Page 1 of 3 From : Geotechnical To : All site Engineering Date : J anuary 05, 2012 Cc : Bill Dixon Subject : General Of Geotechnical Recommendation, All Site Area
1. Background
Mining has potential of unstable condition. Swamp, waste dump, and pit which is not accordance on design are prediction area. Based on climatology meteorology and geophysics agency (BMKG) data that weather of J anuary predicted has high rainfall. For Kaltim area (sanga-sanga, tenggarong, and moriss) indicated has 201-300 mm rainfall rate, and for Kalsel and central Kalimantan Area indicated have 201-400 mm rainfall rate. As our knows that rains afford to increase the failure potential because of increasing saturation in rock mass or waste dump.
Figure 1. The Weather Forecast on J anuary 2012
Geotechnical - Mine Planning Group PT Pinang Coal Indonesia
TECHNICAL MEMORANDUM Geotechnical - Mine Planning Group PT PINANG COAL INDONESIA
Page 2 of 3 2. Recommendation
There are some of recommendation to avoid incident or failure, are : Increasing the visual of monitoring regularly Need checking our EOM to assign the location which is not on design maintance all locations which is not on the design like swamp and waste dump location maintance the old perimeter ditch to ensure no water ponding location need perimeter ditch construction if there are water ponding indicated
TECHNICAL MEMORANDUM Geotechnical - Mine Planning Group PT PINANG COAL INDONESIA