Anda di halaman 1dari 64

Page 1 of 3

CENTRAL ELECTRICITY AUTHORITY


OPERATION MONITORING DIVISION
DAILY COAL REPORT
COAL STOCKS POSITION AT VARIOUS THERMAL POWER STATIONS IN THE COUNTRY ( AS ON 01-Jan-2014 )
REGION/
STATE

MODE
OF
TRANS PORT

NAME OF THERMAL
POWER STATION

CAPA
CITY
(MW)

NORM
ATIVE
STOCK
Reqd.
(DAYS)

DAILY
REQUIR
EMENT
IN '000
TONNES

ACTUAL STOCK

IN, 000 TONNES TOTAL

Imp ort

CRITICAL

REASONS FOR CRITICAL


COAL STOCK

COAL
STOCK

IN
DAYS

<7
<4
DAYS DAYS

Indig
enous

NORTHERN
DELHI
1

RAIL

RAJGHAT TPS

135

20

1.9

79.9

79.9

43

RAIL

BADARPUR TPS

705

30

10.6

166.17

166.17

16

RAIL

PANIPAT TPS

1360

25

19.6

57

468.17

525.17

27

RAIL

YAMUNA NAGAR TPS

600

25

6.9

38

188.67

226.67

33

RAIL

RAJIV GANDHI TPS

1200

25

12.3

82

613.89

695.89

57

RAIL

INDIRA GANDHI STPP

1500

25

19

142

371.66

513.66

27

RAIL

MAHATMA GANDHI TPS

1320

25

16.7

97.32

102.32

PUNJAB
8

RAIL

GH TPS (LEH.MOH.)

RAIL

ROPAR TPS

10

RAIL

GND TPS(BHATINDA)

HARYANA

920

30

12.9

174.98

174.98

14

1260

25

18.5

244.91

244.91

13

440

30

4.9

51.75

51.75

10

CIL Supply: 54% of ACQ

RAJASTHAN
11

RAIL

KOTA TPS

1240

30

21

197.08

197.08

12

RAIL

SURATGARH TPS

1500

30

20.4

361.2

362.2

18

13

RAIL

CHHABRA TPP

750

30

6.3

169.26

169.26

27

15

UTTAR PRADESH
14

PITHEAD

ANPARA TPS

15

RAIL

HARDUAGANJ TPS

16

RAIL

OBRA TPS

17

RAIL

PANKI TPS

18

RAIL

PARICHHA TPS

19

RAIL

DADRI (NCTPP)

1820

20

PITHEAD

RIHAND STPS

21

PITHEAD

SINGRAULI STPS

22

RAIL

TANDA TPS

440

23

RAIL

UNCHAHAR TPS

24

RAIL

ROSA TPP Ph-I

25

PITHEAD

ANPARA C TPS

1200

25

14.2

49.82

49.82

28563

24

380.7

484

4829.41

5313.41

14

TOTAL OF N.R.

1630

15

24

368.75

368.75

665

25

7.2

51.09

51.09

1278

20

11.7

311.06

311.06

27

210

20

2.6

47.58

47.58

19

1140

30

14

116.44

116.44

30

26.4

80

244.12

324.12

12

3000

15

36.4

73.26

73.26

** CIL Supply: 99% of ACQ

2000

15

33.1

139.16

139.16

CIL Supply: 96% of ACQ

25

8.4

59.14

59.14

1050

25

16.7

** CIL Supply: 95% of ACQ

1200

25

15

79

184.04

263.04

17

WESTERN
CHHATTISGARH
26

RAIL

DSPM TPS

500

15

8.2

301.8

301.8

37

27

PITHEAD

KORBA-II

440

15

246.32

246.32

35

28

PITHEAD

KORBA-WEST TPS

1340

15

11.7

248.47

248.47

21

29

PITHEAD

KORBA STPS

2600

15

45.7

436.78

436.78

10

30

PITHEAD

SIPAT STPS

2980

20

42.5

106

474.54

580.54

14

31

RAIL

PATHADI TPP

600

15

164.41

164.41

23

32

RAIL

BHILAI TPS

500

25

6.7

38

256.28

294.28

44

33

RAIL

AKALTARA TPS

600

20

7.1

83.89

83.89

12

34

RAIL

SIKKA REP. TPS

240

30

1.3

59.41

59.41

46

35

RAIL

GANDHI NAGAR TPS

870

30

8.7

206.02

206.02

24

36

RAIL

UKAI TPS

1350

30

13.7

269.01

269.01

20

37

RAIL

WANAKBORI TPS

1470

30

19.4

474.83

474.83

25

38

RAIL

SABARMATI (C STATION)

400

30

5.3

68.32

68.32

13

GUJARAT

CIL Supply: 109% of ACQ


2

Page 2 of 3

REGION/
STATE

MODE
OF
TRANS PORT

NAME OF THERMAL
POWER STATION

CAPA
CITY
(MW)

NORM
ATIVE
STOCK
Reqd.
(DAYS)

DAILY
REQUIR
EMENT
IN '000
TONNES

ACTUAL STOCK

IN, 000 TONNES TOTAL

Imp ort

CRITICAL

REASONS FOR CRITICAL


COAL STOCK

COAL
STOCK

IN
DAYS

<7
<4
DAYS DAYS

Indig
enous

MADHYA PRADESH
39

PITHEAD

AMARKANTAK EXT TPS

450

15

5.3

37

22.02

59.02

11

40

RAIL

SANJAY GANDHI TPS

1340

20

16.5

194.93

194.93

12

41

RAIL

SATPURA TPS

1580

20

17.3

34

615.8

649.8

38

42

PITHEAD

VINDHYACHAL STPS

4260

15

56.6

119.53

120.53

43

RAIL

BINA TPS

500

25

7.5

110.36

110.36

15

** CIL Supply: 92% of ACQ

** CIL Supply: 80% of ACQ

** Less import

MAHARASHTRA
44

RAIL

BHUSAWAL TPS

1420

20

17.4

211.67

211.67

12

45

RAIL

CHANDRAPUR(MAHARASHTR
A) STPS

2340

20

34.7

481.4

481.4

14

46

RAIL

KHAPARKHEDA TPS

1340

25

17.5

89

88.21

177.21

10

47

RAIL

KORADI TPS

1040

25

8.1

149.26

149.26

18

48

RAIL

NASIK TPS

630

25

11.2

138.74

138.74

12

49

RAIL

PARLI TPS

1130

25

15.6

17.67

17.67

50

RAIL

PARAS TPS

500

25

6.4

126.91

126.91

20

51

RAIL

DAHANU TPS

500

25

10.1

47

37.66

84.66

52

RAIL

WARDHA WARORA TPP

540

20

5.3

0.05

1.05

53

RAIL

TIRORA TPS

1980

20

18.1

18

319.61

337.61

19

54

RAIL

BELA TPS

270

20

2.4

55

RAIL

BUTIBORI TPP

300

20

3.6

56

RAIL

AMARAVATI TPS

270

20

3.2

12.99

12.99

CIL Supply: 97% of ACQ

57

RAIL

EMCO WARORA TPS

600

20

3.4

18.73

19.73

Less import

58

RAIL

MAUDA TPS

1000

30

7.1

114.86

114.86

16

35880

21

451.6

374

6070.51

6444.51

14

TOTAL OF W.R.

Data not received


Data not received

SOUTHERN
ANDHRA PRADESH
59

RAIL

Dr. N.TATA RAO TPS

1760

20

28.5

18

139.79

157.79

60

RAIL

KOTHAGUDEM TPS

1720

20

27.8

39.07

39.07

** Less Receipt

CIL Supply 64% of ACQ

61

RAIL

RAYALASEEMA TPS

1050

25

15.9

10

17.89

27.89

** Less Receipt

62

PITHEAD

RAMAGUNDEM STPS

2600

15

40.6

91.7

92.7

** Less import

63

RAIL

SIMHADRI

2000

25

29.4

21

36.39

57.39

** CIL Supply: 85% of ACQ

64

RAIL

KAKATIYA TPS

500

25

7.1

7.98

7.98

** Less Receipt

KARNATAKA
65

RAIL

RAICHUR TPS

1720

30

23.3

21

30.03

51.03

** CIL Supply: 74% of ACQ

66

RAIL

BELLARY TPS

1000

30

14.1

15

24.7

39.7

** Coal Sup.for U-II yet to resume

TAMIL NADU
67

INTER
MODAL

ENNORE TPS

450

30

4.3

29.09

29.09

68

INTER
MODAL

METTUR TPS

1440

30

20

96

197.42

293.42

15

69

INTER
MODAL

NORTH CHENNAI TPS

1830

30

22.7

35

124.68

159.68

70

INTER
MODAL

TUTICORIN TPS

1050

30

18.1

52

265.7

317.7

18

71

RAIL

VALLUR TPP

TOTAL OF S.R.

1000

30

13.6

81.33

81.33

18120

25

265.4

270

1085.77

1355.77

CIL Supply: 96% of ACQ


7

EASTERN
BIHAR
72

RAIL

BARAUNI TPS

210

20

0.7

9.19

9.19

14

73

RAIL

MUZAFFARPUR TPS

220

20

1.2

11.44

11.44

10

74

PITHEAD

KAHALGAON TPS

2340

15

36.2

49

331.37

380.37

10

Under R & M

JHARKHAND
75

RAIL

PATRATU TPS

770

20

2.5

95.03

95.03

38

76

ROAD

TENUGHAT TPS

420

20

278.34

278.34

70

77

RAIL

BOKARO `B` TPS

630

20

9.7

194.55

194.55

20

78

RAIL

CHANDRAPURA(DVC) TPS

890

20

8.7

18.72

18.72

79

RAIL

MAITHON RB TPP

1050

20

13.3

322.51

322.51

24

80

RAIL

KODARMA TPP

1000

20

7.5

89.95

89.95

12

81

RAIL

MAHADEV PRASAD STPP

540

20

6.3

20.92

20.92

** Less Receipt

** Less Receipt

Page 3 of 3

REGION/
STATE

MODE
OF
TRANS PORT

NAME OF THERMAL
POWER STATION

CAPA
CITY
(MW)

DAILY
REQUIR
EMENT
IN '000
TONNES

NORM
ATIVE
STOCK
Reqd.
(DAYS)

ACTUAL STOCK

IN, 000 TONNES TOTAL

Imp ort

CRITICAL

REASONS FOR CRITICAL


COAL STOCK

COAL
STOCK

IN
DAYS

<7
<4
DAYS DAYS

Indig
enous

ORISSA
82

PITHEAD

IB VALLEY TPS

420

15

7.5

161.19

161.19

22

83

PITHEAD

TALCHER (OLD) TPS

470

15

8.5

63.96

63.96

84

PITHEAD

TALCHER STPS

3000

15

52.5

141

55.36

196.36

85

RAIL

STERLITE TPP

2400

20

15.6

326.18

326.18

21

86

RAIL

KAMALANGA TPS

350

20

5.1

27

63.66

90.66

18

Less Receipt

WEST BENGAL
87

RAIL

DURGAPUR TPS

340

20

3.8

191.04

191.04

51

88

RAIL

MEJIA TPS

2340

20

22.7

46.57

46.57

** Less import

89

RAIL

BAKRESWAR TPS

1050

20

14.4

14.16

14.16

** CIL Supply: 94% of ACQ

90

RAIL

BANDEL TPS

450

20

4.3

30.38

30.38

91

RAIL

D.P.L. TPS

92

RAIL

KOLAGHAT TPS

93

RAIL

94

630

25

5.5

37.75

37.75

1260

25

16.2

48.53

48.53

** CIL Supply: 77% of ACQ

SAGARDIGHI TPS

600

20

7.4

10.11

10.11

** Less import

RAIL

SANTALDIH TPS

980

20

4.5

68.69

68.69

15

95

RAIL

BUDGE BUDGE TPS

750

20

10.2

132.6

132.6

13

96

RAIL

NEW COSSIPORE TPS

160

20

0.9

12.39

12.39

13

97

RAIL

SOUTHERN REPL. TPS

135

20

51.69

51.69

25

98

RAIL

TITAGARH TPS

240

20

3.1

59.15

59.15

19

99

PITHEAD

FARAKKA STPS

2100

15

23.6

23

221.92

244.92

10

100

RAIL

DURGAPUR STEEL TPS

1000

20

9.8

70.88

70.88

26745

18

307.7

239

3038.23

3277.23

11

109308

22

1405

1367

15023.9

16390.9

12

26

18

TOTAL OF E.R.
ALL INDIA TOTAL
(*) Critical i.e. stock less than 7 days in
(**) Super Critical i.e. stock less than 4 days in

26
18

TPSs
TPSs

{Includes super critical also}

Page 1 of 3

CENTRAL ELECTRICITY AUTHORITY


OPERATION MONITORING DIVISION
DAILY COAL REPORT
COAL STOCKS POSITION AT VARIOUS THERMAL POWER STATIONS IN THE COUNTRY ( AS ON 02-Jan-2014 )
REGION/
STATE

MODE
OF
TRANS
PORT

NAME OF THERMAL
POWER STATION

CAPA
CITY
(MW)

NORM
ATIVE
STOCK
Reqd.
(DAYS)

ACTUAL STOCK

DAILY
REQUIR
EMENT
IN '000
TONNES

CRITICAL
COAL STOCK

IN, 000 TONNES

Imp
ort

TOTAL

REASONS FOR
CRITICAL COAL STOCK

IN
DAYS
<7
DAYS

Indigeno
us

<4
DAYS

NORTHERN
DELHI
1

RAIL

RAJGHAT TPS

135

20

1.9

79.9

79.9

43

RAIL

BADARPUR TPS

705

30

10.6

171.85

171.85

16

RAIL

PANIPAT TPS

1360

25

19.6

56

469.51

525.51

27

RAIL

YAMUNA NAGAR TPS

600

25

6.9

40

185.38

225.38

32

RAIL

RAJIV GANDHI TPS

1200

25

12.3

80

615.64

695.64

57

RAIL

INDIRA GANDHI STPP

1500

25

19

148

366.66

514.66

27

RAIL

MAHATMA GANDHI TPS

1320

25

16.7

97.32

102.32

RAIL

GH TPS (LEH.MOH.)

RAIL

ROPAR TPS

10

RAIL

GND TPS(BHATINDA)

HARYANA

CIL Supply: 54% of ACQ

PUNJAB

RAJASTHAN
RAIL
11

920

30

12.9

174.53

174.53

14

1260

25

18.5

239.69

239.69

13

440

30

4.9

46.92

46.92

10

KOTA TPS

1240

30

21

199.83

199.83

10

12

RAIL

SURATGARH TPS

1500

30

20.4

342.76

343.76

17

13

RAIL

CHHABRA TPP

750

30

6.3

169.26

169.26

27
15

UTTAR PRADESH
PITHEAD
14

1630

15

24

362.26

362.26

665

25

7.2

53.48

53.48

1278

20

11.7

312.03

312.03

27

210

20

2.6

49.8

49.8

20

1140

30

14

119.24

119.24

1820

30

26.4

72

247.76

319.76

12

RIHAND STPS

3000

15

36.4

76.93

76.93

** CIL Supply: 99% of ACQ

SINGRAULI STPS

2000

15

33.1

141.12

141.12

CIL Supply: 96% of ACQ

440

25

8.4

58.81

58.81

1050

25

16.7

0.46

0.46

** CIL Supply: 95% of ACQ

1200

25

15

80

187.17

267.17

18

57.68

57.68

482 4826.02

5308.02

14

ANPARA TPS

15

RAIL

HARDUAGANJ TPS

16

RAIL

OBRA TPS

17

RAIL

PANKI TPS

18

RAIL

PARICHHA TPS

19

RAIL

DADRI (NCTPP)

20

PITHEAD

21

PITHEAD

22

RAIL

TANDA TPS

23

RAIL

UNCHAHAR TPS

24

RAIL

ROSA TPP Ph-I

25

PITHEAD

ANPARA C TPS

TOTAL OF N.R.

1200

25

14.2

28563

24

380.7

WESTERN
CHHATTISGARH
26
RAIL

DSPM TPS

500

15

8.2

300.3

300.3

37

27

PITHEAD

KORBA-II

440

15

245.98

245.98

35

28

PITHEAD

KORBA-WEST TPS

1340

15

11.7

245.03

245.03

21

29

PITHEAD

KORBA STPS

2600

15

45.7

439.85

439.85

10

30

PITHEAD

SIPAT STPS

2980

20

42.5

103

477.3

580.3

14

31

RAIL

PATHADI TPP

600

15

163.34

163.34

23

32

RAIL

BHILAI TPS

500

25

6.7

38

247.44

285.44

43

33

RAIL

AKALTARA TPS

600

20

7.1

86.9

86.9

12

34

RAIL

SIKKA REP. TPS

240

30

1.3

62.03

62.03

48

35

RAIL

GANDHI NAGAR TPS

870

30

8.7

203.47

203.47

23

36

RAIL

UKAI TPS

1350

30

13.7

273.87

273.87

20

37

RAIL

WANAKBORI TPS

1470

30

19.4

470.98

470.98

24

38

RAIL

SABARMATI (C STATION)

400

30

5.3

68.32

68.32

13

GUJARAT

CIL Supply: 109% of ACQ


2

Page 2 of 3

REGION/
STATE

MODE
OF
TRANS
PORT

NAME OF THERMAL
POWER STATION

CAPA
CITY
(MW)

NORM
ATIVE
STOCK
Reqd.
(DAYS)

DAILY
REQUIR
EMENT
IN '000
TONNES

ACTUAL STOCK

CRITICAL
COAL STOCK

IN, 000 TONNES

Imp
ort

TOTAL

REASONS FOR
CRITICAL COAL STOCK

IN
DAYS
<7
DAYS

Indigeno
us

<4
DAYS

MADHYA PRADESH
39

PITHEAD

AMARKANTAK EXT TPS

450

15

5.3

37

24.68

61.68

12

40

RAIL

SANJAY GANDHI TPS

1340

20

16.5

210.34

210.34

13

41

RAIL

SATPURA TPS

1580

20

17.3

38

626.27

664.27

38

42

PITHEAD

VINDHYACHAL STPS

4260

15

56.6

122.33

123.33

43

RAIL

BINA TPS

500

25

7.5

110.36

110.36

15

** CIL Supply: 92% of ACQ

Unloading Constraint

** CIL Supply: 80% of ACQ

** Less import

MAHARASHTRA
44

RAIL

BHUSAWAL TPS

1420

20

17.4

204.53

204.53

12

45

RAIL

CHANDRAPUR(MAHARASHTR
A) STPS

2340

20

34.7

507.51

507.51

15

46

RAIL

KHAPARKHEDA TPS

1340

25

17.5

97.05

97.05

47

RAIL

KORADI TPS

1040

25

8.1

146.84

146.84

18

48

RAIL

NASIK TPS

630

25

11.2

144.83

144.83

13

49

RAIL

PARLI TPS

1130

25

15.6

18.81

18.81

50

RAIL

PARAS TPS

500

25

6.4

129.26

129.26

20

51

RAIL

DAHANU TPS

500

25

10.1

46

36.45

82.45

52

RAIL

WARDHA WARORA TPP

53

RAIL

TIRORA TPS

54

RAIL

BELA TPS

55

RAIL

BUTIBORI TPP

56

RAIL

AMARAVATI TPS

57

RAIL

EMCO WARORA TPS

58

RAIL

MAUDA TPS

TOTAL OF W.R.

540

20

5.3

1.51

2.51

1980

20

18.1

16

317.21

333.21

18

270

20

2.4

300

20

3.6

270

20

3.2

9.53

9.53

Data not received


Data not received
*

600

20

3.4

26.17

27.17

1000

30

7.1

108.16

108.16

15

35880

21

451.6

281 6126.68

6407.68

14

** CIL Supply: 97% of ACQ

SOUTHERN
ANDHRA PRADESH
59

RAIL

Dr. N.TATA RAO TPS

1760

20

28.5

161.94

161.94

60

RAIL

KOTHAGUDEM TPS

1720

20

27.8

38.64

38.64

** Less Receipt

61

RAIL

RAYALASEEMA TPS

1050

25

15.9

26.64

26.64

** Less Receipt

62

PITHEAD

RAMAGUNDEM STPS

2600

15

40.6

97.65

99.65

** Less import

63

RAIL

SIMHADRI

2000

25

29.4

32

34.61

66.61

** CIL Supply: 85% of ACQ

64

RAIL

KAKATIYA TPS

500

25

7.1

7.79

7.79

** Less Receipt

CIL Supply 64% of ACQ

KARNATAKA
65

RAIL

RAICHUR TPS

1720

30

23.3

20

34.56

54.56

** CIL Supply: 74% of ACQ

66

RAIL

BELLARY TPS

1000

30

14.1

15

18.63

33.63

** Coal Sup.for U-II yet to


resume

TAMIL NADU
67

INTER
MODAL

ENNORE TPS

450

30

4.3

30.34

30.34

68

INTER
MODAL

METTUR TPS

1440

30

20

105

194.89

299.89

15

69

INTER
MODAL

NORTH CHENNAI TPS

1830

30

22.7

30

147.19

177.19

70

INTER
MODAL

TUTICORIN TPS

1050

30

18.1

52

265.7

317.7

18

71

RAIL

VALLUR TPP

85.28

85.28

258 1143.86

1401.86

TOTAL OF S.R.

1000

30

13.6

18120

25

265.4

CIL Supply: 96% of ACQ


7

EASTERN
BIHAR
72

RAIL

BARAUNI TPS

210

20

0.7

9.19

9.19

14

73

RAIL

MUZAFFARPUR TPS

220

20

1.2

10.36

10.36

74

PITHEAD

KAHALGAON TPS

2340

15

36.2

50

342.25

392.25

11

Under R & M

Page 3 of 3

REGION/
STATE

MODE
OF
TRANS
PORT

NAME OF THERMAL
POWER STATION

NORM
ATIVE
STOCK
Reqd.
(DAYS)

CAPA
CITY
(MW)

DAILY
REQUIR
EMENT
IN '000
TONNES

ACTUAL STOCK

CRITICAL
COAL STOCK

IN, 000 TONNES

Imp
ort

TOTAL

REASONS FOR
CRITICAL COAL STOCK

IN
DAYS
<7
DAYS

Indigeno
us

<4
DAYS

JHARKHAND
75

RAIL

PATRATU TPS

770

20

2.5

92.36

92.36

37

76

ROAD

TENUGHAT TPS

420

20

276.83

276.83

69

77

RAIL

BOKARO `B` TPS

630

20

9.7

190.54

190.54

20

78

RAIL

CHANDRAPURA(DVC) TPS

890

20

8.7

16.13

16.13

79

RAIL

MAITHON RB TPP

1050

20

13.3

312.09

312.09

23

80

RAIL

KODARMA TPP

1000

20

7.5

90.73

90.73

12

81

RAIL

MAHADEV PRASAD STPP

540

20

6.3

20.27

20.27

82

PITHEAD

IB VALLEY TPS

420

15

7.5

160.79

160.79

22

83

PITHEAD

TALCHER (OLD) TPS

470

15

8.5

61.06

61.06

84

PITHEAD

TALCHER STPS

3000

15

52.5

139

60.56

199.56

85

RAIL

STERLITE TPP

2400

20

15.6

328.12

328.12

21

86

RAIL

KAMALANGA TPS

350

20

5.1

30

60.85

90.85

18

** Less Receipt

** Less Receipt

ORISSA
Receipt regulated

Less Receipt

WEST BENGAL
87

RAIL

DURGAPUR TPS

340

20

3.8

199.37

199.37

53

88

RAIL

MEJIA TPS

2340

20

22.7

44.04

44.04

** Less import

89

RAIL

BAKRESWAR TPS

1050

20

14.4

18.07

18.07

** CIL Supply: 94% of ACQ

90

RAIL

BANDEL TPS

450

20

4.3

28.78

28.78

91

RAIL

D.P.L. TPS

92

RAIL

KOLAGHAT TPS

93

RAIL

SAGARDIGHI TPS

94

RAIL

SANTALDIH TPS

95

RAIL

BUDGE BUDGE TPS

96

RAIL

NEW COSSIPORE TPS

97

RAIL

SOUTHERN REPL. TPS

98

RAIL

99
100

630

25

5.5

44.5

44.5

1260

25

16.2

51.41

51.41

** CIL Supply: 77% of ACQ

600

20

7.4

11.22

11.22

** Less import

980

20

4.5

71.87

71.87

16

750

20

10.2

136.43

136.43

13

160

20

0.9

12.17

12.17

13

135

20

49.56

49.56

24

TITAGARH TPS

240

20

3.1

59.98

59.98

20

PITHEAD

FARAKKA STPS

2100

15

23.6

22

222.77

244.77

10

RAIL

DURGAPUR STEEL TPS

1000

20

9.8

70.06

70.06

26745

18

307.7

240 3052.35

3292.35

11

109308

22

1405

1261 15148.9

16409.9

12

26

19

TOTAL OF E.R.
ALL INDIA TOTAL
(*) Critical i.e. stock less than 7 days in
(**) Super Critical i.e. stock less than 4 days in

26
19

TPSs
TPSs

{Includes super critical also}

Page 1 of 3

CENTRAL ELECTRICITY AUTHORITY


OPERATION MONITORING DIVISION
DAILY COAL REPORT
COAL STOCKS POSITION AT VARIOUS THERMAL POWER STATIONS IN THE COUNTRY ( AS ON 05-Jan-2014 )
REGION/
STATE

MODE
OF
TRANS
PORT

NAME OF THERMAL
POWER STATION

CAPA
CITY
(MW)

NORM
ATIVE
STOCK
Reqd.
(DAYS)

DAILY
REQUIR
EMENT
IN '000
TONNES

ACTUAL STOCK

CRITICAL
COAL STOCK

IN, 000
TONNES

TOTAL

REASONS FOR CRITICAL


COAL STOCK

IN
DAYS
<7
<4
DAYS DAYS

Impor Indigeno
t
us
NORTHERN
DELHI
1

RAIL

RAJGHAT TPS

135

20

1.9

79.9

79.9

43

RAIL

BADARPUR TPS

705

30

10.6

172.45

172.45

16

RAIL

PANIPAT TPS

1360

25

19.6

51

494

545

28

RAIL

YAMUNA NAGAR TPS

600

25

6.9

40

185.38

225.38

32

RAIL

RAJIV GANDHI TPS

1200

25

12.3

74

611.06

685.06

56

RAIL

INDIRA GANDHI STPP

1500

25

19

160

356.44

516.44

27

RAIL

MAHATMA GANDHI TPS

1320

25

16.7

97.32

102.32

RAIL

GH TPS (LEH.MOH.)

RAIL

ROPAR TPS

10

RAIL

GND TPS(BHATINDA)

HARYANA

CIL Supply: 54% of ACQ

CIL Supply 67% of ACQ

PUNJAB
920

30

12.9

173.14

173.14

13

1260

25

18.5

244.93

244.93

13

440

30

4.9

46.92

46.92

10

RAJASTHAN
11

RAIL

KOTA TPS

1240

30

21

198.66

198.66

12

RAIL

SURATGARH TPS

1500

30

20.4

351.66

352.66

17

13

RAIL

CHHABRA TPP

750

30

6.3

126.54

126.54

20

1630

15

24

353.38

353.38

15

665

25

7.2

46.56

46.56

1278

20

11.7

322.72

322.72

28
19

UTTAR PRADESH
14

PITHEAD

ANPARA TPS

15

RAIL

HARDUAGANJ TPS

16

RAIL

OBRA TPS

17

RAIL

PANKI TPS

210

20

2.6

47.33

47.33

18

RAIL

PARICHHA TPS

1140

30

14

124.17

124.17

19

RAIL

DADRI (NCTPP)

1820

30

26.4

57

239.05

296.05

11

20

PITHEAD

RIHAND STPS

3000

15

36.4

66.69

66.69

** CIL Supply: 99% of ACQ

21

PITHEAD

SINGRAULI STPS

2000

15

33.1

151.59

151.59

CIL Supply: 96% of ACQ

22

RAIL

TANDA TPS

440

25

8.4

50.48

50.48

CIL Supply: 95% of ACQ

23

RAIL

UNCHAHAR TPS

1050

25

16.7

13.22

13.22

** CIL Supply: 95% of ACQ

24

RAIL

ROSA TPP Ph-I

1200

25

15

83

194.59

277.59

18

25

PITHEAD

ANPARA C TPS

1200

25

14.2

43.82

43.82

** CIL Supply: 109% of ACQ

28563

24

380.7

472

4791.99

5263.99

14

TOTAL OF N.R.
WESTERN
CHHATTISGARH
26

RAIL

DSPM TPS

500

15

8.2

302.49

302.49

37

27

PITHEAD

KORBA-II

440

15

245.24

245.24

35

28

PITHEAD

KORBA-WEST TPS

1340

15

11.7

241.44

241.44

21

29

PITHEAD

KORBA STPS

2600

15

45.7

446.7

446.7

10

30

PITHEAD

SIPAT STPS

2980

20

42.5

88

469.48

557.48

13

31

RAIL

PATHADI TPP

600

15

163.34

163.34

23

32

RAIL

BHILAI TPS

500

25

6.7

35

242.88

277.88

42

33

RAIL

AKALTARA TPS

600

20

7.1

78.92

78.92

11

34

RAIL

SIKKA REP. TPS

240

30

1.3

57.83

57.83

45

35

RAIL

GANDHI NAGAR TPS

870

30

8.7

195.67

195.67

22

36

RAIL

UKAI TPS

1350

30

13.7

299.92

299.92

22

37

RAIL

WANAKBORI TPS

1470

30

19.4

470.91

470.91

24

38

RAIL

SABARMATI (C STATION)

400

30

5.3

68.32

68.32

13

GUJARAT

Page 2 of 3

REGION/
STATE

MODE
OF
TRANS
PORT

NAME OF THERMAL
POWER STATION

CAPA
CITY
(MW)

NORM
ATIVE
STOCK
Reqd.
(DAYS)

ACTUAL STOCK

DAILY
REQUIR
EMENT
IN '000
TONNES

CRITICAL
COAL STOCK

IN, 000
TONNES

TOTAL

REASONS FOR CRITICAL


COAL STOCK

IN
DAYS
<7
<4
DAYS DAYS

Impor Indigeno
t
us
MADHYA PRADESH
39

PITHEAD

AMARKANTAK EXT TPS

450

15

5.3

37

27.83

64.83

12

40

RAIL

SANJAY GANDHI TPS

1340

20

16.5

190.24

190.24

12

41

RAIL

SATPURA TPS

1580

20

17.3

41

621.44

662.44

38

42

PITHEAD

VINDHYACHAL STPS

4260

15

56.6

110.56

111.56

43

RAIL

BINA TPS

500

25

7.5

98.99

98.99

13

** CIL Supply: 92% of ACQ

MAHARASHTRA
44

RAIL

BHUSAWAL TPS

1420

20

17.4

206.67

206.67

12

45

RAIL

CHANDRAPUR(MAHARASHTR
A) STPS

2340

20

34.7

526.12

526.12

15

46

RAIL

KHAPARKHEDA TPS

1340

25

17.5

98.78

98.78

47

RAIL

KORADI TPS

1040

25

8.1

139.55

139.55

17

48

RAIL

NASIK TPS

630

25

11.2

143.65

143.65

13

49

RAIL

PARLI TPS

1130

25

15.6

23.18

23.18

50

RAIL

PARAS TPS

500

25

6.4

144.84

144.84

23

51

RAIL

DAHANU TPS

500

25

10.1

57

46.53

103.53

10

52

RAIL

WARDHA WARORA TPP

540

20

5.3

2.78

3.78

53

RAIL

TIRORA TPS

1980

20

18.1

17

325.49

342.49

19

54

RAIL

BELA TPS

270

20

2.4

55

RAIL

BUTIBORI TPP

300

20

3.6

56

RAIL

AMARAVATI TPS

270

20

3.2

7.68

7.68

57

RAIL

EMCO WARORA TPS

58

RAIL

MAUDA TPS

TOTAL OF W.R.

Unloading Constraint

** CIL Supply: 80% of ACQ

** Less import

Data not received


Data not received
*

600

20

3.4

37.7

37.7

11

1000

30

7.1

100.61

100.61

14

35880

21

451.6

276

6135.8

6411.8

14

** CIL Supply: 97% of ACQ

SOUTHERN
ANDHRA PRADESH
59

RAIL

Dr. N.TATA RAO TPS

1760

20

28.5

123.16

130.16

60

RAIL

KOTHAGUDEM TPS

1720

20

27.8

23.78

23.78

** Less Receipt

61

RAIL

RAYALASEEMA TPS

1050

25

15.9

30.31

39.31

** Less Receipt

62

PITHEAD

RAMAGUNDEM STPS

2600

15

40.6

116.71

125.71

** Less import

63

RAIL

SIMHADRI

2000

25

29.4

44

51.1

95.1

** CIL Supply: 85% of ACQ

64

RAIL

KAKATIYA TPS

500

25

7.1

8.85

8.85

** Less Receipt

CIL Supply 64% of ACQ

KARNATAKA
65

RAIL

RAICHUR TPS

1720

30

23.3

13

68.09

81.09

** CIL Supply: 74% of ACQ

66

RAIL

BELLARY TPS

1000

30

14.1

31.82

40.82

** Coal Sup.for U-II yet to resum

TAMIL NADU
67

INTER
MODAL

ENNORE TPS

450

30

4.3

33.34

33.34

68

INTER
MODAL

METTUR TPS

1440

30

20

108

200.3

308.3

15

69

INTER
MODAL

NORTH CHENNAI TPS

1830

30

22.7

43

138.24

181.24

70

INTER
MODAL

TUTICORIN TPS

1050

30

18.1

43

291.27

334.27

19

71

RAIL

VALLUR TPP

TOTAL OF S.R.

1000

30

13.6

89.22

89.22

18120

25

265.4

284

1206.18

1490.18

EASTERN
BIHAR
72

RAIL

BARAUNI TPS

210

20

0.7

9.19

9.19

14

73

RAIL

MUZAFFARPUR TPS

220

20

1.2

11.73

11.73

10

74

PITHEAD

KAHALGAON TPS

2340

15

36.2

54

372.09

426.09

12

Under R & M

JHARKHAND
75

RAIL

PATRATU TPS

770

20

2.5

88.24

88.24

36

76

ROAD

TENUGHAT TPS

420

20

279.57

279.57

70

77

RAIL

BOKARO `B` TPS

630

20

9.7

194.91

194.91

20

78

RAIL

CHANDRAPURA(DVC) TPS

890

20

8.7

8.4

8.4

79

RAIL

MAITHON RB TPP

1050

20

13.3

304.04

304.04

23

80

RAIL

KODARMA TPP

1000

20

7.5

85.04

85.04

11

81

RAIL

MAHADEV PRASAD STPP

540

20

6.3

8.54

8.54

** Less Receipt

** Less Receipt

Page 3 of 3

REGION/
STATE

MODE
OF
TRANS
PORT

NAME OF THERMAL
POWER STATION

CAPA
CITY
(MW)

NORM
ATIVE
STOCK
Reqd.
(DAYS)

ACTUAL STOCK

DAILY
REQUIR
EMENT
IN '000
TONNES

CRITICAL
COAL STOCK

IN, 000
TONNES

TOTAL

REASONS FOR CRITICAL


COAL STOCK

IN
DAYS
<7
<4
DAYS DAYS

Impor Indigeno
t
us
ORISSA
82

PITHEAD

IB VALLEY TPS

420

15

7.5

159.65

159.65

21

83

PITHEAD

TALCHER (OLD) TPS

470

15

8.5

62.07

62.07

84

PITHEAD

TALCHER STPS

3000

15

52.5

146

65.59

211.59

85

RAIL

STERLITE TPP

2400

20

15.6

332.14

332.14

21

86

RAIL

KAMALANGA TPS

350

20

5.1

33

52.25

85.25

17

Less Receipt

WEST BENGAL
87

RAIL

DURGAPUR TPS

340

20

3.8

185.38

185.38

49

88

RAIL

MEJIA TPS

2340

20

22.7

47.03

47.03

** Less import

89

RAIL

BAKRESWAR TPS

1050

20

14.4

14.09

14.09

** CIL Supply: 94% of ACQ

90

RAIL

BANDEL TPS

450

20

4.3

25.03

25.03

CIL Supply: 54% of ACQ

91

RAIL

D.P.L. TPS

630

25

5.5

48.16

48.16

92

RAIL

KOLAGHAT TPS

1260

25

16.2

50.05

50.05

** CIL Supply: 77% of ACQ

93

RAIL

SAGARDIGHI TPS

600

20

7.4

18.02

18.02

** Less import

94

RAIL

SANTALDIH TPS

980

20

4.5

61.34

61.34

14

95

RAIL

BUDGE BUDGE TPS

750

20

10.2

6.54

6.54

** CIL Supply: 80% of ACQ

96

RAIL

NEW COSSIPORE TPS

160

20

0.9

11.52

11.52

12

97

RAIL

SOUTHERN REPL. TPS

135

20

54.37

54.37

27

98

RAIL

TITAGARH TPS

240

20

3.1

62.87

62.87

21

99

PITHEAD

FARAKKA STPS

2100

15

23.6

15

239.26

254.26

11

100

RAIL

DURGAPUR STEEL TPS

1000

20

9.8

72.22

72.22

26745

18

307.7

249

2929.33

3178.33

10

109308

22

1405

1280

15063.3

16343.3

12

29

21

TOTAL OF E.R.
ALL INDIA TOTAL
(*) Critical i.e. stock less than 7 days in
(**) Super Critical i.e. stock less than 4 days in

29
21

TPSs
TPSs

{Includes super critical also}

Page 1 of 3

CENTRAL ELECTRICITY AUTHORITY


OPERATION MONITORING DIVISION
DAILY COAL REPORT
COAL STOCKS POSITION AT VARIOUS THERMAL POWER STATIONS IN THE COUNTRY ( AS ON 06-Jan-2014 )
MODE
OF
TRANS
PORT

REGION/
STATE

NAME OF THERMAL
POWER STATION

CAPA
CITY
(MW)

NORM
ATIVE
STOCK
Reqd.
(DAYS)

DAILY
REQUIR
EMENT
IN '000
TONNES

ACTUAL STOCK

CRITICAL
COAL STOCK

IN, 000 TONNES

Imp
ort

TOTAL

REASONS FOR
CRITICAL COAL
STOCK

IN DAYS
<7
DAYS

Indigen
ous

<4
DAYS

NORTHERN
DELHI
1

RAIL

RAJGHAT TPS

135

20

1.9

79.9

79.9

43

RAIL

BADARPUR TPS

705

30

10.6

170.26

170.26

16

RAIL

PANIPAT TPS

1360

25

19.6

51

494

545

28

RAIL

YAMUNA NAGAR TPS

600

25

6.9

40

185.38

225.38

32

RAIL

RAJIV GANDHI TPS

1200

25

12.3

79

603.4

682.4

56

RAIL

INDIRA GANDHI STPP

1500

25

19

156

352.29

508.29

27

RAIL

MAHATMA GANDHI TPS

1320

25

16.7

90.5

99.5

RAIL

GH TPS (LEH.MOH.)

RAIL

ROPAR TPS

10

RAIL

GND TPS(BHATINDA)

HARYANA

CIL Supply 55% of ACQ

CIL Supply 71% of ACQ

PUNJAB
920

30

12.9

173.14

173.14

13

1260

25

18.5

244.93

244.93

13

440

30

4.9

46.92

46.92

10

RAJASTHAN
11

RAIL

KOTA TPS

1240

30

21

198.66

198.66

12

RAIL

SURATGARH TPS

1500

30

20.4

351.66

352.66

17

13

RAIL

CHHABRA TPP

750

30

6.3

126.54

126.54

20

1630

15

24

353.38

353.38

15

665

25

7.2

46.56

46.56

1278

20

11.7

322.72

322.72

28
19

UTTAR PRADESH
14

PITHEAD

ANPARA TPS

15

RAIL

HARDUAGANJ TPS

16

RAIL

OBRA TPS

17

RAIL

PANKI TPS

210

20

2.6

47.33

47.33

18

RAIL

PARICHHA TPS

1140

30

14

124.17

124.17

19

RAIL

DADRI (NCTPP)

1820

30

26.4

52

245.77

297.77

11

20

PITHEAD

RIHAND STPS

3000

15

36.4

63.66

63.66

21

PITHEAD

SINGRAULI STPS

2000

15

33.1

147.18

147.18

CIL Supply 98% of ACQ

22

RAIL

TANDA TPS

440

25

8.4

60.6

60.6

23

RAIL

UNCHAHAR TPS

1050

25

16.7

12.18

12.18

** CIL Supply 94% of ACQ

24

RAIL

ROSA TPP Ph-I

1200

25

15

86

199.78

285.78

19

25

PITHEAD

ANPARA C TPS

16.61

16.61

** CIL Supply 110% of ACQ

475 4757.51

5232.51

14

TOTAL OF N.R.

1200

25

14.2

28563

24

380.7

WESTERN
CHHATTISGARH
26

RAIL

DSPM TPS

500

15

8.2

306.36

306.36

38

27

PITHEAD

KORBA-II

440

15

253.55

253.55

36

28

PITHEAD

KORBA-WEST TPS

1340

15

11.7

219.65

219.65

19

29

PITHEAD

KORBA STPS

2600

15

45.7

444.67

444.67

10

30

PITHEAD

SIPAT STPS

2980

20

42.5

82

473.52

555.52

13

31

RAIL

PATHADI TPP

600

15

163.34

163.34

23

32

RAIL

BHILAI TPS

500

25

6.7

34

244.19

278.19

42

33

RAIL

AKALTARA TPS

600

20

7.1

76.62

76.62

11

34

RAIL

SIKKA REP. TPS

240

30

1.3

61.18

61.18

47

35

RAIL

GANDHI NAGAR TPS

870

30

8.7

198.58

198.58

23

36

RAIL

UKAI TPS

1350

30

13.7

300.66

300.66

22

37

RAIL

WANAKBORI TPS

1470

30

19.4

470.72

470.72

24

38

RAIL

SABARMATI (C STATION)

400

30

5.3

68.32

68.32

13

GUJARAT

** CIL Supply 101% of ACQ

Page 2 of 3

REGION/
STATE

MODE
OF
TRANS
PORT

NAME OF THERMAL
POWER STATION

CAPA
CITY
(MW)

NORM
ATIVE
STOCK
Reqd.
(DAYS)

DAILY
REQUIR
EMENT
IN '000
TONNES

ACTUAL STOCK

CRITICAL
COAL STOCK

IN, 000 TONNES

Imp
ort

TOTAL

REASONS FOR
CRITICAL COAL
STOCK

IN DAYS
<7
DAYS

Indigen
ous

<4
DAYS

MADHYA PRADESH
39

PITHEAD

AMARKANTAK EXT TPS

450

15

5.3

36

28.88

64.88

12

40

RAIL

SANJAY GANDHI TPS

1340

20

16.5

191.23

191.23

12

41

RAIL

SATPURA TPS

1580

20

17.3

37

624.14

661.14

38

42

PITHEAD

VINDHYACHAL STPS

4260

15

56.6

112.3

113.3

43

RAIL

BINA TPS

500

25

7.5

92.84

92.84

12

** CIL Supply 92% of ACQ

Unloading Constraint

** CIL Supply 92% of ACQ

** Less import

MAHARASHTRA
44

RAIL

BHUSAWAL TPS

1420

20

17.4

206.17

210.17

12

45

RAIL

CHANDRAPUR(MAHARASH
TRA) STPS

2340

20

34.7

523.83

523.83

15

46

RAIL

KHAPARKHEDA TPS

1340

25

17.5

94.13

94.13

47

RAIL

KORADI TPS

1040

25

8.1

143.02

143.02

18

48

RAIL

NASIK TPS

630

25

11.2

144.08

144.08

13

49

RAIL

PARLI TPS

1130

25

15.6

20.11

20.11

50

RAIL

PARAS TPS

500

25

6.4

151.67

151.67

24

51

RAIL

DAHANU TPS

500

25

10.1

64

47.55

111.55

11

52

RAIL

WARDHA WARORA TPP

540

20

5.3

0.85

0.85

53

RAIL

TIRORA TPS

1980

20

18.1

14

324.15

338.15

19

54

RAIL

BELA TPS

270

20

2.4

55

RAIL

BUTIBORI TPP

300

20

3.6

56

RAIL

AMARAVATI TPS

270

20

3.2

7.68

7.68

57

RAIL

EMCO WARORA TPS

12

58

RAIL

MAUDA TPS

TOTAL OF W.R.

Data not received


Data not received
*

600

20

3.4

40.75

40.75

1000

30

7.1

93.89

93.89

13

35880

21

451.6

273 6128.64

6401.64

14

** CIL Supply 94% of ACQ

SOUTHERN
ANDHRA PRADESH
59

RAIL

Dr. N.TATA RAO TPS

1760

20

28.5

124.12

124.12

60

RAIL

KOTHAGUDEM TPS

1720

20

27.8

23.25

23.25

** Less Receipt

CIL Supply: 61% of ACQ

61

RAIL

RAYALASEEMA TPS

1050

25

15.9

32.74

32.74

** Less import

62

PITHEAD

RAMAGUNDEM STPS

2600

15

40.6

20

122

142

** Less Receipt

63

RAIL

SIMHADRI

2000

25

29.4

51

56.49

107.49

CIL Supply 83% of ACQ

64

RAIL

KAKATIYA TPS

500

25

7.1

9.36

9.36

** CIL Supply 88% of ACQ

KARNATAKA
65

RAIL

RAICHUR TPS

1720

30

23.3

12

67.76

79.76

** CIL Supply 102% of ACQ

66

RAIL

BELLARY TPS

1000

30

14.1

31.36

39.36

** Coal Sup.for U-II yet to


resum

TAMIL NADU
67

INTER
MODAL

ENNORE TPS

450

30

4.3

34.52

34.52

68

INTER
MODAL

METTUR TPS

1440

30

20

111

190.62

301.62

15

69

INTER
MODAL

NORTH CHENNAI TPS

1830

30

22.7

43

138.24

181.24

70

INTER
MODAL

TUTICORIN TPS

1050

30

18.1

43

291.27

334.27

19

71

RAIL

VALLUR TPP

93.39

93.39

288 1215.13

1503.13

TOTAL OF S.R.

1000

30

13.6

18120

25

265.4

EASTERN
BIHAR
72

RAIL

BARAUNI TPS

210

20

0.7

9.19

9.19

14

73

RAIL

MUZAFFARPUR TPS

220

20

1.2

11.73

11.73

10

74

PITHEAD

KAHALGAON TPS

2340

15

36.2

52

379.51

431.51

12

Under R & M

JHARKHAND
75

RAIL

PATRATU TPS

770

20

2.5

88.24

88.24

36

76

ROAD

TENUGHAT TPS

420

20

282.77

282.77

71

77

RAIL

BOKARO `B` TPS

630

20

9.7

196.21

196.21

20

78

RAIL

CHANDRAPURA(DVC) TPS

890

20

8.7

2.84

2.84

79

RAIL

MAITHON RB TPP

1050

20

13.3

307.9

307.9

23

80

RAIL

KODARMA TPP

1000

20

7.5

82.3

82.3

11

81

RAIL

MAHADEV PRASAD STPP

540

20

6.3

8.65

8.65

** Less Receipt

** CIL Supply 94% of ACQ

Page 3 of 3

REGION/
STATE

MODE
OF
TRANS
PORT

NAME OF THERMAL
POWER STATION

CAPA
CITY
(MW)

NORM
ATIVE
STOCK
Reqd.
(DAYS)

DAILY
REQUIR
EMENT
IN '000
TONNES

ACTUAL STOCK

CRITICAL
COAL STOCK

IN, 000 TONNES

Imp
ort

TOTAL

REASONS FOR
CRITICAL COAL
STOCK

IN DAYS
<7
DAYS

Indigen
ous

<4
DAYS

ORISSA
82

PITHEAD

IB VALLEY TPS

420

15

7.5

159.23

159.23

21

83

PITHEAD

TALCHER (OLD) TPS

470

15

8.5

62.71

62.71

84

PITHEAD

TALCHER STPS

3000

15

52.5

148

66.71

214.71

85

RAIL

STERLITE TPP

2400

20

15.6

329.22

329.22

21

86

RAIL

KAMALANGA TPS

350

20

5.1

36

50.65

86.65

17

CIL Supply 87% of ACQ

WEST BENGAL
87

RAIL

DURGAPUR TPS

340

20

3.8

186.64

186.64

49

88

RAIL

MEJIA TPS

2340

20

22.7

46.25

46.25

** Less receipt - MCL

89

RAIL

BAKRESWAR TPS

1050

20

14.4

15.3

15.3

** CIL Supply 92% of ACQ

90

RAIL

BANDEL TPS

450

20

4.3

23.76

23.76

CIL Supply 52% of ACQ

91

RAIL

D.P.L. TPS

630

25

5.5

55.35

55.35

10

92

RAIL

KOLAGHAT TPS

1260

25

16.2

49.16

49.16

** CIL Supply 60% of ACQ

93

RAIL

SAGARDIGHI TPS

600

20

7.4

18.5

18.5

** Less Receipt

94

RAIL

SANTALDIH TPS

980

20

4.5

57.34

57.34

13

95

RAIL

BUDGE BUDGE TPS

750

20

10.2

145.33

145.33

14

96

RAIL

NEW COSSIPORE TPS

160

20

0.9

11.28

11.28

12

97

RAIL

SOUTHERN REPL. TPS

135

20

52.48

52.48

26

98

RAIL

TITAGARH TPS

240

20

3.1

60.19

60.19

20

99

PITHEAD

FARAKKA STPS

2100

15

23.6

19

242.1

261.1

11

100

RAIL

DURGAPUR STEEL TPS

1000

20

9.8

73.04

73.04

26745

18

307.7

255 3074.57

3329.57

11

109308

22

1405

1290 15175.8

16465.8

12

27

19

TOTAL OF E.R.
ALL INDIA TOTAL
(*) Critical i.e. stock less than 7 days in
(**) Super Critical i.e. stock less than 4 days in

27
19

TPSs
TPSs

{Includes super critical also}

Page 1 of 3

CENTRAL ELECTRICITY AUTHORITY


OPERATION MONITORING DIVISION
DAILY COAL REPORT
COAL STOCKS POSITION AT VARIOUS THERMAL POWER STATIONS IN THE COUNTRY ( AS ON 08-Jan-2014 )
REGION/
STATE

MODE
OF
TRANS
PORT

NAME OF THERMAL
POWER STATION

CAPA
CITY
(MW)

NORM
ATIVE
STOCK
Reqd.
(DAYS)

DAILY
REQUIR
EMENT
IN '000
TONNES

ACTUAL STOCK

IN, 000
TONNES

TOTAL

CRITICAL

IN
DAYS

REASONS FOR CRITICAL


COAL STOCK

COAL
STOCK
<7
<4
DAYS DAYS

Impor Indigeno
t
us
NORTHERN
DELHI
1

RAIL

RAJGHAT TPS

135

20

1.9

79.9

79.9

43

RAIL

BADARPUR TPS

705

30

10.6

177.66

177.66

17

RAIL

PANIPAT TPS

1360

25

19.6

58

497.44

555.44

28

RAIL

YAMUNA NAGAR TPS

600

25

6.9

44

184.91

228.91

33

RAIL

RAJIV GANDHI TPS

1200

25

12.3

83

592.73

675.73

55

RAIL

INDIRA GANDHI STPP

1500

25

19

148

349.49

497.49

26

RAIL

MAHATMA GANDHI TPS

1320

25

16.7

10

96.96

106.96

RAIL

GH TPS (LEH.MOH.)

RAIL

ROPAR TPS

10

RAIL

GND TPS(BHATINDA)

HARYANA

CIL Supply 55% of ACQ

CIL Supply 71% of ACQ

PUNJAB
920

30

12.9

189.09

189.09

15

1260

25

18.5

250.56

250.56

14

440

30

4.9

45.57

45.57

RAJASTHAN
11

RAIL

KOTA TPS

1240

30

21

197

197

12

RAIL

SURATGARH TPS

1500

30

20.4

376.51

378.51

19

13

RAIL

CHHABRA TPP

750

30

6.3

134.59

134.59

22

15

UTTAR PRADESH
14

PITHEAD

ANPARA TPS

15

RAIL

HARDUAGANJ TPS

1630

15

24

361.59

361.59

665

25

7.2

38.44

38.44

16

RAIL

OBRA TPS

1278

20

11.7

332.89

332.89

28

17

RAIL

PANKI TPS

18

RAIL

PARICHHA TPS

210

20

2.6

48.16

48.16

19

1140

30

14

121.6

121.6

19

RAIL

DADRI (NCTPP)

1820

30

26.4

44

232.91

276.91

11

20

PITHEAD

21

PITHEAD

RIHAND STPS

3000

15

36.4

66.77

66.77

SINGRAULI STPS

2000

15

33.1

151.06

151.06

22

RAIL

TANDA TPS

CIL Supply 98% of ACQ

440

25

8.4

69.32

69.32

23

RAIL

24

RAIL

UNCHAHAR TPS

1050

25

16.7

13.61

13.61

** CIL Supply: 94% of ACQ

ROSA TPP Ph-I

1200

25

15

83

193.94

276.94

18

25

PITHEAD

ANPARA C TPS

10.86

10.86

** CIL Supply 110% of ACQ

473 4813.57

5286.57

14

TOTAL OF N.R.

1200

25

14.2

28563

24

380.7

WESTERN
CHHATTISGARH
26

RAIL

DSPM TPS

500

15

8.2

304.04

304.04

37

27

PITHEAD

KORBA-II

440

15

256.28

256.28

37

28

PITHEAD

KORBA-WEST TPS

1340

15

11.7

215.79

215.79

18

29

PITHEAD

KORBA STPS

2600

15

45.7

440.57

440.57

10

30

PITHEAD

SIPAT STPS

2980

20

42.5

76

475.12

551.12

13

31

RAIL

PATHADI TPP

600

15

182.46

182.46

26

32

RAIL

BHILAI TPS

500

25

6.7

32

245.69

277.69

42

33

RAIL

AKALTARA TPS

600

20

7.1

74.36

74.36

10

34

RAIL

SIKKA REP. TPS

240

30

1.3

67.86

67.86

53

35

RAIL

GANDHI NAGAR TPS

870

30

8.7

199.74

199.74

23

36

RAIL

UKAI TPS

1350

30

13.7

312.84

312.84

23

37

RAIL

WANAKBORI TPS

1470

30

19.4

482.53

482.53

25

38

RAIL

SABARMATI (C STATION)

400

30

5.3

61.6

61.6

12

GUJARAT

** CIL Supply 101% of ACQ

Page 2 of 3

REGION/
STATE

MODE
OF
TRANS
PORT

NAME OF THERMAL
POWER STATION

CAPA
CITY
(MW)

NORM
ATIVE
STOCK
Reqd.
(DAYS)

DAILY
REQUIR
EMENT
IN '000
TONNES

ACTUAL STOCK

IN, 000
TONNES

TOTAL

CRITICAL

IN
DAYS

REASONS FOR CRITICAL


COAL STOCK

COAL
STOCK
<7
<4
DAYS DAYS

Impor Indigeno
t
us
MADHYA PRADESH
39

PITHEAD

AMARKANTAK EXT TPS

450

15

5.3

35

29.03

64.03

12

40

RAIL

SANJAY GANDHI TPS

1340

20

16.5

191.38

191.38

12

41

RAIL

SATPURA TPS

1580

20

17.3

38

631.08

669.08

39

42

PITHEAD

VINDHYACHAL STPS

4260

15

56.6

122.3

123.3

43

RAIL

BINA TPS

500

25

7.5

88.04

88.04

12

** CIL Supply: 92% of ACQ

MAHARASHTRA
44

RAIL

BHUSAWAL TPS

1420

20

17.4

202.67

206.67

12

45

RAIL

CHANDRAPUR(MAHARASH
TRA) STPS

2340

20

34.7

519.56

519.56

15

46

RAIL

KHAPARKHEDA TPS

1340

25

17.5

97.58

97.58

47

RAIL

KORADI TPS

1040

25

8.1

137.62

137.62

17

48

RAIL

NASIK TPS

630

25

11.2

138.52

138.52

12

49

RAIL

PARLI TPS

1130

25

15.6

11.61

11.61

50

RAIL

PARAS TPS

500

25

6.4

160.89

160.89

25

51

RAIL

DAHANU TPS

500

25

10.1

92

49.36

141.36

14

52

RAIL

WARDHA WARORA TPP

540

20

5.3

5.84

13.84

53

RAIL

TIRORA TPS

1980

20

18.1

22

313.32

335.32

19

54

RAIL

BELA TPS

270

20

2.4

55

RAIL

BUTIBORI TPP

300

20

3.6

56

RAIL

AMARAVATI TPS

270

20

3.2

19.03

19.03

57

RAIL

EMCO WARORA TPS

600

20

3.4

46.66

49.66

15

58

RAIL

MAUDA TPS

79.65

79.65

11

310 6163.05

6473.05

14

TOTAL OF W.R.

1000

30

7.1

35880

21

451.6

Unloading Constraint

** Less Receipt CIL/ SCCL

** Less import

Data not received


Data not received
*

CIL Supply: 94% of ACQ

SOUTHERN
ANDHRA PRADESH
59

RAIL

Dr. N.TATA RAO TPS

1760

20

28.5

121.48

121.48

60

RAIL

KOTHAGUDEM TPS

1720

20

27.8

20.16

20.16

** Less Receipt

CIL Supply: 61% of ACQ

61

RAIL

RAYALASEEMA TPS

1050

25

15.9

11

10.84

21.84

** Less receipt-SCCL

62

PITHEAD

RAMAGUNDEM STPS

2600

15

40.6

28

119.31

147.31

63

RAIL

SIMHADRI

2000

25

29.4

65

72.1

137.1

64

RAIL

KAKATIYA TPS

500

25

7.1

9.81

9.81

Less Receipt
CIL Supply 83% of ACQ
** Less receipt-SCCL

KARNATAKA
65

RAIL

RAICHUR TPS

1720

30

23.3

15

71.29

86.29

Less import

66

RAIL

BELLARY TPS

1000

30

14.1

12

46.19

58.19

Coal Sup.for U-II yet to resume

Less import

TAMIL NADU
67

INTER
MODAL

ENNORE TPS

450

30

4.3

29.7

29.7

68

INTER
MODAL

METTUR TPS

1440

30

20

120

179.29

299.29

15

69

INTER
MODAL

NORTH CHENNAI TPS

1830

30

22.7

39

103.71

142.71

70

INTER
MODAL

TUTICORIN TPS

1050

30

18.1

65

281.07

346.07

19

71

RAIL

VALLUR TPP

86.92

86.92

355 1151.88

1506.88

10

TOTAL OF S.R.

1000

30

13.6

18120

25

265.4

CIL Supply: 61% of ACQ


3

EASTERN
BIHAR
72

RAIL

BARAUNI TPS

210

20

0.7

9.19

9.19

14

73

RAIL

MUZAFFARPUR TPS

220

20

1.2

13.13

13.13

11

74

PITHEAD

KAHALGAON TPS

2340

15

36.2

52

407.53

459.53

13

JHARKHAND
75

RAIL

PATRATU TPS

770

20

2.5

88.73

88.73

36

76

ROAD

TENUGHAT TPS

420

20

285.22

285.22

71

77

RAIL

BOKARO `B` TPS

630

20

9.7

197.42

197.42

20

78

RAIL

CHANDRAPURA(DVC) TPS

890

20

8.7

8.86

8.86

79

RAIL

MAITHON RB TPP

1050

20

13.3

318.72

318.72

24

80

RAIL

KODARMA TPP

1000

20

7.5

85.25

85.25

11

81

RAIL

MAHADEV PRASAD STPP

540

20

6.3

2.46

2.46

** Less Receipt

** CIL Supply: 94% of ACQ

Page 3 of 3

REGION/
STATE

MODE
OF
TRANS
PORT

NAME OF THERMAL
POWER STATION

CAPA
CITY
(MW)

NORM
ATIVE
STOCK
Reqd.
(DAYS)

DAILY
REQUIR
EMENT
IN '000
TONNES

ACTUAL STOCK

IN, 000
TONNES

TOTAL

CRITICAL

IN
DAYS

REASONS FOR CRITICAL


COAL STOCK

COAL
STOCK
<7
<4
DAYS DAYS

Impor Indigeno
t
us
ORISSA
82

PITHEAD

IB VALLEY TPS

420

15

7.5

163.01

163.01

22

83

PITHEAD

TALCHER (OLD) TPS

470

15

8.5

66.26

66.26

84

PITHEAD

TALCHER STPS

3000

15

52.5

147

51.87

198.87

85

RAIL

STERLITE TPP

2400

20

15.6

336

336

22

86

RAIL

KAMALANGA TPS

350

20

5.1

38

57.42

95.42

19

CIL Supply 87% of ACQ

WEST BENGAL
87

RAIL

DURGAPUR TPS

340

20

3.8

189.84

189.84

50

88

RAIL

MEJIA TPS

2340

20

22.7

44.06

44.06

** Less import

89

RAIL

BAKRESWAR TPS

1050

20

14.4

16.33

16.33

** CIL Supply: 92% of ACQ

90

RAIL

BANDEL TPS

450

20

4.3

24.71

24.71

CIL Supply 52% of ACQ

91

RAIL

D.P.L. TPS

630

25

5.5

64.29

64.29

12

92

RAIL

KOLAGHAT TPS

1260

25

16.2

44.45

44.45

** CIL Supply 60% of ACQ

93

RAIL

SAGARDIGHI TPS

600

20

7.4

22.68

22.68

** Less import

94

RAIL

SANTALDIH TPS

980

20

4.5

52.79

52.79

12

95

RAIL

BUDGE BUDGE TPS

750

20

10.2

154.88

154.88

15

96

RAIL

NEW COSSIPORE TPS

160

20

0.9

10.84

10.84

12

97

RAIL

SOUTHERN REPL. TPS

135

20

48.53

48.53

24

98

RAIL

TITAGARH TPS

240

20

3.1

60.7

60.7

20

99

PITHEAD

FARAKKA STPS

2100

15

23.6

21

246.88

267.88

11

100

RAIL

DURGAPUR STEEL TPS

1000

20

9.8

74.71

74.71

26745

18

307.7

257 3146.75

3403.75

11

109308

22

1405

1396 15275.2

16671.2

12

29

15

TOTAL OF E.R.
ALL INDIA TOTAL
(*) Critical i.e. stock less than 7 days in
(**) Super Critical i.e. stock less than 4 days in

29
15

TPSs
TPSs

{Includes super critical also}

Page 1 of 3

CENTRAL ELECTRICITY AUTHORITY


OPERATION MONITORING DIVISION
DAILY COAL REPORT
COAL STOCKS POSITION AT VARIOUS THERMAL POWER STATIONS IN THE COUNTRY ( AS ON 09-Jan-2014 )
REGION/
STATE

MODE
OF
TRANS
PORT

NAME OF THERMAL
POWER STATION

CAPA
CITY
(MW)

NORM
ATIVE
STOCK
Reqd.
(DAYS)

CRITICAL

ACTUAL STOCK

DAILY
REQUIR
EMENT
IN '000
TONNES

IN, 000 TONNES

Imp ort

TOTAL

REASONS FOR CRITICAL


COAL STOCK

COAL
STOCK

IN
DAYS

<7
<4
DAYS DAYS

Indig
enous

NORTHERN
DELHI
1

RAIL

RAJGHAT TPS

135

20

1.9

79.9

79.9

43

RAIL

BADARPUR TPS

705

30

10.6

175.58

175.58

17

RAIL

PANIPAT TPS

1360

25

19.6

59

497.6

556.6

28

RAIL

YAMUNA NAGAR TPS

600

25

6.9

46

196.05

242.05

35

RAIL

RAJIV GANDHI TPS

1200

25

12.3

83

596.67

679.67

55

RAIL

INDIRA GANDHI STPP

1500

25

19

144

343.53

487.53

26

RAIL

MAHATMA GANDHI TPS

1320

25

16.7

93.43

102.43

RAIL

GH TPS (LEH.MOH.)

RAIL

ROPAR TPS

10

RAIL

GND TPS(BHATINDA)

HARYANA

CIL Supply 55% of ACQ

CIL Supply 71% of ACQ

PUNJAB
920

30

12.9

185.58

185.58

14

1260

25

18.5

240.77

240.77

13

440

30

4.9

45.12

45.12

RAJASTHAN
11

RAIL

KOTA TPS

1240

30

21

193.06

193.06

12

RAIL

SURATGARH TPS

1500

30

20.4

375.91

377.91

19

13

RAIL

CHHABRA TPP

750

30

6.3

140.22

140.22

22

1630

15

24

357.61

357.61

15

665

25

7.2

39.59

39.59

1278

20

11.7

329.09

329.09

28
18

UTTAR PRADESH
14

PITHEAD

ANPARA TPS

15

RAIL

HARDUAGANJ TPS

16

RAIL

OBRA TPS

17

RAIL

PANKI TPS

210

20

2.6

46.4

46.4

18

RAIL

PARICHHA TPS

1140

30

14

122.88

122.88

19

RAIL

DADRI (NCTPP)

1820

30

26.4

40

221.57

261.57

10

20

PITHEAD

RIHAND STPS

3000

15

36.4

64.69

64.69

21

PITHEAD

SINGRAULI STPS

2000

15

33.1

170.34

170.34

CIL Supply 98% of ACQ

22

RAIL

TANDA TPS

440

25

8.4

69.3

69.3

23

RAIL

UNCHAHAR TPS

1050

25

16.7

16.15

16.15

** CIL Supply 94% of ACQ

24

RAIL

ROSA TPP Ph-I

1200

25

15

79

184.69

263.69

18

25

PITHEAD

ANPARA C TPS

** CIL Supply 110% of ACQ

TOTAL OF N.R.

1200

25

14.2

7.69

7.69

28563

24

380.7

463

4793.39

5256.39

14

WESTERN
CHHATTISGARH
26

RAIL

DSPM TPS

500

15

8.2

302.5

302.5

37

27

PITHEAD

KORBA-II

440

15

253.94

253.94

36

28

PITHEAD

KORBA-WEST TPS

1340

15

11.7

213.46

213.46

18

29

PITHEAD

KORBA STPS

2600

15

45.7

433.71

433.71

10

30

PITHEAD

SIPAT STPS

2980

20

42.5

71

477.66

548.66

13

31

RAIL

PATHADI TPP

600

15

182.34

182.34

26

32

RAIL

BHILAI TPS

500

25

6.7

31

242.87

273.87

41

33

RAIL

AKALTARA TPS

600

20

7.1

67.53

67.53

10

34

RAIL

SIKKA REP. TPS

240

30

1.3

65.66

65.66

51

35

RAIL

GANDHI NAGAR TPS

870

30

8.7

197.19

197.19

23

36

RAIL

UKAI TPS

1350

30

13.7

319.21

319.21

23

37

RAIL

WANAKBORI TPS

1470

30

19.4

478.36

478.36

25

38

RAIL

SABARMATI (C STATION)

400

30

5.3

61.6

61.6

12

GUJARAT

** CIL Supply 101% of ACQ

Page 2 of 3

REGION/
STATE

MODE
OF
TRANS
PORT

NAME OF THERMAL
POWER STATION

CAPA
CITY
(MW)

NORM
ATIVE
STOCK
Reqd.
(DAYS)

DAILY
REQUIR
EMENT
IN '000
TONNES

ACTUAL STOCK

IN, 000 TONNES

Imp ort

TOTAL

CRITICAL

REASONS FOR CRITICAL


COAL STOCK

COAL
STOCK

IN
DAYS

<7
<4
DAYS DAYS

Indig
enous

MADHYA PRADESH
39

PITHEAD

AMARKANTAK EXT TPS

450

15

5.3

34

29.14

63.14

12

40

RAIL

SANJAY GANDHI TPS

1340

20

16.5

189.38

189.38

11

41

RAIL

SATPURA TPS

1580

20

17.3

42

633.62

675.62

39

42

PITHEAD

VINDHYACHAL STPS

4260

15

56.6

125.1

126.1

43

RAIL

BINA TPS

500

25

7.5

85.92

85.92

11

** CIL Supply: 92% of ACQ

MAHARASHTRA
44

RAIL

BHUSAWAL TPS

1420

20

17.4

203.6

206.6

12

45

RAIL

CHANDRAPUR(MAHARASHT
RA) STPS

2340

20

34.7

518.35

518.35

15

46

RAIL

KHAPARKHEDA TPS

1340

25

17.5

94.36

96.36

47

RAIL

KORADI TPS

1040

25

8.1

138.6

138.6

17

48

RAIL

NASIK TPS

630

25

11.2

137.25

137.25

12

49

RAIL

PARLI TPS

1130

25

15.6

8.19

8.19

50

RAIL

PARAS TPS

500

25

6.4

166.4

166.4

26

51

RAIL

DAHANU TPS

500

25

10.1

91

50.27

141.27

14

52

RAIL

WARDHA WARORA TPP

540

20

5.3

2.71

9.71

53

RAIL

TIRORA TPS

1980

20

18.1

22

303.11

325.11

18

54

RAIL

BELA TPS

270

20

2.4

Data not received

55

RAIL

BUTIBORI TPP

300

20

3.6

Data not received

56

RAIL

AMARAVATI TPS

270

20

3.2

22.86

22.86

57

RAIL

EMCO WARORA TPS

58

RAIL

MAUDA TPS

TOTAL OF W.R.

Unloading Constraint

** Less Receipt CIL/SCCL

** Less import

600

20

3.4

46.66

49.66

15

1000

30

7.1

79.65

79.65

11

35880

21

451.6

309

6131.22

6440.22

14

SOUTHERN
ANDHRA PRADESH
59

RAIL

Dr. N.TATA RAO TPS

1760

20

28.5

118.62

118.62

60

RAIL

KOTHAGUDEM TPS

1720

20

27.8

20.35

20.35

** Less Receipt

CIL Supply 61% of ACQ

61

RAIL

RAYALASEEMA TPS

1050

25

15.9

20.02

20.02

** Less receipt-SCCL

62

PITHEAD

RAMAGUNDEM STPS

2600

15

40.6

30

121.2

151.2

63

RAIL

SIMHADRI

2000

25

29.4

73

76.02

149.02

64

RAIL

KAKATIYA TPS

500

25

7.1

11.6

11.6

** Less receipt-SCCL

** Less import

Less Receipt
CIL Supply 83% of ACQ

KARNATAKA
65

RAIL

RAICHUR TPS

1720

30

23.3

10

63.79

73.79

66

RAIL

BELLARY TPS

1000

30

14.1

12

42.04

54.04

Coal Sup.for U-II yet to resume

Less import

TAMIL NADU
67

INTER
MODAL

ENNORE TPS

450

30

4.3

30.74

30.74

68

INTER
MODAL

METTUR TPS

1440

30

20

130

173.29

303.29

15

69

INTER
MODAL

NORTH CHENNAI TPS

1830

30

22.7

43

90.85

133.85

70

INTER
MODAL

TUTICORIN TPS

1050

30

18.1

74

277.45

351.45

19

71

RAIL

VALLUR TPP

TOTAL OF S.R.

1000

30

13.6

90.87

90.87

18120

25

265.4

372

1136.83

1508.83

EASTERN
BIHAR
72

RAIL

BARAUNI TPS

210

20

0.7

9.19

9.19

14

73

RAIL

MUZAFFARPUR TPS

220

20

1.2

14.76

14.76

13

74

PITHEAD

KAHALGAON TPS

2340

15

36.2

47

416.92

463.92

13

JHARKHAND
75

RAIL

PATRATU TPS

770

20

2.5

88.73

88.73

36

76

ROAD

TENUGHAT TPS

420

20

286.11

286.11

72

77

RAIL

BOKARO `B` TPS

630

20

9.7

197.87

197.87

20

78

RAIL

CHANDRAPURA(DVC) TPS

890

20

8.7

6.01

6.01

79

RAIL

MAITHON RB TPP

1050

20

13.3

326.78

326.78

25

80

RAIL

KODARMA TPP

1000

20

7.5

82.07

82.07

11

81

RAIL

MAHADEV PRASAD STPP

540

20

6.3

2.46

2.46

** Less Receipt

** CIL Supply: 94% of ACQ

Page 3 of 3

REGION/
STATE

MODE
OF
TRANS
PORT

NAME OF THERMAL
POWER STATION

CAPA
CITY
(MW)

NORM
ATIVE
STOCK
Reqd.
(DAYS)

DAILY
REQUIR
EMENT
IN '000
TONNES

ACTUAL STOCK

IN, 000 TONNES

Imp ort

TOTAL

CRITICAL

REASONS FOR CRITICAL


COAL STOCK

COAL
STOCK

IN
DAYS

<7
<4
DAYS DAYS

Indig
enous

ORISSA
82

PITHEAD

IB VALLEY TPS

420

15

7.5

164.94

164.94

22

83

PITHEAD

TALCHER (OLD) TPS

470

15

8.5

66.65

66.65

84

PITHEAD

TALCHER STPS

3000

15

52.5

146

60.26

206.26

85

RAIL

STERLITE TPP

2400

20

15.6

327.82

327.82

21

86

RAIL

KAMALANGA TPS

350

20

5.1

37

60.74

97.74

19

CIL Supply 87% of ACQ

WEST BENGAL
87

RAIL

DURGAPUR TPS

340

20

3.8

183.63

183.63

49

88

RAIL

MEJIA TPS

2340

20

22.7

51.14

51.14

** Less import

89

RAIL

BAKRESWAR TPS

1050

20

14.4

15.4

15.4

** CIL Supply 92% of ACQ

90

RAIL

BANDEL TPS

450

20

4.3

23.28

23.28

CIL Supply 52% of ACQ

91

RAIL

D.P.L. TPS

630

25

5.5

63.22

63.22

12

92

RAIL

KOLAGHAT TPS

1260

25

16.2

49.24

49.24

** CIL Supply 60% of ACQ

93

RAIL

SAGARDIGHI TPS

600

20

7.4

23.6

23.6

** Less import

94

RAIL

SANTALDIH TPS

980

20

4.5

48.63

48.63

11

95

RAIL

BUDGE BUDGE TPS

750

20

10.2

151.59

151.59

15

96

RAIL

NEW COSSIPORE TPS

160

20

0.9

10.62

10.62

11

97

RAIL

SOUTHERN REPL. TPS

135

20

50.21

50.21

25

98

RAIL

TITAGARH TPS

240

20

3.1

57.17

57.17

19

99

PITHEAD

FARAKKA STPS

2100

15

23.6

25

250.44

275.44

12

100

RAIL

DURGAPUR STEEL TPS

1000

20

9.8

72.11

72.11

26745

18

307.7

254

3161.57

3415.57

11

109308

22

1405

1398

15223

16621

12

27

16

TOTAL OF E.R.
ALL INDIA TOTAL
(*) Critical i.e. stock less than 7 days in
(**) Super Critical i.e. stock less than 4 days in

27
16

TPSs
TPSs

{Includes super critical also}

Page 1 of 3

CENTRAL ELECTRICITY AUTHORITY


OPERATION MONITORING DIVISION
DAILY COAL REPORT
COAL STOCKS POSITION AT VARIOUS THERMAL POWER STATIONS IN THE COUNTRY ( AS ON 12-Jan-2014 )
REGION/
STATE

MODE
OF
TRANS
PORT

NAME OF THERMAL
POWER STATION

CAPA CITY
(MW)

NORM
ATIVE
STOCK
Reqd.
(DAYS)

DAILY
REQUIR
EMENT
IN '000
TONNES

ACTUAL STOCK

IN, 000 TONNES

Imp
ort

CRITICAL

TOTAL IN DAYS

REASONS FOR
CRITICAL COAL
STOCK

COAL
STOCK

<7
<4
DAYS DAYS

Indig
enous

NORTHERN
DELHI
1

RAIL

RAJGHAT TPS

135

20

1.9

79.9

79.9

43

RAIL

BADARPUR TPS

705

30

10.6

158.79

158.79

15

RAIL

PANIPAT TPS

1360

25

19.6

59

497.6

556.6

28

RAIL

YAMUNA NAGAR TPS

600

25

6.9

48

196.96

244.96

35

RAIL

RAJIV GANDHI TPS

1200

25

12.3

91

580.43

671.43

55

RAIL

INDIRA GANDHI STPP

1500

25

19

136

337.56

473.56

25

RAIL

MAHATMA GANDHI TPS

1320

25

16.7

11

80.08

91.08

RAIL

GH TPS (LEH.MOH.)

RAIL

ROPAR TPS

10

RAIL

GND TPS(BHATINDA)

HARYANA

CIL Supply 55% of ACQ

CIL Supply 71% of ACQ

PUNJAB
920

30

12.9

185.58

185.58

14

1260

25

18.5

225.49

225.49

12

440

30

4.9

39.48

39.48

RAJASTHAN
11

RAIL

KOTA TPS

1240

30

21

185.32

185.32

12

RAIL

SURATGARH TPS

1500

30

20.4

375.91

377.91

19

13

RAIL

CHHABRA TPP

750

30

6.3

151.29

151.29

24

1630

15

24

378.14

378.14

16

665

25

7.2

38.52

38.52

1278

20

11.7

333.46

333.46

28

UTTAR PRADESH
14

PITHEAD

ANPARA TPS

15

RAIL

HARDUAGANJ TPS

16

RAIL

OBRA TPS

17

RAIL

PANKI TPS

210

20

2.6

40.31

40.31

16

18

RAIL

PARICHHA TPS

1140

30

14

117.91

117.91

19

RAIL

DADRI (NCTPP)

1820

30

26.4

26

210.22

236.22

20

PITHEAD

RIHAND STPS

3000

15

36.4

67.48

67.48

21

PITHEAD

SINGRAULI STPS

2000

15

33.1

192.98

192.98

CIL Supply 98% of ACQ

22

RAIL

TANDA TPS

440

25

8.4

61.97

61.97

23

RAIL

UNCHAHAR TPS

1050

25

16.7

8.22

8.22

** CIL Supply 94% of ACQ

24

RAIL

ROSA TPP Ph-I

1200

25

15

85

198.5

283.5

19

25

PITHEAD

ANPARA C TPS

** CIL Supply 110% of ACQ

TOTAL OF N.R.

1200

25

14.2

6.3

6.3

28563

24

380.7

459

4748.4

5207.4

14

WESTERN
CHHATTISGARH
26

RAIL

DSPM TPS

500

15

8.2

298.71

298.71

37

27

PITHEAD

KORBA-II

440

15

253.92

253.92

36

28

PITHEAD

KORBA-WEST TPS

1340

15

11.7

213.46

213.46

18

29

PITHEAD

KORBA STPS

2600

15

45.7

433.92

433.92

10

30

PITHEAD

SIPAT STPS

2980

20

42.5

59

470.79

529.79

12

31

RAIL

PATHADI TPP

600

15

82.34

82.34

12

32

RAIL

BHILAI TPS

500

25

6.7

32

250.3

282.3

43

33

RAIL

AKALTARA TPS

600

20

7.1

69.39

69.39

10

34

RAIL

SIKKA REP. TPS

240

30

1.3

66.32

66.32

52

35

RAIL

GANDHI NAGAR TPS

870

30

8.7

201.66

201.66

23

36

RAIL

UKAI TPS

1350

30

13.7

333.7

333.7

24

37

RAIL

WANAKBORI TPS

1470

30

19.4

502.88

502.88

26

38

RAIL

SABARMATI (C STATION)

400

30

5.3

43.76

43.76

GUJARAT

** CIL Supply 101% of ACQ

Page 2 of 3

REGION/
STATE

MODE
OF
TRANS
PORT

NAME OF THERMAL
POWER STATION

CAPA CITY
(MW)

NORM
ATIVE
STOCK
Reqd.
(DAYS)

DAILY
REQUIR
EMENT
IN '000
TONNES

ACTUAL STOCK

IN, 000 TONNES

Imp
ort

CRITICAL

TOTAL IN DAYS

REASONS FOR
CRITICAL COAL
STOCK

COAL
STOCK

<7
<4
DAYS DAYS

Indig
enous

MADHYA PRADESH
39

PITHEAD

AMARKANTAK EXT TPS

450

15

5.3

33

26

59

11

40

RAIL

SANJAY GANDHI TPS

1340

20

16.5

192.08

192.08

12

41

RAIL

SATPURA TPS

1580

20

17.3

38

628.22

666.22

38

42

PITHEAD

VINDHYACHAL STPS

4260

15

56.6

177.07

178.07

43

RAIL

BINA TPS

500

25

7.5

78.99

78.99

11

** CIL Supply: 92% of ACQ

MAHARASHTRA
44

RAIL

BHUSAWAL TPS

1420

20

17.4

199.26

199.26

11

45

RAIL

CHANDRAPUR(MAHARASHT
RA) STPS

2340

20

34.7

528.54

528.54

15

46

RAIL

KHAPARKHEDA TPS

1340

25

17.5

87.51

88.51

47

RAIL

KORADI TPS

1040

25

8.1

126.78

126.78

16

48

RAIL

NASIK TPS

630

25

11.2

126.21

126.21

11

49

RAIL

PARLI TPS

1130

25

15.6

15.7

15.7

50

RAIL

PARAS TPS

500

25

6.4

169.86

169.86

27

51

RAIL

DAHANU TPS

500

25

10.1

91

47.27

138.27

14

52

RAIL

WARDHA WARORA TPP

540

20

5.3

6.66

10.66

53

RAIL

TIRORA TPS

1980

20

18.1

30

299.04

329.04

18

54

RAIL

BELA TPS

270

20

2.4

Data not received

55

RAIL

BUTIBORI TPP

300

20

3.6

Data not received

56

RAIL

AMARAVATI TPS

270

20

3.2

29.5

29.5

57

RAIL

EMCO WARORA TPS

58

RAIL

MAUDA TPS

TOTAL OF W.R.

Unloading Constraint

** Less Receipt CIL/SCCL

** Less import

600

20

3.4

30.12

31.12

1000

30

7.1

79.99

79.99

11

35880

21

451.6

289

6069.94

6358.94

14

SOUTHERN
ANDHRA PRADESH
59

RAIL

Dr. N.TATA RAO TPS

1760

20

28.5

118.62

118.62

60

RAIL

KOTHAGUDEM TPS

1720

20

27.8

20.35

20.35

** Less Receipt

CIL Supply: 61% of ACQ

61

RAIL

RAYALASEEMA TPS

1050

25

15.9

20.02

20.02

** Less receipt-SCCL

62

PITHEAD

RAMAGUNDEM STPS

2600

15

40.6

27

118.9

145.9

63

RAIL

SIMHADRI

2000

25

29.4

104

78.68

182.68

64

RAIL

KAKATIYA TPS

500

25

7.1

11.6

11.6

Less Receipt
CIL Supply 83% of ACQ
** Less receipt-SCCL

KARNATAKA
65

RAIL

RAICHUR TPS

1720

30

23.3

15

75.26

90.26

66

RAIL

BELLARY TPS

1000

30

14.1

10

34.45

44.45

Less import

Less import

TAMIL NADU
67

INTER
MODAL

ENNORE TPS

450

30

4.3

26.05

26.05

68

INTER
MODAL

METTUR TPS

1440

30

20

159

148.35

307.35

15

69

INTER
MODAL

NORTH CHENNAI TPS

1830

30

22.7

43

90.85

133.85

70

INTER
MODAL

TUTICORIN TPS

1050

30

18.1

77

263.83

340.83

19

71

RAIL

VALLUR TPP

TOTAL OF S.R.

1000

30

13.6

87.8

87.8

18120

25

265.4

435

1094.77

1529.77

11

Less import
** Coal Sup.for U-II yet to
resum

CIL Supply: 61% of ACQ


4

EASTERN
BIHAR
72

RAIL

BARAUNI TPS

210

20

0.7

9.19

9.19

14

73

RAIL

MUZAFFARPUR TPS

220

20

1.2

16.04

16.04

14

74

PITHEAD

KAHALGAON TPS

2340

15

36.2

35

468.21

503.21

14

JHARKHAND
75

RAIL

PATRATU TPS

770

20

2.5

96.1

96.1

39

76

ROAD

TENUGHAT TPS

420

20

283.94

283.94

71

77

RAIL

BOKARO `B` TPS

630

20

9.7

194.71

194.71

20

78

RAIL

CHANDRAPURA(DVC) TPS

890

20

8.7

79

RAIL

MAITHON RB TPP

1050

20

13.3

346.16

346.16

26

80

RAIL

KODARMA TPP

1000

20

7.5

71.6

71.6

10

81

RAIL

MAHADEV PRASAD STPP

540

20

6.3

1.2

1.2

** Less Receipt

** CIL Supply 94% of ACQ

Page 3 of 3

REGION/
STATE

MODE
OF
TRANS
PORT

NAME OF THERMAL
POWER STATION

CAPA CITY
(MW)

NORM
ATIVE
STOCK
Reqd.
(DAYS)

DAILY
REQUIR
EMENT
IN '000
TONNES

ACTUAL STOCK

IN, 000 TONNES

Imp
ort

CRITICAL

TOTAL IN DAYS

REASONS FOR
CRITICAL COAL
STOCK

COAL
STOCK

<7
<4
DAYS DAYS

Indig
enous

ORISSA
82

PITHEAD

IB VALLEY TPS

420

15

7.5

171.87

171.87

23

83

PITHEAD

TALCHER (OLD) TPS

470

15

8.5

71.8

71.8

84

PITHEAD

TALCHER STPS

3000

15

52.5

155

70.61

225.61

85

RAIL

STERLITE TPP

2400

20

15.6

349.55

349.55

22

86

RAIL

KAMALANGA TPS

350

20

5.1

36

63.86

99.86

20

CIL Supply 87% of ACQ

WEST BENGAL
87

RAIL

DURGAPUR TPS

340

20

3.8

187.51

187.51

50

88

RAIL

MEJIA TPS

2340

20

22.7

51.09

51.09

** Less import

89

RAIL

BAKRESWAR TPS

1050

20

14.4

29.84

29.84

** CIL Supply 92% of ACQ

90

RAIL

BANDEL TPS

450

20

4.3

22.81

22.81

CIL Supply 52% of ACQ

91

RAIL

D.P.L. TPS

630

25

5.5

63.43

63.43

12

92

RAIL

KOLAGHAT TPS

1260

25

16.2

48.97

48.97

** CIL Supply 60% of ACQ

93

RAIL

SAGARDIGHI TPS

600

20

7.4

30.38

30.38

94

RAIL

SANTALDIH TPS

980

20

4.5

39.13

39.13

95

RAIL

BUDGE BUDGE TPS

750

20

10.2

153.38

153.38

15

96

RAIL

NEW COSSIPORE TPS

160

20

0.9

9.84

9.84

11

97

RAIL

SOUTHERN REPL. TPS

135

20

55.24

55.24

27

98

RAIL

TITAGARH TPS

240

20

3.1

58.39

58.39

19

99

PITHEAD

FARAKKA STPS

2100

15

23.6

31

251.44

282.44

12

100

RAIL

DURGAPUR STEEL TPS

1000

20

9.8

71.6

71.6

26745

18

307.7

257

3287.9

3544.9

12

109308

22

1405

1441

15201

16642

12

29

15

TOTAL OF E.R.
ALL INDIA TOTAL
(*) Critical i.e. stock less than 7 days in
(**) Super Critical i.e. stock less than 4 days in

29
15

TPSs
TPSs

{Includes super critical also}

Less import

Page 1 of 3

CENTRAL ELECTRICITY AUTHORITY


OPERATION MONITORING DIVISION
DAILY COAL REPORT
COAL STOCKS POSITION AT VARIOUS THERMAL POWER STATIONS IN THE COUNTRY ( AS ON 14-Jan-2014 )
REGION/
STATE

MODE
OF
TRANS
PORT

NAME OF THERMAL
POWER STATION

CAPA
CITY
(MW)

NORM
ATIVE
STOCK
Reqd.
(DAYS)

DAILY
REQUIR
EMENT
IN '000
TONNES

ACTUAL STOCK

IN, 000
TONNES
Imp
ort

TOTAL

CRITICAL

IN
DAYS

REASONS FOR CRITICAL


COAL STOCK

COAL
STOCK

<7
<4
DAYS DAYS

Indigen
ous

NORTHERN
DELHI
1

RAIL

RAJGHAT TPS

135

20

1.9

79.9

79.9

43

RAIL

BADARPUR TPS

705

30

10.6

157.8

157.8

15

1360

25

19.6

65

501.34

566.34

29

600

25

6.9

52

197.39

249.39

36

HARYANA
3

RAIL

PANIPAT TPS

RAIL

YAMUNA NAGAR TPS

RAIL

RAJIV GANDHI TPS

1200

25

12.3

95

577.36

672.36

55

RAIL

INDIRA GANDHI STPP

1500

25

19

139

329.54

468.54

25

RAIL

MAHATMA GANDHI TPS

1320

25

16.7

15

78.78

93.78

RAIL

GH TPS (LEH.MOH.)

RAIL

ROPAR TPS

10

RAIL

GND TPS(BHATINDA)

CIL Supply 55% of ACQ

CIL Supply 71% of ACQ

PUNJAB
920

30

12.9

213.63

213.63

17

1260

25

18.5

219.9

219.9

12

440

30

4.9

38.38

38.38

RAJASTHAN
11

RAIL

KOTA TPS

1240

30

21

180.97

180.97

12

RAIL

SURATGARH TPS

1500

30

20.4

393.11

395.11

19

13

RAIL

CHHABRA TPP

750

30

6.3

149.85

149.85

24

1630

15

24

382.75

382.75

16

665

25

7.2

45.33

45.33

1278

20

11.7

334.61

334.61

29

UTTAR PRADESH
14

PITHEAD

ANPARA TPS

15

RAIL

HARDUAGANJ TPS

16

RAIL

OBRA TPS

17

RAIL

PANKI TPS

210

20

2.6

38.1

38.1

15

18

RAIL

PARICHHA TPS

1140

30

14

109.31

109.31

19

RAIL

DADRI (NCTPP)

1820

30

26.4

18

188.88

206.88

20

PITHEAD

RIHAND STPS

3000

15

36.4

71.79

71.79

21

PITHEAD

SINGRAULI STPS

2000

15

33.1

216.72

216.72

22

RAIL

TANDA TPS

440

25

8.4

62.81

62.81

23

RAIL

UNCHAHAR TPS

1050

25

16.7

24

RAIL

ROSA TPP Ph-I

1200

25

15

82

192.24

274.24

18

25

PITHEAD

ANPARA C TPS

TOTAL OF N.R.

** CIL Supply 101% of ACQ

** CIL Supply 94% of ACQ

** CIL Supply 110% of ACQ

1200

25

14.2

3.09

3.09

28563

24

380.7

468

4763.6

5231.56

14

WESTERN
CHHATTISGARH
26

RAIL

DSPM TPS

500

15

8.2

299.26

299.26

37

27

PITHEAD

KORBA-II

440

15

256.11

256.11

37

28

PITHEAD

KORBA-WEST TPS

1340

15

11.7

201.03

201.03

17

29

PITHEAD

KORBA STPS

2600

15

45.7

435.76

435.76

10

30

PITHEAD

SIPAT STPS

2980

20

42.5

50

471.05

521.05

12

31

RAIL

PATHADI TPP

600

15

82.34

82.34

12

32

RAIL

BHILAI TPS

500

25

6.7

38

252.9

290.9

44

33

RAIL

AKALTARA TPS

600

20

7.1

66.4

66.4

34

RAIL

SIKKA REP. TPS

240

30

1.3

70.07

70.07

55

35

RAIL

GANDHI NAGAR TPS

870

30

8.7

216.45

216.45

25

36

RAIL

UKAI TPS

1350

30

13.7

346.1

346.1

25

37

RAIL

WANAKBORI TPS

1470

30

19.4

506.92

506.92

26

38

RAIL

SABARMATI (C STATION)

400

30

5.3

40.79

40.79

GUJARAT

Page 2 of 3

REGION/
STATE

MODE
OF
TRANS
PORT

NAME OF THERMAL
POWER STATION

CAPA
CITY
(MW)

NORM
ATIVE
STOCK
Reqd.
(DAYS)

DAILY
REQUIR
EMENT
IN '000
TONNES

ACTUAL STOCK

IN, 000
TONNES
Imp
ort

TOTAL

CRITICAL

IN
DAYS

REASONS FOR CRITICAL


COAL STOCK

COAL
STOCK

<7
<4
DAYS DAYS

Indigen
ous

MADHYA PRADESH
39

PITHEAD

AMARKANTAK EXT TPS

450

15

5.3

31

24.43

55.43

11

40

RAIL

SANJAY GANDHI TPS

1340

20

16.5

186.5

186.5

11

41

RAIL

SATPURA TPS

1580

20

17.3

33

631.47

664.47

38

42

PITHEAD

VINDHYACHAL STPS

4260

15

56.6

208.36

209.36

43

RAIL

BINA TPS

500

25

7.5

79.25

79.25

11

CIL Supply 92% of ACQ

Unloading Constraint

** Less Receipt CIL/SCCL

** Less import

MAHARASHTRA
44

RAIL

BHUSAWAL TPS

1420

20

17.4

10

187.76

197.76

11

45

RAIL

CHANDRAPUR(MAHARASH
TRA) STPS

2340

20

34.7

535.34

535.34

15

46

RAIL

KHAPARKHEDA TPS

1340

25

17.5

87.68

88.68

47

RAIL

KORADI TPS

1040

25

8.1

126.83

126.83

16

48

RAIL

NASIK TPS

630

25

11.2

115.34

115.34

10

49

RAIL

PARLI TPS

1130

25

15.6

28.2

28.2

50

RAIL

PARAS TPS

500

25

6.4

165.5

165.5

26

51

RAIL

DAHANU TPS

500

25

10.1

90

51.11

141.11

14

52

RAIL

WARDHA WARORA TPP

540

20

5.3

10.39

13.39

53

RAIL

TIRORA TPS

1980

20

18.1

28

299.72

327.72

18

54

RAIL

BELA TPS

270

20

2.4

Data not received

55

RAIL

BUTIBORI TPP

300

20

3.6

Data not received

56

RAIL

AMARAVATI TPS

270

20

3.2

37.25

37.25

12

57

RAIL

EMCO WARORA TPS

58

RAIL

MAUDA TPS

TOTAL OF W.R.

600

20

3.4

26.76

27.76

1000

30

7.1

87.94

87.94

12

35880

21

451.6

286

6135

6421.02

14

SOUTHERN
ANDHRA PRADESH
59

RAIL

Dr. N.TATA RAO TPS

1760

20

28.5

118.62

118.62

60

RAIL

KOTHAGUDEM TPS

1720

20

27.8

20.35

20.35

** Less Receipt

CIL Supply: 61% of ACQ

61

RAIL

RAYALASEEMA TPS

1050

25

15.9

20.02

20.02

** Less receipt-SCCL

62

PITHEAD

RAMAGUNDEM STPS

2600

15

40.6

28

122.28

150.28

63

RAIL

SIMHADRI

2000

25

29.4

131

69.14

200.14

64

RAIL

KAKATIYA TPS

500

25

7.1

11.6

11.6

Less Receipt

** Less receipt-SCCL

KARNATAKA
65

RAIL

RAICHUR TPS

1720

30

23.3

15

75.26

90.26

66

RAIL

BELLARY TPS

1000

30

14.1

10

34.45

44.45

Less import

Less import

Less import

** Coal Sup.for U-II yet to resume

TAMIL NADU
67

INTER
MODAL

ENNORE TPS

450

30

4.3

26.05

26.05

68

INTER
MODAL

METTUR TPS

1440

30

20

159

148.35

307.35

15

69

INTER
MODAL

NORTH CHENNAI TPS

1830

30

22.7

40

53.56

93.56

70

INTER
MODAL

TUTICORIN TPS

1050

30

18.1

77

263.83

340.83

19

71

RAIL

VALLUR TPP

TOTAL OF S.R.

1000

30

13.6

92.48

92.48

18120

25

265.4

459

1056

1515

EASTERN
BIHAR
72

RAIL

BARAUNI TPS

210

20

0.7

9.19

9.19

14

73

RAIL

MUZAFFARPUR TPS

220

20

1.2

22.61

22.61

19

74

PITHEAD

KAHALGAON TPS

2340

15

36.2

30

482.82

512.82

14

JHARKHAND
75

RAIL

PATRATU TPS

770

20

2.5

96.79

96.79

39

76

ROAD

TENUGHAT TPS

420

20

282.24

282.24

71

77

RAIL

BOKARO `B` TPS

630

20

9.7

193.76

193.76

20

78

RAIL

CHANDRAPURA(DVC) TPS

890

20

8.7

79

RAIL

MAITHON RB TPP

1050

20

13.3

358.14

358.14

27

80

RAIL

KODARMA TPP

1000

20

7.5

68.72

68.72

81

RAIL

MAHADEV PRASAD STPP

540

20

6.3

1.99

1.99

** Less Receipt

** CIL Supply: 94% of ACQ

Page 3 of 3

REGION/
STATE

MODE
OF
TRANS
PORT

NAME OF THERMAL
POWER STATION

CAPA
CITY
(MW)

NORM
ATIVE
STOCK
Reqd.
(DAYS)

DAILY
REQUIR
EMENT
IN '000
TONNES

ACTUAL STOCK

IN, 000
TONNES
Imp
ort

TOTAL

CRITICAL

IN
DAYS

REASONS FOR CRITICAL


COAL STOCK

COAL
STOCK

<7
<4
DAYS DAYS

Indigen
ous

ORISSA
82

PITHEAD

IB VALLEY TPS

420

15

7.5

178.63

178.63

24

83

PITHEAD

TALCHER (OLD) TPS

470

15

8.5

65.48

65.48

84

PITHEAD

TALCHER STPS

3000

15

52.5

160

69.77

229.77

85

RAIL

STERLITE TPP

2400

20

15.6

354.37

354.37

23

86

RAIL

KAMALANGA TPS

350

20

5.1

44

67.48

111.48

22

CIL Supply 87% of ACQ

WEST BENGAL
87

RAIL

DURGAPUR TPS

340

20

3.8

199.35

199.35

53

88

RAIL

MEJIA TPS

2340

20

22.7

59.34

59.34

** Less import

89

RAIL

BAKRESWAR TPS

1050

20

14.4

27.84

27.84

** CIL Supply: 92% of ACQ

90

RAIL

BANDEL TPS

450

20

4.3

23.69

23.69

CIL Supply 52% of ACQ

91

RAIL

D.P.L. TPS

630

25

5.5

61

61

11

92

RAIL

KOLAGHAT TPS

1260

25

16.2

49.41

49.41

** CIL Supply 60% of ACQ

93

RAIL

SAGARDIGHI TPS

600

20

7.4

37.44

37.44

94

RAIL

SANTALDIH TPS

980

20

4.5

33.91

33.91

95

RAIL

BUDGE BUDGE TPS

750

20

10.2

149.37

149.37

15

96

RAIL

NEW COSSIPORE TPS

160

20

0.9

9.15

9.15

10

97

RAIL

SOUTHERN REPL. TPS

135

20

51.42

51.42

25

98

RAIL

TITAGARH TPS

240

20

3.1

58.49

58.49

19

99

PITHEAD

FARAKKA STPS

2100

15

23.6

30

250.28

280.28

12

100

RAIL

DURGAPUR STEEL TPS

1000

20

9.8

75.84

75.84

26745

18

307.7

264

3338.5

3602.53

12

109308

22

1405

1477

15293

16770.1

12

26

14

TOTAL OF E.R.
ALL INDIA TOTAL
(*) Critical i.e. stock less than 7 days in
(**) Super Critical i.e. stock less than 4 days in

26
14

TPSs {Includes super critical also}


TPSs

Less import

Page 1 of 3

CENTRAL ELECTRICITY AUTHORITY


OPERATION MONITORING DIVISION
DAILY COAL REPORT
COAL STOCKS POSITION AT VARIOUS THERMAL POWER STATIONS IN THE COUNTRY ( AS ON 15-Jan-2014 )
REGION/
STATE

MODE
OF
TRANS
PORT

NAME OF THERMAL
POWER STATION

CAPA NORM DAILY


CITY ATIVE REQUIR
(MW) STOCK EMENT
IN '000
Reqd.
(DAYS) TONNES

ACTUAL STOCK

IN, 000
TONNES

TOTAL

IN
DAY
S

Imp Indig
ort enous

CRITICAL REASONS FOR CRITICAL


COAL STOCK
COAL
STOCK

<7
<4
DAYS DAYS

NORTHERN
DELHI
1

RAIL

RAJGHAT TPS

135

20

1.9

79.9

79.9

43

RAIL

BADARPUR TPS

705

30

10.6

0 157.9

157.91

15

1360

25

19.6

68 498.8

566.81

29

600

25

6.9

50 190.1

240.13

35

HARYANA
3

RAIL

PANIPAT TPS

RAIL

YAMUNA NAGAR TPS

RAIL

RAJIV GANDHI TPS

1200

25

12.3

97 573.5

670.53

55

RAIL

INDIRA GANDHI STPP

1500

25

19

141 332.1

473.09

25

RAIL

MAHATMA GANDHI TPS

1320

25

16.7

17 80.76

97.76

RAIL

GH TPS (LEH.MOH.)

RAIL

ROPAR TPS

10

RAIL

GND TPS(BHATINDA)

CIL Supply 55% of ACQ

CIL Supply 71% of ACQ

PUNJAB
920

30

12.9

0 218.2

218.24

17

1260

25

18.5

0 221.5

221.5

12

440

30

4.9

0 33.76

33.76

RAJASTHAN
11

RAIL

KOTA TPS

1240

30

21

0 180.9

180.9

12

RAIL

SURATGARH TPS

1500

30

20.4

2 390.6

392.63

19

13

RAIL

CHHABRA TPP

750

30

6.3

0 151.9

151.91

24

1630

15

24

0 378.2

378.21

16

665

25

7.2

0 44.75

44.75

1278

20

11.7

0 331.5

331.54

28

UTTAR PRADESH
14

PITHEAD ANPARA TPS

15

RAIL

HARDUAGANJ TPS

16

RAIL

OBRA TPS

17

RAIL

PANKI TPS

210

20

2.6

0 36.22

36.22

14

18

RAIL

PARICHHA TPS

1140

30

14

0 102.3

102.32

19

RAIL

DADRI (NCTPP)

1820

30

26.4

12 194.9

206.9

20

PITHEAD RIHAND STPS

3000

15

36.4

0 76.66

76.66

21

PITHEAD SINGRAULI STPS

2000

15

33.1

0 219.5

219.47

22

RAIL

TANDA TPS

440

25

8.4

0 57.59

57.59

23

RAIL

UNCHAHAR TPS

1050

25

16.7

24

RAIL

ROSA TPP Ph-I

1200

25

15

25

PITHEAD ANPARA C TPS

TOTAL OF N.R.

2.97

2.97

88 204.8

292.83

19

** CIL Supply 101% of ACQ

** CIL Supply 94% of ACQ

** CIL Supply 110% of ACQ

1200

25

14.2

6.34

6.34

28563

24

380.7

474

4766

5239.87

14

WESTERN
CHHATTISGARH
26

RAIL

DSPM TPS

500

15

8.2

0 298.3

298.3

37

27

PITHEAD KORBA-II

440

15

0 255.8

255.84

37

28

PITHEAD KORBA-WEST TPS

1340

15

11.7

201

201.03

17

29

PITHEAD KORBA STPS

2600

15

45.7

0 427.5

427.45

30

PITHEAD SIPAT STPS

2980

20

42.5

47 470.2

517.17

12

31

RAIL

PATHADI TPP

600

15

0 82.34

82.34

12

32

RAIL

BHILAI TPS

500

25

6.7

37 254.7

291.66

44

33

RAIL

AKALTARA TPS

600

20

7.1

0 64.56

64.56

GUJARAT
34

RAIL

SIKKA REP. TPS

240

30

1.3

1 74.09

75.09

58

35

RAIL

GANDHI NAGAR TPS

870

30

8.7

0 227.4

227.37

26

36

RAIL

UKAI TPS

1350

30

13.7

0 354.9

354.94

26

37

RAIL

WANAKBORI TPS

1470

30

19.4

0 514.2

514.22

27

38

RAIL

SABARMATI (C STATION)

400

30

5.3

0 40.79

40.79

Page 2 of 3

REGION/
STATE

MODE
OF
TRANS
PORT

NAME OF THERMAL
POWER STATION

CAPA NORM DAILY


CITY ATIVE REQUIR
(MW) STOCK EMENT
IN '000
Reqd.
(DAYS) TONNES

ACTUAL STOCK

IN, 000
TONNES

TOTAL

IN
DAY
S

Imp Indig
ort enous

CRITICAL REASONS FOR CRITICAL


COAL STOCK
COAL
STOCK

<7
<4
DAYS DAYS

MADHYA PRADESH
39

PITHEAD AMARKANTAK EXT TPS

450

15

5.3

31 24.69

55.69

11

40

RAIL

SANJAY GANDHI TPS

1340

20

16.5

0 192.3

192.27

12

41

RAIL

SATPURA TPS

1580

20

17.3

30 634.9

664.86

38

42

PITHEAD VINDHYACHAL STPS

4260

15

56.6

1 215.7

216.74

43

RAIL

500

25

7.5

0 74.04

74.04

10

BINA TPS

CIL Supply: 92% of ACQ

Unloading Constraint

** Less Receipt CIL/SCCL

MAHARASHTRA
44

RAIL

BHUSAWAL TPS

1420

20

17.4

0 180.4

180.4

10

45

RAIL

CHANDRAPUR(MAHARAS
HTRA) STPS

2340

20

34.7

0 544.1

544.08

16

46

RAIL

KHAPARKHEDA TPS

1340

25

17.5

0 79.56

79.56

47

RAIL

KORADI TPS

1040

25

8.1

0 125.5

125.5

16

48

RAIL

NASIK TPS

630

25

11.2

0 108.4

108.44

10

49

RAIL

PARLI TPS

1130

25

15.6

0 36.27

36.27

50

RAIL

PARAS TPS

500

25

6.4

0 160.7

160.72

25

51

RAIL

DAHANU TPS

500

25

10.1

89 51.78

140.78

14

52

RAIL

WARDHA WARORA TPP

540

20

5.3

3 15.89

18.89

53

RAIL

TIRORA TPS

1980

20

18.1

28 285.6

313.55

17

54

RAIL

BELA TPS

270

20

2.4

Data not received

55

RAIL

BUTIBORI TPP

300

20

3.6

Data not received

56

RAIL

AMARAVATI TPS

270

20

3.2

0 39.84

39.84

12

57

RAIL

EMCO WARORA TPS

58

RAIL

MAUDA TPS

TOTAL OF W.R.

600

20

3.4

1 23.26

24.26

1000

30

7.1

0 81.98

81.98

12

35880

21

451.6

6141

6407.62

14

267

Less import

SOUTHERN
ANDHRA PRADESH
59

RAIL

Dr. N.TATA RAO TPS

1760

20

28.5

4 85.49

89.49

** CIL Supply: 61% of ACQ

60

RAIL

KOTHAGUDEM TPS

1720

20

27.8

0 29.94

29.94

** Less Receipt

61

RAIL

RAYALASEEMA TPS

1050

25

15.9

0.32

0.32

** Less receipt-SCCL

62

PITHEAD RAMAGUNDEM STPS

2600

15

40.6

22 126.6

148.6

63

RAIL

SIMHADRI

2000

25

29.4

139 61.35

200.35

64

RAIL

KAKATIYA TPS

500

25

7.1

0 16.52

16.52

** Less receipt-SCCL

Less Receipt

KARNATAKA
65

RAIL

RAICHUR TPS

1720

30

23.3

9 65.76

74.76

** Less import

66

RAIL

BELLARY TPS

1000

30

14.1

7 29.45

36.45

** Coal Sup.for U-II yet to


resume

Less import

Less import

TAMIL NADU
67

INTER
MODAL

ENNORE TPS

450

30

4.3

0 26.05

26.05

68

INTER
MODAL

METTUR TPS

1440

30

20

159 148.4

307.35

15

69

INTER
MODAL

NORTH CHENNAI TPS

1830

30

22.7

44 56.84

100.84

70

INTER
MODAL

TUTICORIN TPS

1050

30

18.1

77 263.8

340.83

19

71

RAIL

VALLUR TPP

TOTAL OF S.R.

1000

30

13.6

18120

25

265.4

462

1003

0 92.64

92.64

1465.15

EASTERN
BIHAR
72

RAIL

BARAUNI TPS

210

20

0.7

9.19

9.19

14

73

RAIL

MUZAFFARPUR TPS

220

20

1.2

0 22.18

22.18

19

74

PITHEAD KAHALGAON TPS

2340

15

36.2

26 501.5

527.45

15

JHARKHAND
75

RAIL

PATRATU TPS

770

20

2.5

0 98.29

98.29

40

76

ROAD

TENUGHAT TPS

420

20

0 280.4

280.43

70

77

RAIL

BOKARO `B` TPS

630

20

9.7

0 194.3

194.32

20

78

RAIL

890

20

8.7

79

RAIL

CHANDRAPURA(DVC)
TPS
MAITHON RB TPP

1050

20

80

RAIL

KODARMA TPP

1000

81

RAIL

MAHADEV PRASAD STPP

540

13.3

0 364.9

364.9

27

20

7.5

0 65.08

65.08

20

6.3

** Less Receipt

** CIL Supply 94% of ACQ

Page 3 of 3

REGION/
STATE

MODE
OF
TRANS
PORT

NAME OF THERMAL
POWER STATION

CAPA NORM DAILY


CITY ATIVE REQUIR
(MW) STOCK EMENT
IN '000
Reqd.
(DAYS) TONNES

ACTUAL STOCK

IN, 000
TONNES

TOTAL

IN
DAY
S

Imp Indig
ort enous

CRITICAL REASONS FOR CRITICAL


COAL STOCK
COAL
STOCK

<7
<4
DAYS DAYS

ORISSA
82

PITHEAD IB VALLEY TPS

420

15

7.5

0 178.6

178.59

24

83

PITHEAD TALCHER (OLD) TPS

470

15

8.5

0 66.94

66.94

84

PITHEAD TALCHER STPS

3000

15

52.5

85

RAIL

STERLITE TPP

2400

20

86

RAIL

KAMALANGA TPS

350

20

155

86.4

241.4

15.6

0 359.9

359.87

23

5.1

44 67.48

111.48

22

CIL Supply 87% of ACQ

WEST BENGAL
87

RAIL

DURGAPUR TPS

340

20

3.8

0 200.6

200.6

53

88

RAIL

MEJIA TPS

2340

20

22.7

0 66.96

66.96

** Less import

89

RAIL

BAKRESWAR TPS

1050

20

14.4

0 33.02

33.02

** CIL Supply: 92% of ACQ

90

RAIL

BANDEL TPS

450

20

4.3

22.4

22.4

CIL Supply 52% of ACQ

91

RAIL

D.P.L. TPS

630

25

5.5

0 59.82

59.82

11

92

RAIL

KOLAGHAT TPS

1260

25

16.2

0 48.14

48.14

** CIL Supply 60% of ACQ

93

RAIL

SAGARDIGHI TPS

600

20

7.4

0 42.51

42.51

94

RAIL

SANTALDIH TPS

980

20

4.5

0 36.88

36.88

95

RAIL

BUDGE BUDGE TPS

750

20

10.2

150

149.96

15

96

RAIL

NEW COSSIPORE TPS

160

20

0.9

8.84

8.84

97

RAIL

SOUTHERN REPL. TPS

135

20

0 49.55

49.55

24

98

RAIL

TITAGARH TPS

240

20

3.1

99

PITHEAD FARAKKA STPS

2100

15

23.6

100

RAIL

1000

20

9.8

26745

18

307.7

109308

22

DURGAPUR STEEL TPS

TOTAL OF E.R.
ALL INDIA TOTAL
(*) Critical i.e. stock less than 7 days in
(**) Super Critical i.e. stock less than 4 days in

26
15

TPSs
TPSs

0 58.75

Less import

58.75

19

255

282.04

12

0 75.86

75.86

3403

3657.43

12

1405 1456 15313

16769

12

26

15

27

254

{Includes super critical also}

Page 1 of 3

CENTRAL ELECTRICITY AUTHORITY


OPERATION MONITORING DIVISION
DAILY COAL REPORT
COAL STOCKS POSITION AT VARIOUS THERMAL POWER STATIONS IN THE COUNTRY ( AS ON 16-Jan-2014 )
REGION/
STATE

MODE
OF
TRANS
PORT

NAME OF THERMAL
POWER STATION

CAPA
CITY
(MW)

NORM
ATIVE
STOCK
Reqd.
(DAYS)

CRITICAL

ACTUAL STOCK

DAILY
REQUIR
EMENT
IN '000
TONNES

IN, 000 TONNES

Imp ort

TOTAL

IN
DAYS

REASONS FOR CRITICAL


COAL STOCK

COAL
STOCK

<7
<4
DAYS DAYS

Indig
enous

NORTHERN
DELHI
1

RAIL

RAJGHAT TPS

135

20

1.9

79.9

79.9

43

RAIL

BADARPUR TPS

705

30

10.6

158.21

158.21

15

1360

25

19.6

69

505.36

574.36

29

600

25

6.9

52

197.27

249.27

36

HARYANA
3
RAIL

PANIPAT TPS

RAIL

YAMUNA NAGAR TPS

RAIL

RAJIV GANDHI TPS

1200

25

12.3

98

574.28

672.28

55

RAIL

INDIRA GANDHI STPP

1500

25

19

137

337.96

474.96

25

RAIL

MAHATMA GANDHI TPS

1320

25

16.7

30

86.75

116.75

PUNJAB
8

RAIL

GH TPS (LEH.MOH.)

RAIL

ROPAR TPS

10

RAIL

GND TPS(BHATINDA)

920

30

12.9

218.24

218.24

17

1260

25

18.5

215.94

215.94

12

440

30

4.9

36.88

36.88

RAJASTHAN
11
RAIL

KOTA TPS

1240

30

21

188.05

188.05

12

RAIL

SURATGARH TPS

1500

30

20.4

386.12

388.12

19

13

RAIL

CHHABRA TPP

750

30

6.3

150.65

150.65

24

1630

15

24

378.9

378.9

16

665

25

7.2

47.19

47.19

1278

20

11.7

328.98

328.98

28

UTTAR PRADESH
14
PITHEAD

ANPARA TPS

15

RAIL

HARDUAGANJ TPS

16

RAIL

OBRA TPS

17

RAIL

PANKI TPS

210

20

2.6

39.34

39.34

15

18

RAIL

PARICHHA TPS

1140

30

14

102.4

102.4

19

RAIL

DADRI (NCTPP)

1820

30

26.4

10

194.5

204.5

20

PITHEAD

RIHAND STPS

3000

15

36.4

70.12

70.12

21

PITHEAD

SINGRAULI STPS

2000

15

33.1

220.24

220.24

22

RAIL

TANDA TPS

440

25

8.4

58.12

58.12

23

RAIL

UNCHAHAR TPS

1050

25

16.7

24

RAIL

ROSA TPP Ph-I

1200

25

15

91

212.85

303.85

20

25

PITHEAD

ANPARA C TPS

TOTAL OF N.R.

** CIL Supply 101% of ACQ

** CIL Supply: 94% of ACQ

** CIL Supply 110% of ACQ

1200

25

14.2

0.52

0.52

28563

24

380.7

490

4788.77

5278.77

14

WESTERN
CHHATTISGARH
26

RAIL

DSPM TPS

500

15

8.2

296.84

296.84

36

27

PITHEAD

KORBA-II

440

15

255.77

255.77

37

28

PITHEAD

KORBA-WEST TPS

1340

15

11.7

201.03

201.03

17

29

PITHEAD

KORBA STPS

2600

15

45.7

425.5

425.5

30

PITHEAD

SIPAT STPS

2980

20

42.5

44

453.29

497.29

12

31

RAIL

PATHADI TPP

600

15

171.03

171.03

24

32

RAIL

BHILAI TPS

500

25

6.7

37

254.66

291.66

44

33

RAIL

AKALTARA TPS

600

20

7.1

61.43

61.43

34

RAIL

SIKKA REP. TPS

240

30

1.3

73.44

74.44

58

35

RAIL

GANDHI NAGAR TPS

870

30

8.7

231.32

231.32

27

36

RAIL

UKAI TPS

1350

30

13.7

358.82

358.82

26

37

RAIL

WANAKBORI TPS

1470

30

19.4

523.11

523.11

27

38

RAIL

SABARMATI (C STATION)

400

30

5.3

42.86

42.86

GUJARAT

Page 2 of 3

REGION/
STATE

MODE
OF
TRANS
PORT

NAME OF THERMAL
POWER STATION

CAPA
CITY
(MW)

NORM
ATIVE
STOCK
Reqd.
(DAYS)

DAILY
REQUIR
EMENT
IN '000
TONNES

ACTUAL STOCK

IN, 000 TONNES

Imp ort

CRITICAL

TOTAL

IN
DAYS

REASONS FOR CRITICAL


COAL STOCK

COAL
STOCK

<7
<4
DAYS DAYS

Indig
enous

MADHYA PRADESH
39

PITHEAD

AMARKANTAK EXT TPS

450

15

5.3

31

25.59

56.59

11

40

RAIL

SANJAY GANDHI TPS

1340

20

16.5

194.45

194.45

12

41

RAIL

SATPURA TPS

1580

20

17.3

29

635.73

664.73

38

42

PITHEAD

VINDHYACHAL STPS

4260

15

56.6

217.84

218.84

43

RAIL

BINA TPS

500

25

7.5

75.37

75.37

10

527.93

15

CIL Supply: 92% of ACQ

Unloading Constraint

** Less Receipt CIL/SCCL

** Less import

MAHARASHTRA
44

RAIL

BHUSAWAL TPS

1420

20

17.4

17

155.27

45

RAIL

CHANDRAPUR(MAHARASHT
RA) STPS

2340

20

34.7

527.93

46

RAIL

KHAPARKHEDA TPS

1340

25

17.5

82.38

82.38

47

RAIL

KORADI TPS

1040

25

8.1

121.66

121.66

15

48

RAIL

NASIK TPS

630

25

11.2

101.8

101.8

49

RAIL

PARLI TPS

1130

25

15.6

37.96

37.96

50

RAIL

PARAS TPS

500

25

6.4

162.25

162.25

26

51

RAIL

DAHANU TPS

500

25

10.1

118

52.52

170.52

17

52

RAIL

WARDHA WARORA TPP

540

20

5.3

13.57

15.57

53

RAIL

TIRORA TPS

1980

20

18.1

36

270.42

306.42

17

54

RAIL

BELA TPS

270

20

2.4

Data not received

55

RAIL

BUTIBORI TPP

300

20

3.6

Data not received

56

RAIL

AMARAVATI TPS

270

20

3.2

39.86

39.86

12

57

RAIL

EMCO WARORA TPS

58

RAIL

MAUDA TPS

TOTAL OF W.R.

10

600

20

3.4

19.91

20.91

1000

30

7.1

78.46

78.46

11

35880

21

451.6

316

6162.1

6478.1

14

Less import

SOUTHERN
ANDHRA PRADESH
59

RAIL

Dr. N.TATA RAO TPS

1760

20

28.5

88.84

95.84

** CIL Supply: 61% of ACQ

60

RAIL

KOTHAGUDEM TPS

1720

20

27.8

34.2

34.2

** Less Receipt

61

RAIL

RAYALASEEMA TPS

1050

25

15.9

0.09

0.09

** Less receipt-SCCL

62

PITHEAD

RAMAGUNDEM STPS

2600

15

40.6

16

127.84

143.84

63

RAIL

SIMHADRI

2000

25

29.4

149

54.71

203.71

64

RAIL

KAKATIYA TPS

500

25

7.1

19.91

19.91

** Less receipt-SCCL

Less Receipt

KARNATAKA
65

RAIL

RAICHUR TPS

1720

30

23.3

69.88

73.88

** Less import

66

RAIL

BELLARY TPS

1000

30

14.1

28.7

32.7

** Coal Sup.for U-II yet to resume

Less import

Less import

TAMIL NADU
67

INTER
MODAL

ENNORE TPS

450

30

4.3

25.27

25.27

68

INTER
MODAL

METTUR TPS

1440

30

20

142

167.48

309.48

16

69

INTER
MODAL

NORTH CHENNAI TPS

1830

30

22.7

40

73.54

113.54

70

INTER
MODAL

TUTICORIN TPS

1050

30

18.1

69

281

350

19

71

RAIL

VALLUR TPP

TOTAL OF S.R.

1000

30

13.6

83.56

83.56

18120

25

265.4

431

1055.01

1486.01

10

CIL Supply: 61% of ACQ


6

EASTERN
BIHAR
72

RAIL

BARAUNI TPS

210

20

0.7

9.19

9.19

14

73

RAIL

MUZAFFARPUR TPS

220

20

1.2

23.86

23.86

21

74

PITHEAD

KAHALGAON TPS

2340

15

36.2

22

513.14

535.14

15

JHARKHAND
75

RAIL

PATRATU TPS

770

20

2.5

99.78

99.78

40

76

ROAD

TENUGHAT TPS

420

20

278.43

278.43

70

77

RAIL

BOKARO `B` TPS

630

20

9.7

194.94

194.94

20

78

RAIL

CHANDRAPURA(DVC) TPS

890

20

8.7

79

RAIL

MAITHON RB TPP

1050

20

13.3

370.38

370.38

28

80

RAIL

KODARMA TPP

1000

20

7.5

62.1

62.1

81

RAIL

MAHADEV PRASAD STPP

540

20

6.3

0.52

0.52

** Less Receipt

** CIL Supply: 94% of ACQ

Page 3 of 3

REGION/
STATE

MODE
OF
TRANS
PORT

NAME OF THERMAL
POWER STATION

CAPA
CITY
(MW)

NORM
ATIVE
STOCK
Reqd.
(DAYS)

DAILY
REQUIR
EMENT
IN '000
TONNES

ACTUAL STOCK

IN, 000 TONNES

Imp ort

TOTAL

CRITICAL

IN
DAYS

REASONS FOR CRITICAL


COAL STOCK

COAL
STOCK

<7
<4
DAYS DAYS

Indig
enous

ORISSA
82

PITHEAD

IB VALLEY TPS

420

15

7.5

178.55

178.55

24

83

PITHEAD

TALCHER (OLD) TPS

470

15

8.5

63.87

63.87

84

PITHEAD

TALCHER STPS

3000

15

52.5

150

103.56

253.56

85

RAIL

STERLITE TPP

2400

20

15.6

360.59

360.59

23

86

RAIL

KAMALANGA TPS

350

20

5.1

43

67.03

110.03

22

CIL Supply 87% of ACQ

WEST BENGAL
87

RAIL

DURGAPUR TPS

340

20

3.8

198.83

198.83

53

88

RAIL

MEJIA TPS

2340

20

22.7

70.76

70.76

** Less import

89

RAIL

BAKRESWAR TPS

1050

20

14.4

36.97

36.97

** CIL Supply: 92% of ACQ

90

RAIL

BANDEL TPS

450

20

4.3

21.09

21.09

CIL Supply 52% of ACQ

91

RAIL

D.P.L. TPS

630

25

5.5

58.69

58.69

11

92

RAIL

KOLAGHAT TPS

1260

25

16.2

45.62

45.62

** CIL Supply 60% of ACQ

93

RAIL

SAGARDIGHI TPS

600

20

7.4

42.16

42.16

94

RAIL

SANTALDIH TPS

980

20

4.5

32.9

32.9

95

RAIL

BUDGE BUDGE TPS

750

20

10.2

154.24

154.24

15

96

RAIL

NEW COSSIPORE TPS

160

20

0.9

8.54

8.54

97

RAIL

SOUTHERN REPL. TPS

135

20

51.08

51.08

25

98

RAIL

TITAGARH TPS

240

20

3.1

55.19

55.19

18

99

PITHEAD

FARAKKA STPS

2100

15

23.6

30

252.99

282.99

12

100

RAIL

DURGAPUR STEEL TPS

1000

20

9.8

76.04

76.04

26745

18

307.7

245

3431.04

3676.04

12

109308

22

1405

1481

15436.9

16917.9

12

26

16

TOTAL OF E.R.
ALL INDIA TOTAL
(*) Critical i.e. stock less than 7 days in
(**) Super Critical i.e. stock less than 4 days in

26
16

TPSs
TPSs

{Includes super critical also}

Less import

Page 1 of 3

CENTRAL ELECTRICITY AUTHORITY


OPERATION MONITORING DIVISION
DAILY COAL REPORT
COAL STOCKS POSITION AT VARIOUS THERMAL POWER STATIONS IN THE COUNTRY ( AS ON 19-Jan-2014 )
REGION/
STATE

MODE
OF
TRANS
PORT

NAME OF THERMAL
POWER STATION

CAPA
CITY
(MW)

NORM
ATIVE
STOCK
Reqd.
(DAYS)

ACTUAL STOCK

DAILY
REQUIR
EMENT
IN '000
TONNES

IN, 000
TONNES

CRITICAL REASONS FOR CRITICAL


COAL STOCK
COAL

TOTAL

IN
DAYS

STOCK
<7
<4
DAY
DAYS
S

Indig
Imp ort
enous
NORTHERN
DELHI
1

RAIL

RAJGHAT TPS

135

20

1.9

79.9

79.9

43

RAIL

BADARPUR TPS

705

30

10.6

159.97

159.97

15

1360

25

19.6

77

498.93

575.93

29

600

25

6.9

54

193.18

247.18

36

HARYANA
3

RAIL

PANIPAT TPS

RAIL

YAMUNA NAGAR TPS

RAIL

RAJIV GANDHI TPS

1200

25

12.3

103

577.1

680.1

55

RAIL

INDIRA GANDHI STPP

1500

25

19

143

352.97

495.97

26

RAIL

MAHATMA GANDHI TPS

1320

25

16.7

34

81.64

115.64

RAIL

GH TPS (LEH.MOH.)

RAIL

ROPAR TPS

10

RAIL

GND TPS(BHATINDA)

PUNJAB
920

30

12.9

241.34

241.34

19

1260

25

18.5

239.82

239.82

13

440

30

4.9

39.53

39.53

RAJASTHAN
11

RAIL

KOTA TPS

1240

30

21

168.01

168.01

12

RAIL

SURATGARH TPS

1500

30

20.4

365.23

365.23

18

13

RAIL

CHHABRA TPP

750

30

6.3

155.47

155.47

25

1630

15

24

369.66

369.66

15

665

25

7.2

45

45

1278

20

11.7

320.42

320.42

27

UTTAR PRADESH
14

PITHEAD

ANPARA TPS

15

RAIL

HARDUAGANJ TPS

16

RAIL

OBRA TPS

17

RAIL

PANKI TPS

210

20

2.6

43

43

17

18

RAIL

PARICHHA TPS

1140

30

14

100.64

100.64

19

RAIL

DADRI (NCTPP)

1820

30

26.4

168.74

171.74

20

PITHEAD

RIHAND STPS

3000

15

36.4

95.62

95.62

21

PITHEAD

SINGRAULI STPS

2000

15

33.1

216.56

216.56

22

RAIL

TANDA TPS

440

25

8.4

45.04

45.04

CIL Supply 88% of ACQ

23

RAIL

UNCHAHAR TPS

1050

25

16.7

** CIL Supply: 94% of ACQ

24

RAIL

ROSA TPP Ph-I

1200

25

15

103

239.66

342.66

23

25

PITHEAD

ANPARA C TPS

1200

25

14.2

** CIL Supply 110% of ACQ

28563

24

380.7

518 4797.43

5315.43

14

TOTAL OF N.R.
WESTERN
CHHATTISGARH
26

RAIL

DSPM TPS

500

15

8.2

292.69

292.69

36

27

PITHEAD

KORBA-II

440

15

253.19

253.19

36

28

PITHEAD

KORBA-WEST TPS

1340

15

11.7

191.34

191.34

16

29

PITHEAD

KORBA STPS

2600

15

45.7

432.79

432.79

30

PITHEAD

SIPAT STPS

2980

20

42.5

32

448.63

480.63

11

31

RAIL

PATHADI TPP

600

15

158.65

158.65

23

32

RAIL

BHILAI TPS

500

25

6.7

37

251.62

288.62

43

33

RAIL

AKALTARA TPS

600

20

7.1

54.5

54.5

34

RAIL

SIKKA REP. TPS

240

30

1.3

76.48

79.48

61

35

RAIL

GANDHI NAGAR TPS

870

30

8.7

239.3

239.3

28

36

RAIL

UKAI TPS

1350

30

13.7

375.48

375.48

27

37

RAIL

WANAKBORI TPS

1470

30

19.4

535.09

535.09

28

38

RAIL

SABARMATI (C STATION)

400

30

5.3

53.78

53.78

10

GUJARAT

CIL Supply 71% of ACQ

** CIL Supply 101% of ACQ

Page 2 of 3

REGION/
STATE

MODE
OF
TRANS
PORT

NAME OF THERMAL
POWER STATION

CAPA
CITY
(MW)

NORM
ATIVE
STOCK
Reqd.
(DAYS)

DAILY
REQUIR
EMENT
IN '000
TONNES

ACTUAL STOCK

IN, 000
TONNES
Imp ort

CRITICAL REASONS FOR CRITICAL


COAL STOCK
COAL

TOTAL

IN
DAYS

STOCK
<7
<4
DAY
DAYS
S

Indig
enous

MADHYA PRADESH
39

PITHEAD

AMARKANTAK EXT TPS

450

15

5.3

29

31.49

60.49

11

40

RAIL

SANJAY GANDHI TPS

1340

20

16.5

186.13

186.13

11

41

RAIL

SATPURA TPS

1580

20

17.3

27

648.88

675.88

39

42

PITHEAD

VINDHYACHAL STPS

4260

15

56.6

287.14

288.14

43

RAIL

BINA TPS

500

25

7.5

68.72

68.72

CIL Supply: 92% of ACQ

Unloading Constraint

** Less Receipt CIL/SCCL

** Less import

MAHARASHTRA
44

RAIL

BHUSAWAL TPS

1420

20

17.4

14

144.91

158.91

45

RAIL

CHANDRAPUR(MAHARAS
HTRA) STPS

2340

20

34.7

564.04

564.04

16

46

RAIL

KHAPARKHEDA TPS

1340

25

17.5

96.71

96.71

47

RAIL

KORADI TPS

1040

25

8.1

118.28

118.28

15

48

RAIL

NASIK TPS

630

25

11.2

86

86

49

RAIL

PARLI TPS

1130

25

15.6

48.33

48.33

50

RAIL

PARAS TPS

500

25

6.4

164.35

164.35

26

51

RAIL

DAHANU TPS

500

25

10.1

138

51.14

189.14

19

52

RAIL

WARDHA WARORA TPP

540

20

5.3

12.33

16.33

53

RAIL

TIRORA TPS

1980

20

18.1

47

278.63

325.63

18

54

RAIL

BELA TPS

270

20

2.4

Data not received

55

RAIL

BUTIBORI TPP

300

20

3.6

Data not received

56

RAIL

AMARAVATI TPS

270

20

3.2

37.29

37.29

12

57

RAIL

EMCO WARORA TPS

58

RAIL

MAUDA TPS

TOTAL OF W.R.

600

20

3.4

14.02

15.02

1000

30

7.1

82.7

82.7

12

35880

21

451.6

334

6284.6

6618.6

15

Less import
2

SOUTHERN
ANDHRA PRADESH
59

RAIL

Dr. N.TATA RAO TPS

1760

20

28.5

101.6

101.6

60

RAIL

KOTHAGUDEM TPS

1720

20

27.8

40.4

40.4

** Less Receipt

CIL Supply: 61% of ACQ

61

RAIL

RAYALASEEMA TPS

1050

25

15.9

4.12

4.12

** Less receipt-SCCL

62

PITHEAD

RAMAGUNDEM STPS

2600

15

40.6

154.72

154.72

Less Receipt

63

RAIL

SIMHADRI

2000

25

29.4

169

42.79

211.79

64

RAIL

KAKATIYA TPS

500

25

7.1

31.28

31.28

Less receipt-SCCL

KARNATAKA
65

RAIL

RAICHUR TPS

1720

30

23.3

58.66

66.66

** Less import

66

RAIL

BELLARY TPS

1000

30

14.1

32.89

40.89

** Coal Sup.for U-II yet to resume

TAMIL NADU
67

INTER
MODAL

ENNORE TPS

450

30

4.3

32.79

32.79

68

INTER
MODAL

METTUR TPS

1440

30

20

108

187.29

295.29

15

69

INTER
MODAL

NORTH CHENNAI TPS

1830

30

22.7

22

120.69

142.69

70

INTER
MODAL

TUTICORIN TPS

1050

30

18.1

63

279.4

342.4

19

71

RAIL

VALLUR TPP

1000

30

13.6

53.63

53.63

18120

25

265.4

378 1140.26

1518.26

TOTAL OF S.R.

Less import

CIL Supply: 61% of ACQ


4

EASTERN
BIHAR
72

RAIL

BARAUNI TPS

210

20

0.7

9.19

9.19

14

73

RAIL

MUZAFFARPUR TPS

220

20

1.2

21.81

21.81

19

74

PITHEAD

KAHALGAON TPS

2340

15

36.2

21

536.09

557.09

15

JHARKHAND
75

RAIL

PATRATU TPS

770

20

2.5

104.64

104.64

42

76

ROAD

TENUGHAT TPS

420

20

276.1

276.1

69

77

RAIL

BOKARO `B` TPS

630

20

9.7

197.05

197.05

20

78

RAIL

CHANDRAPURA(DVC) TPS

890

20

8.7

79

RAIL

MAITHON RB TPP

1050

20

13.3

385.41

385.41

29

80

RAIL

KODARMA TPP

1000

20

7.5

62.03

62.03

81

RAIL

MAHADEV PRASAD STPP

540

20

6.3

4.19

4.19

** Less Receipt

** CIL Supply: 94% of ACQ

Page 3 of 3

REGION/
STATE

MODE
OF
TRANS
PORT

NAME OF THERMAL
POWER STATION

NORM
ATIVE
STOCK
Reqd.
(DAYS)

CAPA
CITY
(MW)

DAILY
REQUIR
EMENT
IN '000
TONNES

ACTUAL STOCK

IN, 000
TONNES
Imp ort

TOTAL

CRITICAL REASONS FOR CRITICAL


COAL STOCK
COAL
IN
DAYS

STOCK
<7
<4
DAY
DAYS
S

Indig
enous

ORISSA
82

PITHEAD

IB VALLEY TPS

420

15

7.5

182.84

182.84

25

83

PITHEAD

TALCHER (OLD) TPS

470

15

8.5

67.85

67.85

84

PITHEAD

TALCHER STPS

3000

15

52.5

157

131.64

288.64

85

RAIL

STERLITE TPP

2400

20

15.6

371.41

371.41

24

86

RAIL

KAMALANGA TPS

350

20

5.1

34

70.48

104.48

21

CIL Supply 87% of ACQ

WEST BENGAL
87

RAIL

DURGAPUR TPS

340

20

3.8

194.44

88

RAIL

MEJIA TPS

2340

20

22.7

60.78

60.78

52
3

** Less import

89

RAIL

BAKRESWAR TPS

1050

20

14.4

32.09

32.09

** CIL Supply: 92% of ACQ

90

RAIL

BANDEL TPS

450

20

4.3

35.97

35.97

91

RAIL

D.P.L. TPS

92

RAIL

KOLAGHAT TPS

** CIL Supply 60% of ACQ

93

RAIL

94

630

25

5.5

56.21

56.21

10

1260

25

16.2

36.81

36.81

SAGARDIGHI TPS

600

20

7.4

41.17

41.17

RAIL

SANTALDIH TPS

980

20

4.5

34.28

34.28

95

RAIL

BUDGE BUDGE TPS

750

20

10.2

171.42

171.42

17

96

RAIL

NEW COSSIPORE TPS

160

20

0.9

11.62

11.62

12

97

RAIL

SOUTHERN REPL. TPS

135

20

54.45

54.45

27

98

RAIL

TITAGARH TPS

240

20

3.1

60.24

60.24

20

99

PITHEAD

FARAKKA STPS

2100

15

23.6

28

263.42

291.42

12

100

RAIL

DURGAPUR STEEL TPS

1000

20

9.8

80.1

80.1

26745

18

307.7

240 3553.72

3793.72

12

109308

22

1405

17245

12

26

14

TOTAL OF E.R.
ALL INDIA TOTAL
(*) Critical i.e. stock less than 7 days in
(**) Super Critical i.e. stock less than 4 days in

26
14

TPSs
TPSs

1469

15776

{Includes super critical also}

Less import

Page 1 of 3

CENTRAL ELECTRICITY AUTHORITY


OPERATION MONITORING DIVISION
DAILY COAL REPORT
COAL STOCKS POSITION AT VARIOUS THERMAL POWER STATIONS IN THE COUNTRY ( AS ON 20-Jan-2014 )
REGION/
STATE

MODE
OF
TRANS
PORT

NAME OF THERMAL
POWER STATION

CAPA
CITY
(MW)

NORM
ATIVE
STOCK
Reqd.
(DAYS)

DAILY
REQUIR
EMENT
IN '000
TONNES

ACTUAL STOCK

TOTAL

IN, 000
TONNES
Imp
ort

CRITICAL

IN
DAYS

REASONS FOR CRITICAL


COAL STOCK

COAL
STOCK
<4
<7
DAY
DAYS
S

Indig
enous

NORTHERN
DELHI
1

RAIL

RAJGHAT TPS

135

20

1.9

79.9

79.9

43

RAIL

BADARPUR TPS

705

30

10.6

146.56

146.56

14

RAIL

PANIPAT TPS

1360

25

19.6

79

505.96

584.96

30

RAIL

YAMUNA NAGAR TPS

600

25

6.9

53

193.18

246.18

35

RAIL

RAJIV GANDHI TPS

1200

25

12.3

107

578.73

685.73

56

RAIL

INDIRA GANDHI STPP

1500

25

19

147

356.9

503.9

27

RAIL

MAHATMA GANDHI TPS

1320

25

16.7

34

81.64

115.64

RAIL

GH TPS (LEH.MOH.)

RAIL

ROPAR TPS

10

RAIL

GND TPS(BHATINDA)

HARYANA

PUNJAB
920

30

12.9

241.34

241.34

19

1260

25

18.5

243

243

13

440

30

4.9

38.73

38.73

RAJASTHAN
11

RAIL

KOTA TPS

1240

30

21

163.76

163.76

12

RAIL

SURATGARH TPS

1500

30

20.4

368.78

368.78

18

13

RAIL

CHHABRA TPP

750

30

6.3

155.47

155.47

25

1630

15

24

372.66

372.66

16

665

25

7.2

47.13

47.13

1278

20

11.7

307.92

307.92

26

UTTAR PRADESH
14

PITHEAD

ANPARA TPS

15

RAIL

HARDUAGANJ TPS

16

RAIL

OBRA TPS

17

RAIL

PANKI TPS

210

20

2.6

43

43

17

18

RAIL

PARICHHA TPS

1140

30

14

91.02

91.02

19

RAIL

DADRI (NCTPP)

1820

30

26.4

151.91

156.91

CIL Supply: 97% of ACQ

20

PITHEAD

RIHAND STPS

3000

15

36.4

107.22

107.22

** CIL Supply 101% of ACQ

21

PITHEAD

SINGRAULI STPS

2000

15

33.1

220.2

220.2

22

RAIL

TANDA TPS

440

25

8.4

40.73

40.73

CIL Supply 88% of ACQ

23

RAIL

UNCHAHAR TPS

1050

25

16.7

** CIL Supply: 94% of ACQ

24

RAIL

ROSA TPP Ph-I

1200

25

15

107

249.78

356.78

24

25

PITHEAD

ANPARA C TPS

1200

25

14.2

1.05

1.05

** CIL Supply 110% of ACQ

28563

24

380.7

532 4786.57

5318.57

14

TOTAL OF N.R.
WESTERN
CHHATTISGARH
26

RAIL

DSPM TPS

500

15

8.2

291.15

291.15

36

27

PITHEAD

KORBA-II

440

15

252.56

252.56

36

28

PITHEAD

KORBA-WEST TPS

1340

15

11.7

190.58

190.58

16

29

PITHEAD

KORBA STPS

2600

15

45.7

444.06

444.06

10

30

PITHEAD

SIPAT STPS

2980

20

42.5

28

441.59

469.59

11

31

RAIL

PATHADI TPP

600

15

161.47

161.47

23

32

RAIL

BHILAI TPS

500

25

6.7

40

251.79

291.79

44

33

RAIL

AKALTARA TPS

600

20

7.1

50.82

50.82

34

RAIL

SIKKA REP. TPS

240

30

1.3

76.48

79.48

62

35

RAIL

GANDHI NAGAR TPS

870

30

8.7

240.68

240.68

28

36

RAIL

UKAI TPS

1350

30

13.7

370.4

370.4

27

37

RAIL

WANAKBORI TPS

1470

30

19.4

542.58

542.58

28

38

RAIL

SABARMATI (C STATION)

400

30

5.3

53.78

53.78

10

GUJARAT

Page 2 of 3

REGION/
STATE

MODE
OF
TRANS
PORT

NAME OF THERMAL
POWER STATION

CAPA
CITY
(MW)

NORM
ATIVE
STOCK
Reqd.
(DAYS)

DAILY
REQUIR
EMENT
IN '000
TONNES

ACTUAL STOCK

IN, 000
TONNES
Imp
ort

TOTAL

CRITICAL

IN
DAYS

REASONS FOR CRITICAL


COAL STOCK

COAL
STOCK
<4
<7
DAY
DAYS
S

Indig
enous

MADHYA PRADESH
39

PITHEAD

AMARKANTAK EXT TPS

450

15

5.3

28

29.75

57.75

11

40

RAIL

SANJAY GANDHI TPS

1340

20

16.5

187.45

187.45

11

41

RAIL

SATPURA TPS

1580

20

17.3

26

652.89

678.89

39

42

PITHEAD

VINDHYACHAL STPS

4260

15

56.6

308.84

309.84

43

RAIL

BINA TPS

500

25

7.5

69.85

69.85

CIL Supply: 92% of ACQ

Unloading Constraint

** Less Receipt CIL/SCCL

** Less import

MAHARASHTRA
44

RAIL

BHUSAWAL TPS

1420

20

17.4

13

142.28

155.28

45

RAIL

CHANDRAPUR(MAHARASH
TRA) STPS

2340

20

34.7

596.92

596.92

17

46

RAIL

KHAPARKHEDA TPS

1340

25

17.5

98.16

98.16

47

RAIL

KORADI TPS

1040

25

8.1

114.14

114.14

14

48

RAIL

NASIK TPS

630

25

11.2

86.6

86.6

49

RAIL

PARLI TPS

1130

25

15.6

45.84

45.84

50

RAIL

PARAS TPS

500

25

6.4

163.34

163.34

26

51

RAIL

DAHANU TPS

500

25

10.1

138

52.05

190.05

19

52

RAIL

WARDHA WARORA TPP

540

20

5.3

13.37

16.37

53

RAIL

TIRORA TPS

1980

20

18.1

51

272.6

323.6

18

54

RAIL

BELA TPS

270

20

2.4

Data not received

55

RAIL

BUTIBORI TPP

300

20

3.6

Data not received

56

RAIL

AMARAVATI TPS

270

20

3.2

37.07

37.07

11

57

RAIL

EMCO WARORA TPS

58

RAIL

MAUDA TPS

TOTAL OF W.R.

600

20

3.4

10.93

11.93

1000

30

7.1

76.01

76.01

11

35880

21

451.6

333 6326.05

6659.05

15

Less import
2

SOUTHERN
ANDHRA PRADESH
59

RAIL

Dr. N.TATA RAO TPS

1760

20

28.5

94.9

94.9

** CIL Supply: 61% of ACQ

60

RAIL

KOTHAGUDEM TPS

1720

20

27.8

37.74

37.74

** Less Receipt

61

RAIL

RAYALASEEMA TPS

1050

25

15.9

5.73

5.73

** Less receipt-SCCL

62

PITHEAD

RAMAGUNDEM STPS

2600

15

40.6

153.06

153.06

Less Receipt

63

RAIL

SIMHADRI

2000

25

29.4

180

35.21

215.21

64

RAIL

KAKATIYA TPS

500

25

7.1

34.41

34.41

Less receipt-SCCL

KARNATAKA
65

RAIL

RAICHUR TPS

1720

30

23.3

55.06

57.06

** Less import

66

RAIL

BELLARY TPS

1000

30

14.1

38.24

45.24

** Coal Sup.for U-II yet to resume

TAMIL NADU
67

INTER
MODAL

ENNORE TPS

450

30

4.3

33.39

33.39

68

INTER
MODAL

METTUR TPS

1440

30

20

101

193.4

294.4

15

69

INTER
MODAL

NORTH CHENNAI TPS

1830

30

22.7

17

129.14

146.14

70

INTER
MODAL

TUTICORIN TPS

1050

30

18.1

61

263.65

324.65

18

71

RAIL

VALLUR TPP

55.13

55.13

369 1129.07

1498.07

TOTAL OF S.R.

1000

30

13.6

18120

25

265.4

Less import

CIL Supply: 61% of ACQ


5

EASTERN
BIHAR
72

RAIL

BARAUNI TPS

210

20

0.7

9.19

9.19

14

73

RAIL

MUZAFFARPUR TPS

220

20

1.2

21.81

21.81

19

74

PITHEAD

KAHALGAON TPS

2340

15

36.2

18

548.18

566.18

16

JHARKHAND
75

RAIL

PATRATU TPS

770

20

2.5

104.64

104.64

42

76

ROAD

TENUGHAT TPS

420

20

274.66

274.66

69

77

RAIL

BOKARO `B` TPS

630

20

9.7

198.18

198.18

20

78

RAIL

CHANDRAPURA(DVC) TPS

890

20

8.7

79

RAIL

MAITHON RB TPP

1050

20

13.3

393.53

393.53

30

80

RAIL

KODARMA TPP

1000

20

7.5

60.6

60.6

81

RAIL

MAHADEV PRASAD STPP

540

20

6.3

2.2

2.2

** Less Receipt

** CIL Supply 94% of ACQ

Page 3 of 3

REGION/
STATE

MODE
OF
TRANS
PORT

NAME OF THERMAL
POWER STATION

CAPA
CITY
(MW)

NORM
ATIVE
STOCK
Reqd.
(DAYS)

DAILY
REQUIR
EMENT
IN '000
TONNES

ACTUAL STOCK

IN, 000
TONNES
Imp
ort

TOTAL

CRITICAL

IN
DAYS

REASONS FOR CRITICAL


COAL STOCK

COAL
STOCK
<4
<7
DAY
DAYS
S

Indig
enous

ORISSA
82

PITHEAD

IB VALLEY TPS

420

15

7.5

181.06

181.06

24

83

PITHEAD

TALCHER (OLD) TPS

470

15

8.5

71.65

71.65

84

PITHEAD

TALCHER STPS

3000

15

52.5

160

122.66

282.66

85

RAIL

STERLITE TPP

2400

20

15.6

382.31

382.31

25

86

RAIL

KAMALANGA TPS

350

20

5.1

33

69.95

102.95

20

CIL Supply 87% of ACQ

WEST BENGAL
87

RAIL

DURGAPUR TPS

340

20

3.8

194.94

194.94

52

88

RAIL

MEJIA TPS

2340

20

22.7

61.72

61.72

** Less import

89

RAIL

BAKRESWAR TPS

1050

20

14.4

31.73

31.73

** CIL Supply: 92% of ACQ

90

RAIL

BANDEL TPS

450

20

4.3

34.7

34.7

91

RAIL

D.P.L. TPS

92

RAIL

KOLAGHAT TPS

** CIL Supply 60% of ACQ

93

RAIL

94

630

25

5.5

56.21

56.21

10

1260

25

16.2

31.82

31.82

SAGARDIGHI TPS

600

20

7.4

42.71

42.71

RAIL

SANTALDIH TPS

980

20

4.5

36.54

36.54

95

RAIL

BUDGE BUDGE TPS

750

20

10.2

172.25

172.25

17

96

RAIL

NEW COSSIPORE TPS

160

20

0.9

11.4

11.4

12

97

RAIL

SOUTHERN REPL. TPS

135

20

52.88

52.88

26

98

RAIL

TITAGARH TPS

240

20

3.1

56.79

56.79

19

99

PITHEAD

FARAKKA STPS

2100

15

23.6

28

264.66

292.66

12

100

RAIL

DURGAPUR STEEL TPS

1000

20

9.8

80.67

80.67

26745

18

307.7

239 3569.66

3808.66

12

109308

22

1405

1473 15811.3

17284.3

12

26

15

TOTAL OF E.R.
ALL INDIA TOTAL
(*) Critical i.e. stock less than 7 days in
(**) Super Critical i.e. stock less than 4 days in

26
15

TPSs
TPSs

{Includes super critical also}

Less import

Page 1 of 3

CENTRAL ELECTRICITY AUTHORITY


OPERATION MONITORING DIVISION
DAILY COAL REPORT
COAL STOCKS POSITION AT VARIOUS THERMAL POWER STATIONS IN THE COUNTRY ( AS ON 21-Jan-2014 )
REGION/
STATE

MODE
OF
TRANS
PORT

NAME OF THERMAL
POWER STATION

CAPA
CITY
(MW)

NORM
ATIVE
STOCK
Reqd.
(DAYS)

DAILY
REQUIR
EMENT
IN '000
TONNES

ACTUAL STOCK

IN, 000
TONNES

TOTAL

CRITICAL

IN
DAYS

REASONS FOR CRITICAL


COAL STOCK

COAL
STOCK
<4
<7
DAY
DAYS
S

Impo Indigen
rt
ous
NORTHERN
DELHI
1

RAIL

RAJGHAT TPS

135

20

1.9

RAIL

BADARPUR TPS

705

30

10.6

1360

25

19.6

600

25

6.9

79.9

79.9

43

0 148.84

148.84

14

79 505.96

584.96

30

55 197.61

252.61

36

HARYANA
3

RAIL

PANIPAT TPS

RAIL

YAMUNA NAGAR TPS

RAIL

RAJIV GANDHI TPS

1200

25

12.3

104 579.99

683.99

56

RAIL

INDIRA GANDHI STPP

1500

25

19

144 353.31

497.31

26

RAIL

MAHATMA GANDHI TPS

1320

25

16.7

82.29

119.29

RAIL

GH TPS (LEH.MOH.)

RAIL

ROPAR TPS

10

RAIL

GND TPS(BHATINDA)

37

PUNJAB
920

30

12.9

0 240.22

240.22

19

1260

25

18.5

0 228.72

228.72

12

440

30

4.9

37.95

37.95

RAJASTHAN
11

RAIL

KOTA TPS

1240

30

21

0 181.45

181.45

12

RAIL

SURATGARH TPS

1500

30

20.4

0 366.36

366.36

18

13

RAIL

CHHABRA TPP

750

30

6.3

158.1

158.1

25

15

UTTAR PRADESH
14

PITHEAD ANPARA TPS

15

RAIL

HARDUAGANJ TPS

1630

15

24

367.6

367.6

665

25

7.2

42.63

42.63

16

RAIL

OBRA TPS

1278

20

11.7

0 304.36

304.36

26

17

RAIL

PANKI TPS

18

RAIL

PARICHHA TPS

210

20

2.6

41.56

41.56

16

1140

30

14

86.02

86.02

19

RAIL

DADRI (NCTPP)

1820

30

26.4

5 149.24

154.24

20

PITHEAD RIHAND STPS

3000

15

36.4

0 109.31

21

PITHEAD SINGRAULI STPS

2000

15

33.1

0 235.84

22

RAIL

TANDA TPS

440

25

8.4

35.98

23

RAIL

UNCHAHAR TPS

1050

25

16.7

24

RAIL

ROSA TPP Ph-I

25

PITHEAD ANPARA C TPS

TOTAL OF N.R.

1200

25

15

1200

25

14.2

28563

24

380.7

CIL Supply 71% of ACQ

CIL Supply 110% of ACQ

CIL Supply: 97% of ACQ

109.31

** CIL Supply 101% of ACQ

235.84

35.98

CIL Supply 88% of ACQ

** CIL Supply: 94% of ACQ

107 249.78

356.78

24
** CIL Supply 110% of ACQ

6.49

6.49

532 4789.5

5321.49

14

0 289.62

WESTERN
CHHATTISGARH
26

RAIL

DSPM TPS

500

15

8.2

27

PITHEAD KORBA-II

440

15

289.62

35

252.7

252.7

28

PITHEAD KORBA-WEST TPS

1340

15

36

11.7

0 192.26

192.26

29

PITHEAD KORBA STPS

2600

16

15

45.7

0 450.68

450.68

30

PITHEAD SIPAT STPS

10

2980

20

42.5

28 431.31

459.31

31

RAIL

11

PATHADI TPP

600

15

0 160.46

160.46

32

23

RAIL

BHILAI TPS

500

25

6.7

39 246.22

285.22

33

43

RAIL

AKALTARA TPS

600

20

7.1

47.14

47.14

34

RAIL

SIKKA REP. TPS

240

30

1.3

76.48

80.48

62

35

RAIL

GANDHI NAGAR TPS

870

30

8.7

0 242.47

242.47

28

36

RAIL

UKAI TPS

1350

30

13.7

0 375.23

375.23

27

37

RAIL

WANAKBORI TPS

1470

30

19.4

0 540.14

540.14

28

38

RAIL

SABARMATI (C STATION)

400

30

5.3

53.78

10

GUJARAT

53.78

Page 2 of 3

REGION/
STATE

MODE
OF
TRANS
PORT

NAME OF THERMAL
POWER STATION

CAPA
CITY
(MW)

NORM
ATIVE
STOCK
Reqd.
(DAYS)

DAILY
REQUIR
EMENT
IN '000
TONNES

ACTUAL STOCK

IN, 000
TONNES

TOTAL

CRITICAL

IN
DAYS

REASONS FOR CRITICAL


COAL STOCK

COAL
STOCK
<4
<7
DAY
DAYS
S

Impo Indigen
rt
ous
MADHYA PRADESH
39

PITHEAD AMARKANTAK EXT TPS

450

15

5.3

31.04

59.04

11

40

RAIL

SANJAY GANDHI TPS

1340

20

16.5

0 191.53

191.53

12

41

RAIL

SATPURA TPS

1580

20

17.3

24 654.47

678.47

39

42

PITHEAD VINDHYACHAL STPS

4260

15

56.6

1 333.51

334.51

43

RAIL

500

25

7.5

70.83

70.83

BINA TPS

28

CIL Supply: 92% of ACQ

Unloading Constraint

** Less Receipt CIL/SCCL

** Less import

MAHARASHTRA
44

RAIL

BHUSAWAL TPS

1420

20

17.4

14 147.87

161.87

45

RAIL

CHANDRAPUR(MAHARASH
TRA) STPS

2340

20

34.7

0 599.38

599.38

17

46

RAIL

KHAPARKHEDA TPS

1340

25

17.5

47

RAIL

KORADI TPS

1040

25

8.1

48

RAIL

NASIK TPS

630

25

11.2

49

RAIL

PARLI TPS

1130

25

15.6

50

RAIL

PARAS TPS

500

25

6.4

51

RAIL

DAHANU TPS

500

25

10.1

137

52

RAIL

WARDHA WARORA TPP

540

20

5.3

53

RAIL

TIRORA TPS

1980

20

18.1

55 268.32

54

RAIL

BELA TPS

270

20

2.4

55

RAIL

BUTIBORI TPP

300

20

3.6

56

RAIL

AMARAVATI TPS

270

20

3.2

57

RAIL

EMCO WARORA TPS

58

RAIL

MAUDA TPS

TOTAL OF W.R.

93.79

93.79

0 117.42

117.42

15

80.01

80.01

46.2

46.2

0 163.72

163.72

26

64.95

201.95

20

14.63

16.63

323.32

18

Data not received

Data not received

37.21

37.21

12

600

20

3.4

14.81

15.81

1000

30

7.1

74.78

74.78

11

35880

21

451.6

334

6363

6696.95

15

Less import
2

SOUTHERN
ANDHRA PRADESH
59

RAIL

Dr. N.TATA RAO TPS

1760

20

28.5

21

79.98

100.98

60

RAIL

KOTHAGUDEM TPS

1720

20

27.8

44.27

44.27

** Less Receipt

CIL Supply: 61% of ACQ

61

RAIL

RAYALASEEMA TPS

1050

25

15.9

** Less receipt-SCCL

62

PITHEAD RAMAGUNDEM STPS

2600

15

40.6

1 154.79

155.79

Less Receipt

63

RAIL

SIMHADRI

2000

25

29.4

180

16.2

196.2

64

RAIL

KAKATIYA TPS

500

25

7.1

36.16

36.16

Less receipt-SCCL

KARNATAKA
65

RAIL

RAICHUR TPS

1720

30

23.3

51.39

51.39

** Less import

66

RAIL

BELLARY TPS

1000

30

14.1

33.66

42.66

** Coal Sup.for U-II yet to resume

TAMIL NADU
67

INTER
MODAL

ENNORE TPS

450

30

4.3

37.23

37.23

68

INTER
MODAL

METTUR TPS

1440

30

20

92

199.6

291.6

15

69

INTER
MODAL

NORTH CHENNAI TPS

1830

30

22.7

16 121.55

137.55

70

INTER
MODAL

TUTICORIN TPS

1050

30

18.1

58 246.23

304.23

17

71

RAIL

VALLUR TPP

51.79

51.79

383 1073.9

1456.85

TOTAL OF S.R.

1000

30

13.6

18120

25

265.4

Less import

CIL Supply: 61% of ACQ


4

EASTERN
BIHAR
72

RAIL

BARAUNI TPS

210

20

0.7

9.19

9.19

14

73

RAIL

MUZAFFARPUR TPS

220

20

1.2

21.81

21.81

19

74

PITHEAD KAHALGAON TPS

2340

15

36.2

24 551.93

575.93

16

JHARKHAND
75

RAIL

PATRATU TPS

770

20

2.5

0 104.64

104.64

42

76

ROAD

TENUGHAT TPS

420

20

0 273.28

273.28

68

77

RAIL

BOKARO `B` TPS

630

20

9.7

0 199.19

199.19

21

78

RAIL

CHANDRAPURA(DVC) TPS

890

20

8.7

79

RAIL

MAITHON RB TPP

1050

20

13.3

80

RAIL

KODARMA TPP

1000

20

7.5

81

RAIL

MAHADEV PRASAD STPP

540

20

6.3

0 397.63

397.63

30

58.74

58.74

2.48

2.48

** Less Receipt

** CIL Supply: 94% of ACQ

Page 3 of 3

REGION/
STATE

MODE
OF
TRANS
PORT

NAME OF THERMAL
POWER STATION

CAPA
CITY
(MW)

NORM
ATIVE
STOCK
Reqd.
(DAYS)

DAILY
REQUIR
EMENT
IN '000
TONNES

ACTUAL STOCK

IN, 000
TONNES

TOTAL

CRITICAL

IN
DAYS

REASONS FOR CRITICAL


COAL STOCK

COAL
STOCK
<4
<7
DAY
DAYS
S

Impo Indigen
rt
ous
ORISSA
82

PITHEAD IB VALLEY TPS

420

15

7.5

0 180.81

83

PITHEAD TALCHER (OLD) TPS

470

15

8.5

180.81

24

75.49

75.49

84

PITHEAD TALCHER STPS

3000

15

52.5

160 110.35

270.35

85

RAIL

STERLITE TPP

2400

20

15.6

0 392.17

392.17

25

86

RAIL

KAMALANGA TPS

350

20

5.1

70.31

102.31

20

0 188.88

32

CIL Supply 87% of ACQ

WEST BENGAL
87

RAIL

DURGAPUR TPS

340

20

3.8

188.88

50

88

RAIL

MEJIA TPS

2340

20

22.7

73.32

73.32

** Less import

89

RAIL

BAKRESWAR TPS

1050

20

14.4

33.77

33.77

** CIL Supply: 92% of ACQ

90

RAIL

BANDEL TPS

450

20

4.3

32.91

32.91

91

RAIL

D.P.L. TPS

92

RAIL

KOLAGHAT TPS

** CIL Supply 60% of ACQ

93

RAIL

94

630

25

5.5

54.08

54.08

10

1260

25

16.2

41.36

41.36

SAGARDIGHI TPS

600

20

7.4

45.63

45.63

RAIL

SANTALDIH TPS

980

20

4.5

32.49

32.49

95

RAIL

BUDGE BUDGE TPS

750

20

10.2

0 174.64

174.64

17

96

RAIL

NEW COSSIPORE TPS

160

20

0.9

11.2

11.2

12

97

RAIL

SOUTHERN REPL. TPS

135

20

51.25

51.25

25

98

RAIL

TITAGARH TPS

240

20

3.1

57.55

57.55

19

99

PITHEAD FARAKKA STPS

2100

15

23.6

28 270.73

298.73

13

100

RAIL

1000

20

9.8

26745

18

307.7

109308

22

1405 1494

DURGAPUR STEEL TPS

TOTAL OF E.R.
ALL INDIA TOTAL
(*) Critical i.e. stock less than 7 days in
(**) Super Critical i.e. stock less than 4 days in

28
14

TPSs
TPSs

Less import

80.54

80.54

244 3596.4

3840.35

12

17316.6

12

28

14

15823

{Includes super critical also}

Page 1 of 4

CENTRAL ELECTRICITY AUTHORITY


OPERATION MONITORING DIVISION
DAILY COAL REPORT
COAL STOCKS POSITION AT VARIOUS THERMAL POWER STATIONS IN THE COUNTRY ( AS ON 22-Jan-2014 )
REGION/
STATE

MODE
OF
TRANS
PORT

NAME OF THERMAL
POWER STATION

CAPA
CITY
(MW)

NORM
ATIVE
STOCK
Reqd.
(DAYS)

DAILY
REQUIR
EMENT
IN '000
TONNES

CRITICAL

ACTUAL STOCK
IN, 000
TONNES
Imp
ort

TOTAL

REASONS FOR CRITICAL


COAL STOCK

COAL
STOCK

IN
DAYS

<7
<4
DAYS DAYS

Indig
enous

NORTHERN
DELHI
1

RAIL

RAJGHAT TPS

135

20

1.9

79.9

79.9

43

RAIL

BADARPUR TPS

705

30

10.6

148.04

148.04

14

1360

25

19.6

78

517.09

595.09

30

600

25

6.9

61

197.63

258.63

37

HARYANA
3

RAIL

PANIPAT TPS

RAIL

YAMUNA NAGAR TPS

RAIL

RAJIV GANDHI TPS

1200

25

12.3

102

573.34

675.34

55

RAIL

INDIRA GANDHI STPP

1500

25

19

141

358.96

499.96

26

RAIL

MAHATMA GANDHI TPS

1320

25

16.7

49

77.18

126.18

PUNJAB
8

RAIL

GH TPS (LEH.MOH.)

RAIL

ROPAR TPS

10

RAIL

GND TPS(BHATINDA)

920

30

12.9

252.67

252.67

20

1260

25

18.5

232.3

232.3

13

440

30

4.9

43.51

43.51

RAJASTHAN
11

RAIL

KOTA TPS

1240

30

21

167.86

167.86

12

RAIL

SURATGARH TPS

1500

30

20.4

387.08

387.08

19

13

RAIL

CHHABRA TPP

750

30

6.3

157.26

157.26

25
15

UTTAR PRADESH
14

PITHEAD ANPARA TPS

15

RAIL

HARDUAGANJ TPS

16

RAIL

OBRA TPS

1630

15

24

362.54

362.54

665

25

7.2

42.37

42.37

1278

20

11.7

300.64

300.64

26

CIL Supply 71% of ACQ

CIL Supply 110% of ACQ

17

RAIL

PANKI TPS

210

20

2.6

40.08

40.08

16

18

RAIL

PARICHHA TPS

1140

30

14

80.68

80.68

19

RAIL

DADRI (NCTPP)

1820

30

26.4

145.4

150.4

CIL Supply: 97% of ACQ

20

PITHEAD RIHAND STPS

3000

15

36.4

124.68

124.68

** CIL Supply 101% of ACQ

2000

15

33.1

242.58

242.58

440

25

8.4

42.83

42.83

CIL Supply 88% of ACQ

1050

25

16.7

** CIL Supply: 94% of ACQ

24
** CIL Supply 110% of ACQ

21

PITHEAD SINGRAULI STPS

22

RAIL

TANDA TPS

23

RAIL

UNCHAHAR TPS

24

RAIL

ROSA TPP Ph-I

25

PITHEAD ANPARA C TPS

TOTAL OF N.R.

1200

25

15

106

247.49

353.49

1200

25

14.2

13.04

13.04

28563

24

380.7

544

4835.14

5379.14

14

WESTERN
CHHATTISGARH
26

RAIL

DSPM TPS

500

15

8.2

291.13

291.13

36

27

PITHEAD KORBA-II

440

15

253.25

253.25

36

28

PITHEAD KORBA-WEST TPS

1340

15

11.7

195.24

195.24

17

29

PITHEAD KORBA STPS

2600

15

45.7

454.65

454.65

10

30

PITHEAD SIPAT STPS

2980

20

42.5

21

427.64

448.64

11

31

RAIL

PATHADI TPP

600

15

160.46

160.46

23

32

RAIL

BHILAI TPS

500

25

6.7

42

254.08

296.08

45

33

RAIL

AKALTARA TPS

600

20

7.1

47.14

47.14

34

RAIL

SIKKA REP. TPS

240

30

1.3

76.48

80.48

63

35

RAIL

GANDHI NAGAR TPS

870

30

8.7

255.53

255.53

29

36

RAIL

UKAI TPS

1350

30

13.7

385.07

385.07

28

37

RAIL

WANAKBORI TPS

1470

30

19.4

537.06

537.06

28

38

RAIL

SABARMATI (C STATION)

400

30

5.3

53.78

53.78

10

GUJARAT

Page 2 of 4

REGION/
STATE

MODE
OF
TRANS
PORT

NAME OF THERMAL
POWER STATION

CAPA
CITY
(MW)

NORM
ATIVE
STOCK
Reqd.
(DAYS)

DAILY
REQUIR
EMENT
IN '000
TONNES

ACTUAL STOCK
IN, 000
TONNES
Imp
ort

TOTAL

CRITICAL

REASONS FOR CRITICAL


COAL STOCK

COAL
STOCK

IN
DAYS

<7
<4
DAYS DAYS

Indig
enous

MADHYA PRADESH
39

PITHEAD AMARKANTAK EXT TPS

450

15

5.3

27

29.23

56.23

11

40

RAIL

SANJAY GANDHI TPS

1340

20

16.5

196.1

196.1

12

41

RAIL

SATPURA TPS

1580

20

17.3

24

658.25

682.25

39

42

PITHEAD VINDHYACHAL STPS

4260

15

56.6

354.27

355.27

43

RAIL

500

25

7.5

73.16

73.16

10

BINA TPS

CIL Supply: 92% of ACQ

Unloading Constraint

** Less Receipt CIL/SCCL

** Less import

MAHARASHTRA
44

RAIL

BHUSAWAL TPS

1420

20

17.4

13

149.46

162.46

45

RAIL

CHANDRAPUR(MAHARASH
TRA) STPS

2340

20

34.7

607.39

607.39

18

46

RAIL

KHAPARKHEDA TPS

1340

25

17.5

88.67

88.67

47

RAIL

KORADI TPS

1040

25

8.1

114.87

114.87

14

48

RAIL

NASIK TPS

630

25

11.2

76.05

76.05

49

RAIL

PARLI TPS

1130

25

15.6

41.93

41.93

50

RAIL

PARAS TPS

500

25

6.4

167.59

167.59

26

51

RAIL

DAHANU TPS

500

25

10.1

137

73.78

210.78

21

52

RAIL

WARDHA WARORA TPP

540

20

5.3

11.9

13.9

53

RAIL

TIRORA TPS

1980

20

18.1

50

269.89

319.89

18

54

RAIL

BELA TPS

270

20

2.4

Data not received

55

RAIL

BUTIBORI TPP

300

20

3.6

Data not received

13

56

RAIL

AMARAVATI TPS

270

20

3.2

41.29

41.29

57

RAIL

EMCO WARORA TPS

600

20

3.4

11.57

12.57

58

RAIL

MAUDA TPS

1000

30

7.1

71.9

71.9

10

35880

21

451.6

321

6428.78

6749.78

15

TOTAL OF W.R.

*
5

Less import
2

SOUTHERN
ANDHRA PRADESH
59

RAIL

Dr. N.TATA RAO TPS

1760

20

28.5

23

67.76

90.76

60

RAIL

KOTHAGUDEM TPS

1720

20

27.8

46.64

46.64

** Less Receipt

61

RAIL

RAYALASEEMA TPS

1050

25

15.9

3.24

7.24

** Less receipt-SCCL

Less Receipt
Less receipt-SCCL

62

PITHEAD RAMAGUNDEM STPS

2600

15

40.6

159.28

159.28

63

RAIL

SIMHADRI

2000

25

29.4

187

15.35

202.35

64

RAIL

KAKATIYA TPS

500

25

7.1

38.23

38.23

** CIL Supply: 61% of ACQ

KARNATAKA
65

RAIL

RAICHUR TPS

1720

30

23.3

35.34

35.34

66

RAIL

BELLARY TPS

1000

30

14.1

42.92

51.92

ENNORE TPS

450

30

4.3

37.55

37.55

METTUR TPS

1440

30

20

89

195.2

284.2

14

NORTH CHENNAI TPS

1830

30

22.7

38

110.96

148.96

TUTICORIN TPS

1050

30

18.1

56

229.68

285.68

16

** Less import
Coal Sup.for U-II yet to resume

TAMIL NADU
67
68
69
70
71

INTER
MODAL
INTER
MODAL
INTER
MODAL
INTER
MODAL
RAIL

VALLUR TPP

TOTAL OF S.R.

1000

30

13.6

63.6

63.6

18120

25

265.4

406

1045.75

1451.75

CIL Supply: 61% of ACQ


4

EASTERN
BIHAR
72

RAIL

BARAUNI TPS

210

20

0.7

9.19

9.19

14

73

RAIL

MUZAFFARPUR TPS

220

20

1.2

21.81

21.81

19

74

PITHEAD KAHALGAON TPS

2340

15

36.2

26

553.48

579.48

16

JHARKHAND
75

RAIL

PATRATU TPS

770

20

2.5

104.82

104.82

42

76

ROAD

TENUGHAT TPS

420

20

271.89

271.89

68

77

RAIL

BOKARO `B` TPS

630

20

9.7

199.19

199.19

21

78

RAIL

CHANDRAPURA(DVC) TPS

890

20

8.7

79

RAIL

MAITHON RB TPP

1050

20

13.3

405.78

405.78

31

80

RAIL

KODARMA TPP

1000

20

7.5

58.74

58.74

** Less Receipt

Page 3 of 4

REGION/
STATE

MODE
OF
TRANS
PORT

NAME OF THERMAL
POWER STATION

CAPA
CITY
(MW)

NORM
ATIVE
STOCK
Reqd.
(DAYS)

DAILY
REQUIR
EMENT
IN '000
TONNES

ACTUAL STOCK
IN, 000
TONNES
Imp
ort

81

RAIL

MAHADEV PRASAD STPP

540

20

6.3

Indig
enous
3.87

TOTAL

CRITICAL
COAL
STOCK

IN
DAYS

REASONS FOR CRITICAL


COAL STOCK

<7
<4
DAYS DAYS
3.87

** CIL Supply: 94% of ACQ

Page 4 of 4

REGION/
STATE

MODE
OF
TRANS
PORT

NAME OF THERMAL
POWER STATION

NORM
ATIVE
STOCK
Reqd.
(DAYS)

CAPA
CITY
(MW)

DAILY
REQUIR
EMENT
IN '000
TONNES

ACTUAL STOCK
IN, 000
TONNES
Imp
ort

TOTAL

CRITICAL

REASONS FOR CRITICAL


COAL STOCK

COAL
STOCK

IN
DAYS

<7
<4
DAYS DAYS

Indig
enous

ORISSA
82

PITHEAD IB VALLEY TPS

420

15

7.5

182.88

182.88

25

83

PITHEAD TALCHER (OLD) TPS

470

15

8.5

75.8

75.8

84

PITHEAD TALCHER STPS

3000

15

52.5

175

114.12

289.12

85

RAIL

STERLITE TPP

2400

20

15.6

396.07

396.07

25

86

RAIL

KAMALANGA TPS

350

20

5.1

32

70.31

102.31

20

CIL Supply 87% of ACQ

WEST BENGAL
87

RAIL

DURGAPUR TPS

340

20

3.8

188.88

188.88

50

88

RAIL

MEJIA TPS

2340

20

22.7

73.32

73.32

** Less import

89

RAIL

BAKRESWAR TPS

1050

20

14.4

33.77

33.77

** CIL Supply: 92% of ACQ

90

RAIL

BANDEL TPS

450

20

4.3

32.91

32.91

8
** CIL Supply 60% of ACQ

91

RAIL

D.P.L. TPS

92

RAIL

KOLAGHAT TPS

630

25

5.5

53.09

53.09

10

1260

25

16.2

41.36

41.36

93

RAIL

SAGARDIGHI TPS

600

20

7.4

45.63

45.63

94

RAIL

SANTALDIH TPS

980

20

4.5

32.49

32.49

95

RAIL

BUDGE BUDGE TPS

750

20

10.2

174.95

174.95

17

96

RAIL

NEW COSSIPORE TPS

160

20

0.9

11.01

11.01

12

Less import

97

RAIL

SOUTHERN REPL. TPS

135

20

49.6

49.6

24

98

RAIL

TITAGARH TPS

240

20

3.1

54.43

54.43

18

99

PITHEAD FARAKKA STPS

2100

15

23.6

23

274.39

297.39

13

100

RAIL

1000

20

9.8

80.54

80.54

26745

18

307.7

256

3614.3

3870.3

13

109308

22

1405

1527

15923.9

17450.9

12

27

14

DURGAPUR STEEL TPS

TOTAL OF E.R.
ALL INDIA TOTAL
(*) Critical i.e. stock less than 7 days in
(**) Super Critical i.e. stock less than 4 days in

27
14

TPSs
TPSs

{Includes super critical also}

Page 1 of 3

CENTRAL ELECTRICITY AUTHORITY


OPERATION MONITORING DIVISION
DAILY COAL REPORT
COAL STOCKS POSITION AT VARIOUS THERMAL POWER STATIONS IN THE COUNTRY ( AS ON 23-Jan-2014 )
REGION/
STATE

MODE
OF
TRANS
PORT

NAME OF THERMAL
POWER STATION

CAPA
CITY
(MW)

NORM
ATIVE
STOCK
Reqd.
(DAYS)

DAILY
REQUIR
EMENT
IN '000
TONNES

ACTUAL STOCK

IN, 000 TONNES

Imp
ort

CRITICAL

TOTAL

REASONS FOR CRITICAL


COAL STOCK

COAL
STOCK

IN
DAYS

<7
<4
DAYS DAYS

Indig
enous

NORTHERN
DELHI
1

RAIL

RAJGHAT TPS

135

20

1.9

74.94

74.94

40

RAIL

BADARPUR TPS

705

30

10.6

136.1

136.1

13

1360

25

19.6

76

536.03

612.03

31

600

25

6.9

61

197.63

258.63

37

HARYANA
3

RAIL

PANIPAT TPS

RAIL

YAMUNA NAGAR TPS

RAIL

RAJIV GANDHI TPS

1200

25

12.3

100

577.84

677.84

55

RAIL

INDIRA GANDHI STPP

1500

25

19

138

359.12

497.12

26

RAIL

MAHATMA GANDHI TPS

1320

25

16.7

54

87.65

141.65

RAIL

GH TPS (LEH.MOH.)

RAIL

ROPAR TPS

10

RAIL

GND TPS(BHATINDA)

PUNJAB
920

30

12.9

249.52

249.52

19

1260

25

18.5

231.04

231.04

12

440

30

4.9

42.17

42.17

RAJASTHAN
11

RAIL

KOTA TPS

1240

30

21

155.04

155.04

12

RAIL

SURATGARH TPS

1500

30

20.4

398.46

398.46

20

13

RAIL

CHHABRA TPP

750

30

6.3

157.26

157.26

25

15

UTTAR PRADESH
14

PITHEAD

ANPARA TPS

15

RAIL

HARDUAGANJ TPS

1630

15

24

364.11

364.11

665

25

7.2

45.57

45.57

16

RAIL

OBRA TPS

1278

20

11.7

304.96

304.96

26

17

RAIL

PANKI TPS

18

RAIL

PARICHHA TPS

210

20

2.6

38.52

38.52

15

1140

30

14

70.72

70.72

19

RAIL

DADRI (NCTPP)

1820

30

26.4

142.07

147.07

20

PITHEAD

RIHAND STPS

3000

15

36.4

133.23

21

PITHEAD

SINGRAULI STPS

2000

15

33.1

22

RAIL

TANDA TPS

440

25

8.4

23

RAIL

UNCHAHAR TPS

1050

25

16.7

24

RAIL

ROSA TPP Ph-I

1200

25

25

PITHEAD

ANPARA C TPS

1200

25

28563

24

TOTAL OF N.R.

CIL Supply 71% of ACQ

CIL Supply 110% of ACQ

CIL Supply: 97% of ACQ

133.23

CIL Supply 101% of ACQ

249.98

249.98

52.75

52.75

CIL Supply 88% of ACQ

** CIL Supply: 94% of ACQ

15

109

254.54

363.54

24

14.2

26.68

26.68

** CIL Supply 110% of ACQ

380.7

544

4885.92

5429.92

14

WESTERN
CHHATTISGARH
26

RAIL

DSPM TPS

500

15

8.2

292.68

292.68

36

27

PITHEAD

KORBA-II

440

15

253.51

253.51

36

28

PITHEAD

KORBA-WEST TPS

1340

15

11.7

199.43

199.43

17

29

PITHEAD

KORBA STPS

2600

15

45.7

461.05

461.05

10

30

PITHEAD

SIPAT STPS

2980

20

42.5

19

413.24

432.24

10

31

RAIL

PATHADI TPP

600

15

152.94

152.94

22

32

RAIL

BHILAI TPS

500

25

6.7

45

258.24

303.24

46

33

RAIL

AKALTARA TPS

600

20

7.1

41.66

41.66

34

RAIL

SIKKA REP. TPS

240

30

1.3

76.48

81.48

63

35

RAIL

GANDHI NAGAR TPS

870

30

8.7

252.94

252.94

29

36

RAIL

UKAI TPS

1350

30

13.7

387.63

387.63

28

37

RAIL

WANAKBORI TPS

1470

30

19.4

530.75

530.75

27

38

RAIL

SABARMATI (C STATION)

400

30

5.3

53.78

53.78

10

GUJARAT

CIL Supply: 94% of ACQ

Page 2 of 3

REGION/
STATE

MODE
OF
TRANS
PORT

NAME OF THERMAL
POWER STATION

CAPA
CITY
(MW)

NORM
ATIVE
STOCK
Reqd.
(DAYS)

DAILY
REQUIR
EMENT
IN '000
TONNES

ACTUAL STOCK

IN, 000 TONNES

Imp
ort

CRITICAL

TOTAL

REASONS FOR CRITICAL


COAL STOCK

COAL
STOCK

IN
DAYS

<7
<4
DAYS DAYS

Indig
enous

MADHYA PRADESH
39

PITHEAD

AMARKANTAK EXT TPS

450

15

5.3

27

34.39

61.39

12

40

RAIL

SANJAY GANDHI TPS

1340

20

16.5

198.43

198.43

12

41

RAIL

SATPURA TPS

1580

20

17.3

24

660.82

684.82

40

42

PITHEAD

VINDHYACHAL STPS

4260

15

56.6

378.33

379.33

43

RAIL

BINA TPS

500

25

7.5

73.16

73.16

10

MAHARASHTRA
44

RAIL

BHUSAWAL TPS

1420

20

17.4

11

54.44

65.44

45

RAIL

CHANDRAPUR(MAHARASHT
RA) STPS

2340

20

34.7

617.3

617.3

18

46

RAIL

KHAPARKHEDA TPS

1340

25

17.5

89.52

95.52

47

RAIL

KORADI TPS

1040

25

8.1

113.23

113.23

14

48

RAIL

NASIK TPS

630

25

11.2

69.78

69.78

49

RAIL

PARLI TPS

1130

25

15.6

41.4

41.4

** Less Receipt CIL/SCCL

50

RAIL

PARAS TPS

500

25

6.4

170.49

170.49

27

51

RAIL

DAHANU TPS

500

25

10.1

137

90.8

227.8

23

52

RAIL

WARDHA WARORA TPP

540

20

5.3

8.86

9.86

** Less import

53

RAIL

TIRORA TPS

1980

20

18.1

45

263.61

308.61

17

54

RAIL

BELA TPS

270

20

2.4

Data not received

55

RAIL

BUTIBORI TPP

300

20

3.6

Data not received

56

RAIL

AMARAVATI TPS

270

20

3.2

45.13

45.13

14

57

RAIL

EMCO WARORA TPS

58

RAIL

MAUDA TPS

TOTAL OF W.R.

600

20

3.4

11.71

12.71

1000

30

7.1

69.95

69.95

10

35880

21

451.6

321

6365.66

6686.66

15

Unloading Constraint

CIL Supply 65% of ACQ

Less import

SOUTHERN
ANDHRA PRADESH
59

RAIL

Dr. N.TATA RAO TPS

1760

20

28.5

23

52.2

75.2

** CIL Supply: 61% of ACQ

60

RAIL

KOTHAGUDEM TPS

1720

20

27.8

52.03

52.03

** Less Receipt

61

RAIL

RAYALASEEMA TPS

1050

25

15.9

4.11

7.11

** Less receipt-SCCL

62

PITHEAD

RAMAGUNDEM STPS

2600

15

40.6

171.35

173.35

Less Receipt

63

RAIL

SIMHADRI

2000

25

29.4

189

15.16

204.16

64

RAIL

KAKATIYA TPS

500

25

7.1

37.97

37.97

Less receipt-SCCL

KARNATAKA
65

RAIL

RAICHUR TPS

1720

30

23.3

42.77

42.77

** Less import

66

RAIL

BELLARY TPS

1000

30

14.1

39.91

48.91

** Coal Sup.for U-II yet to resume

TAMIL NADU
67

INTER
MODAL

ENNORE TPS

450

30

4.3

34.18

34.18

68

INTER
MODAL

METTUR TPS

1440

30

20

88

186.09

274.09

14

69

INTER
MODAL

NORTH CHENNAI TPS

1830

30

22.7

52

102.59

154.59

70

INTER
MODAL

TUTICORIN TPS

1050

30

18.1

54

214.14

268.14

15

71

RAIL

VALLUR TPP

TOTAL OF S.R.

1000

30

13.6

71.58

71.58

18120

25

265.4

420

1024.07

1444.07

CIL Supply: 61% of ACQ


5

EASTERN
BIHAR
72

RAIL

BARAUNI TPS

210

20

0.7

9.19

9.19

14

73

RAIL

MUZAFFARPUR TPS

220

20

1.2

24.74

24.74

21

74

PITHEAD

KAHALGAON TPS

2340

15

36.2

26

583.42

609.42

17

JHARKHAND
75

RAIL

PATRATU TPS

770

20

2.5

109.82

109.82

44

76

ROAD

TENUGHAT TPS

420

20

270.37

270.37

68

77

RAIL

BOKARO `B` TPS

630

20

9.7

198.14

198.14

20

78

RAIL

CHANDRAPURA(DVC) TPS

890

20

8.7

79

RAIL

MAITHON RB TPP

1050

20

13.3

415.37

415.37

31

80

RAIL

KODARMA TPP

1000

20

7.5

56.34

56.34

81

RAIL

MAHADEV PRASAD STPP

540

20

6.3

3.65

3.65

** Less Receipt

** CIL Supply: 94% of ACQ

Page 3 of 3

REGION/
STATE

MODE
OF
TRANS
PORT

NAME OF THERMAL
POWER STATION

CAPA
CITY
(MW)

DAILY
REQUIR
EMENT
IN '000
TONNES

NORM
ATIVE
STOCK
Reqd.
(DAYS)

ACTUAL STOCK

IN, 000 TONNES

Imp
ort

TOTAL

CRITICAL

REASONS FOR CRITICAL


COAL STOCK

COAL
STOCK

IN
DAYS

<7
<4
DAYS DAYS

Indig
enous

ORISSA
82

PITHEAD

IB VALLEY TPS

420

15

7.5

182.32

182.32

24

83

PITHEAD

TALCHER (OLD) TPS

470

15

8.5

75.25

75.25

84

PITHEAD

TALCHER STPS

3000

15

52.5

172

120.42

292.42

85

RAIL

STERLITE TPP

2400

20

15.6

402.63

402.63

26

86

RAIL

KAMALANGA TPS

350

20

5.1

36

72.43

108.43

21

CIL Supply 87% of ACQ

WEST BENGAL
87

RAIL

DURGAPUR TPS

340

20

3.8

188.58

188.58

50

88

RAIL

MEJIA TPS

2340

20

22.7

85.02

85.02

89

RAIL

BAKRESWAR TPS

1050

20

14.4

24.19

24.19

** CIL Supply: 92% of ACQ

90

RAIL

BANDEL TPS

450

20

4.3

32.3

32.3

91

RAIL

D.P.L. TPS

630

25

5.5

52.08

52.08

92

RAIL

KOLAGHAT TPS

1260

25

16.2

38.67

38.67

** CIL Supply 60% of ACQ

93

RAIL

SAGARDIGHI TPS

600

20

7.4

38.79

38.79

94

RAIL

SANTALDIH TPS

980

20

4.5

31.41

31.41

95

RAIL

BUDGE BUDGE TPS

750

20

10.2

169.27

169.27

17

96

RAIL

NEW COSSIPORE TPS

160

20

0.9

10.76

10.76

12

97

RAIL

SOUTHERN REPL. TPS

135

20

51.56

51.56

25

98

RAIL

TITAGARH TPS

240

20

3.1

55.3

55.3

18

99

PITHEAD

FARAKKA STPS

2100

15

23.6

27

273.83

300.83

13

100

RAIL

DURGAPUR STEEL TPS

1000

20

9.8

79.07

79.07

26745

18

307.7

261

3654.93

3915.93

13

109308

22

1405

1546

15930.5

17476.5

12

29

13

TOTAL OF E.R.
ALL INDIA TOTAL
(*) Critical i.e. stock less than 7 days in
(**) Super Critical i.e. stock less than 4 days in

29
13

TPSs {Includes super critical also}


TPSs

Less import

Less import

CENTRAL ELECTRICITY AUTHORITY


OPERATION MONITORING DIVISION

DAILY COAL REPORT


COAL STOCKS POSITION AT VARIOUS THERMAL POWER STATIONS IN THE COUNTRY ( AS ON 26-Jan-2014 )
REGION/
STATE

MODE OF
TRANSPORT

NAME OF
THERMAL
POWER
STATION

CAPACITY NORMAT DAILY


(MW)
IVE
LINKAGE
STOCK
IN '000
Reqd.
TONNES
(DAYS)

Page 1 of 3

ACTUAL STOCK

CRITICAL
In days COAL STOCK

IN, 000 TONNES

Import Indigenous

<7
DAYS

Total

REASONS FOR
CRITICAL COAL
STOCK

<4
DAYS

NORTHERN
DELHI
135
705

20
30

1.9
10.6

74.94

74.94

132.83

132.83

PANIPAT TPS
YAMUNA NAGAR TPS
RAJIV GANDHI TPS
INDIRA GANDHI STPP
MAHATMA GANDHI
TPS

1360
600
1200
1500
1320

25
25
25
25
25

19.6
6.9
12.3
19
16.7

72

534.91

607.2

63

205.88

268.62
658.2

8
RAIL
9
RAIL
10
RAIL
RAJASTHAN

GH TPS (LEH.MOH.)
ROPAR TPS
GND TPS(BHATINDA)

920
1260
440

30
25
30

11
RAIL
12
RAIL
13
RAIL
UTTAR PRADESH

KOTA TPS
SURATGARH TPS
CHHABRA TPP

1240
1500
750

14
15

PITHEAD
RAIL

ANPARA TPS
HARDUAGANJ TPS

16
17
18

RAIL
RAIL
RAIL

19

1
RAIL
2
RAIL
HARYANA

RAJGHAT TPS
BADARPUR TPS

3
4
5
6
7

RAIL
RAIL
RAIL
RAIL
RAIL

92

566.52

145

360.66

505.7

54

93.61

147.46

12.9
18.5
4.9

246.57

246.57

227.47

227.47

53.67

53.67

30
30
30

21
20.4
6.3

163.86

163.86

421.46

421.87

170.31

170.31

1630
665

15
25

24
7.2

372.8

372.8

38.72

38.72

OBRA TPS
PANKI TPS
PARICHHA TPS

1278
210
1140

20
20
30

11.7
2.6
14

303.11

303.11

40.36

40.36

66.38

RAIL

DADRI (NCTPP)

1820

30

26.4

20

PITHEAD

RIHAND STPS

3000

15

36.4

21
22

PITHEAD
RAIL

SINGRAULI STPS
TANDA TPS

2000
440

15
25

23

RAIL

UNCHAHAR TPS

1050

24

RAIL

ROSA TPP Ph-I

25

PITHEAD

ANPARA C TPS

40
13
31
39
54
27
9

PUNJAB

TOTAL OF N.R.

19
12
11
8
21
27
16
5

CIL Supply 71% of ACQ

66.38

26
16
5

CIL Supply 110% of ACQ

128.99

134.23

CIL Supply: 97% of ACQ

172.31

172.31

CIL Supply 101% of ACQ

33.1
8.4

251.95

251.95

40.49

40.49

8
5

CIL Supply 88% of ACQ

25

16.7

** CIL Supply 94% of ACQ

1200

25

15

108

251.16

358.8

24

1200

25

14.2

46.86

46.86

28563

24

380.7

539

4965.8

5504.71

14

306.51

306.51

247.53

247.53

219.02

219.02

473.8

473.8

395.06

403.2

162.19

162.19

43

260.83

304.12

41.66

41.66

38
35
19
10
9
23
46
6

80.32

86.49

273.5

273.78

416.15

416.15

528.54

528.54

38.19

38.19

Inadequate linkage
** CIL Supply 110% of ACQ

WESTERN
CHHATTISGARH
26
27
28
29
30
31
32
33

RAIL
PITHEAD
PITHEAD
PITHEAD
PITHEAD
RAIL
RAIL
RAIL

DSPM TPS
KORBA-II
KORBA-WEST TPS
KORBA STPS
SIPAT STPS
PATHADI TPP
BHILAI TPS
AKALTARA TPS

500
440
1340
2600
2980
600
500
600

15
15
15
15
20
15
25
20

8.2
7
11.7
45.7
42.5
7
6.7
7.1

RAIL
RAIL
RAIL
RAIL
RAIL

SIKKA REP. TPS


GANDHI NAGAR TPS
UKAI TPS
WANAKBORI TPS
SABARMATI (C
STATION)

240
870
1350
1470
400

30
30
30
30
30

1.3
8.7
13.7
19.4
5.3

GUJARAT
34
35
36
37
38

67
31
30
27
7

CIL Supply: 94% of ACQ

MADHYA PRADESH
39
PITHEAD
40
RAIL
41
RAIL
42
PITHEAD
43
RAIL
MAHARASHTRA

AMARKANTAK EXT
TPS
SANJAY GANDHI TPS
SATPURA TPS
VINDHYACHAL STPS
BINA TPS

450
1340
1580
4260
500

15
20
20
15
25

5.3
16.5
17.3
56.6
7.5

27

32.53

59.46

200.75

200.75

26

646.86

672.65

442.18

443.07

74.96

74.96

44
45

RAIL
RAIL

BHUSAWAL TPS
CHANDRAPUR(MAHAR
ASHTRA) STPS

1420
2340

20
20

17.4
34.7

155.74

162.01

639.23

639.23

9
18

46

RAIL

KHAPARKHEDA TPS

1340

25

17.5

13

88.3

101.65

Unloading Constraint

47
48

RAIL
RAIL

KORADI TPS
NASIK TPS

1040
630

25
25

8.1
11.2

119.37

119.37

71.59

71.59

15
6

CIL Supply 65% of ACQ

49

RAIL

PARLI TPS

1130

25

15.6

45.76

45.76

** Less Receipt CIL/SCCL

50
51
52
53
54

RAIL
RAIL
RAIL
RAIL
RAIL

PARAS TPS
DAHANU TPS
WARDHA WARORA TPP
TIRORA TPS
BELA TPS

500
500
540
1980
270

25
25
20
20
20

6.4
10.1
5.3
18.1
2.4

186.75

186.75

135

94.53

229.67

** Less import

55

RAIL

BUTIBORI TPP

300

20

270
600
1000
35880

56
RAIL
57
RAIL
58
RAIL
TOTAL OF W.R.

AMARAVATI TPS
EMCO WARORA TPS
MAUDA TPS

11
12
39
8
10

1.66

5.65

31

274.71

305.39

29
23
1
17
0

3.6

20
20
30
21

3.2
3.4
7.1
451.6

42.2

42.2

22.18

23.17

94.34

94.34

302

6676.94

6978.85

13
7
13
15

Data not received


Data not received

SOUTHERN
ANDHRA PRADESH
59

RAIL

Dr. N.TATA RAO TPS

1760

20

28.5

21

42.02

63.03

** CIL Supply: 61% of ACQ

60
61

RAIL
RAIL

KOTHAGUDEM TPS
RAYALASEEMA TPS

1720
1050

20
25

27.8
15.9

51.35

51.35

** Less Receipt

14.34

14.34

2
1

** Less receipt-SCCL

62
63
64

PITHEAD
RAIL
RAIL

RAMAGUNDEM STPS
SIMHADRI
KAKATIYA TPS

2600
2000
500

15
25
25

40.6
29.4
7.1

193.11

195.36

Less Receipt

34.11

223.54

38.87

38.87

5
8
5

189

Less receipt-SCCL

KARNATAKA
65

RAIL

RAICHUR TPS

1720

30

23.3

33.19

35.91

** Less Receipt CIL/SCCL

66

RAIL

BELLARY TPS

1000

30

14.1

20

34.76

55.19

Coal Sup. for U-2 yet to


Comence

ENNORE TPS
METTUR TPS
NORTH CHENNAI TPS

450
1440
1830

30
30
30

4.3
20
22.7

38.25

38.25

71

182.67

253.2

131.6

131.6

9
13
6

Less Receipt-MCL Ib

TUTICORIN TPS
VALLUR TPP

1050
1000

30
30

18.1
13.6

48

172.33

220.22

73.82

73.82

12
5

CIL Supply: 61% of ACQ

18120

25

265.4

354

1040.43

1394.68

9.19

9.19

23.06

23.06

23

607.32

630.52

14
20
17

113.77

113.77

269.71

269.71

194.32

194.32

2.51

2.51

434.28

434.28

60.65

60.65

7.92

7.92

TAMIL NADU
67
68
69
70
71

INTER
MODAL
INTER
MODAL
INTER
MODAL
INTER
MODAL
RAIL

TOTAL OF S.R.

EASTERN
BIHAR
72
RAIL
73
RAIL
74
PITHEAD
JHARKHAND

BARAUNI TPS
MUZAFFARPUR TPS
KAHALGAON TPS

210
220
2340

20
20
15

0.7
1.2
36.2

75
76
77
78
79
80
81

PATRATU TPS
TENUGHAT TPS
BOKARO `B` TPS
CHANDRAPURA(DVC)
MAITHON RB TPP
KODARMA TPP
MAHADEV PRASAD
STPP

770
420
630
890
1050
1000
540

20
20
20
20
20
20
20

2.5
4
9.7
8.7
13.3
7.5
6.3

RAIL
ROAD
RAIL
RAIL
RAIL
RAIL
RAIL

46
67
20
0
33
8
1

** Less Receipt

** CIL Supply: 94% of ACQ

ORISSA
82
83
84

PITHEAD
PITHEAD
PITHEAD

IB VALLEY TPS
TALCHER (OLD) TPS
TALCHER STPS

420
470
3000

15
15
15

7.5
8.5
52.5

186.1

186.1

89.1

89.1

183

114.3

297.15

429.02

429.02

33

73.31

106.67

85
RAIL
86
RAIL
WEST BENGAL

STERLITE TPP
KAMALANGA TPS

2400
350

20
20

15.6
5.1

87
88
89

RAIL
RAIL
RAIL

DURGAPUR TPS
MEJIA TPS
BAKRESWAR TPS

340
2340
1050

20
20
20

3.8
22.7
14.4

186.68

186.68

90.66

90.66

25.05

25.05

90
91
92

RAIL
RAIL
RAIL

BANDEL TPS
D.P.L. TPS
KOLAGHAT TPS

450
630
1260

20
25
25

4.3
5.5
16.2

29.74

29.74

49.06

49.06

11.4

11.4

33.67

33.67

25.48

25.48

181.34

181.34

10.13

10.13

46.35

46.35

54.42

54.42

30

286.62

317.11

93
RAIL
94
RAIL
95
RAIL
96
RAIL
97
RAIL
98
RAIL
99
PITHEAD
100
RAIL
TOTAL OF E.R.

SAGARDIGHI TPS
SANTALDIH TPS
BUDGE BUDGE TPS
NEW COSSIPORE TPS
SOUTHERN REPL. TPS
TITAGARH TPS
FARAKKA STPS
DURGAPUR STEEL TPS

ALL INDIA TOTAL

(*) Critical i.e. stock less than 7 days in


(**) Super Critical i.e. stock less than 4 days in

600
980
750
160
135
240
2100
1000
26745

20
20
20
20
20
20
15
20
18

7.4
4.5
10.2
0.9
2
3.1
23.6
9.8
307.7

93.82

93.82

270

3738.97

109308

22

1405

1465

16422.1

29
12

25
11
6

CIL Supply 87% of ACQ

28
21
49
4
2
7
9
1

Less import

** CIL Supply: 92% of ACQ

** CIL Supply 60% of ACQ

Less import

Less Receipt

4008.87

5
6
18
11
23
18
13
10
13

17887.11

13

29

12

TPSs {Includes super critical also}


TPSs

CENTRAL ELECTRICITY AUTHORITY


OPERATION MONITORING DIVISION

DAILY COAL REPORT


COAL STOCKS POSITION AT VARIOUS THERMAL POWER STATIONS IN THE COUNTRY ( AS ON 27-Jan-2014
REGIO
MODE OF
NAME OF
CAPACIT NORMAT DAILY )
ACTUAL STOCK
CRITICAL
REASONS FOR CRITICAL
N/
STATE

TRANSPORT

THERMAL
POWER
STATION

Y
(MW)

IVE
LINKAGE
STOCK
IN '000
Reqd.
TONNES
(DAYS)

COAL STOCK
IN COAL STOCK
DAY
S
<7
<4
DAYS DAYS

IN, 000 TONNES

Import Indigenous

Total

NORTHERN
DELHI
135
705

20
30

1.9
10.6

74.94

74.94

129.7

129.7

PANIPAT TPS
YAMUNA NAGAR TPS
RAJIV GANDHI TPS
INDIRA GANDHI STPP
MAHATMA GANDHI
TPS

1360
600
1200
1500
1320

25
25
25
25
25

19.6
6.9
12.3
19
16.7

71

537.16

607.73

205.88

205.88
648.67

RAIL
8
9
RAIL
10
RAIL
RAJASTHAN

GH TPS (LEH.MOH.)
ROPAR TPS
GND TPS(BHATINDA)

920
1260
440

30
25
30

11
RAIL
12
RAIL
13
RAIL
UTTAR PRADESH

KOTA TPS
SURATGARH TPS
CHHABRA TPP

1240
1500
750

14
15

PITHEAD
RAIL

ANPARA TPS
HARDUAGANJ TPS

16
17
18

RAIL
RAIL
RAIL

OBRA TPS
PANKI TPS
PARICHHA TPS

1
RAIL
2
RAIL
HARYANA

RAJGHAT TPS
BADARPUR TPS

3
4
5
6
7

RAIL
RAIL
RAIL
RAIL
RAIL

89

559.84

142

360.88

502.88

54

94.58

148.44

12.9
18.5
4.9

246.57

246.57

225.93

225.93

56.06

56.06

30
30
30

21
20.4
6.3

171.74

171.74

426.96

427.37

170.31

170.31

1630
665

15
25

24
7.2

369.18

369.18

38.77

38.77

1278
210
1140

20
20
30

11.7
2.6
14

308.02

308.02

45.35

45.35

64.69

64.69

123.99

40
12
31
30
53
27
9

PUNJAB
19
12
11
8
21
27
15
5

CIL Supply 71% of ACQ

26
18
5

CIL Supply 110% of ACQ

129.23

CIL Supply: 97% of ACQ

19

RAIL

DADRI (NCTPP)

1820

30

26.4

20

PITHEAD

RIHAND STPS

3000

15

36.4

168.29

168.29

CIL Supply 101% of ACQ

21
22

PITHEAD
RAIL

SINGRAULI STPS
TANDA TPS

2000
440

15
25

33.1
8.4

252.76

252.76

40.57

40.57

8
5

CIL Supply 88% of ACQ

23

RAIL

UNCHAHAR TPS

1050

25

16.7

** CIL Supply 94% of ACQ

24
25

RAIL
PITHEAD

ROSA TPP Ph-I


ANPARA C TPS

1200
1200

25
25

15
14.2

251.16

251.16

57.99

57.99

17
4

28563

24

380.7

361

4981.3

5342.2

14

DSPM TPS
KORBA-II
KORBA-WEST TPS
KORBA STPS
SIPAT STPS
PATHADI TPP
BHILAI TPS
AKALTARA TPS

500
440
1340
2600
2980
600
500
600

15
15
15
15
20
15
25
20

8.2
7
11.7
45.7
42.5
7
6.7
7.1

307.86

307.86

244.24

244.24

224.23

224.23

477

477

395.89

400.72

38
35
19
10
9
23
47
4

SIKKA REP. TPS


GANDHI NAGAR TPS
UKAI TPS
WANAKBORI TPS
SABARMATI (C
STATION)

240
870
1350
1470
400

30
30
30
30
30

1.3
8.7
13.7
19.4
5.3

TOTAL OF N.R.

CIL Supply 110% of ACQ

WESTERN
CHHATTISGARH
26
27
28
29
30
31
32
33

RAIL
PITHEAD
PITHEAD
PITHEAD
PITHEAD
RAIL
RAIL
RAIL

161.53

161.53

46

265.51

311.67

30.95

30.95

GUJARAT
34
35
36
37
38

RAIL
RAIL
RAIL
RAIL
RAIL

80.32

87

270.88

271.16

416.87

416.87

533.96

533.96

38.19

38.19

67
31
30
28
7

CIL Supply 94% of ACQ

MADHYA PRADESH
39
40
41
42
43

PITHEAD
RAIL
RAIL
PITHEAD
RAIL

AMARKANTAK EXT
TPS
SANJAY GANDHI TPS
SATPURA TPS
VINDHYACHAL STPS
BINA TPS

450
1340
1580
4260
500

15
20
20
15
25

5.3
16.5
17.3
56.6
7.5

27

35.47

62.39

203.16

203.16

26

649.26

675.06

459.12

460.01

67.11

67.11

1420
2340

20
20

17.4
34.7

165.69

171.96

650.04

650.04

10
19

1340

25

17.5

13

84.57

97.57

Unloading Constraint

CIL Supply 65% of ACQ

12
12
39
8
9

MAHARASHTRA
44
45

RAIL
RAIL

46

RAIL

BHUSAWAL TPS
CHANDRAPUR(MAHA
RASHTRA) STPS
KHAPARKHEDA TPS

47
48

RAIL
RAIL

KORADI TPS
NASIK TPS

1040
630

25
25

8.1
11.2

118.54

118.54

71.79

71.79

15
6

49

RAIL

PARLI TPS

1130

25

15.6

45.75

45.75

** Less Receipt CIL/SCCL

50
51
52
53
54

RAIL
RAIL
RAIL
RAIL
RAIL

PARAS TPS
DAHANU TPS
WARDHA WARORA
TPP
TIRORA TPS
BELA TPS

500
500
540
1980
270

25
25
20
20
20

6.4
10.1
5.3
18.1
2.4

182.92

182.92

134

92.53

227

** Less import

55

RAIL

BUTIBORI TPP

300

20

270
600
1000
35880

56
RAIL
57
RAIL
58
RAIL
TOTAL OF W.R.

AMARAVATI TPS
EMCO WARORA TPS
MAUDA TPS

1.66

1.66

24

277.65

301.88

29
23
0
17
0

3.6

20
20
30
21

3.2
3.4
7.1
451.6

47.13

47.13

22.18

22.18

88.8

88.8

289

6710.82

7000.3

15
7
13
16

71.61

92.62

** CIL Supply: 61% of ACQ

2
1

** Less Receipt

** Less receipt-SCCL

5
8
5

Less Receipt

Less receipt-SCCL

1
4

Data not received


Data not received

SOUTHERN
ANDHRA PRADESH
59

RAIL

Dr. N.TATA RAO TPS

1760

20

28.5

21

60
61

RAIL
RAIL

KOTHAGUDEM TPS
RAYALASEEMA TPS

1720
1050

20
25

27.8
15.9

51.9

51.9

17.57

17.57

62
63
64

PITHEAD
RAIL
RAIL

RAMAGUNDEM STPS
SIMHADRI
KAKATIYA TPS

2600
2000
500

15
25
25

40.6
29.4
7.1

RAICHUR TPS
BELLARY TPS

1720
1000

30
30

23.3
14.1

ENNORE TPS
METTUR TPS
NORTH CHENNAI TPS
TUTICORIN TPS
VALLUR TPP

450
1440
1830
1050
1000

30
30
30
30
30

4.3
20
22.7
18.1
13.6

18120

25

210
220
2340

199.72

202.94

188

47.88

235.86

38.67

38.67

25.07

30.57

17

44.76

61.87

KARNATAKA
65
66

RAIL
RAIL

** Less import

Coal Sup. for U-2 yet to


Commence

CIL Supply: 61% of ACQ

TAMIL NADU
67
68
69
70
71

INTER
MODAL
INTER
MODAL
INTER
MODAL
INTER
MODAL
RAIL

TOTAL OF S.R.

38.74

38.74

65

194.23

259.24

34

125.64

159.77

46

164.78

210.56

76.07

76.07

9
13
7
12
6

265.4

380

1096.67

1476.4

20
20
15

0.7
1.2
36.2

9.19

9.19

23.06

23.06

23

612.58

635.73

14
20
18

770
420
630
890

20
20
20
20

2.5
4
9.7
8.7

111.45

111.45

270.03

270.03

193.48

193.48

4.87

4.87

1050
1000
540

20
20
20

13.3
7.5
6.3

440.8

440.8

59.69

59.69

9.42

9.42

EASTERN
BIHAR
72
RAIL
73
RAIL
74
PITHEAD
JHARKHAND

BARAUNI TPS
MUZAFFARPUR TPS
KAHALGAON TPS

75
76
77
78

RAIL
ROAD
RAIL
RAIL

79
80
81

RAIL
RAIL
RAIL

PATRATU TPS
TENUGHAT TPS
BOKARO `B` TPS
CHANDRAPURA(DVC)
TPS
MAITHON RB TPP
KODARMA TPP
MAHADEV PRASAD
STPP

45
68
20
1

** Less Receipt

33
8
1

** CIL Supply 94% of ACQ

ORISSA
82
83
84

PITHEAD
PITHEAD
PITHEAD

85
RAIL
86
RAIL
WEST BENGAL

186.25

186.25

93.46

93.46

186

107.68

293.82

IB VALLEY TPS
TALCHER (OLD) TPS
TALCHER STPS

420
470
3000

15
15
15

7.5
8.5
52.5

STERLITE TPP
KAMALANGA TPS

2400
350

20
20

15.6
5.1

435

435

33

63.18

96.29

87
88
89

RAIL
RAIL
RAIL

DURGAPUR TPS
MEJIA TPS
BAKRESWAR TPS

340
2340
1050

20
20
20

3.8
22.7
14.4

184.64

184.64

82.82

82.82

17.46

17.46

90
91
92

RAIL
RAIL
RAIL

BANDEL TPS
D.P.L. TPS
KOLAGHAT TPS

450
630
1260

20
25
25

4.3
5.5
16.2

31.23

31.23

48.02

48.02

14.19

14.19

SAGARDIGHI TPS
SANTALDIH TPS
BUDGE BUDGE TPS
NEW COSSIPORE TPS
SOUTHERN REPL. TPS
TITAGARH TPS
FARAKKA STPS
DURGAPUR STEEL
TPS

600
980
750
160
135
240
2100
1000

20
20
20
20
20
20
15
20

7.4
4.5
10.2
0.9
2
3.1
23.6
9.8

27.76

27.76

27.9

27.9

182.54

182.54

88.4

88.4

26745

18

307.7

275

3722.41

109308

22

1405

1306

16511.2

93
RAIL
94
RAIL
95
RAIL
96
RAIL
97
RAIL
98
RAIL
99
PITHEAD
RAIL
100
TOTAL OF E.R.
ALL INDIA TOTAL

(*) Critical i.e. stock less than 7 days in


(**) Super Critical i.e. stock less than 4 days
in

28
11

TPSs
TPSs

25
11
6

CIL Supply 87% of ACQ

28
19
49
4
1
7
9
1

Less import

** CIL Supply: 92% of ACQ

** CIL Supply 60% of ACQ

Less import

Less Receipt

3997.8

4
6
18
11
24
18
13
9
13

17817

13

28

11

9.92

9.92

48.13

48.13

55.39

55.39

33

283.87

316.87

{Includes super critical also}

CENTRAL ELECTRICITY AUTHORITY


OPERATION MONITORING DIVISION

DAILY COAL REPORT


COAL STOCKS POSITION AT VARIOUS THERMAL POWER STATIONS IN THE COUNTRY ( AS ON 27-Jan-2014
REGIO
MODE OF
NAME OF
CAPACIT NORMAT DAILY )
ACTUAL STOCK
CRITICAL
REASONS FOR CRITICAL
N/
STATE

TRANSPORT

THERMAL
POWER
STATION

Y
(MW)

IVE
LINKAGE
STOCK
IN '000
Reqd.
TONNES
(DAYS)

COAL STOCK
IN COAL STOCK
DAY
S
<7
<4
DAYS DAYS

IN, 000 TONNES

Import Indigenous

Total

NORTHERN
DELHI
135
705

20
30

1.9
10.6

74.94

74.94

129.7

129.7

PANIPAT TPS
YAMUNA NAGAR TPS
RAJIV GANDHI TPS
INDIRA GANDHI STPP
MAHATMA GANDHI
TPS

1360
600
1200
1500
1320

25
25
25
25
25

19.6
6.9
12.3
19
16.7

71

537.16

607.73

205.88

205.88
648.67

RAIL
8
9
RAIL
10
RAIL
RAJASTHAN

GH TPS (LEH.MOH.)
ROPAR TPS
GND TPS(BHATINDA)

920
1260
440

30
25
30

11
RAIL
12
RAIL
13
RAIL
UTTAR PRADESH

KOTA TPS
SURATGARH TPS
CHHABRA TPP

1240
1500
750

14
15

PITHEAD
RAIL

ANPARA TPS
HARDUAGANJ TPS

16
17
18

RAIL
RAIL
RAIL

OBRA TPS
PANKI TPS
PARICHHA TPS

1
RAIL
2
RAIL
HARYANA

RAJGHAT TPS
BADARPUR TPS

3
4
5
6
7

RAIL
RAIL
RAIL
RAIL
RAIL

89

559.84

142

360.88

502.88

54

94.58

148.44

12.9
18.5
4.9

246.57

246.57

225.93

225.93

56.06

56.06

30
30
30

21
20.4
6.3

171.74

171.74

426.96

427.37

170.31

170.31

1630
665

15
25

24
7.2

369.18

369.18

38.77

38.77

1278
210
1140

20
20
30

11.7
2.6
14

308.02

308.02

45.35

45.35

64.69

64.69

123.99

40
12
31
30
53
27
9

PUNJAB
19
12
11
8
21
27
15
5

CIL Supply 71% of ACQ

26
18
5

CIL Supply 110% of ACQ

129.23

CIL Supply: 97% of ACQ

19

RAIL

DADRI (NCTPP)

1820

30

26.4

20

PITHEAD

RIHAND STPS

3000

15

36.4

168.29

168.29

CIL Supply 101% of ACQ

21
22

PITHEAD
RAIL

SINGRAULI STPS
TANDA TPS

2000
440

15
25

33.1
8.4

252.76

252.76

40.57

40.57

8
5

CIL Supply 88% of ACQ

23

RAIL

UNCHAHAR TPS

1050

25

16.7

** CIL Supply 94% of ACQ

24
25

RAIL
PITHEAD

ROSA TPP Ph-I


ANPARA C TPS

1200
1200

25
25

15
14.2

251.16

251.16

57.99

57.99

17
4

28563

24

380.7

361

4981.3

5342.2

14

DSPM TPS
KORBA-II
KORBA-WEST TPS
KORBA STPS
SIPAT STPS
PATHADI TPP
BHILAI TPS
AKALTARA TPS

500
440
1340
2600
2980
600
500
600

15
15
15
15
20
15
25
20

8.2
7
11.7
45.7
42.5
7
6.7
7.1

307.86

307.86

244.24

244.24

224.23

224.23

477

477

395.89

400.72

38
35
19
10
9
23
47
4

SIKKA REP. TPS


GANDHI NAGAR TPS
UKAI TPS
WANAKBORI TPS
SABARMATI (C
STATION)

240
870
1350
1470
400

30
30
30
30
30

1.3
8.7
13.7
19.4
5.3

TOTAL OF N.R.

CIL Supply 110% of ACQ

WESTERN
CHHATTISGARH
26
27
28
29
30
31
32
33

RAIL
PITHEAD
PITHEAD
PITHEAD
PITHEAD
RAIL
RAIL
RAIL

161.53

161.53

46

265.51

311.67

30.95

30.95

GUJARAT
34
35
36
37
38

RAIL
RAIL
RAIL
RAIL
RAIL

80.32

87

270.88

271.16

416.87

416.87

533.96

533.96

38.19

38.19

67
31
30
28
7

CIL Supply 94% of ACQ

MADHYA PRADESH
39
40
41
42
43

PITHEAD
RAIL
RAIL
PITHEAD
RAIL

AMARKANTAK EXT
TPS
SANJAY GANDHI TPS
SATPURA TPS
VINDHYACHAL STPS
BINA TPS

450
1340
1580
4260
500

15
20
20
15
25

5.3
16.5
17.3
56.6
7.5

27

35.47

62.39

203.16

203.16

26

649.26

675.06

459.12

460.01

67.11

67.11

1420
2340

20
20

17.4
34.7

165.69

171.96

650.04

650.04

10
19

1340

25

17.5

13

84.57

97.57

Unloading Constraint

CIL Supply 65% of ACQ

12
12
39
8
9

MAHARASHTRA
44
45

RAIL
RAIL

46

RAIL

BHUSAWAL TPS
CHANDRAPUR(MAHA
RASHTRA) STPS
KHAPARKHEDA TPS

47
48

RAIL
RAIL

KORADI TPS
NASIK TPS

1040
630

25
25

8.1
11.2

118.54

118.54

71.79

71.79

15
6

49

RAIL

PARLI TPS

1130

25

15.6

45.75

45.75

** Less Receipt CIL/SCCL

50
51
52
53
54

RAIL
RAIL
RAIL
RAIL
RAIL

PARAS TPS
DAHANU TPS
WARDHA WARORA
TPP
TIRORA TPS
BELA TPS

500
500
540
1980
270

25
25
20
20
20

6.4
10.1
5.3
18.1
2.4

182.92

182.92

134

92.53

227

** Less import

55

RAIL

BUTIBORI TPP

300

20

270
600
1000
35880

56
RAIL
57
RAIL
58
RAIL
TOTAL OF W.R.

AMARAVATI TPS
EMCO WARORA TPS
MAUDA TPS

1.66

1.66

24

277.65

301.88

29
23
0
17
0

3.6

20
20
30
21

3.2
3.4
7.1
451.6

47.13

47.13

22.18

22.18

88.8

88.8

289

6710.82

7000.3

15
7
13
16

71.61

92.62

** CIL Supply: 61% of ACQ

2
1

** Less Receipt

** Less receipt-SCCL

5
8
5

Less Receipt

Less receipt-SCCL

1
4

Data not received


Data not received

SOUTHERN
ANDHRA PRADESH
59

RAIL

Dr. N.TATA RAO TPS

1760

20

28.5

21

60
61

RAIL
RAIL

KOTHAGUDEM TPS
RAYALASEEMA TPS

1720
1050

20
25

27.8
15.9

51.9

51.9

17.57

17.57

62
63
64

PITHEAD
RAIL
RAIL

RAMAGUNDEM STPS
SIMHADRI
KAKATIYA TPS

2600
2000
500

15
25
25

40.6
29.4
7.1

RAICHUR TPS
BELLARY TPS

1720
1000

30
30

23.3
14.1

ENNORE TPS
METTUR TPS
NORTH CHENNAI TPS
TUTICORIN TPS
VALLUR TPP

450
1440
1830
1050
1000

30
30
30
30
30

4.3
20
22.7
18.1
13.6

18120

25

210
220
2340

199.72

202.94

188

47.88

235.86

38.67

38.67

25.07

30.57

17

44.76

61.87

KARNATAKA
65
66

RAIL
RAIL

** Less import

Coal Sup. for U-2 yet to


Commence

CIL Supply: 61% of ACQ

TAMIL NADU
67
68
69
70
71

INTER
MODAL
INTER
MODAL
INTER
MODAL
INTER
MODAL
RAIL

TOTAL OF S.R.

38.74

38.74

65

194.23

259.24

34

125.64

159.77

46

164.78

210.56

76.07

76.07

9
13
7
12
6

265.4

380

1096.67

1476.4

20
20
15

0.7
1.2
36.2

9.19

9.19

23.06

23.06

23

612.58

635.73

14
20
18

770
420
630
890

20
20
20
20

2.5
4
9.7
8.7

111.45

111.45

270.03

270.03

193.48

193.48

4.87

4.87

1050
1000
540

20
20
20

13.3
7.5
6.3

440.8

440.8

59.69

59.69

9.42

9.42

EASTERN
BIHAR
72
RAIL
73
RAIL
74
PITHEAD
JHARKHAND

BARAUNI TPS
MUZAFFARPUR TPS
KAHALGAON TPS

75
76
77
78

RAIL
ROAD
RAIL
RAIL

79
80
81

RAIL
RAIL
RAIL

PATRATU TPS
TENUGHAT TPS
BOKARO `B` TPS
CHANDRAPURA(DVC)
TPS
MAITHON RB TPP
KODARMA TPP
MAHADEV PRASAD
STPP

45
68
20
1

** Less Receipt

33
8
1

** CIL Supply 94% of ACQ

ORISSA
82
83
84

PITHEAD
PITHEAD
PITHEAD

85
RAIL
86
RAIL
WEST BENGAL

186.25

186.25

93.46

93.46

186

107.68

293.82

IB VALLEY TPS
TALCHER (OLD) TPS
TALCHER STPS

420
470
3000

15
15
15

7.5
8.5
52.5

STERLITE TPP
KAMALANGA TPS

2400
350

20
20

15.6
5.1

435

435

33

63.18

96.29

87
88
89

RAIL
RAIL
RAIL

DURGAPUR TPS
MEJIA TPS
BAKRESWAR TPS

340
2340
1050

20
20
20

3.8
22.7
14.4

184.64

184.64

82.82

82.82

17.46

17.46

90
91
92

RAIL
RAIL
RAIL

BANDEL TPS
D.P.L. TPS
KOLAGHAT TPS

450
630
1260

20
25
25

4.3
5.5
16.2

31.23

31.23

48.02

48.02

14.19

14.19

SAGARDIGHI TPS
SANTALDIH TPS
BUDGE BUDGE TPS
NEW COSSIPORE TPS
SOUTHERN REPL. TPS
TITAGARH TPS
FARAKKA STPS
DURGAPUR STEEL
TPS

600
980
750
160
135
240
2100
1000

20
20
20
20
20
20
15
20

7.4
4.5
10.2
0.9
2
3.1
23.6
9.8

27.76

27.76

27.9

27.9

182.54

182.54

88.4

88.4

26745

18

307.7

275

3722.41

109308

22

1405

1306

16511.2

93
RAIL
94
RAIL
95
RAIL
96
RAIL
97
RAIL
98
RAIL
99
PITHEAD
RAIL
100
TOTAL OF E.R.
ALL INDIA TOTAL

(*) Critical i.e. stock less than 7 days in


(**) Super Critical i.e. stock less than 4 days
in

28
11

TPSs
TPSs

25
11
6

CIL Supply 87% of ACQ

28
19
49
4
1
7
9
1

Less import

** CIL Supply: 92% of ACQ

** CIL Supply 60% of ACQ

Less import

Less Receipt

3997.8

4
6
18
11
24
18
13
9
13

17817

13

28

11

9.92

9.92

48.13

48.13

55.39

55.39

33

283.87

316.87

{Includes super critical also}

1
CENTRAL ELECTRICITY AUTHORITY
OPERATION MONITORING DIVISION

DAILY COAL REPORT


COAL STOCKS POSITION AT VARIOUS THERMAL POWER STATIONS IN THE COUNTRY ( AS ON 28-Jan-2014 )
REGIO
N/
STATE

MODE OF
TRANSPORT

NAME OF
THERMAL
POWER
STATION

CAPACIT NORMA DAILY


ACTUAL STOCK
Y
TIVE LINKAG
IN, 000 TONNES
(MW)
STOCK
E
Reqd. IN '000
(DAYS) TONNE Import Indigenou Total
s
S

CRITICAL
IN
DA
YS

COAL
STOCK
<7
<4
DAYS DAYS

REASONS FOR
CRITICAL COAL
STOCK

NORTHERN
DELHI
1
2

RAIL
RAIL
HARYANA

RAJGHAT TPS
BADARPUR TPS

135
705

20
30

1.9
10.6

0
0

74.94
123.62

74.94
123.62

40
12

3
4
5
6
7

PANIPAT TPS
YAMUNA NAGAR TPS
RAJIV GANDHI TPS
INDIRA GANDHI STPP
MAHATMA GANDHI
TPS

1360
600
1200
1500
1320

25
25
25
25
25

19.6
6.9
12.3
19
16.7

69
59
86
139
54

530.9
205.55
553.25
358.94
94.87

599.94
264.72
639.26
498.29
148.73

31
38
52
26
9

8
RAIL
9
RAIL
RAIL
10
RAJASTHAN

GH TPS (LEH.MOH.)
ROPAR TPS
GND TPS(BHATINDA)

920
1260
440

30
25
30

12.9
18.5
4.9

0
0
0

242.74
224.13
58.24

242.74
224.13
58.24

19
12
12

11
RAIL
12
RAIL
13
RAIL
UTTAR PRADESH

KOTA TPS
SURATGARH TPS
CHHABRA TPP

1240
1500
750

30
30
30

21
20.4
6.3

0
0
0

174.43
428.8
166.61

174.43
428.8
166.61

8
21
27

14
15

PITHEAD
RAIL

ANPARA TPS
HARDUAGANJ TPS

1630
665

15
25

24
7.2

0
0

369.24
37.59

369.24
37.59

15
5

CIL Supply 71% of ACQ

16
17
18

RAIL
RAIL
RAIL

OBRA TPS
PANKI TPS
PARICHHA TPS

1278
210
1140

20
20
30

11.7
2.6
14

0
0
0

307.17
43.53
61.45

307.17
43.53
61.45

26
17
4

CIL Supply 110% of ACQ

19

RAIL

DADRI (NCTPP)

1820

30

26.4

115.35

120.59

CIL Supply: 97% of ACQ

20

PITHEAD

RIHAND STPS

3000

15

36.4

142.97

142.97

CIL Supply 101% of ACQ

21
22

PITHEAD
RAIL

SINGRAULI STPS
TANDA TPS

2000
440

15
25

33.1
8.4

0
0

256.76
39.63

256.76
39.63

8
5

CIL Supply 88% of ACQ

23

RAIL

UNCHAHAR TPS

1050

25

16.7

** CIL Supply 94% of ACQ

24

RAIL

ROSA TPP Ph-I

1200

25

15

105

243.98

348.54

23

25

PITHEAD

ANPARA C TPS

1200

25

14.2

61.02

61.02

28563

24

380.7

517

4915.72

5432.94

14

DSPM TPS
KORBA-II
KORBA-WEST TPS
KORBA STPS
SIPAT STPS
PATHADI TPP
BHILAI TPS
AKALTARA TPS

500
440
1340
2600
2980
600
500
600

15
15
15
15
20
15
25
20

8.2
7
11.7
45.7
42.5
7
6.7
7.1

0
0
0
0
3
0
49
0

303.61
243.18
220.96
475.25
397.05
160.89
266.53
29.21

303.61
243.18
220.96
475.25
399.99
160.89
315.63
29.21

37
35
19
10
9
23
47
4

SIKKA REP. TPS


GANDHI NAGAR TPS
UKAI TPS
WANAKBORI TPS
SABARMATI (C
STATION

240
870
1350
1470
400

30
30
30
30
30

1.3
8.7
13.7
19.4
5.3

7
0
0
0
0

80.32
276.33
416.92
534.46
46.1

87.53
276.6
416.92
534.46
46.1

68
32
30
28
9

RAIL
RAIL
RAIL
RAIL
RAIL

PUNJAB

TOTAL OF N.R.

Inadequate linkage
CIL Supply 110% of ACQ
1

WESTERN
CHHATTISGARH
26
27
28
29
30
31
32
33

RAIL
PITHEAD
PITHEAD
PITHEAD
PITHEAD
RAIL
RAIL
RAIL

GUJARAT
34
35
36
37
38

RAIL
RAIL
RAIL
RAIL
RAIL

CIL Supply 94% of ACQ

2
MADHYA PRADESH
39
PITHEAD
40
RAIL
41
RAIL
42
PITHEAD
43
RAIL
MAHARASHTRA

AMARKANTAK EXT
TPS
SANJAY
GANDHI TPS
SATPURA TPS
VINDHYACHAL STPS
BINA TPS

450
1340
1580
4260
500

15
20
20
15
25

5.3
16.5
17.3
56.6
7.5

25
0
24
1
0

58.92
203.85
662.98
471.85
61.4

83.84
203.85
687.19
472.74
61.4

16
12
40
8
8

44
45

RAIL
RAIL

1420
2340

20
20

17.4
34.7

6
0

154.58
653.97

160.85
653.97

9
19

46

RAIL

BHUSAWAL TPS
CHANDRAPUR(MAHA
RASHTRA) STPS
KHAPARKHEDA TPS

1340

25

17.5

13

96.1

109.09

Unloading Constraint

47
48

RAIL
RAIL

KORADI TPS
NASIK TPS

1040
630

25
25

8.1
11.2

0
0

121.6
65.85

121.6
65.85

15
6

CIL Supply 65% of ACQ

49

RAIL

PARLI TPS

1130

25

15.6

49.63

49.63

** Less Receipt CIL/SCCL

50
51
52
53
54

RAIL
RAIL
RAIL
RAIL
RAIL

PARAS TPS
DAHANU TPS
WARDHA WARORA
TPP
TIRORA
TPS
BELA TPS

500
500
540
1980
270

25
25
20
20
20

6.4
10.1
5.3
18.1
2.4

0
134
3
18
0

187.31
89.28
2.61
280.28
0

187.31
223.38
5.75
298.24
0

29
22
1
16
0

** Less import

55

RAIL

BUTIBORI TPP

300

20

3.6

270
600
1000
35880

20
20
30
21

3.2
3.4
7.1
451.6

0
1
0
285

47.3
19.46
87.26
6765.03

47.3
20.45
87.26
7050.04

15
6
12
16

56
RAIL
57
RAIL
58
RAIL
TOTAL OF W.R.

AMARAVATI TPS
EMCO WARORA TPS
MAUDA TPS

Data not received


Data not received

*
6

Less import
2

SOUTHERN
ANDHRA PRADESH
59

RAIL

Dr. N.TATA RAO TPS

1760

20

28.5

20

45.5

65.28

** CIL Supply: 61% of ACQ

60
61

RAIL
RAIL

KOTHAGUDEM TPS
RAYALASEEMA TPS

1720
1050

20
25

27.8
15.9

0
0

54.73
20.82

54.73
20.82

2
1

*
*

** Less Receipt
** Less receipt-SCCL

62
63
64

PITHEAD
RAIL
RAIL

RAMAGUNDEM STPS
SIMHADRI
KAKATIYA TPS

2600
2000
500

15
25
25

40.6
29.4
7.1

0
191
0

208.62
45.44
39.68

208.62
236.36
39.68

5
8
6

Less Receipt

Less receipt-SCCL

RAICHUR TPS
BELLARY TPS

1720
1000

30
30

23.3
14.1

5
20

23.35
45.99

28.28
66.11

1
5

*
*

ENNORE TPS
METTUR TPS
NORTH CHENNAI TPS
TUTICORIN TPS
VALLUR TPP

450
1440
1830
1050
1000

30
30
30
30
30

4.3
20
22.7
18.1
13.6

0
70
38
43
0

38.66
193.97
121.36
165.63
75.37

38.66
263.61
159.24
208.97
75.37

9
13
7
12
6

18120

25

265.4

387

1079.13

1465.75

210
220
2340

20
20
15

0.7
1.2
36.2

0
0
0

9.19
30.25
627.76

9.19
30.25
627.76

14
26
17

770
420
630
890

20
20
20
20

2.5
4
9.7
8.7

0
0
0
0

112.68
269.84
192.73
6.2

112.68
269.84
192.73
6.2

45
67
20
1

** Less Receipt

1050
1000
540

20
20
20

13.3
7.5
6.3

0
0
0

447.74
57.98
10.62

447.74
57.98
10.62

34
8
2

** CIL Supply: 94% of ACQ

CIL Supply 87% of ACQ

KARNATAKA
65
66

RAIL
RAIL

** Less import
Coal Sup.for U-II yet to
resume

TAMIL NADU
67
68
69
70
71

INTER MODAL
INTER MODAL
INTER MODAL
INTER MODAL
RAIL

TOTAL OF S.R.

CIL Supply: 61% of ACQ


4

EASTERN
BIHAR
72
RAIL
73
RAIL
74
PITHEAD
JHARKHAND

BARAUNI TPS
MUZAFFARPUR TPS
KAHALGAON TPS

75
76
77
78

RAIL
ROAD
RAIL
RAIL

79
80
81

RAIL
RAIL
RAIL

PATRATU TPS
TENUGHAT TPS
BOKARO `B` TPS
CHANDRAPURA(DVC)
TPS
MAITHON RB TPP
KODARMA TPP
MAHADEV PRASAD
STPP

ORISSA
82
83
84

PITHEAD
PITHEAD
PITHEAD

IB VALLEY TPS
TALCHER (OLD) TPS
TALCHER STPS

420
470
3000

15
15
15

7.5
8.5
52.5

0
23
190

188.81
96.68
99.95

188.81
119.4
290.02

25
14
6

85
86

RAIL
RAIL

STERLITE TPP
KAMALANGA TPS

2400
350

20
20

15.6
5.1

0
32

441.83
58.97

441.83
91.34

28
18

3
WEST BENGAL
87
88
89

RAIL
RAIL
RAIL

DURGAPUR TPS
MEJIA TPS
BAKRESWAR TPS

340
2340
1050

20
20
20

3.8
22.7
14.4

0
0
0

179.03
91.39
16.75

179.03
91.39
16.75

47
4
1

*
*

Less import
** CIL Supply: 92% of ACQ

90
91
92

RAIL
RAIL
RAIL

BANDEL TPS
D.P.L. TPS
KOLAGHAT TPS

450
630
1260

20
25
25

4.3
5.5
16.2

0
0
0

29.04
47.03
21

29.04
47.03
21

7
9
1

** CIL Supply 60% of ACQ

600
980
750
160
135
240
2100
1000
26745

20
20
20
20
20
20
15
20
18

7.4
4.5
10.2
0.9
2
3.1
23.6
9.8
307.7

0
0
0
0
0
0
33
0
278

24.6
26.76
183.24
9.72
46.31
56.46
286.66
87.81
3757.01

24.6
26.76
183.24
9.72
46.31
56.46
319.47
87.81
4034.99

3
6
18
10
23
18
14
9
13

*
*

** Less import
Less Receipt

109308

22

1405

1467

16516.8

17983.7

13

29

12

93
RAIL
94
RAIL
95
RAIL
96
RAIL
97
RAIL
98
RAIL
99
PITHEAD
100
RAIL
TOTAL OF E.R.

SAGARDIGHI TPS
SANTALDIH TPS
BUDGE BUDGE TPS
NEW COSSIPORE TPS
SOUTHERN REPL. TPS
TITAGARH TPS
FARAKKA STPS
DURGAPUR STEEL
TPS

ALL INDIA TOTAL

(*) Critical i.e. stock less than 7 days in


(**) Super Critical i.e. stock less than 4 days in

29
12

TPSs
TPSs

{Includes super critical also}

CENTRAL ELECTRICITY AUTHORITY


OPERATION MONITORING DIVISION

DAILY COAL REPORT


COAL STOCKS POSITION AT VARIOUS THERMAL POWER STATIONS IN THE COUNTRY ( AS ON 29-Jan-2014 )
REGION/
STATE

MODE OF
TRANSPORT

NAME OF
THERMAL
POWER
STATION

CAPACIT NORMA DAILY


Y
TIVE
LINKAG
(MW)
STOCK
E
Reqd.
IN '000
(DAYS) TONNES

ACTUAL STOCK

CRITICAL

IN, 000 TONNES

Import

Indigeno
us

IN
DAY
S

Total

NORTHERN

REASONS FOR CRITICAL


COAL STOCK

COAL STOCK

<7
<4
DAY
DAYS
S

DELHI
135
705

20
30

1.9
10.6

74.94

74.94

123.04

123.04

PANIPAT TPS
YAMUNA NAGAR TPS
RAJIV GANDHI TPS
INDIRA GANDHI STPP
MAHATMA GANDHI TPS

1360
600
1200
1500
1320

25
25
25
25
25

19.6
6.9
12.3
19
16.7

68

524.46

591.99

59

202

261.16
634.24

8
RAIL
9
RAIL
10
RAIL
RAJASTHAN

GH TPS (LEH.MOH.)
ROPAR TPS
GND TPS(BHATINDA)

920
1260
440

30
25
30

11
RAIL
12
RAIL
13
RAIL
UTTAR PRADESH

KOTA TPS
SURATGARH TPS
CHHABRA TPP

1240
1500
750

14
15

PITHEAD
RAIL

ANPARA TPS
HARDUAGANJ TPS

16
17
18

RAIL
RAIL
RAIL

19

RAIL

RAIL
1
2
RAIL
HARYANA

RAJGHAT TPS
BADARPUR TPS

3
4
5
6
7

RAIL
RAIL
RAIL
RAIL
RAIL

83

550.94

139

357.11

495.77

54

91.32

145.18

12.9
18.5
4.9

242.74

242.74

227.28

227.28

60.46

60.46

30
30
30

21
20.4
6.3

165.4

165.4

424.87

424.87

172.58

172.58

1630
665

15
25

24
7.2

363.98

363.98

37.02

37.02

OBRA TPS
PANKI TPS
PARICHHA TPS

1278
210
1140

20
20
30

11.7
2.6
14

314.29

314.29

49.04

49.04

60.11

DADRI (NCTPP)

1820

30

26.4

40
12
30
38
52
26
9

PUNJAB
19
12
12
8
21
28
15
5

CIL Supply 67% of ACQ

60.11

27
19
4

CIL Supply 110% of ACQ

109.47

114.71

CIL Supply: 97% of ACQ

126.45

126.45

** CIL Supply 101% of ACQ

8
5

CIL Supply 88% of ACQ

** CIL Supply: 94% of ACQ

20

PITHEAD

RIHAND STPS

3000

15

36.4

21
22

PITHEAD
RAIL

SINGRAULI STPS
TANDA TPS

2000
440

15
25

33.1
8.4

257.81

257.81

38.14

38.14

23

RAIL

UNCHAHAR TPS

1050

25

16.7

24

RAIL

ROSA TPP Ph-I

1200

25

15

105

246.03

351.47

23

25

PITHEAD

ANPARA C TPS

1200

25

14.2

65.41

65.41

28563

24

380.7

513

4884.9 5397.9

14

298.39

298.39

247.25

247.25

228.87

228.87

479.15

479.15

37
35
20
10
9
23
46
4

TOTAL OF N.R.

Inadequate linkage
CIL Supply 110% of ACQ

WESTERN
CHHATTISGARH
26
27
28
29
30
31
32
33

RAIL
PITHEAD
PITHEAD
PITHEAD
PITHEAD
RAIL
RAIL
RAIL

DSPM TPS
KORBA-II
KORBA-WEST TPS
KORBA STPS
SIPAT STPS
PATHADI TPP
BHILAI TPS
AKALTARA TPS

500
440
1340
2600
2980
600
500
600

15
15
15
15
20
15
25
20

8.2
7
11.7
45.7
42.5
7
6.7
7.1

RAIL
RAIL
RAIL
RAIL
RAIL

SIKKA REP. TPS


GANDHI NAGAR TPS
UKAI TPS
WANAKBORI TPS
SABARMATI (C STATION)

240
870
1350
1470
400

30
30
30
30
30

1.3
8.7
13.7
19.4
5.3

AMARKANTAK EXT TPS


SANJAY GANDHI TPS
SATPURA TPS
VINDHYACHAL STPS
BINA TPS

450
1340
1580
4260
500

15
20
20
15
25

5.3
16.5
17.3
56.6
7.5

25

36.05

60.97

208.27

208.27

28

634.16

661.97

492.4

493.29

63.48

63.48

392.2

392.2

160.59

160.59

48

256.52

304.84

31.03

31.03

80.32

88.06

273.73

274

417.38

417.38

532.46

532.46

44.24

44.24

GUJARAT
34
35
36
37
38

68
31
30
28
8

MADHYA PRADESH
39
40
41
42
43

PITHEAD
RAIL
RAIL
PITHEAD
RAIL

12
13
38
9
8

CIL Supply: 94% of ACQ

MAHARASHTRA
1420
2340

20
20

17.4
34.7

11

148.84

160.28

655.62

655.62

9
19

RAIL

BHUSAWAL TPS
CHANDRAPUR(MAHARASH
TRA) STPS
KHAPARKHEDA TPS

1340

25

17.5

18

85.03

103.5

RAIL
RAIL

KORADI TPS
NASIK TPS

1040
630

25
25

8.1
11.2

125.21

125.21

64.66

64.66

15
6

50.48

50.48

** Less Receipt CIL/SCCL

** Less import

44
45

RAIL
RAIL

46
47
48
49

RAIL

PARLI TPS

1130

25

15.6

50
51
52
53
54

RAIL
RAIL
RAIL
RAIL
RAIL

PARAS TPS
DAHANU TPS
WARDHA WARORA TPP
TIRORA TPS
BELA TPS

500
500
540
1980
270

25
25
20
20
20

6.4
10.1
5.3
18.1
2.4

188.02

188.02

134

93.82

227.57

0.12

2.76

16

281.26

296.83

30
23
1
16
0

55

RAIL

BUTIBORI TPP

300

20

3.6

56
57

RAIL
RAIL

AMARAVATI TPS
EMCO WARORA TPS

270
600

20
20

3.2
3.4

51.34

51.34

19.46

20.45

16
6

1000
35880

30
21

7.1
451.6

80.46

80.46

293

11
16

58
RAIL
TOTAL OF W.R.

MAUDA TPS

6720.8 7013.8

Unloading Constraint

CIL Supply 65% of ACQ

Data not received


Data not received

Inadequate coal availability

SOUTHERN
ANDHRA PRADESH
59

RAIL

Dr. N.TATA RAO TPS

1760

20

28.5

23

40.04

63.22

** CIL Supply: 61% of ACQ

60
61

RAIL
RAIL

KOTHAGUDEM TPS
RAYALASEEMA TPS

1720
1050

20
25

27.8
15.9

60.62

60.62

** Less Receipt

25

25

2
2

** Less receipt-SCCL

62
63
64

PITHEAD
RAIL
RAIL

RAMAGUNDEM STPS
SIMHADRI
KAKATIYA TPS

2600
2000
500

15
25
25

40.6
29.4
7.1

5
8
6

Less Receipt

Less receipt-SCCL

RAICHUR TPS
BELLARY TPS

1720
1000

30
30

23.3
14.1

1
5

ENNORE TPS
METTUR TPS
NORTH CHENNAI TPS
TUTICORIN TPS
VALLUR TPP

450
1440
1830
1050
1000

30
30
30
30
30

4.3
20
22.7
18.1
13.6

18120

25

265.4

401

210
220
2340

20
20
15

0.7
1.2
36.2

9.19

9.19

28.21

28.21

23

643.17

665.93

214.87

214.87

188

36.04

224.42

41.32

41.32

15.67

22.22

23

43.86

66.44

KARNATAKA
65
66

RAIL
RAIL

** Less import

Coal Sup.for U-2 yet to


commence

CIL Supply: 61% of ACQ

TAMIL NADU
67
68
69
70
71

INTER MODAL
INTER MODAL
INTER MODAL
INTER MODAL
RAIL

TOTAL OF S.R.

38.9

38.9

73

191.44

264.6

47

117.34

164.28

41

165.93

206.58

71.48

71.48

9
13
7
11
5

1062.5 1463.5

EASTERN
BIHAR
RAIL
72
73
RAIL
74
PITHEAD
JHARKHAND

BARAUNI TPS
MUZAFFARPUR TPS
KAHALGAON TPS

75
76
77
78

RAIL
ROAD
RAIL
RAIL

PATRATU TPS
TENUGHAT TPS
BOKARO `B` TPS
CHANDRAPURA(DVC) TPS

770
420
630
890

20
20
20
20

2.5
4
9.7
8.7

112.68

112.68

268.39

268.39

191.32

191.32

4.45

4.45

79
80
81

RAIL
RAIL
RAIL

MAITHON RB TPP
KODARMA TPP
MAHADEV PRASAD STPP

1050
1000
540

20
20
20

13.3
7.5
6.3

456.11

456.11

58

58

10.86

10.86

82
83
84

PITHEAD
PITHEAD
PITHEAD

IB VALLEY TPS
TALCHER (OLD) TPS
TALCHER STPS

420
470
3000

15
15
15

7.5
8.5
52.5

191.05

191.05

97.23

97.23

197

98.78

295.33

85
86

RAIL
RAIL

STERLITE TPP
KAMALANGA TPS

2400
350

20
20

15.6
5.1

444.88

444.88

31

53.28

84.65

14
24
18
45
67
20
1

** Less Receipt

34
8
2

** CIL Supply: 94% of ACQ

26
11
6

CIL Supply 87% of ACQ

ORISSA

29
17

WEST BENGAL
87
88
89

RAIL
RAIL
RAIL

DURGAPUR TPS
MEJIA TPS
BAKRESWAR TPS

340
2340
1050

20
20
20

3.8
22.7
14.4

176.84

176.84

96.19

96.19

19.83

19.83

90
91
92

RAIL
RAIL
RAIL

BANDEL TPS
D.P.L. TPS
KOLAGHAT TPS

450
630
1260

20
25
25

4.3
5.5
16.2

30.54

30.54

46.76

46.76

23.3

23.3

25.11

25.11

25.34

25.34

187.22

187.22

93
RAIL
94
RAIL
95
RAIL
96
RAIL
97
RAIL
98
RAIL
99
PITHEAD
100
RAIL
TOTAL OF E.R.

SAGARDIGHI TPS
SANTALDIH TPS
BUDGE BUDGE TPS
NEW COSSIPORE TPS
SOUTHERN REPL. TPS
TITAGARH TPS
FARAKKA STPS
DURGAPUR STEEL TPS

ALL INDIA TOTAL

(*) Critical i.e. stock less than 7 days in


(**) Super Critical i.e. stock less than 4 days in

600
980
750
160
135
240
2100
1000
26745

20
20
20
20
20
20
15
20
18

7.4
4.5
10.2
0.9
2
3.1
23.6
9.8
307.7

283

109308

22

1405

1491

29
12

47
4
1
7
9
1

Less import

** CIL Supply: 92% of ACQ

** CIL Supply 60% of ACQ

** Less import

3790.3 4073.3

3
6
18
11
24
17
14
9
13

16458

13

29

12

9.9

9.9

48.19

48.19

53.36

53.36

33

287.55

320.2

92.52

92.52

17949

TPSs {Includes super critical also}


TPSs

Less Receipt

CENTRAL ELECTRICITY AUTHORITY


OPERATION MONITORING DIVISION

DAILY COAL REPORT


COAL STOCKS POSITION AT VARIOUS THERMAL POWER STATIONS IN THE COUNTRY ( AS ON 30-JanREGION/
MODE OF
NAME OF
CAPACITY NORMAT DAILY
ACTUAL STOCK
CRITICAL
REASONS FOR CRITICAL
2014 )
STATE

TRANSPORT

THERMAL
POWER
STATION

(MW)

IVE
LINKAGE
STOCK
IN '000
Reqd.
TONNES
(DAYS)

COAL STOCK
IN COAL STOCK
DAY
S
<7
<4
DAYS DAYS

IN, 000 TONNES

Import Indigenous

Total

NORTHERN
DELHI
135
705

20
30

1.9
10.6

74.94

74.94

125.18

125.18

PANIPAT TPS
YAMUNA NAGAR TPS
RAJIV GANDHI TPS
INDIRA GANDHI STPP
MAHATMA GANDHI
TPS

1360
600
1200
1500
1320

25
25
25
25
25

19.6
6.9
12.3
19
16.7

66

518.9

584.91

58

196.56

254.37

GH TPS (LEH.MOH.)
ROPAR TPS
GND TPS(BHATINDA)

920
1260
440

30
25
30

KOTA TPS
SURATGARH TPS
CHHABRA TPP

1240
1500
750

RAIL
1
2
RAIL
HARYANA

RAJGHAT TPS
BADARPUR TPS

3
4
5
6
7

RAIL
RAIL
RAIL
RAIL
RAIL

8
RAIL
9
RAIL
10
RAIL
RAJASTHAN

81

544.66

625.28

135

366.31

500.83

54

98.18

152.03

12.9
18.5
4.9

233.63

233.63

230.08

230.08

63.21

63.21

30
30
30

21
20.4
6.3

157.15

157.15

413.92

413.92

173.37

173.37

40
12
30
37
51
26
9

PUNJAB

11
12
13

RAIL
RAIL
RAIL

18
12
13
7
20
28

UTTAR PRADESH
14
15

PITHEAD
RAIL

ANPARA TPS
HARDUAGANJ TPS

1630
665

15
25

24
7.2

359.54

359.54

36.08

36.08

16
17
18
19

RAIL
RAIL
RAIL
RAIL

OBRA TPS
PANKI TPS
PARICHHA TPS
DADRI (NCTPP)

1278
210
1140
1820

20
20
30
30

11.7
2.6
14
26.4

316.37

316.37

50.96

50.96

20

PITHEAD

RIHAND STPS

3000

15

21
22

PITHEAD
RAIL

SINGRAULI STPS
TANDA TPS

2000
440

23

RAIL

UNCHAHAR TPS

24

RAIL

25

PITHEAD

15
5

CIL Supply 67% of ACQ

No import

CIL Supply: 97% of ACQ


** CIL Supply 101% of ACQ

57.9

57.9

111.21

116.45

27
20
4
4

36.4

113.38

113.38

15
25

33.1
8.4

262.13

262.13

33.18

33.18

8
4

CIL Supply 88% of ACQ

1050

25

16.7

** CIL Supply: 94% of ACQ

ROSA TPP Ph-I

1200

25

15

105

244.37

349.1

23

ANPARA C TPS

1200

25

14.2

69.07

69.07

28563

24

380.7

503

4850.29 5353.06

14

DSPM TPS
KORBA-II
KORBA-WEST TPS
KORBA STPS
SIPAT STPS
PATHADI TPP
BHILAI TPS
AKALTARA TPS

500
440
1340
2600
2980
600
500
600

15
15
15
15
20
15
25
20

8.2
7
11.7
45.7
42.5
7
6.7
7.1

299.86

299.86

250.73

250.73

236.83

236.83

484.73

484.73

394.98

394.98

159.54

159.54

47

250.95

298.43

31.03

31.03

37
36
20
11
9
23
45
4

SIKKA REP. TPS


GANDHI NAGAR TPS
UKAI TPS
WANAKBORI TPS
SABARMATI (C
STATION)

240
870
1350
1470
400

30
30
30
30
30

1.3
8.7
13.7
19.4
5.3

TOTAL OF N.R.

Inadequate linkage
Inadequate linkage

WESTERN
CHHATTISGARH
26
27
28
29
30
31
32
33

RAIL
PITHEAD
PITHEAD
PITHEAD
PITHEAD
RAIL
RAIL
RAIL

GUJARAT
34
35
36
37
38

RAIL
RAIL
RAIL
RAIL
RAIL

80.32

88.63

279.19

279.46

413.58

413.58

530.15

530.15

42.3

42.3

69
32
30
27
8

Tapering Linkage

MADHYA PRADESH
39
40
41
42
43

PITHEAD
RAIL
RAIL
PITHEAD
RAIL

AMARKANTAK EXT
TPS
SANJAY GANDHI TPS
SATPURA TPS
VINDHYACHAL STPS
BINA TPS

450
1340
1580
4260
500

15
20
20
15
25

5.3
16.5
17.3
56.6
7.5

25

36.32

61.24

209.53

209.53

28

630.44

658.25

507.97

508.85

68.83

68.83

1420
2340

20
20

17.4
34.7

11

169.19

180.63

662.79

662.79

10
19

1340

25

17.5

19

84.09

102.76

Unloading Constraint

12
13
38
9
9

MAHARASHTRA
44
45

RAIL
RAIL

46

RAIL

BHUSAWAL TPS
CHANDRAPUR(MAHA
RASHTRA) STPS
KHAPARKHEDA TPS

47
48

RAIL
RAIL

KORADI TPS
NASIK TPS

1040
630

25
25

8.1
11.2

125.98

125.98

67.52

67.52

16
6

CIL Supply 65% of ACQ

49

RAIL

PARLI TPS

1130

25

15.6

57.02

57.02

Less Receipt CIL/SCCL

50
51
52
53
54

RAIL
RAIL
RAIL
RAIL
RAIL

PARAS TPS
DAHANU TPS
WARDHA WARORA
TPP
TIRORA TPS
BELA TPS

500
500
540
1980
270

25
25
20
20
20

6.4
10.1
5.3
18.1
2.4

189.37

189.37

133

101.39

234.69

55

RAIL

BUTIBORI TPP

300

20

56
57

RAIL
RAIL

AMARAVATI TPS
EMCO WARORA TPS

270
600

58
RAIL
TOTAL OF W.R.

MAUDA TPS

2.39

269.65

277.99

30
23
0
15
0

3.6

20
20

3.2
3.4

51.31

51.31

19.29

20.28

16
6

1000
35880

30
21

7.1
451.6

81.32

81.32

285

6786.2

7071

11
16

1760

20

28.5

26

35.38

61.28

** CIL Supply: 61% of ACQ

62.39

62.39

** Less receipt-SCCL
** Less receipt-SCCL

** Less import
Data not received
Data not received

Inadequate coal availability

SOUTHERN
ANDHRA PRADESH
59

RAIL

Dr. N.TATA RAO TPS

60

RAIL

KOTHAGUDEM TPS

1720

20

27.8

61

RAIL

RAYALASEEMA TPS

1050

25

15.9

26.7

28.81

62

PITHEAD

RAMAGUNDEM STPS

2600

15

40.6

227.01

227.01

Less Receipt CIL/SCCL

63
64

RAIL
RAIL

SIMHADRI
KAKATIYA TPS

2000
500

25
25

29.4
7.1

189

40.85

229.65

41.5

41.5

8
6

Less receipt-SCCL

KARNATAKA
65

RAIL

RAICHUR TPS

1720

30

23.3

16

30.64

46.34

** Less Receipt CIL/SCCL

66

RAIL

BELLARY TPS

1000

30

14.1

21

30.44

51.36

Coal Sup.for U-2 yet to commence

ENNORE TPS
METTUR TPS
NORTH CHENNAI TPS
TUTICORIN TPS
VALLUR TPP

450
1440
1830
1050
1000

30
30
30
30
30

4.3
20
22.7
18.1
13.6

CIL Supply: 61% of ACQ

18120

25

265.4

409

210
220
2340

20
20
15

0.7
1.2
36.2

9.19

9.19

26.24

26.24

29

644.95

673.83

770
420
630
890

20
20
20
20

2.5
4
9.7
8.7

112.68

112.68

269.51

269.51

189.94

189.94

15.53

15.53

1050
1000
540

20
20
20

13.3
7.5
6.3

464.52

464.52

57.36

57.36

11.28

11.28

TAMIL NADU
67
68
69
70
71

INTER
MODAL
INTER
MODAL
INTER
MODAL
INTER
MODAL
RAIL

TOTAL OF S.R.

39.1

39.1

76

187.64

263.56

42

124.9

166.45

39

175.55

214.06

59.93

59.93

9
13
7
12
4

1082.04 1491.44

EASTERN
BIHAR
72
RAIL
73
RAIL
74
PITHEAD
JHARKHAND

BARAUNI TPS
MUZAFFARPUR TPS
KAHALGAON TPS

75
76
77
78

RAIL
ROAD
RAIL
RAIL

PATRATU TPS
TENUGHAT TPS
BOKARO `B` TPS
CHANDRAPURA(DVC)
TPS

79
80
81

RAIL
RAIL
RAIL

MAITHON RB TPP
KODARMA TPP
MAHADEV PRASAD
STPP

14
23
19
45
67
20
2

** Coal Sup. for U-8 yet to start

35
8
2

** Tapering Linkage

ORISSA
82
83
84

190.9

190.9

99.64

99.64

204

102.8

306.37

437.54

437.54

30

47.3

77.61

178.23

178.23

94.6

94.6

14.4

16.23

20
25
25

4.3
5.5
16.2

0
0

600
980
750
160
135
240
2100
1000

20
20
20
20
20
20
15
20

7.4
4.5
10.2
0.9
2
3.1
23.6
9.8

26745

18

307.7

297

3811.16 4108.22

13

109308

22

1405

1494

16529.6 18023.7

13

28

12

IB VALLEY TPS
TALCHER (OLD) TPS
TALCHER STPS

420
470
3000

15
15
15

7.5
8.5
52.5

85
RAIL
86
RAIL
WEST BENGAL

STERLITE TPP
KAMALANGA TPS

2400
350

20
20

15.6
5.1

87
88

RAIL
RAIL

DURGAPUR TPS
MEJIA TPS

340
2340

20
20

3.8
22.7

89

RAIL

BAKRESWAR TPS

1050

20

90
91
92

RAIL
RAIL
RAIL

BANDEL TPS
D.P.L. TPS
KOLAGHAT TPS

450
630
1260

93
94
95
96
97
98
99
100

RAIL
RAIL
RAIL
RAIL
RAIL
RAIL
PITHEAD
RAIL

SAGARDIGHI TPS
SANTALDIH TPS
BUDGE BUDGE TPS
NEW COSSIPORE TPS
SOUTHERN REPL. TPS
TITAGARH TPS
FARAKKA STPS
DURGAPUR STEEL
TPS

PITHEAD
PITHEAD
PITHEAD

TOTAL OF E.R.
ALL INDIA TOTAL

(*) Critical i.e. stock less than 7 days in


(**) Super Critical i.e. stock less than 4 days in

28
12

TPSs
TPSs

26
12
6

CIL Supply 87% of ACQ

47
4

Coal Sup. for U-8 yet to start

16.23

** CIL Supply: 92% of ACQ

28.46

28.46

46.76

46.76

30.98

30.98

7
9
2

** CIL Supply 60% of ACQ

22.26

22.26

** Less import

31.79

31.79

186.32

186.32

9.68

9.68

50.19

50.19

51.02

51.02

34

287.18

321.48

98.08

98.08

28
15

3
7
18
10
25
17
14
10

{Includes super critical also}