Anda di halaman 1dari 110

MINIMUM DESIGN STANDARDS OF PHILIPPINE HIGHWAYS

URBAN

RURAL

AADT: > 2000

AADT: 1000 - 2000

Design Speed:

EXPRESSWAY

AADT: 1000 - 2000

Design Speed:

Design Speed:

Level

95

(kph)

Level

90

(kph)

Level

95

(kph)

Rolling:

85

(kph)

Rolling:

75

(kph)

Rolling:

75

(kph)

Mountainous:

70

(kph)

Mountainous:

50

(kph)

Mountainous:

60

(kph)

Minimum Desirable Radius:

Minimum Desirable Radius:

Minimum Desirable Radius:

Level

350

m.

Level

320

m.

Level

320

m.

Rolling:

280

m.

Rolling:

220

m.

Rolling:

220

m.

Mountainous:

180

m.

Mountainous:

120

m.

Mountainous:

120

m.

Safe Sight Distance:

Safe Sight Distance:

Safe Sight Distance:

Level

175

m.

Level

165

m.

Level

155

m.

Rolling:

150

m.

Rolling:

140

m.

Rolling:

105

m.

Mountainous:

110

m.

Mountainous:

57.4

m.

Mountainous:

75

m.

Designers:

Reyes, Ma. Karisse P.


Santillan, Jan Sherwin F.

Uy, Kwin Juvy H.

Project & Location:


PROPOSED 20 KM ARTERIAL
ROAD LAGUNA

Approved By:
ENGR. MANUEL M. MUHI
(Instructor)

Sheet Content:

HORIZONTAL ALIGNMENT

Sheet No.

HORIZONTAL ALIGNMENT
(OPTION NO. 1)

SUMMARY
Line Dist. (m)
A-1
1-2
2-3
3-4
4-5
5-6
6-7
7-8
8-9
9-10
10-11
11-12
12-13
13-14
14-15
15-16
16-17
17-18
18-19
19-20
20-21
21-22
22-23
23-24
24-25
25-26
26-27
27-28
28-29
29-30
30-31
31-32
32-33
33-34
34-35
35-36
36-37
37-38
38-39
39-40'
40-41
41-42
42-43
43-44
44-45
45-46
46-47
47-48
48-49
49-50
50-51
51-52

Bearing
N 52.14
0
N 31.37
0
N 46.1
0
N 31.47
0
N 46.1
N 68.6
0
S 58.19
0
50
S
20
S
70
S
40
S
0
50
S
0
50
S
0
60
N
N 34.04
0
N 55.72
70
N
S 81.07
S 67.4
0
25
N
N 48.2
N 69.4
0
N 70.93
80
N
0
55
N
15
N
40
N
50
N
20
N
60
N
0

Total Road Distance:

E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E

CURVE PARAMETERS

Azi fr S.

Latitude

Departure

Northings

Eastings

Category

Terrain

Curve

232.14
180
211.37
180
226.1
180
211.47
180
226.1
248.6
180
301.81
180
310
340
20
320
180
310
180
310
180
240
214.04
180
235.72
250
278.93
292.57
180
205
228.2
249.4
180
250.931
260
180
235
195
220
230
200
240
180
260.11
313.18
350.53
319.31
296.21
328.89
286.77
329.51

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

Rural
Rural
Rural
Rural
Rural
Rural
Rural
Rural
Rural
Rural
Rural
Rural
Rural
Rural
Rural
Rural
Rural
Rural
Rural
Rural
Rural
Rural
Rural
Rural
Rural
Rural
Rural
Rural
Rural
Rural
Rural
Rural
Rural
Rural
Rural
Rural
Rural
Rural
Rural
Rural
Urban
Urban
Urban
Urban
Urban
Urban
Urban
Urban
Urban
Urban
Urban
Urban

Level
Level
Level
Level
Level
Level
Level
Level
Level
Level
Level
Mountainous
Mountainous
Mountainous
Mountainous
Mountainous
Mountainous
Mountainous
Mountainous
Mountainous
Mountainous
Mountainous
Mountainous
Mountainous
Mountainous
Mountainous
Mountainous
Mountainous
Mountainous
Mountainous
Mountainous
Mountainous
Mountainous
Mountainous
Mountainous
Mountainous
Mountainous
Mountainous
Mountainous
Mountainous
Level
Level
Level
Level
Level
Level
Level
Level
Level
Level
Level
Level

1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
51

-537.46

Total Traverse Line Distance:

0 m

V(kph) I(deg)
90
90
90
90
90
90
90
90
90
90
90
50
50
50
50
50
50
50
50
50
50
50
50
50
50
50
50
50
50
50
50
50
50
50
50
50
50
50
50
50
95
95
95
95
95
95
95
95
95
95
95

20
20
35
45
50
60
35
40
55
40
40
60
40
50
60
50
50
40
35
25
50
80
50
50
90
25
32
50
44
19
25
32
43
23
25
24
24
15
15
60
35
18
53
30
40
37
62
50
63
38
29

I/2

Radius

10.00
10.00
17.50
22.50
25.00
30.00
17.50
20.00
27.50
20.00
20.00
30.00
20.00
25.00
30.00
25.00
25.00
20.00
17.50
12.50
25.00
40.00
25.00
25.00
45.00
12.50
16.00
25.00
22.00
9.50
12.50
16.00
21.50
11.50
12.50
12.00
12.00
7.50
7.50
30.00
17.50
9.00
26.50
15.00
20.00
18.50
31.00
25.00
31.50
19.00
14.50

321.73
321.73
321.73
321.73
321.73
321.73
321.73
321.73
321.73
321.73
320.17
120.56
120.56
120.56
120.56
120.56
120.56
120.56
120.56
120.56
120.56
120.56
120.56
120.56
120.56
120.56
120.56
120.56
120.56
120.56
120.56
120.56
120.56
120.56
120.56
120.56
120.56
120.56
120.56
120.56
351.78
351.78
351.78
351.78
351.78
351.78
351.78
351.78
351.78
351.78
351.78

fsmax emax edmax


0.14
0.14
0.14
0.14
0.14
0.14
0.14
0.14
0.14
0.14
0.14
0.19
0.19
0.19
0.19
0.19
0.19
0.19
0.19
0.19
0.19
0.19
0.19
0.19
0.19
0.19
0.19
0.19
0.19
0.19
0.19
0.19
0.19
0.19
0.19
0.19
0.19
0.19
0.19
0.19
0.13
0.13
0.13
0.13
0.13
0.13
0.13
0.13
0.13
0.13
0.13

0.08
0.08
0.08
0.08
0.08
0.08
0.08
0.08
0.08
0.08
0.08
0.03
0.03
0.03
0.03
0.03
0.03
0.03
0.03
0.03
0.03
0.03
0.03
0.03
0.03
0.03
0.03
0.03
0.03
0.03
0.03
0.03
0.03
0.03
0.03
0.03
0.03
0.03
0.03
0.03
0.09
0.09
0.09
0.09
0.09
0.09
0.09
0.09
0.09
0.09
0.09

0.08
0.08
0.08
0.08
0.08
0.08
0.08
0.08
0.08
0.08
0.08
0.03
0.03
0.03
0.03
0.03
0.03
0.03
0.03
0.03
0.03
0.03
0.03
0.03
0.03
0.03
0.03
0.03
0.03
0.03
0.03
0.03
0.03
0.03
0.03
0.03
0.03
0.03
0.03
0.03
0.09
0.09
0.09
0.09
0.09
0.09
0.09
0.09
0.09
0.09
0.09

SD

tangent

165
165
165
165
165
165
165
165
165
165
57.4
57.4
57.4
57.4
57.4
57.4
57.4
57.4
57.4
57.4
57.4
57.4
57.4
57.4
57.4
57.4
57.4
57.4
57.4
57.4
57.4
57.4
57.4
57.4
57.4
57.4
57.4
57.4
57.4
57.4
175
175
175
175
175
175
175
175
175
175
175

10.58
10.58
10.58
10.58
10.58
10.58
10.58
10.58
10.58
10.58
1.29
3.42
3.42
3.42
3.42
3.42
3.42
3.42
3.42
3.42
3.42
3.42
3.42
3.42
3.42
3.42
3.42
3.42
3.42
3.42
3.42
3.42
3.42
3.42
3.42
3.42
3.42
3.42
3.42
3.42
10.88
10.88
10.88
10.88
10.88
10.88
10.88
10.88
10.88
10.88
10.88

56.73
56.73
101.44
133.27
150.03
185.75
101.44
117.10
167.48
117.10
116.53
69.60
43.88
56.22
69.60
56.22
56.22
43.88
38.01
26.73
56.22
101.16
56.22
56.22
120.56
26.73
34.57
56.22
48.71
20.17
26.73
34.57
47.49
24.53
26.73
25.62
25.62
15.87
15.87
69.60
110.91
55.72
175.39
94.26
128.04
117.70
211.37
164.04
215.57
121.13
90.98

CHECK FOR TRANSITION


(OPTION NO. 1)

Curve#

1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
51

Rdmin=Max( Rsr:Rso:Rsd)
RSR
RSO
RSD
Rdmin
290
67
322
322
290
67
322
322
290
67
322
322
290
67
322
322
290
67
322
322
290
67
322
322
290
67
322
322
290
67
322
322
290
67
322
322
290
67
322
322
290
67
320
320
89
23
121
121
89
23
121
121
89
23
121
121
89
23
121
121
89
23
121
121
89
23
121
121
89
23
121
121
89
23
121
121
89
23
121
121
89
23
121
121
89
23
121
121
89
23
121
121
89
23
121
121
89
23
121
121
89
23
121
121
89
23
121
121
89
23
121
121
89
23
121
121
89
23
121
121
89
23
121
121
89
23
121
121
89
23
121
121
89
23
121
121
89
23
121
121
89
23
121
121
89
23
121
121
89
23
121
121
89
23
121
121
89
23
121
121
323
74
352
352
323
74
352
352
323
74
352
352
323
74
352
352
323
74
352
352
323
74
352
352
323
74
352
352
323
74
352
352
323
74
352
352
323
74
352
352
323
74
352
352

CURVE TYPE
Simple WITH Trans
Simple WITH Trans
Simple WITH Trans
Simple WITH Trans
Simple WITH Trans
Simple WITH Trans
Simple WITH Trans
Simple WITH Trans
Simple WITH Trans
Simple WITH Trans
Simple WITH Trans
Simple WITH Trans
Simple WITH Trans
Simple WITH Trans
Simple WITH Trans
Simple WITH Trans
Simple WITH Trans
Simple WITH Trans
Simple WITH Trans
Simple WITH Trans
Simple WITH Trans
Simple WITH Trans
Simple WITH Trans
Simple WITH Trans
Simple WITH Trans
Simple WITH Trans
Simple WITH Trans
Simple WITH Trans
Simple WITH Trans
Simple WITH Trans
Simple WITH Trans
Simple WITH Trans
Simple WITH Trans
Simple WITH Trans
Simple WITH Trans
Simple WITH Trans
Simple WITH Trans
Simple WITH Trans
Simple WITH Trans
Simple WITH Trans
Simple WITH Trans
Simple WITH Trans
Simple WITH Trans
Simple WITH Trans
Simple WITH Trans
Simple WITH Trans
Simple WITH Trans
Simple WITH Trans
Simple WITH Trans
Simple WITH Trans
Simple WITH Trans

s
7.3
7.3
7.3
7.3
7.3
7.3
7.3
7.3
7.3
7.3
7.3
8.9
8.9
8.9
8.9
8.9
8.9
8.9
8.9
8.9
8.9
8.9
8.9
8.9
8.9
8.9
8.9
8.9
8.9
8.9
8.9
8.9
8.9
8.9
8.9
8.9
8.9
8.9
8.9
8.9
7.1
7.1
7.1
7.1
7.1
7.1
7.1
7.1
7.1
7.1
7.1

Ic
5.5
5.5
20.5
30.5
35.5
45.5
20.5
25.5
40.5
25.5
25.3
42.3
22.3
32.3
42.3
32.3
32.3
22.3
17.3
7.3
32.3
62.3
32.3
32.3
72.3
7.3
14.3
32.3
26.3
1.3
7.3
14.3
25.3
5.3
7.3
6.3
6.3
-2.7
-2.7
42.3
20.7
3.7
38.7
15.7
25.7
22.7
47.7
35.7
48.7
23.7
14.7

Designers:

Ls;T
81.6
81.6
81.6
81.6
81.6
81.6
81.6
81.6
81.6
81.6
82.0
37.3
37.3
37.3
37.3
37.3
37.3
37.3
37.3
37.3
37.3
37.3
37.3
37.3
37.3
37.3
37.3
37.3
37.3
37.3
37.3
37.3
37.3
37.3
37.3
37.3
37.3
15.9
15.9
37.3
87.7
87.7
87.7
87.7
87.7
87.7
87.7
87.7
87.7
87.7
87.7

ELEMENTS OF THE CURVE


Lc;E
X;M
Xm;Lc
Y;D
30.7
81.4
40.8
3.4
30.7
81.4
40.8
3.4
115.0
81.4
40.8
3.4
171.1
81.4
40.8
3.4
199.2
81.4
40.8
3.4
255.3
81.4
40.8
3.4
115.0
81.4
40.8
3.4
143.0
81.4
40.8
3.4
227.3
81.4
40.8
3.4
143.0
81.4
40.8
3.4
141.5
81.8
41.0
3.5
88.9
37.2
18.6
1.9
46.8
37.2
18.6
1.9
67.9
37.2
18.6
1.9
88.9
37.2
18.6
1.9
67.9
37.2
18.6
1.9
67.9
37.2
18.6
1.9
46.8
37.2
18.6
1.9
36.3
37.2
18.6
1.9
15.3
37.2
18.6
1.9
67.9
37.2
18.6
1.9
131.0
37.2
18.6
1.9
67.9
37.2
18.6
1.9
67.9
37.2
18.6
1.9
152.0
37.2
18.6
1.9
15.3
37.2
18.6
1.9
30.0
37.2
18.6
1.9
67.9
37.2
18.6
1.9
55.3
37.2
18.6
1.9
2.7
37.2
18.6
1.9
15.3
37.2
18.6
1.9
30.0
37.2
18.6
1.9
53.1
37.2
18.6
1.9
11.1
37.2
18.6
1.9
15.3
37.2
18.6
1.9
13.2
37.2
18.6
1.9
13.2
37.2
18.6
1.9
1.0
1.0
31.5
9.5
1.0
1.0
31.5
9.5
88.9
37.2
18.6
1.9
127.1
87.6
43.8
3.6
22.8
87.6
43.8
3.6
237.7
87.6
43.8
3.6
96.4
87.6
43.8
3.6
157.8
87.6
43.8
3.6
139.4
87.6
43.8
3.6
292.9
87.6
43.8
3.6
219.2
87.6
43.8
3.6
299.1
87.6
43.8
3.6
145.6
87.6
43.8
3.6
90.3
87.6
43.8
3.6

Project & Location:

R;Lcu
0.9
0.9
0.9
0.9
0.9
0.9
0.9
0.9
0.9
0.9
0.9
0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.5
31.6
31.6
0.5
0.9
0.9
0.9
0.9
0.9
0.9
0.9
0.9
0.9
0.9
0.9

Ts
97.6
97.6
142.5
174.4
191.2
227.0
142.5
158.2
208.7
158.2
157.8
88.5
62.7
75.1
88.5
75.1
75.1
62.7
56.8
45.5
75.1
120.2
75.1
75.1
139.7
45.5
53.4
75.1
67.6
38.9
45.5
53.4
66.3
43.3
45.5
44.4
44.4
------88.5
155.1
99.7
219.7
138.4
172.2
161.9
255.8
208.3
260.0
165.3
135.1

E
8.5
8.5
21.9
34.7
42.4
60.8
21.9
27.9
51.1
27.9
27.8
23.7
11.1
16.6
23.7
16.6
16.6
11.1
8.7
5.0
16.6
43.8
16.6
16.6
57.9
5.0
7.5
16.6
13.1
3.2
5.0
7.5
12.6
4.4
5.0
4.7
4.7
------23.7
23.9
7.8
51.7
18.2
30.4
26.4
70.9
46.2
73.3
27.7
17.2

Approved By:

Sta. PI
0 + 650
1 + 300
1 + 950
2 + 450
2 + 950
3 + 650
4 + 300
4 + 800
5 + 500
6 + 200
7 + 000
7 + 700
8 + 400
8 + 900
9 + 400
9 + 900
10 + 400
10 + 900
11 + 400
11 + 900
12 + 400
12 + 900
13 + 400
13 + 900
14 + 400
14 + 900
15 + 600
16 + 200
16 + 700
17 + 300
17 + 800
18 + 400
18 + 900
19 + 550
20 + 050
20 + 650
21 + 150
21 + 750
22 + 250
22 + 850
23 + 350
23 + 950
24 + 450
25 + 050
25 + 550
26 + 050
26 + 650
27 + 150
27 + 750
28 + 350
28 + 850

Sta.TS;PC
0 + 552
1 + 202
1 + 808
2 + 276
2 + 759
3 + 423
4 + 158
4 + 642
5 + 291
6 + 042
6 + 842
7 + 611
8 + 337
8 + 825
9 + 311
9 + 825
10 + 325
10 + 837
11 + 343
11 + 855
12 + 325
12 + 780
13 + 325
13 + 825
14 + 260
14 + 855
15 + 547
16 + 125
16 + 632
17 + 261
17 + 755
18 + 347
18 + 834
19 + 507
20 + 005
20 + 606
21 + 106
#VALUE!
#VALUE!
------23 + 850
24 + 230
24 + 912
25 + 378
25 + 888
26 + 394
26 + 942
27 + 490
28 + 185
28 + 715

STATIONING
Sta. SC;PT
0 + 634
1 + 284
1 + 889
2 + 357
2 + 840
3 + 505
4 + 239
4 + 723
5 + 373
6 + 123
6 + 924
7 + 649
8 + 375
8 + 862
9 + 349
9 + 862
10 + 362
10 + 875
11 + 381
11 + 892
12 + 362
12 + 817
13 + 362
13 + 862
14 + 298
14 + 892
15 + 584
16 + 162
16 + 670
17 + 298
17 + 792
18 + 384
18 + 871
19 + 544
20 + 042
20 + 643
21 + 143
#VALUE!
#VALUE!
------23 + 938
24 + 318
24 + 999
25 + 466
25 + 976
26 + 482
27 + 029
27 + 578
28 + 272
28 + 803

Sta. CS
0 + 665
1 + 315
2 + 004
2 + 528
3 + 040
3 + 760
4 + 354
4 + 866
5 + 600
6 + 266
7 + 066
7 + 738
8 + 421
8 + 930
9 + 438
9 + 930
10 + 430
10 + 921
11 + 417
11 + 907
12 + 430
12 + 948
13 + 430
13 + 930
14 + 450
14 + 907
15 + 614
16 + 230
16 + 725
17 + 301
17 + 807
18 + 414
18 + 924
19 + 555
20 + 057
20 + 656
21 + 156
#VALUE!
#VALUE!
------23 + 961
24 + 556
25 + 096
25 + 623
26 + 115
26 + 775
27 + 249
27 + 877
28 + 418
28 + 893

Sheet Content:

Reyes, Ma. Karisse P.


Santillan, Jan Sherwin F.

Uy, Kwin Juvy H.

PROPOSED 20 KM ARTERIAL
ROAD LAGUNA

ENGR. MANUEL M. MUHI


(Instructor)

HORIZONTAL ALIGNMENT

Sta. ST
0 + 746
1 + 396
2 + 086
2 + 610
3 + 121
3 + 841
4 + 436
4 + 948
5 + 682
6 + 348
7 + 148
7 + 775
8 + 459
8 + 967
9 + 475
9 + 967
10 + 467
10 + 959
11 + 454
11 + 944
12 + 467
12 + 985
13 + 467
13 + 967
14 + 487
14 + 944
15 + 651
16 + 267
16 + 762
17 + 338
17 + 844
18 + 451
18 + 961
19 + 592
20 + 094
20 + 693
21 + 193
#VALUE!
#VALUE!
------24 + 049
24 + 643
25 + 184
25 + 711
26 + 203
26 + 863
27 + 336
27 + 965
28 + 506
28 + 981

Sheet No.

CURVE NO.
1
simple curve WITH Transition

CURVE NO.
2
simple curve WITH Transition

DESIGN PARAMETERS:
V (kph) =
I(deg) =

DESIGN PARAMETERS:
90
20

SD
m

fsmax = 0.37{0.000214V2 - 0.0064V + 0.77}


emax = 0.22 - fsmax

=
=

165
10.58

=
=

0.14
0.084

m
m

x =
y =

1.2 m
1.5 m

V (kph) =
I(deg) =

90
20

SD
m

fsmax = 0.37{0.000214V2 - 0.0064V + 0.77}


emax = 0.22 - fsmax

=
=

165
10.58

=
=

0.14
0.084

m
m

x =
y =

Rsr = V2/127(emax + fsmax)

290

V2/127Rdmin

0.20

Rsr = V2/127(emax + fsmax)

290 m

V2/127Rdmin

0.20

Rso = V2(y - xe)/127(x + ye)

67

V2/282 Rdmin

0.089

Rso = V2(y - xe)/127(x + ye)

67

V2/282 Rdmin

0.089

Rsd = SD2/8m
Rdmin =MAX {Rsr, Rso, Rsd}

=
=

322
322

m
m

Rsd = SD2/8m
Rdmin =MAX {Rsr, Rso, Rsd}

=
=

322 m
322 m

edmax = Min [emax; (V^2/282 Rdmin)]

0.08

edmax = Min [emax; (V^2/282 Rdmin)]

0.08

fd = V2/127Rdmin - edmax

0.11

fd = V2/127Rdmin - edmax

0.11

CHECKING:

CHECKING:

Danger of Skidding exist when:


(V2/127Rdmin) > (fsmax+emax)
(V2/127Rdmin) > [(x+ye)/(y-xe)]
Danger of Overturning exist when:
Side Friction:
fsmax > fdemand = SAFE
NEED FOR TRANSITIONS:

Danger of Skidding exist when:


(V2/127Rdmin) > (fsmax+emax)
(V2/127Rdmin) > [(x+ye)/(y-xe)]
Danger of Overturning exist when:
Side Friction:
fsmax > fdemand = SAFE

= SAFE
= SAFE

NEED FOR TRANSITIONS:

( when I/2 > s, transition needed; not needed)

Length of Spiral, Ls
Lsdmin = 0.036V3/Rdmin
s = 180Lsdmin/2Rdmin
I/2 > s

82
m
=
= 7.263 (deg)
= Transition NEEDED

= 180Lsdmin/2Rdmin
I - (2s)
=
0.035V^3/Rdmin
=
Rdmin Ic / 180
=
Ls - (Ls^3/40R^2)
=
X - R sin s
=
Ls^2 / 6R
=
y - R (1-coss)
=
= Xm+(R+R)tan I/2
Ts Tan I/4
=

=
=
=
=
=
=
=
=
=
=

7.26
5.47
81.57
30.73
81.44
40.76
3.45
0.87
97.65
8.54

=
=
=
=

m
= 82
= 7.26 (deg)
= Transition NEEDED

ELEMENTS OF CURVE WITH TRANSITION:


(deg)
(deg)
m
m
m
m
m
m
m
m

s
Ic
Ls
Lc
X
Xm
y
R
Ts
E

STATIONINGS:
Sta. TS
Sta. SC
Sta. CS
Sta. ST

= SAFE
= SAFE

( when I/2 > s, transition needed; not needed)

Length of Spiral, Ls
Lsdmin = 0.036V3/Rdmin
s = 180Lsdmin/2Rdmin
I/2 > s

ELEMENTS OF CURVE WITH TRANSITION:


s
Ic
Ls
Lc
X
Xm
y
R
Ts
E

1.2 m
1.5 m

= 180Lsdmin/2Rdmin
I - (2s)
=
0.035V^3/Rdmin
=
Rdmin Ic / 180
=
Ls - (Ls^3/40R^2)
=
X - R sin s
=
Ls^2 / 6R
=
y - R (1-coss)
=
= Xm+(R+R)tan I/2
Ts Tan I/4
=

=
=
=
=
=
=
=
=
=
=

7.26
5.47
81.57
30.73
81.44
40.76
3.45
0.87
97.65
8.54

(deg)
(deg)
m
m
m
m
m
m
m
m

STATIONINGS:
Sta of PI
Sta. PI - Ts
Sta. Ts + Ls
Sta. SC + Lc
Sta. CS + Ls

=
=
=
=
=

0 + 000
-0 + 098
-0 + 016
0 + 015
0 + 096

Sta. TS
Sta. SC
Sta. CS
Sta. ST

Designers:

Project & Location:

=
=
=
=

Sta of PI
Sta. PI - Ts
Sta. Ts + Ls
Sta. SC + Lc
Sta. CS + Ls

=
=
=
=
=

0 + 000
-0 + 098
-0 + 016
0 + 015
0 + 096

Approved By:

Sheet Content:

Reyes, Ma. Karisse P.


Santillan, Jan Sherwin F.

Uy, Kwin Juvy H.

PROPOSED 20 KM ARTERIAL
ROAD LAGUNA

ENGR. MANUEL M. MUHI


(Instructor)

COMPUTATION OF HORIZONTAL ALIGNMENT

Sheet No.

CURVE NO.
3
simple curve WITH Transition

CURVE NO.
4
simple curve WITH Transition

DESIGN PARAMETERS:
V (kph) =
I(deg) =

DESIGN PARAMETERS:
90
35

SD
m

fsmax = 0.37{0.000214V2 - 0.0064V + 0.77}


emax = 0.22 - fsmax
Rsr = V2/127(emax + fsmax)
Rso = V2(y - xe)/127(x + ye)
Rsd = SD2/8m
Rdmin =MAX {Rsr, Rso, Rsd}

290
67
322
322

=
=
=
=

=
=

165
10.58

=
=

0.14
0.084

m
m

V2/127Rdmin
V2/282 Rdmin

m
m
m
m

x =
y =

1.2 m
1.5 m

V (kph) =
I(deg) =

90
45

SD
m

fsmax = 0.37{0.000214V2 - 0.0064V + 0.77}


emax = 0.22 - fsmax
=
=

0.20
0.089

Rsr = V2/127(emax + fsmax)


Rso = V2(y - xe)/127(x + ye)
Rsd = SD2/8m
Rdmin =MAX {Rsr, Rso, Rsd}

=
=
=
=

290
67
322
322

0.08

edmax = Min [emax; (V^2/282 Rdmin)]

0.08

fd = V2/127Rdmin - edmax

0.11

fd = V2/127Rdmin - edmax

0.11

(V2/127Rdmin) > (fsmax+emax)

Danger of Overturning exist when:


Side Friction:
fsmax > fdemand = SAFE
NEED FOR TRANSITIONS:

(V2/127Rdmin) > [(x+ye)/(y-xe)]

x =
y =

=
=

1.2 m
1.5 m

0.20
0.089

(V2/127Rdmin) > (fsmax+emax)


Danger of Overturning exist when:
(V2/127Rdmin) > [(x+ye)/(y-xe)]
Side Friction:
fsmax > fdemand = SAFE

= SAFE

NEED FOR TRANSITIONS:

82
m
=
= 7.263 (deg)
Transition NEEDED
=

= 180Lsdmin/2Rdmin
I - (2s)
=
0.035V^3/Rdmin
=
Rdmin Ic / 180
=
Ls - (Ls^3/40R^2)
=
X - R sin s
=
Ls^2 / 6R
=
y - R (1-coss)
=
= Xm+(R+R)tan I/2
Ts Tan I/4
=

=
=
=
=
=
=
=
=
=
=

7.26
20.47
81.57
114.96
81.44
40.76
3.45
0.87
142.48
21.93

= SAFE
= SAFE

( when I/2 > s, transition needed; not needed)

Length of Spiral, Ls
Lsdmin = 0.036V3/Rdmin
s = 180Lsdmin/2Rdmin
I/2 > s

ELEMENTS OF CURVE WITH TRANSITION:

= 82
= 7.26
=

m
(deg)
Transition NEEDED

ELEMENTS OF CURVE WITH TRANSITION:


(deg)
(deg)
m
m
m
m
m
m
m
m

s
Ic
Ls
Lc
X
Xm
y
R
Ts
E

STATIONINGS:
=
=
=
=

0.14
0.084

Danger of Skidding exist when:

= SAFE

( when I/2 > s, transition needed; not needed)

Length of Spiral, Ls
Lsdmin = 0.036V3/Rdmin
s = 180Lsdmin/2Rdmin
I/2 > s

Sta. TS
Sta. SC
Sta. CS
Sta. ST

=
=

m
m

CHECKING:

Danger of Skidding exist when:

s
Ic
Ls
Lc
X
Xm
y
R
Ts
E

165
10.58

V2/127Rdmin
V2/282 Rdmin

m
m
m
m

edmax = Min [emax; (V^2/282 Rdmin)]

CHECKING:

=
=

= 180Lsdmin/2Rdmin
I - (2s)
=
0.035V^3/Rdmin
=
Rdmin Ic / 180
=
Ls - (Ls^3/40R^2)
=
X - R sin s
=
Ls^2 / 6R
=
y - R (1-coss)
=
= Xm+(R+R)tan I/2
Ts Tan I/4
=

=
=
=
=
=
=
=
=
=
=

7.26
30.47
81.57
171.12
81.44
40.76
3.45
0.87
174.39
34.69

(deg)
(deg)
m
m
m
m
m
m
m
m

STATIONINGS:
Sta of PI
Sta. PI - Ts
Sta. Ts + Ls
Sta. SC + Lc
Sta. CS + Ls

=
=
=
=
=

0 + 000
-0 + 142
-0 + 061
0 + 054
0 + 136

Sta. TS
Sta. SC
Sta. CS
Sta. ST

Designers:

Project & Location:

=
=
=
=

Sta of PI
Sta. PI - Ts
Sta. Ts + Ls
Sta. SC + Lc
Sta. CS + Ls

=
=
=
=
=

0 + 000
-0 + 174
-0 + 093
0 + 078
0 + 160

Approved By:

Sheet Content:

Reyes, Ma. Karisse P.


Santillan, Jan Sherwin F.

Uy, Kwin Juvy H.

PROPOSED 20 KM ARTERIAL
ROAD LAGUNA

ENGR. MANUEL M. MUHI


(Instructor)

COMPUTATION OF HORIZONTAL ALIGNMENT

Sheet No.

CURVE NO.
5
simple curve WITH Transition

6
CURVE NO.
simple curve WITH Transition

DESIGN PARAMETERS:
V (kph) =
I(deg) =

DESIGN PARAMETERS:
90
50

SD
m

=
=

fsmax = 0.37{0.000214V2 - 0.0064V + 0.77}


emax = 0.22 - fsmax
Rsr = V2/127(emax + fsmax)
Rso = V2(y - xe)/127(x + ye)
Rsd = SD2/8m
Rdmin =MAX {Rsr, Rso, Rsd}

=
=
=

290
67
322

m
m
m

322

edmax = Min [emax; (V^2/282 Rdmin)]


fd = V2/127Rdmin - edmax

165
10.58

0.14

0.084

V2/127Rdmin
V2/282 Rdmin

=
=

m
m

x =
y =

1.2 m
1.5 m

V (kph) =
I(deg) =

=
=

0.20
0.089

Rsr = V2/127(emax + fsmax)


Rso = V2(y - xe)/127(x + ye)
Rsd = SD2/8m
Rdmin =MAX {Rsr, Rso, Rsd}

0.08
0.11

=
=
=
=

290 m
67 m
322 m
322 m

edmax = Min [emax; (V^2/282 Rdmin)]


fd = V2/127Rdmin - edmax

165
10.58

0.14

0.084

V2/127Rdmin
V2/282 Rdmin

m
m

x =
y =

=
=

1.2 m
1.5 m

0.20
0.089

0.08
0.11

=
=

CHECKING:

NEED FOR TRANSITIONS:

(V2/127Rdmin) > (fsmax+emax)


Danger of Skidding exist when:
(V2/127Rdmin) > [(x+ye)/(y-xe)]
Danger of Overturning exist when:
Side Friction:
fsmax > fdemand = SAFE

= SAFE
= SAFE

NEED FOR TRANSITIONS:

( when I/2 > s, transition needed; not needed)

Length of Spiral, Ls
Lsdmin = 0.036V3/Rdmin
s = 180Lsdmin/2Rdmin
I/2 > s

82
m
=
= 7.263 (deg)
Transition
NEEDED
=

= 180Lsdmin/2Rdmin
I - (2s)
=
0.035V^3/Rdmin
=
Rdmin Ic / 180
=
Ls - (Ls^3/40R^2)
=
X - R sin s
=
Ls^2 / 6R
=
y - R (1-coss)
=
= Xm+(R+R)tan I/2
Ts Tan I/4
=

=
=
=
=
=
=
=
=
=
=

7.26
35.47
81.57
199.19
81.44
40.76
3.45
0.87
191.19
42.39

= SAFE
= SAFE

( when I/2 > s, transition needed; not needed)

Length of Spiral, Ls
Lsdmin = 0.036V3/Rdmin
s = 180Lsdmin/2Rdmin
I/2 > s

ELEMENTS OF CURVE WITH TRANSITION:

m
= 82
= 7.26 (deg)
Transition
NEEDED
=

ELEMENTS OF CURVE WITH TRANSITION:


(deg)
(deg)
m
m
m
m
m
m
m
m

s
Ic
Ls
Lc
X
Xm
y
R
Ts
E

STATIONINGS:
=
=
=
=

=
=

emax = 0.22 - fsmax

CHECKING:

Sta. TS
Sta. SC
Sta. CS
Sta. ST

SD
m

fsmax = 0.37{0.000214V2 - 0.0064V + 0.77}

Danger of Skidding exist when:


(V2/127Rdmin) > (fsmax+emax)
Danger of Overturning exist when:
(V2/127Rdmin) > [(x+ye)/(y-xe)]
Side Friction:
fsmax > fdemand = SAFE

s
Ic
Ls
Lc
X
Xm
y
R
Ts
E

90
60

= 180Lsdmin/2Rdmin
I - (2s)
=
0.035V^3/Rdmin
=
Rdmin Ic / 180
=
Ls - (Ls^3/40R^2)
=
X - R sin s
=
Ls^2 / 6R
=
y - R (1-coss)
=
= Xm+(R+R)tan I/2
Ts Tan I/4
=

=
=
=
=
=
=
=
=
=
=

7.26
45.47
81.57
255.34
81.44
40.76
3.45
0.87
227.01
60.83

(deg)
(deg)
m
m
m
m
m
m
m
m

STATIONINGS:
Sta of PI
Sta. PI - Ts
Sta. Ts + Ls
Sta. SC + Lc
Sta. CS + Ls

=
=
=
=
=

0 + 000
-0 + 191
-0 + 110
0 + 090
0 + 171

Sta. TS
Sta. SC
Sta. CS
Sta. ST

Designers:

Project & Location:

=
=
=
=

Sta of PI
Sta. PI - Ts
Sta. Ts + Ls
Sta. SC + Lc
Sta. CS + Ls

=
=
=
=
=

0 + 000
-0 + 227
-0 + 145
0 + 110
0 + 191

Approved By:

Sheet Content:

Reyes, Ma. Karisse P.


Santillan, Jan Sherwin F.

Uy, Kwin Juvy H.

PROPOSED 20 KM ARTERIAL
ROAD LAGUNA

ENGR. MANUEL M. MUHI


(Instructor)

COMPUTATION OF HORIZONTAL ALIGNMENT

Sheet No.

CURVE NO.
7
simple curve WITH Transition

CURVE NO.
8
simple curve WITH Transition

DESIGN PARAMETERS:
V (kph) =
I(deg) =

DESIGN PARAMETERS:
90
35

SD
m

fsmax = 0.37{0.000214V2 - 0.0064V + 0.77}


emax = 0.22 - fsmax
Rsr = V2/127(emax + fsmax)
Rso = V2(y - xe)/127(x + ye)
Rsd = SD2/8m
Rdmin =MAX {Rsr, Rso, Rsd}

290
67
322
322

=
=
=
=

=
=

165
10.58

=
=

0.14
0.084

m
m

V2/127Rdmin
V2/282 Rdmin

m
m
m
m

x =
y =

1.2 m
1.5 m

V (kph) =
I(deg) =

90
40

SD
m

fsmax = 0.37{0.000214V2 - 0.0064V + 0.77}


emax = 0.22 - fsmax
=
=

0.20
0.089

Rsr = V2/127(emax + fsmax)


Rso = V2(y - xe)/127(x + ye)
Rsd = SD2/8m
Rdmin =MAX {Rsr, Rso, Rsd}

=
=
=
=

290
67
322
322

0.08

edmax = Min [emax; (V^2/282 Rdmin)]

0.08

fd = V2/127Rdmin - edmax

0.11

fd = V2/127Rdmin - edmax

0.11

(V2/127Rdmin) > (fsmax+emax)

Danger of Overturning exist when:


Side Friction:
fsmax > fdemand = SAFE
NEED FOR TRANSITIONS:

(V2/127Rdmin) > [(x+ye)/(y-xe)]

Danger of Skidding exist when:

= SAFE

Danger of Overturning exist when:


Side Friction:
fsmax > fdemand = SAFE
NEED FOR TRANSITIONS:

=
=

1.2 m
1.5 m

0.20
0.089

82
m
=
= 7.263 (deg)
= Transition NEEDED

= 180Lsdmin/2Rdmin
I - (2s)
=
0.035V^3/Rdmin
=
Rdmin Ic / 180
=
Ls - (Ls^3/40R^2)
=
X - R sin s
=
Ls^2 / 6R
=
y - R (1-coss)
=
= Xm+(R+R)tan I/2
Ts Tan I/4
=

=
=
=
=
=
=
=
=
=
=

7.26
20.47
81.57
114.96
81.44
40.76
3.45
0.87
142.48
21.93

(V2/127Rdmin) > [(x+ye)/(y-xe)]

= SAFE
= SAFE

( when I/2 > s, transition needed; not needed)

Length of Spiral, Ls
Lsdmin = 0.036V3/Rdmin
s = 180Lsdmin/2Rdmin
I/2 > s

ELEMENTS OF CURVE WITH TRANSITION:

m
= 82
= 7.26 (deg)
= Transition NEEDED

ELEMENTS OF CURVE WITH TRANSITION:


(deg)
(deg)
m
m
m
m
m
m
m
m

s
Ic
Ls
Lc
X
Xm
y
R
Ts
E

STATIONINGS:
=
=
=
=

0.14
0.084

x =
y =

(V2/127Rdmin) > (fsmax+emax)

= SAFE

( when I/2 > s, transition needed; not needed)

Length of Spiral, Ls
Lsdmin = 0.036V3/Rdmin
s = 180Lsdmin/2Rdmin
I/2 > s

Sta. TS
Sta. SC
Sta. CS
Sta. ST

=
=

m
m

CHECKING:

Danger of Skidding exist when:

s
Ic
Ls
Lc
X
Xm
y
R
Ts
E

165
10.58

V2/127Rdmin
V2/282 Rdmin

m
m
m
m

edmax = Min [emax; (V^2/282 Rdmin)]

CHECKING:

=
=

= 180Lsdmin/2Rdmin
I - (2s)
=
0.035V^3/Rdmin
=
Rdmin Ic / 180
=
Ls - (Ls^3/40R^2)
=
X - R sin s
=
Ls^2 / 6R
=
y - R (1-coss)
=
= Xm+(R+R)tan I/2
Ts Tan I/4
=

=
=
=
=
=
=
=
=
=
=

7.26
25.47
81.57
143.04
81.44
40.76
3.45
0.87
158.18
27.89

(deg)
(deg)
m
m
m
m
m
m
m
m

STATIONINGS:
Sta of PI
Sta. PI - Ts
Sta. Ts + Ls
Sta. SC + Lc
Sta. CS + Ls

=
=
=
=
=

0 + 000
-0 + 142
-0 + 061
0 + 054
0 + 136

Sta. TS
Sta. SC
Sta. CS
Sta. ST

Designers:

Project & Location:

=
=
=
=

Sta of PI
Sta. PI - Ts
Sta. Ts + Ls
Sta. SC + Lc
Sta. CS + Ls

=
=
=
=
=

0 + 000
-0 + 158
-0 + 077
0 + 066
0 + 148

Approved By:

Sheet Content:

Reyes, Ma. Karisse P.


Santillan, Jan Sherwin F.

Uy, Kwin Juvy H.

PROPOSED 20 KM ARTERIAL
ROAD LAGUNA

ENGR. MANUEL M. MUHI


(Instructor)

COMPUTATION OF HORIZONTAL ALIGNMENT

Sheet No.

CURVE NO.
9
simple curve WITH Transition

CURVE NO.
10
simple curve WITH Transition

DESIGN PARAMETERS:
V (kph) =
I(deg) =

DESIGN PARAMETERS:
90
55

SD
m

fsmax = 0.37{0.000214V2 - 0.0064V + 0.77}


emax = 0.22 - fsmax
Rsr = V2/127(emax + fsmax)
Rso = V2(y - xe)/127(x + ye)
Rsd = SD2/8m
Rdmin =MAX {Rsr, Rso, Rsd}

290
67
322
322

=
=
=
=

165
10.58

=
=

0.14
0.084

m
m

V2/127Rdmin
V2/282 Rdmin

m
m
m
m

edmax = Min [emax; (V^2/282 Rdmin)]


fd = V2/127Rdmin - edmax

=
=

=
=

x =
y =

1.2 m
1.5 m

V (kph) =
I(deg) =

=
=

0.20
0.089

Rsr = V2/127(emax + fsmax)


Rso = V2(y - xe)/127(x + ye)
Rsd = SD2/8m
Rdmin =MAX {Rsr, Rso, Rsd}

0.08
0.11

290
67
322
322

=
=

165
10.58

=
=

0.14
0.084

V2/127Rdmin
V2/282 Rdmin

m
m
m
m

m
m

x =
y =

=
=

1.2 m
1.5 m

0.20
0.089

0.08
0.11

=
=

CHECKING:

NEED FOR TRANSITIONS:

(V2/127Rdmin) > [(x+ye)/(y-xe)]

Danger of Skidding exist when:

(V2/127Rdmin) > (fsmax+emax)


Danger of Overturning exist when:
(V2/127Rdmin) > [(x+ye)/(y-xe)]
Side Friction:
fsmax > fdemand = SAFE

= SAFE
= SAFE

NEED FOR TRANSITIONS:

( when I/2 > s, transition needed; not needed)

Length of Spiral, Ls
Lsdmin = 0.036V3/Rdmin
s = 180Lsdmin/2Rdmin
I/2 > s

82
m
=
= 7.263 (deg)
= Transition NEEDED

= 180Lsdmin/2Rdmin
I - (2s)
=
0.035V^3/Rdmin
=
Rdmin Ic / 180
=
Ls - (Ls^3/40R^2)
=
X - R sin s
=
Ls^2 / 6R
=
y - R (1-coss)
=
= Xm+(R+R)tan I/2
Ts Tan I/4
=

=
=
=
=
=
=
=
=
=
=

7.26
40.47
81.57
227.27
81.44
40.76
3.45
0.87
208.70
51.07

= SAFE
= SAFE

( when I/2 > s, transition needed; not needed)

Length of Spiral, Ls
Lsdmin = 0.036V3/Rdmin
s = 180Lsdmin/2Rdmin
I/2 > s

ELEMENTS OF CURVE WITH TRANSITION:

m
= 82
= 7.26 (deg)
= Transition NEEDED

ELEMENTS OF CURVE WITH TRANSITION:


(deg)
(deg)
m
m
m
m
m
m
m
m

s
Ic
Ls
Lc
X
Xm
y
R
Ts
E

STATIONINGS:
=
=
=
=

=
=
=
=

edmax = Min [emax; (V^2/282 Rdmin)]


fd = V2/127Rdmin - edmax

(V2/127Rdmin) > (fsmax+emax)

Danger of Overturning exist when:


Side Friction:
fsmax > fdemand = SAFE

Sta. TS
Sta. SC
Sta. CS
Sta. ST

SD
m

fsmax = 0.37{0.000214V2 - 0.0064V + 0.77}


emax = 0.22 - fsmax

CHECKING:
Danger of Skidding exist when:

s
Ic
Ls
Lc
X
Xm
y
R
Ts
E

90
40

= 180Lsdmin/2Rdmin
I - (2s)
=
0.035V^3/Rdmin
=
Rdmin Ic / 180
=
Ls - (Ls^3/40R^2)
=
X - R sin s
=
Ls^2 / 6R
=
y - R (1-coss)
=
= Xm+(R+R)tan I/2
Ts Tan I/4
=

=
=
=
=
=
=
=
=
=
=

7.26
25.47
81.57
143.04
81.44
40.76
3.45
0.87
158.18
27.89

(deg)
(deg)
m
m
m
m
m
m
m
m

STATIONINGS:
Sta of PI
Sta. PI - Ts
Sta. Ts + Ls
Sta. SC + Lc
Sta. CS + Ls

=
=
=
=
=

0 + 000
-0 + 209
-0 + 127
0 + 100
0 + 182

Sta. TS
Sta. SC
Sta. CS
Sta. ST

Designers:

Project & Location:

=
=
=
=

Sta of PI
Sta. PI - Ts
Sta. Ts + Ls
Sta. SC + Lc
Sta. CS + Ls

=
=
=
=
=

0 + 000
-0 + 158
-0 + 077
0 + 066
0 + 148

Approved By:

Sheet Content:

Reyes, Ma. Karisse P.


Santillan, Jan Sherwin F.

Uy, Kwin Juvy H.

PROPOSED 20 KM ARTERIAL
ROAD LAGUNA

ENGR. MANUEL M. MUHI


(Instructor)

COMPUTATION OF HORIZONTAL ALIGNMENT

Sheet No.

CURVE NO.
11
simple curve WITH Transition

CURVE NO.
12
simple curve WITH Transition

DESIGN PARAMETERS:
V (kph) =
I(deg) =

DESIGN PARAMETERS:
90
40

SD
m

=
=

fsmax = 0.37{0.000214V2 - 0.0064V + 0.77}


emax = 0.22 - fsmax
Rsr = V2/127(emax + fsmax)
Rso = V2(y - xe)/127(x + ye)
2

290
67

=
=

57.4
1.29

0.14

0.084

V2/127Rdmin
V2/282 Rdmin

m
m

m
m

x =
y =

1.2 m
1.5 m

V (kph) =
I(deg) =

50
60

SD
m

fsmax = 0.37{0.000214V2 - 0.0064V + 0.77}


emax = 0.22 - fsmax
=
=

0.20
0.090

Rsr = V2/127(emax + fsmax)


Rso = V2(y - xe)/127(x + ye)
2

=
=

89
23

320

Rsd = SD /8m

121 m

Rdmin =MAX {Rsr, Rso, Rsd}

320

Rdmin =MAX {Rsr, Rso, Rsd}

121 m

=
=

0.08
0.12

edmax = Min [emax; (V^2/282 Rdmin)]


fd = V2/127Rdmin - edmax

CHECKING:
Danger of Skidding exist when:
(V /127Rdmin) > (fsmax+emax)
(V2/127Rdmin) > [(x+ye)/(y-xe)]
Danger of Overturning exist when:
Side Friction:
fsmax > fdemand = SAFE
NEED FOR TRANSITIONS:

NEED FOR TRANSITIONS:

0.034
=
=

1.2 m
1.5 m

0.16
0.074

0.03
0.13

=
=

82
m
=
= 7.334 (deg)
= Transition NEEDED

= 180Lsdmin/2Rdmin
I - (2s)
=
0.035V^3/Rdmin
=
Rdmin Ic / 180
=
Ls - (Ls^3/40R^2)
=
X - R sin s
=
Ls^2 / 6R
=
y - R (1-coss)
=
= Xm+(R+R)tan I/2
Ts Tan I/4
=

=
=
=
=
=
=
=
=
=
=

7.33
25.33
81.97
141.55
81.84
40.96
3.50
0.88
157.81
27.83

= SAFE
= SAFE

( when I/2 > s, transition needed; not needed)

Length of Spiral, Ls
Lsdmin = 0.036V3/Rdmin
s = 180Lsdmin/2Rdmin
I/2 > s

ELEMENTS OF CURVE WITH TRANSITION:

m
= 37
= 8.87 (deg)
= Transition NEEDED

ELEMENTS OF CURVE WITH TRANSITION:


(deg)
(deg)
m
m
m
m
m
m
m
m

s
Ic
Ls
Lc
X
Xm
y
R
Ts
E

STATIONINGS:
=
=
=
=

0.19

x =
y =

Danger of Skidding exist when:


(V2/127Rdmin) > (fsmax+emax)
Danger of Overturning exist when:
(V2/127Rdmin) > [(x+ye)/(y-xe)]
Side Friction:
fsmax > fdemand = SAFE

= SAFE
= SAFE

( when I/2 > s, transition needed; not needed)

Length of Spiral, Ls
Lsdmin = 0.036V3/Rdmin
s = 180Lsdmin/2Rdmin
I/2 > s

Sta. TS
Sta. SC
Sta. CS
Sta. ST

m
m

CHECKING:
2

s
Ic
Ls
Lc
X
Xm
y
R
Ts
E

57.4
3.42

V2/127Rdmin
V2/282 Rdmin

m
m

Rsd = SD /8m

edmax = Min [emax; (V^2/282 Rdmin)]


fd = V2/127Rdmin - edmax

=
=

= 180Lsdmin/2Rdmin
I - (2s)
=
0.035V^3/Rdmin
=
Rdmin Ic / 180
=
Ls - (Ls^3/40R^2)
=
X - R sin s
=
Ls^2 / 6R
=
y - R (1-coss)
=
= Xm+(R+R)tan I/2
Ts Tan I/4
=

=
=
=
=
=
=
=
=
=
=

8.87
42.26
37.33
88.92
37.24
18.65
1.93
0.48
88.53
23.72

(deg)
(deg)
m
m
m
m
m
m
m
m

STATIONINGS:
Sta of PI
Sta. PI - Ts
Sta. Ts + Ls
Sta. SC + Lc
Sta. CS + Ls

=
=
=
=
=

0 + 000
-0 + 158
-0 + 076
0 + 066
0 + 148

Sta. TS
Sta. SC
Sta. CS
Sta. ST

Designers:

Project & Location:

=
=
=
=

Sta of PI
Sta. PI - Ts
Sta. Ts + Ls
Sta. SC + Lc
Sta. CS + Ls

=
=
=
=
=

0 + 000
-0 + 089
-0 + 051
0 + 038
0 + 075

Approved By:

Sheet Content:

Reyes, Ma. Karisse P.


Santillan, Jan Sherwin F.

Uy, Kwin Juvy H.

PROPOSED 20 KM ARTERIAL
ROAD LAGUNA

ENGR. MANUEL M. MUHI


(Instructor)

COMPUTATION OF HORIZONTAL ALIGNMENT

Sheet No.

CURVE NO.
13
simple curve WITH Transition

CURVE NO.
14
simple curve WITH Transition

DESIGN PARAMETERS:
V (kph) =
I(deg) =

DESIGN PARAMETERS:
50
40 m

SD
m

fsmax = 0.37{0.000214V2 - 0.0064V + 0.77}


emax = 0.22 - fsmax
Rsr = V2/127(emax + fsmax)
Rso = V2(y - xe)/127(x + ye)
Rsd = SD2/8m
Rdmin =MAX {Rsr, Rso, Rsd}

89
23
121
121

=
=
=
=

edmax = Min [emax; (V^2/282 Rdmin)]


fd = V2/127Rdmin - edmax

=
=

57.4
3.42

=
=

0.19
0.034

V2/127Rdmin
V2/282 Rdmin

m
m
m
m
=
=

m
m

x =
y =

1.2 m
1.5 m

V (kph) =
I(deg) =

=
=

0.16
0.074

Rsr = V2/127(emax + fsmax)


Rso = V2(y - xe)/127(x + ye)
Rsd = SD2/8m
Rdmin =MAX {Rsr, Rso, Rsd}

0.03
0.13

89
23
121
121

=
=

57.4
3.42

=
=

0.19
0.034

V2/127Rdmin
V2/282 Rdmin

m
m
m
m

m
m

x =
y =

=
=

1.2 m
1.5 m

0.16
0.074

0.03
0.13

=
=

CHECKING:

NEED FOR TRANSITIONS:

Danger of Skidding exist when:


(V2/127Rdmin) > (fsmax+emax)
Danger of Overturning exist when:
(V2/127Rdmin) > [(x+ye)/(y-xe)]
Side Friction:
fsmax > fdemand = SAFE

= SAFE
= SAFE

NEED FOR TRANSITIONS:

( when I/2 > s, transition needed; not needed)

Length of Spiral, Ls
Lsdmin = 0.036V3/Rdmin
s = 180Lsdmin/2Rdmin
I/2 > s

37
m
=
= 8.87 (deg)
= Transition NEEDED

= 180Lsdmin/2Rdmin
I - (2s)
=
0.035V^3/Rdmin
=
Rdmin Ic / 180
=
Ls - (Ls^3/40R^2)
=
X - R sin s
=
Ls^2 / 6R
=
y - R (1-coss)
=
= Xm+(R+R)tan I/2
Ts Tan I/4
=

=
=
=
=
=
=
=
=
=
=

8.87
22.26
37.33
46.84
37.24
18.65
1.93
0.48
62.70
11.06

= SAFE
= SAFE

( when I/2 > s, transition needed; not needed)

Length of Spiral, Ls
Lsdmin = 0.036V3/Rdmin
s = 180Lsdmin/2Rdmin
I/2 > s

ELEMENTS OF CURVE WITH TRANSITION:

m
= 37
= 8.87 (deg)
= Transition NEEDED

ELEMENTS OF CURVE WITH TRANSITION:


(deg)
(deg)
m
m
m
m
m
m
m
m

s
Ic
Ls
Lc
X
Xm
y
R
Ts
E

STATIONINGS:
=
=
=
=

=
=
=
=

edmax = Min [emax; (V^2/282 Rdmin)]


fd = V2/127Rdmin - edmax

CHECKING:

Sta. TS
Sta. SC
Sta. CS
Sta. ST

SD
m

fsmax = 0.37{0.000214V2 - 0.0064V + 0.77}


emax = 0.22 - fsmax

Danger of Skidding exist when:


(V2/127Rdmin) > (fsmax+emax)
Danger of Overturning exist when:
(V2/127Rdmin) > [(x+ye)/(y-xe)]
Side Friction:
fsmax > fdemand = SAFE

s
Ic
Ls
Lc
X
Xm
y
R
Ts
E

50
50

= 180Lsdmin/2Rdmin
I - (2s)
=
0.035V^3/Rdmin
=
Rdmin Ic / 180
=
Ls - (Ls^3/40R^2)
=
X - R sin s
=
Ls^2 / 6R
=
y - R (1-coss)
=
= Xm+(R+R)tan I/2
Ts Tan I/4
=

=
=
=
=
=
=
=
=
=
=

8.87
32.26
37.33
67.88
37.24
18.65
1.93
0.48
75.09
16.65

(deg)
(deg)
m
m
m
m
m
m
m
m

STATIONINGS:
Sta of PI
Sta. PI - Ts
Sta. Ts + Ls
Sta. SC + Lc
Sta. CS + Ls

=
=
=
=
=

0 + 000
-0 + 063
-0 + 025
0 + 021
0 + 059

Sta. TS
Sta. SC
Sta. CS
Sta. ST

Designers:
Reyes, Ma. Karisse P.
Santillan, Jan Sherwin F.
Uy, Kwin Juvy H.

Project & Location:


PROPOSED 20 KM ARTERIAL
ROAD LAGUNA

=
=
=
=

Sta of PI
Sta. PI - Ts
Sta. Ts + Ls
Sta. SC + Lc
Sta. CS + Ls

=
=
=
=
=

0 + 000
-0 + 075
-0 + 038
0 + 030
0 + 067

Approved By:
ENGR. MANUEL M. MUHI
(Instructor)

Sheet Content:

COMPUTATION OF HORIZONTAL ALIGNMENT

Sheet No.

CURVE NO.

15

CURVE NO.

simple curve WITH Transition


DESIGN PARAMETERS:

DESIGN PARAMETERS:

V (kph) =
I(deg) =

50
60

SD
m

fsmax = 0.37{0.000214V - 0.0064V + 0.77}


emax = 0.22 - fsmax
Rsr = V2/127(emax + fsmax)
Rso = V2(y - xe)/127(x + ye)
Rsd = SD2/8m
Rdmin =MAX {Rsr, Rso, Rsd}

89
23
121
121

=
=
=
=

=
=

fd = V2/127Rdmin - edmax

=
=

57.4
3.42

=
=

0.19
0.034

V2/127Rdmin
V2/282 Rdmin

m
m
m
m

edmax = Min [emax; (V^2/282 Rdmin)]

m
m

x =
y =

1.2 m
1.5 m

V (kph) =
I(deg) =

NEED FOR TRANSITIONS:

=
=

0.16
0.074

Rsr = V2/127(emax + fsmax)


Rso = V2(y - xe)/127(x + ye)
Rsd = SD2/8m
Rdmin =MAX {Rsr, Rso, Rsd}

0.03
0.13

=
=
=
=

89
23
121
121

=
=

57.4
3.42

=
=

0.19
0.034

V2/127Rdmin
V2/282 Rdmin

m
m
m
m

edmax = Min [emax; (V^2/282 Rdmin)]


fd = V2/127Rdmin - edmax

(V2/127Rdmin) > (fsmax+emax)


(V2/127Rdmin) > [(x+ye)/(y-xe)]

m
m

x =
y =

=
=

1.2 m
1.5 m

0.16
0.074

0.03
0.13

=
=

Danger of Skidding exist when:

(V2/127Rdmin) > (fsmax+emax)


Danger of Overturning exist when:
(V2/127Rdmin) > [(x+ye)/(y-xe)]
Side Friction:
fsmax > fdemand = SAFE

= SAFE
= SAFE

NEED FOR TRANSITIONS:

( when I/2 > s, transition needed; not needed)

Length of Spiral, Ls
Lsdmin = 0.036V3/Rdmin
s = 180Lsdmin/2Rdmin
I/2 > s

37
m
=
= 8.87 (deg)
= Transition NEEDED

= 180Lsdmin/2Rdmin
I - (2s)
=
0.035V^3/Rdmin
=
Rdmin Ic / 180
=
Ls - (Ls^3/40R^2)
=
X - R sin s
=
Ls^2 / 6R
=
y - R (1-coss)
=
= Xm+(R+R)tan I/2
Ts Tan I/4
=

=
=
=
=
=
=
=
=
=
=

8.87
42.26
37.33
88.92
37.24
18.65
1.93
0.48
88.53
23.72

= SAFE
= SAFE

( when I/2 > s, transition needed; not needed)

Length of Spiral, Ls
Lsdmin = 0.036V3/Rdmin
s = 180Lsdmin/2Rdmin
I/2 > s

ELEMENTS OF CURVE WITH TRANSITION:

m
= 37
= 8.87 (deg)
= Transition NEEDED

ELEMENTS OF CURVE WITH TRANSITION:


(deg)
(deg)
m
m
m
m
m
m
m
m

s
Ic
Ls
Lc
X
Xm
y
R
Ts
E

STATIONINGS:
=
=
=
=

SD
m

CHECKING:

Danger of Overturning exist when:


Side Friction:
fsmax > fdemand = SAFE

Sta. TS
Sta. SC
Sta. CS
Sta. ST

50
50 m

fsmax = 0.37{0.000214V2 - 0.0064V + 0.77}


emax = 0.22 - fsmax

CHECKING:
Danger of Skidding exist when:

s
Ic
Ls
Lc
X
Xm
y
R
Ts
E

16

simple curve WITH Transition

= 180Lsdmin/2Rdmin
I - (2s)
=
0.035V^3/Rdmin
=
Rdmin Ic / 180
=
Ls - (Ls^3/40R^2)
=
X - R sin s
=
Ls^2 / 6R
=
y - R (1-coss)
=
= Xm+(R+R)tan I/2
Ts Tan I/4
=

=
=
=
=
=
=
=
=
=
=

8.87
32.26
37.33
67.88
37.24
18.65
1.93
0.48
75.09
16.65

(deg)
(deg)
m
m
m
m
m
m
m
m

STATIONINGS:
Sta of PI
Sta. PI - Ts
Sta. Ts + Ls
Sta. SC + Lc
Sta. CS + Ls

=
=
=
=
=

0 + 000
-0 + 089
-0 + 051
0 + 038
0 + 075

Sta. TS
Sta. SC
Sta. CS
Sta. ST

Designers:

Project & Location:

=
=
=
=

Sta of PI
Sta. PI - Ts
Sta. Ts + Ls
Sta. SC + Lc
Sta. CS + Ls

=
=
=
=
=

0 + 000
-0 + 075
-0 + 038
0 + 030
0 + 067

Approved By:

Sheet Content:

Reyes, Ma. Karisse P.


Santillan, Jan Sherwin F.

Uy, Kwin Juvy H.

PROPOSED 20 KM ARTERIAL
ROAD LAGUNA

ENGR. MANUEL M. MUHI


(Instructor)

COMPUTATION OF HORIZONTAL ALIGNMENT

Sheet No.

CURVE NO.
17
simple curve WITH Transition

CURVE NO.
18
simple curve WITH Transition

DESIGN PARAMETERS:
V (kph) =
I(deg) =

DESIGN PARAMETERS:
50
50

SD
m

fsmax = 0.37{0.000214V2 - 0.0064V + 0.77}


emax = 0.22 - fsmax
Rsr = V2/127(emax + fsmax)
Rso = V2(y - xe)/127(x + ye)
Rsd = SD2/8m
Rdmin =MAX {Rsr, Rso, Rsd}

89
23
121
121

=
=
=
=

57.4
3.42

=
=

0.19
0.034

m
m

V2/127Rdmin
V2/282 Rdmin

m
m
m
m

edmax = Min [emax; (V^2/282 Rdmin)]


fd = V2/127Rdmin - edmax

=
=

=
=

x =
y =

1.2 m
1.5 m

V (kph) =
I(deg) =

=
=

0.16
0.074

Rsr = V2/127(emax + fsmax)


Rso = V2(y - xe)/127(x + ye)
Rsd = SD2/8m
Rdmin =MAX {Rsr, Rso, Rsd}

0.03
0.13

89
23
121
121

=
=

57.4
3.42

=
=

0.19
0.034

V2/127Rdmin
V2/282 Rdmin

m
m
m
m

m
m

x =
y =

=
=

1.2 m
1.5 m

0.16
0.074

0.03
0.13

=
=

CHECKING:

NEED FOR TRANSITIONS:

(V2/127Rdmin) > [(x+ye)/(y-xe)]

(V2/127Rdmin) > (fsmax+emax)


Danger of Overturning exist when:
(V2/127Rdmin) > [(x+ye)/(y-xe)]
Side Friction:
fsmax > fdemand = SAFE
Danger of Skidding exist when:

= SAFE
= SAFE

NEED FOR TRANSITIONS:

( when I/2 > s, transition needed; not needed)

Length of Spiral, Ls
Lsdmin = 0.036V3/Rdmin
s = 180Lsdmin/2Rdmin
I/2 > s

37
m
=
= 8.87 (deg)
= Transition NEEDED

= 180Lsdmin/2Rdmin
I - (2s)
=
0.035V^3/Rdmin
=
Rdmin Ic / 180
=
Ls - (Ls^3/40R^2)
=
X - R sin s
=
Ls^2 / 6R
=
y - R (1-coss)
=
= Xm+(R+R)tan I/2
Ts Tan I/4
=

=
=
=
=
=
=
=
=
=
=

8.87
32.26
37.33
67.88
37.24
18.65
1.93
0.48
75.09
16.65

= SAFE
= SAFE

( when I/2 > s, transition needed; not needed)

Length of Spiral, Ls
Lsdmin = 0.036V3/Rdmin
s = 180Lsdmin/2Rdmin
I/2 > s

ELEMENTS OF CURVE WITH TRANSITION:

m
= 37
= 8.87 (deg)
= Transition NEEDED

ELEMENTS OF CURVE WITH TRANSITION:


(deg)
(deg)
m
m
m
m
m
m
m
m

s
Ic
Ls
Lc
X
Xm
y
R
Ts
E

STATIONINGS:
=
=
=
=

=
=
=
=

edmax = Min [emax; (V^2/282 Rdmin)]


fd = V2/127Rdmin - edmax

(V2/127Rdmin) > (fsmax+emax)

Danger of Overturning exist when:


Side Friction:
fsmax > fdemand = SAFE

Sta. TS
Sta. SC
Sta. CS
Sta. ST

SD
m

fsmax = 0.37{0.000214V2 - 0.0064V + 0.77}


emax = 0.22 - fsmax

CHECKING:
Danger of Skidding exist when:

s
Ic
Ls
Lc
X
Xm
y
R
Ts
E

50
40

= 180Lsdmin/2Rdmin
I - (2s)
=
0.035V^3/Rdmin
=
Rdmin Ic / 180
=
Ls - (Ls^3/40R^2)
=
X - R sin s
=
Ls^2 / 6R
=
y - R (1-coss)
=
= Xm+(R+R)tan I/2
Ts Tan I/4
=

=
=
=
=
=
=
=
=
=
=

8.87
22.26
37.33
46.84
37.24
18.65
1.93
0.48
62.70
11.06

(deg)
(deg)
m
m
m
m
m
m
m
m

STATIONINGS:
Sta of PI
Sta. PI - Ts
Sta. Ts + Ls
Sta. SC + Lc
Sta. CS + Ls

=
=
=
=
=

0 + 000
-0 + 075
-0 + 038
0 + 030
0 + 067

Sta. TS
Sta. SC
Sta. CS
Sta. ST

Designers:

Project & Location:

=
=
=
=

Sta of PI
Sta. PI - Ts
Sta. Ts + Ls
Sta. SC + Lc
Sta. CS + Ls

=
=
=
=
=

0 + 000
-0 + 063
-0 + 025
0 + 021
0 + 059

Approved By:

Sheet Content:

Reyes, Ma. Karisse P.


Santillan, Jan Sherwin F.

Uy, Kwin Juvy H.

PROPOSED 20 KM ARTERIAL
ROAD LAGUNA

ENGR. MANUEL M. MUHI


(Instructor)

COMPUTATION OF HORIZONTAL ALIGNMENT

Sheet No.

CURVE NO.

19

CURVE NO.

simple curve WITH Transition


DESIGN PARAMETERS:
V (kph) =
I(deg) =

20

simple curve WITH Transition


DESIGN PARAMETERS:

50
35

SD
m

fsmax = 0.37{0.000214V2 - 0.0064V + 0.77}


emax = 0.22 - fsmax

=
=

57.4
3.42

=
=

0.19
0.034

m
m

x =
y =

1.2 m
1.5 m

V (kph) =
I(deg) =

50
25

SD
m

fsmax = 0.37{0.000214V2 - 0.0064V + 0.77}


emax = 0.22 - fsmax

=
=

57.4
3.42

=
=

0.19
0.034

m
m

x =
y =

Rsr = V2/127(emax + fsmax)

89

V2/127Rdmin

0.16

Rsr = V2/127(emax + fsmax)

89

V2/127Rdmin

0.16

Rso = V2(y - xe)/127(x + ye)

23

V2/282 Rdmin

0.074

Rso = V2(y - xe)/127(x + ye)

23

V2/282 Rdmin

0.074

=
=

121
121

=
=

121 m
121 m

Rsd = SD /8m
Rdmin =MAX {Rsr, Rso, Rsd}

m
m

Rsd = SD /8m
Rdmin =MAX {Rsr, Rso, Rsd}

edmax = Min [emax; (V^2/282 Rdmin)]

0.03

edmax = Min [emax; (V^2/282 Rdmin)]

0.03

fd = V2/127Rdmin - edmax

0.13

fd = V2/127Rdmin - edmax

0.13

CHECKING:

CHECKING:

Danger of Skidding exist when:

(V2/127Rdmin) > (fsmax+emax)


Danger of Overturning exist when:
(V2/127Rdmin) > [(x+ye)/(y-xe)]
Side Friction:
fsmax > fdemand = SAFE
NEED FOR TRANSITIONS:

Danger of Skidding exist when:

(V2/127Rdmin) > (fsmax+emax)


Danger of Overturning exist when:
(V2/127Rdmin) > [(x+ye)/(y-xe)]
Side Friction:
fsmax > fdemand = SAFE

= SAFE
= SAFE

NEED FOR TRANSITIONS:

( when I/2 > s, transition needed; not needed)

Length of Spiral, Ls
Lsdmin = 0.036V3/Rdmin
s = 180Lsdmin/2Rdmin
I/2 > s

37
m
=
= 8.87 (deg)
= Transition NEEDED

= 180Lsdmin/2Rdmin
I - (2s)
=
0.035V^3/Rdmin
=
Rdmin Ic / 180
=
Ls - (Ls^3/40R^2)
=
X - R sin s
=
Ls^2 / 6R
=
y - R (1-coss)
=
= Xm+(R+R)tan I/2
Ts Tan I/4
=

=
=
=
=
=
=
=
=
=
=

8.87
17.26
37.33
36.32
37.24
18.65
1.93
0.48
56.81
8.74

=
=
=
=

m
= 37
= 8.87 (deg)
= Transition NEEDED

ELEMENTS OF CURVE WITH TRANSITION:


(deg)
(deg)
m
m
m
m
m
m
m
m

s
Ic
Ls
Lc
X
Xm
y
R
Ts
E

STATIONINGS:
Sta. TS
Sta. SC
Sta. CS
Sta. ST

= SAFE
= SAFE

( when I/2 > s, transition needed; not needed)

Length of Spiral, Ls
Lsdmin = 0.036V3/Rdmin
s = 180Lsdmin/2Rdmin
I/2 > s

ELEMENTS OF CURVE WITH TRANSITION:


s
Ic
Ls
Lc
X
Xm
y
R
Ts
E

1.2 m
1.5 m

= 180Lsdmin/2Rdmin
I - (2s)
=
0.035V^3/Rdmin
=
Rdmin Ic / 180
=
Ls - (Ls^3/40R^2)
=
X - R sin s
=
Ls^2 / 6R
=
y - R (1-coss)
=
= Xm+(R+R)tan I/2
Ts Tan I/4
=

=
=
=
=
=
=
=
=
=
=

8.87
7.26
37.33
15.28
37.24
18.65
1.93
0.48
45.48
4.98

(deg)
(deg)
m
m
m
m
m
m
m
m

STATIONINGS:
Sta of PI
Sta. PI - Ts
Sta. Ts + Ls
Sta. SC + Lc
Sta. CS + Ls

=
=
=
=
=

0 + 000
-0 + 057
-0 + 019
0 + 017
0 + 054

Sta. TS
Sta. SC
Sta. CS
Sta. ST

Designers:

Project & Location:

=
=
=
=

Sta of PI
Sta. PI - Ts
Sta. Ts + Ls
Sta. SC + Lc
Sta. CS + Ls

=
=
=
=
=

0 + 000
-0 + 045
-0 + 008
0 + 007
0 + 044

Approved By:

Sheet Content:

Reyes, Ma. Karisse P.


Santillan, Jan Sherwin F.

Uy, Kwin Juvy H.

PROPOSED 20 KM ARTERIAL
ROAD LAGUNA

ENGR. MANUEL M. MUHI


(Instructor)

COMPUTATION OF HORIZONTAL ALIGNMENT

Sheet No.

CURVE NO.
21
simple curve WITH Transition

CURVE NO.
22
simple curve WITH Transition

DESIGN PARAMETERS:
V (kph) =
I(deg) =

DESIGN PARAMETERS:
50
50

SD
m

=
=

fsmax = 0.37{0.000214V2 - 0.0064V + 0.77}


emax = 0.22 - fsmax
Rsr = V2/127(emax + fsmax)
Rso = V2(y - xe)/127(x + ye)
Rsd = SD2/8m
Rdmin = max{Rsr, Rso, Rsd}

89
23
121
121

=
=
=
=

=
=

fd = V2/127Rdmin - edmax

0.19

0.034

m
m

V2/127Rdmin
V2/282 Rdmin

m
m
m
m

edmax = Min [emax; (V^2/282 Rdmin)]

57.4
3.42

x =
y =

1.2 m
1.5 m

V (kph) =
I(deg) =

=
=

0.16
0.074

Rsr = V2/127(emax + fsmax)


Rso = V2(y - xe)/127(x + ye)
Rsd = SD2/8m
Rdmin = MAX{Rsr, Rso, Rsd}

0.03
0.13

=
=
=
=

89
23
121
121

0.19

0.034

m
m

x =
y =

=
=

1.2 m
1.5 m

0.16
0.074

0.03
0.13

=
=

fd = V2/127Rdmin - edmax

V2/127Rdmin
V2/282 Rdmin

m
m
m
m

edmax = Min [emax; (V^2/282 Rdmin)]

57.4
3.42

CHECKING:
(V /127Rdmin) > (fsmax+emax)

NEED FOR TRANSITIONS:

(V2/127Rdmin) > [(x+ye)/(y-xe)]

Danger of Skidding exist when:

(V2/127Rdmin) > (fsmax+emax)


Danger of Overturning exist when:
(V2/127Rdmin) > [(x+ye)/(y-xe)]
Side Friction:
fsmax > fdemand = SAFE

= SAFE
= SAFE

NEED FOR TRANSITIONS:

( when I/2 > s, transition needed; not needed)

Length of Spiral, Ls
Lsdmin = 0.036V3/Rdmin
s = 180Lsdmin/2Rdmin
I/2 > s

37
m
=
= 8.87 (deg)
= Transition NEEDED

= 180Lsdmin/2Rdmin
I - (2s)
=
0.035V^3/Rdmin
=
Rdmin Ic / 180
=
Ls - (Ls^3/40R^2)
=
X - R sin s
=
Ls^2 / 6R
=
y - R (1-coss)
=
= Xm+(R+R)tan I/2
Ts Tan I/4
=

=
=
=
=
=
=
=
=
=
=

8.87
32.26
37.33
67.88
37.24
18.65
1.93
0.48
75.09
16.65

= SAFE
= SAFE

( when I/2 > s, transition needed; not needed)

Length of Spiral, Ls
Lsdmin = 0.036V3/Rdmin
s = 180Lsdmin/2Rdmin
I/2 > s

ELEMENTS OF CURVE WITH TRANSITION:

m
= 37
= 8.87 (deg)
= Transition NEEDED

ELEMENTS OF CURVE WITH TRANSITION:


(deg)
(deg)
m
m
m
m
m
m
m
m

s
Ic
Ls
Lc
X
Xm
y
R
Ts
E

STATIONINGS:
=
=
=
=

=
=

emax = 0.22 - fsmax

Danger of Overturning exist when:


Side Friction:
fsmax > fdemand = SAFE

Sta. TS
Sta. SC
Sta. CS
Sta. ST

SD
m

fsmax = 0.37{0.000214V2 - 0.0064V + 0.77}

CHECKING:
Danger of Skidding exist when:

s
Ic
Ls
Lc
X
Xm
y
R
Ts
E

50
80

= 180Lsdmin/2Rdmin
I - (2s)
=
0.035V^3/Rdmin
=
Rdmin Ic / 180
=
Ls - (Ls^3/40R^2)
=
X - R sin s
=
Ls^2 / 6R
=
y - R (1-coss)
=
= Xm+(R+R)tan I/2
Ts Tan I/4
=

=
=
=
=
=
=
=
=
=
=

8.87
62.26
37.33
131.00
37.24
18.65
1.93
0.48
120.21
43.75

(deg)
(deg)
m
m
m
m
m
m
m
m

STATIONINGS:
Sta of PI
Sta. PI - Ts
Sta. Ts + Ls
Sta. SC + Lc
Sta. CS + Ls

=
=
=
=
=

0 + 000
-0 + 075
-0 + 038
0 + 030
0 + 067

Sta. TS
Sta. SC
Sta. CS
Sta. ST

Designers:

Project & Location:

=
=
=
=

Sta of PI
Sta. PI - Ts
Sta. Ts + Ls
Sta. SC + Lc
Sta. CS + Ls

=
=
=
=
=

0 + 000
-0 + 120
-0 + 083
0 + 048
0 + 085

Approved By:

Sheet Content:

Reyes, Ma. Karisse P.


Santillan, Jan Sherwin F.

Uy, Kwin Juvy H.

PROPOSED 20 KM ARTERIAL
ROAD LAGUNA

ENGR. MANUEL M. MUHI


(Instructor)

COMPUTATION OF HORIZONTAL ALIGNMENT

Sheet No.

CURVE NO.
23
simple curve WITH Transition

CURVE NO.
24
simple curve WITH Transition

DESIGN PARAMETERS:
V (kph) =
I(deg) =

DESIGN PARAMETERS:
50
50

SD
m

fsmax = 0.37{0.000214V2 - 0.0064V + 0.77}


emax = 0.22 - fsmax

=
=

57.4
3.42

=
=

0.19
0.034

m
m

x =
y =

1.2 m
1.5 m

V (kph) =
I(deg) =

50
50

SD
m

fsmax = 0.37{0.000214V2 - 0.0064V + 0.77}


emax = 0.22 - fsmax

=
=

57.4
3.42

=
=

0.19
0.034

m
m

x =
y =

Rsr = V2/127(emax + fsmax)

89

V2/127Rdmin

0.16

Rsr = V2/127(emax + fsmax)

89

V2/127Rdmin

0.16

Rso = V2(y - xe)/127(x + ye)

23

V2/282 Rdmin

0.074

Rso = V2(y - xe)/127(x + ye)

23

V2/282 Rdmin

0.074

Rsd = SD2/8m
Rdmin = MAX{Rsr, Rso, Rsd}

121

121

Rsd = SD2/8m
Rdmin = MAX{Rsr, Rso, Rsd}

121 m
121 m

edmax = Min [emax; V^2 Rdmin)]

0.03

edmax = Min [emax; (V^2/282 Rdmin)]

0.03

fd = V2/127Rdmin - edmax

0.13

fd = V2/127Rdmin - edmax

0.13

CHECKING:

CHECKING:
(V2/127Rdmin) > (fsmax+emax)

Danger of Skidding exist when:

Danger of Overturning exist when:


(V2/127Rdmin) > [(x+ye)/(y-xe)]
Side Friction:
fsmax > fdemand = SAFE
NEED FOR TRANSITIONS:

Danger of Skidding exist when:

= SAFE

Danger of Overturning exist when:


(V2/127Rdmin) > [(x+ye)/(y-xe)]
Side Friction:
fsmax > fdemand = SAFE
NEED FOR TRANSITIONS:

ELEMENTS OF CURVE WITH TRANSITION:


=
=
=
=
=
=
=
=
=
=

8.87
32.26
37.33
67.88
37.24
18.65
1.93
0.48
75.09
16.65

=
=
=
=

= SAFE

m
= 37
= 8.87 (deg)
= Transition NEEDED

ELEMENTS OF CURVE WITH TRANSITION:


(deg)
(deg)
m
m
m
m
m
m
m
m

s
Ic
Ls
Lc
X
Xm
y
R
Ts
E

STATIONINGS:
Sta. TS
Sta. SC
Sta. CS
Sta. ST

= SAFE

( when I/2 > s, transition needed; not needed)

Length of Spiral, Ls
Lsdmin = 0.036V3/Rdmin
s = 180Lsdmin/2Rdmin
I/2 > s

37
m
=
= 8.87 (deg)
= Transition NEEDED

= 180Lsdmin/2Rdmin
I - (2s)
=
0.035V^3/Rdmin
=
Rdmin Ic / 180
=
Ls - (Ls^3/40R^2)
=
X - R sin s
=
Ls^2 / 6R
=
y - R (1-coss)
=
= Xm+(R+R)tan I/2
Ts Tan I/4
=

(V2/127Rdmin) > (fsmax+emax)

= SAFE

( when I/2 > s, transition needed; not needed)

Length of Spiral, Ls
Lsdmin = 0.036V3/Rdmin
s = 180Lsdmin/2Rdmin
I/2 > s

s
Ic
Ls
Lc
X
Xm
y
R
Ts
E

1.2 m
1.5 m

= 180Lsdmin/2Rdmin
I - (2s)
=
0.035V^3/Rdmin
=
Rdmin Ic / 180
=
Ls - (Ls^3/40R^2)
=
X - R sin s
=
Ls^2 / 6R
=
y - R (1-coss)
=
= Xm+(R+R)tan I/2
Ts Tan I/4
=

=
=
=
=
=
=
=
=
=
=

8.87
32.26
37.33
67.88
37.24
18.65
1.93
0.48
75.09
16.65

(deg)
(deg)
m
m
m
m
m
m
m
m

STATIONINGS:
Sta of PI
Sta. PI - Ts
Sta. Ts + Ls
Sta. SC + Lc
Sta. CS + Ls

=
=
=
=
=

0 + 000
-0 + 075
-0 + 038
0 + 030
0 + 067

Sta. TS
Sta. SC
Sta. CS
Sta. ST

Designers:
Reyes, Ma. Karisse P.
Santillan, Jan Sherwin F.
Uy, Kwin Juvy H.

Project & Location:


PROPOSED 20 KM ARTERIAL
ROAD LAGUNA

=
=
=
=

Sta of PI
Sta. PI - Ts
Sta. Ts + Ls
Sta. SC + Lc
Sta. CS + Ls

=
=
=
=
=

0 + 000
-0 + 075
-0 + 038
0 + 030
0 + 067

Approved By:
ENGR. MANUEL M. MUHI
(Instructor)

Sheet Content:

COMPUTATION OF HORIZONTAL ALIGNMENT

Sheet No.

CURVE NO.
25
simple curve WITH Transition

CURVE NO.
26
simple curve WITH Transition

DESIGN PARAMETERS:
V (kph) =
I(deg) =

DESIGN PARAMETERS:
50
90

SD
m

=
=

fsmax = 0.37{0.000214V2 - 0.0064V + 0.77}


emax = 0.22 - fsmax
Rsr = V2/127(emax + fsmax)
Rso = V2(y - xe)/127(x + ye)
Rsd = SD2/8m
Rdmin = MAX{Rsr, Rso, Rsd}

89
23
121
121

=
=
=
=

0.19

0.034

m
m

V2/127Rdmin
V2/282 Rdmin

m
m
m
m

edmax = Min [emax; (V^2/282 Rdmin)]


fd = V2/127Rdmin - edmax

57.4
3.42

=
=

x =
y =

1.2 m
1.5 m

V (kph) =
I(deg) =

=
=

0.16
0.074

Rsr = V2/127(emax + fsmax)


Rso = V2(y - xe)/127(x + ye)
Rsd = SD2/8m
Rdmin = MAX{Rsr, Rso, Rsd}

0.03
0.13

=
=
=
=

89
23
121
121

0.19

0.034

V2/127Rdmin
V2/282 Rdmin

m
m
m
m

edmax = Min [emax; (V^2/282 Rdmin)]


fd = V2/127Rdmin - edmax

57.4
3.42

m
m

x =
y =

=
=

1.2 m
1.5 m

0.16
0.074

0.03
0.13

=
=

CHECKING:

NEED FOR TRANSITIONS:

(V2/127Rdmin) > [(x+ye)/(y-xe)]

Danger of Skidding exist when:

= SAFE

Danger of Overturning exist when:


Side Friction:
fsmax > fdemand = SAFE
NEED FOR TRANSITIONS:

ELEMENTS OF CURVE WITH TRANSITION:


=
=
=
=
=
=
=
=
=
=

8.87
72.26
37.33
152.04
37.24
18.65
1.93
0.48
139.69
57.86

(V2/127Rdmin) > [(x+ye)/(y-xe)]

= SAFE
= SAFE

( when I/2 > s, transition needed; not needed)

Length of Spiral, Ls
Lsdmin = 0.036V3/Rdmin
s = 180Lsdmin/2Rdmin
I/2 > s

37
m
=
= 8.87 (deg)
= Transition NEEDED

= 180Lsdmin/2Rdmin
I - (2s)
=
0.035V^3/Rdmin
=
Rdmin Ic / 180
=
Ls - (Ls^3/40R^2)
=
X - R sin s
=
Ls^2 / 6R
=
y - R (1-coss)
=
= Xm+(R+R)tan I/2
Ts Tan I/4
=

(V2/127Rdmin) > (fsmax+emax)

= SAFE

( when I/2 > s, transition needed; not needed)

Length of Spiral, Ls
Lsdmin = 0.036V3/Rdmin
s = 180Lsdmin/2Rdmin
I/2 > s

m
= 37
= 8.87 (deg)
= Transition NEEDED

ELEMENTS OF CURVE WITH TRANSITION:


(deg)
(deg)
m
m
m
m
m
m
m
m

s
Ic
Ls
Lc
X
Xm
y
R
Ts
E

STATIONINGS:
=
=
=
=

=
=

emax = 0.22 - fsmax

(V2/127Rdmin) > (fsmax+emax)

Danger of Overturning exist when:


Side Friction:
fsmax > fdemand = SAFE

Sta. TS
Sta. SC
Sta. CS
Sta. ST

SD
m

fsmax = 0.37{0.000214V2 - 0.0064V + 0.77}

CHECKING:
Danger of Skidding exist when:

s
Ic
Ls
Lc
X
Xm
y
R
Ts
E

50
25

= 180Lsdmin/2Rdmin
I - (2s)
=
0.035V^3/Rdmin
=
Rdmin Ic / 180
=
Ls - (Ls^3/40R^2)
=
X - R sin s
=
Ls^2 / 6R
=
y - R (1-coss)
=
= Xm+(R+R)tan I/2
Ts Tan I/4
=

=
=
=
=
=
=
=
=
=
=

8.87
7.26
37.33
15.28
37.24
18.65
1.93
0.48
45.48
4.98

(deg)
(deg)
m
m
m
m
m
m
m
m

STATIONINGS:
Sta of PI
Sta. PI - Ts
Sta. Ts + Ls
Sta. SC + Lc
Sta. CS + Ls

=
=
=
=
=

0 + 000
-0 + 140
-0 + 102
0 + 050
0 + 087

Sta. TS
Sta. SC
Sta. CS
Sta. ST

Designers:

Project & Location:

=
=
=
=

Sta of PI
Sta. PI - Ts
Sta. Ts + Ls
Sta. SC + Lc
Sta. CS + Ls

=
=
=
=
=

0 + 000
-0 + 045
-0 + 008
0 + 007
0 + 044

Approved By:

Sheet Content:

Reyes, Ma. Karisse P.


Santillan, Jan Sherwin F.

Uy, Kwin Juvy H.

PROPOSED 20 KM ARTERIAL
ROAD LAGUNA

ENGR. MANUEL M. MUHI


(Instructor)

COMPUTATION OF HORIZONTAL ALIGNMENT

Sheet No.

CURVE NO.
29
simple curve WITH Transition

CURVE NO.
30
simple curve WITH Transition

DESIGN PARAMETERS:
V (kph) =
I(deg) =

DESIGN PARAMETERS:
50
44

SD
m

fsmax = 0.37{0.000214V2 - 0.0064V + 0.77}


emax = 0.22 - fsmax

=
=

57.4
3.42

=
=

0.19
0.034

m
m

x =
y =

1.2 m
1.5 m

V (kph) =
I(deg) =

50
19

SD
m

fsmax = 0.37{0.000214V2 - 0.0064V + 0.77}


emax = 0.22 - fsmax

=
=

57.4
3.42

=
=

0.19
0.034

m
m

x =
y =

Rsr = V2/127(emax + fsmax)

89

V2/127Rdmin

0.16

Rsr = V2/127(emax + fsmax)

89

V2/127Rdmin

0.16

Rso = V2(y - xe)/127(x + ye)

23

V2/282 Rdmin

0.074

Rso = V2(y - xe)/127(x + ye)

23

V2/282 Rdmin

0.074

Rsd = SD2/8m
Rdmin = MAX{Rsr, Rso, Rsd}

=
=

121
121

m
m

Rsd = SD2/8m
Rdmin = MAX{Rsr, Rso, Rsd}

=
=

121 m
121 m

edmax = Min [emax; (V^2/282 Rdmin)]

0.03

edmax = Min [emax; (V^2/282 Rdmin)]

0.03

fd = V2/127Rdmin - edmax

0.13

fd = V2/127Rdmin - edmax

0.13

CHECKING:

CHECKING:

Danger of Skidding exist when:


(V2/127Rdmin) > (fsmax+emax)
(V2/127Rdmin) > [(x+ye)/(y-xe)]
Danger of Overturning exist when:
Side Friction:
fsmax > fdemand = SAFE
NEED FOR TRANSITIONS:

Danger of Skidding exist when:


(V2/127Rdmin) > (fsmax+emax)
(V2/127Rdmin) > [(x+ye)/(y-xe)]
Danger of Overturning exist when:
Side Friction:
fsmax > fdemand = SAFE

= SAFE
= SAFE

NEED FOR TRANSITIONS:

( when I/2 > s, transition needed; not needed)

Length of Spiral, Ls
Lsdmin = 0.036V3/Rdmin
s = 180Lsdmin/2Rdmin
I/2 > s

37
m
=
= 8.87 (deg)
= Transition NEEDED

= 180Lsdmin/2Rdmin
I - (2s)
=
0.035V^3/Rdmin
=
Rdmin Ic / 180
=
Ls - (Ls^3/40R^2)
=
X - R sin s
=
Ls^2 / 6R
=
y - R (1-coss)
=
= Xm+(R+R)tan I/2
Ts Tan I/4
=

=
=
=
=
=
=
=
=
=
=

8.87
26.26
37.33
55.25
37.24
18.65
1.93
0.48
67.55
13.13

=
=
=
=

m
= 37
(deg)
= 8.87
= Transition NEEDED

ELEMENTS OF CURVE WITH TRANSITION:


(deg)
(deg)
m
m
m
m
m
m
m
m

s
Ic
Ls
Lc
X
Xm
y
R
Ts
E

STATIONINGS:
Sta. TS
Sta. SC
Sta. CS
Sta. ST

= SAFE
= SAFE

( when I/2 > s, transition needed; not needed)

Length of Spiral, Ls
Lsdmin = 0.036V3/Rdmin
s = 180Lsdmin/2Rdmin
I/2 > s

ELEMENTS OF CURVE WITH TRANSITION:


s
Ic
Ls
Lc
X
Xm
y
R
Ts
E

1.2 m
1.5 m

=
=
=
=
=
=
=
=
=
=

180Lsdmin/2Rdmin
I - (2s)
0.035V^3/Rdmin
Rdmin Ic / 180
Ls - (Ls^3/40R^2)
X - R sin s
Ls^2 / 6R
y - R (1-coss)
Xm+(R+R)tan I/2
Ts Tan I/4

=
=
=
=
=
=
=
=
=
=

8.87
1.26
37.33
2.65
37.24
18.65
1.93
0.48
38.90
3.23

(deg)
(deg)
m
m
m
m
m
m
m
m

STATIONINGS:
Sta of PI
Sta. PI - Ts
Sta. Ts + Ls
Sta. SC + Lc
Sta. CS + Ls

=
=
=
=
=

0 + 000
-0 + 068
-0 + 030
0 + 025
0 + 062

Sta. TS
Sta. SC
Sta. CS
Sta. ST

Designers:

Project & Location:

=
=
=
=

Sta of PI
Sta. PI - Ts
Sta. Ts + Ls
Sta. SC + Lc
Sta. CS + Ls

=
=
=
=
=

Approved By:

0 + 000
-0 + 039
-0 + 002
0 + 001
0 + 038

Sheet Content:

Reyes, Ma. Karisse P.


Santillan, Jan Sherwin F.

Uy, Kwin Juvy H.

PROPOSED 20 KM ARTERIAL
ROAD LAGUNA

ENGR. MANUEL M. MUHI


(Instructor)

COMPUTATION OF HORIZONTAL ALIGNMENT

Sheet No.

CURVE NO.
31
simple curve WITH Transition

CURVE NO.
32
simple curve WITH Transition

DESIGN PARAMETERS:
V (kph) =
I(deg) =

DESIGN PARAMETERS:
50
25

SD
m

fsmax = 0.37{0.000214V2 - 0.0064V + 0.77}


emax = 0.22 - fsmax
Rsr = V2/127(emax + fsmax)
Rso = V2(y - xe)/127(x + ye)
Rsd = SD2/8m
Rdmin = MAX{Rsr, Rso, Rsd}

89
23
121
121

=
=
=
=

edmax = Min [emax; (V^2/282 Rdmin)]


fd = V2/127Rdmin - edmax

=
=

57.4
3.42

=
=

0.19
0.034

V2/127Rdmin
V2/282 Rdmin

m
m
m
m
=
=

m
m

x =
y =

1.2 m
1.5 m

V (kph) =
I(deg) =

=
=

0.16
0.074

Rsr = V2/127(emax + fsmax)


Rso = V2(y - xe)/127(x + ye)
Rsd = SD2/8m
Rdmin = MAX{Rsr, Rso, Rsd}

0.03
0.13

89
23
121
121

=
=

57.4
3.42

=
=

0.19
0.034

m
m

V2/127Rdmin
V2/282 Rdmin

m
m
m
m

x =
y =

=
=

1.2 m
1.5 m

0.16
0.074

0.03
0.13

=
=

CHECKING:

NEED FOR TRANSITIONS:

Danger of Skidding exist when:


(V2/127Rdmin)
> (fsmax+emax)
(V2/127Rdmin) > [(x+ye)/(y-xe)]
Danger of Overturning exist when:
Side Friction:
fsmax > fdemand = SAFE

= SAFE
= SAFE

NEED FOR TRANSITIONS:

( when I/2 > s, transition needed; not needed)

Length of Spiral, Ls
Lsdmin = 0.036V3/Rdmin
s = 180Lsdmin/2Rdmin
I/2 > s

37
m
=
= 8.87 (deg)
= Transition NEEDED

= 180Lsdmin/2Rdmin
I - (2s)
=
0.035V^3/Rdmin
=
Rdmin Ic / 180
=
Ls - (Ls^3/40R^2)
=
X - R sin s
=
Ls^2 / 6R
=
y - R (1-coss)
=
= Xm+(R+R)tan I/2
Ts Tan I/4
=

=
=
=
=
=
=
=
=
=
=

8.87
7.26
37.33
15.28
37.24
18.65
1.93
0.48
45.48
4.98

= SAFE
= SAFE

( when I/2 > s, transition needed; not needed)

Length of Spiral, Ls
Lsdmin = 0.036V3/Rdmin
s = 180Lsdmin/2Rdmin
I/2 > s

ELEMENTS OF CURVE WITH TRANSITION:

m
= 37
(deg)
= 8.87
= Transition NEEDED

ELEMENTS OF CURVE WITH TRANSITION:


(deg)
(deg)
m
m
m
m
m
m
m
m

s
Ic
Ls
Lc
X
Xm
y
R
Ts
E

STATIONINGS:
=
=
=
=

=
=
=
=

edmax = Min [emax; (V^2/282 Rdmin)]


fd = V2/127Rdmin - edmax

CHECKING:

Sta. TS
Sta. SC
Sta. CS
Sta. ST

SD
m

fsmax = 0.37{0.000214V2 - 0.0064V + 0.77}


emax = 0.22 - fsmax

Danger of Skidding exist when:


(V2/127Rdmin)
> (fsmax+emax)
(V2/127Rdmin) > [(x+ye)/(y-xe)]
Danger of Overturning exist when:
Side Friction:
fsmax > fdemand = SAFE

s
Ic
Ls
Lc
X
Xm
y
R
Ts
E

50
32

=
=
=
=
=
=
=
=
=
=

180Lsdmin/2Rdmin
I - (2s)
0.035V^3/Rdmin
Rdmin Ic / 180
Ls - (Ls^3/40R^2)
X - R sin s
Ls^2 / 6R
y - R (1-coss)
Xm+(R+R)tan I/2
Ts Tan I/4

=
=
=
=
=
=
=
=
=
=

8.87
14.26
37.33
30.00
37.24
18.65
1.93
0.48
53.36
7.50

(deg)
(deg)
m
m
m
m
m
m
m
m

STATIONINGS:
Sta of PI
Sta. PI - Ts
Sta. Ts + Ls
Sta. SC + Lc
Sta. CS + Ls

=
=
=
=
=

0 + 000
-0 + 045
-0 + 008
0 + 007
0 + 044

Sta. TS
Sta. SC
Sta. CS
Sta. ST

Designers:

Project & Location:

=
=
=
=

Sta of PI
Sta. PI - Ts
Sta. Ts + Ls
Sta. SC + Lc
Sta. CS + Ls

=
=
=
=
=

Approved By:

0 + 000
-0 + 053
-0 + 016
0 + 014
0 + 051

Sheet Content:

Reyes, Ma. Karisse P.


Santillan, Jan Sherwin F.

Uy, Kwin Juvy H.

PROPOSED 20 KM ARTERIAL
ROAD LAGUNA

ENGR. MANUEL M. MUHI


(Instructor)

COMPUTATION OF HORIZONTAL ALIGNMENT

Sheet No.

CURVE NO.
33
simple curve WITH Transition

CURVE NO.
34
simple curve WITH Transition

DESIGN PARAMETERS:
V (kph) =
I(deg) =

DESIGN PARAMETERS:
50
43

SD
m

fsmax = 0.37{0.000214V2 - 0.0064V + 0.77}


emax = 0.22 - fsmax
Rsr = V2/127(emax + fsmax)
Rso = V2(y - xe)/127(x + ye)
Rsd = SD2/8m
Rdmin = MAX{Rsr, Rso, Rsd}

89
23
121
121

=
=
=
=

edmax = Min [emax; (V^2/282 Rdmin)]


fd = V2/127Rdmin - edmax

=
=

57.4
3.42

=
=

0.19
0.034

V2/127Rdmin
V2/282 Rdmin

m
m
m
m
=
=

m
m

x =
y =

1.2 m
1.5 m

V (kph) =
I(deg) =

=
=

0.16
0.074

Rsr = V2/127(emax + fsmax)


Rso = V2(y - xe)/127(x + ye)
Rsd = SD2/8m
Rdmin = MAX{Rsr, Rso, Rsd}

0.03
0.13

89
23
121
121

=
=

57.4
3.42

=
=

0.19
0.034

m
m

V2/127Rdmin
V2/282 Rdmin

m
m
m
m

x =
y =

=
=

1.2 m
1.5 m

0.16
0.074

0.03
0.13

=
=

CHECKING:

NEED FOR TRANSITIONS:

Danger of Skidding exist when:


(V2/127Rdmin)
> (fsmax+emax)
(V2/127Rdmin) > [(x+ye)/(y-xe)]
Danger of Overturning exist when:
Side Friction:
fsmax > fdemand = SAFE

= SAFE
= SAFE

NEED FOR TRANSITIONS:

( when I/2 > s, transition needed; not needed)

Length of Spiral, Ls
Lsdmin = 0.036V3/Rdmin
s = 180Lsdmin/2Rdmin
I/2 > s

37
m
=
= 8.87 (deg)
= Transition NEEDED

= 180Lsdmin/2Rdmin
I - (2s)
=
0.035V^3/Rdmin
=
Rdmin Ic / 180
=
Ls - (Ls^3/40R^2)
=
X - R sin s
=
Ls^2 / 6R
=
y - R (1-coss)
=
= Xm+(R+R)tan I/2
Ts Tan I/4
=

=
=
=
=
=
=
=
=
=
=

8.87
25.26
37.33
53.15
37.24
18.65
1.93
0.48
66.33
12.59

= SAFE
= SAFE

( when I/2 > s, transition needed; not needed)

Length of Spiral, Ls
Lsdmin = 0.036V3/Rdmin
s = 180Lsdmin/2Rdmin
I/2 > s

ELEMENTS OF CURVE WITH TRANSITION:

m
= 37
(deg)
= 8.87
= Transition NEEDED

ELEMENTS OF CURVE WITH TRANSITION:


(deg)
(deg)
m
m
m
m
m
m
m
m

s
Ic
Ls
Lc
X
Xm
y
R
Ts
E

STATIONINGS:
=
=
=
=

=
=
=
=

edmax = Min [emax; (V^2/282 Rdmin)]


fd = V2/127Rdmin - edmax

CHECKING:

Sta. TS
Sta. SC
Sta. CS
Sta. ST

SD
m

fsmax = 0.37{0.000214V2 - 0.0064V + 0.77}


emax = 0.22 - fsmax

Danger of Skidding exist when:


(V2/127Rdmin)
> (fsmax+emax)
(V2/127Rdmin) > [(x+ye)/(y-xe)]
Danger of Overturning exist when:
Side Friction:
fsmax > fdemand = SAFE

s
Ic
Ls
Lc
X
Xm
y
R
Ts
E

50
23

=
=
=
=
=
=
=
=
=
=

180Lsdmin/2Rdmin
I - (2s)
0.035V^3/Rdmin
Rdmin Ic / 180
Ls - (Ls^3/40R^2)
X - R sin s
Ls^2 / 6R
y - R (1-coss)
Xm+(R+R)tan I/2
Ts Tan I/4

=
=
=
=
=
=
=
=
=
=

8.87
5.26
37.33
11.07
37.24
18.65
1.93
0.48
43.27
4.36

(deg)
(deg)
m
m
m
m
m
m
m
m

STATIONINGS:
Sta of PI
Sta. PI - Ts
Sta. Ts + Ls
Sta. SC + Lc
Sta. CS + Ls

=
=
=
=
=

0 + 000
-0 + 066
-0 + 029
0 + 024
0 + 061

Sta. TS
Sta. SC
Sta. CS
Sta. ST

Designers:

Project & Location:

=
=
=
=

Sta of PI
Sta. PI - Ts
Sta. Ts + Ls
Sta. SC + Lc
Sta. CS + Ls

=
=
=
=
=

Approved By:

0 + 000
-0 + 043
-0 + 006
0 + 005
0 + 042

Sheet Content:

Reyes, Ma. Karisse P.


Santillan, Jan Sherwin F.

Uy, Kwin Juvy H.

PROPOSED 20 KM ARTERIAL
ROAD LAGUNA

ENGR. MANUEL M. MUHI


(Instructor)

COMPUTATION OF HORIZONTAL ALIGNMENT

Sheet No.

CURVE NO.

35

CURVE NO.

simple curve WITH Transition

36

simple curve WITH Transition

DESIGN PARAMETERS:

DESIGN PARAMETERS:

V (kph) =

50

SD

57.4

x =

1.2 m

V (kph) =

50

SD

57.4

x =

1.2 m

I(deg) =

25

3.42

y =

1.5 m

I(deg) =

24

3.42

y =

1.5 m

fsmax = 0.37{0.000214V - 0.0064V + 0.77}


emax = 0.22 - fsmax

0.19

0.034

fsmax = 0.37{0.000214V - 0.0064V + 0.77}


emax = 0.22 - fsmax

0.19

0.034

Rsr = V2/127(emax + fsmax)

89

V2/127Rdmin

0.16

Rsr = V2/127(emax + fsmax)

89

V2/127Rdmin

0.16

Rso = V2(y - xe)/127(x + ye)

23

V2/282 Rdmin

0.074

Rso = V2(y - xe)/127(x + ye)

23

V2/282 Rdmin

0.074

Rsd = SD2/8m

121

Rsd = SD2/8m

121 m

Rdmin = MAX{Rsr, Rso, Rsd}

121

Rdmin = MAX{Rsr, Rso, Rsd}

121 m

edmax = Min [emax; (V^2/282 Rdmin)]

0.03

edmax = Min [emax; (V^2/282 Rdmin)]

0.03

fd = V2/127Rdmin - edmax

0.13

fd = V2/127Rdmin - edmax

0.13

CHECKING:

CHECKING:
(V2/127Rdmin) > (fsmax+emax)

Danger of Skidding exist when:


Danger of Overturning exist when:

(V2/127Rdmin) > [(x+ye)/(y-xe)]

(V2/127Rdmin) > (fsmax+emax)

= SAFE

Danger of Skidding exist when:

= SAFE

Danger of Overturning exist when:

Side Friction:

(V2/127Rdmin) > [(x+ye)/(y-xe)]

= SAFE

Side Friction:
fsmax > fdemand = SAFE

NEED FOR TRANSITIONS:

fsmax > fdemand

= SAFE

NEED FOR TRANSITIONS:

( when I/2 > s, transition needed; not needed)

Length of Spiral, Ls

( when I/2 > s, transition needed; not needed)

Length of Spiral, Ls

Lsdmin = 0.036V3/Rdmin

37

Lsdmin = 0.036V3/Rdmin

s = 180Lsdmin/2Rdmin

8.87

(deg)

s = 180Lsdmin/2Rdmin

= 8.87

I/2 > s

= Transition NEEDED

I/2 > s

= Transition NEEDED

ELEMENTS OF CURVE WITH TRANSITION:

37

m
(deg)

ELEMENTS OF CURVE WITH TRANSITION:

= 180Lsdmin/2Rdmin

8.87

(deg)

180Lsdmin/2Rdmin

8.87

(deg)

Ic

I - (2s)

7.26

(deg)

Ic

I - (2s)

6.26

(deg)

Ls

0.035V^3/Rdmin

37.33

Ls

0.035V^3/Rdmin

37.33

Lc

Rdmin Ic / 180

15.28

Lc

Rdmin Ic / 180

13.17

Ls - (Ls^3/40R^2)

37.24

Ls - (Ls^3/40R^2)

37.24

X - R sin s

18.65

X - R sin s

18.65

Xm =

Xm =

Ls^2 / 6R

1.93

Ls^2 / 6R

1.93

y - R (1-coss)

0.48

y - R (1-coss)

0.48

Ts

Xm+(R+R)tan I/2

45.48

Ts

Xm+(R+R)tan I/2

44.38

Ts Tan I/4

4.98

Ts Tan I/4

4.66

STATIONINGS:

STATIONINGS:
Sta of PI =

0 + 000

Sta of PI =

Sta. PI - Ts

-0 + 045

Sta. TS =

Sta. SC =

Sta. Ts + Ls

-0 + 008

Sta. CS =

Sta. SC + Lc

0 + 007

Sta. ST =

Sta. CS + Ls

0 + 044

Sta. TS =

= SAFE

Designers:

0 + 000

Sta. PI - Ts

-0 + 044

Sta. SC =

Sta. Ts + Ls

-0 + 007

Sta. CS =

Sta. SC + Lc

0 + 006

Sta. ST =

Sta. CS + Ls

0 + 043

Project & Location:

Approved By:

Sheet Content:

Reyes, Ma. Karisse P.


Santillan, Jan Sherwin F.

Uy, Kwin Juvy H.

PROPOSED 20 KM ARTERIAL
ROAD LAGUNA

ENGR. MANUEL M. MUHI


(Instructor)

COMPUTATION OF HORIZONTAL ALIGNMENT

Sheet No.

CURVE NO.

37

CURVE NO.

simple curve WITH Transition

38

simple curve WITHOUT Transition

DESIGN PARAMETERS:

DESIGN PARAMETERS:

V (kph) =

50

SD

57.4

x =

1.2 m

V (kph) =

50

SD

57.4

x =

1.2 m

I(deg) =

24

3.42

y =

1.5 m

I(deg) =

15

3.42

y =

1.5 m

fsmax = 0.37{0.000214V2 - 0.0064V + 0.77}


emax = 0.22 - fsmax

0.19

0.034

fsmax = 0.37{0.000214V2 - 0.0064V + 0.77}


emax = 0.22 - fsmax

0.19

0.034

Rsr = V2/127(emax + fsmax)

89

V2/127Rdmin

0.16

Rsr = V2/127(emax + fsmax)

89

V2/127Rdmin

0.16

Rso = V2(y - xe)/127(x + ye)

23

V2/282 Rdmin

0.074

Rso = V2(y - xe)/127(x + ye)

23

V2/282 Rdmin

0.074

Rsd = SD2/8m

121

Rsd = SD2/8m

121 m

Rdmin = MAX{Rsr, Rso, Rsd}

121

Rdmin = MAX{Rsr, Rso, Rsd}

121 m

edmax = Min [emax; (V^2/282 Rdmin)]

0.03

edmax = Min [emax; (V^2/282 Rdmin)]

0.03

fd = V2/127Rdmin - edmax

0.13

fd = V2/127Rdmin - edmax

0.13

CHECKING:

CHECKING:
2

Danger of Skidding exist when:

(V /127Rdmin) > (fsmax+emax)

Danger of Overturning exist when:

(V2/127Rdmin) > [(x+ye)/(y-xe)]

(V2/127Rdmin) > (fsmax+emax)

= SAFE

Danger of Skidding exist when:

= SAFE

Danger of Overturning exist when:

Side Friction:

(V2/127Rdmin) > [(x+ye)/(y-xe)]

= SAFE

Side Friction:
fsmax > fdemand = SAFE

NEED FOR TRANSITIONS:

fsmax > fdemand

= SAFE

NEED FOR TRANSITIONS:

( when I/2 > s, transition needed; not needed)

Length of Spiral, Ls

( when I/2 > s, transition needed; not needed)

Length of Spiral, Ls

Lsdmin = 0.036V3/Rdmin

37

Lsdmin = 0.036V3/Rdmin

s = 180Lsdmin/2Rdmin

8.87

(deg)

s = 180Lsdmin/2Rdmin

= 8.87

I/2 > s

= Transition NEEDED

I/2 > s

= Transition NOT NEEDED

ELEMENTS OF CURVE WITH TRANSITION:

37

m
(deg)

ELEMENTS OF CURVE WITHOUT TRANSITION:

= 180Lsdmin/2Rdmin

8.87

(deg)

180Lsdmin/2Rdmin

8.87

(deg)

Ic

I - (2s)

6.26

(deg)

Ic

I - (2s)

-2.74

(deg)

Ls

0.035V^3/Rdmin

37.33

Rdmin(Tan(I/2))

15.87

Lc

Rdmin Ic / 180

13.17

Rdmin(SecI/2-1)

1.04

Ls - (Ls^3/40R^2)

37.24

Rdmin(1-CosI/2)

1.03

X - R sin s

18.65

Lc

2Rdmin(SinI/2)

31.47

1146/Rdmin

9.51

RdminI(/180)

31.56

Xm =
y

Ls^2 / 6R

1.93

y - R (1-coss)

0.48

Lcu =

Ts

Xm+(R+R)tan I/2

44.38

----

----

----

Ts Tan I/4

4.66

---

----

----

STATIONINGS:

STATIONINGS:
Sta of PI =

0 + 000

Sta of PI =

Sta. PI - Ts

-0 + 044

Sta. SC =

Sta. Ts + Ls

-0 + 007

----

Sta. CS =

Sta. SC + Lc

0 + 006

---

Sta. ST =

Sta. CS + Ls

0 + 043

Sta. TS =

= SAFE

-0 + 016

----

----

----

----

Sta. PT + Lcu

0 + 016

Sta. PT =

Designers:

Project & Location:

0 + 000

Sta. PI - T

Sta. PC =

Approved By:

Sheet Content:

Reyes, Ma. Karisse P.


Santillan, Jan Sherwin F.

Uy, Kwin Juvy H.

PROPOSED 20 KM ARTERIAL
ROAD LAGUNA

ENGR. MANUEL M. MUHI


(Instructor)

COMPUTATION OF HORIZONTAL ALIGNMENT

Sheet No.

CURVE NO.

39

CURVE NO.

simple curve WITHOUT Transition

40

simple curve WITH Transition

DESIGN PARAMETERS:

DESIGN PARAMETERS:

V (kph) =

50

SD

57.4

x =

1.2 m

V (kph) =

50

SD

57.4

x =

1.2 m

I(deg) =

15

3.42

y =

1.5 m

I(deg) =

60

3.42

y =

1.5 m

fsmax = 0.37{0.000214V2 - 0.0064V + 0.77}


emax = 0.22 - fsmax

0.19

0.034

fsmax = 0.37{0.000214V2 - 0.0064V + 0.77}


emax = 0.22 - fsmax

0.19

0.034

Rsr = V2/127(emax + fsmax)

89

V2/127Rdmin

0.16

Rsr = V2/127(emax + fsmax)

89

V2/127Rdmin

0.16

Rso = V2(y - xe)/127(x + ye)

23

V2/282 Rdmin

0.074

Rso = V2(y - xe)/127(x + ye)

23

V2/282 Rdmin

0.074

Rsd = SD2/8m

121

Rsd = SD2/8m

121 m

Rdmin = MAX{Rsr, Rso, Rsd}

121

Rdmin = MAX{Rsr, Rso, Rsd}

121 m

edmax = Min [emax; (V^2/282 Rdmin)]

0.03

edmax = Min [emax; (V^2/282 Rdmin)]

0.03

fd = V2/127Rdmin - edmax

0.13

fd = V2/127Rdmin - edmax

0.13

CHECKING:

CHECKING:
2

Danger of Skidding exist when:

(V /127Rdmin) > (fsmax+emax)

Danger of Overturning exist when:

(V2/127Rdmin) > [(x+ye)/(y-xe)]

(V2/127Rdmin) > (fsmax+emax)

= SAFE

Danger of Skidding exist when:

= SAFE

Danger of Overturning exist when:

Side Friction:

(V2/127Rdmin) > [(x+ye)/(y-xe)]

NEED FOR TRANSITIONS:

fsmax > fdemand

= SAFE

NEED FOR TRANSITIONS:

( when I/2 > s, transition needed; not needed)

Length of Spiral, Ls

( when I/2 > s, transition needed; not needed)

Length of Spiral, Ls

Lsdmin = 0.036V3/Rdmin

37

Lsdmin = 0.036V3/Rdmin

s = 180Lsdmin/2Rdmin

8.87

(deg)

s = 180Lsdmin/2Rdmin

= 8.87

I/2 > s

= Transition NOT NEEDED

I/2 > s

= Transition NEEDED

ELEMENTS OF CURVE WITHOUT TRANSITION:

37

m
(deg)

ELEMENTS OF CURVE WITH TRANSITION:

= 180Lsdmin/2Rdmin

8.87

(deg)

180Lsdmin/2Rdmin

8.87

(deg)

Ic

I - (2s)

-2.74

(deg)

Ic

I - (2s)

42.26

(deg)

Rdmin(Tan(I/2))

15.87

Ls

0.035V^3/Rdmin

37.33

Rdmin(SecI/2-1)

1.04

Lc

Rdmin Ic / 180

88.92

Rdmin(1-CosI/2)

1.03

Ls - (Ls^3/40R^2)

37.24

Lc

2Rdmin(SinI/2)

31.47

X - R sin s

18.65

1146/Rdmin

9.51

Ls^2 / 6R

1.93

RdminI(/180)

31.56

y - R (1-coss)

0.48

Lcu =

Xm =

----

----

----

Ts

Xm+(R+R)tan I/2

88.53

---

----

----

Ts Tan I/4

23.72

STATIONINGS:

STATIONINGS:
Sta of PI =

0 + 000

Sta of PI =

Sta. PI - T

-0 + 016

Sta. TS =

0 + 000

Sta. PI - Ts

-0 + 089

----

----

----

Sta. SC =

Sta. Ts + Ls

-0 + 051

---

----

----

Sta. CS =

Sta. SC + Lc

0 + 038

Sta. PT + Lcu

0 + 016

Sta. ST =

Sta. CS + Ls

0 + 075

Sta. PT =

= SAFE

Side Friction:
fsmax > fdemand = SAFE

Sta. PC =

= SAFE

Designers:

Project & Location:

Approved By:

Sheet Content:

Reyes, Ma. Karisse P.


Santillan, Jan Sherwin F.

Uy, Kwin Juvy H.

PROPOSED 20 KM ARTERIAL
ROAD LAGUNA

ENGR. MANUEL M. MUHI


(Instructor)

COMPUTATION OF HORIZONTAL ALIGNMENT

Sheet No.

CURVE NO.

41

CURVE NO.

simple curve WITH Transition

42

simple curve WITH Transition

DESIGN PARAMETERS:

DESIGN PARAMETERS:

V (kph) =

95

SD

175

x =

1.2 m

V (kph) =

95

SD

175

x =

1.2 m

I(deg) =

35

10.88

y =

1.5 m

I(deg) =

18

10.88

y =

1.5 m

fsmax = 0.37{0.000214V2 - 0.0064V + 0.77}


emax = 0.22 - fsmax

0.13

0.089

fsmax = 0.37{0.000214V2 - 0.0064V + 0.77}


emax = 0.22 - fsmax

0.13

0.089

Rsr = V2/127(emax + fsmax)

323

V2/127Rdmin

0.20

Rsr = V2/127(emax + fsmax)

323 m

V2/127Rdmin

0.20

Rso = V2(y - xe)/127(x + ye)

74

V2/282 Rdmin

0.091

Rso = V2(y - xe)/127(x + ye)

74

V2/282 Rdmin

0.091

Rsd = SD2/8m

352

Rsd = SD2/8m

352 m

Rdmin = MAX{Rsr, Rso, Rsd}

352

Rdmin = MAX{Rsr, Rso, Rsd}

352 m

edmax = Min [emax; (V^2/282 Rdmin)]

0.09

edmax = Min [emax; (V^2/282 Rdmin)]

0.09

fd = V2/127Rdmin - edmax

0.11

fd = V2/127Rdmin - edmax

0.11

CHECKING:

CHECKING:
2

Danger of Skidding exist when:

(V /127Rdmin) > (fsmax+emax)

Danger of Overturning exist when:

(V2/127Rdmin) > [(x+ye)/(y-xe)]

(V2/127Rdmin) > (fsmax+emax)

= SAFE

Danger of Skidding exist when:

= SAFE

Danger of Overturning exist when:

Side Friction:

(V2/127Rdmin) > [(x+ye)/(y-xe)]

= SAFE

Side Friction:
fsmax > fdemand = SAFE

NEED FOR TRANSITIONS:

fsmax > fdemand

= SAFE

NEED FOR TRANSITIONS:

( when I/2 > s, transition needed; not needed)

Length of Spiral, Ls

( when I/2 > s, transition needed; not needed)

Length of Spiral, Ls

Lsdmin = 0.036V3/Rdmin

s = 180Lsdmin/2Rdmin
I/2 > s

Lsdmin = 0.036V3/Rdmin

= 7.145 (deg)

s = 180Lsdmin/2Rdmin

= 7.15

= Transition NEEDED

I/2 > s

= Transition NEEDED

88

ELEMENTS OF CURVE WITH TRANSITION:

88

m
(deg)

ELEMENTS OF CURVE WITH TRANSITION:

= 180Lsdmin/2Rdmin

7.15

(deg)

180Lsdmin/2Rdmin

7.15

(deg)

Ic

I - (2s)

20.71

(deg)

Ic

I - (2s)

3.71

(deg)

Ls

0.035V^3/Rdmin

87.74

Ls

0.035V^3/Rdmin

87.74

Lc

Rdmin Ic / 180

127.15

Lc

Rdmin Ic / 180

22.77

Ls - (Ls^3/40R^2)

87.61

Ls - (Ls^3/40R^2)

87.61

X - R sin s

43.85

X - R sin s

43.85

Xm =

Xm =

Ls^2 / 6R

3.65

Ls^2 / 6R

3.65

y - R (1-coss)

0.92

y - R (1-coss)

0.92

Ts

Xm+(R+R)tan I/2

155.05

Ts

Xm+(R+R)tan I/2

99.71

Ts Tan I/4

23.86

Ts Tan I/4

7.85

STATIONINGS:

STATIONINGS:
Sta of PI =

0 + 000

Sta of PI =

Sta. PI - Ts

-0 + 155

Sta. TS =

Sta. SC =

Sta. Ts + Ls

-0 + 067

Sta. CS =

Sta. SC + Lc

0 + 060

Sta. ST =

Sta. CS + Ls

0 + 148

Sta. TS =

= SAFE

Designers:

0 + 000

Sta. PI - Ts

-0 + 100

Sta. SC =

Sta. Ts + Ls

-0 + 012

Sta. CS =

Sta. SC + Lc

0 + 011

Sta. ST =

Sta. CS + Ls

0 + 099

Project & Location:

Approved By:

Sheet Content:

Reyes, Ma. Karisse P.


Santillan, Jan Sherwin F.

Uy, Kwin Juvy H.

PROPOSED 20 KM ARTERIAL
ROAD LAGUNA

ENGR. MANUEL M. MUHI


(Instructor)

COMPUTATION OF HORIZONTAL ALIGNMENT

Sheet No.

CURVE NO.

43

CURVE NO.

simple curve WITH Transition

44

simple curve WITH Transition

DESIGN PARAMETERS:

DESIGN PARAMETERS:

V (kph) =

95

SD

175

x =

1.2 m

V (kph) =

95

SD

175

x =

1.2 m

I(deg) =

53

10.88

y =

1.5 m

I(deg) =

30

10.88

y =

1.5 m

fsmax = 0.37{0.000214V2 - 0.0064V + 0.77}


emax = 0.22 - fsmax

0.13

0.089

fsmax = 0.37{0.000214V2 - 0.0064V + 0.77}


emax = 0.22 - fsmax

0.13

0.089

Rsr = V2/127(emax + fsmax)

323

V2/127Rdmin

0.20

Rsr = V2/127(emax + fsmax)

323 m

V2/127Rdmin

0.20

Rso = V2(y - xe)/127(x + ye)

74

V2/282 Rdmin

0.091

Rso = V2(y - xe)/127(x + ye)

74

V2/282 Rdmin

0.091

Rsd = SD2/8m

352

Rsd = SD2/8m

352 m

Rdmin = MAX{Rsr, Rso, Rsd}

352

Rdmin = MAX{Rsr, Rso, Rsd}

352 m

edmax = Min [emax; (V^2/282 Rdmin)]

0.09

edmax = Min [emax; (V^2/282 Rdmin)]

0.09

fd = V2/127Rdmin - edmax

0.11

fd = V2/127Rdmin - edmax

0.11

CHECKING:

CHECKING:
2

Danger of Skidding exist when:

(V /127Rdmin) > (fsmax+emax)

Danger of Overturning exist when:

(V2/127Rdmin) > [(x+ye)/(y-xe)]

(V2/127Rdmin) > (fsmax+emax)

= SAFE

Danger of Skidding exist when:

= SAFE

Danger of Overturning exist when:

Side Friction:

(V2/127Rdmin) > [(x+ye)/(y-xe)]

= SAFE

Side Friction:
fsmax > fdemand = SAFE

NEED FOR TRANSITIONS:

fsmax > fdemand

= SAFE

NEED FOR TRANSITIONS:

( when I/2 > s, transition needed; not needed)

Length of Spiral, Ls

( when I/2 > s, transition needed; not needed)

Length of Spiral, Ls

Lsdmin = 0.036V3/Rdmin

s = 180Lsdmin/2Rdmin
I/2 > s

Lsdmin = 0.036V3/Rdmin

= 7.145 (deg)

s = 180Lsdmin/2Rdmin

= 7.15

= Transition NEEDED

I/2 > s

= Transition NEEDED

88

ELEMENTS OF CURVE WITH TRANSITION:

88

m
(deg)

ELEMENTS OF CURVE WITH TRANSITION:

= 180Lsdmin/2Rdmin

7.15

(deg)

180Lsdmin/2Rdmin

7.15

(deg)

Ic

I - (2s)

38.71

(deg)

Ic

I - (2s)

15.71

(deg)

Ls

0.035V^3/Rdmin

87.74

Ls

0.035V^3/Rdmin

87.74

Lc

Rdmin Ic / 180

237.66

Lc

Rdmin Ic / 180

96.45

Ls - (Ls^3/40R^2)

87.61

Ls - (Ls^3/40R^2)

87.61

X - R sin s

43.85

X - R sin s

43.85

Xm =

Xm =

Ls^2 / 6R

3.65

Ls^2 / 6R

3.65

y - R (1-coss)

0.92

y - R (1-coss)

0.92

Ts

Xm+(R+R)tan I/2

219.69

Ts

Xm+(R+R)tan I/2

138.35

Ts Tan I/4

51.73

Ts Tan I/4

18.21

STATIONINGS:

STATIONINGS:
Sta of PI =

0 + 000

Sta of PI =

Sta. PI - Ts

-0 + 220

Sta. TS =

Sta. SC =

Sta. Ts + Ls

-0 + 132

Sta. CS =

Sta. SC + Lc

0 + 106

Sta. ST =

Sta. CS + Ls

0 + 193

Sta. TS =

= SAFE

Designers:

0 + 000

Sta. PI - Ts

-0 + 138

Sta. SC =

Sta. Ts + Ls

-0 + 051

Sta. CS =

Sta. SC + Lc

0 + 046

Sta. ST =

Sta. CS + Ls

0 + 134

Project & Location:

Approved By:

Sheet Content:

Reyes, Ma. Karisse P.


Santillan, Jan Sherwin F.

Uy, Kwin Juvy H.

PROPOSED 20 KM ARTERIAL
ROAD LAGUNA

ENGR. MANUEL M. MUHI


(Instructor)

COMPUTATION OF HORIZONTAL ALIGNMENT

Sheet No.

CURVE NO.

45

CURVE NO.

simple curve WITH Transition

46

simple curve WITH Transition

DESIGN PARAMETERS:

DESIGN PARAMETERS:

V (kph) =

95

SD

175

x =

1.2 m

V (kph) =

95

SD

175

x =

1.2 m

I(deg) =

40

10.88

y =

1.5 m

I(deg) =

37

10.88

y =

1.5 m

fsmax = 0.37{0.000214V2 - 0.0064V + 0.77}


emax = 0.22 - fsmax

0.13

0.089

fsmax = 0.37{0.000214V2 - 0.0064V + 0.77}


emax = 0.22 - fsmax

0.13

0.089

Rsr = V2/127(emax + fsmax)

323

V2/127Rdmin

0.20

Rsr = V2/127(emax + fsmax)

323 m

V2/127Rdmin

0.20

Rso = V2(y - xe)/127(x + ye)

74

V2/282 Rdmin

0.091

Rso = V2(y - xe)/127(x + ye)

74

V2/282 Rdmin

0.091

Rsd = SD2/8m

352

Rsd = SD2/8m

352 m

Rdmin = MAX{Rsr, Rso, Rsd}

352

Rdmin = MAX{Rsr, Rso, Rsd}

352 m

edmax = Min [emax; (V^2/282 Rdmin)]

0.09

edmax = Min [emax; (V^2/282 Rdmin)]

0.09

fd = V2/127Rdmin - edmax

0.11

fd = V2/127Rdmin - edmax

0.11

CHECKING:

CHECKING:
2

Danger of Skidding exist when:

(V /127Rdmin) > (fsmax+emax)

Danger of Overturning exist when:

(V2/127Rdmin) > [(x+ye)/(y-xe)]

(V2/127Rdmin) > (fsmax+emax)

= SAFE

Danger of Skidding exist when:

= SAFE

Danger of Overturning exist when:

Side Friction:

(V2/127Rdmin) > [(x+ye)/(y-xe)]

= SAFE

Side Friction:
fsmax > fdemand = SAFE

NEED FOR TRANSITIONS:

fsmax > fdemand

= SAFE

NEED FOR TRANSITIONS:

( when I/2 > s, transition needed; not needed)

Length of Spiral, Ls

( when I/2 > s, transition needed; not needed)

Length of Spiral, Ls

Lsdmin = 0.036V3/Rdmin

s = 180Lsdmin/2Rdmin
I/2 > s

Lsdmin = 0.036V3/Rdmin

= 7.145 (deg)

s = 180Lsdmin/2Rdmin

= 7.15

= Transition NEEDED

I/2 > s

= Transition NEEDED

88

ELEMENTS OF CURVE WITH TRANSITION:

88

m
(deg)

ELEMENTS OF CURVE WITH TRANSITION:

= 180Lsdmin/2Rdmin

7.15

(deg)

180Lsdmin/2Rdmin

7.15

(deg)

Ic

I - (2s)

25.71

(deg)

Ic

I - (2s)

22.71

(deg)

Ls

0.035V^3/Rdmin

87.74

Ls

0.035V^3/Rdmin

87.74

Lc

Rdmin Ic / 180

157.85

Lc

Rdmin Ic / 180

139.43

Ls - (Ls^3/40R^2)

87.61

Ls - (Ls^3/40R^2)

87.61

X - R sin s

43.85

X - R sin s

43.85

Xm =

Xm =

Ls^2 / 6R

3.65

Ls^2 / 6R

3.65

y - R (1-coss)

0.92

y - R (1-coss)

0.92

Ts

Xm+(R+R)tan I/2

172.22

Ts

Xm+(R+R)tan I/2

161.86

Ts Tan I/4

30.37

Ts Tan I/4

26.36

STATIONINGS:

STATIONINGS:
Sta of PI =

0 + 000

Sta of PI =

Sta. PI - Ts

-0 + 172

Sta. TS =

Sta. SC =

Sta. Ts + Ls

-0 + 084

Sta. CS =

Sta. SC + Lc

0 + 073

Sta. ST =

Sta. CS + Ls

0 + 161

Sta. TS =

= SAFE

Designers:

0 + 000

Sta. PI - Ts

-0 + 162

Sta. SC =

Sta. Ts + Ls

-0 + 074

Sta. CS =

Sta. SC + Lc

0 + 065

Sta. ST =

Sta. CS + Ls

0 + 153

Project & Location:

Approved By:

Sheet Content:

Reyes, Ma. Karisse P.


Santillan, Jan Sherwin F.

Uy, Kwin Juvy H.

PROPOSED 20 KM ARTERIAL
ROAD LAGUNA

ENGR. MANUEL M. MUHI


(Instructor)

COMPUTATION OF HORIZONTAL ALIGNMENT

Sheet No.

CURVE NO.

47

CURVE NO.

simple curve WITH Transition

48

simple curve WITH Transition

DESIGN PARAMETERS:

DESIGN PARAMETERS:

V (kph) =

95

SD

175

x =

1.2 m

V (kph) =

95

SD

175

x =

1.2 m

I(deg) =

62

10.88

y =

1.5 m

I(deg) =

50

10.88

y =

1.5 m

fsmax = 0.37{0.000214V2 - 0.0064V + 0.77}


emax = 0.22 - fsmax

0.13

0.089

fsmax = 0.37{0.000214V2 - 0.0064V + 0.77}


emax = 0.22 - fsmax

0.13

0.089

Rsr = V2/127(emax + fsmax)

323

V2/127Rdmin

0.20

Rsr = V2/127(emax + fsmax)

323 m

V2/127Rdmin

0.20

Rso = V2(y - xe)/127(x + ye)

74

V2/282 Rdmin

0.091

Rso = V2(y - xe)/127(x + ye)

74

V2/282 Rdmin

0.091

Rsd = SD2/8m

352

Rsd = SD2/8m

352 m

Rdmin = MAX{Rsr, Rso, Rsd}

352

Rdmin = MAX{Rsr, Rso, Rsd}

352 m

edmax = Min [emax; (V^2/282 Rdmin)]

0.09

edmax = Min [emax; (V^2/282 Rdmin)]

0.09

fd = V2/127Rdmin - edmax

0.11

fd = V2/127Rdmin - edmax

0.11

CHECKING:

CHECKING:
2

Danger of Skidding exist when:

(V /127Rdmin) > (fsmax+emax)

Danger of Overturning exist when:

(V2/127Rdmin) > [(x+ye)/(y-xe)]

(V2/127Rdmin) > (fsmax+emax)

= SAFE

Danger of Skidding exist when:

= SAFE

Danger of Overturning exist when:

Side Friction:

(V2/127Rdmin) > [(x+ye)/(y-xe)]

= SAFE

Side Friction:
fsmax > fdemand = SAFE

NEED FOR TRANSITIONS:

fsmax > fdemand

= SAFE

NEED FOR TRANSITIONS:

( when I/2 > s, transition needed; not needed)

Length of Spiral, Ls

( when I/2 > s, transition needed; not needed)

Length of Spiral, Ls

Lsdmin = 0.036V3/Rdmin

s = 180Lsdmin/2Rdmin
I/2 > s

Lsdmin = 0.036V3/Rdmin

= 7.145 (deg)

s = 180Lsdmin/2Rdmin

= 7.15

= Transition NEEDED

I/2 > s

= Transition NEEDED

88

ELEMENTS OF CURVE WITH TRANSITION:

88

m
(deg)

ELEMENTS OF CURVE WITH TRANSITION:

= 180Lsdmin/2Rdmin

7.15

(deg)

180Lsdmin/2Rdmin

7.15

(deg)

Ic

I - (2s)

47.71

(deg)

Ic

I - (2s)

35.71

(deg)

Ls

0.035V^3/Rdmin

87.74

Ls

0.035V^3/Rdmin

87.74

Lc

Rdmin Ic / 180

292.92

Lc

Rdmin Ic / 180

219.24

Ls - (Ls^3/40R^2)

87.61

Ls - (Ls^3/40R^2)

87.61

X - R sin s

43.85

X - R sin s

43.85

Xm =

Xm =

Ls^2 / 6R

3.65

Ls^2 / 6R

3.65

y - R (1-coss)

0.92

y - R (1-coss)

0.92

Ts

Xm+(R+R)tan I/2

255.77

Ts

Xm+(R+R)tan I/2

208.31

Ts Tan I/4

70.93

Ts Tan I/4

46.18

STATIONINGS:

STATIONINGS:
Sta of PI =

0 + 000

Sta of PI =

Sta. PI - Ts

-0 + 256

Sta. TS =

Sta. SC =

Sta. Ts + Ls

-0 + 168

Sta. CS =

Sta. SC + Lc

0 + 125

Sta. ST =

Sta. CS + Ls

0 + 213

Sta. TS =

= SAFE

Designers:

0 + 000

Sta. PI - Ts

-0 + 208

Sta. SC =

Sta. Ts + Ls

-0 + 121

Sta. CS =

Sta. SC + Lc

0 + 099

Sta. ST =

Sta. CS + Ls

0 + 186

Project & Location:

Approved By:

Sheet Content:

Reyes, Ma. Karisse P.


Santillan, Jan Sherwin F.

Uy, Kwin Juvy H.

PROPOSED 20 KM ARTERIAL
ROAD LAGUNA

ENGR. MANUEL M. MUHI


(Instructor)

COMPUTATION OF HORIZONTAL ALIGNMENT

Sheet No.

CURVE NO.

49

CURVE NO.

simple curve WITH Transition

50

simple curve WITH Transition

DESIGN PARAMETERS:

DESIGN PARAMETERS:

V (kph) =

95

SD

175

x =

1.2 m

V (kph) =

95

SD

175

x =

1.2 m

I(deg) =

63

10.88

y =

1.5 m

I(deg) =

38

10.88

y =

1.5 m

fsmax = 0.37{0.000214V2 - 0.0064V + 0.77}


emax = 0.22 - fsmax

0.13

0.089

fsmax = 0.37{0.000214V2 - 0.0064V + 0.77}


emax = 0.22 - fsmax

0.13

0.089

Rsr = V2/127(emax + fsmax)

323

V2/127Rdmin

0.20

Rsr = V2/127(emax + fsmax)

323 m

V2/127Rdmin

0.20

Rso = V2(y - xe)/127(x + ye)

74

V2/282 Rdmin

0.091

Rso = V2(y - xe)/127(x + ye)

74

V2/282 Rdmin

0.091

Rsd = SD2/8m

352

Rsd = SD2/8m

352 m

Rdmin = MAX{Rsr, Rso, Rsd}

352

Rdmin = MAX{Rsr, Rso, Rsd}

352 m

edmax = Min [emax; (V^2/282 Rdmin)]

0.09

edmax = Min [emax; (V^2/282 Rdmin)]

0.09

fd = V2/127Rdmin - edmax

0.11

fd = V2/127Rdmin - edmax

0.11

CHECKING:

CHECKING:
2

Danger of Skidding exist when:

(V /127Rdmin) > (fsmax+emax)

Danger of Overturning exist when:

(V2/127Rdmin) > [(x+ye)/(y-xe)]

(V2/127Rdmin) > (fsmax+emax)

= SAFE

Danger of Skidding exist when:

= SAFE

Danger of Overturning exist when:

Side Friction:

(V2/127Rdmin) > [(x+ye)/(y-xe)]

= SAFE

Side Friction:
fsmax > fdemand = SAFE

NEED FOR TRANSITIONS:

fsmax > fdemand

= SAFE

NEED FOR TRANSITIONS:

( when I/2 > s, transition needed; not needed)

Length of Spiral, Ls

( when I/2 > s, transition needed; not needed)

Length of Spiral, Ls

Lsdmin = 0.036V3/Rdmin

s = 180Lsdmin/2Rdmin
I/2 > s

Lsdmin = 0.036V3/Rdmin

= 7.145 (deg)

s = 180Lsdmin/2Rdmin

= 7.15

= Transition NEEDED

I/2 > s

= Transition NEEDED

88

ELEMENTS OF CURVE WITH TRANSITION:

88

m
(deg)

ELEMENTS OF CURVE WITH TRANSITION:

= 180Lsdmin/2Rdmin

7.15

(deg)

180Lsdmin/2Rdmin

7.15

(deg)

Ic

I - (2s)

48.71

(deg)

Ic

I - (2s)

23.71

(deg)

Ls

0.035V^3/Rdmin

87.74

Ls

0.035V^3/Rdmin

87.74

Lc

Rdmin Ic / 180

299.06

Lc

Rdmin Ic / 180

145.57

Ls - (Ls^3/40R^2)

87.61

Ls - (Ls^3/40R^2)

87.61

X - R sin s

43.85

X - R sin s

43.85

Xm =

Xm =

Ls^2 / 6R

3.65

Ls^2 / 6R

3.65

y - R (1-coss)

0.92

y - R (1-coss)

0.92

Ts

Xm+(R+R)tan I/2

259.98

Ts

Xm+(R+R)tan I/2

165.29

Ts Tan I/4

73.32

Ts Tan I/4

27.66

STATIONINGS:

STATIONINGS:
Sta of PI =

0 + 000

Sta of PI =

Sta. PI - Ts

-0 + 260

Sta. TS =

Sta. SC =

Sta. Ts + Ls

-0 + 172

Sta. CS =

Sta. SC + Lc

0 + 127

Sta. ST =

Sta. CS + Ls

0 + 215

Sta. TS =

= SAFE

Designers:

0 + 000

Sta. PI - Ts

-0 + 165

Sta. SC =

Sta. Ts + Ls

-0 + 078

Sta. CS =

Sta. SC + Lc

0 + 068

Sta. ST =

Sta. CS + Ls

0 + 156

Project & Location:

Approved By:

Sheet Content:

Reyes, Ma. Karisse P.


Santillan, Jan Sherwin F.

Uy, Kwin Juvy H.

PROPOSED 20 KM ARTERIAL
ROAD LAGUNA

ENGR. MANUEL M. MUHI


(Instructor)

COMPUTATION OF HORIZONTAL ALIGNMENT

Sheet No.

CURVE NO.

51

simple curve WITH Transition


DESIGN PARAMETERS:
V (kph) =

95

SD

175

x =

1.2 m

I(deg) =

29

10.88

y =

1.5 m

fsmax = 0.37{0.000214V2 - 0.0064V + 0.77}


emax = 0.22 - fsmax

0.13

0.089

Rsr = V2/127(emax + fsmax)

323

V2/127Rdmin

0.20

Rso = V2(y - xe)/127(x + ye)

74

V2/282 Rdmin

0.091

Rsd = SD2/8m

352

Rdmin = MAX{Rsr, Rso, Rsd}

352

edmax = Min [emax; (V^2/282 Rdmin)]

0.09

fd = V2/127Rdmin - edmax

0.11

CHECKING:
(V2/127Rdmin) > (fsmax+emax)

Danger of Skidding exist when:


Danger of Overturning exist when:

(V2/127Rdmin) > [(x+ye)/(y-xe)]

= SAFE
= SAFE

Side Friction:
fsmax > fdemand = SAFE
NEED FOR TRANSITIONS:

( when I/2 > s, transition needed; not needed)

Length of Spiral, Ls
Lsdmin = 0.036V3/Rdmin

s = 180Lsdmin/2Rdmin

= 7.145 (deg)

I/2 > s

= Transition NEEDED

88

ELEMENTS OF CURVE WITH TRANSITION:


s

= 180Lsdmin/2Rdmin

7.15

(deg)

Ic

I - (2s)

14.71

(deg)

Ls

0.035V^3/Rdmin

87.74

Lc

Rdmin Ic / 180

90.31

Ls - (Ls^3/40R^2)

87.61

X - R sin s

43.85

Xm =
y

Ls^2 / 6R

3.65

y - R (1-coss)

0.92

Ts

Xm+(R+R)tan I/2

135.06

Ts Tan I/4

17.18

STATIONINGS:
Sta of PI =

0 + 000

Sta. PI - Ts

-0 + 135

Sta. SC =

Sta. Ts + Ls

-0 + 047

Sta. CS =

Sta. SC + Lc

0 + 043

Sta. ST =

Sta. CS + Ls

0 + 131

Sta. TS =

Designers:

Project & Location:

Approved By:

Sheet Content:

Reyes, Ma. Karisse P.


Santillan, Jan Sherwin F.

Uy, Kwin Juvy H.

PROPOSED 20 KM ARTERIAL
ROAD LAGUNA

ENGR. MANUEL M. MUHI


(Instructor)

COMPUTATION OF HORIZONTAL ALIGNMENT

Sheet No.

VERTICAL ALIGNMENT
(OPTION NO.1)

SUMMARY

6
7
8
9
10
11
12
13
14
14
14
14
14
14
14
14
14
14
14
14
14
14
14
14
14
14
14
14
14
14
14
14
14
14
14
14
14
14
14
14
14
14
14
14
14
14
14
14
14
14
14

Curve

SD

El.1

El.V

El.3

Sta. 1

Sta. V

Sta. 3

g1 %

g2 %

He

Ho

1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
51

90
90
90
90
90
90
90
90
90
90
50
50
50
50
50
50
50
50
50
50
50
50
50
50
50
50
50
50
50
50
50
50
50
50
50
50
50
50
50
50
95
95
95
95
95
95
95
95
95
95
95

165
165
165
165
165
165
165
165
165
165
57
57
57
57
57
57
57
57
57
57
57
57
57
57
57
57
57
57
57
57
57
57
57
57
57
57
57
57
57
57
175
175
175
175
175
175
175
175
175
175
175

250
257
260
272
285
294
306
314
320
332
380
400
415
410
407
420
435
445
453
460
467
472
475
482
488
495
501
513
522
528
533
541
548
555
560
567
573
579
586
592
598
602
607
160
180
200
210
160
180
200
210

257
260
272
285
294
306
314
320
332
341
400
415
410
407
420
435
445
453
460
467
472
475
482
488
495
501
513
522
528
533
541
548
555
560
567
573
579
586
592
598
602
607
612
170
200
210
220
170
200
210
220

260
272
285
294
306
314
320
332
341
350
415
410
407
420
435
445
453
460
467
472
475
482
488
495
501
513
522
528
533
541
548
555
560
567
573
579
586
592
598
602
607
612
618
180
200
210
225
180
200
210
225

0 + 150
1 + 000
2 + 370
3 + 850
11 + 500
12 + 100
13 + 640
14 + 400
16 + 700
17 + 800
18 + 560
19 + 200
16 + 700
17 + 800
18 + 560
19 + 200
16 + 700
17 + 800
18 + 560
19 + 200
16 + 700
17 + 800
18 + 560
19 + 200
16 + 700
17 + 800
18 + 560
19 + 200
16 + 700
17 + 800
18 + 560
19 + 200
17 + 800
18 + 560
19 + 200
16 + 700
17 + 800
18 + 560
19 + 200
16 + 700
17 + 800
18 + 560
19 + 200
16 + 700
17 + 800
18 + 560
19 + 200
16 + 700
17 + 800
18 + 560
19 + 200

0 + 600
1 + 310
3 + 300
4 + 480
11 + 950
13 + 240
14 + 000
15 + 000
17 + 300
18 + 500
19 + 120
19 + 400
17 + 300
18 + 500
19 + 120
19 + 400
17 + 300
18 + 500
19 + 120
19 + 400
17 + 300
18 + 500
19 + 120
19 + 400
17 + 300
18 + 500
19 + 120
19 + 400
17 + 300
18 + 500
19 + 120
19 + 400
18 + 500
19 + 120
19 + 400
17 + 300
18 + 500
19 + 120
19 + 400
17 + 300
18 + 500
19 + 120
19 + 400
17 + 300
18 + 500
19 + 120
19 + 400
17 + 300
18 + 500
19 + 120
19 + 400

1 + 000
1 + 980
3 + 850
5 + 100
12 + 100
13 + 640
14 + 400
15 + 400
17 + 800
18 + 560
19 + 200
19 + 600
17 + 800
18 + 560
19 + 200
19 + 600
17 + 800
18 + 560
19 + 200
19 + 600
17 + 800
18 + 560
19 + 200
19 + 600
17 + 800
18 + 560
19 + 200
19 + 600
17 + 800
18 + 560
19 + 200
19 + 600
18 + 560
19 + 200
19 + 600
17 + 800
18 + 560
19 + 200
19 + 600
17 + 800
18 + 560
19 + 200
19 + 600
17 + 800
18 + 560
19 + 200
19 + 600
17 + 800
18 + 560
19 + 200
19 + 600

1.56
0.97
1.29
2.06
2.00
1.05
2.22
1.00
2.00
1.29
3.57
7.50
-0.83
-0.43
2.32
7.50
1.67
1.14
1.25
3.50
0.83
0.43
1.25
3.00
1.17
0.86
2.14
4.50
1.00
0.71
1.43
3.50
1.00
0.89
3.50
1.00
0.86
1.25
3.00
1.00
0.57
0.89
2.50
1.67
2.86
1.79
5.00
1.67
2.86
1.79
5.00

0.75
1.79
2.36
1.45
8.00
2.00
1.50
3.00
1.80
15.00
18.75
-2.50
-0.60
21.67
18.75
5.00
1.60
11.67
8.75
2.50
0.60
11.67
7.50
3.50
1.20
20.00
11.25
3.00
1.00
13.33
8.75
3.50
8.33
8.75
3.00
1.20
11.67
7.50
3.00
0.80
8.33
6.25
3.00
2.00
0.00
0.00
2.50
2.00
0.00
0.00
2.50

0.81
0.82
1.07
0.61
6.00
0.95
0.72
2.00
0.20
13.71
15.18
10.00
0.23
22.10
16.43
2.50
0.07
10.52
7.50
1.00
0.23
11.24
6.25
0.50
0.03
19.14
9.11
1.50
0.00
12.62
7.32
0.00
7.33
7.86
0.50
0.20
10.81
6.25
0.00
0.20
7.76
5.36
0.50
0.33
2.86
1.79
2.50
0.33
2.86
1.79
2.50

1.14
1.14
1.14
1.14
1.14
1.14
1.14
1.14
1.14
1.14
1.14
1.14
------1.14
1.14
1.14
1.14
1.14
1.14
1.14
1.14
1.14
1.14
1.14
1.14
1.14
1.14
1.14
1.14
1.14
1.14
1.14
1.14
1.14
1.14
1.14
1.14
1.14
1.14
1.14
1.14
1.14
1.14
1.14
1.14
1.14
1.14
1.14
1.14
1.14

0.15 ---- ---0.15 ---- ---0.15 ---- ---0.15 ---- ---0.15 ---- ---0.15 ---- ---0.15 ---- ---0.15 ---- ---0.15 ---- ---0.15 ---- ---0.15 ---- ---0.15 ---- ------- 0.60 1.00
---- 0.60 1.00
0.15 ---- ---0.15 ---- ---0.15 ---- ---0.15 ---- ---0.15 ---- ---0.15 ---- ---0.15 ---- ---0.15 ---- ---0.15 ---- ---0.15 ---- ---0.15 ---- ---0.15 ---- ---0.15 ---- ---0.15 ---- ---0.15 ---- ---0.15 ---- ---0.15 ---- ---0.15 ---- ---0.15 ---- ---0.15 ---- ---0.15 ---- ---0.15 ---- ---0.15 ---- ---0.15 ---- ---0.15 ---- ---0.15 ---- ---0.15 ---- ---0.15 ---- ---0.15 ---- ---0.15 ---- ---0.15 ---- ---0.15 ---- ---0.15 ---- ---0.15 ---- ---0.15 ---- ---0.15 ---- ---0.15 ---- ----

Type of
Curve
CREST
CREST
CREST
CREST
CREST
CREST
CREST
CREST
CREST
CREST
CREST
CREST
SAG
SAG
CREST
CREST
CREST
CREST
CREST
CREST
CREST
CREST
CREST
CREST
CREST
CREST
CREST
CREST
CREST
CREST
CREST
CREST
CREST
CREST
CREST
CREST
CREST
CREST
CREST
CREST
CREST
CREST
CREST
CREST
CREST
CREST
CREST
CREST
CREST
CREST
CREST

Vcldmin=Max((Lsd/Lnv) ; Lc ; La)
Lsd
Lnv
Lc
La
Vcldmin
28.76
---16.77
180
180
29.39
---17.14
180
180
38.32
---22.35
180
180
21.85
---12.74
180
180
214.22
---124.94
180
214
33.82
---19.73
180
180
25.79
---15.04
180
180
71.41
---41.65
180
180
7.14
---4.16
180
180
489.64
---285.57
180
490
65.58
---97.55
100
100
43.21
---64.27
100
100
---2.40
1.50
100
100
---227.22
142.00
100
227
70.98
---105.58
100
106
10.80
---16.07
100
100
0.29
---0.43
100
100
45.47
---67.63
100
100
32.41
---48.20
100
100
4.32
---6.43
100
100
1.01
---1.50
100
100
48.56
---72.22
100
100
27.00
---40.17
100
100
2.16
---3.21
100
100
0.14
---0.21
100
100
82.71
---123.03
100
123
39.35
---58.53
100
100
6.48
---9.64
100
100
0.00
---0.00
100
100
54.52
---81.10
100
100
31.63
---47.05
100
100
0.00
---0.00
100
100
31.69
---47.13
100
100
33.95
---50.50
100
100
2.16
---3.21
100
100
0.86
---1.29
100
100
46.71
---69.47
100
100
27.00
---40.17
100
100
0.00
---0.00
100
100
0.86
---1.29
100
100
311.73
---180.08
190
312
215.15
---124.29
190
215
20.08
---11.60
190
190
13.39
---7.73
190
190
114.75
---66.29
190
190
71.72
---41.43
190
190
100.40
---58.00
190
190
13.39
---7.73
190
190
114.75
---66.29
190
190
71.72
---41.43
190
190
100.40
---58.00
190
190

ELEMENTS OF CREST/SAG PARABOLIC CURVE

6
7
8
9
10
11
12
13
14
15
16
17

Curve

L/2

Yv

S1

S2

el HP

el LP

el PC

el PT

Sta. HP/LP

Sta. PC

Sta. PT

1
2
3
4
5
6
7
8
9
10
11
12

90
90
90
90
107.11
90
90
90
90
244.82
50
50

0.1813
0.1852
0.2415
0.1377
1.6066
0.2132
0.1625
0.45
0.045
8.3938
1.8973
1.25

348
212
216
607
71
200
554
90
1800
46
24
75

168
392
396
427
286
380
374
270
1620
536
124
25

1.9319
1.1766
1.6309
7.5053
0.7141
1.1579
6.9577
0
30.78
2.56
0.95
0.63

257.59
121.58
126.39
517.03
35.703
110
463.85
0
#####
198.92
26.47
25.00

0.6284
1.0238
1.3961
3.0994
0.7141
1.0526
2.8038
0.45
14.58
0.2951
0.4202
0.3125

254
258
269
274
293
304
304
320
287
338
399
414

-------------------------------------

255.6
259.13
270.84
283.14
291.86
305.05
312
319.1
330.2
337.85
398.21
411.25

256.33
258.39
269.87
283.69
285.43
304.20
312.65
317.30
330.38
304.28
390.63
413.75

0 + 858
1 + 432
3 + 426
4 + 997
11 + 986
13 + 350
14 + 464
15 + 000
19 + 010
18 + 699
19 + 146
19 + 425

0 + 510
1 + 220
3 + 210
4 + 390
11 + 843
13 + 150
13 + 910
14 + 910
17 + 210
18 + 255
19 + 070
19 + 350

0 + 690
1 + 400
3 + 390
4 + 570
12 + 057
13 + 330
14 + 090
15 + 090.0
17 + 390
18 + 745
19 + 170
19 + 450

Designers:

Reyes, Ma. Karisse P.


Santillan, Jan Sherwin F.

Uy, Kwin Juvy H.

Project & Location:


PROPOSED 20 KM ARTERIAL
ROAD LAGUNA

Approved By:
ENGR. MANUEL M. MUHI
(Instructor)

Sheet Content:

VERTICAL ALIGNMENT

Sheet No.

CREST

PARABOLIC CURVE

CREST

ELEMENTS and DESIGN PARAMETERS:


Sta V
g1 (%)
g2 (%)
A (g1-g2)%
V(kph)
SD( fm table)
Elevation V
He
Ho
Lc
La
Lsd
Vcldmin

Rdmin(Crest) =

0+600
1.56
0.75
0.81
90
165
257
1.14
0.15

=
=
=
=
=
=
=
=
=

Sta V
g1 (%)
g2 (%)
A (g1-g2)%
V(kph)
SD( fm table)
Elevation V
He
Ho

m
m

MAX[{1.25(V-20)^2};(v^3/SD)]

=
=

7796
180

26281.25

=
=
=
=

S1
S2

=
=

=
=

0.18
257.59
0.63
1.93

=
=
=
=

347.59
167.59

m
m
m
m

m
m

STATIONING:
Sta. PC
Sta. HP
Sta. PT

=
=
=

=
=
=

1+310
0.97
1.79
0.82
90
165
260
1.14
0.15

=
=
=
=
=
=
=
=
=

Sta V
g1 (%)
g2 (%)
A (g1-g2)%
V(kph)
SD( fm table)
Elevation V
He
Ho

m
m

2
17
=
(V A)/389
2V
180
=
(SD^2*A)/((He+Ho+ 2He^(0.5)+Ho^(0.5))*200
Max [Lsd;La;Lc]

=
=
=
=

MAX[{1.25(V-20)^2};(v^3/SD)]

= (L/8)*/g1-g2/
= S2-(Vcldmin/2)
= (S1^2)(Yv)/(Vcldmin/2)^2
= x*g1

S1
S2

=
=

=
=

Sta. V - (Vcldmin/2)
Sta. V + X
Sta. PC + (Vcldmin)

0 + 510.00
0 + 857.59
0 + 690.00

=
=
=

Sta. PC
Sta. HP
Sta. PT

=
=
=

7979
180

=
=

26281.25

0.19
121.58
1.02
1.18

=
=
=
=

211.58
391.58

m
m
m
m

m
m

=
=
=

255.60
254.44
256.33

Elev. PC
Elev. HP
Elev. PT

Designers:

Reyes, Ma. Karisse P.


Santillan, Jan Sherwin F.

Uy, Kwin Juvy H.

=
=
=

Lc
La
Lsd
Vcldmin

3+300
1.29
2.36
1.07
90
165
272
1.14
0.15

=
=
=
=
=
=
=
=
=

m
m

2
22
=
(V A)/389
2V
180
=
(SD^2*A)/((He+Ho+ 2He^(0.5)+Ho^(0.5))*200
Max [Lsd;La;Lc]

=
=
=
=

MAX[{1.25(V-20)^2};(v^3/SD)]

Rdmin(Crest) =

=
=

8732
180

26281.25

Yv
x
y
z

= (L/8)*/g1-g2/
= S2-(Vcldmin/2)
= (S1^2)(Yv)/(Vcldmin/2)^2
= x*g1

S1
S2

=
=

g1L //g1-g2/
g2L //g1-g2/

=
=

0.24
126.39
1.40
1.63

=
=
=
=

216.39
396.39

m
m
m
m

m
m

STATIONING:

Sta. V - (Vcldmin/2)
Sta. V - X
Sta. PC + (Vcldmin)

1 + 220.00
1 + 188.42
1 + 400.00

=
=
=

Sta. PC
Sta. HP
Sta. PT

ELEVATIONS:
Elev. V - [g1*(Vcldmin/2)]
Elev. V - y - z
Elev. V - [g2*(Vcldmin/2)]

HIGHEST POINT ON THE CURVE:

Yv
x
y
z

g1L //g1-g2/
g2L //g1-g2/

PARABOLIC CURVE

ELEMENTS and DESIGN PARAMETERS:

STATIONING:

ELEVATIONS:
Elev. PC
Elev. HP
Elev. PT

CREST

HIGHEST POINT ON THE CURVE:

(L/8)*/g1-g2/
S1-(Vcldmin/2)
(S2^2)(Yv)/(Vcldmin/2)^2
x*g2
g1L //g1-g2/
g2L //g1-g2/

Lc
La
Lsd
Vcldmin

Rdmin(Crest) =

HIGHEST POINT ON THE CURVE:


Yv
x
y
z

ELEMENTS and DESIGN PARAMETERS:

2
17
=
(V A)/389
2V
180
=
(SD^2*A)/((He+Ho+ 2He^(0.5)+Ho^(0.5))*200
Max [Lsd;La;Lc]

=
=
=
=

PARABOLIC CURVE

=
=
=

Sta. V - (Vcldmin/2)
Sta. V - X
Sta. PC + (Vcldmin)

3 + 210.00
3 + 173.61
3 + 390.00

=
=
=

ELEVATIONS:
Elev. V - [g1*(Vcldmin/2)]
Elev. V - y - z
Elev. V - [g2*(Vcldmin/2)]

=
=
=

259.13
257.80
258.39

Project & Location:


PROPOSED 20 KM ARTERIAL ROAD
LAGUNA

Elev. PC
Elev. HP
Elev. PT

Approved By:
ENGR. MANUEL M. MUHI
(Instructor)

=
=
=

Elev. V - [g1*(Vcldmin/2)]
Elev. V - y - z
Elev. V - [g2*(Vcldmin/2)]

=
=
=

270.84
268.97
269.87

Sheet Content:

VERTICAL ALIGNMENT COMPUTATION

Sheet No.

CREST

PARABOLIC CURVE

CREST

ELEMENTS and DESIGN PARAMETERS:


Sta V
g1 (%)
g2 (%)
A (g1-g2)%
V(kph)
SD( fm table)
Elevation V
He
Ho
Lc
La
Lsd
Vcldmin

Rdmin(Crest) =

4+480
2.06
1.45
0.61
90
165
285
1.14
0.15

=
=
=
=
=
=
=
=
=

Sta V
g1 (%)
g2 (%)
A (g1-g2)%
V(kph)
SD( fm table)
Elevation V
He
Ho

m
m

MAX[{1.25(V-20)^2};(v^3/SD)]

=
=

9587
180

26281.25

=
=
=
=

S1
S2

=
=

=
=

0.14
517.03
3.10
7.51

=
=
=
=

607.03
427.03

m
m
m
m

m
m

STATIONING:
Sta. PC
Sta. HP
Sta. PT

=
=
=

=
=
=

11+950
2.00
8.00
6.00
90
165
294
1.14
0.15

=
=
=
=
=
=
=
=
=

Sta V
g1 (%)
g2 (%)
A (g1-g2)%
V(kph)
SD( fm table)
Elevation V
He
Ho

m
m

2
125
=
(V A)/389
2V
180
=
(SD^2*A)/((He+Ho+ 2He^(0.5)+Ho^(0.5))*200
Max [Lsd;La;Lc]

=
=
=
=

MAX[{1.25(V-20)^2};(v^3/SD)]

= (L/8)*/g1-g2/
= S2-(Vcldmin/2)
= (S1^2)(Yv)/(Vcldmin/2)^2
= x*g1

S1
S2

=
=

=
=

Sta. V - (Vcldmin/2)
Sta. V + X
Sta. PC + (Vcldmin)

4 + 390.00
4 + 997.03
4 + 570.00

=
=
=

Sta. PC
Sta. HP
Sta. PT

=
=
=

10202
214

=
=

26281.25

1.61
35.70
0.71
0.71

=
=
=
=

71.41
285.62

m
m
m
m

m
m

=
=
=

283.14
274.40
283.69

Elev. PC
Elev. HP
Elev. PT

Designers:

Reyes, Ma. Karisse P.


Santillan, Jan Sherwin F.

Uy, Kwin Juvy H.

=
=
=

Lc
La
Lsd
Vcldmin

13+240
1.05
2.00
0.95
90
165
306
1.14
0.15

=
=
=
=
=
=
=
=
=

m
m

2
20
=
(V A)/389
2V
180
=
(SD^2*A)/((He+Ho+ 2He^(0.5)+Ho^(0.5))*200
Max [Lsd;La;Lc]

=
=
=
=

MAX[{1.25(V-20)^2};(v^3/SD)]

Rdmin(Crest) =

=
=

11051
180

26281.25

Yv
x
y
z

= (L/8)*/g1-g2/
= S2-(Vcldmin/2)
= (S1^2)(Yv)/(Vcldmin/2)^2
= x*g1

S1
S2

=
=

g1L //g1-g2/
g2L //g1-g2/

=
=

0.21
110.00
1.05
1.16

=
=
=
=

200.00
380.00

m
m
m
m

m
m

STATIONING:

Sta. V - (Vcldmin/2)
Sta. V - X
Sta. PC + (Vcldmin)

11 + 842.89
11 + 914.30
12 + 057.11

=
=
=

Sta. PC
Sta. HP
Sta. PT

ELEVATIONS:
Elev. V - [g1*(Vcldmin/2)]
Elev. V - y - z
Elev. V - [g2*(Vcldmin/2)]

HIGHEST POINT ON THE CURVE:

Yv
x
y
z

g1L //g1-g2/
g2L //g1-g2/

PARABOLIC CURVE

ELEMENTS and DESIGN PARAMETERS:

STATIONING:

ELEVATIONS:
Elev. PC
Elev. HP
Elev. PT

CREST

HIGHEST POINT ON THE CURVE:

(L/8)*/g1-g2/
S1-(Vcldmin/2)
(S2^2)(Yv)/(Vcldmin/2)^2
x*g2
g1L //g1-g2/
g2L //g1-g2/

Lc
La
Lsd
Vcldmin

Rdmin(Crest) =

HIGHEST POINT ON THE CURVE:


Yv
x
y
z

ELEMENTS and DESIGN PARAMETERS:

2
13
=
(V A)/389
2V
180
=
(SD^2*A)/((He+Ho+ 2He^(0.5)+Ho^(0.5))*200
Max [Lsd;La;Lc]

=
=
=
=

PARABOLIC CURVE

=
=
=

Sta. V - (Vcldmin/2)
Sta. V - X
Sta. PC + (Vcldmin)

13 + 150.00
13 + 130.00
13 + 330.00

=
=
=

ELEVATIONS:
Elev. V - [g1*(Vcldmin/2)]
Elev. V - y - z
Elev. V - [g2*(Vcldmin/2)]

=
=
=

291.86
292.57
285.43

Project & Location:


PROPOSED 20 KM ARTERIAL ROAD
LAGUNA

Elev. PC
Elev. HP
Elev. PT

Approved By:
ENGR. MANUEL M. MUHI
(Instructor)

=
=
=

Elev. V - [g1*(Vcldmin/2)]
Elev. V - y - z
Elev. V - [g2*(Vcldmin/2)]

=
=
=

305.05
303.79
304.20

Sheet Content:

VERTICAL ALIGNMENT COMPUTATION

Sheet No.

CREST

PARABOLIC CURVE

CREST

ELEMENTS and DESIGN PARAMETERS:


Sta V
g1 (%)
g2 (%)
A (g1-g2)%
V(kph)
SD( fm table)
Elevation V
He
Ho
Lc
La
Lsd
Vcldmin

Rdmin(Crest) =

14+000
2.22
1.50
0.72
90
165
314
1.14
0.15

=
=
=
=
=
=
=
=
=

Sta V
g1 (%)
g2 (%)
A (g1-g2)%
V(kph)
SD( fm table)
Elevation V
He
Ho

m
m

MAX[{1.25(V-20)^2};(v^3/SD)]

=
=

11637
180

26281.25

=
=
=
=

S1
S2

=
=

=
=

0.16
463.85
2.80
6.96

=
=
=
=

553.85
373.85

m
m
m
m

m
m

STATIONING:
Sta. PC
Sta. HP
Sta. PT

=
=
=

=
=
=

15+000
1.00
3.00
2.00
90
165
320
1.14
0.15

=
=
=
=
=
=
=
=
=

Sta V
g1 (%)
g2 (%)
A (g1-g2)%
V(kph)
SD( fm table)
Elevation V
He
Ho

m
m

2
42
=
(V A)/389
2V
180
=
(SD^2*A)/((He+Ho+ 2He^(0.5)+Ho^(0.5))*200
Max [Lsd;La;Lc]

=
=
=
=

MAX[{1.25(V-20)^2};(v^3/SD)]

= (L/8)*/g1-g2/
= S2-(Vcldmin/2)
= (S1^2)(Yv)/(Vcldmin/2)^2
= x*g1

S1
S2

=
=

=
=

Sta. V - (Vcldmin/2)
Sta. V + X
Sta. PC + (Vcldmin)

13 + 910.00
14 + 463.85
14 + 090.00

=
=
=

Sta. PC
Sta. HP
Sta. PT

=
=
=

12086
180

=
=

26281.25

0.45
0.00
0.45
0.00

=
=
=
=

90.00
270.00

m
m
m
m

m
m

=
=
=

312.00
304.24
312.65

Elev. PC
Elev. HP
Elev. PT

Designers:

Reyes, Ma. Karisse P.


Santillan, Jan Sherwin F.

Uy, Kwin Juvy H.

=
=
=

Lc
La
Lsd
Vcldmin

17+300
2.00
1.80
0.20
90
165
332
1.14
0.15

=
=
=
=
=
=
=
=
=

m
m

2
4
=
(V A)/389
2V
180
=
(SD^2*A)/((He+Ho+ 2He^(0.5)+Ho^(0.5))*200
Max [Lsd;La;Lc]

=
=
=
=

MAX[{1.25(V-20)^2};(v^3/SD)]

Rdmin(Crest) =

=
=

13009
180

26281.25

Yv
x
y
z

= (L/8)*/g1-g2/
= S1-(Vcldmin/2)
= (S2^2)(Yv)/(Vcldmin/2)^2
= x*g2

S1
S2

=
=

g1L //g1-g2/
g2L //g1-g2/

=
=

0.05
1710.00
14.58
30.78

=
=
=
=

m
m
m
m

1800.00 m
1620.00 m

STATIONING:

Sta. V - (Vcldmin/2)
Sta. V - X
Sta. PC + (Vcldmin)

14 + 910.00
15 + 000.00
15 + 090.00

=
=
=

Sta. PC
Sta. HP
Sta. PT

ELEVATIONS:
Elev. V - [g1*(Vcldmin/2)]
Elev. V - y - z
Elev. V - [g2*(Vcldmin/2)]

HIGHEST POINT ON THE CURVE:

Yv
x
y
z

g1L //g1-g2/
g2L //g1-g2/

PARABOLIC CURVE

ELEMENTS and DESIGN PARAMETERS:

STATIONING:

ELEVATIONS:
Elev. PC
Elev. HP
Elev. PT

CREST

HIGHEST POINT ON THE CURVE:

(L/8)*/g1-g2/
S1-(Vcldmin/2)
(S2^2)(Yv)/(Vcldmin/2)^2
x*g2
g1L //g1-g2/
g2L //g1-g2/

Lc
La
Lsd
Vcldmin

Rdmin(Crest) =

HIGHEST POINT ON THE CURVE:


Yv
x
y
z

ELEMENTS and DESIGN PARAMETERS:

2
15
=
(V A)/389
2V
180
=
(SD^2*A)/((He+Ho+ 2He^(0.5)+Ho^(0.5))*200
Max [Lsd;La;Lc]

=
=
=
=

PARABOLIC CURVE

=
=
=

Sta. V - (Vcldmin/2)
Sta. V + X
Sta. PC + (Vcldmin)

17 + 210.00
19 + 010.00
17 + 390.00

=
=
=

ELEVATIONS:
Elev. V - [g1*(Vcldmin/2)]
Elev. V - y - z
Elev. V - [g2*(Vcldmin/2)]

=
=
=

319.10
319.55
317.30

Project & Location:


PROPOSED 20 KM ARTERIAL ROAD
LAGUNA

Elev. PC
Elev. HP
Elev. PT

Approved By:
ENGR. MANUEL M. MUHI
(Instructor)

=
=
=

Elev. V - [g1*(Vcldmin/2)]
Elev. V - y - z
Elev. V - [g2*(Vcldmin/2)]

=
=
=

330.20
286.64
330.38

Sheet Content:

VERTICAL ALIGNMENT COMPUTATION

Sheet No.

CREST

PARABOLIC CURVE

10

CREST

ELEMENTS and DESIGN PARAMETERS:


Sta V
g1 (%)
g2 (%)
A (g1-g2)%
V(kph)
SD( fm table)
Elevation V
He
Ho
Lc
La
Lsd
Vcldmin

Rdmin(Crest) =

18+500
1.29
15.00
13.71
90
165
341
1.14
0.15

=
=
=
=
=
=
=
=
=

Sta V
g1 (%)
g2 (%)
A (g1-g2)%
V(kph)
SD( fm table)
Elevation V
He
Ho

m
m

MAX[{1.25(V-20)^2};(v^3/SD)]

=
=

13724
490

26281.25

=
=
=
=

S1
S2

=
=

=
=

8.39
198.92
0.30
2.56

=
=
=
=

45.90
535.54

m
m
m
m

m
m

STATIONING:
Sta. PC
Sta. HP
Sta. PT

=
=
=

=
=
=

19+120
3.57
18.75
15.18
50
57.4
400
1.14
0.15

=
=
=
=
=
=
=
=
=

Sta V
g1 (%)
g2 (%)
A (g1-g2)%
V(kph)
SD( fm table)
Elevation V
He
Ho

m
m

2
98
=
(V A)/389
2V
100
=
(SD^2*A)/((He+Ho+ 2He^(0.5)+Ho^(0.5))*200
Max [Lsd;La;Lc]

=
=
=
=

MAX[{1.25(V-20)^2};(v^3/SD)]

= (L/8)*/g1-g2/
= S2-(Vcldmin/2)
= (S1^2)(Yv)/(Vcldmin/2)^2
= x*g1

S1
S2

=
=

=
=

Sta. V - (Vcldmin/2)
Sta. V - X
Sta. PC + (Vcldmin)

18 + 255.18
18 + 301.08
18 + 744.82

=
=
=

Sta. PC
Sta. HP
Sta. PT

=
=
=

10491
100

=
=
1748.45

=
=
=

337.85
338.15
304.28

Elev. PC
Elev. HP
Elev. PT

Designers:

Reyes, Ma. Karisse P.


Santillan, Jan Sherwin F.

Uy, Kwin Juvy H.

=
=
=

Lc
La
Lsd
Vcldmin

19+400
7.50
-2.50
10.00
50
57.4
415
1.14
0.15

=
=
=
=
=
=
=
=
=

m
m

2
64
=
(V A)/389
2V
100
=
(SD^2*A)/((He+Ho+ 2He^(0.5)+Ho^(0.5))*200
Max [Lsd;La;Lc]

=
=
=
=

MAX[{1.25(V-20)^2};(v^3/SD)]

Rdmin(Crest) =

1.90
26.47
0.42
0.95

=
=
=
=

23.53
123.53

m
m
m
m

m
m

=
=

11293
100

1748.45

Yv
x
y
z

= (L/8)*/g1-g2/
= S1-(Vcldmin/2)
= (S2^2)(Yv)/(Vcldmin/2)^2
= x*g2

S1
S2

=
=

g1L //g1-g2/
g2L //g1-g2/

=
=

1.25
25.00
0.31
0.63

=
=
=
=

75.00
25.00

m
m
m
m

m
m

STATIONING:

Sta. V - (Vcldmin/2)
Sta. V - X
Sta. PC + (Vcldmin)

19 + 070.00
19 + 093.53
19 + 170.00

=
=
=

Sta. PC
Sta. HP
Sta. PT

ELEVATIONS:
Elev. V - [g1*(Vcldmin/2)]
Elev. V - y - z
Elev. V - [g2*(Vcldmin/2)]

12

HIGHEST POINT ON THE CURVE:

Yv
x
y
z

g1L //g1-g2/
g2L //g1-g2/

PARABOLIC CURVE

ELEMENTS and DESIGN PARAMETERS:

STATIONING:

ELEVATIONS:
Elev. PC
Elev. HP
Elev. PT

CREST

HIGHEST POINT ON THE CURVE:

(L/8)*/g1-g2/
S2-(Vcldmin/2)
(S1^2)(Yv)/(Vcldmin/2)^2
x*g1
g1L //g1-g2/
g2L //g1-g2/

Lc
La
Lsd
Vcldmin

Rdmin(Crest) =

HIGHEST POINT ON THE CURVE:


Yv
x
y
z

11

ELEMENTS and DESIGN PARAMETERS:

2
286
=
(V A)/389
2V
180
=
(SD^2*A)/((He+Ho+ 2He^(0.5)+Ho^(0.5))*200
Max [Lsd;La;Lc]

=
=
=
=

PARABOLIC CURVE

=
=
=

Sta. V - (Vcldmin/2)
Sta. V + X
Sta. PC + (Vcldmin)

19 + 350.00
19 + 425.00
19 + 450.00

=
=
=

ELEVATIONS:
Elev. V - [g1*(Vcldmin/2)]
Elev. V - y - z
Elev. V - [g2*(Vcldmin/2)]

=
=
=

398.21
398.63
390.63

Project & Location:


PROPOSED 20 KM ARTERIAL ROAD
LAGUNA

Elev. PC
Elev. HP
Elev. PT

Approved By:
ENGR. MANUEL M. MUHI
(Instructor)

=
=
=

Elev. V - [g1*(Vcldmin/2)]
Elev. V - y - z
Elev. V - [g2*(Vcldmin/2)]

=
=
=

411.25
414.06
413.75

Sheet Content:

VERTICAL ALIGNMENT COMPUTATION

Sheet No.

ROAD WIDENING
(OPTION NO.1)

Curve

1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
51

Designers:

Curve Type
Simple WITH
Simple WITH
Simple WITH
Simple WITH
Simple WITH
Simple WITH
Simple WITH
Simple WITH
Simple WITH
Simple WITH
Simple WITH
Simple WITH
Simple WITH
Simple WITH
Simple WITH
Simple WITH
Simple WITH
Simple WITH
Simple WITH
Simple WITH
Simple WITH
Simple WITH
Simple WITH
Simple WITH
Simple WITH
Simple WITH
Simple WITH
Simple WITH
Simple WITH
Simple WITH
Simple WITH
Simple WITH
Simple WITH
Simple WITH
Simple WITH
Simple WITH
Simple WITH
Simple WITH
Simple WITH
Simple WITH
Simple WITH
Simple WITH
Simple WITH
Simple WITH
Simple WITH
Simple WITH
Simple WITH
Simple WITH
Simple WITH
Simple WITH
Simple WITH

Trans
Trans
Trans
Trans
Trans
Trans
Trans
Trans
Trans
Trans
Trans
Trans
Trans
Trans
Trans
Trans
Trans
Trans
Trans
Trans
Trans
Trans
Trans
Trans
Trans
Trans
Trans
Trans
Trans
Trans
Trans
Trans
Trans
Trans
Trans
Trans
Trans
Trans
Trans
Trans
Trans
Trans
Trans
Trans
Trans
Trans
Trans
Trans
Trans
Trans
Trans

Category

Rdmin

Wdmin

Rural
Rural
Rural
Rural
Rural
Rural
Rural
Rural
Rural
Rural
Rural
Rural
Rural
Rural
Rural
Rural
Rural
Rural
Rural
Rural
Rural
Rural
Rural
Rural
Rural
Rural
Rural
Rural
Rural
Rural
Rural
Rural
Rural
Rural
Rural
Rural
Rural
Rural
Rural
Rural
Urban
Urban
Urban
Urban
Urban
Urban
Urban
Urban
Urban
Urban
Urban

90
90
90
90
90
90
90
90
90
90
90
50
50
50
50
50
50
50
50
50
50
50
50
50
50
50
50
50
50
50
50
50
50
50
50
50
50
50
50
50
95
95
95
95
95
95
95
95
95
95
95

322
322
322
322
322
322
322
322
322
322
320
121
121
121
121
121
121
121
121
121
121
121
121
121
121
121
121
121
121
121
121
121
121
121
121
121
121
121
121
121
352
352
352
352
352
352
352
352
352
352
352

2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
4
4
4
4
4
4
4
4
4
4
4

5.512
5.512
5.512
5.512
5.512
5.512
5.512
5.512
5.512
5.512
5.512
5.512
5.512
5.512
5.512
5.512
5.512
5.512
5.512
5.512
5.512
5.512
5.512
5.512
5.512
5.512
5.512
5.512
5.512
5.512
5.512
5.512
5.512
5.512
5.512
5.512
5.512
5.512
5.512
5.512
5.512
5.512
5.512
5.512
5.512
5.512
5.512
5.512
5.512
5.512
5.512

0.62128
0.62128
0.62128
0.62128
0.62128
0.62128
0.62128
0.62128
0.62128
0.62128
0.62303
0.73017
0.73017
0.73017
0.73017
0.73017
0.73017
0.73017
0.73017
0.73017
0.73017
0.73017
0.73017
0.73017
0.73017
0.73017
0.73017
0.73017
0.73017
0.73017
0.73017
0.73017
0.73017
0.73017
0.73017
0.73017
0.73017
0.73017
0.73017
0.73017
0.70430
0.70430
0.70430
0.70430
0.70430
0.70430
0.70430
0.70430
0.70430
0.70430
0.70430

Project & Location:

Approved By:

Sheet Content:

Reyes, Ma. Karisse P.


Santillan, Jan Sherwin F.

Uy, Kwin Juvy H.

PROPOSED 20 KM ARTERIAL
ROAD LAGUNA

ENGR. MANUEL M. MUHI


(Instructor)

ROAD WIDENING

Sheet No.

SUPERELEVATION
(OPTION NO.1)

Curve
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
51

Curve Type
Simple WITH
Simple WITH
Simple WITH
Simple WITH
Simple WITH
Simple WITH
Simple WITH
Simple WITH
Simple WITH
Simple WITH
Simple WITH
Simple WITH
Simple WITH
Simple WITH
Simple WITH
Simple WITH
Simple WITH
Simple WITH
Simple WITH
Simple WITH
Simple WITH
Simple WITH
Simple WITH
Simple WITH
Simple WITH
Simple WITH
Simple WITH
Simple WITH
Simple WITH
Simple WITH
Simple WITH
Simple WITH
Simple WITH
Simple WITH
Simple WITH
Simple WITH
Simple WITH
Simple WITH
Simple WITH
Simple WITH
Simple WITH
Simple WITH
Simple WITH
Simple WITH
Simple WITH
Simple WITH
Simple WITH
Simple WITH
Simple WITH
Simple WITH
Simple WITH

Trans
Trans
Trans
Trans
Trans
Trans
Trans
Trans
Trans
Trans
Trans
Trans
Trans
Trans
Trans
Trans
Trans
Trans
Trans
Trans
Trans
Trans
Trans
Trans
Trans
Trans
Trans
Trans
Trans
Trans
Trans
Trans
Trans
Trans
Trans
Trans
Trans
Trans
Trans
Trans
Trans
Trans
Trans
Trans
Trans
Trans
Trans
Trans
Trans
Trans
Trans

Category V
Rural
Rural
Rural
Rural
Rural
Rural
Rural
Rural
Rural
Rural
Rural
Rural
Rural
Rural
Rural
Rural
Rural
Rural
Rural
Rural
Rural
Rural
Rural
Rural
Rural
Rural
Rural
Rural
Rural
Rural
Rural
Rural
Rural
Rural
Rural
Rural
Rural
Rural
Rural
Rural
Urban
Urban
Urban
Urban
Urban
Urban
Urban
Urban
Urban
Urban
Urban

90
90
90
90
90
90
90
90
90
90
90
50
50
50
50
50
50
50
50
50
50
50
50
50
50
50
50
50
50
50
50
50
50
50
50
50
50
50
50
50
95
95
95
95
95
95
95
95
95
95
95

Designers:

emax Lane
Widt
0.08
0.08
0.08
0.08
0.08
0.08
0.08
0.08
0.08
0.08
0.08
0.03
0.03
0.03
0.03
0.03
0.03
0.03
0.03
0.03
0.03
0.03
0.03
0.03
0.03
0.03
0.03
0.03
0.03
0.03
0.03
0.03
0.03
0.03
0.03
0.03
0.03
0.03
0.03
0.03
0.09
0.09
0.09
0.09
0.09
0.09
0.09
0.09
0.09
0.09
0.09

3.5
3.5
3.5
3.5
3.5
3.5
3.5
3.5
3.5
3.5
3.5
3.5
3.5
3.5
3.5
3.5
3.5
3.2
3.2
3.2
3.2
3.2
3.5
3.5
3.5
3.5
3.5
3.5
3.5
3.5
3.5
3.5
3.5
3.5
3.5
3.5
3.5
3.5
3.5
3.5
3.12
3.12
3.12
3.12
3.12
3.12
3.12
3.12
3.12
3.12
3.12

NC

SR(%)

SR

TR

0.02
0.02
0.02
0.02
0.02
0.02
0.02
0.02
0.02
0.02
0.02
0.02
0.02
0.02
0.02
0.02
0.02
0.02
0.02
0.02
0.02
0.02
0.02
0.02
0.02
0.02
0.02
0.02
0.02
0.02
0.02
0.02
0.02
0.02
0.02
0.02
0.02
0.02
0.02
0.02
0.02
0.02
0.02
0.02
0.02
0.02
0.02
0.02
0.02
0.02
0.02

165
165
165
165
165
165
165
165
165
165
57.4
57.4
57.4
57.4
57.4
57.4
57.4
57.4
57.4
57.4
57.4
57.4
57.4
57.4
57.4
57.4
57.4
57.4
57.4
57.4
57.4
57.4
57.4
57.4
57.4
57.4
57.4
57.4
57.4
57.4
175
175
175
175
175
175
175
175
175
175
175

65.00
65.00
65.00
65.00
65.00
65.00
65.00
65.00
65.00
65.00
65.00
75.00
75.00
75.00
75.00
75.00
75.00
75.00
75.00
75.00
75.00
75.00
75.00
75.00
75.00
75.00
75.00
75.00
75.00
75.00
75.00
75.00
75.00
75.00
75.00
75.00
75.00
75.00
75.00
75.00
68.61
68.61
68.61
68.61
68.61
68.61
68.61
68.61
68.61
68.61
68.61

48.56
48.56
48.56
48.56
48.56
48.56
48.56
48.56
48.56
48.56
16.89
6.77
6.77
6.77
6.77
6.77
6.77
6.19
6.19
6.19
6.19
6.19
6.77
6.77
6.77
6.77
6.77
6.77
6.77
6.77
6.77
6.77
6.77
6.77
6.77
6.77
6.77
6.77
6.77
6.77
49.14
49.14
49.14
49.14
49.14
49.14
49.14
49.14
49.14
49.14
49.14

11.55
11.55
11.55
11.55
11.55
11.55
11.55
11.55
11.55
11.55
4.02
4.02
4.02
4.02
4.02
4.02
4.02
3.67
3.67
3.67
3.67
3.67
4.02
4.02
4.02
4.02
4.02
4.02
4.02
4.02
4.02
4.02
4.02
4.02
4.02
4.02
4.02
4.02
4.02
4.02
10.92
10.92
10.92
10.92
10.92
10.92
10.92
10.92
10.92
10.92
10.92

Project & Location:

Sta. TS;PC Sta. ST;PT Sta. SC


0 + 552
1 + 202
1 + 808
2 + 276
2 + 759
3 + 423
4 + 158
4 + 642
5 + 291
6 + 042
6 + 842
7 + 611
8 + 337
8 + 825
9 + 311
9 + 825
1 0 + 325
1 0 + 837
1 1 + 343
1 1 + 855
1 2 + 325
1 2 + 780
1 3 + 325
1 3 + 825
1 4 + 260
1 4 + 855
1 5 + 547
1 6 + 125
1 6 + 632
1 7 + 261
1 7 + 755
1 8 + 347
1 8 + 834
1 9 + 507
2 0 + 005
2 0 + 606
2 1 + 106
#VALUE!
#VALUE!
------2 3 + 850
2 4 + 230
2 4 + 912
2 5 + 378
2 5 + 888
2 6 + 394
2 6 + 942
2 7 + 490
2 8 + 185
2 8 + 715

Approved By:

Reyes, Ma. Karisse P.


Santillan, Jan Sherwin F.

Uy, Kwin Juvy H.

PROPOSED 20 KM ARTERIAL
ROAD LAGUNA

ENGR. MANUEL M. MUHI


(Instructor)

0 + 746
1 + 396
2 + 086
2 + 610
3 + 121
3 + 841
4 + 436
4 + 948
5 + 682
6 + 348
7 + 148
7 + 775
8 + 459
8 + 967
9 + 475
9 + 967
10 + 467
10 + 959
11 + 454
11 + 944
12 + 467
12 + 985
13 + 467
13 + 967
14 + 487
14 + 944
15 + 651
16 + 267
16 + 762
17 + 338
17 + 844
18 + 451
18 + 961
19 + 592
20 + 094
20 + 693
21 + 193
#VALUE!
#VALUE!
------24 + 049
24 + 643
25 + 184
25 + 711
26 + 203
26 + 863
27 + 336
27 + 965
28 + 506
28 + 981

0 + 634
1 + 284
1 + 889
2 + 357
2 + 840
3 + 505
4 + 239
4 + 723
5 + 373
6 + 123
6 + 924
7 + 649
8 + 375
8 + 862
9 + 349
9 + 862
10 + 362
10 + 875
11 + 381
11 + 892
12 + 362
12 + 817
13 + 362
13 + 862
14 + 298
14 + 892
15 + 584
16 + 162
16 + 670
17 + 298
17 + 792
18 + 384
18 + 871
19 + 544
20 + 042
20 + 643
21 + 143
#VALUE!
#VALUE!
------23 + 938
24 + 318
24 + 999
25 + 466
25 + 976
26 + 482
27 + 029
27 + 578
28 + 272
28 + 803

Sta. CS
0 + 665
1 + 315
2 + 004
2 + 528
3 + 040
3 + 760
4 + 354
4 + 866
5 + 600
6 + 266
7 + 066
7 + 738
8 + 421
8 + 930
9 + 438
9 + 930
10 + 430
10 + 921
11 + 417
11 + 907
12 + 430
12 + 948
13 + 430
13 + 930
14 + 450
14 + 907
15 + 614
16 + 230
16 + 725
17 + 301
17 + 807
18 + 414
18 + 924
19 + 555
20 + 057
20 + 656
21 + 156
#VALUE!
#VALUE!
------23 + 961
24 + 556
25 + 096
25 + 623
26 + 115
26 + 775
27 + 249
27 + 877
28 + 418
28 + 893

Sheet Content:

SUPERELEVATION

Sheet No.

SUPERELEVATION
(OPTION NO.1)

Curv e

1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
51

Sta. E

Sta. D

Sta. C

Sta. B

Station of Superelevation
Sta. A
Sta. E'
Sta. D'

Sta. C'

Sta. B'

Sta. A'

0 + 634
1 + 284
1 + 889
2 + 357
2 + 840
3 + 505
4 + 239
4 + 723
5 + 373
6 + 123
6 + 924
7 + 649
8 + 375
8 + 862
9 + 349
9 + 862
10 + 362
10 + 875
11 + 381
11 + 892
12 + 362
12 + 817

0 + 602
1 + 252
1 + 858
2 + 326
2 + 809
3 + 473
4 + 208
4 + 692
5 + 341
6 + 092
6 + 913
7 + 644
8 + 370
8 + 857
9 + 344
9 + 857
10 + 357
10 + 870
11 + 376
11 + 887
12 + 358
12 + 812

0 + 597
1 + 247
1 + 852
2 + 320
2 + 803
3 + 468
4 + 202
4 + 686
5 + 336
6 + 086
6 + 911
7 + 646
8 + 372
8 + 859
9 + 346
9 + 859
10 + 359
10 + 872
11 + 378
11 + 889
12 + 360
12 + 815

0 + 585
1 + 235
1 + 841
2 + 309
2 + 792
3 + 456
4 + 191
4 + 675
5 + 324
6 + 075
6 + 907
7 + 642
8 + 368
8 + 855
9 + 342
9 + 855
10 + 355
10 + 868
11 + 374
11 + 886
12 + 356
12 + 811

0 + 574
1 + 224
1 + 829
2 + 297
2 + 780
3 + 444
4 + 179
4 + 663
5 + 313
6 + 063
6 + 903
7 + 638
8 + 364
8 + 851
9 + 338
9 + 851
1 0 + 351
1 0 + 865
1 1 + 371
1 1 + 882
1 2 + 352
1 2 + 807

0 + 665
1 + 315
2 + 004
2 + 528
3 + 040
3 + 760
4 + 354
4 + 866
5 + 600
6 + 266
7 + 066
7 + 738
8 + 421
8 + 930
9 + 438
9 + 930
10 + 430
10 + 921
11 + 417
11 + 907
12 + 430
12 + 948

0 + 696
1 + 346
2 + 036
2 + 560
3 + 071
3 + 791
4 + 386
4 + 898
5 + 632
6 + 298
7 + 077
7 + 743
8 + 427
8 + 935
9 + 443
9 + 935
10 + 435
10 + 926
11 + 421
11 + 912
12 + 435
12 + 953

0 + 725
1 + 375
2 + 064
2 + 588
3 + 100
3 + 820
4 + 414
4 + 927
5 + 660
6 + 327
7 + 087
7 + 749
8 + 432
8 + 941
9 + 449
9 + 941
10 + 441
10 + 931
11 + 427
11 + 917
12 + 440
12 + 958

0 + 736
1 + 386
2 + 076
2 + 600
3 + 111
3 + 832
4 + 426
4 + 938
5 + 672
6 + 338
7 + 091
7 + 753
8 + 436
8 + 945
9 + 453
9 + 945
10 + 445
10 + 935
11 + 430
11 + 921
12 + 444
12 + 962

0 + 748
1 + 398
2 + 087
2 + 612
3 + 123
3 + 843
4 + 437
4 + 950
5 + 683
6 + 350
7 + 095
7 + 757
8 + 440
8 + 949
9 + 457
9 + 949
1 0 + 449
1 0 + 939
1 1 + 434
1 1 + 924
1 2 + 447
1 2 + 965

13 + 362
13 + 862
14 + 298
14 + 892

13 + 357
13 + 857
14 + 293
14 + 887

13 + 359
13 + 859
14 + 295
14 + 889

13 + 355
13 + 855
14 + 291
14 + 885

1 3 + 351
1 3 + 851
1 4 + 287
1 4 + 881

13 + 430
13 + 930
14 + 450
14 + 907

13 + 435
13 + 935
14 + 455
14 + 912

13 + 441
13 + 941
14 + 460
14 + 918

13 + 445
13 + 945
14 + 464
14 + 922

1 3 + 449
1 3 + 949
1 4 + 469
1 4 + 926

Designers:

Project & Location:

Approved By:

Sheet Content:

Reyes, Ma. Karisse P.


Santillan, Jan Sherwin F.

Uy, Kwin Juvy H.

PROPOSED 20 KM ARTERIAL
ROAD LAGUNA

ENGR. MANUEL M. MUHI


(Instructor)

SUPERELEVATION

Sheet No.

ROAD WIDENING
(OPTION NO. 1)

CURVE NO. 1
N
L
V
Rdmin
Wdmin
Wdmin

=
=

=
=
=
=

CURVE NO. 2
N
L
V
Rdmin

2
5.512 m
90
kph
321.73 m

0.5

(0.5NL /Rdmin)+(0.105/Rdmin
0.6213

Wdmin
Wdmin

CURVE NO. 6
N
L
V
Rdmin
Wdmin
Wdmin

=
=

=
=
=
=

Wdmin
Wdmin

=
=

Wdmin
Wdmin

=
=
=
=
2

Wdmin
Wdmin

=
=
=
=

Wdmin
Wdmin

Wdmin
Wdmin

0.5

Wdmin
Wdmin

=
=
=
=

Wdmin
Wdmin

=
=

=
=
=
=

2
5.512
90
321.731

Wdmin
Wdmin

=
=

2
5.512
50
120.556

Wdmin
Wdmin

=
=

=
=
=
=

2
5.512
50
120.556

Wdmin
Wdmin

=
=
=
=

Wdmin
Wdmin

Wdmin
Wdmin

Wdmin
Wdmin

Wdmin
Wdmin

=
=
=
=

=
=
=
=

= (0.5NL 2/Rdmin)+(0.105/Rdmin0.5 )
0.7302
=

Wdmin
Wdmin

= (0.5NL 2/Rdmin)+(0.105/Rdmin0.5 )
0.7302
=

CURVE NO. 20
N
L
V
Rdmin

=
=
=
=

2
5.512 m
50
kph
120.56 m

Sheet Content:

Reyes, Ma. Karisse P.


Santillan, Jan Sherwin F.

Uy, Kwin Juvy H.

PROPOSED 20 KM ARTERIAL
ROAD LAGUNA

ENGR. MANUEL M. MUHI


(Instructor)

15

2
5.512 m
50
kph
120.56 m

Wdmin
Wdmin

2
5.512 m
50
kph
120.56 m

= (0.5NL 2/Rdmin)+(0.105/Rdmin0.5 )
0.7302
=

Approved By:

2
5.512 m
90
kph
321.73 m

CURVE NO.

= (0.5NL 2/Rdmin)+(0.105/Rdmin0.5 )
0.7302
=

N
L
V
Rdmin
0.5

=
=
=
=

= (0.5NL 2/Rdmin)+(0.105/Rdmin0.5 )
0.6213
=

N
L
V
Rdmin

2
5.512 m
50
kph
120.56 m

CURVE NO. 19

m
kph
m

2
5.512 m
90
kph
321.73 m

CURVE NO. 10

CURVE NO. 14
=
=
=
=

=
=
=
=

= (0.5NL 2/Rdmin)+(0.105/Rdmin0.5 )
0.6213
=

N
L
V
Rdmin

2
5.512 m
90
kph
321.73 m

= (0.5NL 2/Rdmin)+(0.105/Rdmin0.5 )
0.6213
=

N
L
V
Rdmin

m
kph
m

(0.5NL /Rdmin)+(0.105/Rdmin
0.7302

Project & Location:

0.5

CURVE NO. 9

(0.5NL 2/Rdmin)+(0.105/Rdmin0.5 )
0.7302

N
L
V
Rdmin

2
5.512 m
50
kph
120.56 m

CURVE NO. 5
N
L
V
Rdmin

2
5.512 m
90
kph
321.73 m

= (0.5NL /Rdmin)+(0.105/Rdmin
0.6213
=

N
L
V
Rdmin

m
kph
m

(0.5NL 2/Rdmin)+(0.105/Rdmin0.5 )
0.6213

=
=
=
=

=
=
=
=
2

CURVE NO. 18

= (0.5NL 2/Rdmin)+(0.105/Rdmin0.5 )
0.7302
=

Designers:

0.5

CURVE NO. 13

= (0.5NL 2/Rdmin)+(0.105/Rdmin0.5 )
0.7302
=

N
L
V
Rdmin

2
5.512 m
50
kph
120.56 m

CURVE NO. 4
N
L
V
Rdmin

m
kph
m

(0.5NL /Rdmin)+(0.105/Rdmin
0.6213

N
L
V
Rdmin

2
5.512 m
50
kph
120.56 m

CURVE NO. 17

(0.5NL /Rdmin)+(0.105/Rdmin
0.7302

2
5.512
90
321.731

CURVE NO. 8

= (0.5NL 2/Rdmin)+(0.105/Rdmin0.5 )
0.6213
=

=
=
=
=

=
=

=
=
=
=
2

N
L
V
Rdmin

2
5.512 m
90
kph
321.73 m

CURVE NO. 12

(0.5NL 2/Rdmin)+(0.105/Rdmin0.5 )
0.6230

N
L
V
Rdmin
=
=

= (0.5NL /Rdmin)+(0.105/Rdmin
0.6213
=

N
L
V
Rdmin

2
5.512 m
90
kph
320.17 m

CURVE NO. 16

Wdmin
Wdmin

N
L
V
Rdmin
0.5

CURVE NO. 7

CURVE NO. 11
=
=
=
=

CURVE NO. 3

2
5.512 m
90
kph
321.73 m

N
L
V
Rdmin

2
5.512 m
90
kph
321.73 m

(0.5NL 2/Rdmin)+(0.105/Rdmin0.5 )
0.6213

N
L
V
Rdmin

=
=
=
=

ROAD WIDENING COMPUTATION

Sheet No.

CURVE NO. 21
N
L
V
Rdmin
Wdmin
Wdmin

=
=

=
=
=
=

CURVE NO. 22
N
L
V
Rdmin

2
5.512 m
50
kph
120.56 m

(0.5NL 2/Rdmin)+(0.105/Rdmin0.5 )
0.7302

Wdmin
Wdmin

CURVE NO. 26
N
L
V
Rdmin
Wdmin
Wdmin

=
=

=
=
=
=

Wdmin
Wdmin

=
=

Wdmin
Wdmin

Wdmin
Wdmin

Wdmin
Wdmin

=
=

Wdmin
Wdmin

=
=

4
5.512
95
352

=
=

=
=
=
=

4
5.512
95
352

4
5.512
95
352

=
=

Wdmin
Wdmin

=
=

0.5

(0.5NL /Rdmin)+(0.105/Rdmin
0.7043

Wdmin
Wdmin

=
=
=
=

4
5.512
95
352

2
5.512
50
120.556

=
=
=
=

2
5.512
50
120.556

2
5.512
50
120.556

Wdmin
Wdmin

4
5.512
95
352

Wdmin
Wdmin

Wdmin
Wdmin

=
=

=
=
=
=
2

4
5.512
95
352

=
=
=
=

Wdmin
Wdmin

Wdmin
Wdmin

(0.5NL /Rdmin)+(0.105/Rdmin
0.7043

Wdmin
Wdmin

=
=
=
=

Wdmin
Wdmin

= (0.5NL 2/Rdmin)+(0.105/Rdmin0.5 )
=
0.7043

CURVE NO. 45
N
L
V
Rdmin

m
kph
m

4
5.512
95
352

=
=
=
=

4
5.512
95
352

m
kph
m

CURVE NO. 50
N
L
V
Rdmin

m
kph
m

= (0.5NL /Rdmin)+(0.105/Rdmin
=
0.7043
2

2
5.512 m
50
kph
120.56 m

= (0.5NL 2/Rdmin)+(0.105/Rdmin0.5 )
=
0.7302

CURVE NO. 49
N
L
V
Rdmin
0.5

=
=
=
=

Wdmin
Wdmin

CURVE NO. 44

m
kph
m

2
5.512 m
50
kph
120.56 m

CURVE NO. 40

= (0.5NL 2/Rdmin)+(0.105/Rdmin0.5 )
=
0.7043

4
5.512
95
352

=
=
=
=

= (0.5NL 2/Rdmin)+(0.105/Rdmin0.5 )
=
0.7302

N
L
V
Rdmin

2
5.512 m
50
kph
120.56 m

Wdmin
Wdmin

=
=
=
=

2
5.512 m
50
kph
120.56 m

CURVE NO. 35

= (0.5NL 2/Rdmin)+(0.105/Rdmin0.5 )
=
0.7302

N
L
V
Rdmin

=
=
=
=

= (0.5NL 2/Rdmin)+(0.105/Rdmin0.5 )
=
0.7302

N
L
V
Rdmin

2
5.512 m
50
kph
120.56 m

Wdmin
Wdmin

m
kph
m

2
5.512 m
50
kph
120.56 m

CURVE NO. 30

CURVE NO. 39
=
=
=
=

=
=
=
=

= (0.5NL 2/Rdmin)+(0.105/Rdmin0.5 )
0.7302
=

N
L
V
Rdmin

2
5.512 m
50
kph
120.56 m

= (0.5NL 2/Rdmin)+(0.105/Rdmin0.5 )
=
0.7302

N
L
V
Rdmin

m
kph
m

CURVE NO. 48

0.5

Wdmin
Wdmin

CURVE NO. 34

(0.5NL 2/Rdmin)+(0.105/Rdmin0.5 )
0.7043

N
L
V
Rdmin

m
kph
m

=
=
=
=

= (0.5NL 2/Rdmin)+(0.105/Rdmin0.5 )
=
0.7302

N
L
V
Rdmin

m
kph
m

(0.5NL 2/Rdmin)+(0.105/Rdmin0.5 )
0.7302

=
=
=
=

CURVE NO. 25
N
L
V
Rdmin

2
5.512 m
50
kph
120.56 m

CURVE NO. 29

(0.5NL 2/Rdmin)+(0.105/Rdmin0.5 )
0.7302

=
=
=
=

=
=
=
=

= (0.5NL 2/Rdmin)+(0.105/Rdmin0.5 )
0.7302
=

N
L
V
Rdmin

m
kph
m

CURVE NO. 43

= (0.5NL /Rdmin)+(0.105/Rdmin
=
0.7043
2

=
=
=
=

(0.5NL 2/Rdmin)+(0.105/Rdmin0.5 )
0.7302

N
L
V
Rdmin

m
kph
m

CURVE NO. 47
N
L
V
Rdmin

m
kph
m

=
=

Wdmin
Wdmin

CURVE NO. 42
=
=
=
=

Wdmin
Wdmin

CURVE NO. 38

= (0.5NL 2/Rdmin)+(0.105/Rdmin0.5 )
=
0.7043

N
L
V
Rdmin

=
=

N
L
V
Rdmin

Wdmin
Wdmin

CURVE NO. 46
N
L
V
Rdmin
Wdmin
Wdmin

Wdmin
Wdmin

2
5.512 m
50
kph
120.56 m

= (0.5NL 2/Rdmin)+(0.105/Rdmin0.5 )
=
0.7302

m
kph
m

(0.5NL 2/Rdmin)+(0.105/Rdmin0.5 )
0.7043

CURVE NO. 24
N
L
V
Rdmin

m
kph
m

CURVE NO. 33

Wdmin
Wdmin

CURVE NO. 41
=
=
=
=

=
=
=
=

2
5.512
50
120.556

(0.5NL 2/Rdmin)+(0.105/Rdmin0.5 )
0.7302

N
L
V
Rdmin

CURVE NO. 37

(0.5NL 2/Rdmin)+(0.105/Rdmin0.5 )
0.7302

N
L
V
Rdmin

Wdmin
Wdmin

2
5.512 m
50
kph
120.56 m

= (0.5NL 2/Rdmin)+(0.105/Rdmin0.5 )
=
0.7302

N
L
V
Rdmin

2
5.512 m
50
kph
120.56 m

=
=
=
=

CURVE NO. 28

= (0.5NL 2/Rdmin)+(0.105/Rdmin0.5 )
=
0.7302

=
=
=
=

=
=

N
L
V
Rdmin

2
5.512 m
50
kph
120.56 m

CURVE NO. 32

CURVE NO. 36
=
=
=
=

=
=
=
=

N
L
V
Rdmin

2
5.512 m
50
kph
120.56 m

(0.5NL 2/Rdmin)+(0.105/Rdmin0.5 )
0.7302

N
L
V
Rdmin

Wdmin
Wdmin

CURVE NO. 27

CURVE NO. 31
=
=
=
=

CURVE NO. 23
N
L
V
Rdmin

2
5.512 m
50
kph
120.56 m

= (0.5NL 2/Rdmin)+(0.105/Rdmin0.5 )
0.7302
=

N
L
V
Rdmin

2
5.512 m
50
kph
120.56 m

(0.5NL 2/Rdmin)+(0.105/Rdmin0.5 )
0.7302

N
L
V
Rdmin

=
=
=
=

0.5

Wdmin
Wdmin

=
=
=
=

4
5.512
95
352

m
kph
m

= (0.5NL 2/Rdmin)+(0.105/Rdmin0.5 )
=
0.7043

CURVE NO. 51
N
L
V
Rdmin
Wdmin
Wdmin

=
=

=
=
=
=

4
5.512
95
352

m
kph
m

(0.5NL 2/Rdmin)+(0.105/Rdmin0.5 )
0.7043

Designers:

Project & Location:

Approved By:

Sheet Content:

Sheet No.

Reyes, Ma. Karisse P.


Santillan, Jan Sherwin F.

Uy, Kwin Juvy H.

PROPOSED 20 KM ARTERIAL
ROAD LAGUNA

ENGR. MANUEL M. MUHI


(Instructor)

ROAD WIDENING COMPUTATION

SUPERELEVATION
(OPTION NO.1)

CURVE NO.

CURVE NO.

Simple WITH Trans


V
e
NC

=
=
=

90
0.08
0.02

kph

Lw
S
SR%
TR
SR

Sta E
Sta D
Sta C
Sta B
Sta A
Sta E'
Sta D'
Sta C'
Sta B'
Sta A'

=
=
=

3.5
165
65

(Nc)(Lw)(S)
(e)(Lw)(S)

=
=

=
=

Sta SC
Sta E-(%SR)*SR
Sta E-SR+TR
Sta C-TR
Sta B-TR
Sta CS
Sta E'+(%SR)*SR
Sta E+SR-TR
Sta C'-TR
Sta B'-TR

=
=
=
=
=
=
=
=
=
=

0 + 665
0 + 634
0 + 746

V
e
NC

=
=
=

90
0.08
0.02

kph

11.55
48.559

Lw
S
SR%
TR
SR

0+
0+
0+
0+
0+
0+
0+
0+
0+
0+

=
=
=
=
=
=
=
=
=
=

CURVE NO.

=
=
=

634
602
597
585
574
665
696
725
736
748

Sta E
Sta D
Sta C
Sta B
Sta A
Sta E'
Sta D'
Sta C'
Sta B'
Sta A'

=
=
=

90
0.08
0.02

kph

Lw
S
SR%
TR
SR

Sta E
Sta D
Sta C
Sta B
Sta A
Sta E'
Sta D'
Sta C'
Sta B'
Sta A'

=
=
=
=
=
=
=
=
=
=

=
=

=
=
=

3.5
165
65

(Nc)(Lw)(S)
(e)(Lw)(S)

=
=

3.5
165
65

Sta CS
=
Sta SC
=
Sta. PT;ST =

1 + 315
1 + 284
1 + 396

= 11.55
= 48.559

Sta SC
Sta E-(%SR)*SR
Sta E-SR+TR
Sta C-TR
Sta B-TR
Sta CS
Sta E'+(%SR)*SR
Sta E+SR-TR
Sta C'-TR
Sta B'-TR

1+
1+
1+
1+
1+
1+
1+
1+
1+
1+

=
=
=
=
=
=
=
=
=
=

CURVE NO.

284
252
247
235
224
315
346
375
386
398

Simple WITH Trans


Sta CS
Sta SC
Sta. PT;ST

Sta SC
Sta E-(%SR)*SR
Sta E-SR+TR
Sta C-TR
Sta B-TR
Sta CS
Sta E'+(%SR)*SR
Sta E+SR-TR
Sta C'-TR
Sta B'-TR

=
=
=

(Nc)(Lw)(S)
(e)(Lw)(S)

=
=

=
=
=
=
=
=
=
=
=
=

Simple WITH Trans


V
e
NC

Simple WITH Trans


Sta CS
Sta SC
Sta. PT;ST

=
=
=

2 + 004
1 + 889
2 + 086

V
e
NC

=
=
=

90
0.08
0.02

kph

11.55
48.559
=
=
=
=
=
=
=
=
=
=

Lw
S
SR%
TR
SR

1+
1+
1+
1+
1+
2+
2+
2+
2+
2+

889
858
852
841
829
004
036
064
076
087

Designers:

Sta E
Sta D
Sta C
Sta B
Sta A
Sta E'
Sta D'
Sta C'
Sta B'
Sta A'

Project & Location:

=
=
=
=
=
=
=
=
=
=

Approved By:

=
=

=
=
=

3.5
165
65

Sta CS
=
Sta SC
=
Sta. PT;ST =

(Nc)(Lw)(S)
(e)(Lw)(S)

2 + 528
2 + 357
2 + 610

= 11.55
= 48.559

Sta SC
Sta E-(%SR)*SR
Sta E-SR+TR
Sta C-TR
Sta B-TR
Sta CS
Sta E'+(%SR)*SR
Sta E+SR-TR
Sta C'-TR
Sta B'-TR

=
=
=
=
=
=
=
=
=
=

2+
2+
2+
2+
2+
2+
2+
2+
2+
2+

357
326
320
309
297
528
560
588
600
612

Sheet Content:

Reyes, Ma. Karisse P.


Santillan, Jan Sherwin F.

Uy, Kwin Juvy H.

PROPOSED 20 KM ARTERIAL
ROAD LAGUNA

ENGR. MANUEL M. MUHI


(Instructor)

SUPERELEVATION COMPUTATION

Sheet No.

CURVE NO.

CURVE NO.

Simple WITH Trans


V
e
NC

=
=
=

90
0.08
0.02

kph

Lw
S
SR%
TR
SR

Sta E
Sta D
Sta C
Sta B
Sta A
Sta E'
Sta D'
Sta C'
Sta B'
Sta A'

=
=
=

3.5
165
65

(Nc)(Lw)(S)
(e)(Lw)(S)

=
=

=
=

Sta SC
Sta E-(%SR)*SR
Sta E-SR+TR
Sta C-TR
Sta B-TR
Sta CS
Sta E'+(%SR)*SR
Sta E+SR-TR
Sta C'-TR
Sta B'-TR

=
=
=
=
=
=
=
=
=
=

3 + 040
2 + 840
3 + 121

V
e
NC

=
=
=

90
0.08
0.02

kph

11.55
48.559

Lw
S
SR%
TR
SR

2+
2+
2+
2+
2+
3+
3+
3+
3+
3+

=
=
=
=
=
=
=
=
=
=

CURVE NO.

=
=
=

840
809
803
792
780
040
071
100
111
123

Sta E
Sta D
Sta C
Sta B
Sta A
Sta E'
Sta D'
Sta C'
Sta B'
Sta A'

=
=
=

90
0.08
0.02

kph

Lw
S
SR%
TR
SR

Sta E
Sta D
Sta C
Sta B
Sta A
Sta E'
Sta D'
Sta C'
Sta B'
Sta A'

=
=
=
=
=
=
=
=
=
=

=
=

=
=
=

3.5
165
65

(Nc)(Lw)(S)
(e)(Lw)(S)
Sta SC
Sta E-(%SR)*SR
Sta E-SR+TR
Sta C-TR
Sta B-TR
Sta CS
Sta E'+(%SR)*SR
Sta E+SR-TR
Sta C'-TR
Sta B'-TR

3.5
165
65

Sta CS
=
Sta SC
=
Sta. PT;ST =

3 + 760
3 + 505
3 + 841

= 11.55
= 48.559

Sta SC
Sta E-(%SR)*SR
Sta E-SR+TR
Sta C-TR
Sta B-TR
Sta CS
Sta E'+(%SR)*SR
Sta E+SR-TR
Sta C'-TR
Sta B'-TR

3+
3+
3+
3+
3+
3+
3+
3+
3+
3+

=
=
=
=
=
=
=
=
=
=

CURVE NO.

505
473
468
456
444
760
791
820
832
843

Simple WITH Trans


Sta CS
Sta SC
Sta. PT;ST

=
=

=
=
=

(Nc)(Lw)(S)
(e)(Lw)(S)

=
=

=
=
=
=
=
=
=
=
=
=

Simple WITH Trans


V
e
NC

Simple WITH Trans


Sta CS
Sta SC
Sta. PT;ST

=
=
=

4 + 354
4 + 239
4 + 436

V
e
NC

=
=
=

90
0.08
0.02

kph

11.55
48.559
=
=
=
=
=
=
=
=
=
=

Lw
S
SR%
TR
SR

4+
4+
4+
4+
4+
4+
4+
4+
4+
4+

239
208
202
191
179
354
386
414
426
437

Designers:

Sta E
Sta D
Sta C
Sta B
Sta A
Sta E'
Sta D'
Sta C'
Sta B'
Sta A'

Project & Location:

=
=
=
=
=
=
=
=
=
=

Approved By:

=
=

=
=
=

3.5
165
65

Sta CS
=
Sta SC
=
Sta. PT;ST =

(Nc)(Lw)(S)
(e)(Lw)(S)

4 + 866
4 + 723
4 + 948

= 11.55
= 48.559

Sta SC
Sta E-(%SR)*SR
Sta E-SR+TR
Sta C-TR
Sta B-TR
Sta CS
Sta E'+(%SR)*SR
Sta E+SR-TR
Sta C'-TR
Sta B'-TR

=
=
=
=
=
=
=
=
=
=

4+
4+
4+
4+
4+
4+
4+
4+
4+
4+

723
692
686
675
663
866
898
927
938
950

Sheet Content:

Reyes, Ma. Karisse P.


Santillan, Jan Sherwin F.

Uy, Kwin Juvy H.

PROPOSED 20 KM ARTERIAL
ROAD LAGUNA

ENGR. MANUEL M. MUHI


(Instructor)

SUPERELEVATION COMPUTATION

Sheet No.

CURVE NO.

CURVE NO.

Simple WITH Trans


V
e
NC

=
=
=

90
0.08
0.02

kph

Lw
S
SR%
TR
SR

Sta E
Sta D
Sta C
Sta B
Sta A
Sta E'
Sta D'
Sta C'
Sta B'
Sta A'

=
=
=

3.5
165
65

(Nc)(Lw)(S)
(e)(Lw)(S)

=
=

=
=

Sta SC
Sta E-(%SR)*SR
Sta E-SR+TR
Sta C-TR
Sta B-TR
Sta CS
Sta E'+(%SR)*SR
Sta E+SR-TR
Sta C'-TR
Sta B'-TR

=
=
=
=
=
=
=
=
=
=

5 + 600
5 + 373
5 + 682

V
e
NC

=
=
=

90
0.08
0.02

kph

11.55
48.559

Lw
S
SR%
TR
SR

5+
5+
5+
5+
5+
5+
5+
5+
5+
5+

=
=
=
=
=
=
=
=
=
=

CURVE NO.

=
=
=

373
341
336
324
313
600
632
660
672
683

Sta E
Sta D
Sta C
Sta B
Sta A
Sta E'
Sta D'
Sta C'
Sta B'
Sta A'

=
=
=

90
0.08
0.02

kph

Lw
S
SR%
TR
SR

Sta E
Sta D
Sta C
Sta B
Sta A
Sta E'
Sta D'
Sta C'
Sta B'
Sta A'

=
=
=
=
=
=
=
=
=
=

=
=

=
=
=

3.5
57.4
65

11

(Nc)(Lw)(S)
(e)(Lw)(S)
Sta SC
Sta E-(%SR)*SR
Sta E-SR+TR
Sta C-TR
Sta B-TR
Sta CS
Sta E'+(%SR)*SR
Sta E+SR-TR
Sta C'-TR
Sta B'-TR

3.5
165
65

Sta CS
=
Sta SC
=
Sta. PT;ST =

6 + 266
6 + 123
6 + 348

= 11.55
= 48.559

Sta SC
Sta E-(%SR)*SR
Sta E-SR+TR
Sta C-TR
Sta B-TR
Sta CS
Sta E'+(%SR)*SR
Sta E+SR-TR
Sta C'-TR
Sta B'-TR

CURVE NO.

6+
6+
6+
6+
6+
6+
6+
6+
6+
6+

=
=
=
=
=
=
=
=
=
=

123
092
086
075
063
266
298
327
338
350

12

Simple WITH Trans


Sta CS
Sta SC
Sta. PT;ST

=
=

=
=
=

(Nc)(Lw)(S)
(e)(Lw)(S)

=
=

=
=
=
=
=
=
=
=
=
=

Simple WITH Trans


V
e
NC

10

Simple WITH Trans


Sta CS
Sta SC
Sta. PT;ST

=
=
=

7 + 066
6 + 924
7 + 148

V
e
NC

=
=
=

50
0.03
0.02

kph

4.018
16.893
=
=
=
=
=
=
=
=
=
=

Lw
S
SR%
TR
SR

6+
6+
6+
6+
6+
7+
7+
7+
7+
7+

924
913
911
907
903
066
077
087
091
095

Designers:

Sta E
Sta D
Sta C
Sta B
Sta A
Sta E'
Sta D'
Sta C'
Sta B'
Sta A'

Project & Location:

=
=
=
=
=
=
=
=
=
=

Approved By:

=
=

=
=
=

3.5
57.4
75

Sta CS
=
Sta SC
=
Sta. PT;ST =

(Nc)(Lw)(S)
(e)(Lw)(S)

7 + 738
7 + 649
7 + 775

= 4.018
= 6.7713

Sta SC
Sta E-(%SR)*SR
Sta E-SR+TR
Sta C-TR
Sta B-TR
Sta CS
Sta E'+(%SR)*SR
Sta E+SR-TR
Sta C'-TR
Sta B'-TR

=
=
=
=
=
=
=
=
=
=

7+
7+
7+
7+
7+
7+
7+
7+
7+
7+

649
644
646
642
638
738
743
749
753
757

Sheet Content:

Reyes, Ma. Karisse P.


Santillan, Jan Sherwin F.

Uy, Kwin Juvy H.

PROPOSED 20 KM ARTERIAL
ROAD LAGUNA

ENGR. MANUEL M. MUHI


(Instructor)

SUPERELEVATION COMPUTATION

Sheet No.

CURVE NO.

13

CURVE NO.

Simple WITH Trans


V
e
NC

=
=
=

50
0.03
0.02

kph

Lw
S
SR%
TR
SR

Sta E
Sta D
Sta C
Sta B
Sta A
Sta E'
Sta D'
Sta C'
Sta B'
Sta A'

=
=
=

3.5
57.4
75

(Nc)(Lw)(S)
(e)(Lw)(S)

=
=

=
=

Sta SC
Sta E-(%SR)*SR
Sta E-SR+TR
Sta C-TR
Sta B-TR
Sta CS
Sta E'+(%SR)*SR
Sta E+SR-TR
Sta C'-TR
Sta B'-TR

=
=
=
=
=
=
=
=
=
=

8 + 421
8 + 375
8 + 459

V
e
NC

=
=
=

50
0.03
0.02

kph

4.018
6.7713

Lw
S
SR%
TR
SR

8+
8+
8+
8+
8+
8+
8+
8+
8+
8+

=
=
=
=
=
=
=
=
=
=

CURVE NO.

=
=
=

375
370
372
368
364
421
427
432
436
440

Sta E
Sta D
Sta C
Sta B
Sta A
Sta E'
Sta D'
Sta C'
Sta B'
Sta A'

=
=
=

50
0.03
0.02

kph

Lw
S
SR%
TR
SR

Sta E
Sta D
Sta C
Sta B
Sta A
Sta E'
Sta D'
Sta C'
Sta B'
Sta A'

=
=
=
=
=
=
=
=
=
=

=
=

=
=
=

3.5
57.4
75

15

(Nc)(Lw)(S)
(e)(Lw)(S)
Sta SC
Sta E-(%SR)*SR
Sta E-SR+TR
Sta C-TR
Sta B-TR
Sta CS
Sta E'+(%SR)*SR
Sta E+SR-TR
Sta C'-TR
Sta B'-TR

3.5
57.4
75

Sta CS
=
Sta SC
=
Sta. PT;ST =

8 + 930
8 + 862
8 + 967

= 4.018
= 6.7713

Sta SC
Sta E-(%SR)*SR
Sta E-SR+TR
Sta C-TR
Sta B-TR
Sta CS
Sta E'+(%SR)*SR
Sta E+SR-TR
Sta C'-TR
Sta B'-TR

CURVE NO.

8+
8+
8+
8+
8+
8+
8+
8+
8+
8+

=
=
=
=
=
=
=
=
=
=

862
857
859
855
851
930
935
941
945
949

16

Simple WITH Trans


Sta CS
Sta SC
Sta. PT;ST

=
=

=
=
=

(Nc)(Lw)(S)
(e)(Lw)(S)

=
=

=
=
=
=
=
=
=
=
=
=

Simple WITH Trans


V
e
NC

14

Simple WITH Trans


Sta CS
Sta SC
Sta. PT;ST

=
=
=

9 + 438
9 + 349
9 + 475

V
e
NC

=
=
=

50
0.03
0.02

kph

4.018
6.7713
=
=
=
=
=
=
=
=
=
=

Lw
S
SR%
TR
SR

9+
9+
9+
9+
9+
9+
9+
9+
9+
9+

349
344
346
342
338
438
443
449
453
457

Designers:

Sta E
Sta D
Sta C
Sta B
Sta A
Sta E'
Sta D'
Sta C'
Sta B'
Sta A'

Project & Location:

=
=
=
=
=
=
=
=
=
=

Approved By:

=
=

=
=
=

3.5
57.4
75

Sta CS
=
Sta SC
=
Sta. PT;ST =

(Nc)(Lw)(S)
(e)(Lw)(S)

9 + 930
9 + 862
9 + 967

= 4.018
= 6.7713

Sta SC
Sta E-(%SR)*SR
Sta E-SR+TR
Sta C-TR
Sta B-TR
Sta CS
Sta E'+(%SR)*SR
Sta E+SR-TR
Sta C'-TR
Sta B'-TR

=
=
=
=
=
=
=
=
=
=

9+
9+
9+
9+
9+
9+
9+
9+
9+
9+

862
857
859
855
851
930
935
941
945
949

Sheet Content:

Reyes, Ma. Karisse P.


Santillan, Jan Sherwin F.

Uy, Kwin Juvy H.

PROPOSED 20 KM ARTERIAL
ROAD LAGUNA

ENGR. MANUEL M. MUHI


(Instructor)

SUPERELEVATION COMPUTATION

Sheet No.

CURVE NO.

17

CURVE NO.

Simple WITH Trans


V
e
NC

=
=
=

50
0.03
0.02

kph

Lw
S
SR%
TR
SR

Sta E
Sta D
Sta C
Sta B
Sta A
Sta E'
Sta D'
Sta C'
Sta B'
Sta A'

=
=
=

3.5
57.4
75

(Nc)(Lw)(S)
(e)(Lw)(S)

=
=

=
=

Sta SC
Sta E-(%SR)*SR
Sta E-SR+TR
Sta C-TR
Sta B-TR
Sta CS
Sta E'+(%SR)*SR
Sta E+SR-TR
Sta C'-TR
Sta B'-TR

=
=
=
=
=
=
=
=
=
=

10 + 430
10 + 362
10 + 467

V
e
NC

=
=
=

50
0.03
0.02

kph

4.018
6.7713

Lw
S
SR%
TR
SR

10+
10+
10+
10+
10+
10+
10+
10+
10+
10+

=
=
=
=
=
=
=
=
=
=

CURVE NO.

=
=
=

362
357
359
355
351
430
435
441
445
449

Sta E
Sta D
Sta C
Sta B
Sta A
Sta E'
Sta D'
Sta C'
Sta B'
Sta A'

=
=
=

50
0.03
0.02

kph

Lw
S
SR%
TR
SR

Sta E
Sta D
Sta C
Sta B
Sta A
Sta E'
Sta D'
Sta C'
Sta B'
Sta A'

=
=
=
=
=
=
=
=
=
=

=
=

=
=
=

3.2
57.4
75

19

(Nc)(Lw)(S)
(e)(Lw)(S)
Sta SC
Sta E-(%SR)*SR
Sta E-SR+TR
Sta C-TR
Sta B-TR
Sta CS
Sta E'+(%SR)*SR
Sta E+SR-TR
Sta C'-TR
Sta B'-TR

3.2
57.4
75

Sta CS
=
Sta SC
=
Sta. PT;ST =

10 + 921
10 + 875
10 + 959

= 3.6736
= 6.1909

Sta SC
Sta E-(%SR)*SR
Sta E-SR+TR
Sta C-TR
Sta B-TR
Sta CS
Sta E'+(%SR)*SR
Sta E+SR-TR
Sta C'-TR
Sta B'-TR

CURVE NO.

10+
10+
10+
10+
10+
10+
10+
10+
10+
10+

=
=
=
=
=
=
=
=
=
=

875
870
872
868
865
921
926
931
935
939

20

Simple WITH Trans


Sta CS
Sta SC
Sta. PT;ST

=
=

=
=
=

(Nc)(Lw)(S)
(e)(Lw)(S)

=
=

=
=
=
=
=
=
=
=
=
=

Simple WITH Trans


V
e
NC

18

Simple WITH Trans


Sta CS
Sta SC
Sta. PT;ST

=
=
=

11 + 417
11 + 381
11 + 454

V
e
NC

=
=
=

50
0.03
0.02

kph

3.6736
6.1909
=
=
=
=
=
=
=
=
=
=

Lw
S
SR%
TR
SR

11+
11+
11+
11+
11+
11+
11+
11+
11+
11+

381
376
378
374
371
417
421
427
430
434

Designers:

Sta E
Sta D
Sta C
Sta B
Sta A
Sta E'
Sta D'
Sta C'
Sta B'
Sta A'

Project & Location:

=
=
=
=
=
=
=
=
=
=

Approved By:

=
=

=
=
=

3.2
57.4
75

Sta CS
=
Sta SC
=
Sta. PT;ST =

(Nc)(Lw)(S)
(e)(Lw)(S)

11 + 907
11 + 892
11 + 944

= 3.6736
= 6.1909

Sta SC
Sta E-(%SR)*SR
Sta E-SR+TR
Sta C-TR
Sta B-TR
Sta CS
Sta E'+(%SR)*SR
Sta E+SR-TR
Sta C'-TR
Sta B'-TR

=
=
=
=
=
=
=
=
=
=

11+
11+
11+
11+
11+
11+
11+
11+
11+
11+

892
887
889
886
882
907
912
917
921
924

Sheet Content:

Reyes, Ma. Karisse P.


Santillan, Jan Sherwin F.

Uy, Kwin Juvy H.

PROPOSED 20 KM ARTERIAL
ROAD LAGUNA

ENGR. MANUEL M. MUHI


(Instructor)

SUPERELEVATION COMPUTATION

Sheet No.

CURVE NO.

21

CURVE NO.

Simple WITH Trans


V
e
NC

=
=
=

50
0.03
0.02

kph

Lw
S
SR%
TR
SR

Sta E
Sta D
Sta C
Sta B
Sta A
Sta E'
Sta D'
Sta C'
Sta B'
Sta A'

=
=
=

3.2
57.4
75

(Nc)(Lw)(S)
(e)(Lw)(S)

=
=

=
=

Sta SC
Sta E-(%SR)*SR
Sta E-SR+TR
Sta C-TR
Sta B-TR
Sta CS
Sta E'+(%SR)*SR
Sta E+SR-TR
Sta C'-TR
Sta B'-TR

=
=
=
=
=
=
=
=
=
=

12 + 430
12 + 362
12 + 467

V
e
NC

=
=
=

50
0.03
0.02

kph

3.6736
6.1909

Lw
S
SR%
TR
SR

12+
12+
12+
12+
12+
12+
12+
12+
12+
12+

=
=
=
=
=
=
=
=
=
=

CURVE NO.

=
=
=

362
358
360
356
352
430
435
440
444
447

Sta E
Sta D
Sta C
Sta B
Sta A
Sta E'
Sta D'
Sta C'
Sta B'
Sta A'

=
=
=

50
0.03
0.02

kph

Lw
S
SR%
TR
SR

Sta E
Sta D
Sta C
Sta B
Sta A
Sta E'
Sta D'
Sta C'
Sta B'
Sta A'

=
=
=
=
=
=
=
=
=
=

=
=

=
=
=

3.5
57.4
75

23

(Nc)(Lw)(S)
(e)(Lw)(S)
Sta SC
Sta E-(%SR)*SR
Sta E-SR+TR
Sta C-TR
Sta B-TR
Sta CS
Sta E'+(%SR)*SR
Sta E+SR-TR
Sta C'-TR
Sta B'-TR

3.2
57.4
75

Sta CS
=
Sta SC
=
Sta. PT;ST =

12 + 948
12 + 817
12 + 985

= 3.6736
= 6.1909

Sta SC
Sta E-(%SR)*SR
Sta E-SR+TR
Sta C-TR
Sta B-TR
Sta CS
Sta E'+(%SR)*SR
Sta E+SR-TR
Sta C'-TR
Sta B'-TR

CURVE NO.

12+
12+
12+
12+
12+
12+
12+
12+
12+
12+

=
=
=
=
=
=
=
=
=
=

817
812
815
811
807
948
953
958
962
965

24

Simple WITH Trans


Sta CS
Sta SC
Sta. PT;ST

=
=

=
=
=

(Nc)(Lw)(S)
(e)(Lw)(S)

=
=

=
=
=
=
=
=
=
=
=
=

Simple WITH Trans


V
e
NC

22

Simple WITH Trans


Sta CS
Sta SC
Sta. PT;ST

=
=
=

13 + 430
13 + 362
13 + 467

V
e
NC

=
=
=

50
0.03
0.02

kph

4.018
6.7713
=
=
=
=
=
=
=
=
=
=

Lw
S
SR%
TR
SR

0+
0+
0+
0+
0+
0+
0+
0+
0+
0+

000
000
000
000
000
000
000
000
000
000

Designers:

Sta E
Sta D
Sta C
Sta B
Sta A
Sta E'
Sta D'
Sta C'
Sta B'
Sta A'

Project & Location:

=
=
=
=
=
=
=
=
=
=

Approved By:

=
=

=
=
=

3.5
57.4
75

Sta CS
=
Sta SC
=
Sta. PT;ST =

(Nc)(Lw)(S)
(e)(Lw)(S)

13 + 930
13 + 862
13 + 967

= 4.018
= 6.7713

Sta SC
Sta E-(%SR)*SR
Sta E-SR+TR
Sta C-TR
Sta B-TR
Sta CS
Sta E'+(%SR)*SR
Sta E+SR-TR
Sta C'-TR
Sta B'-TR

=
=
=
=
=
=
=
=
=
=

0+
0+
0+
0+
0+
0+
0+
0+
0+
0+

000
000
000
000
000
000
000
000
000
000

Sheet Content:

Reyes, Ma. Karisse P.


Santillan, Jan Sherwin F.

Uy, Kwin Juvy H.

PROPOSED 20 KM ARTERIAL
ROAD LAGUNA

ENGR. MANUEL M. MUHI


(Instructor)

SUPERELEVATION COMPUTATION

Sheet No.

CURVE NO.

25

CURVE NO.

Simple WITH Trans


V
e
NC

=
=
=

50
0.03
0.02

kph

Lw
S
SR%
TR
SR

Sta E
Sta D
Sta C
Sta B
Sta A
Sta E'
Sta D'
Sta C'
Sta B'
Sta A'

=
=
=

3.5
57.4
75

(Nc)(Lw)(S)
(e)(Lw)(S)

=
=

=
=

Sta SC
Sta E-(%SR)*SR
Sta E-SR+TR
Sta C-TR
Sta B-TR
Sta CS
Sta E'+(%SR)*SR
Sta E+SR-TR
Sta C'-TR
Sta B'-TR

=
=
=
=
=
=
=
=
=
=

14 + 450
14 + 298
14 + 487

V
e
NC

=
=
=

50
0.03
0.02

kph

Lw
S
SR%
TR
SR

0+
0+
0+
0+
0+
0+
0+
0+
0+
0+

=
=
=
=
=
=
=
=
=
=

CURVE NO.

=
=
=

4.018
6.7713
000
000
000
000
000
000
000
000
000
000

Sta E
Sta D
Sta C
Sta B
Sta A
Sta E'
Sta D'
Sta C'
Sta B'
Sta A'

=
=
=

50
0.03
0.02

kph

Lw
S
SR%
TR
SR

Sta E
Sta D
Sta C
Sta B
Sta A
Sta E'
Sta D'
Sta C'
Sta B'
Sta A'

=
=
=

3.5
57.4
75

27

(Nc)(Lw)(S)
(e)(Lw)(S)

=
=

=
=

15 + 614
15 + 584
15 + 651

V
e
NC

=
=
=

50
0.03
0.02

kph

4.018
6.7713

50
0.03
0.02

kph

Lw
S
SR%
TR
SR

Sta E
Sta D
Sta C
Sta B
Sta A
Sta E'
Sta D'
Sta C'
Sta B'
Sta A'

=
=
=

3.5
57.4
75

(Nc)(Lw)(S)
(e)(Lw)(S)

=
=

000
000
000
000
000
000
000
000
000
000

Sta E
Sta D
Sta C
Sta B
Sta A
Sta E'
Sta D'
Sta C'
Sta B'
Sta A'

=
=

50
0.03
0.02

kph

Lw
S
SR%
TR
SR

Sta E
Sta D
Sta C
Sta B
Sta A
Sta E'
Sta D'
Sta C'
Sta B'
Sta A'

=
=
=

3.5
57.4
75

(Nc)(Lw)(S)
(e)(Lw)(S)

=
=

=
=
=

16 + 725
16 + 670
16 + 762

V
e
NC

=
=
=

50
0.03
0.02

kph

4.018
6.7713

TR
SR
0+
0+
0+
0+
0+
0+
0+
0+
0+
0+

000
000
000
000
000
000
000
000
000
000

Sta E
Sta D
Sta C
Sta B
Sta A
Sta E'
Sta D'
Sta C'
Sta B'
Sta A'

50
0.03
0.02

kph

Lw
S
SR%
TR
SR

Sta E
Sta D
Sta C
Sta B
Sta A
Sta E'
Sta D'
Sta C'
Sta B'
Sta A'

=
=
=

3.5
57.4
75

(Nc)(Lw)(S)
(e)(Lw)(S)

=
=

=
=
=

17 + 807
17 + 792
17 + 844

V
e
NC

=
=
=

50
0.03
0.02

kph

4.018
6.7713

TR
SR
0+
0+
0+
0+
0+
0+
0+
0+
0+
0+

000
000
000
000
000
000
000
000
000
000

Sta E
Sta D
Sta C
Sta B
Sta A
Sta E'
Sta D'
Sta C'
Sta B'
Sta A'

50
0.03
0.02

kph

Lw
S
SR%
TR
SR

Sta E
Sta D
Sta C
Sta B
Sta A
Sta E'
Sta D'
Sta C'
Sta B'
Sta A'

=
=
=

3.5
57.4
75

(Nc)(Lw)(S)
(e)(Lw)(S)

=
=

=
=

=
=
=

18 + 924
18 + 871
18 + 961

V
e
NC

=
=
=

50
0.03
0.02

kph

50
0.03
0.02

kph

Lw
S
SR%
TR
SR

Sta E
Sta D
Sta C
Sta B
Sta A
Sta E'
Sta D'
Sta C'
Sta B'
Sta A'

=
=
=

3.5
57.4
75

(Nc)(Lw)(S)
(e)(Lw)(S)

=
=

000
000
000
000
000
000
000
000
000
000

Sta E
Sta D
Sta C
Sta B
Sta A
Sta E'
Sta D'
Sta C'
Sta B'
Sta A'

=
=

50
0.03
0.02

kph

Lw
S
SR%
TR
SR

Sta E
Sta D
Sta C
Sta B
Sta A
Sta E'
Sta D'
Sta C'
Sta B'
Sta A'

=
=
=

3.5
57.4
75

(Nc)(Lw)(S)
(e)(Lw)(S)

=
=

=
=
=

20 + 057
20 + 042
20 + 094

V
e
NC

=
=
=

50
0.03
0.02

kph

4.018
6.7713

TR
SR
0+
0+
0+
0+
0+
0+
0+
0+
0+
0+

000
000
000
000
000
000
000
000
000
000

Sta E
Sta D
Sta C
Sta B
Sta A
Sta E'
Sta D'
Sta C'
Sta B'
Sta A'

95
0.09
0.02

kph

Lw
S
SR%
TR
SR

Sta E
Sta D
Sta C
Sta B
Sta A
Sta E'
Sta D'
Sta C'
Sta B'
Sta A'

=
=
=

21 + 156
21 + 143
21 + 193

V
e
NC

=
=
=

50
0.03
0.02

kph

4.018
6.7713
000
000
000
000
000
000
000
000
000
000

Sta E
Sta D
Sta C
Sta B
Sta A
Sta E'
Sta D'
Sta C'
Sta B'
Sta A'

39

95
0.09
0.02

kph

Lw
S
SR%
TR
SR

Sta E
Sta D
Sta C
Sta B
Sta A
Sta E'
Sta D'
Sta C'
Sta B'
Sta A'

=
=

=
=
=

#VALUE!
#VALUE!
#VALUE!

V
e
NC

=
=
=

50
0.03
0.02

kph

4.018
6.7713

TR
SR
0+
0+
0+
0+
0+
0+
0+
0+
0+
0+

=
=
=
=
=
=
=
=
=
=

000
000
000
000
000
000
000
000
000
000

Sta E
Sta D
Sta C
Sta B
Sta A
Sta E'
Sta D'
Sta C'
Sta B'
Sta A'

95
0.09
0.02

kph

TR
SR
Sta E
Sta D
Sta C
Sta B
Sta A
Sta E'
Sta D'
Sta C'
Sta B'
Sta A'

=
=

=
=
=

----------

V
e
NC

=
=
=

95
0.09
0.02

kph

10.92
49.14
000
000
000
000
000
000
000
000
000
000

Sta E
Sta D
Sta C
Sta B
Sta A
Sta E'
Sta D'
Sta C'
Sta B'
Sta A'

43

95
0.09
0.02

kph

Lw
S
SR%
TR
SR

Sta E
Sta D
Sta C
Sta B
Sta A
Sta E'
Sta D'
Sta C'
Sta B'
Sta A'

=
=
=

24 + 556
24 + 318
24 + 643

V
e
NC

=
=
=

95
0.09
0.02

kph

10.92
49.14
000
000
000
000
000
000
000
000
000
000

Sta E
Sta D
Sta C
Sta B
Sta A
Sta E'
Sta D'
Sta C'
Sta B'
Sta A'

45

95
0.09
0.02

kph

Lw
S
SR%
TR
SR

Sta E
Sta D
Sta C
Sta B
Sta A
Sta E'
Sta D'
Sta C'
Sta B'
Sta A'

=
=
=

25 + 623
25 + 466
25 + 711

V
e
NC

=
=
=

95
0.09
0.02

kph

10.92
49.14

0+
0+
0+
0+
0+
0+
0+
0+
0+
0+

=
=
=
=
=
=
=
=
=
=

3.5
57.4
75

000
000
000
000
000
000
000
000
000
000

40

Sta CS
=
Sta SC
=
Sta. PT;ST =

----------

= 4.018
= 6.7713
=
=
=
=
=
=
=
=
=
=

0+
0+
0+
0+
0+
0+
0+
0+
0+
0+

000
000
000
000
000
000
000
000
000
000

42

= 3.12 m
175
=
= 68.611
=
=

Sta CS
=
Sta SC
=
Sta. PT;ST =

23 + 961
23 + 938
24 + 049

10.92
49.14
=
=
=
=
=
=
=
=
=
=

0+
0+
0+
0+
0+
0+
0+
0+
0+
0+

000
000
000
000
000
000
000
000
000
000

44

= 3.12 m
175
=
= 68.611
=
=

Sta SC
Sta E-(%SR)*SR
Sta E-SR+TR
Sta C-TR
Sta B-TR
Sta CS
Sta E'+(%SR)*SR
Sta E+SR-TR
Sta C'-TR
Sta B'-TR

Lw
S
SR%
TR
SR

0+
0+
0+
0+
0+
0+
0+
0+
0+
0+

=
=
=
=
=
=
=
=
=
=

000
000
000
000
000
000
000
000
000
000

Sta E
Sta D
Sta C
Sta B
Sta A
Sta E'
Sta D'
Sta C'
Sta B'
Sta A'

Sta CS
=
Sta SC
=
Sta. PT;ST =

25 + 096
24 + 999
25 + 184

10.92
49.14
=
=
=
=
=
=
=
=
=
=

0+
0+
0+
0+
0+
0+
0+
0+
0+
0+

000
000
000
000
000
000
000
000
000
000

46

= 3.12 m
175
=
= 68.611
(Nc)(Lw)(S)
(e)(Lw)(S)

=
=

=
=

Sta SC
Sta E-(%SR)*SR
Sta E-SR+TR
Sta C-TR
Sta B-TR
Sta CS
Sta E'+(%SR)*SR
Sta E+SR-TR
Sta C'-TR
Sta B'-TR

=
=
=
=
=
=
=
=
=
=

47

CURVE NO.

Sta CS
=
Sta SC
=
Sta. PT;ST =

26 + 115
25 + 976
26 + 203

10.92
49.14
=
=
=
=
=
=
=
=
=
=

13+
13+
13+
13+
13+
13+
13+
13+
13+
13+

362
357
359
355
351
430
435
441
445
449

48

Simple WITH Trans

=
=

Sta CS
Sta SC
Sta. PT;ST

=
=
=

26 + 775
26 + 482
26 + 863

V
e
NC

=
=
=

95
0.09
0.02

kph

10.92
49.14

Lw
S
SR%
TR
SR

13+
13+
13+
13+
13+
13+
13+
13+
13+
13+

=
=
=
=
=
=
=
=
=
=

862
857
859
855
851
930
935
941
945
949

Sta E
Sta D
Sta C
Sta B
Sta A
Sta E'
Sta D'
Sta C'
Sta B'
Sta A'

= 3.12 m
175
=
= 68.611
(Nc)(Lw)(S)
(e)(Lw)(S)

=
=

=
=

Sta SC
Sta E-(%SR)*SR
Sta E-SR+TR
Sta C-TR
Sta B-TR
Sta CS
Sta E'+(%SR)*SR
Sta E+SR-TR
Sta C'-TR
Sta B'-TR

=
=
=
=
=
=
=
=
=
=

49

CURVE NO.

Sta CS
=
Sta SC
=
Sta. PT;ST =

27 + 249
27 + 029
27 + 336

10.92
49.14
=
=
=
=
=
=
=
=
=
=

14+
14+
14+
14+
14+
14+
14+
14+
14+
14+

298
293
295
291
287
450
455
460
464
469

50

Simple WITH Trans

=
=

Sta SC
Sta E-(%SR)*SR
Sta E-SR+TR
Sta C-TR
Sta B-TR
Sta CS
Sta E'+(%SR)*SR
Sta E+SR-TR
Sta C'-TR
Sta B'-TR

Sta CS
Sta SC
Sta. PT;ST

=
=
=

27 + 877
27 + 578
27 + 965

V
e
NC

=
=
=

95
0.09
0.02

kph

10.92
49.14

Lw
S
SR%
TR
SR

14+
14+
14+
14+
14+
14+
14+
14+
14+
14+

=
=
=
=
=
=
=
=
=
=

CURVE NO.

=
=
=

CURVE NO.

Sta CS
Sta SC
Sta. PT;ST

= 3.12
m
175
=
= 68.611
(Nc)(Lw)(S)
(e)(Lw)(S)

=
=

=
=
=
=
=
=
=
=
=
=

#VALUE!
#VALUE!
#VALUE!

Simple WITH Trans

=
=

CURVE NO.

=
=
=

Sta CS
=
Sta SC
=
Sta. PT;ST =

= 4.018
= 6.7713

(Nc)(Lw)(S)
(e)(Lw)(S)

=
=

=
=
=
=
=
=
=
=
=
=

Simple WITH Trans


V
e
NC

20 + 656
20 + 643
20 + 693

000
000
000
000
000
000
000
000
000
000

38

Sta SC
Sta E-(%SR)*SR
Sta E-SR+TR
Sta C-TR
Sta B-TR
Sta CS
Sta E'+(%SR)*SR
Sta E+SR-TR
Sta C'-TR
Sta B'-TR

Lw
S
SR%
TR
SR

0+
0+
0+
0+
0+
0+
0+
0+
0+
0+

=
=
=
=
=
=
=
=
=
=

Sta SC
Sta E-(%SR)*SR
Sta E-SR+TR
Sta C-TR
Sta B-TR
Sta CS
Sta E'+(%SR)*SR
Sta E+SR-TR
Sta C'-TR
Sta B'-TR

=
=
=
=
=
=
=
=
=
=

3.5
57.4
75

CURVE NO.

Sta CS
Sta SC
Sta. PT;ST

= 3.12
m
175
=
= 68.611
(Nc)(Lw)(S)
(e)(Lw)(S)

=
=

0+
0+
0+
0+
0+
0+
0+
0+
0+
0+

=
=
=
=
=
=
=
=
=
=

Simple WITH Trans

=
=

CURVE NO.

=
=
=

=
=
=

(Nc)(Lw)(S)
(e)(Lw)(S)

=
=

=
=
=
=
=
=
=
=
=
=

Simple WITH Trans


V
e
NC

Sta CS
=
Sta SC
=
Sta. PT;ST =

= 4.018
= 6.7713

Sta SC
Sta E-(%SR)*SR
Sta E-SR+TR
Sta C-TR
Sta B-TR
Sta CS
Sta E'+(%SR)*SR
Sta E+SR-TR
Sta C'-TR
Sta B'-TR

Lw
S
SR%
TR
SR

0+
0+
0+
0+
0+
0+
0+
0+
0+
0+

=
=
=
=
=
=
=
=
=
=

Sta SC
Sta E-(%SR)*SR
Sta E-SR+TR
Sta C-TR
Sta B-TR
Sta CS
Sta E'+(%SR)*SR
Sta E+SR-TR
Sta C'-TR
Sta B'-TR

=
=
=
=
=
=
=
=
=
=

000
000
000
000
000
000
000
000
000
000

36

CURVE NO.

Sta CS
Sta SC
Sta. PT;ST

= 3.12
m
175
=
= 68.611
(Nc)(Lw)(S)
(e)(Lw)(S)

=
=

19 + 555
19 + 544
19 + 592

Simple WITH Trans

Sta SC
Sta E-(%SR)*SR
Sta E-SR+TR
Sta C-TR
Sta B-TR
Sta CS
Sta E'+(%SR)*SR
Sta E+SR-TR
Sta C'-TR
Sta B'-TR

Lw
S
SR%

3.5
57.4
75

(Nc)(Lw)(S)
(e)(Lw)(S)

=
=

=
=
=
=
=
=
=
=
=
=

41

CURVE NO.

=
=
=

0+
0+
0+
0+
0+
0+
0+
0+
0+
0+

=
=
=
=
=
=
=
=
=
=

Sta SC
Sta E-(%SR)*SR
Sta E-SR+TR
Sta C-TR
Sta B-TR
Sta CS
Sta E'+(%SR)*SR
Sta E+SR-TR
Sta C'-TR
Sta B'-TR

Lw
S
SR%

Simple WITH Trans


V
e
NC

=
=
=

CURVE NO.

= 3.12
m
175
=
= 68.611
(Nc)(Lw)(S)
(e)(Lw)(S)

=
=

=
=
=
=
=
=
=
=
=
=

Sta CS
=
Sta SC
=
Sta. PT;ST =

= 4.018
= 6.7713

Simple WITH Trans


Sta CS
Sta SC
Sta. PT;ST

CURVE NO.

=
=
=

000
000
000
000
000
000
000
000
000
000

34

(Nc)(Lw)(S)
(e)(Lw)(S)

=
=

=
=
=
=
=
=
=
=
=
=

Simple WITH Trans


V
e
NC

0+
0+
0+
0+
0+
0+
0+
0+
0+
0+

=
=
=
=
=
=
=
=
=
=

Sta SC
Sta E-(%SR)*SR
Sta E-SR+TR
Sta C-TR
Sta B-TR
Sta CS
Sta E'+(%SR)*SR
Sta E+SR-TR
Sta C'-TR
Sta B'-TR

Lw
S
SR%
TR
SR

0+
0+
0+
0+
0+
0+
0+
0+
0+
0+

=
=
=
=
=
=
=
=
=
=

Sta SC
Sta E-(%SR)*SR
Sta E-SR+TR
Sta C-TR
Sta B-TR
Sta CS
Sta E'+(%SR)*SR
Sta E+SR-TR
Sta C'-TR
Sta B'-TR

=
=
=
=
=
=
=
=
=
=

3.5
57.4
75

CURVE NO.

Sta CS
Sta SC
Sta. PT;ST

= 3.12
m
175
=
= 68.611
(Nc)(Lw)(S)
(e)(Lw)(S)

=
=

18 + 414
18 + 384
18 + 451

Simple WITH Trans

=
=

CURVE NO.

=
=
=

=
=
=

(Nc)(Lw)(S)
(e)(Lw)(S)

=
=

=
=
=
=
=
=
=
=
=
=

Simple WITH Trans


V
e
NC

Sta CS
=
Sta SC
=
Sta. PT;ST =

= 4.018
= 6.7713

Sta SC
Sta E-(%SR)*SR
Sta E-SR+TR
Sta C-TR
Sta B-TR
Sta CS
Sta E'+(%SR)*SR
Sta E+SR-TR
Sta C'-TR
Sta B'-TR

Lw
S
SR%

37

Sta SC
Sta E-(%SR)*SR
Sta E-SR+TR
Sta C-TR
Sta B-TR
Sta CS
Sta E'+(%SR)*SR
Sta E+SR-TR
Sta C'-TR
Sta B'-TR

=
=
=
=
=
=
=
=
=
=

32

CURVE NO.

=
=
=
=
=
=
=
=
=
=

CURVE NO.

=
=
=

17 + 301
17 + 298
17 + 338

000
000
000
000
000
000
000
000
000
000

Simple WITH Trans


Sta CS
Sta SC
Sta. PT;ST

Simple WITH Trans


V
e
NC

3.5
57.4
75

(Nc)(Lw)(S)
(e)(Lw)(S)

=
=

=
=
=
=
=
=
=
=
=
=

35

Sta SC
Sta E-(%SR)*SR
Sta E-SR+TR
Sta C-TR
Sta B-TR
Sta CS
Sta E'+(%SR)*SR
Sta E+SR-TR
Sta C'-TR
Sta B'-TR

=
=
=
=
=
=
=
=
=
=

0+
0+
0+
0+
0+
0+
0+
0+
0+
0+

=
=
=
=
=
=
=
=
=
=

Sta SC
Sta E-(%SR)*SR
Sta E-SR+TR
Sta C-TR
Sta B-TR
Sta CS
Sta E'+(%SR)*SR
Sta E+SR-TR
Sta C'-TR
Sta B'-TR

Lw
S
SR%
TR
SR

0+
0+
0+
0+
0+
0+
0+
0+
0+
0+

=
=
=
=
=
=
=
=
=
=

CURVE NO.

=
=
=

=
=
=

CURVE NO.

Sta CS
Sta SC
Sta. PT;ST
4.018
6.7713

Simple WITH Trans


V
e
NC

Sta CS
=
Sta SC
=
Sta. PT;ST =

= 4.018
= 6.7713

Simple WITH Trans

Sta SC
Sta E-(%SR)*SR
Sta E-SR+TR
Sta C-TR
Sta B-TR
Sta CS
Sta E'+(%SR)*SR
Sta E+SR-TR
Sta C'-TR
Sta B'-TR

=
=
=
=
=
=
=
=
=
=

16 + 230
16 + 162
16 + 267

000
000
000
000
000
000
000
000
000
000

30

(Nc)(Lw)(S)
(e)(Lw)(S)

=
=

=
=
=
=
=
=
=
=
=
=

33

CURVE NO.

=
=
=

3.5
57.4
75

Sta SC
Sta E-(%SR)*SR
Sta E-SR+TR
Sta C-TR
Sta B-TR
Sta CS
Sta E'+(%SR)*SR
Sta E+SR-TR
Sta C'-TR
Sta B'-TR

Lw
S
SR%

Simple WITH Trans


V
e
NC

=
=
=

CURVE NO.

Sta CS
Sta SC
Sta. PT;ST

=
=
=
=
=
=
=
=
=
=

Sta SC
Sta E-(%SR)*SR
Sta E-SR+TR
Sta C-TR
Sta B-TR
Sta CS
Sta E'+(%SR)*SR
Sta E+SR-TR
Sta C'-TR
Sta B'-TR

=
=
=
=
=
=
=
=
=
=

0+
0+
0+
0+
0+
0+
0+
0+
0+
0+

=
=
=
=
=
=
=
=
=
=

Simple WITH Trans

=
=

CURVE NO.

=
=
=

Sta CS
=
Sta SC
=
Sta. PT;ST =

= 4.018
= 6.7713

(Nc)(Lw)(S)
(e)(Lw)(S)

=
=

=
=
=
=
=
=
=
=
=
=

Simple WITH Trans


V
e
NC

000
000
000
000
000
000
000
000
000
000

28

Sta SC
Sta E-(%SR)*SR
Sta E-SR+TR
Sta C-TR
Sta B-TR
Sta CS
Sta E'+(%SR)*SR
Sta E+SR-TR
Sta C'-TR
Sta B'-TR

Lw
S
SR%

31

Sta SC
Sta E-(%SR)*SR
Sta E-SR+TR
Sta C-TR
Sta B-TR
Sta CS
Sta E'+(%SR)*SR
Sta E+SR-TR
Sta C'-TR
Sta B'-TR

=
=
=
=
=
=
=
=
=
=

3.5
57.4
75

CURVE NO.

=
=
=
=
=
=
=
=
=
=

CURVE NO.

=
=
=

0+
0+
0+
0+
0+
0+
0+
0+
0+
0+

=
=
=
=
=
=
=
=
=
=

Simple WITH Trans


Sta CS
Sta SC
Sta. PT;ST

Simple WITH Trans


V
e
NC

=
=
=

(Nc)(Lw)(S)
(e)(Lw)(S)

=
=

=
=
=
=
=
=
=
=
=
=

29

Sta SC
Sta E-(%SR)*SR
Sta E-SR+TR
Sta C-TR
Sta B-TR
Sta CS
Sta E'+(%SR)*SR
Sta E+SR-TR
Sta C'-TR
Sta B'-TR

=
=
=
=
=
=
=
=
=
=

14 + 907
14 + 892
14 + 944

= 4.018
= 6.7713

Sta SC
Sta E-(%SR)*SR
Sta E-SR+TR
Sta C-TR
Sta B-TR
Sta CS
Sta E'+(%SR)*SR
Sta E+SR-TR
Sta C'-TR
Sta B'-TR

Lw
S
SR%
TR
SR

0+
0+
0+
0+
0+
0+
0+
0+
0+
0+

=
=
=
=
=
=
=
=
=
=

CURVE NO.

=
=
=

Sta CS
=
Sta SC
=
Sta. PT;ST =

CURVE NO.

=
=
=

Simple WITH Trans


V
e
NC

3.5
57.4
75

Simple WITH Trans


Sta CS
Sta SC
Sta. PT;ST

Sta SC
Sta E-(%SR)*SR
Sta E-SR+TR
Sta C-TR
Sta B-TR
Sta CS
Sta E'+(%SR)*SR
Sta E+SR-TR
Sta C'-TR
Sta B'-TR

=
=
=
=
=
=
=
=
=
=

=
=
=

(Nc)(Lw)(S)
(e)(Lw)(S)

=
=

=
=
=
=
=
=
=
=
=
=

Simple WITH Trans


V
e
NC

26

Simple WITH Trans


Sta CS
Sta SC
Sta. PT;ST

892
887
889
885
881
907
912
918
922
926

Sta E
Sta D
Sta C
Sta B
Sta A
Sta E'
Sta D'
Sta C'
Sta B'
Sta A'

=
=
=
=
=
=
=
=
=
=

=
=

= 3.12 m
175
=
= 68.611
(Nc)(Lw)(S)
(e)(Lw)(S)

=
=

Sta SC
Sta E-(%SR)*SR
Sta E-SR+TR
Sta C-TR
Sta B-TR
Sta CS
Sta E'+(%SR)*SR
Sta E+SR-TR
Sta C'-TR
Sta B'-TR

Sta CS
=
Sta SC
=
Sta. PT;ST =

28 + 418
28 + 272
28 + 506

10.92
49.14
=
=
=
=
=
=
=
=
=
=

0+
0+
0+
0+
0+
0+
0+
0+
0+
0+

000
000
000
000
000
000
000
000
000
000

51

Simple WITH Trans


V
e
NC

=
=
=

95
0.09
0.02

kph

Lw
S
SR%
TR
SR

Sta E
Sta D
Sta C
Sta B
Sta A
Sta E'
Sta D'
Sta C'
Sta B'
Sta A'

=
=
=
=
=
=
=
=
=
=

=
=

= 3.12
m
175
=
= 68.611
(Nc)(Lw)(S)
(e)(Lw)(S)

=
=

Sta SC
Sta E-(%SR)*SR
Sta E-SR+TR
Sta C-TR
Sta B-TR
Sta CS
Sta E'+(%SR)*SR
Sta E+SR-TR
Sta C'-TR
Sta B'-TR

Designers:

Sta CS
Sta SC
Sta. PT;ST

=
=
=

28 + 893
28 + 803
28 + 981

10.92
49.14
=
=
=
=
=
=
=
=
=
=

0+
0+
0+
0+
0+
0+
0+
0+
0+
0+

000
000
000
000
000
000
000
000
000
000

Project & Location:

Approved By:

Sheet Content:

Sheet No.

Reyes, Ma. Karisse P.


Santillan, Jan Sherwin F.

Uy, Kwin Juvy H.

PROPOSED 20 KM ARTERIAL
ROAD LAGUNA

ENGR. MANUEL M. MUHI

SUPERELEVATION COMPUTATION

PROPOSED 20 KM ARTERIAL
ROAD LAGUNA
(Instructor)

TRAFFIC FORECASTING
(OPTION NO.1)

URBAN
LEVEL :

ROLLING :
2325
6
20

Average Daily Traffic, ADT :


Traffic Growth, i :
Design Years, n :

Veh/day
%
yrs.

Types of Vehicles :
Light Vehicles (Cars & Jeepneys)
Heavy Vehicles ( Buses & Trucks)

=
=

65 %
35 %

Light Vehicles (Cars & Jeepneys)


Heavy Vehicles ( Buses & Trucks)

0.0008
1.2

=
=

[Wo (2-18) ](GF)(365) =

70

90

(2-18)

GROWTH FACTOR:

70

DL =

%
08.27 (E+06)

90

(2-18)

[Wo (2-18) ](GF)(365) =

DD =

70

9357090.36

Design Load Factor, DL:


DL =

W18 = (DD)(DL)[ W (2-18) ] =

Designers:

33.07

GF = [( 1+ i )n -1] / i =
W

Major Traffic Contributor, DD:

Design Load Factor, DL:

W18 = (DD)(DL)[ W (2-18) ] =

0.0008
1.2

775.20

Wo (2-18) =

13281226.17

[Wo (2-18) ](GF)(365) =

DD =

=
=

Wo (2-18) = [ (ADT)(%LV)(.0008) ] + [ (ADT)(%HV)(1.2) ]

1100.30

Major Traffic Contributor, DD:

=
=

Light Vehicles (Cars & Jeepneys)


Heavy Vehicles ( Buses & Trucks)

33.07

GF = [( 1+ i )n -1] / i =
13129032.08

Design Load Factor, DL:


DL =

Light Vehicles (Cars & Jeepneys)


Heavy Vehicles ( Buses & Trucks)

0.0008
1.2

=
=

GROWTH FACTOR:
36.79

GF = [( 1+ i )n -1] / i =

Major Traffic Contributor, DD:

Veh/day
%
yrs.

70 %
30 %

Traffic Load Factor :

Wo (2-18) =

GROWTH FACTOR:

DD =

60 %
40 %

Wo (2-18) = [ (ADT)(%LV)(.0008) ] + [ (ADT)(%HV)(1.2) ]

977.71

Wo (2-18) =

=
=

Light Vehicles (Cars & Jeepneys)


Heavy Vehicles ( Buses & Trucks)

Wo (2-18) = [ (ADT)(%LV)(.0008) ] + [ (ADT)(%HV)(1.2) ]

2150
5
20

Average Daily Traffic, ADT :


Traffic Growth, i :
Design Years, n :
Types of Vehicles :

Traffic Load Factor :

Light Vehicles (Cars & Jeepneys)


Heavy Vehicles ( Buses & Trucks)

(2-18)

Veh/day
%
yrs.

Types of Vehicles :

Traffic Load Factor :

MOUNTAINOUS :
2290
5
20

Average Daily Traffic, ADT :


Traffic Growth, i :
Design Years, n :

08.37 (E+06)

Project & Location:

90

W18 = (DD)(DL)[ W (2-18) ] =

Approved By:

05.89 (E+06)

Sheet Content:

Reyes, Ma. Karisse P.


Santillan, Jan Sherwin F.

Uy, Kwin Juvy H.

PROPOSED 20 KM ARTERIAL
ROAD LAGUNA

ENGR. MANUEL M. MUHI


(Instructor)

TRAFFIC FORECATING

Sheet No.

TRAFFIC FORECASTING
(OPTION NO.1)
RURAL
LEVEL :

ROLLING :

1800
5
20

Average Daily Traffic, ADT :


Traffic Growth, i :
Design Years, n :

Veh/day
%
yrs.

Types of Vehicles :
=
=

60 %
40 %

Traffic Load Factor :


0.0008
1.2

=
=

33.07

GF = [( 1+ i )n -1] / i =

[Wo (2-18) ](GF)(365) =

70

Light Vehicles (Cars & Jeepneys)


Heavy Vehicles ( Buses & Trucks)

(2-18)

70

DL =
06.58 (E+06)

90

(2-18)

10441868.61

[Wo (2-18) ](GF)(365) =

Major Traffic Contributor, DD:

DD =

70

Design Load Factor, DL:


DL =

W18 = (DD)(DL)[ W (2-18) ] =

Designers:

29.78

GF = [( 1+ i )n -1] / i =
7485672.29

Design Load Factor, DL:


%

W18 = (DD)(DL)[ W (2-18) ] =

04.72 (E+06)

Project & Location:

90

W18 = (DD)(DL)[ W (2-18) ] =

Approved By:

06.58 (E+06)

Sheet Content:

Reyes, Ma. Karisse P.


Santillan, Jan Sherwin F.

Uy, Kwin Juvy H.

0.0008
1.2

960.64

Wo (2-18) =

33.07

[Wo (2-18) ](GF)(365) =

DD =

=
=

Wo (2-18) = [ (ADT)(%LV)(.0008) ] + [ (ADT)(%HV)(1.2) ]

Major Traffic Contributor, DD:

Design Load Factor, DL:


90

Veh/day
%
yrs.

50 %
50 %

GROWTH FACTOR:

GF = [( 1+ i )n -1] / i =
10439335.87

=
=

Traffic Load Factor :


0.0008
1.2

=
=

GROWTH FACTOR:

Major Traffic Contributor, DD:

DL =

Light Vehicles (Cars & Jeepneys)


Heavy Vehicles ( Buses & Trucks)

620.16

Wo (2-18) =

GROWTH FACTOR:

DD =

70 %
30 %

Wo (2-18) = [ (ADT)(%LV)(.0008) ] + [ (ADT)(%HV)(1.2) ]

864.86

Wo (2-18) =

=
=

Light Vehicles (Cars & Jeepneys)


Heavy Vehicles ( Buses & Trucks)

Wo (2-18) = [ (ADT)(%LV)(.0008) ] + [ (ADT)(%HV)(1.2) ]

1600
4
20

Average Daily Traffic, ADT :


Traffic Growth, i :
Design Years, n :
Types of Vehicles :

Light Vehicles (Cars & Jeepneys)


Heavy Vehicles ( Buses & Trucks)
Traffic Load Factor :

Light Vehicles (Cars & Jeepneys)


Heavy Vehicles ( Buses & Trucks)

(2-18)

Veh/day
%
yrs.

Types of Vehicles :

Light Vehicles (Cars & Jeepneys)


Heavy Vehicles ( Buses & Trucks)

MOUNTAINOUS :

1720
5
20

Average Daily Traffic, ADT :


Traffic Growth, i :
Design Years, n :

PROPOSED 20 KM ARTERIAL
ROAD LAGUNA

ENGR. MANUEL M. MUHI


(Instructor)

TRAFFIC FORECATING

Sheet No.

TRAFFIC FORECASTING
(OPTION NO.1)

EXPRESSWAY
LEVEL :

ROLLING :

1900
6
20

Average Daily Traffic, ADT :


Traffic Growth, i :
Design Years, n :

Veh/day
%
yrs.

Types of Vehicles :
=
=

30 %
70 %

Traffic Load Factor :

Light Vehicles (Cars & Jeepneys)


Heavy Vehicles ( Buses & Trucks)

0.0008
1.2

=
=

0.0008
1.2

=
=

[Wo (2-18) ](GF)(365) =

70

(2-18)

70

DL =

%
13.51 (E+06)

90

(2-18)

[Wo (2-18) ](GF)(365) =

DD =

70

10931331.2

Design Load Factor, DL:


DL =

W18 = (DD)(DL)[ W (2-18) ] =

Designers:

29.78

GF = [( 1+ i )n -1] / i =
W

Major Traffic Contributor, DD:

Design Load Factor, DL:

W18 = (DD)(DL)[ W (2-18) ] =

07.99 (E+06)

Project & Location:

90

W18 = (DD)(DL)[ W (2-18) ] =

Approved By:

06.89 (E+06)

Sheet Content:

Reyes, Ma. Karisse P.


Santillan, Jan Sherwin F.

Uy, Kwin Juvy H.

0.0008
1.2

GROWTH FACTOR:

12682526.89

[Wo (2-18) ](GF)(365) =

DD =

=
=

1005.67

Wo (2-18) =

Major Traffic Contributor, DD:

Design Load Factor, DL:


90

Veh/day
%
yrs.

50 %
50 %

Wo (2-18) = [ (ADT)(%LV)(.0008) ] + [ (ADT)(%HV)(1.2) ]

33.07

GF = [( 1+ i )n -1] / i =
21437823.64

=
=

Light Vehicles (Cars & Jeepneys)


Heavy Vehicles ( Buses & Trucks)

1050.70

GROWTH FACTOR:
36.79

GF = [( 1+ i )n -1] / i =

Major Traffic Contributor, DD:

DL =

Light Vehicles (Cars & Jeepneys)


Heavy Vehicles ( Buses & Trucks)
Traffic Load Factor :

Wo (2-18) =

GROWTH FACTOR:

DD =

50 %
50 %

Wo (2-18) = [ (ADT)(%LV)(.0008) ] + [ (ADT)(%HV)(1.2) ]

1596.46

Wo (2-18) =

=
=

Light Vehicles (Cars & Jeepneys)


Heavy Vehicles ( Buses & Trucks)

Wo (2-18) = [ (ADT)(%LV)(.0008) ] + [ (ADT)(%HV)(1.2) ]

1675
4
20

Average Daily Traffic, ADT :


Traffic Growth, i :
Design Years, n :
Types of Vehicles :

Traffic Load Factor :

Light Vehicles (Cars & Jeepneys)


Heavy Vehicles ( Buses & Trucks)

(2-18)

Veh/day
%
yrs.

Types of Vehicles :

Light Vehicles (Cars & Jeepneys)


Heavy Vehicles ( Buses & Trucks)

MOUNTAINOUS :

1750
5
20

Average Daily Traffic, ADT :


Traffic Growth, i :
Design Years, n :

PROPOSED 20 KM ARTERIAL
ROAD LAGUNA

ENGR. MANUEL M. MUHI


(Instructor)

TRAFFIC FORECATING

Sheet No.

DESIGN PAVEMENT VARIABLES


(OPTION NO.1)

URBAN
LEVEL :

ROLLING :

1850
6
20

Average Daily Traffic, ADT :


Traffic Growth, i :
Design Years, n :

Veh/day
%
yrs.

Types of Vehicles :
Light Vehicles (Cars & Jeepneys)
Heavy Vehicles ( Buses & Trucks)

=
=

Light Vehicles (Cars & Jeepneys)


Heavy Vehicles ( Buses & Trucks)

0.0008
1.2

=
=

[Wo (2-18) ](GF)(365) =

Major Traffic Contributor, DD:


70

85

(2-18)

GROWTH FACTOR:

70

DL =
10.65 (E+06)

85

16074329.75

[Wo (2-18) ](GF)(365) =

DD =

70

Design Load Factor, DL:


DL =

W18 = (DD)(DL)[ W (2-18) ] =

Designers:

(2-18)

Major Traffic Contributor, DD:

Design Load Factor, DL:


%

W18 = (DD)(DL)[ W (2-18) ] =

29.78

GF = [( 1+ i )n -1] / i =
16764786.9

[Wo (2-18) ](GF)(365) =

DD =

09.98 (E+06)

Project & Location:

85

W18 = (DD)(DL)[ W (2-18) ] =

Approved By:

09.56 (E+06)

Sheet Content:

Reyes, Ma. Karisse P.


Santillan, Jan Sherwin F.

Uy, Kwin Juvy H.

0.0008
1.2

1478.82

Wo (2-18) =

Major Traffic Contributor, DD:

Design Load Factor, DL:


DL =

=
=

Wo (2-18) = [ (ADT)(%LV)(.0008) ] + [ (ADT)(%HV)(1.2) ]

33.07

GF = [( 1+ i )n -1] / i =
17894484.93

=
=

Light Vehicles (Cars & Jeepneys)


Heavy Vehicles ( Buses & Trucks)

GROWTH FACTOR:
36.79

GF = [( 1+ i )n -1] / i =

DD =

Light Vehicles (Cars & Jeepneys)


Heavy Vehicles ( Buses & Trucks)

1388.90

Wo (2-18) =

GROWTH FACTOR:

Veh/day
%
yrs.

30 %
70 %

Traffic Load Factor :


0.0008
1.2

=
=

Wo (2-18) = [ (ADT)(%LV)(.0008) ] + [ (ADT)(%HV)(1.2) ]

1332.59

Wo (2-18) =

=
=

Light Vehicles (Cars & Jeepneys)


Heavy Vehicles ( Buses & Trucks)

Wo (2-18) = [ (ADT)(%LV)(.0008) ] + [ (ADT)(%HV)(1.2) ]

1760
4
20

Average Daily Traffic, ADT :


Traffic Growth, i :
Design Years, n :
Types of Vehicles :

35 %
65 %

Traffic Load Factor :

Light Vehicles (Cars & Jeepneys)


Heavy Vehicles ( Buses & Trucks)

(2-18)

Veh/day
%
yrs.

Types of Vehicles :
40 %
60 %

Traffic Load Factor :

MOUNTAINOUS :

1780
5
20

Average Daily Traffic, ADT :


Traffic Growth, i :
Design Years, n :

PROPOSED 20 KM ARTERIAL
ROAD LAGUNA

ENGR. MANUEL M. MUHI


(Instructor)

PAVEMENT DESIGN

Sheet No.

DESIGN PAVEMENT VARIABLES


(OPTION NO.1)

RURAL
LEVEL :

ROLLING :

1850
5
20

Average Daily Traffic, ADT :


Traffic Growth, i :
Design Years, n :

Veh/day
%
yrs.

Types of Vehicles :
=
=

40 %
60 %

0.0008
1.2

=
=

0.0008
1.2

=
=

[Wo (2-18) ](GF)(365) =

Major Traffic Contributor, DD:


70

(2-18)

29.78

[Wo (2-18) ](GF)(365) =

DD =

70

DL =
09.57 (E+06)

85

13780170.87

[Wo (2-18) ](GF)(365) =

DD =

70

Design Load Factor, DL:


DL =

W18 = (DD)(DL)[ W (2-18) ] =

Designers:

(2-18)

Major Traffic Contributor, DD:

Design Load Factor, DL:


%

W18 = (DD)(DL)[ W (2-18) ] =

08.98 (E+06)

Project & Location:

85

W18 = (DD)(DL)[ W (2-18) ] =

Approved By:

08.20 (E+06)

Sheet Content:

Reyes, Ma. Karisse P.


Santillan, Jan Sherwin F.

Uy, Kwin Juvy H.

0.0008
1.2

29.78

GF = [( 1+ i )n -1] / i =
15096926.33

Major Traffic Contributor, DD:

Design Load Factor, DL:


85

=
=

1267.76

Wo (2-18) =
GROWTH FACTOR:

GF = [( 1+ i )n -1] / i =
16085094.22

Veh/day
%
yrs.

40 %
60 %

Wo (2-18) = [ (ADT)(%LV)(.0008) ] + [ (ADT)(%HV)(1.2) ]

GROWTH FACTOR:
33.07

GF = [( 1+ i )n -1] / i =

=
=

Light Vehicles (Cars & Jeepneys)


Heavy Vehicles ( Buses & Trucks)

1388.90

Wo (2-18) =

GROWTH FACTOR:

DL =

Light Vehicles (Cars & Jeepneys)


Heavy Vehicles ( Buses & Trucks)

Wo (2-18) = [ (ADT)(%LV)(.0008) ] + [ (ADT)(%HV)(1.2) ]

1332.59

Wo (2-18) =

DD =

35 %
65 %

Traffic Load Factor :

Light Vehicles (Cars & Jeepneys)


Heavy Vehicles ( Buses & Trucks)

Wo (2-18) = [ (ADT)(%LV)(.0008) ] + [ (ADT)(%HV)(1.2) ]

=
=

Traffic Load Factor :

Light Vehicles (Cars & Jeepneys)


Heavy Vehicles ( Buses & Trucks)

1760
4
20

Average Daily Traffic, ADT :


Traffic Growth, i :
Design Years, n :
Types of Vehicles :

Light Vehicles (Cars & Jeepneys)


Heavy Vehicles ( Buses & Trucks)

Traffic Load Factor :

(2-18)

Veh/day
%
yrs.

Types of Vehicles :

Light Vehicles (Cars & Jeepneys)


Heavy Vehicles ( Buses & Trucks)

MOUNTAINOUS :

1780
4
20

Average Daily Traffic, ADT :


Traffic Growth, i :
Design Years, n :

PROPOSED 20 KM ARTERIAL
ROAD LAGUNA

ENGR. MANUEL M. MUHI


(Instructor)

PAVEMENT DESIGN

Sheet No.

DESIGN PAVEMENT VARIABLES


(OPTION NO.1)

EXPRESSWAY
LEVEL :

ROLLING :

1850
5
20

Average Daily Traffic, ADT :


Traffic Growth, i :
Design Years, n :

Veh/day
%
yrs.

Types of Vehicles :
=
=

50 %
50 %

Traffic Load Factor :


0.0008
1.2

=
=

[Wo (2-18) ](GF)(365) =

70

85

(2-18)

0.0008
1.2

=
=

Light Vehicles (Cars & Jeepneys)


Heavy Vehicles ( Buses & Trucks)

GROWTH FACTOR:

70

DL =

%
07.98 (E+06)

85

(2-18)

[Wo (2-18) ](GF)(365) =

10363638.09

Major Traffic Contributor, DD:

DD =

70

Design Load Factor, DL:


DL =

W18 = (DD)(DL)[ W (2-18) ] =

Designers:

26.87

GF = [( 1+ i )n -1] / i =
11616557.09

Design Load Factor, DL:

W18 = (DD)(DL)[ W (2-18) ] =

06.91 (E+06)

Project & Location:

85

W18 = (DD)(DL)[ W (2-18) ] =

Approved By:

06.17 (E+06)

Sheet Content:

Reyes, Ma. Karisse P.


Santillan, Jan Sherwin F.

Uy, Kwin Juvy H.

0.0008
1.2

1056.70

Wo (2-18) =

29.78

[Wo (2-18) ](GF)(365) =

DD =

=
=

Wo (2-18) = [ (ADT)(%LV)(.0008) ] + [ (ADT)(%HV)(1.2) ]

1068.71

Major Traffic Contributor, DD:

50 %
50 %

=
=

Traffic Load Factor :

GF = [( 1+ i )n -1] / i =
13407242.71

Design Load Factor, DL:


DL =

Light Vehicles (Cars & Jeepneys)


Heavy Vehicles ( Buses & Trucks)

GROWTH FACTOR:
33.07

GF = [( 1+ i )n -1] / i =

Major Traffic Contributor, DD:


DD =

50 %
50 %

Wo (2-18) = [ (ADT)(%LV)(.0008) ] + [ (ADT)(%HV)(1.2) ]


Wo (2-18) =

GROWTH FACTOR:

=
=

Light Vehicles (Cars & Jeepneys)


Heavy Vehicles ( Buses & Trucks)

1110.74

Wo (2-18) =

Veh/day
%
yrs.

Types of Vehicles :

Light Vehicles (Cars & Jeepneys)


Heavy Vehicles ( Buses & Trucks)

Wo (2-18) = [ (ADT)(%LV)(.0008) ] + [ (ADT)(%HV)(1.2) ]

1760
3
20

Average Daily Traffic, ADT :


Traffic Growth, i :
Design Years, n :

Traffic Load Factor :

Light Vehicles (Cars & Jeepneys)


Heavy Vehicles ( Buses & Trucks)

(2-18)

Veh/day
%
yrs.

Types of Vehicles :

Light Vehicles (Cars & Jeepneys)


Heavy Vehicles ( Buses & Trucks)

MOUNTAINOUS :

1780
4
20

Average Daily Traffic, ADT :


Traffic Growth, i :
Design Years, n :

PROPOSED 20 KM ARTERIAL
ROAD LAGUNA

ENGR. MANUEL M. MUHI


(Instructor)

PAVEMENT DESIGN

Sheet No.

.
Sta.

0+0

RURAL

LEVEL

RURAL

Acut =
Afill =
Area (cut) =
m2.
0
Volume (cut) =
3
####### m .

Sta.

CUT
b=
7
c=
0
h=
0
d=
7
19.25

7
0
0
7

--------Area (fill) =
m2.
0
Volume (fill) =
3
####### m .

Rolling

7
0
0
7

Rolling

Acut =
Afill =
Area (cut) =
m2.
0
Volume (cut) =
m3.
0

CUT
b=
c=
h=
d=

7
0
0
7

--------Area (fill) =
m2.
0
Volume (fill) =
m3.
0

7
0
0
7

Acut =
Afill =
Area (cut) =
m2.
0
Volume (cut) =
m3.
0

Designers:

Reyes, Ma. Karisse P.


Santillan, Jan Sherwin F.

Uy, Kwin Juvy H.

FILL
b=
c=
h=
d=

RURAL

Acut =
Afill =
Area (cut) =
m2.
0
Volume (cut) =
m3.
0

Sta.

----1/2*eh
Area (fill) =
m2.
0
Volume (fill) =
m3.
0

CUT
b=
c=
h=
d=

Acut =
Afill =
Area (cut) =
m2.
0
Volume (cut) =
m3.
0

Project & Location:


PROPOSED 20 KM ARTERIAL
ROAD LAGUNA

7
0
0
7

1/2*eh
----Area (fill) =
m2.
0
Volume (fill) =
m3.
0

1 + 200
Rolling
CL

FILL
b=
c=
h=
d=

7
0
0
7

FILL
b=
c=
h=
d=

RURAL

CL

FILL
b=
7
c = 0.02475
h = 0.75
d = 7.75
e=

LEVEL

CUT
b=
7
c = 0.1705
h = 7.75
d = 14.75
e=

7
0
7
14

Rolling

CL

FILL
b=
c=
h=
d=

RURAL

1 + 150

Sta.

0 + 600

CL

f = -5.80
1/2*eh
1/2*fh
Area (fill) =
2
20.3 m .
Volume (fill) =
3
3654 m .

Acut =
Afill =
Area (cut) =
2
27.225 m .
Volume (cut) =
3
4900.5 m .

1 + 100

RURAL

CL

CUT
b=
c=
h=
d=

LEVEL

CUT
b=
7
c = 0.0605
h = 2.75
d = 9.75
e = 19.8

7
0
7
14

f = -5.25
----1/2*fh
Area (fill) =
2
18.375 m .
Volume (fill) =
3
1740.38 m .

Sta.

Sta.

CL

FILL
b=
c=
h=
d=

Acut =
Afill =
Area (cut) =
m2.
0
Volume (cut) =
3
1225.13 m .

1 + 000

RURAL

RURAL

CL

FILL
b=
c=
h=
d=

7
0
0
7

0 + 240

Sta.
LEVEL

CL

CUT
b=
c=
h=
d=

0 + 150

Sta.

--------Area (fill) =
m2.
0
Volume (fill) =
m3.
0

Approved By:
ENGR. MANUEL M. MUHI
(Instructor)

CUT
b=
7
c = 0.02428
h = 0.75
d = 7.75
e=

7
0
0
7

Acut =
Afill =
Area (cut) =
m2.
0
Volume (cut) =
m3.
0

FILL
b=
c=
h=
d=

7
0
0
7

1/2*eh
----Area (fill) =
m2.
0
Volume (fill) =
m3.
0

Sheet Content:

Sheet No.

EARTHWORKS

Sta.

1 + 440

RURAL

Rolling

RURAL

CL

CUT
b=
7
c = 0.12863
h = 3.75
d = 10.75
e=
19.13
Acut =
Afill =
Area (cut) =
m2.
0
Volume (cut) =
3
3676.5 m .

Sta.

FILL
b=
c=
h=
d=

Rolling

CUT
b=
7
c = 0.17718
h = 4.75
d = 11.75
e = 19.35

7
0
0
7

1/2*eh
----Area (fill) =
m2.
0
Volume (fill) =
m3.
0

Rolling

2 + 300

Acut =
Afill =
Area (cut) =
m2.
0
Volume (cut) =
m3.
0

2 + 370

Sta.
LEVEL

CUT
b=
7
c = 0.30773
h = 8.25
d = 15.25
e=

7
0
0
7

f = -5.35
1/2*eh
----Area (fill) =
m2.
0
Volume (fill) =
m3.
0

RURAL

FILL
b=
c=
h=
d=

CUT
b=
7
c=
0
h=
0
d=
7
12.68

7
0
0
7

f = -5.23
--------Area (fill) =
m2.
0
Volume (fill) =
m3.
0

Acut =
Afill =
Area (cut) =
m2.
0
Volume (cut) =
m3.
0

Reyes, Ma. Karisse P.


Uy, Kwin Juvy H.

3 + 200

Sta.

FILL
b=
c=
h=
d=

RURAL

LEVEL

CUT
b=
c=
h=
d=

7
0
0
7

Acut =
Afill =
Area (cut) =
m2.
0
Volume (cut) =
m3.
0

Sta.
LEVEL

FILL
b=
c=
h=
d=

CUT
b=
c=
h=
d=

7
0
0
7

f = 1.32
--------Area (fill) =
m2.
0
Volume (fill) =
m3.
0

Acut =
Afill =
Area (cut) =
m2.
0
Volume (cut) =
m3.
0

PROPOSED 20 KM ARTERIAL
ROAD LAGUNA

3 + 850

--------Area (fill) =
m2.
0
Volume (fill) =
m3.
0

2 + 870

RURAL

CUT
b=
7
c = 0.27573
h = 10.25
d = 17.25
e=

7
0
0
7

--------Area (fill) =
m2.
0
Volume (fill) =
m3.
0

Approved By:

LEVEL

Acut =
Afill =
Area (cut) =
m2.
0
Volume (cut) =
3
9977.34 m .

FILL
b=
c=
h=
d=

Sheet No.

HORIZONTAL ALIGNMENT

(Instructor)

4 + 300

7
0
0
7

1/2*eh
----Area (fill) =
m2.
0
Volume (fill) =
m3.
0

Sheet Content:

ENGR. MANUEL M. MUHI

Sta.

7
0
0
7

CL

FILL
b=
c=
h=
d=

7
0
0
7

FILL
b=
c=
h=
d=

7
0
0
7

CL

Project & Location:

Santillan, Jan Sherwin F.

RURAL

2 + 700

CL

1 + 980

CL

1/2*eh
----Area (fill) =
m2.
0
Volume (fill) =
m3.
0

Sta.
LEVEL

Designers:

Sta.

RURAL

Sta.

CL

FILL
b=
c=
h=
d=

Acut =
Afill =
Area (cut) =
2
45.9563 m .
Volume (cut) =
3
4136.06 m .

CL

Acut =
Afill =
Area (cut) =
m2.
0
Volume (cut) =
m3.
0

1 + 780

Sta.

CL

RURAL

CUT
b=
7
c=
0
h=
0
d=
7
19.23

1 + 600

Sta.

Sta.

5 + 100

RURAL

Rolling

RURAL

Rolling

CL

CUT
b=
7
c = 0.16813
h = 6.25
d = 13.25
e = 19.35
Acut =
Afill =
Area (cut) =
2
60.4688 m .
Volume (cut) =
3
19652.3 m .

Sta.

FILL
b=
c=
h=
d=

CUT
b=
c=
h=
d=

7
0
0
7

f = -5.35
1/2*eh
----Area (fill) =
m2.
0
Volume (fill) =
m3.
0

Acut =
Afill =
Area (cut) =
m2.
0
Volume (cut) =
m3.
0

1 1 + 500

Sta.
Level

Level

--------Area (fill) =
m2.
0
Volume (fill) =
m3.
0

Level

Reyes, Ma. Karisse P.

Sta.
Level

4.84
Acut =
Afill =
Area (cut) =
m2.
0
Volume (cut) =
m3.
0

URBAN

PROPOSED 20 KM ARTERIAL
ROAD LAGUNA

1 3 + 240

7
0
0
7

f = -5.32
1/2*2bh
----Area (fill) =
m2.
0
Volume (fill) =
m3.
0

1 2 + 300

URBAN

FILL
b = 12.48
c = 0.0033
h = -0.75
d = 13.23
20.12

Level

CUT
b = 12.48
c=
0
h=
0
d = 12.48
4.83
Acut =
Afill =
Area (cut) =
m2.
0
Volume (cut) =
m3.
0

FILL
b = 12.48
c=
0
h=
0
d = 12.48
20.13

f=

----1/2*eh
Area (fill) =
2
7.545 m .
Volume (fill) =
3
754.5 m .

Approved By:

--------Area (fill) =
m2.
0
Volume (fill) =
m3.
0

Sheet Content:

ENGR. MANUEL M. MUHI

Sheet No.

HORIZONTAL ALIGNMENT

(Instructor)

Sta.
Level

FILL
b=
c=
h=
d=

CL

f=

Santillan, Jan Sherwin F.

1 2 + 900

CUT
b = 12.48
c=
0
h=
0
d = 12.48

Project & Location:

Uy, Kwin Juvy H.

Sta.

CL

--------Area (fill) =
m2.
0
Volume (fill) =
3
565.88 m .

Designers:

URBAN

URBAN

FILL
b = 12.48
c=
0
h=
0
d = 12.48
19.32

5.64
Acut =
Afill =
Area (cut) =
m2.
0
Volume (cut) =
m3.
0

Acut =
Afill =
Area (cut) =
m2.
3.5
Volume (cut) =
3
11200 m .

1 2 + 100

CL

CUT
b = 12.48
c=
0
h=
0
d = 12.48

CUT
b=
7
c=
0
h=
0.5
d=
7.5
19.32

7
0
0
7

f = 6.37
--------Area (fill) =
m2.
0
Volume (fill) =
m3.
0

Sta.

Level
CL

FILL
b=
c=
h=
d=

7
0
0
7
7.63

Acut =
Afill =
Area (cut) =
m2.
0
Volume (cut) =
3
1400 m .

1 1 + 950

f=

Sta.

CUT
b=
c=
h=
d=

7
0
0
7

--------Area (fill) =
m2.
0
Volume (fill) =
m3.
0

URBAN

FILL
b = 12.48
c=
0
h=
0
d = 12.48

RURAL

CL

FILL
b=
c=
h=
d=

7
0
0
7

CL

Acut =
Afill =
Area (cut) =
m2.
0
Volume (cut) =
m3.
0

Level

CL

URBAN

CUT
b = 12.48
c=
0
h=
0
d = 12.48

RURAL

URBAN

1 3 + 400
MOUNTAINOUS

Sta.
URBAN

1 3 + 640
Level

CL

CUT
b = 12.48
c=
0
h=
0
d = 12.48

CL

FILL
b = 12.48
c=
0
h=
0
d = 12.48

CUT
b = 12.48
c=
0
h=
0
d = 12.48

CL

FILL
b = 12.48
c = -0.0045
h = 0.45
d = 12.93
e = 20.15

4.81
Acut =
Afill =
Area (cut) =
m2.
0
Volume (cut) =
3
644.16 m .

CUT
b = 12.48
c = 0.0045
h=
0.8
d = 13.28
e = 20.13

f=

Acut =
Afill =
Area (cut) =
m2.
0
Volume (cut) =
m3.
0

Sta.

--------Area (fill) =
m2.
0
Volume (fill) =
3
770.74 m .

1 3 + 780

URBAN

Sta.
Level

Acut =
Afill =
Area (cut) =
m2.
0
Volume (cut) =
3
1783.96 m .

f = 5.43
--------Area (fill) =
m2.
0
Volume (fill) =
m3.
0

CUT
b = 12.48
c = 0.03135
h = 2.85
d = 15.33
e = 19.26

f = 5.70
1/2*eh
----Area (fill) =
m2.
0
Volume (fill) =
m3.
0

Acut =
Afill =
Area (cut) =
2
27.4455 m .
Volume (cut) =
3
1235.05 m .

Reyes, Ma. Karisse P.


Uy, Kwin Juvy H.

1 4 + 700

URBAN

Sta.
Level

CL

PROPOSED 20 KM ARTERIAL
ROAD LAGUNA

1 4 + 770

URBAN

FILL
b = 12.48
c=
0
h=
0
d = 12.48
f = 4.86
--------Area (fill) =
m2.
0
Volume (fill) =
m3.
0

1 4 + 400

URBAN

Level
CL

FILL
b = 12.48
c=
0
h=
0
d = 12.48
19.53
1/2*eh
----Area (fill) =
m2.
0
Volume (fill) =
m3.
0

Approved By:

CUT
b = 12.48
c=
0
h=
0
d = 12.48

Acut =
Afill =
Area (cut) =
m2.
0
Volume (cut) =
m3.
0

FILL
b = 12.48
c=
0
h=
0
d = 12.48

--------Area (fill) =
m2.
0
Volume (fill) =
m3.
0

Sheet Content:

ENGR. MANUEL M. MUHI

Sheet No.

HORIZONTAL ALIGNMENT

(Instructor)

Sta.
Level

CL

Sta.
Level

CUT
b = 12.48
c = 0.01815
h = 1.65
d = 14.13
e=
f = 5.43
Acut =
Afill =
Area (cut) =
m2.
0
Volume (cut) =
m3.
0

Project & Location:

Santillan, Jan Sherwin F.

Acut =
Afill =
Area (cut) =
m2.
0
Volume (cut) =
m3.
0

CL

FILL
b = 12.48
c=
0
h=
0
d = 12.48

Designers:

Sta.

URBAN

CL

FILL
b = 12.48
c=
0
h=
0
d = 12.48

CUT
b = 12.48
c=
0
h=
0
d = 12.48
20.1

1 4 + 000

Sta.

Level

FILL
b = 12.48
c=
0
h=
0
d = 12.48
f=
1/2*eh
----Area (fill) =
m2.
0
Volume (fill) =
m3.
0

Acut =
Afill =
Area (cut) =
2
8.052 m .
Volume (cut) =
3
966.24 m .

1 3 + 910

URBAN

CL

CUT
b = 12.48
c=
0
h=
0
d = 12.48
19.53

----1/2*eh
Area (fill) =
2
4.53375 m .
Volume (fill) =
3
30013.4 m .

CL

1 5 + 000

URBAN

Sta.
Level

CL

1 5 + 900

URBAN

Level
CL

CUT
b = 12.48
c=
0
h=
0
d = 12.48
19.3
Acut =
Afill =
Area (cut) =
m2.
0
Volume (cut) =
m3.
0

Sta.

FILL
b = 12.48
c = 0.00042
h=
1.3
d = 13.78
e=
f = 5.66
----1/2*eh
Area (fill) =
m2.
0
Volume (fill) =
m3.
0

CUT
b = 12.48
c=
0
h=
0
d = 12.48
5.61
Acut =
Afill =
Area (cut) =
m2.
0
Volume (cut) =
m3.
0

Sta.

ROLLING

-5.56
Acut =
Afill =
Area (cut) =
m2.
0
Volume (cut) =
m3.
0
f=

FILL
b = 12.48
c = 0.00291
h = 0.35
d = 12.83
e=

1 7 + 300

----1/2*eh
Area (fill) =
m2.
0
Volume (fill) =
m3.
0

ROLLING

RURAL

CUT
b=
c=
h=
d=

-5.6
Acut =
Afill =
Area (cut) =
m2.
0
Volume (cut) =
m3.
0

CUT
b=
c=
h=
d=

FILL
b = 12.48
c = -0.0087
h = -1.05
d = 13.53

Project & Location:

Reyes, Ma. Karisse P.


Santillan, Jan Sherwin F.

Uy, Kwin Juvy H.

1 8 + 000
ROLLING
CL

----1/2*eh
Area (fill) =
m2.
0
Volume (fill) =
m3.
0

Approved By:

PROPOSED 20 KM ARTERIAL
ROAD LAGUNA

----1/2*eh
Area (fill) =
m2.
0
Volume (fill) =
m3.
0

RURAL

FILL
b=
7
c = 0.09185
h=
5.5
d = 12.5
e=
f = -5.40

7
0
0
7
19.4

Acut =
Afill =
Area (cut) =
m2.
0
Volume (cut) =
m3.
0

--------Area (fill) =
m2.
0
Volume (fill) =
m3.
0

Designers:

Sta.

CL

FILL
b=
7
c=
0
h=
0
d=
7
19.6

7
0
0
7

Acut =
Afill =
Area (cut) =
m2.
0
Volume (cut) =
m3.
0

ROLLING

f=

--------Area (fill) =
m2.
0
Volume (fill) =
m3.
0

CUT
b = 12.48
c=
0
h=
0
d = 12.48

1 7 + 800

Sta.

CL

FILL
b=
7
c=
0
h=
0
d=
7
19.56

7
0
0
7

Acut =
Afill =
Area (cut) =
m2.
0
Volume (cut) =
m3.
0

--------Area (fill) =
m2.
0
Volume (fill) =
m3.
0

RURAL

CL

CUT
b=
c=
h=
d=

CUT
b = 12.48
c=
0
h=
0
d = 12.48

f=

1 6 + 700

RURAL

FILL
b = 12.48
c=
0
h=
0
d = 12.48
19.35

CUT
b=
7
c=
0
h=
0
d=
7
19.32
Acut =
Afill =
Area (cut) =
m2.
0
Volume (cut) =
3
12250 m .

FILL
b=
c=
h=
d=

7
0
0
7

f = -5.32
--------Area (fill) =
m2.
0
Volume (fill) =
m3.
0

Sheet Content:

ENGR. MANUEL M. MUHI

Sheet No.

HORIZONTAL ALIGNMENT

(Instructor)

1
Sta.

1 8 + 500

Sta.

1 8 + 560

RURAL
RURAL

ROLLING

Sta.

1 9 + 120

RURAL

ROLLING

Sta.

1 9 + 200

RURAL

ROLLING

ROLLING
CL

CL

CL

CL

CUT
b=
c=
h=
d=

FILL
b=
c=
h=
d=

7
0
7
14

Acut =
Afill =
Area (cut) =
m2.
49
Volume (cut) =
3
1470 m .

Sta.

CUT
b=
c=
h=
d=

7
0
0
7

1/2*2bh
----Area (fill) =
m2.
0
Volume (fill) =
m3.
0

Acut =
Afill =
Area (cut) =
m2.
0
Volume (cut) =
m3.
0

1 9 + 400

RURAL

Sta.

ROLLING

FILL
b=
7
c=
0
h=
0
d=
7
19.3

-5.3
Acut = 1/2*bh + 1/2*cd
Afill =
----Area (cut) =
Area (fill) =
m2.
m2.
0
0
Volume (cut) =
Volume (fill) =
m3.
m3.
0
0

CUT
b=
7
c = 0.025
h=
1
d=
8
e=
f = -5.3
Acut =
Afill =
Area (cut) =
m2.
0
Volume (cut) =
3
-61152 m .

0 + 500

ROLLING

ROLLING

CUT
b = 19.2
c = 0.65
h=
0
d = 19.2

0 + 750

RURAL
CL

Approved By:

0 + 250
ROLLING

CUT
b = 19.2
c=
0
h = 0.18
d = 19.38

FILL
b = 19.2
c = -0.88
h = -0.3
d = 19.5
e = 19.5

18.9
Acut =
1/2*fh
Afill = 1/2*bh + 1/2*cd
Area (cut) =
Area (fill) =
2
2
1.701 m .
11.46 m .
Volume (cut) =
Volume (fill) =
3
3
900.54 m .
1432.5 m .
f=

Sheet Content:

ENGR. MANUEL M. MUHI

Sheet No.

HORIZONTAL ALIGNMENT

(Instructor)

Sta.
ROLLING

7
0
0
7

f = -5.31
1/2*eh
----Area (fill) =
m2.
0
Volume (fill) =
m3.
0

URBAN

FILL
b = 19.2
c = -0.23
h = -0.03
d = 19.23
e = 19.4

19
Acut =
----Afill = 1/2*bh + 1/2*cd
Area (cut) =
Area (fill) =
2
2
6.24 m .
2.49945 m .
Volume (cut) =
Volume (fill) =
3
3
780 m .
1744.93 m .

PROPOSED 20 KM ARTERIAL
ROAD LAGUNA

FILL
b=
c=
h=
d=

CL

f=

Project & Location:

Sta.

Sta.

CL

1/2*eh
----Area (fill) =
m2.
0
Volume (fill) =
3
-24495 m .

Uy, Kwin Juvy H.

Acut =
Afill =
Area (cut) =
2
36.2063 m .
Volume (cut) =
3
3620.63 m .

0 + 000

URBAN

FILL
b=
7
c=
0
h=
0
d=
7
19.3

Reyes, Ma. Karisse P.

CUT
b=
7
c = 0.1875
h = 3.75
d = 10.75
e = 19.31

7
0
0
7

--------Area (fill) =
m2.
0
Volume (fill) =
m3.
0

Sta.

ROLLING

Santillan, Jan Sherwin F.

CL

Acut =
Afill =
Area (cut) =
m2.
0
Volume (cut) =
3
1448.25 m .

1 9 + 600

Designers:

RURAL

FILL
b=
c=
h=
d=

7
0
0
7

CL

f=

Sta.

CUT
b=
c=
h=
d=

7
0
0
7

--------Area (fill) =
m2.
0
Volume (fill) =
m3.
0

RURAL

CL

CUT
b=
7
c = 3.25
h = 3.25
d = 10.25

FILL
b=
c=
h=
d=

7
0
0
7

1 + 000

URBAN

Sta.
ROLLING

CL

1 + 250

URBAN

LEVEL
CL

CUT
b = 19.2
c = 0.52
h = 0.57
d = 19.77
e = 19.31
Acut =
Afill =
Area (cut) =
2
5.50335 m .
Volume (cut) =
3
1123.74 m .

Sta.

FILL
b = 19.2
c=
0
h=
0
d = 19.2
f = 19.09
1/2*eh
----Area (fill) =
m2.
0
Volume (fill) =
3
372 m .

CUT
b = 19.2
c = 0.31
h = 0.36
d = 19.56
e = 19.37
f = 14.94
Acut =
Afill =
Area (cut) =
2
3.4866 m .
Volume (cut) =
3
2062.09 m .

1 + 500

URBAN

RURAL

CL

Acut =
Afill =
Area (cut) =
m2.
0
Volume (cut) =
m3.
24

--------Area (fill) =
m2.
0
Volume (fill) =
m3.
24

CUT
b = 19.2
c=
0
h = 0.02
d = 19.22

2 + 500

Sta.
ROLLING

CL

Acut =
Afill =
Area (cut) =
2
0.096 m .
Volume (cut) =
m3.
12

PROPOSED 20 KM ARTERIAL
ROAD LAGUNA

Uy, Kwin Juvy H.

2 + 750

EXPRESSWAY

FILL
b = 19.2
c=
0
h=
0
d = 19.2
f = 14.78
--------Area (fill) =
m2.
0
Volume (fill) =
m3.
0

2 + 250

RURAL

LEVEL
CL

FILL
b = 19.2
c=
0
h = 0.01
d = 19.21

1/2*bh
1/2*bh
Area (fill) =
2
0.096 m .
Volume (fill) =
3
84.03 m .

Approved By:

CUT
b = 19.2
c = 0.05
h=
0
d = 19.2

FILL
b = 19.2
c = 0.05
h = 0.01
d = 19.21

Acut =
----Afill = 1/2*bh + 1/2*cd
Area (cut) =
Area (fill) =
2
2
0.48 m .
0.57625 m .
Volume (cut) =
Volume (fill) =
3
3
518.61 m .
107.83 m .

Sheet Content:

ENGR. MANUEL M. MUHI

Sheet No.

HORIZONTAL ALIGNMENT

(Instructor)

Sta.
LEVEL

CL

Sta.
LEVEL

CUT
b = 19.2
c=
0
h = 0.01
d = 19.21

Project & Location:

Reyes, Ma. Karisse P.

Acut =
Afill =
Area (cut) =
m2.
0
Volume (cut) =
m3.
0

CL

1/2*bh
1/2*bh
Area (fill) =
2
0.192 m .
Volume (fill) =
m3.
36

Santillan, Jan Sherwin F.

EXPRESSWAY

EXPRESSWAY

FILL
b = 19.2
c=
0
h = -0.02
d = 19.22

Acut =
Afill =
Area (cut) =
2
0.192 m .
Volume (cut) =
m3.
36

CUT
b = 19.2
c=
0
h=
0
d = 19.2
23.62

2 + 000

Sta.

CL

FILL
b = 19.2
c=
0
h=
0
d = 19.2

FILL
b = 19.2
c = -0.67
h=
0
d = 19.2
e = 19.32

f = 19.08
Acut = 1/2*bh + 1/2*cd
Afill =
----Area (cut) =
Area (fill) =
2
2
13.0102 m .
6.432 m .
Volume (cut) =
Volume (fill) =
3
3
1626.27 m .
804 m .

LEVEL

Designers:

Sta.

CUT
b = 19.2
c = -0.67
h = -0.71
d = 18.49

1 + 750

Sta.
LEVEL

CUT
b = 19.2
c=
0
h=
0
d = 19.2

FILL
b = 19.2
c = 0.31
h=
0
d = 19.2
23.46
f = 19.03
1/2*eh
----Area (fill) =
2
2.976 m .
Volume (fill) =
3
3528 m .

3 + 000

EXPRESSWAY

Sta.
LEVEL

CL

3 + 250

EXPRESSWAY

LEVEL
CL

CUT
b = 19.2
c = 0.35
h = 0.38
d = 19.58
e = 19.31
Acut =
Afill =
Area (cut) =
2
3.6689 m .
Volume (cut) =
3
458.61 m .

Sta.

FILL
b = 19.2
c=
0
h = -0.03
d = 19.23
f = 19.09
1/2*eh
1/2*fh
Area (fill) =
2
0.28635 m .
Volume (fill) =
3
35.79 m .

CUT
b = 19.2
c=
0
h=
0
d = 19.2

Acut =
Afill =
Area (cut) =
m2.
0
Volume (cut) =
m3.
0

3 + 500

EXPRESSWAY

--------Area (fill) =
m2.
0
Volume (fill) =
m3.
0

CUT
b = 19.2
c = 0.05
h=
0
d = 19.2

Acut =
Afill =
Area (cut) =
2
0.48 m .
Volume (cut) =
m3.
60

EXPRESSWAY

4 + 500

Sta.
ROLLING

4 + 750

CL

CUT

--------Area (fill) =
m2.
0
Volume (fill) =
m3.
0

LEVEL

CUT
b = 19.2
c=
0
h=
0
d = 19.2

Acut =
Afill =
Area (cut) =
m2.
0
Volume (cut) =
3
456.66 m .

FILL
b = 19.2
c=
0
h=
0
d = 19.2

--------Area (fill) =
m2.
0
Volume (fill) =
m3.
0

Sheet No.

HORIZONTAL ALIGNMENT

(Instructor)

5 + 000

RURAL

Sta.
LEVEL

CUT

5 + 250

URBAN

CL

FILL

4 + 250

Sheet Content:

ENGR. MANUEL M. MUHI

CL

FILL

--------Area (fill) =
m2.
0
Volume (fill) =
m3.
0

CL

Approved By:

Sta.
LEVEL

FILL
b = 19.2
c=
0
h=
0
d = 19.2

EXPRESSWAY

FILL
b = 19.2
c=
0
h=
0
d = 19.2

Acut =
Afill =
Area (cut) =
m2.
0
Volume (cut) =
m3.
0

PROPOSED 20 KM ARTERIAL
ROAD LAGUNA

EXPRESSWAY

Sta.
LEVEL

CUT
b = 19.2
c=
0
h=
0
d = 19.2

Project & Location:

Uy, Kwin Juvy H.

Acut =
Afill =
Area (cut) =
m2.
0
Volume (cut) =
m3.
0

CL

----1/2*eh
Area (fill) =
m2.
0
Volume (fill) =
m3.
0

Reyes, Ma. Karisse P.

CUT
b = 19.2
c=
0
h=
0
d = 19.2

4 + 000

Sta.

FILL
b = 19.2
c = -0.03
h = -0.12
d = 19.32

Santillan, Jan Sherwin F.

CUT

--------Area (fill) =
m2.
0
Volume (fill) =
m3.
0

CL

FILL
b = 19.2
c=
0
h=
0
d = 19.2

EXPRESSWAY

FILL
b = 19.2
c=
0
h=
0
d = 19.2

Acut =
Afill =
Area (cut) =
m2.
0
Volume (cut) =
m3.
0

LEVEL

Designers:

Sta.

CUT
b = 19.2
c=
0
h=
0
d = 19.2

3 + 750

EXPRESSWAY

CL

Acut =
Afill =
Area (cut) =
m2.
0
Volume (cut) =
m3.
60

--------Area (fill) =
m2.
0
Volume (fill) =
m3.
0

Sta.
LEVEL

CUT
b = 19.2
c=
0
h=
0
d = 19.2

FILL
b = 19.2
c=
0
h=
0
d = 19.2

LEVEL
CL

FILL

CUT

FILL

b=
c=
h=
d=

19.2
0.35
0.03
19.23
24.81

b=
c=
h=
d=

19.2
0
0
19.2

f = 13.59
Acut = 1/2*bh + 1/2*cd
Afill =
----Area (cut) =
Area (fill) =
2
m2.
3.65325 m .
0
Volume (cut) =
Volume (fill) =
3
m3.
456.66 m .
0

Sta.

b=
c=
h=
d=

Acut =
Afill =
Area (cut) =
m2.
0
Volume (cut) =
m3.
60

----1/2*2bh
Area (fill) =
2
0.576 m .
Volume (fill) =
m3.
72

CUT
b = 19.2
c = 0.05
h=
0
d = 19.2

Acut =
Afill =
Area (cut) =
0.48 m2.
Volume (cut) =
m3.
78

6 + 500

Sta.
ROLLING

CL

6 + 750

CUT
b = 19.2
c=
0

6 + 250
LEVEL

CUT
b = 19.2
c=
0
h=
0
d = 19.2

Acut =
Afill =
Area (cut) =
m2.
0
Volume (cut) =
3
601.41 m .

FILL
b = 19.2
c=
0
h=
0
d = 19.2

--------Area (fill) =
m2.
0
Volume (fill) =
m3.
0

Sheet Content:

ENGR. MANUEL M. MUHI

Sheet No.

HORIZONTAL ALIGNMENT

(Instructor)

7 + 000

URBAN

Sta.
LEVEL

CUT
b = 19.2
c = 0.021

7 + 250

URBAN

CL

FILL
b = 19.2
c=
0

19.2
0
0.02
19.22

1/2*bh
1/2*bh
Area (fill) =
2
0.192 m .
Volume (fill) =
m3.
96

URBAN

FILL
b = 19.2
c = 0.01
h = 0.005
d = 19.205

Approved By:

Sta.
LEVEL

b=
c=
h=
d=

CL

Acut = 1/2*bh + 1/2*cd


Afill = 1/2*bh + 1/2*cd
Area (cut) =
Area (fill) =
2
2
0.14403 m .
0.14403 m .
Volume (cut) =
Volume (fill) =
m3.
m3.
18
18

CL

FILL
b = 19.2
c=
0

Sta.
LEVEL

CUT
b = 19.2
c = 0.01
h = 0.005
d = 19.205

PROPOSED 20 KM ARTERIAL
ROAD LAGUNA

RURAL

19.2
0
0.02
19.22

Acut =
Afill =
Area (cut) =
2
0.192 m .
Volume (cut) =
m3.
24

6 + 000

URBAN

Project & Location:

Uy, Kwin Juvy H.

b=
c=
h=
d=

CL

----1/2*eh
Area (fill) =
m2.
0
Volume (fill) =
m3.
18

Reyes, Ma. Karisse P.

19.2
0
0
19.2

--------Area (fill) =
m2.
0
Volume (fill) =
m3.
24

Sta.

FILL
b = 19.2
c = -0.03
h = -0.12
d = 19.32

Santillan, Jan Sherwin F.

CUT
b = 19.2
c = 0.45

b=
c=
h=
d=

CL

FILL
b = 19.2
c=
0
h = -0.03
d = 19.23

RURAL

19.2
0
0
19.2

Acut =
Afill =
Area (cut) =
m2.
0
Volume (cut) =
m3.
24

LEVEL

Designers:

Sta.

b=
c=
h=
d=

5 + 750

RURAL

CL

19.2
0
0
19.2
21.24

--------Area (fill) =
m2.
0
Volume (fill) =
m3.
0

Sta.
LEVEL

CUT
b = 19.2
c=
0
h=
0
d = 19.2

b=
c=
h=
d=

f = 17.16
Acut =
Afill =
Area (cut) =
m2.
0
Volume (cut) =
m3.
0

5 + 500

URBAN

19.2
0
0
19.2

LEVEL
CL

FILL
b = 19.2
c = 0.021

CUT
b = 19.2
c=
0

FILL
b = 19.2
c=
0

h=
d=

0.05
19.25

h=
d=

0
19.2

Acut = 1/2*bh + 1/2*cd


Afill =
----Area (cut) =
Area (fill) =
2
m2.
4.81125 m .
0
Volume (cut) =
Volume (fill) =
3
m3.
601.41 m .
0

Sta.

h=
d=

h=
d=

Acut =
Afill =
Area (cut) =
m2.
0
Volume (cut) =
3
37.21 m .

7 + 500

0
19.2

--------Area (fill) =
m2.
0
Volume (fill) =
3
1004.75 m .

h=
d=

0.01
19.21

h=
d=

0.01
19.21

h=
d=

Acut = 1/2*bh + 1/2*cd


Afill = 1/2*bh + 1/2*cd
Area (cut) =
Area (fill) =
2
2
0.29771 m .
0.29771 m .
Volume (cut) =
Volume (fill) =
3
3
37.21 m .
37.21 m .

TOTAL VOLUME OF CUT

CUT
b = 19.2
c = 0.03
h = 0.015
d = 19.215

CL

FILL
b = 19.2
c=
0
h=
0
d = 19.2

Acut = 1/2*bh + 1/2*cd


Afill =
----Area (cut) =
Area (fill) =
2
m2.
0.43223 m .
0
Volume (cut) =
Volume (fill) =
3
3
65.82 m .
24.41 m .

CUT
b = 19.2
c=
0
h = -0.01
d = 19.19
f = 18.87
Acut =
Afill =
Area (cut) =
0.09435 m2.
Volume (cut) =
365.61 m3.

Designers:

Reyes, Ma. Karisse P.


Santillan, Jan Sherwin F.

Uy, Kwin Juvy H.

h=
d=

Acut =
Afill =
Area (cut) =
m2.
0
Volume (cut) =
3
54.03 m .

0
19.2

--------Area (fill) =
m2.
0
Volume (fill) =
m3.
0

LEVEL

RURAL

CL

0
19.2

7 + 750

Sta.
LEVEL

URBAN

0
19.2

##
##
##

#VALUE!

TOTAL VOLUME OF FILL

m3

#VALUE!

m3

##
##
96

FILL
b = 19.2
c = 0.01
h = 0.02
d = 19.22
e = 19.53
1/2*fh
1/2*eh
Area (fill) =
0.1953 m2.
Volume (fill) =
756.79 m3.

Project & Location:


PROPOSED 20 KM ARTERIAL
ROAD LAGUNA

Approved By:
ENGR. MANUEL M. MUHI
(Instructor)

Sheet Content:

HORIZONTAL ALIGNMENT

Sheet No.

Sheet No.

Sheet No.

Sheet No.

Sheet No.

Sheet No.

Sheet No.

Sheet No.

Sheet No.

Sheet No.

Sheet No.

VERTICAL ALIGNMENT

25
20
15
10
5
0+000

0+100

0+200

Designers:

0+300

Project & Location:

0+400

0+500

Approved By:

0+600

Sheet Content:

Reyes, Ma. Karisse P.


Santillan, Jan Sherwin F.

Uy, Kwin Juvy H.

PROPOSED 20 KM ARTERIAL ROAD


LAGUNA

ENGR. MANUEL M. MUHI


(Instructor)

VERTICAL ALIGNMENT

0+700

Sheet No.

VERTICAL ALIGNMENT

0+000

0+100

0+200

Designers:

0+300

Project & Location:

0+400

0+500

Approved By:

0+600

Sheet Content:

Reyes, Ma. Karisse P.


Santillan, Jan Sherwin F.

Uy, Kwin Juvy H.

PROPOSED 20 KM ARTERIAL ROAD


LAGUNA

ENGR. MANUEL M. MUHI


(Instructor)

VERTICAL ALIGNMENT

0+700

Sheet No.

VERTICAL ALIGNMENT

0+000

0+100

0+200

Designers:

0+300

Project & Location:

0+400

0+500

Approved By:

0+600

Sheet Content:

Reyes, Ma. Karisse P.


Santillan, Jan Sherwin F.

Uy, Kwin Juvy H.

PROPOSED 20 KM ARTERIAL ROAD


LAGUNA

ENGR. MANUEL M. MUHI


(Instructor)

VERTICAL ALIGNMENT

0+700

Sheet No.

VERTICAL ALIGNMENT

0+000

0+100

0+200

Designers:

0+300

Project & Location:

0+400

0+500

Approved By:

0+600

Sheet Content:

Reyes, Ma. Karisse P.


Santillan, Jan Sherwin F.

Uy, Kwin Juvy H.

PROPOSED 20 KM ARTERIAL ROAD


LAGUNA

ENGR. MANUEL M. MUHI


(Instructor)

VERTICAL ALIGNMENT

0+700

Sheet No.

VERTICAL ALIGNMENT

0+000

0+100

0+200

Designers:

0+300

Project & Location:

0+400

0+500

Approved By:

0+600

Sheet Content:

Reyes, Ma. Karisse P.


Santillan, Jan Sherwin F.

Uy, Kwin Juvy H.

PROPOSED 20 KM ARTERIAL ROAD


LAGUNA

ENGR. MANUEL M. MUHI


(Instructor)

VERTICAL ALIGNMENT

0+700

Sheet No.

VERTICAL ALIGNMENT

0+000

0+100

0+200

Designers:

0+300

Project & Location:

0+400

0+500

Approved By:

0+600

Sheet Content:

Reyes, Ma. Karisse P.


Santillan, Jan Sherwin F.

Uy, Kwin Juvy H.

PROPOSED 20 KM ARTERIAL ROAD


LAGUNA

ENGR. MANUEL M. MUHI


(Instructor)

VERTICAL ALIGNMENT

0+700

Sheet No.

VERTICAL ALIGNMENT

0+000

0+100

0+200

Designers:

0+300

Project & Location:

0+400

0+500

Approved By:

0+600

Sheet Content:

Reyes, Ma. Karisse P.


Santillan, Jan Sherwin F.

Uy, Kwin Juvy H.

PROPOSED 20 KM ARTERIAL ROAD


LAGUNA

ENGR. MANUEL M. MUHI


(Instructor)

VERTICAL ALIGNMENT

0+700

Sheet No.

VERTICAL ALIGNMENT

0+000

0+100

0+200

Designers:

0+300

Project & Location:

0+400

0+500

Approved By:

0+600

Sheet Content:

Reyes, Ma. Karisse P.


Santillan, Jan Sherwin F.

Uy, Kwin Juvy H.

PROPOSED 20 KM ARTERIAL ROAD


LAGUNA

ENGR. MANUEL M. MUHI


(Instructor)

VERTICAL ALIGNMENT

0+700

Sheet No.

VERTICAL ALIGNMENT

0+000

0+100

0+200

Designers:

0+300

Project & Location:

0+400

0+500

Approved By:

0+600

Sheet Content:

Reyes, Ma. Karisse P.


Santillan, Jan Sherwin F.

Uy, Kwin Juvy H.

PROPOSED 20 KM ARTERIAL ROAD


LAGUNA

ENGR. MANUEL M. MUHI


(Instructor)

VERTICAL ALIGNMENT

0+700

Sheet No.

VERTICAL ALIGNMENT

0+000

0+100

0+200

Designers:

0+300

Project & Location:

0+400

0+500

Approved By:

0+600

Sheet Content:

Reyes, Ma. Karisse P.


Santillan, Jan Sherwin F.

Uy, Kwin Juvy H.

PROPOSED 20 KM ARTERIAL ROAD


LAGUNA

ENGR. MANUEL M. MUHI


(Instructor)

VERTICAL ALIGNMENT

0+700

Sheet No.

VERTICAL ALIGNMENT

0+000

0+100

0+200

Designers:

0+300

Project & Location:

0+400

0+500

Approved By:

0+600

Sheet Content:

Reyes, Ma. Karisse P.


Santillan, Jan Sherwin F.

Uy, Kwin Juvy H.

PROPOSED 20 KM ARTERIAL ROAD


LAGUNA

ENGR. MANUEL M. MUHI


(Instructor)

VERTICAL ALIGNMENT

0+700

Sheet No.

VERTICAL ALIGNMENT

0+000

0+100

0+200

Designers:

0+300

Project & Location:

0+400

0+500

Approved By:

0+600

Sheet Content:

Reyes, Ma. Karisse P.


Santillan, Jan Sherwin F.

Uy, Kwin Juvy H.

PROPOSED 20 KM ARTERIAL ROAD


LAGUNA

ENGR. MANUEL M. MUHI


(Instructor)

VERTICAL ALIGNMENT

0+700

Sheet No.

VERTICAL ALIGNMENT

0+000

0+100

0+200

Designers:

0+300

Project & Location:

0+400

0+500

Approved By:

0+600

Sheet Content:

Reyes, Ma. Karisse P.


Santillan, Jan Sherwin F.

Uy, Kwin Juvy H.

PROPOSED 20 KM ARTERIAL ROAD


LAGUNA

ENGR. MANUEL M. MUHI


(Instructor)

VERTICAL ALIGNMENT

0+700

Sheet No.

VERTICAL ALIGNMENT

0+000

0+100

0+200

Designers:

0+300

Project & Location:

0+400

0+500

Approved By:

0+600

Sheet Content:

Reyes, Ma. Karisse P.


Santillan, Jan Sherwin F.

Uy, Kwin Juvy H.

PROPOSED 20 KM ARTERIAL ROAD


LAGUNA

ENGR. MANUEL M. MUHI


(Instructor)

VERTICAL ALIGNMENT

0+700

Sheet No.

VERTICAL ALIGNMENT

0+000

0+100

0+200

Designers:

0+300

Project & Location:

0+400

0+500

Approved By:

0+600

Sheet Content:

Reyes, Ma. Karisse P.


Santillan, Jan Sherwin F.

Uy, Kwin Juvy H.

PROPOSED 20 KM ARTERIAL ROAD


LAGUNA

ENGR. MANUEL M. MUHI


(Instructor)

VERTICAL ALIGNMENT

0+700

Sheet No.

VERTICAL ALIGNMENT

0+000

0+100

0+200

Designers:

0+300

Project & Location:

0+400

0+500

Approved By:

0+600

Sheet Content:

Reyes, Ma. Karisse P.


Santillan, Jan Sherwin F.

Uy, Kwin Juvy H.

PROPOSED 20 KM ARTERIAL ROAD


LAGUNA

ENGR. MANUEL M. MUHI


(Instructor)

VERTICAL ALIGNMENT

0+700

Sheet No.

VERTICAL ALIGNMENT

0+000

0+100

0+200

Designers:

0+300

Project & Location:

0+400

0+500

Approved By:

0+600

Sheet Content:

Reyes, Ma. Karisse P.


Santillan, Jan Sherwin F.

Uy, Kwin Juvy H.

PROPOSED 20 KM ARTERIAL ROAD


LAGUNA

ENGR. MANUEL M. MUHI


(Instructor)

VERTICAL ALIGNMENT

0+700

Sheet No.

VERTICAL ALIGNMENT

0+000

0+100

0+200

Designers:

0+300

Project & Location:

0+400

0+500

Approved By:

0+600

Sheet Content:

Reyes, Ma. Karisse P.


Santillan, Jan Sherwin F.

Uy, Kwin Juvy H.

PROPOSED 20 KM ARTERIAL ROAD


LAGUNA

ENGR. MANUEL M. MUHI


(Instructor)

VERTICAL ALIGNMENT

0+700

Sheet No.

VERTICAL ALIGNMENT

0+000

0+100

0+200

Designers:

0+300

Project & Location:

0+400

0+500

Approved By:

0+600

Sheet Content:

Reyes, Ma. Karisse P.


Santillan, Jan Sherwin F.

Uy, Kwin Juvy H.

PROPOSED 20 KM ARTERIAL ROAD


LAGUNA

ENGR. MANUEL M. MUHI


(Instructor)

VERTICAL ALIGNMENT

0+700

Sheet No.

VERTICAL ALIGNMENT

0+000

0+100

0+200

Designers:

0+300

Project & Location:

0+400

0+500

Approved By:

0+600

Sheet Content:

Reyes, Ma. Karisse P.


Santillan, Jan Sherwin F.

Uy, Kwin Juvy H.

PROPOSED 20 KM ARTERIAL ROAD


LAGUNA

ENGR. MANUEL M. MUHI


(Instructor)

VERTICAL ALIGNMENT

0+700

Sheet No.

VERTICAL ALIGNMENT

0+000

0+100

0+200

Designers:

0+300

Project & Location:

0+400

0+500

Approved By:

0+600

Sheet Content:

Reyes, Ma. Karisse P.


Santillan, Jan Sherwin F.

Uy, Kwin Juvy H.

PROPOSED 20 KM ARTERIAL ROAD


LAGUNA

ENGR. MANUEL M. MUHI


(Instructor)

VERTICAL ALIGNMENT

0+700

Sheet No.

VERTICAL ALIGNMENT

0+000

0+100

0+200

Designers:

0+300

Project & Location:

0+400

0+500

Approved By:

0+600

Sheet Content:

Reyes, Ma. Karisse P.


Santillan, Jan Sherwin F.

Uy, Kwin Juvy H.

PROPOSED 20 KM ARTERIAL ROAD


LAGUNA

ENGR. MANUEL M. MUHI


(Instructor)

VERTICAL ALIGNMENT

0+700

Sheet No.

VERTICAL ALIGNMENT

0+000

0+100

0+200

Designers:

0+300

Project & Location:

0+400

0+500

Approved By:

0+600

Sheet Content:

Reyes, Ma. Karisse P.


Santillan, Jan Sherwin F.

Uy, Kwin Juvy H.

PROPOSED 20 KM ARTERIAL ROAD


LAGUNA

ENGR. MANUEL M. MUHI


(Instructor)

VERTICAL ALIGNMENT

0+700

Sheet No.

VERTICAL ALIGNMENT

0+000

0+100

0+200

Designers:

0+300

Project & Location:

0+400

0+500

Approved By:

0+600

Sheet Content:

Reyes, Ma. Karisse P.


Santillan, Jan Sherwin F.

Uy, Kwin Juvy H.

PROPOSED 20 KM ARTERIAL ROAD


LAGUNA

ENGR. MANUEL M. MUHI


(Instructor)

VERTICAL ALIGNMENT

0+700

Sheet No.

VERTICAL ALIGNMENT

0+000

0+100

0+200

Designers:

0+300

Project & Location:

0+400

0+500

Approved By:

0+600

Sheet Content:

Reyes, Ma. Karisse P.


Santillan, Jan Sherwin F.

Uy, Kwin Juvy H.

PROPOSED 20 KM ARTERIAL ROAD


LAGUNA

ENGR. MANUEL M. MUHI


(Instructor)

VERTICAL ALIGNMENT

0+700

Sheet No.

VERTICAL ALIGNMENT

0+000

0+100

0+200

Designers:

0+300

Project & Location:

0+400

0+500

Approved By:

0+600

Sheet Content:

Reyes, Ma. Karisse P.


Santillan, Jan Sherwin F.

Uy, Kwin Juvy H.

PROPOSED 20 KM ARTERIAL ROAD


LAGUNA

ENGR. MANUEL M. MUHI


(Instructor)

VERTICAL ALIGNMENT

0+700

Sheet No.

VERTICAL ALIGNMENT

0+000

0+100

0+200

Designers:

0+300

Project & Location:

0+400

0+500

Approved By:

0+600

Sheet Content:

Reyes, Ma. Karisse P.


Santillan, Jan Sherwin F.

Uy, Kwin Juvy H.

PROPOSED 20 KM ARTERIAL ROAD


LAGUNA

ENGR. MANUEL M. MUHI


(Instructor)

VERTICAL ALIGNMENT

0+700

Sheet No.

VERTICAL ALIGNMENT

0+000

0+100

0+200

Designers:

0+300

Project & Location:

0+400

0+500

Approved By:

0+600

Sheet Content:

Reyes, Ma. Karisse P.


Santillan, Jan Sherwin F.

Uy, Kwin Juvy H.

PROPOSED 20 KM ARTERIAL ROAD


LAGUNA

ENGR. MANUEL M. MUHI


(Instructor)

VERTICAL ALIGNMENT

0+700

Sheet No.

VERTICAL ALIGNMENT

0+000

0+100

0+200

Designers:

0+300

Project & Location:

0+400

0+500

Approved By:

0+600

Sheet Content:

Reyes, Ma. Karisse P.


Santillan, Jan Sherwin F.

Uy, Kwin Juvy H.

PROPOSED 20 KM ARTERIAL ROAD


LAGUNA

ENGR. MANUEL M. MUHI


(Instructor)

VERTICAL ALIGNMENT

0+700

Sheet No.

VERTICAL ALIGNMENT

0+000

0+100

0+200

Designers:

0+300

Project & Location:

0+400

0+500

Approved By:

0+600

Sheet Content:

Reyes, Ma. Karisse P.


Santillan, Jan Sherwin F.

Uy, Kwin Juvy H.

PROPOSED 20 KM ARTERIAL ROAD


LAGUNA

ENGR. MANUEL M. MUHI


(Instructor)

VERTICAL ALIGNMENT

0+700

Sheet No.

VERTICAL ALIGNMENT

0+000

0+100

0+200

Designers:

0+300

Project & Location:

0+400

0+500

Approved By:

0+600

Sheet Content:

Reyes, Ma. Karisse P.


Santillan, Jan Sherwin F.

Uy, Kwin Juvy H.

PROPOSED 20 KM ARTERIAL ROAD


LAGUNA

ENGR. MANUEL M. MUHI


(Instructor)

VERTICAL ALIGNMENT

0+700

Sheet No.

VERTICAL ALIGNMENT

0+000

0+100

0+200

Designers:

0+300

Project & Location:

0+400

0+500

Approved By:

0+600

Sheet Content:

Reyes, Ma. Karisse P.


Santillan, Jan Sherwin F.

Uy, Kwin Juvy H.

PROPOSED 20 KM ARTERIAL ROAD


LAGUNA

ENGR. MANUEL M. MUHI


(Instructor)

VERTICAL ALIGNMENT

0+700

Sheet No.

VERTICAL ALIGNMENT

0+000

0+100

0+200

Designers:

0+300

Project & Location:

0+400

0+500

Approved By:

0+600

Sheet Content:

Reyes, Ma. Karisse P.


Santillan, Jan Sherwin F.

Uy, Kwin Juvy H.

PROPOSED 20 KM ARTERIAL ROAD


LAGUNA

ENGR. MANUEL M. MUHI


(Instructor)

VERTICAL ALIGNMENT

0+700

Sheet No.

Anda mungkin juga menyukai