Anda di halaman 1dari 3

MMUP Sample Questions

1. If you were awarded a project, you will start work:


a. One week before the approval of the authorities
b. After the approval of the authorities
c. One day before the approval of the authorities
2. Project Scope Management:
a. Define scope and control scope
b. Executing scope and verify scope
c. Closing process and Create work breakdown structure
d. All of the above
e. Only A & B
3. Scope Management starts with is:
a. To identify the client requirements
b. Meet the team
c. Review strategic plan
4. Final as built drawings for what purpose
a. To keep record for later maintenance
b. To give more work to architect
c. To be used for further renovation
5. Control department work starts
a. From the beginning of the project
b. During construction
c. After construction
6. Project management is ideally suited except
a. Accountability
b. Flexibility
c. Innovation
d. Speed
e. Repeatability
7. A critical path is the ----------------------in the project management:
a. longest
b. shortest
c. none
8. The forward pass review of the project management will indicate the following:
a. The earliest start of the task
b. The earliest finish of the task
c. Critical path (longest path)
d. Only A & B
e. All of the above
9. The back pass review of the project will indicate the following:
a. The latest start of the task.
b. The earliest finish of the task.
c. The critical path.
d. Only A & C
e. All of the above.
10. Intersecting point for WBS and OBS
a. Cost account
b. Intersect matrix
c. Project matrix
d. None of above
11. For operation and designed auto mobile factory
a. Mechanical Engineer
b. Civil Engineer
c. Chemical Engineer
d. Petroleum Engineer
12. Which of the following discipline is most suitable for doing a natural gas pipeline work?
a. Mechanical Engg
b. Petroleum Engg
c. Chemical Engg
d. Civil Engg
13. Gypsum board at residence and industrial building used except
a. Low cost
b. Ease of installation
c. Recyclability
14. Stress defined
a. Strain time force
b. Mass divide volume
c. Pressure time length
d. None of above
15. What is the last of estimation for project
a. Estimation
b. Assembly schedule
16. Which one of the following is suitable in engineering manner? Decision shall be based on
reason than situation .
a. Quantity Thinking.
b. Logical Thinking.
c. Interpersonal Skills.
d. Honesty.
17. What is QSAS?
a. Qatar Sustainability Assessment System
18. An activity in a project network can be represented by which of the following?
a. Arrow
b. Line
c. Node
d. All of the above
19. Before starting work at site, the major factor has to be checked is?
a. Access to site (EFE)
b. Storage of Water, tools & equipments
c. Safety
d. Approval from MMUP / Civil / Defence etc.
e. All of the above
20. Software programming flow
a. Plan, Do, Check, Act
b. Plan, Do, Act, Check
c. Plan, Act, Do, Check
21. First step of Scope planning starts with
a. Budgeting
b. Current earning estimation
c. Objectives and requirements to satisfy customer
22. In network which point getting more inward flow
a. Float
b. Critical path
c. Slack
d. Merging point
23. What is the least level of WBS
a. Deliverable
b. Cost
c. Work package
d. Lowest sub deliverable
24. The best place to build an exhibition and convention center (near the Airport? Or in satellite
place far from Urban? Etc)
25. One situation for cancel project.
26. What is the most sensitive period in the project?