Anda di halaman 1dari 4

DAILY REPORT

Proyek : METHANOL TANK 4 X 5 KMT


INSPECTION TYPE :

Subject

SUMMARY DAY OF PILE DRIVING RECORD

PILING WORK DAILY

Location: Kapten Darmo Sugondo Gresik


Date: 20 Januari 2013
s/d

TYPE OF MACHINE DRIVING

COMMENT / NOTE

No. of Page

HAMMER DD - 40 & DD 53

1.. Of 1

PILE DATA

No.

Date

Axis

ID Pile

Pile Cap

No.

Final

Section Pile

Type

PILING CARASTERISTIC

Total

Pene-

Dolly /

Length

tration of

Ruyung

Joint

Potong

Stroke

Settle-

Amount

Weight

Total

Pile

of

ment of

of

of

Blow

Hammer

one drive

Rebound

Hammer

Pile
(m)

(m)

(mm)

(m)

(m)

(m)

(m)

(cm)

(cm)

(cm)

(ton)

(blow)

METHANOL TANK

65

400

13

13

26

26

200

1.34

0.7

5.3

658

TC-38

20-Jan-14

METHANOL TANK

66

400

13

13

26

26

200

1.28

0.7

5.3

679

TC-38

20-Jan-14

METHANOL TANK

67

400

13

13

26

26

200

1.45

0.8

5.3

681

TC-38

20-Jan-14

METHANOL TANK

68

400

13

13

26

26

200

1.27

0.8

5.3

686

TC-38

20-Jan-14

METHANOL TANK

44

400

13

13

26

26

200

1.45

0.7

5.3

691

TC-38

20-Jan-14

METHANOL TANK

43

400

13

13

26

26

200

1.36

0.8

5.3

684

TC-38

20-Jan-14

METHANOL TANK

42

400

13

13

26

26

200

1.30

0.8

5.3

685

TC-38

20-Jan-14

METHANOL TANK

41

400

13

13

26

26

200

1.29

0.8

5.3

689

TC-38

20-Jan-14

METHANOL TANK

25

400

13

13

26

26

200

1.34

0.8

5.3

690

TC-38

10

20-Jan-14

METHANOL TANK

24

400

13

13

26

26

200

1.32

0.7

5.3

682

TC-38

11

20-Jan-14

METHANOL TANK

23

400

13

13

26

26

200

1.25

0.7

5.3

685

TC-38

12

20-Jan-14

METHANOL TANK

67

400

13

13

26

26

200

0.93

0.6

5.3

752

TC-38

13

20-Jan-14

METHANOL TANK

68

400

13

13

26

26

200

0.90

0.7

736

TC-14

14

20-Jan-14

METHANOL TANK

44

400

13

13

26

26

200

1.01

0.6

730

TC-14

15

20-Jan-14

METHANOL TANK

25

400

13

13

26

26

200

0.97

1.0

734

TC-14

16

20-Jan-14

METHANOL TANK

12

400

13

13

26

26

200

1.05

0.7

742

TC-14

17

20-Jan-14

METHANOL TANK

69

400

13

13

26

26

200

1.04

0.7

702

TC-14

18

20-Jan-14

METHANOL TANK

45

400

13

13

26

26

200

1.01

0.8

748

TC-14

19

20-Jan-14

METHANOL TANK

26

400

13

13

26

26

200

1.03

0.8

740

TC-14

20

20-Jan-14

METHANOL TANK

70

400

13

13

26

26

200

1.05

0.6

718

TC-14

21

20-Jan-14

METHANOL TANK

46

400

13

13

26

26

200

1.12

0.7

720

TC-14

546

0.0

Quantity unit

(nos)

Rig

Qa

20-Jan-14

AKTIVITAS

(m)

Unit

TOTAL TITIK REACTION 400mm

(m)

Bearing
Cap*)

0.0

Keterangan/ Remark

ttk
ttk

TOTAL PEMANCANGAN HARI INI

TOTAL PEMANCANGAN s/d HARI INI

7
0
7

ttk
ttk
ttk

REMARK / CATATAN LAIN-LAIN:


TADANO KRAINE SERVIS
JAM : 07.30 - 16.00 -> Lansir Pile

(code)

21

ttk

TOTAL PEMANCANGAN s/d HARI KEMARIN

(ton)

Jam kerja alat

ABSENSI : (Nama)
1 AHMAD SAKRON
2 JUNAIDI
3 PURWANTO
4 SUKARMAN
5 SANCOKO
7 BUDI S.
8 ISYA' A.
9 DWI ISMANTO
10 JASMO
11 T. ANWAR
12 SYAMSUDIN
13 HERI
14 KUSAINI (DRIVER
15 A. ARIF M. (LOGI

Dibuat oleh :

( AHMAD SAKRONI )

Diperiksa oleh

disetujuhi oleh :

PILING WORK DAILY

Location: Kapten Darmo Sugondo Gresik


s/d
No. of Page
1.. Of 1..

REMARK

TANKI 4
TANKI 4
TANKI 4
TANKI 4
TANKI 4
TANKI 4
TANKI 4
TANKI 4
TANKI 4
TANKI 4
TANKI 4
TANKI 2
TANKI 2
TANKI 2
TANKI 2
TANKI 2
TANKI 2
TANKI 2
TANKI 2
TANKI 2
TANKI 2

ABSENSI : (Nama)
AHMAD SAKRONI
JUNAIDI
PURWANTO
SUKARMAN
SANCOKO
BUDI S.
ISYA' A.
DWI ISMANTO
JASMO
T. ANWAR
SYAMSUDIN
HERI
KUSAINI (DRIVER)
A. ARIF M. (LOGISTIC)

Anda mungkin juga menyukai