Anda di halaman 1dari 2

1 Ahli Muda K3 Konstruksi 5 7,250,000 3-7 5-9 11-15 1-5 BANDUNG

2 Ahli Madya K3 Konstruksi 8 9,000,000


3 Teknisi K3 Listrik 4 7,000,000
4 Ahli Muda Manajemen Proyek 4 8,000,000
5 Ahli K3 Umum 10 11,000,000
6 Teknisi Survey Pemetaan 8 9,000,000 10-19 9 -18 13-22 8-17
7 Teknisi K3 Perancah 5 7,000,000
8 K3 Mesin Forklift 5 7,000,000
9 Teknisi K 3 Crane 5 7,000,000
10 Teknisi K 3 Lift/Escalator 5 7,000,000
11 Teknisi Welding 5 7,000,000
12 Teknisi Laboratorium Tanah 10 9,750,000 10-21 2-13 6-17
13 Teknisi Laboratorium Beton 10 9,750,000 10-21 7-18 3-14
14 Teknisi Laboratorium Aspal 10 9,750,000 14-25 18-29 1-12
15 Sertifikasi Ketrampilan Teknisi Laboratorium Tanah 3 6,500,000 10-13 2-4 6-8
16 Sertifikasi Ketrampilan Teknisi Laboratorium Beton 3 6,500,000 10-13 7-9 3-5
17 Sertifikasi Ketrampilan Teknisi Laboratorium Aspal 3 6,500,000 14-16 18-20 1-3
18 Project Management 5 6,950,000 3-7 23-27 13-17
19 Contract Management 5 6,950,000 13-17 14-18 11-15 10-14
20 Project Planning And Controling 5 6,950,000 10-14 12-16 8-12 1-5
21 Project Cost Estimation 5 6,950,000 3-7 2-6 15-19 17-21
22 Project Risk Management 5 6,950,000 20-24 21-25 18-23 20-24
23 Advanced Project Planning And Controling 5 6,950,000 17-21 19-23 22-26 8-12
24 Construction Methods 5 6,950,000 27-31 9-13 15-19
25 Heavy Equipment Management 5 6,950,000 10-14 26-30 25-30 27-31
26 Building Management 4 6,450,000 24-27 1-4 24-27
27 Claim And Dispute Resolution 3 5,450,000 13-15 16-18 8-10 1-3
28 Quantity Surveyor 4 5,950,000 3-6 7-10 11-14 6-9
29 Teknik Rancang Bangun 5 6,950,000 17-21 5-9 15-19 3-7
30 Material Handling for Civil Construction 5 6,950,000 24-28 23-27 22-26 8-12
31 Soil Improvement 5 6,950,000 20-24 14-18 18-22 15-19
32 Quality Control of Civil Works 10 9,500,000 10-21 12-23 1-12
33 Foundation Design & Analysis With Computer Program 5 6,950,000 2-6 13-17
34 Advanced Foundation Design & Analysis With Computer Program 5 6,950,000 27-31 21-25 25-29 10-14
35 Structure Design & Analysis With Computer Program 5 6,950,000 17-21 19-23 1-5 8-12
36 Advanced Structure Design & Analysis With Computer Program 5 6,950,000 10-14 9-13 20-24
37 Road Design With Computer Program + Program Profile ProCAD *) 6 8,950,000 13-17 11-16 17-21
38 Adv. Road Design with Land Desktop Development Program 5 6,950,000 24-28 26-30 8-12 15-19
39 Laboratory Management (General - civil) 5 6,950,000 17-21 16-20 27-31
40 Maintenance of Building 5 6,950,000 20-24 7-11 18-22 24-28
28-1
MAY DES OCT
29-10
28-3
CONSTRUCTION MANAGEMENT
2015
JUL NOV
SPECIAL PROGRAM (NATIONAL CERTIFICATION)
NO COURSE TITLE
COURSE FEE
(Rp)
DUR
(DAY)
MAR APR AUG JAN
29-3
VENUE FEB SEP
CIVIL ENGINEERING
JUN
31-4
TRAINING PROVIDER SINCE 1987
41 Maintenance of Highway And Bridge 5 6,950,000 3-7 5-9 15-19 1-5
42 Design and Strengthening of Tower 5 6,950,000 24-28 23-27 6-10
43 Structural Analysis and Design of Tank Structures 5 6,950,000 27-31 14-18 25-29 3-7
44 Lapis Pondasi Agregat 5 6,950,000 10-14 12-16 22-26 8-12
45 Perencanaan dan Pemeliharaan Jalan Tanah 5 6,950,000 2-6 13-17
46 SAP2000 for Steel Dynamic Analysis & TEKLA Structures 5 6,950,000 13-17 21-25 11-15 10-14
47 Perencanaan Jalan Tambang 5 6,950,000 17-21 19-23 15-19
48 Las Busur Listrik & Las Oxyacetylene (National Certificate) 5 7,000,000 13-27 26-30 20-24
49 Welding Technology 5 6,950,000 24-28 9-13 17-21
50 Preventive & Predictive Maintenance 5 6,950,000 3-7 18-22 22-26
51 Total Productive Maintenance 4 6,950,000 1-4
52 Maintenance Of Mechanical System 5 6,950,000 20-24 5-9 27-31
53 Maintenance Of Electrical System 5 6,950,000 3-7 16-20 24-28
54 Heavy Equipment Maintenance 5 6,950,000 10-14 25-29 1-5
55 Maintenance of Pump & Compressor 5 6,950,000 7-11 8-12
56 Maintenance of Genset 5 6,950,000 27-31 12-16 6-10
57 Maintenance of Belt Conveyor 5 6,950,000 10-14 23-27 3-7
58 Diesel Electric Set Operation & Maintenance 5 6,450,000 17-21 11-15 8-12
59 Electrical Drawing with Computer Program 8 9,000,000 14-23 15-24
60 Electro Pneumatic & Electro Hydraulic 5 6,950,000 13-17 19-23 13-17
61 Programable Logic Controller (PLC) 5 6,950,000 17-21 2-6 10-14
62 Pipe & Pipeline Technology 5 6,950,000 20-24 26-30 18-22 15-19
63 Corrosion Control & Cathodic Protection 5 6,950,000 24-28 9-13
64 Air Conditioning 4 5,950,000 24-27 20-23
65 Teknisi Komputer dan Jaringan 3 4,500,000 21-23 11-13 17-19
66 Advanced Survey & Mapping (+ Program AutoMAP) 6 9,250,000 5-10
67 Digital Mapping LDD (+ Program AutoMAP) 6 9,250,000 3-8 16-21 24-29
68 Autocad Mapping (+ Program AutoMAP) 5 8,500,000 18-22 22-26
69 Environmental Impact Analysis (AMDAL) 5 6,950,000
70 Environmental Assessment & Audit 4 5,950,000 13-16 12-15 6-9
71 Wastewater Treatment Technology (IPAL) 5 6,950,000 10-12 23-27 3-7
72 Air Polution Monitoring 4 5,950,000 7-10 25-28 1-4
73 Teknik Sampling dan Pemantauan Kualitas Air Limbah Industri 4 5,950,000 7-10 1-4
29-3
27-1
Sekretariat :
BANDUNG : Setrasari Mall C3 No. 81 Bandung 40164 Telp. (022) 2016466, 2007297, Fax. (022) 2018851
31-4
28-3
31-4
GEODETIC ENGINEER
29-3
MECHANICAL & ELECTRICAL ENGINEERING
27-1
28-1

Anda mungkin juga menyukai