Anda di halaman 1dari 23

Site Name

Type Tower

:
: LIGHT DUTY-72m

PERENCANAAN PONDASI
C
F

T
B

Lpile

Keterangan :
Lebar Pondasi
Tebal Pondasi
Kedalaman Pondasi
Pedestal

(B)
(T)
(D)
(C)
F
H
pile

=
=
=
=
=
=
=

2.50
0.40
1.50
0.55
0.50
2.00
10.50

m
m
m
m
m
m
m

1. BEBAN RENCANA :
Gaya Tekan
Gaya Uplift
Gaya lateral

68.26
59.50
4.35

Ton
Ton
Ton

2. DAYA DUKUNG PONDASI TIANG BOR:


**** Daya Dukung Tekan Tiang Bor Tunggal:
Qc

= (Nc*cu*Ab) + (ca*As)
= (9*cu*Ab) + (a cu*As)
Ket :
cu = undrained shear strength pada ujung tiang bor = qc/15
ca = adhesi rata-rata sepanjang selimut tiang = a cu
ult

(kg/cm2)
(kg/cm2)

a = koefisien adhesi

cu = undrained shear strength rata-rata sepanjang selimut tiang

(kg/cm2)

Dari data sondir :


2
qc =
250 Kg/cm
cu = qc/15
= 16.667 kg/cm2

, Pada Elevasi - 12.00

(pada ujung tiang)

2
qc =
20.0 Kg/cm
, (rata-rata qc sepanjang tiang)
(undrained shear strength rata-rata sepanjang tiang)
cu = qc/15
= 1.33 kg/cm2
= 13.3 ton/m2
( dari grafik a VS cu diperoleh a =
0.4

Dipakai : Tiang bor f 30 cm


2
Ab =
706.5 cm
pf =
94.2 cm
As = pf Lpile
2
=
98910 cm
Qc

ult

Qc

all

=
=
=
=

pile

10.50

(9*cu*Ab) + (a cu*As)
105975
+
52752
158727 kg
158.73 ton

= Qc ult/SF
= Qc ult/2.5
= 63.491 ton

(tekan)

**** Daya Dukung Tarik Tiang Bor Tunggal:


QT

ult

= (ca*As)
= (a cu*As)

Ket :

ca = adhesi rata-rata sepanjang selimut tiang = a cu

(kg/cm2)
a = koefisien adhesi
cu = undraine shear strength rata-rata sepanjang selimut tiang
(kg/cm2)

Dari data sondir :


2
qc =
20.0 Kg/cm
cu = qc/15
= 1.33
= 13.3

(rata-rata qc sepanjang tiang)

(undrained shear strength rata-rata sepanjang tiang)


kg/cm2
ton/m2
( dari grafik a VS cu diperoleh a =
0.4

Dipakai : Tiang bor f 40 cm


2
Ab = 1256.0 cm
pf =
125.6 cm
As = pf Lpile
2
= 131880 cm
QT

ult

QT

all

= (a cu*As)
= 70336 kg
= 70.34 ton
= QT ult/SF
= QT ult/3
= 23.445 ton

(tarik)

pile

10.50

**** Daya Dukung Lateral Tiang Bor Tunggal:


Hall = ( k.f.da ) / b
Ket :

Ha
k
f
da

=
=
=
=

Daya dukung mendatar yang diijinkan (kg)


Koefisien reaksi lapisan tanah di bawah permukaan dalam arah lateral (Kg/cm3)
Diameter tiang (cm)
Besarnya pergeseran normal (cm)

b = 4
( k.f )/4EI
E = Modulus elastisitas bahan tiang (Kg/cm2)
I = Momen Inersia penampang (cm4)
I =
125600
fc'=
189
Ec =
204328
k =
0.50
da =
1.00
b = 0.003736

cm4
kg/cm2
kg/cm2
kg/cm3
cm

Hall = ( k. f. da ) / b
=
=

5353.2 Kg
5.00
Ton

(lateral)

Daya Dukung Bored pile Group :


Jumlah Tiang bor (s) =
3
effisiensi group (x) = {16-(s-1)}/16
=
0.88
jarak antar tiang (m) =
jarak ke tepi (n) =
Lebar Pondasi (B) =

1.50
0.50
2.50

(Fled formula)

m
m
m

n
Qcompr.total = s (x *Qcomp.tunggal)
Qtension total = s (x *Qtension tunggal)
Hall total = s (x *Hall)

166.66 Ton

61.54 Ton

13.13 Ton

3. KEAMANAN TERHADAP UPLIFT/TARIK :


Volume Beton (Vb) = {(m+2n)*B*T} - {(msin60)*0.5m*T} + {C*C*(H-T)}
3
= 2.59 m
Berat Beton (Wb) = Vb * 2.4 t/m3
= 6.23 Ton
0
Volume Tanah (Vs) = (Berbentuk limas terpancung terbalik dengan sudut 30 )
(D-T)
2
1
2
1
= [{B+(
/cos30)} * /3*{(Bcos30)+(D-T)}] - [B * /3Bcos30] - [C*C*(D-T)]
m3
= 10.63
Berat tanah (Ws) = Vs * 1.6 t/m3
= 17.00 Ton

Qtension

total

= s (x *Qtension tunggal)
= 61.54 Ton (daya dukung tarik bored pile total)

Wtot =
=
Gaya Uplift =

Wb + Ws + Qtension
84.77 Ton

total

59.50 Ton

<

Total

84.77

Ton

(OK)

4. KEAMANAN TERHADAP BEARING / TEKAN :


P = Gaya Tekan + Berat Beton (Wb)
= 74.49 Ton
Qcompr.

total

= s (x *Qcomp.tunggal)
= 166.66 Ton (daya dukung tekan bored pile total)

P =

74.49 Ton

<

Qcompr.tot = 166.66 Ton

(OK)

5. KEAMANAN TERHADAP SLIDING/GESER :


d = Koefisien friksi = 0.45
H

all

13.13 Ton

(daya dukung lateral bored pile total)

P = Gaya Tekan + Berat Beton (Wb)


=
74.49 Ton
Gaya Lateral

SF

=
=

sliding

4.35 Ton
(P*d + H all )

Lateral

10.72

>

1.5

(OK)

6. PENULANGAN :
Mutu Beton :
fc' =
18.9 Mpa

(K-225)

Mutu Tulangan :
fy =
400 Mpa
fys =
240 Mpa

(BJTD40)
(BJTP24)

D > 13mm
f < 13mm

A. PEDESTAL
faktor beban = 1.3
P

tot

= Gaya Tekan + Berat Pedestal


=
69.42 Ton

Gaya Tarik =

59.50 Ton

Momen = Lateral*(H-T)
=
6.96 Ton.m

Pu = 1.3* Ptot =

90.25

Ton

Tu = 1.3* tarik =

77.35

Ton

Mu = 1.3* Momen =

9.05

Ton.m

Penulangan Utama:
C

- Akibat Tekan:
C

Pu =
90.25
Ton
Pu = f 0.8*(0.85fc'*(Ag-As) + As*fy)
{Pu/(0.65*0.8)}-0.85fc'Ag
fy - 0.85fc'
2
= -81.37 cm

As =
C =
0.55 m
Ag = C*C
= 0.3025 m2
2
= 3025 cm

As1
- Akibat Tarik:

Tu =
Tu =

Asmin = 1%* Ag
Asmin =

As =

2
30.25 cm

As2 =
- Akibat Momen (bolak-balik):
Mu =
9.05

77.35

Ton

f As*fy
(Tu/0.7)
fy
27.63

cm2

Ton.m

Mu = f Asfy (d-1/2a)
Mu = 0.8 Asfy (d-1/2a)
Mu = 0.8 Asfy (d-(Asfy/1.7fc'b))
As = Mu /{0.8fy (d-(Asfy/1.7fc'b))}
2
11.64 cm

As3 =

, dimana

a= Asfy/0.85fc'b

As
As

Perlu

Perlu

=
(

= Max( As min, As1, As2, As3)


2
30.25 cm
, digunakan besi :
16 D16 )

16

DIAGRAM INTERAKSI PEDESTAL


400

200

100

f Pn

(Ton)

300

0
0

10

15

20

25

30

-100

-200

f Mn

(Ton.m)

Penulangan Sengkang:
Gaya Lateral =

4.35

Ton

Vu = 1.3* tekan =

5.66

Ton

1.57

cm2

Vc = 1/6 fc'1/2 bd
= 19.93 Ton
Vs = Vu/f - Vc
= -12.39 Ton

(Sengkang minimum)
f 10 mm

Dicoba :
smin <
<

, f = 0.75

Av*fys

/3b

22.84 cm

smin < 1/2 C


< 27.50
Sengkang dipakai :

cm
f 10 -150

Av = 2.1/4. p f2 =

35

B. PELAT PONDASI/PILE CAP


C

T
B

Lebar Pondasi (B) =


2.50 m
Tebal Pondasi (T) =
0.40 m
Tebal efektif (d) = T - (selimut beton T= 7cm)
=
0.33 m
=
33 cm
Pedestal (C) =
55 cm
Analisa Geser Pons:
Teg. geser beton 2 arah :

vc

= /3 fc'

=
=

1/2

1.449
14.49

MPa
Kg/cm2

Luas bidang Geser Pons = 4*(C+d)*d


2
11616 cm

=
kuat geser beton : Vc =

=
P

tot

vc

*4*(C+d)*d
168332 Kg

= Gaya Tekan + Berat Pedestal


=
69.42 Ton

Syarat :
Pu

Pu < f Vc
Pu < 0.75Vc
= 90248 kg

Pu = 1.3* Ptot =
=

f Vc

<

90.25
90248

126249 Kg

Ton
kg

(OK)

Penulangan pile cap:


P

tot

Luas pile cap (A) =

69.42 Ton
2
4.30 m
2
16.14 Ton/m

qmax = Ptot/A =

qu = 1.3*qmax * B
qu =
52.45
Ton/m

faktor beban = 1.3

Mu = 1/2*qu*(1/2B -1/2C)2
Mu = 24.93 Ton.m =

2493086.2 Kg.cm

Mu = f Asfy (d-1/2a)
Mu = 0.8 Asfy (d-1/2a)

, dimana

a= Asfy/0.85fc'b

Mu = 0.8 Asfy (d-(Asfy/1.7fc'b))


As = Mu /{0.8fy (d-(Asfy/1.7fc'b))}
2
As = 24.58 cm
As

min

= rmin*B*d
=

As

perlu

16.50
2

24.58 cm
(16 D16 - 150 )

, rmin =
cm2
,

0.002

digunakan besi :

16

C. TIE BEAM
30 cm

50 cm
L

tiebeam

584.00 cm

Beban tetap :
3
qbalok = b*h* 2400kg/m
=
360
kg/m
qhidup =
250
kg/m
3
qtanah = b * kedalaman tiebeam * 1600kg/m
=
240
kg/m
q tot = q balok+qhidup+qtanah
=
850
kg/m
faktor beban = 1.3
qu = 1.3*qtot
Mu = 1/12*qu*L2
= 1105 kg/m
= 3140.557 kg.m
Penulangan Utama:
- Akibat Momen:
Mu = f Asfy (d-1/2a)
Mu = 0.8 Asfy (d-1/2a)

, dimana

a= Asfy/0.85fc'b

Mu = 0.8 Asfy (d-(Asfy/1.7fc'b))


As = Mu /{0.8fy (d-(Asfy/1.7fc'b))}
2
2.23 cm

As1 =

- Akibat Tarik:
Tu = f As*fy

As

As

min

perlu

As =

(Tu/0.7)
fy

As2 =

2.44

= rmin*b*d
=

4.73

=
(
(
(

4.73
3 D16
3 D16
2 D16

, Tu = 10% Gaya Tekan


=
6.826
Ton

cm2

, rmin =
cm2

1.4/fy = 0.0035

cm2
)
)
)

digunakan besi :

16

Tul. Atas
Tul. Bawah
Tul. Pinggang

Penulangan Sengkang:
Vu = 1/2 qu L
= 3.23 Ton
Vc = 1/6 fc'1/2 bd
= 9.78 Ton
Vs = Vu/f - Vc
= -5.48 Ton
Dicoba :

(Sengkang minimum)
f 10 mm

Av*fys

smin <
/3b
<
41.87 cm
smin < 1/2 h
< 25.00 cm
Sengkang dipakai :

f 10 -200

Av = 2.1/4. p f2 =

1.57

cm2

D. BORED PILE
faktor beban = 1.3
Tekan (P

Tarik (T

1 bored pile)

= (Gaya Tekan + Berat beton) / 3


=
24.83 Ton

1 bored pile)

19.83 Ton

Pu = 1.3* P =

32.28

Ton

Tu = 1.3* tarik =

25.78

Ton

Penulangan Utama:

- Akibat Tekan:
D

Pu =
32.28
Ton
Pu = f 0.8*(0.85fc'*(Ag-As) + As*fy)
{Pu/(0.65*0.8)}-0.85fc'Ag
fy - 0.85fc'
2
= -36.39 cm

As =
f =

0.40 m

As1

Ag = 1/4 p f2
= 0.1256 m2
2
= 1256 cm

- Akibat Tarik:
Tu =
Tu =

Asmin = 1%* Ag
Asmin =

As =

2
12.56 cm

As2 =
As
As

Perlu

=
(

= Max( As
cm2
)

Perlu

min,

25.78

Ton

f As*fy
(Tu/0.7)
fy
cm2

9.21

As1, As2)
,

12.56
7 D16

digunakan besi :

16

Penulangan Sengkang:
Lateral (H

1 bored pile)

1.45

Ton

Vu = 1.3* tekan =

1.89

Vc = 1/6 fc'1/2 bd
= 10.14 Ton
Vs = Vu/f - Vc
= -7.63 Ton

(Sengkang minimum)
f 8 mm

Dicoba :
smin <
<

, f = 0.75

Av*fys

/3b

20.10 cm

smin < 1/2 D


< 20.00
Sengkang dipakai :

cm
f8 -200

Av = 2.1/4. p f2 =

1.00

cm2

Ton

Proyek :
Tanggal :
Subject :

ANALISA TULANGAN LENTUR BALOK


Beton : K
Besi Beton : BJTP

BEAM ID

B1

Stress
Point
TUMPUAN

225
40

Properties Penampang
b
h
d
cm
250

fc' =
fy =

Momen yang terjadi


MU
Mn

18
400

MPa
MPa

Tul. Perlu
n - D

Rasio Tulangan
rmin

40

33

kg-m
24931

kg-m
31164

15

(mm)
D - 16

0.0035

cm

cm

LAPANGAN

250

40

33

24931

31164

15

D -

16

0.0035

B1

TUMPUAN
LAPANGAN

55
55

55
55

50
50

9048
9048

11310
11310

5
5

D D -

16
16

0.0035
0.0035

B1

TUMPUAN
LAPANGAN

30
30

50
50

45
45

3141
3141

3926
3926

3
3

D D -

16
16

0.0035
0.0035

ALOK

Rasio Tulangan
rterpasang
rmax

Luas Tulangan
Asmin Asperlu
Asmax

0.0037

0.0144

cm2
28.88

cm2
28.88

cm2
118.47 24.58

0.0037

0.0144

28.88

28.88

118.47

0.0037
0.0037

0.0144
0.0144

9.63
9.63

9.63
9.63

39.49 5.82
39.49

0.0045
0.0045

0.0144
0.0144

4.73
4.73

4.73
4.73

19.39 2.23
19.39

x
-1.88
-1.69
-1.50
-1.31
-1.13
-0.94
-0.75
-0.56
-0.38
-0.19
0.00

y
1.90
1.90
1.90
1.90
1.90
1.90
1.90
1.90
1.90
1.90
1.90

x
2.43
2.24
2.05
1.86
1.68
1.49
1.30
1.11
0.93
0.74
0.55

y
1.90
1.90
1.90
1.90
1.90
1.90
1.90
1.90
1.90
1.90
1.90

x
5.00
4.56
4.11
3.67
3.22
2.78
2.33
1.89
1.44
1.00
0.55

y
1.40
1.40
1.40
1.40
1.40
1.40
1.40
1.40
1.40
1.40
1.40

x
5.00
4.56
4.11
3.67
3.22
2.78
2.33
1.89
1.44
1.00
0.55

y
0.90
0.90
0.90
0.90
0.90
0.90
0.90
0.90
0.90
0.90
0.90

x
0.55
0.50
0.44
0.39
0.33
0.28
0.22
0.17
0.11
0.06
0.00

y
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

x
0.55
0.55
0.55
0.55
0.55
0.55
0.55
0.55
0.55
0.55
0.55

y
2.40
2.20
2.00
1.80
1.60
1.40
1.20
1.00
0.80
0.60
0.40

x
0.55
0.50
0.44
0.39
0.33
0.28
0.22
0.17
0.11
0.06
0.00

y
2.40
2.40
2.40
2.40
2.40
2.40
2.40
2.40
2.40
2.40
2.40

x
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

y
2.40
2.20
2.00
1.80
1.60
1.40
1.20
1.00
0.80
0.60
0.40

x
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

y
2.40
2.40
2.40
2.40
2.40
2.40
2.40
2.40
2.40
2.40
2.40

x
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

y
2.40
2.35
2.30
2.25
2.20
2.15
2.10
2.05
2.00
1.95
1.90

x
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

y
1.90
1.90
1.9
1.9
1.9
1.9
1.9
1.9
1.9
1.9
1.9

H
bw
bf1
bf2
T1
T2

x
0.55
0.55
0.55
0.55
0.55
0.55
0.55

y
2.40
2.40
2.40
2.40
2.40
2.40
2.40

x
0.55
0.55
0.55
0.55
0.55
0.55
0.55

y
2.40
2.35
2.30
2.25
2.20
2.15
2.10

x
0.55
0.55
0.55
0.55
0.55
0.55
0.55

y
1.90
1.90
1.90
1.90
1.90
1.90
1.90

=
=
=
=
=
=

2.00
0.55
0.55
2.50
0.50
0.40

0.55
0.55
0.55
0.55

2.40
2.40
2.40
2.40

0.55
0.55
0.55
0.55

2.05
2.00
1.95
1.90

0.55
0.55
0.55
0.55

1.90
1.90
1.90
1.90

x
-0.98
-0.88
-0.78
-0.68
-0.59
-0.49
-0.39
-0.29
-0.20
-0.10
0.00

y
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

x
-0.98
-0.98
-0.98
-0.98
-0.98
-0.98
-0.98
-0.98
-0.98
-0.98
-0.98

y
0.00
0.04
0.08
0.12
0.16
0.20
0.24
0.28
0.32
0.36
0.40

x
-0.98
-0.88
-0.78
-0.68
-0.59
-0.49
-0.39
-0.29
-0.20
-0.10
0.00

y
0.40
0.40
0.4
0.4
0.4
0.4
0.4
0.4
0.4
0.4
0.4

x
1.53
1.43
1.33
1.23
1.14
1.04
0.94
0.84
0.75
0.65
0.55

y
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

x
1.53
1.53
1.53
1.53
1.53
1.53
1.53
1.53
1.53
1.53
1.53

y
0.00
0.04
0.08
0.12
0.16
0.20
0.24
0.28
0.32
0.36
0.40

x
1.53
1.43
1.33
1.23
1.14
1.04
0.94
0.84
0.75
0.65
0.55

y
0.40
0.40
0.40
0.40
0.40
0.40
0.40
0.40
0.40
0.40
0.40

x
5.00
4.56
4.11
3.67
3.22
2.78
2.33
1.89
1.44
1.00
0.55

y
-0.10
-0.10
-0.10
-0.10
-0.10
-0.10
-0.10
-0.10
-0.10
-0.10
-0.10

x
5.00
5.00
5.00
5.00
5.00
5.00
5.00
5.00
5.00
5.00
5.00

y
2.40
2.20
2.00
1.80
1.60
1.40
1.20
1.00
0.80
0.60
0.40

x
-0.98
-0.73
-0.48
-0.23
0.02
0.28
0.53
0.78
1.03
1.28
1.53

y
-0.20
-0.20
-0.20
-0.20
-0.20
-0.20
-0.20
-0.20
-0.20
-0.20
-0.20

C/bf1
x
0.00
0.06
0.11
0.17
0.22
0.28
0.33
0.39
0.44
0.50
0.55

y
2.60
2.60
2.60
2.60
2.60
2.60
2.60
2.60
2.60
2.60
bf1
2.60

y
0.00
0.04
0.08
0.12
0.16
0.20
0.24
0.28
0.32
0.36
0.40

t1 t1
x
-0.88
-0.88
-0.88
-0.88
-0.88
-0.88
-0.88
-0.88
-0.88
-0.88
-0.88

y
1.90
1.95
2.00
bw
2.05
2.10
2.15
2.20
2.25
2.30
bf2
2.35
2.40

bf2

t2
x
1.73
1.73
1.73
1.73
1.73
1.73
1.73
1.73
1.73
1.73
1.73

x
5.55
5.55
5.55
5.55
5.55
5.55
5.55
5.55
5.55
5.55
5.55

y
2.40
2.20
2.00
1.80
1.60
1.40
1.20
1.00
0.80
0.60
0.40

x
5.55
5.50
5.44
5.39
5.33
5.28
5.22
5.17
5.11
5.06
5.00

x
-1.58
-1.58
-1.58
-1.58
-1.58
-1.58
-1.58
-1.58
-1.58
-1.58
-1.58

y
0.00
0.25
0.50
0.75
1.00
1.25
1.50
1.75
2.00
2.25
2.50

x
-1.18
-1.18
-1.18
-1.18
-1.18
-1.18
-1.18
-1.18
-1.18
-1.18
-1.18

11

Bw
x
0.55
0.50
0.44
0.39
0.33
0.28
0.22t2
0.17
0.11
0.06
0.00

y
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00

y
2.40
2.40
2.40
2.40
2.40
2.40
2.40
2.40
2.40
2.40
2.40

y
0.00
0.19
0.38
0.57
0.76
0.95
1.14
1.33
1.52
1.71
1.90

KOLOM DENGAN 4 SISI PENULANGAN


g

fc' (Mpa)

fy (Mpa)

b (mm)

h (mm)

0.8

18.9

400

550.00

550.00

Mu (Ton.m)

Pu (Ton)

9.0

90.2

9.0

-77.35

g
Mn

Pn

Ag (mm2)

Pn/Ag

Mn/(Ag.h)

302500

90.248

9.048

DIAGRAM INTERAKSI KOLOM 4 SISI


f c '=
fy =

Beton : K - 225
Besi : U - 40

19
400

MPa
MPa

350
300
250

(Ton)

200
150

fc Pn

100
50
0
0

10

15

20

25

-50
-100
-150

fc Mn

Ast (mm2) Dia. (mm)

r
8.0%

28800

(Ton.m)

n (batang)

16

144

ANALISA
n (btg) Dia.(mm)Ast (mm2) b (mm)
11

13 1459.315

200

h (mm)
200

r
3.6%

4 SISI
g =

0.8
b

gh

B
H
Ag
r
Ast

=
=
=
=
=

ntul =

30

35

550.00 mm
550.00 mm
2
302500 mm
1.06%
2
3217 mm
16 D - 16

tul

16

D(mm)
16

Fc'
18.9
18.9
18.9
18.9
18.9
18.9
18.9
18.9
18.9
18.9
18.9

Betha 1
0.85
0.85
0.85
0.85
0.85
0.85
0.85
0.85
0.85
0.85
0.85

c/h

Gamma

0.1
0.2
0.3
0.4
0.5
0.6
0.7
0.8
0.9
1
~

c/h

0.8
0.8
0.8
0.8
0.8
0.8
0.8
0.8
0.8
0.8
0.8

teg pd 0,1h
0.1
0.2
0.3
0.4
0.5
0.6
0.7
0.8
0.9

c/h

0
400
400
400
400
400
400
400
400

teg pd 0,1h
0.1
0.2
0.3
0.4
0.5
0.6
0.7
0.8
0.9

0
600
1200
1800
2400
3000
3600
4200
4800

rho
1.06%
0.010635
0.010635
0.010635
0.010635
0.010635
0.010635
0.010635
0.010635
0.010635
0.010635

0.2h
300
0
300
400
400
400
400
400
400

0.2h
300
0
300
600
900
1200
1500
1800
2100

Fy

Fs
400
400
400
400
400
400
400
400
400
400
400

0.3h
400
200
0
200
400
400
400
400
400

0.3h
400
200
0
200
400
600
800
1000
1200

Fs ambil

4800
2100
1200
750
480
300
171.43
75
0
-60
400

0.4h
400
300
150
0
150
300
400
400
400

0.4h
450
300
150
0
150
300
450
600
750

0.5h
400
360
240
120
0
120
240
360
400

0.5h
480
360
240
120
0
120
240
360
480

400
400
400
400
400
300
171.4
75
0
-60
400

0.6h
400
400
300
200
100
0
100
200
300

0.6h
500
400
300
200
100
0
100
200
300

Fs'
0
300
400
450
480
500
514.29
525
533.33
540
400

0.7h
400.0
400.0
342.9
257.1
171.4
85.7
0.0
85.7
171.4

0.7h
514.29
428.57
342.86
257.14
171.43
85.71
0.00
85.71
171.43

0.8h
400.0
400.0
375.0
300.0
225.0
150.0
75.0
0.0
75.0

0.8h
525
450
375
300
225
150
75
0
75

f Pn/Ag f Mn/Ag.h
-3.403
0
-1.460
0.84
0.546
1.51
1.873
1.68
3.155
1.90
4.438
1.99
5.844
1.93
7.187
1.77
8.415
1.56
9.568
1.30
10.477
0.97
10.477
0.00

Fs' ambil
0
300
400
400
400
400
400
400
400
400
400

0.9h

533.33
466.67
400.00
333.33
266.67
200.00
133.33
66.67
0.00

1.890

400.0
400.0
400.0
333.3
266.7
200.0
133.3
66.7
0.0

0.9h

0.1 fc'

400
400
400
360
300
240
180
120
60

h
540
480
420
360
300
240
180
120
60

0.00

0.55

1.87

0.8

0.75629

0.65

f Pn
-102.944
-44.1621
16.50813
56.65126
95.44972
134.2482
176.7806
217.3928
254.5643
289.442
316.9285
316.9285

f Mn
0
13.97703
25.08871
28.0032
31.56861
33.18877
32.0586
29.40564
25.96689
21.58585
16.1358
0