
Sub - Upah
1,500.00
1,100.00
2,600.00 Rp
TOTAL Rp
2,600.00
2,600.00
Org
75,000.00
Org
110,000.00
Sub - Upah
4,500.00
1,650.00
6,150.00 Rp
TOTAL Rp
6,150.00
6,150.00
Org
75,000.00
Org
110,000.00
Sub - Upah
3,750.00
2,750.00
6,500.00 Rp
TOTAL Rp
6,500.00
6,500.00
Org
75,000.00
Org
90,000.00
Org
105,000.00
Org
110,000.00
Sub - Upah
7,500.00
2,250.00
315.00
550.00
10,615.00 Rp
TOTAL Rp
10,615.00
10,615.00
Org
75,000.00
Org
110,000.00
Sub - Upah
7,500.00
550.00
8,050.00 Rp
TOTAL Rp
8,050.00
8,050.00
Org
75,000.00
Org
90,000.00
Org
105,000.00
Org
110,000.00
Sub - Upah
199,950.00
360,000.00
42,000.00
14,630.00
616,580.00 Rp
TOTAL Rp
616,580.00
616,580.00
Org
75,000.00
Org
110,000.00
Sub - Upah
300,000.00
44,000.00
344,000.00 Rp
TOTAL Rp
344,000.00
344,000.00
Org
75,000.00
Org
110,000.00
Sub - Upah
7,500.00
550.00
8,050.00 Rp
TOTAL Rp
8,050.00
8,050.00
Org
75,000.00
Org
110,000.00
Sub - Upah
2,250.00
330.00
2,580.00 Rp
TOTAL Rp
2,580.00
2,580.00
PEKERJAAN BETON
3.1.
1
SNI-2008
247.00
869.00
999.00
215.00
Pekerja
Tukang batu
Kepala Tukang batu
Mandor
1.650
0.275
0.028
0.083
kg
1,300.00
kg
193.13
Kg
199.63
liter
100.00
Sub - Bahan
Org
75,000.00
Org
90,000.00
Org
100,000.00
Org
110,000.00
Sub - Upah
321,100.00
167,825.63
199,430.26
21,500.00
709,855.88
123,750.00
24,750.00
2,800.00
9,130.00
160,430.00
TOTAL
kg
1,300.00
kg
193.13
Kg
199.63
liter
100.00
Sub - Bahan
299,000.00
172,460.63
205,019.90
20,000.00
696,480.52
Rp
709,855.88
Rp
Rp
160,430.00
870,285.88
Rp
696,480.52
SNI-2008
230.00
893.00
1,027.00
200.00
RAB - 011
URAIAN PEKERJAAN
Upah
1.200
0.200
0.020
0.060
90,000.00
18,000.00
2,000.00
6,600.00
116,600.00
TOTAL
kg
1,300.00
kg
193.13
Kg
199.63
liter
100.00
Sub - Bahan
Org
75,000.00
Org
90,000.00
Org
100,000.00
Org
110,000.00
Sub - Upah
358,800.00
159,907.50
202,025.45
21,500.00
742,232.95
123,750.00
24,750.00
2,800.00
9,130.00
160,430.00
TOTAL
kg
1,300.00
kg
193.13
Kg
199.63
liter
100.00
Sub - Bahan
Sub - Upah
388,700.00
154,306.88
203,023.60
21,500.00
767,530.47
Rp
Rp
116,600.00
813,080.52
276.00
828.00
1,012.00
215.00
1.650
0.275
0.028
0.083
Rp
742,232.95
Rp
Rp
160,430.00
902,662.95
Rp
Rp
Rp
767,530.47
160,430.00
927,960.47
Rp
Rp
Rp
797,494.16
160,430.00
957,924.16
Rp
Rp
Rp
826,092.79
160,430.00
986,522.79
Rp
Rp
Rp
826,092.79
160,430.00
986,522.79
Rp
Rp
Rp
861,757.95
160,430.00
1,022,187.95
Rp
Rp
Rp
886,217.77
160,430.00
1,046,647.77
TOTAL
Rp
Rp
Rp
893,740.24
160,430.00
1,054,170.24
570,700.00
129,393.75
200,827.67
21,500.00
922,421.42
Rp
922,421.42
SNI-2008
299.00
799.00
1,017.00
215.00
TOTAL
5
SNI-2008
326.00
760.00
1,029.00
215.00
kg
1,300.00
kg
193.13
Kg
199.63
liter
100.00
Sub - Bahan
Sub - Upah
423,800.00
146,775.00
205,419.16
21,500.00
797,494.16
TOTAL
SNI-2008
352.00
731.00
1,031.00
215.00
kg
1,300.00
kg
193.13
Kg
199.63
liter
100.00
Sub - Bahan
Sub - Upah
457,600.00
141,174.38
205,818.42
21,500.00
826,092.79
TOTAL
SNI-2008
352.00
731.00
1,031.00
215.00
kg
1,300.00
kg
193.13
Kg
199.63
liter
100.00
Sub - Bahan
Sub - Upah
457,600.00
141,174.38
205,818.42
21,500.00
826,092.79
TOTAL
SNI-2008
384.00
692.00
1,039.00
215.00
kg
1,300.00
kg
193.13
Kg
199.63
liter
100.00
Sub - Bahan
Sub - Upah
499,200.00
133,642.50
207,415.45
21,500.00
861,757.95
TOTAL
SNI-2008
406.00
684.00
1,026.00
215.00
kg
1,300.00
kg
193.13
Kg
199.63
liter
100.00
Sub - Bahan
Sub - Upah
527,800.00
132,097.50
204,820.27
21,500.00
886,217.77
TOTAL
10
11
SNI-2008
413.00
681.00
1,021.00
215.00
HARGA SATUAN
PEKERJAAN
SNI-2008
Pekerja
Tukang batu
Kepala Tukang batu
Mandor
kfsn
Pekerja
Tukang batu
Kepala Tukang batu
Mandor
SNI
kg
1,300.00
kg
193.13
Kg
199.63
liter
100.00
Sub - Bahan
Sub - Upah
536,900.00
131,518.13
203,822.12
21,500.00
893,740.24
SNI-2008
439.00
670.00
1,006.00
215.00
RAB - 012
kg
1,300.00
kg
193.13
Kg
199.63
liter
100.00
Sub - Bahan
URAIAN PEKERJAAN
Upah
12
kfsn
Pekerja
Tukang batu
Kepala Tukang batu
Mandor
SNI
2.100
0.350
0.035
0.105
157,500.00
31,500.00
3,500.00
11,550.00
204,050.00
TOTAL
kg
1,300.00
kg
193.13
Kg
199.63
liter
100.00
Sub - Bahan
Sub - Upah
570,700.00
129,393.75
200,827.67
21,500.00
922,421.42
439.00
670.00
1,006.00
215.00
400.00
0.48
0.80
1.20
210.00
kg
1,300.00
m3
270,375.00
m3
269,500.35
kg
50,000.00
liter
100.00
Sub - Bahan
Sub - Upah
4.000
0.006
0.009
0.002
0.010
3.000
0.045
Pekerja
Tukang batu
Tukang kayu
Tukang besi
Kepala Tukang batu
Mandor
520,000.00
129,780.00
215,600.28
60,000.00
21,000.00
946,380.28
0.180
0.020
0.020
0.020
0.006
0.009
kg
1,300.00
m3
270,375.00
m3
269,500.35
M3
3,045,000.00
Kg
15,356.25
Kg
13,125.00
Kg
20,212.50
Sub - Bahan
Org
75,000.00
Org
90,000.00
Org
90,000.00
Org
85,000.00
Org
100,000.00
Org
110,000.00
Sub - Upah
5,200.00
1,622.25
2,425.50
6,090.00
153.56
39,375.00
909.56
55,775.88
13,500.00
1,800.00
1,800.00
1,700.00
600.00
990.00
20,390.00
TOTAL
Harga/m3
Rp
Rp
Rp
946,380.28
204,050.00
1,150,430.28
Rp
55,775.88
Rp
Rp
Rp
20,390.00
76,165.88
6,294,700.67
kg
1,300.00
m3
270,375.00
m3
269,500.35
M3
3,045,000.00
Kg
15,356.25
Kg
13,125.00
Kg
20,212.50
Sub - Bahan
Org
75,000.00
Org
90,000.00
Org
90,000.00
Org
85,000.00
Org
100,000.00
Org
110,000.00
Sub - Upah
7,150.00
2,433.38
4,042.51
9,135.00
307.13
47,250.00
1,010.63
71,328.63
22,275.00
2,970.00
2,970.00
2,805.00
1,000.00
1,650.00
33,670.00
TOTAL
Harga/m3
Rp
71,328.63
Rp
Rp
Rp
33,670.00
104,998.63
6,363,553.35
M3
3,045,000.00
Kg
15,356.25
liter
35,000.00
Kg
13,125.00
Kg
20,212.50
kg
1,300.00
m3
270,375.00
m3
269,500.35
Sub - Bahan
Org
75,000.00
Org
90,000.00
Org
90,000.00
Org
85,000.00
Org
100,000.00
Org
110,000.00
Sub - Upah
822,150.00
30,712.50
21,000.00
2,756,250.00
60,637.50
436,800.00
146,002.50
218,295.28
4,491,847.78
423,750.00
24,750.00
140,400.00
119,000.00
32,300.00
31,130.00
771,330.00
TOTAL
Rp
4,491,847.78
Rp
Rp
771,330.00
5,263,177.78
M3
Kg
liter
Kg
Kg
609,000.00
23,034.38
14,000.00
2,067,187.50
45,478.13
SNI-2008
5.500
0.009
0.015
0.003
0.020
3.600
0.050
Pekerja
Tukang batu
Tukang kayu
Tukang besi
Kepala Tukang batu
Mandor
0.297
0.033
0.033
0.033
0.010
0.015
0.0165
MEMBUAT 1 M3 SLOOF BETON BERTULANG
(200 kg besi + bekisting)
Bahan : Kayu kelas III (kayu papan Terentang)
Paku 5-12 cm
Minyak bekisting
Besi beton polos
Kawat beton
Semen PC
Pasir beton
Kerikil / split (2-3 cm)
Upah
922,421.42
204,050.00
1,126,471.42
SNI-2008
0.0121
Rp
Rp
Rp
Upah
204,050.00
1,126,471.42
SNI-2008
TOTAL
3.2.
Rp
Rp
SNI-2008
TOTAL
13
HARGA SATUAN
PEKERJAAN
SNI-2008
0.270
2.000
0.600
210.000
3.000
336.000
0.540
0.810
Pekerja
Tukang batu
Tukang kayu
Tukang besi
Kepala Tukang batu
Mandor
5.650
0.275
1.560
1.400
0.323
0.283
SNI-2008
0.200
1.500
0.400
157.500
2.250
RAB - 013
3,045,000.00
15,356.25
35,000.00
13,125.00
20,212.50
URAIAN PEKERJAAN
SNI
kfsn
Semen PC
Pasir beton
Kerikil / split (2-3 cm)
Upah
5.300
0.275
1.300
1.050
0.262
0.265
0.400
4.000
2.000
315.000
4.500
336.000
0.540
0.810
0.150
3.500
20.000
7.050
0.275
1.650
2.100
0.403
0.353
436,800.00
146,002.50
218,295.28
3,559,797.78
397,500.00
24,750.00
117,000.00
89,250.00
26,200.00
29,150.00
683,850.00
TOTAL
M3
3,045,000.00
Kg
15,356.25
liter
35,000.00
Kg
13,125.00
Kg
20,212.50
kg
1,300.00
m3
270,375.00
m3
269,500.35
M3
3,360,000.00
lmbr
110,250.00
btg
36,750.00
Sub - Bahan
Org
75,000.00
Org
90,000.00
Org
90,000.00
Org
85,000.00
Org
100,000.00
Org
110,000.00
Sub - Upah
1,218,000.00
61,425.00
70,000.00
4,134,375.00
90,956.25
436,800.00
146,002.50
218,295.28
504,000.00
385,875.00
735,000.00
8,000,729.03
528,750.00
24,750.00
148,500.00
178,500.00
40,300.00
38,830.00
959,630.00
TOTAL
M3
3,045,000.00
Kg
15,356.25
liter
35,000.00
Kg
13,125.00
Kg
20,212.50
kg
1,300.00
m3
270,375.00
m3
269,500.35
M3
3,360,000.00
lmbr
110,250.00
btg
36,750.00
Sub - Bahan
Org
75,000.00
Org
90,000.00
Org
90,000.00
Org
85,000.00
Org
100,000.00
Org
110,000.00
Sub - Upah
1,218,000.00
61,425.00
70,000.00
3,445,312.50
90,956.25
436,800.00
146,002.50
218,295.28
504,000.00
385,875.00
735,000.00
7,311,666.53
528,750.00
24,750.00
148,500.00
148,750.00
40,300.00
38,830.00
929,880.00
TOTAL
M3
3,045,000.00
Kg
15,356.25
liter
35,000.00
Kg
13,125.00
Kg
20,212.50
kg
1,300.00
m3
270,375.00
m3
269,500.35
M3
3,360,000.00
lmbr
110,250.00
btg
36,750.00
Sub - Bahan
Org
75,000.00
Org
90,000.00
Org
90,000.00
Org
85,000.00
Org
100,000.00
Org
110,000.00
Sub - Upah
1,218,000.00
61,425.00
70,000.00
2,756,250.00
90,956.25
436,800.00
146,002.50
218,295.28
504,000.00
385,875.00
735,000.00
6,622,604.03
528,750.00
24,750.00
148,500.00
119,000.00
40,300.00
38,830.00
900,130.00
TOTAL
M3
Kg
liter
Kg
Kg
974,400.00
49,140.00
56,000.00
2,756,250.00
60,637.50
Rp
3,559,797.78
Rp
Rp
683,850.00
4,243,647.78
Rp
8,000,729.03
Rp
Rp
959,630.00
8,960,359.03
Rp
7,311,666.53
Rp
Rp
929,880.00
8,241,546.53
Rp
6,622,604.03
Rp
Rp
900,130.00
7,522,734.03
SNI-2008
0.400
4.000
2.000
262.500
4.500
336.000
0.540
0.810
0.150
3.500
20.000
Pekerja
Tukang batu
Tukang kayu
Tukang besi
Kepala Tukang batu
Mandor
7.050
0.275
1.650
1.750
0.403
0.353
SNI-2008
0.400
4.000
2.000
210.000
4.500
336.000
0.540
0.810
0.150
3.500
20.000
Pekerja
Tukang batu
Tukang kayu
Tukang besi
Kepala Tukang batu
Mandor
kg
1,300.00
m3
270,375.00
m3
269,500.35
Sub - Bahan
Org
75,000.00
Org
90,000.00
Org
90,000.00
Org
85,000.00
Org
100,000.00
Org
110,000.00
Sub - Upah
HARGA SATUAN
PEKERJAAN
SNI-2008
Pekerja
Tukang batu
Tukang kayu
Tukang besi
Kepala Tukang batu
Mandor
5.b
Pekerja
Tukang batu
Tukang kayu
Tukang besi
Kepala Tukang batu
Mandor
5.a
336.000
0.540
0.810
7.050
0.275
1.650
1.400
0.403
0.353
SNI-2008
0.320
3.200
1.600
210.000
3.000
RAB - 014
3,045,000.00
15,356.25
35,000.00
13,125.00
20,212.50
URAIAN PEKERJAAN
SNI
kfsn
Semen PC
Pasir beton
Kerikil / split (2-3 cm)
Kayu kelas II (kayu Meranti basah Balok)
Plywood/multiplex 9mm
Dolken kayu Galam, dia. 8-10cm, panjang 4m
Upah
6.350
0.275
1.650
1.400
0.333
0.318
0.320
3.200
1.600
157.500
2.250
336.000
0.540
0.810
0.120
2.800
32.000
5.300
0.275
1.300
1.050
0.265
0.265
436,800.00
146,002.50
218,295.28
470,400.00
308,700.00
588,000.00
6,064,625.28
476,250.00
24,750.00
148,500.00
119,000.00
33,300.00
34,980.00
836,780.00
TOTAL
M3
3,045,000.00
Kg
15,356.25
liter
35,000.00
Kg
13,125.00
Kg
20,212.50
kg
1,300.00
m3
270,375.00
m3
269,500.35
M3
3,360,000.00
lmbr
110,250.00
btg
36,750.00
Sub - Bahan
Org
75,000.00
Org
90,000.00
Org
90,000.00
Org
85,000.00
Org
100,000.00
Org
110,000.00
Sub - Upah
974,400.00
49,140.00
56,000.00
2,067,187.50
45,478.13
436,800.00
146,002.50
218,295.28
403,200.00
308,700.00
1,176,000.00
5,881,203.41
397,500.00
24,750.00
117,000.00
89,250.00
26,500.00
29,150.00
684,150.00
TOTAL
M3
3,045,000.00
Kg
15,356.25
liter
35,000.00
Kg
13,125.00
Kg
20,212.50
kg
1,300.00
m3
270,375.00
m3
269,500.35
M3
3,360,000.00
lmbr
110,250.00
btg
36,750.00
Sub - Bahan
Org
75,000.00
Org
90,000.00
Org
90,000.00
Org
85,000.00
Org
100,000.00
Org
110,000.00
Sub - Upah
974,400.00
49,140.00
56,000.00
2,067,187.50
45,478.13
436,800.00
146,002.50
218,295.28
403,200.00
308,700.00
1,176,000.00
5,881,203.41
397,500.00
24,750.00
117,000.00
89,250.00
26,500.00
29,150.00
684,150.00
TOTAL
M3
3,045,000.00
Kg
15,356.25
liter
35,000.00
Kg
13,125.00
Kg
20,212.50
kg
1,300.00
m3
270,375.00
m3
269,500.35
M3
3,360,000.00
lmbr
110,250.00
btg
36,750.00
Sub - Bahan
Org
75,000.00
Org
90,000.00
Org
90,000.00
Org
85,000.00
Org
100,000.00
Org
110,000.00
Sub - Upah
974,400.00
49,140.00
56,000.00
1,722,656.25
45,478.13
436,800.00
146,002.50
218,295.28
403,200.00
308,700.00
1,176,000.00
5,536,672.16
397,500.00
24,750.00
117,000.00
89,250.00
26,500.00
29,150.00
684,150.00
TOTAL
Rp
6,064,625.28
Rp
Rp
836,780.00
6,901,405.28
Rp
5,881,203.41
Rp
Rp
684,150.00
6,565,353.41
Rp
5,881,203.41
Rp
Rp
684,150.00
6,565,353.41
Rp
5,536,672.16
Rp
Rp
684,150.00
6,220,822.16
SNI-2008
0.320
3.200
1.600
157.500
2.250
336.000
0.540
0.810
0.120
2.800
32.000
Pekerja
Tukang batu
Tukang kayu
Tukang besi
Kepala Tukang batu
Mandor
5.300
0.275
1.300
1.050
0.265
0.265
SNI-2008
0.320
3.200
1.600
131.250
2.250
336.000
0.540
0.810
0.120
2.800
32.000
Pekerja
Tukang batu
Tukang kayu
Tukang besi
Kepala Tukang batu
Mandor
kg
1,300.00
m3
270,375.00
m3
269,500.35
M3
3,360,000.00
lmbr
110,250.00
btg
36,750.00
Sub - Bahan
Org
75,000.00
Org
90,000.00
Org
90,000.00
Org
85,000.00
Org
100,000.00
Org
110,000.00
Sub - Upah
HARGA SATUAN
PEKERJAAN
SNI-2008
Pekerja
Tukang batu
Tukang kayu
Tukang besi
Kepala Tukang batu
Mandor
8.b
8.a
Pekerja
Tukang batu
Tukang kayu
Tukang besi
Kepala Tukang batu
Mandor
336.000
0.540
0.810
0.140
2.800
16.000
5.300
0.275
1.300
1.050
0.265
0.265
SNI-2008
RAB - 015
URAIAN PEKERJAAN
SNI
kfsn
Pekerja
Tukang batu
Kepala Tukang batu
Mandor
M3
3,045,000.00
Kg
15,356.25
liter
35,000.00
Kg
13,125.00
Kg
20,212.50
kg
1,300.00
m3
270,375.00
m3
269,500.35
M3
3,360,000.00
lmbr
110,250.00
btg
36,750.00
Sub - Bahan
Org
75,000.00
Org
90,000.00
Org
90,000.00
Org
85,000.00
Org
100,000.00
Org
110,000.00
Sub - Upah
974,400.00
49,140.00
56,000.00
1,378,125.00
45,478.13
436,800.00
146,002.50
218,295.28
403,200.00
308,700.00
1,176,000.00
5,192,140.91
397,500.00
24,750.00
117,000.00
89,250.00
26,500.00
29,150.00
684,150.00
TOTAL
M3
3,045,000.00
Kg
15,356.25
liter
35,000.00
Kg
13,125.00
Kg
20,212.50
kg
1,300.00
m3
270,375.00
m3
269,500.35
M3
3,360,000.00
lmbr
110,250.00
btg
36,750.00
Sub - Bahan
Org
75,000.00
Org
90,000.00
Org
90,000.00
Org
85,000.00
Org
100,000.00
Org
110,000.00
Sub - Upah
730,800.00
49,140.00
56,000.00
2,067,187.50
45,478.13
436,800.00
146,002.50
218,295.28
537,600.00
308,700.00
882,000.00
5,478,003.41
397,500.00
24,750.00
117,000.00
89,250.00
26,200.00
29,150.00
683,850.00
TOTAL
M3
3,045,000.00
Kg
15,356.25
liter
35,000.00
Kg
13,125.00
Kg
20,212.50
kg
1,300.00
m3
270,375.00
m3
269,500.35
M3
3,360,000.00
lmbr
110,250.00
btg
36,750.00
Sub - Bahan
Org
75,000.00
Org
90,000.00
Org
90,000.00
Org
85,000.00
Org
100,000.00
Org
110,000.00
Sub - Upah
761,250.00
46,068.75
42,000.00
2,756,250.00
60,637.50
436,800.00
146,002.50
218,295.28
352,800.00
275,625.00
882,000.00
5,977,729.03
423,750.00
24,750.00
140,400.00
119,000.00
32,300.00
31,130.00
771,330.00
TOTAL
m'
60,000.00
Sub - Bahan
Org
75,000.00
Org
90,000.00
Org
100,000.00
Org
110,000.00
Sub - Upah
63,000.00
63,000.00
5,250.00
3,150.00
400.00
440.00
9,240.00
TOTAL
kg
1,300.00
M3
270,375.00
Kg
286,125.00
ltr
100.00
Sub - Bahan
Org
100,000.00
Org
90,000.00
Org
75,000.00
Org
110,000.00
Sub - Upah
321,100.00
135,187.50
286,125.00
21,500.00
763,912.50
2,800.00
24,750.00
123,750.00
9,130.00
160,430.00
HARGA SATUAN
PEKERJAAN
Rp
5,192,140.91
Rp
Rp
684,150.00
5,876,290.91
Rp
5,478,003.41
Rp
Rp
683,850.00
6,161,853.41
Rp
5,977,729.03
Rp
Rp
771,330.00
6,749,059.03
Rp
63,000.00
Rp
Rp
9,240.00
72,240.00
Rp
763,912.50
Rp
Rp
160,430.00
924,342.50
SNI-2008
0.240
3.200
1.600
157.500
2.250
336.000
0.540
0.810
0.160
2.800
24.000
5.300
0.275
1.300
1.050
0.262
0.265
SNI-2008
0.250
3.000
1.200
210.000
3.000
336.000
0.540
0.810
0.105
2.500
24.000
Pekerja
Tukang batu
Tukang kayu
Tukang besi
Kepala Tukang batu
Mandor
5.300
0.275
1.300
1.050
0.265
0.265
Pekerja
Tukang batu
Tukang kayu
Tukang besi
Kepala Tukang batu
Mandor
11
10
Pekerja
Tukang batu
Tukang kayu
Tukang besi
Kepala Tukang batu
Mandor
9.a
0.320
3.200
1.600
105.000
2.250
336.000
0.540
0.810
0.120
2.800
32.000
5.650
0.275
1.560
1.400
0.323
0.283
SNI-2008
1.05
0.070
0.035
0.004
0.004
247.000
0.500
1.000
215.000
0.028
0.275
1.650
0.083
RAB - 016
URAIAN PEKERJAAN
SNI
kfsn
12
13
14
untuk pembesian 75 kg
PEKERJAAN BEKISTING
MEMASANG 1 M2 BEKISTING untuk BALOK
Bahan : Kayu kelas III (Kayu Rimba Campuran)
Balok kayu kelas II (kayu Rimba Campuran)
Kayu Dolken (kayu Galam 8-10cm - 400cm
Plywood tebal 9 mm (122x244 cm)
Minyak bekisting
Paku 5-12 cm
Rp
598,710.00
Rp
Rp
121,230.00
1,752,252.50
Rp
821,992.79
Rp
342,200.00
Rp
Rp
Rp
994,481.25
202,050.00
2,360,724.04
Org
100,000.00
Org
90,000.00
Org
75,000.00
Org
110,000.00
Sub - Upah
Kg
13,125.00
M3
20,212.50
Sub - Bahan
4,000.00
36,000.00
300,000.00
2,200.00
342,200.00
984,375.00
10,106.25
994,481.25
M3
2,415,000.00
M3
2,415,000.00
btg
36,750.00
M2
110,250.00
liter
30,000.00
Kg
15,356.25
Sub - Bahan
Org
105,000.00
Org
90,000.00
Org
75,000.00
Org
110,000.00
Sub - Upah
96,600.00
43,470.00
73,500.00
38,587.50
6,000.00
6,142.50
264,300.00
3,465.00
29,700.00
49,500.00
3,630.00
86,295.00
TOTAL
Rp
264,300.00
Rp
Rp
86,295.00
350,595.00
M3
2,415,000.00
M3
2,415,000.00
btg
36,750.00
M2
110,250.00
liter
30,000.00
Kg
15,356.25
Sub - Bahan
Org
105,000.00
Org
90,000.00
Org
75,000.00
Org
110,000.00
Sub - Upah
96,600.00
36,225.00
73,500.00
38,587.50
6,000.00
6,142.50
257,055.00
3,465.00
29,700.00
49,500.00
3,630.00
86,295.00
TOTAL
Rp
257,055.00
Rp
Rp
86,295.00
343,350.00
M3
M3
btg
96,600.00
36,225.00
220,500.00
75.000
0.500
SNI-2008
0.040
0.018
2.000
0.350
0.200
0.400
0.033
0.330
0.660
0.033
SNI-2008
0.040
0.015
2.000
0.350
0.200
0.400
266,500.00
0.040
0.400
4.000
0.020
0.350
1.050
3.150
0.020
Rp
455,000.00
146,002.50
220,990.29
821,992.79
765,812.50
zak
65,000.00
M3
270,375.00
M3
269,500.35
Sub - Bahan
Upah
Upah
Rp
7.000
0.540
0.820
45.000
0.400
358,700.00
2,642,776.00
31,500.00
89,250.00
236,250.00
2,200.00
359,200.00
269,400.00
Bahan :
(besi)
Rp
Rp
Org
90,000.00
Org
85,000.00
Org
75,000.00
Org
110,000.00
Sub - Upah
Sub-Upah 100kg (75%)
Bahan :
(besi)
2,284,076.00
344,500.00
135,187.50
286,125.00
765,812.50
5,000.00
45,000.00
450,000.00
33,000.00
533,000.00
590,625.00
8,085.00
598,710.00
5.300
0.500
1.000
0.050
0.500
6.000
0.300
Rp
zak
65,000.00
M3
270,375.00
Kg
286,125.00
Sub - Bahan
Org
100,000.00
Org
90,000.00
Org
75,000.00
Org
110,000.00
Sub - Upah
Kg
13,125.00
M3
20,212.50
Sub - Bahan
3.400
0.850
0.085
0.170
46,217.13
252,200.00
123,480.00
84,357.00
133,906.50
1,653,750.00
36,382.50
2,284,076.00
255,000.00
76,500.00
8,500.00
18,700.00
358,700.00
TOTAL
Rp
Kg
1,300.00
M3
257,250.00
M3
270,375.00
M3
286,125.00
Kg
13,125.00
M3
20,212.50
Sub - Bahan
Org
75,000.00
Org
90,000.00
Org
100,000.00
Org
110,000.00
Sub - Upah
Upah :
50%
Upah
Pekerja
Tukang batu
Kep. Tukang Batu
Mandor
Upah
3.3
1
SNI-2008
194.00
0.480
0.312
0.468
126.00
1.800
HARGA SATUAN
PEKERJAAN
0.033
0.330
0.660
0.033
SNI-2008
0.040
0.015
6.000
RAB - 017
2,415,000.00
2,415,000.00
36,750.00
URAIAN PEKERJAAN
SNI
kfsn
0.350
0.200
0.400
38,587.50
6,000.00
6,142.50
404,055.00
TOTAL
0.030
0.015
2.000
0.350
0.150
0.400
M3
2,415,000.00
M3
2,415,000.00
btg
36,750.00
M2
110,250.00
liter
30,000.00
Kg
15,356.25
Sub - Bahan
Sub - Upah
72,450.00
36,225.00
73,500.00
38,587.50
4,500.00
6,142.50
231,405.00
0.030
0.020
3.000
0.350
0.200
0.400
4.000
Upah
0.040
0.300
0.100
0.026
0.260
0.520
0.026
M3
2,415,000.00
M3
2,415,000.00
btg
36,750.00
M2
110,250.00
liter
30,000.00
Kg
15,356.25
bh
10,000.00
Sub - Bahan
Sub - Upah
72,450.00
48,300.00
110,250.00
38,587.50
6,000.00
6,142.50
40,000.00
321,730.00
M3
2,415,000.00
liter
30,000.00
Kg
15,356.25
Sub - Bahan
Org
105,000.00
Org
90,000.00
Org
75,000.00
Org
110,000.00
Sub - Upah
96,600.00
9,000.00
1,535.63
107,135.63
2,730.00
23,400.00
39,000.00
2,860.00
67,990.00
TOTAL
0.045
0.300
0.100
M3
2,415,000.00
liter
30,000.00
Kg
15,356.25
Sub - Bahan
Org
105,000.00
Org
90,000.00
Org
75,000.00
Org
110,000.00
Sub - Upah
108,675.00
9,000.00
1,535.63
119,210.63
2,730.00
23,400.00
39,000.00
2,860.00
67,990.00
TOTAL
0.026
0.260
0.520
0.026
10.50
0.15
Pekerja
Tukang besi
Kep. Tukang Besi
Mandor
Kg
13,125.00
Kg
20,212.50
Sub - Bahan
Org
75,000.00
Org
85,000.00
Org
90,000.00
Org
110,000.00
Sub - Upah
SUB-TOTAL
137,812.50
3,031.88
140,844.38
5,250.00
5,950.00
630.00
440.00
12,270.00
0.070
0.070
0.007
0.004
10.50
0.10
Pekerja
Tukang besi
Kep. Tukang Besi
Mandor
Pekerja
Tukang besi
Kep. Tukang Besi
Mandor
321,730.00
86,295.00
408,025.00
Rp
107,135.63
Rp
Rp
67,990.00
175,125.63
Rp
119,210.63
Rp
Rp
67,990.00
187,200.63
Rp
140,844.38
Rp
Rp
Rp
12,270.00
153,114.38
15,311.44
Rp
139,833.75
Rp
Rp
Rp
8,780.00
148,613.75
14,861.38
Rp
13,760.63
Rp
Rp
4,290.00
18,050.63
bekisting 2x pakai
SNI-2008
0.050
0.050
0.005
0.003
Kg
13,125.00
Kg
20,212.50
Sub - Bahan
Org
75,000.00
Org
85,000.00
Org
90,000.00
Org
110,000.00
Sub - Upah
SUB-TOTAL
137,812.50
2,021.25
139,833.75
3,750.00
4,250.00
450.00
330.00
8,780.00
atau / KG
Rp
Rp
Rp
SNI-2008
atau / KG
2
231,405.00
86,295.00
317,700.00
SNI-2008
PEK. PEMBESIAN
PEMBESIAN (10 Kg) dengan besi polos atau ulir
Bahan : Besi beton
Kawat beton
Rp
Rp
Rp
SNI-2008
3.4
1
404,055.00
86,295.00
490,350.00
SNI-2008
TOTAL
6
Rp
Rp
Rp
SNI-2008
TOTAL
5
HARGA SATUAN
PEKERJAAN
SNI-2008
1.02
0.05
0.025
0.025
0.002
0.001
RAB - 018
Kg
12,500.00
Kg
20,212.50
Sub - Bahan
Org
75,000.00
Org
85,000.00
Org
90,000.00
Org
110,000.00
Sub - Upah
SUB-TOTAL
12,750.00
1,010.63
13,760.63
1,875.00
2,125.00
180.00
110.00
4,290.00
URAIAN PEKERJAAN
SNI
kfsn
126.50
2.00
Kg
13,125.00
Kg
20,212.50
Sub - Bahan
1,660,312.50
40,425.00
1,700,737.50
137.50
2.00
Kg
13,125.00
Kg
20,212.50
Sub - Bahan
1,804,687.50
40,425.00
1,845,112.50
165.00
2.00
Kg
13,125.00
Kg
20,212.50
Sub - Bahan
2,165,625.00
40,425.00
2,206,050.00
192.50
2.00
Kg
13,125.00
Kg
20,212.50
Sub - Bahan
2,526,562.50
40,425.00
2,566,987.50
220.00
2.00
Kg
13,125.00
Kg
20,212.50
Sub - Bahan
2,887,500.00
40,425.00
2,927,925.00
247.50
2.00
Kg
13,125.00
Kg
20,212.50
Sub - Bahan
3,248,437.50
40,425.00
3,288,862.50
10
275.00
2.00
Kg
13,125.00
Kg
20,212.50
Sub - Bahan
3,609,375.00
40,425.00
3,649,800.00
2.
3.5.2
1.
3.5.3
1.
3.5.4
3.5.5
1.
3.5.6
8.33
1.00
100.00
M2
M3
KG
490,350.00
986,522.79
15,311.44
4,086,250.00
986,522.79
1,531,143.75
8.33
1.00
125.00
M2
M3
KG
490,350.00
986,522.79
15,311.44
4,086,250.00
986,522.79
1,913,929.69
HARGA SATUAN
PEKERJAAN
Rp
Rp
Rp
1,700,737.50
141,105.00
1,841,842.50
Rp
Rp
Rp
1,845,112.50
153,375.00
1,998,487.50
Rp
Rp
Rp
2,206,050.00
184,050.00
2,390,100.00
Rp
Rp
Rp
2,566,987.50
214,725.00
2,781,712.50
Rp
Rp
Rp
2,927,925.00
245,400.00
3,173,325.00
Rp
Rp
Rp
3,288,862.50
276,075.00
3,564,937.50
Rp
Rp
Rp
3,649,800.00
306,750.00
3,956,550.00
Rp
6,603,916.54
Rp
6,986,702.48
0.00
0.00
0.00
Rp
Rp
Rp
Rp
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
RAB - 019
URAIAN PEKERJAAN
1
IV.
SNI
kfsn
6.67
1.00
150.00
M2
M3
KG
490,350.00
986,522.79
15,311.44
HARGA SATUAN
PEKERJAAN
3,269,000.00
986,522.79
2,296,715.63
Rp
6,552,238.42
Rp
434,574.00
Rp
Rp
101,790.00
536,364.00
Rp
699,885.63
Rp
Rp
195,750.00
895,635.63
Rp
Rp
Rp
658,465.00
195,750.00
854,215.00
Rp
Rp
Rp
629,728.00
195,750.00
825,478.00
Rp
Rp
Rp
609,535.13
195,750.00
805,285.13
Rp
Rp
Rp
581,833.00
195,750.00
777,583.00
Rp
Rp
Rp
465,780.00
195,750.00
661,530.00
Rp
165,960.00
Rp
Rp
68,300.00
234,260.00
Rp
Rp
Rp
155,161.38
68,300.00
223,461.38
PEK. PASANGAN
4.1.
4.2.
1
1.200
0.432
Pekerja
Tukang batu
Kep. Tukang Batu
Mandor
SNI-2008
0.780
0.390
0.039
0.039
SNI-2008
Pekerja
Tukang batu
Kep. Tukang Batu
Mandor
202.000
1.200
0.485
1.500
0.750
0.075
0.075
SNI-2008
163.000
1.200
0.520
M3
257,250.00
308,700.00
M3
291,375.00
125,874.00
Sub - Bahan
434,574.00
Org
75,000.00
58,500.00
Org
90,000.00
35,100.00
Org
100,000.00
3,900.00
Org
110,000.00
4,290.00
Sub - Upah
101,790.00
Total Harga Pond. Bt. Kali 1Pc : 3Ps / m3
Kg
1,300.00
262,600.00
M3
257,250.00
308,700.00
M3
265,125.00
128,585.63
Sub - Bahan
699,885.63
Org
75,000.00
112,500.00
Org
90,000.00
67,500.00
Org
100,000.00
7,500.00
Org
110,000.00
8,250.00
Sub - Upah
195,750.00
Total Harga Pond. Bt. Kali 1Pc : 3Ps / m3
Kg
1,300.00
M3
257,250.00
M3
265,125.00
Sub - Bahan
211,900.00
308,700.00
137,865.00
658,465.00
SNI-2008
136.000
1.200
0.544
Kg
1,300.00
M3
257,250.00
M3
265,125.00
Sub - Bahan
176,800.00
308,700.00
144,228.00
629,728.00
SNI-2008
117.000
1.200
0.561
Kg
1,300.00
M3
257,250.00
M3
265,125.00
Sub - Bahan
152,100.00
308,700.00
148,735.13
609,535.13
SNI-2008
91.000
1.200
0.584
Kg
1,300.00
M3
257,250.00
M3
265,125.00
Sub - Bahan
118,300.00
308,700.00
154,833.00
581,833.00
SNI-2008
0.170
0.170
1.200
0.340
M3
210,000.00
M3
183,750.00
M3
257,250.00
M3
265,125.00
Sub - Bahan
35,700.00
31,237.50
308,700.00
90,142.50
465,780.00
4.3.
1
43.500
140.00
0.080
Pekerja
Tukang batu
Kep. Tukang Batu
Mandor
SNI-2008
0.600
0.200
0.020
0.030
kg
1,300.00
56,550.00
Bh
630.00
88,200.00
M3
265,125.00
21,210.00
Sub - Bahan
165,960.00
Org
75,000.00
45,000.00
Org
90,000.00
18,000.00
Org
100,000.00
2,000.00
Org
110,000.00
3,300.00
Sub - Upah
68,300.00
Total harga / M2
SNI-2008
32.950
140.00
0.091
RAB - 020
kg
1,300.00
42,835.00
Bh
630.00
88,200.00
M3
265,125.00
24,126.38
Sub - Bahan
155,161.38
Sub - Upah
Total harga / M2
URAIAN PEKERJAAN
3
18.950
70.00
0.038
0.300
0.100
0.010
0.015
14.370
70.00
0.040
kg
1,300.00
28,860.00
Bh
630.00
88,200.00
M3
265,125.00
27,042.75
Sub - Bahan
144,102.75
Sub - Upah
Total harga / M2
Rp
Rp
Rp
144,102.75
68,300.00
212,402.75
kg
1,300.00
24,050.00
Bh
630.00
88,200.00
M3
265,125.00
32,345.25
Sub - Bahan
144,595.25
Sub - Upah
Total harga / M2
Rp
Rp
Rp
144,595.25
68,300.00
212,895.25
Rp
78,809.75
Rp
Rp
34,150.00
112,959.75
kg
1,300.00
18,681.00
Bh
630.00
44,100.00
M3
265,125.00
10,605.00
Sub - Bahan
73,386.00
Sub - Upah
Total harga / M2
Rp
Rp
Rp
73,386.00
34,150.00
107,536.00
kg
1,300.00
14,950.00
Bh
630.00
44,100.00
M3
265,125.00
11,400.38
Sub - Bahan
70,450.38
Sub - Upah
Total harga / M2
Rp
Rp
Rp
70,450.38
34,150.00
104,600.38
kg
1,300.00
12,584.00
Bh
630.00
44,100.00
M3
265,125.00
11,930.63
Sub - Bahan
68,614.63
Sub - Upah
Total harga / M2
Rp
Rp
Rp
68,614.63
34,150.00
102,764.63
kg
1,300.00
10,816.00
Bh
630.00
44,100.00
M3
265,125.00
12,991.13
Sub - Bahan
67,907.13
Sub - Upah
Total harga / M2
Rp
Rp
Rp
67,907.13
34,150.00
102,057.13
kg
1,300.00
8,450.00
Bh
630.00
44,100.00
M3
265,125.00
13,256.25
Sub - Bahan
65,806.25
Sub - Upah
Total harga / M2
Rp
Rp
Rp
65,806.25
34,150.00
99,956.25
Rp
66,356.25
Rp
Rp
34,150.00
100,506.25
kg
1,300.00
24,635.00
Bh
630.00
44,100.00
M3
265,125.00
10,074.75
Sub - Bahan
78,809.75
Org
75,000.00
22,500.00
Org
90,000.00
9,000.00
Org
100,000.00
1,000.00
Org
110,000.00
1,650.00
Sub - Upah
34,150.00
Total harga / M2
SNI-2008
11.500
70.00
0.043
SNI-2008
9.680
70.00
0.045
SNI-2008
8.320
70.00
0.049
SNI-2008
6.500
70.00
0.050
SNI-2008
4.500
0.015
0.050
70.00
Pekerja
Tukang batu
Kep. Tukang Batu
Mandor
147,371.63
68,300.00
215,671.63
SNI-2008
Rp
Rp
Rp
SNI-2008
18.500
140.00
0.122
kg
1,300.00
34,515.00
Bh
630.00
88,200.00
M3
265,125.00
24,656.63
Sub - Bahan
147,371.63
Sub - Upah
Total harga / M2
SNI-2008
22.200
140.00
0.102
HARGA SATUAN
PEKERJAAN
SNI-2008
Pekerja
Tukang batu
Kep. Tukang Batu
Mandor
26.550
140.00
0.093
SNI-2008
4.4.
1
kfsn
SNI
0.300
0.100
0.010
0.015
SNI-2008
RAB - 021
kg
1,300.00
5,850.00
M3
210,000.00
3,150.00
M3
265,125.00
13,256.25
Bh
630.00
44,100.00
Sub - Bahan
66,356.25
Org
75,000.00
22,500.00
Org
90,000.00
9,000.00
Org
100,000.00
1,000.00
Org
110,000.00
1,650.00
Sub - Upah
34,150.00
Total harga / M2
URAIAN PEKERJAAN
4.5.
1
Bahan :
Semen Merah
Kapur Padam
Pasir pasang
Batu bata uk. 5 x 11 x 22 cm
Upah
14.370
8.340
0.0728
0.350
0.150
0.015
0.018
0.728
14.370
8.340
0.0728
8.500
3.200
Pekerja
Tukang batu
Kep. Tukang Batu
Mandor
0.300
0.150
0.015
0.015
8.500
2.400
Pekerja
Tukang batu
Kep. Tukang Batu
Mandor
4.8.
0.728
Pekerja
Tukang batu
Kep. Tukang Batu
Mandor
4.7.
0.018
0.018
0.018
70.00
4.6.
kfsn
SNI
Pekerja
Tukang batu
Kep. Tukang Batu
Mandor
0.728
14.370
12.50
0.0728
0.350
0.150
0.015
0.018
14.370
25.000
0.0420
0.350
0.150
0.015
0.018
0.420
16.000
0.050
kg
1,300.00
18,681.00
bh
8,542.80
71,246.95
M3
265,125.00
19,301.10
Sub - Bahan
109,229.05
Org
75,000.00
26,250.00
Org
90,000.00
13,500.00
Org
100,000.00
1,500.00
Org
110,000.00
1,980.00
Sub - Upah
43,230.00
Total harga / M2
kg
1,300.00
18,681.00
bh
5,979.96
49,872.87
M3
265,125.00
19,301.10
Sub - Bahan
87,854.97
Sub - Upah
Total harga / M2
bh
8,542.80
72,613.80
kg
1,575.00
5,040.00
Sub - Bahan
77,653.80
Org
75,000.00
22,500.00
Org
90,000.00
13,500.00
Org
100,000.00
1,500.00
Org
110,000.00
1,650.00
Sub - Upah
39,150.00
Total harga / M2
bh
5,979.96
50,829.66
M3
1,575.00
3,780.00
Sub - Bahan
54,609.66
Sub - Upah
Total harga / M2
4.10.
Pekerja
Tukang allumunium
Kep. Tukang
Mandor
1.0000
5.000
0.580
0.8000
1.500
1.500
0.150
0.600
280.00
RAB - 022
Rp
Rp
Rp
55,959.75
34,150.00
90,109.75
Rp
109,229.05
Rp
Rp
43,230.00
152,459.05
Rp
Rp
Rp
87,854.97
43,230.00
131,084.97
Rp
77,653.80
Rp
Rp
39,150.00
116,803.80
Rp
Rp
Rp
54,609.66
39,150.00
93,759.66
kg
1,300.00
Bh
4,200.00
M3
265,125.00
Sub - Bahan
Org
75,000.00
Org
90,000.00
Org
100,000.00
Org
110,000.00
Sub - Upah
18,681.00
52,500.00
19,301.10
90,482.10 Rp
26,250.00
13,500.00
1,500.00
1,980.00
43,230.00 Rp
T O T A L Rp
kg
1,300.00
Bh
31,500.00
M3
265,125.00
Sub - Bahan
Org
75,000.00
Org
90,000.00
Org
100,000.00
Org
110,000.00
Sub - Upah
18,681.00
787,500.00
11,135.25
817,316.25 Rp
26,250.00
13,500.00
1,500.00
1,980.00
43,230.00 Rp
T O T A L Rp
zak
65,000.00
Bh
5,075.70
M3
265,125.00
Sub - Bahan
4.9.
HARGA SATUAN
PEKERJAAN
27,300.00
81,211.20
13,256.25
121,767.45
Rp
Rp
T O T A L Rp
m2
400,000.00
400,000.00
m'
12,500.00
62,500.00
kg
45,000.00
26,100.00
m'
8,531.25
6,825.00
Sub - Bahan
495,425.00
Org
75,000.00
112,500.00
Org
100,000.00
150,000.00
Org
90,000.00
13,500.00
Org
110,000.00
66,000.00
Sub - Upah
342,000.00
Total harga / M2
m'
157,500.00
44,100,000.00
90,482.10
43,230.00
133,712.10
817,316.25
43,230.00
860,546.25
121,767.45
43,230.00
164,997.45
Rp
495,425.00
Rp
Rp
239,400.00
734,825.00
URAIAN PEKERJAAN
SNI
kfsn
V.
m'
189,000.00
45,360,000.00
m'
105,000.00
0.00
400.00
m'
708,750.00 283,500,000.00
520.00
m'
8,531.25
4,436,250.00
Nilai harga untuk seluas 400m2
377,396,250.00
Total harga / M2
HARGA SATUAN
PEKERJAAN
240.00
Rp
Rp
377,396,250.00
943,490.63
PEKERJAAN BAJA
1
kg
0.060
0.060
0.006
0.003
Org
Org
Org
Org
Sewa Alat
0.800
jam
15.000
32.800
0.050
kg
kg
kg
16,623.65
16,623.65 Rp
4,500.00
6,000.00
540.00
330.00
11,370.00 Rp
T O T A L Rp
13,125.00
Sub - Bahan
75,000.00
100,000.00
90,000.00
110,000.00
Sub - Upah
15,093.75
15,093.75 Rp
4,500.00
6,000.00
540.00
330.00
11,370.00 Rp
T O T A L Rp
16,623.65
5,685.00
22,308.65
15,093.75
5,685.00
20,778.75
1.050
1.050
0.105
0.052
Org
Org
Org
Org
4,500.00
35,000.00
Sub - Bahan
75,000.00
85,000.00
90,000.00
110,000.00
Sub - Upah
50,000.00
4,500.00
3,500.00
8,000.00
7,500.00
8,500.00
90.00
550.00
16,640.00
40,000.00
T O T A L
Biaya untuk perakitan / kg
Rp
8,000.00
Rp
Rp
Rp
Rp
16,640.00
40,000.00
64,640.00
646.40
SNI-2008
Pekerja
Tukang Las konstruksi
Kepala tukang
Mandor
14,455.35
15,750.00
31,500.00
Sub - Bahan
75,000.00
100,000.00
90,000.00
110,000.00
Sub - Upah
216,830.25
516,600.00
1,575.00
735,005.25 Rp
78,750.00
105,000.00
9,450.00
5,720.00
198,920.00 Rp
T O T A L Rp
735,005.25
198,920.00
933,925.25
SNI-2008
0.400
0.300
0.040
kg
liter
liter
Pekerja
Tukang Las konstruksi
Kepala tukang
Mandor
0.040
0.020
0.002
0.002
Org
Org
Org
Org
Sewa Alat
0.170
jam
1.000
M2
1.200
1.200
0.120
0.006
Org
Org
Org
Org
31,500.00
4,500.00
35,000.00
Sub - Bahan
75,000.00
100,000.00
90,000.00
110,000.00
Sub - Upah
50,000.00
12,600.00
1,350.00
1,400.00
15,350.00
3,000.00
2,000.00
180.00
220.00
5,400.00
8,500.00
T O T A L
Biaya untuk 1m pengelasan
Rp
15,350.00
Rp
Rp
Rp
Rp
5,400.00
8,500.00
29,250.00
292,500.00
SNI-2008
Pekerja
Tukang Las konstruksi
Kepala tukang
Mandor
450,000.00
Sub - Bahan
75,000.00
100,000.00
90,000.00
110,000.00
Sub - Upah
450,000.00
450,000.00 Rp
90,000.00
120,000.00
10,800.00
660.00
221,460.00 Rp
T O T A L Rp
300,000.00
Sub - Bahan
75,000.00
100,000.00
90,000.00
110,000.00
Sub - Upah
300,000.00
300,000.00 Rp
6,000.00
80,000.00
7,200.00
440.00
93,640.00 Rp
T O T A L Rp
450,000.00
221,460.00
671,460.00
SNI-2008
Pekerja
Tukang Allumunium
Kepala tukang
Mandor
Pekerja
Tukang Allumunium
Kepala tukang
Mandor
14,455.35
Sub - Bahan
75,000.00
100,000.00
90,000.00
110,000.00
Sub - Upah
SNI-2008
Org
Org
Org
Org
1.150
0.100
0.100
0.001
0.005
Org
Org
Org
Org
Pekerja
Tukang besi konstruksi
Kepala tukang
Mandor
0.060
0.060
0.006
0.003
liter
liter
kg
1.000
0.100
1.150
SNI-2008
Pekerja
Tukang Las konstruksi
Kepala tukang
Mandor
Pekerja
Tukang Las konstruksi
Kepala tukang
Mandor
SNI-2008
1.000
M2
0.080
0.800
0.080
0.004
Org
Org
Org
Org
300,000.00
93,640.00
393,640.00
SNI-2008
1.000
M2
1.000
1.000
0.100
0.050
Org
Org
Org
Org
RAB - 023
550,000.00
Sub - Bahan
75,000.00
100,000.00
90,000.00
110,000.00
Sub - Upah
550,000.00
550,000.00
75,000.00
100,000.00
9,000.00
5,500.00
189,500.00
Rp
550,000.00
Rp
189,500.00
URAIAN PEKERJAAN
SNI
kfsn
HARGA SATUAN
PEKERJAAN
T O T A L Rp
10
11
12
13
14
V.A.
1
3.50
4.40
14.00
4.00
1.00
1.00
3.50
4.40
14.00
4.00
1.00
12.00
2.52
8.04
1.00
Pek. Tralis besi hollow, Parkir Mobil PK (modul 7,50 x 0,90 m)/M2
- Frame besi hollow 60x40x2 mm
- Tralis besi hollow 40x20x1,8 mm
- Finishing pengecatan
- Upah
pasang
14.70
67.50
13.50
1.00
40.90
6.10
17.25
17.25
1.00
1.00
m'
m'
m'
bh
lot
lot
m'
m'
m'
bh
lot
lot
m'
m'
m'
bh
lot
lot
m'
m2
m2
lot
m'
m'
m2
lot
m'
m'
m'
m2
lot
lot
142,967
600,460.00
112,800
744,480.00
65,967
1,108,240.00
40,000.00
240,000.00
245,318.00
245,318.00
734,624.50
734,624.50
Total harga / unit
Harga / m'
3,673,122.50
874,552.98
142,967
500,383.33
112,800
496,320.00
65,967
923,533.33
40,000.00
160,000.00
192,023.67
192,023.67
568,065.08
568,065.08
Total harga / unit
Harga / m'
2,840,325.42
811,521.55
206,007
721,023.33
185,857
817,769.33
85,757
1,200,593.33
60,000.00
240,000.00
273,938.60
0.00
744,846.50
744,846.50
Total harga / unit
Harga / m'
3,724,232.50
1,064,066.43
98,335.00
1,180,020.00
650,724.17
1,639,824.90
#REF!
#REF!
#REF!
#REF!
Total harga / unit
Harga / m2
#REF!
#REF!
38,490.83
565,815.25
21,211.67
1,431,787.50
#REF!
#REF!
#REF!
#REF!
Total harga / unit
Harga / m2
#REF!
#REF!
124,300.00
5,083,870.00
91,133.00
555,911.30
29,562.13
509,946.74
#REF!
#REF!
500,000.00
500,000.00
#REF!
#REF!
Total harga / unit
Harga / m2
#REF!
#REF!
Pekerja
Tukang Allumunium
Kepala tukang
Mandor
1.b.
4.20
6.60
16.80
6.00
1.00
1.00
Upah
1.a.
m'
m'
m'
bh
lot
lot
739,500.00
m'
bh
m'
0.043
0.043
0.0043
0.0021
Org
Org
Org
Org
1.100
2.000
1.100
m'
bh
m'
1.100
2.000
1.100
1.100
2.000
1.100
RAB - 024
m'
bh
m'
115,500.00
1,500.00
8,531.25
Sub - Bahan
75,000.00
100,000.00
90,000.00
110,000.00
Sub - Upah
157,500.00
1,500.00
8,531.25
Sub - Bahan
Sub - Upah
168,000.00
1,500.00
8,531.25
Sub - Bahan
Sub - Upah
127,050.00
3,000.00
9,384.38
139,434.38 Rp
3,225.00
4,300.00
387.00
231.00
8,143.00 Rp
T O T A L Rp
173,250.00
3,000.00
9,384.38
185,634.38
Rp
Rp
T O T A L Rp
184,800.00
3,000.00
9,384.38
197,184.38
Rp
Rp
T O T A L Rp
139,434.38
8,143.00
147,577.38
185,634.38
8,143.00
193,777.38
197,184.38
8,143.00
205,327.38
URAIAN PEKERJAAN
m'
bh
m'
161,700.00
1,500.00
8,531.25
Sub - Bahan
1.100
2.000
1.100
m'
bh
m'
89,250.00
1,500.00
8,531.25
Sub - Bahan
1.100
2.000
1.100
m'
bh
m'
105,000.00
1,500.00
8,531.25
Sub - Bahan
1.100
2.000
1.100
m'
bh
m'
126,000.00
1,500.00
8,531.25
Sub - Bahan
Pekerja
Tukang Allumunium
Kepala tukang
Mandor
1.100
2.000
1.100
m'
bh
m'
0.043
0.043
0.0043
0.0021
Org
Org
Org
Org
1.100
2.000
1.100
m'
bh
m'
147,000.00
1,500.00
8,531.25
Sub - Bahan
4.b.
m'
bh
m'
4.a.
1.100
2.000
1.100
1.100
2.000
1.100
105,000.00
1,500.00
8,531.25
Sub - Bahan
HARGA SATUAN
PEKERJAAN
115,500.00
3,000.00
9,384.38
127,884.38
Rp
Rp
T O T A L Rp
161,700.00
3,000.00
9,384.38
174,084.38
Rp
Rp
T O T A L Rp
127,884.38
8,143.00
136,027.38
174,084.38
8,143.00
182,227.38
SNI-2008
3.b.
m'
bh
m'
3.a.
1.100
2.000
1.100
2.b.
kfsn
2.a.
SNI
1.100
2.000
1.100
m'
bh
m'
1.100
2.000
1.100
RAB - 025
m'
bh
m'
68,250.00
1,500.00
8,531.25
Sub - Bahan
75,000.00
100,000.00
90,000.00
110,000.00
Sub - Upah
78,750.00
1,500.00
8,531.25
Sub - Bahan
Sub - Upah
168,000.00
1,500.00
8,531.25
Sub - Bahan
Sub - Upah
63,000.00
1,500.00
8,531.25
Sub - Bahan
177,870.00
3,000.00
9,384.38
190,254.38
Rp
Rp
T O T A L Rp
98,175.00
3,000.00
9,384.38
110,559.38
Rp
Rp
T O T A L Rp
115,500.00
3,000.00
9,384.38
127,884.38
Rp
Rp
T O T A L Rp
138,600.00
3,000.00
9,384.38
150,984.38
Rp
Rp
T O T A L Rp
75,075.00
3,000.00
9,384.38
87,459.38 Rp
3,225.00
4,300.00
387.00
231.00
8,143.00 Rp
T O T A L Rp
86,625.00
3,000.00
9,384.38
99,009.38
Rp
Rp
T O T A L Rp
184,800.00
3,000.00
9,384.38
197,184.38
Rp
Rp
T O T A L Rp
69,300.00
3,000.00
9,384.38
81,684.38
Rp
190,254.38
8,143.00
198,397.38
110,559.38
8,143.00
118,702.38
127,884.38
8,143.00
136,027.38
150,984.38
8,143.00
159,127.38
87,459.38
8,143.00
95,602.38
99,009.38
8,143.00
107,152.38
197,184.38
8,143.00
205,327.38
81,684.38
URAIAN PEKERJAAN
Upah
5.a.
m'
bh
m'
73,500.00
1,500.00
8,531.25
Sub - Bahan
1.100
2.000
1.100
m'
bh
m'
157,500.00
1,500.00
8,531.25
Sub - Bahan
1.100
2.000
1.100
m'
bh
m'
52,500.00
1,500.00
8,531.25
Sub - Bahan
1.100
2.000
1.100
m'
bh
m'
63,000.00
1,500.00
8,531.25
Sub - Bahan
VI.
1.100
2.000
1.100
6.b.
HARGA SATUAN
PEKERJAAN
Rp
T O T A L Rp
6.a.
kfsn
5.b.
SNI
1.100
2.000
1.100
m'
bh
m'
126,000.00
1,500.00
8,531.25
Sub - Bahan
80,850.00
3,000.00
9,384.38
93,234.38
Rp
Rp
T O T A L Rp
173,250.00
3,000.00
9,384.38
185,634.38
Rp
Rp
T O T A L Rp
57,750.00
3,000.00
9,384.38
70,134.38
Rp
Rp
T O T A L Rp
69,300.00
3,000.00
9,384.38
81,684.38
Rp
Rp
T O T A L Rp
138,600.00
3,000.00
9,384.38
150,984.38
Rp
Rp
T O T A L Rp
8,143.00
89,827.38
93,234.38
8,143.00
101,377.38
185,634.38
8,143.00
193,777.38
70,134.38
8,143.00
78,277.38
81,684.38
8,143.00
89,827.38
150,984.38
8,143.00
159,127.38
6.1.
1
M3
Kg
Kg
4.000
12.000
1.200
0.200
Org
Org
Org
Org
7,350,000.00
15,356.25
14,542.50
Sub - Bahan
75,000.00
90,000.00
105,000.00
110,000.00
Sub - Upah
8,085,000.00
85,995.00
218,137.50
8,389,132.50 Rp
300,000.00
1,080,000.00
126,000.00
22,000.00
1,528,000.00 Rp
T O T A L Rp
5,040,000.00
15,356.25
14,542.50
Sub - Bahan
5,544,000.00
85,995.00
218,137.50
5,848,132.50
4,725,000.00
15,356.25
14,542.50
Sub - Bahan
5,197,500.00
85,995.00
218,137.50
5,501,632.50
7,350,000.00
15,356.25
14,542.50
Sub - Bahan
75,000.00
90,000.00
8,820,000.00
85,995.00
218,137.50
9,124,132.50
502,500.00
1,809,000.00
Pekerja
Tukang Kayu
8,389,132.50
1,528,000.00
9,917,132.50
SNI-2008
1.100
5.600
15.000
M3
Kg
Kg
Rp
Rp
T O T A L Rp
5,848,132.50
1,528,000.00
7,376,132.50
SNI-2008
1.100
5.600
15.000
M3
Kg
Kg
1.100
5.600
15.000
6.2.
Pekerja
Tukang Kayu
Kep. Tukang Kayu
Mandor
SNI-2008
Rp
Rp
T O T A L Rp
5,501,632.50
1,528,000.00
7,029,632.50
SNI-2008
1.200
5.600
15.000
M3
Kg
Kg
6.700
20.100
Org
Org
RAB - 026
Rp
9,124,132.50
URAIAN PEKERJAAN
SNI
kfsn
6.3.
6.4.
1
6.5.
1
Pekerja
Tukang Kayu
Kep. Tukang Kayu
Mandor
5,040,000.00
15,356.25
14,542.50
Sub - Bahan
75,000.00
90,000.00
105,000.00
110,000.00
Sub - Upah
5,544,000.00
46,068.75
218,137.50
5,808,206.25 Rp
180,000.00
648,000.00
75,600.00
13,200.00
916,800.00 Rp
T O T A L Rp
4,725,000.00
4,725,000.00
15,356.25
Sub - Bahan
75,000.00
90,000.00
105,000.00
110,000.00
Sub - Upah
66,150.00
17,010.00
3,839.06
86,999.06 Rp
7,500.00
9,000.00
1,050.00
550.00
18,100.00 Rp
T O T A L Rp
2,559,400.00
11,683,532.50
M3
Kg
Kg
2.400
7.200
0.720
0.120
Org
Org
Org
Org
5,808,206.25
916,800.00
6,725,006.25
0.014
0.0036
0.250
M3
M3
Kg
0.100
0.100
0.010
0.005
Org
Org
Org
Org
86,999.06
18,100.00
105,099.06
SNI-2008
0.014
0.0036
0.250
M3
M3
Kg
7,140,000.00
7,140,000.00
15,356.25
Sub - Bahan
99,960.00
25,704.00
3,839.06
129,503.06
Rp
Rp
T O T A L Rp
129,503.06
18,100.00
147,603.06
SNI-2008
0.014
0.0036
0.250
M3
M3
Kg
4,462,500.00
4,462,500.00
15,356.25
Sub - Bahan
62,475.00
16,065.00
3,839.06
82,379.06
Rp
Rp
T O T A L Rp
82,379.06
18,100.00
100,479.06
SNI-2008
Pekerja
Tukang Kayu
Kep. Tukang Kayu
Mandor
PEK. LISTPLANK
PEK. LISTPLANK JATI 3/20 / M'
Bahan : Papan Jati
Paku (5 - 7 cm)
Upah
1.100
3.000
15.000
211,050.00
36,850.00
2,559,400.00 Rp
T O T A L Rp
105,000.00
110,000.00
Sub - Upah
SNI-2008
Pekerja
Tukang Kayu
Kep. Tukang Kayu
Mandor
Org
Org
HARGA SATUAN
PEKERJAAN
SNI-2008
Pekerja
Tukang Kayu
Kep. Tukang Kayu
Mandor
2.010
0.335
0.014
0.0072
0.250
M3
M3
Kg
0.100
0.100
0.010
0.005
Org
Org
Org
Org
4,725,000.00
4,725,000.00
15,356.25
Sub - Bahan
75,000.00
90,000.00
105,000.00
110,000.00
Sub - Upah
66,150.00
34,020.00
3,839.06
104,009.06 Rp
7,500.00
9,000.00
1,050.00
550.00
18,100.00 Rp
T O T A L Rp
4,725,000.00
15,356.25
Sub - Bahan
75,000.00
90,000.00
105,000.00
110,000.00
Sub - Upah
77,962.50
3,071.25
81,033.75 Rp
9,000.00
10,800.00
1,260.00
660.00
21,720.00 Rp
T O T A L Rp
104,009.06
18,100.00
122,109.06
SNI-2008
0.165
0.0165
0.200
M3
Kg
0.120
0.120
0.012
0.006
Org
Org
Org
Org
0.007
0.050
M3
kg
0.020
0.200
0.100
0.005
Org
Org
Org
Org
0.011
0.050
M3
kg
0.022
0.220
0.110
0.005
Org
Org
Org
Org
RAB - 027
############
15,356.25
Sub - Bahan
105,000.00
90,000.00
75,000.00
110,000.00
Sub - Upah
422,625.00
767.81
423,392.81
2,100.00
18,000.00
7,500.00
550.00
28,150.00
############
15,356.25
Sub - Bahan
105,000.00
90,000.00
75,000.00
110,000.00
664,125.00
767.81
664,892.81
2,310.00
19,800.00
8,250.00
550.00
81,033.75
21,720.00
102,753.75
Rp
423,392.81
Rp
Rp
28,150.00
451,542.81
Rp
664,892.81
URAIAN PEKERJAAN
kfsn
SNI
SNI-2008
0.011
0.050
M3
kg
0.022
0.220
0.110
0.005
Org
Org
Org
Org
Sub - Upah
30,910.00
7,612,500.00
15,356.25
Sub - Bahan
105,000.00
90,000.00
75,000.00
110,000.00
Sub - Upah
83,737.50
767.81
84,505.31
2,310.00
19,800.00
8,250.00
550.00
30,910.00
############
15,356.25
Sub - Bahan
105,000.00
90,000.00
75,000.00
110,000.00
Sub - Upah
72,765.00
767.81
73,532.81
2,100.00
18,000.00
7,500.00
550.00
28,150.00
8,137,500.00
15,356.25
Sub - Bahan
56,962.50
767.81
57,730.31
############
15,356.25
Sub - Bahan
114,345.00
767.81
115,112.81
Upah
105,000.00
90,000.00
75,000.00
110,000.00
Sub - Upah
2,310.00
19,800.00
8,250.00
550.00
30,910.00
8,137,500.00
15,356.25
Sub - Bahan
89,512.50
767.81
90,280.31
0.007
0.050
M3
kg
0.020
0.200
0.100
0.005
Org
Org
Org
Org
0.007
0.050
M3
kg
0.011
0.050
0.022
0.220
0.110
0.005
M3
kg
Org
Org
Org
Org
0.011
0.050
M3
kg
30,910.00
115,415.31
Rp
73,532.81
Rp
Rp
28,150.00
101,682.81
Rp
Rp
Rp
57,730.31
28,150.00
85,880.31
Rp
115,112.81
Rp
Rp
30,910.00
146,022.81
Rp
Rp
Rp
90,280.31
30,910.00
121,190.31
0.015
0.200
M3
Kg
0.150
0.300
0.030
0.008
Org
Org
Org
Org
4,725,000.00
15,356.25
Sub - Bahan
75,000.00
90,000.00
105,000.00
110,000.00
Sub - Upah
72,765.00
3,071.25
75,836.25 Rp
11,250.00
27,000.00
3,150.00
880.00
42,280.00 Rp
T O T A L Rp
75,836.25
42,280.00
118,116.25
SNI-2008
0.015
0.200
M3
Kg
4,462,500.00
15,356.25
Sub - Bahan
68,722.50
3,071.25
71,793.75
Rp
Rp
T O T A L Rp
71,793.75
42,280.00
114,073.75
SNI-2008
Pekerja
Tukang Kayu
Kep. Tukang Kayu
Mandor
Rp
Rp
SNI-2008
84,505.31
SNI-2008
Pekerja
Tukang Kayu
Kep. Tukang Kayu
Mandor
Rp
SNI-2008
6.6.
1
30,910.00
695,802.81
SNI-2008
Rp
Rp
0.0066
HARGA SATUAN
PEKERJAAN
0.016
0.250
M3
Kg
0.200
0.300
0.030
0.010
Org
Org
Org
Org
4,725,000.00
15,356.25
Sub - Bahan
75,000.00
90,000.00
105,000.00
110,000.00
Sub - Upah
77,017.50
3,839.06
80,856.56 Rp
15,000.00
27,000.00
3,150.00
1,100.00
46,250.00 Rp
T O T A L Rp
80,856.56
46,250.00
127,106.56
SNI-2008
0.0163
0.250
RAB - 028
M3
Kg
4,462,500.00
15,356.25
Sub - Bahan
72,738.75
3,839.06
76,577.81
Rp
76,577.81
URAIAN PEKERJAAN
Upah
6.7.
7.1.
0.200
0.400
0.025
0.010
Org
Org
Org
Org
31,500.00
19,950.00
6,825,000.00
Sub - Bahan
75,000.00
90,000.00
105,000.00
110,000.00
Sub - Upah
33,075.00
299.25
129,675.00
163,049.25 Rp
15,000.00
36,000.00
2,625.00
1,100.00
54,725.00 Rp
T O T A L Rp
11.000
Bh
12,600.00
Sub - Bahan
100,000.00
90,000.00
75,000.00
110,000.00
Sub - Upah
138,600.00
138,600.00 Rp
2,000.00
18,000.00
30,000.00
2,200.00
52,200.00 Rp
T O T A L Rp
0.020
0.200
0.400
0.020
Org
Org
Org
Org
14.500
Bh
13,125.00
Sub - Bahan
14.500
Bh
3,675.00
Sub - Bahan
2.860
0.050
0.006
Bh
zak
M3
26,250.00
65,000.00
265,125.00
Sub - Bahan
5.000
0.050
0.006
Bh
zak
M3
26,565.00
65,000.00
265,125.00
Sub - Bahan
10.000
Bh
12,600.00
Sub - Bahan
3.500
0.025
0.006
Bh
M3
M3
26,250.00
65,000.00
265,125.00
Sub - Bahan
Tukang kayu
Pekerja
Mandor
7.10.
m'
Kg
M3
Upah
7.9.
1.050
0.015
0.019
Upah
7.8.
46,250.00
122,827.81
SNI-2008
Upah
7.7.
HARGA SATUAN
PEKERJAAN
Rp
T O T A L Rp
Upah
7.6.
Upah
7.5.
Upah
7.4.
163,049.25
54,725.00
217,774.25
Upah
7.3.
Pekerja
Tukang Kayu
Kep. Tukang Kayu
Mandor
7.2.
kfsn
VII.
SNI
0.500
4.000
Lmbr
Bh
0.200
0.100
0.005
Org
Org
Org
2.000
4.000
Lmbr
Bh
0.003
0.025
0.025
0.001
Org
Org
Org
Org
0.700
RAB - 029
Lmbr
190,312.50
190,312.50
Rp
Rp
T O T A L Rp
53,287.50
53,287.50
Rp
Rp
T O T A L Rp
75,075.00
3,250.00
1,590.75
79,915.75
Rp
Rp
T O T A L Rp
132,825.00
3,250.00
1,590.75
137,665.75
Rp
Rp
T O T A L Rp
126,000.00
126,000.00
Rp
Rp
T O T A L Rp
91,875.00
1,625.00
1,590.75
91,875.00
Rp
Rp
T O T A L Rp
126,000.00
472.50
Sub - Bahan
90,000.00
75,000.00
110,000.00
Sub - Upah
63,000.00
1,890.00
63,000.00 Rp
18,000.00
7,500.00
550.00
26,050.00 Rp
T O T A L Rp
35,000.00
472.50
Sub - Bahan
105,000.00
90,000.00
75,000.00
110,000.00
Sub - Upah
70,000.00
1,890.00
70,000.00 Rp
315.00
2,250.00
1,875.00
110.00
4,550.00 Rp
T O T A L Rp
45,000.00
31,500.00
138,600.00
26,100.00
164,700.00
190,312.50
26,100.00
216,412.50
53,287.50
26,100.00
79,387.50
79,915.75
65,250.00
145,165.75
137,665.75
65,250.00
202,915.75
126,000.00
26,100.00
152,100.00
91,875.00
65,250.00
157,125.00
63,000.00
26,050.00
89,050.00
70,000.00
4,550.00
74,550.00
URAIAN PEKERJAAN
Skrup + ring
Upah
7.11.
7.12.
7.13.
7.14.
1
7.15.
7.16
1
M2
Kg
0.010
0.200
0.200
0.010
Org
Org
Org
Org
1.000
0.400
4.000
1.000
1.100
1.000
1.100
M'
Lmbr
Bh
m2
m2
m2
m2
0.408
0.039
1.000
zak
M3
m2
0.020
0.200
0.400
0.020
Org
Org
Org
Org
0.340
0.033
1.000
0.500
0.020
0.200
0.400
0.020
Tukang besi
Pekerja
Mandor
0.200
0.100
0.005
1.500
0.500
Lmbr
Bh
0.300
2.000
Bh
472.50
Sub - Bahan
45,000.00
472.50
Sub - Bahan
236,250.00
31,500.00
Sub - Bahan
105,000.00
90,000.00
75,000.00
110,000.00
Sub - Upah
49,896.00
45,000.00
472.50
Sub - Bahan
4.000
kfsn
SNI
18,375.00
157,500.00
Sub - Bahan
Sub - Upah
18,375.00
141,750.00
Sub - Bahan
Sub - Upah
1.100
4.000
RAB - 030
1,890.00
31,500.00
Rp
Rp
T O T A L Rp
13,500.00
945.00
13,500.00
Rp
Rp
T O T A L Rp
354,375.00
15,750.00
354,375.00 Rp
1,050.00
18,000.00
15,000.00
1,100.00
35,150.00 Rp
T O T A L Rp
49,896.00
18,000.00
1,890.00
69,786.00
Rp
Rp
T O T A L Rp
18,375.00
173,250.00
191,625.00
Rp
Rp
T O T A L Rp
18,375.00
155,925.00
174,300.00
Rp
Rp
T O T A L Rp
65,000.00
265,125.00
10,000.00
Sub - Bahan
100,000.00
95,000.00
75,000.00
110,000.00
Sub - Upah
26,520.00
10,339.88
10,000.00
46,859.88 Rp
2,000.00
19,000.00
30,000.00
2,200.00
53,200.00 Rp
T O T A L Rp
zak
65,000.00
M3
265,125.00
kg
52,500.00
Bh
15,750.00
Sub - Bahan
Org
100,000.00
Org
95,000.00
Org
75,000.00
Org
110,000.00
Sub - Upah
22,100.00
8,616.56
52,500.00
7,875.00
91,091.56 Rp
2,000.00
19,000.00
30,000.00
2,200.00
53,200.00 Rp
T O T A L Rp
m2
Bh
Org
Org
Org
m2
Bh
177,975.00
500.00
Sub - Bahan
85,000.00
75,000.00
110,000.00
Sub - Upah
91,875.00
500.00
Sub - Bahan
HARGA SATUAN
PEKERJAAN
m2
Bh
210,000.00
500.00
186,873.75
2,000.00
186,873.75 Rp
17,000.00
7,500.00
550.00
25,050.00 Rp
T O T A L Rp
96,468.75
2,000.00
96,468.75
Rp
Rp
T O T A L Rp
231,000.00
2,000.00
31,500.00
26,050.00
57,550.00
13,500.00
52,100.00
65,600.00
354,375.00
35,150.00
389,525.00
69,786.00
52,100.00
121,886.00
191,625.00
7,500.00
199,125.00
174,300.00
7,500.00
181,800.00
46,859.88
21,280.00
68,139.88
91,091.56
26,600.00
117,691.56
186,873.75
25,050.00
211,923.75
96,468.75
25,050.00
121,518.75
URAIAN PEKERJAAN
Upah
8.1.
1
Org
Org
Org
1.100
4.000
m2
Bh
0.200
0.100
0.005
Org
Org
Org
HARGA SATUAN
PEKERJAAN
Sub - Bahan
85,000.00
75,000.00
110,000.00
Sub - Upah
231,000.00 Rp
17,000.00
7,500.00
550.00
25,050.00 Rp
T O T A L Rp
121,800.00
500.00
Sub - Bahan
85,000.00
75,000.00
110,000.00
Sub - Upah
133,980.00
2,000.00
133,980.00 Rp
17,000.00
7,500.00
550.00
25,050.00 Rp
T O T A L Rp
231,000.00
25,050.00
256,050.00
133,980.00
25,050.00
159,030.00
M3
Kg
Kg
2.100
21.000
7.000
0.350
Org
Org
Org
Org
1.100
1.250
1.000
M3
Kg
Kg
2.100
21.000
7.000
0.350
Org
Org
Org
Org
1.200
1.250
1.000
M3
Kg
Kg
1.800
18.000
6.000
0.300
Org
Org
Org
Org
63,525,000.00
19,195.31
42,000.00
63,586,195.31 Rp
220,500.00
1,995,000.00
525,000.00
38,500.00
2,779,000.00 Rp
T O T A L Rp
9,975,000.00
15,356.25
42,000.00
Sub - Bahan
105,000.00
95,000.00
75,000.00
110,000.00
Sub - Upah
10,972,500.00
19,195.31
42,000.00
11,033,695.31 Rp
220,500.00
1,995,000.00
525,000.00
38,500.00
2,779,000.00 Rp
T O T A L Rp
7,875,000.00
15,356.25
42,000.00
Sub - Bahan
105,000.00
95,000.00
75,000.00
110,000.00
Sub - Upah
9,450,000.00
19,195.31
42,000.00
9,511,195.31 Rp
189,000.00
1,710,000.00
450,000.00
33,000.00
2,382,000.00 Rp
T O T A L Rp
6,300,000.00
15,356.25
42,000.00
Sub - Bahan
Sub - Upah
7,560,000.00
19,195.31
42,000.00
7,621,195.31
7,875,000.00
15,356.25
42,000.00
Sub - Bahan
Sub - Upah
9,450,000.00
19,195.31
42,000.00
9,511,195.31
############
15,356.25
42,000.00
Sub - Bahan
Sub - Upah
12,600,000.00
19,195.31
42,000.00
12,661,195.31
############
15,356.25
Sub - Bahan
105,000.00
2,415,000.00
767.81
2,415,767.81
31,500.00
63,586,195.31
2,779,000.00
66,365,195.31
11,033,695.31
2,779,000.00
13,812,695.31
9,511,195.31
2,382,000.00
11,893,195.31
SNI - 2008
1.200
1.250
1.000
M3
Kg
Kg
Rp
Rp
T O T A L Rp
7,621,195.31
2,382,000.00
10,003,195.31
SNI - 2008
1.200
1.250
1.000
M3
Kg
Kg
Rp
Rp
T O T A L Rp
9,511,195.31
2,382,000.00
11,893,195.31
SNI - 2008
1.200
1.250
1.000
M3
Kg
Kg
############
15,356.25
42,000.00
Sub - Bahan
105,000.00
95,000.00
75,000.00
110,000.00
Sub - Upah
SNI - 2008
1.100
1.250
1.000
SNI - 2008
SNI - 2008
Upah
8.2.
1
Upah
6
Tukang besi
Pekerja
Mandor
Upah
Upah
0.200
0.100
0.005
Upah
Tukang besi
Pekerja
Mandor
kfsn
VIII.
SNI
Rp
Rp
T O T A L Rp
12,661,195.31
2,382,000.00
15,043,195.31
SNI - 2008
0.040
0.050
M3
Kg
0.300
Org
RAB - 031
Rp
2,415,767.81
URAIAN PEKERJAAN
SNI
kfsn
8.3.
Upah
8.4.
8.5.
1
8.7.
M3
Kg
M3
Kg
0.040
0.050
M3
Kg
397,000.00
2,812,767.81
############
15,356.25
Sub - Bahan
Sub - Upah
415,800.00
767.81
416,567.81 Rp
833,135.63 Rp
T O T A L Rp
416,567.81
397,000.00
813,567.81
8,137,500.00
15,356.25
Sub - Bahan
Sub - Upah
325,500.00
767.81
326,267.81 Rp
652,535.63 Rp
T O T A L Rp
326,267.81
397,000.00
723,267.81
############
15,356.25
Sub - Bahan
Sub - Upah
430,500.00
767.81
431,267.81 Rp
862,535.63 Rp
T O T A L Rp
431,267.81
397,000.00
828,267.81
############
15,356.25
Sub - Bahan
105,000.00
95,000.00
75,000.00
110,000.00
Sub - Upah
415,800.00
767.81
416,567.81 Rp
11,025.00
99,750.00
26,250.00
1,980.00
139,005.00 Rp
T O T A L Rp
3,360,000.00
15,356.25
Sub - Bahan
105,000.00
95,000.00
75,000.00
110,000.00
Sub - Upah
134,400.00
767.81
135,167.81 Rp
11,025.00
99,750.00
26,250.00
1,980.00
139,005.00 Rp
T O T A L Rp
SNI - 2008
0.040
0.050
M3
Kg
0.105
1.050
0.350
0.018
Org
Org
Org
Org
416,567.81
139,005.00
555,572.81
SNI - 2008
0.040
0.050
M3
Kg
0.105
1.050
0.350
0.018
Org
Org
Org
Org
135,167.81
139,005.00
274,172.81
SNI - 2008
0.024
M3
############
0.300
Kg
0.240
2.400
0.800
0.040
Org
Org
Org
Org
42,000.00
Sub - Bahan
105,000.00
95,000.00
75,000.00
110,000.00
Sub - Upah
12,600.00
262,080.00 Rp
25,200.00
228,000.00
60,000.00
4,400.00
317,600.00 Rp
T O T A L Rp
249,480.00
8,137,500.00
42,000.00
Sub - Bahan
Sub - Upah
195,300.00
12,600.00
207,900.00 Rp
415,800.00 Rp
T O T A L Rp
############
42,000.00
Sub - Bahan
105,000.00
95,000.00
75,000.00
110,000.00
Sub - Upah
665,280.00
21,000.00
686,280.00 Rp
31,500.00
285,000.00
75,000.00
5,500.00
397,000.00 Rp
T O T A L Rp
262,080.00
317,600.00
579,680.00
SNI - 2008
0.024
0.300
M3
Kg
285,000.00
75,000.00
5,500.00
397,000.00 Rp
T O T A L Rp
SNI - 2008
0.040
0.050
8.6.
95,000.00
75,000.00
110,000.00
Sub - Upah
SNI - 2008
0.040
0.050
HARGA SATUAN
PEKERJAAN
SNI - 2008
Org
Org
Org
3.000
1.000
0.050
207,900.00
317,600.00
525,500.00
SNI - 2008
0.064
0.500
M3
Kg
0.300
3.000
1.000
0.050
Org
Org
Org
Org
686,280.00
397,000.00
1,083,280.00
M3
Lmbr
Kg
Kg
0.210
Org
RAB - 032
############
105,000.00
19,950.00
42,000.00
Sub - Bahan
105,000.00
259,875.00
73,500.00
598.50
21,000.00
354,973.50
22,050.00
Rp
354,973.50
URAIAN PEKERJAAN
SNI
kfsn
8.8.
8.9.
95,000.00
75,000.00
110,000.00
Sub - Upah
199,500.00
52,500.00
3,850.00
277,900.00 Rp
T O T A L Rp
############
105,000.00
19,950.00
42,000.00
Sub - Bahan
105,000.00
95,000.00
75,000.00
110,000.00
Sub - Upah
1,509,375.00
73,500.00
598.50
12,600.00
1,596,073.50 Rp
25,200.00
228,000.00
60,000.00
4,400.00
317,600.00 Rp
T O T A L Rp
############
105,000.00
19,950.00
42,000.00
Sub - Bahan
105,000.00
95,000.00
75,000.00
110,000.00
Sub - Upah
266,112.00
73,500.00
598.50
21,000.00
361,210.50 Rp
25,200.00
228,000.00
60,000.00
4,400.00
317,600.00 Rp
T O T A L Rp
############
19,950.00
Sub - Bahan
105,000.00
95,000.00
75,000.00
110,000.00
Sub - Upah
623,700.00
2,992.50
626,692.50 Rp
21,000.00
190,000.00
37,500.00
2,750.00
251,250.00 Rp
T O T A L Rp
0.025
0.700
0.030
0.300
M3
Lmbr
Kg
Kg
0.240
2.400
0.800
0.040
Org
Org
Org
Org
0.0256
0.700
0.030
0.500
M3
Lmbr
Kg
Kg
0.240
2.400
0.800
0.040
Org
Org
Org
Org
0.060
0.150
M3
Kg
0.200
2.000
0.500
0.025
Org
Org
Org
Org
0.017
0.700
0.700
0.100
0.250
M3
Lmbr
Lmbr
Kg
Kg
############
80,850.00
183,750.00
19,950.00
42,000.00
Sub - Bahan
0.017
0.700
0.700
0.100
0.250
M3
Lmbr
Lmbr
Kg
Kg
############
57,750.00
183,750.00
19,950.00
42,000.00
Sub - Bahan
IX.
PEKERJAAN FINISHING
9.1.
9.1.1
9.1.2
1
11.000
0.030
0.007
0.070
0.150
0.008
317,600.00
1,913,673.50
361,210.50
317,600.00
678,810.50
176,715.00
56,595.00
128,625.00
1,995.00
10,500.00
374,430.00
Rp
Rp
T O T A L Rp
176,715.00
40,425.00
128,625.00
1,995.00
10,500.00
358,260.00
Rp
Rp
T O T A L Rp
kg
1,300.00
M3
265,125.00
Sub - Bahan
Org
100,000.00
Org
95,000.00
Org
75,000.00
Org
110,000.00
Sub - Upah
14,300.00
7,953.75
22,253.75 Rp
700.00
6,650.00
11,250.00
880.00
19,480.00 Rp
T O T A L Rp
kg
1,300.00
M3
265,125.00
Sub - Bahan
Org
75,000.00
Org
95,000.00
Org
100,000.00
Org
110,000.00
Sub - Upah
20,155.20
4,242.00
24,397.20 Rp
22,500.00
14,250.00
1,500.00
1,650.00
39,900.00 Rp
T O T A L Rp
626,692.50
251,250.00
877,942.50
374,430.00
277,900.00
652,330.00
358,260.00
277,900.00
636,160.00
22,253.75
19,480.00
41,733.75
SNI-2008
15.504
0.016
Pekerja
Tukang batu halus
Kep. Tukang Batu
Mandor
1,596,073.50
277,900.00
632,873.50
8.11.
Org
Org
Org
HARGA SATUAN
PEKERJAAN
8.10.
2.100
0.700
0.035
0.300
0.150
0.015
0.015
SNI-2008
10.224
RAB - 033
kg
1,300.00
13,291.20
24,397.20
39,900.00
64,297.20
URAIAN PEKERJAAN
SNI
kfsn
Pasir pasang
Upah
4.416
0.027
3.936
0.028
Upah
kg
1,300.00
M3
265,125.00
Sub - Bahan
Sub - Upah
8,112.00
6,363.00
14,475.00
kg
1,300.00
M3
265,125.00
Sub - Bahan
Sub - Upah
6,739.20
6,893.25
13,632.45
kg
1,300.00
M3
265,125.00
Sub - Bahan
Sub - Upah
5,740.80
7,158.38
12,899.18
kg
1,300.00
M3
265,125.00
Sub - Bahan
Sub - Upah
5,116.80
7,423.50
12,540.30
kg
1,300.00
M3
265,125.00
Sub - Bahan
Sub - Upah
4,492.80
7,688.63
12,181.43
kg
105,262.50
kg
1,575.00
kg
2,546.25
Sub - Bahan
Org
75,000.00
Org
90,000.00
Org
100,000.00
Org
110,000.00
Sub - Upah
11,578.88
31,500.00
5,092.50
48,171.38 Rp
15,000.00
9,000.00
1,000.00
1,100.00
26,100.00 Rp
T O T A L Rp
kg
1,300.00
M3
265,125.00
Sub - Bahan
Org
75,000.00
Org
95,000.00
Org
100,000.00
Org
110,000.00
Sub - Upah
17,721.60
7,158.38
24,879.98 Rp
30,000.00
19,000.00
2,000.00
2,420.00
53,420.00 Rp
T O T A L Rp
kg
1,300.00
M3
265,125.00
Sub - Bahan
Sub - Upah
13,478.40
8,218.88
21,697.28
kg
1,300.00
M3
265,125.00
Sub - Bahan
Sub - Upah
10,816.00
8,484.00
19,300.00
kg
1,300.00
M3
265,125.00
Sub - Bahan
Sub - Upah
8,985.60
9,279.38
18,264.98
Rp
Rp
T O T A L Rp
16,206.68
39,900.00
56,106.68
Rp
Rp
T O T A L Rp
14,475.00
39,900.00
54,375.00
Rp
Rp
T O T A L Rp
13,632.45
39,900.00
53,532.45
Rp
Rp
T O T A L Rp
12,899.18
39,900.00
52,799.18
Rp
Rp
T O T A L Rp
12,540.30
39,900.00
52,440.30
SNI-2008
3.456
0.029
0.110
20.000
2.000
0.200
0.100
0.010
0.010
Rp
Rp
T O T A L Rp
12,181.43
39,900.00
52,081.43
48,171.38
26,100.00
74,271.38
SNI-2008
13.632
0.027
Pekerja
Tukang batu halus
Kep. Tukang Batu
Mandor
0.400
0.200
0.020
0.022
24,879.98
53,420.00
78,299.98
SNI-2008
10.368
0.031
Rp
Rp
T O T A L Rp
21,697.28
53,420.00
75,117.28
SNI-2008
8.320
0.032
10,108.80
6,097.88
16,206.68
18,593.70
39,900.00
58,493.70
SNI-2008
Pekerja
Tukang batu
Kep. Tukang Batu
Mandor
kg
1,300.00
M3
265,125.00
Sub - Bahan
Sub - Upah
Rp
Rp
T O T A L Rp
SNI-2008
5.184
0.026
5,302.50
18,593.70
SNI-2008
9.1.3
1
6.240
0.024
M3
265,125.00
Sub - Bahan
Sub - Upah
SNI-2008
7.776
0.023
HARGA SATUAN
PEKERJAAN
SNI-2008
0.020
Rp
Rp
T O T A L Rp
19,300.00
53,420.00
72,720.00
SNI-2008
6.912
0.035
RAB - 034
Rp
Rp
T O T A L Rp
18,264.98
53,420.00
71,684.98
URAIAN PEKERJAAN
9.1.4
1
0.300
0.100
0.010
0.015
3.108
0.150
0.075
0.008
0.008
kg
1,300.00
kg
5,000.00
Sub - Bahan
Org
75,000.00
Org
95,000.00
Org
100,000.00
Org
110,000.00
Sub - Upah
13,000.00
75,000.00
88,000.00 Rp
33,000.00
21,375.00
2,300.00
2,530.00
59,205.00 Rp
T O T A L Rp
kg
1,300.00
kg
4,000.00
Sub - Bahan
Org
75,000.00
Org
95,000.00
Org
100,000.00
Org
110,000.00
Sub - Upah
13,000.00
60,000.00
73,000.00 Rp
33,000.00
21,375.00
2,300.00
2,530.00
59,205.00 Rp
T O T A L Rp
kg
1,300.00
m3
265,125.00
Sub - Bahan
Org
75,000.00
Org
95,000.00
Org
100,000.00
Org
110,000.00
Sub - Upah
5,616.00
1,590.75
7,206.75 Rp
22,500.00
9,500.00
1,000.00
1,650.00
34,650.00 Rp
T O T A L Rp
kg
1,300.00
Sub - Bahan
Org
75,000.00
Org
95,000.00
Org
100,000.00
Org
110,000.00
Sub - Upah
4,040.40
4,040.40 Rp
11,250.00
7,125.00
800.00
880.00
20,055.00 Rp
T O T A L Rp
kg
1,300.00
Sub - Bahan
Org
75,000.00
Org
95,000.00
Org
100,000.00
Org
110,000.00
Sub - Upah
2,080.00
2,080.00 Rp
5,250.00
3,325.00
400.00
440.00
9,415.00 Rp
T O T A L Rp
kg
1,300.00
m3
265,125.00
Sub - Bahan
Org
75,000.00
Org
95,000.00
Org
100,000.00
Org
110,000.00
Sub - Upah
8,242.00
3,181.50
11,423.50 Rp
22,500.00
14,250.00
1,500.00
1,650.00
39,900.00 Rp
T O T A L Rp
kg
1,300.00
Sub - Bahan
Org
75,000.00
Org
95,000.00
Org
100,000.00
Org
110,000.00
Sub - Upah
4,225.00
4,225.00 Rp
11,250.00
9,500.00
1,000.00
880.00
22,630.00 Rp
T O T A L Rp
kg
4,160.63
Sub - Bahan
Org
75,000.00
Org
95,000.00
Org
100,000.00
Org
110,000.00
Sub - Upah
12,481.88
12,481.88 Rp
11,250.00
9,500.00
1,000.00
880.00
22,630.00 Rp
T O T A L Rp
Kg
1,300.00
M3
265,125.00
M2
57,750.00
Kg
10,500.00
Sub - Bahan
Org
100,000.00
Org
95,000.00
Org
75,000.00
Org
110,000.00
12,090.00
4,772.25
60,117.75
15,750.00
92,730.00
3,000.00
28,500.00
22,500.00
330.00
88,000.00
59,205.00
147,205.00
73,000.00
59,205.00
132,205.00
7,206.75
34,650.00
41,856.75
4,040.40
20,055.00
24,095.40
SNI-2008
1.600
0.070
0.035
0.004
0.004
2,080.00
9,415.00
11,495.00
SNI-2008
6.340
0.012
0.300
0.150
0.015
0.015
11,423.50
39,900.00
51,323.50
SNI-2008
3.250
Pekerja
Tukang batu halus
Kep. Tukang Batu
Mandor
0.150
0.100
0.010
0.008
4,225.00
22,630.00
26,855.00
SNI-2008
3.000
Pekerja
Tukang batu halus
Kep. Tukang Batu
Mandor
HARGA SATUAN
PEKERJAAN
SNI-2008
Pekerja
Tukang batu halus
Kep. Tukang Batu
Mandor
4.320
0.006
Pekerja
Tukang batu halus
Kep. Tukang Batu
Mandor
9.1.5
1
SNI-2008
Pekerja
Tukang batu halus
Kep. Tukang Batu
Mandor
FINISHING ACIAN / M2
Bahan : Semen PC
Upah
10.000
15.000
0.440
0.225
0.023
0.023
Pekerja
Tukang batu halus
Kep. Tukang Batu
Mandor
10.000
15.000
0.440
0.225
0.023
0.023
Pekerja
Tukang batu halus
Kep. Tukang Batu
Mandor
Pekerja
Tukang batu halus
Kep. Tukang Batu
Mandor
kfsn
SNI
0.150
0.100
0.010
0.008
12,481.88
22,630.00
35,111.88
SNI-2008
9.300
0.018
1.041
1.500
0.030
0.300
0.300
0.003
RAB - 035
Rp
92,730.00
URAIAN PEKERJAAN
SNI
kfsn
9.1.6
1
Upah
9.300
0.018
1.060
2.750
Kg
1,300.00
M3
265,125.00
M2
68,250.00
Kg
10,500.00
Sub - Bahan
Org
100,000.00
Org
95,000.00
Org
75,000.00
Org
110,000.00
Sub - Upah
12,090.00
4,772.25
72,345.00
28,875.00
118,082.25 Rp
3,000.00
28,500.00
22,500.00
330.00
54,330.00 Rp
T O T A L Rp
0.030
0.300
0.300
0.003
kg
1,300.00
M3
265,125.00
M2
79,800.00
Kg
10,500.00
Sub - Bahan
Org
100,000.00
Org
95,000.00
Org
75,000.00
Org
110,000.00
Sub - Upah
12,090.00
4,772.25
84,588.00
20,370.00
121,820.25 Rp
3,000.00
28,500.00
22,500.00
330.00
54,330.00 Rp
T O T A L Rp
kg
1,300.00
M3
265,125.00
M2
86,100.00
Kg
10,500.00
Sub - Bahan
12,090.00
4,772.25
91,266.00
20,370.00
128,498.25
kg
1,300.00
M3
265,125.00
M2
134,925.00
Kg
10,500.00
Sub - Bahan
12,090.00
4,772.25
143,020.50
20,370.00
180,252.75
kg
1,300.00
M3
265,125.00
M2
84,000.00
Kg
10,500.00
Sub - Bahan
12,090.00
4,772.25
89,040.00
20,370.00
126,272.25
kg
1,300.00
M3
265,125.00
M2
73,500.00
Kg
10,500.00
Sub - Bahan
12,090.00
4,772.25
77,910.00
20,370.00
115,142.25
Kg
1,300.00
M3
265,125.00
M2
420,000.00
bh
300.00
Kg
12,600.00
Sub - Bahan
Org
100,000.00
16,172.00
6,628.13
445,200.00
900.90
8,190.00
477,091.03
4,500.00
119,657.25
54,330.00
173,987.25
118,082.25
54,330.00
172,412.25
SNI-2008
9.300
0.018
1.060
1.940
0.030
0.300
0.300
0.003
121,820.25
40,747.50
162,567.75
SNI-2008
9.300
0.018
1.060
1.940
Rp
Rp
T O T A L Rp
128,498.25
40,747.50
169,245.75
SNI-2008
9.300
0.018
1.060
1.940
Rp
Rp
T O T A L Rp
180,252.75
40,747.50
221,000.25
SNI-2008
9.300
0.018
1.060
1.940
Rp
Rp
T O T A L Rp
126,272.25
40,747.50
167,019.75
SNI-2008
9.300
0.018
1.060
1.940
54,330.00
147,060.00
SNI-2008
12,090.00
4,772.25
72,345.00
30,450.00
119,657.25 Rp
3,000.00
28,500.00
22,500.00
330.00
54,330.00 Rp
T O T A L Rp
Kg
1,300.00
M3
265,125.00
M2
68,250.00
Kg
10,500.00
Sub - Bahan
Org
100,000.00
Org
95,000.00
Org
75,000.00
Org
110,000.00
Sub - Upah
0.030
0.300
0.300
0.003
9.300
0.018
1.060
2.900
54,330.00 Rp
T O T A L Rp
SNI-2008
HARGA SATUAN
PEKERJAAN
Rp
Rp
T O T A L Rp
115,142.25
40,747.50
155,889.75
SNI-2008
12.440
0.025
1.060
3.003
0.650
0.045
RAB - 036
Rp
477,091.03
URAIAN PEKERJAAN
SNI
kfsn
Upah
9.1.7
1
16,172.00
6,628.13
1,085,175.00
900.90
8,190.00
1,117,066.03 Rp
4,500.00
42,750.00
33,750.00
990.00
81,990.00 Rp
T O T A L Rp
81,990.00
559,081.03
1,117,066.03
81,990.00
1,199,056.03
SNI-2008
12.440
0.025
1.060
3.003
0.650
Kg
1,300.00
M3
265,125.00
M2
577,500.00
bh
300.00
Kg
12,600.00
Sub - Bahan
16,172.00
6,628.13
612,150.00
900.90
8,190.00
644,041.03
Kg
1,300.00
M3
265,125.00
M2
310,695.00
Kg
12,600.00
Sub - Bahan
Org
100,000.00
Org
95,000.00
Org
75,000.00
Org
110,000.00
Sub - Upah
12,090.00
4,772.25
329,336.70
24,444.00
370,642.95 Rp
4,500.00
42,750.00
33,750.00
990.00
81,990.00 Rp
T O T A L Rp
Kg
1,300.00
M2
133,000.35
M3
265,125.00
Sub - Bahan
Org
100,000.00
Org
95,000.00
Org
75,000.00
Org
110,000.00
Sub - Upah
15,275.00
146,300.39
9,279.38
170,854.76 Rp
3,500.00
33,250.00
26,250.00
3,850.00
66,850.00 Rp
T O T A L Rp
Kg
1,300.00
M2
147,000.00
M3
265,125.00
Sub - Bahan
15,275.00
161,700.00
9,279.38
186,254.38
Kg
1,300.00
M2
157,500.00
M3
265,125.00
Sub - Bahan
15,275.00
173,250.00
9,279.38
197,804.38
Kg
1,300.00
M2
189,000.00
M3
265,125.00
Sub - Bahan
15,275.00
207,900.00
9,279.38
232,454.38
Kg
1,300.00
M2
99,750.00
M3
265,125.00
Sub - Bahan
15,275.00
109,725.00
9,279.38
134,279.38
Rp
Rp
T O T A L Rp
644,041.03
81,990.00
726,031.03
SNI-2008
9.300
0.018
1.060
1.940
0.045
0.450
0.450
0.009
370,642.95
81,990.00
452,632.95
SNI-2008
11.750
1.100
0.035
0.035
0.350
0.350
0.035
170,854.76
66,850.00
237,704.76
SNI-2008
11.750
1.100
0.035
11.750
1.100
0.035
11.750
1.100
0.035
9.1.8
1
Kg
1,300.00
M3
265,125.00
M2
1,023,750.00
bh
300.00
Kg
12,600.00
Sub - Bahan
Org
100,000.00
Org
95,000.00
Org
75,000.00
Org
110,000.00
Sub - Upah
42,750.00
33,750.00
990.00
81,990.00 Rp
T O T A L Rp
0.045
0.450
0.450
0.009
12.440
0.025
1.060
3.003
0.650
Org
95,000.00
Org
75,000.00
Org
110,000.00
Sub - Upah
HARGA SATUAN
PEKERJAAN
SNI-2008
0.450
0.450
0.009
11.750
1.100
0.035
RAB - 037
Rp
Rp
T O T A L Rp
Rp
Rp
T O T A L Rp
Rp
Rp
T O T A L Rp
Rp
Rp
T O T A L Rp
186,254.38
66,850.00
253,104.38
197,804.38
66,850.00
264,654.38
232,454.38
66,850.00
299,304.38
134,279.38
66,850.00
201,129.38
URAIAN PEKERJAAN
Bahan :
Upah
Tukang Allumunium
Tukang gypsum
Pekerja
Mandor
Tukang Allumunium
Tukang gypsum
Pekerja
Mandor
Tukang Allumunium
Tukang gypsum
Pekerja
Mandor
Tukang Allumunium
Tukang gypsum
Pekerja
Mandor
Tukang Allumunium
Tukang gypsum
Pekerja
Mandor
SNI
kfsn
1.250
0.250
8.000
8.000
0.700
0.240
0.120
24.000
0.500
0.200
0.300
0.200
0.015
1.250
8.000
8.000
0.700
0.240
0.120
24.000
0.500
0.200
0.300
0.200
0.015
1.250
0.250
8.000
8.000
0.350
0.240
0.120
24.000
0.500
0.200
0.150
0.200
0.015
1.250
8.000
8.000
0.350
0.240
0.120
24.000
0.500
0.200
0.150
0.200
0.015
3.000
1.000
8.000
8.000
0.350
0.240
0.120
24.000
0.500
0.200
0.300
0.200
0.015
RAB - 038
HARGA SATUAN
PEKERJAAN
btg
21,000.00
btg
21,000.00
bh
300.00
bh
450.00
lbr
78,750.00
roll
18,375.00
zak
60,375.00
bh
400.00
lbr
2,887.50
Sub - Bahan
Org
100,000.00
Org
90,000.00
Org
75,000.00
Org
110,000.00
Sub - Upah
26,250.00
5,250.00
2,400.00
3,600.00
55,125.00
4,410.00
7,245.00
9,600.00
1,443.75
115,323.75 Rp
20,000.00
27,000.00
15,000.00
1,650.00
63,650.00 Rp
T O T A L Rp
btg
37,800.00
bh
300.00
bh
450.00
lbr
78,750.00
roll
18,375.00
zak
60,375.00
bh
400.00
lbr
2,887.50
Sub - Bahan
Org
100,000.00
Org
90,000.00
Org
75,000.00
Org
110,000.00
Sub - Upah
47,250.00
2,400.00
3,600.00
55,125.00
4,410.00
7,245.00
9,600.00
1,443.75
131,073.75 Rp
20,000.00
27,000.00
15,000.00
1,650.00
63,650.00 Rp
T O T A L Rp
btg
21,000.00
btg
21,000.00
bh
300.00
bh
450.00
lbr
78,750.00
roll
18,375.00
zak
60,375.00
bh
400.00
lbr
2,887.50
Sub - Bahan
Org
100,000.00
Org
90,000.00
Org
75,000.00
Org
110,000.00
Sub - Upah
26,250.00
5,250.00
2,400.00
3,600.00
27,562.50
4,410.00
7,245.00
9,600.00
1,443.75
87,761.25 Rp
20,000.00
13,500.00
15,000.00
1,650.00
50,150.00 Rp
T O T A L Rp
btg
37,800.00
bh
300.00
bh
450.00
lbr
78,750.00
roll
18,375.00
zak
60,375.00
bh
400.00
lbr
2,887.50
Sub - Bahan
Org
100,000.00
Org
90,000.00
Org
75,000.00
Org
110,000.00
Sub - Upah
47,250.00
2,400.00
3,600.00
27,562.50
4,410.00
7,245.00
9,600.00
1,443.75
103,511.25 Rp
20,000.00
13,500.00
15,000.00
1,650.00
50,150.00 Rp
T O T A L Rp
m
36,575.00
m
18,375.00
bh
300.00
bh
450.00
lbr
136,500.00
roll
18,375.00
zak
60,375.00
bh
400.00
lbr
2,887.50
Sub - Bahan
Org
100,000.00
Org
90,000.00
Org
75,000.00
Org
110,000.00
Sub - Upah
109,725.00
18,375.00
2,400.00
3,600.00
47,775.00
4,410.00
7,245.00
9,600.00
1,443.75
204,573.75 Rp
20,000.00
27,000.00
15,000.00
1,650.00
63,650.00 Rp
T O T A L Rp
115,323.75
63,650.00
178,973.75
131,073.75
63,650.00
194,723.75
87,761.25
50,150.00
137,911.25
103,511.25
50,150.00
153,661.25
204,573.75
63,650.00
268,223.75
URAIAN PEKERJAAN
Bahan :
Upah
Tukang kayu
Pekerja
Mandor
9.2.
9.2.1
1
SNI
kfsn
0.025
0.300
0.750
0.240
0.120
32.000
0.500
0.600
0.200
0.010
1.a.
15.552
0.046
0.020
0.200
0.400
0.020
0.010
0.100
0.100
0.005
5.000
0.010
0.100
0.100
0.005
SNI-2008
137,812.50
4,606.88
63,000.00
4,410.00
7,245.00
12,800.00
1,443.75
231,318.13 Rp
60,000.00
15,000.00
1,100.00
76,100.00 Rp
T O T A L Rp
231,318.13
76,100.00
307,418.13
kg
1,300.00
M3
265,125.00
Sub - Bahan
Org
100,000.00
Org
95,000.00
Org
75,000.00
Org
110,000.00
Sub - Upah
20,217.60
12,195.75
32,413.35
2,000.00
19,000.00
30,000.00
2,200.00
53,200.00
Kg
9,450.00
Sub - Bahan
Org
100,000.00
Org
95,000.00
Org
75,000.00
Org
110,000.00
Sub - Upah
47,250.00
47,250.00 Rp
1,000.00
9,500.00
7,500.00
550.00
18,550.00 Rp
T O T A L Rp
Kg
9,450.00
Sub - Bahan
Org
100,000.00
Org
95,000.00
Org
75,000.00
Org
110,000.00
Sub - Upah
47,250.00
47,250.00 Rp
1,000.00
9,500.00
7,500.00
550.00
18,550.00 Rp
T O T A L Rp
kg
1,300.00
M3
265,125.00
M2
577,500.00
Kg
10,500.00
Sub - Bahan
Org
100,000.00
Org
95,000.00
Org
75,000.00
Org
110,000.00
Sub - Upah
12,480.00
11,930.63
644,490.00
15,750.00
684,650.63 Rp
2,500.00
23,750.00
37,500.00
550.00
64,300.00 Rp
T O T A L Rp
kg
1,300.00
M3
265,125.00
M2
255,255.00
Kg
10,500.00
Sub - Bahan
Org
100,000.00
Org
95,000.00
Org
75,000.00
Org
110,000.00
Sub - Upah
12,480.00
11,930.63
284,864.58
15,750.00
325,025.21 Rp
2,500.00
23,750.00
37,500.00
550.00
64,300.00 Rp
T O T A L Rp
kg
1,300.00
M3
265,125.00
M2
259,875.00
Kg
10,500.00
Sub - Bahan
Org
100,000.00
Org
95,000.00
Org
75,000.00
Org
110,000.00
Sub - Upah
12,480.00
11,930.63
290,020.50
15,750.00
330,181.13 Rp
2,500.00
23,750.00
37,500.00
550.00
64,300.00 Rp
T O T A L Rp
Rp
32,413.35
Rp
53,200.00
47,250.00
18,550.00
151,413.35
47,250.00
18,550.00
65,800.00
684,650.63
64,300.00
748,950.63
SNI-2008
9.600
0.045
1.116
1.500
0.025
0.250
0.500
0.005
9.600
0.045
1.116
1.500
0.025
0.250
0.500
0.005
5.000
m
5,512,500.00
kg
15,356.25
lbr
84,000.00
roll
18,375.00
zak
60,375.00
bh
400.00
lbr
2,887.50
Sub - Bahan
Org
100,000.00
Org
75,000.00
Org
110,000.00
Sub - Upah
HARGA SATUAN
PEKERJAAN
SNI-2008
Floor Hardener
Bahan : Floor Hardener (Tesa/Gan's Floor), 5 kg/m2
Upah
9.600
0.045
1.116
1.500
0.025
0.250
0.500
0.005
SNI-2008
10.000
RAB - 039
kg
1,300.00
13,000.00
325,025.21
64,300.00
389,325.21
330,181.13
64,300.00
394,481.13
URAIAN PEKERJAAN
Upah
10.000
0.045
1.068
1.500
0.015
0.150
0.300
0.015
SNI-2008
8.190
0.045
1.089
1.620
0.015
0.150
0.300
0.015
11,930.63
182,563.92
15,750.00
223,244.55 Rp
1,500.00
14,250.00
22,500.00
1,650.00
39,900.00 Rp
T O T A L Rp
kg
1,300.00
M3
265,125.00
M2
157,080.00
Kg
10,500.00
Sub - Bahan
Org
100,000.00
Org
95,000.00
Org
75,000.00
Org
110,000.00
Sub - Upah
13,000.00
11,930.63
167,761.44
15,750.00
208,442.07 Rp
1,500.00
14,250.00
22,500.00
1,650.00
39,900.00 Rp
T O T A L Rp
kg
1,300.00
M3
265,125.00
M2
97,650.00
Kg
10,500.00
Sub - Bahan
Org
100,000.00
Org
95,000.00
Org
75,000.00
Org
110,000.00
Sub - Upah
10,647.00
11,930.63
106,340.85
17,010.00
145,928.48 Rp
1,500.00
14,250.00
22,500.00
1,650.00
39,900.00 Rp
T O T A L Rp
10.400
0.045
1.060
1.620
kg
1,300.00
M3
265,125.00
M2
86,100.00
Kg
10,500.00
Sub - Bahan
Org
100,000.00
Org
95,000.00
Org
75,000.00
Org
110,000.00
Sub - Upah
13,520.00
11,930.63
91,266.00
17,010.00
133,726.63 Rp
1,500.00
14,250.00
22,500.00
1,650.00
39,900.00 Rp
T O T A L Rp
0.015
0.150
0.300
0.015
kg
1,300.00
M3
265,125.00
M2
73,500.00
Kg
10,500.00
Sub - Bahan
13,000.00
11,930.63
78,498.00
15,750.00
119,178.63
kg
1,300.00
M3
265,125.00
M2
82,500.00
Kg
10,500.00
Sub - Bahan
13,000.00
11,930.63
88,110.00
15,750.00
128,790.63
223,244.55
39,900.00
263,144.55
208,442.07
39,900.00
248,342.07
145,928.48
39,900.00
185,828.48
133,726.63
29,925.00
163,651.63
SNI-2008
10.000
0.045
1.068
1.500
Rp
Rp
T O T A L Rp
119,178.63
29,925.00
149,103.63
SNI-2008
10.000
0.045
1.068
1.500
Rp
Rp
T O T A L Rp
128,790.63
29,925.00
158,715.63
SNI-2008
1.140
0.003
0.123
0.025
kg
1,300.00
1,482.00
M3
265,125.00
795.38
M2
255,255.00
31,335.10
Kg
10,500.00
262.50
Sub - Bahan
33,874.98
0.009
Org
100,000.00
900.00
0.090
Org
95,000.00
8,550.00
0.090
Org
75,000.00
6,750.00
0.005
Org
110,000.00
550.00
Sub - Upah
16,750.00
Ditambah upah potong ubin & tali air (1x upah)
TOTAL
Rp
33,874.98
Rp
Rp
Rp
16,750.00
16,750.00
67,374.98
SNI-2008
0.002
0.050
HARGA SATUAN
PEKERJAAN
SNI-2008
9.2.3
1
0.015
0.150
0.300
0.015
9.2.2
1
10
0.045
1.068
1.500
Pasir pasang
Homogenous Tile Granitto 40/40 Cm, polished
Semen warna
kfsn
SNI
0.012
0.120
0.120
0.006
SNI-2008
RAB - 040
m3
############
Kg
19,950.00
Sub - Bahan
Org
105,000.00
Org
95,000.00
Org
75,000.00
Org
110,000.00
Sub - Upah
20,790.00
997.50
21,787.50 Rp
1,260.00
11,400.00
9,000.00
660.00
22,320.00 Rp
T O T A L Rp
21,787.50
22,320.00
44,107.50
URAIAN PEKERJAAN
9.2.4
1
Semen PC
Pasir pasang
Marmer Tulung Agung, 60/60 cm
Semen Warna
8.190
0.045
1.060
0.650
Upah
0.025
0.250
0.500
0.005
1.050
0.350
0.015
0.150
0.150
0.008
- Biaya Instol
- Biaya pengiriman ke Pangkal Pinang
kg
1,300.00
M3
265,125.00
M2
420,000.00
Kg
10,500.00
Sub - Bahan
Org
100,000.00
Org
95,000.00
Org
75,000.00
Org
110,000.00
Sub - Upah
10,647.00
11,930.63
445,200.00
6,825.00
474,602.63 Rp
2,500.00
23,750.00
37,500.00
550.00
64,300.00 Rp
T O T A L Rp
M2
31,500.00
Kg
42,000.00
Sub - Bahan
Org
105,000.00
Org
95,000.00
Org
75,000.00
Org
110,000.00
Sub - Upah
33,075.00
14,700.00
47,775.00 Rp
1,050.00
9,500.00
7,500.00
220.00
18,270.00 Rp
T O T A L Rp
M2
52,500.00
Kg
42,000.00
Sub - Bahan
Org
105,000.00
Org
95,000.00
Org
75,000.00
Org
110,000.00
Sub - Upah
55,125.00
14,700.00
69,825.00 Rp
1,575.00
14,250.00
11,250.00
880.00
27,955.00 Rp
T O T A L Rp
M2
236,250.00
Kg
42,000.00
Sub - Bahan
Org
105,000.00
Org
95,000.00
Org
75,000.00
Org
110,000.00
Sub - Upah
248,062.50
14,700.00
262,762.50 Rp
1,050.00
9,500.00
7,500.00
220.00
18,270.00 Rp
T O T A L Rp
M2
157,500.00
Kg
42,000.00
Sub - Bahan
Org
105,000.00
Org
95,000.00
Org
75,000.00
Org
110,000.00
Sub - Upah
165,375.00
14,700.00
180,075.00 Rp
1,050.00
9,500.00
7,500.00
220.00
18,270.00 Rp
T O T A L Rp
M2
150,000.00
Kg
42,000.00
Sub - Bahan
Org
105,000.00
Org
95,000.00
Org
75,000.00
Org
110,000.00
Sub - Upah
157,500.00
25,200.00
182,700.00 Rp
3,675.00
33,250.00
26,250.00
3,850.00
67,025.00 Rp
T O T A L Rp
M2
78,750.00
Kg
42,000.00
Sub - Bahan
Org
105,000.00
Org
95,000.00
Org
75,000.00
Org
110,000.00
Sub - Upah
82,687.50
14,700.00
97,387.50 Rp
1,050.00
9,500.00
7,500.00
220.00
18,270.00 Rp
T O T A L Rp
474,602.63
64,300.00
538,902.63
47,775.00
18,270.00
66,045.00
69,825.00
27,955.00
97,780.00
SNI-2008
1.050
0.350
0.010
0.100
0.100
0.002
262,762.50
18,270.00
281,032.50
SNI-2008
1.050
0.350
0.010
0.100
0.100
0.002
180,075.00
18,270.00
198,345.00
SNI-2008
1.050
0.600
HARGA SATUAN
PEKERJAAN
SNI-2008
0.010
0.100
0.100
0.002
Upah
9.2.6.
1.050
0.350
Upah
SNI-2008
Upah
9.2.5
1
Upah
Upah
kfsn
Bahan :
Upah
SNI
0.035
0.350
0.350
0.035
182,700.00
67,025.00
249,725.00
SNI-2008
1.050
0.350
0.010
0.100
0.100
0.002
31.000
1.000
1.000
RAB - 041
M2
1,200,000.00
Sub - Bahan
lot
6,000,000.00
lot
############
37,200,000.00
37,200,000.00
6,000,000.00
13,500,000.00
Rp
97,387.50
18,270.00
115,657.50
37,200,000.00
URAIAN PEKERJAAN
SNI
kfsn
9.2.7.
1
PEK. SALURAN
Pas. Saluran terbuka, pas. bata + buis beton 1/2 dia 30 cm / M'
Bahan : - Dinding dari pas batu bata 1Pc : 5Ps
- Pas. Bata sambungan buis beton
- Plesteran dinding bata
- Buis beton 1/2 dia 30 cm, @ panjang 0,5 m
Upah pas buis beton :
Pekerja
Tukang batu
Kep. Tukang
Mandor
9.3.
1
293,041.36
37,500.00
9,500.00
1,000.00
550.00
48,550.00 Rp
T O T A L Rp
48,550.00
341,591.36
1,000,000.00
900,000.00
1.000
0.120
1.000
2.000
M2
102,764.63
M2
102,764.63
M2
71,684.98
bh
53,130.00
Sub - Bahan
102,764.63
12,331.76
71,684.98
106,260.00
293,041.36
0.500
0.100
0.010
0.005
0.500
0.100
0.010
0.005
0.217
1.000
0.500
0.100
0.010
0.005
Org
75,000.00
Org
95,000.00
Org
100,000.00
Org
110,000.00
Sub - Upah
M2
102,764.63
M2
102,764.63
M2
71,684.98
bh
53,130.00
M3
5,263,177.78
Sub - Bahan
Org
75,000.00
Org
95,000.00
Org
100,000.00
Org
110,000.00
Sub - Upah
M2
102,764.63
M2
102,764.63
M2
71,684.98
bh
53,130.00
M3
5,263,177.78
Sub - Bahan
Org
75,000.00
Org
95,000.00
Org
100,000.00
Org
110,000.00
Sub - Upah
M2
102,764.63
bh
88,935.00
Sub - Bahan
102,764.63
12,331.76
71,684.98
106,260.00
473,686.00
766,727.36
Rp
766,727.36
37,500.00
9,500.00
1,000.00
550.00
48,550.00 Rp
T O T A L Rp
48,550.00
815,277.36
102,764.63
12,331.76
71,684.98
106,260.00
263,158.89
556,200.24
Rp
556,200.24
37,500.00
9,500.00
1,000.00
550.00
48,550.00 Rp
T O T A L Rp
48,550.00
604,750.24
22,264.98
88,935.00
111,199.98
Rp
111,199.98
Org
75,000.00
Org
95,000.00
Org
100,000.00
Org
110,000.00
Sub - Upah
37,500.00
9,500.00
1,000.00
550.00
48,550.00 Rp
T O T A L Rp
48,550.00
159,749.98
bh
2,500.00
btg
21,000.00
btg
21,000.00
kg
30,000.00
bh
400.00
lbr
59,000.00
bh
400.00
rol
18,375.00
zak
60,375.00
lbr
2,887.50
Sub - Bahan
Org
95,000.00
Org
100,000.00
Org
90,000.00
Org
75,000.00
Org
110,000.00
Sub - Upah
975.00
9,639.00
9,051.00
300.00
5,600.00
21,476.00
8,400.00
441.00
1,207.50
288.75
57,378.25 Rp
2,945.00
26,000.00
4,500.00
19,500.00
1,430.00
54,375.00 Rp
T O T A L Rp
bh
btg
975.00
47,250.00
PEKERJAAN PLAFOND
PAS. PLAFOND GYPSUM BOARD 9 MM, RGK HOLLOW / M2
(Rangka Plafond Hollow)
Bahan : Paku peluru ramset
Hollow 40x40x0,35mm (rangka utama)
Hollow 20x40x0,35mm (rangka pembagi)
Paku beton
Sekrup 6x1-1,5
Gypsumboard 120x240 cm 9 mm
Sekrup gypsum
Textile tape
Compound gypsum
Amplas
Upah
Rp
1,000,000.00
900,000.00
Pas. Saluran tertutup, pas bata + buis beton 1/2 dia 30 cm, ditutup plat beton 10 cm / M'
Bahan : - Dinding dari pas batu bata 1Pc : 5Ps
1.000
- Pas. Bata sambungan buis beton
0.120
- Plesteran dinding bata
1.000
- Buis beton 1/2 dia 30 cm, @ panjang 0,5 m
2.000
- Tutup beton tulang tebal 15 cm
0.050
Upah pas buis beton :
Pekerja
Tukang batu
Kep. Tukang
Mandor
19,500,000.00
56,700,000.00
1,829,032.26
lot
unit
Pas. Saluran tertutup, pas bata + buis beton 1/2 dia 30 cm, ditutup plat beton 15 cm / M'
Bahan : - Dinding dari pas batu bata 1Pc : 5Ps
1.000
- Pas. Bata sambungan buis beton
0.120
- Plesteran dinding bata
1.000
- Buis beton 1/2 dia 30 cm, @ panjang 0,5 m
2.000
- Tutup beton tulang tebal 15 cm
0.090
Upah pas buis beton :
Pekerja
Tukang batu
Kep. Tukang
Mandor
Rp
Rp
Rp
1.000
1.000
0.500
0.100
0.010
0.005
HARGA SATUAN
PEKERJAAN
Kepala tukang
Tukang Allumunium
Tukang gypsum
Pekerja
Mandor
0.390
0.459
0.431
0.010
14.000
0.364
21.000
0.024
0.020
0.100
0.031
0.260
0.050
0.260
0.013
0.390
1.250
RAB - 042
2,500.00
37,800.00
57,378.25
54,375.00
111,753.25
URAIAN PEKERJAAN
SNI
kfsn
Paku beton
Sekrup 6x1-1,5
Gypsumboard 120x240 cm 9 mm
Sekrup gypsum
Textile tape
Compound gypsum
Amplas
Upah
0.390
0.459
0.431
0.010
14.000
0.364
21.000
0.024
0.020
0.100
Kepala tukang
Tukang Allumunium
Tukang gypsum
Pekerja
Mandor
0.031
0.260
0.050
0.260
0.013
0.390
0.459
0.431
0.010
14.000
0.364
21.000
0.024
0.020
0.100
Kepala tukang
Tukang Allumunium
Tukang gypsum
Pekerja
Mandor
0.031
0.260
0.050
0.260
0.013
0.031
0.260
0.050
0.260
0.013
Kepala tukang
Tukang Allumunium
Tukang gypsum
Pekerja
Mandor
0.010
14.000
0.364
21.000
0.024
0.020
0.100
Kepala tukang
Tukang Allumunium
Tukang gypsum
Pekerja
Mandor
0.390
0.459
0.431
0.010
14.000
0.364
21.000
0.024
0.020
0.100
Pekerja
Tukang Gypsum
Kepala Tukang
Mandor
0.031
0.260
0.050
0.260
0.013
HARGA SATUAN
PEKERJAAN
kg
30,000.00
bh
400.00
lbr
59,000.00
bh
400.00
rol
18,375.00
zak
60,375.00
lbr
2,887.50
Sub - Bahan
Org
95,000.00
Org
100,000.00
Org
90,000.00
Org
75,000.00
Org
110,000.00
Sub - Upah
300.00
5,600.00
21,476.00
8,400.00
441.00
1,207.50
288.75
85,938.25 Rp
2,945.00
26,000.00
4,500.00
19,500.00
1,430.00
54,375.00 Rp
T O T A L Rp
bh
2,500.00
btg
21,000.00
btg
21,000.00
kg
30,000.00
bh
400.00
lbr
102,500.00
bh
400.00
rol
18,375.00
zak
60,375.00
lbr
2,887.50
Sub - Bahan
Org
95,000.00
Org
100,000.00
Org
90,000.00
Org
75,000.00
Org
110,000.00
Sub - Upah
975.00
9,639.00
9,051.00
300.00
5,600.00
37,310.00
8,400.00
441.00
1,207.50
288.75
73,212.25 Rp
2,945.00
26,000.00
4,500.00
19,500.00
1,430.00
54,375.00 Rp
T O T A L Rp
bh
2,500.00
btg
21,000.00
btg
21,000.00
kg
30,000.00
bh
400.00
lbr
106,365.00
bh
400.00
rol
18,375.00
zak
60,375.00
lbr
2,887.50
Sub - Bahan
Org
95,000.00
Org
100,000.00
Org
90,000.00
Org
75,000.00
Org
110,000.00
Sub - Upah
975.00
9,639.00
9,051.00
300.00
5,600.00
38,716.86
8,400.00
441.00
1,207.50
288.75
74,619.11 Rp
2,945.00
26,000.00
4,500.00
19,500.00
1,430.00
54,375.00 Rp
T O T A L Rp
bh
2,500.00
btg
21,000.00
btg
21,000.00
kg
30,000.00
bh
400.00
lbr
73,500.00
bh
400.00
rol
18,375.00
zak
60,375.00
lbr
2,887.50
Sub - Bahan
Org
95,000.00
Org
100,000.00
Org
90,000.00
Org
75,000.00
Org
110,000.00
Sub - Upah
975.00
9,639.00
9,051.00
300.00
5,600.00
26,754.00
8,400.00
441.00
1,207.50
288.75
62,656.25 Rp
2,945.00
26,000.00
4,500.00
19,500.00
1,430.00
54,375.00 Rp
T O T A L Rp
m'
7,291.67
m'
6,562.50
m'
8,750.00
kg
17,500.00
bh
2,500.00
Sub - Bahan
26,250.00
7,875.00
5,250.00
2,625.00
2,625.00
44,625.00
lmbr
37,800.00
Sub - Bahan
Org
75,000.00
Org
90,000.00
Org
95,000.00
Org
110,000.00
Sub - Upah
56,700.00
56,700.00
11,250.00
45,000.00
4,750.00
880.00
61,880.00
85,938.25
54,375.00
140,313.25
73,212.25
54,375.00
127,587.25
74,619.11
54,375.00
128,994.11
62,656.25
54,375.00
117,031.25
SNI-2008
3.600
1.200
0.600
0.150
1.050
1.500
0.150
0.500
0.050
0.008
RAB - 043
Rp
44,625.00
Rp
56,700.00
Rp
61,880.00
URAIAN PEKERJAAN
SNI
kfsn
HARGA SATUAN
PEKERJAAN
T O T A L Rp
7
3.600
1.200
0.600
0.150
1.050
Penutup Plafond
Bahan : Gypsum Tile 600x1200x9 mm (porporated)
Upah
0.364
0.020
26,250.00
7,875.00
5,250.00
2,625.00
2,625.00
44,625.00
lmbr
18,375.00
Sub - Bahan
Org
75,000.00
Org
90,000.00
Org
95,000.00
Org
110,000.00
Sub - Upah
27,562.50
27,562.50 Rp
11,250.00
45,000.00
4,750.00
880.00
61,880.00 Rp
T O T A L Rp
m3
4,462,500.00
kg
15,356.25
m3
############
Sub - Bahan
Org
105,000.00
Org
95,000.00
Org
75,000.00
Org
110,000.00
Sub - Upah
89,250.00
3,071.25
207,900.00
300,221.25 Rp
3,255.00
47,500.00
26,250.00
1,430.00
78,435.00 Rp
T O T A L Rp
1.100
0.010
0.007
0.070
0.030
0.004
lbr
57,750.00
Kg
95,000.00
Sub - Bahan
21,021.00
1,900.00
22,921.00
M2
47,250.00
Kg
95,000.00
Sub - Bahan
Org
105,000.00
Org
95,000.00
Org
75,000.00
Org
110,000.00
Sub - Upah
51,975.00
950.00
52,925.00 Rp
735.00
6,650.00
2,250.00
440.00
10,075.00 Rp
T O T A L Rp
m3
############
Kg
95,000.00
Sub - Bahan
Org
105,000.00
Org
95,000.00
Org
75,000.00
Org
110,000.00
Sub - Upah
155,925.00
950.00
156,875.00 Rp
8,400.00
76,000.00
60,000.00
4,400.00
148,800.00 Rp
T O T A L Rp
m'
15,000.00
Kg
95,000.00
Sub - Bahan
Org
105,000.00
Org
95,000.00
Org
75,000.00
Org
110,000.00
Sub - Upah
15,750.00
950.00
16,700.00 Rp
525.00
4,750.00
3,750.00
330.00
9,355.00 Rp
T O T A L Rp
m'
5,250.00
Kg
4,725.00
Sub - Bahan
Org
95,000.00
Org
90,000.00
Org
75,000.00
Org
110,000.00
Sub - Upah
5,512.50
1,417.50
6,930.00 Rp
570.00
5,400.00
4,500.00
330.00
10,800.00 Rp
T O T A L Rp
m'
2,500.00
Sub - Bahan
Org
95,000.00
Org
90,000.00
Org
75,000.00
Org
110,000.00
Sub - Upah
2,750.00
2,750.00 Rp
380.00
3,600.00
8,475.00
770.00
7,500.00 Rp
T O T A L Rp
0.015
0.010
0.080
0.800
0.800
0.040
kg
m3
8,970.00
4,772.25
27,562.50
61,880.00
134,067.50
300,221.25
78,435.00
378,656.25
22,921.00
10,075.00
32,996.00
52,925.00
10,075.00
63,000.00
156,875.00
148,800.00
305,675.00
SNI-2008
1.050
0.010
0.005
0.050
0.050
0.003
16,700.00
9,355.00
26,055.00
SNI-2008
1.050
0.300
Rp
Rp
T O T A L Rp
44,625.00
SNI-2008
Rp
SNI-2008
15
0.031
0.500
0.350
0.013
14
0.020
0.200
0.020
m'
7,291.67
m'
6,562.50
m'
8,750.00
kg
17,500.00
bh
2,500.00
Sub - Bahan
13
12
SNI-2008
11
0.150
0.500
0.050
0.008
10
1.500
Pekerja
Tukang Gypsum
Kepala Tukang
Mandor
163,205.00
SNI-2008
0.006
0.060
0.060
0.003
6,930.00
10,800.00
17,730.00
SNI-2008
1.100
0.004
0.040
0.113
0.007
6.900
0.018
RAB - 044
1,300.00
265,125.00
2,750.00
7,500.00
10,250.00
URAIAN PEKERJAAN
Upah
9.4.
1
kfsn
0.019
0.190
0.019
0.002
13,742.25 Rp
1,900.00
18,050.00
1,425.00
220.00
21,595.00 Rp
T O T A L Rp
0.360
0.100
0.300
0.015
Kg
44,257.50
kg
18,375.00
lbr
2,887.50
Bh
36,750.00
Sub - Bahan
Org
90,000.00
Org
100,000.00
Org
75,000.00
Org
110,000.00
Sub - Upah
15,932.70
1,837.50
866.25
551.25
19,187.70 Rp
540.00
6,000.00
2,250.00
330.00
9,120.00 Rp
T O T A L Rp
0.006
0.060
0.030
0.003
0.220
0.110
0.500
0.100
Kg
60,375.00
Bh
45,596.25
Bh
2,887.50
Bh
36,750.00
Sub - Bahan
13,282.50
5,015.59
1,443.75
3,675.00
23,416.84
Kg
39,375.00
Bh
18,375.00
Bh
2,887.50
Bh
36,750.00
Sub - Bahan
8,662.50
2,021.25
1,443.75
3,675.00
15,802.50
Kg
57,750.00
Bh
45,596.25
Bh
2,887.50
Bh
36,750.00
Sub - Bahan
12,705.00
5,015.59
1,443.75
3,675.00
22,839.34
Kg
20,000.00
Bh
18,375.00
Bh
2,887.50
Bh
36,750.00
Sub - Bahan
4,400.00
2,021.25
1,443.75
3,675.00
11,540.00
Kg
26,250.00
Bh
18,375.00
Bh
2,887.50
Bh
36,750.00
Sub - Bahan
5,775.00
2,021.25
1,443.75
3,675.00
12,915.00
Kg
44,257.50
Bh
2,887.50
Bh
36,750.00
Sub - Bahan
Org
90,000.00
Org
100,000.00
Org
75,000.00
Org
110,000.00
Sub - Upah
13,277.25
721.88
1,837.50
15,836.63 Rp
360.00
4,000.00
2,100.00
110.00
6,570.00 Rp
T O T A L Rp
0.220
0.110
0.500
0.100
0.220
0.110
0.500
0.100
0.220
0.110
0.500
0.100
0.220
0.110
0.500
0.100
HARGA SATUAN
PEKERJAAN
13,742.25
21,595.00
35,337.25
PEKERJAAN PENGECATAN
Upah
SNI
0.300
0.250
0.050
0.004
0.040
0.028
0.001
0.300
0.250
0.050
RAB - 045
Kg
20,000.00
Bh
2,887.50
Bh
36,750.00
Sub - Bahan
Rp
Rp
T O T A L Rp
Rp
Rp
T O T A L Rp
Rp
Rp
T O T A L Rp
Rp
Rp
T O T A L Rp
Rp
Rp
T O T A L Rp
6,000.00
721.88
1,837.50
8,559.38
Rp
Rp
T O T A L Rp
19,187.70
9,120.00
28,307.70
23,416.84
9,120.00
32,536.84
15,802.50
9,120.00
24,922.50
22,839.34
9,120.00
31,959.34
11,540.00
9,120.00
20,660.00
12,915.00
9,120.00
22,035.00
15,836.63
6,570.00
22,406.63
8,559.38
6,570.00
15,129.38
URAIAN PEKERJAAN
9
SNI
0.430
0.200
0.150
0.200
1.000
0.050
0.005
0.100
0.100
0.005
Menie kayu/besi
Upah
10
0.400
0.350
0.200
1.000
1.000
0.008
0.080
0.080
0.008
Plamur tembok
Upah
11
12
0.040
0.400
0.400
0.004
0.250
0.150
0.150
0.350
0.800
2.000
1.000
0.030
0.300
0.300
0.003
0.400
0.200
0.002
0.100
0.001
X.
14
0.400
0.750
0.800
2.000
1.000
13
kfsn
0.500
0.200
Kep. Tukang
Tukang Cat
Mandor
0.002
0.100
0.001
HARGA SATUAN
PEKERJAAN
Kg
57,750.00
Kg
23,625.00
Bh
26,250.00
Kg
28,875.00
Bh
2,887.50
Bh
15,750.00
Sub - Bahan
Org
90,000.00
Org
100,000.00
Org
75,000.00
Org
110,000.00
Sub - Upah
24,832.50
4,725.00
3,937.50
5,775.00
2,887.50
787.50
42,945.00 Rp
450.00
10,000.00
7,500.00
550.00
18,500.00 Rp
T O T A L Rp
Kg
60,000.00
Kg
0.00
Kg
28,875.00
Bh
2,887.50
Lot
5,000.00
Sub - Bahan
Org
90,000.00
Org
100,000.00
Org
75,000.00
Org
110,000.00
Sub - Upah
24,000.00
0.00
5,775.00
2,887.50
5,000.00
37,662.50 Rp
720.00
8,000.00
6,000.00
880.00
15,600.00 Rp
T O T A L Rp
Kg
88,725.00
Kg
36,750.00
Kg
28,875.00
Bh
2,887.50
Lot
10,000.00
Sub - Bahan
Org
90,000.00
Org
100,000.00
Org
75,000.00
Org
110,000.00
Sub - Upah
35,490.00
27,562.50
23,100.00
5,775.00
10,000.00
101,927.50 Rp
3,600.00
40,000.00
30,000.00
440.00
74,040.00 Rp
T O T A L Rp
Kg
52,500.00
Kg
55,125.00
Kg
52,500.00
Kg
63,000.00
Kg
28,875.00
Bh
2,887.50
Lot
10,000.00
Sub - Bahan
Org
90,000.00
Org
100,000.00
Org
75,000.00
Org
110,000.00
Sub - Upah
13,125.00
8,268.75
7,875.00
22,050.00
23,100.00
5,775.00
10,000.00
90,193.75 Rp
2,700.00
30,000.00
22,500.00
330.00
55,530.00 Rp
T O T A L Rp
Kg
23,625.00
Bh
15,750.00
Sub - Bahan
Org
90,000.00
Org
100,000.00
Org
110,000.00
Sub - Upah
9,450.00
3,150.00
12,600.00 Rp
180.00
10,000.00
110.00
10,290.00 Rp
T O T A L Rp
Kg
18,375.00
Bh
15,750.00
Sub - Bahan
Org
90,000.00
Org
100,000.00
Org
110,000.00
Sub - Upah
9,187.50
3,150.00
12,337.50 Rp
180.00
10,000.00
110.00
10,290.00 Rp
T O T A L Rp
42,945.00
18,500.00
61,445.00
37,662.50
15,600.00
53,262.50
101,927.50
74,040.00
175,967.50
90,193.75
55,530.00
145,723.75
12,600.00
10,290.00
22,890.00
12,337.50
10,290.00
22,627.50
31.4
bh
bh
kg
m
m
1.000
32.000
3.920
0.056
0.024
Oh
Oh
0.140
0.070
RAB - 046
41,815
41,815.00
630
20,160.00
1,300
5,096.00
265,125
14,847.00
291,375
6,993.00
Jumlah Harga Bahan
75,000
10,500.00
90,000
6,300.00
88,911.00
URAIAN PEKERJAAN
SNI
- Kepala tukang
- Mandor
37.68
43.96
Pekerja
Tukang batu
Kepala tukang
Mandor
Oh
Oh
Oh
Oh
Pekerja
Tukang batu
Kepala tukang
Mandor
Pekerja
Tukang batu
Kepala tukang
Mandor
Oh
Oh
Memasang saluran buis beton 1/2 dia 20 cm dinding bata, dalam 15-25 cm tiap m'
Bahan : - Buis beton 1/2 dia 20 panj. 100 cm
bh
- Bata merah
bh
- Semen portland
kg
- Pasir pasang
m
- Pasir urug
m
Upah : -
kfsn
Pekerja
Tukang batu
Kepala tukang
Mandor
50.24
1.000
42.000
14.785
0.042
0.008
0.460
0.198
0.020
0.027
bh
bh
kg
m
m
1.000
38.000
10.300
0.061
0.069
Oh
Oh
Oh
Oh
0.380
0.190
0.019
0.019
bh
bh
kg
m
m
1.000
44.000
10.300
0.061
0.069
Oh
Oh
Oh
Oh
0.380
0.190
0.019
0.019
bh
bh
kg
m
m
1.000
50.000
20.600
0.122
0.138
Oh
Oh
Oh
Oh
0.570
0.285
0.029
0.029
bh
bh
kg
m
m
1.000
56.52
20.600
0.122
0.138
Upah : -
Oh
Oh
Oh
Oh
0.570
0.285
0.029
0.029
Pekerja
Tukang batu
Kepala tukang
Mandor
bh
bh
kg
m
m
2.000
138.16
30.900
0.183
0.207
Upah : -
Oh
Oh
Oh
Oh
0.760
0.380
0.038
0.038
Pekerja
Tukang batu
Kepala tukang
Mandor
RAB - 047
100,000
700.00
110,000
770.00
Jumlah Upah Tenaga
Jumlah Total
Dibulatkan
22,452
22,452.00
630
26,460.00
1,300
19,220.50
265,125
11,135.25
291,375
2,331.00
Jumlah Harga Bahan
75,000
34,500.00
90,000
17,820.00
100,000
2,000.00
110,000
2,970.00
Jumlah Upah Tenaga
Jumlah Total
Dibulatkan
55,157
55,157.00
630
23,940.00
1,300
13,390.00
265,125
16,172.63
291,375
20,104.88
Jumlah Harga Bahan
75,000
28,500.00
90,000
17,100.00
100,000
1,900.00
110,000
2,090.00
Jumlah Upah Tenaga
Jumlah Total
Dibulatkan
68,825
68,825.00
630
27,720.00
1,300
13,390.00
265,125
16,172.63
291,375
20,104.88
Jumlah Harga Bahan
75,000
28,500.00
90,000
17,100.00
100,000
1,900.00
110,000
2,090.00
Jumlah Upah Tenaga
Jumlah Total
Dibulatkan
110,530
110,530.00
630
31,500.00
1,300
26,780.00
265,125
32,345.25
291,375
40,209.75
Jumlah Harga Bahan
75,000
42,750.00
90,000
25,650.00
100,000
2,850.00
110,000
3,135.00
Jumlah Upah Tenaga
Jumlah Total
Dibulatkan
165,375
165,375.00
630
35,607.60
1,300
26,780.00
265,125
32,345.25
291,375
40,209.75
Jumlah Harga Bahan
75,000
42,750.00
90,000
25,650.00
100,000
2,850.00
110,000
3,135.00
Jumlah Upah Tenaga
Jumlah Total
Dibulatkan
179,155
358,310.00
630
87,040.80
1,300
40,170.00
265,125
48,517.88
291,375
60,314.63
Jumlah Harga Bahan
75,000
57,000.00
90,000
34,200.00
100,000
3,800.00
110,000
4,180.00
Jumlah Upah Tenaga
Jumlah Total
Dibulatkan
HARGA SATUAN
PEKERJAAN
18,270.00
107,181.00
107,180.00
81,598.75
57,290.00
138,888.75
138,880.00
128,764.50
49,590.00
178,354.50
178,350.00
146,212.50
49,590.00
195,802.50
195,800.00
241,365.00
74,385.00
315,750.00
315,750.00
300,317.60
74,385.00
374,702.60
374,700.00
594,353.30
99,180.00
693,533.30
693,530.00
URAIAN PEKERJAAN
8
10
11
12
13
SNI
kfsn
bh
bh
kg
m
m
2.000
163.28
30.900
0.183
0.207
Upah : -
Oh
Oh
Oh
Oh
0.760
0.380
0.038
0.038
Pekerja
Tukang batu
Kepala tukang
Mandor
bh
kg
m
m
kg
m
82.00
44.000
0.070
0.070
1.600
0.060
Upah : -
Oh
Oh
Oh
Oh
1.500
0.015
0.002
0.016
Pekerja
Tukang batu
Kepala tukang
Mandor
bh
kg
m
m
kg
m
208.00
114.000
0.184
0.033
4.850
0.120
Upah : -
Oh
Oh
Oh
Oh
Oh
2.160
0.720
0.072
0.108
0.100
Pekerja
Tukang batu
Kepala tukang
Mandor
Tk Gali
SALURAN AIR, dari batu kali lebar bawah 30 cm tinggi 60 cm, tiap 1 M'
Bahan : - Batu belah 15/20
- Semen portland
- Pasir pasang
m
kg
m
0.47
94.420
0.227
Pemakaian alat
- Tamper / Hand Compactor
jam
0.046
Upah : -
Oh
Oh
Oh
Oh
Oh
1.241
0.398
0.040
0.083
0.250
Pekerja
Tukang batu
Kepala tukang
Mandor
Tk Gali
SALURAN AIR, dari batu kali lebar bawah 80 cm tinggi 100 cm, tiap 1 M'
Bahan : - Batu belah 15/20
- Semen portland
- Pasir pasang
m
kg
m
1.01
193.400
0.464
Pemakaian alat
- Tamper / Hand Compactor
jam
0.093
Upah : -
Oh
Oh
Oh
Oh
Oh
2.983
0.692
0.069
0.219
0.500
Pekerja
Tukang batu
Kepala tukang
Mandor
Tk Gali
SALURAN AIR, dari batu kali lebar bawah 100 cm tinggi 120 cm, tiap 1 M'
Bahan : - Batu belah 15/20
- Semen portland
- Pasir pasang
m
kg
m
1.29
244.980
0.588
Pemakaian alat
- Tamper / Hand Compactor
jam
0.104
Upah : -
Oh
Oh
Oh
Oh
4.105
0.862
0.086
0.309
Pekerja
Tukang batu
Kepala tukang
Mandor
RAB - 048
189,080
378,160.00
630
102,866.40
1,300
40,170.00
265,125
48,517.88
291,375
60,314.63
Jumlah Harga Bahan
75,000
57,000.00
90,000
34,200.00
100,000
3,800.00
110,000
4,180.00
Jumlah Upah Tenaga
Jumlah Total
Dibulatkan
630
51,660.00
1,300
57,200.00
265,125
18,558.75
269,500
18,865.02
13,125
21,000.00
270,375
16,222.50
Jumlah Harga Bahan
75,000
112,500.00
90,000
1,350.00
100,000
200.00
110,000
1,760.00
Jumlah Upah Tenaga
Jumlah Total
Dibulatkan
630
131,040.00
1,300
148,200.00
265,125
48,783.00
269,500
8,893.51
13,125
63,656.25
270,375
32,445.00
Jumlah Harga Bahan
75,000
162,000.00
90,000
64,800.00
100,000
7,200.00
110,000
11,880.00
109,960
10,996.00
Jumlah Upah Tenaga
Jumlah Total
Dibulatkan
257,250
121,679.25
1,300
122,746.00
265,125
60,183.38
Jumlah Harga Bahan
HARGA SATUAN
PEKERJAAN
630,028.90
99,180.00
729,208.90
729,200.00
183,506.27
115,810.00
299,316.27
299,310.00
433,017.76
256,876.00
689,893.76
689,890.00
304,608.63
27,060
1,244.76
Jumlah Harga Alat
75,000
93,075.00
90,000
35,820.00
100,000
4,000.00
110,000
9,130.00
109,960
27,490.00
Jumlah Upah Tenaga
Jumlah Total
Dibulatkan
169,515.00
474,123.63
474,120.00
257,250
260,337.00
1,300
251,420.00
265,125
123,018.00
Jumlah Harga Bahan
634,775.00
1,244.76
27,060
2,516.58
Jumlah Harga Alat
75,000
223,725.00
90,000
62,280.00
100,000
6,900.00
110,000
24,090.00
109,960
54,980.00
Jumlah Upah Tenaga
Jumlah Total
Dibulatkan
371,975.00
1,006,750.00
1,006,750.00
257,250
331,080.75
1,300
318,474.00
265,125
155,893.50
Jumlah Harga Bahan
805,448.25
27,060
2,814.24
Jumlah Harga Alat
75,000
307,875.00
90,000
77,580.00
100,000
8,600.00
110,000
33,990.00
2,516.58
2,814.24
URAIAN PEKERJAAN
SNI
kfsn
- Tk Gali
14
15
16
17
18
19
20
21
Oh
bh
1.00
Upah : -
Oh
Oh
Oh
Oh
1.140
0.570
0.057
0.057
Pekerja
Tukang batu
Kepala tukang
Mandor
Pas. Pipa beton, type FJ-Dusaspun (class 2) dia 100 cm panj 250 cm / BH
Bahan : - Pipa beton FJ-Dusaspun (class 2) dia. 60 cm, panjang 250 cm
bh
1.00
Upah : -
Oh
Oh
Oh
Oh
1.140
0.570
0.057
0.057
Pekerja
Tukang batu
Kepala tukang
Mandor
bh
1.00
Upah : -
Oh
Oh
Oh
Oh
1.140
0.570
0.057
0.057
Pekerja
Tukang batu
Kepala tukang
Mandor
bh
1.00
Upah : -
Oh
Oh
Oh
Oh
1.140
0.570
0.057
0.057
Pekerja
Tukang batu
Kepala tukang
Mandor
bh
1.00
Upah : -
Oh
Oh
Oh
Oh
1.140
0.570
0.057
0.057
Pekerja
Tukang batu
Kepala tukang
Mandor
bh
1.00
Upah : -
Oh
Oh
Oh
Oh
1.140
0.570
0.057
0.057
Pekerja
Tukang batu
Kepala tukang
Mandor
bh
kg
m
m
1.00
115.000
0.345
0.080
Upah : -
Oh
Oh
Oh
Oh
1.500
0.600
0.060
0.075
Pekerja
Tukang batu
Kepala tukang
Mandor
bh
kg
m
m
1.00
91.600
0.275
0.080
Upah : -
Oh
Oh
Oh
Oh
1.500
0.600
0.060
0.075
Pekerja
Tukang batu
Kepala tukang
Mandor
RAB - 049
109,960
82,470.00
Jumlah Upah Tenaga
Jumlah Total
Dibulatkan
1,199,700
1,199,700.00
Jumlah Harga Bahan
75,000
85,500.00
90,000
51,300.00
100,000
5,700.00
110,000
6,270.00
Jumlah Upah Tenaga
Total harga/bh
Harga/M'
2,457,100
2,457,100.00
Jumlah Harga Bahan
75,000
85,500.00
90,000
51,300.00
100,000
5,700.00
110,000
6,270.00
Jumlah Upah Tenaga
Total harga/bh
Harga/M'
1,400,480
1,400,480.00
Jumlah Harga Bahan
75,000
85,500.00
90,000
51,300.00
100,000
5,700.00
110,000
6,270.00
Jumlah Upah Tenaga
Total harga/bh
Harga/M'
2,759,250
2,759,250.00
Jumlah Harga Bahan
75,000
85,500.00
90,000
51,300.00
100,000
5,700.00
110,000
6,270.00
Jumlah Upah Tenaga
Total harga/bh
Harga/M'
3,536,860
3,536,860.00
Jumlah Harga Bahan
75,000
85,500.00
90,000
51,300.00
100,000
5,700.00
110,000
6,270.00
Jumlah Upah Tenaga
Total harga/bh
Harga/M'
5,511,460
5,511,460.00
Jumlah Harga Bahan
75,000
85,500.00
90,000
51,300.00
100,000
5,700.00
110,000
6,270.00
Jumlah Upah Tenaga
Total harga/bh
Harga/M'
672,000
672,000.00
1,300
149,500.00
265,125
91,468.13
291,375
23,310.00
Jumlah Harga Bahan
75,000
112,500.00
90,000
54,000.00
100,000
6,000.00
110,000
8,250.00
Jumlah Upah Tenaga
Total harga/bh
Harga/M'
561,000
561,000.00
1,300
119,080.00
265,125
72,909.38
291,375
23,310.00
Jumlah Harga Bahan
75,000
112,500.00
90,000
54,000.00
100,000
6,000.00
110,000
8,250.00
Jumlah Upah Tenaga
Total harga/bh
HARGA SATUAN
PEKERJAAN
510,515.00
1,315,963.25
1,315,960.00
1,199,700.00
148,770.00
1,348,470.00
539,388.00
2,457,100.00
148,770.00
2,605,870.00
1,042,348.00
1,400,480.00
148,770.00
1,549,250.00
634,938.52
2,759,250.00
148,770.00
2,908,020.00
1,191,811.48
3,536,860.00
148,770.00
3,685,630.00
1,510,504.10
5,511,460.00
148,770.00
5,660,230.00
2,319,766.39
912,968.13
180,750.00
1,093,718.13
911,431.77
752,989.38
180,750.00
933,739.38
URAIAN PEKERJAAN
SNI
kfsn
22
23
24
25
26
27
28
bh
kg
m
m
1.00
91.600
0.275
0.080
Upah : -
Oh
Oh
Oh
Oh
1.500
0.600
0.060
0.075
Pekerja
Tukang batu
Kepala tukang
Mandor
bh
kg
m
m
1.00
91.600
0.275
0.080
Upah : -
Oh
Oh
Oh
Oh
1.500
0.600
0.060
0.075
Pekerja
Tukang batu
Kepala tukang
Mandor
bh
kg
m
m
1.00
91.600
0.275
0.080
Upah : -
Oh
Oh
Oh
Oh
1.500
0.600
0.060
0.075
Pekerja
Tukang batu
Kepala tukang
Mandor
bh
bh
kg
m
m
1.00
2.00
91.600
0.275
0.080
Upah : -
Oh
Oh
Oh
Oh
1.500
0.600
0.060
0.075
Pekerja
Tukang batu
Kepala tukang
Mandor
bh
bh
kg
m
m
1.00
2.00
91.600
0.275
0.080
Upah : -
Oh
Oh
Oh
Oh
1.500
0.600
0.060
0.075
Pekerja
Tukang batu
Kepala tukang
Mandor
bh
bh
kg
m
m
1.00
2.00
91.600
0.275
0.080
Upah : -
Oh
Oh
Oh
Oh
1.500
0.600
0.060
0.075
Pekerja
Tukang batu
Kepala tukang
Mandor
bh
bh
kg
m
m
RAB - 050
1.00
2.00
91.600
0.275
0.080
249,000
249,000.00
1,300
119,080.00
265,125
72,909.38
291,375
23,310.00
Jumlah Harga Bahan
75,000
112,500.00
90,000
54,000.00
100,000
6,000.00
110,000
8,250.00
Jumlah Upah Tenaga
Total harga/bh
Harga/M'
1,450,000
1,450,000.00
1,300
119,080.00
265,125
72,909.38
291,375
23,310.00
Jumlah Harga Bahan
75,000
112,500.00
90,000
54,000.00
100,000
6,000.00
110,000
8,250.00
Jumlah Upah Tenaga
Total harga/bh
Harga/M'
2,277,000
2,277,000.00
1,300
119,080.00
265,125
72,909.38
291,375
23,310.00
Jumlah Harga Bahan
75,000
112,500.00
90,000
54,000.00
100,000
6,000.00
110,000
8,250.00
Jumlah Upah Tenaga
Total harga/bh
Harga/M'
249,000
249,000.00
77,500
155,000.00
1,300
119,080.00
265,125
72,909.38
291,375
23,310.00
Jumlah Harga Bahan
75,000
112,500.00
90,000
54,000.00
100,000
6,000.00
110,000
8,250.00
Jumlah Upah Tenaga
Total harga/bh
Harga/M'
672,000
672,000.00
197,500
395,000.00
1,300
119,080.00
265,125
72,909.38
291,375
23,310.00
Jumlah Harga Bahan
75,000
112,500.00
90,000
54,000.00
100,000
6,000.00
110,000
8,250.00
Jumlah Upah Tenaga
Total harga/bh
Harga/M'
1,450,000
1,450,000.00
338,500
677,000.00
1,300
119,080.00
265,125
72,909.38
291,375
23,310.00
Jumlah Harga Bahan
75,000
112,500.00
90,000
54,000.00
100,000
6,000.00
110,000
8,250.00
Jumlah Upah Tenaga
Total harga/bh
Harga/M'
2,277,000
2,277,000.00
398,500
797,000.00
1,300
119,080.00
265,125
72,909.38
291,375
23,310.00
Jumlah Harga Bahan
HARGA SATUAN
PEKERJAAN
778,116.15
440,989.38
180,750.00
621,739.38
518,116.15
1,641,989.38
180,750.00
1,822,739.38
1,518,949.48
2,468,989.38
180,750.00
2,649,739.38
2,208,116.15
595,989.38
180,750.00
776,739.38
647,282.81
1,258,989.38
180,750.00
1,439,739.38
1,199,782.81
2,318,989.38
180,750.00
2,499,739.38
2,083,116.15
3,265,989.38
URAIAN PEKERJAAN
Upah : -
29
XI.
1
Pekerja
Tukang batu
Kepala tukang
Mandor
Oh
Oh
Oh
Oh
bh
bh
kg
m
m
1.00
2.00
91.600
0.275
0.080
Upah : -
Oh
Oh
Oh
Oh
1.500
0.600
0.060
0.075
Pekerja
Tukang batu
Kepala tukang
Mandor
75,000
112,500.00
90,000
54,000.00
100,000
6,000.00
110,000
8,250.00
Jumlah Upah Tenaga
Total harga/bh
Harga/M'
2,778,000
2,778,000.00
568,500
1,137,000.00
1,300
119,080.00
265,125
72,909.38
291,375
23,310.00
Jumlah Harga Bahan
75,000
112,500.00
90,000
54,000.00
100,000
6,000.00
110,000
8,250.00
Jumlah Upah Tenaga
Total harga/bh
Harga/M'
HARGA SATUAN
PEKERJAAN
180,750.00
3,446,739.38
2,872,282.81
4,106,989.38
180,750.00
4,287,739.38
3,573,116.15
kfsn
Upah : -
SNI
Pekerja
Tukang batu
Kepala tukang
Mandor
Pekerja
Tukang batu
Kepala tukang
Mandor
lmbr
btg
kg
m
m
1.778
0.445
4.890
0.010
0.017
Oh
Oh
Oh
Oh
0.375
0.125
0.012
0.019
lmbr
btg
kg
m
m
2.223
0.445
4.890
0.010
0.017
Oh
Oh
Oh
Oh
0.375
0.125
0.012
0.019
lmbr
btg
kg
m
m
2.500
0.445
4.890
0.010
0.017
Oh
Oh
Oh
Oh
0.375
0.125
0.012
0.019
RAB - 051
86,108
153,100.02
195,107
86,822.62
1,300
6,357.00
270,375
2,703.75
269,500
4,581.51
Jumlah Harga Bahan
75,000
28,125.00
90,000
11,250.00
100,000
1,200.00
110,000
2,090.00
Jumlah Upah Tenaga
Total harga/bh
Dibulatkan
86,108
191,418.08
195,107
86,822.62
1,300
6,357.00
270,375
2,703.75
269,500
4,581.51
Jumlah Harga Bahan
75,000
28,125.00
90,000
11,250.00
100,000
1,200.00
110,000
2,090.00
Jumlah Upah Tenaga
Total harga/bh
Dibulatkan
104,740
261,850.00
195,107
86,822.62
1,300
6,357.00
270,375
2,703.75
269,500
4,581.51
Jumlah Harga Bahan
75,000
28,125.00
90,000
11,250.00
100,000
1,200.00
110,000
2,090.00
Jumlah Upah Tenaga
Total harga/bh
Dibulatkan
248,983.39
42,665.00
291,648.39
291,640.00
287,301.45
42,665.00
329,966.45
329,960.00
357,733.37
42,665.00
400,398.37
400,390.00