Anda di halaman 1dari 9

Nama : Mega Selvi

NIM : 2007020006

Jadwal Penggantian Sparepart Pada Pabrik Kelapa Sawit


Produksi Kebun = 2 ton/ha/bln
Kapasitas Kebun= 288000 Ton/ha/thn
Luas Kebun = 12000 ha
Libur Minggu = 54 hari
Libur Lebaran = 7 hari
Libur Lain-Lain = 16 hari
Kapasitas Pabrik= 60 tph
Kapasitas pabrik= 1000 jam
Jam Olah = 17 jam
Kapasitas Lori = 3 ton/lori

Januari Februari Maret April Mei Juni Juli Agustus September Oktober November Desember
No. Station Group Equipment Parts Standart Keterangan Keterangan
1 2 3 4 1 2 3 4 1 2 3 4 5 1 2 3 4 1 2 3 4 5 1 2 3 4 1 2 3 4 1 2 3 4 5 1 2 3 4 5 1 2 3 4 1 2 3 4 5 1 2 3 4 5

1). Cap Cages


Cages (Using Hosting 20 % Ttl Cages Penggantian dilakukan 24 kali/thn
1 Loading Ramp 2,50 ; 2,75 ; 3,75
Crane) ton Replacement Cycle/YR dan 4 cages setiap kali ganti

Penggantian wire rope = 2280


Capstan Wire Rope 0,01 Meters/Ton FFB meter

4 buah sterilizer=24 pieces/yr dan


2 Sterilizer 1) Sterilizer 60 TPH Door Packing 3 Pieces/Door/YR
4 pieces sekali ganti

Horizontal-Bunch Penggantian dilakukan setiap 823 Penggantian ke-1 setiap Januari 2009, maka
1) Chain 14000 HRS penggantian selanjutnya setiap minggu ke-2
Conveyors HK
November 2011

Penggantian dilakukan setiap 411 Penggantian ke-1 setiap awal Februari 2009, maka
Sprocket 7000 HRS HK penggantian selanjutnya setiap akhir Juli 2010

Inclined-Bunch Penggantian dilakukan setiap 558 Penggantian ke-2 setiap April 2009, maka penggantian
1) Chain 9500 HRS
Conveyors HK selanjutnya setiap minggu ke-3 Agustus 2011

Penggantian ke-1 setiap minggu ke-2 Januari 2009,


Inclined-Bunch Penggantian dilakukan setiap 235 maka penggantian selanjutnya setiap minggu ke-3 Mei
1) Conveyors Sprocket 4000 HRS HK
20011

Penggantian 4 kali masing-masing


2) Hoist Endless Chain 70000 tons FFB/Set Cahin
1 set

Sprockets 36500 tons FFB/Set Penggantian 8 kali masing-masing


Sprocket 1 set

Jumlah wire rope 374,4 meter,


1,3 Meters/1000 Tons
Wire Rope FFB dilakukan 4 kali penggantian @
93,6 meter

Conveyor Below Penggantian dilakukan setiap 647 Penggantian ke-1 setiap akhir Mei 2009, maka
3) Liner 11000 HRS
Thresher HK penggantian selanjutnya setiap minggu ke-3 April 2011

Penggantian ke-1 setiap akhir Juni 2009, maka


Penggantian dilakukan setiap 647 penggantian selanjutnya dilakukan setiap minggu ke-3
Scroll 11000 HRS HK
Mei 2011

Penggantian pertama dilakukan akhir September


700000 Tons Penggantian dilakukan setiap 700
4) Thresher Flat Bars 2009, maka penggantian selanjutnya dilakukan setiap
FFB/Thresher HK awal April 2012

5 % of Total/YR/Unit of Penggantian dilakukan sebanyak 3


3 Pressing 1) Fruit Elevator Buckets Elevator buckets/YR
Penggantian ke-1 setiap awal Maret 2009, maka
Penggantian dilakukan setiap 441 penggantian selanjutnya dilakukan setiap minggu ke-3
Chain 7500 HRS HK
September 2011
2) Fruit Distributing
Conveyor, Bottom Cross Penggantian ke-1 setiap akhir Desember 2009, maka
Penggantian dilakukan setiap 735
Conveyor, Top Cross Liner 12500 HRS penggantian seelanjutnya dilakukan setiap minggu ke-
Conveyor, Recycling HK 3 Juli 2012
Fruit Conveyor
Penggantian ke-1 setiap akhir November 2009, maka
Scroll 12500 HRS Penggantian dilakukan setiap 735 penggantian selanjutnya dilakukan setiap minggu ke-3
HK
Juni 20012

Penggantian dilakukan setiap 176


3) Digester Expeller Arms 3000 HRS HK

Penggantian dilakukan setiap 470 Penggantian ke-1 setiap awal September 2009, maka
Liner, Baffles & Bot 8000 HRS penggantian selanjutnya dilakukan setiap awal Agustus
HK
2011

Penggantian ke-1 setiap awal Desember 2009, maka


Penggantian dilakukan setiap penggantian selanjutnya dilakukan setiap minggu ke-2
Shaft 21000 HRS 1235 HK
Juni 2015

Penggantian dilakukan setiap 176


Stirring Arms 3000 HRS
HK

Penggantian ke-1 setiap akhir Maret 2009, maka


Penggantian dilakukan setiap 617 penggantian selanjutnya dilakukan setiap akhir
4) Screw Press Bearing 10500 HRS HK
Oktober 2011

Penggantian dilakukan setiap 176


4.1) Screw Press-P15 Adjusting Cone 3000 HRS
HK

Bushing for Penggantian dilakuan setiap 66


1100 HRS/SET
Lenghtening Shaft HK/Set

Penggantian pertama setiap awal Oktober 2009, maka


Penggantian dilakukan setiap 206
Lenghtening Shaft 3500 HRS HK penggantian dilakukan selanjutnya setiap awal Agustus
2010

Penggantian dilakukan setiap 147


Press Cage 2500 HRS
HK

Penggantian ke-1 setiap akhir Juli 2009, maka


Penggantian dilakukan setiap 647 penggantian selanjutnya dilakukan setiap minggu ke-2
Strainer Plate 11000 HRS HK
Juni 2012

Penggantian dilakukan setiap 59


Worm Screws 1000 HRS
HK

Penggantian ke-1 setiap minggu ke-3 September 2009,


5) Cake Breaker Liner 7000 HRS Penggantian dilakukan setiap 412 maka penggantian selanjutnya dilakukan setiap
Conveyor HK
minggu ke-3 Juli 2011

Penggantian ke-1 setiap minggu ke-3 Agustus 2009,


Penggantian dilakukan setiap 412
Scroll 7000 HRS HK maka penggantian selanjutnya dilakukan setiap
minggu ke-3 Juni 2011

Pengagntian dilakukan setiap 54


4 Nut and Kernel 1) Ripple Mill Ripple Plate 900 HRS/SET/Unit
HK

Penggantian dilakukan setiap 36


Rotor Bar 600 HRS/SET/Unit HK

Penggantian dilakukan setiap 72


Rotor Plates 1200 HRS/SET/Unit
HK

Penggantian dilakukan setiap 36


Stator Bar 600 HRS/SET/Unit HK

Dry---> 5 % Total Penggantian dilakukan sebanyak 3


2) Elevators Buckets
Buckets/YR buckets/YR

Wet---> 10 % Total Penggantian dilakukan sebanyak 5


Buckets/YR buckets/YR
Penggantian dilakukan setiap 510 Penggantian ke-1 dilakukan setiap akhir Maret 2009
Chain Dry---> 8500 HRS HK maka penggantian selanjutnya dilakukan setiap
minggu ke- Juni 2011

Penggantian dilakukan setiap 210


Wet--->3500 HRS
HK

Sprockets Dry---> 3500 HRS Penggantian dilakukan setiap 210 Penggantian pertama dilakukan setiap akhir Agustus
HK 2009, maka penggantian selanjutnya dilakukan setiap
minggu ke-2 Mei 2010

Penggantian dilakukan setiap 150


Wet--->2500 HRS HK

Penggantian dilakukan setiap 647 Penggantian ke-1 setiap akhir Mei 2009, maka
6) Fiber Cyclone Airlock 11000 HRS penggantian selanjutnya dilakukan setiap minggu ke-2
HK
April 2012

Penggantian ke-1 setiap akhir Oktober 2009, amak


Penggantian dilakukan setiap penggantian selanjutnya dilakukan setiap awal Agustus
6) Kernel Silo Airlock 26000 HRS 1529 HK
2015

Penggantian dilakukan setiap 323 Penggantian ke-1 setiap awal November 2009, maka
6) LTDS Cyclone Airlock 5500 HRS
HK penggantian selanjutnya setiap minggu ke-2 Mei 2011

Penggantian ke-1 setiap awal Juli 2009, maka


Penggantian dilakukan setiap 676 penggantian selanjutnya dilakukan setiap minggu ke-3
6) Nut Cyclone Airlock 11500 HRS HK
Juni 2012

Penggantian ke-1 setiap akhir September 2009, maka


Penggantian dilakukan setiap
6) Umpan Ripple Mill Airlock 21000 HRS penggantian selanjutnya dilakukan setiap minggu ke-2
1235 HK April 2015

Crude Oil Penggantian dilakukan setiap 647 Penggantian ke-1 setiap minggu ke-4 Maret 2009,
5 Clarification 1) Bearing 11000 HRS maka penggantian selanjutnya dilakukan setiap akhir
Vibrating Screen HK
November 2011

Screens 60 TPH = 4 Screens/YR 4 screen/YR

Penggantian pertama setiap awal Mei 2009, maka


Penggantian dilakukan setiap 323
2) Solids Conveyor Liner 6000 HRS penggantian selanjutnya dilakukan setiap akhir
HK Agustus 2010

Penggantian dilakukan setiap 176


Scrool 3000 HRS HK

Penggantian dilakuakn 2
3) Sand Cyclone Keramik Cone 2 Pieces/Unit/YR
unit/pieces/YR

4) Sludge Vibrating Clamp Rings 60 TPH = 1,5 Clamps/YR 1,5 clamps/YR


Screen

Hycer Gasket 60 TPH = 4 Gasket/YR 4 gaskets/YR

Screens 60 TPH = 4 Screens/YR 4 screen/YR

Penggantian ke-1 setiap akhir Juni 2009, maka


Penggantian dilakukan setiap 647 penggantian selanjutnya dilakukan setiap minggu ke-2
5) Sludge Centrifuge Bearing 11000 HRS HK
Mei 2012

Penggantian dilakukan setiap 428 Penggantian ke-1 setiap minggu ke-2 Mei 2009, maka
Cap Nut 3000 HRS/PC
HK/PC penggantian selanjutnya dilakukan setiap akhir
November 2010

Penggantian dilakukan setiap 324 Penggantian ke-1 setiap minggu ke-3 Juli 2009, maka
Lock Nut 5500 HRS/PC HK/PC penggantian selanjutnya dilakukan setiap akhir
September 2010

Penggantian dilakukan setiap 324 Penggantian ke-1 setiap minggu ke-3 Agustus 2009,
Nozzle Holder 5500 HRS/PC
HK/PC maka penggantian selanjutnya dilakukan setiap akhir
November 2010

Penggantian dilakuakan setiap 428 Penggantian ke-1 setiap minggu ke-2 Februari, maka
Nozzles 3000 HRS/Nozzle
HK/Nozzle penggantian selanjutnya dilakukan setiap minggu ke-2
Mei 2012
6 Boiler 1) ID Fan Impeller 1 Unit/17000 HRS/Boiler 1 unit/1000 HK/boiler Penggantian ke-1 dilakukan setiap minggu ke-3 Januari
2009, maka penggantian selanjutnya dilakukan setiap
minggu ke-2 Juni 2012

1 Set/8000 HRS/Unit Penggantian dilakukan setiap 941 Penggantian ke-1 akhir Maret 2009, maka penggantian
2) Dust Cyclone Cyclones
Boiler HK selanjutnya dilakukan akhir Juli 2012

5) Fuel Conveyor Liners 16000 HRS Penggantian dilakukan setiap 941 Penggantian pertama akhir Mei 2009, maka
HK penggantian selanjutnya dilakukan akhir Juli 2012

Penggantian pertama akhir Agustus 2009, maka


Penggantian dilakukan setiap 941
Scrool 16000 HRS HK penggantian selanjutnya dilakukan akhir November
2012

EB. Horizontal Penggantian dilakukan setiap 941 Penggantian ke-1 akhir Desember 2009, maka
7 Empty Bunch 1) Chain 16000 HRS
Conveyor HK penggantian selanjutnya dilakukan setiap akhir Maret
2013

Penggantian dilakukan setiap 470 Penggantian ke-1 setiap awal Maret 2009, maka
Sprocket-2 Sets 8000 HRS HK penggantian selanjutnya dilakukan setiap minggu ke-2
Oktober 2010

EB. Inclined Penggantian dilakukan setiap 500 Penggantian pertama setiap awal April 2009, maka
2) Chain 8500 HRS
Conveyor HK penggantian selanjutnya dilakukan setiap akhir
Desember 2010

Penggantian dilakukan setiap 265


Sprocket-2 Sets 4500 HRS HK

Bunch Crusher Penggantian dilakukan setiap 970 Penggantian ke-1 setiap minggu ke-2 Desember 2009,
3) Chain 16500 HRS
Elevator HK maka penggantian selanjutnya dilakukan setiap akhir
Mei 2014

Penggantian dilakukan setiap 500 Penggantian ke-1 setiap awal Mei 2009, maka
Sprocket-2 Sets 8500 HRS
HK penggantian selanjutnya dilakukan setiap akhir Januari
2011
Biaya Gaji Karyawan Pada PT. Bias Senja
BHL = 1/7*Upah/hari
SKUH = 3/20 * Upah/hari
SKUB = 1/173 * Upah/bulan
Jumlah jam lembur = 1,75 jam
Jumlah jam kerja = 24 HK
Upah per hari = Rp. 30.000

No. Nama Jabatan Status Gaji Pokok Lembur Gaji Pokok + Januari Februari Maret April Mei Juni Juli Agustus September Oktober November Desember Gaji Pokok +
Lembur/Bln Lembur/Thn

1 Aji Mandor SKU-B 1,500,000 364,162 1,864,162 1,864,162 1,864,162 1,864,162 1,864,162 1,864,162 1,864,162 1,864,162 1,864,162 1,864,162 1,864,162 1,864,162 1,864,162 22,369,944
2 Joko Wakil Mandor SKU-B 1,350,000 327,746 1,677,746 1,677,764 1,677,764 1,677,764 1,677,764 1,677,764 1,677,764 1,677,764 1,677,764 1,677,764 1,677,764 1,677,764 1,677,764 20,133,168
3 Sukir Teknisi SKU-B 1,100,000 267,052 1,367,052 1,367,052 1,367,052 1,367,052 1,367,052 1,367,052 1,367,052 1,367,052 1,367,052 1,367,052 1,367,052 1,367,052 1,367,052 16,404,624
4 Jadi Teknisi SKU-B 1,100,000 267,052 1,367,052 1,367,052 1,367,052 1,367,052 1,367,052 1,367,052 1,367,052 1,367,052 1,367,052 1,367,052 1,367,052 1,367,052 1,367,052 16,404,624
5 Dedi Teknisi SKU-B 1,100,000 267,052 1,367,052 1,367,052 1,367,052 1,367,052 1,367,052 1,367,052 1,367,052 1,367,052 1,367,052 1,367,052 1,367,052 1,367,052 1,367,052 16,404,624
6 Kirman Teknisi SKU-B 1,100,000 267,052 1,367,052 1,367,052 1,367,052 1,367,052 1,367,052 1,367,052 1,367,052 1,367,052 1,367,052 1,367,052 1,367,052 1,367,052 1,367,052 16,404,624
7 Sahat Teknisi SKU-B 1,100,000 267,052 1,367,052 1,367,052 1,367,052 1,367,052 1,367,052 1,367,052 1,367,052 1,367,052 1,367,052 1,367,052 1,367,052 1,367,052 1,367,052 16,404,624
8 Jono Teknisi SKU-B 1,100,000 267,052 1,367,052 1,367,052 1,367,052 1,367,052 1,367,052 1,367,052 1,367,052 1,367,052 1,367,052 1,367,052 1,367,052 1,367,052 1,367,052 16,404,624
9 Murdi Teknisi SKU-B 1,100,000 267,052 1,367,052 1,367,052 1,367,052 1,367,052 1,367,052 1,367,052 1,367,052 1,367,052 1,367,052 1,367,052 1,367,052 1,367,052 1,367,052 16,404,624
10 Salut Teknisi SKU-B 1,100,000 267,052 1,367,052 1,367,052 1,367,052 1,367,052 1,367,052 1,367,052 1,367,052 1,367,052 1,367,052 1,367,052 1,367,052 1,367,052 1,367,052 16,404,624
11 Ramlan Teknisi SKU-B 1,100,000 267,052 1,367,052 1,367,052 1,367,052 1,367,052 1,367,052 1,367,052 1,367,052 1,367,052 1,367,052 1,367,052 1,367,052 1,367,052 1,367,052 16,404,624
12 Arif Teknisi SKU-B 950,000 230,636 1,180,636 1,180,636 1,180,636 1,180,636 1,180,636 1,180,636 1,180,636 1,180,636 1,180,636 1,180,636 1,180,636 1,180,636 1,180,636 14,167,632
13 Mustakim Teknisi SKU-B 950,000 230,636 1,180,636 1,180,636 1,180,636 1,180,636 1,180,636 1,180,636 1,180,636 1,180,636 1,180,636 1,180,636 1,180,636 1,180,636 1,180,636 14,167,632
14 Wardi Teknisi SKU-B 950,000 230,636 1,180,636 1,180,636 1,180,636 1,180,636 1,180,636 1,180,636 1,180,636 1,180,636 1,180,636 1,180,636 1,180,636 1,180,636 1,180,636 14,167,632
15 Kardi Teknisi SKU-B 950,000 230,636 1,180,636 1,180,636 1,180,636 1,180,636 1,180,636 1,180,636 1,180,636 1,180,636 1,180,636 1,180,636 1,180,636 1,180,636 1,180,636 14,167,632
16 Heri Teknisi SKU-B 850,000 206,358 1,056,358 1,056,358 1,056,358 1,056,358 1,056,358 1,056,358 1,056,358 1,056,358 1,056,358 1,056,358 1,056,358 1,056,358 1,056,358 12,676,296
17 Sulaiman Teknisi SKU-B 850,000 206,358 1,056,358 1,056,358 1,056,358 1,056,358 1,056,358 1,056,358 1,056,358 1,056,358 1,056,358 1,056,358 1,056,358 1,056,358 1,056,358 12,676,296
18 Warno Teknisi SKU-B 850,000 206,358 1,056,358 1,056,358 1,056,358 1,056,358 1,056,358 1,056,358 1,056,358 1,056,358 1,056,358 1,056,358 1,056,358 1,056,358 1,056,358 12,676,296
19 Saiful Teknisi SKU-H 800,000 210,000 1,010,000 1,010,000 1,010,000 1,010,000 1,010,000 1,010,000 1,010,000 1,010,000 1,010,000 1,010,000 1,010,000 1,010,000 1,010,000 12,120,000
20 Budi Teknisi SKU-H 800,000 210,000 1,010,000 1,010,000 1,010,000 1,010,000 1,010,000 1,010,000 1,010,000 1,010,000 1,010,000 1,010,000 1,010,000 1,010,000 1,010,000 12,120,000
21 Sitorus Teknisi SKU-H 800,000 210,000 1,010,000 1,010,000 1,010,000 1,010,000 1,010,000 1,010,000 1,010,000 1,010,000 1,010,000 1,010,000 1,010,000 1,010,000 1,010,000 12,120,000
22 Pangaribuan Teknisi SKU-H 800,000 210,000 1,010,000 1,010,000 1,010,000 1,010,000 1,010,000 1,010,000 1,010,000 1,010,000 1,010,000 1,010,000 1,010,000 1,010,000 1,010,000 12,120,000
23 Markus Teknisi SKU-H 800,000 210,000 1,010,000 1,010,000 1,010,000 1,010,000 1,010,000 1,010,000 1,010,000 1,010,000 1,010,000 1,010,000 1,010,000 1,010,000 1,010,000 12,120,000
24 Seno Teknisi BHL 700,000 175,000 875,000 875,000 875,000 875,000 875,000 875,000 875,000 875,000 875,000 875,000 875,000 875,000 875,000 10,500,000
25 Ratman Teknisi BHL 700,000 175,000 875,000 875,000 875,000 875,000 875,000 875,000 875,000 875,000 875,000 875,000 875,000 875,000 875,000 10,500,000
Total 30,536,994 30,536,994 30,536,994 30,536,994 30,536,994 30,536,994 30,536,994 30,536,994 30,536,994 30,536,994 30,536,994 30,536,994 30,536,994 366,443,928
Jumlah Biaya Penggantian Sparepart Tahun 2009 Pada PT. Bias Senja
Produksi Kebun = 2 ton/ha/bln
Kapasitas Kebun = 288000 ton/thn
Luas Kebun = 12000 ha
Libur Minggu = 54 hari
Libur Lebaran = 7 hari
Libur Lain-Lain = 16 hari
Kapasitas Pabrik = 60 tph
Kapasitas pabrik/hari = 1000 jam
Jam Olah = 17 jam
Kapasitas Lori = 3 ton/lori
Jumlah HK = 288 HK

No. Station Group Equipment Parts Standart Keterangan Jumlah Harga Januari Februari Maret April Mei Juni Juli Agustus September Oktober November Desember Biaya per Tahun

Cages (Using Hosting 1). Cap Cages 20 % Ttl Cages Penggantian dilakukan
1 Loading Ramp 2,50 ; 2,75 ; 3,75 Replacement 24 kali/thn dan 4 cages 15 juta/ea 60,000,000 60,000,000 60,000,000 60,000,000 60,000,000 60,000,000 360,000,000
Crane) ton Cycle/YR setiap kali ganti

Capstan Wire Rope 0,01 Meters/Ton FF Penggantian wire rope = 23 rb/meter 52,440,000 52,440,000
2280 meter

4 buah sterilizer=24
2 Sterilizer 1) Sterilizer 60 TPH Door Packing 3 Pieces/Door/YR pieces/yr dan 4 pieces 4 Sterilizer 182 rb/ea 728,000 728,000 728,000 728,000 728,000 728,000 4,368,000
sekali ganti

Horizontal- Penggantian dilakukan 1 Conveyor (2


1) Bunch Chain 14000 HRS 368 rb/side 736,000 736,000
setiap 823 HK side)
Conveyors

Sprocket 7000 HRS Penggantian dilakukan 415 rb/ea 1,660,000 1,660,000


setiap 411 HK

Inclined-Bunch Penggantian dilakukan 1 Conveyor (2


1) Chain 9500 HRS 368 rb/side 736,000 736,000
Conveyors setiap 558 HK side)

1) Inclined-Bunch Sprocket 4000 HRS Penggantian dilakukan 415 rb/ea 415,000 415,000
Conveyors setiap 235 HK

70000 tons Penggantian 4 kali 2 Hoist crane


2) Hoist Endless Chain 650 rb/ea 1,300,000 1,300,000 1,300,000 1,300,000 5,200,000
FFB/Set Cahin masing-masing 1 set (2 side)

36500 tons Penggantian 8 kali


Sprockets 950 rb/ea 1,900,000 1,900,000 1,900,000 1,900,000 1,900,000 1,900,000 1,900,000 1,900,000 15,200,000
FFB/Set Sprocket masing-masing 1 set

Jumlah wire rope 374,4


1,3 Meters/1000 meter, dilakukan 4 kali
Wire Rope 56 rb/meter 5,241,600 5,241,600 5,241,600 5,241,600 20,966,400
Tons FFB penggantian @ 93,6
meter

Conveyor Below Liner Penggantian dilakukan 1,975


3) 11000 HRS 3 Threshing 5,925,000 5,925,000
Thresher setiap 647 HK jt/conveyor

Scroll 11000 HRS Penggantian dilakukan 1,45 4,350,000 4,350,000


setiap 647 HK jt/conveyor

700000 Tons Penggantian dilakukan


4) Thresher Flat Bars 3 Threshing 9,5 jt/treshing 28,500,000 28,500,000
FFB/Thresher setiap 700 HK

5 % of
3 Pressing 1) Fruit Elevator Buckets Total/YR/Unit of Penggantian dilakukan 3 Elevator 187 rb/bucket 1,683,000 1,683,000
Elevator sebanyak 3 buckets/YR

Penggantian dilakukan
Chain 7500 HRS 300 rb/side 600,000 600,000
setiap 441 HK
2) Fruit Distributing
Conveyor, Bottom
Cross Conveyor, Top Penggantian dilakukan Masing-masing 1,975
Liner 12500 HRS 7,900,000 7,900,000
Cross Conveyor, setiap 735 HK conveyor jt/conveyor
Recycling Fruit
Conveyor
Penggantian dilakukan 1,45
Scroll 12500 HRS 5,800,000 5,800,000
setiap 735 HK jt/conveyor

4 mesin press
3) Digester Expeller Arms 3000 HRS Penggantian dilakukan (1 Expeller 674 rb/ea 2,696,000 2,696,000 5,392,000
setiap 176 HK arms/digester)
1,2 jt/liner ;
Liner, Baffles & Penggantian dilakukan 450 rb/bafle
8000 HRS digester ; 2,1 10,050,000 10,050,000
Bottom Plate setiap 470 HK
jt/bottom
plate digester
Penggantian dilakukan
Shaft 21000 HRS 2,75 jt/ea 11,000,000 11,000,000
setiap 1235 HK

Stirring Arms 3000 HRS Penggantian dilakukan 1,5 jt/digester 6,000,000 6,000,000 12,000,000
setiap 176 HK

4) Screw Press Bearing 10500 HRS Penggantian dilakukan 2,85 jt/ea 22,800,000 22,800,000
setiap 617 HK

4.1) Screw Press-P15 Adjusting Cone 3000 HRS Penggantian dilakukan 987 rb/ea 3,948,000 3,948,000 7,896,000
setiap 176 HK

Bushing for Penggantian dilakuan 2 Bushing for


Lenghtening 1100 HRS/SET lenghtening 244 rb/ea 1,952,000 1,952,000 1,952,000 1,952,000 7,808,000
setiap 66 HK/Set
Shaft shaft

Lenghtening 3500 HRS Penggantian dilakukan 2 Lenghtening 2,05 jt/ea 16,400,000 16,400,000
Shaft setiap 206 HK Shaft

Penggantian dilakukan
Press Cage 2500 HRS 4,945 jt/ea 19,780,000 19,780,000 39,560,000
setiap 147 HK

Strainer Plate 11000 HRS Penggantian dilakukan 785 rb/ea 3,140,000 3,140,000
setiap 647 HK

Worm Screws 1000 HRS Penggantian dilakukan 2 Worm 5,175 jt/ea 41,400,000 41,400,000 41,400,000 41,400,000 41,400,000 207,000,000
setiap 59 HK Screws

Cake Breaker Penggantian dilakukan 1,975


5) Liner 7000 HRS 1,975,000 1,975,000
Conveyor setiap 412 HK jt/conveyor

Scroll 7000 HRS Penggantian dilakukan 1,45 1,450,000 1,450,000


setiap 412 HK jt/conveyor

Penggantian dilakukan 576 rb/ripple


4 Nut and Kernel 1) Ripple Mill Ripple Plate 900 HRS/SET/Unit 4 Ripple mill 2,304,000 2,304,000 2,304,000 2,304,000 2,304,000 2,304,000 13,824,000
setiap 54 HK mill

Rotor Bar 600 HRS/SET/Unit Penggantian dilakukan 625 rb/ripple 2,500,000 2,500,000 2,500,000 2,500,000 2,500,000 2,500,000 2,500,000 2,500,000 2,500,000 2,500,000 2,500,000 27,500,000
setiap 36 HK mill

2) Elevators Buckets Dry---> 5 % Total Penggantian dilakukan 4 Elevators 155 rb/buckets 1,860,000 1,860,000
Buckets/YR sebanyak 3 buckets/YR

Wet---> 10 % Total Penggantian dilakukan


1 Elevator 155 rb/buckets 775,000 775,000
Buckets/YR sebanyak 5 buckets/YR

Penggantian dilakukan
Chain Dry---> 8500 HRS setiap 510 HK 4 Elevators 1,1 jt/side 8,800,000 8,800,000

Penggantian dilakukan
Wet--->3500 HRS setiap 210 HK 1 Elevator 1,1 jt/side 2,200,000 2,200,000 4,400,000

Penggantian dilakukan
Sprockets Dry---> 3500 HRS setiap 210 HK 4 Elevators 800 rb/ea 12,800,000 12,800,000

Penggantian dilakukan
Wet--->2500 HRS 1 Elevator 800 rb/ea 3,200,000 3,200,000 6,400,000
setiap 150 HK

Penggantian dilakukan
6) Fiber Cyclone Airlock 11000 HRS 2 Fiber cyclone 1,35 jt/ea 2,700,000 2,700,000
setiap 647 HK

Penggantian dilakukan
6) Kernel Silo Airlock 26000 HRS setiap 1529 HK 2 Kernel silo 1,35 jt/ea 2,700,000 2,700,000

6) LTDS Cyclone Airlock 5500 HRS Penggantian dilakukan 2 LTDS 1,35 jt/ea 2,700,000 2,700,000
setiap 323 HK

Penggantian dilakukan
6) Nut Cyclone Airlock 11500 HRS setiap 676 HK 1 Nut transport 1,35 jt/ea 1,350,000 1,350,000

Umpan Ripple Penggantian dilakukan


6) Airlock 21000 HRS 4 Ripple mill 1,35 jt/ea 5,400,000 5,400,000
Mill setiap 1235 HK

3 Vibrating
Crude Oil Penggantian dilakukan
5 Clarification 1)
Vibrating Screen Bearing
11000 HRS screen ; 2 1,25 jt/ea 7,500,000 7,500,000
setiap 647 HK
ea/screen

60 TPH = 4
Screens 4 screen/YR 1,55 jt/ea 9,300,000 9,300,000
Screens/YR

Penggantian dilakukan 1,975


2) Solids Conveyor Liner 6000 HRS setiap 323 HK jt/conveyor 1,975,000 1,975,000
Scrool 3000 HRS Penggantian dilakukan 1,45 1,450,000 1,450,000 2,900,000
setiap 176 HK jt/conveyor

4) Sludge Vibrating Clamp Rings 60 TPH = 1,5 1,5 clamps/YR Double deck ; 1 215 rb/ea 430,000 430,000
Screen Clamps/YR Vibra screen

Hycer Gasket 60 TPH = 4 Gasket/ 4 gaskets/YR 2 Hycer Gasket 85 rb/ea 680,000 680,000

Screens 60 TPH = 4 4 screen/YR 2 Screens 1,55 jt/ea 12,400,000 12,400,000


Screens/YR

8 Sludge
Sludge Penggantian dilakukan centrifugde
5) Centrifuge Bearing 11000 HRS setiap 647 HK 6000 ltr/jm ; 2 1,87 jt/ea 29,920,000 29,920,000
bearing/centrif
udge

Cap Nut 3000 HRS/PC Penggantian dilakukan 6 Cap nut 96 rb/ea 570,000 570,000
setiap 428 HK/PC

Lock Nut 5500 HRS/PC Penggantian dilakukan 6 Lock nut 56 rb/ea 336,000 336,000
setiap 324 HK/PC

Penggantian dilakukan 6 Nozzle


Nozzle Holder 5500 HRS/PC setiap 324 HK/PC Holder 134 rb/ea 804,000 804,000

Nozzles 3000 HRS/Nozzle Penggantian dilakuakan 6 Nozzles 43 rb/ea 258,000 258,000


setiap 428 HK/Nozzle

1 Unit/17000
6 Boiler 1) ID Fan Impeller HRS/Boiler 1 unit/1000 HK/boiler 2 Boiler 20 ton/ 4,25 jt/ea 8,500,000 8,500,000

2) Dust Cyclone Cyclones 1 Set/8000 Penggantian dilakukan 3 jt/ea 6,000,000 6,000,000


HRS/Unit Boiler setiap 941 HK

5) Fuel Conveyor Liners 16000 HRS Penggantian dilakukan 1 Conveyor 2,375 2,375,000 2,375,000
setiap 941 HK jt/conveyor

Penggantian dilakukan 1,85


Scrool 16000 HRS 1,850,000 1,850,000
setiap 941 HK jt/conveyor

EB. Horizontal Penggantian dilakukan 1 Conveyor (2


7 Empty Bunch 1) Chain 16000 HRS 468 rb/side 936,000 936,000
Conveyor setiap 941 HK side)

Penggantian dilakukan
Sprocket-2 Sets 8000 HRS setiap 470 HK 515 rb/ea 2,060,000 2,060,000

EB. Inclined Penggantian dilakukan


2) Conveyor Chain 8500 HRS setiap 500 HK 468 rb/side 936,000 936,000

Penggantian dilakukan
Sprocket-2 Sets 4500 HRS setiap 265 HK 515 rb/ea 2,060,000 2,060,000 4,120,000

Bunch Crusher Penggantian dilakukan


3) Chain 16500 HRS 378 rb/side 756,000 756,000
Elevator setiap 970 HK

Penggantian dilakukan
Sprocket-2 Sets 8500 HRS 485 rb/ea 1,940,000 1,940,000
setiap 500 HK

Jumlah 126,748,600 18,602,000 55,810,000 112,645,600 28,243,000 121,482,000 59,326,000 103,855,600 54,315,000 129,284,000 69,288,000 171,105,600 1,050,705,400
Jumlah Biaya Pada PT. Bias Senja

No. Keterangan Biaya


1. Total Biaya
- Biaya penggantian sparepart Rp1,050,705,400
- Biaya gaji karyawan & lembur Rp366,443,928
Jumlah Rp1,417,149,328
2. Produksi TBS/Thn Rp288,000
3. Produksi CPO/Thn Rp64,800
4. Rupiah/Kg TBS Rp5
5. Rupiah/Kg CPO Rp22

Anda mungkin juga menyukai