Anda di halaman 1dari 30

Contrato N GL-C-032 2013

Supervisin de la Obra: MEJORAMIENTO DE LAS CALLES DEL A.H. ALTO MARCAVALLE POR REMEDIACION
DE SUELOS EN LA CIUDAD DISTRITO DE SANTA ROSA DE SACCO - PROVINCIA DE YAULI - JUNN.

A&A
PROYECTOS SAC

RESUMEN
VALORIZACIN N 13 DEL 01 AL 31 DE JULIO DEL 2014
OBRA:

COMPONENTES DE INFRAESTRUCTURA DEL MEJORAMIENTO DE LAS CALLES DEL AA.HH. ALTO MARCAVALLE PARA REMEDIACIN
DE SUELOS EN LA CIUDAD DE LA OROYA, PROVINCIA DE YAULI - JUNN

PROP:

ACTIVOS MINEROS SAC

CONTRAT:

CEBA S.A.

SUPERV:

CONSORCIO VIAL DE LIMA

FECHA:

Thu 31 Jul 2014

CONCEPTOS

VALORIZACION
ACTUAL

VALORIZACION
ACUMULADA
ANTERIOR

VALORIZACION
ACUMULADA
ACTUAL

1.1
1.2

MONTO VALORIZACION
REAJUSTE DE VALORIZACIN

193,251.06
12,096.88

4,133,302.97
213,433.69

4,326,554.03
225,530.58

A.

TOTAL VALORIZACION REAJUSTADA

205,347.94

4,346,736.66

4,552,084.61

2.0
2.1
2.2

AMORTIZACIONES
ADELANTO DIRECTO
ADELANTO DE MATERIALES

38,650.21
35,452.86

826,660.58
1,084,201.39

865,310.79
1,119,654.26

B.

TOTAL AMORTIZACIONES

74,103.07

1,910,861.97

1,984,965.05

3.0
3.1
3.3

DEDUCCIONES
POR EL ADELANTO DIRECTO
POR EL ADELANTO POR MATERIALES

1,370.23
1,155.78

21,031.91
19,791.28

22,402.14
20,947.06

C.

TOTAL DEDUCCIONES

2,526.01

40,823.19

43,349.20

4.0

IGV 18% DE (A-B-C)

23,169.39

431,109.27

454,278.66

5.0

LIQUIDO A PAGAR AL CONTRATISTA (A-B-C+IGV)

151,888.25

2,826,160.77

2,978,049.02

A FAVOR DEL CONTRATISTA

128,718.86

2,395,051.50

2,523,770.36

23,169.39

431,109.27

454,278.66

POR CONCEPTO DE I.G.V

Contrato N GL-C-032 2013


Supervisin de la Obra: MEJORAMIENTO DE LAS CALLES DEL A.H. ALTO
MARCAVALLE POR REMEDIACION DE SUELOS EN LA CIUDAD DISTRITO DE
SANTA ROSA DE SACCO - PROVINCIA DE YAULI - JUNN.

CONSORCIO VIAL LIMA

VALORIZACIN N 13 DEL 01 AL 31 DE JULIO DEL 2014

(SUMA ALZADA)

A&A
PROYECTOS SAC
OBRA:
PROP.
CONT.
SUP.

COMPONENTES DE INFRAESTRUCTURA DEL MEJORAMIENTO DE LAS CALLES DEL AA.HH. ALTO MARCAVALLE PARA REMEDIACIN DE SUELOS EN LA CIUDAD DE LA OROYA, PROVINCIA DE YAULI - JUNN
ACTIVOS MINEROS SAC
CEBA S.A.
CONSORCIO VIAL DE LIMA
PRESUPUESTO

VAL. ACTUAL

VAL. ACUM. ANTERIOR

FECHA:

VAL. ACUM. ACTUAL

Thu 31 Jul 2014

SALDOS

ITEM DESCRIPCION
Und.

Metrado

Precio (S/.)

PISTAS ALTO MARCAVALLE

Parcial (S/.)

Metrado

4,419,457.50
166,357.20

01

OBRAS PRELIMINARES

01.01

MOVILIZACION DE MAQUINARIAS HERRAMIENTAS PARA glb


LA OBRA

Parcial (S/.)

Metrado

Parcial (S/.)

Metrado

Parcial (S/.)

2,952,012.06 66.80%
133,669.69
80.35%

138,022.52
393.43

3.12%
0.24%

134,063.12

69.92%
80.59%

0.00

0.00%

0.70

41,970.37

70.00%

1.00

59,957.67

59,957.67

0.70

41,970.37

70.00%

69,384.40

3,090,034.58

Metrado

Parcial (S/.)

1,329,422.92
32,294.08
0.30

17,987.30

01.02

INSTALACIONES PROVISIONALES

glb

1.00

69,384.40

69,384.40

1.00

100.00% 0.00

0.00

0.00%

1.00

69,384.40

100.00% 0.00

01.03

TRAZO Y REPLANTEO OBRAS DE PAVIMENTACION

m2

35,723.89

0.99

35,366.65

20,875.19 20,666.44

58.43%

393.43

1.11%

21,272.59

21,059.87

59.55%

1.00

1,648.48

1,648.48

1.00

1,648.48

100.00% 0.00

0.00

0.00%

1.00

1,648.48

100.00% 0.00

0.00

01.04

CARTEL DE IDENTIFICACION DE LA OBRA DE 5.40 X 3.60 u

397.40

0.00

14,451.30 14,306.78

m
02

440,954.58

99.15%

803.31

0.18%

441,757.89

99.33%

2,966.89

02.01

MOVIMIENTO DE TIERRAS
DESBROCE Y LIMPIEZA

m2

574.45

0.31

444,724.78
178.08

574.45

178.08

100.00% 0.00

0.00

0.00%

574.45

178.08

100.00% 0.00

0.00

02.02

EXCAVACION DE SUB RASANTE EN TERRENO NORMAL

m3

8,189.99

4.53

37,100.65

8,189.99

37,100.66

100.00%

0.00

0.00%

8,189.99

37,100.66

100.00% 0.00

-0.01

02.03

RELLENO CON MATERIAL DE PRESTAMO DE CANTERA

m3

1,002.98

55.64

55,805.81

991.37

55,160.05

98.84%

0.00

0.00

0.00%

991.37

55,160.05

98.84%

11.61

645.76

02.04

PERFILADO Y COMPACTADO DE SUB RASANTE

m2

16,224.98

1.54

24,986.47

15,381.16 23,686.99

94.80%

402.00

619.08

2.48%

15,783.16

24,306.07

97.28%

441.82

680.40

02.05

DEMOLICION DE VEREDAS EXISTENTES

m3

24.17

56.81

1,373.10

8.89

504.98

36.78%

3.24

184.23

13.42%

12.13

689.21

50.19%

12.04

683.89

02.06

ELIMINACION DE MATERIAL EXCEDENTE Y


CONTAMINADO

m3

9,856.99

33.00

325,280.67

9,827.99

324,323.82

99.71%

0.00

0.00%

9,827.99

324,323.82

99.71%

29.00

956.85

03

PAVIMENTOS

956,854.21

76.45%

91,620.66

7.32%

1,048,474.87

83.77%

03.01

SUB BASE DE 0.15 m EN CALLES LONGITUDINALES

m2

13,495.00

10.74

144,936.30

11,639.09 125,003.82

86.25%

1,142.40

12,269.38

8.47%

12,781.49

137,273.20

94.71%

713.51

7,663.10

03.02

SUB BASE DE 0.15 m. EN CALLES TRANSVERSALES

M2

2,729.94

12.76

34,834.03

1,988.93

72.86%

0.00

0.00

0.00%

1,988.93

25,378.68

72.86%

741.02

9,455.35

16,224.98

65.13

1,056,732.95

12,208.17 795,118.11

75.24%

1,201.20

78,234.16

7.40%

13,409.37

873,352.27

82.65%

2,815.61

183,380.68

16,224.98

0.93

15,089.23

12,208.17 11,353.60

75.24%

1,201.20

1,117.12

7.40%

13,409.37

12,470.72

82.65%

2,815.61

2,618.51

98,532.15

48,726.35

49.45%

0.00

0.00%

0.00

48,726.35

49.45%

03.03
03.04
04

1,251,592.51

LOSA DE CONCRETO F'C 210 KG/CM2 E=0.15M INCLUYE m2


ENCOFRADO (ACABADO FROTACHADO)
CURADO DE LOSA DE CONCRETO

m2

JUNTAS

25,378.68

203,117.64

49,805.80

04.01

JUNTA LONGITUDINAL TIPO "A" C/DOWELL

1,070.86

21.54

23,066.32

645.73

13,909.12

60.30%

0.00

0.00%

645.73

13,909.12

60.30%

425.13

9,157.20

04.02

JUNTA LONGITUDINAL TIPO "A" S/DOWELL

803.31

8.71

6,996.83

97.20

846.61

12.10%

0.00

0.00%

97.20

846.61

12.10%

706.11

6,150.22

04.03

JUNTA DE CONTRACCION TIPO "B" C/DOWELL

1,254.00

26.37

33,067.98

817.13

21,547.79

65.16%

0.00

0.00%

817.13

21,547.79

65.16%

436.87

11,520.19

04.04

JUNTA DE CONTRACCION TIPO "B" S/DOWELL

1,498.20

8.71

13,049.32

151.05

1,315.64

10.08%

0.00

0.00%

151.05

1,315.64

10.08%

1,347.15

11,733.68

04.05

JUNTA DE CONSTRUCCION TIPO "C" C/DOWELL

627.00

25.28

15,850.56

406.30

10,271.16

64.80%

0.00

0.00%

406.30

10,271.16

64.80%

220.70

5,579.40

04.06

JUNTA DE CONSTRUCCION TIPO "C" S/DOWELL

746.40

8.71

6,501.14

95.99

836.03

12.86%

0.00

0.00%

95.99

836.03

12.86%

650.42

5,665.11

06

36,657.76

10.82%

8,860.41

2.62%

45,518.17

13.44%

06.01

VEREDAS
EXCAVACION PARA ESTRUCTURAS

m3

493.85

31.77

338,789.19
15,689.61

65.20

2,071.34

13.20%

4.07

129.24

0.82%

69.27

2,200.58

14.03%

424.58

293,271.02
13,489.03

06.02

BASE COMPACTACION MANUAL e= 0.10 m

m2

4,938.54

11.94

58,966.17

587.98

7,020.49

11.91%

104.68

1,249.88

2.12%

692.66

8,270.37

14.03%

4,245.88

50,695.80

Contrato N GL-C-032 2013


Supervisin de la Obra: MEJORAMIENTO DE LAS CALLES DEL A.H. ALTO
MARCAVALLE POR REMEDIACION DE SUELOS EN LA CIUDAD DISTRITO DE
SANTA ROSA DE SACCO - PROVINCIA DE YAULI - JUNN.

CONSORCIO VIAL LIMA

VALORIZACIN N 13 DEL 01 AL 31 DE JULIO DEL 2014

(SUMA ALZADA)

A&A
PROYECTOS SAC
OBRA:
PROP.
CONT.
SUP.

COMPONENTES DE INFRAESTRUCTURA DEL MEJORAMIENTO DE LAS CALLES DEL AA.HH. ALTO MARCAVALLE PARA REMEDIACIN DE SUELOS EN LA CIUDAD DE LA OROYA, PROVINCIA DE YAULI - JUNN
ACTIVOS MINEROS SAC
CEBA S.A.
CONSORCIO VIAL DE LIMA
PRESUPUESTO

VAL. ACTUAL

VAL. ACUM. ANTERIOR

FECHA:

VAL. ACUM. ACTUAL

Thu 31 Jul 2014

SALDOS

ITEM DESCRIPCION
Und.

06.03

06.04

CONCRETO f'c=175 kg/cm2 E=10 cm ACABADO


FOTACHADO EN PASTA 1:2 INCLUYE ENCOFRADO Y
DESENCOFRADO
JUNTAS DE CONSTRUCCION Y DILATACION

06.05

ELIMINACION DE MATERIAL EXCEDENTE Y


CONTAMINADO

08

MUROS

Metrado

Precio (S/.)

Parcial (S/.)

Metrado

Parcial (S/.)

Metrado

Parcial (S/.)

Metrado

Parcial (S/.)

Metrado

Parcial (S/.)

m2

4,938.54

47.53

234,728.81

530.98

25,237.53

10.75%

148.68

7,066.76

3.01%

679.66

32,304.29

13.76%

4,258.88

202,424.52

970.26

10.15

9,848.14

0.00

0.00

0.00%

0.00

0.00

0.00%

0.00

0.00

0.00%

970.26

9,848.14

m3

592.62

33.00

19,556.46

70.56

2,328.40

11.91%

12.56

414.53

2.12%

83.12

2,742.93

14.03%

509.50

16,813.53

490,655.94

65.38%

17,470.64

2.33%

508,126.58

67.71%

08.01

EXCAVACION PARA ESTRUCTURAS

m3

1,166.59

31.77

37,062.56

761.67

24,198.10

65.29%

16.64

528.53

1.43%

778.30

24,726.63

66.72%

388.29

12,335.93

08.02

NIVELACION Y REFINE DE EXCAVACION

m2

1,092.39

3.19

3,484.72

647.71

2,066.18

59.29%

59.18

188.77

5.42%

706.88

2,254.95

64.71%

385.51

1,229.77

543.59

73.03

39,698.38

354.63

25,898.26

65.24%

36.01

2,629.68

6.62%

390.63

28,527.94

71.86%

152.96

11,170.44

08.03

750,445.63

RELLENO Y COMPACTADO CON MATERIAL DE PRESTAMO M3


PARA ESTRUCTURAS

242,319.05

08.04

ENCOFRADO Y DESENCOFRADO EN MUROS

m2

4,050.22

44.80

181,449.86

2,353.41

105,432.68

58.11%

142.44

6,381.40

3.52%

2,495.85

111,814.08

61.62%

1,554.37

69,635.78

08.05

CONCRETO F'C 210 KG/CM2 EN MUROS

m3

690.35

411.51

284,085.93

450.28

185,293.57

65.22%

15.74

6,477.74

2.28%

466.02

191,771.31

67.50%

224.33

92,314.62

08.06

ACERO fy=4200 kg/cm2 GRADO 60

kg

35,198.74

3.90

137,275.09

27,777.39 108,331.82

78.92%

-9.79

-38.18

-0.03%

27,767.60

108,293.64

78.89%

7,431.14

28,981.45

08.07

SOLADOS CONCRETO f'c=100 kg/cm2 h=2"

m2

1,092.39

14.01

15,304.38

673.76

9,439.32

61.68%

34.12

477.98

3.12%

707.87

9,917.30

64.80%

384.52

5,387.08

08.08

JUNTAS DE CONSTRUCCION Y DILATACION

375.49

15.68

5,887.68

0.00

0.00

0.00%

0.00

0.00

0.00%

0.00

0.00

0.00%

375.49

5,887.68

m3

1,399.91

33.00

46,197.03

908.97

29,996.01

64.93%

24.99

824.72

1.79%

933.96

30,820.73

66.72%

465.94

15,376.30

08.09

ELIMINACION DE MATERIAL EXCEDENTE Y


CONTAMINADO

09

CUNETAS

91,675.09

36.29%

14,957.10

5.92%

106,632.19

42.21%

09.01

EXCAVACION PARA ESTRUCTURAS

m3

357.06

31.77

11,343.80

190.42

6,049.71

53.33%

31.07

987.03

8.70%

221.49

7,036.74

62.03%

135.57

4,307.06

09.02

NIVELACION Y REFINE DE EXCAVACION

m2

3,669.81

3.19

11,706.69

1,957.12

6,243.20

53.33%

319.31

1,018.60

8.70%

2,276.43

7,261.80

62.03%

1,393.39

4,444.89

09.03

ENCOFRADO Y DESENCOFRADO DE CUNETAS

m2

495.92

24.75

12,274.02

264.48

6,545.76

53.33%

43.15

1,067.96

8.70%

307.63

7,613.72

62.03%

188.30

4,660.30

09.04

CONCRETO F'C 210 KG/CM2 EN CUNETAS

4,959.20

27.54

136,576.37

2,644.75

72,836.42

53.33%

431.50

11,883.51

8.70%

3,076.25

84,719.93

62.03%

1,882.95

51,856.44

09.05
JUNTAS DE CONSTRUCCION Y DILATACION
10
CANALETA EN PAVIMENTO

7,952.6500

10.15

80,719.40
68,375.79

0.00

0.00
0.00

0.00%
0.00%

0.00

0.00
0.00

0.00%
0.00%

0.00

0.00
0.00

0.00%
0.00%

7,952.65

80,719.40
68,375.79

10.01

EXCAVACION PARA ESTRUCTURAS

m3

65.96

31.77

2,095.55

0.00

0.00

0.00%

0.00

0.00%

0.00

0.00

0.00%

65.96

2,095.55

10.02

NIVELACION Y REFINE DE EXCAVACION

m2

131.92

3.19

420.82

0.00

0.00

0.00%

0.00

0.00%

0.00

0.00

0.00%

131.92

420.82

10.03

ENCOFRADO Y DESENCOFRADO DE CANALETAS

m2

182.48

28.73

5,242.65

0.00

0.00

0.00%

0.00

0.00%

0.00

0.00

0.00%

182.48

5,242.65

10.04

CONCRETO F'C 210 KG/CM2 EN CANALETA

219.86

69.40

15,258.28

0.00

0.00

0.00%

0.00

0.00%

0.00

0.00

0.00%

219.86

15,258.28

10.05

ACERO fy=4200 kg/cm2 GRADO 60

kg

1,655.50

3.90

6,456.45

0.00

0.00

0.00%

0.00

0.00%

0.00

0.00

0.00%

1,655.50

6,456.45

10.06

REJILLA METALICA PARA DESAGUE PLUVIAL

219.86

165.06

36,290.09

0.00

0.00

0.00%

0.00

0.00%

0.00

0.00

0.00%

219.86

36,290.09

m3

79.15

33.00

2,611.95

0.00

0.00

0.00%

0.00

0.00%

0.00

0.00

0.00%

79.15

2,611.95

0.00

0.00%

0.00

0.00%

0.00

0.00%

10.07

ELIMINACION DE MATERIAL EXCEDENTE Y


CONTAMINADO

11

CANALETA EN VEREDA

252,620.28

36,672.59

145,988.09

36,672.59

Contrato N GL-C-032 2013


Supervisin de la Obra: MEJORAMIENTO DE LAS CALLES DEL A.H. ALTO
MARCAVALLE POR REMEDIACION DE SUELOS EN LA CIUDAD DISTRITO DE
SANTA ROSA DE SACCO - PROVINCIA DE YAULI - JUNN.

CONSORCIO VIAL LIMA

VALORIZACIN N 13 DEL 01 AL 31 DE JULIO DEL 2014

(SUMA ALZADA)

A&A
PROYECTOS SAC
OBRA:
PROP.
CONT.
SUP.

COMPONENTES DE INFRAESTRUCTURA DEL MEJORAMIENTO DE LAS CALLES DEL AA.HH. ALTO MARCAVALLE PARA REMEDIACIN DE SUELOS EN LA CIUDAD DE LA OROYA, PROVINCIA DE YAULI - JUNN
ACTIVOS MINEROS SAC
CEBA S.A.
CONSORCIO VIAL DE LIMA
PRESUPUESTO

VAL. ACTUAL

VAL. ACUM. ANTERIOR

FECHA:

VAL. ACUM. ACTUAL

Thu 31 Jul 2014

SALDOS

ITEM DESCRIPCION
Und.

Metrado

Precio (S/.)

Parcial (S/.)

Metrado

Parcial (S/.)

Metrado

Parcial (S/.)

Metrado

Parcial (S/.)

Metrado

Parcial (S/.)

11.01

EXCAVACION PARA ESTRUCTURAS

m3

60.97

31.77

1,937.02

0.00

0.00

0.00%

0.00

0.00%

0.00

0.00

0.00%

60.97

1,937.02

11.02

NIVELACION Y REFINE DE EXCAVACION

m2

121.95

3.19

389.02

0.00

0.00

0.00%

0.00

0.00%

0.00

0.00

0.00%

121.95

389.02

11.03

ENCOFRADO Y DESENCOFRADO DE CANALETAS

m2

182.92

28.73

5,255.29

0.00

0.00

0.00%

0.00

0.00%

0.00

0.00

0.00%

182.92

5,255.29

11.04

CONCRETO F'C=210 KG/CM2 EN CANALETA

203.24

89.76

18,242.82

0.00

0.00

0.00%

0.00

0.00%

0.00

0.00

0.00%

203.24

18,242.82

11.05

ACERO fy=4200 kg/cm2 GRADO 60

kg

2,162.52

3.90

8,433.83

0.00

0.00

0.00%

0.00

0.00%

0.00

0.00

0.00%

2,162.52

8,433.83

m3

73.17

33.00

2,414.61

0.00

0.00

0.00%

0.00

0.00%

0.00

0.00

0.00%

73.17

2,414.61

0.00

0.00%

0.00

0.00%

0.00

0.00%

200,091.02

M2

10,492.45

19.07

0.00

0.00%

0.00

0.00%

0.00

0.00%

10,492.45 200,091.02

11.06

ELIMINACION DE MATERIAL EXCEDENTE Y


CONTAMINADO

12

AREA VERDE

12.01
13

SEMBRADO DE PASTIZAL

200,091.02
0.00

16,347.60

51.00%

1,015.35

3.17%

17,362.95

54.17%

REUBICACION DE POSTES DE LUZ

15.00

333.24

4,998.60

0.00

0.00

0.00%

0.00

0.00%

0.00

0.00

0.00%

15.00

4,998.60

13.02

NIVELACION DE BUZONES EN GENERAL

16.00

414.24

6,627.84

0.00

0.00

0.00%

0.00

0.00%

0.00

0.00

0.00%

16.00

6,627.84

13.03

PRUEBA DE CALIDAD DEL CONCRETO (ENSAYOS)

glb

1.00

12,272.00

12,272.00

0.80

9,817.60

80.00%

0.05

613.60

5.00%

0.85

10,431.20

85.00%

0.15

1,840.80

13.04

PRUEBA DE CALIDAD DEL SUELO (ENSAYOS)

glb

1.00

8,035.00

8,035.00

0.80

6,428.00

80.00%

0.05

401.75

5.00%

0.85

6,829.75

85.00%

0.15

1,205.25

13.05

PRUEBA DE CALIDAD EN EL ACERO

glb

1.00

120.00

120.00

0.85

102.00

85.00%

0.00

0.00

0.00%

0.85

102.00

85.00%

0.15

18.00

111,871.56

93.00%

0.00

0.00%

111,871.56

93.00%

111,871.56

93.00%

0.00

0.00%

111,871.56

93.00%

134,925.12

93.00%

2,901.62

2.00%

137,826.74

95.00%

134,925.12

93.00%

2,901.62

2.00%

137,826.74

95.00%

372,867.09

98.56%

0.00

0.00%

372,867.09

98.56%

5,451.94

14.01
15
15.01
16

32,053.44

0.00

13.01

14

VARIOS

200,091.02

IMPACTO AMBIENTAL
MITIGACION DE IMPACTO AMBIENTAL

120,292.00
glb

1.00

120,292.00

SEGURIDAD Y SALUD
SEGURIDAD Y SALUD EN OBRA

120,292.00

0.93

145,080.77
glb

1.00

145,080.77

RED DE AGUA POTABLE

145,080.77

0.93

378,319.03

0.00
0.02

0.93
0.95

14,690.49

8,420.44
0.07

8,420.44
7,254.03

0.05

7,254.03

16.01

TRAZO Y REPLANTEO OBRAS DE SANEAMIENTO

glb

4,114.35

0.96

3,949.78

4,114.35

3,949.78

100.00% 0.00

0.00

0.00%

4,114.35

3,949.78

100.00% 0.00

0.00

16.02

EXCAVACION EN TERRENO NORMAL A PULSO

m3

1,974.89

26.87

53,065.29

1,974.89

53,065.29

100.00% 0.00

0.00

0.00%

1,974.89

53,065.29

100.00% 0.00

0.00

4,114.35

1.48

6,089.24

4,114.35

6,089.24

100.00% 0.00

0.00

0.00%

4,114.35

6,089.24

100.00% 0.00

0.00

16.03

REFINE Y NIVELACION ZANJA EN TERRENO NORMAL


A=0.40

16.04

CAMA DE APOYO DE TUBERIAS

4,114.35

2.71

11,149.89

4,114.35

11,149.89

100.00% 0.00

0.00

0.00%

4,114.35

11,149.89

100.00% 0.00

0.00

16.05

RELLENO Y COMPACTADO DE ZANJAS

m3

1,877.36

73.48

137,948.41

1,856.90

136,445.05

98.91%

0.00

0.00%

1,856.90

136,445.05

98.91%

20.46

1,503.36

m3

2,468.61

33.00

81,464.13

2,428.61

80,144.13

98.38%

0.00

0.00%

2,428.61

80,144.13

98.38%

40.00

1,320.00

SUM E INSTAL TUBERIA PVC ISO 4422, C-10, DN=63 mm m

3,014.35

8.47

25,531.54

3,014.35

25,531.54

100.00% 0.00

0.00

0.00%

3,014.35

25,531.54

100.00% 0.00

0.00

CONEXIONES DOMICILIARIAS DE AGUA POTABLE

220.00

231.90

51,018.00

215.00

49,858.50

97.73%

0.00

0.00%

215.00

49,858.50

97.73%

1,159.50

116,807.07

98.61%

0.00

0.00%

116,807.07

98.61%

116,807.07

98.61%

0.00

0.00%

116,807.07

98.61%

16.06
16.07
16.14
17
17.01

ELIMINACION DE MATERIAL EXCEDENTE Y


CONTAMINADO

RED DE DESAGUE
CONEXIONES DOMICILIARIAS DE DESAGUE

118,452.24
u

216.00

548.39

118,452.24

213.00

213.00

5.00

1,645.17
3.00

1,645.17

Contrato N GL-C-032 2013


Supervisin de la Obra: MEJORAMIENTO DE LAS CALLES DEL A.H. ALTO
MARCAVALLE POR REMEDIACION DE SUELOS EN LA CIUDAD DISTRITO DE
SANTA ROSA DE SACCO - PROVINCIA DE YAULI - JUNN.

CONSORCIO VIAL LIMA

VALORIZACIN N 13 DEL 01 AL 31 DE JULIO DEL 2014

(SUMA ALZADA)

A&A
PROYECTOS SAC
OBRA:
PROP.
CONT.
SUP.

COMPONENTES DE INFRAESTRUCTURA DEL MEJORAMIENTO DE LAS CALLES DEL AA.HH. ALTO MARCAVALLE PARA REMEDIACIN DE SUELOS EN LA CIUDAD DE LA OROYA, PROVINCIA DE YAULI - JUNN
ACTIVOS MINEROS SAC
CEBA S.A.
CONSORCIO VIAL DE LIMA
PRESUPUESTO

VAL. ACTUAL

VAL. ACUM. ANTERIOR

FECHA:

VAL. ACUM. ACTUAL

Thu 31 Jul 2014

SALDOS

ITEM DESCRIPCION
Und.

COSTO DIRECTO
GASTOS GENERALES
UTILIDAD
SUB TOTAL
IGV 18%
PRESUPUESTO TOTAL

Metrado

30.014150%
10.00%
18.00%

Precio (S/.)

Parcial (S/.)

4,419,457.50
1,326,462.61
441,945.75
6,187,865.86
1,113,815.85
7,301,681.71

Metrado

Parcial (S/.)

2,952,012.06
886,021.33
295,201.21
4,133,234.60
743,982.23
4,877,216.83

66.80%

Metrado

Parcial (S/.)

138,022.52
41,426.29
13,802.25
193,251.06
34,785.19
228,036.25

3.12%

Metrado

Parcial (S/.)

3,090,034.58
927,447.62
309,003.46
4,326,485.66
778,767.42
5,105,253.08

69.92%

Metrado

Parcial (S/.)

1,329,422.92
399,014.99
132,942.29
1,861,380.20
335,048.44
2,196,428.64

Thu 31 Jul 2014

SALDOS
%

30.08%
19.41%
30.00%
0.00%
40.45%
0.00%
0.67%
0.00%
0.00%
1.16%
2.72%
49.81%
0.29%
16.23%
5.29%
27.14%
17.35%
17.35%
50.55%
39.70%
87.90%
34.84%
89.92%
35.20%
87.14%
86.56%
85.97%
85.97%

Thu 31 Jul 2014

SALDOS
%

86.24%

100.00%
85.97%
32.29%
33.28%
35.29%
28.14%
38.38%
32.50%
21.11%
35.20%
100.00%
33.28%
57.79%
37.97%
37.97%
37.97%
37.97%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%

Thu 31 Jul 2014

SALDOS
%

100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
45.83%
100.00%
100.00%
15.00%
15.00%
15.00%
7.00%
7.00%
5.00%
5.00%
1.44%
0.00%
0.00%
0.00%
0.00%
1.09%
1.62%
0.00%
2.27%
1.39%
1.39%

Thu 31 Jul 2014

SALDOS
%

30.08%

VALORIZACIN N 13 DEL 01 AL 31 DE JULIO DEL 2014

Contrato N GL-C-032 2013


Supervisin de la Obra: MEJORAMIENTO DE LAS CALLES DEL A.H. ALTO MARCAVALLE
POR REMEDIACION DE SUELOS EN LA CIUDAD DISTRITO DE SANTA ROSA DE SACCO PROVINCIA DE YAULI - JUNN.

(SUMA ALZADA)

OBRA:

COMPONENTES DE INFRAESTRUCTURA DEL MEJORAMIENTO DE LAS CALLES DEL AA.HH. ALTO MARCAVALLE PARA REMEDIACIN DE SUELOS EN LA CIUDAD DE LA OROYA, PROVINCIA DE YAULI - JUNN

PROP.
CONT.
SUP.

ACTIVOS MINEROS SAC


CEBA S.A.
CONSORCIO VIAL DE LIMA

Valorizacin N:
Fecha:
Monto Contrato:

Avance Acumulado
Anterior

Presupuesto
Frmula
Descripcin

02

Obra a Suma alzada


VALORIZACIN N 13 DEL 01 AL 31 DE JULIO DEL 2014
(SUMA ALZADA)

Sub Total Presupuesto

(S/. IGV)

Monto Total

Valorizado

Avance
Actual
Valorizado

13
Thu 31 Jul 2014
S/. 6,187,865.86

(S/. IGV.)

S/. 7,301,681.71

(C/. IGV.)

Avance Acumulado
Actual
%

Valorizado

Saldo por
Ejecutar
Valorizado

6,187,865.86

4,133,234.60

66.80%

193,251.06

3.12%

4,326,485.66

69.92%

1,861,380.20

30.08%

6,187,865.86

4,133,234.60

66.80%

193,251.06

3.12%

4,326,485.66

69.92%

1,861,380.20

30.08%

Contrato N GL-C-032 2013


Supervisin de la Obra: MEJORAMIENTO DE LAS CALLES DEL A.H. ALTO MARCAVALLE POR
REMEDIACION DE SUELOS EN LA CIUDAD DISTRITO DE SANTA ROSA DE SACCO - PROVINCIA
DE YAULI - JUNN.

VALORIZACIN N 13 DEL 01 AL 31 DE JULIO DEL 2014


(SUMA ALZADA)

OBRA:
PROP.
CONT.
SUP.

COMPONENTES DE INFRAESTRUCTURA DEL MEJORAMIENTO DE LAS CALLES DEL AA.HH. ALTO MARCAVALLE PARA REMEDIACIN DE SUELOS EN LA CIUDAD DE LA OROYA, PROVINCIA DE YAULI - JUNN
ACTIVOS MINEROS SAC
CEBA S.A.
CONSORCIO VIAL DE LIMA

AMORTIZACIN Y DEDUCCIN DEL ADELANTO DIRECTO - N 01


Monto Adelanto Directo (Sin I.G.V.):
Fecha de Pago:

S/. 1,237,573.17
May-2013
A/C= 19.99999997%

MontoContratado (Sin I.G.V.):


Monto Adelanto Directo asignado (Sin I.G.V.):
Amortizacin
en el mes

Valorizacin
N

Mes

01
02
03
04
05
06
07
08
09
10
11
12
13

Jul-13
Aug-13
Sep-13
Oct-13
Nov-13
Dec-13
Jan-14
Feb-14
Mar-14
Apr-14
May-14
Jun-14
Jul-14

Total
(*) : IU conocido hasta el momento

Monto Total (1)

S/. 6,187,865.86
S/. 1,237,573.17
Deuda

(2) = (1)*(A/C)

(3)

232,988.47
87,423.94
88,483.92
434,417.22
196,186.31
766,202.87
536,151.11
677,923.99
150,075.85
567,837.83
241,327.32
154,284.14
193,251.06

46,597.69
17,484.79
17,696.78
86,883.44
39,237.26
153,240.57
107,230.22
135,584.80
30,015.17
113,567.57
48,265.46
30,856.83
38,650.21

4,326,554.03

865,310.79

1,237,573.17

865,310.79

(3) - (2)

1,190,975.48
1,173,490.69
1,155,793.91
1,068,910.47
1,029,673.21
876,432.64
769,202.42
633,617.62
603,602.45
490,034.88
441,769.42
410,912.59
372,262.38

Mes

Jul-13
Aug-13
Sep-13
Oct-13
Nov-13
Dec-13
Jan-14
Feb-14
Mar-14
Apr-14
May-14
Jun-14
Jul-14

1.044
1.047
1.048
1.047
1.048
1.048
1.051
1.054
1.057
1.057
1.059
1.061
1.061

"K" al Pago
( MAYO 2013)

Coeficiente

Deduccin
Adelanto Directo
N 01

1.025
1.025
1.025
1.025
1.025
1.025
1.025
1.025
1.025
1.025
1.025
1.025
1.025

0.018
0.021
0.022
0.021
0.022
0.022
0.025
0.028
0.030
0.030
0.032
0.034
0.034

826.28
360.56
392.97
1,839.99
853.40
3,426.18
2,661.44
3,738.50
911.43
3,448.55
1,558.97
1,058.29
1,325.58
22,402.14

Acumulado Total
Acumulado Anterior
Deduccion del mes

Amortizacin Actual (ABRIL 2014)

"K" del Mes

Saldo al Mes

22,402.14
21,031.91
1,370.23

Deduccin Actual (Abril 2014)

1,370.23

Contrato N GL-C-032 2013


Supervisin de la Obra: MEJORAMIENTO DE LAS CALLES DEL A.H. ALTO MARCAVALLE
POR REMEDIACION DE SUELOS EN LA CIUDAD DISTRITO DE SANTA ROSA DE SACCO PROVINCIA DE YAULI - JUNN.

(SUMA ALZADA)

OBRA:

COMPONENTES DE INFRAESTRUCTURA DEL MEJORAMIENTO DE LAS CALLES DEL AA.HH. ALTO MARCAVALLE PARA REMEDIACIN DE SUELOS EN LA CIUDAD DE LA OROYA, PROVINCIA DE YAULI - JUNN
Distrito de Santa Rosa de Sacco, Provincia de Yauli - JUNIN

PROP.
CONT.
SUP.

ACTIVOS MINEROS SAC


CEBA S.A.
CONSORCIO VIAL DE LIMA

CUADRO DE AMORTIZACIONES
Adelanto Directo- N 01
Monto Contrato
(S/I.G.V.)

Concepto

S/. 6,187,865.86 Adelanto Directo (20%)


Total Otorgado

Monto Contrato

Monto Otorgado

Amortiz.Acum. Anterior
Amortizado
%

Amortizacin Actual
Amortizado
%

Amortiz Acum. Actual


Amortizado
%

Saldo por Amortizar


Monto
%

S/. 1,237,573.17

S/. 826,660.58

66.80%

S/. 38,650.21

3.12%

S/. 865,310.79

69.92%

S/. 372,262.38

30.08%

S/. 1,237,573.17

S/. 826,660.58

66.80%

S/. 38,650.21

3.12%

S/. 865,310.79

69.92%

S/. 372,262.38

30.08%

Contrato N GL-C-032 2013


Supervisin de la Obra: MEJORAMIENTO DE LAS CALLES DEL A.H. ALTO MARCAVALLE POR REMEDIACION
DE SUELOS EN LA CIUDAD DISTRITO DE SANTA ROSA DE SACCO - PROVINCIA DE YAULI - JUNN.

VALORIZACIN N 13 DEL 01 AL 31 DE JULIO DEL 2014

VALORIZACIN N 13 DEL 01 AL 31 DE JULIO DEL 2014

OBRA:
PROP.
CONTRAT.
SUPERV.

(SUMA ALZADA)

COMPONENTES DE INFRAESTRUCTURA DEL MEJORAMIENTO DE LAS CALLES DEL AA.HH. ALTO MARCAVALLE PARA REMEDIACIN DE SUELOS EN LA CIUDAD DE LA OROYA, PROVINCIA DE YAULI - JUNN
ACTIVOS MINEROS SAC
CEBA S.A.
CONSORCIO VIAL DE LIMA

CUADRO DE REINTEGROS
FORMULA POLINMICA N 01:

MES

Jul-2103
Aug-2013
Sep-2013
Oct-2013
Nov-2013
Dec-2013
Jan-2014
Feb-2014
Mar-2014
Apr-2014
May-2014
Jun-2014
Jul-2014
TOTAL

VAL N

01
02
03
04
05
06
07
08
09
10
11
12
13

PROGRAMADO
"K" del Mes

Valorizacin
Programada

Valorizacin
Programada
Acumulada

S/. 289,535.13
S/. 981,601.64
S/. 1,201,360.91
S/. 1,171,135.86
S/. 1,191,486.62
S/. 1,071,573.50
S/. 281,172.22

S/. 289,535.13 Jul-2013


S/. 1,271,136.77 Aug-2013
S/. 2,472,497.68 Sep-2013
S/. 3,643,633.54 Oct-2013
S/. 4,835,120.16 Nov-2013
S/. 5,906,693.66 Dec-2013
S/. 6,187,865.88 Jan-2014

S/. 6,187,865.88

Mes

Reajuste
Programado
Acumulado

Reajuste
V(K-1)

Valorizacin
Ejecutada

1.044
1.047
1.048
1.047
1.048
1.048
1.051

12,635.742
45,746.801
57,940.722
55,247.964
56,907.013
51,848.382
14,314.357

S/. 12,635.74
S/. 58,382.54
S/. 116,323.27
S/. 171,571.23
S/. 228,478.24
S/. 280,326.62
S/. 294,640.98

S/. 232,988.47
S/. 87,423.94
S/. 88,483.92
S/. 434,417.22
S/. 196,186.31
S/. 766,202.87
S/. 536,151.11
S/. 677,923.99
S/. 150,075.85
S/. 567,837.83
S/. 241,327.32
S/. 154,284.14
S/. 193,251.06

294,640.982

S/. 1,162,358.63

S/. 4,326,554.03

Acumulado Total
Acumulado Anterior
Reintegro del mes

225,530.58
213,433.69
12,096.88

Valorizacin
Ejecutada
Acumulada
S/. 232,988.47
S/. 320,412.41
S/. 408,896.33
S/. 843,313.55
S/. 1,039,499.86
S/. 1,805,702.73
S/. 2,341,853.84
S/. 3,019,777.83
S/. 3,169,853.68
S/. 3,737,691.51
S/. 3,979,018.83
S/. 4,133,302.97
S/. 4,326,554.03

EJECUTADO
"K" del Mes

Reajuste
Ejecutado
Acumulado

Reajuste
Reconocido

Mes

Reajuste
V(K-1)

Jul-2013
Aug-2013
Sep-2013
Oct-2013
Nov-2013
Dec-2013
Jan-2014
Feb-2014
Mar-2014
Apr-2014
May-2014
Jun-2014
Jul-2014

1.044
1.047
1.048
1.047
1.048
1.048
1.051
1.054
1.057
1.057
1.059
1.061
1.061

10,251.493
4,108.925
4,247.228
20,417.609
9,416.943
36,777.738
27,343.707
36,607.895
8,554.323
32,366.756
14,238.312
9,411.333
11,788.315

S/. 10,251.49
S/. 14,360.42
S/. 18,607.65
S/. 39,025.26
S/. 48,442.20
S/. 85,219.94
S/. 112,563.64
S/. 149,171.54
S/. 157,725.86
S/. 190,092.62
S/. 204,330.93
S/. 213,742.26
S/. 225,530.58

S/. 10,251.49
S/. 14,360.42
S/. 18,607.65
S/. 39,025.26
S/. 48,442.20
S/. 85,219.94
S/. 112,563.64
S/. 149,171.54
S/. 157,725.86
S/. 190,092.62
S/. 204,330.93
S/. 213,742.26
S/. 225,530.58

225,530.577

S/. 1,469,064.38

S/. 1,469,064.38

Contrato N GL-C-032 2013


Supervisin de la Obra: MEJORAMIENTO DE LAS CALLES DEL A.H. ALTO MARCAVALLE
POR REMEDIACION DE SUELOS EN LA CIUDAD DISTRITO DE SANTA ROSA DE SACCO PROVINCIA DE YAULI - JUNN.

VALORIZACIN N 13 DEL 01 AL 31 DE JULIO DEL 2014


(SUMA ALZADA)

Frmula Polinmica
Presupuesto

"MEJORAMIENTO DE LAS CALLES DEL A.H. ALTO MARCAVALLE POR REMEDIACION DE SUELOS EN LA CIUDAD DE LA OROYA-JUNIN"
DISTRITO DE SANTA ROSA DE SACCO, PROVINCIA DE YAULI - JUNIN

Fecha Presupuesto 31/07/2012


Propietario:
Contratista:
Supervisin:
K=

ACTIVOS MINEROS S.A.C.


CEBA S.A.
CONSORCIO VIAL DE LIMA

0.221*(Mr / Mo) + 0.142*(MFr / MFo) + 0.107*(Ar / Ao) + 0.098*(Cr / Co) + 0.131*(Mr / Mo) + 0.301*(Ir / Io)

rea Geogrfica:

3
C.BASE

Monomio
1
2
3
4
5
6

Factor
0.221
0.142
0.107
0.098
0.131
0.301

(%)
100.00%
52.82%
47.18%
100.00%
100.00%
100.00%
100.00%

Smbolo Indice Descripcin


M
M
F
A
C
M
I

47
45
32
05
21
48
39

IU

Jul-12
COEFIC

448.25
311.80
449.56
360.73
354.74
327.55
377.50

MANO DE OBRA
MADERA TERCIADA PARA ENCOFRADO
FLETE TERRESTRE
AGREGADO GRUESO
CEMENTO PORTLAND TIPO I
MAQUINARIA Y EQUIPO NACIONAL
INDICE GENERAL DE PRECIOS AL CONSUMIDOR

Kr =

0.221
0.075
0.067
0.107
0.098
0.131
0.301
1.000

C. A.D
Val. 1
Val. 2
Val. 3
Val. 4
Val. 5
May-13
Jun-13
Jul-13
Aug-13
Sep-13
IU
COEFIC
IU
COEFIC
IU
COEFIC
IU
COEFIC
IU
COEFIC
IU
471.44
314.48
455.86
377.24
354.74
328.27
386.60

0.232
0.076
0.068
0.112
0.098
0.131
0.308
1.025

471.44
311.57
455.72
375.79
354.74
335.41
387.61

0.232
0.075
0.068
0.111
0.098
0.134
0.309
1.028

497.55
311.60
455.72
377.23
354.74
337.08
389.74

0.245
0.075
0.068
0.112
0.098
0.135
0.311
1.044

497.55
311.97
455.72
379.17
354.74
338.62
391.85

0.245
0.075
0.068
0.112
0.098
0.135
0.312
1.047

497.55
311.97
455.86
384.73
354.74
337.65
392.28

0.245
0.075
0.068
0.114
0.098
0.135
0.313
1.048

Val. 6

Val. 7

Oct-13

497.55
311.73
455.86
381.91
354.74
336.95
392.43

COEFIC
0.245
0.075
0.068
0.113
0.098
0.135
0.313
1.047

IU

Nov-13
COEFIC

497.55
311.88
455.86
384.46
354.74
338.15
391.57

0.245
0.075
0.068
0.114
0.098
0.135
0.312
1.048

Val. 8
IU

Dec-13
COEFIC

497.55
311.88
455.19
387.00
354.74
336.78
392.22

0.245
0.075
0.068
0.115
0.098
0.135
0.313
1.048

Val. 9

Val. 10

Jan-14
IU
498.10
311.89
455.19
388.14
354.74
339.09
393.46

COEFIC
0.246
0.075
0.068
0.115
0.098
0.136
0.314
1.051

IU

Feb-14
COEFIC

498.10
311.97
455.19
390.36
354.74
339.73
395.83

0.246
0.075
0.068
0.116
0.098
0.136
0.316
1.054

IU

Mar-14
COEFIC

498.10
311.97
465.69
389.12
354.74
339.81
397.88

0.246
0.075
0.069
0.115
0.098
0.136
0.317
1.057

Apr-14
IU
498.10
312.28
465.69
388.89
354.74
338.89
399.44

COEFIC
0.246
0.075
0.069
0.115
0.098
0.136
0.318
1.057

IU

May-14
COEFIC

498.10
313.84
465.69
389.66
354.74
338.34
400.34

0.246
0.075
0.069
0.116
0.098
0.135
0.319
1.059

Jun-14
IU
498.10
313.47
468.30
393.67
354.74
338.46
400.98

COEFIC
0.246
0.075
0.070
0.117
0.098
0.135
0.320
1.061

Contrato N GL-C-032 2013


Supervisin de la Obra: MEJORAMIENTO DE LAS CALLES DEL A.H. ALTO MARCAVALLE POR REMEDIACION DE SUELOS EN LA CIUDAD
DISTRITO DE SANTA ROSA DE SACCO - PROVINCIA DE YAULI - JUNN.
CONSORCIO VIAL DE LIMA

VALORIZACIN N 13 DEL 01 AL 31 DE JULIO DEL 2014

(SUMA ALZADA)

OBRA:

COMPONENTES DE INFRAESTRUCTURA DEL MEJORAMIENTO DE LAS CALLES DEL AA.HH. ALTO MARCAVALLE PARA REMEDIACIN DE SUELOS EN LA CIUDAD DE LA OROYA, PROVINCIA DE YAULI - JUNN

PROP.
CONT.
SUP.

DISTRITO DE SANTA ROSA SACCO, PROVINCIA DE YAULI - JUNIN"


ACTIVOS MINEROS S.A.C.
CEBA S.A.
CONSORCIO VIAL DE LIMA

CURVA "S"
Programado vs Ejecutado
GENERAL
100%

100.00%
100.00%

100.00%

100.00%

100.00%

93.32%

90%

80%

70%

69.92%
66.80%

64.30%
60.40%

60%

51.23%

50%
46.99%
48.80%
42.05%

40%
37.85%
31.88%

30%

29.18%

20%
16.89%
16.80%
13.63%

10%
6.61%

0%
Inicio de obra

0.00%

Monto mes
Monto Acumulados
% de avance del mes
% Avance Acum. Prog.

Monto mes
Monto Acumulados
% de avance del mes
% Avance Acum. Ejec.

Acumulado

3.77%

Jul-2013

% Avance Acum. Prog.

6.61%

5.18%
3.77%
0.00%

% Avance Acum. Ejec.

5.18%

Aug-2013

Sep-2013

Oct-2013

COSTO DIRECTO - AVANCE PROGRAMADO VIGENTE POR ADICIONAL N 03


Inicio de
Jul-2013
obra
Aug-2013
Sep-2013
Oct-2013
S/. 166,403.52
S/. 62,439.36
S/. 63,196.41
S/. 454,611.26
S/. 166,403.52
S/. 228,842.88
S/. 292,039.29
S/. 746,650.55
3.77%
1.41%
1.43%
10.29%
3.77%
5.18%
6.61%
16.89%
COSTO DIRECTO - AVANCE EJECUTADO
S/. 166,403.52
S/. 62,439.36
S/. 166,403.52
S/. 228,842.88
3.77%
1.41%
3.77%
5.18%

S/. 63,196.41
S/. 292,039.29
1.43%
6.61%

S/. 310,266.65
S/. 602,305.94
7.02%
13.63%

PORCENTAJE ( EJECUTADO / PROGRAMA ACELERADO ACTUALIZADO)


100.00%
100.00%
100.00%
80.67%

Nov-2013

Dec-2013

Jan-2014

Feb-2014

Mar-2014

Apr-2014

May-2014

31/06/2014

Nov-2013
S/. 662,245.97
S/. 1,408,896.52
14.98%
31.88%

Dec-2013
S/. 449,277.74
S/. 1,858,174.26
10.17%
42.05%

Jan-2014
S/. 218,314.55
S/. 2,076,488.81
4.94%
46.99%

Feb-2014
S/. 2,047,721.21
S/. 4,124,210.02
46.33%
93.32%

Mar-2014
S/. 295,247.50
S/. 4,419,457.52
6.68%
100.00%

Apr-2014
S/. 295,247.50
S/. 4,419,457.52
6.68%
100.00%

May-2014
S/. 295,247.50
S/. 4,419,457.52
6.68%
100.00%

S/. 295,247.50
S/. 4,419,457.52
6.68%
100.00%

S/. 295,247.50
S/. 4,419,457.52
6.68%
100.00%

S/. 140,118.92
S/. 742,424.86
3.17%
16.80%

S/. 547,232.45
S/. 1,289,657.31
12.38%
29.18%

S/. 382,926.37
S/. 1,672,583.68
8.66%
37.85%

S/. 484,182.48
S/. 2,156,766.16
10.96%
48.80%

S/. 107,186.20
S/. 2,263,952.36
2.43%
51.23%

S/. 405,557.46
S/. 2,669,509.82
9.18%
60.40%

S/. 172,359.24
S/. 2,841,869.06
3.90%
64.30%

S/. 110,191.82
S/. 2,952,060.88
2.49%
66.80%

S/. 3,090,083.40
3.12%
69.92%

52.70%

69.40%

80.55%

52.30%

51.23%

60.40%

64.30%

31/06/2014

66.80%

S/. 138,022.52

69.92%

Contrato N GL-C-032 2013


Supervisin de la Obra: MEJORAMIENTO DE LAS CALLES DEL A.H. ALTO
MARCAVALLE POR REMEDIACION DE SUELOS EN LA CIUDAD DISTRITO DE
SANTA ROSA DE SACCO - PROVINCIA DE YAULI - JUNN.

VALORIZACIN N 13 DEL 01 AL 31 DE JULIO DEL 2014


(SUMA ALZADA)

AVANCE MENSUAL PROGRAMA POR AMPLIACION DE PLAZO N03


DESCRIPCION
COSTO DIRECTO
GASTOS GENERALES
UTILIDAD
SUB TOTAL
ACUMULADO
PORCENTAJE DE
AVANCE PROGRAMADO

30.014150%
10.00%

PARCIAL
ACUMULADO

Jul-2013
S/. 166,403.52
S/. 49,944.60
S/. 16,640.35
232,988.46
232,988.46

Aug-2013
S/. 62,439.36
S/. 18,740.64
S/. 6,243.94
87,423.94
320,412.40

31/09/2013
S/. 63,196.41
S/. 18,967.87
S/. 6,319.64
88,483.92
408,896.32

Oct-2013
S/. 454,611.26
S/. 136,447.71
S/. 45,461.13
636,520.09
1,045,416.41

31/11/2013
S/. 662,245.97
S/. 198,767.50
S/. 66,224.60
927,238.07
1,972,654.48

Dec-2013
S/. 449,277.74
S/. 134,846.90
S/. 44,927.77
629,052.41
2,601,706.89

Jan-2014
S/. 218,314.55
S/. 65,525.26
S/. 21,831.46
305,671.26
2,907,378.16

Feb-2014
S/. 2,047,721.21
S/. 614,606.12
S/. 204,772.12
2,867,099.45
5,774,477.61

Mar-2014
S/. 295,247.50
S/. 88,616.03
S/. 29,524.75
413,388.28
6,187,865.89

3.77%
3.77%

1.41%
5.18%

1.43%
6.61%

10.29%
16.89%

14.98%
31.88%

10.17%
42.05%

4.94%
46.99%

46.33%
93.32%

6.68%
100.00%

TOTAL
4,419,457.52
1,326,462.62
441,945.75
6,187,865.89
Ok

VALORIZACION N 13, DEL 01 AL 31 JULIO 2014

Contrato GL-C-032-2013: Supervisin de la


Obra:MEJORAMIENTO DE LAS CALLES DE AH ALTO
MARCAVALLE POR REMEDIACION DE SUELOS EN LA CIUDAD
DISTRITO DE SANTA ROSA DE SACCO-PROVINCIA DE YAULIJUNIN.

(SUMA ALZADA)

PARTIDAS EJECUTADAS AFECTAS AL DESCUENTO POR ADELANTO DE MATERIALES EN OBRA

MES: ABRIL 2014


MOVIMIENTO DE TIERRAS
RELLENO CON MATERIAL DE PRESTAMO

02
02.03
03
03.01

PAVIMENTOS
SUB BASE DE 0.15M, EN CALLES LONGITUDINALES, TRANSVERSALES
LOSA DE CONCRETO F'C 210 KG/CM2 E=0.15M INCLUYE ENCOFRADO
(ACABADO FROTACHADO)
CURADO DE LOSA DE CONCRETO

03.03
03.04

04
04.01
04.03

JUNTAS
JUNTA LONGITUDINAL TIPO "A" C/DOWELL
JUNTA DE CONTRACCION TIPO "B" C/DOWELL
JUNTA DE CONSTRUCCION TIPO "C" C/DOWELL

04.05

06
06.02
06.03

VEREDAS
BASE COMPACTACION MANUAL e=0.10 m
CONCRETO f'c= 175KG/CM2, ACABADO FROTACHADO

MUROS
RELLENO Y COMPACTACION MATERIAL PRESTAMO

08
08.03
08.04
08.05
08.06
08.07

ENCOFRADO Y DESENCOFRADO EN MUROS


CONCRETO F'C 210 KG/CM2 EN MUROS
ACERO fy=4200 kg/cm2 GRADO 60
SOLADOS CONCRETO f'c=100 kg/cm2 h=2"

09
09.03
09.04

ENCOFRADO Y DESENCOFRADO DE CUNETAS


CONCRETO F'C 210 KG/CM2 EN CUNETAS

CUNETAS

REDES DE AGUA
CAMA DE APOYO DE TUBERIAS
RELLENO Y COMPACTACION DE ZANJAS
SUM E INSTAL TUBERIA PVC ISO 4422, C-10, DN=63 mm
CODO 45 PVC SAP DN63 MM
CODO PVC 135 PVC SAP DN=63 mm
TAPON PVC 63 mm
TEE PVC SAP DN= 63 mm
CRUZ PVC SAP DN=63 mm
CONEXIONES DOMICILIARIAS DE AGUA POTABLE
CONEXIONES DOMICILIARIAS DE DESAGUE

16
16.04
16.05
16.07
16.08
16.09
16.10
16.11
16.12
16.14
17.01

und
m3

metrado
0.00

precio
55.64

Importe

und
m3

metrado
1,142.40

precio
10.74

Importe

m2

1,201.20

65.13

m2

1,201.20

0.93

metrado
0.00
0.00
0.00

precio
21.54
26.37
25.28

Importe

precio
11.94
47.53

Importe

m2

metrado
104.68
148.68

und
m3

metrado
36.01

precio
73.03

Importe

m2
m3
kg
m2

142.44
15.74
-9.79
34.12

44.80
411.51
3.90
14.01

und
m2

metrado
43.15

precio
24.75

m3

431.50

27.54

1,067.96
11,883.51

und
m
m3
m
u
u
u
u
u
u
u

metrado
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

precio
2.71
73.48
8.47
18.79
18.79
13.06
30.65
32.22
231.90
548.39

Importe
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

und
m3
m2
m2

und
m3

0.00

12,269.38
78,234.16
1,117.12

0.00
0.00
0.00

1,249.88
7,066.76

2,629.68
6,381.40
6,477.74
-38.18
477.98

Importe

DESCUENTOS SEGN EL ANALISIS DE PU DE LAS PARTIDAS EJECUTADAS


MUROS
08.03 RELLENO Y COMPACTACION C/MATERIAL DE PRESTAMO
Materiales
0205010015 MATERIAL DE RELLENO

36.01
Und
m3

Cantidad
1.2000

08.04 ENCOFRADO Y DESENCOFRADOS EN MUROS


Materiales

Precio S/.

142.44
Und

Cantidad

por m2
Parcial S/.

42.00

Precio S/.

Descuento

50.40

1,814.81

50.40

1,814.81

por m2
Parcial S/.

Descuento

0202000008 ALAMBRE NEGRO N8

kg

0.1000

4.55

0.46

0202010022 CLAVO C/C DE 3"

kg

0.1000

3.90

0.39

55.55

0245010001 MADERA TORNILLO INCLUIDO CORTE PARA ENCOFRADO

p2

4.0700

5.05

20.55

2,927.68

21.40

3,048.05

08.05 CONCRETO F'C=210 KG/CM2 EN MUROS


Materiales

15.74
Und

Cantidad

Precio S/.

64.81

por m3
Parcial S/.

Descuento

0205000005 PIEDRA CHANCADA DE 1"

m3

0.7000

60.00

0205010004 ARENA GRUESA

m3

0.5100

42.50

21.68

341.19

0221000094 CEMENTO PORTLAND TIPO IP

bolsa

8.6000

15.89

136.65

2,151.13

0230120003 ADITIVO ACELERANTE DE FRAGUA

gal

0.5720

25.92

14.83

233.39

0230230007 ADITIVO EUCO 360

gal

0.8033

29.48

23.68

0230520001 ADITIVO INCORPORADOR DE AIRE

gal

0.0120

33.01

0.40

6.24

239.24

3,765.86

08.06 ACERO fy=4200 kg/cm2 GRADO 60


Materiales

-9.79
Und

Cantidad

Precio S/.

42.00

661.14

372.78

por kg
Parcial S/.

Descuento

0202000007 ALAMBRE NEGRO N 16

kg

0.0300

4.55

0.14

-1.34

0203020003 ACERO CORRUGADO fy=4200 kg/cm2 GRADO 60

kg

1.0500

2.59

2.72

-26.62

2.86

-27.96

08.07 SOLADO CONCRETO f'c= 100 kg/cm2 h=2"


Materiales

34.12
Und

Cantidad

Precio S/.

por m2
Parcial S/.

Descuento

0221000094 CEMENTO PORTLAND TIPO IP

bls

0.2250

15.89

3.58

0238000000 HORMIGON (PUESTO EN OBRA)

m3

0.0600

41.50

2.49

84.95

6.07

206.93

16.04

CAMA DE APOYO DE TUBERIAS


Materiales

0205010004 ARENA GRUESA

0.00
Und
m3

Cantidad
0.0400

16.05 RELLENO Y COMPACTACION DE ZANJAS


Materiales

Precio S/.

Und

Cantidad

m
Parcial S/.

12.08

0.00
Precio S/.

121.98

Descuento
0.48

0.00

m3
Parcial S/.

Descuento

0205010015 MATERIAL DE RELLENO

m3

1.2000

42.00

50.40

0.00

0239050000 AGUA

m3

0.15

15.84

2.38

0.00

52.78

0.00

DESCUENTOS SEGN EL ANALISIS DE PU DE LAS PARTIDAS EJECUTADAS


16.07 SUM E INSTAL TUBERIA PVC ISO 4422,C10 DN=63MM

0.00

Materiales

Und

Cantidad

Precio S/.

2
m
Parcial S/.

Descuento

0201800002 LUBRICANTE PAR TUBERIA

gal

0.0030

50.37

0.15

0.00

0273010035 TUBERIA PVC ISO 4422, C10, DN=63 mm

1.0200

6.04

6.16

0.00

6.31

0.00

16.09 CODO 45 PVC SAP DN= 63mm

0.00 u

Materiales

Und

Cantidad

Precio S/.

Parcial S/.

Descuento

0201800002 LUBRICANTE PARA TUBERIA

gal

0.0100

50.37

0.50

0.00

0265180014 CODO 45 PVC SAP DN= 63mm

1.0000

10.10

10.10

0.00

10.60

0.00

16.09 CODO 135 PVC SAP DN= 63mm

0.00 u

Materiales

Und

Cantidad

Precio S/.

Parcial S/.

Descuento

0201800002 LUBRICANTE PARA TUBERIA

gal

0.0100

50.37

0.50

0.00

0265180014 CODO 135 PVC SAP DN= 63mm

1.0000

10.10

10.10

0.00

10.60

0.00

DESCUENTOS SEGN EL ANALISIS DE PU DE LAS PARTIDAS EJECUTADAS

16.10 TAPON PVC 63mm

0.00 u

Materiales
0201800002 LUBRICANTE PARA TUBERIA
0272040046

TAPON HEMBRA PVC SAP P/AGUA DN=63 mm

Und

Cantidad

TEE PVC SAP DN=63mm

Descuento

0.0100

50.37

0.50

0.00

1.0000

4.37

4.37

0.00

4.87

0.00

0.00 u

Materiales
0201800002 LUBRICANTE PARA TUBERIA

Parcial S/.

gal

16.11 TEE PVC SAP DN=63mm

0272070081

Precio S/.

Und

Cantidad

Precio S/.

Parcial S/.

Descuento

gal

0.0029

50.37

0.15

0.00

1.0000

10.04

10.04

0.00
0.00

16.12 CRUZ PVC SAP DN=63 mm

0.00 u

Materiales
0201800002 LUBRICANTE PARA TUBERIA

Und

Cantidad

Precio S/.

gal

0.0290

50.37

0.0030
1.00

0230460049

PEGAMENTO PARA TUBO PVC

gal

0273150008

CRUZ PVC SAP DN=63 mm

Parcial S/.

Descuento
1.46

0.00

86.25

0.26

0.00

10.04

10.04

0.00
0.00

16.14 CONEXIONES DOMICILIARIAS DE AGUA POTABLE

0.00 u

Materiales

Und

Cantidad

Precio S/.

Parcial S/.

Descuento

0221030002

CAJA DE CONCRETO PARA MEDIDOR 12.5mm

1.0000

18.06

18.06

0.00

0230460049

PEGAMENTO PARA TUBO PVC

gal

0.0300

86.25

2.59

0.00

0230480032

CINTA TEFLON

pza

0.16

1.52

0.24

0.00

0265180011

CODO DE 90 SP PVC SAP P/AGUA DE 12.5 mm

2.00

1.02

2.04

0.00

0265240003

MARCO Y TAPA DE FIERRO GALVANIZADO PARA MEDIDOR 12.5mm

1.00

12.57

12.57

0.00

0272000000

TUBERIA PVC SAP PRESION PARA AGUA C-5 EC 2"X5m

1.50

19.96

29.94

0.00

0272020000

REDUCCION PVC SAP PARA AGUA CON ROSCA 3/4" A 1/2"

1.00

0.94

0.94

0.00

0272050030

CURVA PVC 12.5 mm P/AGUA

1.00

1.18

1.16

0.00

0272330004

CORPORATION RT NIPLE TUERCA EMPAQ. 12.5 mm

1.00

14.76

14.76

0.00

0272330005

LLAVE PASO RT NIPLE TUERCA EMPAQ. 12.5 mm

2.00

26.72

53.44

0.00

0272330006

ABRAZADERA TERMOPLASTICA

1.00

17.00

17.00

0.00

0273010034

TUBERIA PVC SAP A-10 DE DN= 12.5 mm

9.00

1.65

14.85

0.00
0.00

17.01 CONEXIONES DOMICILIARIAS DE DESAGUE

0.00 u

Materiales

Und

Cantidad

Precio S/.

Parcial S/.

Descuento

0201800002

LUBRICANTE PARA TUBERIA

gal

0.0240

50.37

18.06

0.00

0203020003

ACERO CORRUGADO GRADO 60

kg

0.8000

2.59

2.59

0.00

0231520002

CAJA DE CONCRETO SIMPLE DESAG 0.30X0.60M INC TAPA

1.00

74.80

0.24

0.00

0265180009

CODO DE 45 PVC SAL DE 150 MM

1.00

23.35

2.04

0.00

0265180010

REDUCCION PVC SAL P/DESAGUE DE 200 MM A 150 MM

1.00

31.64

12.57

0.00

027301''36

TUB. PVC SAL P/DESAGUE DE 150 MM

12.00

17.76

29.94

0.00
0.00

02

MOVIMIENTO DE TIERRAS

02.03 RELLENO CON MATERIAL DE PRESTAMO CANTERA


Materiales
0205000040 MATERIAL GRANULAR

0.00
Und
m3

Cantidad
1.2000

Precio S/.

por m2
Parcial S/.

42.00

Descuento

50.40

0.00

50.40

0.00

02 PAVIMENTACION
02.01 SUB BASE DE 0.15M EN CALLES LONGITUDINALES
Materiales
0205000040 MATERIAL GRANULAR

03.03

1,142.40
Und
m3

Cantidad
0.1950

LOSA DE CONCRETO F'C 210 KG/CM2 E=0.15M INCLUYE ENCOFRADO (ACABADO


FROTACHADO)

Precio S/.

1,201.20
Cantidad

por m2
Parcial S/.

42.00

Precio S/.

Descuento
8.19

9,356.26

8.19

9,356.26

por m2

Materiales

Und

0205000005 PIEDRA CHANCADA DE 1"

m3

0.1050

60.00

Parcial S/.
6.30

0205010004 ARENA GRUESA

m3

0.0765

42.50

3.25

Descuento

3,903.90

0221000001 CEMENTO PORTLAND TIPO I

bls

1.2900

16.76

21.62

25,969.94

0230120003 ADITIVO ACELERANTE FRAGUA

gal

0.0858

25.92

2.22

2,666.66

0230230007 ADITIVO EUCO 360

gal

0.1205

29.48

3.55

4,264.26

0230520001 ADITIVO INCORPORADOR DE AIRE

gal

0.0018

33.01

0.06

72.07

7,567.56

DESCUENTOS SEGN EL ANALISIS DE PU DE LAS PARTIDAS EJECUTADAS


03.04

CURADO DE LOSA

1,201.20

Materiales

Und

0229010100 CURADOR MENBRANA LIQUIDA

04.01

gal

Cantidad
0.0500

JUNTA LONGITUDINAL TIPO "A" C/DOWELL

por m2

Precio S/.

Parcial S/.

16.08

Descuento
0.80

0.00

960.96

por m2

Materiales

Und

0202000007 ALAMBRE NEGRO N 16

kg

0.0500

4.55

0.23

0.00

0205010037 MATERIAL DE RESPALDO PARA SELLO ELASTICO DE 9 MM

1.0500

0.41

0.43

0.00

0230150045 SELLANTE ELASTICO DE POLIURETANO 300ML

0.3167

15.93

5.05

0.00

900305150102 ACERO GRADO 60

kg

0.7861

3.90

3.07

0.00

900539500112 CANASTILLLAS PARA JUNTAS (ACERO CORRUGADO)

2.1900

3.90

8.54

0.00

04.03

Cantidad

JUNTA LONGITUDINAL TIPO "B" C/DOWELL

Parcial S/.

0.00

Materiales

Und

0202000007 ALAMBRE NEGRO N 16

kg

0.0500

0205010037 MATERIAL DE RESPALDO PARA SELLO ELASTICO DE 9 MM

0230150045 SELLANTE ELASTICO DE POLIURETANO 300ML

0252070010 BARRA DE ACERO LISO 5/8"


0253010000 GRASA
900539500112 CANASTILLLAS PARA JUNTAS (ACERO CORRUGADO)

04.05

Precio S/.

Cantidad

Descuento

por m2

Precio S/.

Parcial S/.

Descuento

4.55

0.23

0.00

1.0500

0.41

0.43

0.00

0.3167

15.93

5.05

0.00

1.3670

4.21

5.76

0.00

kg

0.0100

15.00

0.15

0.00

2.7000

3.90

10.53

0.00

JUNTA LONGITUDINAL TIPO "C" C/DOWELL

0.00

Materiales

Und

0202000007 ALAMBRE NEGRO N 16

kg

0.0500

4.55

0.23

0.00

0205010037 MATERIAL DE RESPALDO PARA SELLO ELASTICO DE 9 MM

1.0500

0.41

0.43

0.00

0230150045 SELLANTE ELASTICO DE POLIURETANO 300ML

0.3167

15.93

5.05

0.00

0252070010 BARRA DE ACERO LISO 5/8"

1.3670

4.21

5.76

0.00

0253010000 GRASA

kg

0.0100

15.00

0.15

0.00

2.4200

3.90

9.44

0.00

900539500112 CANASTILLLAS PARA JUNTAS (ACERO CORRUGADO)

Cantidad

por m2

Precio S/.

Parcial S/.

Descuento

09 CUNETAS
09.03

ENCOFRADO Y DESENCOFRADO DE CUNETAS

43.15

Materiales

Und

0202000008 ALAMBRE NEGRO N 8

Cantidad

por m2

Precio S/.

Parcial S/.

Descuento

kg

0.0200

4.55

0202010022 CLAVO C/C DE 3"

kg

0.1600

3.90

0.62

26.75

0245010001 MADERA TORNILLO INCLUYE CORTE

p2

2.8900

5.05

14.59

629.56

09.04

CONCRETO F'C=210 KG/CM2 EN CUNETAS

0.09

431.50

por m2

Materiales

Und

0202000008 PIEDRA CHANCADA DE 1"

m3

0.0583

60.00

0202010022 ARENA GRUESA

m3

0.0385

42.50

1.64

707.66

0245010001 CEMENTO PORTLAND TIPO I

bls

0.6375

16.76

10.68

4,608.42

0230120003 ADITIVO ACELERANTE FRAGUA

gal

0.0427

25.92

1.11

478.97

0230230007 ADITIVO EUCO 360

gal

0.0603

29.48

1.78

768.07

0230520001 ADITIVO INCORPORADOR DE AIRE

gal

0.0009

33.01

0.03

12.95

06
06.02

Precio S/.

Parcial S/.

Descuento
3.38

1,458.47

VEREDAS
BASE COMPACTACION MANUAL e=0.10 m

104.68 m2

Materiales

Und

0205000040 MATERIAL GRANULAR

06.03

Cantidad

3.88

m3

Cantidad
0.1200

CONCRETO f'c= 175KG/CM2, ACABADO FROTACHADO


Materiales

Precio S/.

Parcial S/.

42.00

Descuento
5.04

527.59

148.68 m2
Und

Cantidad

Precio S/.

Parcial S/.

Descuento

0205000005 PIEDRA CHANCADA DE 1"

m3

0.7500

60.00

4.50

0205010004 ARENA GRUESA

m3

0.0500

42.50

2.13

315.95

0221000094 CEMENTO PORTLAND TIPO IP

bolsa

0.8000

15.89

13.41

1,993.80

0230120003 ADITIVO ACELERANTE DE FRAGUA

gal

0.0570

25.92

1.48

219.67

0230230007 ADITIVO EUCO 360

gal

0.0804

29.48

2.37

352.40

0230520001 ADITIVO INCORPORADOR DE AIRE

gal

0.0012

33.01

0.04

5.89

VALORIZACION N 12, DEL 01 AL 30 JUNIO 2014

669.06

Contrato GL-C-032-2013: Supervisin de la


Obra:MEJORAMIENTO DE LAS CALLES DE AH ALTO
MARCAVALLE POR REMEDIACION DE SUELOS EN LA CIUDAD
DISTRITO DE SANTA ROSA DE SACCO-PROVINCIA DE YAULIJUNIN.

(SUMA ALZADA)

AMORTIZACION POR ADELANTO DE MATERIAL EN OBRA N 01-VALORIZACION N 13


MES: JULIO 2014
OBRA:
LUGAR:
TRAMITE:
Codigo
0201800002
0202000007
0202000008
0202010022
0203020003
0229010100
0230120003
0230230007
0252070010
0265180011
0265180013
0272000000
0272020000
0272040046
0272050030
0272070081
0273010035
0273010036
0273150008

"COMPONENTE DE INFRAESTRUCTURA DEL MEJORAMIENTO DE LAS CALLES DEL AAHH. ALTO MARCAVALLE PARA
REMEDIACION DE SUELOS EN LA CIUDAD DELA OROYA, PROVINCIA DE YAULI - JUNIN"
JUNIN-YAULI-SANTA ROSA DE SACCO
10/16/2013

Recurso
LUBRICANTES PARA TUBERIAS
ALAMBRE NEGRO N 16
ALAMBRE NEGRO N 8
CLAVOS C/C DE 3"
ACERO CORRUGADO f'c= 4200 kg/cm2 GRADO 60
CURADOR DE MENBRANA LIQUIDA
ADITIVO ACELERANTE FRAGUA
ADITIVO EUCO 360
BARRA DE ACERO LISO 5/8"
CODO DE 90 SP PVC SAP P/AGUA DE 12.5 mm
CODO 45 PVC SAP DN=63mm
TUBERIA PVC SAP PRESION PARA AGUA C-5 EC 2"X5m
REDUCCION PVC SAP PARA AGUA CON ROSCA3/4" A 1/2"
TAPON HEMBRA PVC SAP P/AGUA DN=63mm
CURVA PVC 12.5 mm P/AGUA
TEE PVC SAP DN=63mm
TUBERIA PVC ISO 4422, CLASE 10, DN=63mm
TUBERIA PVC SAL P/DESAGUE DE 150 mm
CRUZ PVC SAP DN=63 mm

Und
gal
kg
kg
kg
kg
gal
gal
gal
m
u
u
u
u
u
u
u
u
u
u

Cantidad
2.00
800.00
200.00
150.00
24,660.27
100.00
320.00
148.00
1,800.00
50.00
3.00
60.00
50.00
5.00
50.00
5.00
134.00
99.00
10.00

Precio (S/.)
50.37
4.55
4.55
3.90
2.59
16.08
25.92
29.48
4.21
1.02
10.10
19.96
1.16
4.37
1.16
10.04
6.04
17.76
10.04
SUBTOTAL
IGV (18%)
TOTAL

Importe (S/.)
100.74
3,640.00
910.00
585.00
63,870.10
1,608.00
8,294.40
4,363.04
7,578.00
51.00
30.30
1,197.60
58.00
21.85
58.00
50.20
809.36
1,758.24
100.40
95,084.23
17,115.16
112,199.39

AMORTIZACION 8
JULIO 2014

0.00
0.00
0.00

VALORIZACION N 09, DEL 01 AL 31 MARZO 2014

Contrato GL-C-032-2013: Supervisin de la


Obra:MEJORAMIENTO DE LAS CALLES DE AH ALTO
MARCAVALLE POR REMEDIACION DE SUELOS EN LA CIUDAD
DISTRITO DE SANTA ROSA DE SACCO-PROVINCIA DE YAULI-

(SUMA ALZADA)

AMORTIZACION POR ADELANTO DE MATERIAL EN OBRA N 02- VALORIZACION N 13


MES: JULIO 2014
OBRA:
LUGAR:
TRAMITE:

"COMPONENTE DE INFRAESTRUCTURA DEL MEJORAMIENTO DE LAS CALLES DEL AAHH. ALTO MARCAVALLE PARA
REMEDIACION DE SUELOS EN LA CIUDAD DELA OROYA, PROVINCIA DE YAULI - JUNIN"
JUNIN-YAULI-SANTA ROSA DE SACCO
10/24/2013

Codigo
0221000001
0221000094
0245010001
0205010004
0205000005
0205000040
0205010015
0238000000

Recurso
CEMENTO TIPO I
CEMENTO TIPO IP
MADERA TORNILLO
ARENA GRUESA
PIEDRA CHANCADA
MATERIAL GRANULAR
MATERIAL DE RELLENO
HORMIGON

Und
bls
bls
p2
m3
m3
m3
m3
m3

Cantidad
500.00
1,000.00
5,343.31
45.00
45.00
170.00
150.00
10.00

Precio (S/.)

Importe (S/.)

16.76
15.89
5.05
42.50
60.00
42.00
42.00
41.50
SUBTOTAL
IGV (18%)
TOTAL

8,380.00
15,890.00
26,983.72
1,912.50
2,700.00
7,140.00
6,300.00
415.00
69,721.22
12,549.82
82,271.04

AMORTIZACION 8
JULIO 2014

0.00
0.00
0.00

AMORTIZACION POR ADELANTO DE MATERIAL EN OBRA N 03- VALORIZACION N 13


MES: JULIO 2014
OBRA:
LUGAR:
TRAMITE:
Codigo
0205000005
0205000040
0205010004
0205010015
0221000001
0221000094
0230460049
0236000000
0265180011
0265180014
0272000000
0272020000
0272040046
0272050030
0272070081
0273010034
0273010035
0273010036

"COMPONENTE DE INFRAESTRUCTURA DEL MEJORAMIENTO DE LAS CALLES DEL AAHH. ALTO MARCAVALLE PARA
REMEDIACION DE SUELOS EN LA CIUDAD DELA OROYA, PROVINCIA DE YAULI - JUNIN"
JUNIN-YAULI-SANTA ROSA DE SACCO
11/26/2013

Recurso
PIEDRA CHANCADA DE 1"
MATERIAL GRANULAR
ARENA GRUESA
MATERIAL DE RELLENO
CEMENTO PORTLAND I (42.5kg)
CEMENTO PORTLAND TIPO IP
PEGAMENTO PARA TUBO PVC
HORMIGON (PUESTO EN OBRA)
CODO DE 90 SP PVC SAP P/AGUA E 12.5 mm
CODO 135 PVC SAP DN=63 mm
TUBERIA PVC SAP PRESION PARA AGUA C-5 EC 2"X5m
REDUCCION PVC SAP PARA AGUA CON ROSCA 3/4" A 1/2"
TAPON HEMBRA PVC SAP P/AGUA DN=63 mm
CURVA PVC 12.5 mm P/AGUA
TEE PVC SAP DN=63 mm
TUBERIA PVC SAP A-10 DE DN=12.5 mm
TUBERIA PVC ISO 4422, CLASE 10, DN=63 mm
TUB. PVC SAL P/DESAGUE DE 150 mm

Und
m3
m3
m3
m3
bls
bls
gal
m3
u
u
u
u
u
u
u
u
u
u

Cantidad
700.00
1,600.00
790.00
1,400.00
11,500.00
2,900.00
6.38
30.00
309.00
2.00
270.00
170.00
7.00
170.00
7.00
1,645.00
2,196.00
2,493.00

Precio (S/.)
60.00
42.00
42.50
42.00
16.76
15.89
86.25
41.50
1.02
10.10
19.96
0.94
4.37
1.16
10.04
1.65
6.04
17.76
SUBTOTAL
IGV (18%)
TOTAL

Importe (S/.)
42,000.00
67,200.00
33,575.00
58,800.00
192,740.00
46,081.00
550.28
1,245.00
315.18
20.20
5,389.20
159.80
30.59
197.20
70.28
2,714.25
13,263.84
44,275.68
508,627.50
91,552.95
600,180.44

AMORTIZACION 8
JULIO 2014

9,687.17
9,356.26
4,952.75
1,814.81
30,578.36
2,273.10
0.00
84.95
0.00
0.00

0.00
0.00
28,169.05
5,070.43
33,239.47

5
VALORIZACION N 13, DEL 01 AL 31 JULIO 2014

Contrato GL-C-032-2013: Supervisin de la


Obra:MEJORAMIENTO DE LAS CALLES DE AH ALTO
MARCAVALLE POR REMEDIACION DE SUELOS EN LA CIUDAD
DISTRITO DE SANTA ROSA DE SACCO-PROVINCIA DE YAULI-

(SUMA ALZADA)

AMORTIZACION POR ADELANTO DE MATERIAL EN OBRA N 04- VALORIZACION N 13


MES: JULIO 2014
OBRA:
LUGAR:
TRAMITE:

"COMPONENTE DE INFRAESTRUCTURA DEL MEJORAMIENTO DE LAS CALLES DEL AAHH. ALTO MARCAVALLE PARA
REMEDIACION DE SUELOS EN LA CIUDAD DELA OROYA, PROVINCIA DE YAULI - JUNIN"
JUNIN-YAULI-SANTA ROSA DE SACCO
11/26/2013

CODIGO

0201800002
0202000007
0202000008
0202010022
0203020003
0205000005
0205000040
0205000041
0205010004
0205010015
0205010037
0205010038
0221000001
0221000094
0221030002
0229500003
0230120003
0230230007
0230340001
0230460049
0230520001
0231520002
0236000000
0243040000
0244010000
0245010001
0251010013
0251040129
0251070005
0252070010
0253010000
0253010002
0253050006
0254120002
0254450070
0265180009
0265180010
0265240003
0272040046
0272330004
0272330005
0272330006

RECURSO

UND

CANTIDAD

LUBRICANTE PARA TUBERIA


ALAMBRE NEGRO N 16
ALAMBRE NEGRO N 8
CLAVOS C/C DE 3"
ACERO CORRUGADO GRADO 60

gal
kg
kg
kg
kg

9.04
764.82
237.25
411.19
20,000.00

PIEDRA CHANCADA DE 1"


MATERIAL GRANULAR
PIEDRA BASE
ARENA GRUESA
MATERIAL DE RELLENO

m3
m3
m3
m3
m3
m
m
bls
bls
u
kg
gal
gal
kg
gal
gal
u
m3
p2
p2
p2
pza
u
pza
m
kg
lb
gal
gal
gal
u
u
u
u
u
u
u

1,300.00
2,500.00
6.75
1,200.00
1,200.00
6,200.00
9,500.00
3,000.00
2,100.00
60.00
100.00
80.00
352.00
100.00
0.25
20.00
50.00
25.54
100.82
893.10
16,932.66
50.00
60.00
0.35
771.33
18.81
0.16
12.07
15.00
20.00
50.00
50.00
50.00
6.00
50.00
50.00
50.00

MATERIAL DE RESPALDO PARA SELLO ELASTICO DE JUNTA DE 9MM


MATERIAL DE RESPALDO PARA SELLO ELASTICO DE JUNTA DE 12.7 MM

CEMENTO PORTLAND I (42.5kg)


CEMENTO PORTLAND TIPO IP
CAJA DE CONCRETO PARA MEDIDOR 12.5 mm
SOLDADURA CELLOCORD 1/8"
ADITIVO ACELERANTE DE FRAGUA
ADITIVO EUCO 360
MICROESFERAS TIPO DROPON
PEGAMENTO PARA TUBO PVC
ADITIVO INCORPORADOR DE AIRE
CAJA DE CONCRETO SIMPLE DESAG 0.30X0.60 INC. TAPA
HORMIGON (PUESTO EN OBRA)
MADERA TORNILLO
ESTACA DE MADERA TORNILLO TRATADA
MADERA TORNILLO INCLUYE CORTE PARA ENCOFRADO
ANGULO DEACERO LIVIANO DE 1 1/4 2X 6m
PLATINA DE ACERO LIVIANO DE 1"X1/4"X6m
TUBO CUADRADO DE ACERO 4" e=1" L=6.00m
BARRA DE ACERO LISO 5/8"
GRASA
GRASA
DISOLVENTE XIXOL
PINTURA ESMALTE
PINTURA DE TRAFICO
CODO 45 PVC SAL DE 150 mm
REDUCCION PVC SAL P/DESAGUE DE 200mm A 150 mm
MARCO Y TAPA DE FIERRO GALVANIZADO PARA MEDIDORE 12.5 mmm

TAPON HEMBRA PVC SAP P/AGUA DN=63mm


CORPORATION RT NIPLE TUERCA EMPAQ. 12.5mm
LLAVE DE PASO RT NIPLE TUERCA EMPAQ. 12.5 mm
ABRAZADERA TERMOPLASTICA

Precio (S/.)
50.37
4.55
4.55
3.90
2.59
60.00
42.00
45.00
42.50
42.00
0.41
0.70
16.76
15.89
18.06
14.66
25.92
29.48
3.03
86.25
33.01
74.80
41.50
5.05
4.87
5.05
66.12
34.71
158.74
4.21
15.00
6.28
31.60
35.98
40.02
23.35
31.64
12.57
4.37
14.76
26.72
17.00
SUBTOTAL
IGV (18%)
TOTAL

TOTAL DE AMORTIZACION DE ADELANTO DE MATERIALES (COSTO DIRECTO) - JULIO 2014

Importe (S/.)
455.34
3,479.93
1,079.49
1,603.64
51,800.00
78,000.00
105,000.00
303.75
51,000.00
50,400.00
2,542.00
6,650.00
50,280.00
33,369.00
1,083.60
1,466.00
2,073.60
10,376.96
303.00
21.56
660.20
3,740.00
1,059.91
509.14
4,349.40
85,509.92
3,306.00
2,082.60
55.56
3,247.30
282.15
1.00
381.41
539.70
800.40
1,167.50
1,582.00
628.50
26.22
738.00
1,336.00
850.00
564,140.79
101,545.34
665,686.14

AMORTIZACION 8
JULIO 2014

0.00
-1.34
68.69
82.31
-26.62
669.06
527.59
315.95

1,993.80
0.00
3,598.68
6,718.47

97.14
0.00

3,557.24

0.00

0.00
0.00
0.00
0.00
0.00
0.00
7,283.82
1,311.09
8,594.90

35,452.86

100.74
3,739.35
936.43
828.33
47,065.62
3,664.32
16,604.43
5,607.00
6,375.28
51.00
30.30
2,305.38
150.12
21.85
171.68
50.20
3,664.75
4,812.12
100.40
96,279.32
17,330.28
113,609.59

AMORTIZACION 6 AMORTIZACION 7 AMORTIZACION 8


MAYO 2014
JUNIO 2014
JUlIO 2014

13,721.00
4,776.05
7,009.26
0.00
42,224.19
4,194.30
0.00
115.91
0.00

9,370.16
1,544.18
4,751.98
0.00
31,430.24
0.00
0.00
0.00
0.00

0.00

0.00

0.00
0.00

0.00
0.00

72,040.71
12,967.33
85,008.04

47,096.57
8,477.38
55,573.95

9,687.17
9,356.26
4,952.75
1,814.81
30,578.36
2,273.10
0.00
84.95
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
28,169.05
5,070.43
33,239.47

TOTAL
105,505.70
123,714.09
57,698.87
90,650.47
322,764.93
48,808.71
157.99
827.74
312.12
10.10
4,131.72
51.98
30.59
77.72
70.28
2,643.30
14,166.76
1,565.10
773,188.17
139,173.87
912,362.04

diferencia
-63,505.70
-56,514.09
-24,123.87
-31,850.47
-130,024.93
-2,727.71
392.29
417.26
3.06
10.10
1,257.48
107.82
0.00
119.48
0.00
70.95
-902.92
42,710.58
-264,560.68

AMORTIZACION 6 AMORTIZACION 7 AMORTIZACION 7


MAYO 2014
JUNIO 2014
JULIO 2014

0.00
141.76
80.54
105.32
806.94
216.00
241.92

0.00
157.19
7.11
48.95
3,131.78
0.00
0.00

102.00

0.00

643.68
0.00

0.00
0.00

4,852.54
9,060.86

3,237.88
6,032.65

131.00
0.00

87.51
0.00

4,341.86

1,151.87

-51.82

0.00

0.00
0.00
0.00

0.00
0.00
0.00

0.00
0.00
0.00
20,672.59
3,721.07
24,393.65

0.00
0.00
0.00
13,854.93
2,493.89
16,348.82

92,713.30

60,951.50

92,713.30

60,951.50

0.00
-1.34
68.69
82.31
-26.62
669.06
527.59
0.00
315.95
0.00
0.00
0.00
0.00
1,993.80
0.00
0.00
3,598.68
6,718.47
0.00
0.00
97.14
0.00
0.00
0.00
0.00
3,557.24
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
7,283.82
1,311.09
8,594.90

TOTAL
2,391.92
480.84
226.87
335.78
48,936.86
3,058.47
3,491.01
0.00
1,444.28
10,582.15
0.00
0.00
0.00
9,114.25
1,101.66
0.00
24,492.47
67,182.01
0.00
0.00
1,060.37
24.48
345.74
0.00
0.00
31,110.46
0.00
0.00
0.00
0.00
183.51
0.00
0.00
0.00
0.00
208.08
2,677.41
766.77
0.00
1,638.36
4,595.84
1,887.00
217,336.59
39120.5855
256,457.17
409,228.96
409,228.96

diferencia
-1,936.58
2,999.09
852.62
1,267.87
2,863.14
74,941.53
101,508.99
303.75
49,555.72
39,817.85
2,542.00
6,650.00
50,280.00
24,254.75
-18.06
1,466.00
-22,418.87
-56,805.05
303.00
21.56
-400.17
3,715.52
714.17
509.14
4,349.40
54,399.47
3,306.00
2,082.60
55.56
3,247.30
98.64
1.00
381.41
539.70
800.40
959.42
-1,095.41
-138.27
26.22
-900.36
-3,259.84
-1,037.00

diferencia del
Adelanto 03

-63,505.70
-56,514.09
-24,123.87
-31,850.47

-130,024.93
-2,727.71

392.29

417.26

Saldo

2,999.09
852.62
1,267.87
2,863.14
11,435.83
44,994.90
303.75
25,431.85
7,967.38
2,542.00
6,650.00
-79,744.93
21,527.04
-18.06
1,466.00
-22,418.87
-56,805.05
303.00
413.85
-400.17
3,715.52
1,131.43
509.14
4,349.40
54,399.47
3,306.00
2,082.60
55.56
3,247.30
98.64
1.00
381.41
539.70
800.40
959.42
-1,095.41
-138.27
26.22
-900.36
-3,259.84
-1,037.00

Contrato GL-C-032-2013: Supervisin de la


Obra:MEJORAMIENTO DE LAS CALLES DE AH ALTO
MARCAVALLE POR REMEDIACION DE SUELOS EN LA CIUDAD
DISTRITO DE SANTA ROSA DE SACCO-PROVINCIA DE YAULI-

VALORIZACION N 12, DEL 01 AL 30 JUNIO 2014


(SUMA ALZADA)
DEDUCCION POR ADELANTO DE MATERIALES

PERIODO
VAL N 04-OCT. 13

VALORIZACION BRUTA

434,417.22

VAL N 05-NOV. 13

196,186.31

VAL N 06-DIC. 13

766,202.87
536,151.11
677,923.99

VAL N 07-ENE. 14
VAL N 08-FEB. 14
VAL N 09-MAR. 14
VAL N 10-ABRIL 14
VAL N 11-MAYO 14
VAL N 12-JUNIO 14
VAL N 13-JULIO 14

150,075.85
567,837.83
241,327.32
154,284.14
193,251.06

AMORTIZACION
MATERIALES

31,454.16
43,431.57
171,000.36
159,653.84
247,520.28
247,520.28
50,490.09
50,490.09
226,986.31
226,986.31
92,713.30
92,713.30
60,951.50
60,951.50
35,452.86
35,452.86

MATERIALES DE
MAYOR
INCIDENCIA

Cemento
Cemento
Agregado
Agregado
Cemento
Agregado
Cemento
Agregado
Cemento
Agregado
Cemento
Agregado
Cemento
Agregado
Cemento
Agregado

DEDUCCION ACUMULADA A JULIO 14


DEDUCCION ACUMULADA MES ANTERIOR
DEDUCCION EN EL MES DE JULIO 14

DEDUCCION POR
ADELANTO DE
MATERIALES
PROMEDIO

0.00
0.00
2,412.86
2,757.31
0.00
5,798.09
0.00
1,182.72
0.00
4,536.83
0.00
1,793.97
0.00
1,309.49
0.00
1,155.78
20,947.06
19,791.28
1,155.78

0.00

D = A (Imr-Ima)/ Im0
D

Deduccion en cada valorizacion bruta reajustada

Monto utilizado en la valorizacion que se reajusta

Imr

Indice del material representativo a la fecha de reajuste

Ima

Indice del material representativo a la fecha de la entrega del adelanto

Imo

Indice del material representativo a la fecha del presupuesto base

Monomio

Factor

(%)

Smbolo

Indice

Descripcin

100.00%
52.82%
47.18%
100.00%
100.00%
100.00%
100.00%

M
M
F
A
C
M
I

47
45
32
05
21
48
39

MANO DE OBRA
MADERA TERCIADA PARA ENCOFRADO
FLETE TERRESTRE
AGREGADO GRUESO
CEMENTO PORTLAND TIPO I
MAQUINARIA Y EQUIPO NACIONAL
INDICE GENERAL DE PRECIOS AL CONSUMIDOR

Jul-12
IU

1
2
3
4
5
6

0.221
0.142
0.107
0.098
0.131
0.301

May-13

COEFIC

IU

COEFIC

Jun-13
IU

COEFIC

Jul-13
IU

Aug-13

COEFIC

IU

COEFIC

Sep-13
IU

COEFIC

Oct-13
IU

COEFIC

Nov-13
IU

COEFIC

Dec-13
IU

COEFIC

Jan-14
IU

COEFIC

Feb-14
IU

COEFIC

Mar-14
IU

COEFIC

448.25

0.221

471.44

0.232

471.44

0.232

497.55

0.245

497.55

0.245

497.55

0.245

497.55

0.245

497.55

0.245

497.55

0.245

498.10

0.246

498.10

0.246

498.10

0.246

311.80

0.075

314.48

0.076

311.57

0.075

311.60

0.075

311.97

0.075

311.97

0.075

311.73

0.075

311.88

0.075

311.88

0.075

311.89

0.075

311.97

0.075

311.97

0.075

449.56

0.067

455.86

0.068

455.72

0.068

455.72

0.068

455.72

0.068

455.86

0.068

455.86

0.068

455.86

0.068

455.19

0.068

455.19

0.068

455.19

0.068

465.69

0.069

360.73

0.107

377.24

0.112

375.79

0.111

377.23

0.112

379.17

0.112

384.73

0.114

381.91

0.113

384.46

0.114

387.00

0.115

388.14

0.115

390.36

0.116

389.12

0.115

354.74

0.098

354.74

0.098

354.74

0.098

354.74

0.098

354.74

0.098

354.74

0.098

354.74

0.098

354.74

0.098

354.74

0.098

354.74

0.098

354.74

0.098

354.74

0.098

327.55

0.131

328.27

0.131

335.41

0.134

337.08

0.135

338.62

0.135

337.65

0.135

336.95

0.135

338.15

0.135

336.78

0.135

339.09

0.136

339.73

0.136

339.81

0.136

377.50

0.301

386.60

0.308

387.61

0.309

389.74

0.311

391.85

0.312

392.28

0.313

392.43

0.313

391.57

0.312

392.22

0.313

393.46

0.314

395.83

0.316

397.88

0.317

EXCAVACION A NIVEL DE SUBRASANTE


REPLANTEO
PROYECTO
DIFERENCIAS
AV. ITALIA 1
827.58
AV. ITALIA 2
481.81
1,331.16
21.77
AV. PERU
2,442.98
2,659.53
216.55
AV. ARGENTINA
1,830.59
1,391.78
-438.81
AV. BRASIL 1
1,375.43
760.83
-614.60
AV. BRASIL 2
352.79
789.07
436.28
AV. PERU-ITALIA
175.22
240.60
65.38
JR. RAZURI
416.75
358.28
-58.47
JR. 28 DE JULIO
299.27
273.87
-25.40
JR. SIMON BOLIVAR
197.85
107.73
-90.12
JR. JOSE OLAYA
192.09
69.94
-122.15
JR. ALFONSO UGARTE
226.88
207.21
-19.67
TOTAL
8,819.24
8,189.99
-629.25
Acumulado a Octubre 13
Acumulado a Setiembre 13
Val mes Octubre 13

7,450.01
2,883.90
4,566.11

ELIMINACION DE MATERIAL EXCDTE


Acumulado a Octubre 13
Acumulado a Setiembre 13
Val mes Octubre 13

8,940.01
3,311.57
5,628.44

TRAZO Y REPLANTEO
PISTAS
CUNETAS
MUROS
Alfonso Ugarte

Jose Olaya
Simon Bolivar
Av Peru

Av Italia
Av. Peru

Acumulado
19,313.17
16,224.58
2,975.52
113.07
0+000/0+042.68
0+057.56/0+085
0+115.83/0+155.43
0+058.23/0+075
056.53/0+075
0+015/0+024.28
0+065/0+084.10
0+245/265
0+265/0+285
0+015/0+045
0+215.02/0+225.69
0+000/0+010
0+425/0+439.60
0+451.99/0+465
0+465/0+488.20

MITIGACION DE IMPACTO AMBIENTAL


SEGURIDAD Y SALUD EN OBRA

Anterior
18,556.90

l
42.68
27.44
39.60
16.77
18.47
9.28
19.10
20.00
20.00
213.34
30.00
10.67
10.00
14.60
13.01
23.20

Acumulado
0.33
0.33

OBRAS DE SANEAMIENTO
TRAZO Y REPLANTEO DE OBRAS DE SANEAMIENTO
EXCAVACION EN TERRENO NORMAL A PULSO
REFINE Y NIVELACION DE ZANJA
CAMA DE APOYO A TUBERIAS
SUMINISTRO E INSTALACION DE TUBERIAS

179.16
86.00
179.16
140.00
120.00

90.96%

Mes
756.27

tipo
S
S
M1
M1
S
M2
S
M3
M6
M1
M1
M5
M3
M6
M3

Anterior
0.22
0.22

excavacion
1.32
31.68
12.4
5.25
1.09
4.47
1.11
78.63
135.95
8.33
2.58
20.89
13.05
39.22
16.84

Mes
0.11
0.11

nivelacion
6.40
4.12
15.84
6.71
2.77
5.10
2.87
15.00
32.00
90.81
12.00
4.27
12.00
10.95
20.82
17.40

encofrado concreto 210


51.22
3.84
32.93
2.47
55.44
8.91
23.48
3.77
22.16
1.66
18.56
2.92
22.92
1.72
52.00
9.90
104.00
23.20
382.71
58.40
42.00
6.75
14.94
2.40
42.00
9.00
37.96
7.23
67.65
15.09
60.32
11.48

acero
133.84
86.05
274.98
116.45
57.92
123.94
59.90
638.76
1,577.60
3,069.45
208.32
74.09
575.80
466.29
1,026.23
740.96

solado
6.40
4.12
15.84
6.71
2.77
5.10
2.87
15.00
32.00
90.81
12.00
4.27
12.00
10.95
20.82
17.40

Nov-13

Anda mungkin juga menyukai