E.A
CONTRACTOR
CONSULTANT
Trial # : 10-B
Dated:05.04.2010
Lab No.
Date Moulded.08.03.2010
RFT No.
Request No.
Part of Structure:
Structure No.
Laboratory
Testing
Date
Age
Days
Dimensions (cm)
Area
(cm2)
D1
D2
Avg
Type of
Load (KN)
Fracture
Compressive
strength
Kg/ cm2
04
15.03.10
30.48
15.24
15.24
15.24
182.4
320
178.9
05
15.03.10
30.48
15.24
15.24
15.24
182.4
310
173.3
06
15.03.10
30.48
15.24
15.24
15.24
182.4
330
184.5
Average for
Tested by:
Checked By:
7 days
178.9
Date:
179
07
05.04.10
28
30.48
15.24
15.24
15.24
182.4
500
279.5
08
05.04.10
28
30.48
15.24
15.24
15.24
182.4
520
290.7
09
05.04.10
28
30.48
15.24
15.24
15.24
182.4
490
273.9
Tested By :
Dated :
281.4
Checked By :
Dated :
281
Cylinder No.
Date:
Volume (cc)
Density (g/cc)
Average
(g/cc)
CONTRACTOR
CONSULTANTS
Material Engineer:_________________