Anda di halaman 1dari 1

1 * 75 MVA

TRANSFORMER
EXISTING WWIL WIND
FARM CAPACITY 188Mw
BETAGERI (SOUTH)
WWIL WIND FARMS 50.4 Mw
220/33 kV HARTHI S/S
(WWIL)
220 kV GADAG S/S
(KPTCL)
220 kV TADAS S/S
(WWIL)
220 kV NAGJ HARI S/S
(KPTCL)
220 kV NARENDRA S/S
(KPTCL)
To 220 kV LINGAPUR S/S
(KPTCL)
220 kV BIDNAL S/S
(KPTCL)
220 kV HUBLI S/S
(KPTCL)
220 kV BUS
33 kV BUS
DRAWN : VINOD.G
CHECKED BY : SR SINGHAL
NOT TO SCALE
DRAWING NO : 1
DATE: 10.02.14
SINGLE LINE DIAGRAM OF 50.4 Mw WIND POWER EVACUATION FROM BETAGERI (SOUTH)
THROUGH EXISTING 220/33 kV HARTHI (WWIL) S/S DISTRICT . GADAG STATE KARNATAKA
1 * 63.5 MVA
TRANSFORMER
1 * 100 MVA TRANSFORMER
to be replaced by 1 * 150 MVA
TRANSFORMER

Anda mungkin juga menyukai