VALORIZACION N01

OBRA

SUB CONTRATISTA

CONTRATISTA GENERAL

FECHA

CREACION DE ESCALINATAS Y MURO DE CONTENCION DEL JR. SALAVERRY SECTOR ALTO, DISTRITO COISHCO- SANTA ANCASH 1ETAPA
CONSTRUTEC M&Z S.A.C.
CONSORCIO SALAVERRY
27 DE NOVIEMBRE AL 08 DE DICIEMBRE DEL 2012

VALORIZACIN I DE OBRA

.
ACUMULADO ANTERIOR
DESCRIPCIN

PRECIO
UNITARIO

PARCIAL

METR.

ACTUAL

UND.

METR.

GLB

1.00

440.00

440.00

0.00

0.00%

0.00

TRAZO Y REPLANTEO PRELIMINAR EN ESCALINATAS

m2

52.83

1.00

52.83

0.00

0.00%

0.00

0.00

0.00%

TRAZO Y REPLANTEO EN MURO DE CONTENCION

m2

76.55

1.00

76.55

0.00

0.00%

0.00

25.00

32.66%

TRAZO Y REPLANTEO PARA SARDINELES

70.14

0.40

28.06

0.00

0.00%

0.00

25.00

35.64%

TRAZO Y REPLANTEO EN CALZADURAS

m2

7.91

1.00

7.91

0.00

0.00%

0.00

0.00

TRAZO Y REPLANTEO PARA RED DE DESAGUE

46.31

0.40

18.52

0.00

0.00%

0.00

LIMPIEZA INICIAL DE OBRA

m2

173.68

1.00

173.68

0.00

0.00%

SEALIZACION PARA LIMITE DE SEGURIDAD DE OBRA

76.55

0.50

38.28

0.00

0.00%

CORTE EN TERRENO ROCOSO - SIN MARTILLO NEUMATICO

m3

390.96

52.00

20,329.92

0.00

PREPARACION DE BASE DE ZAPATA C/PLANCHA

m2

76.55

4.00

306.20

0.00

RELLENO COMPACTADO CON MATERIAL DE PRESTAMO

m3

131.36

22.00

2,889.92

ACARREO DE MATERIAL EXCENDETE D=100 m

m3

508.25

17.00

ELIMINACION DE MATERIAL EXCEDENTE DM=2 km - SIN VOLQUETE

m3

508.25

4.10

m2

76.55

CONCRETO ZAPATAS f'c=210 kg/cm2

m3

ENCOFRADO Y DESENCOFRADO PARA ZAPATAS - CON MADERA Y HERR.

m2

ACERO CORRUGADO f'y =4200 kg/cm2 PARA ZAPATA

kg

% AVANCE

PARCIAL

METR.

% AVANCE

ACUMULADO
PARCIAL

METR.

% AVANCE

SALDO
PARCIAL

METR.

% AVANCE

PARCIAL

OBRAS CIVILES
OBRAS PROVISIONALES
GUARDIANIA Y TRANSPORTE

0.50

50.00%

220.00

0.50

50.00%

220.00

0.00

0.00

52.83

100.00%

52.83

0.33

25.00

51.55

67.34%

51.55

25.00

0.36

10.00

45.14

64.36%

18.06

0.00

0.00

0.00

0.00

7.91

100.00%

7.91

0.00%

0.00

0.00

0.00

0.00

46.31

100.00%

18.52

173.68

100.00%

173.68

173.68

1.00

173.68

0.00

0.00%

0.00

40.00

52.25%

20.00

40.00

0.52

20.00

36.55

47.75%

18.28

0.00

195.00

49.88%

10,140.00

195.00

0.50

10,140.00

195.96

50.12%

10,189.92

0.00

0.00

0.00%

0.00

0.00

0.00

0.00

76.55

100.00%

306.20

0.00%

0.00

0.00

0.00%

0.00

0.00

0.00

0.00

131.36

100.00%

2,889.92

0.00

0.00%

0.00

253.50

49.88%

4,309.50

253.50

0.50

4,309.50

254.75

50.12%

4,330.75

0.00

0.00%

0.00

60.00

11.81%

246.00

60.00

0.12

246.00

448.25

88.19%

1,837.83

535.85

0.00

0.00%

0.00

0.00

0.00%

0.00

0.00

0.00

0.00

76.55

100.00%

535.85

100.00

3,042.00

0.00

0.00%

0.00

0.00

0.00%

0.00

0.00

0.00

0.00

30.42

100.00%

3,042.00

35.00

1,550.85

0.00

0.00%

0.00

0.00

0.00%

0.00

0.00

0.00

0.00

44.31

100.00%

1,550.85

0.98

2,041.43

0.00

0.00%

0.00

0.00

0.00%

0.00

0.00

0.00

0.00

2,083.09

100.00%

2,041.43

220.00

0.50

0.50

0.00

0.00

25.00

25.00

10.00

0.00%

0.00

0.00
0.00

0.00%
0.00%

0.00

8,640.25
2,083.83

7.00

30.42
44.31
2,083.1

OBRAS PRELIMINARES

MURO DE CONTENCION
MOVIMIENTO DE TIERRAS

OBRA DE CONCRETO SIMPLE


SOLADO DE 4" PARA CIMIENTOS MEZCLA C : H 1:10
OBRA DE CONCRETO ARMADO
ZAPATAS

PANTALLA
CONCRETO f'c=210 kg/cm2 PARA PANTALLA DE MURO
ENCOFRADO Y DESENCOFRADO CARAVISTA EN PANTALLA DE MURO - CON PANELES Y
HERR.
ACERO CORRUGADO f'y =4200 kg/cm2 PARA PANTALLA DE MURO

m3

37.84

110.00

4,162.40

0.00

0.00%

0.00

0.00

0.00%

0.00

0.00

0.00

0.00

37.84

100.00%

4,162.40

m2

297.79

50.00

14,889.50

0.00

0.00%

0.00

0.00

0.00%

0.00

0.00

0.00

0.00

297.79

100.00%

14,889.50

kg

3,180.2

0.98

3,116.62

0.00

0.00%

0.00

0.00

0.00%

0.00

0.00

0.00

0.00

3,180.22

100.00%

3,116.62

m2

5.77

4.00

23.08

0.00

0.00%

0.00

0.00

0.00%

0.00

0.00

0.00

0.00

5.77

100.00%

23.08

EXCAVACION MANUAL A NIVEL DE SUBRASANTE

m3

26.00

14.00

364.00

0.00

0.00%

0.00

0.00

0.00%

0.00

0.00

0.00

0.00

26.00

100.00%

364.00

CONFORMACION Y COMPACTACION DE SUBRASANTE PARA VEREDAS Y ESCALONES

m2

52.83

10.00

528.30

0.00

0.00%

0.00

0.00

0.00%

0.00

0.00

0.00

0.00

52.83

100.00%

528.30

AFIRMADO COMPACADO E= 4" VEREDAS Y ESCALONES - C/PLANCHA COMPACTADORA

m2

52.83

10.00

528.30

0.00

0.00%

0.00

0.00

0.00%

0.00

0.00

0.00

0.00

52.83

100.00%

528.30

ACARREO DE MATERIAL EXCENDETE D=100 m

m3

33.80

17.00

574.60

0.00

0.00%

0.00

0.00

0.00%

0.00

0.00

0.00

0.00

33.80

100.00%

574.60

ELIMINACION DE MATERIAL EXCEDENTE DM=2 km

m3

33.80

4.10

138.58

0.00

0.00%

0.00

0.00

0.00%

0.00

0.00

0.00

0.00

33.80

100.00%

138.58

CONCRETO EN VEREDAS Y ESCALONES f'c = 175 kg/cm2

m2

52.83

18.00

950.94

0.00

0.00%

0.00

0.00

0.00%

0.00

0.00

0.00

0.00

52.83

100.00%

950.94

CONCRETO EN SARDINELES SUMERGIDOS f'c = 175 kg/cm2

32.40

8.00

259.20

0.00

0.00%

0.00

0.00

0.00%

0.00

0.00

0.00

0.00

32.40

100.00%

259.20

ENCOFRADO Y DESENCOFRADO P/VEREDAS Y ESCALONES - CON MADERA Y HERR.

11.16

12.00

133.92

0.00

0.00%

0.00

0.00

0.00%

0.00

0.00

0.00

0.00

11.16

100.00%

133.92

m2

5.85

20.00

117.00

0.00

0.00%

0.00

0.00

0.00%

0.00

0.00

0.00

0.00

5.85

100.00%

117.00

EXCAVACION MANUAL DE ZANJAS PARA SARDINELES

m3

0.98

15.00

14.70

0.00

0.00%

0.00

0.00

0.00%

0.00

0.00

0.00

0.00

0.98

100.00%

14.70

ELIMINACION DE MATERIAL EXCEDENTE DM=2 km - SIN VOLQUETE

m3

1.27

4.10

5.21

0.00

0.00%

0.00

0.00

0.00%

0.00

0.00

0.00

0.00

1.27

100.00%

5.21

VARIOS
JUNTA DE CONSTRUCCION EN MURO CON TECKNOPOR E=1"
ESCALINATAS
MOVIMIENTO DE TIERRAS

ESCALINATAS DE CONCRETO

VARIOS
JUNTAS ASFALTICAS
SARDINEL PERALTADO
MOVIMIENTO DE TIERRAS

CONCRETO EN SARDINEL

VALORIZACION N01

OBRA

SUB CONTRATISTA

CONTRATISTA GENERAL

FECHA

CREACION DE ESCALINATAS Y MURO DE CONTENCION DEL JR. SALAVERRY SECTOR ALTO, DISTRITO COISHCO- SANTA ANCASH 1ETAPA
CONSTRUTEC M&Z S.A.C.
CONSORCIO SALAVERRY
27 DE NOVIEMBRE AL 08 DE DICIEMBRE DEL 2012

VALORIZACIN I DE OBRA

.
ACUMULADO ANTERIOR
DESCRIPCIN

PRECIO
UNITARIO

PARCIAL

METR.

ACTUAL
METR.

SARDINEL PERALTADO DE CONCRETO F'C= 175 kg/cm2

m3

4.13

70.00

289.10

0.00

0.00%

0.00

0.00

0.00%

0.00

0.00

0.00

0.00

4.13

100.00%

289.10

SARDINEL PERALTADO ENCOFRADO Y DESENCOFRADO CARA VISTA

m2

59.33

35.00

2,076.55

0.00

0.00%

0.00

0.00

0.00%

0.00

0.00

0.00

0.00

59.33

100.00%

2,076.55

SARDINEL PERALTADO ACERO REFUERZO

kg

218.85

0.98

214.47

0.00

0.00%

0.00

0.00

0.00%

0.00

0.00

0.00

0.00

218.85

100.00%

214.47

m2

4.22

20.00

84.40

0.00

0.00%

0.00

0.00

0.00%

0.00

0.00

0.00

0.00

4.22

100.00%

84.40

EXCAVACION EN TERRENO P/CALZADURA EN VEREDAS Y ESCALONES

m3

4.15

30.00

124.50

0.00

0.00%

0.00

0.00

0.00%

0.00

0.00

0.00

0.00

4.15

100.00%

124.50

ELIMINACION DE MATERIAL EXCEDENTE DM=2 km

m3

5.40

4.10

22.14

0.00

0.00%

0.00

0.00

0.00%

0.00

0.00

0.00

0.00

5.40

100.00%

22.14

CONCRETO SIMPLE
CONCRETO CICLOPEO PARA CALZADURA EN VEREDAS Y ESCALONES MEZCLA 1:10 + 30%
P.G.ENCOFRADO Y DESENCOFRADO PARA CALZADURAS EN VEREDAS Y ESCALONES - CON

m3

10.54

90.00

948.60

0.00

0.00%

0.00

0.00

0.00%

0.00

0.00

0.00

0.00

10.54

100.00%

948.60

MADERA
REVESTIMIENTO DE CALZADURAS PARA VEREDAS Y ESCALONES

m2

30.88

30.00

926.40

0.00

0.00%

0.00

0.00

0.00%

0.00

0.00

0.00

0.00

30.88

100.00%

926.40

m2

30.88

14.00

432.32

0.00

0.00%

0.00

0.00

0.00%

0.00

0.00

0.00

0.00

30.88

100.00%

432.32

EXCAVACION DE ZANJAS H prom = 1.00m

m3

23.17

24.00

556.08

0.00

0.00%

0.00

0.00

0.00%

0.00

0.00

0.00

0.00

23.17

100.00%

556.08

EXCAVACION PARA CAJAS

m3

1.60

24.00

38.40

0.00

0.00%

0.00

0.00

0.00%

0.00

0.00

0.00

0.00

1.60

100.00%

38.40

EXCAVACION PARA BUZONETAS

m3

0.79

24.00

18.96

0.00

0.00%

0.00

0.00

0.00%

0.00

0.00

0.00

0.00

0.79

100.00%

18.96

RELLENO COMPACTADO CON MATERIAL DE PRESTAMO

m3

13.67

22.00

300.74

0.00

0.00%

0.00

0.00

0.00%

0.00

0.00

0.00

0.00

13.67

100.00%

300.74

ELIMINACION DE MATERIAL EXCEDENTE DM=2 km

m3

2.61

4.10

10.70

0.00

0.00%

0.00

0.00

0.00%

0.00

0.00

0.00

0.00

2.61

100.00%

10.70

SUMINISTRO E INSTALACION DE TUBERIA PVC ISO4435 DN110 MM S-20

46.31

2.70

125.04

0.00

0.00%

0.00

0.00

0.00%

0.00

0.00

0.00

0.00

46.31

100.00%

125.04

ALINEAMIENTO Y AJUSTE DE TUBERIA PVC ISO4435 DN110 MM S-20

46.31

1.10

50.94

0.00

0.00%

0.00

0.00

0.00%

0.00

0.00

0.00

0.00

46.31

100.00%

50.94

und

6.00

150.00

900.00

0.00

0.00%

0.00

0.00

0.00%

0.00

0.00

0.00

0.00

6.00

100.00%

900.00

CONCRETO f'c= 140 kg/cm2 PARA MEDIA CAA

m3

0.11

50.00

5.50

0.00

0.00%

0.00

0.00

0.00%

0.00

0.00

0.00

0.00

0.11

100.00%

5.50

CONCRETO f'c= 140 kg/cm2 PARA DADOS DE EMPALME A CAMARA DE INSPECCION

m3

0.03

80.00

2.40

0.00

0.00%

0.00

0.00

0.00%

0.00

0.00

0.00

0.00

0.03

100.00%

2.40

CONCRETO f'c=175 kg/cm2 PARA CAMARA DE INSPECCION

m3

0.32

100.00

32.00

0.00

0.00%

0.00

0.00

0.00%

0.00

0.00

0.00

0.00

0.32

100.00%

32.00

CONCRETO f'c=210 kg/cm2 PARA TECHO DE CAMARA DE INSPECCION

m3

0.08

100.00

8.00

0.00

0.00%

0.00

0.00

0.00%

0.00

0.00

0.00

0.00

0.08

100.00%

8.00

ENCOFRADO Y DESENCOFRADO PARA DADOS DE EMPALME DE BUZON

m2

0.32

12.00

3.84

0.00

0.00%

0.00

0.00

0.00%

0.00

0.00

0.00

0.00

0.32

100.00%

3.84

ENCOFRADO Y DESENCOFRADO PARA CAMARA DE INSPECCION - SOLO MANO DE O.

m2

2.50

22.00

55.00

0.00

0.00%

0.00

0.00

0.00%

0.00

0.00

0.00

0.00

2.50

100.00%

55.00

ACERO DE REFUERZO f'y =4200 kg/cm2 PARA TECHO DE CAMARA DE INSPECCION

kg

0.61

0.98

0.60

0.00

0.00%

0.00

0.00

0.00%

0.00

0.00

0.00

0.00

0.61

100.00%

0.60

INSTALACION DE MARCO DE FF Y TAPA DE CA PARA CAMARA DE INSPECCION

und

1.00

45.00

45.00

0.00

0.00%

0.00

0.00

0.00%

0.00

0.00

0.00

0.00

1.00

100.00%

45.00

CAJAS DE CAMBIO 12" x 24"

pto

6.00

120.00

720.00

0.00

0.00%

0.00

0.00

0.00%

0.00

0.00

0.00

0.00

6.00

100.00%

720.00

% AVANCE

PARCIAL

METR.

SALDO

METR.

% AVANCE

PARCIAL

ACUMULADO

UND.

% AVANCE

PARCIAL

METR.

% AVANCE

PARCIAL

VARIOS
JUNTA DE DILATACION CON ASFALTO EN SARDINELES
CALZADURA
MOVIMIENTO DE TIERRAS

RED DE DESAGUE
MOVIMIENTO DE TIERRAS

INSTALACIONES

NIVELACION DE CAJA Y DESAGUE


CAMARA DE INSPECCION

TOTAL MONTO A PAGAR


AVANCE (%)

76,054.09
100.00%

0.00
0.00%

15,144.18
19.91%

15,144.18
19.91%

ZEGARRA ZABALETA JENNY


RUC N 20531963149

60,909.91
80.09%

VALORIZACION N 02

OBRA

SUB CONTRATISTA

CONTRATISTA GENERAL

FECHA

CREACION DE ESCALINATAS Y MURO DE CONTENCION DEL JR. SALAVERRY SECTOR ALTO, DISTRITO COISHCO- SANTA ANCASH 1ETAPA
CONSTRUTEC M&Z S.A.C.
CONSORCIO SALAVERRY
8 DE NOVIEMBRE AL 22 DE DICIEMBRE DEL 2012

VALORIZACIN I DE OBRA

.
ACUMULADO ANTERIOR
DESCRIPCIN

PRECIO
UNITARIO

PARCIAL

METR.

ACTUAL

UND.

METR.

GLB

1.00

440.00

440.00

TRAZO Y REPLANTEO PRELIMINAR EN ESCALINATAS

m2

52.83

1.00

52.83

0.00

0.00%

0.00

TRAZO Y REPLANTEO EN MURO DE CONTENCION

m2

76.55

1.00

76.55

25.00

32.66%

25.00

TRAZO Y REPLANTEO PARA SARDINELES

70.14

0.40

28.06

25.00

35.64%

TRAZO Y REPLANTEO EN CALZADURAS

m2

7.91

1.00

7.91

0.00

TRAZO Y REPLANTEO PARA RED DE DESAGUE

46.31

0.40

18.52

LIMPIEZA INICIAL DE OBRA

m2

173.68

1.00

SEALIZACION PARA LIMITE DE SEGURIDAD DE OBRA

76.55

0.50

CORTE EN TERRENO ROCOSO - SIN MARTILLO NEUMATICO

m3

390.96

PREPARACION DE BASE DE ZAPATA C/PLANCHA

m2

76.55

RELLENO COMPACTADO CON MATERIAL DE PRESTAMO

m3

ACARREO DE MATERIAL EXCENDETE D=100 m


ELIMINACION DE MATERIAL EXCEDENTE DM=2 km - SIN VOLQUETE

% AVANCE

PARCIAL

METR.

% AVANCE

ACUMULADO
PARCIAL

METR.

% AVANCE

SALDO
PARCIAL

METR.

% AVANCE

PARCIAL

OBRAS CIVILES
OBRAS PROVISIONALES
GUARDIANIA Y TRANSPORTE

0.50

50.00%

0.00%

0.00

0.50

50.00%

220.00

0.50

50.00%

220.00

25.85

48.93%

25.85

25.85

48.93%

25.85

26.98

51.07%

26.98

24.00

31.35%

24.00

49.00

64.01%

49.00

27.55

35.99%

27.55

10.00

20.00

28.51%

8.00

45.00

64.16%

18.00

25.14

35.84%

10.06

0.00%

0.00

0.00

0.00%

0.00

0.00

0.00%

0.00

7.91

100.00%

7.91

0.00

0.00%

0.00

0.00

0.00%

0.00

0.00

0.00%

0.00

46.31

100.00%

18.52

173.68

173.68

100.00%

173.68

0.00

0.00%

0.00

173.68

100.00%

173.68

0.00

0.00%

0.00

38.28

40.00

52.25%

20.00

15.00

19.60%

7.50

55.00

71.85%

27.50

21.55

28.15%

10.78

52.00

20,329.92

195.00

49.88%

10,140.00

20.00

5.12%

1,040.00

215.00

54.99%

11,180.00

175.96

45.01%

9,149.92

4.00

306.20

0.00

0.00%

0.00

49.00

64.01%

196.00

49.00

64.01%

196.00

27.55

35.99%

110.20

131.36

22.00

2,889.92

0.00

0.00%

0.00

0.00

0.00%

0.00

0.00

0.00%

0.00

131.36

100.00%

2,889.92

m3

508.25

17.00

8,640.25

253.50

49.88%

4,309.50

100.00

19.68%

1,700.00

353.50

69.55%

6,009.50

154.75

30.45%

2,630.75

m3

508.25

4.10

2,083.83

60.00

11.81%

246.00

100.00

19.68%

410.00

160.00

31.48%

656.00

348.25

68.52%

1,427.83

m2

76.55

7.00

535.85

0.00

0.00%

0.00

49.00

64.01%

343.00

49.00

64.01%

343.00

27.55

35.99%

192.85

CONCRETO ZAPATAS f'c=210 kg/cm2

m3

30.42

100.00

3,042.00

0.00

0.00%

0.00

20.00

65.75%

2,000.00

20.00

65.75%

2,000.00

10.42

34.25%

1,042.00

ENCOFRADO Y DESENCOFRADO PARA ZAPATAS - CON MADERA Y HERR.

m2

44.31

35.00

1,550.85

0.00

0.00%

0.00

30.12

67.98%

1,054.20

30.12

67.98%

1,054.20

14.19

32.02%

496.65

ACERO CORRUGADO f'y =4200 kg/cm2 PARA ZAPATA

kg

2,083.1

0.98

2,041.43

0.00

0.00%

0.00

1230.45

59.07%

1,205.84

1,230.45

59.07%

1,205.84

852.64

40.93%

835.59

m3

37.84

110.00

4,162.40

0.00

0.00%

0.00

10.41

27.51%

1,145.10

10.41

27.51%

1,145.10

27.43

72.49%

3,017.30

m2

297.79

50.00

14,889.50

0.00

0.00%

0.00

60.00

20.15%

3,000.00

60.00

20.15%

3,000.00

237.79

79.85%

11,889.50

kg

3,180.2

0.98

3,116.62

0.00

0.00%

0.00

2300.00

72.32%

2,254.00

2,300.00

72.32%

2,254.00

880.22

27.68%

862.62

m2

5.77

4.00

23.08

0.00

0.00%

0.00

1.50

26.00%

6.00

1.50

26.00%

6.00

4.27

74.00%

17.08

220.00

OBRAS PRELIMINARES

MURO DE CONTENCION
MOVIMIENTO DE TIERRAS

OBRA DE CONCRETO SIMPLE


SOLADO DE 4" PARA CIMIENTOS MEZCLA C : H 1:10
OBRA DE CONCRETO ARMADO
ZAPATAS

PANTALLA
CONCRETO f'c=210 kg/cm2 PARA PANTALLA DE MURO
ENCOFRADO Y DESENCOFRADO CARAVISTA EN PANTALLA DE MURO - CON PANELES Y
HERR.
ACERO CORRUGADO f'y =4200 kg/cm2 PARA PANTALLA DE MURO
VARIOS
JUNTA DE CONSTRUCCION EN MURO CON TECKNOPOR E=1"
ESCALINATAS
MOVIMIENTO DE TIERRAS
EXCAVACION MANUAL A NIVEL DE SUBRASANTE

m3

26.00

14.00

364.00

0.00

0.00%

0.00

0.00

0.00%

0.00

0.00

0.00%

0.00

26.00

100.00%

364.00

CONFORMACION Y COMPACTACION DE SUBRASANTE PARA VEREDAS Y ESCALONES

m2

52.83

10.00

528.30

0.00

0.00%

0.00

0.00

0.00%

0.00

0.00

0.00%

0.00

52.83

100.00%

528.30

AFIRMADO COMPACADO E= 4" VEREDAS Y ESCALONES - C/PLANCHA COMPACTADORA

m2

52.83

10.00

528.30

0.00

0.00%

0.00

0.00

0.00%

0.00

0.00

0.00%

0.00

52.83

100.00%

528.30

ACARREO DE MATERIAL EXCENDETE D=100 m

m3

33.80

17.00

574.60

0.00

0.00%

0.00

0.00

0.00%

0.00

0.00

0.00%

0.00

33.80

100.00%

574.60

ELIMINACION DE MATERIAL EXCEDENTE DM=2 km

m3

33.80

4.10

138.58

0.00

0.00%

0.00

0.00

0.00%

0.00

0.00

0.00%

0.00

33.80

100.00%

138.58

VALORIZACION N 02

OBRA

SUB CONTRATISTA

CONTRATISTA GENERAL

FECHA

CREACION DE ESCALINATAS Y MURO DE CONTENCION DEL JR. SALAVERRY SECTOR ALTO, DISTRITO COISHCO- SANTA ANCASH 1ETAPA
CONSTRUTEC M&Z S.A.C.
CONSORCIO SALAVERRY
8 DE NOVIEMBRE AL 22 DE DICIEMBRE DEL 2012

ESCALINATAS DE CONCRETO
CONCRETO EN VEREDAS Y ESCALONES f'c = 175 kg/cm2

m2

52.83

18.00

950.94

0.00

0.00%

0.00

0.00

0.00%

0.00

0.00

0.00%

0.00

52.83

100.00%

950.94

CONCRETO EN SARDINELES SUMERGIDOS f'c = 175 kg/cm2

32.40

8.00

259.20

0.00

0.00%

0.00

0.00

0.00%

0.00

0.00

0.00%

0.00

32.40

100.00%

259.20

ENCOFRADO Y DESENCOFRADO P/VEREDAS Y ESCALONES - CON MADERA Y HERR.

11.16

12.00

133.92

0.00

0.00%

0.00

0.00

0.00%

0.00

0.00

0.00%

0.00

11.16

100.00%

133.92

m2

5.85

20.00

117.00

0.00

0.00%

0.00

0.00

0.00%

0.00

0.00

0.00%

0.00

5.85

100.00%

117.00

EXCAVACION MANUAL DE ZANJAS PARA SARDINELES

m3

0.98

15.00

14.70

0.00

0.00%

0.00

0.50

51.02%

7.50

0.50

51.02%

7.50

0.48

48.98%

7.20

ELIMINACION DE MATERIAL EXCEDENTE DM=2 km - SIN VOLQUETE

m3

1.27

4.10

5.21

0.00

0.00%

0.00

0.80

62.99%

3.28

0.80

62.99%

3.28

0.47

37.01%

1.93

VARIOS
JUNTAS ASFALTICAS
SARDINEL PERALTADO
MOVIMIENTO DE TIERRAS

CONCRETO EN SARDINEL
SARDINEL PERALTADO DE CONCRETO F'C= 175 kg/cm2

m3

4.13

70.00

289.10

0.00

0.00%

0.00

0.00

0.00%

0.00

0.00

0.00%

0.00

4.13

100.00%

289.10

SARDINEL PERALTADO ENCOFRADO Y DESENCOFRADO CARA VISTA

m2

59.33

35.00

2,076.55

0.00

0.00%

0.00

0.00

0.00%

0.00

0.00

0.00%

0.00

59.33

100.00%

2,076.55

SARDINEL PERALTADO ACERO REFUERZO

kg

218.85

0.98

214.47

0.00

0.00%

0.00

0.00

0.00%

0.00

0.00

0.00%

0.00

218.85

100.00%

214.47

m2

4.22

20.00

84.40

0.00

0.00%

0.00

0.00

0.00%

0.00

0.00

0.00%

0.00

4.22

100.00%

84.40

EXCAVACION EN TERRENO P/CALZADURA EN VEREDAS Y ESCALONES

m3

4.15

30.00

124.50

0.00

0.00%

0.00

0.00

0.00%

0.00

0.00

0.00%

0.00

4.15

100.00%

124.50

ELIMINACION DE MATERIAL EXCEDENTE DM=2 km

m3

5.40

4.10

22.14

0.00

0.00%

0.00

0.00

0.00%

0.00

0.00

0.00%

0.00

5.40

100.00%

22.14

VARIOS
JUNTA DE DILATACION CON ASFALTO EN SARDINELES
CALZADURA
MOVIMIENTO DE TIERRAS

CONCRETO SIMPLE
CONCRETO CICLOPEO PARA CALZADURA EN VEREDAS Y ESCALONES MEZCLA 1:10 + 30%
P.G.
ENCOFRADO Y DESENCOFRADO PARA CALZADURAS EN VEREDAS Y ESCALONES - CON
MADERA
REVESTIMIENTO DE CALZADURAS PARA VEREDAS Y ESCALONES

0.00%
m3

10.54

90.00

948.60

0.00

0.00%

0.00

0.00

0.00%

0.00

0.00

0.00%

0.00

10.54

100.00%

948.60

m2

30.88

30.00

926.40

0.00

0.00%

0.00

0.00

0.00%

0.00

0.00

0.00%

0.00

30.88

100.00%

926.40

m2

30.88

14.00

432.32

0.00

0.00%

0.00

0.00

0.00%

0.00

0.00

0.00%

0.00

30.88

100.00%

432.32

EXCAVACION DE ZANJAS H prom = 1.00m

m3

23.17

24.00

556.08

0.00

0.00%

0.00

0.00

0.00%

0.00

0.00

0.00%

0.00

23.17

100.00%

556.08

EXCAVACION PARA CAJAS

m3

1.60

24.00

38.40

0.00

0.00%

0.00

0.00

0.00%

0.00

0.00

0.00%

0.00

1.60

100.00%

38.40

EXCAVACION PARA BUZONETAS

m3

0.79

24.00

18.96

0.00

0.00%

0.00

0.00

0.00%

0.00

0.00

0.00%

0.00

0.79

100.00%

18.96

RELLENO COMPACTADO CON MATERIAL DE PRESTAMO

m3

13.67

22.00

300.74

0.00

0.00%

0.00

0.00

0.00%

0.00

0.00

0.00%

0.00

13.67

100.00%

300.74

ELIMINACION DE MATERIAL EXCEDENTE DM=2 km

m3

2.61

4.10

10.70

0.00

0.00%

0.00

0.00

0.00%

0.00

0.00

0.00%

0.00

2.61

100.00%

10.70

SUMINISTRO E INSTALACION DE TUBERIA PVC ISO4435 DN110 MM S-20

46.31

2.70

125.04

0.00

0.00%

0.00

0.00

0.00%

0.00

0.00

0.00%

0.00

46.31

100.00%

125.04

ALINEAMIENTO Y AJUSTE DE TUBERIA PVC ISO4435 DN110 MM S-20

46.31

1.10

50.94

0.00

0.00%

0.00

0.00

0.00%

0.00

0.00

0.00%

0.00

46.31

100.00%

50.94

und

6.00

150.00

900.00

0.00

0.00%

0.00

0.00

0.00%

0.00

0.00

0.00%

0.00

6.00

100.00%

900.00

RED DE DESAGUE
MOVIMIENTO DE TIERRAS

INSTALACIONES

NIVELACION DE CAJA Y DESAGUE

VALORIZACION N 02

OBRA

SUB CONTRATISTA

CONTRATISTA GENERAL

FECHA

CREACION DE ESCALINATAS Y MURO DE CONTENCION DEL JR. SALAVERRY SECTOR ALTO, DISTRITO COISHCO- SANTA ANCASH 1ETAPA
CONSTRUTEC M&Z S.A.C.
CONSORCIO SALAVERRY
8 DE NOVIEMBRE AL 22 DE DICIEMBRE DEL 2012

CAMARA DE INSPECCION
CONCRETO f'c= 140 kg/cm2 PARA MEDIA CAA

m3

0.11

50.00

5.50

0.00

0.00%

0.00

0.00

0.00%

0.00

0.00

0.00%

0.00

0.11

100.00%

CONCRETO f'c= 140 kg/cm2 PARA DADOS DE EMPALME A CAMARA DE INSPECCION

m3

0.03

80.00

2.40

0.00

0.00%

0.00

0.00

0.00%

0.00

0.00

0.00%

0.00

0.03

100.00%

2.40

CONCRETO f'c=175 kg/cm2 PARA CAMARA DE INSPECCION

m3

0.32

100.00

32.00

0.00

0.00%

0.00

0.00

0.00%

0.00

0.00

0.00%

0.00

0.32

100.00%

32.00

CONCRETO f'c=210 kg/cm2 PARA TECHO DE CAMARA DE INSPECCION

m3

0.08

100.00

8.00

0.00

0.00%

0.00

0.00

0.00%

0.00

0.00

0.00%

0.00

0.08

100.00%

8.00

ENCOFRADO Y DESENCOFRADO PARA DADOS DE EMPALME DE BUZON

m2

0.32

12.00

3.84

0.00

0.00%

0.00

0.00

0.00%

0.00

0.00

0.00%

0.00

0.32

100.00%

3.84

ENCOFRADO Y DESENCOFRADO PARA CAMARA DE INSPECCION - SOLO MANO DE O.

m2

2.50

22.00

55.00

0.00

0.00%

0.00

0.00

0.00%

0.00

0.00

0.00%

0.00

2.50

100.00%

55.00

ACERO DE REFUERZO f'y =4200 kg/cm2 PARA TECHO DE CAMARA DE INSPECCION

kg

0.61

0.98

0.60

0.00

0.00%

0.00

0.00

0.00%

0.00

0.00

0.00%

0.00

0.61

100.00%

0.60

INSTALACION DE MARCO DE FF Y TAPA DE CA PARA CAMARA DE INSPECCION

und

1.00

45.00

45.00

0.00

0.00%

0.00

0.00

0.00%

0.00

0.00

0.00%

0.00

1.00

100.00%

45.00

CAJAS DE CAMBIO 12" x 24"

pto

6.00

120.00

720.00

0.00

0.00%

0.00

0.00

0.00%

0.00

0.00

0.00%

0.00

6.00

100.00%

720.00

TOTAL MONTO A PAGAR


AVANCE (%)

76,054.09
100.00%

15,144.18
19.91%

14,430.27
18.97%

29,574.45
38.89%

DESCRIPCION

FECHA DE PAGO

VALORIZACION N02

08/12/2012 - 22/12/2012

GLB

14430.27

14430.27

ING. RESIDENTE

26/12/12-26/12/12

HH

3000

3000.00

BASES

UND

300

300.00

CLAVOS DE 2" Y3"

CAJAS

1.5

120

TOTAL

UND

CANT

5.50

46,479.64
61.11%

TOTAL

C/U

180.00

S/. 17,910.27

ZEGARRA ZABALETA JENNY


RUC N 20531963149

VALORIZACION N 03

OBRA

SUB CONTRATISTA

CONTRATISTA GENERAL

FECHA

CREACION DE ESCALINATAS Y MURO DE CONTENCION DEL JR. SALAVERRY SECTOR ALTO, DISTRITO COISHCO- SANTA ANCASH 1ETAPA
CONSTRUTEC M&Z S.A.C.
CONSORCIO SALAVERRY
24 DE DICIEMBRE AL 05 DE ENERO DEL 2013

VALORIZACIN III DE OBRA

.
ACUMULADO ANTERIOR
DESCRIPCIN

UND.

METR.

PRECIO
UNITARIO

PARCIAL

METR.

% AVANCE

ACTUAL

PARCIAL

METR.

% AVANCE

ACUMULADO
PARCIAL

METR.

% AVANCE

SALDO
PARCIAL

METR.

% AVANCE

PARCIAL

OBRAS CIVILES
OBRAS PROVISIONALES
GUARDIANIA Y TRANSPORTE

GLB

1.00

440.00

440.00

0.50

50.00%

220.00

0.00

0.00%

0.00

0.50

50.00%

220.00

0.50

50.00%

220.00

TRAZO Y REPLANTEO PRELIMINAR EN ESCALINATAS

m2

52.83

1.00

52.83

25.85

48.93%

25.85

0.00

0.00%

0.00

25.85

48.93%

25.85

26.98

51.07%

26.98

TRAZO Y REPLANTEO EN MURO DE CONTENCION

m2

76.55

1.00

76.55

49.00

64.01%

49.00

20.00

26.13%

20.00

69.00

90.14%

69.00

7.55

9.86%

7.55

TRAZO Y REPLANTEO PARA SARDINELES

70.14

0.40

28.06

45.00

64.16%

18.00

15.00

21.39%

6.00

60.00

85.54%

24.00

10.14

14.46%

4.06

TRAZO Y REPLANTEO EN CALZADURAS

m2

7.91

1.00

7.91

0.00

0.00%

0.00

0.00

0.00%

0.00

0.00

0.00%

0.00

7.91

100.00%

7.91

TRAZO Y REPLANTEO PARA RED DE DESAGUE

46.31

0.40

18.52

0.00

0.00%

0.00

0.00

0.00%

0.00

0.00

0.00%

0.00

46.31

100.00%

18.52

LIMPIEZA INICIAL DE OBRA

m2

173.68

1.00

173.68

173.68

100.00%

173.68

0.00

0.00%

0.00

173.68

100.00%

173.68

0.00

0.00%

0.00

SEALIZACION PARA LIMITE DE SEGURIDAD DE OBRA

76.55

0.50

38.28

55.00

71.85%

27.50

12.00

15.68%

6.00

67.00

87.52%

33.50

9.55

12.48%

4.78

CORTE EN TERRENO ROCOSO - SIN MARTILLO NEUMATICO

m3

390.96

52.00

20,329.92

215.00

54.99%

11,180.00

65.00

16.63%

3,380.00

280.00

71.62%

14,560.00

110.96

28.38%

5,769.92

PREPARACION DE BASE DE ZAPATA C/PLANCHA

m2

76.55

4.00

306.20

49.00

64.01%

196.00

12.00

15.68%

48.00

61.00

79.69%

244.00

15.55

20.31%

62.20

RELLENO COMPACTADO CON MATERIAL DE PRESTAMO

m3

131.36

22.00

2,889.92

0.00

0.00%

0.00

14.00

10.66%

308.00

14.00

10.66%

308.00

117.36

89.34%

2,581.92

ACARREO DE MATERIAL EXCENDETE D=100 m

m3

508.25

17.00

8,640.25

353.50

69.55%

6,009.50

8.00

1.57%

136.00

361.50

71.13%

6,145.50

146.75

28.87%

2,494.75

ELIMINACION DE MATERIAL EXCEDENTE DM=2 km - SIN VOLQUETE

m3

508.25

4.10

2,083.83

160.00

31.48%

656.00

55.00

10.82%

225.50

215.00

42.30%

881.50

293.25

57.70%

1,202.33

m2

76.55

7.00

535.85

49.00

64.01%

343.00

0.00

0.00%

0.00

49.00

64.01%

343.00

27.55

35.99%

192.85

OBRAS PRELIMINARES

MURO DE CONTENCION
MOVIMIENTO DE TIERRAS

OBRA DE CONCRETO SIMPLE


SOLADO DE 4" PARA CIMIENTOS MEZCLA C : H 1:10
OBRA DE CONCRETO ARMADO
ZAPATAS
CONCRETO ZAPATAS f'c=210 kg/cm2

m3

30.42

100.00

3,042.00

20.00

65.75%

2,000.00

4.00

13.15%

400.00

24.00

78.90%

2,400.00

6.42

21.10%

642.00

ENCOFRADO Y DESENCOFRADO PARA ZAPATAS - CON MADERA Y HERR.

m2

44.31

35.00

1,550.85

30.12

67.98%

1,054.20

0.00

0.00%

0.00

30.12

67.98%

1,054.20

14.19

32.02%

496.65

ACERO CORRUGADO f'y =4200 kg/cm2 PARA ZAPATA

kg

2,083.1

0.98

2,041.43

1230.45

59.07%

1,205.84

0.00

0.00%

0.00

1,230.45

59.07%

1,205.84

852.64

40.93%

835.59

m3

37.84

110.00

4,162.40

10.41

27.51%

1,145.10

20.00

52.85%

2,200.00

30.41

80.36%

3,345.10

7.43

19.64%

817.30

m2

297.79

50.00

14,889.50

60.00

20.15%

3,000.00

68.00

22.83%

3,400.00

128.00

42.98%

6,400.00

169.79

57.02%

8,489.50

2300.00

PANTALLA
CONCRETO f'c=210 kg/cm2 PARA PANTALLA DE MURO
ENCOFRADO Y DESENCOFRADO CARAVISTA EN PANTALLA DE MURO - CON PANELES Y
HERR.
ACERO CORRUGADO f'y =4200 kg/cm2 PARA PANTALLA DE MURO

kg

3,180.2

0.98

3,116.62

72.32%

2,254.00

100.00

3.14%

98.00

2,400.00

75.47%

2,352.00

780.22

24.53%

764.62

m2

5.77

4.00

23.08

1.50

26.00%

6.00

0.00

0.00%

0.00

1.50

26.00%

6.00

4.27

74.00%

17.08

EXCAVACION MANUAL A NIVEL DE SUBRASANTE

m3

26.00

14.00

364.00

0.00

0.00%

0.00

0.00

0.00%

0.00

0.00

0.00%

0.00

26.00

100.00%

364.00

CONFORMACION Y COMPACTACION DE SUBRASANTE PARA VEREDAS Y ESCALONES

m2

52.83

10.00

528.30

0.00

0.00%

0.00

0.00

0.00%

0.00

0.00

0.00%

0.00

52.83

100.00%

528.30

AFIRMADO COMPACADO E= 4" VEREDAS Y ESCALONES - C/PLANCHA COMPACTADORA

m2

52.83

10.00

528.30

0.00

0.00%

0.00

0.00

0.00%

0.00

0.00

0.00%

0.00

52.83

100.00%

528.30

ACARREO DE MATERIAL EXCENDETE D=100 m

m3

33.80

17.00

574.60

0.00

0.00%

0.00

0.00

0.00%

0.00

0.00

0.00%

0.00

33.80

100.00%

574.60

ELIMINACION DE MATERIAL EXCEDENTE DM=2 km

m3

33.80

4.10

138.58

0.00

0.00%

0.00

12.00

35.50%

49.20

12.00

35.50%

49.20

21.80

64.50%

89.38

CONCRETO EN VEREDAS Y ESCALONES f'c = 175 kg/cm2

m2

52.83

18.00

950.94

0.00

0.00%

0.00

0.00

0.00%

0.00

0.00

0.00%

0.00

52.83

100.00%

950.94

CONCRETO EN SARDINELES SUMERGIDOS f'c = 175 kg/cm2

32.40

8.00

259.20

0.00

0.00%

0.00

0.00

0.00%

0.00

0.00

0.00%

0.00

32.40

100.00%

259.20

ENCOFRADO Y DESENCOFRADO P/VEREDAS Y ESCALONES - CON MADERA Y HERR.

11.16

12.00

133.92

0.00

0.00%

0.00

0.00

0.00%

0.00

0.00

0.00%

0.00

11.16

100.00%

133.92

m2

5.85

20.00

117.00

0.00

0.00%

0.00

0.00

0.00%

0.00

0.00%

0.00

5.85

100.00%

117.00

VARIOS
JUNTA DE CONSTRUCCION EN MURO CON TECKNOPOR E=1"

0.00

ESCALINATAS
MOVIMIENTO DE TIERRAS

ESCALINATAS DE CONCRETO

VARIOS
JUNTAS ASFALTICAS
SARDINEL PERALTADO
MOVIMIENTO DE TIERRAS

0.00
0.00

EXCAVACION MANUAL DE ZANJAS PARA SARDINELES

m3

0.98

15.00

14.70

0.50

51.02%

7.50

0.50

51.02%

7.50

1.00

102.04%

15.00

-0.02

-2.04%

-0.30

ELIMINACION DE MATERIAL EXCEDENTE DM=2 km - SIN VOLQUETE

m3

1.27

4.10

5.21

0.80

62.99%

3.28

0.60

47.24%

2.46

1.40

110.24%

5.74

-0.13

-10.24%

-0.53

CONCRETO EN SARDINEL
SARDINEL PERALTADO DE CONCRETO F'C= 175 kg/cm2

m3

4.13

70.00

289.10

0.00

0.00%

0.00

1.00

24.21%

70.00

1.00

24.21%

70.00

3.13

75.79%

219.10

SARDINEL PERALTADO ENCOFRADO Y DESENCOFRADO CARA VISTA

m2

59.33

35.00

2,076.55

0.00

0.00%

0.00

35.00

58.99%

1,225.00

35.00

58.99%

1,225.00

24.33

41.01%

851.55

SARDINEL PERALTADO ACERO REFUERZO

kg

218.85

0.98

214.47

0.00

0.00%

0.00

51.00

23.30%

49.98

51.00

23.30%

49.98

167.85

76.70%

164.49

m2

4.22

20.00

84.40

0.00

0.00%

0.00

0.00

0.00%

0.00

0.00

0.00%

0.00

4.22

100.00%

84.40

EXCAVACION EN TERRENO P/CALZADURA EN VEREDAS Y ESCALONES

m3

4.15

30.00

124.50

0.00

0.00%

0.00

0.00

0.00%

0.00

0.00

0.00%

0.00

4.15

100.00%

124.50

ELIMINACION DE MATERIAL EXCEDENTE DM=2 km

m3

5.40

4.10

22.14

0.00

0.00%

0.00

0.00

0.00%

0.00

0.00

0.00%

0.00

5.40

100.00%

22.14

VARIOS
JUNTA DE DILATACION CON ASFALTO EN SARDINELES
CALZADURA
MOVIMIENTO DE TIERRAS

CONCRETO SIMPLE
CONCRETO CICLOPEO PARA CALZADURA EN VEREDAS Y ESCALONES MEZCLA 1:10 + 30%
P.G.
ENCOFRADO Y DESENCOFRADO PARA CALZADURAS EN VEREDAS Y ESCALONES - CON
MADERA
REVESTIMIENTO DE CALZADURAS PARA VEREDAS Y ESCALONES

0.00%
m3

10.54

90.00

948.60

0.00

0.00%

0.00

0.00

0.00%

0.00

0.00

0.00%

0.00

10.54

100.00%

948.60

m2

30.88

30.00

926.40

0.00

0.00%

0.00

0.00

0.00%

0.00

0.00

0.00%

0.00

30.88

100.00%

926.40

m2

30.88

14.00

432.32

0.00

0.00%

0.00

0.00

0.00%

0.00

0.00

0.00%

0.00

30.88

100.00%

432.32

EXCAVACION DE ZANJAS H prom = 1.00m

m3

23.17

24.00

556.08

0.00

0.00%

0.00

0.00

0.00%

0.00

0.00

0.00%

0.00

23.17

100.00%

556.08

EXCAVACION PARA CAJAS

m3

1.60

24.00

38.40

0.00

0.00%

0.00

0.00

0.00%

0.00

0.00

0.00%

0.00

1.60

100.00%

EXCAVACION PARA BUZONETAS

m3

0.79

24.00

18.96

0.00

0.00%

0.00

0.00

0.00%

0.00

0.00

0.00%

0.00

0.79

100.00%

18.96

RELLENO COMPACTADO CON MATERIAL DE PRESTAMO

m3

13.67

22.00

300.74

0.00

0.00%

0.00

0.00

0.00%

0.00

0.00

0.00%

0.00

13.67

100.00%

300.74

ELIMINACION DE MATERIAL EXCEDENTE DM=2 km

m3

2.61

4.10

10.70

0.00

0.00%

0.00

0.00

0.00%

0.00

0.00

0.00%

0.00

2.61

100.00%

10.70

SUMINISTRO E INSTALACION DE TUBERIA PVC ISO4435 DN110 MM S-20

46.31

2.70

125.04

0.00

0.00%

0.00

0.00

0.00%

0.00

0.00

0.00%

0.00

46.31

100.00%

125.04

ALINEAMIENTO Y AJUSTE DE TUBERIA PVC ISO4435 DN110 MM S-20

46.31

1.10

50.94

0.00

0.00%

0.00

0.00

0.00%

0.00

0.00

0.00%

0.00

46.31

100.00%

50.94

und

6.00

150.00

900.00

0.00

0.00%

0.00

0.00

0.00%

0.00

0.00

0.00%

0.00

6.00

100.00%

900.00

CONCRETO f'c= 140 kg/cm2 PARA MEDIA CAA

m3

0.11

50.00

5.50

0.00

0.00%

0.00

0.00

0.00%

0.00

0.00

0.00%

0.00

0.11

100.00%

CONCRETO f'c= 140 kg/cm2 PARA DADOS DE EMPALME A CAMARA DE INSPECCION

m3

0.03

80.00

2.40

0.00

0.00%

0.00

0.00

0.00%

0.00

0.00

0.00%

0.00

0.03

100.00%

2.40

CONCRETO f'c=175 kg/cm2 PARA CAMARA DE INSPECCION

m3

0.32

100.00

32.00

0.00

0.00%

0.00

0.00

0.00%

0.00

0.00

0.00%

0.00

0.32

100.00%

32.00

CONCRETO f'c=210 kg/cm2 PARA TECHO DE CAMARA DE INSPECCION

m3

0.08

100.00

8.00

0.00

0.00%

0.00

0.00

0.00%

0.00

0.00

0.00%

0.00

0.08

100.00%

8.00

ENCOFRADO Y DESENCOFRADO PARA DADOS DE EMPALME DE BUZON

m2

0.32

12.00

3.84

0.00

0.00%

0.00

0.00

0.00%

0.00

0.00

0.00%

0.00

0.32

100.00%

3.84

ENCOFRADO Y DESENCOFRADO PARA CAMARA DE INSPECCION - SOLO MANO DE O.

m2

2.50

22.00

55.00

0.00

0.00%

0.00

0.00

0.00%

0.00

0.00

0.00%

0.00

2.50

100.00%

55.00

ACERO DE REFUERZO f'y =4200 kg/cm2 PARA TECHO DE CAMARA DE INSPECCION

kg

0.61

0.60

0.00

0.00%

0.00

0.00

0.00%

0.00

0.00

0.00%

0.00

0.61

100.00%

INSTALACION DE MARCO DE FF Y TAPA DE CA PARA CAMARA DE INSPECCION

und

1.00

45.00

45.00

0.00

0.00%

0.00

0.00

0.00%

0.00

0.00

0.00%

0.00

1.00

100.00%

45.00

CAJAS DE CAMBIO 12" x 24"

pto

6.00

120.00

720.00

0.00

0.00%

0.00

0.00

0.00%

0.00

0.00

0.00%

0.00

6.00

100.00%

720.00

RED DE DESAGUE
MOVIMIENTO DE TIERRAS
38.40

INSTALACIONES

NIVELACION DE CAJA Y DESAGUE


CAMARA DE INSPECCION

TOTAL MONTO A PAGAR


AVANCE (%)

0.98

76,054.09
100.00%

29,574.45
38.89%

11,631.64
15.29%

41,206.09
54.18%

5.50

0.60

34,848.00
45.82%

ZEGARRA ZABALETA JENNY


RUC N 20531963149

OBRA

SUB CONTRATISTA

CONTRATISTA GENERAL

FECHA

CREACION DE ES
CONSTRUTEC M&
CONSORCIO SAL
07 DE ENERO AL

DESCRIPCIN

UND.

OBRAS CIVILES
OBRAS PROVISIONALES
GUARDIANIA Y TRANSPORTE

GLB

OBRAS PRELIMINARES
TRAZO Y REPLANTEO PRELIMINAR EN ESCALINATAS

m2

TRAZO Y REPLANTEO EN MURO DE CONTENCION

m2

TRAZO Y REPLANTEO PARA SARDINELES

TRAZO Y REPLANTEO EN CALZADURAS

m2

TRAZO Y REPLANTEO PARA RED DE DESAGUE

LIMPIEZA INICIAL DE OBRA

m2

SEALIZACION PARA LIMITE DE SEGURIDAD DE OBRA

MURO DE CONTENCION
MOVIMIENTO DE TIERRAS
CORTE EN TERRENO ROCOSO - SIN MARTILLO NEUMATICO

m3

PREPARACION DE BASE DE ZAPATA C/PLANCHA

m2

RELLENO COMPACTADO CON MATERIAL DE PRESTAMO

m3

ACARREO DE MATERIAL EXCENDETE D=100 m

m3

ELIMINACION DE MATERIAL EXCEDENTE DM=2 km - SIN VOLQUETE

m3

OBRA DE CONCRETO SIMPLE


SOLADO DE 4" PARA CIMIENTOS MEZCLA C : H 1:10
OBRA DE CONCRETO ARMADO
ZAPATAS

m2

CONCRETO ZAPATAS f'c=210 kg/cm2

m3

ENCOFRADO Y DESENCOFRADO PARA ZAPATAS - CON MADERA Y HERR.

m2

ACERO CORRUGADO f'y =4200 kg/cm2 PARA ZAPATA

kg

PANTALLA
CONCRETO f'c=210 kg/cm2 PARA PANTALLA DE MURO
ENCOFRADO Y DESENCOFRADO CARAVISTA EN PANTALLA DE MURO - CON PANELES Y
HERR.
ACERO CORRUGADO f'y =4200 kg/cm2 PARA PANTALLA DE MURO

m3
m2
kg

VARIOS
JUNTA DE CONSTRUCCION EN MURO CON TECKNOPOR E=1"

m2

ESCALINATAS
MOVIMIENTO DE TIERRAS
EXCAVACION MANUAL A NIVEL DE SUBRASANTE

m3

CONFORMACION Y COMPACTACION DE SUBRASANTE PARA VEREDAS Y ESCALONES

m2

AFIRMADO COMPACADO E= 4" VEREDAS Y ESCALONES - C/PLANCHA COMPACTADORA

m2

ACARREO DE MATERIAL EXCENDETE D=100 m

m3

ELIMINACION DE MATERIAL EXCEDENTE DM=2 km

m3

ESCALINATAS DE CONCRETO
CONCRETO EN VEREDAS Y ESCALONES f'c = 175 kg/cm2

m2

CONCRETO EN SARDINELES SUMERGIDOS f'c = 175 kg/cm2

ENCOFRADO Y DESENCOFRADO P/VEREDAS Y ESCALONES - CON MADERA Y HERR.

VARIOS
JUNTAS ASFALTICAS

m2

SARDINEL PERALTADO
MOVIMIENTO DE TIERRAS
EXCAVACION MANUAL DE ZANJAS PARA SARDINELES

m3

ELIMINACION DE MATERIAL EXCEDENTE DM=2 km - SIN VOLQUETE

m3

CONCRETO EN SARDINEL
SARDINEL PERALTADO DE CONCRETO F'C= 175 kg/cm2

m3

SARDINEL PERALTADO ENCOFRADO Y DESENCOFRADO CARA VISTA

m2

SARDINEL PERALTADO ACERO REFUERZO

kg

VARIOS
JUNTA DE DILATACION CON ASFALTO EN SARDINELES

m2

CALZADURA
MOVIMIENTO DE TIERRAS
EXCAVACION EN TERRENO P/CALZADURA EN VEREDAS Y ESCALONES

m3

ELIMINACION DE MATERIAL EXCEDENTE DM=2 km

m3

CONCRETO SIMPLE

CONCRETO CICLOPEO PARA CALZADURA EN VEREDAS Y ESCALONES MEZCLA 1:10 + 30%


P.G. - DISMINUIRA METRADO POR LO QUE SE CAMBIO POR MURO ARMADO
ENCOFRADO Y DESENCOFRADO PARA CALZADURAS EN VEREDAS Y ESCALONES - CON
MADERA
REVESTIMIENTO DE CALZADURAS PARA VEREDAS Y ESCALONES

m3
m2
m2

RED DE DESAGUE
MOVIMIENTO DE TIERRAS
EXCAVACION DE ZANJAS H prom = 1.00m

m3

EXCAVACION PARA CAJAS

m3

EXCAVACION PARA BUZONETAS

m3

RELLENO COMPACTADO CON MATERIAL DE PRESTAMO

m3

ELIMINACION DE MATERIAL EXCEDENTE DM=2 km

m3

INSTALACIONES
SUMINISTRO E INSTALACION DE TUBERIA PVC ISO4435 DN110 MM S-20

ALINEAMIENTO Y AJUSTE DE TUBERIA PVC ISO4435 DN110 MM S-20

NIVELACION DE CAJA Y DESAGUE

und

CAMARA DE INSPECCION
CONCRETO f'c= 140 kg/cm2 PARA MEDIA CAA

m3

CONCRETO f'c= 140 kg/cm2 PARA DADOS DE EMPALME A CAMARA DE INSPECCION

m3

CONCRETO f'c=175 kg/cm2 PARA CAMARA DE INSPECCION

m3

CONCRETO f'c=210 kg/cm2 PARA TECHO DE CAMARA DE INSPECCION

m3

ENCOFRADO Y DESENCOFRADO PARA DADOS DE EMPALME DE BUZON

m2

ENCOFRADO Y DESENCOFRADO PARA CAMARA DE INSPECCION - SOLO MANO DE O.

m2

ACERO DE REFUERZO f'y =4200 kg/cm2 PARA TECHO DE CAMARA DE INSPECCION

kg

INSTALACION DE MARCO DE FF Y TAPA DE CA PARA CAMARA DE INSPECCION

und

CAJAS DE CAMBIO 12" x 24"

pto

TOTAL MONTO A PAGAR


AVANCE (%)

MURO ARMADO DE CONTENCION ADICIONAL


MURO DE CONTENCION
MOVIMIENTO DE TIERRAS
PREPARACION DE BASE DE ZAPATA C/PLANCHA

m2

OBRA DE CONCRETO SIMPLE


SOLADO DE 4" PARA CIMIENTOS MEZCLA C : H 1:10
OBRA DE CONCRETO ARMADO
ZAPATAS

m2

CONCRETO ZAPATAS f'c=210 kg/cm2

m3

ENCOFRADO Y DESENCOFRADO PARA ZAPATAS - CON MADERA Y HERR.

m2

ACERO CORRUGADO f'y =4200 kg/cm2 PARA ZAPATA

kg

PANTALLA
CONCRETO f'c=210 kg/cm2 PARA PANTALLA DE MURO
ENCOFRADO Y DESENCOFRADO CARAVISTA EN PANTALLA DE MURO - CON PANELES Y
HERR.
ACERO CORRUGADO f'y =4200 kg/cm2 PARA PANTALLA DE MURO

m3
m2
kg

VAL

MURO ARMADO

COLOCACI

RETROEXCAVADO

VALORIZACION N 04

CREACION DE ESCALINATAS Y MURO DE CONTENCION DEL JR. SALAVERRY SECTOR ALTO, DISTRITO
CONSTRUTEC M&Z S.A.C.
CONSORCIO SALAVERRY
07 DE ENERO AL 19 DE ENERO DEL 2013

VALORIZACIN III DE OBRA


ACUMULADO ANTERIOR

METR.

PRECIO
UNITARIO

PARCIAL

METR.

% AVANCE

ACTUAL

PARCIAL

METR.

% AVANCE

1.00

440.00

440.00

0.50

50.00%

220.00

0.00

0.00%

52.83

1.00

52.83

25.85

48.93%

25.85

0.00

0.00%

76.55

1.00

76.55

69.00

90.14%

69.00

7.55

9.86%

70.14

0.40

28.06

60.00

85.54%

24.00

0.00

0.00%

7.91

1.00

7.91

0.00

0.00%

0.00

0.00

0.00%

46.31

0.40

18.52

0.00

0.00%

0.00

0.00

0.00%

173.68

1.00

173.68

173.68

100.00%

173.68

0.00

0.00%

76.55

0.50

38.28

67.00

87.52%

33.50

4.55

5.94%

390.96

52.00

20,329.92

280.00

71.62%

14,560.00

80.96

20.71%

76.55

4.00

306.20

61.00

79.69%

244.00

8.55

11.17%

131.36

22.00

2,889.92

14.00

10.66%

308.00

45.36

34.53%

508.25

17.00

8,640.25

361.50

71.13%

6,145.50

70.00

13.77%

508.25

4.10

2,083.83

215.00

42.30%

881.50

55.00

10.82%

76.55

7.00

535.85

49.00

64.01%

343.00

0.00

0.00%

30.42

100.00

3,042.00

24.00

78.90%

2,400.00

0.00

0.00%

44.31

35.00

1,550.85

30.12

67.98%

1,054.20

0.00

0.00%

2,083.1

0.98

2,041.43

1230.45

59.07%

1,205.84

0.00

0.00%

37.84

110.00

4,162.40

30.41

80.36%

3,345.10

0.00

0.00%

297.79

50.00

14,889.50

128.00

42.98%

6,400.00

0.00

0.00%

3,180.2

0.98

3,116.62

2400.00

75.47%

2,352.00

0.00

0.00%

5.77

4.00

23.08

1.50

26.00%

6.00

0.00

0.00%

26.00

14.00

364.00

0.00

0.00%

0.00

0.00

0.00%

52.83

10.00

528.30

0.00

0.00%

0.00

0.00

0.00%

52.83

10.00

528.30

0.00

0.00%

0.00

0.00

0.00%

33.80

17.00

574.60

0.00

0.00%

0.00

0.00

0.00%

33.80

4.10

138.58

12.00

35.50%

49.20

0.00

0.00%

52.83

18.00

950.94

0.00

0.00%

0.00

0.00

0.00%

32.40

8.00

259.20

0.00

0.00%

0.00

0.00

0.00%

11.16

12.00

133.92

0.00

0.00%

0.00

0.00

0.00%

5.85

20.00

117.00

0.00

0.00%

0.00

0.00

0.00%

0.98

15.00

14.70

1.00

102.04%

15.00

0.00

0.00%

1.27

4.10

5.21

1.40

110.24%

5.74

0.00

0.00%

0.00
4.13

70.00

289.10

1.00

24.21%

70.00

0.00

0.00%

59.33

35.00

2,076.55

35.00

58.99%

1,225.00

0.00

0.00%

218.85

0.98

214.47

51.00

23.30%

49.98

0.00

0.00%

0.00
4.22

20.00

84.40

0.00

0.00%

0.00

0.00

0.00%

4.15

30.00

124.50

0.00

0.00%

0.00

0.00

0.00%

5.40

4.10

22.14

0.00

0.00%

0.00

0.00

0.00%

10.54

90.00

948.60

0.00

0.00%

0.00

0.00

0.00%

30.88

30.00

926.40

0.00

0.00%

0.00

0.00

0.00%

30.88

14.00

432.32

0.00

0.00%

0.00

0.00

0.00%

23.17

24.00

556.08

0.00

0.00%

0.00

0.00

0.00%

1.60

24.00

38.40

0.00

0.00%

0.00

0.00

0.00%

0.79

24.00

18.96

0.00

0.00%

0.00

0.00

0.00%

13.67

22.00

300.74

0.00

0.00%

0.00

0.00

0.00%

2.61

4.10

10.70

0.00

0.00%

0.00

0.00

0.00%

46.31

2.70

125.04

0.00

0.00%

0.00

0.00

0.00%

46.31

1.10

50.94

0.00

0.00%

0.00

0.00

0.00%

6.00

150.00

900.00

0.00

0.00%

0.00

0.00

0.00%

0.11

50.00

5.50

0.00

0.00%

0.00

0.00

0.00%

0.03

80.00

2.40

0.00

0.00%

0.00

0.00

0.00%

0.32

100.00

32.00

0.00

0.00%

0.00

0.00

0.00%

0.08

100.00

8.00

0.00

0.00%

0.00

0.00

0.00%

0.32

12.00

3.84

0.00

0.00%

0.00

0.00

0.00%

2.50

22.00

55.00

0.00

0.00%

0.00

0.00

0.00%

0.61

0.98

0.60

0.00

0.00%

0.00

0.00

0.00%

1.00

45.00

45.00

0.00

0.00%

0.00

0.00

0.00%

6.00

120.00

720.00

0.00

0.00%

0.00

0.00

0.00%

76,054.09
100.00%

4.00

4.00

16.00

4.00

7.00

28.00

41,206.09
54.18%

1.20

100.00

120.00

5.10

35.00

178.50

32.0

0.98

31.36

3.00

110.00

330.00

33.63

50.00

1,681.25

184.0

0.98

180.32

2,565.43

DESCRIPCION

FECHA DE PAGO

VALORIZACION N04

07/01/2013 - 12/01/2013

GLB

MURO ARMADO DE CONTENCION ADICIONAL

26/12/12-26/12/12

HH

COLOCACION DE CARTEL DE OBRA

UND

RETROEXCAVADORA AL 50% UN TOTAL DE 13.40HR

GLB

TOTAL

UND

CANT

OR ALTO, DISTRITO COISHCO- SANTA ANCASH 1ETAPA

ZACIN III DE OBRA


ACTUAL

ACUMULADO
PARCIAL

METR.

% AVANCE

SALDO
PARCIAL

METR.

% AVANCE

PARCIAL

0.00

0.50

50.00%

220.00

0.50

50.00%

220.00

0.00

25.85

48.93%

25.85

26.98

51.07%

26.98

7.55

76.55

100.00%

76.55

0.00

0.00%

0.00

0.00

60.00

85.54%

24.00

10.14

14.46%

4.06

0.00

0.00

0.00%

0.00

7.91

100.00%

7.91

0.00

0.00

0.00%

0.00

46.31

100.00%

18.52

0.00

173.68

100.00%

173.68

0.00

0.00%

0.00

2.28

71.55

93.47%

35.78

5.00

6.53%

2.50

4,209.92

360.96

92.33%

18,769.92

30.00

7.67%

1,560.00

34.20

69.55

90.86%

278.20

7.00

9.14%

28.00

997.92

59.36

45.19%

1,305.92

72.00

54.81%

1,584.00

1,190.00

431.50

84.90%

7,335.50

76.75

15.10%

1,304.75

225.50

270.00

53.12%

1,107.00

238.25

46.88%

976.83

0.00

49.00

64.01%

343.00

27.55

35.99%

192.85

0.00

24.00

78.90%

2,400.00

6.42

21.10%

642.00

0.00

30.12

67.98%

1,054.20

14.19

32.02%

496.65

0.00

1,230.45

59.07%

1,205.84

852.64

40.93%

835.59

0.00

30.41

80.36%

3,345.10

7.43

19.64%

817.30

0.00

128.00

42.98%

6,400.00

169.79

57.02%

8,489.50

0.00

2,400.00

75.47%

2,352.00

780.22

24.53%

764.62

0.00

1.50

26.00%

6.00

4.27

74.00%

17.08

0.00

0.00

0.00%

0.00

26.00

100.00%

364.00

0.00

0.00

0.00%

0.00

52.83

100.00%

528.30

0.00

0.00

0.00%

0.00

52.83

100.00%

528.30

0.00

0.00

0.00%

0.00

33.80

100.00%

574.60

0.00

12.00

35.50%

49.20

21.80

64.50%

89.38

0.00

0.00

0.00%

0.00

52.83

100.00%

950.94

0.00

0.00

0.00%

0.00

32.40

100.00%

259.20

0.00

0.00

0.00%

0.00

11.16

100.00%

133.92

0.00
0.00

0.00

0.00%

0.00

5.85

100.00%

117.00

0.00

1.00

102.04%

15.00

-0.02

-2.04%

-0.30

0.00

1.40

110.24%

5.74

-0.13

-10.24%

-0.53

0.00

1.00

24.21%

70.00

3.13

75.79%

219.10

0.00

35.00

58.99%

1,225.00

24.33

41.01%

851.55

0.00

51.00

23.30%

49.98

167.85

76.70%

164.49

0.00

0.00

0.00%

0.00

4.22

100.00%

84.40

0.00

0.00

0.00%

0.00

4.15

100.00%

124.50

0.00

0.00

0.00%

0.00

5.40

100.00%

22.14

0.00%

0.00

0.00

0.00%

0.00

10.54

100.00%

948.60

0.00

0.00

0.00%

0.00

30.88

100.00%

926.40

0.00

0.00

0.00%

0.00

30.88

100.00%

432.32

0.00

0.00

0.00%

0.00

23.17

100.00%

556.08

0.00

0.00

0.00%

0.00

1.60

100.00%

38.40

0.00

0.00

0.00%

0.00

0.79

100.00%

18.96

0.00

0.00

0.00%

0.00

13.67

100.00%

300.74

0.00

0.00

0.00%

0.00

2.61

100.00%

10.70

0.00

0.00

0.00%

0.00

46.31

100.00%

125.04

0.00

0.00

0.00%

0.00

46.31

100.00%

50.94

0.00

0.00

0.00%

0.00

6.00

100.00%

900.00

0.00

0.00

0.00%

0.00

0.11

100.00%

5.50

0.00

0.00

0.00%

0.00

0.03

100.00%

2.40

0.00

0.00

0.00%

0.00

0.32

100.00%

32.00

0.00

0.00

0.00%

0.00

0.08

100.00%

8.00

0.00

0.00

0.00%

0.00

0.32

100.00%

3.84

0.00

0.00

0.00%

0.00

2.50

100.00%

55.00

0.00

0.00

0.00%

0.00

0.61

100.00%

0.60

0.00

0.00

0.00%

0.00

1.00

100.00%

45.00

0.00

0.00

0.00%

0.00

6.00

100.00%

720.00

6,667.37
8.77%

47,873.46
62.95%

28,180.63
37.05%

TOTAL

C/U
6,667.37

6667.37

2,565.43

2565.43

250

250.00

642

642.00

S/. 10,124.80

ZEGARRA ZABALETA JENNY


RUC N 20531963149

OBRA

SUB CONTRATISTA

CONTRATISTA GENERAL

FECHA

CREACION DE ES
CONSTRUTEC M&
CONSORCIO SAL
21 DE ENERO AL

DESCRIPCIN

UND.

OBRAS CIVILES
OBRAS PROVISIONALES
GUARDIANIA Y TRANSPORTE

GLB

OBRAS PRELIMINARES
TRAZO Y REPLANTEO PRELIMINAR EN ESCALINATAS

m2

TRAZO Y REPLANTEO EN MURO DE CONTENCION

m2

TRAZO Y REPLANTEO PARA SARDINELES

TRAZO Y REPLANTEO EN CALZADURAS

m2

TRAZO Y REPLANTEO PARA RED DE DESAGUE

LIMPIEZA INICIAL DE OBRA

m2

SEALIZACION PARA LIMITE DE SEGURIDAD DE OBRA

MURO DE CONTENCION
MOVIMIENTO DE TIERRAS
CORTE EN TERRENO ROCOSO - SIN MARTILLO NEUMATICO

m3

PREPARACION DE BASE DE ZAPATA C/PLANCHA

m2

RELLENO COMPACTADO CON MATERIAL DE PRESTAMO

m3

ACARREO DE MATERIAL EXCENDETE D=100 m

m3

ELIMINACION DE MATERIAL EXCEDENTE DM=2 km - SIN VOLQUETE

m3

OBRA DE CONCRETO SIMPLE


SOLADO DE 4" PARA CIMIENTOS MEZCLA C : H 1:10
OBRA DE CONCRETO ARMADO
ZAPATAS

m2

CONCRETO ZAPATAS f'c=210 kg/cm2

m3

ENCOFRADO Y DESENCOFRADO PARA ZAPATAS - CON MADERA Y HERR.

m2

ACERO CORRUGADO f'y =4200 kg/cm2 PARA ZAPATA

kg

PANTALLA
CONCRETO f'c=210 kg/cm2 PARA PANTALLA DE MURO
ENCOFRADO Y DESENCOFRADO CARAVISTA EN PANTALLA DE MURO - CON PANELES Y
HERR.
ACERO CORRUGADO f'y =4200 kg/cm2 PARA PANTALLA DE MURO

m3
m2
kg

VARIOS
JUNTA DE CONSTRUCCION EN MURO CON TECKNOPOR E=1"

m2

ESCALINATAS
MOVIMIENTO DE TIERRAS
EXCAVACION MANUAL A NIVEL DE SUBRASANTE

m3

CONFORMACION Y COMPACTACION DE SUBRASANTE PARA VEREDAS Y ESCALONES

m2

AFIRMADO COMPACADO E= 4" VEREDAS Y ESCALONES - C/PLANCHA COMPACTADORA

m2

ACARREO DE MATERIAL EXCENDETE D=100 m

m3

ELIMINACION DE MATERIAL EXCEDENTE DM=2 km

m3

ESCALINATAS DE CONCRETO
CONCRETO EN VEREDAS Y ESCALONES f'c = 175 kg/cm2

m2

CONCRETO EN SARDINELES SUMERGIDOS f'c = 175 kg/cm2

ENCOFRADO Y DESENCOFRADO P/VEREDAS Y ESCALONES - CON MADERA Y HERR.

VARIOS
JUNTAS ASFALTICAS

m2

SARDINEL PERALTADO
MOVIMIENTO DE TIERRAS
EXCAVACION MANUAL DE ZANJAS PARA SARDINELES

m3

ELIMINACION DE MATERIAL EXCEDENTE DM=2 km - SIN VOLQUETE

m3

CONCRETO EN SARDINEL
SARDINEL PERALTADO DE CONCRETO F'C= 175 kg/cm2

m3

SARDINEL PERALTADO ENCOFRADO Y DESENCOFRADO CARA VISTA

m2

SARDINEL PERALTADO ACERO REFUERZO

kg

VARIOS
JUNTA DE DILATACION CON ASFALTO EN SARDINELES

m2

CALZADURA
MOVIMIENTO DE TIERRAS
EXCAVACION EN TERRENO P/CALZADURA EN VEREDAS Y ESCALONES

m3

ELIMINACION DE MATERIAL EXCEDENTE DM=2 km

m3

CONCRETO SIMPLE

CONCRETO CICLOPEO PARA CALZADURA EN VEREDAS Y ESCALONES MEZCLA 1:10 + 30%


P.G. - DISMINUIRA METRADO POR LO QUE SE CAMBIO POR MURO ARMADO
ENCOFRADO Y DESENCOFRADO PARA CALZADURAS EN VEREDAS Y ESCALONES - CON
MADERA
REVESTIMIENTO DE CALZADURAS PARA VEREDAS Y ESCALONES

m3
m2
m2

RED DE DESAGUE
MOVIMIENTO DE TIERRAS
EXCAVACION DE ZANJAS H prom = 1.00m

m3

EXCAVACION PARA CAJAS

m3

EXCAVACION PARA BUZONETAS

m3

RELLENO COMPACTADO CON MATERIAL DE PRESTAMO

m3

ELIMINACION DE MATERIAL EXCEDENTE DM=2 km

m3

INSTALACIONES
SUMINISTRO E INSTALACION DE TUBERIA PVC ISO4435 DN110 MM S-20

ALINEAMIENTO Y AJUSTE DE TUBERIA PVC ISO4435 DN110 MM S-20

NIVELACION DE CAJA Y DESAGUE

und

CAMARA DE INSPECCION
CONCRETO f'c= 140 kg/cm2 PARA MEDIA CAA

m3

CONCRETO f'c= 140 kg/cm2 PARA DADOS DE EMPALME A CAMARA DE INSPECCION

m3

CONCRETO f'c=175 kg/cm2 PARA CAMARA DE INSPECCION

m3

CONCRETO f'c=210 kg/cm2 PARA TECHO DE CAMARA DE INSPECCION

m3

ENCOFRADO Y DESENCOFRADO PARA DADOS DE EMPALME DE BUZON

m2

ENCOFRADO Y DESENCOFRADO PARA CAMARA DE INSPECCION - SOLO MANO DE O.

m2

ACERO DE REFUERZO f'y =4200 kg/cm2 PARA TECHO DE CAMARA DE INSPECCION

kg

INSTALACION DE MARCO DE FF Y TAPA DE CA PARA CAMARA DE INSPECCION

und

CAJAS DE CAMBIO 12" x 24"

pto

TOTAL MONTO A PAGAR


AVANCE (%)

VAL

VALORI

ING. RES

VALORIZACION N 05

CREACION DE ESCALINATAS Y MURO DE CONTENCION DEL JR. SALAVERRY SECTOR ALTO, DISTRITO
CONSTRUTEC M&Z S.A.C.
CONSORCIO SALAVERRY
21 DE ENERO AL 02 DE FEBRERO DEL 2013

VALORIZACIN III DE OBRA


ACUMULADO ANTERIOR

METR.

PRECIO
UNITARIO

PARCIAL

METR.

% AVANCE

ACTUAL

PARCIAL

METR.

% AVANCE

1.00

440.00

440.00

0.50

50.00%

220.00

0.20

20.00%

52.83

1.00

52.83

25.85

48.93%

25.85

0.00

0.00%

76.55

1.00

76.55

76.55

100.00%

76.55

0.00

0.00%

70.14

0.40

28.06

60.00

85.54%

24.00

10.14

14.46%

7.91

1.00

7.91

0.00

0.00%

0.00

0.00

0.00%

46.31

0.40

18.52

0.00

0.00%

0.00

46.31

100.00%

173.68

1.00

173.68

173.68

100.00%

173.68

0.00

0.00%

76.55

0.50

38.28

71.55

93.47%

35.78

0.00

0.00%

390.96

52.00

20,329.92

360.96

92.33%

18,769.92

16.40

4.19%

76.55

4.00

306.20

69.55

90.86%

278.20

7.00

9.14%

131.36

22.00

2,889.92

59.36

45.19%

1,305.92

5.20

3.96%

508.25

17.00

8,640.25

431.50

84.90%

7,335.50

22.50

4.43%

508.25

4.10

2,083.83

270.00

53.12%

1,107.00

25.80

5.08%

76.55

7.00

535.85

49.00

64.01%

343.00

27.55

35.99%

30.42

100.00

3,042.00

24.00

78.90%

2,400.00

6.42

21.10%

44.31

35.00

1,550.85

30.12

67.98%

1,054.20

14.19

32.02%

2,083.1

0.98

2,041.43

1230.45

59.07%

1,205.84

852.65

40.93%

37.84

110.00

4,162.40

30.41

80.36%

3,345.10

6.20

16.38%

297.79

50.00

14,889.50

128.00

42.98%

6,400.00

105.00

35.26%

3,180.2

0.98

3,116.62

2400.00

75.47%

2,352.00

528.70

16.62%

5.77

4.00

23.08

1.50

26.00%

6.00

0.80

13.86%

26.00

14.00

364.00

0.00

0.00%

0.00

9.80

37.69%

52.83

10.00

528.30

0.00

0.00%

0.00

22.40

42.40%

52.83

10.00

528.30

0.00

0.00%

0.00

0.00

0.00%

33.80

17.00

574.60

0.00

0.00%

0.00

8.20

24.26%

33.80

4.10

138.58

12.00

35.50%

49.20

18.70

55.33%

52.83

18.00

950.94

0.00

0.00%

0.00

0.00

0.00%

32.40

8.00

259.20

0.00

0.00%

0.00

0.00

0.00%

11.16

12.00

133.92

0.00

0.00%

0.00

0.00

0.00%

0.00
5.85

20.00

117.00

0.00

0.00%

0.00

0.00

0.00%

0.98

15.00

14.70

0.98

100.00%

14.70

0.00

0.00%

1.27

4.10

5.21

1.27

100.00%

5.21

0.00

0.00%

4.13

70.00

289.10

1.00

24.21%

70.00

2.50

60.53%

59.33

35.00

2,076.55

35.00

58.99%

1,225.00

4.80

8.09%

218.85

0.98

214.47

51.00

23.30%

49.98

62.70

28.65%

4.22

20.00

84.40

0.00

0.00%

0.00

0.00

0.00%

4.15

30.00

124.50

0.00

0.00%

0.00

0.00

0.00%

5.40

4.10

22.14

0.00

0.00%

0.00

0.00

0.00%

10.54

90.00

948.60

0.00

0.00%

0.00

30.88

30.00

926.40

0.00

0.00%

0.00

30.88

14.00

432.32

0.00

0.00%

0.00

0.00

0.00%

23.17

24.00

556.08

0.00

0.00%

0.00

7.20

31.07%

1.60

24.00

38.40

0.00

0.00%

0.00

1.20

75.00%

0.79

24.00

18.96

0.00

0.00%

0.00

0.79

100.00%

13.67

22.00

300.74

0.00

0.00%

0.00

9.50

69.50%

2.61

4.10

10.70

0.00

0.00%

0.00

1.70

65.13%

46.31

2.70

125.04

0.00

0.00%

0.00

22.60

48.80%

46.31

1.10

50.94

0.00

0.00%

0.00

22.60

48.80%

6.00

150.00

900.00

0.00

0.00%

0.00

3.00

50.00%

0.11

50.00

5.50

0.00

0.00%

0.00

0.11

100.00%

0.03

80.00

2.40

0.00

0.00%

0.00

0.03

100.00%

0.32

100.00

32.00

0.00

0.00%

0.00

0.00

0.00%

0.08

100.00

8.00

0.00

0.00%

0.00

0.00

0.00%

0.32

12.00

3.84

0.00

0.00%

0.00

0.32

100.00%

2.50

22.00

55.00

0.00

0.00%

0.00

1.50

60.00%

0.61

0.98

0.60

0.00

0.00%

0.00

0.00

0.00%

1.00

45.00

45.00

0.00

0.00%

0.00

0.00

0.00%

6.00

120.00

720.00

0.00

0.00%

0.00

4.00

66.67%

76,054.09
100.00%

0.00

0.00%
0.00%

47,872.62
62.95%

DESCRIPCION

FECHA DE PAGO

VALORIZACION N05

21/01/2013 - 02/02/2013

GLB

VALORIZACION N 04 - SALDO

07/01/13-19/01/13

HH

ING. RESIDENTE YEISON LUERA

26/12/12-26/01/13

GLB

TOTAL

UND

CANT

OR ALTO, DISTRITO COISHCO- SANTA ANCASH 1ETAPA

ZACIN III DE OBRA


ACTUAL

ACUMULADO
PARCIAL

METR.

% AVANCE

SALDO
PARCIAL

METR.

% AVANCE

PARCIAL

88.00

0.70

70.00%

308.00

0.30

30.00%

132.00

0.00

25.85

48.93%

25.85

26.98

51.07%

26.98

0.00

76.55

100.00%

76.55

0.00

0.00%

0.00

4.06

70.14

100.00%

28.06

0.00

0.00%

0.00

0.00

0.00

0.00%

0.00

7.91

100.00%

7.91

18.52

46.31

100.00%

18.52

0.00

0.00%

0.00

0.00

173.68

100.00%

173.68

0.00

0.00%

0.00

0.00

71.55

93.47%

35.78

5.00

6.53%

2.50

852.80

377.36

96.52%

19,622.72

13.60

3.48%

707.20

28.00

76.55

100.00%

306.20

0.00

0.00%

0.00

114.40

64.56

49.15%

1,420.32

66.80

50.85%

1,469.60

382.50

454.00

89.33%

7,718.00

54.25

10.67%

922.25

105.78

295.80

58.20%

1,212.78

212.45

41.80%

871.05

192.85

76.55

100.00%

535.85

0.00

0.00%

0.00

642.00

30.42

100.00%

3,042.00

0.00

0.00%

0.00

496.65

44.31

100.00%

1,550.85

0.00

0.00%

0.00

835.60

2,083.10

100.00%

2,041.44

-0.01

0.00%

-0.01

682.00

36.61

96.75%

4,027.10

1.23

3.25%

135.30

5,250.00

233.00

78.24%

11,650.00

64.79

21.76%

3,239.50

518.13

2,928.70

92.09%

2,870.13

251.52

7.91%

246.49

3.20

2.30

39.86%

9.20

3.47

60.14%

13.88

137.20

9.80

37.69%

137.20

16.20

62.31%

226.80

224.00

22.40

42.40%

224.00

30.43

57.60%

304.30

0.00

0.00

0.00%

0.00

52.83

100.00%

528.30

139.40

8.20

24.26%

139.40

25.60

75.74%

435.20

76.67

30.70

90.83%

125.87

3.10

9.17%

12.71

0.00

0.00

0.00%

0.00

52.83

100.00%

950.94

0.00

0.00

0.00%

0.00

32.40

100.00%

259.20

0.00

0.00

0.00%

0.00

11.16

100.00%

133.92

0.00
0.00

0.00

0.00%

0.00

5.85

100.00%

117.00

0.00

0.98

100.00%

14.70

0.00

0.00%

0.00

0.00

1.27

100.00%

5.21

0.00

0.00%

0.00

175.00

3.50

84.75%

245.00

0.63

15.25%

44.10

168.00

39.80

67.08%

1,393.00

19.53

32.92%

683.55

61.45

113.70

51.95%

111.43

105.15

48.05%

103.05

0.00

0.00

0.00%

0.00

4.22

100.00%

84.40

0.00

0.00

0.00%

0.00

4.15

100.00%

124.50

0.00

0.00

0.00%

0.00

5.40

100.00%

22.14

0.00%

0.00

0.00

0.00%

0.00

10.54

100.00%

948.60

0.00

0.00

0.00%

0.00

30.88

100.00%

926.40

0.00

0.00

0.00%

0.00

30.88

100.00%

432.32

172.80

7.20

31.07%

172.80

15.97

68.93%

383.28

28.80

1.20

75.00%

28.80

0.40

25.00%

9.60

18.96

0.79

100.00%

18.96

0.00

0.00%

0.00

209.00

9.50

69.50%

209.00

4.17

30.50%

91.74

6.97

1.70

65.13%

6.97

0.91

34.87%

3.73

61.02

22.60

48.80%

61.02

23.71

51.20%

64.02

24.86

22.60

48.80%

24.86

23.71

51.20%

26.08

450.00

3.00

50.00%

450.00

3.00

50.00%

450.00

5.50

0.11

100.00%

5.50

0.00

0.00%

0.00

2.40

0.03

100.00%

2.40

0.00

0.00%

0.00

0.00

0.00

0.00%

0.00

0.32

100.00%

32.00

0.00

0.00

0.00%

0.00

0.08

100.00%

8.00

3.84

0.32

100.00%

3.84

0.00

0.00%

0.00

33.00

1.50

60.00%

33.00

1.00

40.00%

22.00

0.00

0.00

0.00%

0.00

0.61

100.00%

0.60

0.00

0.00

0.00%

0.00

1.00

100.00%

45.00

0.00

4.00

66.67%

0.00

2.00

33.33%

240.00

12,213.35
16.06%

60,085.97
79.00%

TOTAL

C/U
12,213.35

12213.35

134.80

134.80

3000

3000.00

S/. 15,348.15

15,488.12
20.36%

ZEGARRA ZABALETA JENNY


RUC N 20531963149