2. TOPOGRAPHY MAP IF SLOPE IS 50% CRITICAL (1:10,000 SCALE)
3. VICINITY MAP/LOCATION MAP. 4. SKETCH PLAN with Polygonal Coordinates/GPS Reading (closed-loop Geographical Coordinates) of the project area. With complete technical description. 5. SITE DEVELOPMENT PLAN showing the following with specified area per component: a. facilities b. amenities c. tree planting area/landscape d. drainage e. disposal area f. Material Recovery Facility g. Waste Treatment Facility and recycling scheme h. Rain Collection Tank and recycling scheme 6. PROOF OF OWNERSHIP OR RIGHTS TO ESTABLISH IN THE AREA EXAMPLE. OCT/TCT- IF CONTRACT OF LEASE ATTACH TAX DECLARATION 7. Fill-up pre evaluation format/summary report on IEE Checklist 8. Fill-up screening form 9. electronic copy of IEEC including e-copy of the summary report, screening form, IMP, EMoP, and PEMAPS (should be in 2003 word format) 10. Letter request 11. Zoning Certification 12. Copy of SEC Registration if project owned by a company, and give list of its members Note: Indication of the CP # of the proponent is a must.