Anda di halaman 1dari 4

ESSAR CONSTRUCTIONS ( INDIA ) LTD.

HAZIRA
RELEASE NOTE
From: QA/QC (Mech)
ECIL, Hazira.

Date : 2-Apr-2008
Report no.: NY-BQM3-14
SHT-1/1

Please arrange to shift the following materials from Blasting yard to Erection site which are cleared today in all respects :
SL
NO

DESCRIPTION OF ITEMS
/IDENTIFICATION MARK

MKD NO

1
2
3
4
5
6
7
8
9
10
11

GIRDER
PLATE
ROOF FRAME ( 1-1 & 2-2 )
ROOF FRAME ( 3-3 & 4-4 )
ROOF FRAME ( 5-5 & 6-6 )
DUCT 1016 DIA * 8 * 5924
DUCT 1016 DIA * 8 * 10050
DUCT 1016 DIA * 8 * 10050
DUCT 1016 DIA * 8 * 10050
DUCT 1016 DIA * 8 * 10050
DUCT 1016 DIA * 8 * 17100

B1
MKD 487
1-1 & 2-2
3-3 & 4-4
5-5 & 6-6
IT-1
IT-2
IT-1
IT-2
IT-1
IT-2

UNIT
Wt.
(kg)
9666.66
219.44
435.50
387.81
356.02
1178.11
1998.65
1998.65
1998.65
1998.65
3400.71

QTY
3
4
2
2
2
2
1
2
2
2
1

TOTAL
Wt.
(kg)
28999.98
877.76
871.00
775.62
712.03
2356.22
1998.65
3997.30
3997.30
3997.30
3400.71

DRAWING NO.
ES/QM3/058/3058013-01
ES/QM3/058/305824/25/26-01
ES/QM3/058/305824/25/26-01
ES/QM3/058/305824/25/26-01
ES/QM3/058/305824/25/26-01
ES/QM3/058/5058020-01
ES/QM3/058/5058020-01
ES/QM3/058/5058021-01
ES/QM3/058/5058021-01
ES/QM3/058/5058022-01
ES/QM3/058/5058022-01

AGENCY REMARKS

NSCL

F1
F1
F1
F1
F1
F1
F1
F1
F1
F1
F1

NOTE : Weight as Certified by Execution Dept.

ECIL QA/QC

PAGE : 1

NY-BQM3-14

ESSAR CONSTRUCTIONS ( INDIA ) LTD.


HAZIRA
FORMAT NO: ECL/QA/QC/F-011-1 R0

HYDROTEST PRESSURE REPORT


SITE:
CLIENT:
INSPECTION AUTHORITY:
WORK DESCRIPTION:
JOB/DRG NO:

DATE:
REPORT NO:
SHEET NO.
MKD NO:

TYPE OF TEST & POSITION:


PROCEDURE NO:
CODE:

SR NO.

PARTICULARS

MAWP
(KG/CM2)

TEST
PRESSURE
(KG/CM2)

PRESSURE
GAUGE

DETAIL

HOLDING
TIME

REMARKS

RANGE:
NO:
CALIBRATION DATE :
RANGE:
NO:
CALIBRATION DATE :
RANGE:
NO:
CALIBRATION DATE :
RANGE:
NO:
CALIBRATION DATE :
TEST CONDUCTED BY:

TEST WITNESSED BY:

TEST WITNESSED BY:

AGENCY:

INSPECTION AUTHORITY:

CLIENT:

SIGN:

SIGN:

SIGN:

Anda mungkin juga menyukai