PEKERJAAN
BREBES
NOMOR
ANALISA
JENIS PEKERJAAN
SATUA
N
HARGA SATUAN
( Rp )
A.
m
m
m
m
m
m
m
m
m
m
m
m'
m
m
m
m
SNI 03-2835-2002
377,609.00
492,929.00
169,846.00
85,890.00
1,227,545.00
1,178,495.00
1,464,704.00
5,150.00
1,193,774.00
127,730.50
23,579.00
62,760.00
214,329.00
201,429.00
1,500.00
93,870.00
4,287.50
395,600.00
272,900.00
4,287.50
17,150.00
3,430.00
11,310.00
8,482.50
404,200.00
248,600.00
16,780.00
5,145.00
B. PEKERJAAN TANAH
29
B.001
Menggali 1 m tanah biasa sedalam 1 meter
30
B.002
Menggali 1 m tanah biasa sedalam 2 meter
31
B.003
Menggali 1 m tanah biasa sedalam 3 meter
32
B.004
Menggali 1 m tanah keras sedalam 1 meter
33
B.005
Menggali 1 m tanah cadas sedalam 1 meter
34
B.006
Menggali 1 m tanah lumpur sedalam 1 meter
35
B.007
Mengerjakan 1 m stripping tebing setinggi 1 meter
36
B.008
Membuang 1 m tanah sejauh 30 meter
37
B.009
Membuang 1 m tanah sejauh 150 meter
38
B.010
Mengurug kembali 1 m galian
39
B.011
Memadatkan 1 m tanah (per 20 cm)
40
B.012
Mengurug 1 m pasir urug
41
B.013
Memasang 1 m lapisan pudel campuran 1 KP : 3 PP : 7 TL
42
B.014
Memasang 1 m lapisan pudel campuran 1 KP : 5 TL
43
B.015
Memasang 1 m lapisan ijuk tebal 10 cm
44
B.016
Mengurug 1 m sirtu padat untuk peninggian lantai bangunan
Membuang 1 m tanah sejauh 2 kilometer
45
B.017
Mengurug 1 m tanah degnag tanah urug pilihan menggunakan alat berat
46
B.018
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
SNI
23,575.00
28,935.00
34,381.00
31,376.00
47,580.00
37,935.00
1,715.00
10,330.00
17,630.00
7,858.33
17,150.00
112,630.00
207,940.00
217,600.00
95,145.00
116,575.00
28,110.00
131,545.60
C. PEKERJAAN PONDASI
47
C.001
Memasang 1 m pondasi batu belah; campuran 1 PC : 1 PP
48
C.002
Memasang 1 m pondasi batu belah; campuran 1 PC : 2 PP
49
C.003
Memasang 1 m pondasi batu belah; campuran 1 PC : 2,5 PP
m
m
m
SNI 03-2836-2002
787,319.00
632,242.00
787,319.00
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
PEKERJAAN PERSIAPAN
A.001
Membuat 1 m' pagar sementara dari kayu tinggi 2 meter
A.002
Membuat 1 m' pagar sementara dari seng gelombang tinggi 2 meter
A.003
Membuat 1 m' pagar sementara dari kawat duri tinggi 1.2 meter
A.004
Mengerjakan 1 m pengukuran dan pemasangan bouwplank
A.005
Membuat 1 m kantor sementara, dengan lantai plesteran
A.006
Membuat 1 m gudang semen dan alat-alat
A.007
Membuat 1 m rumah jaga konstruksi kayu
A.008
Membersihkan 1 m lapangan dan perataan
A.009
Membuat 1 m bedeng buruh
A.010
Membuat 1 m bak adukan ukuran (40 x 50 x 50) cm
A.011
Membuat 1 m steger dari bambu, ukuran (40 x 60 x 20) cm
A.012
Membuat 1 m jalan sementara
A.013
Membongkar 1 m beton bertulang
A.014
Membongkar 1 m dinding tembok bata merah
Mengerjakan1 m pengukuran kembali (site)
A.015
Membongkar 1 m dinding bata/ pas. batu kali (bongkaran dipakai kembali)
A.016
Mengupas 1 m plesteran
A.017
Membongkar 1 m jembatan kayu (bongkaran dipakai kembali)
A.018
Membongkar 1 m jembatan kayu (bongkaran tidak dipakai kembali)
A.019
Membongkar 1 m plesteran dinding/ siaran
A.020
Membongkar 1 m genteng/ sirap ( bongkaran dipakai kembali)
A.021
Membongkar 1 m genteng/ sirap (bongkaran tidak dipakai kembali)
A.022
Membongkar 1 m rangka atap/ reng/ kaso (bongkaran dipakai kembali)
A.023
Membongkar 1 m rangka atap/ reng/ kaso (bongkaran tidak dipakai kembali)
A.024
Membongkar 1 m kuda-kuda/ gording/ balok (bongkaran dipakai kembali)
A.025
Membongkar 1 m kuda-kuda/ gording/ balok (bongkaran tidak dipakai kembali)
A.026
Membongkar 1 m plafond (bongkaran dipakai kembali)
A.027
Membongkar 1 m plafond (bongkaran tidak dipakai kembali)
A.028
m'
m'
m'
m
m
m
m
m
m
m
m
m
2 dari 102
NO.
NOMOR
ANALISA
50
51
52
53
54
55
56
57
58
59
C.004
C.005
C.006
C.007
C.008
C.009
C.010
C.011
C.012
C.013
60
61
62
63
C.014
C.015
C.016
C.017
JENIS PEKERJAAN
D. PEKERJAAN DINDING
62
D.001
Memasang 1 m dinding bata merah (5x11x22) cm; tebal 1 bata; campuran 1 PC
: 1 PP
63
D.002
Memasang 1 m dinding bata merah (5x11x22) cm; tebal 1 bata; campuran 1 PC
: 2 PP
64
D.003
Memasang 1 m dinding bata merah (5x11x22) cm; tebal 1 bata; campuran 1 PC
: 3 PP
65
D.004
Memasang 1 m dinding bata merah (5x11x22) cm; tebal 1 bata; campuran 1 PC
: 4 PP
66
D.005
Memasang 1 m dinding bata merah (5x11x22) cm; tebal 1 bata; campuran 1 PC
: 5 PP
67
D.006
Memasang 1 m dinding bata merah (5x11x22) cm; tebal 1 bata; campuran 1 PC
: 6 PP
68
D.007
Memasang 1 m dinding bata merah (5x11x22) cm; tebal 1 bata; campuran 1 PC
: 3 KP : 10 PP
69
D.008
Memasang 1 m dinding bata merah (5x11x22) cm; tebal bata; campuran 1 PC
: 1 PP
70
D.009
Memasang 1 m dinding bata merah (5x11x22) cm; tebal bata; campuran 1 PC
: 2 PP
71
D.010
Memasang 1 m dinding bata merah (5x11x22) cm; tebal bata; campuran 1 PC
: 3 PP
72
D.011
Memasang 1 m dinding bata merah (5x11x22) cm; tebal bata; campuran 1 PC
: 4 PP
73
D.012
Memasang 1 m dinding bata merah (5x11x22) cm; tebal bata; campuran 1 PC
: 5 PP
74
D.013
Memasang 1 m dinding bata merah (5x11x22) cm; tebal bata; campuran 1 PC
: 6 PP
75
D.014
Memasang 1 m dinding bata merah (5x11x22) cm; tebal bata; campuran 1 PC
: 8 PP
76
D.015
Memasang 1 m dinding bata merah (5x11x22) cm; tebal bata; campuran 1 PC
: 3 KP : 10 PP
77
D.016
Memasang 1 m dinding CB 20
78
D.017
Memasang 1 m dinding CB 15
79
D.018
Memasang 1 m dinding CB 10
80
D.019
Memasang 1 m dinding terawang (roster) uk. (12x11x24) cm; campuran spesi 1
PC : 3 PP
81
D.020
Memasang 1 m dinding terawang (roster) uk. (12x11x24) cm; campuran spesi 1
PC : 4 PP
82
D.021
Memasang 1 m dinding bata berongga ekspose uk. (5x11x24) cm; campuran
spesi 1 PC : 3 PP
E. PEKERJAAN PLESTERAN
83
E.001
Memasang 1 m plesteran 1 PC : 1 PP; tebal 15 mm
84
E.002
Memasang 1 m plesteran 1 PC : 2 PP; tebal 15 mm
85
E.003
Memasang 1 m plesteran 1 PC : 3 PP; tebal 15 mm
86
E.004
Memasang 1 m plesteran 1 PC : 4 PP; tebal 15 mm
87
E.005
Memasang 1 m plesteran 1 PC : 5 PP; tebal 15 mm
88
E.006
Memasang 1 m plesteran 1 PC : 6 PP; tebal 15 mm
89
E.007
Memasang 1 m plesteran 1 PC : 7 PP; tebal 15 mm
90
E.008
Memasang 1 m plesteran 1 PC : 8 PP; tebal 15 mm
SATUA
N
HARGA SATUAN
( Rp )
m
m
m
m
m
m
m
m
m
m
551,510.00
503,095.00
469,549.00
445,956.00
413,639.00
511,629.00
409,047.00
380,678.00
224,784.00
2,537,779.00
m
m'
m'
m
526,064.00
1,016,476.00
796,544.00
608,260.00
SNI 03-2837-2002
200,269.50
175,095.00
160,683.50
152,285.50
147,502.00
144,927.00
148,398.00
94,113.00
82,775.50
76,834.50
73,323.00
71,108.00
69,756.00
67,420.00
74,670.00
m
m
m
m
144,516.00
89,864.50
108,245.50
136,317.00
132,630.00
271,142.00
m
m
m
m
m
m
m
m
SNI 03-2837-2002
35,971.40
29,327.40
26,385.60
24,433.00
23,249.40
22,333.60
21,806.60
21,279.60
3 dari 102
NO.
91
92
93
94
95
96
97
98
99
100
101
102
103
104
105
106
107
108
109
110
111
112
113
114
115
116
NOMOR
ANALISA
E.009
E.010
E.011
E.012
E.013
E.014
E.015
E.016
E.024
E.017
E.018
E.019
E.020
E.021
E.022
E.023
E.024
E.025
E.026
E.027
E.028
E.029
E.030
E.031
E.032
E.033
JENIS PEKERJAAN
F. PEKERJAAN KAYU
117
F.001
Membuat dan memasang 1 m kusen pintu dan kusen jendela; Kayu Jati
118
F.002
Membuat dan memasang 1 m kusen pintu dan kusen jendela; Kayu Bangkirai
119
F.003
Membuat dan memasang 1 m kusen pintu dan kusen jendela; Kayu Kruing
120
F.004
Membuat dan memasang 1 m kusen pintu dan kusen jendela; Kayu Meranti
Batu
121
F.005
Membuat dan memasang 1 m pintu klamp sederhana; Kayu Bangkirai
122
F.006
Membuat dan memasang 1 m pintu klamp sederhana; Kayu Meranti Batu
123
F.007
Membuat dan memasang 1 m daun pintu panel; Kayu Bangkirai
124
F.008
Membuat dan memasang 1 m daun pintu panel; Kayu Kruing
125
F.009
Membuat dan memasang 1 m daun pintu panel; Kayu Meranti Batu
126
F.010
Membuat dan memasang 1 m pintu dan jendela kaca; Kayu Bangkirai
127
F.011
Membuat dan memasang 1 m pintu dan jendela kaca; Kayu Kruing
128
F.012
Membuat dan memasang 1 m pintu dan jendela kaca; Kayu Meranti Batu
129
F.013
Membuat dan memasang 1 m pintu dan jendela jalusi; Kayu Bangkirai
130
F.014
Membuat dan memasang 1 m pintu dan jendela jalusi; Kayu Kruing
131
F.015
Membuat dan memasang 1 m pintu dan jendela jalusi; Kayu Meranti Batu
132
F.016
Membuat dan memasang 1 m daun pintu kayu lapis (plywood); rangka tertutup
Kayu Kruing
133
F.017
Membuat dan memasang 1 m pintu plywood rangkap; rangka ekspose Kayu
Kruing
134
F.018
Membuat dan memasang 1 m jalusi kusen; Kayu Meranti Batu
135
F.019
Membuat dan memasang 1 m jalusi kusen; Kayu Kruing
136
F.020
Membuat dan memasang 1 m pintu teakwood rangkap; rangka ekspose Kayu
Kruing
137
F.021
138
139
140
141
142
143
144
145
146
F.022
F.023
F.024
F.025
F.026
F.027
F.028
F.029
F.030
SATUA
N
HARGA SATUAN
( Rp )
m
m
m
m
m
22,722.00
20,483.00
38,929.20
35,006.80
32,363.00
30,825.20
29,563.80
40,957.00
20,044.50
38,556.50
35,855.00
33,897.00
50,782.50
45,191.50
41,815.00
37,871.50
20,044.50
18,103.40
31,992.00
29,344.50
20,997.00
19,067.00
12,154.80
6,162.00
25,886.00
13,681.50
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
SNI 03-3434-2002
15,387,090.00
14,527,675.00
8,009,275.00
6,618,475.00
491,614.00
244,614.00
587,040.00
386,400.00
340,040.00
380,904.00
260,520.00
232,704.00
868,874.00
547,850.00
473,674.00
481,275.00
357,685.00
m
m
m
386,460.00
456,000.00
412,755.00
486,005.00
m
m
m
m
m
m
m
m
m
6,086,900.00
7,361,800.00
6,971,300.00
8,362,100.00
5,771,160.00
7,046,060.00
72,354.00
119,906.40
80,310.00
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m'
4 dari 102
NO.
147
148
149
150
151
152
153
154
155
156
157
158
159
160
161
162
163
NOMOR
ANALISA
F.031
F.032
F.033
F.034
F.035
F.036
F.037
F.038
F.039
F.040
F.041
F.042
F.043
F.044
F.045
F.046
F.047
JENIS PEKERJAAN
G. PEKERJAAN BETON
164
G.001
Membuat 1 m beton tumbuk 1 PC : 3 PB : 5 KR
165
G.002
Membuat 1 m beton tumbuk 1 PC : 3 PB : 6 KR
166
G.003
Membuat 1 m beton tumbuk 1 PC : 4 PB : 6 KR
167
G.004
Membuat 1 m lantai kerja beton tumbuk 1 PC : 3 PB : 5 KR; tebal 5 cm
168
G.005
Membuat 1 m beton bertulang 1 PC : 2 PB : 3 KR
169
G.006
Membuat 1 m beton bertulang 1 PC : 2 PB : 4 KR
170
G.007
Membuat 1 m beton bertulang 1 PC : 2 PB : 2,5 KR
171
G.008
Membuat 1 m beton bertulang 1 PC : 1.5 PB : 3 KR
172
G.009
Membuat 1 m beton bertulang 1 PC : 1.5 PB : 2,5 KR
173
G.010
Membuat 1 m beton bertulang 1 PC : 1 PB : 2 KR
174
G.011
Membuat 1 m beton mutu f'c=7,4 Mpa (K 100); slump (12 2) cm; w/c = 0,87
175
G.012
Membuat 1 m beton mutu f'c=9,8 Mpa (K 125); slump (12 2) cm; w/c = 0,78
176
G.013
Membuat 1 m beton mutu f'c=12,2 Mpa (K 150); slump (12 2) cm; w/c = 0,78
177
G.014
Membuat 1 m beton mutu f'c=7,4 Mpa (K 100); slump (3-6) cm; w/c = 0,87
178
G.015
Membuat 1 m beton mutu f'c=14,5 Mpa (K 175); slump (12 2) cm; w/c = 0,66
179
G.016
Membuat 1 m beton mutu f'c=16,9 Mpa (K 200); slump (12 2) cm; w/c = 0,61
180
G.017
Membuat 1 m beton mutu f'c=19,3 Mpa (K 225); slump (12 2) cm; w/c = 0,58
181
G.018
Membuat 1 m beton mutu f'c=21,7 Mpa (K 250); slump (12 2) cm; w/c = 0,56
182
G.019
Membuat 1 m beton mutu f'c=24 Mpa (K 275); slump (12 2) cm; w/c = 0,53
183
G.020
Membuat 1 m beton mutu f'c=26,4 Mpa (K 300); slump (12 2) cm; w/c = 0,52
184
G.021
Membuat 1 m beton mutu f'c=28,8 Mpa (K 325); slump (12 2) cm; w/c = 0,49
185
G.022
Membuat 1 m beton mutu f'c=31,2 Mpa (K 350); slump (12 2) cm; w/c = 0,48
186
G.023
Pembesian 10 kg dengan besi polos atau besi ulir
187
G.024
Memasang 10 kg jaring kawat baja /wiremesh
188
G.025
Memasang 1 m bekisting untuk pondasi
189
G.026
Memasang 1 m bekisting untuk sloof
190
G.027
Memasang 1 m bekisting untuk kolom
191
G.028
Memasang 1 m bekisting untuk balok
192
G.029
Memasang 1 m bekisting untuk lantai
193
G.030
Memasang 1 m bekisting untuk dinding
194
G.031
Memasang 1 m bekisting untuk tangga
195
G.032
Memasang 1 m jembatan untuk pengecoran beton
196
G.033
Memasang 1 m pondasi beton bertulang (150 kg besi + bekisting)
197
G.034
Memasang 1 m sloof beton bertulang (200 kg besi + bekisting)
198
G.035
Memasang 1 m kolom beton bertulang (300 kg besi + bekisting)
199
G.036
Memasang 1 m balok beton bertulang (200 kg besi + bekisting)
200
G.037
Memasang 1 m kolom beton bertulang (150 kg besi + bekisting)
201
G.038
Memasang 1 m dinding beton bertulang (150 kg besi + bekisting)
202
G.039
Memasang 1 m dinding beton bertulang (200 kg besi + bekisting)
203
G.040
Memasang 1 m' kolom praktis beton bertulang (11 x 11 cm)
204
G.041
Memasang 1 m' ring balok beton bertulang (10 x 15 cm)
Menghamparkan 1 m beton mutu K-125 (ready mix)
205
G.042
Menghamparkan 1 m beton mutu K-175 (ready mix)
206
G.043
SATUA
N
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
kg
kg
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
HARGA SATUAN
( Rp )
133,730.40
277,536.00
495,996.00
778,863.00
68,536.00
84,011.20
89,496.40
76,930.00
64,366.00
190,194.00
345,059.00
356,975.00
209,140.00
73,118.40
21,553.00
69,297.00
31,787.40
RSNI-T-13-2002
577,015.00
555,145.00
522,315.00
60,170.00
579,805.00
657,615.00
732,325.00
693,495.00
781,655.00
887,945.00
610,645.43
647,975.56
677,182.10
575,333.31
711,852.49
744,711.25
769,630.59
785,601.28
812,886.14
821,413.89
871,335.29
882,430.45
168,887.00
483,268.00
102,438.00
110,938.00
500,489.00
511,826.00
1,044,489.00
646,384.00
483,339.00
131,649.00
3,774,065.00
4,759,334.00
10,620,594.00
8,078,349.00
9,296,430.00
8,223,455.00
7,472,429.00
74,239.00
86,684.00
699,930.00
814,930.00
5 dari 102
NO.
207
208
209
210
211
212
213
214
215
216
217
218
NOMOR
ANALISA
G.044
G.045
G.046
G.047
G.048
G.049
G.050
G.051
G.052
G.053
G.054
G.055
JENIS PEKERJAAN
SATUA
N
m
m
m
m
m
m
m
m
m
m
m
m
HARGA SATUAN
( Rp )
914,930.00
964,930.00
179,930.00
1,014,930.00
1,089,930.00
200,790.00
17,802.50
17,802.50
166,046.00
155,215.00
172,218.00
98,150.00
m
m
m
m
m
m
m
m
m
m'
m'
SNI 03-3436-2002
32,454.00
46,271.00
53,216.00
56,566.00
78,785.00
52,149.00
73,317.00
76,050.00
67,188.00
35,398.00
33,704.00
48,918.00
43,354.00
69,548.00
138,354.00
81,973.00
40,960.50
68,330.50
I. PEKERJAAN LANGIT-LANGIT
221
I.001
Memasang 1 m langit-langit asbes semen; tbl. 4 mm, 5 mm, dan 6 mm
222
I.002
Memasang 1 m langit-langit tripleks ukuran (120 x 240 ) cm; tbl. 3 mm, 4 mm
dan 6 mm 1 m langit-langit lambriziring kayu, tebal 9 mm
223
I.003
Memasang
224
I.004
Memasang 1 m langit-langit plywood ukuran (30 x 60) cm; tbl. 4 mm dan 6 mm
225
I.005
Memasang 1 m langit-langit plywood ukuran (60 x 120) cm; tbl. 4 mm dan 6 mm
226
I.006
Memasang 1 m langit-langit teakwood ukuran (30 x 60) cm; tbl. 4 mm dan 6 mm
227
I.007
Memasang 1 m langit-langit teakwood ukuran (60 x 120) cm; tbl. 4 mm dan 6
mm
228
I.008
Memasang 1 m langit-langit lat kayu jati
229
I.009
Memasang 1 m langit-langit lat kayu bengkirai
230
I.010
Memasang 1 m langit-langit lat kayu meranti
231
I.011
Memasang 1 m langit-langit asbes (100 x 100) cm, tbl. 3,2 mm, rangka kayu
meranti
232
I.012
Memasang 1 m plywood 4 mm, rangka kayu meranti
233
I.013
Memasang 1 m langit-langit gypsum board uk. (120 x 240) cm, tebal 9 mm
234
I.014
Memasang 1 m' list kayu profil
m
m
m
m
m
m
m
m
m
m
m
m
m
m
SNI 03-2838-2002
20,796.00
33,125.75
141,980.00
40,045.50
41,410.50
59,791.50
61,979.25
399,301.00
315,309.00
167,109.00
95,695.00
150,057.50
181,566.72
23,999.00
J. PEKERJAAN SANITASI
235
J.001
Memasang 1 buah kloset duduk/monoblok
236
J.002
Memasang 1 buah kloset jongkok porselen
237
J.003
Memasang 1 buah kloset jongkok teraso
238
J.004
Memasang 1 buah urinoir
239
J.005
Memasang 1 buah wastafel
240
J.006
Memasang 1 buah bak mandi fibreglass volume 0,30 m
241
J.007
Memasang 1 buah bak mandi batu bata volume 0,30 m
242
J.008
Memasang 1 buah badkip fiberglass
243
J.009
Membuat 1 buah bak beton volume 1m
244
J.010
Memasangt 1 buah bak fibreglass volume 1m
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
SNI
455,925.00
296,090.00
162,190.00
651,660.00
723,640.00
443,786.00
957,658.67
897,500.00
4,641,365.00
2,263,280.00
m
m
m
m
m
m
m'
6 dari 102
NO.
NOMOR
ANALISA
245
246
247
248
249
250
251
252
253
254
255
256
257
258
259
260
261
262
263
264
265
266
267
J.011
J.012
J.013
J.014
J.015
J.016
J.017
J.018
J.019
J.020
J.021
J.022
J.023
J.024
J.025
J.026
J.027
J.028
J.029
J.030
J.031
J.032
J.033
268
269
J.034
J.035
270
J.036
JENIS PEKERJAAN
SATUA
N
HARGA SATUAN
( Rp )
m
m
m
unit
91,298.00
366,592.00
309,912.17
344,784.67
529,863.33
150,936.00
309,036.00
462,176.00
688,522.20
1,673,857.20
2,452,504.90
9,058.65
10,764.25
12,352.16
24,350.00
31,626.46
44,902.04
66,428.44
94,949.52
358,564.50
40,615.00
29,965.00
9,462,638.98
unit
unit
7,091,880.14
6,105,697.88
unit
4,529,121.02
m
m
m
m
m
m'
m'
m'
m'
m'
m'
m'
m'
m'
m'
m'
m'
m'
m'
bh
bh
bh
bh
bh
bh
bh
bh
bh
m
m
277,629.00
130,965.00
130,482.50
21,157.25
16,771.50
23,157.25
18,543.00
47,857.50
360,629.00
83,057.25
98,457.25
7 dari 102
NO.
NOMOR
ANALISA
JENIS PEKERJAAN
SATUA
N
HARGA SATUAN
( Rp )
m
m
m
68,476.50
86,950.50
151,314.50
160,814.50
576,966.50
1,784,066.50
105,910.00
60,572.00
467,316.50
579,048.00
123,868.00
141,362.50
105,612.50
32,061.00
105,974.00
163,704.00
126,594.00
579,344.00
186,042.00
112,874.00
117,034.00
m
m
m
m
m
m
m
m
m
m
m
6,227.50
21,905.00
30,407.50
38,567.50
23,477.50
5,008.00
36,587.50
14,471.00
10,616.50
13,540.00
32,715.00
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
HSPK
92,955.00
102,045.00
92,955.00
102,045.00
106,085.00
106,085.00
124,113.50
119,518.00
33,346.36
48,780.98
55,872.00
49,822.00
13,869.00
17,601.00
8,672.00
m
m
m
m
m
m
m
m'
m
m
m
m
m
m'
8 dari 102
NO.
322
323
324
325
326
327
328
329
NOMOR
ANALISA
O.016
O.017
O.018
O.019
O.020
O.021
O.022
O.023
JENIS PEKERJAAN
SATUA
N
HARGA SATUAN
( Rp )
m
m
m
m
m
m
m
m
39,570.70
21,070.70
61,555.70
41,531.17
82,906.00
79,712.70
178,381.35
209,881.35
Mengetahui,
Kepala Dinas Pekerjaan Umum
Kabupaten Brebes
Ir. KUSTIYANTO
NIP. 500 082 955
9 dari 102
A.002
A.003
A.004
KOEF
SAT
HARGA SAT
Rp.
5
JUMLAH
Rp.
6=(3x5)
SNI 03-2835-2002
2
PEKERJAAN PERSIAPAN
Membuat 1 m' pagar sementara dari kayu tinggi 2 meter
Bahan
Kayu Dolken
Portland Cement (PC)
Pasir Beton (PB)
Koral Beton (maksimum 30 mm)
Kayu Meranti Batu 5/7 (ikat)
Paku Biasa 2" - 5"
Residu
5.0000
2.5000
0.0050
0.0090
0.0720
0.0600
0.4000
m'
kg
m
m
m
kg
lt
15,000.00
1,350.00
121,000.00
179,000.00
3,779,000.00
19,500.00
5,000.00
Jumlah (1)
75,000.00
3,375.00
605.00
1,611.00
272,088.00
1,170.00
2,000.00
355,849.00
Tenaga
Pekerja
Tukang Kayu
Kepala Tukang
Mandor
0.4000
0.2000
0.0200
0.0200
OH
OH
OH
OH
30,000.00
40,000.00
45,000.00
43,000.00
Jumlah (2)
12,000.00
8,000.00
900.00
860.00
21,760.00
377,609.00
m'
kg
lbr
m
m
m
kg
lt
15,000.00
1,350.00
86,100.00
121,000.00
179,000.00
3,779,000.00
19,500.00
35,000.00
Jumlah (1)
75,000.00
3,375.00
103,320.00
605.00
1,611.00
272,088.00
1,170.00
14,000.00
471,169.00
Tenaga
Pekerja
Tukang Kayu
Kepala Tukang
Mandor
0.4000
0.2000
0.0200
0.0200
OH
OH
OH
OH
30,000.00
40,000.00
45,000.00
43,000.00
Jumlah (2)
12,000.00
8,000.00
900.00
860.00
21,760.00
492,929.00
m'
kg
kg
m
m
kg
15,000.00
1,350.00
3,400.00
121,000.00
179,000.00
19,500.00
Jumlah (1)
60,000.00
2,700.00
85,000.00
605.00
1,611.00
1,170.00
151,086.00
Tenaga
Pekerja
Tukang Kayu
Kepala Tukang
Mandor
0.3000
0.2000
0.0200
0.0200
OH
OH
OH
OH
30,000.00
40,000.00
45,000.00
43,000.00
Jumlah (2)
9,000.00
8,000.00
900.00
860.00
18,760.00
169,846.00
m
kg
m
3,779,000.00
19,500.00
4,641,000.00
Jumlah (1)
45,348.00
390.00
32,487.00
78,225.00
Tenaga
Pekerja
Tukang Kayu
Kepala Tukang
Mandor
OH
OH
OH
OH
30,000.00
40,000.00
45,000.00
43,000.00
Jumlah (2)
3,000.00
4,000.00
450.00
215.00
7,665.00
85,890.00
Analisa Pekerjaan
0.1000
0.1000
0.0100
0.0050
10 dari 102
NO
1
A.005
A.006
KOEF
A.008
A.009
JUMLAH
Rp.
6=(3x5)
m'
m
kg
kg
kg
m
m
m
bh
lbr
bh
m
bh
lbr
15,000.00
3,779,000.00
19,500.00
34,000.00
1,350.00
121,000.00
121,000.00
179,000.00
550.00
89,000.00
25,500.00
83,000.00
110,000.00
91,000.00
Jumlah (1)
75,000.00
680,220.00
16,575.00
37,400.00
47,250.00
18,150.00
12,100.00
26,850.00
16,500.00
22,250.00
51,000.00
6,640.00
16,500.00
5,460.00
1,031,895.00
Pekerja
Tukang Batu
Tukang Kayu
Kepala Tukang
Mandor
2.0000
1.0000
2.0000
0.3000
0.0500
OH
OH
OH
OH
OH
30,000.00
40,000.00
40,000.00
45,000.00
43,000.00
Jumlah (2)
60,000.00
40,000.00
80,000.00
13,500.00
2,150.00
195,650.00
1,227,545.00
6.8000
0.2100
0.3000
10.5000
0.0300
0.0500
1.5000
m'
m
kg
kg
m
m
lbr
15,000.00
3,779,000.00
19,500.00
1,350.00
121,000.00
179,000.00
86,100.00
Jumlah (1)
102,000.00
793,590.00
5,850.00
14,175.00
3,630.00
8,950.00
129,150.00
1,057,345.00
1.0000
2.0000
0.2000
0.0500
OH
OH
OH
OH
30,000.00
40,000.00
45,000.00
43,000.00
Jumlah (2)
30,000.00
80,000.00
9,000.00
2,150.00
121,150.00
1,178,495.00
12.0000
0.2760
0.7000
1.5000
m'
m
kg
lbr
15,000.00
3,779,000.00
19,500.00
86,100.00
Jumlah (1)
180,000.00
1,043,004.00
13,650.00
129,150.00
1,365,804.00
Tenaga
Pekerja
Tukang Kayu
Kepala Tukang
Mandor
1.0000
1.5000
0.1500
0.0500
OH
OH
OH
OH
30,000.00
40,000.00
45,000.00
43,000.00
Jumlah (2)
30,000.00
60,000.00
6,750.00
2,150.00
98,900.00
1,464,704.00
0.1000
0.0500
OH
OH
30,000.00
43,000.00
Jumlah (2)
3,000.00
2,150.00
5,150.00
5.0000
0.1860
0.3000
18.0000
0.0300
0.0500
1.5000
1.3500
m'
m
kg
kg
m
m
lbr
lbr
15,000.00
3,779,000.00
19,500.00
1,350.00
121,000.00
179,000.00
86,100.00
91,000.00
Jumlah (1)
75,000.00
702,894.00
5,850.00
24,300.00
3,630.00
8,950.00
129,150.00
122,850.00
1,072,624.00
1.0000
2.0000
0.2000
0.0500
OH
OH
OH
OH
30,000.00
40,000.00
45,000.00
43,000.00
Jumlah (2)
30,000.00
80,000.00
9,000.00
2,150.00
121,150.00
1,193,774.00
Analisa Pekerjaan
HARGA SAT
Rp.
5
2
3
Membuat 1 m kantor sementara, dengan lantai plesteran
Bahan
Kayu Dolken
5.0000
Kayu Meranti Batu 5/7 (ikat)
0.1800
Paku
0.8500
Besi Strip
1.1000
Semen Portland
35.0000
Pasir Pasang
0.1500
Pasir Beton
0.1000
Koral Beton
0.1500
Bata Merah
30.0000
Seng Plat
0.2500
Jendela Nako
2.0000
Kaca Polos
0.0800
Kunci Tanam
0.1500
Plywood 4 mm
0.0600
Tenaga
Pekerja
Tukang Kayu
Kepala Tukang
Mandor
A.007
SAT
11 dari 102
NO
1
A.010
A.011
A.012
A.013
A.014
A.015
A.016
A.017
A.018
A.019
A.020
A.021
A.022
KOEF
SAT
HARGA SAT
Rp.
5
JUMLAH
Rp.
6=(3x5)
2
Membuat 1 m bak adukan ukuran (40 x 50 x 50) cm
Bahan
Kayu Terentang
Paku
Kayu Meranti Batu 5/7 (ikat)
0.0360
0.0800
0.0140
m
kg
m
1,700,000.00
19,500.00
3,779,000.00
Jumlah (1)
61,200.00
1,560.00
52,906.00
115,666.00
Tenaga
Tukang Kayu
Mandor
0.3000
0.0015
OH
OH
40,000.00
43,000.00
Jumlah (2)
12,000.00
64.50
12,064.50
127,730.50
btg
kg
11,000.00
15,000.00
Jumlah (1)
11,000.00
3,750.00
14,750.00
Tenaga
Pekerja
Tukang Kayu
Kepala Tukang
Mandor
0.2500
0.0170
0.0020
0.0130
OH
OH
OH
OH
30,000.00
40,000.00
45,000.00
43,000.00
Jumlah (2)
7,500.00
680.00
90.00
559.00
8,829.00
23,579.00
0.1500
0.0900
0.0100
m
m
m
121,000.00
125,000.00
121,000.00
Jumlah (1)
18,150.00
11,250.00
1,210.00
30,610.00
Tenaga
Pekerja
Mandor
1.0000
0.0500
OH
OH
30,000.00
43,000.00
Jumlah (2)
30,000.00
2,150.00
32,150.00
62,760.00
6.6670
0.3330
OH
OH
30,000.00
43,000.00
Jumlah
200,010.00
14,319.00
214,329.00
6.6670
0.0330
OH
OH
30,000.00
43,000.00
Jumlah
200,010.00
1,419.00
201,429.00
30,000.00
40,000.00
1,000.00
600.00
400.00
500.00
1,500.00
30,000.00
43,000.00
90,000.00
3,870.00
93,870.00
30,000.00
43,000.00
3,750.00
537.50
4,287.50
30,000.00
40,000.00
45,000.00
43,000.00
120,000.00
240,000.00
27,000.00
8,600.00
395,600.00
30,000.00
40,000.00
43,000.00
180,000.00
80,000.00
12,900.00
272,900.00
30,000.00
43,000.00
3,750.00
537.50
4,287.50
30,000.00
43,000.00
15,000.00
2,150.00
17,150.00
30,000.00
43,000.00
3,000.00
430.00
3,430.00
Analisa Pekerjaan
12 dari 102
NO
1
A.023
A.024
A.025
A.026
A.027
A.028
B.
B.001
B.002
B.003
B.004
B.005
B.006
B.007
B.008
KOEF
SAT
HARGA SAT
Rp.
5
2
3
4
Membongkar 1 m rangka atap/ reng/ kaso (bongkaran dipakai kembali)
Pekerja
0.2000
OH
Tukang Kayu
0.1000
OH
Kepala Tukang
0.0100
OH
Mandor
0.0200
OH
Jumlah
Membongkar 1 m rangka atap/ reng/ kaso (bongkaran tidak dipakai kembali)
Pekerja
0.1500
OH
Tukang Kayu
0.0750
OH
Kepala Tukang
0.0075
OH
Mandor
0.0150
OH
Jumlah
Membongkar 1 m kuda-kuda/ gording/ balok (bongkaran dipakai kembali)
Pekerja
4.0000
OH
Tukang Kayu
6.0000
OH
Kepala Tukang
0.6000
OH
Mandor
0.4000
OH
Jumlah
Membongkar 1 m kuda-kuda/ gording/ balok (bongkaran tidak dipakai kembali)
Pekerja
4.0000
OH
Tukang Kayu
3.0000
OH
Mandor
0.2000
OH
Jumlah
Membongkar 1 m plafond (bongkaran dipakai kembali)
Pekerja
0.1000
OH
Tukang Kayu
0.3000
OH
Kepala Tukang
0.0300
OH
Mandor
0.0100
OH
Jumlah
Membongkar 1 m plafond (bongkaran tidak dipakai kembali)
Pekerja
0.1500
OH
Mandor
0.0150
OH
Jumlah
PEKERJAAN TANAH
Menggali 1 m tanah biasa sedalam 1 meter
Tenaga
Pekerja
0.7500
OH
Mandor
0.0250
OH
Jumlah
Menggali 1 m tanah biasa sedalam 2 meter
Tenaga
Pekerja
0.9000
OH
Mandor
0.0450
OH
Jumlah
Menggali 1 m tanah biasa sedalam 3 meter
Tenaga
Pekerja
1.0500
OH
Mandor
0.0670
OH
Jumlah
Menggali 1 m tanah keras sedalam 1 meter
Tenaga
Pekerja
1.0000
OH
Mandor
0.0320
OH
Jumlah
Menggali 1 m tanah cadas sedalam 1 meter
Tenaga
Pekerja
1.5000
OH
Mandor
0.0600
OH
Jumlah
Menggali 1 m tanah lumpur sedalam 1 meter
Tenaga
Pekerja
1.2000
OH
Mandor
0.0450
OH
Jumlah
Mengerjakan 1 m stripping tebing setinggi 1 meter
Tenaga
Pekerja
0.0500
OH
Mandor
0.0050
OH
Jumlah
Membuang 1 m tanah sejauh 30 meter
Tenaga
Pekerja
0.3300
OH
Mandor
0.0100
OH
Jumlah
Analisa Pekerjaan
JUMLAH
Rp.
6=(3x5)
30,000.00
40,000.00
45,000.00
43,000.00
6,000.00
4,000.00
450.00
860.00
11,310.00
30,000.00
40,000.00
45,000.00
43,000.00
4,500.00
3,000.00
337.50
645.00
8,482.50
30,000.00
40,000.00
45,000.00
43,000.00
120,000.00
240,000.00
27,000.00
17,200.00
404,200.00
30,000.00
40,000.00
43,000.00
120,000.00
120,000.00
8,600.00
248,600.00
30,000.00
40,000.00
45,000.00
43,000.00
3,000.00
12,000.00
1,350.00
430.00
16,780.00
30,000.00
43,000.00
4,500.00
645.00
5,145.00
SNI
30,000.00
43,000.00
22,500.00
1,075.00
23,575.00
30,000.00
43,000.00
27,000.00
1,935.00
28,935.00
30,000.00
43,000.00
31,500.00
2,881.00
34,381.00
30,000.00
43,000.00
30,000.00
1,376.00
31,376.00
30,000.00
43,000.00
45,000.00
2,580.00
47,580.00
30,000.00
43,000.00
36,000.00
1,935.00
37,935.00
30,000.00
43,000.00
1,500.00
215.00
1,715.00
30,000.00
43,000.00
9,900.00
430.00
10,330.00
13 dari 102
NO
1
B.009
B.010
B.011
B.012
2
Membuang 1 m tanah sejauh 150 meter
Tenaga
Pekerja
Mandor
Jumlah
Mengurug kembali 1 m galian
Tenaga
Pekerja
Mandor
Jumlah
Memadatkan 1 m tanah (per 20 cm)
Tenaga
Pekerja
Mandor
Jumlah
Mengurug 1 m pasir urug
Bahan
Pasir Urug
B.014
B.015
B.016
B.017
SAT
HARGA SAT
Rp.
5
JUMLAH
Rp.
6=(3x5)
0.5160
0.0500
OH
OH
30,000.00
43,000.00
15,480.00
2,150.00
17,630.00
0.2500
0.0083
OH
OH
30,000.00
43,000.00
7,500.00
358.33
7,858.33
0.5000
0.0500
OH
OH
30,000.00
43,000.00
15,000.00
2,150.00
17,150.00
1.2000
86,000.00
Jumlah (1)
103,200.00
103,200.00
0.3000
0.0100
OH
OH
30,000.00
43,000.00
Jumlah (2)
9,000.00
430.00
9,430.00
112,630.00
m
m
m
320,000.00
121,000.00
75,000.00
Jumlah (1)
43,200.00
48,400.00
71,100.00
162,700.00
Tenaga
Pekerja
Tukang Batu
Kepala Tukang
Mandor
0.8000
0.4000
0.0400
0.0800
OH
OH
OH
OH
30,000.00
40,000.00
45,000.00
43,000.00
Jumlah (2)
24,000.00
16,000.00
1,800.00
3,440.00
45,240.00
207,940.00
0.2480
1.2400
m
m
320,000.00
75,000.00
Jumlah (1)
79,360.00
93,000.00
172,360.00
Tenaga
Pekerja
Tukang Batu
Kepala Tukang
Mandor
0.8000
0.4000
0.0400
0.0800
OH
OH
OH
OH
30,000.00
40,000.00
45,000.00
43,000.00
Jumlah (2)
24,000.00
16,000.00
1,800.00
3,440.00
45,240.00
217,600.00
6.0000
kg
15,000.00
Jumlah (1)
90,000.00
90,000.00
Tenaga
Pekerja
Mandor
0.1500
0.0150
OH
OH
30,000.00
43,000.00
Jumlah (2)
4,500.00
645.00
5,145.00
95,145.00
90,000.00
Jumlah (1)
108,000.00
108,000.00
Tenaga
Pekerja
Mandor
0.2500
0.0250
OH
OH
30,000.00
43,000.00
Jumlah (2)
7,500.00
1,075.00
8,575.00
116,575.00
0.0500
1.0000
0.0350
OH
m
OH
42,000.00
10,330.00
448,000.00
2,100.00
10,330.00
15,680.00
28,110.00
Tenaga
Pekerja
Mandor
B.013
KOEF
Analisa Pekerjaan
14 dari 102
NO
1
B.018
C.
C.001
KOEF
2
3
4
Mengurug 1 m tanah degnag tanah urug pilihan menggunakan alat berat
Tenaga
Pek. Galian (10 org) 50% - B.001
0.6000
m
Pek. Galian Tanah Keras(10 org) 50% - B.004
0.6000
m
Pek. Striping (10 org) 50% - B.007
5.0000
m
Beli Tanah + Angkut; Max. 10 km (tanah urug pilihan)
1.2000
m
Jumlah
PEKERJAAN PONDASI
Memasang 1 m pondasi batu belah; campuran 1 PC : 1 PP
Bahan
Batu Belah 15/20
1.2000
m
Portland Cement (PC)
392.0000
kg
Pasir Pasang (PP)
0.3140
m
Tenaga
Pekerja
Tukang Batu
Kepala Tukang
Mandor
C.002
C.003
C.004
C.005
SAT
HARGA SAT
Rp.
5
JUMLAH
Rp.
6=(3x5)
23,575.00
31,376.00
1,715.00
75,000.00
14,145.00
18,825.60
8,575.00
90,000.00
131,545.60
SNI 03-2836-2002
121,000.00
1,350.00
121,000.00
Jumlah (1)
145,200.00
529,200.00
37,994.00
712,394.00
1.5000
0.6000
0.0600
0.0750
OH
OH
OH
OH
30,000.00
40,000.00
45,000.00
43,000.00
Jumlah (2)
45,000.00
24,000.00
2,700.00
3,225.00
74,925.00
787,319.00
m
kg
m
121,000.00
1,350.00
121,000.00
Jumlah (1)
145,200.00
360,450.00
51,667.00
557,317.00
Tenaga
Pekerja
Tukang Batu
Kepala Tukang
Mandor
1.5000
0.6000
0.0600
0.0750
OH
OH
OH
OH
30,000.00
40,000.00
45,000.00
43,000.00
Jumlah (2)
45,000.00
24,000.00
2,700.00
3,225.00
74,925.00
632,242.00
m
kg
m
121,000.00
1,350.00
121,000.00
Jumlah (1)
145,200.00
529,200.00
37,994.00
712,394.00
Tenaga
Pekerja
Tukang Batu
Kepala Tukang
Mandor
1.5000
0.6000
0.0600
0.0750
OH
OH
OH
OH
30,000.00
40,000.00
45,000.00
43,000.00
Jumlah (2)
45,000.00
24,000.00
2,700.00
3,225.00
74,925.00
787,319.00
m
kg
m
121,000.00
1,350.00
121,000.00
Jumlah (1)
145,200.00
272,700.00
58,685.00
476,585.00
Tenaga
Pekerja
Tukang Batu
Kepala Tukang
Mandor
1.5000
0.6000
0.0600
0.0750
OH
OH
OH
OH
30,000.00
40,000.00
45,000.00
43,000.00
Jumlah (2)
45,000.00
24,000.00
2,700.00
3,225.00
74,925.00
551,510.00
m
kg
m
121,000.00
1,350.00
121,000.00
Jumlah (1)
145,200.00
220,050.00
62,920.00
428,170.00
Tenaga
Pekerja
Tukang Batu
Kepala Tukang
Mandor
OH
OH
OH
OH
30,000.00
40,000.00
45,000.00
43,000.00
Jumlah (2)
45,000.00
24,000.00
2,700.00
3,225.00
74,925.00
503,095.00
Analisa Pekerjaan
1.5000
0.6000
0.0600
0.0750
15 dari 102
NO
1
C.006
C.007
C.008
C.009
C.010
KOEF
SAT
JUMLAH
Rp.
6=(3x5)
2
3
Memasang 1 m pondasi batu belah; campuran 1 PC : 5 PP
Bahan
Batu Belah 15/20
1.2000
Portland Cement (PC)
136.0000
Pasir Pasang (PP)
0.5440
m
kg
m
121,000.00
1,350.00
121,000.00
Jumlah (1)
145,200.00
183,600.00
65,824.00
394,624.00
Tenaga
Pekerja
Tukang Batu
Kepala Tukang
Mandor
1.5000
0.6000
0.0600
0.0750
OH
OH
OH
OH
30,000.00
40,000.00
45,000.00
43,000.00
Jumlah (2)
45,000.00
24,000.00
2,700.00
3,225.00
74,925.00
469,549.00
m
kg
m
121,000.00
1,350.00
121,000.00
Jumlah (1)
145,200.00
157,950.00
67,881.00
371,031.00
Tenaga
Pekerja
Tukang Batu
Kepala Tukang
Mandor
1.5000
0.6000
0.0600
0.0750
OH
OH
OH
OH
30,000.00
40,000.00
45,000.00
43,000.00
Jumlah (2)
45,000.00
24,000.00
2,700.00
3,225.00
74,925.00
445,956.00
m
kg
m
121,000.00
1,350.00
121,000.00
Jumlah (1)
145,200.00
122,850.00
70,664.00
338,714.00
Tenaga
Pekerja
Tukang Batu
Kepala Tukang
Mandor
OH
OH
OH
OH
30,000.00
40,000.00
45,000.00
43,000.00
Jumlah (2)
45,000.00
24,000.00
2,700.00
3,225.00
74,925.00
413,639.00
m
kg
m
m
121,000.00
1,350.00
320,000.00
121,000.00
Jumlah (1)
145,200.00
210,600.00
10,240.00
70,664.00
436,704.00
Tenaga
Pekerja
Tukang Batu
Kepala Tukang
Mandor
OH
OH
OH
OH
30,000.00
40,000.00
45,000.00
43,000.00
Jumlah (2)
45,000.00
24,000.00
2,700.00
3,225.00
74,925.00
511,629.00
m
kg
m
m
121,000.00
1,350.00
320,000.00
121,000.00
Jumlah (1)
145,200.00
82,350.00
47,040.00
59,532.00
334,122.00
Tenaga
Pekerja
Tukang Batu
Kepala Tukang
Mandor
OH
OH
OH
OH
30,000.00
40,000.00
45,000.00
43,000.00
Jumlah (2)
45,000.00
24,000.00
2,700.00
3,225.00
74,925.00
409,047.00
Analisa Pekerjaan
1.5000
0.6000
0.0600
0.0750
1.5000
0.6000
0.0600
0.0750
1.5000
0.6000
0.0600
0.0750
HARGA SAT
Rp.
5
16 dari 102
NO
1
C.011
C.012
C.013
C.014
C.015
KOEF
SAT
4
HARGA SAT
Rp.
5
JUMLAH
Rp.
6=(3x5)
2
3
Memasang 1 m pondasi batu belah; campuran PC : 1 KP : 4 PP
Bahan
Batu Belah 15/20
1.2000
Portland Cement (PC)
41.0000
Kapur Pasang (KP)
0.1310
Pasir Pasang (PP)
0.5230
m
kg
m
m
121,000.00
1,350.00
320,000.00
121,000.00
Jumlah (1)
145,200.00
55,350.00
41,920.00
63,283.00
305,753.00
Tenaga
Pekerja
Tukang Batu
Kepala Tukang
Mandor
1.5000
0.6000
0.0600
0.0750
OH
OH
OH
OH
30,000.00
40,000.00
45,000.00
43,000.00
Jumlah (2)
45,000.00
24,000.00
2,700.00
3,225.00
74,925.00
380,678.00
1.2000
0.4320
m
m
121,000.00
86,000.00
Jumlah (1)
145,200.00
37,152.00
182,352.00
Tenaga
Pekerja
Tukang Batu
Kepala Tukang
Mandor
0.7800
0.3900
0.0390
0.0390
OH
OH
OH
OH
30,000.00
40,000.00
45,000.00
43,000.00
Jumlah (2)
23,400.00
15,600.00
1,755.00
1,677.00
42,432.00
224,784.00
Analisa Pekerjaan
58,080.00
261,900.00
37,752.00
83,772.00
1,927,800.00
34,200.00
2,403,504.00
90,000.00
34,000.00
3,825.00
6,450.00
134,275.00
2,537,779.00
54,450.00
261,900.00
37,752.00
83,772.00
437,874.00
71,400.00
12,000.00
1,350.00
3,440.00
88,190.00
526,064.00
1,634.00
11,374.00
26,850.00
81,675.00
688,500.00
17,100.00
120,928.00
2,340.00
270.00
3,840.00
954,511.00
30,000.00
26,800.00
3,015.00
2,150.00
61,965.00
1,016,476.00
17 dari 102
NO
1
C.016
C.017
KOEF
D.002
D.003
JUMLAH
Rp.
6=(3x5)
m
m
m
kg
kg
kg
m
kg
lt
kg
86,000.00
121,000.00
179,000.00
1,350.00
15,300.00
19,000.00
3,779,000.00
19,500.00
3,000.00
16,000.00
Jumlah (1)
1,376.00
9,680.00
22,375.00
66,150.00
527,850.00
13,300.00
102,033.00
2,340.00
270.00
3,200.00
748,574.00
Tenaga
Pekerja
Tukang Batu
Kepala Tukang
Mandor
0.8000
0.5000
0.0500
0.0400
OH
OH
OH
OH
30,000.00
40,000.00
45,000.00
43,000.00
Jumlah (2)
24,000.00
20,000.00
2,250.00
1,720.00
47,970.00
796,544.00
1.2000
18.0000
m
kg
102,000.00
24,000.00
Jumlah (1)
122,400.00
432,000.00
554,400.00
1.5000
0.2000
0.0200
OH
OH
OH
30,000.00
40,000.00
43,000.00
Jumlah (2)
45,000.00
8,000.00
860.00
53,860.00
608,260.00
SNI 03-2837-2002
HARGA SAT
Rp.
5
2
3
Memasang 1 m' tiang pancang (35x35) cm, beton bertulang
Bahan
Pasir Urug
0.0160
Pasir Beton (PB)
0.0800
Koral (Batu pecah ukuran 5 mm - 40 mm)
0.1250
Portland Cement (PC)
49.0000
Besi Beton
34.5000
Kawat Beton
0.7000
Kayu Kaso 5/7
0.0270
Paku
0.1200
Minyak Bekisting
0.0900
Plamuur Tembok
0.2000
Tenaga
Pekerja
Tukang Batu
Mandor
D.
D.001
SAT
Analisa Pekerjaan
77,000.00
86,440.50
7,139.00
170,579.50
19,500.00
8,000.00
900.00
1,290.00
29,690.00
200,269.50
77,000.00
58,725.00
9,680.00
145,405.00
19,500.00
8,000.00
900.00
1,290.00
29,690.00
175,095.00
77,000.00
44,482.50
11,011.00
132,493.50
18,000.00
8,000.00
900.00
1,290.00
28,190.00
160,683.50
18 dari 102
NO
1
D.004
D.005
D.006
D.007
D.008
HARGA SAT
Rp.
2
3
4
5
Memasang 1 m dinding bata merah (5x11x22) cm; tebal 1 bata; campuran 1 PC : 4 PP
Bahan
Bata Merah
140.0000 buah
550.00
Portland Cement (PC)
26.5500
kg
1,350.00
Pasir Pasang (PP)
0.0930
m
121,000.00
Jumlah (1)
Tenaga
Pekerja
0.6000
OH
30,000.00
Tukang Batu
0.2000
OH
40,000.00
Kepala Tukang
0.0200
OH
45,000.00
Mandor
0.0300
OH
43,000.00
Jumlah (2)
Jumlah (1) + (2)
Memasang 1 m dinding bata merah (5x11x22) cm; tebal 1 bata; campuran 1 PC : 5 PP
Bahan
Bata Merah
140.0000 buah
550.00
Portland Cement (PC)
22.2000
kg
1,350.00
Pasir Pasang (PP)
0.1020
m
121,000.00
Jumlah (1)
Tenaga
Pekerja
0.6000
OH
30,000.00
Tukang Batu
0.2000
OH
40,000.00
Kepala Tukang
0.0200
OH
45,000.00
Mandor
0.0300
OH
43,000.00
Jumlah (2)
Jumlah (1) + (2)
Memasang 1 m dinding bata merah (5x11x22) cm; tebal 1 bata; campuran 1 PC : 6 PP
Bahan
Bata Merah
140.0000 buah
550.00
Portland Cement (PC)
18.5000
kg
1,350.00
Pasir Pasang (PP)
0.1220
m
121,000.00
Jumlah (1)
Tenaga
Pekerja
0.6000
OH
30,000.00
Tukang Batu
0.2000
OH
40,000.00
Kepala Tukang
0.0200
OH
45,000.00
Mandor
0.0300
OH
43,000.00
Jumlah (2)
Jumlah (1) + (2)
Memasang 1 m dinding bata merah (5x11x22) cm; tebal 1 bata; campuran 1 PC : 3 KP : 10 PP
Bahan
Bata Merah
140.0000 buah
550.00
Portland Cement (PC)
10.0800
kg
1,350.00
Kapur Pasang (KP)
0.0925
m
320,000.00
Pasir Pasang (PP)
0.0275
m
121,000.00
Jumlah (1)
Tenaga
Pekerja
0.6000
OH
30,000.00
Tukang Batu
0.2000
OH
40,000.00
Kepala Tukang
0.0200
OH
45,000.00
Mandor
0.0300
OH
43,000.00
Jumlah (2)
Jumlah (1) + (2)
Memasang 1 m dinding bata merah (5x11x22) cm; tebal bata; campuran 1 PC : 1 PP
Bahan
Bata Merah
70.0000 buah
550.00
Portland Cement (PC)
27.8000
kg
1,350.00
Pasir Pasang (PP)
0.0280
m
121,000.00
Jumlah (1)
Tenaga
Pekerja
0.3200
OH
30,000.00
Tukang Batu
0.1000
OH
40,000.00
Kepala Tukang
0.0100
OH
45,000.00
Mandor
0.0150
OH
43,000.00
Jumlah (2)
Jumlah (1) + (2)
Analisa Pekerjaan
KOEF
SAT
JUMLAH
Rp.
6=(3x5)
77,000.00
35,842.50
11,253.00
124,095.50
18,000.00
8,000.00
900.00
1,290.00
28,190.00
152,285.50
77,000.00
29,970.00
12,342.00
119,312.00
18,000.00
8,000.00
900.00
1,290.00
28,190.00
147,502.00
77,000.00
24,975.00
14,762.00
116,737.00
18,000.00
8,000.00
900.00
1,290.00
28,190.00
144,927.00
77,000.00
13,608.00
29,600.00
3,327.50
120,208.00
18,000.00
8,000.00
900.00
1,290.00
28,190.00
148,398.00
38,500.00
37,530.00
3,388.00
79,418.00
9,600.00
4,000.00
450.00
645.00
14,695.00
94,113.00
19 dari 102
NO
1
D.009
D.010
D.011
D.012
D.013
HARGA SAT
Rp.
2
3
4
5
Memasang 1 m dinding bata merah (5x11x22) cm; tebal bata; campuran 1 PC : 2 PP
Bahan
Bata Merah
70.0000 buah
550.00
Portland Cement (PC)
18.9500
kg
1,350.00
Pasir Pasang (PP)
0.0380
m
121,000.00
Jumlah (1)
Tenaga
Pekerja
0.3000
OH
30,000.00
Tukang Batu
0.1000
OH
40,000.00
Kepala Tukang
0.0100
OH
45,000.00
Mandor
0.0150
OH
43,000.00
Jumlah (2)
Jumlah (1) + (2)
Memasang 1 m dinding bata merah (5x11x22) cm; tebal bata; campuran 1 PC : 3 PP
Bahan
Bata Merah
70.0000 buah
550.00
Portland Cement (PC)
14.3700
kg
1,350.00
Pasir Pasang (PP)
0.0400
m
121,000.00
Jumlah (1)
Tenaga
Pekerja
0.3000
OH
30,000.00
Tukang Batu
0.1000
OH
40,000.00
Kepala Tukang
0.0100
OH
45,000.00
Mandor
0.0150
OH
43,000.00
Jumlah (2)
Jumlah (1) + (2)
Memasang 1 m dinding bata merah (5x11x22) cm; tebal bata; campuran 1 PC : 4 PP
Bahan
Bata Merah
70.0000 buah
550.00
Portland Cement (PC)
11.5000
kg
1,350.00
Pasir Pasang (PP)
0.0430
m
121,000.00
Jumlah (1)
Tenaga
Pekerja
0.3000
OH
30,000.00
Tukang Batu
0.1000
OH
40,000.00
Kepala Tukang
0.0100
OH
45,000.00
Mandor
0.0150
OH
43,000.00
Jumlah (2)
Jumlah (1) + (2)
Memasang 1 m dinding bata merah (5x11x22) cm; tebal bata; campuran 1 PC : 5 PP
Bahan
Bata Merah
70.0000 buah
550.00
Portland Cement (PC)
9.6800
kg
1,350.00
Pasir Pasang (PP)
0.0450
m
121,000.00
Jumlah (1)
Tenaga
Pekerja
0.3000
OH
30,000.00
Tukang Batu
0.1000
OH
40,000.00
Kepala Tukang
0.0100
OH
45,000.00
Mandor
0.0150
OH
43,000.00
Jumlah (2)
Jumlah (1) + (2)
Memasang 1 m dinding bata merah (5x11x22) cm; tebal bata; campuran 1 PC : 6 PP
Bahan
Bata Merah
70.0000 buah
550.00
Portland Cement (PC)
8.3200
kg
1,350.00
Pasir Pasang (PP)
0.0490
m
121,000.00
Jumlah (1)
Tenaga
Pekerja
0.3000
OH
30,000.00
Tukang Batu
0.1000
OH
40,000.00
Kepala Tukang
0.0100
OH
45,000.00
Mandor
0.0150
OH
43,000.00
Jumlah (2)
Jumlah (1) + (2)
Analisa Pekerjaan
KOEF
SAT
JUMLAH
Rp.
6=(3x5)
38,500.00
25,582.50
4,598.00
68,680.50
9,000.00
4,000.00
450.00
645.00
14,095.00
82,775.50
38,500.00
19,399.50
4,840.00
62,739.50
9,000.00
4,000.00
450.00
645.00
14,095.00
76,834.50
38,500.00
15,525.00
5,203.00
59,228.00
9,000.00
4,000.00
450.00
645.00
14,095.00
73,323.00
38,500.00
13,068.00
5,445.00
57,013.00
9,000.00
4,000.00
450.00
645.00
14,095.00
71,108.00
38,500.00
11,232.00
5,929.00
55,661.00
9,000.00
4,000.00
450.00
645.00
14,095.00
69,756.00
20 dari 102
NO
1
D.014
D.015
D.016
D.017
HARGA SAT
Rp.
2
3
4
5
Memasang 1 m dinding bata merah (5x11x22) cm; tebal bata; campuran 1 PC : 8 PP
Bahan
Bata Merah
70.0000 buah
550.00
Portland Cement (PC)
6.5000
kg
1,350.00
Pasir Pasang (PP)
0.0500
m
121,000.00
Jumlah (1)
Tenaga
Pekerja
0.3000
OH
30,000.00
Tukang Batu
0.1000
OH
40,000.00
Kepala Tukang
0.0100
OH
45,000.00
Mandor
0.0150
OH
43,000.00
Jumlah (2)
Jumlah (1) + (2)
Memasang 1 m dinding bata merah (5x11x22) cm; tebal bata; campuran 1 PC : 3 KP : 10 PP
Bahan
Bata Merah
70.0000 buah
550.00
Portland Cement (PC)
4.5000
kg
1,350.00
Kapur Pasang (KP)
0.0500
m
320,000.00
Pasir Pasang (PP)
0.0150
m
121,000.00
Jumlah (1)
Tenaga
Pekerja
0.3000
OH
30,000.00
Tukang Batu
0.1000
OH
40,000.00
Kepala Tukang
0.0100
OH
45,000.00
Mandor
0.0150
OH
43,000.00
Jumlah (2)
Jumlah (1) + (2)
Memasang 1 m dinding CB 20
Bahan
Concret Block (CB) 20 / Batako
12.5000 buah
3,000.00
Portland Cement (PC)
14.0500
kg
1,350.00
Pasir Beton
0.0040
m
121,000.00
Pasir Pasang (PP)
0.0420
m
121,000.00
Besi Angkur 8 mm
3.8700
kg
15,300.00
Paku biasa 2" - 5'
0.0060
kg
19,500.00
Kayu Terentang
0.0010
m
2,496,000.00
Kawat Beton
0.0300
kg
19,000.00
Koral Beton
0.0050
m
179,000.00
Jumlah (1)
Tenaga
Pekerja
0.3700
OH
30,000.00
Tukang Batu
0.1570
OH
40,000.00
Tukang Besi
0.0070
OH
40,000.00
Kepala Tukang
0.0164
OH
45,000.00
Mandor
0.0185
OH
43,000.00
Jumlah (2)
Jumlah (1) + (2)
Memasang 1 m dinding CB 15
Bahan
Concret Block (CB) 15 / Batako
12.5000 buah
3,000.00
Portland Cement (PC)
10.4600
kg
1,350.00
Pasir Beton
0.0030
m
121,000.00
Pasir Pasang (PP)
0.0320
m
121,000.00
Besi Angkur 8 mm
0.8700
kg
15,300.00
Paku biasa 2" - 5'
0.0040
kg
19,500.00
Kayu Terentang
0.0010
m
2,496,000.00
Kawat Beton
0.0200
kg
19,000.00
Koral Beton
0.0040
m
179,000.00
Jumlah (1)
Tenaga
Pekerja
0.3400
OH
30,000.00
Tukang Batu
0.1300
OH
40,000.00
Tukang Besi
0.0070
OH
40,000.00
Kepala Tukang
0.0137
OH
45,000.00
Mandor
0.0170
OH
43,000.00
Jumlah (2)
Jumlah (1) + (2)
Analisa Pekerjaan
KOEF
SAT
JUMLAH
Rp.
6=(3x5)
38,500.00
8,775.00
6,050.00
53,325.00
9,000.00
4,000.00
450.00
645.00
14,095.00
67,420.00
38,500.00
6,075.00
16,000.00
1,815.00
60,575.00
9,000.00
4,000.00
450.00
645.00
14,095.00
74,670.00
37,500.00
18,967.50
484.00
5,082.00
59,211.00
117.00
2,496.00
570.00
895.00
125,322.50
11,100.00
6,280.00
280.00
738.00
795.50
19,193.50
144,516.00
37,500.00
14,121.00
363.00
3,872.00
13,311.00
78.00
2,496.00
380.00
716.00
72,837.00
10,200.00
5,200.00
280.00
616.50
731.00
17,027.50
89,864.50
21 dari 102
NO
1
D.018
2
Memasang 1 m dinding CB 10
Bahan
Concret Block (CB) 10 / Batako
Portland Cement (PC)
Pasir Beton
Pasir Pasang (PP)
Besi Angkur 8 mm
Paku biasa 2" - 5'
Kayu Terentang
Kawat Beton
Koral Beton
Tenaga
Pekerja
Tukang Batu
Tukang Besi
Kepala Tukang
Mandor
D.019
D.020
D.021
E.
E.001
KOEF
SAT
HARGA SAT
Rp.
5
JUMLAH
Rp.
6=(3x5)
12.5000
7.2000
0.0020
0.0210
2.5400
0.0030
0.0010
0.0150
0.0030
buah
kg
m
m
kg
kg
m
kg
m
3,000.00
1,350.00
121,000.00
121,000.00
15,300.00
19,500.00
2,496,000.00
19,000.00
179,000.00
Jumlah (1)
37,500.00
9,720.00
242.00
2,541.00
38,862.00
58.50
2,496.00
285.00
537.00
92,241.50
0.3400
0.1070
0.0070
0.0114
0.0170
OH
OH
OH
OH
OH
30,000.00
40,000.00
40,000.00
45,000.00
43,000.00
Jumlah (2)
10,200.00
4,280.00
280.00
513.00
731.00
16,004.00
108,245.50
Analisa Pekerjaan
22 dari 102
NO
1
E.002
E.003
E.004
E.005
E.006
E.007
2
Memasang 1 m plesteran 1 PC : 2 PP; tebal 15 mm
Bahan
Portland Cement (PC)
Pasir Pasang (PP)
KOEF
SAT
HARGA SAT
Rp.
5
JUMLAH
Rp.
6=(3x5)
10.2240
0.0200
kg
m
1,350.00
121,000.00
Jumlah (1)
13,802.40
2,420.00
16,222.40
Tenaga
Pekerja
Tukang Batu
Kepala Tukang
Mandor
0.2000
0.1500
0.0150
0.0100
OH
OH
OH
OH
30,000.00
40,000.00
45,000.00
43,000.00
Jumlah (2)
6,000.00
6,000.00
675.00
430.00
13,105.00
29,327.40
7.7760
0.0230
kg
m
1,350.00
121,000.00
Jumlah (1)
10,497.60
2,783.00
13,280.60
Tenaga
Pekerja
Tukang Batu
Kepala Tukang
Mandor
0.2000
0.1500
0.0150
0.0100
OH
OH
OH
OH
30,000.00
40,000.00
45,000.00
43,000.00
Jumlah (2)
6,000.00
6,000.00
675.00
430.00
13,105.00
26,385.60
6.2400
0.0240
kg
m
1,350.00
121,000.00
Jumlah (1)
8,424.00
2,904.00
11,328.00
Tenaga
Pekerja
Tukang Batu
Kepala Tukang
Mandor
0.2000
0.1500
0.0150
0.0100
OH
OH
OH
OH
30,000.00
40,000.00
45,000.00
43,000.00
Jumlah (2)
6,000.00
6,000.00
675.00
430.00
13,105.00
24,433.00
5.1840
0.0260
kg
m
1,350.00
121,000.00
Jumlah (1)
6,998.40
3,146.00
10,144.40
Tenaga
Pekerja
Tukang Batu
Kepala Tukang
Mandor
0.2000
0.1500
0.0150
0.0100
OH
OH
OH
OH
30,000.00
40,000.00
45,000.00
43,000.00
Jumlah (2)
6,000.00
6,000.00
675.00
430.00
13,105.00
23,249.40
4.4160
0.0270
kg
m
1,350.00
121,000.00
Jumlah (1)
5,961.60
3,267.00
9,228.60
Tenaga
Pekerja
Tukang Batu
Kepala Tukang
Mandor
0.2000
0.1500
0.0150
0.0100
OH
OH
OH
OH
30,000.00
40,000.00
45,000.00
43,000.00
Jumlah (2)
6,000.00
6,000.00
675.00
430.00
13,105.00
22,333.60
3.9360
0.0280
kg
m
1,350.00
121,000.00
Jumlah (1)
5,313.60
3,388.00
8,701.60
Tenaga
Pekerja
Tukang Batu
Kepala Tukang
Mandor
0.2000
0.1500
0.0150
0.0100
OH
OH
OH
OH
30,000.00
40,000.00
45,000.00
43,000.00
Jumlah (2)
6,000.00
6,000.00
675.00
430.00
13,105.00
21,806.60
Analisa Pekerjaan
23 dari 102
NO
1
E.008
E.009
E.010
E.011
E.013
SAT
HARGA SAT
Rp.
5
JUMLAH
Rp.
6=(3x5)
2
Memasang 1 m plesteran 1 PC : 8 PP; tebal 15 mm
Bahan
Portland Cement (PC)
Pasir Pasang (PP)
3.4560
0.0290
kg
m
1,350.00
121,000.00
Jumlah (1)
4,665.60
3,509.00
8,174.60
Tenaga
Pekerja
Tukang Batu
Kepala Tukang
Mandor
0.2000
0.1500
0.0150
0.0100
OH
OH
OH
OH
30,000.00
40,000.00
45,000.00
43,000.00
Jumlah (2)
6,000.00
6,000.00
675.00
430.00
13,105.00
21,279.60
kg
m
m
1,350.00
320,000.00
121,000.00
Jumlah (1)
7,776.00
960.00
1,573.00
10,309.00
Tenaga
Pekerja
Tukang Batu
Kepala Tukang
Mandor
0.2200
0.1200
0.0120
0.0110
OH
OH
OH
OH
30,000.00
40,000.00
45,000.00
43,000.00
Jumlah (2)
6,600.00
4,800.00
540.00
473.00
12,413.00
22,722.00
kg
m
m
1,350.00
320,000.00
121,000.00
Jumlah (1)
4,050.00
1,600.00
2,420.00
8,070.00
Tenaga
Pekerja
Tukang Batu
Kepala Tukang
Mandor
0.2200
0.1200
0.0120
0.0110
OH
OH
OH
OH
30,000.00
40,000.00
45,000.00
43,000.00
Jumlah (2)
6,600.00
4,800.00
540.00
473.00
12,413.00
20,483.00
13.6320
0.0270
kg
m
1,350.00
121,000.00
Jumlah (1)
18,403.20
3,267.00
21,670.20
0.2600
0.2000
0.0200
0.0130
OH
OH
OH
OH
30,000.00
40,000.00
45,000.00
43,000.00
Jumlah (2)
7,800.00
8,000.00
900.00
559.00
17,259.00
38,929.20
10.3680
0.0310
kg
m
1,350.00
121,000.00
Jumlah (1)
13,996.80
3,751.00
17,747.80
Tenaga
Pekerja
Tukang Batu
Kepala Tukang
Mandor
0.2600
0.2000
0.0200
0.0130
OH
OH
OH
OH
30,000.00
40,000.00
45,000.00
43,000.00
Jumlah (2)
7,800.00
8,000.00
900.00
559.00
17,259.00
35,006.80
8.3200
0.0320
kg
m
1,350.00
121,000.00
Jumlah (1)
11,232.00
3,872.00
15,104.00
Tenaga
Pekerja
Tukang Batu
Kepala Tukang
Mandor
0.2600
0.2000
0.0200
0.0130
OH
OH
OH
OH
30,000.00
40,000.00
45,000.00
43,000.00
Jumlah (2)
7,800.00
8,000.00
900.00
559.00
17,259.00
32,363.00
E.012
KOEF
Analisa Pekerjaan
24 dari 102
NO
1
E.014
E.015
E.016
E.018
E.019
SAT
HARGA SAT
Rp.
5
JUMLAH
Rp.
6=(3x5)
2
Memasang 1 m plesteran 1 PC : 5 PP; tebal 20 mm
Bahan
Portland Cement (PC)
Pasir Pasang (PP)
6.9120
0.0350
kg
m
1,350.00
121,000.00
Jumlah (1)
9,331.20
4,235.00
13,566.20
Tenaga
Pekerja
Tukang Batu
Kepala Tukang
Mandor
0.2600
0.2000
0.0200
0.0130
OH
OH
OH
OH
30,000.00
40,000.00
45,000.00
43,000.00
Jumlah (2)
7,800.00
8,000.00
900.00
559.00
17,259.00
30,825.20
5.8880
0.0360
kg
m
1,350.00
121,000.00
Jumlah (1)
7,948.80
4,356.00
12,304.80
Tenaga
Pekerja
Tukang Batu
Kepala Tukang
Mandor
0.2600
0.2000
0.0200
0.0130
OH
OH
OH
OH
30,000.00
40,000.00
45,000.00
43,000.00
Jumlah (2)
7,800.00
8,000.00
900.00
559.00
17,259.00
29,563.80
15.5000
0.0130
kg
m
1,350.00
121,000.00
Jumlah (1)
20,925.00
1,573.00
22,498.00
0.3000
0.2000
0.0200
0.0130
OH
OH
OH
OH
30,000.00
40,000.00
45,000.00
43,000.00
Jumlah (2)
9,000.00
8,000.00
900.00
559.00
18,459.00
40,957.00
11.7500
0.0350
kg
m
1,350.00
121,000.00
Jumlah (1)
15,862.50
4,235.00
20,097.50
Tenaga
Pekerja
Tukang Batu
Kepala Tukang
Mandor
0.3000
0.2000
0.0200
0.0130
OH
OH
OH
OH
30,000.00
40,000.00
45,000.00
43,000.00
Jumlah (2)
9,000.00
8,000.00
900.00
559.00
18,459.00
38,556.50
9.4800
0.0380
kg
m
1,350.00
121,000.00
Jumlah (1)
12,798.00
4,598.00
17,396.00
Tenaga
Pekerja
Tukang Batu
Kepala Tukang
Mandor
0.3000
0.2000
0.0200
0.0130
OH
OH
OH
OH
30,000.00
40,000.00
45,000.00
43,000.00
Jumlah (2)
9,000.00
8,000.00
900.00
559.00
18,459.00
35,855.00
7.9400
0.0390
kg
m
1,350.00
121,000.00
Jumlah (1)
10,719.00
4,719.00
15,438.00
Tenaga
Pekerja
Tukang Batu
Kepala Tukang
Mandor
0.3000
0.2000
0.0200
0.0130
OH
OH
OH
OH
30,000.00
40,000.00
45,000.00
43,000.00
Jumlah (2)
9,000.00
8,000.00
900.00
559.00
18,459.00
33,897.00
E.017
KOEF
Analisa Pekerjaan
25 dari 102
NO
1
E.020
2
Memasang 1 m plesteran 1 PC : 2 PP; tebal 30 mm
Bahan
Portland Cement (PC)
Pasir Pasang (PP)
E.023
E.024
E.025
HARGA SAT
Rp.
5
JUMLAH
Rp.
6=(3x5)
kg
m
1,350.00
121,000.00
Jumlah (1)
25,177.50
4,235.00
29,412.50
0.3200
0.2500
0.0250
0.0150
OH
OH
OH
OH
30,000.00
40,000.00
45,000.00
43,000.00
Jumlah (2)
9,600.00
10,000.00
1,125.00
645.00
21,370.00
50,782.50
14.1500
0.0390
kg
m
1,350.00
121,000.00
Jumlah (1)
19,102.50
4,719.00
23,821.50
0.3200
0.2500
0.0250
0.0150
OH
OH
OH
OH
30,000.00
40,000.00
45,000.00
43,000.00
Jumlah (2)
9,600.00
10,000.00
1,125.00
645.00
21,370.00
45,191.50
11.3800
0.0420
kg
m
1,350.00
121,000.00
Jumlah (1)
15,363.00
5,082.00
20,445.00
Tenaga
Pekerja
Tukang Batu
Kepala Tukang
Mandor
0.3200
0.2500
0.0250
0.0150
OH
OH
OH
OH
30,000.00
40,000.00
45,000.00
43,000.00
Jumlah (2)
9,600.00
10,000.00
1,125.00
645.00
21,370.00
41,815.00
8.1900
0.0450
kg
m
1,350.00
121,000.00
Jumlah (1)
11,056.50
5,445.00
16,501.50
Tenaga
Pekerja
Tukang Batu
Kepala Tukang
Mandor
0.3200
0.2500
0.0250
0.0150
OH
OH
OH
OH
30,000.00
40,000.00
45,000.00
43,000.00
Jumlah (2)
9,600.00
10,000.00
1,125.00
645.00
21,370.00
37,871.50
7.0700
0.0210
kg
m
1,350.00
121,000.00
Jumlah (1)
9,544.50
2,541.00
12,085.50
Tenaga
Pekerja
Tukang Batu
Kepala Tukang
Mandor
0.1500
0.0700
0.0070
0.0080
OH
OH
OH
OH
30,000.00
40,000.00
45,000.00
43,000.00
Jumlah (2)
4,500.00
2,800.00
315.00
344.00
7,959.00
20,044.50
5.1840
0.0260
kg
m
1,350.00
121,000.00
Jumlah (1)
6,998.40
3,146.00
10,144.40
Tenaga
Pekerja
Tukang Batu
Kepala Tukang
Mandor
0.1500
0.0700
0.0070
0.0080
OH
OH
OH
OH
30,000.00
40,000.00
45,000.00
43,000.00
Jumlah (2)
4,500.00
2,800.00
315.00
344.00
7,959.00
18,103.40
E.022
SAT
18.6500
0.0350
Tenaga
Pekerja
Tukang Batu
Kepala Tukang
Mandor
E.021
KOEF
Analisa Pekerjaan
26 dari 102
NO
1
E.026
E.027
E.028
E.029
E.030
KOEF
JUMLAH
Rp.
6=(3x5)
kg
m
1,350.00
121,000.00
Jumlah (1)
12,555.00
2,178.00
14,733.00
Tenaga
Pekerja
Tukang Batu
Kepala Tukang
Mandor
0.2600
0.2000
0.0200
0.0130
OH
OH
OH
OH
30,000.00
40,000.00
45,000.00
43,000.00
Jumlah (2)
7,800.00
8,000.00
900.00
559.00
17,259.00
31,992.00
kg
m
1,350.00
121,000.00
Jumlah (1)
9,544.50
2,541.00
12,085.50
Tenaga
Pekerja
Tukang Batu
Kepala Tukang
Mandor
0.2600
0.2000
0.0200
0.0130
OH
OH
OH
OH
30,000.00
40,000.00
45,000.00
43,000.00
Jumlah (2)
7,800.00
8,000.00
900.00
559.00
17,259.00
29,344.50
kg
m
1,350.00
121,000.00
Jumlah (1)
675.00
1,573.00
2,248.00
Tenaga
Pekerja
Tukang Batu
Kepala Tukang
Mandor
0.0570
0.3800
0.0380
0.0030
OH
OH
OH
OH
30,000.00
40,000.00
45,000.00
43,000.00
Jumlah (2)
1,710.00
15,200.00
1,710.00
129.00
18,749.00
20,997.00
kg
m
1,350.00
121,000.00
Jumlah (1)
5,832.00
726.00
6,558.00
Tenaga
Pekerja
Tukang Batu
Kepala Tukang
Mandor
OH
OH
OH
OH
30,000.00
40,000.00
45,000.00
43,000.00
Jumlah (2)
7,500.00
4,000.00
450.00
559.00
12,509.00
19,067.00
1,350.00
Jumlah (1)
4,195.80
4,195.80
30,000.00
40,000.00
45,000.00
43,000.00
Jumlah (2)
4,500.00
2,800.00
315.00
344.00
7,959.00
12,154.80
1,350.00
Jumlah (1)
2,160.00
2,160.00
30,000.00
40,000.00
45,000.00
43,000.00
Jumlah (2)
2,250.00
1,400.00
180.00
172.00
4,002.00
6,162.00
0.2500
0.1000
0.0100
0.0130
HARGA SAT
Rp.
5
2
3
Memasang 1 m plesteran beton 1 PC : 2 PP; tebal 15 mm
Bahan
Portland Cement (PC)
9.3000
Pasir Pasang (PP)
0.0180
E.031
SAT
0.1500
0.0700
0.0070
0.0080
OH
OH
OH
OH
Analisa Pekerjaan
0.0750
0.0350
0.0040
0.0040
OH
OH
OH
OH
27 dari 102
NO
1
E.032
E.033
F.
F.001
KOEF
2
3
4
Memasang 1 m finishing siar pasangan batu kali adukan 1 PC : 2 PP
Bahan
Portland Cement (PC)
6.3400
kg
Pasir Pasang (PP)
0.0120
m
F.003
F.004
HARGA SAT
Rp.
5
JUMLAH
Rp.
6=(3x5)
1,350.00
121,000.00
Jumlah (1)
8,559.00
1,452.00
10,011.00
Tenaga
Pekerja
Tukang Batu
Kepala Tukang
Mandor
0.3000
0.1400
0.0140
0.0150
OH
OH
OH
OH
30,000.00
40,000.00
45,000.00
43,000.00
Jumlah (2)
9,000.00
5,600.00
630.00
645.00
15,875.00
25,886.00
3.2500
kg
1,350.00
Jumlah (1)
4,387.50
4,387.50
Tenaga
Pekerja
Tukang Batu
Kepala Tukang
Mandor
0.1500
0.1000
0.0100
0.0080
OH
OH
OH
OH
30,000.00
40,000.00
45,000.00
43,000.00
Jumlah (2)
4,500.00
4,000.00
450.00
344.00
9,294.00
13,681.50
SNI 03-3434-2002
12,961,650.00
19,500.00
22,000.00
Jumlah (1)
14,257,815.00
24,375.00
22,000.00
14,304,190.00
30,000.00
40,000.00
45,000.00
43,000.00
Jumlah (2)
180,000.00
800,000.00
90,000.00
12,900.00
1,082,900.00
15,387,090.00
F.002
SAT
6.0000
20.0000
2.0000
0.3000
OH
OH
OH
OH
Analisa Pekerjaan
13,478,400.00
24,375.00
22,000.00
13,524,775.00
180,000.00
720,000.00
90,000.00
12,900.00
1,002,900.00
14,527,675.00
6,960,000.00
24,375.00
22,000.00
7,006,375.00
180,000.00
720,000.00
90,000.00
12,900.00
1,002,900.00
8,009,275.00
5,569,200.00
24,375.00
22,000.00
5,615,575.00
180,000.00
720,000.00
90,000.00
12,900.00
1,002,900.00
6,618,475.00
28 dari 102
NO
1
F.005
KOEF
2
3
4
Membuat dan memasang 1 m pintu klamp sederhana; Kayu Bangkirai
Bahan
Papan Kayu Bangkirai
0.0400
m
Paku 5 cm - 7 cm
0.0500
kg
Tenaga
Pekerja
Tukang Kayu
Kepala Tukang
Mandor
F.006
F.008
F.009
OH
OH
OH
OH
HARGA SAT
Rp.
5
JUMLAH
Rp.
6=(3x5)
10,816,000.00
19,500.00
Jumlah (1)
432,640.00
975.00
433,615.00
30,000.00
40,000.00
45,000.00
43,000.00
Jumlah (2)
10,500.00
42,000.00
4,725.00
774.00
57,999.00
491,614.00
4,641,000.00
19,500.00
Jumlah (1)
185,640.00
975.00
186,615.00
0.3500
1.0500
0.1050
0.0180
OH
OH
OH
OH
30,000.00
40,000.00
45,000.00
43,000.00
Jumlah (2)
10,500.00
42,000.00
4,725.00
774.00
57,999.00
244,614.00
m
kg
10,816,000.00
22,000.00
Jumlah (1)
432,640.00
11,000.00
443,640.00
Tenaga
Pekerja
Tukang Kayu
Kepala Tukang
Mandor
1.0000
2.5000
0.2500
0.0500
OH
OH
OH
OH
30,000.00
40,000.00
45,000.00
43,000.00
Jumlah (2)
30,000.00
100,000.00
11,250.00
2,150.00
143,400.00
587,040.00
m
kg
5,800,000.00
22,000.00
Jumlah (1)
232,000.00
11,000.00
243,000.00
Tenaga
Pekerja
Tukang Kayu
Kepala Tukang
Mandor
OH
OH
OH
OH
30,000.00
40,000.00
45,000.00
43,000.00
Jumlah (2)
30,000.00
100,000.00
11,250.00
2,150.00
143,400.00
386,400.00
4,641,000.00
22,000.00
Jumlah (1)
185,640.00
11,000.00
196,640.00
30,000.00
40,000.00
45,000.00
43,000.00
Jumlah (2)
30,000.00
100,000.00
11,250.00
2,150.00
143,400.00
340,040.00
10,816,000.00
22,000.00
Jumlah (1)
259,584.00
6,600.00
266,184.00
30,000.00
40,000.00
45,000.00
43,000.00
Jumlah (2)
24,000.00
80,000.00
9,000.00
1,720.00
114,720.00
380,904.00
1.0000
2.5000
0.2500
0.0500
F.010
0.3500
1.0500
0.1050
0.0180
F.007
SAT
1.0000
2.5000
0.2500
0.0500
OH
OH
OH
OH
Analisa Pekerjaan
0.8000
2.0000
0.2000
0.0400
OH
OH
OH
OH
29 dari 102
NO
1
F.011
KOEF
2
3
4
Membuat dan memasang 1 m pintu dan jendela kaca; Kayu Kruing
Bahan
Papan Kayu Kruing
0.0240
m
Lem Kayu
0.3000
kg
Tenaga
Pekerja
Tukang Kayu
Kepala Tukang
Mandor
F.012
OH
OH
OH
OH
1.0000
3.0000
0.3000
0.0500
OH
OH
OH
OH
1.0000
3.0000
0.3000
0.0500
OH
OH
OH
OH
F.016
0.8000
2.0000
0.2000
0.0400
F.015
OH
OH
OH
OH
F.014
0.8000
2.0000
0.2000
0.0400
F.013
SAT
1.0000
3.0000
0.3000
0.0500
OH
OH
OH
OH
HARGA SAT
Rp.
5
5,800,000.00
22,000.00
Jumlah (1)
139,200.00
6,600.00
145,800.00
30,000.00
40,000.00
45,000.00
43,000.00
Jumlah (2)
24,000.00
80,000.00
9,000.00
1,720.00
114,720.00
260,520.00
4,641,000.00
22,000.00
Jumlah (1)
111,384.00
6,600.00
117,984.00
30,000.00
40,000.00
45,000.00
43,000.00
Jumlah (2)
24,000.00
80,000.00
9,000.00
1,720.00
114,720.00
232,704.00
10,816,000.00
22,000.00
Jumlah (1)
692,224.00
11,000.00
703,224.00
30,000.00
40,000.00
45,000.00
43,000.00
Jumlah (2)
30,000.00
120,000.00
13,500.00
2,150.00
165,650.00
868,874.00
5,800,000.00
22,000.00
Jumlah (1)
371,200.00
11,000.00
382,200.00
30,000.00
40,000.00
45,000.00
43,000.00
Jumlah (2)
30,000.00
120,000.00
13,500.00
2,150.00
165,650.00
547,850.00
4,641,000.00
22,000.00
Jumlah (1)
297,024.00
11,000.00
308,024.00
30,000.00
40,000.00
45,000.00
43,000.00
Jumlah (2)
30,000.00
120,000.00
13,500.00
2,150.00
165,650.00
473,674.00
Analisa Pekerjaan
JUMLAH
Rp.
6=(3x5)
270,400.00
585.00
11,000.00
91,000.00
372,985.00
18,000.00
80,000.00
9,000.00
1,290.00
108,290.00
481,275.00
30 dari 102
NO
1
F.017
F.018
F.019
F.020
F.021
HARGA SAT
Rp.
2
3
4
5
Membuat dan memasang 1 m pintu plywood rangkap; rangka ekspose Kayu Kruing
Bahan
Papan Kayu Kruing
0.0256
m
5,800,000.00
Paku 1 cm - 2,5 cm
0.0300
kg
19,500.00
Lem Kayu
0.5000
kg
22,000.00
Plywood tbl. 4 mm; uk. (90 x 220) cm
1.0000 lembar
91,000.00
Jumlah (1)
Tenaga
Pekerja
0.8000
OH
30,000.00
Tukang Kayu
2.0000
OH
40,000.00
Kepala Tukang
0.0200
OH
45,000.00
Mandor
0.0400
OH
43,000.00
Jumlah (2)
Jumlah (1) + (2)
Membuat dan memasang 1 m jalusi kusen; Kayu Meranti Batu
Bahan
Papan Kayu Meranti Batu
0.0600
m
4,641,000.00
Paku 1 cm - 2,5 cm
0.1500
kg
19,500.00
Jumlah (1)
Tenaga
Pekerja
0.5000
OH
30,000.00
Tukang Kayu
2.0000
OH
40,000.00
Kepala Tukang
0.2000
OH
45,000.00
Mandor
0.0250
OH
43,000.00
Jumlah (2)
Jumlah (1) + (2)
Membuat dan memasang 1 m jalusi kusen; Kayu Kruing
Bahan
Papan Kayu Kruing
0.0600
m
5,800,000.00
Paku 1 cm - 2,5 cm
0.1500
kg
19,500.00
Jumlah (1)
Tenaga
Pekerja
0.5000
OH
30,000.00
Tukang Kayu
2.0000
OH
40,000.00
Kepala Tukang
0.2000
OH
45,000.00
Mandor
0.0250
OH
43,000.00
Jumlah (2)
Jumlah (1) + (2)
Membuat dan memasang 1 m pintu teakwood rangkap; rangka ekspose Kayu Kruing
Bahan
Papan Kayu Kruing
0.0250
m
5,800,000.00
Paku 1 cm - 2,5 cm
0.0300
kg
19,500.00
Lem Kayu
0.3000
kg
22,000.00
Teakwood tbl. 4 mm; uk. (90 x 220) cm
1.0000 lembar
145,850.00
Jumlah (1)
Tenaga
Pekerja
0.8000
OH
30,000.00
Tukang Kayu
2.0000
OH
40,000.00
Kepala Tukang
0.2000
OH
45,000.00
Mandor
0.0400
OH
43,000.00
Jumlah (2)
Jumlah (1) + (2)
Membuat dan memasang 1 m pintu teakwood rangkap lapis formika; rgk. ekspose Ky. Kruing
Bahan
Papan Kayu Kruing
0.0250
m
5,800,000.00
Paku 1 cm - 2,5 cm
0.0300
kg
19,500.00
Lem Kayu
0.8000
kg
22,000.00
Teakwood tbl. 4 mm; uk. (90 x 220) cm
1.0000 lembar
145,850.00
Formika
0.5000 lembar
80,000.00
Jumlah (1)
Tenaga
Pekerja
0.8000
OH
30,000.00
Tukang Kayu
2.5000
OH
40,000.00
Kepala Tukang
0.2500
OH
45,000.00
Mandor
0.0400
OH
43,000.00
Jumlah (2)
Jumlah (1) + (2)
Analisa Pekerjaan
KOEF
SAT
JUMLAH
Rp.
6=(3x5)
148,480.00
585.00
11,000.00
91,000.00
251,065.00
24,000.00
80,000.00
900.00
1,720.00
106,620.00
357,685.00
278,460.00
2,925.00
281,385.00
15,000.00
80,000.00
9,000.00
1,075.00
105,075.00
386,460.00
348,000.00
2,925.00
350,925.00
15,000.00
80,000.00
9,000.00
1,075.00
105,075.00
456,000.00
145,000.00
585.00
6,600.00
145,850.00
298,035.00
24,000.00
80,000.00
9,000.00
1,720.00
114,720.00
412,755.00
145,000.00
585.00
17,600.00
145,850.00
40,000.00
349,035.00
24,000.00
100,000.00
11,250.00
1,720.00
136,970.00
486,005.00
31 dari 102
NO
1
F.022
F.023
F.024
F.025
F.026
HARGA SAT
Rp.
2
3
4
5
Membuat dan memasang 1 m konstruksi kuda kuda konvensional; Kayu Meranti Batu
Bahan
Balok Kayu Meranti Batu
1.1000
m
4,641,000.00
Besi Strip 5 mm
15.0000
kg
14,000.00
Paku 12 cm
5.6000
kg
19,500.00
Jumlah (1)
Tenaga
Pekerja
4.0000
OH
30,000.00
Tukang Kayu
12.0000
OH
40,000.00
Kepala Tukang
1.2000
OH
45,000.00
Mandor
0.2000
OH
43,000.00
Jumlah (2)
Jumlah (1) + (2)
Membuat dan memasang 1 m konstruksi kuda kuda konvensional; Kayu Kruing
Bahan
Balok Kayu Kruing
1.1000
m
5,800,000.00
Besi Strip 5 mm
15.0000
kg
14,000.00
Paku 12 cm
5.6000
kg
19,500.00
Jumlah (1)
Tenaga
Pekerja
4.0000
OH
30,000.00
Tukang Kayu
12.0000
OH
40,000.00
Kepala Tukang
1.2000
OH
45,000.00
Mandor
0.2000
OH
43,000.00
Jumlah (2)
Jumlah (1) + (2)
Membuat dan memasang 1 m konstruksi kuda kuda ekspose; Kayu Meranti Batu
Bahan
Balok Kayu Meranti Batu
1.2000
m
4,641,000.00
Besi Strip 5 mm
15.0000
kg
14,000.00
Paku 12 cm
5.6000
kg
19,500.00
Jumlah (1)
Tenaga
Pekerja
6.0000
OH
30,000.00
Tukang Kayu
20.0000
OH
40,000.00
Kepala Tukang
2.0000
OH
45,000.00
Mandor
0.3000
OH
43,000.00
Jumlah (2)
Jumlah (1) + (2)
Membuat dan memasang 1 m konstruksi kuda kuda ekspose; Kayu Kruing
Bahan
Balok Kayu Kruing
1.2000
m
5,800,000.00
Besi Strip 5 mm
15.0000
kg
14,000.00
Paku 12 cm
5.6000
kg
19,500.00
Jumlah (1)
Tenaga
Pekerja
6.0000
OH
30,000.00
Tukang Kayu
20.0000
OH
40,000.00
Kepala Tukang
2.0000
OH
45,000.00
Mandor
0.3000
OH
43,000.00
Jumlah (2)
Jumlah (1) + (2)
Membuat dan memasang 1 m konstruksi gording; Kayu Meranti Batu
Bahan
Balok Kayu Meranti Batu
1.1000
m
4,641,000.00
Besi Strip 5 mm
15.0000
kg
14,000.00
Paku 12 cm
3.0000
kg
19,500.00
Jumlah (1)
Tenaga
Pekerja
2.4000
OH
30,000.00
Tukang Kayu
7.2000
OH
40,000.00
Kepala Tukang
0.7200
OH
45,000.00
Mandor
0.1200
OH
43,000.00
Jumlah (2)
Jumlah (1) + (2)
Analisa Pekerjaan
KOEF
SAT
JUMLAH
Rp.
6=(3x5)
5,105,100.00
210,000.00
109,200.00
5,424,300.00
120,000.00
480,000.00
54,000.00
8,600.00
662,600.00
6,086,900.00
6,380,000.00
210,000.00
109,200.00
6,699,200.00
120,000.00
480,000.00
54,000.00
8,600.00
662,600.00
7,361,800.00
5,569,200.00
210,000.00
109,200.00
5,888,400.00
180,000.00
800,000.00
90,000.00
12,900.00
1,082,900.00
6,971,300.00
6,960,000.00
210,000.00
109,200.00
7,279,200.00
180,000.00
800,000.00
90,000.00
12,900.00
1,082,900.00
8,362,100.00
5,105,100.00
210,000.00
58,500.00
5,373,600.00
72,000.00
288,000.00
32,400.00
5,160.00
397,560.00
5,771,160.00
32 dari 102
NO
1
F.027
F.028
F.029
F.030
F.031
KOEF
SAT
JUMLAH
Rp.
6=(3x5)
2
3
Membuat dan memasang 1 m konstruksi gording; Kayu Kruing
Bahan
Balok Kayu Kruing
1.1000
Besi Strip 5 mm
15.0000
Paku 12 cm
3.0000
m
kg
kg
5,800,000.00
14,000.00
19,500.00
Jumlah (1)
6,380,000.00
210,000.00
58,500.00
6,648,500.00
Tenaga
Pekerja
Tukang Kayu
Kepala Tukang
Mandor
OH
OH
OH
OH
30,000.00
40,000.00
45,000.00
43,000.00
Jumlah (2)
72,000.00
288,000.00
32,400.00
5,160.00
397,560.00
7,046,060.00
2.4000
7.2000
0.7200
0.1200
HARGA SAT
Rp.
5
Analisa Pekerjaan
47,736.00
12,078.00
4,875.00
64,689.00
3,000.00
4,000.00
450.00
215.00
7,665.00
72,354.00
82,944.00
24,422.40
4,875.00
112,241.40
3,000.00
4,000.00
450.00
215.00
7,665.00
119,906.40
55,692.00
12,078.00
4,875.00
72,645.00
3,000.00
4,000.00
450.00
215.00
7,665.00
80,310.00
96,768.00
24,422.40
4,875.00
126,065.40
3,000.00
4,000.00
450.00
215.00
7,665.00
133,730.40
33 dari 102
NO
1
F.032
F.033
F.034
F.035
F.036
F.037
HARGA SAT
Rp.
2
3
4
5
Membuat dan memasang 1 m rangka atap genteng beton; Kayu Meranti Batu
Bahan
Kaso-kaso (5 x 7) cm
0.0140
m
3,978,000.00
Reng (3 x 4) cm
0.0570
m
3,672,000.00
Paku 5 cm & 10 cm
0.2500
kg
19,500.00
Jumlah (1)
Tenaga
Pekerja
0.1000
OH
30,000.00
Tukang Kayu
0.1000
OH
40,000.00
Kepala Tukang
0.0100
OH
45,000.00
Mandor
0.0050
OH
43,000.00
Jumlah (2)
Jumlah (1) + (2)
Membuat dan memasang 1 m rangka atap genteng beton; Kayu Kruing
Bahan
Kaso-kaso (5 x 7) cm
0.0140
m
6,912,000.00
Reng (3 x 4) cm
0.0570
m
6,784,000.00
Paku 5 cm & 10 cm
0.2500
kg
19,500.00
Jumlah (1)
Tenaga
Pekerja
0.1000
OH
30,000.00
Tukang Kayu
0.1000
OH
40,000.00
Kepala Tukang
0.0100
OH
45,000.00
Mandor
0.0050
OH
43,000.00
Jumlah (2)
Jumlah (1) + (2)
Memasang 1 m rangka atap sirap; Kayu Meranti Batu
Bahan
Kayu Meranti Batu
0.1650
m
4,641,000.00
Paku 5 cm & 10 cm
0.2000
kg
19,500.00
Jumlah (1)
Tenaga
Pekerja
0.1200
OH
30,000.00
Tukang Kayu
0.1200
OH
40,000.00
Kepala Tukang
0.0120
OH
45,000.00
Mandor
0.0060
OH
43,000.00
Jumlah (2)
Jumlah (1) + (2)
Memasang 1 m rangka langit-langit (100 x 100) cm; Kayu Meranti Batu
Bahan
Kaso-kaso (5 x 7) cm
0.0120
m
3,978,000.00
Paku 7 cm - 10 cm
0.1000
kg
19,500.00
Jumlah (1)
Tenaga
Pekerja
0.1500
OH
30,000.00
Tukang Kayu
0.2500
OH
40,000.00
Kepala Tukang
0.0250
OH
45,000.00
Mandor
0.0750
OH
43,000.00
Jumlah (2)
Jumlah (1) + (2)
Memasang 1 m rangka langit-langit (50 x 100) cm; Kayu Meranti Batu
Bahan
Kaso-kaso (5 x 7) cm
0.0154
m
3,978,000.00
Paku 7 cm - 10 cm
0.2000
kg
19,500.00
Jumlah (1)
Tenaga
Pekerja
0.1500
OH
30,000.00
Tukang Kayu
0.2500
OH
40,000.00
Kepala Tukang
0.0250
OH
45,000.00
Mandor
0.0750
OH
43,000.00
Jumlah (2)
Jumlah (1) + (2)
Memasang 1 m rangka langit-langit (60 x 60) cm; Kayu Meranti Batu
Bahan
Kaso-kaso (5 x 7) cm
0.0163
m
3,978,000.00
Paku 7 cm - 10 cm
0.2500
kg
19,500.00
Jumlah (1)
Tenaga
Pekerja
0.2000
OH
30,000.00
Tukang Kayu
0.3000
OH
40,000.00
Kepala Tukang
0.0300
OH
45,000.00
Mandor
0.0100
OH
43,000.00
Jumlah (2)
Jumlah (1) + (2)
Analisa Pekerjaan
KOEF
SAT
JUMLAH
Rp.
6=(3x5)
55,692.00
209,304.00
4,875.00
269,871.00
3,000.00
4,000.00
450.00
215.00
7,665.00
277,536.00
96,768.00
386,688.00
4,875.00
488,331.00
3,000.00
4,000.00
450.00
215.00
7,665.00
495,996.00
765,765.00
3,900.00
769,665.00
3,600.00
4,800.00
540.00
258.00
9,198.00
778,863.00
47,736.00
1,950.00
49,686.00
4,500.00
10,000.00
1,125.00
3,225.00
18,850.00
68,536.00
61,261.20
3,900.00
65,161.20
4,500.00
10,000.00
1,125.00
3,225.00
18,850.00
84,011.20
64,841.40
4,875.00
69,716.40
6,000.00
12,000.00
1,350.00
430.00
19,780.00
89,496.40
34 dari 102
NO
1
F.038
F.039
F.040
JUMLAH
Rp.
6=(3x5)
m
kg
5,800,000.00
19,500.00
Jumlah (1)
62,640.00
1,950.00
64,590.00
Tenaga
Pekerja
Tukang Kayu
Kepala Tukang
Mandor
0.1000
0.2000
0.0250
0.0050
OH
OH
OH
OH
30,000.00
40,000.00
45,000.00
43,000.00
Jumlah (2)
3,000.00
8,000.00
1,125.00
215.00
12,340.00
76,930.00
m
kg
4,641,000.00
19,500.00
Jumlah (1)
51,051.00
975.00
52,026.00
Tenaga
Pekerja
Tukang Kayu
Kepala Tukang
Mandor
OH
OH
OH
OH
30,000.00
40,000.00
45,000.00
43,000.00
Jumlah (2)
3,000.00
8,000.00
1,125.00
215.00
12,340.00
64,366.00
5,800,000.00
19,500.00
Jumlah (1)
162,400.00
2,925.00
165,325.00
30,000.00
40,000.00
45,000.00
43,000.00
Jumlah (2)
4,500.00
18,000.00
2,025.00
344.00
24,869.00
190,194.00
5,800,000.00
19,500.00
165,750.00
22,000.00
Jumlah (1)
162,400.00
2,925.00
142,545.00
12,320.00
320,190.00
30,000.00
40,000.00
45,000.00
43,000.00
Jumlah (2)
4,500.00
18,000.00
2,025.00
344.00
24,869.00
345,059.00
5,800,000.00
19,500.00
170,000.00
22,000.00
Jumlah (1)
162,400.00
2,925.00
146,200.00
12,320.00
323,845.00
0.1000
0.2000
0.0250
0.0050
OH
OH
OH
OH
OH
OH
OH
OH
F.043
HARGA SAT
Rp.
5
0.0108
0.1000
Tenaga
Pekerja
Tukang Kayu
Kepala Tukang
Mandor
F.042
SAT
2
Memasang 1 m' lisplank uk. (3 x 20) cm; Kruing
Bahan
Papan Kayu Kruing
Paku 5 cm - 7 cm
Tenaga
Pekerja
Tukang Kayu
Kepala Tukang
Mandor
F.041
KOEF
0.2000
0.6000
0.0600
0.0100
OH
OH
OH
OH
30,000.00
40,000.00
45,000.00
43,000.00
Jumlah (2)
6,000.00
24,000.00
2,700.00
430.00
33,130.00
356,975.00
m
kg
kg
5,800,000.00
19,500.00
448,000.00
Jumlah (1)
40,600.00
1,950.00
67,200.00
109,750.00
Tenaga
Pekerja
Tukang Kayu
Kepala Tukang
Mandor
OH
OH
OH
OH
30,000.00
40,000.00
45,000.00
43,000.00
Jumlah (2)
18,000.00
72,000.00
8,100.00
1,290.00
99,390.00
209,140.00
Analisa Pekerjaan
0.6000
1.8000
0.1800
0.0300
35 dari 102
NO
1
F.044
F.045
F.046
F.047
G.
G.001
KOEF
2
3
4
Memasang 1 m dinding lambriziring dari plywood ukuran (120 x 240) cm
Bahan
Plywood tbl. 4 mm; uk. (120 x 240) cm
0.4000 lembar
Paku 5 cm - 10 cm
0.0500
kg
HARGA SAT
Rp.
5
JUMLAH
Rp.
6=(3x5)
170,000.00
19,500.00
Jumlah (1)
68,000.00
975.00
68,975.00
Tenaga
Pekerja
Tukang Kayu
Kepala Tukang
Mandor
0.0250
0.0750
0.0075
0.0013
OH
OH
OH
OH
30,000.00
40,000.00
45,000.00
43,000.00
Jumlah (2)
750.00
3,000.00
337.50
55.90
4,143.40
73,118.40
1.0500
m'
19,000.00
Jumlah (1)
19,950.00
19,950.00
Tenaga
Pekerja
Tukang Kayu
Kepala Tukang
Mandor
0.0210
0.0210
0.0020
0.0010
OH
OH
OH
OH
30,000.00
40,000.00
45,000.00
43,000.00
Jumlah (2)
630.00
840.00
90.00
43.00
1,603.00
21,553.00
m
kg
5,793,000.00
19,500.00
Jumlah (1)
57,930.00
195.00
58,125.00
Tenaga
Pekerja
Tukang Kayu
Kepala Tukang
Mandor
OH
OH
OH
OH
30,000.00
40,000.00
45,000.00
43,000.00
Jumlah (2)
2,100.00
8,000.00
900.00
172.00
11,172.00
69,297.00
m
kg
4,641,000.00
19,500.00
Jumlah (1)
20,420.40
195.00
20,615.40
Tenaga
Pekerja
Tukang Kayu
Kepala Tukang
Mandor
0.0700
0.2000
0.0200
0.0040
OH
OH
OH
OH
30,000.00
40,000.00
45,000.00
43,000.00
Jumlah (2)
2,100.00
8,000.00
900.00
172.00
11,172.00
31,787.40
RSNI-T-13-2002
218.0000
0.5200
0.8700
kg
m
m
1,350.00
121,000.00
179,000.00
Jumlah (1)
294,300.00
62,920.00
155,730.00
512,950.00
1.6500
0.2500
0.0250
0.0800
OH
OH
OH
OH
30,000.00
40,000.00
45,000.00
43,000.00
Jumlah (2)
49,500.00
10,000.00
1,125.00
3,440.00
64,065.00
577,015.00
197.0000
0.4700
0.9400
kg
m
m
1,350.00
121,000.00
179,000.00
Jumlah (1)
265,950.00
56,870.00
168,260.00
491,080.00
1.6500
0.2500
0.0250
0.0800
OH
OH
OH
OH
30,000.00
40,000.00
45,000.00
43,000.00
Jumlah (2)
49,500.00
10,000.00
1,125.00
3,440.00
64,065.00
555,145.00
G.002
SAT
Analisa Pekerjaan
0.0700
0.2000
0.0200
0.0040
36 dari 102
NO
1
G.003
2
Membuat 1 m beton tumbuk 1 PC : 4 PB : 6 KR
Bahan
Portland Cement (PC)
Pasir Beton (PB)
Koral Beton (maksimum 30 mm)
Tenaga
Pekerja
Tukang Batu
Kepala Tukang
Mandor
G.004
G.005
G.006
G.007
Analisa Pekerjaan
JUMLAH
Rp.
6=(3x5)
SAT
173.0000
0.5700
0.8700
kg
m
m
1,350.00
121,000.00
179,000.00
Jumlah (1)
233,550.00
68,970.00
155,730.00
458,250.00
1.6500
0.2500
0.0250
0.0800
OH
OH
OH
OH
30,000.00
40,000.00
45,000.00
43,000.00
Jumlah (2)
49,500.00
10,000.00
1,125.00
3,440.00
64,065.00
522,315.00
1,350.00
121,000.00
179,000.00
Jumlah (1)
13,500.00
3,146.00
7,876.00
24,522.00
HARGA SAT
Rp.
5
KOEF
1.1500
0.0200
0.0020
0.0060
OH
OH
OH
OH
30,000.00
40,000.00
45,000.00
43,000.00
Jumlah (2)
34,500.00
800.00
90.00
258.00
35,648.00
60,170.00
232.0000
0.5200
0.7800
kg
m
m
1,350.00
121,000.00
179,000.00
Jumlah (1)
313,200.00
62,920.00
139,620.00
515,740.00
1.6500
0.2500
0.0250
0.0800
OH
OH
OH
OH
30,000.00
40,000.00
45,000.00
43,000.00
Jumlah (2)
49,500.00
10,000.00
1,125.00
3,440.00
64,065.00
579,805.00
280.0000
0.4500
0.9000
kg
m
m
1,350.00
121,000.00
179,000.00
Jumlah (1)
378,000.00
54,450.00
161,100.00
593,550.00
1.6500
0.2500
0.0250
0.0800
OH
OH
OH
OH
30,000.00
40,000.00
45,000.00
43,000.00
Jumlah (2)
49,500.00
10,000.00
1,125.00
3,440.00
64,065.00
657,615.00
352.0000
0.5600
0.7000
kg
m
m
1,350.00
121,000.00
179,000.00
Jumlah (1)
475,200.00
67,760.00
125,300.00
668,260.00
1.6500
0.2500
0.0250
0.0800
OH
OH
OH
OH
30,000.00
40,000.00
45,000.00
43,000.00
Jumlah (2)
49,500.00
10,000.00
1,125.00
3,440.00
64,065.00
732,325.00
37 dari 102
NO
1
G.008
2
Membuat 1 m beton bertulang 1 PC : 1.5 PB : 3 KR
Bahan
Portland Cement (PC)
Pasir Beton (PB)
Koral Beton (maksimum 30 mm)
Tenaga
Pekerja
Tukang Batu
Kepala Tukang
Mandor
G.009
G.010
G.011
G.012
357.0000
0.4200
0.5400
kg
m
m
1,350.00
121,000.00
179,000.00
Jumlah (1)
481,950.00
50,820.00
96,660.00
629,430.00
1.6500
0.2500
0.0250
0.0800
OH
OH
OH
OH
30,000.00
40,000.00
45,000.00
43,000.00
Jumlah (2)
49,500.00
10,000.00
1,125.00
3,440.00
64,065.00
693,495.00
386.0000
0.4700
0.7800
kg
m
m
1,350.00
121,000.00
179,000.00
Jumlah (1)
521,100.00
56,870.00
139,620.00
717,590.00
1.6500
0.2500
0.0250
0.0800
OH
OH
OH
OH
30,000.00
40,000.00
45,000.00
43,000.00
Jumlah (2)
49,500.00
10,000.00
1,125.00
3,440.00
64,065.00
781,655.00
479.0000
0.3700
0.7400
kg
m
m
1,350.00
121,000.00
179,000.00
Jumlah (1)
646,650.00
44,770.00
132,460.00
823,880.00
1.6500
0.2500
0.0250
0.0800
OH
OH
OH
OH
30,000.00
40,000.00
45,000.00
43,000.00
Jumlah (2)
49,500.00
10,000.00
1,125.00
3,440.00
64,065.00
887,945.00
1,350.00
121,000.00
179,000.00
20.00
Jumlah (1)
333,450.00
75,106.43
132,460.00
4,300.00
545,316.43
30,000.00
40,000.00
45,000.00
43,000.00
Jumlah (2)
49,500.00
11,000.00
1,260.00
3,569.00
65,329.00
610,645.43
1,350.00
121,000.00
179,000.00
20.00
Jumlah (1)
372,600.00
71,562.86
134,183.70
4,300.00
582,646.56
30,000.00
40,000.00
45,000.00
43,000.00
Jumlah (2)
49,500.00
11,000.00
1,260.00
3,569.00
65,329.00
647,975.56
1.6500
0.2750
0.0280
0.0830
OH
OH
OH
OH
Analisa Pekerjaan
JUMLAH
Rp.
6=(3x5)
SAT
HARGA SAT
Rp.
5
KOEF
1.6500
0.2750
0.0280
0.0830
OH
OH
OH
OH
38 dari 102
NO
1
G.013
G.014
G.015
G.016
G.017
HARGA SAT
Rp.
2
3
4
5
Membuat 1 m beton mutu f'c=12,2 Mpa (K 150); slump (12 2) cm; w/c = 0,78
Bahan
Portland Cement (PC)
299.0000
kg
1,350.00
Pasir Beton (PB)
0.5707
m
121,000.00
Koral Beton (maksimum 30 mm)
0.7533
m
179,000.00
Air
215.0000
liter
20.00
Jumlah (1)
Tenaga
Pekerja
1.6500
OH
30,000.00
Tukang Batu
0.2750
OH
40,000.00
Kepala Tukang
0.0280
OH
45,000.00
Mandor
0.0830
OH
43,000.00
Jumlah (2)
Jumlah (1) + (2)
Membuat 1 m beton mutu f'c=7,4 Mpa (K 100); slump (3-6) cm; w/c = 0,87
Bahan
Portland Cement (PC)
230.0000
kg
1,350.00
Pasir Beton (PB)
0.6379
m
121,000.00
Koral Beton (maksimum 30 mm)
0.7607
m
179,000.00
Air
200.0000
liter
20.00
Jumlah (1)
Tenaga
Pekerja
1.2000
OH
30,000.00
Tukang Batu
0.2000
OH
40,000.00
Kepala Tukang
0.0200
OH
45,000.00
Mandor
0.0600
OH
43,000.00
Jumlah (2)
Jumlah (1) + (2)
Membuat 1 m beton mutu f'c=14,5 Mpa (K 175); slump (12 2) cm; w/c = 0,66
Bahan
Portland Cement (PC)
326.0000
kg
1,350.00
Pasir Beton (PB)
0.5429
m
121,000.00
Koral Beton (maksimum 30 mm)
0.7622
m
179,000.00
Air
215.0000
liter
20.00
Jumlah (1)
Tenaga
Pekerja
1.6500
OH
30,000.00
Tukang Batu
0.2750
OH
40,000.00
Kepala Tukang
0.0280
OH
45,000.00
Mandor
0.0830
OH
43,000.00
Jumlah (2)
Jumlah (1) + (2)
Membuat 1 m beton mutu f'c=16,9 Mpa (K 200); slump (12 2) cm; w/c = 0,61
Bahan
Portland Cement (PC)
352.0000
kg
1,350.00
Pasir Beton (PB)
0.5221
m
121,000.00
Koral Beton (maksimum 30 mm)
0.7637
m
179,000.00
Air
215.0000
liter
20.00
Jumlah (1)
Tenaga
Pekerja
1.6500
OH
30,000.00
Tukang Batu
0.2750
OH
40,000.00
Kepala Tukang
0.0280
OH
45,000.00
Mandor
0.0830
OH
43,000.00
Jumlah (2)
Jumlah (1) + (2)
Membuat 1 m beton mutu f'c=19,3 Mpa (K 225); slump (12 2) cm; w/c = 0,58
Bahan
Portland Cement (PC)
371.0000
kg
1,350.00
Pasir Beton (PB)
0.4986
m
121,000.00
Koral Beton (maksimum 30 mm)
0.7756
m
179,000.00
Air
215.0000
liter
20.00
Jumlah (1)
Tenaga
Pekerja
1.6500
OH
30,000.00
Tukang Batu
0.2750
OH
40,000.00
Kepala Tukang
0.0280
OH
45,000.00
Mandor
0.0830
OH
43,000.00
Jumlah (2)
Jumlah (1) + (2)
Analisa Pekerjaan
KOEF
SAT
JUMLAH
Rp.
6=(3x5)
403,650.00
69,056.43
134,846.67
4,300.00
611,853.10
49,500.00
11,000.00
1,260.00
3,569.00
65,329.00
677,182.10
310,500.00
77,180.71
136,172.59
4,000.00
527,853.31
36,000.00
8,000.00
900.00
2,580.00
47,480.00
575,333.31
440,100.00
65,685.71
136,437.78
4,300.00
646,523.49
49,500.00
11,000.00
1,260.00
3,569.00
65,329.00
711,852.49
475,200.00
63,179.29
136,702.96
4,300.00
679,382.25
49,500.00
11,000.00
1,260.00
3,569.00
65,329.00
744,711.25
500,850.00
60,327.14
138,824.44
4,300.00
704,301.59
49,500.00
11,000.00
1,260.00
3,569.00
65,329.00
769,630.59
39 dari 102
NO
1
G.018
G.019
G.020
G.021
G.022
HARGA SAT
Rp.
2
3
4
5
Membuat 1 m beton mutu f'c=21,7 Mpa (K 250); slump (12 2) cm; w/c = 0,56
Bahan
Portland Cement (PC)
384.0000
kg
1,350.00
Pasir Beton (PB)
0.4943
m
121,000.00
Koral Beton (maksimum 30 mm)
0.7696
m
179,000.00
Air
215.0000
liter
20.00
Jumlah (1)
Tenaga
Pekerja
1.6500
OH
30,000.00
Tukang Batu
0.2750
OH
40,000.00
Kepala Tukang
0.0280
OH
45,000.00
Mandor
0.0830
OH
43,000.00
Jumlah (2)
Jumlah (1) + (2)
Membuat 1 m beton mutu f'c=24 Mpa (K 275); slump (12 2) cm; w/c = 0,53
Bahan
Portland Cement (PC)
406.0000
kg
1,350.00
Pasir Beton (PB)
0.4886
m
121,000.00
Koral Beton (maksimum 30 mm)
0.7600
m
179,000.00
Air
215.0000
liter
20.00
Jumlah (1)
Tenaga
Pekerja
1.6500
OH
30,000.00
Tukang Batu
0.2750
OH
40,000.00
Kepala Tukang
0.0280
OH
45,000.00
Mandor
0.0830
OH
43,000.00
Jumlah (2)
Jumlah (1) + (2)
Membuat 1 m beton mutu f'c=26,4 Mpa (K 300); slump (12 2) cm; w/c = 0,52
Bahan
Portland Cement (PC)
413.0000
kg
1,350.00
Pasir Beton (PB)
0.4864
m
121,000.00
Koral Beton (maksimum 30 mm)
0.7563
m
179,000.00
Air
215.0000
liter
20.00
Jumlah (1)
Tenaga
Pekerja
1.6500
OH
30,000.00
Tukang Batu
0.2750
OH
40,000.00
Kepala Tukang
0.0280
OH
45,000.00
Mandor
0.0830
OH
43,000.00
Jumlah (2)
Jumlah (1) + (2)
Membuat 1 m beton mutu f'c=28,8 Mpa (K 325); slump (12 2) cm; w/c = 0,49
Bahan
Portland Cement (PC)
439.0000
kg
1,350.00
Pasir Beton (PB)
0.4786
m
121,000.00
Koral Beton (maksimum 30 mm)
0.7452
m
179,000.00
Air
215.0000
liter
20.00
Jumlah (1)
Tenaga
Pekerja
2.1000
OH
30,000.00
Tukang Batu
0.3500
OH
40,000.00
Kepala Tukang
0.0350
OH
45,000.00
Mandor
0.1050
OH
43,000.00
Jumlah (2)
Jumlah (1) + (2)
Membuat 1 m beton mutu f'c=31,2 Mpa (K 350); slump (12 2) cm; w/c = 0,48
Bahan
Portland Cement (PC)
448.0000
kg
1,350.00
Pasir Beton (PB)
0.4764
m
121,000.00
Koral Beton (maksimum 30 mm)
0.7407
m
179,000.00
Air
215.0000
liter
20.00
Jumlah (1)
Tenaga
Pekerja
2.1000
OH
30,000.00
Tukang Batu
0.3500
OH
40,000.00
Kepala Tukang
0.0350
OH
45,000.00
Mandor
0.1050
OH
43,000.00
Jumlah (2)
Jumlah (1) + (2)
Analisa Pekerjaan
KOEF
SAT
JUMLAH
Rp.
6=(3x5)
518,400.00
59,808.57
137,763.70
4,300.00
720,272.28
49,500.00
11,000.00
1,260.00
3,569.00
65,329.00
785,601.28
548,100.00
59,117.14
136,040.00
4,300.00
747,557.14
49,500.00
11,000.00
1,260.00
3,569.00
65,329.00
812,886.14
557,550.00
58,857.86
135,377.04
4,300.00
756,084.89
49,500.00
11,000.00
1,260.00
3,569.00
65,329.00
821,413.89
592,650.00
57,907.14
133,388.15
4,300.00
788,245.29
63,000.00
14,000.00
1,575.00
4,515.00
83,090.00
871,335.29
604,800.00
57,647.86
132,592.59
4,300.00
799,340.45
63,000.00
14,000.00
1,575.00
4,515.00
83,090.00
882,430.45
40 dari 102
NO
1
G.023
2
Pembesian 10 kg dengan besi polos atau besi ulir
Bahan
Besi Beton (polos/ulir)
Kawat Beton
G.025
G.026
G.027
SAT
HARGA SAT
Rp.
5
JUMLAH
Rp.
6=(3x5)
10.5000
0.1500
kg
kg
15,300.00
19,000.00
Jumlah (1)
160,650.00
2,850.00
163,500.00
0.0700
0.0700
0.0070
0.0040
OH
OH
OH
OH
30,000.00
40,000.00
45,000.00
43,000.00
Jumlah (2)
2,100.00
2,800.00
315.00
172.00
5,387.00
168,887.00
10.2000
0.0500
kg
kg
47,000.00
19,000.00
Jumlah (1)
479,400.00
950.00
480,350.00
Tenaga
Pekerja
Tukang Besi
Kepala Tukang
Mandor
0.0250
0.0250
0.0250
0.0010
OH
OH
OH
OH
30,000.00
40,000.00
45,000.00
43,000.00
Jumlah (2)
750.00
1,000.00
1,125.00
43.00
2,918.00
483,268.00
0.0400
0.3000
0.1000
m
kg
liter
1,700,000.00
19,500.00
3,000.00
Jumlah (1)
68,000.00
5,850.00
300.00
74,150.00
Tenaga
Pekerja
Tukang Kayu
Kepala Tukang
Mandor
0.5200
0.2600
0.0260
0.0260
OH
OH
OH
OH
30,000.00
40,000.00
45,000.00
43,000.00
Jumlah (2)
15,600.00
10,400.00
1,170.00
1,118.00
28,288.00
102,438.00
0.0450
0.3000
0.1000
m
kg
liter
1,700,000.00
19,500.00
3,000.00
Jumlah (1)
76,500.00
5,850.00
300.00
82,650.00
Tenaga
Pekerja
Tukang Kayu
Kepala Tukang
Mandor
0.5200
0.2600
0.0260
0.0260
OH
OH
OH
OH
30,000.00
40,000.00
45,000.00
43,000.00
Jumlah (2)
15,600.00
10,400.00
1,170.00
1,118.00
28,288.00
110,938.00
0.0400
0.4000
0.2000
0.0150
0.3500
8.0000
m
kg
liter
m
lembar
m'
1,700,000.00
19,500.00
3,000.00
3,779,000.00
170,000.00
34,000.00
Jumlah (1)
68,000.00
7,800.00
600.00
56,685.00
59,500.00
272,000.00
464,585.00
Tenaga
Pekerja
Tukang Kayu
Kepala Tukang
Mandor
0.6600
0.3300
0.0330
0.0330
OH
OH
OH
OH
30,000.00
40,000.00
45,000.00
43,000.00
Jumlah (2)
19,800.00
13,200.00
1,485.00
1,419.00
35,904.00
500,489.00
Tenaga
Pekerja
Tukang Besi
Kepala Tukang
Mandor
G.024
KOEF
Analisa Pekerjaan
41 dari 102
NO
1
G.028
G.029
G.031
SAT
HARGA SAT
Rp.
5
JUMLAH
Rp.
6=(3x5)
2
Memasang 1 m bekisting untuk balok
Bahan
Kayu Pinus/Kayu Rawa
Paku 5 cm - 12 cm
Minyak Bekisting
Balok Kayu Meranti Batu 5/7
Plywood tebal 9 mm
Dolken (8-10) cm
0.0400
0.4000
0.2000
0.0180
0.3500
8.0000
m
kg
liter
m
lembar
m'
1,700,000.00
19,500.00
3,000.00
3,779,000.00
170,000.00
34,000.00
Jumlah (1)
68,000.00
7,800.00
600.00
68,022.00
59,500.00
272,000.00
475,922.00
Tenaga
Pekerja
Tukang Kayu
Kepala Tukang
Mandor
0.6600
0.3300
0.0330
0.0330
OH
OH
OH
OH
30,000.00
40,000.00
45,000.00
43,000.00
Jumlah (2)
19,800.00
13,200.00
1,485.00
1,419.00
35,904.00
511,826.00
0.0400
0.4000
0.2000
0.0150
0.3500
24.0000
m
kg
liter
m
lembar
m'
1,700,000.00
19,500.00
3,000.00
3,779,000.00
170,000.00
34,000.00
Jumlah (1)
68,000.00
7,800.00
600.00
56,685.00
59,500.00
816,000.00
1,008,585.00
0.6600
0.3300
0.0330
0.0330
OH
OH
OH
OH
30,000.00
40,000.00
45,000.00
43,000.00
Jumlah (2)
19,800.00
13,200.00
1,485.00
1,419.00
35,904.00
1,044,489.00
0.0300
0.4000
0.2000
0.0200
0.3500
12.0000
4.0000
m
kg
liter
m
lembar
m'
buah
1,700,000.00
19,500.00
3,000.00
3,779,000.00
170,000.00
34,000.00
2,000.00
Jumlah (1)
51,000.00
7,800.00
600.00
75,580.00
59,500.00
408,000.00
8,000.00
610,480.00
Tenaga
Pekerja
Tukang Kayu
Kepala Tukang
Mandor
0.6600
0.3300
0.0330
0.0330
OH
OH
OH
OH
30,000.00
40,000.00
45,000.00
43,000.00
Jumlah (2)
19,800.00
13,200.00
1,485.00
1,419.00
35,904.00
646,384.00
0.0300
0.4000
0.1500
0.0150
0.3500
8.0000
m
kg
liter
m
lembar
m'
1,700,000.00
19,500.00
3,000.00
3,779,000.00
170,000.00
34,000.00
Jumlah (1)
51,000.00
7,800.00
450.00
56,685.00
59,500.00
272,000.00
447,435.00
Tenaga
Pekerja
Tukang Kayu
Kepala Tukang
Mandor
0.6600
0.3300
0.0330
0.0330
OH
OH
OH
OH
30,000.00
40,000.00
45,000.00
43,000.00
Jumlah (2)
19,800.00
13,200.00
1,485.00
1,419.00
35,904.00
483,339.00
G.030
KOEF
Analisa Pekerjaan
42 dari 102
NO
1
G.032
G.033
G.034
G.035
KOEF
SAT
HARGA SAT
Rp.
5
JUMLAH
Rp.
6=(3x5)
2
Memasang 1 m jembatan untuk pengecoran beton
Bahan
Kayu Pinus/Kayu Rawa
Paku 5 cm - 12 cm
Dolken (8-10) cm
0.0264
0.6000
2.0000
m
kg
m'
1,700,000.00
19,500.00
34,000.00
Jumlah (1)
44,880.00
11,700.00
68,000.00
124,580.00
Tenaga
Pekerja
Tukang Kayu
Kepala Tukang
Mandor
0.1500
0.0500
0.0050
0.0080
OH
OH
OH
OH
30,000.00
40,000.00
45,000.00
43,000.00
Jumlah (2)
4,500.00
2,000.00
225.00
344.00
7,069.00
131,649.00
m
kg
liter
kg
kg
kg
m
m
1,700,000.00
19,500.00
3,000.00
15,300.00
19,000.00
1,350.00
121,000.00
179,000.00
Jumlah (1)
340,000.00
29,250.00
1,200.00
2,409,750.00
42,750.00
453,600.00
65,340.00
144,990.00
3,486,880.00
Tenaga
Pekerja
Tukang Batu
Tukang Kayu
Tukang Besi
Kepala Tukang
Mandor
5.3000
0.2750
1.3000
1.0500
0.2620
0.2650
OH
OH
OH
OH
OH
OH
30,000.00
40,000.00
40,000.00
40,000.00
45,000.00
43,000.00
Jumlah (2)
159,000.00
11,000.00
52,000.00
42,000.00
11,790.00
11,395.00
287,185.00
3,774,065.00
m
kg
liter
kg
kg
kg
m
m
1,700,000.00
19,500.00
3,000.00
15,300.00
19,000.00
1,350.00
121,000.00
179,000.00
Jumlah (1)
459,000.00
39,000.00
1,800.00
3,213,000.00
57,000.00
453,600.00
65,340.00
144,990.00
4,433,730.00
Tenaga
Pekerja
Tukang Batu
Tukang Kayu
Tukang Besi
Kepala Tukang
Mandor
OH
OH
OH
OH
OH
OH
30,000.00
40,000.00
40,000.00
40,000.00
45,000.00
43,000.00
Jumlah (2)
169,500.00
11,000.00
62,400.00
56,000.00
14,535.00
12,169.00
325,604.00
4,759,334.00
m
kg
liter
kg
kg
kg
m
m
m
lembar
m'
1,700,000.00
19,500.00
3,000.00
15,300.00
19,000.00
1,350.00
121,000.00
179,000.00
3,779,000.00
170,000.00
34,000.00
Jumlah (1)
680,000.00
78,000.00
6,000.00
4,819,500.00
85,500.00
453,600.00
65,340.00
144,990.00
566,850.00
595,000.00
2,720,000.00
10,214,780.00
OH
OH
OH
OH
OH
OH
30,000.00
40,000.00
40,000.00
40,000.00
45,000.00
43,000.00
Jumlah (2)
211,500.00
11,000.00
66,000.00
84,000.00
18,135.00
15,179.00
405,814.00
10,620,594.00
5.6500
0.2750
1.5600
1.4000
0.3230
0.2830
Analisa Pekerjaan
7.0500
0.2750
1.6500
2.1000
0.4030
0.3530
43 dari 102
NO
1
G.036
KOEF
2
3
Memasang 1 m balok beton bertulang (200 kg besi + bekisting)
Bahan
Kayu Pinus/Kayu Rawa
0.3200
Paku 5 cm - 12 cm
3.2000
Minyak Bekisting
1.6000
Besi Beton (polos/ulir)
210.0000
Kawat Beton
3.0000
Portland Cement (PC)
336.0000
Pasir Beton (PB)
0.5400
Koral Beton (maksimum 30 mm)
0.8100
Balok Kayu Meranti Batu 5/7
0.1400
Plywood tebal 9 mm
2.8000
Dolken (8-10) cm
64.0000
Tenaga
Pekerja
Tukang Batu
Tukang Kayu
Tukang Besi
Kepala Tukang
Mandor
G.037
G.038
6.3500
0.2750
1.6500
1.4000
0.3330
0.3180
5.3000
0.2750
1.3000
1.0500
0.2650
0.2650
SAT
4
Analisa Pekerjaan
5.3000
0.2750
1.3000
1.0500
0.2620
0.2650
JUMLAH
Rp.
6=(3x5)
m
kg
liter
kg
kg
kg
m
m
m
lembar
m'
1,700,000.00
19,500.00
3,000.00
15,300.00
19,000.00
1,350.00
121,000.00
179,000.00
3,779,000.00
170,000.00
34,000.00
Jumlah (1)
544,000.00
62,400.00
4,800.00
3,213,000.00
57,000.00
453,600.00
65,340.00
144,990.00
529,060.00
476,000.00
2,176,000.00
7,726,190.00
OH
OH
OH
OH
OH
OH
30,000.00
40,000.00
40,000.00
40,000.00
45,000.00
43,000.00
Jumlah (2)
190,500.00
11,000.00
66,000.00
56,000.00
14,985.00
13,674.00
352,159.00
8,078,349.00
m
kg
liter
kg
kg
kg
m
m
m
lembar
m'
1,700,000.00
19,500.00
3,000.00
15,300.00
19,000.00
1,350.00
121,000.00
179,000.00
3,779,000.00
170,000.00
34,000.00
Jumlah (1)
544,000.00
62,400.00
4,800.00
2,409,750.00
42,750.00
453,600.00
65,340.00
144,990.00
453,480.00
476,000.00
4,352,000.00
9,009,110.00
OH
OH
OH
OH
OH
OH
30,000.00
40,000.00
40,000.00
40,000.00
45,000.00
43,000.00
Jumlah (2)
159,000.00
11,000.00
52,000.00
42,000.00
11,925.00
11,395.00
287,320.00
9,296,430.00
1,700,000.00
19,500.00
3,000.00
15,300.00
19,000.00
1,350.00
121,000.00
179,000.00
3,779,000.00
170,000.00
34,000.00
Jumlah (1)
408,000.00
62,400.00
4,800.00
2,409,750.00
42,750.00
453,600.00
65,340.00
144,990.00
604,640.00
476,000.00
3,264,000.00
7,936,270.00
30,000.00
40,000.00
40,000.00
40,000.00
45,000.00
43,000.00
Jumlah (2)
159,000.00
11,000.00
52,000.00
42,000.00
11,790.00
11,395.00
287,185.00
8,223,455.00
HARGA SAT
Rp.
5
OH
OH
OH
OH
OH
OH
44 dari 102
NO
1
G.039
KOEF
2
3
4
Memasang 1 m dinding beton bertulang (200 kg besi + bekisting)
Bahan
Kayu Pinus/Kayu Rawa
0.2500
m
Paku 5 cm - 12 cm
3.0000
kg
Minyak Bekisting
1.2000
liter
Besi Beton (polos/ulir)
210.0000
kg
Kawat Beton
3.0000
kg
Portland Cement (PC)
336.0000
kg
Pasir Beton (PB)
0.5400
m
Koral Beton (maksimum 30 mm)
0.8100
m
Balok Kayu Meranti Batu 5/7
0.1050
m
Plywood tebal 9 mm
2.5000 lembar
Dolken (8-10) cm
56.0000
m'
Tenaga
Pekerja
Tukang Batu
Tukang Kayu
Tukang Besi
Kepala Tukang
Mandor
G.040
G.041
G.042
SAT
HARGA SAT
Rp.
5
JUMLAH
Rp.
6=(3x5)
1,700,000.00
19,500.00
3,000.00
15,300.00
19,000.00
1,350.00
121,000.00
179,000.00
3,779,000.00
170,000.00
34,000.00
Jumlah (1)
425,000.00
58,500.00
3,600.00
3,213,000.00
57,000.00
453,600.00
65,340.00
144,990.00
396,795.00
425,000.00
1,904,000.00
7,146,825.00
5.6500
0.2750
1.5600
1.4000
0.3230
0.2830
OH
OH
OH
OH
OH
OH
30,000.00
40,000.00
40,000.00
40,000.00
45,000.00
43,000.00
Jumlah (2)
169,500.00
11,000.00
62,400.00
56,000.00
14,535.00
12,169.00
325,604.00
7,472,429.00
m
kg
liter
kg
kg
kg
m
m
1,700,000.00
19,500.00
3,000.00
15,300.00
19,000.00
1,350.00
121,000.00
179,000.00
Jumlah (1)
3,400.00
195.00
45,900.00
8,550.00
5,400.00
726.00
1,611.00
65,782.00
Tenaga
Pekerja
Tukang Batu
Tukang Kayu
Tukang Besi
Kepala Tukang
Mandor
0.1800
0.0200
0.0200
0.0200
0.0060
0.0090
OH
OH
OH
OH
OH
OH
30,000.00
40,000.00
40,000.00
40,000.00
45,000.00
43,000.00
Jumlah (2)
5,400.00
800.00
800.00
800.00
270.00
387.00
8,457.00
74,239.00
0.0030
0.0200
0.0000
3.6000
0.0500
5.5000
0.0090
0.0150
m
kg
liter
kg
kg
kg
m
m
1,700,000.00
19,500.00
3,000.00
15,300.00
19,000.00
1,350.00
121,000.00
179,000.00
Jumlah (1)
5,100.00
390.00
55,080.00
950.00
7,425.00
1,089.00
2,685.00
72,719.00
Tenaga
Pekerja
Tukang Batu
Tukang Kayu
Tukang Besi
Kepala Tukang
Mandor
0.2970
0.0330
0.0330
0.0330
0.0100
0.0150
OH
OH
OH
OH
OH
OH
30,000.00
40,000.00
40,000.00
40,000.00
45,000.00
43,000.00
Jumlah (2)
8,910.00
1,320.00
1,320.00
1,320.00
450.00
645.00
13,965.00
86,684.00
1.0000
610,000.00
Jumlah (1)
610,000.00
610,000.00
Tenaga
Pekerja
Tukang Batu
Kepala Tukang
Mandor
Alat Bantu (slang + tes lab.)
2.5000
0.2500
0.1000
0.0100
0.0450
OH
OH
OH
OH
lot
30,000.00
40,000.00
45,000.00
43,000.00
56,870.00
Jumlah (2)
75,000.00
10,000.00
4,500.00
430.00
2,559.15
89,930.00
699,930.00
Analisa Pekerjaan
45 dari 102
NO
1
G.043
G.044
G.045
G.046
G.047
G.048
KOEF
SAT
HARGA SAT
Rp.
5
JUMLAH
Rp.
6=(3x5)
2
Menghamparkan 1 m beton mutu K-175 (ready mix)
Bahan
Beton Ready Mix (K-175)
1.0000
725,000.00
Jumlah (1)
725,000.00
725,000.00
Tenaga
Pekerja
Tukang Batu
Kepala Tukang
Mandor
Alat Bantu (slang + tes lab.)
2.5000
0.2500
0.1000
0.0100
0.0450
OH
OH
OH
OH
lot
30,000.00
40,000.00
45,000.00
43,000.00
56,870.00
Jumlah (2)
75,000.00
10,000.00
4,500.00
430.00
2,559.15
89,930.00
814,930.00
1.0000
825,000.00
Jumlah (1)
825,000.00
825,000.00
Tenaga
Pekerja
Tukang Batu
Kepala Tukang
Mandor
Alat Bantu (slang + tes lab.)
2.5000
0.2500
0.1000
0.0100
0.0450
OH
OH
OH
OH
lot
30,000.00
40,000.00
45,000.00
43,000.00
56,870.00
Jumlah (2)
75,000.00
10,000.00
4,500.00
430.00
2,559.15
89,930.00
914,930.00
1.0000
875,000.00
Jumlah (1)
875,000.00
875,000.00
Tenaga
Pekerja
Tukang Batu
Kepala Tukang
Mandor
Alat Bantu (slang + tes lab.)
2.5000
0.2500
0.1000
0.0100
0.0450
OH
OH
OH
OH
lot
30,000.00
40,000.00
45,000.00
43,000.00
56,870.00
Jumlah (2)
75,000.00
10,000.00
4,500.00
430.00
2,559.15
89,930.00
964,930.00
1.0000
90,000.00
Jumlah (1)
90,000.00
90,000.00
Tenaga
Pekerja
Tukang Batu
Kepala Tukang
Mandor
Alat Bantu (slang + tes lab.)
2.5000
0.2500
0.1000
0.0100
0.0450
OH
OH
OH
OH
lot
30,000.00
40,000.00
45,000.00
43,000.00
56,870.00
Jumlah (2)
75,000.00
10,000.00
4,500.00
430.00
2,559.15
89,930.00
179,930.00
1.0000
925,000.00
Jumlah (1)
925,000.00
925,000.00
Tenaga
Pekerja
Tukang Batu
Kepala Tukang
Mandor
Alat Bantu (slang + tes lab.)
2.5000
0.2500
0.1000
0.0100
0.0450
OH
OH
OH
OH
lot
30,000.00
40,000.00
45,000.00
43,000.00
56,870.00
Jumlah (2)
75,000.00
10,000.00
4,500.00
430.00
2,559.15
89,930.00
1,014,930.00
1.0000
1,000,000.00
Jumlah (1)
1,000,000.00
1,000,000.00
Tenaga
Pekerja
Tukang Batu
Kepala Tukang
Mandor
Alat Bantu (slang + tes lab.)
2.5000
0.2500
0.1000
0.0100
0.0450
OH
OH
OH
OH
lot
30,000.00
40,000.00
45,000.00
43,000.00
56,870.00
Jumlah (2)
75,000.00
10,000.00
4,500.00
430.00
2,559.15
89,930.00
1,089,930.00
Analisa Pekerjaan
46 dari 102
NO
1
G.049
G.050
G.051
G.052
G.053
KOEF
SAT
HARGA SAT
Rp.
5
JUMLAH
Rp.
6=(3x5)
2
Memasang 1 m plat beton "bondex"
Bahan
Bondex
Kawat Las
1.0100
0.1000
kg
kg
176,000.00
19,000.00
Jumlah (1)
177,760.00
1,900.00
179,660.00
Tenaga
Pekerja
Tukang Besi
Mandor
Shear Connector
0.0500
0.0300
0.0100
1.0000
OH
OH
OH
ls
30,000.00
40,000.00
43,000.00
18,000.00
Jumlah (2)
1,500.00
1,200.00
430.00
18,000.00
21,130.00
200,790.00
1.0500
0.0150
kg
kg
14,000.00
19,000.00
Jumlah (1)
14,700.00
285.00
14,985.00
Tenaga
Pekerja
Tukang Besi
Kepala Tukang
Mandor
Peralatan, Spancer
0.0400
0.0150
0.0150
0.0075
0.0200
OH
OH
OH
OH
lot
30,000.00
40,000.00
45,000.00
43,000.00
1,000.00
Jumlah (2)
1,200.00
600.00
675.00
322.50
20.00
2,817.50
17,802.50
1.0500
0.0150
kg
kg
14,000.00
19,000.00
Jumlah (1)
14,700.00
285.00
14,985.00
Tenaga
Pekerja
Tukang Besi
Kepala Tukang
Mandor
Peralatan, Spancer
0.0400
0.0150
0.0150
0.0075
0.0200
OH
OH
OH
OH
lot
30,000.00
40,000.00
45,000.00
43,000.00
1,000.00
Jumlah (2)
1,200.00
600.00
675.00
322.50
20.00
2,817.50
17,802.50
0.0240
0.3000
0.1000
0.0240
m
kg
liter
m
1,700,000.00
19,500.00
3,000.00
3,779,000.00
Jumlah (1)
40,800.00
5,850.00
300.00
90,696.00
137,646.00
Tenaga
Pekerja
Tukang Kayu
Kepala Tukang
Mandor
Pekerja (bongkar cetakan)
0.3000
0.1500
0.1500
0.0500
0.1500
OH
OH
OH
OH
OH
30,000.00
40,000.00
45,000.00
43,000.00
30,000.00
Jumlah (2)
9,000.00
6,000.00
6,750.00
2,150.00
4,500.00
28,400.00
166,046.00
0.3470
0.4000
0.0170
lbr
kg
m
176,000.00
19,500.00
3,779,000.00
Jumlah (1)
61,072.00
7,800.00
64,243.00
133,115.00
Tenaga
Pekerja
Tukang Kayu
Kepala Tukang
Mandor
Pekerja (bongkar cetakan)
0.1200
0.1500
0.1500
0.0500
0.1200
OH
OH
OH
OH
OH
30,000.00
40,000.00
45,000.00
43,000.00
30,000.00
Jumlah (2)
3,600.00
6,000.00
6,750.00
2,150.00
3,600.00
22,100.00
155,215.00
Analisa Pekerjaan
47 dari 102
NO
1
G.054
G.055
H.
H.001
H.002
H.003
H.004
KOEF
SAT
HARGA SAT
Rp.
5
JUMLAH
Rp.
6=(3x5)
2
Memasang 1 m bekisting multipleks 12 mm
Bahan
Multipleks 12 mm
Paku 5 cm - 12 cm
Balok Kayu Meranti Batu 5/7
0.3470
0.4000
0.0170
lbr
kg
m
225,000.00
19,500.00
3,779,000.00
Jumlah (1)
78,075.00
7,800.00
64,243.00
150,118.00
Tenaga
Pekerja
Tukang Kayu
Kepala Tukang
Mandor
Pekerja (bongkar cetakan)
0.1200
0.1500
0.1500
0.0500
0.1200
OH
OH
OH
OH
OH
30,000.00
40,000.00
45,000.00
43,000.00
30,000.00
Jumlah (2)
3,600.00
6,000.00
6,750.00
2,150.00
3,600.00
22,100.00
172,218.00
9.0000
0.5000
0.0160
bt
kg
m
5,500.00
19,500.00
1,275,000.00
Jumlah (1)
49,500.00
9,750.00
20,400.00
79,650.00
Tenaga
Pekerja
Tukang Kayu
Kepala Tukang
Mandor
0.1200
0.1500
0.1500
0.0500
OH
OH
OH
OH
30,000.00
40,000.00
45,000.00
43,000.00
Jumlah (2)
3,600.00
6,000.00
6,750.00
2,150.00
18,500.00
98,150.00
SNI 03-3436-2002
25.0000
bh
970.00
Jumlah (1)
24,250.00
24,250.00
Tenaga
Pekerja
Tukang Kayu
Kepala Tukang
Mandor
0.1500
0.0750
0.0080
0.0080
OH
OH
OH
OH
30,000.00
40,000.00
45,000.00
43,000.00
Jumlah (2)
4,500.00
3,000.00
360.00
344.00
8,204.00
32,454.00
0.6000
0.0500
lbr
kg
63,000.00
19,500.00
Jumlah (1)
37,800.00
975.00
38,775.00
Tenaga
Pekerja
Tukang Kayu
Kepala Tukang
Mandor
0.1400
0.0670
0.0070
0.0070
OH
OH
OH
OH
30,000.00
40,000.00
45,000.00
43,000.00
Jumlah (2)
4,200.00
2,680.00
315.00
301.00
7,496.00
46,271.00
0.5000
0.1200
lbr
kg
86,100.00
18,850.00
Jumlah (1)
43,050.00
2,262.00
45,312.00
Tenaga
Pekerja
Tukang Kayu
Kepala Tukang
Mandor
0.1400
0.0750
0.0080
0.0080
OH
OH
OH
OH
30,000.00
40,000.00
45,000.00
43,000.00
Jumlah (2)
4,200.00
3,000.00
360.00
344.00
7,904.00
53,216.00
0.5000
0.1200
lbr
kg
92,800.00
18,850.00
Jumlah (1)
46,400.00
2,262.00
48,662.00
Tenaga
Pekerja
Tukang Kayu
Kepala Tukang
Mandor
0.1400
0.0750
0.0080
0.0080
OH
OH
OH
OH
30,000.00
40,000.00
45,000.00
43,000.00
Jumlah (2)
4,200.00
3,000.00
360.00
344.00
7,904.00
56,566.00
Analisa Pekerjaan
48 dari 102
NO
1
H.005
2
Memasang 1 m atap genteng beton
Bahan
Genteng Beton
Paku 2" - 5"
H.008
H.009
H.010
HARGA SAT
Rp.
5
JUMLAH
Rp.
6=(3x5)
bh
kg
6,120.00
19,500.00
Jumlah (1)
67,320.00
585.00
67,905.00
0.2000
0.1000
0.0100
0.0100
OH
OH
OH
OH
30,000.00
40,000.00
45,000.00
43,000.00
Jumlah (2)
6,000.00
4,000.00
450.00
430.00
10,880.00
78,785.00
60.0000
0.2000
bh
kg
530.00
19,500.00
Jumlah (1)
31,800.00
3,900.00
35,700.00
0.1660
0.2500
0.0250
0.0080
OH
OH
OH
OH
30,000.00
40,000.00
45,000.00
43,000.00
Jumlah (2)
4,980.00
10,000.00
1,125.00
344.00
16,449.00
52,149.00
3.5000
0.0500
10.8000
0.0320
1.0000
bh
kg
kg
m
kg
9,180.00
19,500.00
1,350.00
121,000.00
3,000.00
Jumlah (1)
32,130.00
975.00
14,580.00
3,872.00
3,000.00
51,557.00
Tenaga
Pekerja
Tukang Kayu
Kepala Tukang
Mandor
0.4000
0.2000
0.0200
0.0200
OH
OH
OH
OH
30,000.00
40,000.00
45,000.00
43,000.00
Jumlah (2)
12,000.00
8,000.00
900.00
860.00
21,760.00
73,317.00
0.4000
0.0600
0.0500
0.0040
lbr
kg
kg
m
89,000.00
19,500.00
19,500.00
5,793,000.00
Jumlah (1)
35,600.00
1,170.00
975.00
23,172.00
60,917.00
Tenaga
Pekerja
Tukang Kayu
Kepala Tukang
Mandor
0.1250
0.2500
0.0250
0.0060
OH
OH
OH
OH
30,000.00
40,000.00
45,000.00
43,000.00
Jumlah (2)
3,750.00
10,000.00
1,125.00
258.00
15,133.00
76,050.00
0.7000
0.0200
lbr
kg
86,100.00
19,500.00
Jumlah (1)
60,270.00
390.00
60,660.00
Tenaga
Pekerja
Tukang Kayu
Kepala Tukang
Mandor
0.1200
0.0600
0.0060
0.0060
OH
OH
OH
OH
30,000.00
40,000.00
45,000.00
43,000.00
Jumlah (2)
3,600.00
2,400.00
270.00
258.00
6,528.00
67,188.00
0.3000
0.0400
lbr
kg
89,000.00
19,500.00
Jumlah (1)
26,700.00
780.00
27,480.00
Tenaga
Pekerja
Tukang Kayu
Kepala Tukang
Mandor
0.1500
0.0700
0.0080
0.0060
OH
OH
OH
OH
30,000.00
40,000.00
45,000.00
43,000.00
Jumlah (2)
4,500.00
2,800.00
360.00
258.00
7,918.00
35,398.00
H.007
SAT
11.0000
0.0300
Tenaga
Pekerja
Tukang Kayu
Kepala Tukang
Mandor
H.006
KOEF
Analisa Pekerjaan
49 dari 102
NO
1
H.011
H.012
H.013
H.014
H.015
H.016
2
Memasang 1 m atap genteng pres jatiwangi
Bahan
Genteng Pres Jatiwangi
KOEF
SAT
HARGA SAT
Rp.
5
JUMLAH
Rp.
6=(3x5)
25.0000
bh
1,020.00
Jumlah (1)
25,500.00
25,500.00
Tenaga
Pekerja
Tukang Kayu
Kepala Tukang
Mandor
0.1500
0.0750
0.0080
0.0080
OH
OH
OH
OH
30,000.00
40,000.00
45,000.00
43,000.00
Jumlah (2)
4,500.00
3,000.00
360.00
344.00
8,204.00
33,704.00
4.0000
8.0000
0.0320
bh
kg
m
3,315.00
1,350.00
121,000.00
Jumlah (1)
13,260.00
10,800.00
3,872.00
27,932.00
Tenaga
Pekerja
Tukang Kayu
Kepala Tukang
Mandor
0.4000
0.2000
0.0200
0.0020
OH
OH
OH
OH
30,000.00
40,000.00
45,000.00
43,000.00
Jumlah (2)
12,000.00
8,000.00
900.00
86.00
20,986.00
48,918.00
19.0000
bh
1,850.00
Jumlah (1)
35,150.00
35,150.00
Tenaga
Pekerja
Tukang Kayu
Kepala Tukang
Mandor
0.1500
0.0750
0.0080
0.0080
OH
OH
OH
OH
30,000.00
40,000.00
45,000.00
43,000.00
Jumlah (2)
4,500.00
3,000.00
360.00
344.00
8,204.00
43,354.00
3.5000
6.5200
0.2100
bh
kg
m
4,100.00
1,350.00
121,000.00
Jumlah (1)
14,350.00
8,802.00
25,410.00
48,562.00
Tenaga
Pekerja
Tukang Kayu
Kepala Tukang
Mandor
0.4000
0.2000
0.0200
0.0020
OH
OH
OH
OH
30,000.00
40,000.00
45,000.00
43,000.00
Jumlah (2)
12,000.00
8,000.00
900.00
86.00
20,986.00
69,548.00
19.0000
bh
6,850.00
Jumlah (1)
130,150.00
130,150.00
Tenaga
Pekerja
Tukang Kayu
Kepala Tukang
Mandor
0.1500
0.0750
0.0080
0.0080
OH
OH
OH
OH
30,000.00
40,000.00
45,000.00
43,000.00
Jumlah (2)
4,500.00
3,000.00
360.00
344.00
8,204.00
138,354.00
3.5000
6.5200
0.2100
bh
kg
m
7,650.00
1,350.00
121,000.00
Jumlah (1)
26,775.00
8,802.00
25,410.00
60,987.00
Tenaga
Pekerja
Tukang Kayu
Kepala Tukang
Mandor
0.4000
0.2000
0.0200
0.0020
OH
OH
OH
OH
30,000.00
40,000.00
45,000.00
43,000.00
Jumlah (2)
12,000.00
8,000.00
900.00
86.00
20,986.00
81,973.00
Analisa Pekerjaan
50 dari 102
NO
1
H.017
H.018
I.
I.001
I.003
I.004
SAT
HARGA SAT
Rp.
5
JUMLAH
Rp.
6=(3x5)
2
Memasang 1 m' bubung asbes gelombang kecil
Bahan
Kerpus asbes gelombang kecil
Paku asbes
1.1500
0.0350
lbr
kg
31,850.00
14,300.00
Jumlah (1)
36,627.50
500.50
37,128.00
Tenaga
Pekerja
Tukang Kayu
Kepala Tukang
Mandor
0.0500
0.0500
0.0050
0.0025
OH
OH
OH
OH
30,000.00
40,000.00
45,000.00
43,000.00
Jumlah (2)
1,500.00
2,000.00
225.00
107.50
3,832.50
40,960.50
1.1500
0.0350
lbr
kg
55,650.00
14,300.00
Jumlah (1)
63,997.50
500.50
64,498.00
Tenaga
Pekerja
Tukang Kayu
Kepala Tukang
Mandor
0.0500
0.0500
0.0050
0.0025
OH
OH
OH
OH
30,000.00
40,000.00
45,000.00
43,000.00
Jumlah (2)
1,500.00
2,000.00
225.00
107.50
3,832.50
68,330.50
SNI 03-2838-2002
15,000.00
19,500.00
Jumlah (1)
16,500.00
195.00
16,695.00
30,000.00
40,000.00
45,000.00
43,000.00
Jumlah (2)
900.00
2,800.00
315.00
86.00
4,101.00
20,796.00
I.002
KOEF
0.0300
0.0700
0.0070
0.0020
OH
OH
OH
OH
Analisa Pekerjaan
25,818.75
585.00
26,403.75
2,100.00
4,000.00
450.00
172.00
6,722.00
33,125.75
86,895.00
195.00
87,090.00
18,000.00
32,000.00
3,600.00
1,290.00
54,890.00
141,980.00
32,760.00
585.00
33,345.00
2,100.00
4,000.00
450.00
150.50
6,700.50
40,045.50
51 dari 102
NO
1
I.005
I.006
I.007
I.008
I.009
I.010
HARGA SAT
Rp.
2
3
4
5
Memasang 1 m langit-langit plywood ukuran (60 x 120) cm; tbl. 4 mm dan 6 mm
Bahan
Plywood
0.3750 lembar
91,000.00
Paku Triplek
0.0300
kg
19,500.00
Jumlah (1)
Tenaga
Pekerja
0.0700
OH
30,000.00
Tukang Kayu
0.1000
OH
40,000.00
Kepala Tukang
0.0100
OH
45,000.00
Mandor
0.0035
OH
43,000.00
Jumlah (2)
Jumlah (1) + (2)
Memasang 1 m langit-langit teakwood ukuran (30 x 60) cm; tbl. 4 mm dan 6 mm
Bahan
Teakwood
0.3600 lembar
145,850.00
Paku Triplek
0.0300
kg
19,500.00
Jumlah (1)
Tenaga
Pekerja
0.0700
OH
30,000.00
Tukang Kayu
0.1000
OH
40,000.00
Kepala Tukang
0.0100
OH
45,000.00
Mandor
0.0035
OH
43,000.00
Jumlah (2)
Jumlah (1) + (2)
Memasang 1 m langit-langit teakwood ukuran (60 x 120) cm; tbl. 4 mm dan 6 mm
Bahan
Teakwood
0.3750 lembar
145,850.00
Paku Triplek
0.0300
kg
19,500.00
Jumlah (1)
Tenaga
Pekerja
0.0700
OH
30,000.00
Tukang Kayu
0.1000
OH
40,000.00
Kepala Tukang
0.0100
OH
45,000.00
Mandor
0.0035
OH
43,000.00
Jumlah (2)
Jumlah (1) + (2)
Memasang 1 m langit-langit lat kayu jati
Bahan
Papan Kayu Jati
0.0240
m
15,249,000.00
Paku
0.0100
kg
19,500.00
Paku Sekrup
0.0500
kg
448,000.00
Jumlah (1)
Tenaga
Pekerja
0.2000
OH
30,000.00
Tukang Kayu
0.6000
OH
40,000.00
Kepala Tukang
0.0600
OH
45,000.00
Mandor
0.0100
OH
43,000.00
Jumlah (2)
Jumlah (1) + (2)
Memasang 1 m langit-langit lat kayu bengkirai
Bahan
Papan Kayu Bengkirai
0.0240
m
10,816,000.00
Paku
0.0100
kg
19,500.00
Paku Sekrup
0.0500
kg
448,000.00
Jumlah (1)
Tenaga
Pekerja
0.2000
OH
30,000.00
Tukang Kayu
0.6000
OH
40,000.00
Kepala Tukang
0.0600
OH
45,000.00
Mandor
0.0100
OH
43,000.00
Jumlah (2)
Jumlah (1) + (2)
Memasang 1 m langit-langit lat kayu meranti
Bahan
Papan Kayu Meranti
0.0240
m
4,641,000.00
Paku
0.0100
kg
19,500.00
Paku Sekrup
0.0500
kg
448,000.00
Jumlah (1)
Tenaga
Pekerja
0.2000
OH
30,000.00
Tukang Kayu
0.6000
OH
40,000.00
Kepala Tukang
0.0600
OH
45,000.00
Mandor
0.0100
OH
43,000.00
Jumlah (2)
Jumlah (1) + (2)
Analisa Pekerjaan
KOEF
SAT
JUMLAH
Rp.
6=(3x5)
34,125.00
585.00
34,710.00
2,100.00
4,000.00
450.00
150.50
6,700.50
41,410.50
52,506.00
585.00
53,091.00
2,100.00
4,000.00
450.00
150.50
6,700.50
59,791.50
54,693.75
585.00
55,278.75
2,100.00
4,000.00
450.00
150.50
6,700.50
61,979.25
365,976.00
195.00
22,400.00
366,171.00
6,000.00
24,000.00
2,700.00
430.00
33,130.00
399,301.00
259,584.00
195.00
22,400.00
282,179.00
6,000.00
24,000.00
2,700.00
430.00
33,130.00
315,309.00
111,384.00
195.00
22,400.00
133,979.00
6,000.00
24,000.00
2,700.00
430.00
33,130.00
167,109.00
52 dari 102
NO
1
I.011
I.012
I.013
I.014
J.
J.001
J.002
J.003
HARGA SAT
Rp.
2
3
4
5
Memasang 1 m langit-langit asbes (100 x 100) cm, tbl. 3,2 mm, rangka kayu meranti
Bahan
Kaso Kayu Meranti
0.0120
m
3,779,000.00
Paku
0.0600
kg
19,500.00
Asbes 100 x 100
1.1000
lbr
26,500.00
Jumlah (1)
Tenaga
Pekerja
0.1800
OH
30,000.00
Tukang Kayu
0.3200
OH
40,000.00
Kepala Tukang
0.0320
OH
45,000.00
Mandor
0.0090
OH
43,000.00
Jumlah (2)
Jumlah (1) + (2)
Memasang 1 m plywood 4 mm, rangka kayu meranti
Bahan
Kaso Kayu Meranti
0.0230
m
3,779,000.00
Paku
0.0600
kg
19,500.00
Plywood 4' x 8' x 4 mm
0.3900
lbr
91,000.00
Jumlah (1)
Tenaga
Pekerja
0.2700
OH
30,000.00
Tukang Kayu
0.4000
OH
40,000.00
Kepala Tukang
0.0400
OH
45,000.00
Mandor
0.0135
OH
43,000.00
Jumlah (2)
Jumlah (1) + (2)
Memasang 1 m langit-langit gypsum board uk. (120 x 240) cm, tebal 9 mm
Bahan
Gypsum Board
0.3640 lembar
348,480.00
Paku Sekrup
0.1100
kg
448,000.00
Jumlah (1)
Tenaga
Pekerja
0.1000
OH
30,000.00
Tukang Kayu
0.0500
OH
40,000.00
Kepala Tukang
0.0050
OH
45,000.00
Mandor
0.0050
OH
43,000.00
Jumlah (2)
Jumlah (1) + (2)
Memasang 1 m' list kayu profil
Bahan
List Kayu Profil
1.0500
m'
19,000.00
Paku Triplek
0.0100
kg
19,500.00
Jumlah (1)
Tenaga
Pekerja
0.0500
OH
30,000.00
Tukang Kayu
0.0500
OH
40,000.00
Kepala Tukang
0.0050
OH
45,000.00
Mandor
0.0030
OH
43,000.00
Jumlah (2)
Jumlah (1) + (2)
PEKERJAAN SANITASI
Memasang 1 buah kloset duduk/monoblok
Bahan
Kolset Duduk/Monblok
1.0000
bh
306,000.00
6% harga kloset
Perlengkapan
18,360.00
Jumlah (1)
Tenaga
Pekerja
3.3000
OH
30,000.00
Tukang Batu
1.1000
OH
40,000.00
Kepala Tukang
0.0010
OH
45,000.00
Mandor
0.1600
OH
43,000.00
Jumlah (2)
Jumlah (1) + (2)
Memasang 1 buah kloset jongkok porselen
Bahan
Kloset Jongkok Porselen
1.0000
bh
122,400.00
Portland Cement (PC)
6.0000
kg
1,350.00
Pasir Pasang
0.0100
m
121,000.00
Jumlah (1)
Tenaga
Pekerja
1.0000
OH
30,000.00
Tukang Batu
1.5000
OH
40,000.00
Kepala Tukang
1.5000
OH
45,000.00
Mandor
0.1600
OH
43,000.00
Jumlah (2)
Jumlah (1) + (2)
Memasang 1 buah kloset jongkok teraso
Analisa Pekerjaan
KOEF
SAT
JUMLAH
Rp.
6=(3x5)
45,348.00
1,170.00
29,150.00
75,668.00
5,400.00
12,800.00
1,440.00
387.00
20,027.00
95,695.00
86,917.00
1,170.00
35,490.00
123,577.00
8,100.00
16,000.00
1,800.00
580.50
26,480.50
150,057.50
126,846.72
49,280.00
176,126.72
3,000.00
2,000.00
225.00
215.00
5,440.00
181,566.72
19,950.00
195.00
20,145.00
1,500.00
2,000.00
225.00
129.00
3,854.00
23,999.00
SNI
306,000.00
18,360.00
306,000.00
99,000.00
44,000.00
45.00
6,880.00
149,925.00
455,925.00
122,400.00
8,100.00
1,210.00
131,710.00
30,000.00
60,000.00
67,500.00
6,880.00
164,380.00
296,090.00
53 dari 102
NO
1
J.004
JUMLAH
Rp.
6=(3x5)
bh
bh
kg
m
40,800.00
550.00
1,350.00
121,000.00
Jumlah (1)
40,800.00
3,850.00
8,100.00
1,210.00
53,960.00
Tenaga
Pekerja
Tukang Batu
Kepala Tukang
Mandor
1.0000
1.5000
0.3000
0.1100
OH
OH
OH
OH
30,000.00
40,000.00
45,000.00
43,000.00
Jumlah (2)
30,000.00
60,000.00
13,500.00
4,730.00
108,230.00
162,190.00
433,500.00
130,050.00
1,350.00
121,000.00
Jumlah (1)
433,500.00
130,050.00
8,100.00
1,210.00
572,860.00
30,000.00
40,000.00
45,000.00
43,000.00
Jumlah (2)
30,000.00
40,000.00
4,500.00
4,300.00
78,800.00
651,660.00
544,000.00
65,280.00
1,350.00
121,000.00
Jumlah (1)
544,000.00
65,280.00
8,100.00
1,210.00
618,590.00
30,000.00
40,000.00
45,000.00
43,000.00
Jumlah (2)
36,000.00
58,000.00
6,750.00
4,300.00
105,050.00
723,640.00
214,200.00
38,556.00
Jumlah (1)
214,200.00
38,556.00
252,756.00
1.0000
bh
30% harga urinoir
6.0000
kg
0.0100
m
1.0000
1.0000
0.1000
0.1000
OH
OH
OH
OH
1.0000
bh
12% harga wastafel
6.0000
kg
0.0100
m
1.2000
1.4500
0.1500
0.1000
OH
OH
OH
OH
J.007
HARGA SAT
Rp.
5
1.0000
7.0000
6.0000
0.0100
Tenaga
Pekerja
Tukang Batu
Kepala Tukang
Mandor
J.006
SAT
Bahan
Kloset Jongkok Teraso
Bata Merah 5 x 12 x 22 cm
Portland Cement (PC)
Pasir Pasang
Tenaga
Pekerja
Tukang Batu
Kepala Tukang
Mandor
J.005
KOEF
1.8000
2.7000
0.5400
0.1100
OH
OH
OH
OH
30,000.00
40,000.00
45,000.00
43,000.00
Jumlah (2)
54,000.00
108,000.00
24,300.00
4,730.00
191,030.00
443,786.00
bh
kg
m
m
kg
550.00
1,350.00
121,000.00
57,000.00
3,000.00
Jumlah (1)
166,666.67
162,000.00
36,300.00
248,292.00
18,000.00
631,258.67
Tenaga
Pekerja
Tukang Batu
Kepala Tukang
Mandor
OH
OH
OH
OH
30,000.00
40,000.00
45,000.00
43,000.00
Jumlah (2)
180,000.00
120,000.00
13,500.00
12,900.00
326,400.00
957,658.67
Analisa Pekerjaan
6.0000
3.0000
0.3000
0.3000
54 dari 102
NO
1
J.008
2
Memasang 1 buah badkip fiberglass
Bahan
Badkip Fibreglass
Perlengkapan
Tenaga
Pekerja
Tukang Batu
Kepala Tukang
Mandor
J.009
J.010
J.011
J.012
Analisa Pekerjaan
KOEF
SAT
1.0000
bh
20% harga badkip
HARGA SAT
Rp.
5
JUMLAH
Rp.
6=(3x5)
850,000.00
170,000.00
Jumlah (1)
850,000.00
170,000.00
850,000.00
30,000.00
40,000.00
45,000.00
43,000.00
Jumlah (2)
3,000.00
33,750.00
10,750.00
47,500.00
897,500.00
781,655.00
15,300.00
2,496,000.00
57,000.00
334,995.50
Jumlah (1)
703,489.50
2,754,000.00
199,680.00
285,000.00
334,995.50
4,277,165.00
OH
OH
OH
OH
30,000.00
40,000.00
45,000.00
43,000.00
Jumlah (2)
105,000.00
180,000.00
40,500.00
38,700.00
364,200.00
4,641,365.00
1.0000
bh
12% harga bak
1,709,000.00
205,080.00
Jumlah (1)
1,709,000.00
205,080.00
1,914,080.00
0.0000
0.0750
0.7500
0.2500
OH
OH
OH
OH
0.9000
m
180.0000
kg
0.0800
m
5.0000
m
10% harga total bahan
3.5000
4.5000
0.9000
0.9000
3.0000
4.5000
0.9000
0.9000
OH
OH
OH
OH
30,000.00
40,000.00
45,000.00
43,000.00
Jumlah (2)
90,000.00
180,000.00
40,500.00
38,700.00
349,200.00
2,263,280.00
1.1000
20.4545
3.9200
0.0560
0.0240
bh
bh
kg
m
m
53,000.00
550.00
1,350.00
121,000.00
86,000.00
Jumlah (1)
58,300.00
11,250.00
5,292.00
6,776.00
2,064.00
83,682.00
0.1400
0.0700
0.0070
0.0070
OH
OH
OH
OH
30,000.00
40,000.00
45,000.00
43,000.00
Jumlah (2)
4,200.00
2,800.00
315.00
301.00
7,616.00
91,298.00
1.1000
420.4545
10.3000
0.0610
0.0690
bh
bh
kg
m
m
79,500.00
550.00
1,350.00
121,000.00
86,000.00
Jumlah (1)
87,450.00
231,250.00
13,905.00
7,381.00
5,934.00
345,920.00
0.3800
0.1900
0.0190
0.0190
OH
OH
OH
OH
30,000.00
40,000.00
45,000.00
43,000.00
Jumlah (2)
11,400.00
7,600.00
855.00
817.00
20,672.00
366,592.00
55 dari 102
NO
1
J.013
J.014
J.015
J.016
J.017
HARGA SAT
Rp.
2
3
4
5
Memasang 1 buah bak kontrol pas. batu bata ukuran (30 x 30) cm tinggi 35 cm
Bahan
Bata Merah 5 x 12 x 22 cm
109.8485
bh
550.00
Portland Cement (PC)
44.0000
kg
1,350.00
Pasir Pasang
0.0700
m
121,000.00
Batu Kerikil
0.0700
m
179,000.00
Besi Beton
1.6000
kg
15,300.00
Pasir Beton
0.0600
m
121,000.00
Jumlah (1)
Tenaga
Pekerja
3.2000
OH
30,000.00
Tukang Batu
1.0150
OH
40,000.00
Kepala Tukang
0.0015
OH
45,000.00
Mandor
0.0160
OH
43,000.00
Jumlah (2)
Jumlah (1) + (2)
Memasang 1 buah bak kontrol pas. batu bata ukuran (45 x 45) cm tinggi 60 cm
Bahan
Bata Merah 5 x 12 x 22 cm
189.3939
bh
550.00
Portland Cement (PC)
77.0000
kg
1,350.00
Pasir Pasang
0.1300
m
121,000.00
Batu Kerikil
0.0200
m
179,000.00
Besi Beton
2.6000
kg
15,300.00
Pasir Beton
0.0900
m
121,000.00
Jumlah (1)
Tenaga
Pekerja
1.4200
OH
30,000.00
Tukang Batu
0.4730
OH
40,000.00
Kepala Tukang
0.0470
OH
45,000.00
Mandor
0.0710
OH
43,000.00
Jumlah (2)
Jumlah (1) + (2)
Memasang 1 buah bak kontrol pas. batu bata ukuran (60 x 60) cm tinggi 65 cm
Bahan
Bata Merah 5 x 12 x 22 cm
281.0606
bh
550.00
Portland Cement (PC)
114.0000
kg
1,350.00
Pasir Pasang
0.1840
m
121,000.00
Batu Kerikil
0.0330
m
179,000.00
Besi Beton
4.8500
kg
15,300.00
Pasir Beton
0.1200
m
121,000.00
Jumlah (1)
Tenaga
Pekerja
2.1600
OH
30,000.00
Tukang Batu
0.7200
OH
40,000.00
Kepala Tukang
0.0720
OH
45,000.00
Mandor
0.1080
OH
43,000.00
Tukang Gali
0.1000
OH
30,000.00
Jumlah (2)
Jumlah (1) + (2)
Memasang 1 m' pipa galvanis "
Bahan
Pipa Galvanis
1.2000
m'
93,000.00
35% harga pipa
Perlengkapan
32,550.00
Jumlah (1)
Tenaga
Pekerja
0.0540
OH
30,000.00
Tukang Batu
0.0900
OH
40,000.00
Kepala Tukang
0.0090
OH
45,000.00
Mandor
0.0270
OH
43,000.00
Jumlah (2)
Jumlah (1) + (2)
Memasang 1 m' pipa galvanis "
Bahan
Pipa Galvanis
1.2000
m'
195,000.00
35% harga pipa
Perlengkapan
68,250.00
Jumlah (1)
Tenaga
Pekerja
0.0540
OH
30,000.00
Tukang Batu
0.0900
OH
40,000.00
Kepala Tukang
0.0090
OH
45,000.00
Mandor
0.0270
OH
43,000.00
Jumlah (2)
Jumlah (1) + (2)
Analisa Pekerjaan
KOEF
SAT
JUMLAH
Rp.
6=(3x5)
60,416.67
59,400.00
8,470.00
12,530.00
24,480.00
7,260.00
172,556.67
96,000.00
40,600.00
67.50
688.00
137,355.50
309,912.17
104,166.67
103,950.00
15,730.00
3,580.00
39,780.00
10,890.00
278,096.67
42,600.00
18,920.00
2,115.00
3,053.00
66,688.00
344,784.67
154,583.33
153,900.00
22,264.00
5,907.00
74,205.00
14,520.00
425,379.33
64,800.00
28,800.00
3,240.00
4,644.00
3,000.00
104,484.00
529,863.33
111,600.00
32,550.00
144,150.00
1,620.00
3,600.00
405.00
1,161.00
6,786.00
150,936.00
234,000.00
68,250.00
302,250.00
1,620.00
3,600.00
405.00
1,161.00
6,786.00
309,036.00
56 dari 102
NO
1
J.018
2
Memasang 1 m' pipa galvanis 1"
Bahan
Pipa Galvanis
Perlengkapan
Tenaga
Pekerja
Tukang Batu
Kepala Tukang
Mandor
J.019
J.020
J.021
J.022
J.023
Analisa Pekerjaan
KOEF
SAT
1.2000
m'
35% harga pipa
HARGA SAT
Rp.
5
JUMLAH
Rp.
6=(3x5)
293,800.00
102,830.00
Jumlah (1)
352,560.00
102,830.00
455,390.00
OH
OH
OH
OH
30,000.00
40,000.00
45,000.00
43,000.00
Jumlah (2)
1,620.00
3,600.00
405.00
1,161.00
6,786.00
462,176.00
1.2000
m'
35% harga pipa
436,800.00
152,880.00
Jumlah (1)
524,160.00
152,880.00
677,040.00
OH
OH
OH
OH
30,000.00
40,000.00
45,000.00
43,000.00
Jumlah (2)
3,240.00
7,200.00
810.00
232.20
11,482.20
688,522.20
1.2000
m'
35% harga pipa
1,072,500.00
375,375.00
Jumlah (1)
1,287,000.00
375,375.00
1,662,375.00
OH
OH
OH
OH
30,000.00
40,000.00
45,000.00
43,000.00
Jumlah (2)
3,240.00
7,200.00
810.00
232.20
11,482.20
1,673,857.20
1.2000
m'
35% harga pipa
1,573,000.00
550,550.00
Jumlah (1)
1,887,600.00
550,550.00
2,438,150.00
OH
OH
OH
OH
30,000.00
40,000.00
45,000.00
43,000.00
Jumlah (2)
4,050.00
9,000.00
1,012.50
292.40
14,354.90
2,452,504.90
1.2000
m'
35% harga pipa
3,375.00
1,181.25
Jumlah (1)
4,050.00
1,181.25
5,231.25
OH
OH
OH
OH
30,000.00
40,000.00
45,000.00
43,000.00
Jumlah (2)
1,080.00
2,400.00
270.00
77.40
3,827.40
9,058.65
1.2000
m'
35% harga pipa
4,475.38
1,566.38
Jumlah (1)
5,370.46
1,566.38
6,936.85
30,000.00
40,000.00
45,000.00
43,000.00
Jumlah (2)
1,080.00
2,400.00
270.00
77.40
3,827.40
10,764.25
0.0540
0.0900
0.0090
0.0270
0.1080
0.1800
0.0180
0.0054
0.1080
0.1800
0.0180
0.0054
0.1350
0.2250
0.0225
0.0068
0.0360
0.0600
0.0060
0.0018
0.0360
0.0600
0.0060
0.0018
OH
OH
OH
OH
57 dari 102
NO
1
J.024
2
Memasang 1 m' pipa PVC tipe AW 1"
Bahan
Pipa PVC
Perlengkapan
Tenaga
Pekerja
Tukang Batu
Kepala Tukang
Mandor
J.025
J.026
J.027
J.028
J.029
Analisa Pekerjaan
KOEF
SAT
1.2000
m'
35% harga pipa
HARGA SAT
Rp.
5
JUMLAH
Rp.
6=(3x5)
5,499.85
1,924.95
Jumlah (1)
6,599.82
1,924.95
8,524.76
OH
OH
OH
OH
30,000.00
40,000.00
45,000.00
43,000.00
Jumlah (2)
1,080.00
2,400.00
270.00
77.40
3,827.40
12,352.16
1.2000
m'
35% harga pipa
13,240.38
4,634.13
Jumlah (1)
15,888.46
4,634.13
20,522.60
OH
OH
OH
OH
30,000.00
40,000.00
45,000.00
43,000.00
Jumlah (2)
1,080.00
2,400.00
270.00
77.40
3,827.40
24,350.00
1.2000
m'
35% harga pipa
16,700.23
5,845.08
Jumlah (1)
20,040.28
5,845.08
25,885.36
OH
OH
OH
OH
30,000.00
40,000.00
45,000.00
43,000.00
Jumlah (2)
1,620.00
3,600.00
405.00
116.10
5,741.10
31,626.46
1.2000
m'
35% harga pipa
26,499.77
9,274.92
Jumlah (1)
31,799.72
9,274.92
41,074.64
OH
OH
OH
OH
30,000.00
40,000.00
45,000.00
43,000.00
Jumlah (2)
1,080.00
2,400.00
270.00
77.40
3,827.40
44,902.04
1.2000
m'
35% harga pipa
37,299.77
13,054.92
Jumlah (1)
44,759.72
13,054.92
57,814.64
OH
OH
OH
OH
30,000.00
40,000.00
45,000.00
43,000.00
Jumlah (2)
2,430.00
5,400.00
607.50
176.30
8,613.80
66,428.44
1.2000
m'
35% harga pipa
55,700.46
19,495.16
Jumlah (1)
66,840.55
19,495.16
86,335.72
30,000.00
40,000.00
45,000.00
43,000.00
Jumlah (2)
2,430.00
5,400.00
607.50
176.30
8,613.80
94,949.52
0.0360
0.0600
0.0060
0.0018
0.0360
0.0600
0.0060
0.0018
0.0540
0.0900
0.0090
0.0027
0.0360
0.0600
0.0060
0.0018
0.0810
0.1350
0.0135
0.0041
0.0810
0.1350
0.0135
0.0041
OH
OH
OH
OH
58 dari 102
NO
1
J.030
J.031
J.032
J.033
J.034
KOEF
SAT
HARGA SAT
Rp.
5
JUMLAH
Rp.
6=(3x5)
2
Memasang 1 buah bak cuci piring satinless steel
Bahan
Bak Cuci Satinless Steel
Water Drain + Aksesoris
1.0000
1.0000
bh
set
255,000.00
89,250.00
Jumlah (1)
255,000.00
89,250.00
344,250.00
Tenaga
Pekerja
Tukang Batu
Kepala Tukang
Mandor
0.0300
0.3000
0.0300
0.0015
OH
OH
OH
OH
30,000.00
40,000.00
45,000.00
43,000.00
Jumlah (2)
900.00
12,000.00
1,350.00
64.50
14,314.50
358,564.50
1.0000
0.0250
bh
bh
33,000.00
2,650.00
Jumlah (1)
33,000.00
2,650.00
35,650.00
Tenaga
Pekerja
Tukang Batu
Kepala Tukang
Mandor
0.0100
0.1000
0.0100
0.0050
OH
OH
OH
OH
30,000.00
40,000.00
45,000.00
43,000.00
Jumlah (2)
300.00
4,000.00
450.00
215.00
4,965.00
40,615.00
1.0000
bh
25,000.00
Jumlah (1)
25,000.00
25,000.00
Tenaga
Pekerja
Tukang Batu
Kepala Tukang
Mandor
0.0100
0.1000
0.0100
0.0050
OH
OH
OH
OH
30,000.00
40,000.00
45,000.00
43,000.00
Jumlah (2)
300.00
4,000.00
450.00
215.00
4,965.00
29,965.00
Analisa Pekerjaan
141,450.00
33,789.00
180,510.00
3,326,805.00
1,698,329.25
854,545.64
1,721,305.50
106,087.50
618,442.50
139,890.00
569,697.09
11,787.50
60,000.00
9,462,638.98
106,087.50
24,125.35
135,382.50
2,626,425.00
1,273,746.94
854,545.64
826,226.64
79,565.63
513,783.00
122,403.75
474,747.58
8,840.63
46,000.00
7,091,880.14
59 dari 102
NO
1
J.035
J.036
K.
K.001
K.002
K.003
HARGA SAT
JUMLAH
Rp.
Rp.
2
3
4
5
6=(3x5)
Membuat 1 unit septic tank ukuran 1,5 x 1,5 x 1,5 m + rembesan (rumah tipe sedang)
Galian Tanah
3.3750
m
23,575.00
79,565.63
Urugan Pasir urug
0.1125
m
112,630.00
12,670.88
Lantai kerja beton
2.2500
m
60,170.00
135,382.50
Pas. Batu bata 1 PC : 2 PS + Plesteran
11.2500
m
175,095.00
1,969,818.75
Plat beton penutup & balok
0.3375
m
3,774,065.00
1,273,746.94
Pipa PVC 4" jenis AW + sambungan
9.0000
m
94,949.52
854,545.64
Pipa GIP 1 1/2"
0.6000
m'
688,522.20
413,113.32
Galian tanah untuk rembesan
2.0250
m
23,575.00
47,739.38
Pasang Ijuk
3.5000
kg
95,145.00
333,007.50
Urugan kerikil 3-5 cm.
0.7500
m
116,575.00
87,431.25
Pipa PVC 4" berlobang jenis AW
9.0000
m'
94,949.52
854,545.64
Urugan kembali perataan tanah
0.8438
m
7,858.33
6,630.47
Tambahan upah
0.0750
ls
500,000.00
37,500.00
Jumlah
6,105,697.88
Membuat 1 unit septic tank ukuran 1,5 x 1 x 1,5 m + rembesan (rumah tipe kecil)
Galian Tanah
2.2500
m
23,575.00
53,043.75
Urugan Pasir urug
0.1071
m
112,630.00
12,062.67
Lantai kerja beton
1.1250
m
60,170.00
67,691.25
Pas. Batu bata 1 PC : 2 PS + Plesteran
7.5000
m
175,095.00
1,313,212.50
Plat beton penutup & balok
0.1500
m
3,774,065.00
566,109.75
Pipa PVC 4" jenis AW + sambungan
9.0000
m
94,949.52
854,545.64
Pipa GIP 1 1/2"
0.6000
m'
688,522.20
413,113.32
Galian tanah untuk rembesan
1.6875
m
23,575.00
39,782.81
Pasang Ijuk
2.7000
kg
95,145.00
256,891.50
Urugan kerikil 3-5 cm.
0.5250
m
116,575.00
61,201.88
Pipa PVC 4" berlobang jenis AW
9.0000
m'
94,949.52
854,545.64
Urugan kembali perataan tanah
0.5625
m
7,858.33
4,420.31
Tambahan upah
0.0650
ls
500,000.00
32,500.00
Jumlah
4,529,121.02
Revisi SNI T-16-2002
PEKERJAAN BESI DAN ALUMUNIUM
Memasang 1 kg rangka atap baja
Bahan
Besi Profil IWF
1.1000
kg
18,000.00
19,800.00
Meni Besi
0.0800
kg
35,000.00
2,800.00
Jumlah (1)
22,600.00
Tenaga
Pekerja
0.0600
OH
30,000.00
1,800.00
Tukang Besi
0.0060
OH
40,000.00
240.00
Kepala Tukang
0.0060
OH
45,000.00
270.00
Mandor
0.0003
OH
43,000.00
12.90
Jumlah (2)
2,322.90
Jumlah (1) + (2)
24,922.90
Memasang 1 kg Besi Profil
Bahan
Besi Profil
1.1500
kg
15,000.00
17,250.00
Jumlah (1)
17,250.00
Tenaga
Pekerja
0.0600
OH
30,000.00
1,800.00
Tukang Besi
0.0600
OH
40,000.00
2,400.00
Kepala Tukang
0.0060
OH
45,000.00
270.00
Mandor
0.0030
OH
43,000.00
129.00
Jumlah (2)
4,599.00
Jumlah (1) + (2)
21,849.00
Mengerjakan 100 kg pekerjaan perakitan
Bahan
Solar
1.0000
ltr
7,100.00
7,100.00
Minyak Pelumas
0.1000
ltr
23,850.00
2,385.00
Jumlah (1)
9,485.00
Tenaga
Pekerja
0.1000
OH
30,000.00
3,000.00
Tukang Besi
0.1000
OH
40,000.00
4,000.00
Kepala Tukang
0.0010
OH
45,000.00
45.00
Mandor
0.0050
OH
43,000.00
215.00
Sewa Alat
0.0080
Jam
75,000.00
600.00
Jumlah (2)
7,860.00
Jumlah (1) + (2)
17,345.00
Analisa Pekerjaan
KOEF
SAT
60 dari 102
NO
1
K.004
K.005
K.006
K.007
K.008
K.009
KOEF
SAT
HARGA SAT
Rp.
5
JUMLAH
Rp.
6=(3x5)
2
Mengerjakan 1 cm pengelasan dengan las listrik
Bahan
Kawat Las Listrik
Solar
Minyak Pelumas
0.04
0.0300
0.0040
kg
ltr
ltr
23,000.00
7,100.00
23,850.00
Jumlah (1)
920.00
213.00
95.40
1,228.40
Tenaga
Pekerja
Tukang Besi
Kepala Tukang
Mandor
Sewa Alat
0.0040
0.0020
0.0002
0.0002
0.0170
OH
OH
OH
OH
Jam
30,000.00
40,000.00
45,000.00
43,000.00
75,000.00
Jumlah (2)
120.00
80.00
9.00
8.60
1,275.00
1,492.60
2,721.00
1.0000
266,000.00
Jumlah (1)
266,000.00
266,000.00
Tenaga
Pekerja
Tukang Besi
Kepala Tukang
Mandor
1.2000
1.2000
0.1200
0.0060
OH
OH
OH
OH
30,000.00
40,000.00
45,000.00
43,000.00
Jumlah (2)
36,000.00
48,000.00
5,400.00
258.00
89,658.00
355,658.00
1.0000
395,000.00
Jumlah (1)
395,000.00
395,000.00
Tenaga
Pekerja
Tukang Besi
Kepala Tukang
Mandor
0.4400
0.4400
0.0440
0.0220
OH
OH
OH
OH
30,000.00
40,000.00
45,000.00
43,000.00
Jumlah (2)
13,200.00
17,600.00
1,980.00
946.00
33,726.00
428,726.00
1.0000
338,000.00
Jumlah (1)
338,000.00
338,000.00
Tenaga
Pekerja
Tukang Besi
Kepala Tukang
Mandor
1.0000
1.0000
0.1000
0.0500
OH
OH
OH
OH
30,000.00
40,000.00
45,000.00
43,000.00
Jumlah (2)
30,000.00
40,000.00
4,500.00
2,150.00
76,650.00
414,650.00
1.0000
375,000.00
Jumlah (1)
375,000.00
375,000.00
Tenaga
Pekerja
Tukang Besi
Kepala Tukang
Mandor
1.0500
1.0500
0.1050
0.0052
OH
OH
OH
OH
30,000.00
40,000.00
45,000.00
43,000.00
Jumlah (2)
31,500.00
42,000.00
4,725.00
223.60
78,448.60
453,448.60
1.0000
158,000.00
Jumlah (1)
158,000.00
158,000.00
Tenaga
Pekerja
Tukang Besi
Kepala Tukang
Mandor
0.3500
0.3500
0.0350
0.0180
OH
OH
OH
OH
30,000.00
40,000.00
45,000.00
43,000.00
Jumlah (2)
10,500.00
14,000.00
1,575.00
774.00
26,849.00
184,849.00
Analisa Pekerjaan
61 dari 102
NO
1
K.010
K.011
K.012
K.013
K.014
K.015
KOEF
SAT
HARGA SAT
Rp.
5
JUMLAH
Rp.
6=(3x5)
2
Memasang 1 m Verticals Blind
Bahan
Verticals Blind
1.0000
158,000.00
Jumlah (1)
158,000.00
158,000.00
Tenaga
Pekerja
Tukang Besi
Kepala Tukang
Mandor
0.3500
0.3500
0.0350
0.0180
OH
OH
OH
OH
30,000.00
40,000.00
45,000.00
43,000.00
Jumlah (2)
10,500.00
14,000.00
1,575.00
774.00
26,849.00
184,849.00
11.5000
27.0800
m'
cm
14,000.00
2,721.00
Jumlah (1)
161,000.00
73,684.68
234,684.68
Tenaga
Pekerja
Tukang Las
Kepala Tukang
Mandor
1.6700
1.6700
0.1670
0.0830
OH
OH
OH
OH
30,000.00
40,000.00
45,000.00
43,000.00
Jumlah (2)
50,100.00
66,800.00
7,515.00
3,569.00
127,984.00
362,668.68
1.1000
0.0200
0.0018
m
kg
m
24,000.00
19,500.00
5,800,000.00
Jumlah (1)
26,400.00
390.00
10,440.00
37,230.00
Tenaga
Pekerja
Tukang Kayu
Kepala Tukang
Mandor
0.1000
0.1000
0.0100
0.0005
OH
OH
OH
OH
30,000.00
40,000.00
45,000.00
43,000.00
Jumlah (2)
3,000.00
4,000.00
450.00
21.50
7,471.50
44,701.50
1.1000
1.7160
11.1100
m
kg
cm
448,000.00
14,000.00
2,721.00
Jumlah (1)
492,800.00
24,024.00
30,230.31
547,054.31
Tenaga
Pekerja
Tukang Kayu
Kepala Tukang
Mandor
0.1000
0.1000
0.0100
0.0005
OH
OH
OH
OH
30,000.00
40,000.00
45,000.00
43,000.00
Jumlah (2)
3,000.00
4,000.00
450.00
21.50
7,471.50
554,525.81
1.1000
0.0200
0.0018
m
kg
m
448,000.00
19,500.00
5,800,000.00
Jumlah (1)
492,800.00
390.00
10,440.00
503,630.00
Tenaga
Pekerja
Tukang Kayu
Kepala Tukang
Mandor
0.1000
0.1000
0.0100
0.0005
OH
OH
OH
OH
30,000.00
40,000.00
45,000.00
43,000.00
Jumlah (2)
3,000.00
4,000.00
450.00
21.50
7,471.50
511,101.50
1.1000
0.0200
0.0018
m
kg
m
24,000.00
19,500.00
5,800,000.00
Jumlah (1)
26,400.00
390.00
10,440.00
37,230.00
Tenaga
Pekerja
Tukang Kayu
Kepala Tukang
Mandor
0.1000
0.1000
0.0100
0.0005
OH
OH
OH
OH
30,000.00
40,000.00
45,000.00
43,000.00
Jumlah (2)
3,000.00
4,000.00
450.00
21.50
7,471.50
44,701.50
Analisa Pekerjaan
62 dari 102
NO
1
K.016
K.017
K.018
K.019
K.020
L.
L.001
KOEF
SAT
HARGA SAT
Rp.
5
JUMLAH
Rp.
6=(3x5)
2
Memasang 1 m jendela nako & tralis
Bahan
Jendela Nako
Paku sekrup 1 - 2,5 cm
Besi Strip
1.1000
0.0200
0.0250
lbr
kg
kg
28,000.00
19,500.00
14,000.00
Jumlah (1)
30,800.00
390.00
350.00
31,540.00
Tenaga
Pekerja
Tukang Kayu
Kepala Tukang
Mandor
0.2000
0.2000
0.0200
0.0010
OH
OH
OH
OH
30,000.00
40,000.00
45,000.00
43,000.00
Jumlah (2)
6,000.00
8,000.00
900.00
43.00
14,943.00
46,483.00
0.5000
0.0150
0.0190
lbr
kg
m
59,000.00
19,500.00
4,641,000.00
Jumlah (1)
29,500.00
292.50
88,179.00
117,971.50
Tenaga
Pekerja
Tukang Kayu
Kepala Tukang
Mandor
0.2000
0.4000
0.0250
0.0100
OH
OH
OH
OH
30,000.00
40,000.00
45,000.00
43,000.00
Jumlah (2)
6,000.00
16,000.00
1,125.00
430.00
23,555.00
141,526.50
0.5000
0.0150
0.0190
0.3000
lbr
kg
m
kg
59,000.00
19,500.00
4,641,000.00
23,000.00
Jumlah (1)
29,500.00
292.50
88,179.00
6,900.00
124,871.50
Tenaga
Pekerja
Tukang Kayu
Kepala Tukang
Mandor
0.1500
0.4000
0.0250
0.0013
OH
OH
OH
OH
30,000.00
40,000.00
45,000.00
43,000.00
Jumlah (2)
4,500.00
16,000.00
1,125.00
53.75
21,678.75
146,550.25
lbr
kg
kg
59,000.00
19,500.00
14,000.00
Jumlah (1)
17,700.00
1,950.00
7,000.00
26,650.00
Tenaga
Pekerja
Tukang Kayu
Kepala Tukang
Mandor
0.1500
0.2500
0.0250
0.0013
OH
OH
OH
OH
30,000.00
40,000.00
45,000.00
43,000.00
Jumlah (2)
4,500.00
10,000.00
1,125.00
53.75
15,678.75
42,328.75
lbr
kg
kg
59,000.00
19,500.00
14,000.00
Jumlah (1)
61,950.00
195.00
7,000.00
69,145.00
Tenaga
Pekerja
Tukang Kayu
Kepala Tukang
Mandor
0.1500
0.2500
0.0250
0.0013
OH
OH
OH
OH
30,000.00
40,000.00
45,000.00
43,000.00
Jumlah (2)
4,500.00
10,000.00
1,125.00
53.75
15,678.75
84,823.75
1.0000
bh
249,000.00
Jumlah (1)
249,000.00
249,000.00
Tenaga
Pekerja
Tukang Kayu
Kepala Tukang
Mandor
0.0600
0.6000
0.0600
0.0030
OH
OH
OH
OH
30,000.00
40,000.00
45,000.00
43,000.00
Jumlah (2)
1,800.00
24,000.00
2,700.00
129.00
28,629.00
277,629.00
Analisa Pekerjaan
63 dari 102
NO
1
L.002
L.003
L.004
L.005
L.006
L.007
L.008
KOEF
SAT
HARGA SAT
Rp.
5
JUMLAH
Rp.
6=(3x5)
2
Memasang 1 buah kunci tanam biasa
Bahan
Kunci Tanam Biasa
1.0000
bh
110,000.00
Jumlah (1)
110,000.00
110,000.00
Tenaga
Pekerja
Tukang Kayu
Kepala Tukang
Mandor
0.0100
0.5000
0.0100
0.0050
OH
OH
OH
OH
30,000.00
40,000.00
45,000.00
43,000.00
Jumlah (2)
300.00
20,000.00
450.00
215.00
20,965.00
130,965.00
1.0000
bh
110,000.00
Jumlah (1)
110,000.00
110,000.00
Tenaga
Pekerja
Tukang Kayu
Kepala Tukang
Mandor
0.0050
0.5000
0.0050
0.0025
OH
OH
OH
OH
30,000.00
40,000.00
45,000.00
43,000.00
Jumlah (2)
150.00
20,000.00
225.00
107.50
20,482.50
130,482.50
1.0000
bh
14,000.00
Jumlah (1)
14,000.00
14,000.00
Tenaga
Pekerja
Tukang Kayu
Kepala Tukang
Mandor
0.0150
0.1500
0.0150
0.0008
OH
OH
OH
OH
30,000.00
40,000.00
45,000.00
43,000.00
Jumlah (2)
450.00
6,000.00
675.00
32.25
7,157.25
21,157.25
1.0000
bh
12,000.00
Jumlah (1)
12,000.00
12,000.00
Tenaga
Pekerja
Tukang Kayu
Kepala Tukang
Mandor
0.0100
0.1000
0.0100
0.0005
OH
OH
OH
OH
30,000.00
40,000.00
45,000.00
43,000.00
Jumlah (2)
300.00
4,000.00
450.00
21.50
4,771.50
16,771.50
1.0000
bh
16,000.00
Jumlah (1)
16,000.00
16,000.00
Tenaga
Pekerja
Tukang Kayu
Kepala Tukang
Mandor
0.0150
0.1500
0.0150
0.0008
OH
OH
OH
OH
30,000.00
40,000.00
45,000.00
43,000.00
Jumlah (2)
450.00
6,000.00
675.00
32.25
7,157.25
23,157.25
1.0000
bh
9,000.00
Jumlah (1)
9,000.00
9,000.00
Tenaga
Pekerja
Tukang Kayu
Kepala Tukang
Mandor
0.0200
0.2000
0.0200
0.0010
OH
OH
OH
OH
30,000.00
40,000.00
45,000.00
43,000.00
Jumlah (2)
600.00
8,000.00
900.00
43.00
9,543.00
18,543.00
1.0000
bh
24,000.00
Jumlah (1)
24,000.00
24,000.00
Tenaga
Pekerja
Tukang Kayu
Kepala Tukang
Mandor
0.0500
0.5000
0.0500
0.0025
OH
OH
OH
OH
30,000.00
40,000.00
45,000.00
43,000.00
Jumlah (2)
1,500.00
20,000.00
2,250.00
107.50
23,857.50
47,857.50
Analisa Pekerjaan
64 dari 102
NO
1
L.009
L.010
L.011
M.
M.001
M.002
M.003
KOEF
SAT
HARGA SAT
Rp.
5
JUMLAH
Rp.
6=(3x5)
2
Memasang 1 buah rel pintu dorong
Bahan
Rel Pintu Dorong
1.0000
bh
332,000.00
Jumlah (1)
332,000.00
332,000.00
Tenaga
Pekerja
Tukang Kayu
Kepala Tukang
Mandor
0.0600
0.6000
0.0600
0.0030
OH
OH
OH
OH
30,000.00
40,000.00
45,000.00
43,000.00
Jumlah (2)
1,800.00
24,000.00
2,700.00
129.00
28,629.00
360,629.00
1.1000
69,000.00
Jumlah (1)
75,900.00
75,900.00
Tenaga
Pekerja
Tukang Kayu
Kepala Tukang
Mandor
0.0150
0.1500
0.0150
0.0008
OH
OH
OH
OH
30,000.00
40,000.00
45,000.00
43,000.00
Jumlah (2)
450.00
6,000.00
675.00
32.25
7,157.25
83,057.25
1.1000
83,000.00
Jumlah (1)
91,300.00
91,300.00
Tenaga
Pekerja
Tukang Kayu
Kepala Tukang
Mandor
0.0150
0.1500
0.0150
0.0008
OH
OH
OH
OH
30,000.00
40,000.00
45,000.00
43,000.00
Jumlah (2)
450.00
6,000.00
675.00
32.25
7,157.25
98,457.25
SNI-Pt-T2000-C
bh
kg
m
3,000.00
1,350.00
121,000.00
Jumlah (1)
35,610.00
13,500.00
5,445.00
54,555.00
Tenaga
Pekerja
Tukang Batu
Kepala Tukang
Mandor
0.2600
0.1250
0.0125
0.0130
OH
OH
OH
OH
30,000.00
40,000.00
45,000.00
43,000.00
Jumlah (2)
7,800.00
5,000.00
562.50
559.00
13,921.50
68,476.50
bh
kg
m
2,000.00
1,350.00
121,000.00
Jumlah (1)
53,000.00
14,040.00
5,445.00
72,485.00
Tenaga
Pekerja
Tukang Batu
Kepala Tukang
Mandor
0.2700
0.1300
0.0130
0.0135
OH
OH
OH
OH
30,000.00
40,000.00
45,000.00
43,000.00
Jumlah (2)
8,100.00
5,200.00
585.00
580.50
14,465.50
86,950.50
6.6300
9.8000
1.3000
0.0450
bh
kg
kg
m
17,400.00
1,350.00
3,000.00
121,000.00
Jumlah (1)
115,362.00
13,230.00
3,900.00
5,445.00
137,937.00
Tenaga
Pekerja
Tukang Batu
Kepala Tukang
Mandor
0.2500
0.1200
0.0120
0.0125
OH
OH
OH
OH
30,000.00
40,000.00
45,000.00
43,000.00
Jumlah (2)
7,500.00
4,800.00
540.00
537.50
13,377.50
151,314.50
Analisa Pekerjaan
65 dari 102
NO
1
M.004
2
Memasang 1 m lantai ubin granito ukuran 30 x 30 cm
Bahan
Ubin Granito 30 x 30 cm
Portland Cement (PC)
Semen Warna
Pasir Pasang
M.006
M.008
HARGA SAT
Rp.
5
JUMLAH
Rp.
6=(3x5)
bh
kg
kg
m
10,400.00
1,350.00
3,000.00
121,000.00
Jumlah (1)
123,448.00
13,500.00
4,500.00
5,445.00
146,893.00
0.2600
0.1250
0.0125
0.0130
OH
OH
OH
OH
30,000.00
40,000.00
45,000.00
43,000.00
Jumlah (2)
7,800.00
5,000.00
562.50
559.00
13,921.50
160,814.50
bh
kg
m
kg
9,750.00
1,350.00
121,000.00
3,000.00
Jumlah (1)
516,750.00
11,056.50
5,445.00
8,250.00
541,501.50
Tenaga
Pekerja
Tukang Batu
Kepala Tukang
Mandor
OH
OH
OH
OH
30,000.00
40,000.00
45,000.00
43,000.00
Jumlah (2)
18,600.00
14,000.00
1,575.00
1,290.00
35,465.00
576,966.50
16,250.00
1,350.00
121,000.00
3,000.00
Jumlah (1)
1,722,500.00
11,056.50
5,445.00
9,600.00
1,748,601.50
0.6200
0.3500
0.0350
0.0300
M.007
SAT
11.8700
10.0000
1.5000
0.0450
Tenaga
Pekerja
Tukang Batu
Kepala Tukang
Mandor
M.005
KOEF
0.6200
0.3500
0.0350
0.0300
OH
OH
OH
OH
30,000.00
40,000.00
45,000.00
43,000.00
Jumlah (2)
18,600.00
14,000.00
1,575.00
1,290.00
35,465.00
1,784,066.50
1.0000
10.0000
0.0450
1.5000
m
kg
m
kg
47,000.00
1,350.00
121,000.00
3,000.00
Jumlah (1)
47,000.00
13,500.00
5,445.00
4,500.00
70,445.00
Tenaga
Pekerja
Tukang Batu
Kepala Tukang
Mandor
0.6200
0.3500
0.0350
0.0300
OH
OH
OH
OH
30,000.00
40,000.00
45,000.00
43,000.00
Jumlah (2)
18,600.00
14,000.00
1,575.00
1,290.00
35,465.00
105,910.00
5.3000
1.1400
0.0030
0.0250
bh
kg
m
kg
9,750.00
1,350.00
121,000.00
3,000.00
Jumlah (1)
51,675.00
1,539.00
363.00
75.00
53,652.00
Tenaga
Pekerja
Tukang Batu
Kepala Tukang
Mandor
0.0900
0.0900
0.0090
0.0050
OH
OH
OH
OH
30,000.00
40,000.00
45,000.00
43,000.00
Jumlah (2)
2,700.00
3,600.00
405.00
215.00
6,920.00
60,572.00
Analisa Pekerjaan
66 dari 102
NO
1
M.009
M.010
M.011
M.012
SAT
HARGA SAT
Rp.
5
JUMLAH
Rp.
6=(3x5)
2
Memasang 1 m lantai marmer ukuran 100 x 100 cm
Bahan
Marmer
Portland Cement (PC)
Pasir Pasang
Semen Warna
1.0600
8.1900
0.0450
0.6500
m
kg
m
kg
390,000.00
1,350.00
121,000.00
3,000.00
Jumlah (1)
413,400.00
11,056.50
5,445.00
1,950.00
431,851.50
Tenaga
Pekerja
Tukang Batu
Kepala Tukang
Mandor
0.6200
0.3500
0.0350
0.0300
OH
OH
OH
OH
30,000.00
40,000.00
45,000.00
43,000.00
Jumlah (2)
18,600.00
14,000.00
1,575.00
1,290.00
35,465.00
467,316.50
bh
kg
m
kg
9,750.00
1,350.00
121,000.00
3,000.00
Jumlah (1)
516,750.00
12,555.00
2,178.00
8,250.00
539,733.00
Tenaga
Pekerja
Tukang Batu
Kepala Tukang
Mandor
0.6000
0.4500
0.0450
0.0300
OH
OH
OH
OH
30,000.00
40,000.00
45,000.00
43,000.00
Jumlah (2)
18,000.00
18,000.00
2,025.00
1,290.00
39,315.00
579,048.00
1.0000
9.3000
0.0180
1.9400
m
kg
m
kg
64,000.00
1,350.00
121,000.00
3,000.00
Jumlah (1)
64,000.00
12,555.00
2,178.00
5,820.00
84,553.00
Tenaga
Pekerja
Tukang Batu
Kepala Tukang
Mandor
0.6000
0.4500
0.0450
0.0300
OH
OH
OH
OH
30,000.00
40,000.00
45,000.00
43,000.00
Jumlah (2)
18,000.00
18,000.00
2,025.00
1,290.00
39,315.00
123,868.00
1.1000
11.7500
0.0350
m
kg
m
78,000.00
1,350.00
121,000.00
Jumlah (1)
85,800.00
15,862.50
4,235.00
105,897.50
0.6200
0.3500
0.0350
0.0300
OH
OH
OH
OH
30,000.00
40,000.00
45,000.00
43,000.00
Jumlah (2)
18,600.00
14,000.00
1,575.00
1,290.00
35,465.00
141,362.50
1.1000
11.7500
0.0350
m
kg
m
45,500.00
1,350.00
121,000.00
Jumlah (1)
50,050.00
15,862.50
4,235.00
70,147.50
0.6200
0.3500
0.0350
0.0300
OH
OH
OH
OH
30,000.00
40,000.00
45,000.00
43,000.00
Jumlah (2)
18,600.00
14,000.00
1,575.00
1,290.00
35,465.00
105,612.50
M.013
KOEF
Analisa Pekerjaan
67 dari 102
NO
1
M.014
M.015
M.016
M.017
M.018
KOEF
SAT
HARGA SAT
Rp.
5
JUMLAH
Rp.
6=(3x5)
2
Memasang 1 m' plint kayu kelas II ukuran 2 x 10 cm
Bahan
Papan Kayu Bengkirai
Paku Sekrup 5 cm
0.0030
0.0500
m
kg
7,296,000.00
19,500.00
Jumlah (1)
21,888.00
975.00
22,863.00
Tenaga
Pekerja
Tukang Kayu
Kepala Tukang
Mandor
0.1200
0.1200
0.0120
0.0060
OH
OH
OH
OH
30,000.00
40,000.00
45,000.00
43,000.00
Jumlah (2)
3,600.00
4,800.00
540.00
258.00
9,198.00
32,061.00
1.0000
9.8000
0.0450
1.3000
m
kg
m
kg
70,000.00
1,350.00
121,000.00
3,000.00
Jumlah (1)
70,000.00
13,230.00
5,445.00
3,900.00
92,575.00
Tenaga
Pekerja
Tukang Batu
Kepala Tukang
Mandor
0.2500
0.1200
0.0120
0.0130
OH
OH
OH
OH
30,000.00
40,000.00
45,000.00
43,000.00
Jumlah (2)
7,500.00
4,800.00
540.00
559.00
13,399.00
105,974.00
1.0000
9.6000
0.0450
1.3000
m
kg
m
kg
128,000.00
1,350.00
121,000.00
3,000.00
Jumlah (1)
128,000.00
12,960.00
5,445.00
3,900.00
150,305.00
Tenaga
Pekerja
Tukang Batu
Kepala Tukang
Mandor
0.2500
0.1200
0.0120
0.0130
OH
OH
OH
OH
30,000.00
40,000.00
45,000.00
43,000.00
Jumlah (2)
7,500.00
4,800.00
540.00
559.00
13,399.00
163,704.00
Analisa Pekerjaan
68 dari 102
NO
1
M.019
M.020
M.021
N.
N.001
N.002
HARGA SAT
JUMLAH
Rp.
Rp.
2
3
4
5
6=(3x5)
Memasang 1 m dinding keramik granit tile; tebal 2 cm memakai perekat keramik LEMKRA (BOW)
Bahan
Ubin Granito 30 x 30 cm
11.8700
bh
10,400.00
123,448.00
Lemkra FK 111
6.0000
kg
6,720.00
40,320.00
Lemkra FS 202
0.1429
kg
10,000.00
1,429.00
Lemkra TG 301
0.1000
ltr
23,000.00
2,300.00
Jumlah (1)
167,497.00
Tenaga
Pekerja
0.3000
OH
30,000.00
9,000.00
Tukang Batu
0.2000
OH
40,000.00
8,000.00
Kepala Tukang
0.0200
OH
45,000.00
900.00
Mandor
0.0150
OH
43,000.00
645.00
Jumlah (2)
18,545.00
Jumlah (1) + (2)
186,042.00
Memasang 1 m lantai keramik ukuran 40 x 40 cm memakai perekat keramik LEMKRA (BOW)
Bahan
m
Ubin Keramik Motif 40 x 40 cm
1.0000
70,000.00
70,000.00
Lemkra Just Do It!
6.0000
kg
3,553.33
21,320.00
Lemkra FS 211
0.1429
kg
10,000.00
1,429.00
Lemkra TG 301
0.1000
ltr
23,000.00
2,300.00
Jumlah (1)
95,049.00
Tenaga
Pekerja
0.2500
OH
30,000.00
7,500.00
Tukang Batu
0.1750
OH
40,000.00
7,000.00
Kepala Tukang
0.0500
OH
45,000.00
2,250.00
Mandor
0.0250
OH
43,000.00
1,075.00
Jumlah (2)
17,825.00
Jumlah (1) + (2)
112,874.00
Memasang 1 m lantai keramik ukuran 30 x 30 cm memakai perekat keramik LEMKRA (BOW)
Bahan
m
Ubin Keramik 30 x 30 cm
1.0000
47,000.00
47,000.00
Lemkra FK 101
6.0000
kg
5,140.00
30,840.00
Lemkra FS 211
0.1429
kg
10,000.00
1,429.00
Lemkra TG 301
0.1000
ltr
23,000.00
2,300.00
Jumlah (1)
81,569.00
Tenaga
Pekerja
0.6200
OH
30,000.00
18,600.00
Tukang Batu
0.3500
OH
40,000.00
14,000.00
Kepala Tukang
0.0350
OH
45,000.00
1,575.00
Mandor
0.0300
OH
43,000.00
1,290.00
Jumlah (2)
35,465.00
Jumlah (1) + (2)
117,034.00
SNI
PEKERJAAN PENGECATAN
Mendempul dan Menggosok 1 m kayu
Bahan
Dempul Jadi
0.0800
kg
34,000.00
2,720.00
Minyak Cat
0.0200
kg
13,000.00
260.00
Batu Apung
0.0100
kg
16,000.00
160.00
Jumlah (1)
3,140.00
Tenaga
Pekerja
0.0400
OH
30,000.00
1,200.00
Tukang Cat
0.0400
OH
40,000.00
1,600.00
Kepala Tukang
0.0040
OH
45,000.00
180.00
Mandor
0.0025
OH
43,000.00
107.50
Jumlah (2)
3,087.50
Jumlah (1) + (2)
6,227.50
Mengecat 1 m bidang kayu lama
Bahan
Plamir
0.1500
kg
15,000.00
2,250.00
Cat Dasar
0.1700
kg
34,000.00
5,780.00
Cat Penutup
0.1700
kg
49,000.00
8,330.00
Jumlah (1)
16,360.00
Tenaga
Pekerja
0.0700
OH
30,000.00
2,100.00
Tukang Cat
0.0750
OH
40,000.00
3,000.00
Kepala Tukang
0.0075
OH
45,000.00
337.50
Mandor
0.0025
OH
43,000.00
107.50
Jumlah (2)
5,545.00
Jumlah (1) + (2)
21,905.00
Analisa Pekerjaan
KOEF
SAT
69 dari 102
NO
1
N.003
N.004
N.005
N.006
N.007
N.008
HARGA SAT
Rp.
2
3
4
5
Mengecat 1 m bidang kayu baru (1 lps plamir, 1 lps cat dsr, 2 lps cat penutup)
Bahan
Cat Meni
0.2000
kg
34,000.00
Plamir
0.1500
kg
15,000.00
Cat Dasar
0.1700
kg
34,000.00
Cat Penutup
0.2600
kg
49,000.00
Jumlah (1)
Tenaga
Pekerja
0.0700
OH
30,000.00
Tukang Cat
0.0090
OH
40,000.00
Kepala Tukang
0.0060
OH
45,000.00
Mandor
0.0025
OH
43,000.00
Jumlah (2)
Jumlah (1) + (2)
Mengecat 1 m bidang kayu baru (1 lps plamir, 1 lps cat dsr, 3 lps cat penutup)
Bahan
Cat Meni
0.2000
kg
34,000.00
Plamir
0.1500
kg
15,000.00
Cat Dasar
0.1700
kg
34,000.00
Cat Penutup
0.3500
kg
49,000.00
Jumlah (1)
Tenaga
Pekerja
0.0700
OH
30,000.00
Tukang Cat
0.1050
OH
40,000.00
Kepala Tukang
0.0040
OH
45,000.00
Mandor
0.0025
OH
43,000.00
Jumlah (2)
Jumlah (1) + (2)
Melabur 1 m bidang kayu dengan politur
Bahan
Politur
0.2000
kg
35,000.00
Politur Jadi
0.1500
kg
35,000.00
Ampelas
2.0000
lbr
4,000.00
Jumlah (1)
Tenaga
Tukang Cat
0.0600
OH
40,000.00
Kepala Tukang
0.0160
OH
45,000.00
Mandor
0.0025
OH
43,000.00
Jumlah (2)
Jumlah (1) + (2)
Melabur 1 m bidang kayu dengan cat residu
Bahan
Residu
0.3500
ltr
5,000.00
Jumlah (1)
Tenaga
Pekerja
0.1000
OH
30,000.00
Tukang Cat
0.0000
OH
40,000.00
Kepala Tukang
0.0000
OH
45,000.00
Mandor
0.0060
OH
43,000.00
Jumlah (2)
Jumlah (1) + (2)
Melabur 1 m bidang kayu dengan vernis
Bahan
Vernis
0.1500
ltr
149,000.00
Dempul
0.0500
kg
34,000.00
Ampelas
0.1000
lbr
4,000.00
Kuas
0.0100
bh
11,000.00
Jumlah (1)
Tenaga
Pekerja
0.1600
OH
30,000.00
Tukang Cat
0.1600
OH
40,000.00
Kepala Tukang
0.0160
OH
45,000.00
Mandor
0.0025
OH
43,000.00
Jumlah (2)
Jumlah (1) + (2)
Mengecat 1 m bidang tembok baru (1 lps plamir, 1 lps cat dsr, 2 lps cat penutup)
Bahan
Plamir
0.1000
kg
16,000.00
Cat Dasar
0.1000
kg
26,000.00
Cat Penutup
0.2600
kg
26,000.00
Jumlah (1)
Tenaga
Pekerja
0.0200
OH
30,000.00
Tukang Cat
0.0630
OH
40,000.00
Kepala Tukang
0.0063
OH
45,000.00
Mandor
0.0025
OH
43,000.00
Jumlah (2)
Jumlah (1) + (2)
Analisa Pekerjaan
KOEF
SAT
JUMLAH
Rp.
6=(3x5)
6,800.00
2,250.00
5,780.00
12,740.00
27,570.00
2,100.00
360.00
270.00
107.50
2,837.50
30,407.50
6,800.00
2,250.00
5,780.00
17,150.00
31,980.00
2,100.00
4,200.00
180.00
107.50
6,587.50
38,567.50
7,000.00
5,250.00
8,000.00
20,250.00
2,400.00
720.00
107.50
3,227.50
23,477.50
1,750.00
1,750.00
3,000.00
258.00
3,258.00
5,008.00
22,350.00
1,700.00
400.00
110.00
24,560.00
4,800.00
6,400.00
720.00
107.50
12,027.50
36,587.50
1,600.00
2,600.00
6,760.00
10,960.00
600.00
2,520.00
283.50
107.50
3,511.00
14,471.00
70 dari 102
NO
1
N.009
N.010
N.011
O.
O.001
O.002
O.003
KOEF
SAT
2
3
4
Mengecat 1 m bidang tembok lama (1 lps cat dsr, 2 lps cat penutup)
Bahan
Cat Dasar
0.1200
kg
Cat Penutup
0.1800
kg
HARGA SAT
Rp.
5
JUMLAH
Rp.
6=(3x5)
26,000.00
26,000.00
Jumlah (1)
3,120.00
4,680.00
7,800.00
Tenaga
Pekerja
Tukang Cat
Kepala Tukang
Mandor
0.0280
0.0420
0.0042
0.0025
OH
OH
OH
OH
30,000.00
40,000.00
45,000.00
43,000.00
Jumlah (2)
840.00
1,680.00
189.00
107.50
2,816.50
10,616.50
0.1000
0.0100
kg
bh
35,000.00
11,000.00
Jumlah (1)
3,500.00
110.00
3,610.00
Tenaga
Pekerja
Tukang Cat
Kepala Tukang
Mandor
0.0200
0.2000
0.0200
0.0100
OH
OH
OH
OH
30,000.00
40,000.00
45,000.00
43,000.00
Jumlah (2)
600.00
8,000.00
900.00
430.00
9,930.00
13,540.00
kg
bh
m
35,000.00
11,000.00
5,635,000.00
Jumlah (1)
3,500.00
110.00
11,270.00
14,880.00
Tenaga
Pekerja
Tukang Cat
Kepala Tukang
Mandor
0.2500
0.2250
0.0225
0.0075
OH
OH
OH
OH
30,000.00
40,000.00
45,000.00
43,000.00
Jumlah (2)
7,500.00
9,000.00
1,012.50
322.50
17,835.00
32,715.00
HSPK
m
m
53,000.00
86,000.00
Jumlah (1)
53,530.00
8,600.00
62,130.00
Tenaga
Pekerja
Tukang Batu
Kepala Tukang
Mandor
0.2500
0.5000
0.0500
0.0250
OH
OH
OH
OH
30,000.00
40,000.00
45,000.00
43,000.00
Jumlah (2)
7,500.00
20,000.00
2,250.00
1,075.00
30,825.00
92,955.00
m
m
62,000.00
86,000.00
Jumlah (1)
62,620.00
8,600.00
71,220.00
Tenaga
Pekerja
Tukang Batu
Kepala Tukang
Mandor
0.2500
0.5000
0.0500
0.0250
OH
OH
OH
OH
30,000.00
40,000.00
45,000.00
43,000.00
Jumlah (2)
7,500.00
20,000.00
2,250.00
1,075.00
30,825.00
102,045.00
m
m
53,000.00
86,000.00
Jumlah (1)
53,530.00
8,600.00
62,130.00
Tenaga
Pekerja
Tukang Batu
Kepala Tukang
Mandor
OH
OH
OH
OH
30,000.00
40,000.00
45,000.00
43,000.00
Jumlah (2)
7,500.00
20,000.00
2,250.00
1,075.00
30,825.00
92,955.00
Analisa Pekerjaan
0.2500
0.5000
0.0500
0.0250
71 dari 102
NO
1
O.004
O.005
O.006
O.007
KOEF
O.009
O.010
JUMLAH
Rp.
6=(3x5)
m
m
62,000.00
86,000.00
Jumlah (1)
62,620.00
8,600.00
71,220.00
Tenaga
Pekerja
Tukang Batu
Kepala Tukang
Mandor
0.2500
0.5000
0.0500
0.0250
OH
OH
OH
OH
30,000.00
40,000.00
45,000.00
43,000.00
Jumlah (2)
7,500.00
20,000.00
2,250.00
1,075.00
30,825.00
102,045.00
m
m
66,000.00
86,000.00
Jumlah (1)
66,660.00
8,600.00
75,260.00
Tenaga
Pekerja
Tukang Batu
Kepala Tukang
Mandor
0.2500
0.5000
0.0500
0.0250
OH
OH
OH
OH
30,000.00
40,000.00
45,000.00
43,000.00
Jumlah (2)
7,500.00
20,000.00
2,250.00
1,075.00
30,825.00
106,085.00
m
m
66,000.00
86,000.00
Jumlah (1)
66,660.00
8,600.00
75,260.00
Tenaga
Pekerja
Tukang Batu
Kepala Tukang
Mandor
OH
OH
OH
OH
30,000.00
40,000.00
45,000.00
43,000.00
Jumlah (2)
7,500.00
20,000.00
2,250.00
1,075.00
30,825.00
106,085.00
83,850.00
86,000.00
Jumlah (1)
84,688.50
8,600.00
93,288.50
30,000.00
40,000.00
45,000.00
43,000.00
Jumlah (2)
7,500.00
20,000.00
2,250.00
1,075.00
30,825.00
124,113.50
0.2500
0.5000
0.0500
0.0250
HARGA SAT
Rp.
5
2
3
Memasang 1 m paving block warna segi enam; tebal 6 cm
Bahan
Paving Segi Enam Warna; tebal 6 cm
1.0100
Pasir Urug
0.1000
O.008
SAT
0.2500
0.5000
0.0500
0.0250
OH
OH
OH
OH
Analisa Pekerjaan
80,093.00
8,600.00
88,693.00
7,500.00
20,000.00
2,250.00
1,075.00
30,825.00
119,518.00
282.90
113.46
22,950.00
10,000.00
33,346.36
282.90
88.08
38,410.00
10,000.00
48,780.98
72 dari 102
NO
1
O.011
O.012
O.013
O.014
O.015
O.016
O.017
KOEF
SAT
HARGA SAT
Rp.
5
JUMLAH
Rp.
6=(3x5)
2
Memasang 1 m lapis onderlaag batu belah tebal 20 cm
Bahan
Pasir Pasang
Batu Belah + Batu Kancing/Tepi
0.1500
0.2500
m
m
121,000.00
121,000.00
Jumlah (1)
18,150.00
30,250.00
48,400.00
Tenaga
Pekerja
Mandor
Peralatan (Sewa Wales) = 1/75000 (W4)
0.2000
0.0200
0.0001
OH
OH
lot
30,000.00
43,000.00
4,590,000.00
Jumlah (2)
6,000.00
860.00
612.00
7,472.00
55,872.00
0.1500
0.2000
m
m
121,000.00
121,000.00
Jumlah (1)
18,150.00
24,200.00
42,350.00
Tenaga
Pekerja
Mandor
Peralatan (Sewa Wales) = 1/75000 (W4)
0.2000
0.0200
0.0001
OH
OH
lot
30,000.00
43,000.00
4,590,000.00
Jumlah (2)
6,000.00
860.00
612.00
7,472.00
49,822.00
125,000.00
Jumlah (1)
7,500.00
7,500.00
Tenaga
Pekerja
Mandor
Peralatan (Sewa Wales) = 1/75000 (W4)
OH
OH
lot
30,000.00
43,000.00
4,590,000.00
Jumlah (2)
4,500.00
645.00
1,224.00
6,369.00
13,869.00
234,000.00
Jumlah (1)
11,232.00
11,232.00
Tenaga
Pekerja
Mandor
Peralatan (Sewa Wales) = 1/75000 (W4)
0.1500
0.0150
0.0003
OH
OH
lot
30,000.00
43,000.00
4,590,000.00
Jumlah (2)
4,500.00
645.00
1,224.00
6,369.00
17,601.00
0.0120
0.0100
m
m
234,000.00
121,000.00
Jumlah (1)
2,808.00
1,210.00
4,018.00
Tenaga
Pekerja
Mandor
Peralatan (Sewa Wales) = 1/75000 (W4)
0.1000
0.0100
0.0003
OH
OH
lot
30,000.00
43,000.00
4,590,000.00
Jumlah (2)
3,000.00
430.00
1,224.00
4,654.00
8,672.00
0.0050
4.0000
0.0300
m
kg
m
227,500.00
7,400.00
120,900.00
Jumlah (1)
1,137.50
29,600.00
3,627.00
34,364.50
Tenaga
Pekerja
Mandor
Peralatan (Sewa Wales) = 1/75000 (W4)
0.1500
0.0150
0.0000
OH
OH
lot
30,000.00
43,000.00
4,590,000.00
Jumlah (2)
4,500.00
645.00
61.20
5,206.20
39,570.70
0.0050
1.5000
0.0300
m
kg
m
227,500.00
7,400.00
120,900.00
Jumlah (1)
1,137.50
11,100.00
3,627.00
15,864.50
Tenaga
Pekerja
Mandor
Peralatan (Sewa Wales) = 1/75000 (W4)
0.1500
0.0150
0.0000
OH
OH
lot
30,000.00
43,000.00
4,590,000.00
Jumlah (2)
4,500.00
645.00
61.20
5,206.20
21,070.70
Analisa Pekerjaan
0.1500
0.0150
0.0003
73 dari 102
NO
1
O.018
KOEF
2
3
4
Mengerjakan 1 m pengaspalan hotmix tangan (sandsheet) tebal 3 cm
Bahan
Abu Batu
0.0350
m
Aspal Drum
5.0000
kg
Kayu Bakar
0.0800
m
Tenaga
Pekerja
Mandor
Peralatan (Sewa Wales) = 1/75000 (W4)
O.019
O.020
O.021
O.022
O.023
SAT
0.2000
0.0200
0.0000
OH
OH
lot
HARGA SAT
Rp.
5
JUMLAH
Rp.
6=(3x5)
227,500.00
7,400.00
120,900.00
Jumlah (1)
7,962.50
37,000.00
9,672.00
54,634.50
30,000.00
43,000.00
4,590,000.00
Jumlah (2)
6,000.00
860.00
61.20
6,921.20
61,555.70
227,500.00
7,400.00
120,900.00
Jumlah (1)
5,300.75
24,666.66
4,642.56
34,609.97
Tenaga
Pekerja
Mandor
Peralatan (Sewa Wales) = 1/75000 (W4)
0.2000
0.0200
0.0000
OH
OH
lot
30,000.00
43,000.00
4,590,000.00
Jumlah (2)
6,000.00
860.00
61.20
6,921.20
41,531.17
0.1110
ton
716,000.00
Jumlah (1)
79,476.00
79,476.00
Tenaga
Pekerja
Mandor
0.1000
0.0100
OH
OH
30,000.00
43,000.00
Jumlah (2)
3,000.00
430.00
3,430.00
82,906.00
m
m
m
m
13,869.00
17,601.00
8,672.00
39,570.70
13,869.00
17,601.00
8,672.00
39,570.70
79,712.70
m
bh
m
ls
23,575.00
70,500.00
103,220.10
7,500.00
3,536.25
70,500.00
103,220.10
1,125.00
178,381.35
m
bh
m
ls
23,575.00
102,000.00
103,220.10
7,500.00
3,536.25
102,000.00
103,220.10
1,125.00
209,881.35
Analisa Pekerjaan
Mengetahui,
Kepala Dinas Pekerjaan Umum
Kabupaten Brebes
Ir. KUSTIYANTO
NIP. 500 082 955
74 dari 102
URAIAN
PONDASI PLAT BETON (U-24 = 230 KG/M3) K-225 SITE MIX BEGISTING PAPAN
PONDASI PLAT BETON (U-24 = 200 KG/M3) K-225 SITE MIX BEGISTING PAPAN
PONDASI PLAT BETON (U-24 = 150 KG/M3) K-225 SITE MIX BEGISTING PAPAN
KOLOM 30 x 30 (U-39 = 300KG/M3) K-300 READY MIX BEGISTING MULTI 12 MM
KOLOM 30 x 30 (U-39 = 300KG/M3) K-300 SITE MIX BEGISTING MULTI 12 MM
KOLOM 30 x 30 (U-39 = 225KG/M3) K-300 READY MIX BEGISTING MULTI 12 MM
KOLOM 30 x 30 (U-39 = 225KG/M3) K-300 SITE MIX BEGISTING MULTI 12 MM
KOLOM 30 x 30 (U-39 = 200KG/M3) K-300 READY MIX BEGISTING MULTI 12 MM
KOLOM 30 x 30 (U-39 = 200KG/M3) K-300 SITE MIX BEGISTING MULTI 12 MM
KOLOM 30 x 30 (U-24 =138KG/M3) K-225 READY MIX BEGISTING MULTI 12 MM
KOLOM 30 x 30 (U-24 = 138KG/M3) K-225 SITE MIX BEGISTING MULTI 12 MM
KOLOM 25 x 30 (U-24 = 140KG/M3) K-225 READY MIX BEGISTING MULTI 12MM
KOLOM 25 x 30 (U-24 = 140KG/M3) K-225 SITE MIX BEGISTING MULTI 12MM
KOLOM 15 x 25 (U-24 = 140KG/M3 U-24) K-225 SITE MIX BEGISTING MULTI 12 MM
KOLOM 15 x 25 (U-24 = 140KG/M3) K-225 SITE MIX BEGISTING PAPAN
KOLOM 15 x 25 (U-24 = 140KG/M3) K-175 SITE MIX BEGISTING MULTI 12 MM
KOLOM 15 x 25 (U-24 = 140KG/M3) K-175 SITE MIX BEGISTING PAPAN
KOLOM 20 x 20 (U-24 = 131KG/M3) K-225 READY MIX BEGISTING PAPAN
KOLOM 20 x 20 (U-24 = 131KG/M3) K-175 SITE MIX BEGISTING PAPAN
KOLOM 15 x 20 (U-24 = 167KG/M3) K-225 READY MIX BEGISTING PAPAN
KOLOM 15 x 20 (U-24 = 167KG/M3) K-175 SITE MIX BEGISTING PAPAN
KOLOM 15 x 15 (U-24 = 232KG/M3) K-175 READY MIX BEGISTING PAPAN
KOLOM 15 x 15 (U-24 = 232KG/M3) K-175 SITE MIX BEGISTING PAPAN
KOLOM 12 x 12 (U-24 = 205KG/M3) K-175 READY MIX BEGISTING PAPAN
KOLOM 12 x 12 (U-24 = 205KG/M3) K-175 SITE MIX BEGISTING PAPAN
KOLOM 12 x 12 (U-24 = 340KG/M3) K-175 SITE MIX BEGISTING PAPAN
KOLOM 12 x 12 (U-24 = 340KG/M3) K-175 SITE MIX BEGISTING PAPAN
KOLOM SUDUT 15 x 25 (U-24 = 250KG/M3) K-175 READY MIX BEGISTING PAPAN
KOLOM SUDUT 15 x 25 (U-24 = 250KG/M3) K-175 SITE MIX BEGISTING PAPAN
BALOK 30 x 50 (U-24 = 230KG/M3) K-225 READY MIX BEGISTING MULTI 12 MM
BALOK 30 x 50 (U-24 = 175KG/M3) K-225 READY MIX BEGISTING MULTI 12 MM
BALOK 25 x 45 (U-24 = 137KG/M3) K-225 READY MIX BEGISTING MULTI 12 MM
BALOK 20 x 30 (U-24 = 215KG/M3) K-225 READY MIX BEGISTING MULTI 12 MM
BALOK 20 x 30 (U-24 = 215KG/M3) K-225 SITE MIX BEGISTING MULTI 12 MM
BALOK 15 x 25 (U-24 = 175KG/M3) K-225 READY MIX BEGISTING MULTIPLEX 12 MM
BALOK 15 x 25 (U-24 = 175KG/M3) K-225 SITE MIX BEGISTING MULTIPLEX 12 MM
BALOK 15 x 25 (U-24 = 175KG/M3) K-175 READY MIX BEGISTING MULTIPLEX 12 MM
BALOK 15 x 25 (U-24 = 175KG/M3) K-225 SITE MIX BEGISTING MULTIPLEX 12 MM
BALOK SLOOF 15 x 25 (U-24 = 172KG/M3) K-175 READY MIX BEGISTING PAPAN
BALOK 15 x 25 (U-24 = 172KG/M3) K-225 SITE MIX BEGISTING PAPAN
BALOK SLOOF 15 x 20 (U-24 = 167KG/M3) K-175 READY MIX BEGISTING PAPAN
BALOK 15 x 20 (U-24 = 167KG/M3) K-225 SITE MIX BEGISTING PAPAN
BALOK LUIFEL 12 x 20 (U-24 = 202KG/M3) K-225 READY MIX BEGISTING PAPAN
BALOK LUIFEL 12 x 20 (U-24 = 202KG/M3) K-175 READY MIX BEGISTING PAPAN
BALOK LUIFEL 12 x 20 (U-24 = 202KG/M3) K-225 SITE MIX BEGISTING PAPAN
JUMLAH
Rp.
5,417,138.77
4,994,314.59
4,270,235.59
8,856,072.00
8,662,555.89
7,520,884.50
7,275,585.09
7,075,822.00
6,830,522.59
5,922,067.00
5,726,767.59
6,187,296.00
5,991,996.59
6,221,620.59
6,122,868.59
6,163,842.49
6,065,090.49
6,822,129.50
6,569,051.99
5,802,559.50
5,549,481.99
8,168,280.18
8,065,202.67
7,687,612.68
7,584,535.17
9,987,872.67
10,090,950.18
7,683,653.67
7,580,576.16
6,383,074.00
5,403,936.50
5,774,816.17
7,906,297.00
7,710,997.59
7,645,137.50
7,449,838.09
7,495,137.50
7,392,059.99
6,367,650.00
6,264,572.49
6,278,637.50
6,175,559.99
8,916,337.00
8,766,337.00
8,721,037.59
75 dari 102
NO.
46
47
48
49
50
51
52
53
54
55
56
57
JUMLAH
Rp.
URAIAN
BALOK LUIFEL 12 x 20 (U-24 = 202KG/M3) K-175 SITE MIX BEGISTING PAPAN
RING BALK 12 x 20 (U-24 = 202KG/M3) K-225 READY MIX BEGISTING MULRIPLEKS 12 MM
RING BALK 12 x 20 (U-24 = 134KG/M3) K-225 READY MIX BEGISTING MULTIPLEKS 12 MM
RING BALK 12 x 20 (U-24 = 202KG/M3) K-175 READY MIX BEGISTING PAPAN
RING BALK 12 x 20 (U-24 = 202KG/M3) K-175 SITE MIX BEGISTING PAPAN
RING BALK 12 x 20 (U-24 = 202KG/M3) K-175 SITE MIX BEGISTING PAPAN
LISTPLANK BETON T= 8 CM (125KG/M3 U-24) K-225 READY MIX BEGISTING MULTIPLEX 12 MM
LISTPLANK BETON T= 8 CM (125KG/M3 U-24) K-175 READY MIX BEGISTING MULTIPLEX 12 MM
PLAT LANTAI T=12 CM (125KG/M3 U-24) K-225 READY MIX BEGISTING MULTIPLEX 12 MM
PLAT LANTAI T=12 CM (125KG/M3 U-24) K-225 SITE MIX BEGISTING MULTIPLEX 12 MM
TANGGA (218,1KG/M3 U-39) K-225 READY MIX BEGISTING MULTIPLEK 12 MM
TANGGA (218,1KG/M3 U-39) K-225 SITE MIX BEGISTING MULTIPLEX 12 MM
8,663,259.49
7,431,335.00
6,220,765.00
7,178,468.33
7,075,390.83
5,864,820.83
5,442,407.94
5,292,407.94
5,442,407.94
5,247,108.53
6,651,009.81
6,455,710.40
Mengetahui,
Kepala Dinas Pekerjaan Umum
Kabupaten Brebes
Ir. KUSTIYANTO
NIP. 500 082 955
76 dari 102
NOMOR HASIL
ANALISA
HARGA BERIKUT
KEUNTUNGAN
G.015
G.017
G.020
G.043
G.044
G.047
G.050
G.051
G.052
G.053
G.054
G.055
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
711,852.49
769,630.59
821,413.89
814,930.00
964,930.00
1,014,930.00
17,802.50
17,802.50
166,046.00
155,215.00
172,218.00
98,150.00
1 PONDASI PLAT BETON (U-24 = 230 KG/M3) K-225 SITE MIX BEGISTING PAPAN
1.00 m3 Beton Site Mix K-225
@ Rp 769,630.59 =
230.00 kg Besi Beton U-24
@ Rp 17,802.50 =
3.33 m2 Begisting Papan
@ Rp 166,046.00 =
Jumlah
769,630.59
4,094,575.00
552,933.18
5,417,138.77
2 PONDASI PLAT BETON (U-24 = 200 KG/M3) K-225 SITE MIX BEGISTING PAPAN
1.00 m3 Beton Site Mix K-225
@ Rp 769,630.59 =
200.00 kg Besi Beton U-24
@ Rp 17,802.50 =
4.00 m2 Begisting Papan
@ Rp 166,046.00 =
Jumlah
769,630.59
3,560,500.00
664,184.00
4,994,314.59
3 PONDASI PLAT BETON (U-24 = 150 KG/M3) K-225 SITE MIX BEGISTING PAPAN
1.00 m3 Beton Site Mix K-225
@ Rp 769,630.59 =
150.00 kg Besi Beton U-24
@ Rp 17,802.50 =
5.00 m2 Begisting Papan
@ Rp 166,046.00 =
Jumlah
769,630.59
2,670,375.00
830,230.00
4,270,235.59
=
=
=
=
Rp
Rp
Rp
Rp
Rp
1,014,930.00
5,340,750.00
2,296,240.00
204,152.00
8,856,072.00
=
=
=
=
Rp
Rp
Rp
Rp
Rp
821,413.89
5,340,750.00
2,296,240.00
204,152.00
8,662,555.89
=
=
=
=
Rp
Rp
Rp
Rp
Rp
1,014,930.00
4,005,562.50
2,296,240.00
204,152.00
7,520,884.50
=
=
=
=
Rp
Rp
Rp
Rp
Rp
769,630.59
4,005,562.50
2,296,240.00
204,152.00
7,275,585.09
77 dari 102
=
=
=
=
Rp
Rp
Rp
Rp
Rp
1,014,930.00
3,560,500.00
2,296,240.00
204,152.00
7,075,822.00
=
=
=
=
Rp
Rp
Rp
Rp
Rp
769,630.59
3,560,500.00
2,296,240.00
204,152.00
6,830,522.59
=
=
=
=
Rp
Rp
Rp
Rp
Rp
964,930.00
2,456,745.00
2,296,240.00
204,152.00
5,922,067.00
=
=
=
=
Rp
Rp
Rp
Rp
Rp
769,630.59
2,456,745.00
2,296,240.00
204,152.00
5,726,767.59
=
=
=
=
Rp
Rp
Rp
Rp
Rp
964,930.00
2,492,350.00
2,525,864.00
204,152.00
6,187,296.00
=
=
=
=
Rp
Rp
Rp
Rp
Rp
769,630.59
2,492,350.00
2,525,864.00
204,152.00
5,991,996.59
=
=
=
=
Rp
Rp
Rp
Rp
Rp
769,630.59
2,492,350.00
2,755,488.00
204,152.00
6,221,620.59
769,630.59
17,802.50
166,046.00
98,150.00
=
=
=
=
Rp
Rp
Rp
Rp
Rp
769,630.59
2,492,350.00
2,656,736.00
204,152.00
6,122,868.59
=
=
=
=
Rp
Rp
Rp
Rp
Rp
711,852.49
2,492,350.00
2,755,488.00
204,152.00
6,163,842.49
=
=
=
=
Rp
Rp
Rp
Rp
Rp
711,852.49
2,492,350.00
2,656,736.00
204,152.00
6,065,090.49
1.00
140.00
16.00
2.08
m3
kg
m2
m3
@
@
@
@
Rp
Rp
Rp
Rp
711,852.49
17,802.50
166,046.00
98,150.00
78 dari 102
1.00
131.00
20.00
2.08
m3
kg
m2
m3
@
@
@
@
Rp
Rp
Rp
Rp
964,930.00
17,802.50
166,046.00
98,150.00
=
=
=
=
Rp
Rp
Rp
Rp
Rp
964,930.00
2,332,127.50
3,320,920.00
204,152.00
6,822,129.50
711,852.49
17,802.50
166,046.00
98,150.00
=
=
=
=
Rp
Rp
Rp
Rp
Rp
711,852.49
2,332,127.50
3,320,920.00
204,152.00
6,569,051.99
964,930.00
17,802.50
166,046.00
98,150.00
=
=
=
=
Rp
Rp
Rp
Rp
Rp
964,930.00
2,973,017.50
1,660,460.00
204,152.00
5,802,559.50
711,852.49
17,802.50
166,046.00
98,150.00
=
=
=
=
Rp
Rp
Rp
Rp
Rp
711,852.49
2,973,017.50
1,660,460.00
204,152.00
5,549,481.99
=
=
=
=
Rp
Rp
Rp
Rp
Rp
814,930.00
4,130,180.00
3,019,018.18
204,152.00
8,168,280.18
711,852.49
17,802.50
166,046.00
98,150.00
=
=
=
=
Rp
Rp
Rp
Rp
Rp
711,852.49
4,130,180.00
3,019,018.18
204,152.00
8,065,202.67
=
=
=
=
Rp
Rp
Rp
Rp
Rp
814,930.00
3,649,512.50
3,019,018.18
204,152.00
7,687,612.68
711,852.49
17,802.50
166,046.00
98,150.00
=
=
=
=
Rp
Rp
Rp
Rp
Rp
711,852.49
3,649,512.50
3,019,018.18
204,152.00
7,584,535.17
711,852.49
17,802.50
166,046.00
98,150.00
=
=
=
=
Rp
Rp
Rp
Rp
Rp
711,852.49
6,052,850.00
3,019,018.18
204,152.00
9,987,872.67
814,930.00
17,802.50
166,046.00
98,150.00
=
=
=
=
Rp
814,930.00
Rp 6,052,850.00
Rp 3,019,018.18
Rp
204,152.00
Rp 10,090,950.18
1.00
131.00
20.00
2.08
m3
kg
m2
m3
@
@
@
@
Rp
Rp
Rp
Rp
1.00
167.00
10.00
2.08
m3
kg
m2
m3
@
@
@
@
Rp
Rp
Rp
Rp
1.00
167.00
10.00
2.08
m3
kg
m2
m3
@
@
@
@
Rp
Rp
Rp
Rp
79 dari 102
=
=
=
=
Rp
Rp
Rp
Rp
Rp
814,930.00
4,450,625.00
2,213,946.67
204,152.00
7,683,653.67
=
=
=
=
Rp
Rp
Rp
Rp
Rp
711,852.49
4,450,625.00
2,213,946.67
204,152.00
7,580,576.16
=
=
=
=
Rp
Rp
Rp
Rp
Rp
964,930.00
4,094,575.00
1,119,417.00
204,152.00
6,383,074.00
=
=
=
=
Rp
Rp
Rp
Rp
Rp
964,930.00
3,115,437.50
1,119,417.00
204,152.00
5,403,936.50
=
=
=
=
Rp
Rp
Rp
Rp
Rp
964,930.00
2,438,942.50
1,760,450.67
610,493.00
5,774,816.17
=
=
=
=
Rp
Rp
Rp
Rp
Rp
964,930.00
3,827,537.50
2,296,240.00
817,589.50
7,906,297.00
=
=
=
=
Rp
Rp
Rp
Rp
Rp
769,630.59
3,827,537.50
2,296,240.00
817,589.50
7,710,997.59
=
=
=
=
Rp
Rp
Rp
Rp
Rp
964,930.00
3,115,437.50
2,583,270.00
981,500.00
7,645,137.50
=
=
=
=
Rp
Rp
Rp
Rp
Rp
769,630.59
3,115,437.50
2,583,270.00
981,500.00
7,449,838.09
=
=
=
=
Rp
Rp
Rp
Rp
Rp
814,930.00
3,115,437.50
2,583,270.00
981,500.00
7,495,137.50
80 dari 102
=
=
=
=
Rp
Rp
Rp
Rp
Rp
711,852.49
3,115,437.50
2,583,270.00
981,500.00
7,392,059.99
=
=
=
Rp
Rp
Rp
Rp
814,930.00
3,062,030.00
2,490,690.00
6,367,650.00
=
=
=
Rp
Rp
Rp
Rp
711,852.49
3,062,030.00
2,490,690.00
6,264,572.49
=
=
=
Rp
Rp
Rp
Rp
814,930.00
2,973,017.50
2,490,690.00
6,278,637.50
=
=
=
Rp
Rp
Rp
Rp
711,852.49
2,973,017.50
2,490,690.00
6,175,559.99
=
=
=
=
Rp
Rp
Rp
Rp
Rp
964,930.00
3,596,105.00
4,151,150.00
204,152.00
8,916,337.00
=
=
=
=
Rp
Rp
Rp
Rp
Rp
814,930.00
3,596,105.00
4,151,150.00
204,152.00
8,766,337.00
=
=
=
=
Rp
Rp
Rp
Rp
Rp
769,630.59
3,596,105.00
4,151,150.00
204,152.00
8,721,037.59
=
=
=
=
Rp
Rp
Rp
Rp
Rp
711,852.49
3,596,105.00
4,151,150.00
204,152.00
8,663,259.49
964,930.00
3,596,105.00
2,870,300.00
7,431,335.00
964,930.00
2,385,535.00
2,870,300.00
6,220,765.00
81 dari 102
=
=
=
Rp
Rp
Rp
Rp
814,930.00
3,596,105.00
2,767,433.33
7,178,468.33
=
=
=
Rp
Rp
Rp
Rp
711,852.49
3,596,105.00
2,767,433.33
7,075,390.83
=
=
=
Rp
Rp
Rp
Rp
711,852.49
2,385,535.00
2,767,433.33
5,864,820.83
964,930.00
2,225,312.50
1,434,575.94
817,589.50
5,442,407.94
55 PLAT LANTAI T=12 CM (125KG/M3 U-24) K-225 SITE MIX BEGISTING MULTIPLEX 12 MM
1.00 m3 Beton Site Mix K-225
@ Rp 769,630.59 =
125.00 kg Besi Beton U-24
@ Rp 17,802.50 =
8.33 m2 Begisting Multiplex 12 mm
@ Rp 172,218.00 =
8.33 m3 Stoot Werk
@ Rp 98,150.00 =
Jumlah
Rp
Rp
Rp
Rp
Rp
769,630.59
2,225,312.50
1,434,575.94
817,589.50
5,247,108.53
=
=
=
=
Rp
Rp
Rp
Rp
Rp
964,930.00
3,882,725.25
1,148,694.06
654,660.50
6,651,009.81
=
=
=
=
Rp
Rp
Rp
Rp
Rp
769,630.59
3,882,725.25
1,148,694.06
654,660.50
6,455,710.40
Mengetahui,
Kepala Dinas Pekerjaan Umum
Kabupaten Brebes
Ir. KUSTIYANTO
NIP. 500 082 955
82 dari 102
URAIAN
SATUAN
A.
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
UPAH TENAGA :
Pekerja
Tukang Gali
Mandor
Tukang cat / plitur / batu
Kepala tukang cat / plitur / batu
Tukang kayu
Kepala tukang kayu
Tukang Besi
Kepala Tukang besi
Tukang Besi Profil
Kepala Tukang Besi Profil
Mekanik
Tukang Instalasi
Mekanik Pembantu
Operator terlatih / masinis
Operator kurang terlatih
Pembantu operator / pemb. Masinis
Sopir truk
Sopir personil
Pembantu sopir
Buruh lapangan tak terlatih
Buruh lapangan kurang terlatih
Buruh lapangan terlatih
Tukang masak aspal
Penjaga malam
Sewa Mesin Gilas, alat tahun ke VII ( 8 - 10 ton ) + bahan bakar
Sewa Mesin Gilas, alat tahun ke V ( 6 - 8 ton ) + bahan bakar
Sewa Mesin Gila Tandem Roller 2,5 ton + bahan bakar
Sewa Mesin Gila Tandem Roller 1,5 ton + bahan bakar
Sewa Excavator EX 100, EX 200 + bahan bakar
Sewa Bechoe Loader, alat tahun ke VII + bahan bakar
Sewa Dump Truck, alat tahun ke V ( 5 ton ) + bahan bakar
Sewa Mesin Gilas (Walls) + bahan bakar (25) hari
B. B A H A N :
Kelompok Material Alam :
34 A i r
35 Tanah urug
36 Tanah urug Pilihan
37 Pasir urug
38 Pasir batu (sirtu)
39 Pasir pasang / Pasir Beton
40 Batu blonos
41 Batu belah 10/15
42 Batu pecah tangan 2-3 cm (split)
43 Batu pecah tangan 3-4 cm
44 Batu pecah tangan 3-5 cm
45 Batu pecah tangan 5-7 cm
46 Batu pecah mesin 0,5-1 cm
47 Batu pecah mesin 1-2 cm
48 Batu pecah mesin 2-3 cm
49 Batu pecah mesin 3-4 cm
50 Abu batu
51 Batu klungson/manggaran
52 Batu Tempel (muka segi 6) tebal 10 cm
53 Batu Tempel Palimanan Hijau
54 Batu Tempel Palimanan Kuning
55 Batu Tempel (Tidak Beraturan) Kecil
56 Batu Tempel (Tidak Beraturan) Besar
57 Batu Teraso
58 Batu Candi Tempel 20/20, 5/20
59 Kerikil sungai (tidak disaring) royalti
60 Batu kali besar royalti
HARGA
SATUAN
Rp.
4
hari
hari
hari
hari
hari
hari
hari
hari
hari
hari
hari
hari
hari
hari
hari
hari
hari
hari
hari
hari
hari
hari
hari
hari
hari
hari
hari
hari
hari
Jam
Jam
hari
bulan
30,000
30,000
43,000
40,000
45,000
40,000
45,000
40,000
45,000
40,000
45,000
45,000
45,000
43,000
55,000
50,000
45,000
42,000
40,000
31,000
28,000
29,000
40,000
43,000
37,500
413,100
336,000
300,000
251,000
300,000
179,000
448,000
4,590,000
liter
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
buah
m
m
m
m
buah
m
m
m
20
66,000
75,000
86,000
90,000
121,000
102,000
121,000
179,000
130,000
125,000
125,000
238,875
234,000
234,000
168,000
227,500
115,000
1,400
78,000
78,000
45,500
45,500
3,500
115,000
26,600
19,500
83 dari 102
NO.
1
61
62
63
64
65
66
67
68
69
70
URAIAN
SATUAN
3
m
m
m
m
m
buah
buah
m
ton
m
Kelompok Kayu
71 a.Kayu Jati Klas 2 : Balok 8/15
b.Kayu Jati Klas 3 : Balok 8/15
c.Papan kayu jati
72 a.Kayu Kamper : Balok 8/15
b.Kayu Kamper : 5/7 & 4/6
c.Kayu Kamper : 3/4 & 3/5
d.Kayu Kamper : 2/3
e.Papan kamper
73 a.Kayu Bangkirai : Balok 8/15
b.Kayu Bangkirai : 5/7 & 4/6 (ikat)
Kayu Bangkirai : 5/7 & 4/6 (lepas)
c.Kayu Bangkirai : 3/4 & 3/5
d.Kayu Bangkirai : 2/3
e.Papan bangkirai ( 2 x 20 x 400 )
f. Papan bangkirai ( 2 x 25 x 400 )
g.Papan bangkirai ( 2 x 30 x 400 )
74 a.Kayu Kruing : Balok 8/15
b.Kayu Kruing : 5/7 & 4/6
c.Kayu Kruing : 3/4 & 3/5
d.Kayu Kruing : 2/3
75 a.Kayu Kalimantan ( Meranti Batu ) : Balok 8/15
b.Kayu Kalimantan ( Meranti Batu ) 5/7 & 4/6 (ikat)
Kayu Kalimantan ( Meranti Batu ) 5/7 & 4/6 (lepas)
c.Kayu Kalimantan ( Meranti Batu ) : 3/4 & 3/5
d.Kayu Kalimantan ( Meranti Batu ) : 2/3
e.Papan Meranti Batu ( 2 x 20 x 400 )
f. Papan Meranti Batu ( 2 x 25 x 400 )
76 a.Kayu Kempas : Balok 8/15
b.Kayu Kempas Ukuran 5/7 & 4/6 (ikat)
Kayu Kempas Ukuran 5/7 & 4/6 (lepas)
c.Kayu Kempas Ukuran 3/4 & 3/5
d.Kayu Kempas Ukuran 2/3
e.Papan kempas
77 a.Kayu Punak : Balok 8/15
b.Kayu Punak Ukuran 5/7 & 4/6 (ikat)
Kayu Punak Ukuran 5/7 & 4/6 (lepas)
c.Kayu Punak Ukuran 3/4 & 3/5
d.Kayu Punak Ukuran 2/3
e.Papan Punak Kalimantan
78 Kayu Rawa (Pinus)
79 Papan Cetak ( kayu pinus ) uk 2 x 20 x 200
80 Kayu tahun
81 Kayu bakar
82 Kayu stoot ( bambu ), 5 m
83 Tripleks tebal 3 mm
84 Tripleks tebal 4 mm
85 Tripleks tebal 3 mm uk. 120 x 240 cm
86 Tripleks tebal 4 mm uk. 120 x 240 cm
87 Tripleks tebal 6 mm uk. 120 x 240 cm
88 Tripleks tebal 4 mm uk. 90 x 210 cm (uk. Pintu)
89 Tripleks tebal 3 mm uk. 90 x 210 cm (uk. Pintu)
90 Teakwood tebal 3 mm
91 Teakwood tebal 3 mm uk. 90 x 120 cm
92 Teakwood tebal 4 mm uk. 90 x 210 cm
93 Teakwood tebal 4 mm uk. 120 x240 cm
94 Multipleks 9 mm
95 Multipleks 12 mm
96 Hardpleks uk. 0,5 x 2 m
97 Hardpleks 0,35 mm 1,22 x 2,44 m, kalsiboard (tahan api)
98 Plywood 3 mm uk. 90 x 220 cm
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
btg
lbr
lbr
lbr
lbr
lbr
lbr
lbr
lbr
lbr
lbr
lbr
lbr
lbr
lbr
lbr
lbr
HARGA
SATUAN
Rp.
4
14,300
72,500
86,000
28,600
128,000
550
3,000
320,000
600,000
65,000
12,961,650
9,149,000
15,249,000
8,619,000
6,630,000
6,298,500
6,298,500
8,619,000
11,232,000
7,904,000
7,650,000
7,424,000
7,296,000
10,816,000
11,929,600
12,979,600
5,800,000
6,912,000
6,784,000
6,656,000
4,641,000
3,779,000
3,978,000
3,672,000
3,355,000
4,641,000
5,793,000
5,967,000
4,335,000
4,845,000
4,243,000
4,080,000
6,298,000
5,635,000
4,176,000
4,284,000
3,978,000
3,712,000
5,712,000
1,700,000
2,496,000
1,224,000
120,900
11,000
56,100
68,850
56,100
68,850
98,500
59,000
44,450
119,000
114,000
145,850
165,750
176,000
225,000
24,000
58,500
58,500
84 dari 102
NO.
URAIAN
SATUAN
3
lbr
lbr
lbr
kg
m'
m'
m'
1
99
100
101
102
103
104
105
Plywood 4 mm
Plywood 9 mm uk. 120 x 240 mm
Formika uk. Pintu
Ijuk
Dolken 5
Dolken 12
List Kayu Profil
106
107
108
109
110
111
112
113
114
115
116
117
118
119
120
121
122
123
124
125
126
127
128
129
130
131
132
133
134
135
136
137
138
139
140
141
142
143
144
145
146
147
148
149
150
151
152
153
154
155
156
157
158
159
160
161
162
163
164
165
166
167
168
kg
kg
kg
kg
kg
unit
unit
m
m
m
m
m
m
m
m
kg
kg
kg
m
kg
m
kg
kg
kg
m
kg
kg
kg
kg
kg
buah
kg
kg
kg
kg
m
m
buah
m
kg
m
m
rol
buah
buah
buah
buah
buah
buah
unit
unit
buah
buah
buah
buah
buah
buah
psg
psg
psg
buah
buah
buah
HARGA
SATUAN
Rp.
4
91,000
170,000
80,000
15,000
15,000
34,000
19,000
19,500
18,500
10,600
18,850
15,300
915,000
141,000
487,500
395,000
429,000
494,000
338,000
266,000
1,289,000
158,000
14,000
14,000
14,000
176,000
19,000
47,000
16,000
24,000
19,000
433,500
19,000
23,000
25,000
16,000
18,000
3,000
17,000
21,000
15,000
18,000
218,000
263,000
512,000
448,000
14,000
448,000
24,000
85,000
141,000
416,000
96,000
332,000
33,000
58,000
332,000
205,000
110,000
249,000
14,000
53,000
12,000
33,000
16,000
9,000
14,000
9,000
41,000
9,000
85 dari 102
1
169
170
171
172
173
174
175
176
177
178
179
180
181
182
183
184
185
186
187
188
189
190
191
192
193
194
195
196
197
198
199
200
201
202
203
204
205
206
207
208
209
210
211
2
Tarikan / Pegangan pintu
Rel pintu dorong
Tangki air fiberglas Isi : 250 ltr
Tangki air fiberglas Isi : 500 ltr
Tangki air fiberglas Isi : 600 ltr
Tangki air fiberglas Isi : 1000 ltr
Pagar BRC Galvanis 90 x 240 cm
Pagar BRC Galvanis 120 x 240 cm
Tiang BRC Galvanis panjang 120 cm
Tiang BRC Galvanis panjang 150 cm
Pintu PVC (lengkap; kusen + daun)
Kosen Almunium 4" Coklat
Kosen Almunium 4" Putih
Pintu Kaca Rayban Alumunium 4" Putih
Pintu Kaca Bening Alumunium 4" Putih
Jendela Kaca Rayban Alumunium 4" Putih Engsel Samping
Jendela Kaca Rayban Alumunium 4" Putih Engsel Ayun
Jendela Kaca Bening Alumunium 4" Putih Engsel Samping
Jendela Kaca Bening Alumunium 4" Putih Engsel Ayun
Pintu Kaca Rayban Alumunium 4" Coklat
Pintu Kaca Bening Alumunium 4" Coklat
Jendela Kaca Rayban Alumunium 4" Coklat Engsel Samping
Jendela Kaca Rayban Alumunium 4" Coklat Engsel Ayun
Jendela Kaca Bening Alumunium 4" Coklat Engsel Samping
Jendela Kaca Bening Alumunium 4" Coklat Engsel Ayun
Jendela Kaca Mati Rayban Alumunium 4"
Jendela Kaca Mati Bening Alumunium 4"
Atap Polikarbonat rangka besi tempa
Atap Polikarbonat rangka Stainless
Railing stainless t = 0,9 m
Gipsum Board
Gipsum bersusun profil
Formite / penjaga jarak bekisting / spacer
Mur Baut Panjang
Mur Baut Pendek
Daun Pintu Plat Baja Hitam tebal 1,5 mm
Pagar besi reling besi / tralis besi polos
Pagar besi reling besi / tralis besi ulir
Pintu Air Sorong Baja
Pintu Air Sorong Baja
Pintu Air Sorong Baja
Pintu Air Sorong Baja Dua
Pintu Air Sorong Baja Dua
3
buah
buah
unit
unit
unit
unit
lbr
lbr
btg
btg
unit
m'
m'
unit
unit
unit
unit
unit
unit
unit
unit
unit
unit
unit
unit
m
m
m
m
m'
m
m
buah
buah
buah
kg
kg
kg
unit
unit
unit
unit
unit
HARGA
SATUAN
Rp.
4
24,000
332,000
540,000
873,000
1,070,000
1,709,000
126,000
152,500
39,750
46,400
375,000
166,000
145,000
1,830,000
1,747,000
877,200
1,014,350
743,500
877,200
2,433,700
1,554,450
1,014,000
1,149,500
877,200
1,014,350
155,500
137,700
550,000
900,000
700,000
121,000
256,000
2,000
14,000
14,000
17,500
19,500
22,100
15,834,000
23,341,500
36,400,000
54,600,000
82,810,000
212
213
214
215
216
217
218
219
220
221
222
223
224
225
226
227
228
229
230
231
232
233
234
235
236
237
238
Kelompok Lantai :
Tegel abu-abu PC 20/20
Tegel abu-abu PC 30/30
Keramik polos kw.1 ukuran 30 x 30 cm
Keramik motif kw.1 ukuran 30 x 30 cm
Keramik motif granit kw.1 ukuran 30 x 30 cm
Keramik polos kw.1 ukuran 40 x 40 cm
Keramik motif kw.1 ukuran 40 x 40 cm
Keramik motif granit kw.1 ukuran 40 x 40 cm
Keramik polos kw.1 ukuran 60 x 60 cm
Keramik motif kw.1 ukuran 60 x 60 cm
Keramik motif granit kw.1 ukuran 60 x 60 cm
Keramik dinding polos kw.1 ukuran 20 x 25 cm
Keramik dinding motif kw.1 uikuran 20 x 25 cm
Keramik dinding polos kw 1 uk. 10 x 20 cm
Keramik dinding polos kw 1 uk. 10 x 25 cm
Granit Import
Ubin Granito uk. 30 x 30 cm
Ubin Granito uk. 40 x 40 cm
Keramik Artistik 10/20
Keramik Artistik 10/10
Marmer Padalarang
Paving segi 4 natural tb. 6 cm (K. 175)
Paving segi 6 natural tb. 6 cm (K. 175)
Paving segi 4 warna tb. 6 cm (K. 175)
Paving segi 6 warna tb. 6 cm (K. 175)
Paving segi 4 warna tb. 8 cm (K. 200)
Paving segi 6 warna tb. 8 cm (K. 200)
buah
buah
m
m
m
m
m
m
m
m
m
m
m
m
m
m
buah
buah
buah
buah
m
m
m
m
m
m
m
2,000
3,000
47,000
60,000
70,000
57,000
70,000
73,000
128,000
140,000
140,000
64,000
70,000
57,000
57,000
179,000
10,400
17,400
9,750
16,250
390,000
53,000
53,000
62,000
62,000
66,000
66,000
NO.
URAIAN
SATUAN
86 dari 102
NO.
1
239
240
241
242
243
244
245
246
247
248
249
250
251
252
253
254
255
256
257
258
259
260
261
262
263
264
265
266
267
268
269
270
271
272
273
274
275
276
277
278
279
280
281
282
283
284
URAIAN
2
Kanstin
Kanstin uk. 15 x 20 x 30 x 60 cm
Kanstin uk. 10 x 15 x 30 x 60 cm
Kanstin uk. 10 x 20 x 50 cm
Kanstin beton cetak 10 x 20 x 40 cm
Kanstin beton cetak 15 x 30 x 60 cm
Paving blok natural segi 4 tb. 6 cm (K.175) kw. 1
Paving blok natural segi 6 tb. 6 cm (K.175) kw. 1
Paving blok natural segi 4 tb. 8 cm (K.175) kw. 1
Paving blok natural segi 6 tb. 8 cm (K.175) kw. 1
Paving blok natural segi 4 tb. 8 cm (K.350) kw. 1
Paving blok natural segi 6 tb. 8 cm (K.350) kw. 1
Paving blok natural segi 4 tb. 10 cm (K.350) kw. 1
Paving blok natural segi 6 tb. 10 cm (K.350) kw. 1
Paving blok merah segi 4 tb. 6 cm (K.175) kw. 1
Paving blok merah segi 6 tb. 6 cm (K.175) kw. 1
Paving blok merah segi 4 tb. 8 cm (K.175) kw. 1
Paving blok merah segi 6 tb. 8 cm (K.175) kw. 1
Paving blok biru segi 4 tb. 6 cm (K.175) kw. 1
Paving blok biru segi 6 tb. 6 cm (K.175) kw. 1
Paving blok biru segi 4 tb. 8 cm (K.175) kw. 1
Paving blok biru segi 6 tb. 8 cm (K.175) kw. 1
Paving blok merah segi 4 tb. 8 cm (K.350) kw. 1
Paving blok merah segi 6 tb. 8 cm (K.350) kw. 1
Paving blok type S natural tb. 6 cm (K.175) kw. 1
Paving blok type S natural tb. 8 cm (K.175) kw. 1
Paving blok type S merah tb. 6 cm (K.175) kw. 1
Paving blok type S merah tb. 8 cm (K.175) kw. 1
Paving blok tiga berlian merah tb. 6 cm (K.175) kw. 1
Paving blok tiga berlian merah tb. 8 cm (K.175) kw. 1
Paving blok tiga berlian natural tb. 6 cm (K.175) kw. 1
Paving blok tiga berlian natural tb. 8 cm (K.175) kw. 1
Paving Diamond Kombinasi K-300 (kotak abu-abu); tebal 8 cm
Paving Diamond Kombinasi K-300 (kotak merah); tebal 8 cm
Grefel beton 20 cm
Grefel beton 30 cm
Roster bata (10x20)
Roster beton (10x20)
Roster keramik (20x20)
LEMKRA FK 101 (A)
- kemasan 5 kg/ktg
- kemasan 30 kg/zak
- kemasan 40 kg/dus
LEMKRA FK 101 (P)
- kemasan 5 kg/ktg
- kemasan 30 kg/zak
- kemasan 40 kg/dus
LEMKRA FK 103 (P)
- kemasan 5 kg/ktg
- kemasan 30 kg/zak
- kemasan 40 kg/dus
LEMKRA FK 103 (A) Plus 30 kg/zak
LEMKRA FK 103 (A)
- kemasan 5 kg/ktg
- kemasan 30 kg/zak
- kemasan 40 kg/dus
LEMKRA FK 111
- kemasan 5 kg/ktg
- kemasan 30 kg/zak
- kemasan 40 kg/dus
LEMKRA Just Do It (30 kg/sak)
SATUAN
3
buah
buah
buah
buah
buah
buah
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
buah
buah
buah
buah
buah
HARGA
SATUAN
Rp.
4
28,100
26,000
24,500
10,200
9,180
23,000
53,700
53,700
70,250
70,250
84,850
84,850
87,500
87,500
60,300
60,300
77,000
77,000
65,600
65,600
82,200
82,200
90,800
90,800
53,700
70,250
60,300
77,000
60,300
77,000
53,700
70,250
79,300
83,850
70,500
102,000
3,315
2,650
40,800
ktg
zak
dus
25,700
150,400
206,100
ktg
zak
dus
27,900
163,700
223,800
ktg
zak
dus
zak
77,800
460,500
621,400
483,600
ktg
zak
dus
85,200
504,700
682,200
ktg
zak
dus
zak
33,600
194,700
268,800
106,600
87 dari 102
NO.
URAIAN
1
2
285 LEMKRA DS 105 (A)
- kemasan 5 kg/ktg
- kemasan 30 kg/zak
- kemasan 40 kg/dus
286 LEMKRA DS 105 (P)
- kemasan 5 kg/ktg
- kemasan 30 kg/zak
- kemasan 40 kg/dus
287 LEMKRA FS 201 (abu-abu)
- kemasan 1 kg/ktg
- kemasan 20 kg/dus
288 LEMKRA FS 202 (putih)
- kemasan 1 kg/ktg
- kemasan 20 kg/dus
289 LEMKRA FS 203 (hitam)
- kemasan 1 kg/ktg
- kemasan 20 kg/dus
290 LEMKRA FS 204 (merah)
- kemasan 1 kg/ktg
- kemasan 20 kg/dus
291 LEMKRA FS 205 (kuning)
- kemasan 1 kg/ktg
- kemasan 20 kg/dus
292 LEMKRA FS 206 (coklat)
- kemasan 1 kg/ktg
- kemasan 20 kg/dus
293 LEMKRA FS 207 (biru muda)
- kemasan 1 kg/ktg
- kemasan 20 kg/dus
294 LEMKRA FS 208 (hijau muda)
- kemasan 1 kg/ktg
- kemasan 20 kg/dus
295 LEMKRA FS 209 (hijau tua)
- kemasan 1 kg/ktg
- kemasan 20 kg/dus
296 LEMKRA FS 210 (krem)
- kemasan 1 kg/ktg
- kemasan 20 kg/dus
297 LEMKRA FS 211 (merah muda)
- kemasan 1 kg/ktg
- kemasan 20 kg/dus
298 LEMKRA FS 212 (biru tua)
- kemasan 1 kg/ktg
- kemasan 20 kg/dus
299 LEMKRA FS 213 (kuning tua)
- kemasan 1 kg/ktg
- kemasan 20 kg/dus
300 LEMKRA FS 214 (abu-abu muda)
- kemasan 1 kg/ktg
- kemasan 20 kg/dus
301 LEMKRA FS 215 (coklat muda)
- kemasan 1 kg/ktg
- kemasan 20 kg/dus
302 LEMKRA FS 216 (kuning kemerahan)
- kemasan 1 kg/ktg
- kemasan 20 kg/dus
303 LEMKRA FS 217 (biru terang)
- kemasan 1 kg/ktg
- kemasan 20 kg/dus
304 LEMKRA FS 218 (salmon)
- kemasan 1 kg/ktg
- kemasan 20 kg/dus
305 LEMKRA FS 219 (terakota)
- kemasan 1 kg/ktg
- kemasan 20 kg/dus
306 LEMKRA TG 301
- kemasan 1 ltr/btl
- kemasan 24 ltr/dus
- kemasan 20 ltr/jerigen
SATUAN
3
HARGA
SATUAN
Rp.
4
ktg
zak
dus
62,800
369,000
502,500
ktg
zak
dus
68,900
405,600
551,400
ktg
dus
10,000
200,200
ktg
dus
10,000
200,200
ktg
dus
10,000
200,200
ktg
dus
13,900
278,800
ktg
dus
10,000
200,200
ktg
dus
10,000
200,200
ktg
dus
10,000
200,200
ktg
dus
10,000
200,200
ktg
dus
13,900
278,800
ktg
dus
10,000
200,200
ktg
dus
10,000
200,200
ktg
dus
13,900
278,800
ktg
dus
12,200
245,700
ktg
dus
12,200
245,700
ktg
dus
12,200
245,700
ktg
dus
12,200
245,700
ktg
dus
13,900
278,800
ktg
dus
13,900
278,800
ktg
dus
12,200
245,700
ktg
dus
jrg
23,000
553,800
420,600
concrete grey
natural white
dark black
maroon red
gold yellow
pure brown
sea blue
fresh green
grass green
cream
elegance pink
water blue
hidden yellow
clay green
mud brown
fish yellow
bright blue
teracotta red
88 dari 102
NO.
URAIAN
1
2
307 LEMKRA TG 302
- kemasan 1 ltr/btl
- kemasan 24 ltr/dus
- kemasan 20 ltr/jerigen
308 LEMKRA TG 302 wet look
- kemasan 1 ltr/btl
- kemasan 24 ltr/dus
- kemasan 20 ltr/jerigen
309 LEMKRA TG 303/304
- kemasan 1 ltr/btl
310 LEMKRA
- LDP 501.1
abu-abu muda
- LDP 501.2
coklat tulip
- LDP 501.3
coklat muda
- LDP 501.4
kuning kecoklatan
- LDP 501.5
merah bata muda
- LDP 501.6
pink
- LDP 501.7
merah muda
- LDP 501.8
putih
- LDP 501.9
cream
- LDP 501.10
kuning muda
- LDP 501.11
hijau muda
- LDP 501.12
biru es
- LDP 501.13
biru langit
- LDP 501.14
biru laut
311 LEMKRA CR 107.2 ===> kasar
LEMKRA CR 107.1 ===> halus
312 LEMKRA CB 109
313 LEMKRA Fire Proofing
314 LEMKRA Plester Mutiara
- Plester Mutiara 113.01
putih
- Plester Mutiara 113.02
cream
- Plester Mutiara 113.03
kuning
- Plester Mutiara 113.04
abu-abu muda
- Plester Mutiara 113.05
abu-abu tua
- Plester Mutiara 113.06
biru
- Plester Mutiara 113.07
biru muda
- Plester Mutiara 113.08
biru tua
- Plester Mutiara 113.09
hijau muda
- Plester Mutiara 113.10
hijau tua
- Plester Mutiara 113.11
coklat muda
- Plester Mutiara 113.12
coklat tua
- Plester Mutiara 113.13
merah bata muda
- Plester Mutiara 113.14
merah bata tua
- Plester Mutiara 113.15
merah muda
- Plester Mutiara 113.16
kuning kecoklatan
315 LEMKRA Plester Mutiara Hitam/warna FS 203
316 LEMKRA Skim Coat A1 (putih)
317 LEMKRA Skim Coat A2 (abu-abu)
318 LEMKRA HF 007 + cairan (TG 303) @ 0,4 ltr/kg
319 LEMKRA HF 007 single componen
320
321
322
323
324
325
326
327
Karet Nat
Karet Nat Kecil
Palu Karet
Serok Gigi Pendek (kecil)
Serok Gigi Pendek (sedang)
Serok Gigi Panjang 45 cm
Mixer
Kain Kasa
328
329
330
331
332
333
Kelompok Atap :
Genteng pres lokal
Genteng pres jatiwangi
Kerpus genteng pres lokal
Kerpus genteng pres jatiwangi
Genteng pres open jatiwangi
Kerpus genteng pres open jatiwangi
SATUAN
3
cloud grey
tulip brown
softly brown
dawn light
lotus red
ice pink
stork pink
snow white
ice cream
sun rise
leaf green
ice blue
sky blue
ocean blue
HARGA
SATUAN
Rp.
4
ktg
dus
jrg
37,800
909,400
716,300
ktg
dus
jrg
43,300
1,039,700
830,300
ktg
42,100
1 klg/2,5 kg
1 dus/8 klg
1 dus/20 kg
54,300
434,900
434,900
1 zak/10 kg
1 dus/3 zak
1 dus/30 kg
1 kg/ktg
1 dus/10 kg
1 zak/10 kg
119,000
357,000
357,000
57,200
572,900
228,800
kemasan lama:
1 zak/10 kg
1 dus/3 zak
1 dus/30 kg
76,700
230,300
230,300
kemasan baru:
1 zak/30 kg
230,300
1 zak/10 kg
1 zak/10 kg
1 ktg/1 kg
1 zak/30 kg
1 ktg/1 kg
1 zak/30 kg
1 zak/10 kg
1 ktg/1 kg
1 dus/20 kg
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
86,300
86,300
4,200
127,400
3,800
115,800
729,000
83,700
1,673,500
16,900
5,800
13,000
13,000
13,000
15,600
18,200
48,700
970
1,020
1,500
3,315
1,735
4,100
89 dari 102
NO.
URAIAN
1
334
335
336
337
338
339
340
341
342
343
344
345
346
347
348
349
350
351
352
353
354
355
356
357
358
359
2
Genteng pres morando biasa
Kerpus genteng morando biasa
Genteng pres morando glasur
Kerpus genteng pres morando glasur
Genteng beton polos
Kerpus genteng beton polos
Genteng beton warna
Kerpus genteng beton warna
Asbes plat teb. 4 mm (100x200)
Asbes gelombang besar (200 x 110 x 5,2)
Asbes gelombang kecil ( 200 x 105 )
Kerpus asbes gelombang besar teb. 5 mm
Kerpus asbes gelombang kecil teb. 4 mm
Atap Sirap 4 lapis
Seng gelombang BJLS 30
Seng gelombang (210 x 80 x 0.2 cm)
Seng gelombang 3'-6' (90 x 180 x 0.2 cm)
Seng Plat BJLS 30 lebar 90 cm ; panjang 180
Seng Plat BJLS 30 lebar 60 cm ; panjang 180 cm
Seng Plat BJLS 30 lebar 30 cm ; panjang 180 cm
Seng Plat BJLS 20 lebar 20 cm ; panjang 180 cm
Eternit
Atap Polikarbonat; lebar = 120 cm tebal
Atap Polikarbonat; lebar = 120 cm tipis
Fiberglass gelombang uk. 180 x 80 cm
Fiberglass plat lebar 100 cm
360
361
362
363
364
365
366
367
368
369
370
371
372
373
374
375
376
377
378
379
380
381
382
383
384
385
386
387
388
389
390
391
392
393
394
395
396
397
398
399
400
401
402
403
SATUAN
3
buah
buah
buah
buah
buah
buah
buah
buah
lbr
lbr
lbr
lbr
lbr
buah
lbr
lbr
lbr
lbr
lbr
lbr
lbr
m
m'
m'
lbr
m'
kg
kg
kg
kg
kg
kg
kg
kg
kg
kg
ltr
kg
kg
lbr
kg
kg
ltrr
kg
kg
kg
kg
ton
kg
ton
ltr
ltr
ltr
ltr
ltr
ltr
ltr
ltr
ltr
ltr
ltr
ltr
kg
ls
kg
kg
kg
kg
kg
kg
HARGA
SATUAN
Rp.
4
1,850
4,100
6,850
7,650
6,120
9,180
10,200
13,260
26,500
92,800
86,100
55,650
31,850
530
86,100
103,400
91,500
89,000
59,000
46,000
64,000
15,000
337,000
197,000
63,000
45,000
49,000
50,000
34,000
35,000
26,000
15,000
16,000
23,000
13,000
13,000
3,000
35,000
34,000
4,000
16,000
149,000
14,000
10,200
7,400
9,000
9,000
360,000
5,800
716,000
7,000
6,100
32,000
7,100
10,000
4,100
4,600
23,850
29,150
23,850
29,170
7,800
38,100
18,000
54,000
44,000
60,000
5,000
6,000
45,000
90 dari 102
1
404
405
406
407
408
409
410
411
Kuas cat
Kuas cat 2"
Kuas cat 3"
Roll Cat
Residu / Soligium
Lem Kayu
Lem Kuning
Wood Filler
3
buah
buah
buah
buah
ltr
kg
kg
kg
HARGA
SATUAN
Rp.
4
11,000
5,000
9,000
22,000
5,000
22,000
44,000
42,000
412
413
414
415
416
417
418
419
420
421
422
423
424
425
426
427
428
429
430
431
432
433
434
435
436
437
438
439
440
441
442
443
444
445
446
447
448
449
450
451
zak
kg
kg
kg
m
m
m
m
m
m
m
m
m
m
m
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
Buah
Buah
Buah
Buah
Buah
Buah
buah
buah
buah
buah
unit
Buah
Buah
Buah
66,300
1,350
3,000
2,000
610,000
725,000
825,000
875,000
90,000
925,000
1,000,000
69,000
83,000
79,500
112,700
25,500
28,000
30,600
35,700
25,000
255,000
214,200
306,000
192,000
282,500
102,000
306,000
408,000
1,326,000
163,200
122,400
40,800
433,500
25,000
850,000
1,750,000
544,000
214,200
280,500
255,000
452
453
454
455
456
457
458
NO.
URAIAN
SATUAN
m'
m'
m'
m'
m'
m'
m'
53,000
79,500
106,000
132,600
171,600
228,800
275,000
m'
m'
m'
m'
93,000
195,000
293,800
436,800
91 dari 102
NO.
URAIAN
SATUAN
3
m'
m'
m'
m'
m'
m'
460
461
462
463
464
465
Ukuran 2"
Ukuran 2"
Ukuran 3"
Ukuran 4"
Ukuran 6"
Ukuran 8"
Knee 90 Pipa GI SNI
Ukuran "
Ukuran "
Ukuran 1"
Ukuran 1"
Ukuran 1"
Ukuran 2"
Ukuran 2"
Ukuran 3"
Ukuran 4"
Ukuran 5"
Ukuran 6"
Knee 45 Pipa GI SNI
Ukuran "
Ukuran "
Ukuran 1"
Ukuran 1"
Ukuran 1"
Ukuran 2"
Ukuran 2"
Ukuran 3"
Ukuran 4"
Tee Pipa GI SNI
Ukuran "
Ukuran "
Ukuran 1"
Ukuran 1"
Ukuran 1"
Ukuran 2"
Ukuran 2"
Ukuran 3"
Ukuran 4"
Ukuran 5"
Ukuran 6"
Boch Pipa GI SNI
Ukuran "
Ukuran "
Ukuran 1"
Ukuran 1"
Ukuran 1"
Ukuran 2"
Ukuran 2"
Ukuran 3"
Ukuran 4"
Ukuran 6"
Double Nepple Pipa GI SNI
Ukuran "
Ukuran "
Ukuran 1"
Ukuran 1"
Ukuran 1"
Ukuran 2"
Ukuran 2"
Ukuran 3"
Ukuran 4"
Ukuran 6"
Water Moor - Union Pipa GI SNI
Ukuran "
Ukuran "
Ukuran 1"
Ukuran 1"
Ukuran 1"
Ukuran 2"
Ukuran 2"
HARGA
SATUAN
Rp.
4
594,100
858,000
1,072,500
1,573,000
2,359,500
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
3,120
4,420
6,370
12,740
10,205
20,020
38,220
58,240
105,560
291,200
41,860
buah
buah
buah
buah
buah
buah
buah
buah
buah
5,304
7,956
9,945
22,542
18,564
33,150
72,930
112,710
198,900
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
3,835
5,655
8,970
17,160
13,520
25,480
58,240
78,260
138,320
364,000
491,400
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
6,240
8,385
12,415
27,300
20,020
41,860
85,540
123,760
254,800
910,000
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
2,730
3,640
5,135
10,400
7,475
14,235
23,660
40,040
65,520
236,600
buah
buah
buah
buah
buah
buah
buah
10,400
12,740
15,470
29,120
21,840
41,860
72,800
92 dari 102
NO.
URAIAN
SATUAN
3
buah
buah
HARGA
SATUAN
Rp.
4
114,660
218,400
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
3,978
4,641
7,956
10,608
9,282
15,912
33,150
53,040
88,842
212,160
225,420
buah
buah
buah
buah
buah
buah
2,600
3,120
4,420
8,385
6,370
11,700
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
2,210
2,730
3,640
6,370
5,460
9,100
18,200
25,480
45,500
136,500
buah
buah
buah
buah
buah
buah
buah
buah
buah
3,182
3,315
3,978
5,039
6,630
10,608
19,890
33,150
59,670
buah
buah
buah
buah
buah
buah
buah
buah
buah
11,934
17,238
26,520
34,476
46,410
63,648
125,970
172,380
222,380
buah
buah
buah
buah
buah
buah
buah
buah
buah
5,304
6,630
13,260
10,608
18,564
26,520
46,410
86,190
265,200
buah
buah
buah
buah
buah
buah
buah
99,450
15,912
26,520
19,890
39,780
92,820
132,600
466
467
468
469
470
471
472
Ukuran 3"
Ukuran 4"
Socket F Top C=C Pipa GI SNI
Ukuran "
Ukuran "
Ukuran 1"
Ukuran 1"
Ukuran 1"
Ukuran 2"
Ukuran 2"
Ukuran 3"
Ukuran 4"
Ukuran 5"
Ukuran 6"
Dop Pipa GI SNI
Ukuran "
Ukuran "
Ukuran 1"
Ukuran 1"
Ukuran 1"
Ukuran 2"
Plug Pipa GI SNI
Ukuran "
Ukuran "
Ukuran 1"
Ukuran 1"
Ukuran 1"
Ukuran 2"
Ukuran 2"
Ukuran 3"
Ukuran 4"
Ukuran 6"
Ring Mur Pipa GI SNI
Ukuran "
Ukuran "
Ukuran 1"
Ukuran 1"
Ukuran 1"
Ukuran 2"
Ukuran 2"
Ukuran 3"
Ukuran 4"
Kristuk Pipa GI SNI
Ukuran "
Ukuran "
Ukuran 1"
Ukuran 1"
Ukuran 1"
Ukuran 2"
Ukuran 2"
Ukuran 3"
Ukuran 4"
V - Ring Reducer M-F Pipa GI SNI
Ukuran "
Ukuran 1"
Ukuran 1"
Ukuran 1"
Ukuran 2"
Ukuran 2"
Ukuran 3"
Ukuran 4"
Ukuran 6"
V - Tee Pipa GI SNI
Ukuran "
Ukuran 1"
Ukuran 1"
Ukuran 1"
Ukuran 2"
Ukuran 2"
Ukuran 3"
93 dari 102
NO.
1
473
474
475
476
477
478
479
480
481
482
URAIAN
2
Ukuran 4"
Ukuran 6"
V - Shock Reducer F-F Pipa GI SNI
Ukuran "
Ukuran 1"
Ukuran 1"
Ukuran 1"
Ukuran 2"
Ukuran 2"
Ukuran 3"
Ukuran 4"
Reducing Elbow Pipa GI SNI
Ukuran "
Reducing Nepple Pipa GI SNI
Ukuran "
Pipa PVC
Ukuran " ( AW ) ex Wavin
Ukuran " ( AW ) ex Wavin
Ukuran 1" ( AW ) ex Wavin
Ukuran 1" ( AW ) ex Wavin
Ukuran 1" ( AW ) ex Wavin
Ukuran 2" ( AW ) ex Wavin
Ukuran 2" ( AW ) ex Wavin
Ukuran 3" ( AW ) ex Wavin
Ukuran 4" ( AW ) ex Wavin
Pipa PVC ( hitam ) 4"
Pipa PVC S 8 - 12,5 bar ( 1,25 MPA )
Ukuran 1/2" ( Wavinsafe / Solven Cement (SC ) )
Ukuran 3/4" ( Wavinsafe / Solven Cement (SC ) )
Ukuran 1" ( Wavinsafe / Solven Cement (SC ) )
Ukuran 1 1/4" ( Wavinsafe / Solven Cement (SC ) )
Pipa PVC S 10 - 10 bar ( 1,0 MPA )
Ukuran 1/2" ( Wavinsafe / Solven Cement (SC ) )
Ukuran 3/4" ( Wavinsafe / Solven Cement (SC ) )
Ukuran 1" ( Wavinsafe / Solven Cement (SC ) )
Ukuran 1 1/4" ( Wavinsafe / Solven Cement (SC ) )
Ukuran 1 1/2" ( Wavinsafe / Solven Cement (SC ) )
Pipa PVC S 10 - 12,5 bar ( 1,25 MPA )
Ukuran 2" ( Wavinsafe / Solven Cement (SC ) )
Ukuran 3" ( Wavinsafe / Solven Cement (SC ) )
Ukuran 4" ( Wavinsafe / Solven Cement (SC ) )
Ukuran 6" ( Wavinsafe / Solven Cement (SC ) )
Ukuran 2" ( Wavinlock / Rubber Ring (RR) )
Ukuran 3" ( Wavinlock / Rubber Ring (RR) )
Ukuran 4" ( Wavinlock / Rubber Ring (RR) )
Ukuran 6" ( Wavinlock / Rubber Ring (RR) )
Ukuran 8" ( Wavinlock / Rubber Ring (RR) )
Ukuran 10" ( Wavinlock / Rubber Ring (RR) )
Ukuran 12" ( Wavinlock / Rubber Ring (RR) )
Ukuran 16" ( Wavinlock / Rubber Ring (RR) )
Ukuran 20" ( Wavinlock / Rubber Ring (RR) )
Ukuran 22" ( Wavinlock / Rubber Ring (RR) )
Pipa PVC S 12,5 - 10 bar ( 1,0 MPA )
Ukuran 2" ( Wavinsafe / Solven Cement (SC ) )
Ukuran 3" ( Wavinsafe / Solven Cement (SC ) )
Ukuran 4" ( Wavinsafe / Solven Cement (SC ) )
Ukuran 6" ( Wavinsafe / Solven Cement (SC ) )
Ukuran 2" ( Wavinlock / Rubber Ring (RR) )
Ukuran 3" ( Wavinlock / Rubber Ring (RR) )
Ukuran 4" ( Wavinlock / Rubber Ring (RR) )
Ukuran 6" ( Wavinlock / Rubber Ring (RR) )
Ukuran 8" ( Wavinlock / Rubber Ring (RR) )
Ukuran 10" ( Wavinlock / Rubber Ring (RR) )
Ukuran 12" ( Wavinlock / Rubber Ring (RR) )
Ukuran 16" ( Wavinlock / Rubber Ring (RR) )
Ukuran 20" ( Wavinlock / Rubber Ring (RR) )
Ukuran 22" ( Wavinlock / Rubber Ring (RR) )
Pipa PVC S 12,5 - 8 bar ( 0,8 MPA )
Ukuran 1 1/2" ( Wavinsafe / Solven Cement (SC ) )
Ukuran 2" ( Wavinsafe / Solven Cement (SC ) )
Ukuran 3" ( Wavinsafe / Solven Cement (SC ) )
Ukuran 4" ( Wavinsafe / Solven Cement (SC ) )
3
buah
buah
HARGA
SATUAN
Rp.
4
265,200
928,200
buah
buah
buah
buah
buah
buah
buah
buah
5,967
9,282
15,912
14,586
19,890
46,410
72,930
132,600
buah
6,630
buah
6,630
m'
m'
m'
m'
m'
m'
m'
m'
m'
m'
3,375
4,475
5,500
10,000
13,240
16,700
26,500
37,300
55,700
8,850
m'
m'
m'
m'
3,575
5,600
8,900
13,850
m'
m'
m'
m'
m'
3,100
4,500
7,750
11,425
17,500
m'
m'
m'
m'
m'
m'
m'
m'
m'
m'
m'
m'
m'
m'
27,500
55,800
84,000
168,800
27,950
57,200
86,000
169,700
281,200
436,800
695,600
1,130,000
1,775,775
2,816,150
m'
m'
m'
m'
m'
m'
m'
m'
m'
m'
m'
m'
m'
m'
22,300
46,525
67,575
144,950
23,000
46,950
69,425
148,100
228,500
383,600
573,800
915,875
1,435,100
2,205,000
m'
m'
m'
m'
14,350
18,250
36,350
53,500
SATUAN
94 dari 102
NO.
1
483
484
485
486
URAIAN
2
Ukuran 6" ( Wavinsafe / Solven Cement (SC ) )
Ukuran 2" ( Wavinlock / Rubber Ring (RR) )
Ukuran 3" ( Wavinlock / Rubber Ring (RR) )
Ukuran 4" ( Wavinlock / Rubber Ring (RR) )
Ukuran 6" ( Wavinlock / Rubber Ring (RR) )
Ukuran 8" ( Wavinlock / Rubber Ring (RR) )
Ukuran 10" ( Wavinlock / Rubber Ring (RR) )
Ukuran 12" ( Wavinlock / Rubber Ring (RR) )
Ukuran 16" ( Wavinlock / Rubber Ring (RR) )
Ukuran 20" ( Wavinlock / Rubber Ring (RR) )
Ukuran 22" ( Wavinlock / Rubber Ring (RR) )
Pipa Galvanis Diameter 2,5" panjang 6 m
Pipa Galvanis Diameter 3" panjang 6 m
Clamp Saddle
Ukuran 50 mm x "
Ukuran 50 mm x "
Ukuran 50 mm x 1"
Ukuran 50 mm x 1"
Ukuran 63 mm x "
Ukuran 63 mm x "
Ukuran 63 mm x 1"
Ukuran 63 mm x 1"
Ukuran 63 mm x 1"
Ukuran 90mm x "
Ukuran 90 mm x "
Ukuran 90 mm x 1"
Ukuran 90 mm x 1"
Ukuran 90 mm x 1"
Ukuran 110 mm x "
Ukuran 110 mm x "
Ukuran 110 mm x 1"
Ukuran 110 mm x 1"
Ukuran 110 mm x 1"
Ukuran 160 mm x "
Ukuran 160 mm x "
Ukuran 160 mm x 1"
Ukuran 160 mm x 1"
Ukuran 160 mm x 1"
Ukuran 160 mm x 2"
Ukuran 200 mm x "
Ukuran 200 mm x "
Ukuran 200 mm x 1"
Ukuran 200 mm x 1"
Ukuran 200 mm x 1"
Ukuran 200 mm x 2"
Ukuran 250 mm x 1"
Ukuran 315 mm x 1"
Tee Solvent Cement (Equal & Reducer)
Ukuran 20 x 20 x 20 mm
Ukuran 25 x 25 x 25 mm
Ukuran 25 x 20 x 25 mm
Ukuran 32 x 32 x 32 mm
Ukuran 32 x 25 x 32 mm
Ukuran 32 x 20 x 32 mm
Ukuran 40 x 40 x 40 mm
Ukuran 40 x 32 x 40 mm
Ukuran 40 x 25 x 40 mm
Ukuran 40 x 20 x 40 mm
Ukuran 50 x 50 x 50 mm
Ukuran 50 x 40 x 50 mm
Ukuran 50 x 32 x 50 mm
Ukuran 50 x 25 x 50 mm
Ukuran 63 x 63 x 63 mm
Ukuran 63 x 50 x 63 mm
Ukuran 63 x 40 x 63 mm
Ukuran 63 x 32 x 63 mm
Ukuran 63 x 25 x 63 mm
Ukuran 90 x 90 x 90 mm
SATUAN
3
m'
m'
m'
m'
m'
m'
m'
m'
m'
m'
m'
m'
m'
HARGA
SATUAN
Rp.
4
115,000
18,600
36,800
55,000
115,000
182,500
300,000
445,000
720,000
1,115,000
1,785,000
75,000
100,000
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
16,000
16,000
16,000
16,000
22,000
22,000
22,000
22,000
22,000
24,600
24,600
24,600
24,600
24,600
38,900
38,900
38,900
38,900
38,900
41,500
41,500
41,500
41,500
41,500
41,500
52,000
52,000
52,000
52,000
52,000
52,000
468,000
800,000
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
2,100
3,100
3,100
5,525
7,225
7,625
8,200
10,700
10,000
10,500
14,100
17,625
19,175
20,000
47,500
47,500
52,900
47,625
50,500
131,400
95 dari 102
NO.
URAIAN
SATUAN
3
buah
buah
buah
buah
buah
buah
buah
buah
buah
HARGA
SATUAN
Rp.
4
227,100
234,650
234,900
285,900
285,900
620,000
865,000
865,000
942,700
buah
buah
buah
buah
buah
buah
buah
buah
buah
1,850
2,475
4,000
6,500
10,625
44,900
104,300
177,850
500,000
buah
buah
1,850
2,875
buah
buah
buah
4,575
6,500
11,000
buah
buah
1,850
2,500
buah
buah
buah
buah
buah
buah
buah
2,350
3,500
4,000
6,100
6,300
8,500
10,000
buah
buah
buah
buah
buah
2,350
3,150
4,225
6,500
9,500
buah
buah
buah
buah
buah
buah
buah
buah
12,350
15,500
24,600
22,900
37,500
53,500
161,600
238,500
buah
buah
buah
buah
buah
buah
buah
buah
6,200
7,000
7,000
10,500
18,500
30,000
97,500
188,500
buah
buah
buah
buah
buah
buah
buah
buah
2,300
3,000
3,500
4,000
4,750
5,550
6,000
8,000
487
488
489
490
491
492
493
494
495
Ukuran 90 x 63 x 90 mm
Ukuran 90 x 50 x 90 mm
Ukuran 110 x 110 x 110 mm
Ukuran 110 x 90 x 110 mm
Ukuran 110 x 63 x 110 mm
Ukuran 160 x 63 x 160 mm
Ukuran 160 x 90 x 160 mm
Ukuran 160 x 110 x 160 mm
Ukuran 160 x 160 x 160 mm
Knee Solvent Cement
Ukuran 20 mm
Ukuran 25 mm
Ukuran 32 mm
Ukuran 40 mm
Ukuran 50 mm
Ukuran 63 mm
Ukuran 90 mm
Ukuran 110 mm
Ukuran 160 mm
Faucet Knee (BSP Tread Taper)
Ukuran 20 mm x "
Ukuran 25 mm x "
Inzert Reducer (long)
Ukuran 40 mm x 20 mm
Ukuran 50 mm x 25 mm
Ukuran 63 mm x 32 mm
Faucet Tee (BSP Tread Taper)
Ukuran 20 mm x "
Ukuran 25 mm x "
Reducer SC / SC
Ukuran 20 mm x 25 mm
Ukuran 32 mm x 25 mm
Ukuran 32 mm x 20 mm
Ukuran 40 mm x 32 mm
Ukuran 40 mm x 25 mm
Ukuran 50 mm x 32 mm
Ukuran 50 mm x 40 mm
Cap
Ukuran 20 mm
Ukuran 25 mm
Ukuran 32 mm
Ukuran 40 mm
Ukuran 50 mm
Faucet Socket
Ukuran 20 mm x "
Ukuran 25 mm x "
Ukuran 32 mm x 1"
Ukuran 40 mm x 1"
Ukuran 50 mm x 1"
Ukuran 63 mm x 2"
Ukuran 90 mm x 3"
Ukuran 110 mm x 4"
Valve Socket
Ukuran 20 mm x "
Ukuran 25 mm x "
Ukuran 32 mm x 1"
Ukuran 40 mm x 1"
Ukuran 50 mm x 1"
Ukuran 63 mm x 2"
Ukuran 90 mm x 3"
Ukuran 110 mm x 4"
Inzert Reducer (short)
Ukuran 20 mm x 25 mm
Ukuran 32 mm x 25 mm
Ukuran 32 mm x 20 mm
Ukuran 40 mm x 32 mm
Ukuran 40 mm x 25 mm
Ukuran 50 mm x 40 mm
Ukuran 50 mm x 32 mm
Ukuran 63 mm x 50 mm
96 dari 102
NO.
URAIAN
SATUAN
3
buah
buah
buah
buah
buah
HARGA
SATUAN
Rp.
4
45,500
80,000
80,000
250,000
250,000
buah
buah
buah
buah
buah
buah
buah
buah
buah
341,000
450,000
415,000
515,000
480,000
480,000
1,020,000
1,140,000
1,200,000
buah
buah
buah
buah
buah
buah
buah
buah
buah
850,000
950,000
900,000
1,290,000
1,000,000
1,210,000
2,050,000
2,050,000
2,050,000
buah
buah
buah
buah
buah
buah
buah
buah
buah
3,500
4,600
5,000
6,000
8,600
12,200
27,000
35,000
80,500
buah
buah
buah
buah
buah
buah
buah
37,350
60,000
80,000
182,000
275,000
495,000
675,000
buah
buah
buah
buah
buah
buah
buah
33,000
51,500
73,500
178,000
228,500
359,500
615,000
buah
buah
buah
buah
buah
127,000
160,000
220,000
270,000
436,000
buah
buah
buah
buah
buah
buah
buah
170,000
232,000
290,000
489,000
727,000
1,192,000
1,955,000
buah
buah
buah
buah
156,000
215,000
267,000
435,000
496
497
498
499
500
501
502
503
Ukuran 90 mm x 63 mm
Ukuran 110 mm x 90 mm
Ukuran 110 mm x 63 mm
Ukuran 160 mm x 110 mm
Ukuran 160 mm x 93 mm
Rubber Ring Tee
Ukuran 63 x 63 x 63 mm
Ukuran 90 x 90 x 90 mm
Ukuran 90 x 63 x 90 mm
Ukuran 110 x 110 x 110 mm
Ukuran 110 x 90 x 110 mm
Ukuran 110 x 63 x 110 mm
Ukuran 160 x 90 x 160 mm
Ukuran 160 x 110 x 160 mm
Ukuran 160 x 160 x 160 mm
Equal & Reducer Tee RR/FL/RR
Ukuran 63 x 50 x 63 mm
Ukuran 90 x 80 x 90 mm
Ukuran 90 x 50 x 90 mm
Ukuran 110 x 100 x 100 mm
Ukuran 110 x 80 x 110 mm
Ukuran 110 x 50 x 110 mm
Ukuran 160 x 150 x 160 mm
Ukuran 160 x 100 x 160 mm
Ukuran 160 x 80 x 160 mm
Double Socket (Solvent Cement)
Ukuran 20 mm
Ukuran 25 mm
Ukuran 32 mm
Ukuran 40 mm
Ukuran 50 mm
Ukuran 63 mm
Ukuran 90 mm
Ukuran 110 mm
Ukuran 160 mm
Double Socket (Rubber Ring)
Ukuran 63 mm
Ukuran 90 mm
Ukuran 110 mm
Ukuran 160 mm
Ukuran 200 mm
Ukuran 260 mm
Ukuran 315 mm
Repair Socket (Rubber Ring)
Ukuran 63 mm
Ukuran 90 mm
Ukuran 110 mm
Ukuran 160 mm
Ukuran 200 mm
Ukuran 260 mm
Ukuran 315 mm
Flange Socket (Solvent Cement)
Ukuran 50 x 40 mm
Ukuran 63 x 50 mm
Ukuran 90 x 60 mm
Ukuran 110 x 100 mm
Ukuran 160 x 160 mm
Flange Socket (Rubber Ring)
Ukuran 63 x 50 mm
Ukuran 90 x 80 mm
Ukuran 110 x 100 mm
Ukuran 160 x 150 mm
Ukuran 200 x 200 mm
Ukuran 250 x 250 mm
Ukuran 315 x 300 mm
Flange Spigot
Ukuran 63 x 50 mm
Ukuran 90 x 80 mm
Ukuran 110 x 100 mm
Ukuran 160 x 150 mm
97 dari 102
NO.
1
504
505
506
507
508
509
URAIAN
2
Ukuran 200 x 200 mm
Ukuran 250 x 250 mm
Ukuran 315 x 300 mm
Flange
Ukuran 50 mm
Ukuran 63 mm
Ukuran 90 mm
Ukuran 110 mm
Ukuran 160 mm
Ukuran 200 mm
Ukuran 250 mm
Ukuran 315 mm
Reducer Socket/Socket (Solvent Cement)
Ukuran 63 x 50 mm
Ukuran 90 x 63 mm
Ukuran 90 x 50 mm
Ukuran 110 x 90 mm
Ukuran 110 x 63 mm
Ukuran 160 x 110 mm
Reducer Socket/Socket (Rubber Ring)
Ukuran 90 x 63 mm
Ukuran 110 x 90 mm
Ukuran 110 x 63 mm
Ukuran 160 x 110 mm
Ukuran 160 x 90 mm
Ukuran 200 x 160 mm
Ukuran 200 x 110 mm
Ukuran 250 x 200 mm
Ukuran 250 x 160 mm
Ukuran 315 x 250 mm
Ukuran 315 x 200 mm
Cap (Solvent Cement)
Ukuran 63 mm
Ukuran 90 mm
Ukuran 110 mm
Ukuran 160 mm
Cap (Rubber Ring)
Ukuran 63 mm
Ukuran 90 mm
Ukuran 110 mm
Ukuran 160 mm
Long Bend Socket/Spigot (Rubber Ring)
Ukuran 63 mm x 11
Ukuran 90 mm x 11
Ukuran 110 mm x 11
Ukuran 160 mm x 11
Ukuran 200 mm x 11
Ukuran 250 mm x 11
Ukuran 315 mm x 11
Ukuran 63 mm x 22
Ukuran 90 mm x 22
Ukuran 110 mm x 22
Ukuran 160 mm x 22
Ukuran 200 mm x 22
Ukuran 250 mm x 22
Ukuran 315 mm x 22
Ukuran 63 mm x 45
Ukuran 90 mm x 45
Ukuran 110 mm x 45
Ukuran 160 mm x 45
Ukuran 200 mm x 45
Ukuran 250 mm x 45
Ukuran 315 mm x 45
Ukuran 63 mm x 90
Ukuran 90 mm x 90
Ukuran 110 mm x 90
Ukuran 160 mm x 90
Ukuran 200 mm x 90
Ukuran 250 mm x 90
Ukuran 315 mm x 90
3
buah
buah
buah
HARGA
SATUAN
Rp.
4
650,000
1,060,000
1,722,000
buah
buah
buah
buah
buah
buah
buah
buah
76,000
95,000
129,000
156,000
240,000
243,000
549,000
710,000
buah
buah
buah
buah
buah
buah
20,500
52,500
52,500
60,000
70,000
125,000
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
75,750
106,500
107,750
207,000
197,750
330,850
322,500
579,000
575,250
953,400
930,250
buah
buah
buah
buah
21,100
33,650
40,750
85,875
buah
buah
buah
buah
36,600
66,500
129,250
196,000
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
31,400
65,200
101,100
283,250
492,750
865,000
1,390,000
36,350
73,500
114,500
332,000
564,000
970,000
1,649,500
37,750
84,000
142,500
395,000
669,000
1,228,000
2,068,000
47,000
101,675
191,500
457,900
965,250
1,741,000
3,130,000
SATUAN
98 dari 102
NO.
URAIAN
1
2
510 Long Bend Double Socket (Solvent Cement)
Ukuran 63 mm x 11
Ukuran 90 mm x 11
Ukuran 110 mm x 11
Ukuran 160 mm x 11
Ukuran 63 mm x 22
Ukuran 90 mm x 22
Ukuran 110 mm x 22
Ukuran 160 mm x 22
Ukuran 63 mm x 45
Ukuran 90 mm x 45
Ukuran 110 mm x 45
Ukuran 160 mm x 45
Ukuran 63 mm x 90
Ukuran 90 mm x 90
Ukuran 110 mm x 90
Ukuran 160 mm x 90
511 Long Bend Duoble Socket (Rubber Ring)
Ukuran 63 mm x 11
Ukuran 90 mm x 11
Ukuran 110 mm x 11
Ukuran 160 mm x 11
Ukuran 200 mm x 11
Ukuran 250 mm x 11
Ukuran 315 mm x 11
Ukuran 63 mm x 22
Ukuran 90 mm x 22
Ukuran 110 mm x 22
Ukuran 160 mm x 22
Ukuran 200 mm x 22
Ukuran 250 mm x 22
Ukuran 315 mm x 22
Ukuran 63 mm x 45
Ukuran 90 mm x 45
Ukuran 110 mm x 45
Ukuran 160 mm x 45
Ukuran 200 mm x 45
Ukuran 250 mm x 45
Ukuran 315 mm x 45
Ukuran 63 mm x 90
Ukuran 90 mm x 90
Ukuran 110 mm x 90
Ukuran 160 mm x 90
Ukuran 200 mm x 90
Ukuran 250 mm x 90
Ukuran 315 mm x 90
512 Welded Tee (FRP Reinforced) 3x Socket Rubber Ring
Ukuran 200 x 200 x 200 mm
Ukuran 200 x 160 x 200 mm
Ukuran 200 x 110 x 200 mm
Ukuran 200 x 90 x 200 mm
Ukuran 250 x 250 x 250 mm
Ukuran 315 x 315 x 315 mm
Ukuran 315 x 200 x 315 mm
Ukuran 315 x 160 x 315 mm
Ukuran 315 x 110 x 315 mm
513 Welded Tee (FRP Reinforced) 3x Socket/Flange
Ukuran 200 x 200 x 200 mm
Ukuran 200 x 160 x 200 mm
Ukuran 200 x 110 x 200 mm
Ukuran 200 x 90 x 200 mm
Ukuran 250 x 250 x 250 mm
Ukuran 315 x 300 x 300 mm
Ukuran 315 x 200 x 315 mm
Ukuran 315 x 160 x 315 mm
Ukuran 315 x 110 x 315 mm
SATUAN
3
HARGA
SATUAN
Rp.
4
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
23,725
47,050
77,000
234,000
28,000
56,000
91,000
275,650
29,500
64,500
115,250
342,000
38,600
80,400
164,200
401,300
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
51,750
94,750
145,000
381,500
643,000
891,000
1,770,000
53,500
103,000
176,650
437,500
726,750
1,273,000
1,952,000
58,700
119,500
191,000
514,000
852,000
1,580,000
2,389,000
69,500
136,500
256,600
594,400
1,208,000
2,194,000
3,399,500
buah
buah
buah
buah
buah
buah
buah
buah
buah
1,103,700
956,300
850,000
788,000
1,850,000
2,785,000
2,134,000
1,920,000
1,748,000
buah
buah
buah
buah
buah
buah
buah
buah
buah
1,650,000
1,355,000
1,190,000
1,000,000
2,765,000
4,126,000
2,690,000
2,376,000
2,110,000
99 dari 102
NO.
URAIAN
1
2
514 Perangkar Mur Baut dan Ring untuk Koneksi Flange
Ukuran 40 mm
Ukuran 50 mm
Ukuran 63 mm
Ukuran 90 mm
Ukuran 110 mm
Ukuran 160 mm
Ukuran 200 mm
Ukuran 250 mm
Ukuran 315 mm
515 Lubricant
516 Cleaner
517 Tropical Glue
518 Rubber Ring (RR)
Ukuran 63 mm
Ukuran 90 mm
Ukuran 110 mm
Ukuran 160 mm
Ukuran 200 mm
Ukuran 250 mm
Ukuran 315 mm
519 Blind Flange
Ukuran 40 mm
Ukuran 50 mm
Ukuran 80 mm
Ukuran 100 mm
Ukuran 150 mm
Ukuran 200 mm
Ukuran 250 mm
Ukuran 300 mm
520
521
522
523
524
525
526
527
528
529
530
531
532
533
534
535
536
537
538
539
540
541
542
543
544
545
546
547
548
549
550
551
552
553
554
555
556
557
558
559
Aksesories
Air valve DN 20
Air valve DN 50
Air valve DN 100
Air Vent
Bend 90GI Ukuran 15
Bend 90GI Ukuran 20
Bend 90GI Ukuran 50
Bend 90GI Ukuran 25
Bend 90GI Ukuran 32
Bend 90GI Ukuran 40
Bend 90GI Ukuran 80
Bend 45 PVC DN 80
Boch Ukuran 15
Boch Ukuran 20
Boch Ukuran 25
Boch Ukuran 32
Boch Ukuran 40
Boch Ukuran 50
Boch Ukuran 65
Boch Ukuran 100
Clamp sadle ukuran 15 x 40
Clamp sadle ukuran 15 x 50
Clamp sadle ukuran 15 x 80
Clamp sadle ukuran 20 x 40
Clamp sadle ukuran 20 x 50
Check valve DN 80
Check valve DN 100
Check valve DN 150
Dop GI ukuran 15
Dop GI ukuran 20
Dop PVC ukuran 15
Dop PVC ukuran 20
Dop PVC ukuran 25
Dop PVC ukuran 32
Dop PVC ukuran 40
Flanged spigot PVC DN 80
Flanged spigot PVC DN 150
Flanged ring steel DN 100
Gate valve flanged DN 100
Giboultr joint ukuran 40
SATUAN
3
HARGA
SATUAN
Rp.
4
buah
buah
buah
buah
buah
buah
buah
buah
buah
botol
botol
botol
23,250
23,250
23,250
48,750
53,850
193,600
208,500
290,500
362,700
41,400
34,500
47,200
buah
buah
buah
buah
buah
buah
buah
3,775
5,250
7,000
12,750
18,500
28,000
49,750
buah
buah
buah
buah
buah
buah
buah
buah
98,275
127,600
158,350
187,700
337,675
468,250
754,000
910,000
unit
unit
unit
unit
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
123,500
487,500
877,500
66,300
2,775
3,975
17,900
5,950
9,275
11,275
51,700
62,300
5,300
7,300
11,250
18,550
25,150
37,125
76,900
222,300
14,550
15,900
22,500
14,550
15,900
884,000
1,274,000
2,730,000
2,375
3,175
1,325
1,600
1,975
6,625
10,600
80,800
90,150
60,950
821,600
34,475
NO.
1
560
561
562
563
564
565
566
567
568
569
570
571
572
573
574
575
576
577
578
579
580
581
582
583
584
585
586
587
588
589
590
591
592
593
594
595
596
597
598
599
600
601
602
603
604
605
606
607
608
609
610
611
612
613
614
615
616
617
618
619
URAIAN
2
Giboultr joint ukuran 50
Giboultr joint ukuran 80
Giboultr joint ukuran 100
Giboultr joint ukuran 150
Giboultr joint for PVC DN 80
Giboultr joint for PVC DN 150
Kawat Selling lapis plastik 6 mm
Las elbow 45 DN 100
Las elbow 90 DN 100
Monom' 25 kg/Cm
Muur baud 5/8 x 2"
Pipa Screen Low Carbon 4"
Reducer G1 DN 100 x 80
Rubber packing t = 3 mm
Seal Tape / TBA
Sock G1 DN 80
Stop kran ukuran 15
Stop kran ukuran 20
Stop kran ukuran 50
TEE GI ukuran 15 x 15
TEE GI ukuran 15 x 20
TEE GI ukuran 15 x 25
TEE GI ukuran 15 x 32
TEE GI ukuran 15 x 40
TEE GI ukuran 20 x 20
TEE GI ukuran 25 x 25
TEE GI ukuran 25 x 50
TEE GI ukuran 25 x 65
TEE GI ukuran 32 x 32
TEE GI ukuran 40 x 40
TEE GI ukuran 40 x 50
TEE GI ukuran 50 x 50
TEE GI ukuran 50 x 80
TEE GI ukuran 65 x 65
TEE GI ukuran 80 x 80
TEE GI ukuran 100 x 100
TEE PVC ukuran 15 x 15
TEE PVC ukuran 15 x 20
TEE PVC ukuran 15 x 25
TEE PVC ukuran 20 x 20
TEE PVC ukuran 32 x 32
TEE PVC ukuran 32 x 50
TEE PVC ukuran 40 x 40
TEE PVC ukuran 50 x 50
TEE Y' 45 all flanged C DN 150 x 80
TIMAH SEGEL
V RING GI ukuran 15 x 20
V RING GI ukuran 20 x 25
V RING GI ukuran 25 x 32
V RING GI ukuran 32 x 40
V RING GI ukuran 50 x 65
V RING GI ukuran 65 x 80
V RING GI ukuran 80 x 100
V SOCK GI REDUCER ukuran 15 x 20
V SOCK GI REDUCER ukuran 20 x 25
V SOCK GI REDUCER ukuran 25 x 32
V SOCK GI REDUCER ukuran 32 x 40
V SOCK GI REDUCER ukuran 50 x 65
V SOCK GI REDUCER ukuran 65 x 80
V SOCK GI REDUCER ukuran 80 x 100
SATUAN
3
buah
buah
buah
buah
buah
buah
m'
buah
buah
unit
buah
buah
buah
kg
pak
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
kg
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
HARGA
SATUAN
Rp.
4
57,000
86,175
130,000
232,700
86,175
232,700
17,225
72,925
72,925
175,500
3,300
1,430,000
79,550
17,225
58,300
39,775
66,300
175,500
520,000
3,575
6,625
10,600
15,900
19,875
5,300
7,950
29,150
59,650
12,575
15,900
29,150
23,850
84,850
53,000
71,600
126,100
2,650
3,975
5,950
4,175
10,600
35,800
14,975
23,850
455,000
34,475
2,650
3,975
6,625
7,950
18,550
27,150
51,050
3,975
5,425
7,950
9,250
27,150
42,425
79,550
NO.
URAIAN
1
2
620 Water Mor
Ukuran 15
Ukuran 20
Ukuran 25
Ukuran 32
Ukuran 40
Ukuran 50
Ukuran 65
621 Water m' DN 100
622 Well Cover / Plat Borders DN 200 x 100
623 Perpack
624 Seal Tape
625 Lem Isarplas
626 Lem Kaleng
627 Box Water m'
Pompa
628 a. Pompa Submersible Non-Clogging
Kap. 900ltr/mnt 2" 1,5 kW 3 phs. 380 V
Kap. 300ltr/mnt 3" 2,2 kW 3 phs. 380 V
Kap. 600ltr/mnt 3" 3,7 kW 3 phs. 380 V
Kap. 1200ltr/mnt 4" 5,5 kW 3 phs. 380 V
Kap. 180ltr/mnt 4" 7,5 kW 3 phs. 380 V
Kap. 2400ltr/mnt 6" 11 kW 3 phs. 380 V
629 b. Pompa Submersible
Kap. 150 ltr/mnt TH: 60 m 2,2 kW 3phs. 380 V
Kap. 300 ltr/mnt TH: 60 m 5,5 kW 3phs. 380 V
Kap. 600 ltr/mnt TH: 60 m 11 kW 3phs. 380 V
Kap. 1200 ltr/mnt TH: 60 m 18,5 kW 3phs. 380 V
630 c. Pompa Centrifugal
Kap. 300 ltr/mnt TH: 40 m 5,5 kW 2900 rpm 3phs. 380 V
Kap. 600 ltr/mnt TH: 40 m 7,5 kW 2900 rpm 3phs. 380 V
Kap. 1200 ltr/mnt TH: 40 m 15 kW 2900 rpm 3phs. 380 V
Kap. 1800 ltr/mnt TH: 40 m 18,5 kW 2900 rpm 3phs. 380 V
Kap. 2400 ltr/mnt TH: 40 m 22 kW 2900 rpm 3phs. 380 V
SATUAN
3
HARGA
SATUAN
Rp.
4
buah
buah
buah
buah
buah
buah
buah
buah
buah
kg
buah
tube
kg
buah
10,600
13,250
15,900
22,500
30,475
43,750
75,575
2,600,000
455,000
17,225
2,650
5,950
33,150
19,875
unit/buahn/psg
unit/buahn/psg
unit/buahn/psg
unit/buahn/psg
unit/buahn/psg
unit/buahn/psg
20,114,890
24,457,540
29,630,398
63,992,495
72,989,670
95,821,931
unit/buahn/psg
unit/buahn/psg
unit/buahn/psg
unit/buahn/psg
25,621,105
43,849,892
71,009,156
101,773,019
unit/buahn/psg
unit/buahn/psg
unit/buahn/psg
unit/buahn/psg
unit/buahn/psg
13,409,971
14,987,911
22,179,869
26,099,658
29,966,274
Brebes,
Oktober 2008
Mengetahui,
Kepala Dinas Pekerjaan Umum
Kabupaten Brebes
Ir. KUSTIYANTO
NIP. 500 082 955