II.A BIAYA SURVEY DAN PENGGUNAAN PERALATAN SURVEY DAN TRANPORTASI HARGA SATUAN TOTAL (RP) (RP) 1 2 3 4 5 6 1 Penggunaan Peralatan a Alat Theodolit Unit - Hari 45 150,000.00 6,750,000.00 b Waterpas Unit - Hari 45 120,000.00 5,400,000.00 c GPS Trimbel Unit - Hari 45 50,000.00 2,250,000.00 Alat DCP Unit - Hari 30 300,000.00 9,000,000.00 d Alat Hand Boor Unit - Hari 30 250,000.00 7,500,000.00 g Alat Laboratorium (1 Set) LS 1 10,000,000.00 10,000,000.00 2. Bahan Perlengkapan a Form Survai + Alat Tulis LS 1 1,000,000.00 1,000,000.00 c Dokumentasi LS 1 200,000.00 200,000.00 d Patok BM Buah 32 100,000.00 3,200,000.00 e Patok Kayu Buah 600 3,000.00 1,800,000.00 II. B BIAYA PENGGUNAAN PERALATAN KANTOR DAN ALAT TULIS HARGA SATUAN TOTAL (RP) (RP) 1 2 3 4 5 6 2 Kendaraan Roda 4 Team Leader ( 1 Buah ) Unit - Bulan 3 7,000,000.00 21,000,000.00 3 Kendaraan Roda 2 Survey ( 4 buah ) Unit - Bulan 1.5 3,000,000.00 4,500,000.00 4 Komunikasi Bulan 1 500,000.00 500,000.00 5 Komputer + Printer Unit - Bulan 2 400,000.00 800,000.00 6 Bahan OP Kantor Unit - Bulan 1 2,000,000.00 2,000,000.00 28,800,000.00 47,100,000.00 VOLUME SUB TOTAL BIAYA PENGGUNAAN PERALATAN KANTOR DAN ALAT TULIS ( II) SUB TOTAL BIAYA SURVAI DAN PENGGUNAAN PERALATAN SURVAI DAN TRAN PORTASI ( I) NO. URAIAN SATUAN VOLUME NO. URAIAN SATUAN III. C BIAYA PERALATAN DAN PERSENTASI HARGA SATUAN TOTAL (RP) (RP) 1 2 3 4 5 6 1 Laporan Perencanaan a Laporan Pendahuluan Buku 3 75,000.00 225,000.00 b Laporan Antara Buku 3 75,000.00 225,000.00 c Draft Laporan Akhir Buku 3 85,000.00 255,000.00 d Laporan akhir Buku 3 120,000.00 360,000.00 e Laporan Ringkasan Eksekutif Buku 3 2 Laporan Teknis c Laporan Desain St ruktur Jalan Buku 3 100,000.00 300,000.00 d Laporan Penyel idikan Tanah Buku 3 100,000.00 300,000.00 d Laporan Topografi Buku 3 100,000.00 300,000.00 3 Gambar - gambar a Gambar A-3 LS 3 500,000.00 1,500,000.00 4 CD auto CAD Laporan & Penggambaran LS 3 75,000.00 225,000.00 5 Persentasi LS 1 10,000,000.00 10,000,000.00 89,590,000.00 TOTAL BIAYA LANGSUNG NON PERSONIL = (I) + (II) + (III) Pontianak 23 Mei 2014 Penawar Team Leader ENGKUS KUSWANDI, BE.ST SUB TOTAL BIAYA PELAPORAN (III) 13,690,000.00 NO. URAIAN SATUAN VOLUME