DESIGN OF BEAM

Span

5.20 m

Size of Beam

20
cover

-ve moment is sagging

fcu

+ve moment is hogging

fy

Max -ve B.M


Mu

=
=

40

=
60
2
35 N/mm

cm

d= 340

mm

2
500 N/mm

50 kN-m
0.062 = k

( factored )

bd2fcu
z
Mbal
Ast

= d(0.5 + (0.25 - k/0.9)) =


314.79 mm
2
zb = 264.14
= k'fcu.bd =
126.235 kN-m
= Mu
0.87fy.z

Ast provided

2
= k'fcu.bd

2
+ (k-k')fcu.bd

0.87fy.z

0.87fy(d-d')

=
=

365.14 mm
2 Y 16

=
=

50 kN-m
0.062 = k

Hence
Max +ve B.M
Mu

401.9 mm2

=
Ok

( factored )

bd2fcu
z
Mbal
Ast

= d(0.5 + (0.25 - k/0.9)) =


314.79 mm
2
zb = 264.14
= k'fcu.bd =
126.235 kN-m
= Mu
0.87fy.z

Ast provided
Asc =

=
=

401.9

2
= k'fcu.bd

2
+ (k-k')fcu.bd

0.87fy.z

0.87fy(d-d')

365.14 mm
2 Y 16
p'

Hence
= 0.591

401.9

Ok

Check for Shear:


Shear Force

Ultimate Shear Stress

50

kN

(factored)

50 x

200 x

340

x 1000
=

Concrete shear stress


where 400/d

=
=

0.79 x p(1/3)
1.25
1
vc =

(400/d)0.25

2
0.552 N/mm

0.74 N/mm2

Area of Stirrups at

200 mm c/c

200 x

x(
x

0.74
500

17 mm2

=
Provide Y

200
0.87

8 Stirrups at

200 c/c

Check for Deflection


Service stress

fs

Modification factor
Top reinforcement

2x
3

365.14
401.92

= 0.55 +

( 477

120 x (

0.9 +

2Y

500 =

302.83 )

302.83 N/mm2
=

2.1626 )

16

p'

0.5024

1.143

Modification factor for compression reinforcement


=

1+

p'
3+p'

<1.5

L/d ratio

20

D required

5200
23.42

D Provided
Hence

Ok

1.024

+ 60

1.143

282.07 mm

400 mm

mm

N/mm2

0.552 )

N/mm2

1.024

23.42

BEAM DESIGN SUMMARY

Beam No.
Size of Beam (cm)
b =
d =

B7

B10

B11

B12

B13

30
80

30
80

30
80

20
80

20
80

20
60

20
60

Max -ve Moment (KNm)

742

477

71

22

699

303

92

0.129

0.083

0.014

0.005

0.213

0.173

0.053

612

664

728

736

575

420

506

Ast Required (cm2)

27.89

16.51

2.24

0.54

26.71

16.37

4.18

Ast Provided (cm2)

29.40

19.60

6.00

4.00

29.40

19.60

6.30

Remarks

OK

OK

OK

OK

OK

OK

OK

Max +ve Moment (KNm)

784

786

42

267

42

78

69

0.136

0.159

0.009

0.081

0.013

0.045

0.039

602

602

733

666

729

512

515

Ast Required (cm2)

29.93

30.03

1.32

9.22

1.32

3.50

3.08

Ast Provided (cm2)

39.30

39.30

4.00

14.70

4.00

8.00

4.00

Remarks

OK

OK

OK

OK

OK

OK

OK

Max Shear Force (KN)

435

563

90

145

288

184

80

Shear Stress( N/mm2) =

1.96

2.54

0.41

0.98

1.95

1.70

0.74

0.655

0.655

0.307

0.541

0.351

0.531

0.422

Stirrups Required (mm2)

135

130

14

40

110

108

29

Stirrups Provided (mm2)

157

157

101

101

157

157

101

8 @ 200

8 @ 200

OK

OK

k
z (mm)

k
z (mm)

2
vc ( N/mm )

Stirrups Provided
Remarks

B8

10 @150 10 @100
OK

OK

B9

10 @100 10 @ 200 8 @ 200


OK

OK

OK

Beam No.
Size of Beam (cm)
b =
d =

B14

B15

B16

B17

B18

B19

B20

20
40

20
40

30
80

20
40

20
40

30
80

20
80

52

16

400

15

16

258

569

0.075

0.023

0.081

0.022

0.023

0.052

0.173

309

331

666

332

331

694

575

Ast Required (cm2)

3.87

1.11

13.81

1.04

1.11

8.54

22.38

Ast Provided (cm2)

4.00

2.30

19.60

4.00

4.00

9.80

24.50

Remarks

OK

OK

OK

OK

OK

OK

OK

Max +ve Moment (KNm)

43

10

82

72

62

280

325

0.062

0.014

0.017

0.104

0.089

0.057

0.099

315

334

726

295

302

690

647

Ast Required (cm2)

3.14

0.69

2.60

5.62

4.72

9.33

11.55

Ast Provided (cm2)

4.00

2.30

4.00

8.00

8.00

9.80

12.60

Remarks

OK

OK

OK

OK

OK

OK

OK

Max Shear Force (KN)

56

25

142

78

83

187

329

0.82

0.37

0.64

1.15

1.22

0.84

2.22

0.552

0.456

0.307

0.696

0.696

0.413

0.513

Stirrups Required (mm2)

25

46

41

48

59

118

Stirrups Provided (mm2)

101

101

101

101

101

101

157

8 @ 200

8 @ 200

8 @ 150

8 @ 200

8 @ 200

OK

OK

OK

OK

OK

Max -ve Moment (KNm)


k
z (mm)

k
z (mm)

Shear Stress( N/mm2) =


2
vc ( N/mm )

Stirrups Provided
Remarks

8 @ 150 10 @ 150
OK

OK

Beam No.
Size of Beam (cm)
b =
d =

B21

B22

B23

B24

B25

B26

B27

20
60

20
60

30
80

20
80

35
130

35
80

20
60

Max -ve Moment (KNm)

154

85

121

218

782

557

102

0.088

0.049

0.069

0.044

0.042

0.083

0.050

481

509

495

575

1180

664

508

Ast Required (cm2)

7.37

3.84

5.62

7.14

15.24

19.29

4.61

Ast Provided (cm2)

12.60

6.30

6.30

12.60

39.30

39.30

8.00

Remarks

OK

OK

OK

OK

OK

OK

OK

Max +ve Moment (KNm)

345

18

123

86

997

657

156

0.129

0.010

0.070

0.017

0.053

0.098

0.076

447

534

494

575

1162

648

489

Ast Required (cm2)

11.58

0.78

5.73

2.73

19.72

23.31

7.33

Ast Provided (cm2)

12.60

6.30

6.30

6.30

39.30

39.30

8.00

Remarks

OK

OK

OK

OK

OK

OK

OK

Max Shear Force (KN)

232

76

128

142

553

489

92

Shear Stress( N/mm2) =

2.15

0.70

1.19

0.64

1.27

1.89

0.85

0.617

0.489

0.489

0.356

0.461

0.622

0.531

Stirrups Required (mm2)

106

15

48

39

98

153

29

Stirrups Provided (mm2)

157

101

101

101

157

157

100

k
z (mm)

k
z (mm)

2
vc ( N/mm )

Stirrups Provided
Remarks

10 @ 150 8 @ 200
OK

OK

8 @ 150
OK

8 @ 200 10 @ 150 10 @ 150 8 @ 200


OK

OK

OK

OK