Anda di halaman 1dari 2

Name of the list who will work Eid Holliday of Mechanical Section.

Mechanical Works in Eid Vacation



SL NO NAME OF THE LIST OF EMPLOYEES
Designation
01 Belal hossain (mechanical foreman)

02 Sree Liton Kumar
Mechanic
03 Md.Rofiquale Islam (Rony)
Mechanic
04 Md. Amzad Hossain
Mechanic
05 Md. Shafor Ali
Mechanic
06 Md. Yousuf Ali (W.T.P).
Asst. Mechanic
07 Md.Abdul kader
Asst. Mechanic
08 Md. Moinul Islam
Mechanic
09 Sree Ronjit Biswas
Mechanic
10 Sree Ripon Goir
Asst. Mechanic
11 Md.Sohag Hossain
Asst. Mechanic
12 Md. Naybul Hossain
Asst. Mechanic
13 Md.Sohel Roy
Asst. Mechanic
14 Md. Sohorab Hossain
Supervisor /m
15 Md.iqbal Hossain
Operator WTP
16 Sree Kirsno Kumar
Operator WTP
17 Sree Ajit Chandra
Operator WTP
18 Md. Mostafizur Rahman
Asst.Operator
19 Md . zakir hossain
Mechanics
SL NO NAME OF THE MACHINE MECHANICAL WORK`S
02 Stenter m/c Major Overhauling
03 Ferraro m/c Maintenance
04 Sliter m/c Maintenance Work
05 All Dyeing M/c Maintenance Work
06 Hydro Extractor Major Overhauling and cable tray making.
07 Boiler Maintenance& inside cleaning Work
08 Tube compacting &Dryer Maintenance
09 All Pipe Line`s Cable Tray And all M/C`S . Cleaning / painting
10 Modification of condensed recovery unit
11 Modification of PR station of steam line
12 Filter press installation
13 Two pcs flow meter installation in water line.



Utility (Boiler)
SL NO NAME OF THE EMPOLAY Designation
1 Md.mosharof Boiler operator
2 Md. Amin Sharif Boiler operator
3 Md. momin Sharif Asst. Boiler operator



Boiler Works in Eid Vacation
SL NO MECHANICAL WORK`S
1 Refractory wall checking
2 Fire Tube cleaning
3 Steiner and gas valve cleaning
4 Feed pump and water valve servicing
5 Open boiler manhole and inside cleaning
6 Gauge glass cleaning
7 Blower servicing
8 Burner servicing.
9


{N.B For stenter m/c overhauling works, need extra 10 person from production section. all works must
be done within 8 days.}

Anda mungkin juga menyukai