GPEC

Global Delivery Readiness



COPYRIGHT 2011 ALCATEL-LUCENT. ALL RIGHTS RESERVED.

1830 PSS 32/16
System Turn Up and Commissioning
4
May 2012
Release 5.0
All Rights Reserved Alcatel-Lucent 2011
Module Outline

Part 4 - System Turn Up and Commissioning

1. System Provisioning

1. Establish connection to the network
2. Connect outside plant fiber
3. DCU Adjustment
2. Commissioning

3. Verifications and Backup


All Rights Reserved Alcatel-Lucent 2011
System Turn Up and Commissionning
System Provisioning

Establish connection to the network
All Rights Reserved Alcatel-Lucent 2011
Exercises - Starting 1354 RM-PhM
Make sure services are started (apache ftp, MySQL, PhM)
1. Start the 1354 RM-PhM application on your PC.
2. Click the Change Server/Port
3. Enter the IP address of your PC(localhost) in the Server, or the server
provided for Management.
User name and Password: If this is your first time logging in, the User
name is admin and Password is tropxnms. You will then be required to
change the password. (exple:tr0pxnms)
All Rights Reserved Alcatel-Lucent 2011
Exercises - Establish connection to the network
This procedure will establish connection to the network and discover all the
network elements.
Refer to your 1830 PSS-32/16 Installation Guide, Part IV, Chapter 10, and perform
Establish connection to the network procedure.

Connect the Line Fiber to the NEs of the Network
Connect the craft terminal to CIT port of the EC board

1. Change the CIT IP address to a unique subnet within the entire DCN
2. Start the 1354 RM-PhM
3. select Maintenance /Auto Discovery/ Auto Discovery by IP
4. Select File /New NE/ create network element with CIT IP address

Additional network elements will being appearing in the map view.
All Rights Reserved Alcatel-Lucent 2011
Connecting local 1354 RM-PhM throughout the Network via CIT port
While connecting through the CIT port of the EC
board, the CIT IP address should be modify so as to
be able to reach the next NEs in the network. The
purpose is to change the CIT IP address on which you
are connected to a unique subnet within the entire
DCN.
In CLI type: config interface ec cit ip 172.16.2.1/24
Re-connect to CLI: config int ec cit red enable
You are then able to establish connection with all NE
of the Network.
NE 1 NE 2 NE 3
172.16.2.1/24 172.16.0.1/24 172.16.0.1/24
Local (craft Terminal)
1354 RM-PhM
OK
CIT IP
NE 1 NE 2 NE 3
172.16.0.1/24 172.16.2.1/24 172.16.0.1/24
Local (craft Terminal)
1354 RM-PhM
NOK
CIT IP
NE 1 NE 2 NE 3
172.16.11.1/24 172.16.12.1/24 172.16.13.1/24
Local (craft Terminal)
1354 RM-PhM
CIT IP
OK
At the end of the operation on this NE, you may
change the CIT IP address back to its default
(172.16.0.1)
However, during the deployment process, you may be
willing to connect your local 1354 RM-PhM to another
site. You may then perform the same steps and meet
this configuration.
The 1354 RM-PhM has already allocated the CIT
address to NE1 in its database and it will encounter
a conflict.
Hence it is recommended, during the time of the
deployment, to modify the CIT IP address of every
NE of the network by defining a unique subnet for
every NE, as shown:
You will then be able to connect you local 1354 RM-
PhM to any site.
Observed with1354 RM-PhM R7.x
All Rights Reserved Alcatel-Lucent 2011
System Turn Up and Commissionning
System Provisioning

Connect outside plant fiber
All Rights Reserved Alcatel-Lucent 2011
System Turn Up steps
CPB
Provision using Plan
Greenfield
Connect outside
plant fiber
System Type ?
TOADM
RING
system
Establish
Network
Connection
NE
provisionning
Yes
Unkeyed Och
System?
No
specific
Line with External
Raman Pump ?
Yes
No
Set LD Power
Managment type to
Manual Mode
FOADM only
System ?
No
Yes
Do not perform
Greenfield
Wizard
Execute Greenfield
using Plan
Line with External
Raman Pump ?
Yes
No
Set LD Power
Managment type to
Auto Mode
Delete service-
Power
Commissioning
END
TOADM
LINEAR System
/ Mixed FOADM
Provision required
Wavelength Service
Power A-Z & Z-A
Adjustment
Is the Status of all
LD in the system
completed
?
Adjust Un-completed
EGRESS and
INGRESS points
No
Yes
Applied to:
Terminal end
EGRESS
Neighbour to
Terminal INGRESS
To be
discussed
All Rights Reserved Alcatel-Lucent 2011
Connect outside plant fiber
Span loss calculation should be as close as possible from the minimum Loss given
in EPT file
The EPT file will be updated if calculation does not match the actual loss !
Note:
The OSC span loss calculation in not a Fiber Optic Characterisation.
Remind that additional loss might be introduced within the head of the Line Cable and
the NE (such as bad connectors, dirty fibers, ODF Insertion loss, etc)
NE2
NE1
LD
OSC
LD
OSC
Span loss= OPT NE1 OPR NE2
Span loss= OPT NE2 OPR NE1
NE side
NE side
LINE
All Rights Reserved Alcatel-Lucent 2011
Exercises - Connect outside plant fiber
This procedure will connect the outside plant fiber to the ingress and
egress LD circuit packs on the Alcatel-Lucent 1830 PSS-32/PSS-16. The
fiber loss will be checked and proper connectivity verified.
Refer to your 1830 PSS-32/16 Installation Guide, Part ///, Chapter 9, and perform
Connect outside plant fiber procedure.

1. Connect the outside plant fibers to the appropriate LINE ports
2. From WebUi, select the OSC port of an LD pack facing a line that has been
connected at the neighbor node
3. Select: Performance / Clear bins
4. Select: Performance / PM Group / OPT
5. Select: Performance / PM Group / OPR
6. Repeat for each of the lines as they are connected to the neighbor nodes.
7. Calculate the span loss. These values should be provided to the EPT owner to
compare with the EPT span loss

All Rights Reserved Alcatel-Lucent 2011
System Turn Up and Commissionning
Commissioning

DCU Adjustment
All Rights Reserved Alcatel-Lucent 2011
System Turn Up and Commissionning
DCU Adjustment
The DCU is provided with an attenuator to pad out the loss to 10 dB for use with
legacy amplifiers that require 10 dB mid-stage loss
If a double DCU, or different DCU has to be installed, make the adjustment of
interstage with a Power Meter so as to get 10dB attenuation.

Note: Modulare Amplifier AM2125A & B
Modular Amplifier with low loss DCM have a mid-stage attenuation of 4dB
DCM bypass does not require an attenuator
Line Driver
S
I
G

Mid-stage LOSS
min 9 db
Max 11 dB
xdB
PAD
Mid stage LOSS = DCU Loss +
PAD + connector loss
measure 10+/-1 dB attenuation with
Power Meter
LIN
E
DCU 2 DCU1
All Rights Reserved Alcatel-Lucent 2011
Module Outline

Part 4 - System Turn Up and Commissionning


1. System Provisioning

2. Commissioning
NE Provisioning
Power Commissioning on TOADM Ring System
Commission a TOADM linear system
Provision New Wavelength Services
Complete commissioning on TOADM Linear System
Commission a FOADM linear system

3. Verifications and Backup
All Rights Reserved Alcatel-Lucent 2011
System Turn Up and Commissionning
Commissioning

NE Provisioning
All Rights Reserved Alcatel-Lucent 2011
Preconditioning
This procedure will ensure that the network and PC are ready for commissioning
using the 1354 RM-PhM.
1. Ensure that all the outside plant fibers (or test set) have been properly
connected to the correct line driver cards on each network element.
2. Verify one pair of OT cards is installed and fibered on the end terminals for a
TOADM system.
3. Obtain the loop back IP addresses of all the NEs in the network.
4. Determine which NE in the network will be used as the connection
commissioning process, as directed by your instructor. Obtain the OAMP port
IP address.
5. Obtain the xml commissioning file produced by EPT and used for
commissioning.
6. Ensure that both the client and server 1354 RM-PhM software has been
installed on the PC. Refer to the 1354 RM-PhM Photonic Manager EMS
Reference Guide for detailed procedures on installing and configuring the
software.


All Rights Reserved Alcatel-Lucent 2011
Exercises - Provision the system
This procedure will provision the cards, power attributes and topological links
for all the NEs in a system as defined in the EPT output file.
Refer to your 1830 PSS-32/16 Installation Guide, Part IV, Chapter 10, and perform
Provision the system procedure.

1. From PhM / Provision -> Launch CPB
2. Type the 1354 RM-PhM user name and password
3. Select Commissioning -> Provision System (using plan)
4. Select NE (one or several)
5. Next/Next/ then Browse button and browse to the folder containing the EPT
commissioning file for the system to be commissioned

Review the error report and troubleshoot any problems encountered.
All Rights Reserved Alcatel-Lucent 2011
Provision the system (continue)
Provisioning Steps:

1. validates any existing card slot assignments.
2. provisions topological links for NEs.
3. preprovisions any required cards defined in the plan (optional).
4. provisions non-OT cards admin states to "up" (optional).
5. provisions Optical Power Level Management (optional).
All Rights Reserved Alcatel-Lucent 2011
Provision the system (continue)
validates any existing card slot
assignments.
provisions topological links for NEs.

View from WebUI:
Connection / Physical Topology
Port highlighted in blue are admin
up
Green logo underneath indicate
connection
Click on the port to check its
connection

All Rights Reserved Alcatel-Lucent 2011
Provision the system (continue)
provisions Optical Power Level Management
Line driver SIG port detail:
Default values
before
provisionning
LD values
provisionned
All Rights Reserved Alcatel-Lucent 2011
Provision the system (continue)
provisions Optical Power Level Management (optional).
Default values
before
provisionning
Note that
Commissioned status is
IN PROGRESS
All Rights Reserved Alcatel-Lucent 2011
System Turn Up and Commissionning
Commissioning

Power Commissioning on TOADM Ring System
All Rights Reserved Alcatel-Lucent 2011
Power Commissioning of a TOADM Ring System
The Power Commissioning of a Linear System requires to perform the
power adjustement using the CPB/ Greenfield Wizard.
1. Perform System Provisioning
2. Perform Greenfield using Plan

For a Ring System, all Line Drivers adjustment will be in state
completed after the process.
TOADM
RING System
L
D

L
D

T
h
r
u

A
A
LD
C
W
R
8

LD
C
W
R
8

Thru
A A
L
D

CWR8
L
D

CWR8
T
h
r
u

A
A
A
LD
C
W
R
8

LD
C
W
R
8

Thru
A
CWR8
CWR8
All Rights Reserved Alcatel-Lucent 2011
Thru LD
CWR8
OMD
CLS
CWR-8
LD
OMD
CLS
LD
C
W
R
-
8

L
D

O
M
D
C
L
S

ASE
1 2 3
Thru
CWR8
OMD
CLS
CWR-8
LD
OMD
CLS
Adjustment
Completed
EGRESS
Adjustment
completed
Light emitting
INGRESS
Adjustment
completed
4 5
EGRESS
Adjustment
completed
6
7
INGRESS
Adjustment
completed
Adjustment
Completed
8
1. In A to Z direction, LD emit light (ASE) toward Egress LD through CWR.
2. EGRESS point is adjusted.
3. Next NE receive Light INGRESS point is adjusted.
4. In Z to A direction, LD emit light (ASE) toward Egress LD through CWR.
5. EGRESS point is adjusted.
6. The LD adjustement is completed
7. Next NE receive Light INGRESS point is adjusted.
8. The LD adjustement is completed
9. Process is applied on every span.
A to Z
Z to A
Power Commissioning of a TOADM Ring System
CPB tool - Greenfield
All Rights Reserved Alcatel-Lucent 2011
System Turn Up and Commissionning
Commissioning

Commission a TOADM linear system
All Rights Reserved Alcatel-Lucent 2011
Commission a TOADM Linear System
The auto managed lines on a linear system adjacent to the terminal sites as
well as the terminal sites themselves will not complete using the
commissioning wizard. Those lines must have further power adjustments to
complete commissioning.
Identify the two terminal nodes and their immediate neighbors in the linear
system. These four nodes have lines that will need power adjustments.
A service must be created to complete the commissioning on these nodes
LD
C
W
R
8

LD
C
W
R
8

Thru
LD
C
W
R
8

LD
C
W
R
8

Thru
LD
C
W
R
8

LD
C
W
R
8

LD
C
W
R
8

Thru
A
1
A
A A
LD
C
W
R
8

A
A A
2 3 4
A
Service Service
All Rights Reserved Alcatel-Lucent 2011
LD
Commission a TOADM Linear System
Greenfield
Perform GREENFIELD using Plan:
1. Intermediate spans are adjusted with ASE
2. LD neighbours of Line Terminal are partially adjusted
3. No Emitting light can achieve the adjustment
4. The LD adjustment at End Terminal & neighbours is skipped
A service must be created to complete adjustment
CWR-8
OMD
CLS
1
2
3
LD
Thru
CWR8
OMD
CLS
CWR-8
LD
OMD
CLS
CWR-8
LD
OMD
CLS
LD
Thru
CWR8
OMD
CLS
CWR-8
LD
OMD
CLS
E
N
D

T
E
R
M
I
N
A
L

E
N
D

T
E
R
M
I
N
A
L

NE A
NE B
NE C
NE Z
Adjustment
completed
EGRESS
completed
Adjustment
completed
2
EGRESS
completed
INGRESS
completed
INGRESS
completed
3
All Rights Reserved Alcatel-Lucent 2011
E
N
D

T
E
R
M
I
N
A
L

LD
Commission a TOADM Linear System
complete Commissioning
Completing commissioning:
1. Create a service between A and Z NE and run Power Management
2. Adjust Egress Power
3. Terminal A EGRESS LD is adjusted and LD completed
4. Adjust Ingress Power
5. Next INGRESS point is adjusted and LD completed
6. Repeat steps for Z to A direction (NE Z and NE C)
A to Z
CWR-8
OMD
CLS
1
2
3
4
LD
Thru
CWR8
OMD
CLS
CWR-8
LD
OMD
CLS
5
CWR-8
LD
OMD
CLS
LD
Thru
CWR8
OMD
CLS
CWR-8
LD
OMD
CLS
E
N
D

T
E
R
M
I
N
A
L

NE A
NE B
NE C
NE Z
Z to A
EGRESS
completed
Adjustment
completed
INGRESS
completed
Adjustment
completed
6
EGRESS
completed
Adjustment
completed
INGRESS
completed
Adjustment
completed
commission Greenfield system
All Rights Reserved Alcatel-Lucent 2011
Exercises - Power Commissioning
This procedure will perform power commissioning on the network using
parameters provided by the EPT output file.

1. Lauch CPB
2. Execute Commission Greenfield system using plan
3. Check if the process has been achieved successfully: check the
warning message in the logs.
4. Proceed to View Report and check the presence of errors
5. Check the Commissioning Status of Amplifiers :
1. Select Line port of Ingress amplifier
2. Select Power adjustment Tab
3. Check if Status is Completed or In progress
4. On PhM, select Line port of the Ingress LD and check Power commissioning
mngt
5. True means complteted/false for in progress..
6. Proceed to Power Balancing to achieve commissioning

All Rights Reserved Alcatel-Lucent 2011
System Turn Up and Commissionning
Commissioning

Provision New Wavelength Services
All Rights Reserved Alcatel-Lucent 2011
Exercises - Provision New Wavelength Services
With 1354 RM-PhM
Use this procedure to establish a new wavelength service.
1. Double Click the NE from the Network Map to enter the Inventory View.
2. Branch the Equipment Tree down to view the cards.
3. Highlight the Transponder Network Port and in the Right Side Pane set the Programmed
ITU Channel and then click Apply.
4. Right Click on the Transponder Network Port and set it to Admin Up AINS.
5. Right Click on the Transponder Client Port and set it to Assigned.
6. Set the Client Signal Type if required.
7. Right Click on the Transponder Client Port and set the Signal Timeslot if required.
8. Right Click on the Transponder Client Port and set it to Admin Up AINS.
9. Exit the Inventory Window and return to the Network Map.
10. Highlight the NE and click on the Topology Button on the Tool Bar.
11. Create the Transponder Line Port Topology Link to either a Filter Port or a Colorless
Port as required.
12. Exit the Topology Window and return to the Network Map.
All Rights Reserved Alcatel-Lucent 2011
Exercises - Provision New Wavelength Services (continue)
With 1354 RM-PhM
Use this procedure to establish a new wavelength service.

13. Highlight both Nodes that are end points for the new Wavelength Service and then go
to Provisioning and Provision New Wavelength Service.
14. Enter all of the necessary information for the new wavelength service and create it.
15. Check Force cross-connection
16. Verify both A to Z and Z to A directions of the circuit through Wave Tracker and
enable the 10 second auto refresh function.
17. When both directions are all green, a test set can be setup at one client port end and a
fiber loop at the other client port end to perform the Error Free Testing observe
optical TX and RX levels and install attenuators as needed.
18. Capture the test results from the test set as proof of the Error Free Tests.
All Rights Reserved Alcatel-Lucent 2011
System Turn Up and Commissionning
Commissioning

Complete commissioning on TOADM Linear System
All Rights Reserved Alcatel-Lucent 2011
Exercises - Power Commissioning
Complete Commissioning



1. Lauch CPB
2. One wavelength has been created through the system
3. Execute Power Balance System using plan
4. Check if the process has been achieved successfully: check the
warning message in the logs.
5. Proceed to View Report and check the presence of errors
All Rights Reserved Alcatel-Lucent 2011
System Turn Up and Commissionning
Commissioning

Commission a FOADM linear system
All Rights Reserved Alcatel-Lucent 2011
Exercises - Commission a FOADM System
This procedure will verify the Commission Greenfield System wizard procedure
completed successfully for each NE in the FOADM linear system.
1. Refer to your 1830 PSS-32/16 Installation Guide, Part IV, Chapter 10, and
perform Commission a FOADM system procedure.
LD
S
F
D

LD
S
F
D

PAD
Thru
LD
S
F
D

LD
S
F
D

LD
S
F
D

PAD
Thru
LD
S
F
D

Thru Band Thru Band
NE 1
A
1
NE 2
M
M
2
3
NE 4
A
4
NE 3
M
M
2
3
Service
All Rights Reserved Alcatel-Lucent 2011
Manual Power Adjustment
All Line Drivers in Manual Mode
Adjust OT
Power Z-bar
to mid range
Adjust
INGRESS LD
Gain
until ch. Level
is green within
the Z-bar at LD
EGRESS point
Adjust
EGRESS LD
(OT Tx)
Measure Power at
the Ingress SIG
OUT port
Calculate delta
between actual
and expected
value
Add delta to Power
Gain value
until ch. Level is in
the middle of Z-bar
at SIG OUT point
Adjust
EGRESS LD
(Add PAD)
Measure Power at
the EGRESS LD
OUT port
Calculate delta
between actual
and expected
value
Add PAD of the
delta value
until ch. Level is
green within the Z-
bar at LD
EGRESS point
1 2 4 3
Adjust
INGRESS LD
Gain
Measure Power at
the Ingress SIG
OUT port
Calculate delta
between actual
and expected
value
Add delta to Power
Gain value
5
Synchronize
Wave Key
expected
Power
Repeat steps
for Z to A
Power
Adjustment
until ch. Level
is green within
the Z-bar at LD
EGRESS point
NE 1
Service
M
A to Z
1
NE 2
M
M
2
3
NE 3
M
4
PAD
All Rights Reserved Alcatel-Lucent 2011
Commission a System
Case of double amplification
LD Power Management in FOADM Linear System with double Amplification
S
F
D
S
F
D

PAD
Thru
S
F
D

PAD
S
F
D

Thru Band Thru Band
NE 1
A
NE 2
M
A
NE 5
A
NE 3
A
M
LD LD
LD LD
LD LD
LD LD
LD LD
LD LD
S
F
D
S
F
D

LD
LD
LD
LD
A
A
NE 4
ILA
All Rights Reserved Alcatel-Lucent 2011
Complete Commissionning steps
Provisionn the
required wavelength
service
Power A-Z
managment
Manually adjust OT
output Power
Is the first NE in
signal path AUTO
Managed ?
Yes No
Execute Power
control EGRESS
Egress point
adjusted
Is the INGRESS Line
of next NE AUTO
Managed ?
Yes No
Execute Power
control INGRESS
Manually Adjust
INGRESS LD
Gain Power
Adjust
EGRESS LD
with upstream
PAD
Execute Power
control EGRESS
Is the EGRESS Line
of same NE AUTO
Managed ?
No Yes
Egress point
adjusted
Ingress point
adjusted

Is the INGRESS Line
of next NE ending
the path?
No
Is the INGRESS Line
of last NE AUTO
Managed ?
Yes No
Execute Power
control INGRESS
Ingress point
adjusted
Adjust
INGRESS LD
Gain Power
Power Z-A
managment
END
Delete Wavelength
service
1
2
3
4
Check all LD status
are completed
(commissioning flag
set to true)
All Rights Reserved Alcatel-Lucent 2011
FOADM End Terminal - Commissionning
1. OA provisioned , parameters before Greenfield
Power Management attributes
Gain adj checked
Power / channel not checked

Identical for TOADM

All Rights Reserved Alcatel-Lucent 2011
Module Outline

Part 4 - System Turn Up and Commissioning

1. System Provisioning

2. Commissioning

3. Verifications and Backup

understanding Loss Report
Wavelength Tracker
Perform Backup with PhM
Perform Backup with WebUi
All Rights Reserved Alcatel-Lucent 2011
System Turn Up and Commissionning
Verification and Backup

Understanding Loss Report
All Rights Reserved Alcatel-Lucent 2011
Exercises - Generating and Understanding the Loss Report

Refer to your 1830 PSS-32/16 Installation Guide, Part IV, Chapter 10, and review
the sample loss report Generate and review network element loss report and
Understanding the loss report procedures.
Pre requisite: complete provisioning of the EPT parameters for the
target system (Provision System using plan)
1. From CPB: Commissioning /Create System Loss Report (using plan)...
2. Follow instruction/Next> button until the system loss report stages
window will display
Minimum EPT parameters for network element
EPT Commissioning Parameter
Tag in planning tool commissioning
.xml file Applicable Port
LD Gmin AmpMinGain LD Sig Out
LD Gmax AmpMaxGain LD Sig Out
Ingress LD target output power TargetOutputPower LD Sig Out
Ingress LD power deviation out DeviationOut LD Sig Out
Egress target output power TargetOutputPower LD Line Out
Egress power deviation out DeviationOut LD Line Out
All Rights Reserved Alcatel-Lucent 2011
Wavelength Tracker Coding Example
All Rights Reserved Alcatel-Lucent 2011
Exercises - Generating and Understanding the Loss Report
Launch CPB / Commissioning / Create system loss report (using plan)
Span Margin + connecto
loss
Span Loss from design
CWR-8
1/8
LD
PSS32-5

SFD
ALPHG
1/6
LD
AHPHG
1/7
Thru
CWR-8
1/8
LD
LD
CWR-8
1/4
LD
PSS32-6

AHPHG
1/3
ALPHG
1/2
ALPHG
1/6
LD
DCM 50
18.6 dB
17.9 dB
75km
AHPHG
1/7
L
I
N
E

S
I
G

L
I
N
E

L
I
N
E

S
I
G

L
I
N
E

All Rights Reserved Alcatel-Lucent 2011
Exercises - Generating and Understanding the Loss Report
CWR-8
1/8
LD
PSS32-5

SFD
ALPHG
1/6
LD
AHPHG
1/7
Thru
CWR-8
1/8
LD
LD
CWR-8
1/4
LD
PSS32-6

AHPHG
1/3
ALPHG
1/2
ALPHG
1/6
LD
DCU 50
18.6 dB
17.9 dB
75km
AHPHG
1/7
L
I
N
E

S
I
G

L
I
N
E

L
I
N
E

S
I
G

L
I
N
E

All Rights Reserved Alcatel-Lucent 2011
Exercises - Generating and Understanding the Loss Report
CWR-8
1/8
LD
PSS32-5

SFD
ALPHG
1/6
LD
AHPHG
1/7
Thru
CWR-8
1/8
LD
LD
CWR-8
1/4
LD
PSS32-6

AHPHG
1/3
ALPHG
1/2
ALPHG
1/6
LD
DCM 50
18.6 dB
17.9 dB
75km
AHPHG
1/7
L
I
N
E

S
I
G

L
I
N
E

L
I
N
E

S
I
G

L
I
N
E

L
I
N
E

S
I
G

L
I
N
E

75km
All Rights Reserved Alcatel-Lucent 2011
Failed Adjustment (Examples)
Refer to your 1830 PSS-32/16 Installation Guide, Part IV, Chapter 10, and
review the sample loss report Troubleshooting failed Adjustment.
no through services provisioned:
1. Provision at least one present wavelength on the through path.
2. Re-try adjustment.
loss too high (ingress adjustment)
1. Identify the source of the excess loss using the loss report
2. If the span loss is too high, perform the following sub steps and re-try the
adjustment after each step. If not, go to Step 8.
3. Clean the fiber connection between the patch panel and the LD Line In port.
4. Perform an in-service adjustment from the PhM light path trace power management
interface.
5. If the Loss too high error remains, check the loss on the affected segment and if
the span loss is too high field personnel will need to try to correct the span loss.
6. If the Loss too high error remains, clean the fiber connection between the patch
panel and the LD Line Out port of the upstream network element.
7. If the span loss cannot be reduced to meet the planned limit, then a re-plan of the
system will be required using the EPT.
8. If the message is generated during ASE commissioning, re-run the commissioning
wizard.
9. If the message is generated as a result of an in-service power adjustment, perform
a power adjustment on the affected span using the PhM, CLI, or WebUI.
All Rights Reserved Alcatel-Lucent 2011
System Turn Up and Commissionning
Verification and Backup

Wavelength Tracker
All Rights Reserved Alcatel-Lucent 2011
Wavelength Tracker
All Rights Reserved Alcatel-Lucent 2011
Wavelength Tracker Light Path Power Trace (1354 RM-PhM)
All Rights Reserved Alcatel-Lucent 2011
Wavelength Tracker Data (CLI)
Example of Wavelength Tracker parameter
data (from CLI):
Type: show wavekey wtsource keys
Type: show wavekey wtsource power

ITU Channel : 28
Expected WaveKey 1: 428
Expected WaveKey 2: 972
WaveKeys Received : Yes
Channel AINS : Disabled
Expected Power : -19.90 dBm
Power Deviation : 2.50 dB
Power Tolerance : 0.00 dB
Measured Power : -19.82 dBm

Keys
Power
All Rights Reserved Alcatel-Lucent 2011
System Turn Up and Commissionning
Verification and Backup

Perform Backup with PhM
All Rights Reserved Alcatel-Lucent 2011
Exercises - Perform database backups with PhM
Database backups are performed using TFTP server, which is provided
with the 1354 RMPhM Photonic Manager
Refer to your 1830 PSS-32/16 Installation Guide, Part IV, Chapter 12, and review
the sample loss report Perform database backups procedures.
Refer to the Alcatel-Lucent 1354 RM-PhM Photonic Manager EMS Reference Guide
for more information.
1. From Phm: Admin /Settings /System Settings /File Transfer
2. TFTP Root Directory : Verify the root directory is /tftpfiles
3. select FTP & Remove Prefix
4. Select the NE you want to backup
5. Maintenance / NE Database Backup & Restore
6. Right click on the NE / select Details...
7. check Use the EMS Server as Backup host recommended and Use default
backup directory recommended.
8. click on the Backup
All Rights Reserved Alcatel-Lucent 2011
System Turn Up and Commissionning
Verification and Backup

Perform Backup with WebUI
All Rights Reserved Alcatel-Lucent 2011
Exercises - Perform database backups with WebUi
Database backups can be performed with WebUI and a TFTP Server
(3CDaemon in this example)
1. Run a TFTP server and browse directory
2. From WebUi: Administration/ database / backup and restore
3. Protocol/TFTP
4. Enter the local host server IP
5. Enter path to directory from the TFTP server root directory
6. Enter backup filename
7. Apply
8. Backup
9. Verify progression in TFTP server window
Enter a new folder
name of required
GPEC
Global Delivery Readiness

COPYRIGHT 2011 ALCATEL-LUCENT. ALL RIGHTS RESERVED.

End of Module
System Turn Up and Commissionning