250 PRELIMINARES
01 Limpieza inicial
Limpieza inicial 4,159.57 m
2
Calle Juana Francisca
Estacin distancia (mts) Ancho (mts) Area (mts
2
)
0+000.00 10.00 0.00
0+020.00 20.00 9.00 190.00
0+040.00 20.00 10.00 190.00
0+060.00 20.00 10.00 200.00
0+077.38 17.38 10.00 173.80
0+081.21 3.83 10.00 38.30
792.10 m
2
Calle Auxiliadora
Estacin distancia (mts) Ancho (mts) Area (mts
2
)
0+081.21 10.00 0.00
0+085.04 3.83 10.00 38.30
0+120.00 34.96 11.00 367.08
0+140.00 20.00 9.30 203.00
0+160.00 20.00 9.15 184.50
0+172.90 12.90 9.50 120.29
0+176.95 4.05 14.50 48.60
0+182.00 5.05 9.45 60.47
1,022.25 m
2
Calle El Gloria
Estacin distancia (mts) Ancho (mts) Area (mts
2
)
0+000.00 8.00 0.00
0+002.00 2.00 9.20 17.20
0+005.98 3.98 20.00 58.11
0+009.96 3.98 10.40 60.50
0+012.10 2.14 8.00 19.69
0+020.00 7.90 9.00 67.15
0+040.00 20.00 9.00 180.00
0+060.00 20.00 9.10 181.00
0+080.00 20.00 9.00 181.00
0+088.70 8.70 9.00 78.30
0+089.90 1.20 10.00 11.40
0+093.82 3.92 25.00 68.60
0+097.74 3.92 10.00 68.60
0+100.00 2.26 8.30 20.68
0+120.00 20.00 10.00 183.00
0+132.40 12.40 9.20 119.04
1,314.26 m
2
Avenida Este ( Socorro Bermudez )
Estacin distancia (mts) Ancho (mts) Area (mts
2
)
0+000.00 30.00 0.00
0+003.35 3.35 10.00 67.00
0+007.28 3.93 9.25 37.83
0+020.00 12.72 10.00 122.43
0+040.00 20.00 9.20 192.00
0+060.00 20.00 8.20 174.00
0+080.00 20.00 9.15 173.50
0+100.00 20.00 9.25 184.00
0+106.00 6.00 9.00 54.75
0+108.68 2.68 10.00 25.46
1,030.97 m
2
Sub Total
Memoria de Calculo de IE -17944 " Adoquinado de calles en barrios Urbanos, Municipio de Diriomo II Etapa
Sub Total
Sub Total
Sub Total
239837037.xls.ms_office
02 Trazo y nivelacin M2 4,067.73
Trazo ( Para adoquinado) M2 3,037.32
Trazo y nivelacin para andenes M2 1,030.41
Trazo de eje central de calle ML 412.28
Trazo de canal
Calle Juana Francisca
Estacin distancia (mts)
Ancho de
adoquinado
(mts)
Area de adoquinado
m2
Area de
andenes
m2 Banda este Banda Oeste
Longitud de
eje central de
calle
-0+006.50 6.00 0.00
-0+004.00 2.50 12.00 22.50 7.16 4.00 4.00
-0+004.00 0.00 25.60 0.00 16.20 6.00 7.50
0+003.85 7.85 25.60 200.96 0.00 0.00 0.00
0+003.85 0.00 10.50 0.00 18.00 7.50 7.50
0+006.35 2.50 6.00 20.63 9.60 4.00 4.00
0+076.00 69.65 6.00 417.90 167.16 69.65 69.65 82.50
661.99 176.76 91.15 92.65 82.50
Calle Auxiliadora
Estacin distancia (mts) Ancho (mts)
Area de adoquinado
m2
Area de
andenes
m2 Banda este Banda Oeste
Longitud de
eje central de
calle
0+087.27 6.00 0.00
0+171.77 84.50 6.00 507.00 187.59 84.50 84.50
0+174.77 3.00 8.50 21.75 9.00 4.50 4.50
0+174.77 0.00 16.00 0.00 6.80 8.50
0+180.00 5.23 16.00 83.68 4.45 5.23
0+180.00 0.00 7.50 0.00 6.80 0.00 8.50
0+182.00 2.00 6.00 13.50 2.00 3.00 94.73
625.93 214.64 96.23 109.00 94.73
Calle El Gloria
Estacin distancia (mts) Ancho (mts)
Area de adoquinado
m2
Area de
andenes
m2 Banda este Banda Oeste
Longitud de
eje central de
calle
0+000.00 6.00 0.00
0+003.00 3.00 9.80 23.70 5.4 4.50 4.50
0+003.00 0.00 29.00 0.00 22.8 9.50 9.50
0+009.00 6.00 29.00 174.00 0.00 0.00
0+009.00 0.00 9.80 0.00 22.8 9.50 9.50
0+011.00 2.00 6.00 15.80
0+088.70 77.70 6.00 466.20 135.98 77.70 77.70
0+090.70 2.00 9.80 15.80 9.60 4.00 4.00
0+090.70 0.00 16.00 0.00 52.80 34.50 9.50
0+096.70 6.00 54.00 210.00 0.00 0.00
0+096.70 0.00 9.80 0.00 52.80 34.50 9.50
0+098.70 2.00 6.00 15.80 9.60 4.00 4.00
0+132.40 33.70 6.00 202.20 80.88 33.70 33.70 132.40
1,123.50 392.66 211.90 161.90 132.40
Avenida Este ( Socorro Bermudez )
Estacin distancia (mts) Ancho (mts)
Area de adoquinado
m2
Area de
andenes
m2 Banda este Banda Oeste
Longitud de
eje central de
calle
0+003.35 11.00 0.00
0+007.35 4.00 6.00 34.00 9.6 4.00 4.00
0+106.00 98.65 6.00 591.90 236.76 98.65 98.65 102.65
625.90 246.36 102.65 102.65 102.65
Longitud de cunetas
Longitud de cunetas
Longitud de cunetas
Sub Total
Sub Total
Sub Total
Sub Total
Longitud de cunetas
239837037.xls.ms_office
04 Rotulo C/U= 1.00
Rotulo FISE de 1.22x2.44M (Estr. Metal & Zinc. C/U= 1.00
251 MOVILIZACIN Y DESMOVILIZACIN
02 MOVILIZACION Y DESMOVILIZACION DE EQUIPOS
Movilizacin / Desmovilizacin ( Ida y Vuelta)
260 MOVIMIENTO DE TIERRA
01 ACARREO DE MATERIALES 349.52 m3
Acarreo de material selecto a 2km ( Con equipo) 349.52 m3
Solo la calle El Gloria lleva utilizacin de material selecto
Calle El Gloria Area de Adoquinado Longitud de Cuneta Espesor= 0.40
0+000.00 0+060.00 507.50 120.00 ml F Abund= 1.3
Vol= 295.10 m3
Calle El Gloria Area de Adoquinado Longitud de Cuneta Espesor= 0.20
0+060.00 0+089.90 179.40 59.80 ml F Abund= 1.3
Vol= 54.42 m3
02 CORTE 1,055.47 m3
Corte y/o Excavacin ( con equipo) 1,055.47 m3
Cantidad
Calle Juana Francisca 191.23 m3
Calle Auxiliadora 284.24 m3
Calle El Gloria 414.37 m3
Avenida Este ( Socorro Bermudez ) 165.63 m3
07 BOTAR TIERRA SOBRANTE DE EXCAVACIN 349.52 m3
Botar tierra sobrante de excavacin a 2km con Equip 349.52 m3
Cantidad
Calle Juana Francisca 0.00 m3
Calle Auxiliadora 0.00 m3
Calle El Gloria 349.52 m3
Avenida Este ( Socorro Bermudez ) 0.00 m3
08 SUELO CEMENTO 636.84 m3
Suelo cemento proporcion 1:25 C:S 636.84 m3
Cantidad
Calle Juana Francisca 0.00 m3
Calle Auxiliadora 0.00 m3
Calle El Gloria 362.00 m3
Calle El Gloria. 274.84
De la estacin 0+089.90 - 0+132.40
Avenida Este ( Socorro Bermudez ) 0.00 m3
Tramos
Tramos
Tramos
239837037.xls.ms_office
09 REVESTIMIENTO (BASE Y SUB-BASE) 881.56 m3
Relleno y compactacin con equipo 290.24 m3
591.31 m3
Calle Juana Francisca Area de Adoquinado Longitud de Cuneta Espesor= 0.15
661.99 183.80 ml
Vol= 113.08 m3
Calle Auxiliadora Area de Adoquinado Longitud de Cuneta Espesor= 0.20
625.93 205.23 ml
Vol= 145.71 m3
Calle El Gloria Area de Adoquinado Longitud de Cuneta Espesor= 0.15
0+000.00 0+060.00 507.50 120.00 ml
Vol= 85.13 m3
Calle El Gloria Area de Adoquinado Longitud de Cuneta Espesor= 0.15
0+060.00 0+089.90 179.40 59.80 ml
Vol= 31.40 m3
Calle El Gloria Area de Adoquinado Longitud de Cuneta Espesor= 0.20
0+089.90 0+132.40 436.60 194.00 ml
Vol= 106.72 m3
Avenida Este ( S Bermudez ) Area de Adoquinado Longitud de Cuneta Espesor= 0.15
625.90 205.30 ml
Vol= 109.28 m3
12 EXPLOTACIN DE BANCOS 268.86 M3
Explotacin de banco con tractor D-6 268.86 m3
Es igual al material selecto a utilizar.
270 CARPETA DE RODAMIENTO
01 ADOQUINADO 3,037.32 M2
Conformacin y compactacin (para adoquines) 3,037.32 m2
Adoquinado 3,500 Psi ( con cama de arena 5 cms) 3,037.32 m2
280 CUNETAS ANDENES Y BORDILLOS
01 CUNETAS DE CAITE DE CONCRETO 968.13 ML
Cuneta de caite conc. 2500 Psi ( 50x35 cms) 968.13 ML
Nota:El costo de esta acitividad involucra Trazado y Nivelacin para cuneta
Cantidad U/M
Calle Juana Francisca 183.80 ML
Calle Auxiliadora 205.23 ML
Calle El Gloria 373.80 ML
Avenida Este ( Socorro Bermudez ) 205.30 ML
05 VIGAS DE REMATE PARA ADOQUINES 72.00 ML
Viga de remate para adoquin de 15x40cm , concreto de 2,500 psi 72.00 ML
Cantidad U/M
Calle Juana Francisca 20.00 ML
Calle Auxiliadora 20.00 ML
Calle El Gloria 24.00 ML
Avenida Este ( Socorro Bermudez ) 8.00 ML
Tramos
Tramos
Escarificacin y compactacin de
terreno P/colocacin de base
239837037.xls.ms_office
07 ANDENES DE CONCRETO 1,030.41 M2
Conformar terreno c/corte y Rell. Hasta 5cm. 1,030.41 M2
Anden de Concreto con siza cada 1 metro espesor 2" 1,030.41 M2
Cantidad U/M
Calle Juana Francisca 176.76 M2
Calle Auxiliadora 214.64 M2
Calle El Gloria 392.66 M2
Avenida Este ( Socorro Bermudez ) 246.36 M2
15 VIGA LONGITUDINAL DE CONCRETO 968.13 ML
Remate longitudinal de concreto para adoquin 968.13 ML
Cantidad U/M
Calle Juana Francisca 183.80 ML
Calle Auxiliadora 205.23 ML
Calle El Gloria 373.80 ML
Avenida Este ( Socorro Bermudez ) 205.30 ML
290 OBRAS DE DRENAJE
04 CANALES DE REVESTIDOS 10.71 ML
Excavacin de canales con ancho <= 4.00M 121.07 M3
ancho = 3.60
alto= 3.14
Largo= 10.71
Relleno ycompactacin para alcantarilla (con equipo) 67.25 M3
ancho de excavacion = 3.60 Vol de Exca 121.07 m3
alto de excavacin = 3.14
Largo de excavacin = 10.71
ancho de canal = 2.50 Vol de Estruc 53.82 m3
alto de canal = 2.01
Largo de canal = 10.71
Botar tierra de excavacin a 3km. Con camion volquete 69.96 M3
Nota: El volumen a botar es igual al volumen del canal y a este se le aplica factor de abundamiento
Losa de concreto 3000 psi Ref #4, doble parrilla, T=35cm 32.51 M2
Pared de bloque de mortero de 8"x8"x16", sin sizar 53.09 M2
Hierro Corrugado menor o igual a No 4 grado 40 ( Mat. Y M. Obras) 229.44 Lbs
Pared de concreto 2500 psi sin ref. T =0.20 M sin acabado 2.04 M2
Viga de concreto 3000 psi, 5 ref. #3 , seccin en L 24.13 ML
Estructura metlica ( acero a - 36) 6,447.39 Lbs
Pintura anticorrosiva 264.00 M2
ALCANTARILLA PARA DRENAJE PLUVIAL 33.20 ML
Excavacin de zanja en T.N. con retroexcavadora 242.27 M3
ancho = 2.32
alto= 3.14
Largo= 33.20
Relleno ycompactacin para alcantarilla (con equipo) 181.74 M3
ancho de excavacion = 2.32 Vol de Exca 242.27 m3
alto de excavacin = 3.14
Largo de excavacin = 33.20
diametro de la tuberia = 1.52 60.53 m3
Largo de alcantarilla = 33.20
Tramos
Tramos
239837037.xls.ms_office
Botar tierra de excavacin a 3km. Con camion volquete 78.69 M3
Nota: El volumen a botar es igual al volumen del canal y a este se le aplica factor de abundamiento
Tuberia de concreto reforzado de 60" ( Sin Excavacin) 33.20 ML
Excavacion en suelo natural 4.99 M3
Vol Diente de mamposteria 1.64 Volumen de cabezal= 3.35
Ancho = 3.35 Ancho = 3.35 3.35
Altura = 1.4 Alto = 2.8 0.4
Largo1 = 0.35 Largo = 2.5 2.5
Cabezal de mampostera de piedra bolon para tubo de 60" S/Excavacion 20.77 M3
Volumen de cabezal= 23.45
Ancho = 3.35
Alto = 2.8
Largo = 2.5
Vol Diente de mamposteria 1.88 Volumen de tuberia 4.56
Ancho = 3.35 D de la tuberia = 1.52
Alto = 1.6 Largo = 2.50
Largo1 = 0.4
Largo2 = 0.3
27 VADO DE CONCRETO 66.90 ML
Vado de concreto 3000 psi, T=0.20, B=1.20M Ref.H3/8 @0.10 A/D 66.90 ML
Cantidad U/M
Calle Juana Francisca 23.00 ML
Calle Auxiliadora 0.00 ML
Calle El Gloria 32.00 ML
Avenida Este ( Socorro Bermudez ) 11.90 ML
POZO DE VISITA 1.00 C/U
Pozo de visita 2.01- 2.5 M. prof. Tapa hierro fund. C/ Todo 1.00 C/U
291 SEALIZACION HORIZONTAL Y VERTICAL
03 SEALES DE PREVENCIN 7.00 C/U
Seal de transito de prevencin (estandar) 7.00 C/U
04 SEALES VIALES PERMANENTES 1.00 C/U
Sealizacin horizontal (Pintada con equipo) 412.28 ML
295 MEDIDAS DE MITIGACIN Y PREVENCION
01 MEDIDAS DE MITIGACION Y PREVENCION 1.00 C/U
Barandal metlica de proteccin con tubo de Ho. Go. De 4" y 3" , H=1.20m 11.76 M2
Longitud = 9.80
Altura = 1.2
300 LIMPIEZA Y ENTREGA
01 LIMPIEZA FINAL 1.00 GLB
LIMPIEZA FINAL 4,159.57 M2
03 PLACA CONMEMORATIVA 1.00 C/U
Pedestal para placa conmemorativa 1.00 C/U
Placa conmemorativa de 65x42 cms (FISE) 1.00 C/U
330 LINEA DE DISTRIBUCIN
10 TUBERIA DE 3" DE DIAMETRO 11.00 ML
Profundizar tubera pvc de 3" hasta 2m 11.00 ML
Cantidad U/M
Calle Juana Francisca 0.00 ML
Calle Auxiliadora 0.00 ML
Calle El Gloria 11.00 ML
Avenida Este ( Socorro Bermudez ) 0.00 ML
Tramos
Tramos
239837037.xls.ms_office
350 CONEXIONES INTRADOMICILIARES
01 CONEXIONES INTRADOMICILIARES 8.00 C/U
Reconexion/profundizar domiciliar ap TipoI (Der de Tubo principal ) 4.00 C/U
Reconexion/profundizar domiciliar ap TipoII(Izq de Tubo principal ) 4.00 C/U
Cantidad Izq Cant D U/M
Calle Juana Francisca C/U
Calle Auxiliadora C/U
Calle El Gloria 4.00 4.00 C/U
Avenida Este ( Socorro Bermudez ) C/U
03 INSTALACIN DE VALVULAS 8.00 C/U
Valvula de pase de 2" (Gaveta de bronce ), Inc Excavacin 8.00 C/U
Val de 2" U/M
Calle Juana Francisca C/U
Calle Auxiliadora C/U
Calle El Gloria 8.00 C/U
Avenida Este ( Socorro Bermudez ) C/U
Tramos
Tramos
239837037.xls.ms_office
239837037.xls.ms_office
239837037.xls.ms_office
239837037.xls.ms_office
239837037.xls.ms_office
239837037.xls.ms_office
239837037.xls.ms_office
239837037.xls.ms_office
239837037.xls.ms_office
239837037.xls.ms_office
239837037.xls.ms_office
239837037.xls.ms_office
239837037.xls.ms_office
239837037.xls.ms_office
239837037.xls.ms_office
239837037.xls.ms_office
239837037.xls.ms_office
239837037.xls.ms_office
239837037.xls.ms_office
239837037.xls.ms_office
239837037.xls.ms_office
239837037.xls.ms_office
239837037.xls.ms_office
239837037.xls.ms_office
239837037.xls.ms_office
239837037.xls.ms_office
239837037.xls.ms_office
239837037.xls.ms_office
239837037.xls.ms_office
239837037.xls.ms_office
239837037.xls.ms_office
239837037.xls.ms_office
239837037.xls.ms_office
239837037.xls.ms_office
239837037.xls.ms_office
239837037.xls.ms_office
239837037.xls.ms_office
239837037.xls.ms_office
239837037.xls.ms_office
239837037.xls.ms_office
239837037.xls.ms_office
239837037.xls.ms_office
239837037.xls.ms_office
239837037.xls.ms_office
239837037.xls.ms_office
239837037.xls.ms_office
239837037.xls.ms_office
239837037.xls.ms_office
239837037.xls.ms_office
239837037.xls.ms_office
239837037.xls.ms_office
239837037.xls.ms_office
239837037.xls.ms_office
239837037.xls.ms_office
239837037.xls.ms_office
239837037.xls.ms_office
239837037.xls.ms_office
239837037.xls.ms_office
4.00 4.00
Moviento de Tierra
Calle Juana Francisca
Estacin distancia (mts)Ancho (mts) Razante P Diferencia de Niveles Razante P Diferencia de Niveles Area M2 I Area M2 D Volumen Corte Volumen de Relleno
0+000.00 10.00
0+020.00 20.00 9.00 98.09 97.07 96.45 1.64 0.62 97.07 97.64 96.45 0.62 1.19 5.08 4.07 91.57
0+040.00 20.00 10.00 98.00 97.30 97.50 0.50 -0.20 97.30 97.45 97.50 -0.20 -0.05 0.75 -0.63 7.50 -6.25
0+060.00 20.00 10.00 97.30 97.11 96.65 0.65 0.46 97.11 97.15 96.65 0.46 0.50 2.77 2.40 51.75
0+077.38 17.38 10.00 96.75 96.68 96.20 0.55 0.48 96.68 96.55 96.20 0.48 0.35 2.58 2.08 40.41
191.23 -6.25
Calle Auxiliadora
Estacin distancia (mts)Ancho (mts) Razante P Diferencia de Niveles Razante P Diferencia de Niveles Area M2 I Area M2 D Volumen Corte Volumen de Relleno
0+081.21 10.00
0+085.04 3.83 6.90 96.75 96.68 96.25 0.50 0.43 96.68 97.64 96.25 0.43 1.39 1.60 3.14 9.08
0+120.00 34.96 11.00 97.80 97.37 96.85 0.95 0.52 97.37 97.60 96.85 0.52 0.75 4.04 3.49 131.71
0+140.00 20.00 9.30 97.40 97.32 96.60 0.80 0.72 97.32 97.55 96.60 0.72 0.95 3.53 3.88 74.17
0+160.00 20.00 9.15 96.87 96.52 96.40 0.47 0.12 96.52 96.55 96.40 0.12 0.15 1.35 0.62 19.67
0+172.90 12.90 9.50 96.80 96.39 96.10 0.70 0.29 96.39 96.20 96.10 0.29 0.10 2.35 0.93 21.14
0+176.95 4.05 14.50 96.90 96.40 96.05 0.85 0.35 96.40 96.20 96.05 0.35 0.15 4.35 1.81 12.48
0+182.00 5.05 9.45 96.90 96.60 96.03 0.87 0.57 96.60 96.70 96.03 0.57 0.67 3.40 2.93 15.99
284.24
Calle El Gloria
Estacin distancia (mts)Ancho (mts) Razante P Diferencia de Niveles Razante P Diferencia de Niveles Area M2 I Area M2 D Volumen Corte Volumen de Relleno
0+000.00 8.00 99.50 99.60 99.00 0.50 0.60 99.60 99.53 99.00 0.60 0.53 2.20 2.26 0.00
0+002.00 2.00 9.20 99.50 99.55 99.00 0.50 0.55 99.55 99.54 99.00 0.55 0.54 2.41 2.51 4.92
0+005.98 3.98 20.00 99.50 99.50 99.00 0.50 0.50 99.50 99.52 99.00 0.50 0.52 5.00 5.10 20.10
0+009.96 3.98 10.40 99.40 99.30 98.65 0.75 0.65 99.30 99.59 98.65 0.65 0.94 3.64 4.13 15.47
0+012.10 2.14 8.00 99.45 99.35 99.00 0.45 0.35 99.35 99.59 99.00 0.35 0.59 1.60 1.88 3.72
0+020.00 7.90 9.00 99.40 99.25 98.60 0.80 0.65 99.25 99.51 98.60 0.65 0.91 3.26 3.51 26.75
0+040.00 20.00 9.00 99.40 99.27 98.50 0.90 0.77 99.27 99.27 98.50 0.77 0.77 3.76 3.46 72.22
0+060.00 20.00 9.10 99.34 99.14 98.45 0.89 0.69 99.14 99.49 98.45 0.69 1.04 3.59 3.94 75.30
0+080.00 20.00 9.00 99.10 99.10 98.65 0.45 0.45 99.10 99.11 98.65 0.45 0.46 2.02 2.05 40.72
0+088.70 8.70 9.00 99.05 99.09 98.50 0.55 0.59 99.09 99.24 98.50 0.59 0.74 2.57 2.99 24.18
0+089.90 1.20 10.00 99.10 99.10 98.50 0.60 0.60 99.10 99.19 98.50 0.60 0.69 3.00 3.22 3.73
0+093.82 3.92 25.00 99.20 99.20 98.70 0.50 0.50 99.20 99.09 98.70 0.50 0.39 6.25 5.56 23.15
0+097.74 3.92 10.00 99.05 99.01 98.67 0.38 0.34 99.01 99.21 98.67 0.34 0.54 1.80 2.20 7.84
0+100.00 2.26 8.30 99.06 98.95 98.45 0.61 0.50 98.95 99.11 98.45 0.50 0.66 2.30 2.41 5.32
0+120.00 20.00 10.00 99.00 98.86 98.40 0.60 0.46 98.86 99.61 98.40 0.46 1.21 2.65 4.17 68.25
0+132.40 12.40 9.20 98.70 98.68 98.40 0.30 0.28 98.68 99.13 98.40 0.28 0.73 1.33 2.32 22.67
414.37
Volumen de Excavacin
Sub Total
Razante Natural Razante Natural
Lado de Derecho Lado Izquierdo
Volumen de Excavacin
Sub Total
Volumen de Excavacin
Sub Total
Razante Natural Razante Natural
Razante Natural Razante Natural
Lado Izquierdo Lado de Derecho
Lado Izquierdo Lado de Derecho
Avenida Este ( Socorro Bermudez )
Estacin distancia (mts)Ancho (mts) Razante P Diferencia de Niveles Razante P Diferencia de Niveles Area M2 I Area M2 D Volumen Corte Volumen de Relleno
0+000.00 30.00 100.10 100.00 99.70 0.40 0.30 100.00 99.95 99.70 0.30 0.25 5.25 4.12 0.00
0+003.35 3.35 10.00 99.97 100.06 99.75 0.22 0.31 100.06 99.82 99.75 0.31 0.07 1.33 0.95 3.81
0+007.28 3.93 9.25 100.05 100.13 99.80 0.25 0.33 100.13 99.90 99.80 0.33 0.10 1.34 0.99 4.59
0+020.00 12.72 10.00 100.60 100.35 100.10 0.50 0.25 100.35 100.55 100.10 0.25 0.45 1.88 1.75 23.06
0+040.00 20.00 9.20 101.30 100.70 100.60 0.70 0.10 100.70 101.25 100.60 0.10 0.65 1.84 1.73 35.65
0+060.00 20.00 8.20 101.09 101.44 101.10 -0.01 0.34 101.44 100.49 101.10 0.34 -0.61 0.68 -0.55 6.77 -5.53
0+080.00 20.00 9.15 102.27 101.52 101.30 0.97 0.22 101.52 102.67 101.30 0.22 1.37 2.72 3.64 63.59
0+100.00 20.00 9.25 101.57 101.47 101.15 0.42 0.32 101.47 101.20 101.15 0.32 0.05 1.71 0.86 25.67
0+106.00 6.00 9.00 101.52 101.15 101.15 0.37 0.00 101.15 101.15 101.15 0.00 0.00 0.83 0.00 2.50
165.63 -5.53
Total= 1,055.47 -11.78
Volumen de Excavacin
Sub Total
Razante Natural Razante Natural
Lado de Derecho Lado de Derecho
CORRER DATOS SOLO EN LAS REAS AZUL
INFORME DE EVALUACIN DE PROYECTOS DE SUPERFICIES DE RODAMIENTO, ADOQUINADOS. PG.. 1
DATOS GENERALES
NOMBRE DEL PROYECTO : ADOQUINADO DE CALLE EN BARRIO DE DIRIOMO
CDIGO : IE-17944 SOLICITANTE : ALCALDA DE DIRIOMO
INGRESO A PROMOCIN : 1/24/2003 VISITA DE CAMPO : 9/20/2004
FECHA DE EVALUACIN : 3/30/2005 EVALUADOR : Marlon A. Gaitn N.
DEPARTAMENTO : MASAYA MUNICIPIO : DIRIOMO
BARRIO : COMARCA :
NUMERO DE HABITANTES 44,703.00 BENEFICIARIOS DIRECTOS 1,121.00
.
INGRESO PER-CAPITA ANUAL C$ 6,430.79 N DE CASAS 7,451.00
AGRCOLA GANADERA PESCA MINERA OTROS
X
Consiste en adoquinar 3,037.32 m de calles, ubicadas en el casco urbano de la ciudad de Diriomo, para lo que se considera la ejecucin
de las siguientes actividades:
Movilizacin y Desmovilizacin del equipo, Limpieza, Trazo y nivelacion para el adoquinado, cunetas y obras de drenaje a
construirse en una de las calles, Movimiento de Tierrra, asi como la conformacin y compactacin de adoqun una vez colocado.
Dentro de las Obras de Drenaje se contempla la construccin un canal de pared de bloque y losas de concreto, asi como las cunetas en calles, as
como la construccin de vados, para la adecuada conduccin de las aguas pluviales.
MONTO MONTO CANTIDAD UNIDAD DE FUENTE DE
C$ US$ MEDIDA FINANCIAMIENTO
0.00 0.00 1 GBL ALCALDA
222,489.79 13,458.86 1 GBL FISE
2,224,894.79 134,588.43 3,836.90 M2 FISE
COSTO TOTAL 2,447,384.58 148,047.29 TASA DE CAMBIO 16.5311
COSTO FISE 2,447,384.58 134,588.43
CONTRAPARTE 0.00 0.00 14,968.71
148.00
MES EMPLEO % MANO DE OBRA MONTO M.O. C$
12.20 271,437.16
CONSTRUCCIN
C.P.M.E. C$
DESCRIPCIN DEL PROYECTO
RESUMEN DE COSTOS
COMPONENTES
FONDO DE INVERSIN SOCIAL DE EMERGENCIA
UBICACIN
CARACTERSTICAS SOCIO - ECONMICAS DE LA POBLACIN OBJETIVO
ACTIVIDADES DE LA ZONA :
PRE-INVERSIN
SUPERVISIN
INFORME DE EVALUACIN DE PROYECTOS DE SUPERFICIES DE RODAMIENTO, ADOQUINADOS. PG.. 2
SITUACIN ACTUAL DEL PROYECTO
Actualmente la calles donde se solicita el proyecto se encuentran en mal estado, producto a que en poca de invierno se ve afectada por las
constantes lluvias producindose con estas y el paso de los vehculos, erosin en la calle que no estn provista de ningn tipo
revestimiento y con pendientes medias, las que se presentan agrietadas y afectan de esta manera a los usuarios de las mismas.
ASPECTOS AMBIENTALES
DISPOSICIN DE LOS MATERIALES DE DESECHO
Durante el periodo de construccin el contratista debe tomar las medidas necesarias que afectan el medio ambiente
tales como:
Todos los materiales de desperdicio; bolsas de cemento vacas, envases vacos con contenidos
qumicos, aceites, lubricantes, grasas, desperdicios de pvc, hierro, etc., deben ser trasladados al botadero municipal.
Los materiales de corte, deben ser trasladados al botadero designado, estos materiales deben ser nivelado y prensados
de inmediato para que no sean arrastrados por el viento o por las corrientes pluviales.
Las excavaciones se deben conservar secas, o sin agua acumulada mas de 48 hrs.
El contratista velar por la seguridad peatonal y la seguridad vehicular, considerando la rotulacin, candiles
controladores de transito, pases provisionales, desvos, entre otros.
US$
INVERS. TOTAL/ M2 RODAMIENTO 35.08
INVERS. MOV. DE TIERRA/ M2 RODAMIENTO 6.77
INVERS. RODAMIENTO/ M2 14.90
4.21
INVERS. DRENAJE/ M2 DE RODAMIENTO 5.34
COSTO MANTENIMIENTO/ M2 2.24
PERIODO DE EJECUCIN (MESES) 4.20
COSTO COSTO
DESCRIPCIN TOTAL MENSUAL ANUAL
C$ U.S $
PERSONAL 2 8,250.00 5,988.71
HERRAMIENTAS 4 1,100.00 798.49
MAQUINARIA/EQUIPO 1 2,500.00 1,814.76

11,850.00 8,601.97
AGUA POTABLE SI ELECTRICIDAD SI
ALC. SANITARIO SI DRENAJE PLUVIAL SI
SERV. SANITARIOS SI LETRINAS NO
CALLE PAVIMENTA SI TANQUE SPTICO NO
CALLE DE TIERRA SI TELFONO SI
COSTOS MANTENIMIENTO ANUAL 142,200.00
SERVICIOS BSICOS EXISTENTES EN EL REA DEL PROYECTO
99,000.00
13,200.00
30,000.00
COSTO
ANUAL
C$
FONDO DE INVERSIN SOCIAL DE EMERGENCIA
INDICADORES COSTO EFICIENCIA
INVERS. CUNET, ANDENES, BORDILLOS / M2 RODAMIENTO
COSTOS DE MANTENIMIENTO DEL PROYECTO
FONDO DE INVERSIN SOCIAL DE EMERGENCIA
COMENTARIOS Y RECOMENDACIONES DEL EVALUADOR PG.. 3
EL material de corte y/o excavacin se reutilizar siempre que presente excelentes condiciones en calles aledaas, el resto se depositara
de manera ordenada en el botadero municipal, el contratista es responsable de tenderlo y depositarlo de la mejor manera, todo esto
se coordinara con la Alcalda Municipal y la Supervisin del proyecto.
TRAMO LONGITUD REA VIGA (ML) DE VIGA (ML) DE CUNETAS OTROS ANDENES VADOS
No. ML M2 REMATE REMATE ML DRENAJES M2 Ml
LONGITUD. TRANSVER. ML
Calle No. 1 204.35 1,166.42 353.12 353.12 54.00
Calle No.2 218.80 1,310.08 446.98 - 446.98 0.00
Calle No.3 205.80 1,360.40 386.52 386.52 1.00
TOTAL 628.95 3,836.90 1,186.62 147.00 1,186.62 1.00 0.00 54.00
VIDA MONTO MONTO
TIL C$ US$ TOTAL TOTAL TOTAL
AOS ML M2 M3
20 945,013.13 57,165.77 - 3,836.90 -
20 429,542.02 25,983.87 - -
20 266,828.36 16,140.99 1,186.62 - -
10 0.00 0.00 - 0.00 -
20 46,128.74 2,790.42 1,333.62 - -
10 46,534.02 2,814.94 - 54.00 -
10 292,003.90 17,663.91 1.00 - -
10 198,844.62 12,028.52 GLB. - -
TOTAL 2,224,894.79 134,588.43 ####### 213.99
Las calles estn en funciones y son del servicio comunal, no se observa problemas de litigio, las calles estn
libres de cercos u otros obstculos particulares.
Marlon A. Gaitn N. 3/30/2005 Ana Lilia Reyes
NOMBRE DEL EVALUADOR FECHA COORDINADOR
PG.. 1
HOJA RESUMEN DE NORMAS Y PARMETROS
ADOQUINADO DE CALLE EN BARRIO DE DIRIOMO
CDIGO : MUNICIPIO : DIRIOMO
URBANO X
RURAL
INDICADORES COSTO EFICIENCIA RESULTADOS INDICADORES ECONOMTRICOS INDICADOR
INVERS. TOTAL/ M2 RODAMIENTO 35.08 35.00 100.22%
INVERS. MOV. DE TIERRA/ M2 RODAMIENTO 6.77 10.00 67.72%
INVERS. RODAMIENTO/ M2 14.90 20.00 74.49%
SOLICITANTE UBICACIN
ALCALDA DE DIRIOMO
REA DE EVALUACIN
INFORME DE EVALUACIN DE PROYECTOS DE SUPERFICIES DE RODAMIENTO, ADOQUINADOS.
NOMBRE DEL PROYECTO :
IE-17944
REA DE PROMOCIN CRITERIOS DE SELECCIN
OTROS DRENAJES
OTROS COSTOS
LA SITUACIN LEGAL DEL DERECHO DE VA Y PASE DE SERVIDUMBRE
FONDO DE INVERSIN SOCIAL DE EMERGENCIA
CUNETAS
ANDENES
BORDILLOS (viga transver, longit)
VADOS
DEL
CONCEPTO
CARPETA DE RODAMIENTO
MOVIMIENTO DE TIERRA
ALCANCES DE OBRAS / SITUACIN CON PROYECTO
CUADRO RESUMEN / COMPONENTES DEL PROYECTO
DESCRIPCIN CANTIDAD
INFORME DE EVALUACIN DE PROYECTOS DE SUPERFICIES DE RODAMIENTO, ADOQUINADOS.
4.21 10.00 42.07%
INVERS. DRENAJE/ M2 DE RODAMIENTO 5.34 5.00 106.75%
COSTO MANTENIMIENTO/ M2 2.24 MONTO EVALUADO EN C$ 2,224,894.79
TOTAL DE BENEFICIARIOS DIRECTOS 1,121.00 MONTO EVALUADO EN US$ 134,588.43
La Inversin total por m2 de adoquinado supera ligeramente la linea de corte en 0.22% pero es sastisfactoria.
La Inversin del Movimiento de Tierra se ve dismunida en un 32.28% denla Linea de corte, siendo satisfactorio.
La Inversin de la carpeta de rodamiento por M2 es el 74.49%, disminuyendo un 25.51% con respecto a la lnea de corte,
La inversin por cunetas con relacin a los M2 de rodamiento es satisfactorio, correspondindole a un 57.93% mas bajo que el
indicador.
La inversin por drenajes con relacin a los M2 de rodamiento se incrementa en un 6.75% de la inversin, por la inclusin de una
caja puente en calle No. 3.
El indicador de Inversin Total es de 100.22%, superando un 0.22% la linea de corte, lo que a consideracion del Evaluador que
el incremento no es excesivo por lo que puede consideranse aceptable, por el valor social y economico en beneficio de la comunidad.
900 6
5400
246.296
Marlon A. Gaitn N. 3/30/2005 Ana Lilia Reyes 1,329,998.40
NOMBRE DEL EVALUADOR FECHA COORDINADOR
SOLO CORRIDA DE DATOS
CONTRAPARTE C$ anlisis de los Indicadores
SUPERVISIN C$ 222,489.79 Resultados Indicador Dif %de Dif. %Tot. De Inversin
CONSTRUCCIN C$ 2,224,894.79 Inver. Tot. 35.08 35.00 0.08 - -0.22% 100.22%
MONTO DE LA CARPETA C$ 945,013.13 Mov Tierra 6.77 10.00 3.23 32.28% 67.72%
MOVIMIENTO DE TIERRA C$ 429,542.02 Carp. De Rodam. 14.90 20.00 5.10 25.51% 74.49%
CUNETAS C$ 266,828.36 4.21 10.00 5.79 57.93% 42.07%
ANDENES C$ 0.00 Invers. Drenaje/M de Rodamiento 5.34 5.00 0.34 - -6.75% 106.75%
BORDILLOS C$ 46,128.74
VADOS C$ C$ 46,534.02
OTROS DRENAJES C$ 292,003.90
OTROS COSTOS C$ 198,844.62
CANTIDAD DE OBRAS
MOVIMIENTO DE TIERRA M3 429,542.02
ADOQUINADO M2 3,836.90 30.48 100 0.3048
QUIEN FINANCIA EL DISEO ALCALDA 0.0283
QUIEN FINANCIA LA SUPERVISIN FISE 1 m equivale a 35.315 Pie
QUIEN FINANCIA LA CONSTRUCCIN FISE 2.00 35.315
TASA DE CAMBIO 16.5311 1.00 17.66
MES EMPLEO 148
CP.M.E. C$ 14,968.71
%MANO DE OBRA 12.20
PERIODO DE EJECUCIN (MESES) 4.20 126
DESCRIPCIN DEL CONCEPTO CANTIDAD COSTO MES C$
TOTAL PERSONAL 2 8,250.00
HERRAMIENTAS 4 1,100.00
MAQUINARIA Y EQUIPO 1 2,500.00
INVERS.CUNETAS, ANDEN, BORDILLOS / M2 RODAMIEN
OBSERVACIONES A LAS NORMAS Y PARMETROS
INVERS.CUNETAS, ANDEN,
BORDILLOS / M2 RODAMIEN
0 ADOQUINADO DE CALLE EN BARRIO ULISES COLOMBIA
CONSIDERACIONES TOMADAS EN LA EVALUACIN DEL PROYECTO.
10cm Adoquin
5 cm Arena
20cm Base de material del Banco Velmont
Al analizar las alternativas de los espesores de pavimento recomendadas por el laboratorio y ver el analisis
de los resultados, se determino la definicion siguiente de ambas estructura:
1 Tomar la estructura combinada de la 1 y 2 considerando la suma de los espesores en 65 cm., 15 cm de sub-rasante
20 cm de sub-base, 15cm de Base estabilizada al 5% de su peso, equivalente a 2bls por metro cubico.
2 Se nivelar y compactar la parte inferior de la sub-rasante mediante la actividad Nivelacin y conformacin
compactada, una vez realizado el corte de la estructura definida por 65 cm.
3 Para ajuste de terraceria a nivel inferior para la colocacin de los 15 cm de mejoramiento de la sub-rasante se
se considera la actividad de relleno y compactacion de 67.60 m.
4 Se botara el material de corte ejecutado hasta el nivel inferior de la sub-rasante el que se sustituira mediante el
material considerando en el rellen oy la compactacion, sub-rasante, sub-base y Base.
5 En caso de encontrarse con material rocoso a como se presenta en el sondeo 2 excavar unicaemnte para la colocacion
de los adoquines. En el caso del sondeo No. 3 este se realizo fuera de la carpeta de rodamiento.
6 Tanto el acarreo de material selecto y el botar tierra sobrante de excavacion seran a un kilometro que es la
distancia del banco, el se depositar donde lo indique la Alcaldia minucipal.
7 Se anexa compromiso de la Alcaldia Municiapal, para realizar el retiro de la viviendas que estan sobre el area a
adoquinar.
10cm Adoquin
5 cm Arena
65 cm. 15cm Base estabilizada con 5% de peso 2bls por m.
20 cm Sub-Base de material del Banco
15 cm Sub-rasante, se ha de utilizar el mismo banco.
Elaborado: Ing. Marlon A. Gaitan N.
Tcnico Evaluador
Utilizacin de 14ha para la deposicin de escombreras
ESTRUCTURAS DE PAVIMETOS (recomendadas por el Laboratorio de Suelos)
35 cm.
Alternativa Definitiva
Al analizar las alternativas de los espesores de pavimento recomendadas por el laboratorio y ver el analisis
1 Tomar la estructura combinada de la 1 y 2 considerando la suma de los espesores en 65 cm., 15 cm de sub-rasante
20 cm de sub-base, 15cm de Base estabilizada al 5% de su peso, equivalente a 2bls por metro cubico.
2 Se nivelar y compactar la parte inferior de la sub-rasante mediante la actividad Nivelacin y conformacin
3 Para ajuste de terraceria a nivel inferior para la colocacin de los 15 cm de mejoramiento de la sub-rasante se
4 Se botara el material de corte ejecutado hasta el nivel inferior de la sub-rasante el que se sustituira mediante el
5 En caso de encontrarse con material rocoso a como se presenta en el sondeo 2 excavar unicaemnte para la colocacion
de los adoquines. En el caso del sondeo No. 3 este se realizo fuera de la carpeta de rodamiento.
6 Tanto el acarreo de material selecto y el botar tierra sobrante de excavacion seran a un kilometro que es la
7 Se anexa compromiso de la Alcaldia Municiapal, para realizar el retiro de la viviendas que estan sobre el area a
Base estabilizada con 5% de peso 2bls por m.
Sub-rasante, se ha de utilizar el mismo banco.
Utilizacin de 14ha para la deposicin de escombreras
ESTRUCTURAS DE PAVIMETOS (recomendadas por el Laboratorio de Suelos)