Anda di halaman 1dari 18

AI ~ HI cl [)

WD3
NOTE
1.0NL Y WRITTEN
DIMENSIONS TO BE
IGB1 0) FOLLOWED.
0) 2 .. EXCAVATION UPTO
...-
~ HARD STRATA.
3. THIS DRAWING
SHOULD BE READ IN
CONJUCTION WITH
STRUCTURAL
DRAWING.
4.THE DRAWING
SHOULD BE

...- THROUGHL Y
III
3 (9 DINNING ...- 3 UNDERSTOOD AND
F.F.L. 2' M DOUBTS, IF ANY
III
(9 SHOULD BE
0 0 CLARIFIED BEFORE
COMMENCEMENT. LO C\I III o,

KITCHEN F.F.L. 2'

STAIR LOBBY F.F.L. 2'

DRAWING:

PLINTH LEVEL. PLAN

PB 7

ISSUED FOR:

EXECUTION

D ATE :2nd JUN 2008

C\I ""'" C\I C\I

III III a.. a..

2

2

LEGENDS

L...-------II G ROU N D BEAM

I I PLINTH BEAM

_ COLUMN

_ STUB COLUMN v;a SUNKEN FLOOR

AR. S. G. BHATE

RESIDENCE FOR PROF. SUNIL TAMBE AT DHULE

00 C\I III (9

co

...-

III (9

drawn by: sachin

i BED RM. . F.F.L. 2'

I

o 16" 32" 64"

d-9 durvankur society I, panchavati, pashan, pune-OB ph(O 2 0) 2 5 B 9 9 5 2 7 email_shrikantbhate@rediffmail.com

LO

...-

III (9 "-------1-------

SCALE

PLINTH LEVEL PLAN BI

AI

D

1

AI

ci

3

mass excavation of black cotton soil

LEVELS:

P LIN T H (FINISHED): 2' ,0"

P B - BOT TOM : 0', 2 -3/4" GR. L V L.: 0', 0"

G B - BOT TOM : - I' ,4- 1/2"

1

skelch : PLINTH LEVEL STUDY CI

n

3

2

D

DRAWING:

PLINTH LEVEL STUDY

ISSUED FOR:

REFERENCE

D ATE :5th JUN 2008

RESIDENCE FOR PROF. SUNIL TAMBE AT DHULE

AR. S. G. BHATE

d-9 durvankur society I, panchavati, pashan, pune-08 ph(O 2 0) 2 5 8 9 9 5 2 7 email_shrikantbhate@rediffmail.com

drawn by: sachin

AI

PLEASE PAY KEEN AnENTION TO :

** TOP OF THE BRICK LEVELLING COURSE SHOULD BE AT 100 ( 4") BELOW RELATIVE UNFINISHED FLOOR LEVEL

SINGLE COURSE

BEAMS OF3 EPTH

living room UFL.:+250

3

verandah

UFL.:

2

sketch: 5KICK LEVELLING COUKSES LAYOUT CN-E VIEW)

D

3

ISSUED FOR:

ACQUAINTANCE

D ATE: 20th JUN 2008

1

NOTE

1.0NL Y WRITTEN DIMENSIONS TO BE FOLLOWED.

2 .. EXCAVATION UPTO HARD STRATA.

3. THIS DRAWING SHOULD BE READ IN CONJUCTION WITH STRUCTURAL DRAWING.

4. THE DRAWING SHOULD BE THROUGHL Y UNDERSTOOD AND DOUBTS, IF ANY, SHOULD BE CLARIFIED BEFORE COMMENCEMENT.

DRAWING:

PLINTH STUDY

2

RESIDENCE FOR PROF. SUNIL TAMBE AT DHULE

u

lB. S. G. BHITE

d-9 durvankur society I, panchavati, pashan, pune-08 ph(O 2 0) 2 5 8 9 9 5 2 7 email_shrikantbhate@rediffmail.com

drawn by: sachin

ci

PLEASE PAY KEEN AnENTION TO :

** TOP OF THE BRICK LEVELLING COURSE SHOULD BE AT 100 ( 4") BELOW RELATIVE UNFINISHED FLOOR LEVEL

70mm .:+400mm

3

car porch UFL.:+ 100

INGLE COURSE ON

S OF300 DEPTH

2

sketch: 5KICK LEVELLING COUKSES LAYOUT (S-W VIEW)

[)

3

ISSUED FOR:

ACQUAINTANCE

D ATE: 20th JUN 2008

NOTE

1.0NL Y WRITTEN DIMENSIONS TO BE FOLLOWED.

2 .. EXCAVATION UPTO HARD STRATA.

3. THIS DRAWING SHOULD BE READ IN CONJUCTION WITH STRUCTURAL DRAWING.

4. THE DRAWING SHOULD BE THROUGHL Y UNDERSTOOD AND DOUBTS, IF ANY, SHOULD BE CLARIFIED BEFORE COMMENCEMENT.

DRAWING:

PLINTH STUDY

2

RESIDENCE FOR PROF. SUNIL TAMBE AT DHULE

AR. S. G. BIATE

d-9 durvankur society I, panchavati, pashan, pune-OB

ph(O 2 0) 2 5 B 9 9 5 2 7 email_shrikantbhate@rediffmail.com

drawn by: sachin

cl

D

3

3

NOTE

1.0NL Y WRITTEN DIMENSIONS TO BE FOLLOWED.

2 .. EXCAVATION UPTO HARD STRATA.

3. THIS DRAWING SHOULD BE READ IN CONJUCTION WITH STRUCTURAL DRAWING.

4. THE DRAWING SHOULD BE THROUGHL Y UNDERSTOOD AND DOUBTS, IF ANY, SHOULD BE CLARIFIED BEFORE COMMENCEMENT .

car porch UFL.:+ 100

. "

DRAWING:

PLINTH STUDY

. : liVing roornl.L .. . UFL.:+250

ISSUED FOR:

ACQUAINTANCE

D ATE: 20th JUN 2008

2

2

RESIDENCE FOR PROF. SUNIL TAMBE AT DHULE

AB. S. G. BHATE

d-9 durvankur society I, panchavati, pashan, pune-08 ph(O 2 0) 2 5 8 9 9 5 2 7 email_shrikantbhate@rediffmail.com

drawn by: sachin

sketch:5RICK LEVELLING COURSES LAYOUT (S-W VIEW)

D

1

cl

3

KIND

FROM

2

I.e. 2 I 50 UNFINIS

PLINTH LVL (+550)

I.e. 2520 UNFINIS

PLINTH LVL (+550)

1

3

2

D

D

NOTE:

THE DRAWING SHOULD BE READ IN CONJUNCTION WITH STRUCTURAL

DRAWl NG FOR SIZES OF STRUCTURAL ELEMENTS.

DRAWING:

ISSUED FOR:

DATE:

RESIDENCE FOR PROF. SUNIL TAMBE AT DHULE

AB. S. G. BHATE

d-9 durvankur society I, panchavati, pashan, pune-08 ph(O 2 0) 2 5 8 9 9 5 2 7 email_shrikantbhate@rediffmail.com

drawn by: sachin

(~2

ci

3

2

52

UFT.: +3550

bed room

52

UFT.: +3550 etudro

A

B

1

D

2

D

NOTE:

THE DRAWING SHOULD BE READ IN CONJUNCTION WITH STRUCTURAL DRAWING FOR SIZES OF STRUCTURAL ELEMENTS.

DRAWING:

ISSUED FOR:

DATE:

RESIDENCE FOR PROF. SUNIL TAMBE AT DHULE

AB. S. G. BHATE

d-9 durvankur society I, panchavati, pashan, pune-08 ph(O 2 0) 2 5 8 9 9 5 2 7 email_shrikantbhate@rediffmail.com

drawn by: sachin

81

cl

3

1115

2

1

D

3

2

D

DRAWING:

STUDY OF TOILET SUNKS

ISSUED FOR:

DATE:

RESIDENCE FOR PROF. SUNIL TAMBE AT DHULE

AB. S. G. BHATE

d-9 durvankur society I, panchavati, pashan, pune-08 ph(O 2 0) 2 5 8 9 9 5 2 7 email_shrikantbhate@rediffmail.com

drawn by: sachin

D

3

2

B

C

D

1

l~()l\ nJ~SI(JN

DRAWING:

STUDY OF THE CORNER WINDOW ISSUED FOR:

DATE:

RESIDENCE FOR PROF. SUNIL TAMBE AT DHULE

AB. S. G. BHATE

d-9 durvankur society I, panchavati, pashan, pune-08 ph(O 2 0) 2 5 8 9 9 5 2 7 email_shrikantbhate@rediffmail.com

drawn by: sachin

(~15

sketch: FRAME AT GROUND LEVEL (S-E VIEW)

D

Ifon Ims{(JN 1)IS(~lJSSION

DRAWING:

STUDY OF THE STRUCTURE

ISSUED FOR:

DATE:

RESIDENCE FOR PROF. SUNIL TAMBE AT DHULE

AB. S. G. BHATE

d-9 durvankur society I, panchavati, pashan, pune-08 ph(O 2 0) 2 5 8 9 9 5 2 7 email_shrikantbhate@rediffmail.com

drawn by: sachin

A

D

B

C

1

Anda mungkin juga menyukai