Anda di halaman 1dari 6

Obra

0401001

Subpresupuesto 001

CONSTRUCCION DEL PUENTE PEATONAL COLGANTE EN EL CAMINO RURAL DEL


ANEXO DE MAYO LUREN,DISTRITO DE AUCARA - LUCANAS - AYACUCHO
PUENTE PEATONAL

Fecha
Lugar

03/01/2014
50602

AYACUCHO - LUCANAS - AUCARA

Cdigo

Recurso

Unidad

Cantidad

Precio S/.

MANO DE OBRA
147010001
147010003
147000022
147010002
147010004
147000032

CAPATAZ
OFICIAL
OPERADOR DE EQUIPO LIVIANO
OPERARIO
PEON
TOPOGRAFO

hh
hh
hh
hh
hh
hh

202910012
203030041
204130001
202040010
202000007
202510088
205010004
237010012
202860005
256060001
230990055
230990052
221000000
202010005
202010063
230990079
228010002
249900027
232010010
227010004
230990008
202910005
202910006
202910008
202910007
227010001
238000002
243960002
251940002
243010006
243010003
205030001
205030005
205030002
230990078
232020002
202860006
202910013
202910014
202510087
202510089
202510090
202510091
205000034
254060000
254110090
261010001
202910010
249900028
243560002
202910011
253030027
272010062
272010063
202910009

ABRAZADERA DE ANCLAJE DE 1 1/2" X 1.5


und
ACERO CORRUGADO fy = 4200 kg/cm2 GRADO 60
AGUA
m3
ALAMBRE NEGRO N8
ALAMBRE NEGRO RECOCIDO # 16
ARANDELA PLANA DE 1/2"
und
ARENA GRUESA
m3
BARRENO DE 7/8" X 8 PIES
und
CABLE DE ACERO TIPO BOA D= 1"
CARRO DE DILATACION
GLB
CARTEL DE OBRA
und
CASETA DE GUARDIANIA y ALMACEN DE OBRA
GLB
CEMENTO PORTLAND TIPO I (42.5KG)
BOL
CLAVOS PARA MADERA C/C 3"
CLAVOS PARA MADERA C/C 4"
CREOSOTA
DINAMITA SEMEXA 65 7/8 x 7 CARTUCHOS
und
DISEO DEL MEZCLA
GLB
FLETE
GLB
FULMINANTE 6.35 MM.
und
GEOTEXTIL
m2
GRAPA DE SUSPENCION DE 1"
und
GRAPA DE SUSPENCION DE 3/4"
und
GUARDACABO EN ANCLAJE 1"
und
GUARDACABO EN ANCLAJE 3/4"
und
GUIA
HORMIGON DE RIO
m3
LIJA PARA MADERA
PGO
LIJA PARA METAL
MADERA ESTRUCTURAL P/PUENTES (CEPILLADA)
MADERA TORNILLO
MATERIAL DE FILTRO
m3
MATERIAL GRANULAR
m3
MATERIAL IMPERMEABLE
m3
MONTAJE PUENTE COLGANTE
MOV. Y DESM. DE EQUIPOS Y HERRAMIENTAS
GLB
PENDOLA CON VARILLA DE ACERO LISO A-36 D=1/2" und
PERNO GALVANIZADO CABEZA DE COCHE 1/2" x 4" und
PERNO GALVANIZADO CABEZA DE COCHE 1/2" x 7" und
PERNOS HEXAGONALES DE 1/2" X 14"
und
PERNOS HEXAGONALES DE 1/2" X 5"
und
PERNOS HEXAGONALES DE 1/2" X 7"
und
PERNOS HEXAGONALES DE 1/2" X 9"
und
PIEDRA CHANCADA DE 1/2"
m3
PINTURA ANTICORROSIVA
PINTURA ESMALTE
PLACA RECORDATORIA METALICA
und
PLATINA DE 1"X8"X4"
und
PRUEBAS DE CALIDAD DE CONCRETO ROTURA
und
REFORESTACION CON PLANTONES
GLB
RIEL DE 6"X6" X 3.00 MT
und
THINER
TUBERIA PVC PRESION C-5 EC =4"x5M PERFORADAund
TUBERIA PVC SAP C-5 EC=3"x5M
und
TUERCAS CON HUACHA DE 1"
und

180.9489
616.5246
86.4862
1,022.1081
2,435.6963
3.1376

18.61
13.88
13.88
16.18
12.52
13.88

6
2,353.9357
2.3911
74.9471
179.872
910
68.9221
0.8
223.86
4
1
1
1,131.6500
59.9568
24
1.5
96
1
1
80
64.68
32
24
4
4
48
50.2827
22.2
0.1
2,991.5800
1,690.0323
20.65
127.2
1.3125
30
1
30
168
60
75
88
32
32
81.3169
0.4
6.3824
1
4
1
1
4
47.2712
8.82
3.969
16

120
3.05
0.5
4.8
4.8
1
160
3.2
38
1,200.00
420
240
24.6
4.8
6.8
11
3.2
750
382.22
2.8
3.9
42
30
22
26
2
50
2.8
2
6.8
6.5
40
40
40
310
3,000.00
150
4
6.2
12
4.2
4.6
6.8
170
38
36
450
80
375
1,200.00
420
18
75.09
49.08
3

MATERIALES
kg
kg
kg

kg
kg
gln

hja
p2
p2

gln
gln

gln

202520006

TUERCAS HEXAGONALES 1/2"

und

EQUIPOS

455

0.8

Parcial S/.

3,367.46
8,557.36
1,200.43
16,537.71
30,494.92
43.55
60,201.43
720
7,179.50
1.2
359.75
863.39
910
11,027.54
2.56
8,506.68
4,800.00
420
240
27,838.59
287.79
163.2
16.5
307.2
750
382.22
224
252.25
1,344.00
720
88
104
96
2,514.14
62.16
0.2
20,342.74
10,985.21
826
5,088.00
52.5
9,300.00
3,000.00
4,500.00
672
372
900
369.6
147.2
217.6
13,823.87
15.2
229.77
450
320
375
1,200.00
1,680.00
850.88
662.29
194.8
48

364
147,167.53

Obra

0401001

Subpresupuesto 001

CONSTRUCCION DEL PUENTE PEATONAL COLGANTE EN EL CAMINO RURAL DEL


ANEXO DE MAYO LUREN,DISTRITO DE AUCARA - LUCANAS - AYACUCHO
PUENTE PEATONAL

Fecha
Lugar

03/01/2014
50602

AYACUCHO - LUCANAS - AUCARA

Cdigo

Recurso

Unidad

0348230005

CIZALLA PARA CORTE DE FIERRO

hm

349550097
337010001
348010011
348230004
349880002
349890006
349070005
349880003
349900025
349070004

EQUIPO DE PERFORACION
HERRAMIENTAS MANUALES
MEZCLADORA DE CONCRETO DE 9 -11P3
MOTOSIERRA 13" - 15" 2.2 HP
NIVEL TOPOGRAFICO
PERFORADORA
TALADRO ELECTRICO 600W - 1/2" 1/2"
TEODOLITO
TIRFOR DE 7 TON.
VIBRADOR DE CONCRETO 4 HP 1.25"

Precio S/.

Parcial S/.

Cantidad

hm
%MO
hm
hm
hm
hm
hm
hm
hm
hm

71.9450

2.00

2.56

45

86.486
141.5
3.1376
6.4
141.5
3.1376
34.112
67.9356

8
3
8
12
2.5
12
12
5

Total

S/.

cio S/.

Parcial S/.

143.89
115.2
2,518.89
691.89
424.5
25.1
76.8
353.75
37.65
409.34
339.68
5,136.69
212,505.65

Anda mungkin juga menyukai