NATIONAL HIGHWAY AUTHORITY

PESHAWAR NORTHERN BYPASS (PACKAGE-1)


M-1 INTERCHANGE TO CHARSADDA ROAD
KM 0 + 000 TO 7 + 600
MATRACON JV (PVT) LTD

E.A

CONTRACTOR

CONSULTANT

CONCRETE COMPRESSIVE STRENGTH (T22)


Concrete Class:A-1

Trial # : 10-B

Dated:05.04.2010

Lab No.

Source Of Aggregate : Batching plant stock pile (MARGALLA SOURCE)


Concrete Class. A-1

Date Moulded.08.03.2010

Structure Location. Laboratory Trail


Curing:
Cylinde
r No.

RFT No.

Request No.
Part of Structure:

Structure No.

Laboratory
Testing
Date

Age
Days

Dimensions (cm)

Area
(cm2)

D1

D2

Avg

Type of

Load (KN)

Fracture

Compressive
strength
Kg/ cm2

04

15.03.10

30.48

15.24

15.24

15.24

182.4

320

178.9

05

15.03.10

30.48

15.24

15.24

15.24

182.4

310

173.3

06

15.03.10

30.48

15.24

15.24

15.24

182.4

330

184.5

Average for
Tested by:
Checked By:

7 days

178.9

Date:

Reported for 7 days

179

07

05.04.10

28

30.48

15.24

15.24

15.24

182.4

500

279.5

08

05.04.10

28

30.48

15.24

15.24

15.24

182.4

520

290.7

09

05.04.10

28

30.48

15.24

15.24

15.24

182.4

490

273.9

Tested By :

Dated :

Average for 28 days

281.4

Checked By :

Dated :

Reported for 28 days

281

Cylinder No.

SSD Mass (g)

(ii) Tested by:


Remarks:

Date:

Volume (cc)

Density (g/cc)

Average

(g/cc)

CONTRACTOR

CONSULTANTS

Material Engineer:_________________

Material Engineer: __________________