Anda di halaman 1dari 13
‘Dy HI \TION_ CORPY 1ON LIMITED. t D From: To: The Chief Engineer elecy., Bharat Heavy Electrical Limited, Thermal projects construction -Il, Vidyut soudha, Hyderabad ~ 500 082. Tele no: 040 -23490211 ‘Component Fabrication Plant(CFP), Rudrapur, Udham Singh Nagar(Distt, Uttarakhand(State) -263153. Fax.n0:040-23499299, lo. CPP/ PP-IVBHEL/QPs/bus duc/D.No, 71/12, DT: 04.06.12 Kind Attention: Sri Rupesh Kumar(Engineer) Sir, "Sub: KTPP Stage-lI - | x 600 MW — IPED and SPBD -Quality Assurance Plans — Approval - Reg Ref: BHEL Lr. No..BHE/RU/QC Dt: 18.04.12. The revised Quality Assurance plans pertaining to Isolated Phase Bus Duct, SPVT/LAVT & NG Cubicle(Doc.No.QP/BD/IP/KAKATIYA STAGE-lI, Rev.No.01) and Segregated Phase Bus duct (Doc.No.QP/BDISP/KAKATIYA STAGE-I, Rev.No.01) required for KTPP Stage-II(1X600MW) are received vide reference cited above. The above QAPs are reviewed and here by approved. Approved QAPs are enclosed herewith for taking necessary action at your end. However, approval of the above Quality Plans does not absolve M/s BHEL of its responsibility of supplying the above materials to the specifications and relevant standards and to ensure satisfactory performance of the above equipment as per the terms of the contract, Enel: Approved QAPs of IPBD & SPBD(12 Pages) yn CHIEF ENGINEER ELECYITPC-Il, CC to: Sri. CSP Mukharji, Executive Director, M/s Desein Pvt. Ltd.102,First Floor, 5-9-22,My Home Sarovar Plaza, Opp.Secretariate Hyderabad-63. ‘The Chief Engineer /O&M/KTPP/APGENCO/Chelpur(V)/Ghanpur(M)/Warangal-506170, ~ BHARAT HEAVY ELECTRICALS LIMITED, RUDRAPUR a "MANUFACTURING PLAN FOR BUSDUCT ‘CUSTOMER: M/s Andhra Pradesh Power | ‘Generation Corporation Limited PROJECT: 15600 MW Kakatiya TPP Stage- oe ‘QUALITY ASSURANCE PLAN FOR | ISOLATED PHASE BUS DUCT, SPVI/LAVT encima hile Bye (RP/S,DE: Joos zo WATEh. INSPECTION TIN" ] PROCESS INSPECTION / FINAL INSPECTION SUB VENDORS] | Doc Na. conrracrors | STAG! ‘VENDORS / works: 1 | / sueveryae | PROMET: 00 | a NT GaARACTERISHS Sy | uaa or ~[rerenence | ACREAGE oma j No. nONS 3/88 aieck | pocumenr | norms | oF | £8 eps pas [ie 7 aaa 7 1 2a | Ami 8] 1 | same | ste surge | 1 | ees o| + | Sie | sme e | o | + | sample | some | 8) + | tenet | Seer | 12 | Aurion a sss | sore | supter I Conan t| ot cow | coma | “fe o) ot eGrassor | “Grasso |r | 13 | ase tortie | srr | wr | sippter | i "e | | + | ot 14 | coppers, sheet _. sss | sasor | supper oe “a "e b) ot bt | oe | eo cuss scencr score rormar orRecono ‘enmen, MANUFACTURE UB CONTRACTOR _P-PERFORMER ems came avon CC pueywonamATeD WSPECTON AGENCY: REVEW OF TC 0 sossevaTiON SET etme maustowen wewnness Ore bras Gerastowennowront Chine cHeckUst Note:- + SAMAR TIPE TEST ERTCATE SHAUL BE ACCEPTED Prepared by Checked & Approved by eT on? yw (saver ARAVA) baat %, Engineer (06) Visun Souda, Hyverabaad - 500 082, BHARAT HEAVY ELECTRICALS LIMITED, RUDRAPUR _T] UT SSTRANCEPIANFOR WATE WSPECTION TW] SUB VERORST 'SOUATED PHASE BUS DUCT SPVT/LAVT | PROCESSINSPECTON/FNAL | VENDORS/ ‘enc cuncie INSPECTION contmacrors PROIECT 35600 AW Katya TP Stag. ‘won sneviore/ac | PROMET: 35600 | 3] coronent | GaacrenTS Se] Can OF | RERERENCE | AOFM — | TORRIRT | RENT ; No. | & OPERATIONS 3) 88 CHECK. Document | NORMS oF i e185 paey] ow recor> = [mT eT NT} I __ 7 | | ‘20 | BOUGHT OUT ITEMS 1 21 | pawyinalstor | a) Viul® Omension 2 | vn | sample | sample | s:oeastorg | oar om | suppter |e |v |v | 1 crepage Once 8] ot | apefor | ageae me Jejvly | alee hele elev 2] | sone | see elev ‘ellighenng mpucevotage |e | | Sample | Sample Privy | withtand tet “*f) Temp. Cycle test. B T ‘Sample | Sample eiviv | araaaiouderetes | 8 | Tt | sample | Somete elyiy 22 | epowysenion | a) vaualomension 2 | vn | sample | sample | uttors | enerors | supoter |» | wv testi, a] [Soom | “oom | “soar | “wsat | “Se” Le lwiy | 5 | 1 | samp | sample elwiy | t | + | simple | Sapte piviy 2 | 1 | sample | semple elwiy 8 T ‘Sample | Sample epiviv 1 o | + | simpe | Semele elwfy i aa e | vn | sox | sox | ouetom | onetow | suppter |e | wl v | Bh aging Test | T | sample | some col a i a Shore Hardness | 1 _| sample | Sample tele |iv a) cass wre oF ack pcencr score FonyaT oF RECORD AcnCAL Viva MEMANUSACTURER/SUB CONTRACTOR PERFORMER TerTest cnneaTe wiaon TE MEASURenaeNT ——-CBHEUNOMINATED INSPECTION AGENCY VREVWOFTC 0s. OnseRvATION SiEET cnn nas nceustowen Ore DRAWING Chust: CHECK UST Note:~ SIMILAR TYPE TEST CERTIFICATE SHAUL BE ACCEPTED Prepared by waa Engineer (QC)

Anda mungkin juga menyukai