Most of Egypts oil has been consumed domestically Estimated demand to increase at a rate of 1500 to 2000MW per year Hydro potential has already been saturated Investment cost in Solar power is high Zafarana wind farm is one of the largest onshore in the world No of wind energy projects in pipeline
What is in it for Egypt? Estimated Turn Over in Egypt (Appx. Egp 2.8 Billion) by 2020 250MW wind energy installed, would save 1,47,560 T.O.E. & reduce emissions of about 347222 TCO2 (Source: Projection on NREA statistics) Creation of immediate jobs. Approximate indirect development of local subsuppliers & related supporting industries.
Opportunities Estimated increase in demand for energy Hydro-power potential is saturated Has worlds one of the best wind resources Financial funding by government Custom duty exception and sales tax exceptions 700 sq kms of land given for private players High Un-employment rate
Threats Un-stable socio-political environment Currency Threat Gap between de-facto and de jure Dispute settlement mechanism Decisions made on ad-hoc basis Soil Condition in Egypt
Strengths Technical expertise in wind power generation High capital backing of Reliance Group JV with chinas low cost wind turbine makers Diversified business covering infra-structure and power Successfully completed wind-farm in India (100 MWs) at various locations Capital backing from Exim bank for 900 MWs of renewable energy
Weakness International exposure Dis-economies to scale Over-leverage financial position Trained manpower for O&M in Egypt
Legal Requirements Power Generation License Power transmission License Verification of License every year Environmental feasibility report Adherence to the set specifications for design, construction, modification and operation Compliance with the transmission code Financial Analysis 250 MW plant generates 10,000,000 KWH Capital Investment cost 300,000,000 USD Avg Cost of Energy per unit 0.07 USD O&M cost 25% of per year generation 20000USD Payback period expected 5 yrs