Generic RF Engineering Replacement Documents
for
MatrixX

Not all MatrixX project fields are required to be populated with the prescribed RF
Design and Optimisation documents.

The following table details which are documents required and the MatrixX fields that
may be populated with this generic document.


0ocument
Hatr|x
workorder Type
8tage 1 P0
Property
r|ef
RF Report
8tage 2 P0
6onf|g
0ata for
0E
8tage 2 P0
P|umb|ng
0|agram
Acceptanc
e Report
NeW 3|le R R R R R R R
3eclor|sal|or NA R R R R
1
R R
Terps & Trarsporlao|es NA R R NA NA R NA
w850 Capac|ly Expars|or
(Nole )
NA C C
2
NA NA R R
w2100 Capac|ly Expars|or
(Nole )
NA C C
2
R R R R
w850 & w2100 Capac|ly
Expars|or (Nole )
NA C C
2
R R R R
3|le Re|ocal|or R R R R R R R
3|le Rerova| NA NA NA NA NA NA NA
ToWer 3Wap NA R R R R R C
Arlerra 3Wap or Add|l|or NA R R R R R C
Arlerra Re|ocal|or NA R R R R R C
xCEV Card Expars|or NA NA NA NA NA NA NA
TVA lrsla|| NA C
3
NA NA NA R NA
Equ|prerl Re|ocal|or NA C
1
NA NA NA NA NA
Equ|prerl Rerova| NA NA NA NA NA NA NA
V|ror wor|s NA C
5
C
5
NA NA NA NA
NOTES:

R - Document required
R
1
- Stage 2 PO for Sectorisaton = Sectorisation PO
NA - Not applicable (may be populated with generic document)
C - Conditional
C
2
- Required if new carrier expansion exceeds the current consented power
C
3
- Required if existing RMA does not include TMAs
C
4
- Required if equipment require RMA (e.g. relocation of roadside cabinet)
C
5
- Required if minor works involve antenna relocation/addition
6 Required if additional cabinet, RRH, antenna for existing or new frequency bad or RMA/Lease
Area changes.

The above table sets a general guideline for documentation with respect to various work-order types.
The actual documentations may vary and should be consider on a case-by-case scenario depending
on the situation.