DAFTAR HARGA SATUAN BAHAN

Keterangan

URAIAN BAHAN
MATERIAL SEMEN
Semen PC / 50 kg
Semen Putih 40 kg (ex Tiga Roda)
Semen warna
Semen Merah
MATERIAL MORTAR UTAMA (MU)
Plester premium (MU 100)
Plester trasraam (MU 101)
Acian plesteran / beton expose (MU 200)
Acian plesteran (MU 250)
Acian profil (MU 260)
Acian putih (MU 270)
Finish plester (MU 290)
Pasangan bata (MU 300)
Pasangan & plesteran bata (MU 301)
Perekat bata ringan (MU 380)
Perekat keramik dinding (MU 400)
Pengisi naad keramik (MU 408)
Perata lantai (MU 440)
Perata lantai premium (MU 445)
Perekat keramik lantai (MU450)
Perekat keramik daerah basah (MU 460)
Perekat keramik diatas keramik (MU 480)
Multi Purpose Tile Adhesive (MU 485)
Fast Setting Tile Adhesive (MU 490)
Perekat mortar & beton / Bonding Agent (MU L-500)
Pelapis kedap air (MU 600)
Floor Hardener (MU 700)
Non shrink grout (MU 800)
Perbaikan permukaan beton (MU 830)
Pengisi celah beton / Finish Coat Repair (MU 840)
MATERIAL PASIR, BATU & BATA
Pasir beton
Pasir extra beton
Pasir Putih (Bangka)
Pasir Pasang
Kapur Padam
Pasir Urug darat
Sirtu
Batu pecah / Split ukuran 1-2 cm
Batu pecah / Split ukuran 2-3 cm
Koral beton
Batu kali belah
Makadam / batu pecah 5-7 cm
Abu batu 5 mm
Sreening 5-13 mm
Batu bata press mesin
Batu bata uk. 5 x 11 x 23 cm (ukuran besar) proses tangan
Batu bata uk. 4 x 9.5 x 20 cm (ukuran kecil) proses tangan
Batu bata ringan (ex Hebel), 10x16x60 cm
Batu bata ringan (ex Hebel), 7x16x60 cm
Batu bata ringan (ex Broco), 10x16x60 cm
Batu bata ringan (ex Broco), 7x16x60 cm
Batako Semen (semen, pasir, abu batu) 9x19x39 cm
Batako Semen (semen, batu apung, pumis) 9x19x39 cm
Glassblock 20/20
Rooster beton 20x20x7 cm
Rooster bata merah 12x11,5x24 cm
Lempengan garis uk. 9x19x39 cm
Tanah merah
I j u k
MATERIAL BESI
Besi beton polos
Besi beton ulir
Besi plat strip
Baja profil siku
Baja WF
Baja H Beam
Baja Kanal C (Channal)

RAB - 01

Perekat keramik area lembab

HRG SATUAN SATUAN


naik 5%
65,000.00
84,000.00
10,500.00
183,750.00
naik 5%
63,000.00
94,500.00
166,425.00
101,850.00
200,025.00
163,800.00
101,850.00
53,025.00
60,375.00
157,500.00
142,800.00
12,075.00
56,700.00
103,950.00
204,750.00
449,400.00
241,500.00
1,155,000.00
336,000.00
210,525.00
1,113,000.00
144,375.00
161,700.00
269,850.00
336,000.00
naik 5%
270,375.00
273,000.00
315,000.00
265,125.00
210,000.00
291,375.00
256,200.00
267,750.00
269,500.35
286,125.00
257,250.00
262,500.00
241,500.00
255,937.50
700.35
630.00
512.40
889,875.00
8,542.80
889,875.00
5,979.96
889,875.00
8,542.80
880,687.50
5,918.22
4,200.00
4,987.50
31,500.00
6,063.75
5,075.70
3,675.00
262,500.00
31,500.00
naik 5%
13,125.00
13,125.00
14,542.50
14,455.35
13,125.00
14,437.50
14,568.75

/zak
/zak
/Kg
/M3
/zak 40Kg
/zak 40Kg
/zak 40Kg
/zak 40Kg
/zak 25Kg
/zak 25Kg
/zak 40Kg
/zak 40Kg
/zak 40Kg
/zak 40Kg
/zak 25Kg
/Kg
/zak 40Kg
/zak 40Kg
/zak 40Kg
/zak 25Kg
/zak 25Kg
/40Kg set
/zak 25Kg
/ 2Kg
/30Kg set
/zak 25Kg
/zak 40Kg
/zak 40Kg
/ 25Kg set
/M3
/M3
/M3
/M3
/M3
/M3
/M3
/M3
/M3
/M3
/M3
/M3
/M3
/M3
/bh
/bh
/bh
/M3
/bh
/M3
/bh
/M3
/bh
/M3
/bh
/bh
/bh
/bh
/bh
/bh
/bh
/M3
/kg
/kg
/kg
/kg
/kg
/kg
/kg
/kg

Besi plat hitam (segala ukuran)


Besi plat putih (segala ukuran)
Besi plat bordes
Kanal C galvaspan HI-TEN, type C 100.16
Kanal C galvaspan HI-TEN, type C 100.20
Kanal C galvaspan HI-TEN, type C 125.16
Kanal C galvaspan HI-TEN, type C 125.20
Kanal C galvaspan HI-TEN, type C 150.16
Kanal C galvaspan HI-TEN, type C 150.20
Kanal C galvaspan HI-TEN, type C 150.25
Kanal C galvaspan HI-TEN, type C 200.16
Kanal C galvaspan HI-TEN, type C 200.20
Kanal C galvaspan HI-TEN, type C 200.25
Besi Wire Mesh DM-8F1, 540 x 210 cm (11,34 M2)
Besi Wire Mesh DM-7F1, 540 x 210 cm (11,34 M2)
Besi Wire Mesh DM-6F1, 540 x 210 cm
Besi Wire Mesh DM-5F1, 540 x 210 cm
Besi Wire Mesh DM-4, 540 x 210 cm
Kawat beton
Kawat Las
Kawat duri 10 kg (60 m')
Paku halus (2 - 3 cm)
Paku ukuran sedang (4 - 5 cm)
Paku ukuran sedang (6 - 7 cm)
Paku ukuran (10-15 cm)
Seng Gelombang 180x90x0,05
Seng Gelombang 180x90x0,03
Plat Seng tebal 0,5 mm, lebar 90 cm
Plat Seng tebal 0,3 mm, lebar 90 cm
Paku Seng
Hollow 40x40 mm galvanized (tebal standart)
Hollow 20x40 mm galvanized (tebal standart)
Hollow 40x40 mm dimenie (tebal standart)
Hollow 20x40 mm dimenie (tebal standart)
Metal Furing 75 mm
Hollow 40x40x1 mm
Hollow 20x40x1 mm
Besi Hollow 40x40x1,2 (rangka utama)
Besi Hollow 20x40x1,2 (rangka pembagi)
Folding Gate :
- Folding Gate, bahan besi plate tbl. 0.3 mm
- Folding Gate, bahan besi plate tbl. 0.4 mm
- Folding Gate, bahan besi plate tbl. 0.5 mm
- Folding Gate, bahan galvalum, tbl. 0.3 mm
- Folding Gate, bahan galvalum, tbl. 0.4 mm
- Folding Gate, bahan galvalume, tbl. 0.5 mm
Rolling Door :
- Folding Gate, bahan besi plate tbl. 0.3 mm
- Folding Gate, bahan Galvalum tbl. 0.3 mm
- Folding Gate, bahan Allumunium tbl. 0.3 mm

Rgk plafond/Partisi
Rgk plafond/Partisi
Rgk plafond/Partisi
Rgk plafond/Partisi
Rgk plafond/Partisi
Rgk. Pintu besi/konstruksi
Rgk. Pintu besi/konstruksi
Rgk. Pintu besi/konstruksi
Rgk. Pintu besi/konstruksi

15,750.00
14,595.00
26,512.50
70,612.50
84,525.00
73,500.00
85,050.00
83,737.50
105,000.00
115,500.00
105,000.00
131,250.00
162,750.00
52,550.09
40,235.37
29,562.13
20,776.02
15,382.04
20,212.50
31,500.00
165,375.00
19,950.00
18,637.50
15,356.25
15,356.25
47,250.00
64,050.00
31,500.00
36,750.00
26,250.00
5,250.00
5,250.00
6,300.00
4,725.00
9,450.00
219,450.00
110,250.00
225,750.00
115,500.00

/kg
/kg
/kg
/M'
/M'
/M'
/M'
/M'
/M'
/M'
/M'
/M'
/M'
/M2
/M2
/M2
/M2
/M2
/kg
/m
/roll
/kg
/kg
/kg
/kg
/lmbr
/lmbr
/M'
/M'
/kg
/M'
/M'
/M'
/M'
/M'
/btg/6m
/btg/6m
/btg/6m
/btg/6m

lengkap dg finishing & kunci dll.


lengkap dg finishing & kunci dll.
lengkap dg finishing & kunci dll.
lengkap dg finishing & kunci dll.
lengkap dg finishing & kunci dll.
lengkap dg finishing & kunci dll.

336,000.00
357,000.00
367,500.00
372,750.00
393,750.00
414,750.00

/m2
/m2
/m2
/m2
/m2
/m2

lengkap dg finishing & kunci dll.


lengkap dg finishing & kunci dll.
lengkap dg finishing & kunci dll.

241,500.00 /m2
294,000.00 /m2
336,000.00 /m2

567,541.00
434,542.00
319,271.00
224,381.00
166,126.00

MATERIAL KAYU
Kayu Meranti basah
- Balok Meranti basah (8/15,8/12,6/15,6/12, 5/10x400 cm)
- Kasau Meranti basah (5/7x400, 4/6x400 cm)
- Reng (3/4x400, 2/3x400)
- Papan Meranti basah (3/30, 3/20 & 2/30x400 cm)
Kayu Rimba Campuran (KRC) basah
- Balok (8/15,8/12,6/15,6/12, 5/10x400 cm)
- Kasau (5/7x400, 4/6x400 cm)
- Reng (3/4x400, 2/3x400)
- Papan (3/30, 3/20 & 2/30x400 cm)
- Kayu Dolken (kayu Galam 8-10cm, L=4m)
- Plastik cor
Kayu Terentang
- Papan uk. 3/30x400, 3/20x400 & 2/30x400 cm
Kayu Kamper Samarinda basah
- Balok (8/15,8/12,6/15,6/12, 5/10x400 cm)
- Kasau (5/7x400, 4/6x400 cm)
- Reng (3/4x400)
- Papan (3/20 & 2/30x400 cm)
Kayu Borneo/Meranti Super
- Balok Borneo/Meranti Super, kelas-3
- Kasau Borneo/Meranti Super
Kayu Kruing
- Balok (8/15,8/12,6/15,6/12, 5/10x400 cm)
- Kasau (5/7x400, 4/6x400 cm)
- Papan (3/20 & 2/30x400 cm)

RAB - 02

/lembar
/lembar
/lembar
/lembar
/lembar

naik 5%
3,360,000.00
2,730,000.00
2,625,000.00
4,200,000.00

/M3
/M3
/M3
/M3

( u/. Bekisting )
( u/. Bekisting )
( u/. Bekisting )

2,415,000.00
1,995,000.00
1,890,000.00
3,045,000.00
36,750.00
6,300.00

/M3
/M3
/M3
/M3
/btg
/M2

( u/. Bekisting )

2,835,000.00 /M3

(u/. Rngk.Atap)
(u/. Rngk.Atap)
(u/. Rngk.Atap)
(u/. Rngk.Atap)

7,350,000.00
6,825,000.00
5,250,000.00
8,505,000.00

(u/. Rngk.Atap)
(u/. Rngk.Atap)

4,725,000.00 /M3
4,462,500.00 /M3

(u/. Rngk.Atap)
(u/. Rngk.Atap)
(u/. Rngk.Atap)

5,040,000.00 /M3
4,725,000.00 /M3
6,825,000.00 /M3

/M3
/M3
/M3
/M3

Kayu Kamper Medan


- Balok (8/15,8/12,6/15,6/12, 5/10x400 cm)
- Kasau (5/7x400, 4/6x400 cm)
- Papan (3/20 & 2/30x400 cm)
Kayu Bengkirai
- Balok (8/15,8/12,6/15,6/12, 5/10x400 cm)
- Kasau (5/7x400, 4/6x400 cm)
- Papan (3/20 & 2/30x400 cm)
Kayu Kamper Singkil
- Balok (8/15,8/12,6/15,6/12, 5/10x400 cm)
- Kasau (5/7x400, 4/6x400 cm)
Kayu Jati Kelas I (Jawa Timur)
- Balok Jati Jawa Timur, Kelas-I
- Papan Jati Jawa Timur, Kelas-I
- Balok Jati Jawa Timur, Super
- Papan Jati Jawa Timur, Super
Kayu Jati Kelas II Basah (Jawa Tengah)
- Balok uk. 6x15x100 - 190 cm
- Balok uk. 6x15x200 - 240 cm
- Balok uk. 6x15x240 - 290 cm
- Balok uk. 6x15x240 - 340 cm
- Balok uk. 6x15x340 - 390 cm
Kayu Kruing oven
- Balok Kamper Kruing (oven)
- Balok Kamper Medan (oven)
Kayu Kamper Singkil oven
- Balok Kamper Singkil (oven)
- Papan Kamper Singkil (oven)
Kayu Kamper Samarinda (kering oven)
- Balok (8/12 x400 & 6/15x400 cm)
- Kasau (5/7x400, 4/6x400 cm)
- Reng (3/4x400)
- Papan (3/20x400 cm)
- Papan (4/30, 4/25x400 cm)
- Balok Kamper Samarinda, super (oven)
- Papan Kamper Samarinda, super (oven)
- Papan Meranti oven
Kayu Bengkirai
- Balok Bengkirai
- Papan Bengkirai
Kayu Merbau
- Balok Merbau (oven)
- Papan Merbau (oven)

(u/. Rngk.Atap)
(u/. Rngk.Atap)
(u/. Rngk.Atap)

5,775,000.00 /M3
5,512,500.00 /M3
6,037,500.00 /M3

(u/. Rngk.Atap)
(u/. Rngk.Atap)
(u/. Rngk.Atap)

7,350,000.00 /M3
7,140,000.00 /M3
7,612,500.00 /M3

(u/. Rngk.Atap)
(u/. Rngk.Atap)

7,350,000.00 /M3
7,140,000.00 /M3

(u/. Kosen/pintu)
(u/. Kosen/pintu)
(u/. Kosen/pintu)
(u/. Kosen/pintu)

57,750,000.00
60,375,000.00
68,250,000.00
70,875,000.00

/M3
/M3
/M3
/M3

38,850,000.00
47,250,000.00
52,500,000.00
52,500,000.00
63,000,000.00

/M3
/M3
/M3
/M3
/M3

(u/. Kosen/pintu)
(u/. Kosen/pintu)

6,300,000.00 /M3
6,300,000.00 /M3

(u/. Kosen/pintu)
(u/. Kosen/pintu)

7,875,000.00 /M3
8,137,500.00 /M3

(u/. Kosen)

(u/. Pintu)
(u/. Kosen/pintu)
(u/. Kosen/pintu)
(u/. Kosen/pintu)

9,975,000.00
9,240,000.00
7,140,000.00
10,395,000.00
10,395,000.00
10,500,000.00
11,025,000.00
6,300,000.00

/M3
/M3
/M3
/M3
/M3
/M3
/M3
/M3

(u/. Kosen/pintu)
(u/. Kosen/pintu)

7,875,000.00 /M3
8,137,500.00 /M3

(u/. Kosen/pintu)
(u/. Kosen/pintu)

10,500,000.00 /M3
10,762,500.00 /M3

MATERIAL MULTIPLEKS

naik 5%

Multipleks, 1220x2440x25 mm
Multipleks, 1220x2440x22 mm
Multipleks, 1220x2440x20 mm
Multipleks, 1220x2440x18 mm
Multipleks, 1220x2440x15 mm
Multipleks, 1220x2440x12 mm
Multipleks, 1220x2440x9 mm
Multipleks, 1220x2440x6 mm
Multipleks, 1220x2440x4 mm
Teakwood 1220x2440x3 mm
Plywood Sungkai, uk. 1220x2440x3 mm
Plywood Sungkai, uk. 1220x2440x4 mm
Plywood Sungkai, uk. 1220x2440x18 mm (1 muka)
Plywood Sungkai, uk. 1220x2440x18 mm (2 muka)
Bloktik, uk. 1220x2440x18 mm (1 muka)
Melamin, uk. 1220x2440x3 mm (mengkilap)
Formika, 92 x 212 mm
HPL 4' x 8'
MATERIAL GYPSUM, CALSIUM, GRC
Gypsum board 9 mm (water resistants)
Gypsum board 9 mm
Gypsum board 12 mm
Calcium Silikat 6 mm
Gypsum Tile 600x1200x9mm
AcousticTile 600x1200x15 mm
Profil allumunium Main Tee (p. 3,6m)
Profil allumunium Cross Tee (p. 1,2 m)
Profil allumunium Cross Tee (p. 0,60 m)
Gypsum bubuk (compound)
Paku skrup gypsum
Textile tape
List gypsum profil 5-10 cm
List plafond allumunium (Wall angle)

Ex Armstrong

RAB - 03

299,250.00
278,250.00
252,000.00
207,900.00
187,950.00
156,450.00
110,250.00
80,850.00
57,750.00
105,000.00
105,000.00
110,250.00
232,575.00
269,850.00
248,587.50
82,425.00
89,250.00
183,750.00
naik 5%
102,500.00
59,000.00
78,750.00
106,365.00
18,375.00
37,800.00
7,291.67
6,562.50
8,750.00
4,725.00
42,000.00
18,375.00
5,250.00
6,825.00

/lmbr
/lmbr
/lmbr
/lmbr
/lmbr
/lmbr
/lmbr
/lmbr
/lmbr
/lmbr
/lmbr
/lmbr
/lmbr
/lmbr
/lmbr
/lmbr
/lmbr
/lmbr
/lmbr
/lmbr
/lmbr
/lmbr
/lmbr
/lmbr
/m'
/m'
/m'
/kg
/Kg
/roll
/m'
/m'

GRC BOARD, 1220x2440x5 mm


GRC BOARD, 1220x2440x6 mm
GRC BOARD, 1220x2440x8 mm
GRC BOARD, 1220x2440x10 mm
GRC SPR PANEL, 1220x2440x9 mm
GRC SPR PANEL, 1220x2440x12 mm
GRC SPR PANEL, 1220x2440x15 mm
Compound GRC (A +B)
Asbes plat 100x100x0,4 cm
Lem kayu
MATERIAL KACA
Kaca polos tempered 12 mm, ex Asahi Mas
harga terpasang
Kaca warna tempered 12 mm, ex Asahi Mas
harga terpasang
Kaca polos tempered 12 mm (lubang dll), khusus pintu
harga terpasang
Kaca warna tempered 12 mm (lubang dll), khusus pintu
harga terpasang
Kaca tempered 10 mm, ex Asahi Mas
harga terpasang
Kaca polos 12 mm, ex Asahi Mas
harga terpasang
Kaca polos 10 mm, ex Asahi Mas
harga terpasang
Kaca polos 8 mm, ex Asahi Mas
harga terpasang
Kaca polos 8 mm tempered, ex Asahi Mas
harga terpasang
Kaca warna 8 mm, ex Asahi Mas
harga terpasang
Kaca warna 8 mm, ex Asahi Mas (Reflective)
harga terpasang
Kaca polos 6 mm tempered, ex Asahi Mas
harga terpasang
Kaca polos 6 mm, ex Asahi Mas
harga terpasang
Kaca warna 6 mm, ex Asahi Mas
harga terpasang
Kaca polos 5 mm, ex Asahi Mas
harga terpasang
Kaca Stopsol Plat Laminated, polos tebal 6 mm
harga terpasang
Kaca Stopsol Plat Laminated, polos tebal 8 mm
harga terpasang
Kaca Stopsol Plat Laminated, polos tebal 10 mm
harga terpasang
MATERIAL ALLUMUNIUM
ALLUMUNIUM PRODUK YKK
Profil kosen Allumunium 1 3/4 x 3", Silver Clear Anodized ex YKK
Profil kosen Allumunium 1 3/4 x 4", Silver Clear Anodized ex YKK
Profil Frame Allumunium Pintu kaca, Silver Clear Anodized ex YKK
Profil Frame Allumunium Jendela kaca, Silver Clear Anodized ex YKK
Profil kosen Allumunium 1 3/4 x 3", Black/Brown Anodized ex YKK
Profil kosen Allumunium 1 3/4 x 4", Black/Brown Anodized ex YKK
Profil Frame Allumunium Pintu kaca, Black/Brown Anodized ex YKK
Profil Frame Allumunium Jendela kaca, Black/Brown Anodized ex YKK
Profil kosen Allumunium 1 3/4 x 3", Powder Coating ex YKK
Profil kosen Allumunium 1 3/4 x 4", Powder Coating ex YKK
Profil Frame Allumunium Pintu kaca, Powder Coating ex YKK
Profil Frame Allumunium Jendela kaca, Powder Coating ex YKK
ALLUMUNIUM PRODUK ALEXINDO
Profil kosen Allumunium 1 3/4 x 3", Silver Clear Anodized ex Alexindo
Profil kosen Allumunium 1 3/4 x 4", Silver Clear Anodized ex Alexindo
Profil Frame Allumunium Pintu kaca, Silver Clear Anodized ex Alexindo
Profil Frame Allumunium Jendela kaca, Silver Clear Anodized ex Alexindo
Profil kosen Allumunium 1 3/4 x 3", Black/Brown Anodized ex Alexindo
Profil kosen Allumunium 1 3/4 x 4", Black/Brown Anodized ex Alexindo
Profil Frame Allumunium Pintu kaca, Black/Brown Anodized ex Alexindo
Profil Frame Allumunium Jendela kaca, Black/Brown Anodized ex alexindo
Profil kosen Allumunium 1 3/4 x 3", Powder Coating serat kayu, ex Alexindo
Profil kosen Allumunium 1 3/4 x 4", Powder Coating serat kayu, ex Alexindo
Profil Frame Allumunium Pintu kaca, Powder Coating serat kayu, ex Alexindo
Profil Frame Allumunium Jendela kaca, Powder Coating serat kayu, ex Alexindo
Sealant kaca
Karet kaca
Allumunium plat tebal 0,4 mm, uk. 1000x2000 mm
Allumunium plat tebal 0,4 mm, uk. 1220x2440 mm
Allumunium plat tebal 0,5 mm, uk. 1000x2000 mm
Allumunium plat tebal 0,5 mm, uk. 1220x2440 mm
Allumunium Bordes tebal 2 mm, uk. 1000x2000 mm
Allumunium Bordes tebal 3 mm, uk. 1000x2000 mm
MATERIAL ATAP
Genteng Plentong Glazur, ex Jatiwangi
Nok Genteng Plentong Glazur, ex Jatiwangi
Genteng Plentong tidak Glazur, ex Jatiwangi
Nok Genteng Plentong tidak Glazur, ex Jatiwangi
Genteng Keramik Glazur ex Kanmuri
Standar Espanica Natural
Genteng Keramik Glazur ex Kanmuri
Standar Espanica Medium
Genteng Keramik Glazur ex KIA
Stadar Natural
Nok Genteng Keramik Glazur, ex KIA
Stadar Natural
Genteng Keramik ex Cisangkan type Victoria
Nok Genteng Keramik, ex Cisangkan
Genteng Morando Glazur, ex Jatiwangi
Genteng Morando tidak Glazur, ex Jatiwangi

RAB - 04

73,500.00
84,000.00
115,500.00
136,500.00
183,750.00
210,000.00
262,500.00
60,375.00
47,250.00
42,000.00
naik 5%
619,500.00
813,750.00
672,000.00
866,250.00
558,600.00
446,250.00
393,750.00
236,250.00
404,250.00
262,500.00
393,750.00
215,000.00
168,000.00
183,750.00
147,000.00
420,000.00
708,750.00
1,076,250.00
naik 5%
94,500.00
115,500.00
105,000.00
89,250.00
115,500.00
157,500.00
147,000.00
105,000.00
147,000.00
168,000.00
161,700.00
126,000.00
52,500.00
68,250.00
63,000.00
52,500.00
68,250.00
78,750.00
73,500.00
63,000.00
136,500.00
168,000.00
157,500.00
126,000.00
8,531.25
2,887.50
129,675.00
192,675.00
162,225.00
240,975.00
752,325.00
1,128,225.00
naik 5%
4,462.50
7,875.00
3,675.00
6,300.00
12,285.00
13,125.00
13,125.00
26,565.00
12,600.00
26,250.00
3,675.00
4,200.00

/lmbr
/lmbr
/lmbr
/lmbr
/lmbr
/lmbr
/lmbr
/kg
/M2
/Kg
/ M2
/ M2
/ M2
/ M2
/ M2
/ M2
/ M2
/ M2
/ M2
/ M2
/ M2
/ M2
/ M2
/ M2
/ M2
/ M2
/ M2
/ M2

/ M'
/ M'
/ M'
/ M'
/ M'
/ M'
/ M'
/ M'
/ M'
/ M'
/ M'
/ M'
/ M'
/ M'
/ M'
/ M'
/ M'
/ M'
/ M'
/ M'
/ M'
/ M'
/ M'
/ M'
/ M'
/ M'
/lmbr
/lmbr
/lmbr
/lmbr
/lmbr
/lmbr
/bh
/bh
/bh
/bh
/bh
/bh
/bh
/bh
/bh
/bh
/bh
/bh

Nok Genteng Morando tidak Glazur, ex Jatiwangi


Genteng Beton ex Karangpilang (berwarna)
Genteng Nok Beton Karangpilang (berwarna)
Djabes gelombang kecil (B100) uk. 300x105, tbl. 6mm
Djabes gelombang kecil (B100) uk. 300x105, tbl. 5mm
Djabes gelombang kecil (K200) uk. 300x105, tbl. 4mm
Skrup + ring
Atap Sirap
Paku sirap
Atap Gelombang GALVALUME, type SPANDEK LYSAGHT, tebal 0,75 mm
(ex. CV. Cipta Prima Sentosa)
Atap Gelombang GALVALUME, type SPANDEK LYSAGHT, tebal 0,50 mm
(ex. CV. Cipta Prima Sentosa)
Atap Metal ZINCALUM, type ada sterofoam 5cm
Atap Metal Spandex Zincalum tebal 0,5 mm
(ex. CV. Cipta Prima Sentosa)
MATERIAL WATERPROOFING
Lapisan Coating PF Primer
waterproofing atap beton
Waterproofing Membrane, Sopralene 4 mm
waterproofing atap beton
Waterproofing Membrane, Gardigum 4 mm
waterproofing atap beton
Waterproofing jenis coating ex Sika/AM/setara
MATERIAL KERAMIK, MARMER, GRANIT & HOMOGENOUS TILE
Granit Import
- Granit Import (Red China & Black China) jenis Slab
- Granit Import (Nero Absolute India) jenis slab
Homogenous Tile Niro Granite
- Niro Granite 80x80 Cm
- Niro Granite 60x60 Cm
- Niro Granite 60x60 Cm (un-polish)
- Niro Granite 40x40 Cm
Homogenous Tile Granito
- Granito Salsa 60x60 Cm (polished)
W : Pearl White, Ivory
- Granito Salsa 60x60 Cm (polished)
W : Water stone, White stone
- Granito group Diamon 60x60 Cm (polished)
W : Water stone, White stone
- Granito Palazzo 60x60 Cm (polished)
W : Sanrosa
- Granito Aurora group Silver 60x60 Cm (polished)
W : Slamon type miror
- Granito Aurora Group Gold 60x60 Cm (polished)
W : Astro
- Granito Lunar group Silver 60x60 Cm (un-polished)
W : Terra, Zephyr type Rustic
- Granito Lunar group Gold 60x60 Cm (un-polished)
W : Amber, Quartz type Rustic
- Granito Lunar group Bronze 60x60 Cm (un-polished)
W : Solar, Helium type Rustic
- Granito Lunar 60x60 Cm (un-polished)
W : Alumina, Oxide
- Granitto Aurora 30x60 Cm (polished), Group Silver
W : Waffel, Latte type miror
- Granitto Lunar 30x60 Cm (Un-polished), Group Bronze
W : Solar, Helium type Rustic
- Granitto Lunar 30x60 Cm (Un-polished), Group Silver
W : Terra, Zephyr type Rustic
- Granitto Lunar 30x60 Cm (Un-polished), Group Gold
W : Amber, Quartz type Rustic
- Granitto 40/40 Cm (polish) Group Silver, type Crystal
W : Pearl White, Ivory, Mustand
- Granitto 40/40 Cm (polish) Group Silver
W : Greystone, Line
- Granitto 40/40 Cm (polish) Group Gold, type Crysta
W : Black
- Granitto 40/40 Cm (Un-polish) Group Gold, type Oasis
W : Forest Green, Brick, Cocoa, Black
- Granitto Gastello 30x30 Cm (Un-polish) Group Silver, type rustic
W : Capucino, expreso, crme
- Homogenous Tile 60x60 Cm, ex China
Homogenous Tile Inesa
- Inesa, 30/30,40/40, Onix (Un-Polished)
- Group A (Pearl, Opal, Agate, Cateye, Topaz, Zamrud)
Inesa, uk. 30/30 & 40/40 (Polished)
- Group A (Pearl, Opal, Agate, Cateye, Topaz, Zamrud)
Inesa, 30/30,40/40 UP (Onix, Phyrus, Ruby, Jade)
Group C
- Inesa, 30/30, 40/40 P (Onix, Phyrus, Ruby, Jade)
Group C
- Inesa, 40/40 Group A (Corypha polish)
- Inesa, 60 x 60 Group A (Corypha polish)
- Inesa, 40x40 (Polish), warna Topaz
- Inesa, 60/60 (P), Raphia
Homogenous Tile Essenza
- Essenza 30/30, Papper Grey (Un-Polished)
- Essenza 30/30, Papper Grey (Polished)
- Essenza Group A 40x40, Papper Grey (Un-Polished)
- Essenza Group A 40x40 polish
warna : prince rubber, silver star
- Essenza 60x60, Blak Orchid (Polished)
- Essenza Group B 60x60 (Polished)
warna : Corypha
- Essenza Group A 60x60 polish
warna : prince rubber, silver star
Homogenous Tile Uero Grace
- Uero Grace 60/60, FHQ 6207 (pgnt Raphia)
- Uero Grace 30/30, FHQ 6207
- Uero Grace 60/60, Golden Black (pgnt Onix)
Marmer
- Marmer Import Crema Evory
Jenis slab
- Marmer Import Golden Perlanto
Jenis slab
- Marmer Import Volacas
Jenis slab
- Marmer Import Travertine
Jenis slab
- Marmer Import Rossi Vietnam
Jenis slab

RAB - 05

10,500.00
12,600.00
26,250.00
141,750.00
126,000.00
94,500.00
472.50
236,250.00
31,500.00
177,975.00
91,875.00
210,000.00
121,800.00

/bh
/bh
/bh
/Lbr
/Lbr
/Lbr
/bh
/M2
/Kg
/M2
/M2
/M2
/M2

18,375.00
157,500.00
141,750.00
52,500.00

/M2
/M2
/M2
/Kg

577,500.00 /M2
1,023,750.00 /M2
257,250.00
231,000.00
210,000.00
168,000.00

/M2
/M2
/M2
/M2

255,255.00
313,005.00
272,580.00
331,485.00
301,455.00
371,910.00
259,875.00
307,461.00
248,325.00
358,050.00
310,695.00
257,565.00
269,115.00
307,461.00
170,940.00
197,505.00
225,750.00
192,885.00
157,080.00
136,500.00

/M2
/M2
/M2
/M2
/M2
/M2
/M2
/M2
/M2
/M2
/M2
/M2
/M2
/M2
/M2
/M2
/M2
/M2
/M2
/M2

102,375.00 /M2
144,900.00 /M2
132,300.00
146,265.00
169,575.00
214,987.50
159,075.00
214,987.50

/M2
/M2
/M2
/M2
/M2
/M2

157,500.00
183,750.00
173,712.00
198,660.00
288,750.00
300,646.50
243,936.00

/M2
/M2
/M2
/M2
/M2
/M2
/M2

178,500.00 /M2
131,250.00 /M2
236,250.00 /M2
682,500.00
682,500.00
997,500.00
1,365,000.00
630,000.00

/M2
/M2
/M2
/M2
/M2

- Marmer Tulung Agung, 60/60 cm


- Marmer Tulung Agung
- Marmer Ujung Pandang (acid wash), 600x600 mm
- Marmer ex Citatah, 30/30
- Marmer ex Citatah, 60/60
- Teralux Marmer 60x60 cm
Floor Hardener
- Floor Hardener (Gan's Floor)
- Epoxy Resin
Keramik Tile
- Porselen 11 x 11 cm
- Keramik Artistik 5x20 Cm
- Keramik lokal 10x20 Cm (ex Roman)
- Keramik lokal 20/20 Cm (ex Roman) Gol A
- Keramik lokal 20/25 Cm (ex Roman) Gol A
- Keramik lokal 30x30 Cm (ex Roman) Gol B
- Keramik lokal 33,3x33,3 Cm (ex Roman) Gol A
- Keramik lokal 30x60 Cm (ex Roman) Gol A
- Keramik lokal 20x40 Cm (ex Roman) Gol A
- Keramik lokal 40/40 Cm (ex Roman) Gol A
- Keramik Homogenous 30/30 Cm (ex Roman Gress)
- Keramik Homogenous 60/60 Cm (ex Roman Gress)
MATERIAL LANTAI PARQUET
- Red Oak lam parquet uk. 1,5 x 6 x 30 cm
- Red Oak lam parquet uk. 1 x 5 x 30 cm
- Jati lem parquet uk. 1 x 5 x 30 cm
- Jati lem parquet uk. 1 x 7 x 35 cm
- Jati lem parquet uk. 1 x 5 x 25 cm
- Tg. Parquet Jati uk. 1,8 x 5 x 30 cm
- Graculad
- Gracewood 144
- Parkit (Kronospan) uk. 19 x 120 cm
- Parkit (Dream Wood) uk. 19 x 120 cm
- Underlayer / Rubber corrugated
- Karpet Sheet ex Lokal
- Carpet Tile 50x50, ex Leiko
- Vinyl tile 30x30 cm, ex ..
- Parket sintetis uk. 10 x 90 cm
MATERIAL BATU ALAM
- Batu Candi 20x40 cm
- Batu alur Candi 20x40 cm
- Batu Alam susun hitam 3x30 cm
- Batu alam Paliaman 20X40
- Batu acak Sukabumi
- Batu acak Garut
- Batu acak Purwakarta
- Batu alam Purwakarta
- Batu alam Andesit 20/20 & 15/30 cm
- Batu alam Andesit 20/30 cm
- Batu alam Andesit 20/40 s/d 30/40 cm
- Paras Jogja 20/30s/d40/40 (cream/putih)
- Paras Jogja 20/40s/d40/60 (cream/putih)
MATERIAL CONBLOCK / INTERBLOCK (Ex. INTERNUSA)
Interblock 16.6, warna abu-abu
Interblock 16.6, warna Mrh, Htm, Kng, Klasik
Interblock 16.6, warna Hijau
Interblock 16.8, warna abu-abu
Interblock 16.8, warna Mrh, Htm, Kng, Klasik
Interblock 16.8, warna Hijau
Zurich 12.6 / Tiga berlian 6, abu-abu
Zurich 12.6 / Tiga berlian 6, (Mrh, Htm, Kng, Klasik)
Zurich 12.6 / Tiga berlian 6, Hijau
Zurich 12.8 / Tiga berlian 8, abu-abu
Zurich 12.8 / Tiga berlian 8, (Mrh, Htm, Kng, Klasik)
Zurich 12.8 / Tiga berlian 8, Hijau
Grassblock 20.10.40 (abu-abu)
Grassblock 20.8.40 (abu-abu)
Kansteen 15 x 30 x 40
MATERIAL BUIS BETON
Buis beton dia. 20 cm tanpa tulang, panjang 1 m
Buis beton dia. 30 cm tanpa tulang, panjang 1 m
Buis beton 1/2 dia. 20 cm tanpa tulang, panjang 0,50 m
Buis beton 1/2 dia. 30 cm tanpa tulang, panjang 0,50 m
MATERIAL CAT
Cat Duco Danagloss
Cat Duco Nippe 2000
Dempul Duco Sanpolac
Tinner Up

RAB - 06

Jenis slab
Jenis slab

420,000.00
498,750.00
609,000.00
170,625.00
275,625.00
367,500.00

/M2
/M2
/M2
/M2
/M2
/M2

9,450.00 /kg
12,600.00 /kg

Wall tile

Gol. D
Gol. B

Dasaran lantai karpet


Kualitas baik

57,750.00
68,250.00
57,750.00
86,100.00
79,800.00
73,500.00
97,650.00
134,925.00
84,000.00
82,500.00
96,600.00
176,400.00

/M2
/M2
/M2
/M2
/M2
/M2
/M2
/M2
/M2
/M2
/M2
/M2

121,380.00
110,775.00
145,923.75
156,187.50
103,635.00
107,730.00
174,510.00
188,685.00
189,000.00
189,000.00
31,500.00
52,500.00
236,250.00
157,500.00
78,750.00

/M2
/M2
/M2
/M2
/M2
/M2
/M2
/M2
/M2
/M2
/M2
/M2
/M2
/M2
/M2

133,000.35
156,187.50
157,500.00
147,000.00
110,250.00
110,250.00
110,250.00
136,500.00
168,000.00
178,500.00
189,000.00
99,750.00
115,500.00

/M2
/M2
/M2
/M2
/M2
/M2
/M2
/M2
/M2
/M2
/M2
/M2
/M2

99,750.00
131,250.00
141,750.00
136,500.00
147,000.00
157,500.00
124,110.00
143,010.00
157,500.00
144,900.00
163,800.00
181,440.00
143,010.00
117,810.00
39,900.00

/M2
/M2
/M2
/M2
/M2
/M2
/M2
/M2
/M2
/M2
/M2
/M2
/M2
/M2
/Bh

63,525.00
88,935.00
38,115.00
53,130.00

/Bh
/Bh
/Bh
/Bh

88,725.00
49,875.00
36,750.00
28,875.00

/Kg
/Kg
/Kg
/Kg

Cat Tembok Catylac (Acrilyc Emulsion), putih


Cat Tembok Dulux ICI (Acrilyc Emulsion)
Cat Tembok Dulux ICI (Acrilyc Emulsion)
Cat Tembok Dulux ICI (Acrilyc Emulsion), warna tua
Cat Tembok luar (ICI Dulux Weathershield)
Cat Tembok luar (ICI Dulux Weathershield)
Cat Tembok luar (ICI Dulux Weathershield), warna tua
Alkali Resistants Dulux ICI
Cat Tembok Mowilex (Acrilyc Emulsion)
Cat Tembok Mowilex (Wather Coat)
Cat Tembok (cat minyak) ex Mowilex
Cat Tembok Vinilex Super
Plamur Tembok Matex (5 kg)
Cat Kayu/besi (ICI Dulux Super Gloss)
Cat Kayu/besi (ex Danapaint, Gloss)
Cat Kayu / besi (kwalitas sedang, Ftalit, Kuda Terbang)
Plamur kayu
Pelitur
Melamik Ultran
Cat warna Ultran
Sanding Ultran
Filler Ultran
Menie Kayu
Residu
Kuas Roll
Kuas
Ampelas

Dulux Pentalite warna standart


Dulux Pentalite warna khusus
Warna standart
Warna khusus

DAFTAR UPAH TENAGA KERJA

26,250.00
44,257.50
51,292.50
47,250.00
60,375.00
80,398.50
86,992.50
45,596.25
39,375.00
57,750.00
60,000.00
20,000.00
18,375.00
57,750.00
52,500.00
47,250.00
26,250.00
52,500.00
63,000.00
52,500.00
55,125.00
52,500.00
23,625.00
18,375.00
36,750.00
15,750.00
2,887.50

/Kg
/Kg
/Kg
/Kg
/Kg
/Kg
/Kg
/Kg
/Kg
/Kg
/Kg
/Kg
/Kg
/Kg
/Kg
/Kg
/Kg
/Kg
/Kg
/Kg
/Kg
/Kg
/Kg
/Kg
/Bh
/Bh
/Bh

Jakarta, Juni 2013

DAFTAR PEKERJA

BIDANG PEKERJAAN

Mandor

Berlaku untuk keseluruhan

110,000.00 /org/hari

Kepala Tukang Kayu


Tukang Kayu (konstruksi)
Tukang Kayu halus
Tukang Kayu Mebel

Pek. Rangka atap


Pek. Kosen, pintu & jendela
Pek. Furniture

105,000.00
90,000.00
95,000.00
100,000.00

Kepala Tukang Batu


Tukang batu
Tukang batu halus

Pek. Pasangan batu/bata


Pek. Finishing

100,000.00 /org/hari
90,000.00 /org/hari
95,000.00 /org/hari

Kepala Tukang Gypsum


Tukang Gypsum

Pek. Plafond / Partisi

Kepala Tukang Besi


Tukang besi
Tukang Las konstruksi

Pembesian konstrusi beton

Kepala Tukang Gali


Tukang Gali

Pek. Galian tanah

Kepala Tukang Cat


Tukang Cat
Tukang Pelitur/melamik

Finishing pengecatan

UPAH
/org/hari
/org/hari
/org/hari
/org/hari

95,000.00 /org/hari
90,000.00 /org/hari
90,000.00 /org/hari
85,000.00 /org/hari
100,000.00 /org/hari
90,000.00 /org/hari
109,960.00 /org/hari
90,000.00 /org/hari
100,000.00 /org/hari
100,000.00 /org/hari

Kepala Tukang Allumunium


Tukang khusus allumunium

90,000.00 /org/hari
100,000.00 /org/hari

Kepala Tukang pipa


Tukang pipa

90,000.00 /org/hari
109,960.00 /org/hari

Pekerja

Berlaku untuk keseluruhan

RAB - 07

75,000.00 /org/hari

ANALISA HARGA SATUAN PEKERJAAN, BERDASARKAN SNI


NO.

URAIAN PEKERJAAN

I.

PEK. PERSIAPAN & TAPAK

1.1.

PEK. BOWPLANK / M'


Bahan : Kayu Meranti Palembang papan
Kayu Meranti Palembang kaso
Paku biasa 2"-5"
Upah

1.2.

Pekerja
Mandor

Kep. Tukang Kayu


Tukang Kayu
Tukang Batu
Pekerja
Mandor

GUDANG SEMEN & PERALATAN, lantai plesteran, atap Seng / M2


Bahan : Kayu dolken 8-10/400 cm
Kayu Meranti Palembang kaso
Paku biasa 2"-5"
Semen portland
Pasir beton
Batu pecah/split 2/3
Seng gelombang 3x6 ft BJLS 20 (0,2 mm)
Upah

1.6.

Kep. Tukang Kayu


Tukang Kayu
Pekerja
Mandor

PEMB. KANTOR SEMENTARA, lantai plesteran, atap Seng / M2


Bahan : Kayu dolken 8-10/400 cm
Kayu Meranti Palembang kaso
Paku biasa 2"-5"
Besi pelat strip
Semen portland
Pasir pasang
Pasir beton
Batu pecah/split 2/3
Bata merah
Seng gelombang 3x6 ft BJLS 20 (0,2 mm)
Jendela nako (rangka)
Kaca 3 mm
Kunci tanam sederhana
Teakwood 4x8 ft 3 mm
Upah

1.5.

PEMB. JALAN SEMENTARA, tebal 20 cm / M2


Bahan : Batu belah 15/20
Batu pecah 5/7
Pasir pasang
Upah

1.4.

Kep. Tukang Kayu


Tukang Kayu
Pekerja
Mandor

PAGAR SEMENTARA dari Seng Gelombang tg. 2 m / M'


Bahan : Semen PC
Pasir beton
Batu pecah/split 2/3
Seng gelombang 3x6 ft BJLS 20 (0,2 mm)
Kayu dolken 8-10/400 cm
Kayu Meranti Palembang kaso
Paku biasa 2"-5"
Cat meni besi
Upah

1.3.

Kep. Tukang Kayu


Tukang Kayu
Pekerja
Mandor

PAGAR PERIMETER, dari kawat duri tinggi 70 cm / M'


Bahan : Besi siku
Semen portland
Pasir beton
Batu pecah/split 2/3
Paku biasa 2"-5"
Kawat duri (10kg/60m/rol)

SNI

kfsn

ANALISA HARGA BAHAN & UPAH


sat
hrg. sat.
Total harga

HARGA SATUAN
PEKERJAAN

BOW
0.007
0.010
0.020
0.010
0.100
0.100
0.005

2.500
0.005
0.009
1.200
1.250
0.014
0.060
0.450
0.020
0.200
0.400
0.020

0.150
0.090
0.010
1.000
0.050

1.250
0.018
0.850
1.100
35.000
0.150
0.100
0.150
30.000
0.250
7.000
0.080
0.150
0.060
0.300
2.000
1.000
1.000
0.050

1.700
0.021
0.300
10.500
0.030
0.050
1.500
0.200
2.000
1.000
0.050

6.750
2.000
0.005
0.009
0.060
0.050

RAB - 08

M3
4,200,000.00
M3
2,730,000.00
Kg
15,356.25
Sub - Bahan
Org
105,000.00
Org
90,000.00
Org
75,000.00
Org
110,000.00
Sub - Upah

27,720.00
26,276.25
307.13
54,303.38 Rp
1,050.00
9,000.00
7,500.00
550.00
18,100.00 Rp
TOTAL Rp

zak
1,300.00
M3
270,375.00
M3
269,500.35
lbr
47,250.00
btg
36,750.00
M3
2,730,000.00
Kg
15,356.25
Kg
23,625.00
Sub - Bahan
Org
105,000.00
Org
90,000.00
Org
75,000.00
Org
110,000.00
Sub - Upah

3,250.00
1,351.88
2,425.50
56,700.00
45,937.50
38,220.00
921.38
10,631.25
159,437.50 Rp
2,100.00
18,000.00
30,000.00
2,200.00
52,300.00 Rp
TOTAL Rp

M3
257,250.00
M3
262,500.00
M3
265,125.00
Sub - Bahan
Org
75,000.00
Org
110,000.00
Sub - Upah

38,587.50
23,625.00
2,651.25
64,863.75 Rp
75,000.00
5,500.00
80,500.00 Rp
TOTAL Rp

btg
36,750.00
m
2,730,000.00
kg
15,356.25
kg
14,542.50
kg
1,300.00
m
265,125.00
m
270,375.00
m
269,500.35
bh
630.00
Lbr
47,250.00
daun
15,000.00
m
75,000.00
bh
60,000.00
lbr
105,000.00
Sub - Bahan
Org
105,000.00
Org
90,000.00
Org
90,000.00
Org
75,000.00
Org
110,000.00
Sub - Upah

45,937.50
49,140.00
13,052.81
15,996.75
45,500.00
39,768.75
27,037.50
40,425.05
18,900.00
11,812.50
105,000.00
6,000.00
9,000.00
6,300.00
433,870.87 Rp
31,500.00
180,000.00
90,000.00
75,000.00
5,500.00
382,000.00 Rp
TOTAL Rp

btg
36,750.00
m
2,730,000.00
kg
15,356.25
kg
1,300.00
m
270,375.00
m
269,500.35
Lbr
47,250.00
Sub - Bahan
Org
105,000.00
Org
90,000.00
Org
75,000.00
Org
110,000.00
Sub - Upah

62,475.00
57,330.00
4,606.88
13,650.00
8,111.25
13,475.02
70,875.00
230,523.14 Rp
21,000.00
180,000.00
75,000.00
5,500.00
281,500.00 Rp
TOTAL Rp

kg
14,455.35
kg
1,300.00
m
270,375.00
m
269,500.35
kg
15,356.25
kg
16,537.50
Sub - Bahan

97,573.61
2,600.00
1,351.88
2,425.50
921.38
826.88
105,699.24

Rp

54,303.38

18,100.00
72,403.38

159,437.50

52,300.00
211,737.50

64,863.75

80,500.00
145,363.75

433,870.87

382,000.00
815,870.87

230,523.14

281,500.00
512,023.14

105,699.24

ANALISA HARGA SATUAN PEKERJAAN, BERDASARKAN SNI


NO.

URAIAN PEKERJAAN
Upah

1.7.
1

10

11

12

13

Kep. Tukang Kayu


Tukang Kayu
Pekerja
Mandor

SNI

GALIAN TANAH BIASA, sedalam 2 m / M3


Upah : Pekerja
Mandor

SNI

GALIAN TANAH BIASA, sedalam 3 m / M3


Upah : Pekerja
Mandor

SNI

GALIAN TANAH KERAS, sedalam 1 m / M3


Upah : Pekerja
Mandor

SNI

GALIAN TANAH CADAS, sedalam 1 m / M3


Upah : Pekerja
Mandor

SNI

GALIAN TANAH LUMPUR, sedalam 1 m / M3


Upah : Pekerja
Mandor

SNI

STRPPING TEBING, setinggi 1 m / M2


Upah : Pekerja
Mandor

SNI

MEMBUANG TANAH, sejauh 150 m / M3


Upah : Pekerja
Mandor

SNI

URUGAN TANAH KEMBALI / M3


Upah : Pekerja
Mandor

SNI

PEK URUGAN TANAH (FILL) dengan Alat Berat / M3


Bahan : Tanah Urug
Upah

Pekerja
Mandor

Harga pemakaian alat berat


- WHEEL LOADER 1-1,6 m3
- DUMP TRUCK 3-4 M3 / 6 ton
- MOTOR GRADER 100 HP
- VIBRATOR ROLLER 5-8 Ton

Rp

13,000.00

Org
75,000.00
Org
110,000.00
Sub - Upah

18,750.00
1,320.00
20,070.00

Rp

20,070.00

Org
75,000.00
Org
110,000.00
Sub - Upah

56,250.00
2,750.00
59,000.00

Rp

59,000.00

Org
75,000.00
Org
110,000.00
Sub - Upah

67,500.00
4,950.00
72,450.00

Rp

72,450.00

1.050
0.067

Org
75,000.00
Org
110,000.00
Sub - Upah

78,750.00
7,370.00
86,120.00

Rp

86,120.00

1.000
0.032

Org
75,000.00
Org
110,000.00
Sub - Upah

75,000.00
3,520.00
78,520.00

Rp

78,520.00

Org
75,000.00
Org
110,000.00
Sub - Upah

112,500.00
6,600.00
119,100.00

Rp

119,100.00

Org
75,000.00
Org
110,000.00
Sub - Upah

90,000.00
4,950.00
94,950.00

Rp

94,950.00

Org
75,000.00
Org
110,000.00
Sub - Upah

3,750.00
550.00
4,300.00

Rp

4,300.00

0.516
0.050

Org
75,000.00
Org
110,000.00
Sub - Upah

38,700.00
5,500.00
44,200.00

Rp

44,200.00

0.250
0.008

Org
75,000.00
Org
110,000.00
Sub - Upah

18,750.00
880.00
19,630.00

Rp

19,630.00

Org
75,000.00
Org
110,000.00
Sub - Upah

37,500.00
5,500.00
43,000.00

Rp

43,000.00

M3
262,500.00
M3
25,000.00
Sub - Bahan

315,000.00
30,000.00
345,000.00

Rp

345,000.00

Org
75,000.00
Org
110,000.00
Sub - Upah

15,000.00
1,100.00
16,100.00 Rp
TOTAL Rp

16,100.00
361,100.00

Org
75,000.00
Org
110,000.00
Sub - Upah

8,175.00
5,940.00
14,115.00

1.500
0.060

1.200
0.045

0.050
0.005

0.500
0.050

44,800.00
150,499.24

BOW
1.200
1.200

0.200
0.010

SNI
0.109
0.054

Harga pemakaian alat berat


- EXCAVATOR 150 HP Kobelco SK200
- DUMP TRUCK 3-4 M3 / 6 ton
- Alat bantu

15

7,500.00
5,500.00
13,000.00

0.900
0.045

menimbun, meratakan & memadatkan


Pekerja
Mandor

PEK. GALIAN TANAH (CUT) dengan Alat Berat / M3


Upah : Pekerja
Mandor

Org
75,000.00
Org
110,000.00
Sub - Upah

0.750
0.025

PERATAAN & PEMADATAN URUGAN TANAH


Upah :
meratakan & memadatkan
Pekerja
Mandor

HARGA SATUAN
PEKERJAAN

2,100.00
18,000.00
22,500.00
2,200.00
44,800.00 Rp
TOTAL Rp

0.250
0.012

GALIAN TANAH BIASA, sedalam 1 m / M3


Upah : Pekerja
Mandor

ANALISA HARGA BAHAN & UPAH


sat
hrg. sat.
Total harga
Org
105,000.00
Org
90,000.00
Org
75,000.00
Org
110,000.00
Sub - Upah

0.100
0.050

PENGUPASAN LAPISAN ATAS / M2


Upah : Pekerja
Mandor

URUGAN TANAH DARI LUAR / M3


Bahan : Tanah Urug
Angkutan Truk

kfsn
0.020
0.200
0.300
0.020

PEK. TANAH DILAKSANAKAN SECARA KONVENSIONAL


PEMBERSIHAN LAPANGAN dan PERATAAN / M2
Upah : Pekerja
Mandor

Upah

14

SNI

0.054
0.100
1.000

jam
469,389.80
jam
242,640.20
ls
10,000.00
Sub - Sewa Peralatan

Rp

14,115.00

25,347.05
24,264.02
10,000.00
59,611.07 Rp
TOTAL Rp

59,611.07
73,726.07

SNI
1.200
0.250
0.025

0.020
0.331
0.007
0.011

RAB - 09

M3
262,500.00
Sub - Bahan
Org
75,000.00
Org
110,000.00
Sub - Upah
jam
jam
jam
jam

267,270.30
242,640.20
288,512.40
247,328.40

315,000.00
315,000.00
18,750.00
2,750.00
21,500.00
5,345.41
80,313.91
2,019.59
2,720.61

Rp

315,000.00

Rp

21,500.00

ANALISA HARGA SATUAN PEKERJAAN, BERDASARKAN SNI


NO.

URAIAN PEKERJAAN

SNI

kfsn

- WATER TANK TRUCK


- Alat bantu

1.8.

PEK. URUGAN PASIR URUG / M3


Bahan : Pasir Urug
Upah

1.9.

1.10.

0.250
0.025

Pekerja
Mandor

1,164.24
10,000.00
101,563.75 Rp
TOTAL Rp

M3
291,375.00
Sub - Bahan
Org
75,000.00
Org
110,000.00
Sub - Upah

349,650.00
349,650.00 Rp
22,500.00
1,100.00
23,600.00 Rp
TOTAL Rp

M3
256,200.00
Sub - Bahan
Org
75,000.00
Org
110,000.00
Sub - Upah

307,440.00
307,440.00 Rp
18,750.00
2,750.00
21,500.00 Rp
TOTAL Rp

M3
273,000.00
Sub - Bahan
Org
75,000.00
Org
110,000.00
Sub - Upah

327,600.00
327,600.00 Rp
18,750.00
2,750.00
21,500.00 Rp
TOTAL Rp

M3
269,500.35
Sub - Bahan
Org
75,000.00
Org
110,000.00
Sub - Upah

323,400.42
323,400.42 Rp
18,750.00
2,750.00
21,500.00 Rp
TOTAL Rp

M3
257,250.00
Sub - Bahan
Org
75,000.00
Org
110,000.00
Sub - Upah

308,700.00
308,700.00 Rp
18,750.00
2,750.00
21,500.00 Rp
TOTAL Rp

M3
262,500.00
Sub - Bahan
Org
75,000.00
Org
110,000.00
Sub - Upah

315,000.00
315,000.00 Rp
18,750.00
2,750.00
21,500.00 Rp
TOTAL Rp

kg
31,500.00
Sub - Bahan
Org
75,000.00
Org
110,000.00
Sub - Upah

189,000.00
189,000.00 Rp
11,250.00
1,650.00
12,900.00 Rp
TOTAL Rp

Org
75,000.00
Org
110,000.00
Sub - Upah

500,025.00
36,630.00
536,655.00 Rp
TOTAL Rp

536,655.00
536,655.00

Org
75,000.00
Org
110,000.00
Sub - Upah

50,025.00
3,630.00
53,655.00 Rp
TOTAL Rp

53,655.00
53,655.00

Org
75,000.00
Org
110,000.00
Sub - Upah

5,475.00
440.00
5,915.00 Rp
TOTAL Rp

5,915.00
5,915.00

Org
75,000.00
Org
110,000.00
Sub - Upah

60,000.00
4,400.00
64,400.00 Rp
TOTAL Rp

64,400.00
64,400.00

Org
75,000.00
Org
110,000.00
Sub - Upah

112,500.00
8,250.00
120,750.00 Rp
TOTAL Rp

120,750.00
120,750.00

Org
75,000.00
Org
110,000.00
Sub - Upah

225,000.00
16,500.00
241,500.00

241,500.00

101,563.75
438,063.75

349,650.00

23,600.00
373,250.00

307,440.00

21,500.00
328,940.00

SNI-2008
1.200
0.250
0.025

327,600.00

21,500.00
349,100.00

SNI-2008
1.200
0.250
0.025

323,400.42

21,500.00
344,900.42

SNI-2008
1.200
0.250
0.025

308,700.00

21,500.00
330,200.00

SNI-2008
1.200

Pekerja
Mandor

PEK. LAPISAN IJUK TEBAL 10 CM (u/. Dinding resapan)


Bahan : I j u k
Upah

1.15.

1.200

Pekerja
Mandor

PEK. LAPISAN MAKADAM BATU PECAH 5-7 cm / M3


Bahan : Makadam/batu pecah 5-7 cm
Upah

1.14.

jam
145,530.00
ls
10,000.00
Sub - Sewa Peralatan

SNI-2008

Pekerja
Mandor

PEK. LAPISAN MAKADAM BATU BELAH / M3


Bahan : Makadam/batu pecah 5-7 cm
Upah

1.13.

0.300
0.010

Pekerja
Mandor

PEK. URUGAN PENETRASI /SPLIT 2-3 cm / M3


Bahan : Batu split 2-3 cm
Upah

1.12.

1.200

Pekerja
Mandor

PEK. URUGAN PASIR EXTRA BETON / M3


Bahan : Pasir Extra beton
Upah

1.11.

HARGA SATUAN
PEKERJAAN

SNI-2008

Pekerja
Mandor

PEK. URUGAN SIRTU / M3


Bahan : Sirtu
Upah

0.008
1.000

ANALISA HARGA BAHAN & UPAH


sat
hrg. sat.
Total harga

0.250
0.025

315,000.00

21,500.00
336,500.00

SNI-2008
6.000
0.150
0.015

189,000.00

12,900.00
201,900.00

PEKERJAAN BONGKARAN
Pek. Bongkar beton bertulang / M3
Upah : Pekerja
Mandor

Pek. Bongkar dinding tembok bata merah / M3


Upah : Pekerja
Mandor

Pek. Bongkar dinding 1/2 bata / M2


Upah : Pekerja
Mandor

Pek. Bongkar plat beton bertulang / M2


Upah : Pekerja
Mandor

Pek. Bongkar batu kali (tebal kurang dari 50 cm) / M3


Upah : Pekerja
Mandor

Pek. Bongkar batu kali (tebal lebih dari 50 cm) / M3


Upah : Pekerja
Mandor

6.667
0.333

0.667
0.033

0.073
0.004

0.800
0.040

1.500
0.075

3.000
0.150

RAB - 010

Rp

ANALISA HARGA SATUAN PEKERJAAN, BERDASARKAN SNI


NO.

URAIAN PEKERJAAN

10

11

12

13

14

15

16

17

18

III.

SNI

kfsn

Pek. Bongkar finishing lantai / M2


Upah : Pekerja
Mandor

0.100
0.010

Pek. Bongkar paving block / M2


Upah : Pekerja
Mandor

0.100
0.005

Pek. Bongkar plesteran / M2


Upah : Pekerja
Mandor

0.075
0.005

Pek. Bongkar Atap genteng / M2


Upah : Pekerja
Mandor

0.020
0.010

Pek. Bongkar karpusan Atap genteng / M'


Upah : Pekerja
Mandor

0.060
0.015

Pek. Bongkar Atap Seng/Asbes / M2


Upah : Pekerja
Mandor

0.050
0.025

Pek. Bongkar kaso reng kayu (kayu akan dipakai lagi) / M2


Upah : Pekerja
Tukang kayu
Kepala Tukang
Mandor

0.100
0.025
0.003
0.005

Pek. Bongkar kaso reng kayu (kayu tidak dipakai lagi) / M2


Upah : Pekerja
Mandor

0.100
0.005

Pek. Bongkar kuda2 & loteng kayu (kayu akan dipakai lagi) / M3
Upah : Pekerja
Tukang kayu
Kepala Tukang
Mandor

2.666
4.000
0.400
0.133

Pek. Bongkar kuda2 & loteng kayu (kayu tidak dipakai lagi) / M3
Upah : Pekerja
Mandor

4.000
0.400

Pek. Bongkar rangka plafond kayu / M2


Upah : Pekerja
Mandor

0.100
0.005

Pek. Bongkar penutup plafond / M2


Upah : Pekerja
Mandor

0.030
0.003

ANALISA HARGA BAHAN & UPAH


sat
hrg. sat.
Total harga

HARGA SATUAN
PEKERJAAN

TOTAL Rp

241,500.00

Org
75,000.00
Org
110,000.00
Sub - Upah

7,500.00
1,100.00
8,600.00 Rp
TOTAL Rp

8,600.00
8,600.00

Org
75,000.00
Org
110,000.00
Sub - Upah

7,500.00
550.00
8,050.00 Rp
TOTAL Rp

8,050.00
8,050.00

Org
75,000.00
Org
110,000.00
Sub - Upah

5,625.00
550.00
6,175.00 Rp
TOTAL Rp

6,175.00
6,175.00

Org
75,000.00
Org
110,000.00
Sub - Upah

1,500.00
1,100.00
2,600.00 Rp
TOTAL Rp

2,600.00
2,600.00

Org
75,000.00
Org
110,000.00
Sub - Upah

4,500.00
1,650.00
6,150.00 Rp
TOTAL Rp

6,150.00
6,150.00

Org
75,000.00
Org
110,000.00
Sub - Upah

3,750.00
2,750.00
6,500.00 Rp
TOTAL Rp

6,500.00
6,500.00

Org
75,000.00
Org
90,000.00
Org
105,000.00
Org
110,000.00
Sub - Upah

7,500.00
2,250.00
315.00
550.00
10,615.00 Rp
TOTAL Rp

10,615.00
10,615.00

Org
75,000.00
Org
110,000.00
Sub - Upah

7,500.00
550.00
8,050.00 Rp
TOTAL Rp

8,050.00
8,050.00

Org
75,000.00
Org
90,000.00
Org
105,000.00
Org
110,000.00
Sub - Upah

199,950.00
360,000.00
42,000.00
14,630.00
616,580.00 Rp
TOTAL Rp

616,580.00
616,580.00

Org
75,000.00
Org
110,000.00
Sub - Upah

300,000.00
44,000.00
344,000.00 Rp
TOTAL Rp

344,000.00
344,000.00

Org
75,000.00
Org
110,000.00
Sub - Upah

7,500.00
550.00
8,050.00 Rp
TOTAL Rp

8,050.00
8,050.00

Org
75,000.00
Org
110,000.00
Sub - Upah

2,250.00
330.00
2,580.00 Rp
TOTAL Rp

2,580.00
2,580.00

PEKERJAAN BETON

3.1.
1

BETON TIDAK BERTULANG


MEMBUAT 1 M3 BETON, mutu f'c = 7,4 Mpa (K 100)
(Slump 12 cm, w/c = 0,87)
Bahan : Semen PC
Pasir beton (BD 1400)
Kerikil / split (2-3 cm) (BD 1350)
Air
Upah

SNI-2008
247.00
869.00
999.00
215.00

Pekerja
Tukang batu
Kepala Tukang batu
Mandor

MEMBUAT 1 M3 BETON, mutu f'c = 7,4 Mpa (K 100)


(Slump 3-6 cm, w/c = 0,87)
Bahan : Semen PC
Pasir beton
Kerikil / split (2-3 cm)
Air

1.650
0.275
0.028
0.083

kg
1,300.00
kg
193.13
Kg
199.63
liter
100.00
Sub - Bahan
Org
75,000.00
Org
90,000.00
Org
100,000.00
Org
110,000.00
Sub - Upah

321,100.00
167,825.63
199,430.26
21,500.00
709,855.88
123,750.00
24,750.00
2,800.00
9,130.00
160,430.00
TOTAL

kg
1,300.00
kg
193.13
Kg
199.63
liter
100.00
Sub - Bahan

299,000.00
172,460.63
205,019.90
20,000.00
696,480.52

Rp

709,855.88

Rp
Rp

160,430.00
870,285.88

Rp

696,480.52

SNI-2008
230.00
893.00
1,027.00
200.00

RAB - 011

ANALISA HARGA SATUAN PEKERJAAN, BERDASARKAN SNI


NO.

URAIAN PEKERJAAN
Upah

1.200
0.200
0.020
0.060

ANALISA HARGA BAHAN & UPAH


sat
hrg. sat.
Total harga
Org
75,000.00
Org
90,000.00
Org
100,000.00
Org
110,000.00
Sub - Upah

90,000.00
18,000.00
2,000.00
6,600.00
116,600.00
TOTAL

kg
1,300.00
kg
193.13
Kg
199.63
liter
100.00
Sub - Bahan
Org
75,000.00
Org
90,000.00
Org
100,000.00
Org
110,000.00
Sub - Upah

358,800.00
159,907.50
202,025.45
21,500.00
742,232.95
123,750.00
24,750.00
2,800.00
9,130.00
160,430.00
TOTAL

kg
1,300.00
kg
193.13
Kg
199.63
liter
100.00
Sub - Bahan
Sub - Upah

388,700.00
154,306.88
203,023.60
21,500.00
767,530.47

Rp
Rp

116,600.00
813,080.52

276.00
828.00
1,012.00
215.00
1.650
0.275
0.028
0.083

Rp

742,232.95

Rp
Rp

160,430.00
902,662.95

Rp
Rp
Rp

767,530.47
160,430.00
927,960.47

Rp
Rp
Rp

797,494.16
160,430.00
957,924.16

Rp
Rp
Rp

826,092.79
160,430.00
986,522.79

Rp
Rp
Rp

826,092.79
160,430.00
986,522.79

Rp
Rp
Rp

861,757.95
160,430.00
1,022,187.95

Rp
Rp
Rp

886,217.77
160,430.00
1,046,647.77

TOTAL

Rp
Rp
Rp

893,740.24
160,430.00
1,054,170.24

570,700.00
129,393.75
200,827.67
21,500.00
922,421.42

Rp

922,421.42

SNI-2008
299.00
799.00
1,017.00
215.00

Sama dengan upah kerja beton K-125

TOTAL
5

MEMBUAT 1 M3 BETON, mutu f'c = 14,5 Mpa (K 175)


(Slump 12 cm, w/c = 0,66)
Bahan : Semen PC
Pasir beton
Kerikil / split (2-3 cm)
Air
Upah

SNI-2008
326.00
760.00
1,029.00
215.00

Sama dengan upah kerja beton K-125

kg
1,300.00
kg
193.13
Kg
199.63
liter
100.00
Sub - Bahan
Sub - Upah

423,800.00
146,775.00
205,419.16
21,500.00
797,494.16
TOTAL

MEMBUAT 1 M3 BETON, mutu f'c = 16,9 Mpa (K 200)


(Slump 12 cm, w/c = 0,61)
Bahan : Semen PC
Pasir beton
Kerikil / split (2-3 cm)
Air
Upah

SNI-2008
352.00
731.00
1,031.00
215.00

Sama dengan upah kerja beton K-125

kg
1,300.00
kg
193.13
Kg
199.63
liter
100.00
Sub - Bahan
Sub - Upah

457,600.00
141,174.38
205,818.42
21,500.00
826,092.79
TOTAL

MEMBUAT 1 M3 BETON, mutu f'c = 19,3 Mpa (K 225)


(Slump 12 cm, w/c = 0,58)
Bahan : Semen PC
Pasir beton
Kerikil / split (2-3 cm)
Air
Upah

SNI-2008
352.00
731.00
1,031.00
215.00

Sama dengan upah kerja beton K-125

kg
1,300.00
kg
193.13
Kg
199.63
liter
100.00
Sub - Bahan
Sub - Upah

457,600.00
141,174.38
205,818.42
21,500.00
826,092.79
TOTAL

MEMBUAT 1 M3 BETON, mutu f'c = 21,7 Mpa (K 250)


(Slump 12 cm, w/c = 0,56)
Bahan : Semen PC
Pasir beton
Kerikil / split (2-3 cm)
Air
Upah

SNI-2008
384.00
692.00
1,039.00
215.00

Sama dengan upah kerja beton K-125

kg
1,300.00
kg
193.13
Kg
199.63
liter
100.00
Sub - Bahan
Sub - Upah

499,200.00
133,642.50
207,415.45
21,500.00
861,757.95
TOTAL

MEMBUAT 1 M3 BETON, mutu f'c = 24,00 Mpa (K 275)


(Slump 12 cm, w/c = 0,53)
Bahan : Semen PC
Pasir beton
Kerikil / split (2-3 cm)
Air
Upah

SNI-2008
406.00
684.00
1,026.00
215.00

Sama dengan upah kerja beton K-125

kg
1,300.00
kg
193.13
Kg
199.63
liter
100.00
Sub - Bahan
Sub - Upah

527,800.00
132,097.50
204,820.27
21,500.00
886,217.77
TOTAL

10

MEMBUAT 1 M3 BETON, mutu f'c = 26,4 Mpa (K 300)


(Slump 12 cm, w/c = 0,52)
Bahan : Semen PC
Pasir beton
Kerikil / split (2-3 cm)
Air
Upah

11

SNI-2008
413.00
681.00
1,021.00
215.00

Sama dengan upah kerja beton K-125

MEMBUAT 1 M3 BETON, mutu f'c = 28,8 Mpa (K 325)


(Slump 12 cm, w/c = 0,49)
Bahan : Semen PC
Pasir beton
Kerikil / split (2-3 cm)
Air

HARGA SATUAN
PEKERJAAN

SNI-2008

Pekerja
Tukang batu
Kepala Tukang batu
Mandor

MEMBUAT 1 M3 BETON, mutu f'c = 12,2 Mpa (K 150)


(Slump 12 cm, w/c = 0,72)
Bahan : Semen PC
Pasir beton
Kerikil / split (2-3 cm)
Air
Upah

kfsn

Pekerja
Tukang batu
Kepala Tukang batu
Mandor

MEMBUAT 1 M3 BETON, mutu f'c = 9.8 Mpa (K 125)


(Slump 12 cm, w/c = 0,78)
Bahan : Semen PC
Pasir beton
Kerikil / split (2-3 cm)
Air
Upah

SNI

kg
1,300.00
kg
193.13
Kg
199.63
liter
100.00
Sub - Bahan
Sub - Upah

536,900.00
131,518.13
203,822.12
21,500.00
893,740.24

SNI-2008
439.00
670.00
1,006.00
215.00

RAB - 012

kg
1,300.00
kg
193.13
Kg
199.63
liter
100.00
Sub - Bahan

ANALISA HARGA SATUAN PEKERJAAN, BERDASARKAN SNI


NO.

URAIAN PEKERJAAN
Upah

12

kfsn

Pekerja
Tukang batu
Kepala Tukang batu
Mandor

MEMBUAT 1 M3 BETON, mutu f'c = 31,2 Mpa (K 350)


(Slump 12 cm, w/c = 0,48)
Bahan : Semen PC
Pasir beton
Kerikil / split (2-3 cm)
Air
Upah

SNI

2.100
0.350
0.035
0.105

ANALISA HARGA BAHAN & UPAH


sat
hrg. sat.
Total harga
Org
75,000.00
Org
90,000.00
Org
100,000.00
Org
110,000.00
Sub - Upah

157,500.00
31,500.00
3,500.00
11,550.00
204,050.00
TOTAL

kg
1,300.00
kg
193.13
Kg
199.63
liter
100.00
Sub - Bahan
Sub - Upah

570,700.00
129,393.75
200,827.67
21,500.00
922,421.42

439.00
670.00
1,006.00
215.00

Sama dengan upah kerja beton K-325

MEMBUAT 1 M3 BETON KEDAP AIR, dengan Strorok-100


Bahan : Semen PC
Pasir beton
Kerikil / split (2-3 cm)
Strorok-100
Air
Upah

400.00
0.48
0.80
1.20
210.00

Sama dengan upah kerja beton K-325

kg
1,300.00
m3
270,375.00
m3
269,500.35
kg
50,000.00
liter
100.00
Sub - Bahan
Sub - Upah

MEMBUAT 1 M' KOLOM PRAKTIS (11 x 11 cm)


Bahan : Semen PC
Pasir beton
Kerikil / split (2-3 cm)
Kayu kelas III (kayu papan Terentang)
Paku 5-12 cm
Besi beton polos
Kawat beton
:

4.000
0.006
0.009
0.002
0.010
3.000
0.045

Pekerja
Tukang batu
Tukang kayu
Tukang besi
Kepala Tukang batu
Mandor

MEMBUAT 1 M' RING BALOK PRAKTIS (11 x 15 cm)


Bahan : Semen PC
Pasir beton
Kerikil / split (2-3 cm)
Kayu kelas III (kayu papan Terentang)
Paku 5-12 cm
Besi beton polos
Kawat beton
Upah

520,000.00
129,780.00
215,600.28
60,000.00
21,000.00
946,380.28

0.180
0.020
0.020
0.020
0.006
0.009

kg
1,300.00
m3
270,375.00
m3
269,500.35
M3
3,045,000.00
Kg
15,356.25
Kg
13,125.00
Kg
20,212.50
Sub - Bahan
Org
75,000.00
Org
90,000.00
Org
90,000.00
Org
85,000.00
Org
100,000.00
Org
110,000.00
Sub - Upah

5,200.00
1,622.25
2,425.50
6,090.00
153.56
39,375.00
909.56
55,775.88
13,500.00
1,800.00
1,800.00
1,700.00
600.00
990.00
20,390.00
TOTAL
Harga/m3

Rp
Rp
Rp

946,380.28
204,050.00
1,150,430.28

Rp

55,775.88

Rp
Rp
Rp

20,390.00
76,165.88
6,294,700.67

kg
1,300.00
m3
270,375.00
m3
269,500.35
M3
3,045,000.00
Kg
15,356.25
Kg
13,125.00
Kg
20,212.50
Sub - Bahan
Org
75,000.00
Org
90,000.00
Org
90,000.00
Org
85,000.00
Org
100,000.00
Org
110,000.00
Sub - Upah

7,150.00
2,433.38
4,042.51
9,135.00
307.13
47,250.00
1,010.63
71,328.63
22,275.00
2,970.00
2,970.00
2,805.00
1,000.00
1,650.00
33,670.00
TOTAL
Harga/m3

Rp

71,328.63

Rp
Rp
Rp

33,670.00
104,998.63
6,363,553.35

M3
3,045,000.00
Kg
15,356.25
liter
35,000.00
Kg
13,125.00
Kg
20,212.50
kg
1,300.00
m3
270,375.00
m3
269,500.35
Sub - Bahan
Org
75,000.00
Org
90,000.00
Org
90,000.00
Org
85,000.00
Org
100,000.00
Org
110,000.00
Sub - Upah

822,150.00
30,712.50
21,000.00
2,756,250.00
60,637.50
436,800.00
146,002.50
218,295.28
4,491,847.78
423,750.00
24,750.00
140,400.00
119,000.00
32,300.00
31,130.00
771,330.00
TOTAL

Rp

4,491,847.78

Rp
Rp

771,330.00
5,263,177.78

M3
Kg
liter
Kg
Kg

609,000.00
23,034.38
14,000.00
2,067,187.50
45,478.13

SNI-2008
5.500
0.009
0.015
0.003
0.020
3.600
0.050

Pekerja
Tukang batu
Tukang kayu
Tukang besi
Kepala Tukang batu
Mandor

0.297
0.033
0.033
0.033
0.010
0.015

0.0165
MEMBUAT 1 M3 SLOOF BETON BERTULANG
(200 kg besi + bekisting)
Bahan : Kayu kelas III (kayu papan Terentang)
Paku 5-12 cm
Minyak bekisting
Besi beton polos
Kawat beton
Semen PC
Pasir beton
Kerikil / split (2-3 cm)
Upah

922,421.42
204,050.00
1,126,471.42

SNI-2008

0.0121

Rp
Rp
Rp

BETON BERTULANG (Lengkap)

Upah

204,050.00
1,126,471.42

SNI-2008

TOTAL

3.2.

Rp
Rp

SNI-2008

TOTAL
13

HARGA SATUAN
PEKERJAAN

SNI-2008
0.270
2.000
0.600
210.000
3.000
336.000
0.540
0.810

Pekerja
Tukang batu
Tukang kayu
Tukang besi
Kepala Tukang batu
Mandor

MEMBUAT 1 M3 PONDASI BETON BERTULANG


(150 kg besi + bekisting)
Bahan : Kayu kelas III (kayu papan Terentang)
Paku 5-12 cm
Minyak bekisting
Besi beton polos
Kawat beton

5.650
0.275
1.560
1.400
0.323
0.283

SNI-2008
0.200
1.500
0.400
157.500
2.250

RAB - 013

3,045,000.00
15,356.25
35,000.00
13,125.00
20,212.50

ANALISA HARGA SATUAN PEKERJAAN, BERDASARKAN SNI


NO.

URAIAN PEKERJAAN

SNI

kfsn

Semen PC
Pasir beton
Kerikil / split (2-3 cm)
Upah

5.300
0.275
1.300
1.050
0.262
0.265

0.400
4.000
2.000
315.000
4.500
336.000
0.540
0.810
0.150
3.500
20.000
7.050
0.275
1.650
2.100
0.403
0.353

436,800.00
146,002.50
218,295.28
3,559,797.78
397,500.00
24,750.00
117,000.00
89,250.00
26,200.00
29,150.00
683,850.00
TOTAL

M3
3,045,000.00
Kg
15,356.25
liter
35,000.00
Kg
13,125.00
Kg
20,212.50
kg
1,300.00
m3
270,375.00
m3
269,500.35
M3
3,360,000.00
lmbr
110,250.00
btg
36,750.00
Sub - Bahan
Org
75,000.00
Org
90,000.00
Org
90,000.00
Org
85,000.00
Org
100,000.00
Org
110,000.00
Sub - Upah

1,218,000.00
61,425.00
70,000.00
4,134,375.00
90,956.25
436,800.00
146,002.50
218,295.28
504,000.00
385,875.00
735,000.00
8,000,729.03
528,750.00
24,750.00
148,500.00
178,500.00
40,300.00
38,830.00
959,630.00
TOTAL

M3
3,045,000.00
Kg
15,356.25
liter
35,000.00
Kg
13,125.00
Kg
20,212.50
kg
1,300.00
m3
270,375.00
m3
269,500.35
M3
3,360,000.00
lmbr
110,250.00
btg
36,750.00
Sub - Bahan
Org
75,000.00
Org
90,000.00
Org
90,000.00
Org
85,000.00
Org
100,000.00
Org
110,000.00
Sub - Upah

1,218,000.00
61,425.00
70,000.00
3,445,312.50
90,956.25
436,800.00
146,002.50
218,295.28
504,000.00
385,875.00
735,000.00
7,311,666.53
528,750.00
24,750.00
148,500.00
148,750.00
40,300.00
38,830.00
929,880.00
TOTAL

M3
3,045,000.00
Kg
15,356.25
liter
35,000.00
Kg
13,125.00
Kg
20,212.50
kg
1,300.00
m3
270,375.00
m3
269,500.35
M3
3,360,000.00
lmbr
110,250.00
btg
36,750.00
Sub - Bahan
Org
75,000.00
Org
90,000.00
Org
90,000.00
Org
85,000.00
Org
100,000.00
Org
110,000.00
Sub - Upah

1,218,000.00
61,425.00
70,000.00
2,756,250.00
90,956.25
436,800.00
146,002.50
218,295.28
504,000.00
385,875.00
735,000.00
6,622,604.03
528,750.00
24,750.00
148,500.00
119,000.00
40,300.00
38,830.00
900,130.00
TOTAL

M3
Kg
liter
Kg
Kg

974,400.00
49,140.00
56,000.00
2,756,250.00
60,637.50

Rp

3,559,797.78

Rp
Rp

683,850.00
4,243,647.78

Rp

8,000,729.03

Rp
Rp

959,630.00
8,960,359.03

Rp

7,311,666.53

Rp
Rp

929,880.00
8,241,546.53

Rp

6,622,604.03

Rp
Rp

900,130.00
7,522,734.03

SNI-2008
0.400
4.000
2.000
262.500
4.500
336.000
0.540
0.810
0.150
3.500
20.000

Pekerja
Tukang batu
Tukang kayu
Tukang besi
Kepala Tukang batu
Mandor

7.050
0.275
1.650
1.750
0.403
0.353

SNI-2008
0.400
4.000
2.000
210.000
4.500
336.000
0.540
0.810
0.150
3.500
20.000

Pekerja
Tukang batu
Tukang kayu
Tukang besi
Kepala Tukang batu
Mandor

MEMBUAT 1 M3 "BALOK PLAT" BETON BERTULANG


(200 kg besi + bekisting)
Bahan : Kayu kelas III (kayu papan Terentang)
Paku 5-12 cm
Minyak bekisting
Besi beton polos
Kawat beton

kg
1,300.00
m3
270,375.00
m3
269,500.35
Sub - Bahan
Org
75,000.00
Org
90,000.00
Org
90,000.00
Org
85,000.00
Org
100,000.00
Org
110,000.00
Sub - Upah

HARGA SATUAN
PEKERJAAN

SNI-2008

Pekerja
Tukang batu
Tukang kayu
Tukang besi
Kepala Tukang batu
Mandor

MEMBUAT 1 M3 KOLOM BETON BERTULANG


(200 kg besi + bekisting)
Bahan : Kayu kelas III (kayu papan Terentang)
Paku 5-12 cm
Minyak bekisting
Besi beton polos
Kawat beton
Semen PC
Pasir beton
Kerikil / split (2-3 cm)
Kayu kelas II (kayu Meranti basah Balok)
Plywood/multiplex 9mm
Dolken kayu Galam, dia. 8-10cm, panjang 4m
Upah

MEMBUAT 1 M3 KOLOM BETON BERTULANG


(250 kg besi + bekisting)
Bahan : Kayu kelas III (kayu papan Terentang)
Paku 5-12 cm
Minyak bekisting
Besi beton polos
Kawat beton
Semen PC
Pasir beton
Kerikil / split (2-3 cm)
Kayu kelas II (kayu Meranti basah Balok)
Plywood/multiplex 9mm
Dolken kayu Galam, dia. 8-10cm, panjang 4m
Upah

5.b

Pekerja
Tukang batu
Tukang kayu
Tukang besi
Kepala Tukang batu
Mandor

MEMBUAT 1 M3 KOLOM BETON BERTULANG


(300 kg besi + bekisting)
Bahan : Kayu kelas III (kayu papan Terentang)
Paku 5-12 cm
Minyak bekisting
Besi beton polos
Kawat beton
Semen PC
Pasir beton
Kerikil / split (2-3 cm)
Kayu kelas II (kayu Meranti basah Balok)
Plywood/multiplex 9mm
Dolken kayu Galam, dia. 8-10cm, panjang 4m
Upah

5.a

336.000
0.540
0.810

ANALISA HARGA BAHAN & UPAH


sat
hrg. sat.
Total harga

7.050
0.275
1.650
1.400
0.403
0.353

SNI-2008
0.320
3.200
1.600
210.000
3.000

RAB - 014

3,045,000.00
15,356.25
35,000.00
13,125.00
20,212.50

ANALISA HARGA SATUAN PEKERJAAN, BERDASARKAN SNI


NO.

URAIAN PEKERJAAN

SNI

kfsn

Semen PC
Pasir beton
Kerikil / split (2-3 cm)
Kayu kelas II (kayu Meranti basah Balok)
Plywood/multiplex 9mm
Dolken kayu Galam, dia. 8-10cm, panjang 4m
Upah

6.350
0.275
1.650
1.400
0.333
0.318

0.320
3.200
1.600
157.500
2.250
336.000
0.540
0.810
0.120
2.800
32.000
5.300
0.275
1.300
1.050
0.265
0.265

436,800.00
146,002.50
218,295.28
470,400.00
308,700.00
588,000.00
6,064,625.28
476,250.00
24,750.00
148,500.00
119,000.00
33,300.00
34,980.00
836,780.00
TOTAL

M3
3,045,000.00
Kg
15,356.25
liter
35,000.00
Kg
13,125.00
Kg
20,212.50
kg
1,300.00
m3
270,375.00
m3
269,500.35
M3
3,360,000.00
lmbr
110,250.00
btg
36,750.00
Sub - Bahan
Org
75,000.00
Org
90,000.00
Org
90,000.00
Org
85,000.00
Org
100,000.00
Org
110,000.00
Sub - Upah

974,400.00
49,140.00
56,000.00
2,067,187.50
45,478.13
436,800.00
146,002.50
218,295.28
403,200.00
308,700.00
1,176,000.00
5,881,203.41
397,500.00
24,750.00
117,000.00
89,250.00
26,500.00
29,150.00
684,150.00
TOTAL

M3
3,045,000.00
Kg
15,356.25
liter
35,000.00
Kg
13,125.00
Kg
20,212.50
kg
1,300.00
m3
270,375.00
m3
269,500.35
M3
3,360,000.00
lmbr
110,250.00
btg
36,750.00
Sub - Bahan
Org
75,000.00
Org
90,000.00
Org
90,000.00
Org
85,000.00
Org
100,000.00
Org
110,000.00
Sub - Upah

974,400.00
49,140.00
56,000.00
2,067,187.50
45,478.13
436,800.00
146,002.50
218,295.28
403,200.00
308,700.00
1,176,000.00
5,881,203.41
397,500.00
24,750.00
117,000.00
89,250.00
26,500.00
29,150.00
684,150.00
TOTAL

M3
3,045,000.00
Kg
15,356.25
liter
35,000.00
Kg
13,125.00
Kg
20,212.50
kg
1,300.00
m3
270,375.00
m3
269,500.35
M3
3,360,000.00
lmbr
110,250.00
btg
36,750.00
Sub - Bahan
Org
75,000.00
Org
90,000.00
Org
90,000.00
Org
85,000.00
Org
100,000.00
Org
110,000.00
Sub - Upah

974,400.00
49,140.00
56,000.00
1,722,656.25
45,478.13
436,800.00
146,002.50
218,295.28
403,200.00
308,700.00
1,176,000.00
5,536,672.16
397,500.00
24,750.00
117,000.00
89,250.00
26,500.00
29,150.00
684,150.00
TOTAL

Rp

6,064,625.28

Rp
Rp

836,780.00
6,901,405.28

Rp

5,881,203.41

Rp
Rp

684,150.00
6,565,353.41

Rp

5,881,203.41

Rp
Rp

684,150.00
6,565,353.41

Rp

5,536,672.16

Rp
Rp

684,150.00
6,220,822.16

SNI-2008
0.320
3.200
1.600
157.500
2.250
336.000
0.540
0.810
0.120
2.800
32.000

Pekerja
Tukang batu
Tukang kayu
Tukang besi
Kepala Tukang batu
Mandor

5.300
0.275
1.300
1.050
0.265
0.265

SNI-2008
0.320
3.200
1.600
131.250
2.250
336.000
0.540
0.810
0.120
2.800
32.000

Pekerja
Tukang batu
Tukang kayu
Tukang besi
Kepala Tukang batu
Mandor

MEMBUAT 1 M3 "PLAT LANTAI" BETON BERTULANG

kg
1,300.00
m3
270,375.00
m3
269,500.35
M3
3,360,000.00
lmbr
110,250.00
btg
36,750.00
Sub - Bahan
Org
75,000.00
Org
90,000.00
Org
90,000.00
Org
85,000.00
Org
100,000.00
Org
110,000.00
Sub - Upah

HARGA SATUAN
PEKERJAAN

SNI-2008

Pekerja
Tukang batu
Tukang kayu
Tukang besi
Kepala Tukang batu
Mandor

MEMBUAT 1 M3 "PLAT LANTAI" BETON BERTULANG


(125 kg besi + bekisting)
Bahan : Kayu kelas III (kayu papan Terentang)
Paku 5-12 cm
Minyak bekisting
Besi beton polos
Kawat beton
Semen PC
Pasir beton
Kerikil / split (2-3 cm)
Kayu kelas II (kayu Meranti basah Balok)
Plywood/multiplex 9mm
Dolken kayu Galam, dia. 8-10cm, panjang 4m
Upah

8.b

MEMBUAT 1 M3 "PLAT LANTAI" BETON BERTULANG


(150 kg besi + bekisting)
Bahan : Kayu kelas III (kayu papan Terentang)
Paku 5-12 cm
Minyak bekisting
Besi beton polos
Kawat beton
Semen PC
Pasir beton
Kerikil / split (2-3 cm)
Kayu kelas II (kayu Meranti basah Balok)
Plywood/multiplex 9mm
Dolken kayu Galam, dia. 8-10cm, panjang 4m
Upah

8.a

Pekerja
Tukang batu
Tukang kayu
Tukang besi
Kepala Tukang batu
Mandor

MEMBUAT 1 M3 "PLAT LANTAI" BETON BERTULANG


(150 kg besi + bekisting)
Bahan : Kayu kelas III (kayu papan Terentang)
Paku 5-12 cm
Minyak bekisting
Besi beton polos
Kawat beton
Semen PC
Pasir beton
Kerikil / split (2-3 cm)
Kayu kelas II (kayu Meranti basah Balok)
Plywood/multiplex 9mm
Dolken kayu Galam, dia. 8-10cm, panjang 4m
Upah

336.000
0.540
0.810
0.140
2.800
16.000

ANALISA HARGA BAHAN & UPAH


sat
hrg. sat.
Total harga

5.300
0.275
1.300
1.050
0.265
0.265

SNI-2008

RAB - 015

ANALISA HARGA SATUAN PEKERJAAN, BERDASARKAN SNI


NO.

URAIAN PEKERJAAN

SNI

kfsn

(100 kg besi + bekisting)


Bahan : Kayu kelas III (kayu papan Terentang)
Paku 5-12 cm
Minyak bekisting
Besi beton polos
Kawat beton
Semen PC
Pasir beton
Kerikil / split (2-3 cm)
Kayu kelas II (kayu Meranti basah Balok)
Plywood/multiplex 9mm
Dolken kayu Galam, dia. 8-10cm, panjang 4m
Upah

Pekerja
Tukang batu
Kepala Tukang batu
Mandor

Kep. Tukang Batu


Tukang batu
Pekerja
Mandor

M3
3,045,000.00
Kg
15,356.25
liter
35,000.00
Kg
13,125.00
Kg
20,212.50
kg
1,300.00
m3
270,375.00
m3
269,500.35
M3
3,360,000.00
lmbr
110,250.00
btg
36,750.00
Sub - Bahan
Org
75,000.00
Org
90,000.00
Org
90,000.00
Org
85,000.00
Org
100,000.00
Org
110,000.00
Sub - Upah

974,400.00
49,140.00
56,000.00
1,378,125.00
45,478.13
436,800.00
146,002.50
218,295.28
403,200.00
308,700.00
1,176,000.00
5,192,140.91
397,500.00
24,750.00
117,000.00
89,250.00
26,500.00
29,150.00
684,150.00
TOTAL

M3
3,045,000.00
Kg
15,356.25
liter
35,000.00
Kg
13,125.00
Kg
20,212.50
kg
1,300.00
m3
270,375.00
m3
269,500.35
M3
3,360,000.00
lmbr
110,250.00
btg
36,750.00
Sub - Bahan
Org
75,000.00
Org
90,000.00
Org
90,000.00
Org
85,000.00
Org
100,000.00
Org
110,000.00
Sub - Upah

730,800.00
49,140.00
56,000.00
2,067,187.50
45,478.13
436,800.00
146,002.50
218,295.28
537,600.00
308,700.00
882,000.00
5,478,003.41
397,500.00
24,750.00
117,000.00
89,250.00
26,200.00
29,150.00
683,850.00
TOTAL

M3
3,045,000.00
Kg
15,356.25
liter
35,000.00
Kg
13,125.00
Kg
20,212.50
kg
1,300.00
m3
270,375.00
m3
269,500.35
M3
3,360,000.00
lmbr
110,250.00
btg
36,750.00
Sub - Bahan
Org
75,000.00
Org
90,000.00
Org
90,000.00
Org
85,000.00
Org
100,000.00
Org
110,000.00
Sub - Upah

761,250.00
46,068.75
42,000.00
2,756,250.00
60,637.50
436,800.00
146,002.50
218,295.28
352,800.00
275,625.00
882,000.00
5,977,729.03
423,750.00
24,750.00
140,400.00
119,000.00
32,300.00
31,130.00
771,330.00
TOTAL

m'
60,000.00
Sub - Bahan
Org
75,000.00
Org
90,000.00
Org
100,000.00
Org
110,000.00
Sub - Upah

63,000.00
63,000.00
5,250.00
3,150.00
400.00
440.00
9,240.00
TOTAL

kg
1,300.00
M3
270,375.00
Kg
286,125.00
ltr
100.00
Sub - Bahan
Org
100,000.00
Org
90,000.00
Org
75,000.00
Org
110,000.00
Sub - Upah

321,100.00
135,187.50
286,125.00
21,500.00
763,912.50
2,800.00
24,750.00
123,750.00
9,130.00
160,430.00

HARGA SATUAN
PEKERJAAN

Rp

5,192,140.91

Rp
Rp

684,150.00
5,876,290.91

Rp

5,478,003.41

Rp
Rp

683,850.00
6,161,853.41

Rp

5,977,729.03

Rp
Rp

771,330.00
6,749,059.03

Rp

63,000.00

Rp
Rp

9,240.00
72,240.00

Rp

763,912.50

Rp
Rp

160,430.00
924,342.50

SNI-2008
0.240
3.200
1.600
157.500
2.250
336.000
0.540
0.810
0.160
2.800
24.000
5.300
0.275
1.300
1.050
0.262
0.265

SNI-2008
0.250
3.000
1.200
210.000
3.000
336.000
0.540
0.810
0.105
2.500
24.000

Pekerja
Tukang batu
Tukang kayu
Tukang besi
Kepala Tukang batu
Mandor

PEK. BETON TUMBUK (1 : 3 : 5) / M3 (slump = 12 cm)


Bahan : Semen PC
Pasir beton
Koral beton
Air
Upah

5.300
0.275
1.300
1.050
0.265
0.265

Pekerja
Tukang batu
Tukang kayu
Tukang besi
Kepala Tukang batu
Mandor

MEMASANG 1M' PVC WATERSTOP, lebar 20 cm


Bahan : Waterstop lebar 20 cm
Upah

11

MEMBUAT 1 M3 "DINDING" BETON BERTULANG


(200 kg besi + bekisting)
Bahan : Kayu kelas III (kayu papan Terentang)
Paku 5-12 cm
Minyak bekisting
Besi beton polos
Kawat beton
Semen PC
Pasir beton
Kerikil / split (2-3 cm)
Kayu kelas II (kayu Meranti basah Balok)
Plywood/multiplex 9mm
Dolken kayu Galam, dia. 8-10cm, panjang 4m
Upah

10

Pekerja
Tukang batu
Tukang kayu
Tukang besi
Kepala Tukang batu
Mandor

MEMBUAT 1 M3 "DINDING" BETON BERTULANG


(150 kg besi + bekisting)
Bahan : Kayu kelas III (kayu papan Terentang)
Paku 5-12 cm
Minyak bekisting
Besi beton polos
Kawat beton
Semen PC
Pasir beton
Kerikil / split (2-3 cm)
Kayu kelas II (kayu Meranti basah Balok)
Plywood/multiplex 9mm
Dolken kayu Galam, dia. 8-10cm, panjang 4m
Upah

9.a

0.320
3.200
1.600
105.000
2.250
336.000
0.540
0.810
0.120
2.800
32.000

ANALISA HARGA BAHAN & UPAH


sat
hrg. sat.
Total harga

5.650
0.275
1.560
1.400
0.323
0.283

SNI-2008
1.05
0.070
0.035
0.004
0.004

247.000
0.500
1.000
215.000
0.028
0.275
1.650
0.083

RAB - 016

ANALISA HARGA SATUAN PEKERJAAN, BERDASARKAN SNI


NO.

URAIAN PEKERJAAN

SNI

kfsn

ANALISA HARGA BAHAN & UPAH


sat
hrg. sat.
Total harga
Lantai kerja tebal 5 cm

12

PEK. BETON SIKLUP SUMURAN / M3 (40% bt.belah + 60% beton 1:2:3)


Bahan : Semen PC
(beton)
Batu kali
Pasir beton
Koral beton
Besi beton
Kawat beton
Upah

13

14

untuk pembesian 75 kg

PEKERJAAN BEKISTING
MEMASANG 1 M2 BEKISTING untuk BALOK
Bahan : Kayu kelas III (Kayu Rimba Campuran)
Balok kayu kelas II (kayu Rimba Campuran)
Kayu Dolken (kayu Galam 8-10cm - 400cm
Plywood tebal 9 mm (122x244 cm)
Minyak bekisting
Paku 5-12 cm

Rp

598,710.00

Rp
Rp

121,230.00
1,752,252.50

Rp

821,992.79

Rp

342,200.00

Rp
Rp
Rp

994,481.25
202,050.00
2,360,724.04

Org
100,000.00
Org
90,000.00
Org
75,000.00
Org
110,000.00
Sub - Upah
Kg
13,125.00
M3
20,212.50
Sub - Bahan

4,000.00
36,000.00
300,000.00
2,200.00
342,200.00
984,375.00
10,106.25
994,481.25

M3
2,415,000.00
M3
2,415,000.00
btg
36,750.00
M2
110,250.00
liter
30,000.00
Kg
15,356.25
Sub - Bahan
Org
105,000.00
Org
90,000.00
Org
75,000.00
Org
110,000.00
Sub - Upah

96,600.00
43,470.00
73,500.00
38,587.50
6,000.00
6,142.50
264,300.00
3,465.00
29,700.00
49,500.00
3,630.00
86,295.00
TOTAL

Rp

264,300.00

Rp
Rp

86,295.00
350,595.00

M3
2,415,000.00
M3
2,415,000.00
btg
36,750.00
M2
110,250.00
liter
30,000.00
Kg
15,356.25
Sub - Bahan
Org
105,000.00
Org
90,000.00
Org
75,000.00
Org
110,000.00
Sub - Upah

96,600.00
36,225.00
73,500.00
38,587.50
6,000.00
6,142.50
257,055.00
3,465.00
29,700.00
49,500.00
3,630.00
86,295.00
TOTAL

Rp

257,055.00

Rp
Rp

86,295.00
343,350.00

M3
M3
btg

96,600.00
36,225.00
220,500.00

75.000
0.500

SNI-2008
0.040
0.018
2.000
0.350
0.200
0.400
0.033
0.330
0.660
0.033

SNI-2008
0.040
0.015
2.000
0.350
0.200
0.400

Kep. Tukang Kayu


Tukang kayu
Pekerja
Mandor

MEMASANG 1 M2 BEKISTING untuk PLAT LANTAI


Bahan : Kayu kelas III (Kayu Rimba Campuran)
Balok kayu kelas II (kayu Rimba Campuran)
Kayu Dolken (kayu Galam 8-10cm - 400cm

266,500.00

0.040
0.400
4.000
0.020

0.350
1.050
3.150
0.020

Kep. Tukang Kayu


Tukang kayu
Pekerja
Mandor

MEMASANG 1 M2 BEKISTING untuk KOLOM


Bahan : Kayu kelas III (Kayu Rimba Campuran)
Balok kayu kelas II (kayu Rimba Campuran)
Kayu Dolken (kayu Galam 8-10cm - 400cm
Plywood tebal 9 mm (122x244 cm)
Minyak bekisting
Paku 5-12 cm
Upah

Rp

455,000.00
146,002.50
220,990.29
821,992.79

100 kg pembesian (75%)


Kep. Tukang Besi
Tukang besi
Pekerja
Mandor

765,812.50

zak
65,000.00
M3
270,375.00
M3
269,500.35
Sub - Bahan

Upah

Upah

Rp

7.000
0.540
0.820

45.000
0.400

Besi beton (tul 8-20, 1 lps)


Kawat beton

358,700.00
2,642,776.00

31,500.00
89,250.00
236,250.00
2,200.00
359,200.00
269,400.00

Besi beton (45 kg)


Kawat beton

Bahan :
(besi)

Rp
Rp

Org
90,000.00
Org
85,000.00
Org
75,000.00
Org
110,000.00
Sub - Upah
Sub-Upah 100kg (75%)

Bahan :
(besi)

Kep. Tukang Batu


Tukang batu
Pekerja
Mandor

2,284,076.00

344,500.00
135,187.50
286,125.00
765,812.50
5,000.00
45,000.00
450,000.00
33,000.00
533,000.00
590,625.00
8,085.00
598,710.00

5.300
0.500
1.000
0.050
0.500
6.000
0.300

Rp

zak
65,000.00
M3
270,375.00
Kg
286,125.00
Sub - Bahan
Org
100,000.00
Org
90,000.00
Org
75,000.00
Org
110,000.00
Sub - Upah
Kg
13,125.00
M3
20,212.50
Sub - Bahan

3.400
0.850
0.085
0.170

BETON PLAT (diatas tanah) (1 : 2 : 3) + TUL. RINGAN / M3


Bahan : Semen PC
Pasir Beton
Split

46,217.13

252,200.00
123,480.00
84,357.00
133,906.50
1,653,750.00
36,382.50
2,284,076.00
255,000.00
76,500.00
8,500.00
18,700.00
358,700.00
TOTAL

Kep. Tukang Batu


Tukang batu
Pekerja
Mandor

Rp

Kg
1,300.00
M3
257,250.00
M3
270,375.00
M3
286,125.00
Kg
13,125.00
M3
20,212.50
Sub - Bahan
Org
75,000.00
Org
90,000.00
Org
100,000.00
Org
110,000.00
Sub - Upah

Upah :
50%

Upah

Pekerja
Tukang batu
Kep. Tukang Batu
Mandor

PEK. BETON LT. KERJA (1 : 3 : 5) + TUL. RINGAN / M3


Bahan : Semen PC
Pasir beton
Koral beton

Upah

3.3
1

SNI-2008
194.00
0.480
0.312
0.468
126.00
1.800

HARGA SATUAN
PEKERJAAN

0.033
0.330
0.660
0.033

SNI-2008
0.040
0.015
6.000

RAB - 017

2,415,000.00
2,415,000.00
36,750.00

ANALISA HARGA SATUAN PEKERJAAN, BERDASARKAN SNI


NO.

URAIAN PEKERJAAN

SNI

kfsn

Plywood tebal 9 mm (122x244 cm)


Minyak bekisting
Paku 5-12 cm
Upah

0.350
0.200
0.400

Sama dengan upah bekisting Kolom/balok

ANALISA HARGA BAHAN & UPAH


sat
hrg. sat.
Total harga
M2
110,250.00
liter
30,000.00
Kg
15,356.25
Sub - Bahan
Sub - Upah

38,587.50
6,000.00
6,142.50
404,055.00
TOTAL

MEMASANG 1 M2 BEKISTING untuk TANGGA


Bahan : Kayu kelas III (Kayu Rimba Campuran)
Balok kayu kelas II (kayu Rimba Campuran)
Kayu Dolken (kayu Galam 8-10cm - 400cm
Plywood tebal 9 mm (122x244 cm)
Minyak bekisting
Paku 5-12 cm
Upah

0.030
0.015
2.000
0.350
0.150
0.400

Sama dengan upah bekisting Kolom/balok

MEMASANG 1 M2 BEKISTING untuk DINDING


Bahan : Kayu kelas III (Kayu Rimba Campuran)
Balok kayu kelas II (kayu Rimba Campuran)
Kayu Dolken (kayu Galam 8-10cm - 400cm
Plywood tebal 9 mm (122x244 cm)
Minyak bekisting
Paku 5-12 cm
Formite/spacer/penjaga jarak bekisting
Upah

M3
2,415,000.00
M3
2,415,000.00
btg
36,750.00
M2
110,250.00
liter
30,000.00
Kg
15,356.25
Sub - Bahan
Sub - Upah

72,450.00
36,225.00
73,500.00
38,587.50
4,500.00
6,142.50
231,405.00

0.030
0.020
3.000
0.350
0.200
0.400
4.000

Sama dengan upah bekisting Kolom/balok

MEMASANG 1 M2 BEKISTING untuk PONDASI


Bahan : Kayu kelas III (Kayu Rimba Campuran)
Minyak bekisting
Paku 5-12 cm
Upah

Upah

0.040
0.300
0.100
0.026
0.260
0.520
0.026

M3
2,415,000.00
M3
2,415,000.00
btg
36,750.00
M2
110,250.00
liter
30,000.00
Kg
15,356.25
bh
10,000.00
Sub - Bahan
Sub - Upah

72,450.00
48,300.00
110,250.00
38,587.50
6,000.00
6,142.50
40,000.00
321,730.00

M3
2,415,000.00
liter
30,000.00
Kg
15,356.25
Sub - Bahan
Org
105,000.00
Org
90,000.00
Org
75,000.00
Org
110,000.00
Sub - Upah

96,600.00
9,000.00
1,535.63
107,135.63
2,730.00
23,400.00
39,000.00
2,860.00
67,990.00
TOTAL

0.045
0.300
0.100

M3
2,415,000.00
liter
30,000.00
Kg
15,356.25
Sub - Bahan
Org
105,000.00
Org
90,000.00
Org
75,000.00
Org
110,000.00
Sub - Upah

108,675.00
9,000.00
1,535.63
119,210.63
2,730.00
23,400.00
39,000.00
2,860.00
67,990.00
TOTAL

0.026
0.260
0.520
0.026

10.50
0.15

Pekerja
Tukang besi
Kep. Tukang Besi
Mandor

MEMASANG 10 Kg KABEL PRESSTRESED


POLOS/STARNDS
Bahan : Besi beton
Kawat beton
Upah

Kg
13,125.00
Kg
20,212.50
Sub - Bahan
Org
75,000.00
Org
85,000.00
Org
90,000.00
Org
110,000.00
Sub - Upah
SUB-TOTAL

137,812.50
3,031.88
140,844.38
5,250.00
5,950.00
630.00
440.00
12,270.00

0.070
0.070
0.007
0.004

10.50
0.10

Pekerja
Tukang besi
Kep. Tukang Besi
Mandor

MEMASANG 1 KG JARING KAWAT BAJA / WIRE MESH


Bahan : Jaring kawat baja dilas (wire mesh)
Kawat beton
Upah

Pekerja
Tukang besi
Kep. Tukang Besi
Mandor

321,730.00
86,295.00
408,025.00

Rp

107,135.63

Rp
Rp

67,990.00
175,125.63

Rp

119,210.63

Rp
Rp

67,990.00
187,200.63

Rp

140,844.38

Rp
Rp
Rp

12,270.00
153,114.38
15,311.44

Rp

139,833.75

Rp
Rp
Rp

8,780.00
148,613.75
14,861.38

Rp

13,760.63

Rp
Rp

4,290.00
18,050.63

bekisting 2x pakai

SNI-2008

0.050
0.050
0.005
0.003

Kg
13,125.00
Kg
20,212.50
Sub - Bahan
Org
75,000.00
Org
85,000.00
Org
90,000.00
Org
110,000.00
Sub - Upah
SUB-TOTAL

137,812.50
2,021.25
139,833.75
3,750.00
4,250.00
450.00
330.00
8,780.00
atau / KG

Rp
Rp
Rp

SNI-2008

atau / KG
2

231,405.00
86,295.00
317,700.00

SNI-2008

Kep. Tukang Kayu


Tukang kayu
Pekerja
Mandor

PEK. PEMBESIAN
PEMBESIAN (10 Kg) dengan besi polos atau ulir
Bahan : Besi beton
Kawat beton

Rp
Rp
Rp

SNI-2008

Kep. Tukang Kayu


Tukang kayu
Pekerja
Mandor

MEMASANG 1 M2 BEKISTING untuk SLOOF


Bahan : Kayu kelas III (Kayu Rimba Campuran)
Minyak bekisting
Paku 5-12 cm
Upah

3.4
1

404,055.00
86,295.00
490,350.00

SNI-2008

TOTAL
6

Rp
Rp
Rp

SNI-2008

TOTAL
5

HARGA SATUAN
PEKERJAAN

SNI-2008
1.02
0.05
0.025
0.025
0.002
0.001

RAB - 018

Kg
12,500.00
Kg
20,212.50
Sub - Bahan
Org
75,000.00
Org
85,000.00
Org
90,000.00
Org
110,000.00
Sub - Upah
SUB-TOTAL

12,750.00
1,010.63
13,760.63
1,875.00
2,125.00
180.00
110.00
4,290.00

ANALISA HARGA SATUAN PEKERJAAN, BERDASARKAN SNI


NO.

URAIAN PEKERJAAN

PEMBESIAN (115 Kg) / M3 BETON


Bahan : Besi beton
Kawat beton

SNI

kfsn

126.50
2.00

ANALISA HARGA BAHAN & UPAH


sat
hrg. sat.
Total harga

Kg
13,125.00
Kg
20,212.50
Sub - Bahan

1,660,312.50
40,425.00
1,700,737.50

Upah : Dasar upah / Kg, sama dengan upah besi 100 Kg


SUB-TOTAL
5

PEMBESIAN (125 Kg) / M3 BETON


Bahan : Besi beton
Kawat beton

137.50
2.00

Kg
13,125.00
Kg
20,212.50
Sub - Bahan

1,804,687.50
40,425.00
1,845,112.50

Upah : Dasar upah / Kg, sama dengan upah besi 100 Kg


SUB-TOTAL
6

PEMBESIAN (150 Kg) / M3 BETON


Bahan : Besi beton
Kawat beton

165.00
2.00

Kg
13,125.00
Kg
20,212.50
Sub - Bahan

2,165,625.00
40,425.00
2,206,050.00

Upah : Dasar upah / Kg, sama dengan upah besi 100 Kg


SUB-TOTAL
7

PEMBESIAN (175 Kg) / M3 BETON


Bahan : Besi beton
Kawat beton

192.50
2.00

Kg
13,125.00
Kg
20,212.50
Sub - Bahan

2,526,562.50
40,425.00
2,566,987.50

Upah : Dasar upah / Kg, sama dengan upah besi 100 Kg


SUB-TOTAL
8

PEMBESIAN (200 Kg) / M3 BETON


Bahan : Besi beton
Kawat beton

220.00
2.00

Kg
13,125.00
Kg
20,212.50
Sub - Bahan

2,887,500.00
40,425.00
2,927,925.00

Upah : Dasar upah / Kg, sama dengan upah besi 100 Kg


SUB-TOTAL
9

PEMBESIAN (225 Kg) / M3 BETON


Bahan : Besi beton
Kawat beton

247.50
2.00

Kg
13,125.00
Kg
20,212.50
Sub - Bahan

3,248,437.50
40,425.00
3,288,862.50

Upah : Dasar upah / Kg, sama dengan upah besi 100 Kg


SUB-TOTAL

10

PEMBESIAN (250 Kg) / M3 BETON


Bahan : Besi beton
Kawat beton

275.00
2.00

Kg
13,125.00
Kg
20,212.50
Sub - Bahan

3,609,375.00
40,425.00
3,649,800.00

Upah : Dasar upah / Kg, sama dengan upah besi 100 Kg


SUB-TOTAL
3.5.
3.5.1
1.

2.

3.5.2
1.

3.5.3
1.

3.5.4

3.5.5
1.

3.5.6

REKAPITULASI PEKERJAAN BETON TULANG


HARGA BETON TULANG PLAT DAK / M3, TBL. 12 CM
BETON PLAT DAK, TULANGAN 100 Kg /M3
A. BEKISTING
B. BETON, mutu f'c = 19,3 Mpa (K 225)
C. PEMBESIAN 100 KG

8.33
1.00
100.00

M2
M3
KG

490,350.00
986,522.79
15,311.44

4,086,250.00
986,522.79
1,531,143.75

BETON PLAT DAK, TULANGAN 100 Kg /M3


A. BEKISTING
B. BETON, mutu f'c = 19,3 Mpa (K 225)
C. PEMBESIAN 125 KG

8.33
1.00
125.00

M2
M3
KG

490,350.00
986,522.79
15,311.44

4,086,250.00
986,522.79
1,913,929.69

HARGA BETON TULANG BALOK PLAT / M3


BETON BALOK PLAT , TULANGAN 150 Kg /M3
A. HARGA BEKISTING
B. HARGA BETON 1Pc : 2Ps : 3Spl
C. HARGA PEMBESIAN (150 Kg)

HARGA SATUAN
PEKERJAAN

Rp
Rp
Rp

1,700,737.50
141,105.00
1,841,842.50

Rp
Rp
Rp

1,845,112.50
153,375.00
1,998,487.50

Rp
Rp
Rp

2,206,050.00
184,050.00
2,390,100.00

Rp
Rp
Rp

2,566,987.50
214,725.00
2,781,712.50

Rp
Rp
Rp

2,927,925.00
245,400.00
3,173,325.00

Rp
Rp
Rp

3,288,862.50
276,075.00
3,564,937.50

Rp
Rp
Rp

3,649,800.00
306,750.00
3,956,550.00

Rp

6,603,916.54

Rp

6,986,702.48

0.00
0.00
0.00

HARGA BETON TULANG KOLOM / M3


BETON KOLOM, TULANGAN 150 Kg / M3
A. HARGA BEKISTING
B. HARGA BETON 1Pc : 2Ps : 3Spl
C. HARGA PEMBESIAN (150 Kg)

Rp

Rp

Rp

Rp

0.00
0.00
0.00

BETON BALOK TEA-BEAM / M3


A. HARGA BEKISTING
B. HARGA BETON 1Pc : 2Ps : 3Spl
C. HARGA PEMBESIAN (175 Kg), 6 d 13 + d8-200

0.00
0.00
0.00

HARGA BETON TULANG PND. POER / M3


BETON PONDASI POER, TULANGAN 100 Kg / M3
A. HARGA BEKISTING
B. HARGA BETON 1Pc : 2Ps : 3Spl
C. HARGA PEMBESIAN (100 Kg)

0.00
0.00
0.00

HARGA BETON TULANG JEMBATAN MASUK / M3

RAB - 019

ANALISA HARGA SATUAN PEKERJAAN, BERDASARKAN SNI


NO.

URAIAN PEKERJAAN
1

IV.

SNI

kfsn

BETON JEMBATAN BETON MASUK, TULANGAN 150 Kg / M3


A. BEKISTING
B. BETON, mutu f'c = 19,3 Mpa (K 225)
C. PEMBESIAN 125 KG

6.67
1.00
150.00

ANALISA HARGA BAHAN & UPAH


sat
hrg. sat.
Total harga

M2
M3
KG

490,350.00
986,522.79
15,311.44

HARGA SATUAN
PEKERJAAN

3,269,000.00
986,522.79
2,296,715.63
Rp

6,552,238.42

Rp

434,574.00

Rp
Rp

101,790.00
536,364.00

Rp

699,885.63

Rp
Rp

195,750.00
895,635.63

Rp
Rp
Rp

658,465.00
195,750.00
854,215.00

Rp
Rp
Rp

629,728.00
195,750.00
825,478.00

Rp
Rp
Rp

609,535.13
195,750.00
805,285.13

Rp
Rp
Rp

581,833.00
195,750.00
777,583.00

Rp
Rp
Rp

465,780.00
195,750.00
661,530.00

Rp

165,960.00

Rp
Rp

68,300.00
234,260.00

Rp
Rp
Rp

155,161.38
68,300.00
223,461.38

PEK. PASANGAN

4.1.

PAS. AANSTAMPENG BATU KALI


Bahan : Batu kali
Pasir urug
Upah

4.2.
1

1.200
0.432

Pekerja
Tukang batu
Kep. Tukang Batu
Mandor

PEK. PONDASI BT. KALI


PEK. PONDASI BT. KALI 1Pc : 3Ps
Bahan : Semen PC
Batu kali
Pasir pasang
Upah

SNI-2008

0.780
0.390
0.039
0.039

SNI-2008

Pekerja
Tukang batu
Kep. Tukang Batu
Mandor

PEK. PONDASI BT. KALI 1Pc : 4Ps


Bahan : Semen PC
Batu kali
Pasir pasang

202.000
1.200
0.485
1.500
0.750
0.075
0.075

SNI-2008

163.000
1.200
0.520

M3
257,250.00
308,700.00
M3
291,375.00
125,874.00
Sub - Bahan
434,574.00
Org
75,000.00
58,500.00
Org
90,000.00
35,100.00
Org
100,000.00
3,900.00
Org
110,000.00
4,290.00
Sub - Upah
101,790.00
Total Harga Pond. Bt. Kali 1Pc : 3Ps / m3

Kg
1,300.00
262,600.00
M3
257,250.00
308,700.00
M3
265,125.00
128,585.63
Sub - Bahan
699,885.63
Org
75,000.00
112,500.00
Org
90,000.00
67,500.00
Org
100,000.00
7,500.00
Org
110,000.00
8,250.00
Sub - Upah
195,750.00
Total Harga Pond. Bt. Kali 1Pc : 3Ps / m3
Kg
1,300.00
M3
257,250.00
M3
265,125.00
Sub - Bahan

211,900.00
308,700.00
137,865.00
658,465.00

Upah : sama dengan upah Pond. 1Pc : 3Ps


Total Harga Pond. Bt. Kali 1Pc : 4Ps / m3
3

PEK. PONDASI BT. KALI 1Pc : 5Ps


Bahan : Semen PC
Batu kali
Pasir pasang

SNI-2008
136.000
1.200
0.544

Kg
1,300.00
M3
257,250.00
M3
265,125.00
Sub - Bahan

176,800.00
308,700.00
144,228.00
629,728.00

Upah : sama dengan upah Pond. 1Pc : 3Ps


Total Harga Pond. Bt. Kali 1Pc : 5Ps / m3
4

PEK. PONDASI BT. KALI 1Pc : 6Ps


Bahan : Semen PC
Batu kali
Pasir pasang

SNI-2008
117.000
1.200
0.561

Kg
1,300.00
M3
257,250.00
M3
265,125.00
Sub - Bahan

152,100.00
308,700.00
148,735.13
609,535.13

Upah : sama dengan upah Pond. 1Pc : 3Ps


Total Harga Pond. Bt. Kali 1Pc : 5Ps / m3
5

PEK. PONDASI BT. KALI 1Pc : 8Ps


Bahan : Semen PC
Batu kali
Pasir pasang

SNI-2008
91.000
1.200
0.584

Kg
1,300.00
M3
257,250.00
M3
265,125.00
Sub - Bahan

118,300.00
308,700.00
154,833.00
581,833.00

Upah : sama dengan upah Pond. 1Pc : 3Ps


Total Harga Pond. Bt. Kali 1Pc : 5Ps / m3
6

PEK. PONDASI BT. KALI 1KP : 1SM : 2Ps


Bahan : Kapur padam
Semen Merah
Batu kali
Pasir pasang

SNI-2008
0.170
0.170
1.200
0.340

M3
210,000.00
M3
183,750.00
M3
257,250.00
M3
265,125.00
Sub - Bahan

35,700.00
31,237.50
308,700.00
90,142.50
465,780.00

Upah : sama dengan upah Pond. 1Pc : 3Ps


Total Harga Pond. Bt. Kali 1Pc : 5Ps / m3

4.3.
1

PEK. DINDING BATA MERAH (1 Batu)


PEK. DINDING BATA MERAH (1 Batu), 1Pc : 2Ps / M2
Bahan : Semen PC
Batu bata uk. 5 x 11 x 22 cm
Pasir pasang
Upah

43.500
140.00
0.080

Pekerja
Tukang batu
Kep. Tukang Batu
Mandor

PEK. DINDING BATA MERAH (1 Batu), 1Pc : 3Ps / M2


Bahan : Semen PC
Batu bata uk. 5 x 11 x 22 cm
Pasir pasang
Upah

SNI-2008

0.600
0.200
0.020
0.030

kg
1,300.00
56,550.00
Bh
630.00
88,200.00
M3
265,125.00
21,210.00
Sub - Bahan
165,960.00
Org
75,000.00
45,000.00
Org
90,000.00
18,000.00
Org
100,000.00
2,000.00
Org
110,000.00
3,300.00
Sub - Upah
68,300.00
Total harga / M2

SNI-2008
32.950
140.00
0.091

Sama dengan upah pas 1Pc : 2Ps

RAB - 020

kg
1,300.00
42,835.00
Bh
630.00
88,200.00
M3
265,125.00
24,126.38
Sub - Bahan
155,161.38
Sub - Upah
Total harga / M2

ANALISA HARGA SATUAN PEKERJAAN, BERDASARKAN SNI


NO.

URAIAN PEKERJAAN
3

PEK. DINDING BATA MERAH (1 Batu), 1Pc : 4Ps / M2


Bahan : Semen PC
Batu bata uk. 5 x 11 x 22 cm
Pasir pasang
Upah

18.950
70.00
0.038
0.300
0.100
0.010
0.015

14.370
70.00
0.040

kg
1,300.00
28,860.00
Bh
630.00
88,200.00
M3
265,125.00
27,042.75
Sub - Bahan
144,102.75
Sub - Upah
Total harga / M2

Rp
Rp
Rp

144,102.75
68,300.00
212,402.75

kg
1,300.00
24,050.00
Bh
630.00
88,200.00
M3
265,125.00
32,345.25
Sub - Bahan
144,595.25
Sub - Upah
Total harga / M2

Rp
Rp
Rp

144,595.25
68,300.00
212,895.25

Rp

78,809.75

Rp
Rp

34,150.00
112,959.75

kg
1,300.00
18,681.00
Bh
630.00
44,100.00
M3
265,125.00
10,605.00
Sub - Bahan
73,386.00
Sub - Upah
Total harga / M2

Rp
Rp
Rp

73,386.00
34,150.00
107,536.00

kg
1,300.00
14,950.00
Bh
630.00
44,100.00
M3
265,125.00
11,400.38
Sub - Bahan
70,450.38
Sub - Upah
Total harga / M2

Rp
Rp
Rp

70,450.38
34,150.00
104,600.38

kg
1,300.00
12,584.00
Bh
630.00
44,100.00
M3
265,125.00
11,930.63
Sub - Bahan
68,614.63
Sub - Upah
Total harga / M2

Rp
Rp
Rp

68,614.63
34,150.00
102,764.63

kg
1,300.00
10,816.00
Bh
630.00
44,100.00
M3
265,125.00
12,991.13
Sub - Bahan
67,907.13
Sub - Upah
Total harga / M2

Rp
Rp
Rp

67,907.13
34,150.00
102,057.13

kg
1,300.00
8,450.00
Bh
630.00
44,100.00
M3
265,125.00
13,256.25
Sub - Bahan
65,806.25
Sub - Upah
Total harga / M2

Rp
Rp
Rp

65,806.25
34,150.00
99,956.25

Rp

66,356.25

Rp
Rp

34,150.00
100,506.25

kg
1,300.00
24,635.00
Bh
630.00
44,100.00
M3
265,125.00
10,074.75
Sub - Bahan
78,809.75
Org
75,000.00
22,500.00
Org
90,000.00
9,000.00
Org
100,000.00
1,000.00
Org
110,000.00
1,650.00
Sub - Upah
34,150.00
Total harga / M2

SNI-2008
11.500
70.00
0.043

SNI-2008
9.680
70.00
0.045

SNI-2008
8.320
70.00
0.049

SNI-2008
6.500
70.00
0.050

SNI-2008
4.500
0.015
0.050
70.00

Pekerja
Tukang batu
Kep. Tukang Batu
Mandor

DINDING BATA MERAH (1/2 Batu), 1KP : 1SM : 1Ps / M2

147,371.63
68,300.00
215,671.63

SNI-2008

Sama dengan upah pas 1Pc : 2Ps

DINDING BATA MERAH (1/2 Batu), 1Pc : 3KP : 10Ps / M2


Bahan : Semen PC
Kapur Padam
Pasir pasang
Batu bata uk. 5 x 11 x 22 cm
Upah

Rp
Rp
Rp

SNI-2008

Sama dengan upah pas 1Pc : 2Ps

PEK. DINDING BATA MERAH (1/2 Batu), 1Pc : 8Ps / M2


Bahan : Semen PC
Batu bata uk. 5 x 11 x 22 cm
Pasir pasang
Upah

18.500
140.00
0.122

Sama dengan upah pas 1Pc : 2Ps

PEK. DINDING BATA MERAH (1/2 Batu), 1Pc : 6Ps / M2


Bahan : Semen PC
Batu bata uk. 5 x 11 x 22 cm
Pasir pasang
Upah

kg
1,300.00
34,515.00
Bh
630.00
88,200.00
M3
265,125.00
24,656.63
Sub - Bahan
147,371.63
Sub - Upah
Total harga / M2

SNI-2008

Sama dengan upah pas 1Pc : 2Ps

PEK. DINDING BATA MERAH (1/2 Batu), 1Pc : 5Ps / M2


Bahan : Semen PC
Batu bata uk. 5 x 11 x 22 cm
Pasir pasang
Upah

22.200
140.00
0.102

Sama dengan upah pas 1Pc : 2Ps

PEK. DINDING BATA MERAH (1/2 Batu), 1Pc : 4Ps / M2


Bahan : Semen PC
Batu bata uk. 5 x 11 x 22 cm
Pasir pasang
Upah

HARGA SATUAN
PEKERJAAN

SNI-2008

Pekerja
Tukang batu
Kep. Tukang Batu
Mandor

PEK. DINDING BATA MERAH (1/2 Batu), 1Pc : 3Ps / M2


Bahan : Semen PC
Batu bata uk. 5 x 11 x 22 cm
Pasir pasang
Upah

26.550
140.00
0.093

Sama dengan upah pas 1Pc : 2Ps

PEK. DINDING BATA MERAH (1/2 Batu)


PEK. DINDING BATA MERAH (1/2 Batu), 1Pc : 2Ps / M2
Bahan : Semen PC
Batu bata uk. 5 x 11 x 22 cm
Pasir pasang
Upah

ANALISA HARGA BAHAN & UPAH


sat
hrg. sat.
Total harga

SNI-2008

Sama dengan upah pas 1Pc : 2Ps

PEK. DINDING BATA MERAH (1 Batu), 1Pc : 6Ps / M2


Bahan : Semen PC
Batu bata uk. 5 x 11 x 22 cm
Pasir pasang
Upah

4.4.
1

kfsn

Sama dengan upah pas 1Pc : 2Ps

PEK. DINDING BATA MERAH (1 Batu), 1Pc : 5Ps / M2


Bahan : Semen PC
Batu bata uk. 5 x 11 x 22 cm
Pasir pasang
Upah

SNI

0.300
0.100
0.010
0.015

SNI-2008

RAB - 021

kg
1,300.00
5,850.00
M3
210,000.00
3,150.00
M3
265,125.00
13,256.25
Bh
630.00
44,100.00
Sub - Bahan
66,356.25
Org
75,000.00
22,500.00
Org
90,000.00
9,000.00
Org
100,000.00
1,000.00
Org
110,000.00
1,650.00
Sub - Upah
34,150.00
Total harga / M2

ANALISA HARGA SATUAN PEKERJAAN, BERDASARKAN SNI


NO.

URAIAN PEKERJAAN

4.5.
1

Bahan :

Semen Merah
Kapur Padam
Pasir pasang
Batu bata uk. 5 x 11 x 22 cm

Upah

Sama dengan upah pas 1Pc : 2Ps

PEK. DINDING "HEBEL


PEK. DINDING "HEBEL" (tbl 10 cm) 1Pc : 3Ps / M2
Bahan : Semen PC (ambil koefisien pas bata 1Pc : 3Ps)
Batu bata ringan (ex Hebel), 10x16x60 cm
Pasir pasang (keofesien diragukan)
Upah

14.370
8.340
0.0728
0.350
0.150
0.015
0.018

0.728

14.370
8.340
0.0728

Sama dengan upah pas Hebel 10 cm

8.500
3.200

Pekerja
Tukang batu
Kep. Tukang Batu
Mandor

0.300
0.150
0.015
0.015

8.500
2.400

Sama dengan upah pas Hebel 10 cm

Pekerja
Tukang batu
Kep. Tukang Batu
Mandor

PEK. DINDING GLASSBLOCK / M2


Bahan : Semen PC (ambil koefisien pas bata 1Pc : 3Ps)
Glassblock 20/20
Pasir pasang (keofesien diragukan)
Upah

4.8.

0.728

Pekerja
Tukang batu
Kep. Tukang Batu
Mandor

PEK. DINDING BATACO 1Pc : 3Ps / M2


Bahan : Semen PC (ambil koefisien pas bata 1Pc : 3Ps)
Bataco semen, 10x19x40 cm
Pasir pasang (keofesien diragukan)
Upah

4.7.

0.018
0.018
0.018
70.00

PEK. DINDING "HEBEL" (tbl 7 cm), perekat Mortar / M2


Bahan : Batu bata ringan (ex Hebel), 7x16x60 cm
Perekat PM-100 / MU-100 (perekat)
Upah

4.6.

kfsn

PEK. DINDING "HEBEL" (tbl 10 cm), perekat Mortar / M2


Bahan : Batu bata ringan (ex Hebel), 10x16x60 cm
Perekat PM-100 / MU-100 (perekat)
Upah

PEK. DINDING "HEBEL" (tbl 7 cm) 1Pc : 3Ps / M2


Bahan : Semen PC (ambil koefisien pas bata 1Pc : 3Ps)
Batu bata ringan (ex Hebel), 7x16x60 cm
Pasir pasang (keofesien diragukan)
Upah

SNI

Pekerja
Tukang batu
Kep. Tukang Batu
Mandor

PEK. DINDING BATA KRAWANG / M2


Bahan : Semen PC
Rooster bata merah 12x24x24 cm
Pasir pasang

0.728

14.370
12.50
0.0728
0.350
0.150
0.015
0.018

14.370
25.000
0.0420
0.350
0.150
0.015
0.018

0.420
16.000
0.050

ANALISA HARGA BAHAN & UPAH


sat
hrg. sat.
Total harga
m3
183,750.00
3,307.50
M3
210,000.00
3,780.00
M3
265,125.00
4,772.25
Bh
630.00
44,100.00
Sub - Bahan
55,959.75
Sub - Upah
Total harga / M2

kg
1,300.00
18,681.00
bh
8,542.80
71,246.95
M3
265,125.00
19,301.10
Sub - Bahan
109,229.05
Org
75,000.00
26,250.00
Org
90,000.00
13,500.00
Org
100,000.00
1,500.00
Org
110,000.00
1,980.00
Sub - Upah
43,230.00
Total harga / M2
kg
1,300.00
18,681.00
bh
5,979.96
49,872.87
M3
265,125.00
19,301.10
Sub - Bahan
87,854.97
Sub - Upah
Total harga / M2

bh
8,542.80
72,613.80
kg
1,575.00
5,040.00
Sub - Bahan
77,653.80
Org
75,000.00
22,500.00
Org
90,000.00
13,500.00
Org
100,000.00
1,500.00
Org
110,000.00
1,650.00
Sub - Upah
39,150.00
Total harga / M2
bh
5,979.96
50,829.66
M3
1,575.00
3,780.00
Sub - Bahan
54,609.66
Sub - Upah
Total harga / M2

PEK. DINDING ALLUMUNIUM COMPOSIT PANEL (ACP) / M2


Bahan : Allumunium Composit Panel (ACP)
Rangka allumunium hollow
Paku skrup
Sealant
Upah

4.10.

Pekerja
Tukang allumunium
Kep. Tukang
Mandor

PEK. CURTAINWALL KACA / M2


(Diambil sample 20x20 m = 400 m2)
Bahan : Curtainwall Transom Hitam (horizontal)

1.0000
5.000
0.580
0.8000
1.500
1.500
0.150
0.600

280.00

RAB - 022

Rp
Rp
Rp

55,959.75
34,150.00
90,109.75

Rp

109,229.05

Rp
Rp

43,230.00
152,459.05

Rp
Rp
Rp

87,854.97
43,230.00
131,084.97

Rp

77,653.80

Rp
Rp

39,150.00
116,803.80

Rp
Rp
Rp

54,609.66
39,150.00
93,759.66

kg
1,300.00
Bh
4,200.00
M3
265,125.00
Sub - Bahan
Org
75,000.00
Org
90,000.00
Org
100,000.00
Org
110,000.00
Sub - Upah

18,681.00
52,500.00
19,301.10
90,482.10 Rp
26,250.00
13,500.00
1,500.00
1,980.00
43,230.00 Rp
T O T A L Rp

kg
1,300.00
Bh
31,500.00
M3
265,125.00
Sub - Bahan
Org
75,000.00
Org
90,000.00
Org
100,000.00
Org
110,000.00
Sub - Upah

18,681.00
787,500.00
11,135.25
817,316.25 Rp
26,250.00
13,500.00
1,500.00
1,980.00
43,230.00 Rp
T O T A L Rp

zak
65,000.00
Bh
5,075.70
M3
265,125.00
Sub - Bahan

Upah : sama dg upah pas glassblok

4.9.

HARGA SATUAN
PEKERJAAN

27,300.00
81,211.20
13,256.25
121,767.45

Rp
Rp
T O T A L Rp

m2
400,000.00
400,000.00
m'
12,500.00
62,500.00
kg
45,000.00
26,100.00
m'
8,531.25
6,825.00
Sub - Bahan
495,425.00
Org
75,000.00
112,500.00
Org
100,000.00
150,000.00
Org
90,000.00
13,500.00
Org
110,000.00
66,000.00
Sub - Upah
342,000.00
Total harga / M2

m'

157,500.00

44,100,000.00

90,482.10

43,230.00
133,712.10

817,316.25

43,230.00
860,546.25

121,767.45
43,230.00
164,997.45

Rp

495,425.00

Rp
Rp

239,400.00
734,825.00

ANALISA HARGA SATUAN PEKERJAAN, BERDASARKAN SNI


NO.

URAIAN PEKERJAAN

SNI

kfsn

Curtainwall Mulion Hitam (vertical)


Frame Allumunium Casement Jendela
Kaca Stopsol 8mm
Sealant

V.

ANALISA HARGA BAHAN & UPAH


sat
hrg. sat.
Total harga

m'
189,000.00
45,360,000.00
m'
105,000.00
0.00
400.00
m'
708,750.00 283,500,000.00
520.00
m'
8,531.25
4,436,250.00
Nilai harga untuk seluas 400m2
377,396,250.00
Total harga / M2

HARGA SATUAN
PEKERJAAN

240.00

Rp
Rp

377,396,250.00
943,490.63

PEKERJAAN BAJA
1

MEMASANG BESI PROFIL / KG


Bahan : Besi profil (besi siku)
Upah :
50%

kg

0.060
0.060
0.006
0.003

Org
Org
Org
Org

Sewa Alat

0.800

jam

15.000
32.800
0.050

kg
kg
kg

16,623.65
16,623.65 Rp
4,500.00
6,000.00
540.00
330.00
11,370.00 Rp
T O T A L Rp

13,125.00
Sub - Bahan
75,000.00
100,000.00
90,000.00
110,000.00
Sub - Upah

15,093.75
15,093.75 Rp
4,500.00
6,000.00
540.00
330.00
11,370.00 Rp
T O T A L Rp

16,623.65

5,685.00
22,308.65

15,093.75

5,685.00
20,778.75

1.050
1.050
0.105
0.052

Org
Org
Org
Org

4,500.00
35,000.00
Sub - Bahan
75,000.00
85,000.00
90,000.00
110,000.00
Sub - Upah
50,000.00

4,500.00
3,500.00
8,000.00
7,500.00
8,500.00
90.00
550.00
16,640.00
40,000.00
T O T A L
Biaya untuk perakitan / kg

Rp

8,000.00

Rp
Rp
Rp
Rp

16,640.00
40,000.00
64,640.00
646.40

SNI-2008

Pekerja
Tukang Las konstruksi
Kepala tukang
Mandor

14,455.35
15,750.00
31,500.00
Sub - Bahan
75,000.00
100,000.00
90,000.00
110,000.00
Sub - Upah

216,830.25
516,600.00
1,575.00
735,005.25 Rp
78,750.00
105,000.00
9,450.00
5,720.00
198,920.00 Rp
T O T A L Rp

735,005.25

198,920.00
933,925.25

SNI-2008
0.400
0.300
0.040

kg
liter
liter

Pekerja
Tukang Las konstruksi
Kepala tukang
Mandor

0.040
0.020
0.002
0.002

Org
Org
Org
Org

Sewa Alat

0.170

jam

1.000

M2

1.200
1.200
0.120
0.006

Org
Org
Org
Org

31,500.00
4,500.00
35,000.00
Sub - Bahan
75,000.00
100,000.00
90,000.00
110,000.00
Sub - Upah
50,000.00

12,600.00
1,350.00
1,400.00
15,350.00
3,000.00
2,000.00
180.00
220.00
5,400.00
8,500.00
T O T A L
Biaya untuk 1m pengelasan

Rp

15,350.00

Rp
Rp
Rp
Rp

5,400.00
8,500.00
29,250.00
292,500.00

SNI-2008

Pekerja
Tukang Las konstruksi
Kepala tukang
Mandor

450,000.00
Sub - Bahan
75,000.00
100,000.00
90,000.00
110,000.00
Sub - Upah

450,000.00
450,000.00 Rp
90,000.00
120,000.00
10,800.00
660.00
221,460.00 Rp
T O T A L Rp

300,000.00
Sub - Bahan
75,000.00
100,000.00
90,000.00
110,000.00
Sub - Upah

300,000.00
300,000.00 Rp
6,000.00
80,000.00
7,200.00
440.00
93,640.00 Rp
T O T A L Rp

450,000.00

221,460.00
671,460.00

SNI-2008

Pekerja
Tukang Allumunium
Kepala tukang
Mandor

Pekerja
Tukang Allumunium
Kepala tukang
Mandor

14,455.35
Sub - Bahan
75,000.00
100,000.00
90,000.00
110,000.00
Sub - Upah

SNI-2008

Org
Org
Org
Org

MEMASANG ROLLING ALLUMUNIUM / M2


Bahan : Rolling Door Allumunium
Upah

1.150

0.100
0.100
0.001
0.005

MEMASANG SUNSCREEN ALLUMUNIUM / M2


Bahan : Sunscreen allumunium
Upah

Org
Org
Org
Org

Pekerja
Tukang besi konstruksi
Kepala tukang
Mandor

MEMASANG PINTU ROLLING DOOR BESI / M2


Bahan : Pintu gulung besi
Upah

0.060
0.060
0.006
0.003

liter
liter

PEK. PENGELASAN 10 CM, dengan Las listrik


Bahan : Kawat las listrik
Solar
Minyak pelumas
Upah

kg

1.000
0.100

PEK. PINTU BESI DOUBLE PLAT 2MM, RANGKA SIKU / M2


Bahan : Besi siku 30x30x3mm
Besi plat baja
Kawat Las
Upah

1.150

SNI-2008

Pekerja
Tukang Las konstruksi
Kepala tukang
Mandor

MENGERJAKAN 100 KG PEK. PERAKITAN


Bahan : Solar
Minyak pelumas
Upah

Pekerja
Tukang Las konstruksi
Kepala tukang
Mandor

MEMASANG BESI BAJA IWF / KG


Bahan : Besi baja IWF
Upah :
50%

SNI-2008

1.000

M2

0.080
0.800
0.080
0.004

Org
Org
Org
Org

300,000.00

93,640.00
393,640.00

SNI-2008
1.000

M2

1.000
1.000
0.100
0.050

Org
Org
Org
Org

RAB - 023

550,000.00
Sub - Bahan
75,000.00
100,000.00
90,000.00
110,000.00
Sub - Upah

550,000.00
550,000.00
75,000.00
100,000.00
9,000.00
5,500.00
189,500.00

Rp

550,000.00

Rp

189,500.00

ANALISA HARGA SATUAN PEKERJAAN, BERDASARKAN SNI


NO.

URAIAN PEKERJAAN

SNI

kfsn

ANALISA HARGA BAHAN & UPAH


sat
hrg. sat.
Total harga

HARGA SATUAN
PEKERJAAN

T O T A L Rp

10

11

12

13

14

V.A.
1

Pekerjaan Railling Besi (black steel) Teras/Balkon /M'


(modul 4,2 m / unit)
- Railling besi bahan pipa besi hitam dia. 2" (hand rail)
- Railling besi bahan pipa besi hitam dia. 1,5" (tiang)
- Railling besi bahan pipa besi hitam dia. 1" (pembagi)
- Base plate + baut angkur
- Finishing pengecatan
- Upah
pasang

3.50
4.40
14.00
4.00
1.00
1.00

Pekerjaan Railling Besi Stainless Steel, Tangga /M'


(modul 3,50 m'/ unit)
- Railling besi bahan pipa stainless steel, dia. 2,5" (hand rail)
- Railling besi bahan pipa stainless steel, dia. 2" (tiang)
- Railling besi bahan pipa stainless steel, dia. 1" (pembagi)
- Base plate + baut angkur
- Finishing pengecatan
- Upah
pasang

3.50
4.40
14.00
4.00
1.00

Pek. Louvre besi Teras/Balkon (uk. 60x420 cm)/unit


(modul 60x420 cm)
- Frame besi hollow 50x100
- Grill besi plat tebal 2 mm
- Finishing pengecatan
- Upah
pasang

12.00
2.52
8.04
1.00

Pek. Tralis besi hollow, Parkir Mobil PK (modul 7,50 x 0,90 m)/M2
- Frame besi hollow 60x40x2 mm
- Tralis besi hollow 40x20x1,8 mm
- Finishing pengecatan
- Upah
pasang

14.70
67.50
13.50
1.00

Pek. Dinding besi wire mesh, rangka pipa GIP


(modul : 4.6 x 3,75 m = 17,25 M2)
- Frame besi pipa dia 2"
- Frame pintu besi pipa dia 1,5"
- Tralis besi wire mesh DM-6F1
- Finishing pengecatan
- Engsel bubut, kunci gembok dan dudukannya
- Upah
pasang

40.90
6.10
17.25
17.25
1.00
1.00

m'
m'
m'
bh
lot
lot

m'
m'
m'
bh
lot
lot

m'
m'
m'
bh
lot
lot

m'
m2
m2
lot

m'
m'
m2
lot

m'
m'
m'
m2
lot
lot

142,967
600,460.00
112,800
744,480.00
65,967
1,108,240.00
40,000.00
240,000.00
245,318.00
245,318.00
734,624.50
734,624.50
Total harga / unit
Harga / m'

3,673,122.50
874,552.98

142,967
500,383.33
112,800
496,320.00
65,967
923,533.33
40,000.00
160,000.00
192,023.67
192,023.67
568,065.08
568,065.08
Total harga / unit
Harga / m'

2,840,325.42
811,521.55

206,007
721,023.33
185,857
817,769.33
85,757
1,200,593.33
60,000.00
240,000.00
273,938.60
0.00
744,846.50
744,846.50
Total harga / unit
Harga / m'

3,724,232.50
1,064,066.43

98,335.00
1,180,020.00
650,724.17
1,639,824.90
#REF!
#REF!
#REF!
#REF!
Total harga / unit
Harga / m2

#REF!
#REF!

38,490.83
565,815.25
21,211.67
1,431,787.50
#REF!
#REF!
#REF!
#REF!
Total harga / unit
Harga / m2

#REF!
#REF!

124,300.00
5,083,870.00
91,133.00
555,911.30
29,562.13
509,946.74
#REF!
#REF!
500,000.00
500,000.00
#REF!
#REF!
Total harga / unit
Harga / m2

#REF!
#REF!

PEK. KOSEN, PINTU & JND. ALLUMUNIUM


PROFIL KOSEN ALLUMUNIUM / M', ex YKK
SNI-2008
Profil kosen All. 1 3/4 x 4", Silver Clear Anodized ex YKK
Bahan : Profil kosen All. 1 3/4 x 4", Silver Clear Anodized ex YKK
Skrup fixer
Sealant
:

Pekerja
Tukang Allumunium
Kepala tukang
Mandor

PROFIL KOSEN ALLUMUNIUM / M', ex YKK


SNI-2008
Profil kosen All. 1 3/4 x 4", Black/Brown Anodized ex YKK
Bahan : Profil kosen All. 1 3/4 x 4", Black/Brown Anodized ex YKK
Skrup fixer
Sealant
Upah

1.b.

4.20
6.60
16.80
6.00
1.00
1.00

Pekerjaan Railling Besi (Black steel) Tangga /M'


(modul 3,50 m'/ unit)
- Railling besi bahan pipa besi hitam dia. 2" (hand rail)
- Railling besi bahan pipa besi hitam dia. 1,5" (tiang)
- Railling besi bahan pipa besi hitam dia. 1" (pembagi)
- Base plate + baut angkur
- Finishing pengecatan
- Upah
pasang

Upah

1.a.

m'
m'
m'
bh
lot
lot

739,500.00

m'
bh
m'

0.043
0.043
0.0043
0.0021

Org
Org
Org
Org

1.100
2.000
1.100

m'
bh
m'

PROFIL KOSEN ALLUMUNIUM / M', ex YKK


SNI-2008
Profil kosen Allumunium 1 3/4 x 4", Powder Coating ex YKK
Bahan : Profil kosen Allumunium 1 3/4 x 4", Powder Coating ex YKK
Skrup fixer
Sealant
Upah

1.100
2.000
1.100

1.100
2.000
1.100

RAB - 024

m'
bh
m'

115,500.00
1,500.00
8,531.25
Sub - Bahan
75,000.00
100,000.00
90,000.00
110,000.00
Sub - Upah

157,500.00
1,500.00
8,531.25
Sub - Bahan
Sub - Upah

168,000.00
1,500.00
8,531.25
Sub - Bahan
Sub - Upah

127,050.00
3,000.00
9,384.38
139,434.38 Rp
3,225.00
4,300.00
387.00
231.00
8,143.00 Rp
T O T A L Rp

173,250.00
3,000.00
9,384.38
185,634.38

Rp
Rp
T O T A L Rp

184,800.00
3,000.00
9,384.38
197,184.38

Rp
Rp
T O T A L Rp

139,434.38

8,143.00
147,577.38

185,634.38
8,143.00
193,777.38

197,184.38
8,143.00
205,327.38

ANALISA HARGA SATUAN PEKERJAAN, BERDASARKAN SNI


NO.

URAIAN PEKERJAAN

m'
bh
m'

161,700.00
1,500.00
8,531.25
Sub - Bahan

1.100
2.000
1.100

m'
bh
m'

89,250.00
1,500.00
8,531.25
Sub - Bahan

1.100
2.000
1.100

m'
bh
m'

105,000.00
1,500.00
8,531.25
Sub - Bahan

sama dengan upah pas. Kosen kaca

1.100
2.000
1.100

m'
bh
m'

126,000.00
1,500.00
8,531.25
Sub - Bahan

sama dengan upah pas. Kosen kaca

Pekerja
Tukang Allumunium
Kepala tukang
Mandor

1.100
2.000
1.100

m'
bh
m'

0.043
0.043
0.0043
0.0021

Org
Org
Org
Org

1.100
2.000
1.100

m'
bh
m'

PROFIL KOSEN ALLUMUNIUM / M' (ALEXINDO)


SNI-2008
Profil kosen All. 1 3/4 x 4", Coating serat kayu, ex Alexindo
Bahan : Profil kosen All. 1 3/4 x 4", coating serat kayu, ex Alexindo
Skrup fixer
Sealant
Upah

147,000.00
1,500.00
8,531.25
Sub - Bahan

sama dengan upah pas. Kosen kaca

PROFIL KOSEN ALLUMUNIUM / M' (ALEXINDO)


SNI-2008
Profil kosen All. 1 3/4 x 4", Black/Brown Anodized ex Alexindo
Bahan : Profil kosen All. 1 3/4 x 4", Black/Brown Anodized ex YKK
Skrup fixer
Sealant
Upah

4.b.

m'
bh
m'

sama dengan upah pas. Kosen kaca

PROFIL KOSEN ALLUMUNIUM / M' Ex ALEXINDO


SNI-2008
Profil kosen All. 1 3/4 x 4", Silver Clear Anodized ex Alexindo
Bahan : Kosen All. 1 3/4 x 4", Silver Clear Anodized ex Alexindo
Skrup fixer
Sealant
Upah

4.a.

1.100
2.000
1.100

1.100
2.000
1.100

PROFIL ALLUMUNIUM RANGKA JENDELA KACA / M', ex YKK SNI-2008


Profil Frame All. Jendela kaca, Powder Coating ex YKK
Bahan : Profil Frame All. Jendela kaca, Powder Coating ex YKK
Skrup fixer
Sealant
Upah

105,000.00
1,500.00
8,531.25
Sub - Bahan

HARGA SATUAN
PEKERJAAN

115,500.00
3,000.00
9,384.38
127,884.38

Rp
Rp
T O T A L Rp

161,700.00
3,000.00
9,384.38
174,084.38

Rp
Rp
T O T A L Rp

127,884.38
8,143.00
136,027.38

174,084.38
8,143.00
182,227.38

SNI-2008

PROFIL ALLUMUNIUM RANGKA JENDELA KACA / M', ex YKK SNI-2008


Profil Frame All. Jendela kaca, Black/Brown Anodized ex YKK
Bahan : Profil Frame All. Jendela kaca, Black/Brown Anodized ex YKK
Skrup fixer
Sealant
Upah

3.b.

m'
bh
m'

sama dengan upah pas. Kosen kaca

PROFIL ALLUMUNIUM RANGKA JENDELA KACA / M', ex YKK SNI-2008


Profil Frame All. Jendela kaca, Silver Clear Anodized ex YKK
Bahan : Profil Frame All. Jendela kaca, Silver Clear Anodized ex YKK
Skrup fixer
Sealant
Upah

3.a.

1.100
2.000
1.100

ANALISA HARGA BAHAN & UPAH


sat
hrg. sat.
Total harga

sama dengan upah pas. Kosen kaca

PROFIL ALLUMUNIUM RANGKA PINTU KACA / M', ex YKK


Profil Frame All. Pintu kaca, Powder Coating ex YKK
Bahan : Profil Frame All. Pintu kaca, Powder Coating ex YKK
Skrup fixer
Sealant
Upah

PROFIL ALLUMUNIUM RANGKA PINTU KACA / M', ex YKK


SNI-2008
Profil Frame All. Pintu kaca, Black/Brown Anodized ex YKK
Bahan : Profil Frame All. Pintu kaca, Black/Brown Anodized ex YKK
Skrup fixer
Sealant
Upah

2.b.

kfsn

PROFIL ALLUMUNIUM RANGKA PINTU KACA / M', ex YKK


SNI-2008
Profil Frame All. Pintu kaca, Silver Clear Anodized ex YKK
Bahan : Profil Frame All. Pintu kaca, Silver Clear Anodized ex YKK
Skrup fixer
Sealant
Upah

2.a.

SNI

1.100
2.000
1.100

m'
bh
m'

FRAME ALLUMUNIUM RANGKA PINTU KACA (ALEXINDO) / M' SNI-2008


Profil Frame All. Pintu kaca, Silver Clear Anodized ex Alexindo
Bahan : Frame All. Pintu kaca, Silver Clear Anodized ex Alexindo
Skrup fixer
Sealant

1.100
2.000
1.100

RAB - 025

m'
bh
m'

68,250.00
1,500.00
8,531.25
Sub - Bahan
75,000.00
100,000.00
90,000.00
110,000.00
Sub - Upah

78,750.00
1,500.00
8,531.25
Sub - Bahan
Sub - Upah

168,000.00
1,500.00
8,531.25
Sub - Bahan
Sub - Upah

63,000.00
1,500.00
8,531.25
Sub - Bahan

177,870.00
3,000.00
9,384.38
190,254.38

Rp
Rp
T O T A L Rp

98,175.00
3,000.00
9,384.38
110,559.38

Rp
Rp
T O T A L Rp

115,500.00
3,000.00
9,384.38
127,884.38

Rp
Rp
T O T A L Rp

138,600.00
3,000.00
9,384.38
150,984.38

Rp
Rp
T O T A L Rp

75,075.00
3,000.00
9,384.38
87,459.38 Rp
3,225.00
4,300.00
387.00
231.00
8,143.00 Rp
T O T A L Rp

86,625.00
3,000.00
9,384.38
99,009.38

Rp
Rp
T O T A L Rp

184,800.00
3,000.00
9,384.38
197,184.38

Rp
Rp
T O T A L Rp

69,300.00
3,000.00
9,384.38
81,684.38

Rp

190,254.38
8,143.00
198,397.38

110,559.38
8,143.00
118,702.38

127,884.38
8,143.00
136,027.38

150,984.38
8,143.00
159,127.38

87,459.38

8,143.00
95,602.38

99,009.38
8,143.00
107,152.38

197,184.38
8,143.00
205,327.38

81,684.38

ANALISA HARGA SATUAN PEKERJAAN, BERDASARKAN SNI


NO.

URAIAN PEKERJAAN
Upah

5.a.

m'
bh
m'

73,500.00
1,500.00
8,531.25
Sub - Bahan

1.100
2.000
1.100

m'
bh
m'

157,500.00
1,500.00
8,531.25
Sub - Bahan

sama dengan upah pas. Kosen kaca

1.100
2.000
1.100

m'
bh
m'

52,500.00
1,500.00
8,531.25
Sub - Bahan

sama dengan upah pas. Kosen kaca

1.100
2.000
1.100

m'
bh
m'

63,000.00
1,500.00
8,531.25
Sub - Bahan

sama dengan upah pas. Kosen kaca

FRAME ALLUMUNIUM RANGKA JENDELA KACA (ALEXINDO) / M'


SNI-2008
Profil Frame All. Jendela kaca, Coating serat kayu, ex Alexindo
Bahan : Profil Frame All. Jendela kaca, coating serat kayu, ex Alexindo
Skrup fixer
Sealant
Upah

VI.

1.100
2.000
1.100

sama dengan upah pas. Kosen kaca

FRAME ALLUMUNIUM RANGKA JENDELA KACA (ALEXINDO) / M'


SNI-2008
Profil Frame All. Jendela kaca, Black/Brown Anodized ex Alexindo
Bahan : Profil Frame All. Jendela kaca, Black/Brown Anodized ex YKK
Skrup fixer
Sealant
Upah

6.b.

HARGA SATUAN
PEKERJAAN

Rp
T O T A L Rp

FRAME ALLUMUNIUM RANGKA JENDELA KACA (ALEXINDO) / M'


SNI-2008
Profil Frame All. Jendela kaca, Silver Clear Anodized ex Alexindo
Bahan : Frame All. Jendela kaca, Silver Clear Anodized ex Alexindo
Skrup fixer
Sealant
Upah

6.a.

ANALISA HARGA BAHAN & UPAH


sat
hrg. sat.
Total harga

sama dengan upah pas. Kosen kaca

PROFIL ALLUMUNIUM RANGKA PINTU KACA (ALEXINDO) / M' SNI-2008


Profil Frame All. Pintu kaca, Coating serat kayu, ex Alexindo
Bahan : Profil Frame All. Pintu kaca, coating serat kayu, ex Alexindo
Skrup fixer
Sealant
Upah

kfsn

PROFIL ALLUMUNIUM RANGKA PINTU KACA (ALEXINDO) / M' SNI-2008


Profil Frame All. Pintu kaca, Black/Brown Anodized ex Alexindo
Bahan : Profil Frame All. Pintu kaca, Black/Brown Anodized ex Alexindo
Skrup fixer
Sealant
Upah

5.b.

SNI

1.100
2.000
1.100

m'
bh
m'

126,000.00
1,500.00
8,531.25
Sub - Bahan

sama dengan upah pas. Kosen kaca

80,850.00
3,000.00
9,384.38
93,234.38

Rp
Rp
T O T A L Rp

173,250.00
3,000.00
9,384.38
185,634.38

Rp
Rp
T O T A L Rp

57,750.00
3,000.00
9,384.38
70,134.38

Rp
Rp
T O T A L Rp

69,300.00
3,000.00
9,384.38
81,684.38

Rp
Rp
T O T A L Rp

138,600.00
3,000.00
9,384.38
150,984.38

Rp
Rp
T O T A L Rp

8,143.00
89,827.38

93,234.38
8,143.00
101,377.38

185,634.38
8,143.00
193,777.38

70,134.38
8,143.00
78,277.38

81,684.38
8,143.00
89,827.38

150,984.38
8,143.00
159,127.38

PEK. KAYU & PLASTIK

6.1.
1

PEK. KUDA-KUDA KAYU KONVENSIONAL


PEK. KUDA-KUDA KAYU KONVENSIONAL / M3
KAYU KELAS - I (Kamper Samarinda), bentang 6 m.
Bahan : Kayu kelas-1 (Kamper Samarinda)
Paku 12 cm
Besi strip tebal 5 mm
Upah

M3
Kg
Kg

4.000
12.000
1.200
0.200

Org
Org
Org
Org

7,350,000.00
15,356.25
14,542.50
Sub - Bahan
75,000.00
90,000.00
105,000.00
110,000.00
Sub - Upah

8,085,000.00
85,995.00
218,137.50
8,389,132.50 Rp
300,000.00
1,080,000.00
126,000.00
22,000.00
1,528,000.00 Rp
T O T A L Rp

5,040,000.00
15,356.25
14,542.50
Sub - Bahan

5,544,000.00
85,995.00
218,137.50
5,848,132.50

4,725,000.00
15,356.25
14,542.50
Sub - Bahan

5,197,500.00
85,995.00
218,137.50
5,501,632.50

7,350,000.00
15,356.25
14,542.50
Sub - Bahan
75,000.00
90,000.00

8,820,000.00
85,995.00
218,137.50
9,124,132.50
502,500.00
1,809,000.00

Pekerja
Tukang Kayu

8,389,132.50

1,528,000.00
9,917,132.50

SNI-2008
1.100
5.600
15.000

M3
Kg
Kg

Rp
Rp
T O T A L Rp

5,848,132.50
1,528,000.00
7,376,132.50

SNI-2008
1.100
5.600
15.000

M3
Kg
Kg

: sama dgn upah Kuda2 kayu Borneo

PEK. KUDA-KUDA EXPOSE, KAYU KELAS-I / M3


KAYU KELAS - I (Kamper Samarinda), bentang 6 m.
Bahan : Kayu kelas-1 (Kamper Samarinda)
Paku 12 cm
Besi strip tebal 5 mm
Upah

1.100
5.600
15.000

: sama dgn upah Kuda2 kayu Borneo

PEK. KUDA-KUDA KAYU KONVENSIONAL / M3


KAYU KELAS - III (Borneo/Meranti super), bentang 6 m.
Bahan : Kayu kelas-III (Borneo / Meranti super)
Paku 12 cm
Besi strip tebal 5 mm
Upah

6.2.

Pekerja
Tukang Kayu
Kep. Tukang Kayu
Mandor

PEK. KUDA-KUDA KAYU KONVENSIONAL / M3


KAYU KELAS - II (Kamper Medan/Kruing), bentang 6 m.
Bahan : Kayu kelas-II (Kamper Medan / Kruing)
Paku 12 cm
Besi strip tebal 5 mm
Upah

SNI-2008

Rp
Rp
T O T A L Rp

5,501,632.50
1,528,000.00
7,029,632.50

SNI-2008
1.200
5.600
15.000

M3
Kg
Kg

6.700
20.100

Org
Org

RAB - 026

Rp

9,124,132.50

ANALISA HARGA SATUAN PEKERJAAN, BERDASARKAN SNI


NO.

URAIAN PEKERJAAN

SNI

kfsn

Kep. Tukang Kayu


Mandor

6.3.

PEK. KONSTRUKSI GORDENG, KAYU KELAS-II / M3


KAYU KELAS - II (Kamper Medan/Kruing), bentang 6 m.
Bahan : Kayu kelas-II (Kamper Medan / Kruing)
Paku 12 cm
Besi strip tebal 5 mm
Upah

6.4.
1

6.5.
1

Pekerja
Tukang Kayu
Kep. Tukang Kayu
Mandor

Kep. Tukang Kayu


Tukang Kayu
Pekerja
Mandor

PEK. LISTPLANK JATI 3/30 / M'


Bahan : Papan Jati
Paku (5 - 7 cm)
Upah

5,040,000.00
15,356.25
14,542.50
Sub - Bahan
75,000.00
90,000.00
105,000.00
110,000.00
Sub - Upah

5,544,000.00
46,068.75
218,137.50
5,808,206.25 Rp
180,000.00
648,000.00
75,600.00
13,200.00
916,800.00 Rp
T O T A L Rp

4,725,000.00
4,725,000.00
15,356.25
Sub - Bahan
75,000.00
90,000.00
105,000.00
110,000.00
Sub - Upah

66,150.00
17,010.00
3,839.06
86,999.06 Rp
7,500.00
9,000.00
1,050.00
550.00
18,100.00 Rp
T O T A L Rp

Kep. Tukang Kayu


Tukang Kayu
Pekerja
Mandor

2,559,400.00
11,683,532.50

M3
Kg
Kg

2.400
7.200
0.720
0.120

Org
Org
Org
Org

5,808,206.25

916,800.00
6,725,006.25

0.014
0.0036
0.250

M3
M3
Kg

0.100
0.100
0.010
0.005

Org
Org
Org
Org

86,999.06

18,100.00
105,099.06

SNI-2008
0.014
0.0036
0.250

M3
M3
Kg

7,140,000.00
7,140,000.00
15,356.25
Sub - Bahan

99,960.00
25,704.00
3,839.06
129,503.06

Rp
Rp
T O T A L Rp

129,503.06
18,100.00
147,603.06

SNI-2008
0.014
0.0036
0.250

M3
M3
Kg

4,462,500.00
4,462,500.00
15,356.25
Sub - Bahan

62,475.00
16,065.00
3,839.06
82,379.06

Rp
Rp
T O T A L Rp

82,379.06
18,100.00
100,479.06

SNI-2008

Pekerja
Tukang Kayu
Kep. Tukang Kayu
Mandor

PEK. LISTPLANK
PEK. LISTPLANK JATI 3/20 / M'
Bahan : Papan Jati
Paku (5 - 7 cm)
Upah

RANGKA ATAP, Sirap / M2, Kayu kelas-II


Kayu kelas-II (Kamper Medan/Kruing)
Bahan : Kayu kelas-II (Kamper Medan / Kruing)
Paku (5 - 10 cm)
Upah

1.100
3.000
15.000

: sama dgn upah rangka atap ky kelas-2

RANGKA ATAP, Genteng Beton / M2


Kayu kelas-II (Kamper Medan/Kruing)
Bahan : Kasau 5/7, kayu kelas-II (Kamper Medan / Kruing)
Reng 3/4, kayu kelas-II (Kamper Medan / Kruing)
Paku (5 - 10 cm)
Upah

211,050.00
36,850.00
2,559,400.00 Rp
T O T A L Rp

: sama dgn upah rangka atap ky kelas-2

RANGKA ATAP, Genteng Keramik / M2


Kayu kelas-III (Kayu Borneo/Meranti super)
Bahan : Kasau 5/7, kayu kelas-III (Borneo/Meranti super)
Reng 2/3, kayu kelas-III (Borneo/Meranti super)
Paku (5 - 10 cm)
Upah

105,000.00
110,000.00
Sub - Upah

SNI-2008

Pekerja
Tukang Kayu
Kep. Tukang Kayu
Mandor

RANGKA ATAP, Genteng Keramik / M2


Kayu kelas-II (Kayu Bengkirai)
Bahan : Kasau 5/7, kayu kelas-II (Bengkirai)
Reng 2/3, kayu kelas-II (Bengkirai)
Paku (5 - 10 cm)
Upah

Org
Org

HARGA SATUAN
PEKERJAAN

SNI-2008

Pekerja
Tukang Kayu
Kep. Tukang Kayu
Mandor

PEK. RANGKA ATAP


RANGKA ATAP, Genteng Keramik / M2
Kayu kelas-II (Kamper Medan/Kruing)
Bahan : Kasau 5/7, kayu kelas-II (Kamper Medan / Kruing)
Reng 2/3, kayu kelas-II (Kamper Medan / Kruing)
Paku (5 - 10 cm)
Upah

2.010
0.335

ANALISA HARGA BAHAN & UPAH


sat
hrg. sat.
Total harga

0.014
0.0072
0.250

M3
M3
Kg

0.100
0.100
0.010
0.005

Org
Org
Org
Org

4,725,000.00
4,725,000.00
15,356.25
Sub - Bahan
75,000.00
90,000.00
105,000.00
110,000.00
Sub - Upah

66,150.00
34,020.00
3,839.06
104,009.06 Rp
7,500.00
9,000.00
1,050.00
550.00
18,100.00 Rp
T O T A L Rp

4,725,000.00
15,356.25
Sub - Bahan
75,000.00
90,000.00
105,000.00
110,000.00
Sub - Upah

77,962.50
3,071.25
81,033.75 Rp
9,000.00
10,800.00
1,260.00
660.00
21,720.00 Rp
T O T A L Rp

104,009.06

18,100.00
122,109.06

SNI-2008
0.165

0.0165
0.200

M3
Kg

0.120
0.120
0.012
0.006

Org
Org
Org
Org

0.007
0.050

M3
kg

0.020
0.200
0.100
0.005

Org
Org
Org
Org

0.011
0.050

M3
kg

0.022
0.220
0.110
0.005

Org
Org
Org
Org

RAB - 027

############
15,356.25
Sub - Bahan
105,000.00
90,000.00
75,000.00
110,000.00
Sub - Upah

422,625.00
767.81
423,392.81
2,100.00
18,000.00
7,500.00
550.00
28,150.00

############
15,356.25
Sub - Bahan
105,000.00
90,000.00
75,000.00
110,000.00

664,125.00
767.81
664,892.81
2,310.00
19,800.00
8,250.00
550.00

81,033.75

21,720.00
102,753.75

Rp

423,392.81

Rp
Rp

28,150.00
451,542.81

Rp

664,892.81

ANALISA HARGA SATUAN PEKERJAAN, BERDASARKAN SNI


NO.

URAIAN PEKERJAAN

Kep. Tukang Kayu


Tukang Kayu
Pekerja
Mandor

PEK. LISTPLANK 3/20 / M', kayu kelas-I atau II


Kayu Kamper Samarinda oven
Bahan : Kayu kelas-I (Papan Kamper Samarinda oven)
Paku (5 - 7 cm)
Upah

kfsn

PEK. LISTPLANK BENGKIRAI 3/30 / M'


Bahan : Papan Bengkirai
Paku (5 - 7 cm)
Upah

SNI

SNI-2008

Kep. Tukang Kayu


Tukang Kayu
Pekerja
Mandor

PEK. LISTPLANK 3/20 / M', kayu kelas-I atau II


Kayu Kamper Singkil oven
Bahan : Kayu kelas-II (Papan Kamper Singkil oven)
Paku (5 - 7 cm)

ANALISA HARGA BAHAN & UPAH


sat
hrg. sat.
Total harga

0.011
0.050

M3
kg

0.022
0.220
0.110
0.005

Org
Org
Org
Org

Sub - Upah

30,910.00

7,612,500.00
15,356.25
Sub - Bahan
105,000.00
90,000.00
75,000.00
110,000.00
Sub - Upah

83,737.50
767.81
84,505.31
2,310.00
19,800.00
8,250.00
550.00
30,910.00

############
15,356.25
Sub - Bahan
105,000.00
90,000.00
75,000.00
110,000.00
Sub - Upah

72,765.00
767.81
73,532.81
2,100.00
18,000.00
7,500.00
550.00
28,150.00

8,137,500.00
15,356.25
Sub - Bahan

56,962.50
767.81
57,730.31

PEK. LISTPLANK 3/30 / M', kayu kelas-I atau II


Kayu Kamper Samarinda oven
Bahan : Kayu kelas-I (Papan Kamper Samarinda oven)
Paku (5 - 7 cm)

############
15,356.25
Sub - Bahan

114,345.00
767.81
115,112.81

Upah

105,000.00
90,000.00
75,000.00
110,000.00
Sub - Upah

2,310.00
19,800.00
8,250.00
550.00
30,910.00

8,137,500.00
15,356.25
Sub - Bahan

89,512.50
767.81
90,280.31

0.007
0.050

M3
kg

0.020
0.200
0.100
0.005

Org
Org
Org
Org

0.007
0.050

M3
kg

PEK. RANGKA PLAFOND


PEK. RANGKA PLAFOND (50x100) / M2, Kayu kelas-II / III
Kayu kelas-II (Kamper Medan/Kruing)
Bahan : Kayu kelas-II (Kamper Medan / Kruing)
Paku (7 - 10 cm)
Upah

0.011
0.050

0.022
0.220
0.110
0.005

M3
kg

Org
Org
Org
Org

0.011
0.050

M3
kg

30,910.00
115,415.31

Rp

73,532.81

Rp
Rp

28,150.00
101,682.81

Rp
Rp
Rp

57,730.31
28,150.00
85,880.31

Rp

115,112.81

Rp
Rp

30,910.00
146,022.81

Rp
Rp
Rp

90,280.31
30,910.00
121,190.31

0.015
0.200

M3
Kg

0.150
0.300
0.030
0.008

Org
Org
Org
Org

4,725,000.00
15,356.25
Sub - Bahan
75,000.00
90,000.00
105,000.00
110,000.00
Sub - Upah

72,765.00
3,071.25
75,836.25 Rp
11,250.00
27,000.00
3,150.00
880.00
42,280.00 Rp
T O T A L Rp

75,836.25

42,280.00
118,116.25

SNI-2008
0.015
0.200

M3
Kg

4,462,500.00
15,356.25
Sub - Bahan

68,722.50
3,071.25
71,793.75

Rp
Rp
T O T A L Rp

71,793.75
42,280.00
114,073.75

SNI-2008

Pekerja
Tukang Kayu
Kep. Tukang Kayu
Mandor

PEK. RANGKA PLAFOND (60x60) / M2, Kayu kelas-II / III


Kayu kelas-III (Kayu Borneo/Meranti super)
Bahan : Kasau 5/7, kayu kelas-III (Borneo/Meranti super)
Paku (7 - 10 cm)

Rp
Rp

SNI-2008

sama dgn rgk ky Kruing

PEK. RANGKA PLAFOND (60x60) / M2, Kayu kelas-II / III


Kayu kelas-II (Kamper Medan/Kruing)
Bahan : Kayu kelas-II (Kamper Medan / Kruing)
Paku (7 - 10 cm)
Upah

84,505.31

SNI-2008

Pekerja
Tukang Kayu
Kep. Tukang Kayu
Mandor

PEK. RANGKA PLAFOND (50x100) / M2, Kayu kelas-II / III


Kayu kelas-III (Kayu Borneo/Meranti super)
Bahan : Kasau 5/7, kayu kelas-III (Borneo/Meranti super)
Paku (7 - 10 cm)
Upah

Rp

SNI-2008

Upah sama dgn listplank kamper Smrd

6.6.
1

30,910.00
695,802.81

SNI-2008

Kep. Tukang Kayu


Tukang Kayu
Pekerja
Mandor

PEK. LISTPLANK 3/30 / M', kayu kelas-I atau II


Kayu Kamper Singkil oven
Bahan : Kayu kelas-II (Papan Kamper Singkil oven)
Paku (5 - 7 cm)

Rp
Rp

0.0066

Upah sama dgn listplank kamper Smrd

HARGA SATUAN
PEKERJAAN

0.016
0.250

M3
Kg

0.200
0.300
0.030
0.010

Org
Org
Org
Org

4,725,000.00
15,356.25
Sub - Bahan
75,000.00
90,000.00
105,000.00
110,000.00
Sub - Upah

77,017.50
3,839.06
80,856.56 Rp
15,000.00
27,000.00
3,150.00
1,100.00
46,250.00 Rp
T O T A L Rp

80,856.56

46,250.00
127,106.56

SNI-2008
0.0163
0.250

RAB - 028

M3
Kg

4,462,500.00
15,356.25
Sub - Bahan

72,738.75
3,839.06
76,577.81

Rp

76,577.81

ANALISA HARGA SATUAN PEKERJAAN, BERDASARKAN SNI


NO.

URAIAN PEKERJAAN
Upah

6.7.

7.1.

0.200
0.400
0.025
0.010

Org
Org
Org
Org

31,500.00
19,950.00
6,825,000.00
Sub - Bahan
75,000.00
90,000.00
105,000.00
110,000.00
Sub - Upah

33,075.00
299.25
129,675.00
163,049.25 Rp
15,000.00
36,000.00
2,625.00
1,100.00
54,725.00 Rp
T O T A L Rp

11.000

Bh

12,600.00
Sub - Bahan
100,000.00
90,000.00
75,000.00
110,000.00
Sub - Upah

138,600.00
138,600.00 Rp
2,000.00
18,000.00
30,000.00
2,200.00
52,200.00 Rp
T O T A L Rp

0.020
0.200
0.400
0.020

Org
Org
Org
Org

14.500

Bh

13,125.00
Sub - Bahan

14.500

Bh

3,675.00
Sub - Bahan

2.860
0.050
0.006

Bh
zak
M3

26,250.00
65,000.00
265,125.00
Sub - Bahan

5.000
0.050
0.006

Bh
zak
M3

26,565.00
65,000.00
265,125.00
Sub - Bahan

10.000

Bh

12,600.00
Sub - Bahan

: sama dengan pasang genteng keramik

3.500
0.025
0.006

Bh
M3
M3

26,250.00
65,000.00
265,125.00
Sub - Bahan

: 2,5 kali upah pasangan genteng beton

PAS. ATAP ASBES GELOMBANG kecil / M2


Bahan : Djabes gelombang kecil (B100) uk. 300x105, tbl. 5mm
Skrup + ring
:

Tukang kayu
Pekerja
Mandor

PAS. BUBUNGAN ASBES / M'


Bahan : Bubung Asbes
Skrup + ring
Upah

7.10.

m'
Kg
M3

: 2,5 kali upah pasangan genteng keramik

PAS. NOK GENTENG BETON Karangpilang / M'


Bahan : Genteng Nok Beton karangpilang (berwarna)
Semen PC
Pasir Pasang

Upah

7.9.

1.050
0.015
0.019

: 2,5 kali upah pasangan genteng keramik

PAS. GENTENG BETON ex Karangpilang / M2


Bahan : Genteng Beton ex Karangpilang (berwarna)

Upah

7.8.

46,250.00
122,827.81

SNI-2008

: sama dengan genteng Cisangkan

PAS. NOK GENTENG KERAMIK KIA / M'


Bahan : Genteng Nok ex KIA
Semen PC
Pasir Pasang

Upah

7.7.

HARGA SATUAN
PEKERJAAN

Rp
T O T A L Rp

: sama dengan genteng Cisangkan

PAS. NOK GENTENG CISANGKAN / M'


Bahan : Gntg Nok Cisangkan type Victoria
Semen PC
Pasir Pasang

Upah

7.6.

Kep. Tukang Batu


Tukang batu
Pekerja
Mandor

PAS. GENTENG (Morando) / M2


Bahan : Genteng Morando glassur

Upah

7.5.

PAS. GENTENG KERAMIK / M2 (KIA)


Bahan : Gntg. Keramik KIA Standart (Natural)

Upah
7.4.

ANALISA HARGA BAHAN & UPAH


sat
hrg. sat.
Total harga

163,049.25

54,725.00
217,774.25

PEK. PENAHAN PANAS & LEMBAB

Upah

7.3.

Pekerja
Tukang Kayu
Kep. Tukang Kayu
Mandor

PAS. GENTENG KERAMIK / M2 (Cisangkan)


Bahan : Genteng ex Cisangkan type Victoria
Upah
50%

7.2.

kfsn

sama dgn rgk ky Kruing

PEK. TALANG DATAR / JURAI, SENG BJLS 28 / M'


Kayu kelas-II (Kamper Medan/Kruing)
Bahan : Seng plat BJLS 28 lebar 90 cm
Paku halus (1-3 cm)
Papan kayu kelas II (Kruing/Kamper Medan)
Upah

VII.

SNI

Kep. Tukang kayu


Tukang kayu
Pekerja
Mandor

PAS. ATAP SENG GELOMBANG / M2


Bahan : Seng Gelombang (0.9 x 1,8 x 0,004)

0.500
4.000

Lmbr
Bh

0.200
0.100
0.005

Org
Org
Org

2.000
4.000

Lmbr
Bh

0.003
0.025
0.025
0.001

Org
Org
Org
Org

0.700

RAB - 029

Lmbr

190,312.50
190,312.50

Rp
Rp
T O T A L Rp

53,287.50
53,287.50

Rp
Rp
T O T A L Rp
75,075.00
3,250.00
1,590.75
79,915.75

Rp
Rp
T O T A L Rp

132,825.00
3,250.00
1,590.75
137,665.75

Rp
Rp
T O T A L Rp

126,000.00
126,000.00

Rp
Rp
T O T A L Rp

91,875.00
1,625.00
1,590.75
91,875.00

Rp
Rp
T O T A L Rp

126,000.00
472.50
Sub - Bahan
90,000.00
75,000.00
110,000.00
Sub - Upah

63,000.00
1,890.00
63,000.00 Rp
18,000.00
7,500.00
550.00
26,050.00 Rp
T O T A L Rp

35,000.00
472.50
Sub - Bahan
105,000.00
90,000.00
75,000.00
110,000.00
Sub - Upah

70,000.00
1,890.00
70,000.00 Rp
315.00
2,250.00
1,875.00
110.00
4,550.00 Rp
T O T A L Rp

45,000.00

31,500.00

138,600.00

26,100.00
164,700.00

190,312.50
26,100.00
216,412.50

53,287.50
26,100.00
79,387.50

79,915.75
65,250.00
145,165.75

137,665.75
65,250.00
202,915.75

126,000.00
26,100.00
152,100.00

91,875.00
65,250.00
157,125.00

63,000.00

26,050.00
89,050.00

70,000.00

4,550.00
74,550.00

ANALISA HARGA SATUAN PEKERJAAN, BERDASARKAN SNI


NO.

URAIAN PEKERJAAN
Skrup + ring
Upah

7.11.

7.12.

7.13.

7.14.
1

7.15.

7.16
1

M2
Kg

0.010
0.200
0.200
0.010

Org
Org
Org
Org

1.000
0.400
4.000

1.000
1.100

1.000
1.100

M'
Lmbr
Bh

m2
m2

m2
m2

Kep. Tukang Batu


Tukang batu halus
Pekerja
Mandor

Kep. Tukang Batu


Tukang batu halus
Pekerja
Mandor

0.408
0.039
1.000

zak
M3
m2

0.020
0.200
0.400
0.020

Org
Org
Org
Org

0.340
0.033
1.000
0.500
0.020
0.200
0.400
0.020

Tukang besi
Pekerja
Mandor

0.200
0.100
0.005

PAS ATAP GEELOMBANG GALVALUME, type SPANDEK LYSAGHT, tebal 0,5 mm


Bahan : Atap GALVALUME, type Spandek Lysaght, tebal 0,5 mm
1.050
Skrup + ring
4.000
Upah

1.500
0.500

PAS. ATAP METAL


PAS ATAP GEELOMBANG GALVALUME, type SPANDEK LYSAGHT, tebal 0,75 mm
Bahan : Atap GALVALUME, type Spandek Lysaght, tebal 0,75 mm
1.050
Skrup + ring
4.000
Upah

Lmbr
Bh

PAS. WATERPROOFING JENIS COATING


(ex SIKA, ketebalan min. 3 lapis)
Pas. Screeding, 1Pc : 3Ps (T=t. 3cm)
Bahan : Semen PC
Pasir pasang
Waterproofing ex Sika / setara
Kuas
Upah
50%

0.300
2.000

Pas. Screeding pelindung 4 cm, 1Pc : 3Ps


Bahan : Semen PC
Pasir pasang
Kawat ayam
Upah
40%

Bh

472.50
Sub - Bahan

45,000.00
472.50
Sub - Bahan

236,250.00
31,500.00
Sub - Bahan
105,000.00
90,000.00
75,000.00
110,000.00
Sub - Upah

49,896.00
45,000.00
472.50
Sub - Bahan

: 2 x upah pas. atap seng

Pas. Waterprrofing Gardigum 4 mm


Bahan : Lapisan Coating PF Primer
Waterproofing Membrane, Gardigum 4 mm
Upah

Kep. Tukang Kayu


Tukang kayu
Pekerja
Mandor

PAS. WATERPROOFING MEMBRANE


Pas. Waterprrofing Sopralene 4 mm
Bahan : Lapisan Coating PF Primer
Waterproofing Membrane, Sopralene 4 mm
Upah

PAS. BUBUNG SENG SIRAP / M'


Bahan : Papan kayu 4/12
Seng Gelombang (0.9 x 1,8 x 0,004)
Skrup + ring
Upah

4.000

ANALISA HARGA BAHAN & UPAH


sat
hrg. sat.
Total harga

: 2 x upah pas. atap seng

PAS. GENTENG SIRAP / M2


Bahan : Atap Sirap
Paku sirap
Upah

kfsn

: sama dengan pas. atap asbes

PAS. BUBUNG SENG / M'


Bahan : Seng Gelombang (0.9 x 1,8 x 0,004)
Skrup + ring
Upah

SNI

18,375.00
157,500.00
Sub - Bahan
Sub - Upah

18,375.00
141,750.00
Sub - Bahan
Sub - Upah

1.100
4.000

RAB - 030

1,890.00
31,500.00

Rp
Rp
T O T A L Rp

13,500.00
945.00
13,500.00

Rp
Rp
T O T A L Rp

354,375.00
15,750.00
354,375.00 Rp
1,050.00
18,000.00
15,000.00
1,100.00
35,150.00 Rp
T O T A L Rp
49,896.00
18,000.00
1,890.00
69,786.00

Rp
Rp
T O T A L Rp

18,375.00
173,250.00
191,625.00

Rp
Rp
T O T A L Rp
18,375.00
155,925.00
174,300.00

Rp
Rp
T O T A L Rp

65,000.00
265,125.00
10,000.00
Sub - Bahan
100,000.00
95,000.00
75,000.00
110,000.00
Sub - Upah

26,520.00
10,339.88
10,000.00
46,859.88 Rp
2,000.00
19,000.00
30,000.00
2,200.00
53,200.00 Rp
T O T A L Rp

zak
65,000.00
M3
265,125.00
kg
52,500.00
Bh
15,750.00
Sub - Bahan
Org
100,000.00
Org
95,000.00
Org
75,000.00
Org
110,000.00
Sub - Upah

22,100.00
8,616.56
52,500.00
7,875.00
91,091.56 Rp
2,000.00
19,000.00
30,000.00
2,200.00
53,200.00 Rp
T O T A L Rp

m2
Bh
Org
Org
Org

m2
Bh

177,975.00
500.00
Sub - Bahan
85,000.00
75,000.00
110,000.00
Sub - Upah

91,875.00
500.00
Sub - Bahan

sama dg upah pas. Spandek tbl. 0,75 mm

PAS. ATAP ZINCALUM SPANDEX (dgn. sterofoam 5 cm) / M2


Bahan : Atap Metal ZINCALUM SPANDEX + Sterofoam
Skrup + ring

HARGA SATUAN
PEKERJAAN

m2
Bh

210,000.00
500.00

186,873.75
2,000.00
186,873.75 Rp
17,000.00
7,500.00
550.00
25,050.00 Rp
T O T A L Rp
96,468.75
2,000.00
96,468.75

Rp
Rp
T O T A L Rp

231,000.00
2,000.00

31,500.00
26,050.00
57,550.00

13,500.00
52,100.00
65,600.00

354,375.00

35,150.00
389,525.00

69,786.00
52,100.00
121,886.00

191,625.00
7,500.00
199,125.00

174,300.00
7,500.00
181,800.00

46,859.88

21,280.00
68,139.88

91,091.56

26,600.00
117,691.56

186,873.75

25,050.00
211,923.75

96,468.75
25,050.00
121,518.75

ANALISA HARGA SATUAN PEKERJAAN, BERDASARKAN SNI


NO.

URAIAN PEKERJAAN

Upah

8.1.
1

Org
Org
Org

1.100
4.000

m2
Bh

0.200
0.100
0.005

Org
Org
Org

HARGA SATUAN
PEKERJAAN

Sub - Bahan
85,000.00
75,000.00
110,000.00
Sub - Upah

231,000.00 Rp
17,000.00
7,500.00
550.00
25,050.00 Rp
T O T A L Rp

121,800.00
500.00
Sub - Bahan
85,000.00
75,000.00
110,000.00
Sub - Upah

133,980.00
2,000.00
133,980.00 Rp
17,000.00
7,500.00
550.00
25,050.00 Rp
T O T A L Rp

231,000.00

25,050.00
256,050.00

133,980.00

25,050.00
159,030.00

M3
Kg
Kg

2.100
21.000
7.000
0.350

Org
Org
Org
Org

1.100
1.250
1.000

M3
Kg
Kg

2.100
21.000
7.000
0.350

Org
Org
Org
Org

1.200
1.250
1.000

M3
Kg
Kg

1.800
18.000
6.000
0.300

Org
Org
Org
Org

63,525,000.00
19,195.31
42,000.00
63,586,195.31 Rp
220,500.00
1,995,000.00
525,000.00
38,500.00
2,779,000.00 Rp
T O T A L Rp

9,975,000.00
15,356.25
42,000.00
Sub - Bahan
105,000.00
95,000.00
75,000.00
110,000.00
Sub - Upah

10,972,500.00
19,195.31
42,000.00
11,033,695.31 Rp
220,500.00
1,995,000.00
525,000.00
38,500.00
2,779,000.00 Rp
T O T A L Rp

7,875,000.00
15,356.25
42,000.00
Sub - Bahan
105,000.00
95,000.00
75,000.00
110,000.00
Sub - Upah

9,450,000.00
19,195.31
42,000.00
9,511,195.31 Rp
189,000.00
1,710,000.00
450,000.00
33,000.00
2,382,000.00 Rp
T O T A L Rp

6,300,000.00
15,356.25
42,000.00
Sub - Bahan
Sub - Upah

7,560,000.00
19,195.31
42,000.00
7,621,195.31

7,875,000.00
15,356.25
42,000.00
Sub - Bahan
Sub - Upah

9,450,000.00
19,195.31
42,000.00
9,511,195.31

############
15,356.25
42,000.00
Sub - Bahan
Sub - Upah

12,600,000.00
19,195.31
42,000.00
12,661,195.31

############
15,356.25
Sub - Bahan
105,000.00

2,415,000.00
767.81
2,415,767.81
31,500.00

63,586,195.31

2,779,000.00
66,365,195.31

11,033,695.31

2,779,000.00
13,812,695.31

9,511,195.31

2,382,000.00
11,893,195.31

SNI - 2008
1.200
1.250
1.000

M3
Kg
Kg

sama dgn upah kayu kelas-II

Rp
Rp
T O T A L Rp

7,621,195.31
2,382,000.00
10,003,195.31

SNI - 2008
1.200
1.250
1.000

M3
Kg
Kg

sama dgn upah kayu kelas-II

Rp
Rp
T O T A L Rp

9,511,195.31
2,382,000.00
11,893,195.31

SNI - 2008
1.200
1.250
1.000

M3
Kg
Kg

sama dgn upah kayu kelas-II

Kep. Tukang Kayu

############
15,356.25
42,000.00
Sub - Bahan
105,000.00
95,000.00
75,000.00
110,000.00
Sub - Upah

SNI - 2008

Kep. Tukang Kayu


Tukang kayu halus
Pekerja
Mandor

PEKERJAAN PINTU PANEL KAYU


PAS. PINTU PANIL KAYU KELAS-I atau II, / M2
( Papan Kayu JATI Jawa Timur, kelas-I)
Bahan : Papan Jati Jawa Timur, Kelas-I
Paku 5 - 7 cm
Upah

1.100
1.250
1.000

SNI - 2008

Kep. Tukang Kayu


Tukang kayu halus
Pekerja
Mandor

KOSEN KAYU KELAS - II atau III / M3


( Kayu MERBAU oven )
Bahan : Kayu kelas-II, Merbau oven
Paku 10 cm
Lem Kayu
:

SNI - 2008

Kep. Tukang Kayu


Tukang kayu halus
Pekerja
Mandor

KOSEN KAYU KELAS - II atau III / M3


( Kayu BENGKIRAI )
Bahan : Kayu kelas-II (Balok Kayu Bengkirai)
Paku 10 cm
Lem Kayu

Upah

8.2.
1

KOSEN KAYU KELAS - II atau III / M3


( Kayu KRUING / KAMPER MEDAN )
Bahan : Kayu kelas-II (Balok Kayu Kruing/Kamper Medan)
Paku 10 cm
Lem Kayu

Upah
6

Tukang besi
Pekerja
Mandor

KOSEN KAYU KELAS - II atau III / M3


( Kayu KAMPER SINGKIL Oven )
Bahan : Kayu kelas-II (Balok Kamper Singkil oven)
Paku 10 cm
Lem Kayu

Upah

PEK. KOSEN KAYU (Kelas-I) / M3


( Kayu KAMPER SAMARINDA Oven)
Bahan : Kayu kelas-I (Balok Kamper Samarinda oven)
Paku 10 cm
Lem Kayu

Upah

0.200
0.100
0.005

ANALISA HARGA BAHAN & UPAH


sat
hrg. sat.
Total harga

PEK. KOSEN, PINTU, JENDELA KAYU

Upah

Tukang besi
Pekerja
Mandor

PEK. KOSEN KAYU


PEK. KOSEN KAYU (Kelas-I) / M3
( Kayu JATI Jawa Timur, kelas-I)
Bahan : Balok Jati Jawa Timur, Kelas-I
Paku 10 cm
Lem Kayu
Upah

kfsn

PAS. ATAP METAL SPANDEX ZINCALUM, tebal 0.5 mm / M2


Bahan : Atap Metal SPANDEX ZINCALUM, tebal 0,5 mm
Skrup + ring
Upah

VIII.

SNI

Rp
Rp
T O T A L Rp

12,661,195.31
2,382,000.00
15,043,195.31

SNI - 2008
0.040
0.050

M3
Kg

0.300

Org

RAB - 031

Rp

2,415,767.81

ANALISA HARGA SATUAN PEKERJAAN, BERDASARKAN SNI


NO.

URAIAN PEKERJAAN

SNI

kfsn

Tukang kayu halus


Pekerja
Mandor

PAS. PINTU PANIL KAYU KELAS-I atau II, / M2


( Papan Kayu KAMPER SAMARINDA Oven )
Bahan : Kayu kelas-I (Papan Kamper Samarinda oven)
Paku 5 - 7 cm
Upah

8.3.

Upah

8.4.

8.5.
1

8.7.

Kep. Tukang Kayu


Tukang Kayu halus
Pekerja
Mandor

PINTU DOBEL TEAKWOOD, RANGKA KAYU KELAS-II / M2


( Kayu KAMPER SAMARINDA Oven )
Bahan : Papan Kamper Samarinda (oven)
Teakwood 122x244x 3mm
Paku halus (1 - 2,5 CM)
Lem Kayu
Upah

M3
Kg

M3
Kg

0.040
0.050

M3
Kg

Kep. Tukang Kayu

397,000.00
2,812,767.81

############
15,356.25
Sub - Bahan
Sub - Upah

415,800.00
767.81
416,567.81 Rp
833,135.63 Rp
T O T A L Rp

416,567.81
397,000.00
813,567.81

8,137,500.00
15,356.25
Sub - Bahan
Sub - Upah

325,500.00
767.81
326,267.81 Rp
652,535.63 Rp
T O T A L Rp

326,267.81
397,000.00
723,267.81

############
15,356.25
Sub - Bahan
Sub - Upah

430,500.00
767.81
431,267.81 Rp
862,535.63 Rp
T O T A L Rp

431,267.81
397,000.00
828,267.81

############
15,356.25
Sub - Bahan
105,000.00
95,000.00
75,000.00
110,000.00
Sub - Upah

415,800.00
767.81
416,567.81 Rp
11,025.00
99,750.00
26,250.00
1,980.00
139,005.00 Rp
T O T A L Rp

3,360,000.00
15,356.25
Sub - Bahan
105,000.00
95,000.00
75,000.00
110,000.00
Sub - Upah

134,400.00
767.81
135,167.81 Rp
11,025.00
99,750.00
26,250.00
1,980.00
139,005.00 Rp
T O T A L Rp

SNI - 2008
0.040
0.050

M3
Kg

0.105
1.050
0.350
0.018

Org
Org
Org
Org

416,567.81

139,005.00
555,572.81

SNI - 2008
0.040
0.050

M3
Kg

0.105
1.050
0.350
0.018

Org
Org
Org
Org

135,167.81

139,005.00
274,172.81

SNI - 2008
0.024

M3

############

0.300

Kg

0.240
2.400
0.800
0.040

Org
Org
Org
Org

42,000.00
Sub - Bahan
105,000.00
95,000.00
75,000.00
110,000.00
Sub - Upah

12,600.00
262,080.00 Rp
25,200.00
228,000.00
60,000.00
4,400.00
317,600.00 Rp
T O T A L Rp

249,480.00

8,137,500.00
42,000.00
Sub - Bahan
Sub - Upah

195,300.00
12,600.00
207,900.00 Rp
415,800.00 Rp
T O T A L Rp

############
42,000.00
Sub - Bahan
105,000.00
95,000.00
75,000.00
110,000.00
Sub - Upah

665,280.00
21,000.00
686,280.00 Rp
31,500.00
285,000.00
75,000.00
5,500.00
397,000.00 Rp
T O T A L Rp

262,080.00

317,600.00
579,680.00

SNI - 2008
0.024
0.300

M3
Kg

285,000.00
75,000.00
5,500.00
397,000.00 Rp
T O T A L Rp

SNI - 2008

Kep. Tukang Kayu


Tukang Kayu halus
Pekerja
Mandor

PAS. PINTU & JENDELA JALUSI KAYU (KREPYAK) / M2


Kayu kelas-I / II (KAMPER SAMARINDA Oven )
Bahan : Papan Kamper Samarinda (oven)
Lem Kayu
Upah

0.040
0.050

Kep. Tukang Kayu


Tukang kayu halus
Pekerja
Mandor

PAS. PINTU & JENDELA KACA, KAYU KELAS-I / II, / M2


( Kayu KAMPER SINGKIL Oven )
Bahan : Kayu kelas-II (Papan Kamper Singkil oven)
Lem Kayu
Upah

8.6.

95,000.00
75,000.00
110,000.00
Sub - Upah

SNI - 2008

Kep. Tukang Kayu


Tukang kayu halus
Pekerja
Mandor

PEKERJAAN PINTU KACA


PAS. PINTU & JENDELA KACA, KAYU KELAS-I / II, / M2
( Kayu KAMPER SAMARINDA Oven )
Bahan : Kayu kelas-I (Papan Kamper Samarinda oven)
List kaca
Lem Kayu
Upah

PINTU KLAMP KAYU KELAS - III / M2


( Kayu BORNEO / MERANTI ), untuk Gudang Sementara
Bahan : kayu kelas-III (Papan Kayu Borneo/Meranti)
Paku 5 - 7 cm
Upah

0.040
0.050

PINTU KLAMP KAYU KELAS - II / M2


( Kayu KAMPER SINGGKIL )
Bahan : Kayu kelas-II (Papan Kamper Singkil oven)
Paku 5 - 7 cm

HARGA SATUAN
PEKERJAAN

SNI - 2008

PAS. PINTU PANIL KAYU KELAS-I atau II, / M2


( Papan Kayu MERBAU Oven )
Bahan : Papan kayu Merbau oven
Paku 5 - 7 cm
Upah

Org
Org
Org

PAS. PINTU PANIL KAYU KELAS-I atau II, / M2


( Papan Kayu KAMPER SINGKIL Oven )
Bahan : Papan Kamper Singkil oven
Paku 5 - 7 cm
Upah

3.000
1.000
0.050

ANALISA HARGA BAHAN & UPAH


sat
hrg. sat.
Total harga

207,900.00
317,600.00
525,500.00

SNI - 2008
0.064
0.500

M3
Kg

0.300
3.000
1.000
0.050

Org
Org
Org
Org

686,280.00

397,000.00
1,083,280.00

SNI - 2008 Analisa no. 6.8, hal 5.


0.025
0.700
0.030
0.500

M3
Lmbr
Kg
Kg

0.210

Org

RAB - 032

############
105,000.00
19,950.00
42,000.00
Sub - Bahan
105,000.00

259,875.00
73,500.00
598.50
21,000.00
354,973.50
22,050.00

Rp

354,973.50

ANALISA HARGA SATUAN PEKERJAAN, BERDASARKAN SNI


NO.

URAIAN PEKERJAAN

SNI

kfsn

Tukang kayu halus


Pekerja
Mandor

8.8.

PINTU DOBEL TEAKWOOD, RANGKA KAYU KELAS-I / M2


( Kayu JATI )
Bahan : Papan Kayu Jati ex Jawa Timur
Teakwood 122x244x 3mm
Paku halus (1 - 2,5 CM)
Lem Kayu
Upah

8.9.

95,000.00
75,000.00
110,000.00
Sub - Upah

199,500.00
52,500.00
3,850.00
277,900.00 Rp
T O T A L Rp

############
105,000.00
19,950.00
42,000.00
Sub - Bahan
105,000.00
95,000.00
75,000.00
110,000.00
Sub - Upah

1,509,375.00
73,500.00
598.50
12,600.00
1,596,073.50 Rp
25,200.00
228,000.00
60,000.00
4,400.00
317,600.00 Rp
T O T A L Rp

############
105,000.00
19,950.00
42,000.00
Sub - Bahan
105,000.00
95,000.00
75,000.00
110,000.00
Sub - Upah

266,112.00
73,500.00
598.50
21,000.00
361,210.50 Rp
25,200.00
228,000.00
60,000.00
4,400.00
317,600.00 Rp
T O T A L Rp

############
19,950.00
Sub - Bahan
105,000.00
95,000.00
75,000.00
110,000.00
Sub - Upah

623,700.00
2,992.50
626,692.50 Rp
21,000.00
190,000.00
37,500.00
2,750.00
251,250.00 Rp
T O T A L Rp

0.025
0.700
0.030
0.300

M3
Lmbr
Kg
Kg

0.240
2.400
0.800
0.040

Org
Org
Org
Org

0.0256
0.700
0.030
0.500

M3
Lmbr
Kg
Kg

0.240
2.400
0.800
0.040

Org
Org
Org
Org

Kep. Tukang Kayu


Tukang kayu halus
Pekerja
Mandor

PINTU DOBEL TRIIPLEX 6 mm lapis HPL, rgk. Kamper / M2


Bahan : Papan Kamper samarinda oven
Multiplex 122x244x6 mm
HPL
Paku halus
Lem Kayu

0.060
0.150

M3
Kg

0.200
2.000
0.500
0.025

Org
Org
Org
Org

0.017
0.700
0.700
0.100
0.250

DINDING / PINTU DOBEL TRIIPLEX 4 mm lapis HPL, rgk. Kamper / M2


Bahan : Papan Kamper samarinda oven
Multiplex 122x244x4 mm
HPL
Paku halus
Lem Kayu

M3
Lmbr
Lmbr
Kg
Kg

############
80,850.00
183,750.00
19,950.00
42,000.00
Sub - Bahan

0.017
0.700
0.700
0.100
0.250

M3
Lmbr
Lmbr
Kg
Kg

############
57,750.00
183,750.00
19,950.00
42,000.00
Sub - Bahan

Upah, sama dengan rangka Kamper Smrd

IX.

PEKERJAAN FINISHING

9.1.

PEK. FINISHING DINDING

9.1.1

PEK. BRAFEN BATU KALI 1Pc : 3Ps / M2


Bahan : Semen PC
Pasir pasang
Upah

9.1.2
1

11.000
0.030

Kep. Tukang Batu


Tukang batu halus
Pekerja
Mandor

PEK. PLESTERAN DINDING 15 cm


PLESTERAN DINDING 15 mm, Camp. 1Pc : 1Ps / M2
Bahan : Semen PC
Pasir pasang
Upah

0.007
0.070
0.150
0.008

317,600.00
1,913,673.50

361,210.50

317,600.00
678,810.50

176,715.00
56,595.00
128,625.00
1,995.00
10,500.00
374,430.00

Rp
Rp
T O T A L Rp
176,715.00
40,425.00
128,625.00
1,995.00
10,500.00
358,260.00

Rp
Rp
T O T A L Rp

kg
1,300.00
M3
265,125.00
Sub - Bahan
Org
100,000.00
Org
95,000.00
Org
75,000.00
Org
110,000.00
Sub - Upah

14,300.00
7,953.75
22,253.75 Rp
700.00
6,650.00
11,250.00
880.00
19,480.00 Rp
T O T A L Rp

kg
1,300.00
M3
265,125.00
Sub - Bahan
Org
75,000.00
Org
95,000.00
Org
100,000.00
Org
110,000.00
Sub - Upah

20,155.20
4,242.00
24,397.20 Rp
22,500.00
14,250.00
1,500.00
1,650.00
39,900.00 Rp
T O T A L Rp

626,692.50

251,250.00
877,942.50

374,430.00
277,900.00
652,330.00

358,260.00
277,900.00
636,160.00

22,253.75

19,480.00
41,733.75

SNI-2008
15.504
0.016

Pekerja
Tukang batu halus
Kep. Tukang Batu
Mandor

PLESTERAN DINDING 15 mm, Camp. 1Pc : 2Ps / M2


Bahan : Semen PC

1,596,073.50

SNI - 2008 Analisa no. 6.10, hal 5.

Upah, sama dengan rangka Kamper Smrd


8.12.

277,900.00
632,873.50

SNI - 2008 Analisa no. 6.9, hal 5.

Kep. Tukang Kayu


Tukang kayu halus
Pekerja
Mandor

PEK. JALUSI KOSEN, KAYU KELAS - I atau II / M2


( Kayu KAMPER SAMARINDA Oven )
Bahan : Papan Kamper Samarinda (oven)
Paku halus (1 - 2,5 CM)
Upah

8.11.

Org
Org
Org

HARGA SATUAN
PEKERJAAN

SNI - 2008 Analisa no. 6.11, hal 5.

Kep. Tukang Kayu


Tukang kayu halus
Pekerja
Mandor

PINTU TEAKWOOD RANGKAP, RANGKA EXPOSE / M2


KAYU KELAS-I atau II (Kamper Samarinda oven)
Bahan : Papan Kamper Samarinda (oven)
Teakwood 122x244x 3mm
Paku halus (1 - 2,5 CM)
Lem Kayu
Upah

8.10.

2.100
0.700
0.035

ANALISA HARGA BAHAN & UPAH


sat
hrg. sat.
Total harga

0.300
0.150
0.015
0.015

SNI-2008
10.224

RAB - 033

kg

1,300.00

13,291.20

24,397.20

39,900.00
64,297.20

ANALISA HARGA SATUAN PEKERJAAN, BERDASARKAN SNI


NO.

URAIAN PEKERJAAN

SNI

kfsn

Pasir pasang
Upah

4.416
0.027

3.936
0.028

Upah

kg
1,300.00
M3
265,125.00
Sub - Bahan
Sub - Upah

8,112.00
6,363.00
14,475.00

kg
1,300.00
M3
265,125.00
Sub - Bahan
Sub - Upah

6,739.20
6,893.25
13,632.45

kg
1,300.00
M3
265,125.00
Sub - Bahan
Sub - Upah

5,740.80
7,158.38
12,899.18

kg
1,300.00
M3
265,125.00
Sub - Bahan
Sub - Upah

5,116.80
7,423.50
12,540.30

kg
1,300.00
M3
265,125.00
Sub - Bahan
Sub - Upah

4,492.80
7,688.63
12,181.43

kg
105,262.50
kg
1,575.00
kg
2,546.25
Sub - Bahan
Org
75,000.00
Org
90,000.00
Org
100,000.00
Org
110,000.00
Sub - Upah

11,578.88
31,500.00
5,092.50
48,171.38 Rp
15,000.00
9,000.00
1,000.00
1,100.00
26,100.00 Rp
T O T A L Rp

kg
1,300.00
M3
265,125.00
Sub - Bahan
Org
75,000.00
Org
95,000.00
Org
100,000.00
Org
110,000.00
Sub - Upah

17,721.60
7,158.38
24,879.98 Rp
30,000.00
19,000.00
2,000.00
2,420.00
53,420.00 Rp
T O T A L Rp

kg
1,300.00
M3
265,125.00
Sub - Bahan
Sub - Upah

13,478.40
8,218.88
21,697.28

kg
1,300.00
M3
265,125.00
Sub - Bahan
Sub - Upah

10,816.00
8,484.00
19,300.00

kg
1,300.00
M3
265,125.00
Sub - Bahan
Sub - Upah

8,985.60
9,279.38
18,264.98

Rp
Rp
T O T A L Rp

16,206.68
39,900.00
56,106.68

Rp
Rp
T O T A L Rp

14,475.00
39,900.00
54,375.00

Rp
Rp
T O T A L Rp

13,632.45
39,900.00
53,532.45

Rp
Rp
T O T A L Rp

12,899.18
39,900.00
52,799.18

Rp
Rp
T O T A L Rp

12,540.30
39,900.00
52,440.30

SNI-2008
3.456
0.029

0.110
20.000
2.000
0.200
0.100
0.010
0.010

Rp
Rp
T O T A L Rp

12,181.43
39,900.00
52,081.43

48,171.38

26,100.00
74,271.38

SNI-2008
13.632
0.027

Pekerja
Tukang batu halus
Kep. Tukang Batu
Mandor

0.400
0.200
0.020
0.022

24,879.98

53,420.00
78,299.98

SNI-2008
10.368
0.031

sama dengan upah plesteran 1Pc : 1Ps

Rp
Rp
T O T A L Rp

21,697.28
53,420.00
75,117.28

SNI-2008
8.320
0.032

sama dengan upah plesteran 1Pc : 1Ps

PLESTERAN DINDING 20 mm, Camp. 1Pc : 5Ps / M2


Bahan : Semen PC
Pasir pasang

10,108.80
6,097.88
16,206.68

18,593.70
39,900.00
58,493.70

SNI-2008

Pekerja
Tukang batu
Kep. Tukang Batu
Mandor

PLESTERAN DINDING 20 mm, Camp. 1Pc : 4Ps / M2


Bahan : Semen PC
Pasir pasang
Upah

kg
1,300.00
M3
265,125.00
Sub - Bahan
Sub - Upah

Rp
Rp
T O T A L Rp

SNI-2008

sama dengan upah plesteran 1Pc : 1Ps

PLESTERAN DINDING 20 mm, Camp. 1Pc : 3Ps / M2


Bahan : Semen PC
Pasir pasang
Upah

5.184
0.026

sama dengan upah plesteran 1Pc : 1Ps

PEK. PLESTERAN DINDING 20 cm


PLESTERAN DINDING 20 mm, Camp. 1Pc : 2Ps / M2
Bahan : Semen PC
Pasir pasang
Upah

5,302.50
18,593.70

SNI-2008

PLESTERAN DINDING CAMPURAN MORTAR, tebal 10 mm


Bahan : Perekat mortar & beton (MU L-500)
Plester premium (MU 100)
Acian plesteran (MU 250)
Upah

9.1.3
1

6.240
0.024

sama dengan upah plesteran 1Pc : 1Ps

PLESTERAN DINDING 15 mm, Camp. 1Pc : 8Ps / M2


Bahan : Semen PC
Pasir pasang
Upah

M3
265,125.00
Sub - Bahan
Sub - Upah

SNI-2008

sama dengan upah plesteran 1Pc : 1Ps

PLESTERAN DINDING 15 mm, Camp. 1Pc : 7Ps / M2


Bahan : Semen PC
Pasir pasang
Upah

7.776
0.023

sama dengan upah plesteran 1Pc : 1Ps

PLESTERAN DINDING 15 mm, Camp. 1Pc : 6Ps / M2


Bahan : Semen PC
Pasir pasang
Upah

HARGA SATUAN
PEKERJAAN

SNI-2008

sama dengan upah plesteran 1Pc : 1Ps

PLESTERAN DINDING 15 mm, Camp. 1Pc : 5Ps / M2


Bahan : Semen PC
Pasir pasang
Upah

PLESTERAN DINDING 15 mm, Camp. 1Pc : 4Ps / M2


Bahan : Semen PC
Pasir pasang
Upah

sama dengan upah plesteran 1Pc : 1Ps

PLESTERAN DINDING 15 mm, Camp. 1Pc : 3Ps / M2


Bahan : Semen PC
Pasir pasang
Upah

0.020

ANALISA HARGA BAHAN & UPAH


sat
hrg. sat.
Total harga

Rp
Rp
T O T A L Rp

19,300.00
53,420.00
72,720.00

SNI-2008
6.912
0.035

sama dengan upah plesteran 1Pc : 1Ps

RAB - 034

Rp
Rp
T O T A L Rp

18,264.98
53,420.00
71,684.98

ANALISA HARGA SATUAN PEKERJAAN, BERDASARKAN SNI


NO.

URAIAN PEKERJAAN

9.1.4
1

0.300
0.100
0.010
0.015

3.108
0.150
0.075
0.008
0.008

kg
1,300.00
kg
5,000.00
Sub - Bahan
Org
75,000.00
Org
95,000.00
Org
100,000.00
Org
110,000.00
Sub - Upah

13,000.00
75,000.00
88,000.00 Rp
33,000.00
21,375.00
2,300.00
2,530.00
59,205.00 Rp
T O T A L Rp

kg
1,300.00
kg
4,000.00
Sub - Bahan
Org
75,000.00
Org
95,000.00
Org
100,000.00
Org
110,000.00
Sub - Upah

13,000.00
60,000.00
73,000.00 Rp
33,000.00
21,375.00
2,300.00
2,530.00
59,205.00 Rp
T O T A L Rp

kg
1,300.00
m3
265,125.00
Sub - Bahan
Org
75,000.00
Org
95,000.00
Org
100,000.00
Org
110,000.00
Sub - Upah

5,616.00
1,590.75
7,206.75 Rp
22,500.00
9,500.00
1,000.00
1,650.00
34,650.00 Rp
T O T A L Rp

kg
1,300.00
Sub - Bahan
Org
75,000.00
Org
95,000.00
Org
100,000.00
Org
110,000.00
Sub - Upah

4,040.40
4,040.40 Rp
11,250.00
7,125.00
800.00
880.00
20,055.00 Rp
T O T A L Rp

kg
1,300.00
Sub - Bahan
Org
75,000.00
Org
95,000.00
Org
100,000.00
Org
110,000.00
Sub - Upah

2,080.00
2,080.00 Rp
5,250.00
3,325.00
400.00
440.00
9,415.00 Rp
T O T A L Rp

kg
1,300.00
m3
265,125.00
Sub - Bahan
Org
75,000.00
Org
95,000.00
Org
100,000.00
Org
110,000.00
Sub - Upah

8,242.00
3,181.50
11,423.50 Rp
22,500.00
14,250.00
1,500.00
1,650.00
39,900.00 Rp
T O T A L Rp

kg
1,300.00
Sub - Bahan
Org
75,000.00
Org
95,000.00
Org
100,000.00
Org
110,000.00
Sub - Upah

4,225.00
4,225.00 Rp
11,250.00
9,500.00
1,000.00
880.00
22,630.00 Rp
T O T A L Rp

kg
4,160.63
Sub - Bahan
Org
75,000.00
Org
95,000.00
Org
100,000.00
Org
110,000.00
Sub - Upah

12,481.88
12,481.88 Rp
11,250.00
9,500.00
1,000.00
880.00
22,630.00 Rp
T O T A L Rp

Kg
1,300.00
M3
265,125.00
M2
57,750.00
Kg
10,500.00
Sub - Bahan
Org
100,000.00
Org
95,000.00
Org
75,000.00
Org
110,000.00

12,090.00
4,772.25
60,117.75
15,750.00
92,730.00
3,000.00
28,500.00
22,500.00
330.00

88,000.00

59,205.00
147,205.00

73,000.00

59,205.00
132,205.00

7,206.75

34,650.00
41,856.75

4,040.40

20,055.00
24,095.40

SNI-2008
1.600
0.070
0.035
0.004
0.004

2,080.00

9,415.00
11,495.00

SNI-2008
6.340
0.012
0.300
0.150
0.015
0.015

11,423.50

39,900.00
51,323.50

SNI-2008
3.250

Pekerja
Tukang batu halus
Kep. Tukang Batu
Mandor

0.150
0.100
0.010
0.008

4,225.00

22,630.00
26,855.00

SNI-2008
3.000

Pekerja
Tukang batu halus
Kep. Tukang Batu
Mandor

Kep. Tukang Batu


Tukang batu halus
Pekerja
Mandor

HARGA SATUAN
PEKERJAAN

SNI-2008

Pekerja
Tukang batu halus
Kep. Tukang Batu
Mandor

PEK. DINDING KERAMIK


PAS. DINDING PORSELIN 11x11 Cm / M2
Bahan : Semen PC
Pasir pasang
Porselin 11 x 11 cm
Semen Warna
Upah

4.320
0.006

Pekerja
Tukang batu halus
Kep. Tukang Batu
Mandor

ACIAN Beton Expose, dengan Mortar / M2


Bahan : Acian plesteran / beton expose (MU 200)
Upah

9.1.5
1

ANALISA HARGA BAHAN & UPAH


sat
hrg. sat.
Total harga

SNI-2008

Pekerja
Tukang batu halus
Kep. Tukang Batu
Mandor

FINISHING ACIAN / M2
Bahan : Semen PC
Upah

10.000
15.000
0.440
0.225
0.023
0.023

Pekerja
Tukang batu halus
Kep. Tukang Batu
Mandor

FINISHING SIAR PAS. BATU KALI, adukan 1Pc : 2Ps / M2


Bahan : Semen PC
Pasir Pasang
Upah

10.000
15.000
0.440
0.225
0.023
0.023

Pekerja
Tukang batu halus
Kep. Tukang Batu
Mandor

FINISHING SIAR DINDING CONBLOCK EXPOSE / M2 (8M')


Bahan : Semen PC
Upah

FINISHING SIAR PAS. DINDING BATA MERAH / M2 (20M')


Bahan : Semen PC
Upah

Pekerja
Tukang batu halus
Kep. Tukang Batu
Mandor

PLESTERAN CIPRAT / KAMPROTAN, Camp. 1Pc : 2Ps / M2


Bahan : Semen PC
Pasir Pasang
Upah

PLESTERAN BATU TERASO tebal 10 mm, Camp. 1Pc : 2Ps / M2 SNI-2008


Bahan : Semen PC
Batu Teraso
Upah

kfsn

PEK. PLESTERAN LAIN-LAIN


PLESTERAN BATU GRANIT tebal 10 mm, Camp. 1Pc : 2Ps / M2 SNI-2008
Bahan : Semen PC
Batu granit
Upah

SNI

0.150
0.100
0.010
0.008

12,481.88

22,630.00
35,111.88

SNI-2008
9.300
0.018
1.041
1.500
0.030
0.300
0.300
0.003

RAB - 035

Rp

92,730.00

ANALISA HARGA SATUAN PEKERJAAN, BERDASARKAN SNI


NO.

URAIAN PEKERJAAN

SNI

kfsn

ANALISA HARGA BAHAN & UPAH


sat
hrg. sat.
Total harga
Sub - Upah

PAS. DINDING KERAMIK ARTISTIK 5x20 Cm / M2


Bahan : Semen PC
Pasir pasang
Keramik Artistik 5x20 cm
Semen Warna
Upah

9.1.6
1

Upah

9.300
0.018
1.060
2.750

Kg
1,300.00
M3
265,125.00
M2
68,250.00
Kg
10,500.00
Sub - Bahan
Org
100,000.00
Org
95,000.00
Org
75,000.00
Org
110,000.00
Sub - Upah

12,090.00
4,772.25
72,345.00
28,875.00
118,082.25 Rp
3,000.00
28,500.00
22,500.00
330.00
54,330.00 Rp
T O T A L Rp

0.030
0.300
0.300
0.003

kg
1,300.00
M3
265,125.00
M2
79,800.00
Kg
10,500.00
Sub - Bahan
Org
100,000.00
Org
95,000.00
Org
75,000.00
Org
110,000.00
Sub - Upah

12,090.00
4,772.25
84,588.00
20,370.00
121,820.25 Rp
3,000.00
28,500.00
22,500.00
330.00
54,330.00 Rp
T O T A L Rp

kg
1,300.00
M3
265,125.00
M2
86,100.00
Kg
10,500.00
Sub - Bahan

12,090.00
4,772.25
91,266.00
20,370.00
128,498.25

kg
1,300.00
M3
265,125.00
M2
134,925.00
Kg
10,500.00
Sub - Bahan

12,090.00
4,772.25
143,020.50
20,370.00
180,252.75

kg
1,300.00
M3
265,125.00
M2
84,000.00
Kg
10,500.00
Sub - Bahan

12,090.00
4,772.25
89,040.00
20,370.00
126,272.25

kg
1,300.00
M3
265,125.00
M2
73,500.00
Kg
10,500.00
Sub - Bahan

12,090.00
4,772.25
77,910.00
20,370.00
115,142.25

Kg
1,300.00
M3
265,125.00
M2
420,000.00
bh
300.00
Kg
12,600.00
Sub - Bahan
Org
100,000.00

16,172.00
6,628.13
445,200.00
900.90
8,190.00
477,091.03
4,500.00

Kep. Tukang Batu

119,657.25

54,330.00
173,987.25

118,082.25

54,330.00
172,412.25

SNI-2008
9.300
0.018
1.060
1.940
0.030
0.300
0.300
0.003

121,820.25

40,747.50
162,567.75

SNI-2008
9.300
0.018
1.060
1.940

Rp
Rp
T O T A L Rp

128,498.25
40,747.50
169,245.75

SNI-2008
9.300
0.018
1.060
1.940

Rp
Rp
T O T A L Rp

180,252.75
40,747.50
221,000.25

SNI-2008
9.300
0.018
1.060
1.940

Rp
Rp
T O T A L Rp

126,272.25
40,747.50
167,019.75

SNI-2008
9.300
0.018
1.060
1.940

Upah sama pasang keramik 20x25

PEK. DINDING HOMOGENOUS TILE


PAS. DINDING MARMER TULUNG AGUNG 60x60 Cm
Bahan : Semen PC
Pasir pasang
Marmer Tulung Agung, 60/60 cm
Paku 12 cm
Epoxy Resin/semen warna

54,330.00
147,060.00

SNI-2008

Upah sama pasang keramik 20x25

PAS. DINDING KERAMIK 30x30 Cm, / M2


Bahan : Semen PC
Pasir pasang
Keramik dinding 30x30 cm, ex Roman
Semen Warna
Upah :

12,090.00
4,772.25
72,345.00
30,450.00
119,657.25 Rp
3,000.00
28,500.00
22,500.00
330.00
54,330.00 Rp
T O T A L Rp

Upah sama pasang keramik 20x25

PAS. DINDING KERAMIK 20x40 Cm, / M2


Bahan : Semen PC
Pasir pasang
Keramik dinding 20x40 cm, ex Roman
Semen Warna
Upah :

Kg
1,300.00
M3
265,125.00
M2
68,250.00
Kg
10,500.00
Sub - Bahan
Org
100,000.00
Org
95,000.00
Org
75,000.00
Org
110,000.00
Sub - Upah

Upah sama pasang keramik 20x25

PAS. DINDING KERAMIK 30x60 Cm, / M2


Bahan : Semen PC
Pasir pasang
Keramik dinding 30x60 cm, ex Roman
Semen Warna
Upah :

0.030
0.300
0.300
0.003

Kep. Tukang Batu


Tukang batu halus
Pekerja
Mandor

PAS. DINDING KERAMIK 20x20 Cm, / M2


Bahan : Semen PC
Pasir pasang
Keramik dinding 20x20 cm, ex Roman
Semen Warna
Upah :

9.300
0.018
1.060
2.900

Kep. Tukang Batu


Tukang batu halus
Pekerja
Mandor

PAS. DINDING KERAMIK 20x25 Cm, ex Roman / M2


Bahan : Semen PC
Pasir pasang
Keramik dinding 20x25 cm, ex Roman
Semen Warna
Upah

54,330.00 Rp
T O T A L Rp

SNI-2008

Kep. Tukang Batu


Tukang batu halus
Pekerja
Mandor

PAS. DINDING KERAMIK 10x20 Cm / M2


Bahan : Semen PC
Pasir pasang
Keramik 10x20 cm
Semen Warna
Upah

HARGA SATUAN
PEKERJAAN

Rp
Rp
T O T A L Rp

115,142.25
40,747.50
155,889.75

SNI-2008
12.440
0.025
1.060
3.003
0.650
0.045

RAB - 036

Rp

477,091.03

ANALISA HARGA SATUAN PEKERJAAN, BERDASARKAN SNI


NO.

URAIAN PEKERJAAN

SNI

kfsn

Tukang batu halus


Pekerja
Mandor

PAS. DINDING GRANIT IMPORT Ex India (slab-Polish)


Bahan : Semen PC
Pasir pasang
Granit Import (Nero Absolute India) jenis slab
Paku 12 cm
Epoxy Resin/semen warna
Upah

Upah

9.1.7
1

16,172.00
6,628.13
1,085,175.00
900.90
8,190.00
1,117,066.03 Rp
4,500.00
42,750.00
33,750.00
990.00
81,990.00 Rp
T O T A L Rp

81,990.00
559,081.03

1,117,066.03

81,990.00
1,199,056.03

SNI-2008
12.440
0.025
1.060
3.003
0.650

Kg
1,300.00
M3
265,125.00
M2
577,500.00
bh
300.00
Kg
12,600.00
Sub - Bahan

16,172.00
6,628.13
612,150.00
900.90
8,190.00
644,041.03

Kg
1,300.00
M3
265,125.00
M2
310,695.00
Kg
12,600.00
Sub - Bahan
Org
100,000.00
Org
95,000.00
Org
75,000.00
Org
110,000.00
Sub - Upah

12,090.00
4,772.25
329,336.70
24,444.00
370,642.95 Rp
4,500.00
42,750.00
33,750.00
990.00
81,990.00 Rp
T O T A L Rp

Kg
1,300.00
M2
133,000.35
M3
265,125.00
Sub - Bahan
Org
100,000.00
Org
95,000.00
Org
75,000.00
Org
110,000.00
Sub - Upah

15,275.00
146,300.39
9,279.38
170,854.76 Rp
3,500.00
33,250.00
26,250.00
3,850.00
66,850.00 Rp
T O T A L Rp

Kg
1,300.00
M2
147,000.00
M3
265,125.00
Sub - Bahan

15,275.00
161,700.00
9,279.38
186,254.38

Kg
1,300.00
M2
157,500.00
M3
265,125.00
Sub - Bahan

15,275.00
173,250.00
9,279.38
197,804.38

Kg
1,300.00
M2
189,000.00
M3
265,125.00
Sub - Bahan

15,275.00
207,900.00
9,279.38
232,454.38

Kg
1,300.00
M2
99,750.00
M3
265,125.00
Sub - Bahan

15,275.00
109,725.00
9,279.38
134,279.38

Rp
Rp
T O T A L Rp

644,041.03
81,990.00
726,031.03

SNI-2008
9.300
0.018
1.060
1.940
0.045
0.450
0.450
0.009

370,642.95

81,990.00
452,632.95

SNI-2008
11.750
1.100
0.035
0.035
0.350
0.350
0.035

170,854.76

66,850.00
237,704.76

SNI-2008
11.750
1.100
0.035

11.750
1.100
0.035

11.750
1.100
0.035

Setandart upah pas. Batu alam

PAS. BATU PARAS JOGJA 20/30, 40/40 cm / M2


Bahan : Semen PC
Paras Jogja 20/30s/d40/40 (cream/putih)
Pasir pasang
Upah

9.1.8
1

Kg
1,300.00
M3
265,125.00
M2
1,023,750.00
bh
300.00
Kg
12,600.00
Sub - Bahan
Org
100,000.00
Org
95,000.00
Org
75,000.00
Org
110,000.00
Sub - Upah

Setandart upah pas. Batu alam

PAS. BATU ALAM ANDESIT 20/40, 30/40 CM / M2


Bahan : Semen PC
Batu alam Andesit 20/40 s/d 30/40 cm
Pasir pasang
Upah

42,750.00
33,750.00
990.00
81,990.00 Rp
T O T A L Rp

Setandart upah pas. Batu alam

PAS. BATU ALAM SUSUN 3x30 cm / M2


Bahan : Semen PC
Batu alam susun hitam 3x30 cm
Pasir pasang
Upah

0.045
0.450
0.450
0.009

Kep. Tukang Batu


Tukang batu halus
Pekerja
Mandor

PAS. BATU ALAM PALIMANAN 20x40 CM / M2


Bahan : Semen PC
Batu alam Paliaman 20X40
Pasir pasang
Upah

12.440
0.025
1.060
3.003
0.650

Kep. Tukang Batu


Tukang batu halus
Pekerja
Mandor

DINDING BATU ALAM


PAS. BATU CANDI 20/40 cm / M2
Bahan : Semen PC
Batu Candi 20x40 cm
Pasir pasang
Upah

Org
95,000.00
Org
75,000.00
Org
110,000.00
Sub - Upah

Upah sama pas Granit 60x60

DINDING HOMOGENOUS TILE, ex Granito 30x60 (polish)


Bahan : Semen PC
Pasir pasang
Granitto Aurora 30x60 Cm (polished), Group Silver
Epoxy Resin/semen warna

HARGA SATUAN
PEKERJAAN

SNI-2008

Kep. Tukang Batu


Tukang batu halus
Pekerja
Mandor

PAS. DINDING GRANIT IMPORT ex China (Slab-Polish)


Bahan : Semen PC
Pasir pasang
Granit Import (Red China & Black China) jenis Slab
Paku 12 cm
Epoxy Resin/semen warna
Upah :

0.450
0.450
0.009

ANALISA HARGA BAHAN & UPAH


sat
hrg. sat.
Total harga

11.750
1.100
0.035

Setandart upah pas. Batu alam

PEK. DINDING PARTISI


PAS. PARTISI DOUBLE GYPSUM 12 MM, / M2
(Rangka hollow)

RAB - 037

Rp
Rp
T O T A L Rp

Rp
Rp
T O T A L Rp

Rp
Rp
T O T A L Rp

Rp
Rp
T O T A L Rp

186,254.38
66,850.00
253,104.38

197,804.38
66,850.00
264,654.38

232,454.38
66,850.00
299,304.38

134,279.38
66,850.00
201,129.38

ANALISA HARGA SATUAN PEKERJAAN, BERDASARKAN SNI


NO.

URAIAN PEKERJAAN

Bahan :

Hollow 40x40 mm, tbl 0.35 mm


Hollow 20x40 mm, tbl 0.35 mm
Paku rivet
Sekrup 6x1-1,5
Gypsumboard 120x240 cm 12 mm
Textile tape
Compound gypsum
Sekrup gypsum
Amplas

Upah

Tukang Allumunium
Tukang gypsum
Pekerja
Mandor

PAS. PARTISI DOUBLE GYPSUM 12 MM, / M2


( Rangka Metal Furing )
Bahan : Metal Furing 75 mm
Paku rivet
Sekrup 6x1-1,5
Gypsumboard 120x240 cm 12 mm
Textile tape
Compound gypsum
Sekrup gypsum
Amplas
Upah

Tukang Allumunium
Tukang gypsum
Pekerja
Mandor

Tukang Allumunium
Tukang gypsum
Pekerja
Mandor

PAS. PARTISI "SINGLE" GRC BOARD 10 mm / M2


(Rangka besi hollow)
Bahan : Besi Hollow 40x40 mm, tbl 1 mm
Besi Hollow 20x40 mm, tbl 1 mm
Paku rivet
Sekrup 6x1-1,5
GRC-Board 120x240 cm 10 mm
Textile tape
Compound GRC
Sekrup gypsum
Amplas
Upah

Tukang Allumunium
Tukang gypsum
Pekerja
Mandor

PAS. PARTISI SINGLE GYPSUM 12 MM, / M2


( Rangka Metal Furing )
Bahan : Metal Furing 75 mm
Paku rivet
Sekrup 6x1-1,5
Gypsumboard 120x240 cm 12 mm
Textile tape
Compound gypsum
Sekrup gypsum
Amplas
Upah

PAS. PARTISI SINGLE GYPSUM 12 MM, / M2


(Rangka hollow)
Pelapis Gypsum 12 mm (1 sisi)
Bahan : Hollow 40x40 mm, tbl 0.35 mm
Hollow 20x40 mm, tbl 0.35 mm
Paku rivet
Sekrup 6x1-1,5
Gypsumboard 120x240 cm 12 mm
Textile tape
Compound gypsum
Sekrup gypsum
Amplas
Upah

Tukang Allumunium
Tukang gypsum
Pekerja
Mandor

SNI

kfsn
1.250
0.250
8.000
8.000
0.700
0.240
0.120
24.000
0.500
0.200
0.300
0.200
0.015

1.250
8.000
8.000
0.700
0.240
0.120
24.000
0.500
0.200
0.300
0.200
0.015

1.250
0.250
8.000
8.000
0.350
0.240
0.120
24.000
0.500
0.200
0.150
0.200
0.015

1.250
8.000
8.000
0.350
0.240
0.120
24.000
0.500
0.200
0.150
0.200
0.015

3.000
1.000
8.000
8.000
0.350
0.240
0.120
24.000
0.500
0.200
0.300
0.200
0.015

PAS. PARTISI DOBLE GRC BOARD 6mm / M2


(Rangka kayu Kamper Medan)

RAB - 038

ANALISA HARGA BAHAN & UPAH


sat
hrg. sat.
Total harga

HARGA SATUAN
PEKERJAAN

btg
21,000.00
btg
21,000.00
bh
300.00
bh
450.00
lbr
78,750.00
roll
18,375.00
zak
60,375.00
bh
400.00
lbr
2,887.50
Sub - Bahan
Org
100,000.00
Org
90,000.00
Org
75,000.00
Org
110,000.00
Sub - Upah

26,250.00
5,250.00
2,400.00
3,600.00
55,125.00
4,410.00
7,245.00
9,600.00
1,443.75
115,323.75 Rp
20,000.00
27,000.00
15,000.00
1,650.00
63,650.00 Rp
T O T A L Rp

btg
37,800.00
bh
300.00
bh
450.00
lbr
78,750.00
roll
18,375.00
zak
60,375.00
bh
400.00
lbr
2,887.50
Sub - Bahan
Org
100,000.00
Org
90,000.00
Org
75,000.00
Org
110,000.00
Sub - Upah

47,250.00
2,400.00
3,600.00
55,125.00
4,410.00
7,245.00
9,600.00
1,443.75
131,073.75 Rp
20,000.00
27,000.00
15,000.00
1,650.00
63,650.00 Rp
T O T A L Rp

btg
21,000.00
btg
21,000.00
bh
300.00
bh
450.00
lbr
78,750.00
roll
18,375.00
zak
60,375.00
bh
400.00
lbr
2,887.50
Sub - Bahan
Org
100,000.00
Org
90,000.00
Org
75,000.00
Org
110,000.00
Sub - Upah

26,250.00
5,250.00
2,400.00
3,600.00
27,562.50
4,410.00
7,245.00
9,600.00
1,443.75
87,761.25 Rp
20,000.00
13,500.00
15,000.00
1,650.00
50,150.00 Rp
T O T A L Rp

btg
37,800.00
bh
300.00
bh
450.00
lbr
78,750.00
roll
18,375.00
zak
60,375.00
bh
400.00
lbr
2,887.50
Sub - Bahan
Org
100,000.00
Org
90,000.00
Org
75,000.00
Org
110,000.00
Sub - Upah

47,250.00
2,400.00
3,600.00
27,562.50
4,410.00
7,245.00
9,600.00
1,443.75
103,511.25 Rp
20,000.00
13,500.00
15,000.00
1,650.00
50,150.00 Rp
T O T A L Rp

m
36,575.00
m
18,375.00
bh
300.00
bh
450.00
lbr
136,500.00
roll
18,375.00
zak
60,375.00
bh
400.00
lbr
2,887.50
Sub - Bahan
Org
100,000.00
Org
90,000.00
Org
75,000.00
Org
110,000.00
Sub - Upah

109,725.00
18,375.00
2,400.00
3,600.00
47,775.00
4,410.00
7,245.00
9,600.00
1,443.75
204,573.75 Rp
20,000.00
27,000.00
15,000.00
1,650.00
63,650.00 Rp
T O T A L Rp

115,323.75

63,650.00
178,973.75

131,073.75

63,650.00
194,723.75

87,761.25

50,150.00
137,911.25

103,511.25

50,150.00
153,661.25

204,573.75

63,650.00
268,223.75

ANALISA HARGA SATUAN PEKERJAAN, BERDASARKAN SNI


NO.

URAIAN PEKERJAAN
Bahan :

Kayu Kamper Medan, kasau


Paku biasa 2"-5"
GRC-board 120x240 cm 6 mm
Textile tape
Compound GRC
Sekrup gypsum
Amplas

Upah

Tukang kayu
Pekerja
Mandor

9.2.

PEK. FINISHING LANTAI

9.2.1
1

PAS. LANTAI KERAMIK


PEK. LANTAI FLOOR HARDENER 5kg/ M2
Screeding 1Pc : 3Ps dasaran (3cm) + floor hardener
Bahan : Semen PC
Pasir pasang
Upah

SNI

kfsn
0.025
0.300
0.750
0.240
0.120
32.000
0.500
0.600
0.200
0.010

1.a.

15.552
0.046

Kep. Tukang Batu


Tukang Batu halus
Pekerja
Mandor

0.020
0.200
0.400
0.020

0.010
0.100
0.100
0.005

5.000

Kep. Tukang Batu


Tukang Batu halus
Pekerja
Mandor

0.010
0.100
0.100
0.005

SNI-2008

Kep. Tukang Batu


Tukang Batu halus
Pekerja
Mandor

137,812.50
4,606.88
63,000.00
4,410.00
7,245.00
12,800.00
1,443.75
231,318.13 Rp
60,000.00
15,000.00
1,100.00
76,100.00 Rp
T O T A L Rp

231,318.13

76,100.00
307,418.13

kg
1,300.00
M3
265,125.00
Sub - Bahan
Org
100,000.00
Org
95,000.00
Org
75,000.00
Org
110,000.00
Sub - Upah

20,217.60
12,195.75
32,413.35
2,000.00
19,000.00
30,000.00
2,200.00
53,200.00

Kg
9,450.00
Sub - Bahan
Org
100,000.00
Org
95,000.00
Org
75,000.00
Org
110,000.00
Sub - Upah

47,250.00
47,250.00 Rp
1,000.00
9,500.00
7,500.00
550.00
18,550.00 Rp
T O T A L Rp

Kg
9,450.00
Sub - Bahan
Org
100,000.00
Org
95,000.00
Org
75,000.00
Org
110,000.00
Sub - Upah

47,250.00
47,250.00 Rp
1,000.00
9,500.00
7,500.00
550.00
18,550.00 Rp
T O T A L Rp

kg
1,300.00
M3
265,125.00
M2
577,500.00
Kg
10,500.00
Sub - Bahan
Org
100,000.00
Org
95,000.00
Org
75,000.00
Org
110,000.00
Sub - Upah

12,480.00
11,930.63
644,490.00
15,750.00
684,650.63 Rp
2,500.00
23,750.00
37,500.00
550.00
64,300.00 Rp
T O T A L Rp

kg
1,300.00
M3
265,125.00
M2
255,255.00
Kg
10,500.00
Sub - Bahan
Org
100,000.00
Org
95,000.00
Org
75,000.00
Org
110,000.00
Sub - Upah

12,480.00
11,930.63
284,864.58
15,750.00
325,025.21 Rp
2,500.00
23,750.00
37,500.00
550.00
64,300.00 Rp
T O T A L Rp

kg
1,300.00
M3
265,125.00
M2
259,875.00
Kg
10,500.00
Sub - Bahan
Org
100,000.00
Org
95,000.00
Org
75,000.00
Org
110,000.00
Sub - Upah

12,480.00
11,930.63
290,020.50
15,750.00
330,181.13 Rp
2,500.00
23,750.00
37,500.00
550.00
64,300.00 Rp
T O T A L Rp

Rp

32,413.35

Rp

53,200.00

47,250.00

18,550.00
151,413.35

47,250.00

18,550.00
65,800.00

684,650.63

64,300.00
748,950.63

SNI-2008
9.600
0.045
1.116
1.500

Kep. Tukang Batu


Tukang Batu halus
Pekerja
Mandor

0.025
0.250
0.500
0.005

Kep. Tukang Batu


Tukang Batu halus
Pekerja
Mandor

LANTAI HOMOGENOUS TILE, GRANITTO 40/40 (polish) / M2


Bahan : Semen PC

9.600
0.045
1.116
1.500
0.025
0.250
0.500
0.005

LANTAI HOMOGENOUS TILE 60x60 (un-polish), ex Granito/M2 SNI-2008


Bahan : Semen PC
Pasir pasang
Homogenous Tile 60x60 cm, ex Granito (un-polish)
Semen warna
Upah

LANTAI HOMOGENOUS TILE 60x60 (polish), ex Granito/M2


Bahan : Semen PC
Pasir pasang
Homogenous Tile 60x60 cm, ex Granito (polish)
Semen warna
Upah

Kep. Tukang Batu


Tukang Batu halus
Pekerja
Mandor

PAS. LANTAI GRANIT 60X60 Cm (ex China) / M2


Bahan : Semen PC
Pasir pasang
Granit China 60x60 cm
Semen warna
Upah

5.000

PEK. FLOOR HARDENER BETON 5kg/ M2 (langsung ke beton)


Floor Hardener
Bahan : Floor Hardener (Tesa/Gan's Floor), 5 kg/m2
Upah

m
5,512,500.00
kg
15,356.25
lbr
84,000.00
roll
18,375.00
zak
60,375.00
bh
400.00
lbr
2,887.50
Sub - Bahan
Org
100,000.00
Org
75,000.00
Org
110,000.00
Sub - Upah

HARGA SATUAN
PEKERJAAN

SNI-2008

Floor Hardener
Bahan : Floor Hardener (Tesa/Gan's Floor), 5 kg/m2
Upah

ANALISA HARGA BAHAN & UPAH


sat
hrg. sat.
Total harga

9.600
0.045
1.116
1.500
0.025
0.250
0.500
0.005

SNI-2008
10.000

RAB - 039

kg

1,300.00

13,000.00

325,025.21

64,300.00
389,325.21

330,181.13

64,300.00
394,481.13

ANALISA HARGA SATUAN PEKERJAAN, BERDASARKAN SNI


NO.

URAIAN PEKERJAAN

Upah

10.000
0.045
1.068
1.500
0.015
0.150
0.300
0.015

SNI-2008

Kep. Tukang Batu


Tukang Batu halus
Pekerja
Mandor

8.190
0.045
1.089
1.620
0.015
0.150
0.300
0.015

ANALISA HARGA BAHAN & UPAH


sat
hrg. sat.
Total harga
M3
265,125.00
M2
170,940.00
Kg
10,500.00
Sub - Bahan
Org
100,000.00
Org
95,000.00
Org
75,000.00
Org
110,000.00
Sub - Upah

11,930.63
182,563.92
15,750.00
223,244.55 Rp
1,500.00
14,250.00
22,500.00
1,650.00
39,900.00 Rp
T O T A L Rp

kg
1,300.00
M3
265,125.00
M2
157,080.00
Kg
10,500.00
Sub - Bahan
Org
100,000.00
Org
95,000.00
Org
75,000.00
Org
110,000.00
Sub - Upah

13,000.00
11,930.63
167,761.44
15,750.00
208,442.07 Rp
1,500.00
14,250.00
22,500.00
1,650.00
39,900.00 Rp
T O T A L Rp

kg
1,300.00
M3
265,125.00
M2
97,650.00
Kg
10,500.00
Sub - Bahan
Org
100,000.00
Org
95,000.00
Org
75,000.00
Org
110,000.00
Sub - Upah

10,647.00
11,930.63
106,340.85
17,010.00
145,928.48 Rp
1,500.00
14,250.00
22,500.00
1,650.00
39,900.00 Rp
T O T A L Rp

10.400
0.045
1.060
1.620

kg
1,300.00
M3
265,125.00
M2
86,100.00
Kg
10,500.00
Sub - Bahan
Org
100,000.00
Org
95,000.00
Org
75,000.00
Org
110,000.00
Sub - Upah

13,520.00
11,930.63
91,266.00
17,010.00
133,726.63 Rp
1,500.00
14,250.00
22,500.00
1,650.00
39,900.00 Rp
T O T A L Rp

0.015
0.150
0.300
0.015

kg
1,300.00
M3
265,125.00
M2
73,500.00
Kg
10,500.00
Sub - Bahan

13,000.00
11,930.63
78,498.00
15,750.00
119,178.63

kg
1,300.00
M3
265,125.00
M2
82,500.00
Kg
10,500.00
Sub - Bahan

13,000.00
11,930.63
88,110.00
15,750.00
128,790.63

223,244.55

39,900.00
263,144.55

208,442.07

39,900.00
248,342.07

145,928.48

39,900.00
185,828.48

133,726.63

29,925.00
163,651.63

SNI-2008
10.000
0.045
1.068
1.500

Sama dengan upah pas. keramik 20x20

Rp
Rp
T O T A L Rp

119,178.63
29,925.00
149,103.63

SNI-2008
10.000
0.045
1.068
1.500

Sama dengan upah pas. keramik 20x20

Rp
Rp
T O T A L Rp

128,790.63
29,925.00
158,715.63

SNI-2008
1.140
0.003
0.123
0.025

kg
1,300.00
1,482.00
M3
265,125.00
795.38
M2
255,255.00
31,335.10
Kg
10,500.00
262.50
Sub - Bahan
33,874.98
0.009
Org
100,000.00
900.00
0.090
Org
95,000.00
8,550.00
0.090
Org
75,000.00
6,750.00
0.005
Org
110,000.00
550.00
Sub - Upah
16,750.00
Ditambah upah potong ubin & tali air (1x upah)
TOTAL

Kep. Tukang Batu


Tukang Batu halus
Pekerja
Mandor

Rp

33,874.98

Rp
Rp
Rp

16,750.00
16,750.00
67,374.98

SNI-2008
0.002
0.050

Kep. Tukang Kayu


Tukang Kayu halus
Pekerja
Mandor

PAS. LANTAI MARMER


LANTAI MARMER LOKAL 60x60 Cm (ex Tulung Agung) / M2

HARGA SATUAN
PEKERJAAN

SNI-2008

Kep. Tukang Batu


Tukang Batu halus
Pekerja
Mandor

PAS. PLINT KAYU KAMPER 2x10 Cm, / M'


Bahan : Papan kayu Kamper
Paku / skrup
Upah

9.2.3
1

Kep. Tukang Batu


Tukang Batu halus
Pekerja
Mandor

PAS. PLINT KERAMIK


PAS. PLINT HOMOGENOUS TILE 10X60 Cm, / M'
Bahan : Semen PC
Pasir pasang
Homogenous Tile 60x60 cm
Semen Warna
Upah

0.015
0.150
0.300
0.015

PAS. LANTAI KERAMIK LOKAL 40/40 Cm (ex Roman) / M2


Bahan : Semen PC
Pasir pasang
Keramik lokal 40/40 Cm (ex Roman)
Semen Warna
Upah

9.2.2
1

Kep. Tukang Batu


Tukang Batu halus
Pekerja
Mandor

PAS. LANTAI KERAMIK LOKAL 30/30 Cm (ex Roman) / M2


Bahan : Semen PC
Pasir pasang
Keramik lokal 30/30 Cm (ex Roman)
Semen Warna
Upah

10

0.045
1.068
1.500

PAS. LANTAI KERAMIK LOKAL 20/20 Cm (ex Roman) / M2


Bahan : Semen PC
Pasir pasang
Keramik lokal 20/20 Cm (ex Roman)
Semen Warna
Upah

Pasir pasang
Homogenous Tile Granitto 40/40 Cm, polished
Semen warna

PAS. LANTAI KERAMIK 33X33 Cm (ex Roman) / M2


Bahan : Semen PC
Pasir pasang
Keramik tile 33x33 cm, ex Roman
Semen warna
Upah

kfsn

LANTAI HOMOGENOUS TILE, GRANITTO 30x30 (un-polish) / M2 SNI-2008


Bahan : Semen PC
Pasir pasang
Homogenous Tile Granitto 30/30 Cm, un-polished
Semen warna
Upah :
75%

SNI

0.012
0.120
0.120
0.006

SNI-2008

RAB - 040

m3
############
Kg
19,950.00
Sub - Bahan
Org
105,000.00
Org
95,000.00
Org
75,000.00
Org
110,000.00
Sub - Upah

20,790.00
997.50
21,787.50 Rp
1,260.00
11,400.00
9,000.00
660.00
22,320.00 Rp
T O T A L Rp

21,787.50

22,320.00
44,107.50

ANALISA HARGA SATUAN PEKERJAAN, BERDASARKAN SNI


NO.

URAIAN PEKERJAAN

9.2.4
1

Semen PC
Pasir pasang
Marmer Tulung Agung, 60/60 cm
Semen Warna

8.190
0.045
1.060
0.650

Upah

Kep. Tukang Batu


Tukang Batu halus
Pekerja
Mandor

0.025
0.250
0.500
0.005

PAS. LANTAI "MERO" RAISED FLOOR, Ex Germany


(Dihitung untuk kebutuhan seluas 31 m2)
Bahan : Mero Raised Floor ex Germany, type Calsium Sulphate
Modul 600x600x30mm, Finish HPL, tinggi 20 cm.
Lain2 :

1.050
0.350
0.015
0.150
0.150
0.008

- Biaya Instol
- Biaya pengiriman ke Pangkal Pinang

kg
1,300.00
M3
265,125.00
M2
420,000.00
Kg
10,500.00
Sub - Bahan
Org
100,000.00
Org
95,000.00
Org
75,000.00
Org
110,000.00
Sub - Upah

10,647.00
11,930.63
445,200.00
6,825.00
474,602.63 Rp
2,500.00
23,750.00
37,500.00
550.00
64,300.00 Rp
T O T A L Rp

M2
31,500.00
Kg
42,000.00
Sub - Bahan
Org
105,000.00
Org
95,000.00
Org
75,000.00
Org
110,000.00
Sub - Upah

33,075.00
14,700.00
47,775.00 Rp
1,050.00
9,500.00
7,500.00
220.00
18,270.00 Rp
T O T A L Rp

M2
52,500.00
Kg
42,000.00
Sub - Bahan
Org
105,000.00
Org
95,000.00
Org
75,000.00
Org
110,000.00
Sub - Upah

55,125.00
14,700.00
69,825.00 Rp
1,575.00
14,250.00
11,250.00
880.00
27,955.00 Rp
T O T A L Rp

M2
236,250.00
Kg
42,000.00
Sub - Bahan
Org
105,000.00
Org
95,000.00
Org
75,000.00
Org
110,000.00
Sub - Upah

248,062.50
14,700.00
262,762.50 Rp
1,050.00
9,500.00
7,500.00
220.00
18,270.00 Rp
T O T A L Rp

M2
157,500.00
Kg
42,000.00
Sub - Bahan
Org
105,000.00
Org
95,000.00
Org
75,000.00
Org
110,000.00
Sub - Upah

165,375.00
14,700.00
180,075.00 Rp
1,050.00
9,500.00
7,500.00
220.00
18,270.00 Rp
T O T A L Rp

M2
150,000.00
Kg
42,000.00
Sub - Bahan
Org
105,000.00
Org
95,000.00
Org
75,000.00
Org
110,000.00
Sub - Upah

157,500.00
25,200.00
182,700.00 Rp
3,675.00
33,250.00
26,250.00
3,850.00
67,025.00 Rp
T O T A L Rp

M2
78,750.00
Kg
42,000.00
Sub - Bahan
Org
105,000.00
Org
95,000.00
Org
75,000.00
Org
110,000.00
Sub - Upah

82,687.50
14,700.00
97,387.50 Rp
1,050.00
9,500.00
7,500.00
220.00
18,270.00 Rp
T O T A L Rp

474,602.63

64,300.00
538,902.63

47,775.00

18,270.00
66,045.00

69,825.00

27,955.00
97,780.00

SNI-2008
1.050
0.350
0.010
0.100
0.100
0.002

262,762.50

18,270.00
281,032.50

SNI-2008
1.050
0.350
0.010
0.100
0.100
0.002

180,075.00

18,270.00
198,345.00

SNI-2008
1.050
0.600

Kep. Tukang Kayu


Tukang Kayu halus
Pekerja
Mandor

Kep. Tukang Kayu


Tukang Kayu halus
Pekerja
Mandor

HARGA SATUAN
PEKERJAAN

SNI-2008

Kep. Tukang Kayu


Tukang Kayu halus
Pekerja
Mandor

PAS. LANTAI PARKET SINTETIS 10X90 CM / M2


Bahan : Parket sintetis
Lem
:

0.010
0.100
0.100
0.002

Kep. Tukang Kayu


Tukang Kayu halus
Pekerja
Mandor

PAS. LANTAI PARQUET


PAS. LANTAI PARQUET KAYU / M2
Bahan : Parquet kayu
Lem

Upah

9.2.6.

1.050
0.350

Kep. Tukang Kayu


Tukang Kayu halus
Pekerja
Mandor

PAS. LANTAI VINYL TILE 30x30 / M2


Bahan : Vinyl tile 30x30 cm, ex ..
Lem

Upah

ANALISA HARGA BAHAN & UPAH


sat
hrg. sat.
Total harga

SNI-2008

Kep. Tukang Kayu


Tukang Kayu halus
Pekerja
Mandor

PAS. LANTAI KARPET TILE 50x50 cm / M2


Bahan : Carpet Tile 50x50, ex Leiko
Lem

Upah

9.2.5
1

PAS. LANTAI KARPET SHEET / M2


Bahan : Karpet Sheet
Lem

Upah

PAS. LANTAI KARPET


PAS. UNDERLAYER / PELAPIS BAWAH KARPET / M2
Bahan : Underlayer / Rubber corrugated
Lem

Upah

kfsn

Bahan :

Upah

SNI

0.035
0.350
0.350
0.035

182,700.00

67,025.00
249,725.00

SNI-2008
1.050
0.350
0.010
0.100
0.100
0.002

31.000
1.000
1.000

RAB - 041

M2
1,200,000.00
Sub - Bahan
lot
6,000,000.00
lot
############

37,200,000.00
37,200,000.00
6,000,000.00
13,500,000.00

Rp

97,387.50

18,270.00
115,657.50

37,200,000.00

ANALISA HARGA SATUAN PEKERJAAN, BERDASARKAN SNI


NO.

URAIAN PEKERJAAN

SNI

kfsn

ANALISA HARGA BAHAN & UPAH


sat
hrg. sat.
Total harga
Sub - Upah
19,500,000.00
Total harga untuk 31 m2
HARGA / M2

- Fascia (penutup RF di depan pintu)


- Veribor (tile lifter)

9.2.7.
1

PEK. SALURAN
Pas. Saluran terbuka, pas. bata + buis beton 1/2 dia 30 cm / M'
Bahan : - Dinding dari pas batu bata 1Pc : 5Ps
- Pas. Bata sambungan buis beton
- Plesteran dinding bata
- Buis beton 1/2 dia 30 cm, @ panjang 0,5 m
Upah pas buis beton :
Pekerja
Tukang batu
Kep. Tukang
Mandor

Pas. Saluran tertutup, buis beton dia 30 cm / M'


Bahan : - Pas. Bata sambungan buis beton
- Buis beton dia 30 cm, @ panjang 1 m
Upah pas buis beton :
Pekerja
Tukang batu
Kep. Tukang
Mandor

9.3.
1

293,041.36

37,500.00
9,500.00
1,000.00
550.00
48,550.00 Rp
T O T A L Rp

48,550.00
341,591.36

1,000,000.00
900,000.00

1.000
0.120
1.000
2.000

M2
102,764.63
M2
102,764.63
M2
71,684.98
bh
53,130.00
Sub - Bahan

102,764.63
12,331.76
71,684.98
106,260.00
293,041.36

0.500
0.100
0.010
0.005

0.500
0.100
0.010
0.005

0.217
1.000

0.500
0.100
0.010
0.005

Org
75,000.00
Org
95,000.00
Org
100,000.00
Org
110,000.00
Sub - Upah

M2
102,764.63
M2
102,764.63
M2
71,684.98
bh
53,130.00
M3
5,263,177.78
Sub - Bahan
Org
75,000.00
Org
95,000.00
Org
100,000.00
Org
110,000.00
Sub - Upah

M2
102,764.63
M2
102,764.63
M2
71,684.98
bh
53,130.00
M3
5,263,177.78
Sub - Bahan
Org
75,000.00
Org
95,000.00
Org
100,000.00
Org
110,000.00
Sub - Upah

M2
102,764.63
bh
88,935.00
Sub - Bahan

102,764.63
12,331.76
71,684.98
106,260.00
473,686.00
766,727.36

Rp

766,727.36

37,500.00
9,500.00
1,000.00
550.00
48,550.00 Rp
T O T A L Rp

48,550.00
815,277.36

102,764.63
12,331.76
71,684.98
106,260.00
263,158.89
556,200.24

Rp

556,200.24

37,500.00
9,500.00
1,000.00
550.00
48,550.00 Rp
T O T A L Rp

48,550.00
604,750.24

22,264.98
88,935.00
111,199.98

Rp

111,199.98

Org
75,000.00
Org
95,000.00
Org
100,000.00
Org
110,000.00
Sub - Upah

37,500.00
9,500.00
1,000.00
550.00
48,550.00 Rp
T O T A L Rp

48,550.00
159,749.98

bh
2,500.00
btg
21,000.00
btg
21,000.00
kg
30,000.00
bh
400.00
lbr
59,000.00
bh
400.00
rol
18,375.00
zak
60,375.00
lbr
2,887.50
Sub - Bahan
Org
95,000.00
Org
100,000.00
Org
90,000.00
Org
75,000.00
Org
110,000.00
Sub - Upah

975.00
9,639.00
9,051.00
300.00
5,600.00
21,476.00
8,400.00
441.00
1,207.50
288.75
57,378.25 Rp
2,945.00
26,000.00
4,500.00
19,500.00
1,430.00
54,375.00 Rp
T O T A L Rp

bh
btg

975.00
47,250.00

PEKERJAAN PLAFOND
PAS. PLAFOND GYPSUM BOARD 9 MM, RGK HOLLOW / M2
(Rangka Plafond Hollow)
Bahan : Paku peluru ramset
Hollow 40x40x0,35mm (rangka utama)
Hollow 20x40x0,35mm (rangka pembagi)
Paku beton
Sekrup 6x1-1,5
Gypsumboard 120x240 cm 9 mm
Sekrup gypsum
Textile tape
Compound gypsum
Amplas
Upah

Rp

1,000,000.00
900,000.00

Pas. Saluran tertutup, pas bata + buis beton 1/2 dia 30 cm, ditutup plat beton 10 cm / M'
Bahan : - Dinding dari pas batu bata 1Pc : 5Ps
1.000
- Pas. Bata sambungan buis beton
0.120
- Plesteran dinding bata
1.000
- Buis beton 1/2 dia 30 cm, @ panjang 0,5 m
2.000
- Tutup beton tulang tebal 15 cm
0.050
Upah pas buis beton :
Pekerja
Tukang batu
Kep. Tukang
Mandor

19,500,000.00
56,700,000.00
1,829,032.26

lot
unit

Pas. Saluran tertutup, pas bata + buis beton 1/2 dia 30 cm, ditutup plat beton 15 cm / M'
Bahan : - Dinding dari pas batu bata 1Pc : 5Ps
1.000
- Pas. Bata sambungan buis beton
0.120
- Plesteran dinding bata
1.000
- Buis beton 1/2 dia 30 cm, @ panjang 0,5 m
2.000
- Tutup beton tulang tebal 15 cm
0.090
Upah pas buis beton :
Pekerja
Tukang batu
Kep. Tukang
Mandor

Rp
Rp
Rp

1.000
1.000

0.500
0.100
0.010
0.005

HARGA SATUAN
PEKERJAAN

Kepala tukang
Tukang Allumunium
Tukang gypsum
Pekerja
Mandor

PAS. PLAFOND GYPSUM 9 MM, RGK. METAL FURING / M2


(Rangka Metal Furing)
Bahan : Paku peluru ramset
Metal furing

0.390
0.459
0.431
0.010
14.000
0.364
21.000
0.024
0.020
0.100
0.031
0.260
0.050
0.260
0.013

0.390
1.250

RAB - 042

2,500.00
37,800.00

57,378.25

54,375.00
111,753.25

ANALISA HARGA SATUAN PEKERJAAN, BERDASARKAN SNI


NO.

URAIAN PEKERJAAN

SNI

kfsn

Paku beton
Sekrup 6x1-1,5
Gypsumboard 120x240 cm 9 mm
Sekrup gypsum
Textile tape
Compound gypsum
Amplas
Upah

0.390
0.459
0.431
0.010
14.000
0.364
21.000
0.024
0.020
0.100

Kepala tukang
Tukang Allumunium
Tukang gypsum
Pekerja
Mandor

0.031
0.260
0.050
0.260
0.013

0.390
0.459
0.431
0.010
14.000
0.364
21.000
0.024
0.020
0.100

Kepala tukang
Tukang Allumunium
Tukang gypsum
Pekerja
Mandor

0.031
0.260
0.050
0.260
0.013

PAS. PLAFOND GRC 5 MM (Rangka Hollow) / M2


Bahan : Paku peluru ramset
Hollow 40x40x0,35mm (rangka utama)
Hollow 20x40x0,35mm (rangka pembagi)
Paku beton
Sekrup 6x1-1,5
GRC-Board 1200x2400x5 mm
Sekrup gypsum
Textile tape
Compound gypsum
Amplas
Upah

0.031
0.260
0.050
0.260
0.013

PAS. PLAFOND CALCIUM SILIKAT 6 MM (RGK HOLLOW) / M2


Bahan : Paku peluru ramset
Hollow 40x40x0,35mm (rangka utama)
Hollow 20x40x0,35mm (rangka pembagi)
Paku beton
Sekrup 6x1-1,5
Calsium Board 1200x2400x6 mm
Sekrup gypsum
Textile tape
Compound gypsum
Amplas
Upah

Kepala tukang
Tukang Allumunium
Tukang gypsum
Pekerja
Mandor

PAS. PLAFOND GYPSUM 9 MM (WATER RESISTANTS) / M2


(Rangka Plafond Hollow)
Bahan : Paku peluru ramset
Hollow 40x40x0,35mm (rangka utama)
Hollow 20x40x0,35mm (rangka pembagi)
Paku beton
Sekrup 6x1-1,5
Gypsumboard Waterresistance 120x240 cm 9 mm
Sekrup gypsum
Textile tape
Compound gypsum
Amplas
Upah

0.010
14.000
0.364
21.000
0.024
0.020
0.100

Kepala tukang
Tukang Allumunium
Tukang gypsum
Pekerja
Mandor

PAS. PLAFOND ACAUSTIC TILE 600X1200X15mm / M2


Rangka Allumunium T
Profil allumunium Main Tee (p. 3,6m)
Profil allumunium Cross Tee (p. 1,2 m)
Profil allumunium Cross Tee (p. 0,60 m)
Kawat diameter 4mm
Paku peluru ramset
Penutup Plafond
Bahan : Acoustic Tile 600x1200x15 mm (ex Armstrong)
Upah

0.390
0.459
0.431
0.010
14.000
0.364
21.000
0.024
0.020
0.100

Pekerja
Tukang Gypsum
Kepala Tukang
Mandor

0.031
0.260
0.050
0.260
0.013

ANALISA HARGA BAHAN & UPAH


sat
hrg. sat.
Total harga

HARGA SATUAN
PEKERJAAN

kg
30,000.00
bh
400.00
lbr
59,000.00
bh
400.00
rol
18,375.00
zak
60,375.00
lbr
2,887.50
Sub - Bahan
Org
95,000.00
Org
100,000.00
Org
90,000.00
Org
75,000.00
Org
110,000.00
Sub - Upah

300.00
5,600.00
21,476.00
8,400.00
441.00
1,207.50
288.75
85,938.25 Rp
2,945.00
26,000.00
4,500.00
19,500.00
1,430.00
54,375.00 Rp
T O T A L Rp

bh
2,500.00
btg
21,000.00
btg
21,000.00
kg
30,000.00
bh
400.00
lbr
102,500.00
bh
400.00
rol
18,375.00
zak
60,375.00
lbr
2,887.50
Sub - Bahan
Org
95,000.00
Org
100,000.00
Org
90,000.00
Org
75,000.00
Org
110,000.00
Sub - Upah

975.00
9,639.00
9,051.00
300.00
5,600.00
37,310.00
8,400.00
441.00
1,207.50
288.75
73,212.25 Rp
2,945.00
26,000.00
4,500.00
19,500.00
1,430.00
54,375.00 Rp
T O T A L Rp

bh
2,500.00
btg
21,000.00
btg
21,000.00
kg
30,000.00
bh
400.00
lbr
106,365.00
bh
400.00
rol
18,375.00
zak
60,375.00
lbr
2,887.50
Sub - Bahan
Org
95,000.00
Org
100,000.00
Org
90,000.00
Org
75,000.00
Org
110,000.00
Sub - Upah

975.00
9,639.00
9,051.00
300.00
5,600.00
38,716.86
8,400.00
441.00
1,207.50
288.75
74,619.11 Rp
2,945.00
26,000.00
4,500.00
19,500.00
1,430.00
54,375.00 Rp
T O T A L Rp

bh
2,500.00
btg
21,000.00
btg
21,000.00
kg
30,000.00
bh
400.00
lbr
73,500.00
bh
400.00
rol
18,375.00
zak
60,375.00
lbr
2,887.50
Sub - Bahan
Org
95,000.00
Org
100,000.00
Org
90,000.00
Org
75,000.00
Org
110,000.00
Sub - Upah

975.00
9,639.00
9,051.00
300.00
5,600.00
26,754.00
8,400.00
441.00
1,207.50
288.75
62,656.25 Rp
2,945.00
26,000.00
4,500.00
19,500.00
1,430.00
54,375.00 Rp
T O T A L Rp

m'
7,291.67
m'
6,562.50
m'
8,750.00
kg
17,500.00
bh
2,500.00
Sub - Bahan

26,250.00
7,875.00
5,250.00
2,625.00
2,625.00
44,625.00

lmbr
37,800.00
Sub - Bahan
Org
75,000.00
Org
90,000.00
Org
95,000.00
Org
110,000.00
Sub - Upah

56,700.00
56,700.00
11,250.00
45,000.00
4,750.00
880.00
61,880.00

85,938.25

54,375.00
140,313.25

73,212.25

54,375.00
127,587.25

74,619.11

54,375.00
128,994.11

62,656.25

54,375.00
117,031.25

SNI-2008
3.600
1.200
0.600
0.150
1.050

1.500
0.150
0.500
0.050
0.008

RAB - 043

Rp

44,625.00

Rp

56,700.00

Rp

61,880.00

ANALISA HARGA SATUAN PEKERJAAN, BERDASARKAN SNI


NO.

URAIAN PEKERJAAN

SNI

kfsn

ANALISA HARGA BAHAN & UPAH


sat
hrg. sat.
Total harga

HARGA SATUAN
PEKERJAAN

T O T A L Rp
7

PAS. PLAFOND GYPSUM TILE 600x1200x9mm / M2


Rangka Allumunium T
Profil allumunium Main Tee (p. 3,6m)
Profil allumunium Cross Tee (p. 1,2 m)
Profil allumunium Cross Tee (p. 0,60 m)
Kawat diameter 4mm
Paku peluru ramset

3.600
1.200
0.600
0.150
1.050

Penutup Plafond
Bahan : Gypsum Tile 600x1200x9 mm (porporated)
Upah

0.364
0.020

26,250.00
7,875.00
5,250.00
2,625.00
2,625.00
44,625.00

lmbr
18,375.00
Sub - Bahan
Org
75,000.00
Org
90,000.00
Org
95,000.00
Org
110,000.00
Sub - Upah

27,562.50
27,562.50 Rp
11,250.00
45,000.00
4,750.00
880.00
61,880.00 Rp
T O T A L Rp

m3
4,462,500.00
kg
15,356.25
m3
############
Sub - Bahan
Org
105,000.00
Org
95,000.00
Org
75,000.00
Org
110,000.00
Sub - Upah

89,250.00
3,071.25
207,900.00
300,221.25 Rp
3,255.00
47,500.00
26,250.00
1,430.00
78,435.00 Rp
T O T A L Rp

1.100
0.010
0.007
0.070
0.030
0.004

lbr
57,750.00
Kg
95,000.00
Sub - Bahan

21,021.00
1,900.00
22,921.00

M2
47,250.00
Kg
95,000.00
Sub - Bahan
Org
105,000.00
Org
95,000.00
Org
75,000.00
Org
110,000.00
Sub - Upah

51,975.00
950.00
52,925.00 Rp
735.00
6,650.00
2,250.00
440.00
10,075.00 Rp
T O T A L Rp

m3
############
Kg
95,000.00
Sub - Bahan
Org
105,000.00
Org
95,000.00
Org
75,000.00
Org
110,000.00
Sub - Upah

155,925.00
950.00
156,875.00 Rp
8,400.00
76,000.00
60,000.00
4,400.00
148,800.00 Rp
T O T A L Rp

m'
15,000.00
Kg
95,000.00
Sub - Bahan
Org
105,000.00
Org
95,000.00
Org
75,000.00
Org
110,000.00
Sub - Upah

15,750.00
950.00
16,700.00 Rp
525.00
4,750.00
3,750.00
330.00
9,355.00 Rp
T O T A L Rp

m'
5,250.00
Kg
4,725.00
Sub - Bahan
Org
95,000.00
Org
90,000.00
Org
75,000.00
Org
110,000.00
Sub - Upah

5,512.50
1,417.50
6,930.00 Rp
570.00
5,400.00
4,500.00
330.00
10,800.00 Rp
T O T A L Rp

m'
2,500.00
Sub - Bahan
Org
95,000.00
Org
90,000.00
Org
75,000.00
Org
110,000.00
Sub - Upah

2,750.00
2,750.00 Rp
380.00
3,600.00
8,475.00
770.00
7,500.00 Rp
T O T A L Rp

0.015
0.010
0.080
0.800
0.800
0.040

kg
m3

8,970.00
4,772.25

27,562.50

61,880.00
134,067.50

300,221.25

78,435.00
378,656.25

22,921.00
10,075.00
32,996.00

52,925.00

10,075.00
63,000.00

156,875.00

148,800.00
305,675.00

SNI-2008
1.050
0.010
0.005
0.050
0.050
0.003

16,700.00

9,355.00
26,055.00

SNI-2008
1.050
0.300

Kep. Tukang gypsum


Tukang Gypsum
Pekerja
Mandor

PERAPIHAN/ACIAN PLAFOND BETON EXPOSE


Bahan : Semen PC
Pasir pasang

Rp
Rp
T O T A L Rp

44,625.00

SNI-2008

Kep. Tukang Kayu


Tukang kayu halus
Pekerja
Mandor

Kep. Tukang gypsum


Tukang Gypsum
Pekerja
Mandor

Rp

SNI-2008

Kep. Tukang Kayu


Tukang kayu halus
Pekerja
Mandor

PAS. LIST PLAFOND ALLUMUNIUM cm / M'


Bahan : Wall angle allumunium
Upah

15

0.031
0.500
0.350
0.013

Kep. Tukang Kayu


Tukang kayu halus
Pekerja
Mandor

PAS. LIST PLAFOND GYPSUM PROFIL 5-10 cm / M'


Bahan : List gypsum profil 5-10 cm
Compound Gypsum
Upah

14

0.020
0.200
0.020

m'
7,291.67
m'
6,562.50
m'
8,750.00
kg
17,500.00
bh
2,500.00
Sub - Bahan

sama dengan upah pas. plafond asbes plat

PAS. LIST PLAFOND KAYU PROFIL / M'


Bahan : List kayu profil
Paku halus
Upah

13

PAS. PENUTUP PLAFOND LAMBRIZIRING KAYU / M2


Bahan : Papan kayu Kamper Samarinda oven
Paku halus
Upah

12

SNI-2008

Kep. Tukang Kayu


Tukang kayu halus
Pekerja
Mandor

PAS. PENUTUP PLAFOND ASBES PLAT 4 MM / M2


Bahan : Asbes plat 4 mm
Paku halus
Upah

11

0.150
0.500
0.050
0.008

PAS. PENUTUP PLAFOND MULTIPLEKS 4 MM / M2


Bahan : Multipleks 4 mm
Paku halus
Upah

10

1.500

Pekerja
Tukang Gypsum
Kepala Tukang
Mandor

PAS. PLAFOND LAMBRESERING KAMPER 10 Cm / M2


(Rangka kayu Borneo Super)
Bahan : Kayu Borneo Super (kasau)
Paku biasa 2"-4"
Papan Kamper Samarinda oven
Upah

163,205.00

SNI-2008

0.006
0.060
0.060
0.003

6,930.00

10,800.00
17,730.00

SNI-2008
1.100
0.004
0.040
0.113
0.007

6.900
0.018

RAB - 044

1,300.00
265,125.00

2,750.00

7,500.00
10,250.00

ANALISA HARGA SATUAN PEKERJAAN, BERDASARKAN SNI


NO.

URAIAN PEKERJAAN

Upah

9.4.
1

PEK. CAT TEMBOK ACRYLIC EMULSION / M2


ICI DULUX PENTALITTE
Bahan : Cat Tembok ICI Dulux Acrilyc Emulsion
Plamur tembok
Amplas besi
Kuas Roll
:

Kep. Tukang Cat


Tukang Cat
Pekerja
Mandor

PEK. CAT TEMBOK DINDING LUAR WEATHERSHIELD / M2


ICI DULUX WEATHERSHIELD
Bahan : Cat Tembok ICI Dulux, Wathershield
Alkali Resistants Dulux ICI
Amplas besi
Kuas Roll
Upah

Kep. Tukang batu


Tukang batu halus
Pekerja
Mandor

kfsn

0.019
0.190
0.019
0.002

ANALISA HARGA BAHAN & UPAH


sat
hrg. sat.
Total harga
Sub - Bahan
Org
100,000.00
Org
95,000.00
Org
75,000.00
Org
110,000.00
Sub - Upah

13,742.25 Rp
1,900.00
18,050.00
1,425.00
220.00
21,595.00 Rp
T O T A L Rp

0.360
0.100
0.300
0.015

Kg
44,257.50
kg
18,375.00
lbr
2,887.50
Bh
36,750.00
Sub - Bahan
Org
90,000.00
Org
100,000.00
Org
75,000.00
Org
110,000.00
Sub - Upah

15,932.70
1,837.50
866.25
551.25
19,187.70 Rp
540.00
6,000.00
2,250.00
330.00
9,120.00 Rp
T O T A L Rp

0.006
0.060
0.030
0.003

0.220
0.110
0.500
0.100

Kg
60,375.00
Bh
45,596.25
Bh
2,887.50
Bh
36,750.00
Sub - Bahan

13,282.50
5,015.59
1,443.75
3,675.00
23,416.84

Kg
39,375.00
Bh
18,375.00
Bh
2,887.50
Bh
36,750.00
Sub - Bahan

8,662.50
2,021.25
1,443.75
3,675.00
15,802.50

Kg
57,750.00
Bh
45,596.25
Bh
2,887.50
Bh
36,750.00
Sub - Bahan

12,705.00
5,015.59
1,443.75
3,675.00
22,839.34

Kg
20,000.00
Bh
18,375.00
Bh
2,887.50
Bh
36,750.00
Sub - Bahan

4,400.00
2,021.25
1,443.75
3,675.00
11,540.00

Kg
26,250.00
Bh
18,375.00
Bh
2,887.50
Bh
36,750.00
Sub - Bahan

5,775.00
2,021.25
1,443.75
3,675.00
12,915.00

Kg
44,257.50
Bh
2,887.50
Bh
36,750.00
Sub - Bahan
Org
90,000.00
Org
100,000.00
Org
75,000.00
Org
110,000.00
Sub - Upah

13,277.25
721.88
1,837.50
15,836.63 Rp
360.00
4,000.00
2,100.00
110.00
6,570.00 Rp
T O T A L Rp

Standart upah cat tembok

PEK. CAT TEMBOK ACRYLIC EMULSION (ex Mowilex) / M2


Bahan : Cat Tembok Mowilex (Acrilyc Emulsion)
Plamur tembok
Amplas besi
Kuas Roll

0.220
0.110
0.500
0.100

Upah : sama dengan upah cat ICI

PEK. CAT TEMBOK DINDING LUAR (Mowilex Watercoat) / M2


Bahan : Cat Tembok Mowilex (Watercoat)
Alkali Resistants
Amplas besi
Kuas Roll
Upah

0.220
0.110
0.500
0.100

Standart upah cat tembok

0.220
0.110
0.500
0.100

Standart upah cat tembok

PEK. CAT TEMBOK "ULANG" (ICI Dulux Pentalitte) / M2


Bahan : Cat Tembok ICI Dulux Acrilyc Emulsion
Amplas besi
Kuas Roll
Upah

0.220
0.110
0.500
0.100

Standart upah cat tembok

PEK. CAT TEMBOK ACRYLIC EMULSION (Catylac) / M2


Bahan : Cat Tembok Catylac (Acrilyc Emulsion)
Plamur tembok
Amplas besi
Kuas Roll
Upah

PEK. CAT TEMBOK ACRYLIC EMULSION (Vinylex) / M2


Bahan : Cat Tembok Vinilex (Acrilyc Emulsion)
Plamur tembok
Amplas besi
Kuas Roll
Upah

HARGA SATUAN
PEKERJAAN
13,742.25

21,595.00
35,337.25

PEKERJAAN PENGECATAN

Upah

SNI

Kep. Tukang Cat


Tukang Cat
Pekerja
Mandor

PEK. CAT TEMBOK "ULANG" (Super Vinylex) / M2


Bahan : Cat Tembok Vinilex (Acrilyc Emulsion)
Amplas besi
Kuas Roll

0.300
0.250
0.050
0.004
0.040
0.028
0.001

0.300
0.250
0.050

Upah : sama dengan upah cat ulang ICI

RAB - 045

Kg
20,000.00
Bh
2,887.50
Bh
36,750.00
Sub - Bahan

Rp
Rp
T O T A L Rp

Rp
Rp
T O T A L Rp

Rp
Rp
T O T A L Rp

Rp
Rp
T O T A L Rp

Rp
Rp
T O T A L Rp

6,000.00
721.88
1,837.50
8,559.38

Rp
Rp
T O T A L Rp

19,187.70

9,120.00
28,307.70

23,416.84
9,120.00
32,536.84

15,802.50
9,120.00
24,922.50

22,839.34
9,120.00
31,959.34

11,540.00
9,120.00
20,660.00

12,915.00
9,120.00
22,035.00

15,836.63

6,570.00
22,406.63

8,559.38
6,570.00
15,129.38

ANALISA HARGA SATUAN PEKERJAAN, BERDASARKAN SNI


NO.

URAIAN PEKERJAAN
9

SNI

PEK. CAT KAYU/BESI BARU, ICI Dulux Supergloss (3 kali) / M2


Bahan : Cat Kayu (ICI Dulux Super Gloss)
Plamur kayu
Tinner Up
Amplas besi
Kuas

0.430
0.200
0.150
0.200
1.000
0.050

Kep. Tukang Cat


Tukang Cat
Pekerja
Mandor

0.005
0.100
0.100
0.005

Menie kayu/besi

Upah

10

PEK. CAT MINYAK / EPOXY ex Mowilex (3 kali) / M2


Bahan : Cat Minyak (ex Mowilex Semi Gloss)
Tinner Up
Amplas besi
Alat semprot

0.400
0.350
0.200
1.000
1.000

Kep. Tukang Cat


Tukang Cat
Pekerja
Mandor

0.008
0.080
0.080
0.008

Plamur tembok

Upah

11

PEK. CAT DUCO DANAGLOSS / M2


Bahan : Cat Duco ex Danapaint
Dempul Duco
Tinner Up
Amplas besi
Alat semprot
Upah

12

0.040
0.400
0.400
0.004

0.250
0.150
0.150
0.350
0.800
2.000
1.000

Kep. Tukang cat


Tukang Cat
Pekerja
Mandor

0.030
0.300
0.300
0.003

0.400
0.200

Kep. Tukang cat


Tukang Cat
Mandor

0.002
0.100
0.001

PEK. RESIDU KAYU / M2


Bahan : Residu
Kuas
Upah

X.

Kep. Tukang cat


Tukang Cat
Pekerja
Mandor

PEK. CAT MENIE KAYU / M2


Bahan : Menie kayu
Kuas
Upah

14

0.400
0.750
0.800
2.000
1.000

PEK. CAT MELAMIK KAYU / M2


Bahan : Wood Filler Ultran
Sending sealer Impra
Cat warna Ultran
Melamik Impra
Tinner (High class)
Amplas besi
Alat semprot
Upah

13

kfsn

0.500
0.200

Kep. Tukang
Tukang Cat
Mandor

0.002
0.100
0.001

ANALISA HARGA BAHAN & UPAH


sat
hrg. sat.
Total harga

HARGA SATUAN
PEKERJAAN

Kg
57,750.00
Kg
23,625.00
Bh
26,250.00
Kg
28,875.00
Bh
2,887.50
Bh
15,750.00
Sub - Bahan
Org
90,000.00
Org
100,000.00
Org
75,000.00
Org
110,000.00
Sub - Upah

24,832.50
4,725.00
3,937.50
5,775.00
2,887.50
787.50
42,945.00 Rp
450.00
10,000.00
7,500.00
550.00
18,500.00 Rp
T O T A L Rp

Kg
60,000.00
Kg
0.00
Kg
28,875.00
Bh
2,887.50
Lot
5,000.00
Sub - Bahan
Org
90,000.00
Org
100,000.00
Org
75,000.00
Org
110,000.00
Sub - Upah

24,000.00
0.00
5,775.00
2,887.50
5,000.00
37,662.50 Rp
720.00
8,000.00
6,000.00
880.00
15,600.00 Rp
T O T A L Rp

Kg
88,725.00
Kg
36,750.00
Kg
28,875.00
Bh
2,887.50
Lot
10,000.00
Sub - Bahan
Org
90,000.00
Org
100,000.00
Org
75,000.00
Org
110,000.00
Sub - Upah

35,490.00
27,562.50
23,100.00
5,775.00
10,000.00
101,927.50 Rp
3,600.00
40,000.00
30,000.00
440.00
74,040.00 Rp
T O T A L Rp

Kg
52,500.00
Kg
55,125.00
Kg
52,500.00
Kg
63,000.00
Kg
28,875.00
Bh
2,887.50
Lot
10,000.00
Sub - Bahan
Org
90,000.00
Org
100,000.00
Org
75,000.00
Org
110,000.00
Sub - Upah

13,125.00
8,268.75
7,875.00
22,050.00
23,100.00
5,775.00
10,000.00
90,193.75 Rp
2,700.00
30,000.00
22,500.00
330.00
55,530.00 Rp
T O T A L Rp

Kg
23,625.00
Bh
15,750.00
Sub - Bahan
Org
90,000.00
Org
100,000.00
Org
110,000.00
Sub - Upah

9,450.00
3,150.00
12,600.00 Rp
180.00
10,000.00
110.00
10,290.00 Rp
T O T A L Rp

Kg
18,375.00
Bh
15,750.00
Sub - Bahan
Org
90,000.00
Org
100,000.00
Org
110,000.00
Sub - Upah

9,187.50
3,150.00
12,337.50 Rp
180.00
10,000.00
110.00
10,290.00 Rp
T O T A L Rp

42,945.00

18,500.00
61,445.00

37,662.50

15,600.00
53,262.50

101,927.50

74,040.00
175,967.50

90,193.75

55,530.00
145,723.75

12,600.00

10,290.00
22,890.00

12,337.50

10,290.00
22,627.50

PEK. PRASARANA LINGKUNGAN - DRAINASE


Memasang pipa beton, dia 15-20 cm tiap m'
Bahan : - Buis beton dia 20 panj. 100 cm
- Bata merah
- Semen portland
- Pasir pasang
- Pasir urug
Upah : - Pekerja
- Tukang batu

31.4

bh
bh
kg
m
m

1.000
32.000
3.920
0.056
0.024

Oh
Oh

0.140
0.070

RAB - 046

41,815
41,815.00
630
20,160.00
1,300
5,096.00
265,125
14,847.00
291,375
6,993.00
Jumlah Harga Bahan
75,000
10,500.00
90,000
6,300.00

88,911.00

ANALISA HARGA SATUAN PEKERJAAN, BERDASARKAN SNI


NO.

URAIAN PEKERJAAN

SNI

- Kepala tukang
- Mandor

37.68

43.96

Pekerja
Tukang batu
Kepala tukang
Mandor

Memasang pipa buis beton, dia 50 cm tiap m'


Bahan : - Buis beton dia 50 panj. 100 cm
- Bata merah
- Semen portland
- Pasir pasang
- Pasir urug
Upah : -

Oh
Oh
Oh
Oh

Pekerja
Tukang batu
Kepala tukang
Mandor

Memasang pipa buis beton, dia 40 cm tiap m'


Bahan : - Buis beton dia 40 panj. 100 cm
- Bata merah
- Semen portland
- Pasir pasang
- Pasir urug
Upah : -

Pekerja
Tukang batu
Kepala tukang
Mandor

Memasang pipa buis beton, dia 30 cm tiap m'


Bahan : - Buis beton dia 30 panj. 100 cm
- Bata merah
- Semen portland
- Pasir pasang
- Pasir urug
Upah : -

Oh
Oh

Memasang saluran buis beton 1/2 dia 20 cm dinding bata, dalam 15-25 cm tiap m'
Bahan : - Buis beton 1/2 dia 20 panj. 100 cm
bh
- Bata merah
bh
- Semen portland
kg
- Pasir pasang
m
- Pasir urug
m
Upah : -

kfsn

Pekerja
Tukang batu
Kepala tukang
Mandor

50.24

ANALISA HARGA BAHAN & UPAH


sat
hrg. sat.
Total harga
0.007
0.007

1.000
42.000
14.785
0.042
0.008
0.460
0.198
0.020
0.027

bh
bh
kg
m
m

1.000
38.000
10.300
0.061
0.069

Oh
Oh
Oh
Oh

0.380
0.190
0.019
0.019

bh
bh
kg
m
m

1.000
44.000
10.300
0.061
0.069

Oh
Oh
Oh
Oh

0.380
0.190
0.019
0.019

bh
bh
kg
m
m

1.000
50.000
20.600
0.122
0.138

Oh
Oh
Oh
Oh

0.570
0.285
0.029
0.029

Memasang pipa buis beton, dia 60 cm tiap m'


Bahan : - Buis beton dia 60 panj. 100 cm
- Bata merah
- Semen portland
- Pasir pasang
- Pasir urug

bh
bh
kg
m
m

1.000
56.52
20.600
0.122
0.138

Upah : -

Oh
Oh
Oh
Oh

0.570
0.285
0.029
0.029

Pekerja
Tukang batu
Kepala tukang
Mandor

Memasang pipa buis beton, dia 80 cm tiap m'


Bahan : - Buis beton dia 80 panj. 50 cm
- Bata merah
- Semen portland
- Pasir pasang
- Pasir urug

bh
bh
kg
m
m

2.000
138.16
30.900
0.183
0.207

Upah : -

Oh
Oh
Oh
Oh

0.760
0.380
0.038
0.038

Pekerja
Tukang batu
Kepala tukang
Mandor

RAB - 047

100,000
700.00
110,000
770.00
Jumlah Upah Tenaga
Jumlah Total
Dibulatkan
22,452
22,452.00
630
26,460.00
1,300
19,220.50
265,125
11,135.25
291,375
2,331.00
Jumlah Harga Bahan
75,000
34,500.00
90,000
17,820.00
100,000
2,000.00
110,000
2,970.00
Jumlah Upah Tenaga
Jumlah Total
Dibulatkan
55,157
55,157.00
630
23,940.00
1,300
13,390.00
265,125
16,172.63
291,375
20,104.88
Jumlah Harga Bahan
75,000
28,500.00
90,000
17,100.00
100,000
1,900.00
110,000
2,090.00
Jumlah Upah Tenaga
Jumlah Total
Dibulatkan
68,825
68,825.00
630
27,720.00
1,300
13,390.00
265,125
16,172.63
291,375
20,104.88
Jumlah Harga Bahan
75,000
28,500.00
90,000
17,100.00
100,000
1,900.00
110,000
2,090.00
Jumlah Upah Tenaga
Jumlah Total
Dibulatkan
110,530
110,530.00
630
31,500.00
1,300
26,780.00
265,125
32,345.25
291,375
40,209.75
Jumlah Harga Bahan
75,000
42,750.00
90,000
25,650.00
100,000
2,850.00
110,000
3,135.00
Jumlah Upah Tenaga
Jumlah Total
Dibulatkan
165,375
165,375.00
630
35,607.60
1,300
26,780.00
265,125
32,345.25
291,375
40,209.75
Jumlah Harga Bahan
75,000
42,750.00
90,000
25,650.00
100,000
2,850.00
110,000
3,135.00
Jumlah Upah Tenaga
Jumlah Total
Dibulatkan
179,155
358,310.00
630
87,040.80
1,300
40,170.00
265,125
48,517.88
291,375
60,314.63
Jumlah Harga Bahan
75,000
57,000.00
90,000
34,200.00
100,000
3,800.00
110,000
4,180.00
Jumlah Upah Tenaga
Jumlah Total
Dibulatkan

HARGA SATUAN
PEKERJAAN

18,270.00
107,181.00
107,180.00

81,598.75

57,290.00
138,888.75
138,880.00

128,764.50

49,590.00
178,354.50
178,350.00

146,212.50

49,590.00
195,802.50
195,800.00

241,365.00

74,385.00
315,750.00
315,750.00

300,317.60

74,385.00
374,702.60
374,700.00

594,353.30

99,180.00
693,533.30
693,530.00

ANALISA HARGA SATUAN PEKERJAAN, BERDASARKAN SNI


NO.

URAIAN PEKERJAAN
8

10

11

12

13

SNI

kfsn

ANALISA HARGA BAHAN & UPAH


sat
hrg. sat.
Total harga

Memasang pipa buis beton, dia 100 cm tiap m'


Bahan : - Buis beton dia 100 panj. 50 cm
- Bata merah
- Semen portland
- Pasir pasang
- Pasir urug

bh
bh
kg
m
m

2.000
163.28
30.900
0.183
0.207

Upah : -

Oh
Oh
Oh
Oh

0.760
0.380
0.038
0.038

Pekerja
Tukang batu
Kepala tukang
Mandor

Memasang 1 bh bak kontrol pas bata, 30x30 cm tinggi 35 cm


Bahan : - Bata merah
- Semen portland
- Pasir pasang
- Batu pecah/split 2/3
- Besi beton polos
- Pasir beton

bh
kg
m
m
kg
m

82.00
44.000
0.070
0.070
1.600
0.060

Upah : -

Oh
Oh
Oh
Oh

1.500
0.015
0.002
0.016

Pekerja
Tukang batu
Kepala tukang
Mandor

Memasang 1 bh bak kontrol pas bata, 60x60 cm tinggi 65 cm


Bahan : - Bata merah
- Semen portland
- Pasir pasang
- Batu pecah/split 2/3
- Besi beton polos
- Pasir beton

bh
kg
m
m
kg
m

208.00
114.000
0.184
0.033
4.850
0.120

Upah : -

Oh
Oh
Oh
Oh
Oh

2.160
0.720
0.072
0.108
0.100

Pekerja
Tukang batu
Kepala tukang
Mandor
Tk Gali

SALURAN AIR, dari batu kali lebar bawah 30 cm tinggi 60 cm, tiap 1 M'
Bahan : - Batu belah 15/20
- Semen portland
- Pasir pasang

m
kg
m

0.47
94.420
0.227

Pemakaian alat
- Tamper / Hand Compactor

jam

0.046

Upah : -

Oh
Oh
Oh
Oh
Oh

1.241
0.398
0.040
0.083
0.250

Pekerja
Tukang batu
Kepala tukang
Mandor
Tk Gali

SALURAN AIR, dari batu kali lebar bawah 80 cm tinggi 100 cm, tiap 1 M'
Bahan : - Batu belah 15/20
- Semen portland
- Pasir pasang

m
kg
m

1.01
193.400
0.464

Pemakaian alat
- Tamper / Hand Compactor

jam

0.093

Upah : -

Oh
Oh
Oh
Oh
Oh

2.983
0.692
0.069
0.219
0.500

Pekerja
Tukang batu
Kepala tukang
Mandor
Tk Gali

SALURAN AIR, dari batu kali lebar bawah 100 cm tinggi 120 cm, tiap 1 M'
Bahan : - Batu belah 15/20
- Semen portland
- Pasir pasang

m
kg
m

1.29
244.980
0.588

Pemakaian alat
- Tamper / Hand Compactor

jam

0.104

Upah : -

Oh
Oh
Oh
Oh

4.105
0.862
0.086
0.309

Pekerja
Tukang batu
Kepala tukang
Mandor

RAB - 048

189,080
378,160.00
630
102,866.40
1,300
40,170.00
265,125
48,517.88
291,375
60,314.63
Jumlah Harga Bahan
75,000
57,000.00
90,000
34,200.00
100,000
3,800.00
110,000
4,180.00
Jumlah Upah Tenaga
Jumlah Total
Dibulatkan
630
51,660.00
1,300
57,200.00
265,125
18,558.75
269,500
18,865.02
13,125
21,000.00
270,375
16,222.50
Jumlah Harga Bahan
75,000
112,500.00
90,000
1,350.00
100,000
200.00
110,000
1,760.00
Jumlah Upah Tenaga
Jumlah Total
Dibulatkan
630
131,040.00
1,300
148,200.00
265,125
48,783.00
269,500
8,893.51
13,125
63,656.25
270,375
32,445.00
Jumlah Harga Bahan
75,000
162,000.00
90,000
64,800.00
100,000
7,200.00
110,000
11,880.00
109,960
10,996.00
Jumlah Upah Tenaga
Jumlah Total
Dibulatkan
257,250
121,679.25
1,300
122,746.00
265,125
60,183.38
Jumlah Harga Bahan

HARGA SATUAN
PEKERJAAN

630,028.90

99,180.00
729,208.90
729,200.00

183,506.27

115,810.00
299,316.27
299,310.00

433,017.76

256,876.00
689,893.76
689,890.00

304,608.63

27,060
1,244.76
Jumlah Harga Alat
75,000
93,075.00
90,000
35,820.00
100,000
4,000.00
110,000
9,130.00
109,960
27,490.00
Jumlah Upah Tenaga
Jumlah Total
Dibulatkan

169,515.00
474,123.63
474,120.00

257,250
260,337.00
1,300
251,420.00
265,125
123,018.00
Jumlah Harga Bahan

634,775.00

1,244.76

27,060
2,516.58
Jumlah Harga Alat
75,000
223,725.00
90,000
62,280.00
100,000
6,900.00
110,000
24,090.00
109,960
54,980.00
Jumlah Upah Tenaga
Jumlah Total
Dibulatkan

371,975.00
1,006,750.00
1,006,750.00

257,250
331,080.75
1,300
318,474.00
265,125
155,893.50
Jumlah Harga Bahan

805,448.25

27,060
2,814.24
Jumlah Harga Alat
75,000
307,875.00
90,000
77,580.00
100,000
8,600.00
110,000
33,990.00

2,516.58

2,814.24

ANALISA HARGA SATUAN PEKERJAAN, BERDASARKAN SNI


NO.

URAIAN PEKERJAAN

SNI

kfsn

- Tk Gali

14

15

16

17

18

19

20

21

Oh

ANALISA HARGA BAHAN & UPAH


sat
hrg. sat.
Total harga
0.750

Pas. Pipa beton, type FJ-Dusaspun (class 2) dia 60 cm panj 250 cm / BH


Bahan : - Pipa beton FJ-Dusaspun (class 2) dia. 60 cm, panjang 250 cm

bh

1.00

Upah : -

Oh
Oh
Oh
Oh

1.140
0.570
0.057
0.057

Pekerja
Tukang batu
Kepala tukang
Mandor

Pas. Pipa beton, type FJ-Dusaspun (class 2) dia 100 cm panj 250 cm / BH
Bahan : - Pipa beton FJ-Dusaspun (class 2) dia. 60 cm, panjang 250 cm

bh

1.00

Upah : -

Oh
Oh
Oh
Oh

1.140
0.570
0.057
0.057

Pekerja
Tukang batu
Kepala tukang
Mandor

Pas. Pipa beton, type RJ ex Boral dia. 80 cm panj 244 cm / BH


Bahan : - Pipa beton ex Boral dia. 80 cm, panjang 244 cm

bh

1.00

Upah : -

Oh
Oh
Oh
Oh

1.140
0.570
0.057
0.057

Pekerja
Tukang batu
Kepala tukang
Mandor

Pas. Pipa beton, type RJ ex Boral dia. 100 cm panj 244 cm / BH


Bahan : - Pipa beton ex Boral dia. 100 cm, panjang 244 cm

bh

1.00

Upah : -

Oh
Oh
Oh
Oh

1.140
0.570
0.057
0.057

Pekerja
Tukang batu
Kepala tukang
Mandor

Pas. Pipa beton, type RJ ex Boral dia. 120 cm panj 244 cm / BH


Bahan : - Pipa beton ex Boral dia. 120 cm, panjang 244 cm

bh

1.00

Upah : -

Oh
Oh
Oh
Oh

1.140
0.570
0.057
0.057

Pekerja
Tukang batu
Kepala tukang
Mandor

Pas. Pipa beton, type RJ ex Boral dia. 150 cm panj 244 cm / BH


Bahan : - Pipa beton ex Boral dia. 150 cm, panjang 244 cm

bh

1.00

Upah : -

Oh
Oh
Oh
Oh

1.140
0.570
0.057
0.057

Pekerja
Tukang batu
Kepala tukang
Mandor

SALURAN TERBUKA, beton U Ditch ex MAS, uk. 60x80x120 cm / BH


Bahan : - Saluran U Ditch uk. 60x80x120 cm
- Semen portland
- Pasir pasang
- Pasir urug

bh
kg
m
m

1.00
115.000
0.345
0.080

Upah : -

Oh
Oh
Oh
Oh

1.500
0.600
0.060
0.075

Pekerja
Tukang batu
Kepala tukang
Mandor

SALURAN TERBUKA, beton U Ditch ex MAS, uk. 60x60x120 cm / BH


Bahan : - Saluran U Ditch uk. 60x60x120 cm
- Semen portland
- Pasir pasang
- Pasir urug

bh
kg
m
m

1.00
91.600
0.275
0.080

Upah : -

Oh
Oh
Oh
Oh

1.500
0.600
0.060
0.075

Pekerja
Tukang batu
Kepala tukang
Mandor

RAB - 049

109,960
82,470.00
Jumlah Upah Tenaga
Jumlah Total
Dibulatkan
1,199,700
1,199,700.00
Jumlah Harga Bahan
75,000
85,500.00
90,000
51,300.00
100,000
5,700.00
110,000
6,270.00
Jumlah Upah Tenaga
Total harga/bh
Harga/M'
2,457,100
2,457,100.00
Jumlah Harga Bahan
75,000
85,500.00
90,000
51,300.00
100,000
5,700.00
110,000
6,270.00
Jumlah Upah Tenaga
Total harga/bh
Harga/M'
1,400,480
1,400,480.00
Jumlah Harga Bahan
75,000
85,500.00
90,000
51,300.00
100,000
5,700.00
110,000
6,270.00
Jumlah Upah Tenaga
Total harga/bh
Harga/M'
2,759,250
2,759,250.00
Jumlah Harga Bahan
75,000
85,500.00
90,000
51,300.00
100,000
5,700.00
110,000
6,270.00
Jumlah Upah Tenaga
Total harga/bh
Harga/M'
3,536,860
3,536,860.00
Jumlah Harga Bahan
75,000
85,500.00
90,000
51,300.00
100,000
5,700.00
110,000
6,270.00
Jumlah Upah Tenaga
Total harga/bh
Harga/M'
5,511,460
5,511,460.00
Jumlah Harga Bahan
75,000
85,500.00
90,000
51,300.00
100,000
5,700.00
110,000
6,270.00
Jumlah Upah Tenaga
Total harga/bh
Harga/M'
672,000
672,000.00
1,300
149,500.00
265,125
91,468.13
291,375
23,310.00
Jumlah Harga Bahan
75,000
112,500.00
90,000
54,000.00
100,000
6,000.00
110,000
8,250.00
Jumlah Upah Tenaga
Total harga/bh
Harga/M'
561,000
561,000.00
1,300
119,080.00
265,125
72,909.38
291,375
23,310.00
Jumlah Harga Bahan
75,000
112,500.00
90,000
54,000.00
100,000
6,000.00
110,000
8,250.00
Jumlah Upah Tenaga
Total harga/bh

HARGA SATUAN
PEKERJAAN

510,515.00
1,315,963.25
1,315,960.00

1,199,700.00

148,770.00
1,348,470.00
539,388.00

2,457,100.00

148,770.00
2,605,870.00
1,042,348.00

1,400,480.00

148,770.00
1,549,250.00
634,938.52

2,759,250.00

148,770.00
2,908,020.00
1,191,811.48

3,536,860.00

148,770.00
3,685,630.00
1,510,504.10

5,511,460.00

148,770.00
5,660,230.00
2,319,766.39

912,968.13

180,750.00
1,093,718.13
911,431.77

752,989.38

180,750.00
933,739.38

ANALISA HARGA SATUAN PEKERJAAN, BERDASARKAN SNI


NO.

URAIAN PEKERJAAN

SNI

kfsn

ANALISA HARGA BAHAN & UPAH


sat
hrg. sat.
Total harga
Harga/M'

22

23

24

25

26

27

28

SALURAN TERBUKA, beton U Ditch ex MAS, uk. 30x40x120 cm / BH


Bahan : - Saluran U Ditch uk. 30x40x120 cm
- Semen portland
- Pasir pasang
- Pasir urug

bh
kg
m
m

1.00
91.600
0.275
0.080

Upah : -

Oh
Oh
Oh
Oh

1.500
0.600
0.060
0.075

Pekerja
Tukang batu
Kepala tukang
Mandor

SALURAN TERBUKA, beton U Ditch ex MAS, uk. 100x100x120 cm / BH


Bahan : - Saluran U Ditch uk. 100x100x120 cm
- Semen portland
- Pasir pasang
- Pasir urug

bh
kg
m
m

1.00
91.600
0.275
0.080

Upah : -

Oh
Oh
Oh
Oh

1.500
0.600
0.060
0.075

Pekerja
Tukang batu
Kepala tukang
Mandor

SALURAN TERBUKA, beton U Ditch ex MAS, uk. 120x120x120 cm / BH


Bahan : - Saluran U Ditch uk. 120x120x120 cm
- Semen portland
- Pasir pasang
- Pasir urug

bh
kg
m
m

1.00
91.600
0.275
0.080

Upah : -

Oh
Oh
Oh
Oh

1.500
0.600
0.060
0.075

Pekerja
Tukang batu
Kepala tukang
Mandor

SALURAN TERTUTUP (U Ditch ex MAS, uk. 30x40x120 cm + tutup) / BH


Bahan : - Saluran U Ditch uk. 30x40x120 cm
- Tutup saluran U.30 @ 60 cm HD
- Semen portland
- Pasir pasang
- Pasir urug

bh
bh
kg
m
m

1.00
2.00
91.600
0.275
0.080

Upah : -

Oh
Oh
Oh
Oh

1.500
0.600
0.060
0.075

Pekerja
Tukang batu
Kepala tukang
Mandor

SALURAN TERTUTUP (U Ditch ex MAS, uk. 60x80x120 cm + tutup) / BH


Bahan : - Saluran U Ditch uk. 60x80x120 cm
- Tutup saluran U.60 @ 60 cm HD
- Semen portland
- Pasir pasang
- Pasir urug

bh
bh
kg
m
m

1.00
2.00
91.600
0.275
0.080

Upah : -

Oh
Oh
Oh
Oh

1.500
0.600
0.060
0.075

Pekerja
Tukang batu
Kepala tukang
Mandor

SALURAN TERTUTUP (U Ditch ex MAS, uk. 100x100x120 cm + tutup) / BH


Bahan : - Saluran U Ditch uk. 100x100x120 cm
- Tutup saluran U.100 @ 60 cm HD
- Semen portland
- Pasir pasang
- Pasir urug

bh
bh
kg
m
m

1.00
2.00
91.600
0.275
0.080

Upah : -

Oh
Oh
Oh
Oh

1.500
0.600
0.060
0.075

Pekerja
Tukang batu
Kepala tukang
Mandor

SALURAN TERTUTUP (U Ditch ex MAS, uk. 120x120x120 cm + tutup) / BH


Bahan : - Saluran U Ditch uk. 120x120x120 cm
- Tutup saluran U.120 @ 60 cm HD
- Semen portland
- Pasir pasang
- Pasir urug

bh
bh
kg
m
m

RAB - 050

1.00
2.00
91.600
0.275
0.080

249,000
249,000.00
1,300
119,080.00
265,125
72,909.38
291,375
23,310.00
Jumlah Harga Bahan
75,000
112,500.00
90,000
54,000.00
100,000
6,000.00
110,000
8,250.00
Jumlah Upah Tenaga
Total harga/bh
Harga/M'
1,450,000
1,450,000.00
1,300
119,080.00
265,125
72,909.38
291,375
23,310.00
Jumlah Harga Bahan
75,000
112,500.00
90,000
54,000.00
100,000
6,000.00
110,000
8,250.00
Jumlah Upah Tenaga
Total harga/bh
Harga/M'
2,277,000
2,277,000.00
1,300
119,080.00
265,125
72,909.38
291,375
23,310.00
Jumlah Harga Bahan
75,000
112,500.00
90,000
54,000.00
100,000
6,000.00
110,000
8,250.00
Jumlah Upah Tenaga
Total harga/bh
Harga/M'
249,000
249,000.00
77,500
155,000.00
1,300
119,080.00
265,125
72,909.38
291,375
23,310.00
Jumlah Harga Bahan
75,000
112,500.00
90,000
54,000.00
100,000
6,000.00
110,000
8,250.00
Jumlah Upah Tenaga
Total harga/bh
Harga/M'
672,000
672,000.00
197,500
395,000.00
1,300
119,080.00
265,125
72,909.38
291,375
23,310.00
Jumlah Harga Bahan
75,000
112,500.00
90,000
54,000.00
100,000
6,000.00
110,000
8,250.00
Jumlah Upah Tenaga
Total harga/bh
Harga/M'
1,450,000
1,450,000.00
338,500
677,000.00
1,300
119,080.00
265,125
72,909.38
291,375
23,310.00
Jumlah Harga Bahan
75,000
112,500.00
90,000
54,000.00
100,000
6,000.00
110,000
8,250.00
Jumlah Upah Tenaga
Total harga/bh
Harga/M'
2,277,000
2,277,000.00
398,500
797,000.00
1,300
119,080.00
265,125
72,909.38
291,375
23,310.00
Jumlah Harga Bahan

HARGA SATUAN
PEKERJAAN
778,116.15

440,989.38

180,750.00
621,739.38
518,116.15

1,641,989.38

180,750.00
1,822,739.38
1,518,949.48

2,468,989.38

180,750.00
2,649,739.38
2,208,116.15

595,989.38

180,750.00
776,739.38
647,282.81

1,258,989.38

180,750.00
1,439,739.38
1,199,782.81

2,318,989.38

180,750.00
2,499,739.38
2,083,116.15

3,265,989.38

ANALISA HARGA SATUAN PEKERJAAN, BERDASARKAN SNI


NO.

URAIAN PEKERJAAN
Upah : -

29

XI.
1

Pekerja
Tukang batu
Kepala tukang
Mandor

Oh
Oh
Oh
Oh

ANALISA HARGA BAHAN & UPAH


sat
hrg. sat.
Total harga
1.500
0.600
0.060
0.075

bh
bh
kg
m
m

1.00
2.00
91.600
0.275
0.080

Upah : -

Oh
Oh
Oh
Oh

1.500
0.600
0.060
0.075

Pekerja
Tukang batu
Kepala tukang
Mandor

75,000
112,500.00
90,000
54,000.00
100,000
6,000.00
110,000
8,250.00
Jumlah Upah Tenaga
Total harga/bh
Harga/M'
2,778,000
2,778,000.00
568,500
1,137,000.00
1,300
119,080.00
265,125
72,909.38
291,375
23,310.00
Jumlah Harga Bahan
75,000
112,500.00
90,000
54,000.00
100,000
6,000.00
110,000
8,250.00
Jumlah Upah Tenaga
Total harga/bh
Harga/M'

HARGA SATUAN
PEKERJAAN

180,750.00
3,446,739.38
2,872,282.81

4,106,989.38

180,750.00
4,287,739.38
3,573,116.15

PEK. PRASARANA LINGKUNGAN - PAGAR


Pek. Pagar beton pracetak, tinggi 1,60 m, tiap 1 M'
Bahan : - Panel beton pracetak 50x400x2130
- Kolom beton pracetak 160x200x2750
- Semen portland
- Pasir beton
- Batu pecah / split 2/3
Pekerja
Tukang batu
Kepala tukang
Mandor

Pek. Pagar beton pracetak, tinggi 2,00 m, tiap 1 M'


Bahan : - Panel beton pracetak 50x400x2130
- Kolom beton pracetak 160x200x2750
- Semen portland
- Pasir beton
- Batu pecah / split 2/3
Upah : -

kfsn

SALURAN TERTUTUP (U Ditch ex MAS, uk. 140x140x120 cm + tutup) / BH


Bahan : - Saluran U Ditch uk. 140x140x120 cm
- Tutup saluran U.140 @ 60 cm HD
- Semen portland
- Pasir pasang
- Pasir urug

Upah : -

SNI

Pekerja
Tukang batu
Kepala tukang
Mandor

Pek. Pagar beton pracetak, tinggi 2,40 m, tiap 1 M'


Bahan : - Panel beton pracetak Primacon 40x2400x5
- Kolom beton pracetak Primacon170x180x2600
- Semen portland
- Pasir beton
- Batu pecah / split 2/3
Upah : -

Pekerja
Tukang batu
Kepala tukang
Mandor

lmbr
btg
kg
m
m

1.778
0.445
4.890
0.010
0.017

Oh
Oh
Oh
Oh

0.375
0.125
0.012
0.019

lmbr
btg
kg
m
m

2.223
0.445
4.890
0.010
0.017

Oh
Oh
Oh
Oh

0.375
0.125
0.012
0.019

lmbr
btg
kg
m
m

2.500
0.445
4.890
0.010
0.017

Oh
Oh
Oh
Oh

0.375
0.125
0.012
0.019

RAB - 051

86,108
153,100.02
195,107
86,822.62
1,300
6,357.00
270,375
2,703.75
269,500
4,581.51
Jumlah Harga Bahan
75,000
28,125.00
90,000
11,250.00
100,000
1,200.00
110,000
2,090.00
Jumlah Upah Tenaga
Total harga/bh
Dibulatkan
86,108
191,418.08
195,107
86,822.62
1,300
6,357.00
270,375
2,703.75
269,500
4,581.51
Jumlah Harga Bahan
75,000
28,125.00
90,000
11,250.00
100,000
1,200.00
110,000
2,090.00
Jumlah Upah Tenaga
Total harga/bh
Dibulatkan
104,740
261,850.00
195,107
86,822.62
1,300
6,357.00
270,375
2,703.75
269,500
4,581.51
Jumlah Harga Bahan
75,000
28,125.00
90,000
11,250.00
100,000
1,200.00
110,000
2,090.00
Jumlah Upah Tenaga
Total harga/bh
Dibulatkan

248,983.39

42,665.00
291,648.39
291,640.00

287,301.45

42,665.00
329,966.45
329,960.00

357,733.37

42,665.00
400,398.37
400,390.00

Anda mungkin juga menyukai