REKAPITULASI
PROYEK
PEMILIK
LOKASI
URAIAN PEKERJAAN
NO
JUMLAH HARGA
PEKERJAAN PENDAHULUAN
Rp.
II
Rp.
III
Rp.
IV
PEKERJAAN BETON
Rp.
Rp.
VI
PEKERJAAN KAYU
Rp.
VII
PENUTUP ATAP
Rp.
VIII
Rp.
IX
Rp.
PEKERJAAN PENGECATAN
Rp.
XI
PEKERJAAN LISTRIK
Rp.
XII
PEKERJAAN AKHIR
Rp.
Terbilang
REAL COST
Rp.
PPN 10%
Rp.
TOTAL COST
Rp.
DIBULATKAN
Rp.
JFW
Architect
JUMLAH HARGA
-
a, 17 April 2012
TUNG OLEH :
JFW
Architect
NO.
1
URAIAN PEKERJAAN
VOLUME
TOTAL HARGA
(Rp.)
5
I
1
2
2
PEKERJAAN PENDAHULUAN
Pembongkaran Bangunan Lama
Pengukuran dan Pemasangan Bouwplank
Ls
15,000,000.00
M2
76,590.00
Sub Total I
II
1
2
3
4
5
6
M3
59,000.00
M3
72,450.00
M3
19,666.67
M3
261,500.00
M3
401,600.00
M3
401,600.00
Sub Total II
III
1
2
1
2
3
4
M3
661,965.00
M3
1,082,725.00
M3
1,369,670.00
M3
1,217,894.00
M2
65,150.00
M2
59,750.00
Jumlah
1
2
3
4
B. LANTAI - 2
Pas. Dinding Bt. Tela Camp. 1 : 2
Pas. Dinding Bt. Tela Camp. 1 : 4
Plesteran Dinding Camp. 1 : 2 (Tebal 1,5 cm)
Plesteran Dinding Camp. 1 : 4 (Tebal 1,5 cm)
M3
1,369,670.00
M3
1,217,894.00
M2
65,150.00
M2
59,750.00
Jumlah
Sub Total III
1
2
3
4
5
6
7
8
9
10
PEKERJAAN BETON
A. LANTAI - I
Cor Lantai Kerja 1 : 3 : 5
Cor Pondasi Telapak Camp. 1 : 2 : 3
Cor Pondasi Tanggga Camp. 1 : 2 : 3
Cor Sloof 20/30 Camp. 1 : 2 : 3
Cor Sloof 15/20 Camp. 1 : 2 : 3
Cor Kolom 25/25 Camp. 1 : 2 : 3
Cor Kolom Praktis 12/12 Camp. 1 : 2 : 3
Cor Ring Balk 10/15 Camp. 1:2:3
Cor Tangga Camp. 1 : 2 : 3
Cor Plat Camp. 1 : 2 : 3 Tbl. 8 CM
M3
M3
M3
M3
M3
M3
M'
M'
M3
M3
Jumlah
1,024,575.00
5,317,360.00
5,317,360.00
6,597,745.00
6,597,745.00
10,546,845.00
94,780.00
126,815.00
7,069,325.00
7,069,325.00
1
2
3
4
5
6
7
B. LANTAI - 2
Cor Balok Lantai 20/35 Camp. 1 : 2 : 3
Cor Balok Anak 15/25 Camp. 1 : 2 : 3
Cor Kolom 25/25 Camp. 1 : 2 : 3
Cor Kolom Praktis 12/12 Camp. 1 : 2 : 3
Cor Ring Balk 10/15 Camp. 1:2:3
Cor Plat Lantai Camp. 1 : 2 : 3 (Tebal 12 cm)
Cor Plat Camp. 1 : 2 : 3 (Tebal 8 cm)
M3
M3
M3
M'
M'
M3
M3
Jumlah
Sub Total
8,012,545.00
8,012,545.00
10,546,845.00
94,780.00
126,815.00
7,069,325.00
7,069,325.00
IV
V
1
2
3
HARGA SATUAN
(Rp.)
4
M2
M2
M2
IV
192,055.00
252,395.00
272,065.00
4
5
M3
1,024,575.00
M3
1,024,575.00
Jumlah
1
2
3
B. LANTAI - 2
Pas. Tegel Porselin lantai 40/40
Pas. Lantai Porselin 20/20 (utk KM/WC)
Pas. Dinding Porselin 20/25 (utk KM/WC)
M2
192,055.00
M2
252,395.00
M2
272,065.00
Jumlah
Sub Total V
M3
6,764,625.00
M2
571,000.00
M2
666,500.00
M2
410,060.00
M2
666,500.00
M3
5,635,200.00
M3
4,362,300.00
M'
68,125.00
M2
103,900.00
M2
47,442.50
M'
25,615.00
Jumlah
B. LANTAI - 2
Pas. Kusen Ky. Besi 5/10
Pas. Pintu Panil Kayu
Pas. Jendela Kaca
Pas. Jendela Kaca pada Ventilasi
Pek. Kuda-Kuda Kayu Besi 5/10
Pek. Gording Ky. Matoa 5/10
Pas. Lisplank Papan Ky. Besi 3/30
Pek. Rangka Plafond
Pas. Tripleks Plafond Tbl. 4 mm
Pas. List Profil kayu Plafond
M3
6,764,625.00
M2
571,000.00
M2
666,500.00
M2
666,500.00
M3
5,635,200.00
M3
4,362,300.00
M'
68,125.00
M2
103,900.00
M2
47,442.50
M'
25,615.00
Jumlah
Sub Total VI
1
2
PENUTUP ATAP
A. LANTAI - 1
Pas. Atap Seng Gelombang BJLS 030
Nok Seng Plat
M2
M'
Jumlah
71,600.00
43,370.00
1
2
3
B. LANTAI - 2
Pas. Atap Seng Gelombang BJLS 030
Nok Seng Plat
Jurai Seng Plat
M2
71,600.00
M'
43,370.00
M'
137,842.50
Jumlah
Sub Total VII
1
2
3
4
5
6
Unit
Unit
Bh
Bh
Bh
Bh
Jumlah
216,300.00
93,625.00
33,365.00
26,350.00
24,000.00
21,640.00
1
2
3
4
5
6
B. LANTAI - 2
Pas. Kunci Tanam 2 Slaag
Pas. Kunci Bulat utk KM/WC
Pas. Engsel Pintu 4"
Pas. Engsel Jendela 3"
Pas. Hak Angin Lipat
Pas. Gerendel Jendela
Unit
216,300.00
Unit
93,625.00
Bh
33,365.00
Bh
26,350.00
Bh
24,000.00
Bh
21,640.00
Jumlah
Sub Total VIII
Bh
Bh
VI
1
2
3
4
5
6
7
8
9
10
11
1
2
3
4
5
6
7
8
9
10
VII
VIII
IX
1
2
PEKERJAAN KAYU
A. LANTAI - 1
Pas. Kusen Ky. Besi 5/10
Pas. Pintu Panil Kayu
Pas. Jendela Kaca
2,336,205.00
46,050.00
3
4
5
6
7
8
9
10
Bh
1,068,150.00
M'
285,542.00
M'
85,050.00
M'
138,292.00
M'
100,076.00
Ls
600,000.00
Bh
30,050.00
Unit
5,000,000.00
Jumlah
1
2
3
4
5
6
7
8
B. LANTAI - 2
Pas. Closed Duduk
Pembuatan bak air
Pas. Wastafel
Stop Kran Air Bersih
Pas. Pipa Air Bersih GIP dia 1/2" + Accesoris
Pas. Pipa Air Bekas PVC dia 2" + Accesoris
Pas. Pipa Air Kotor PVC dia 4" + Accesoris
Pas. Floor drain
Bh
Ls
Bh
Bh
M'
M'
M'
Bh
2,336,205.00
600,000.00
2,511,250.00
46,050.00
85,050.00
138,292.00
115,500.00
30,050.00
Jumlah
Sub Total IX
X
1
2
3
4
5
6
7
8
9
PEKERJAAN PENGECATAN
A. LANTAI - 1
Cat Meny Kayu
Cat Kilap Kusen
Cat Kilap Lisplank
Cat Pintu Panil
Cat. Jendela Kaca
Cat. Jendela Kaca Kecil pada ventilasi
Cat Dinding Tembok
Cat Plafond Tripleks
Residu Kuda-kuda, Gording
M2
M2
M2
M2
M2
M2
M2
M2
M2
Jumlah
40,060.00
50,105.00
50,105.00
50,105.00
50,105.00
50,105.00
24,350.00
26,440.00
38,500.00
1
2
3
4
5
6
7
8
9
B. LANTAI - 2
Cat Meny Kayu
Cat Kilap Kusen
Cat Kilap Lisplank
Cat Pintu Panil
Cat. Jendela Kaca
Cat. Jendela Kaca Kecil pada ventilasi
Cat Dinding Tembok
Cat Plafond Tripleks
Residu Kuda-kuda, Gording
M2
M2
M2
M2
M2
M2
M2
M2
M2
Jumlah
Sub Total X
40,060.00
50,105.00
50,105.00
50,105.00
50,105.00
50,105.00
24,350.00
26,440.00
38,500.00
1
2
3
4
5
PEKERJAAN LISTRIK
A. LANTAI - 1
Pas. Lampu TL 40 Watt
Pas. Lampu XL 18-24 Watt
Pas. Stop kontak
Pas. Panel Listrik
Penyambungan Listrik dari PLN
Ttk
278,250.00
Ttk
194,500.00
Ttk
149,500.00
Ls
500,000.00
Ls
6,000,000.00
Jumlah
1
2
3
4
B. LANTAI - 2
Pas. Lampu TL 40 Watt
Pas. Lampu XL 18-24 Watt
Pas. Stop kontak
Pas. Panel Listrik
Ttk
Ttk
Ttk
Ls
Jumlah
Sub Total XI
278,250.00
194,500.00
149,500.00
500,000.00
PEKERJAAN AKHIR
Pekerjaan Pembersihan/ Finishing
Ls
5,000,000.00
Sub Total XII
XI
XII
1
11.4
Sloof 15/20
3.00
Sloof 20/30
54.00
Pjg Sloof
57.00
8.00
Kolom 25/25
12.00
Tinggi Kolom
3.55
Pembagi
10.00
4.00
1/11
35.00
1/2
0.36
17.50
Pjg dinding
Jendela Depan
44.00
-
Ventilasi
1.26
5.00
Kusen Pintu 2
Kusen Pintu 1
21.00
Kusen jendela
32.00
Kusen Depan
7.30
65.30
5.00
Kusen Pintu 2
Kusen Pintu 1
28.00
Kusen jendela
32.00
Kusen Depan
65.00
Atap Depan
176.00
Kuda-Kuda
176.00
Atap Depan
176.00
Kuda-Kuda
176.00
UPAH KERJA
NO.
SATUAN
1
1
2
3
4
2
Pekerja
Tukang
Kepala tukang
Mandor
3
O/H
O/H
O/H
O/H
II.
HARGA BAHAN
NO.
JENIS BAHAN
SATUAN
1
2
3
4
5
6
7
Batu kali
Batu tela
Pasir urug
Pasir pasang
Pasir beton
Batu kerikil kali / cor
Tanah timbunan
KELOMPOK KAYU
1
2
3
4
5
6
C.
1
2
3
4
5
6
7
Triplek 4 mm
Plywood 4 mm
Plywood 9 mm
Atap multi rooof 38.5 cm X 100 cm
Bumbungan multi roof model C
Seng gelombang BJLS 0.30
Seng plat BJLS 0.30
Seng Plat Almunium
Kaca rayben 5 mm
Kaca Bening 5 mm
Paku campuran
Paku triplek
8
9
10
11
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
Btg
Btg
Lbr
Lbr
Lbr
Lbr
Bh
Lbr
Lbr
Lbr
Lbr
Lbr
Kg
Kg
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
51
52
53
Paku seng
Semen PC 50Kg
Semen warna
Besi Beton
Kawat ikat
Minyak Begisting
Tegel Porselin 20x20 cm
Tegel Porselin 40x40 cm
Tegel Porselin tekstur 40x40 cm
Tegel Porselin 20/25 cm
Lampu XL 18 watt
Fitting lampu
Saklar tunggal
Saklar ganda
Stop kontak
Kabel NYM
Pipa GIV Dia. 3/4' (tebal)
Pipa GIV Dia. 1/2" (tebal)
Pipa PVC 2" (AW)
panjang 6 m'
Pipa PVC 3" (AW)
panjang 6 m'
Pipa PVC 4" (AW)
panjang 6 m'
Closet duduk keramik
Wastafel Keramik + cermin
Bak Cuci Piring Stainless steel
Kran air kwalitas standar
Floordrain Stainless
Cat Meni
Cat Kilat Kayu
Cat Tembok/ Plafond
Cat Kilat Atap
Lem Kayu
Lem Pipa
Minyak Cat/ Thinner
Residu
Dempul Kayu
Plamur Tembok
Amplas
Kunci Tanam 2 Slaag
Kunci Tanam 1 Slaag untuk KM&WC
Engsel Kuningan 4" untuk Pintu
Engsel kuningan 3" utk jend ungkit
Gerendel Jendela
Kait Angin
Kg
Zak
Kg
Kg
Kg
Ltr
Dos
Dos
Dos
Dos
Bh
Bh
Bh
Bh
Bh
M'
Btg
Btg
Btg
Btg
Btg
Bh
Bh
Bh
Bh
Bh
Kg
Kg
Kg
Kg
Kg
Kg
Ltr
Ltr
Kg
Kg
Lbr
Bh
Bh
Psg
Psg
Psg
Bh
HARGA SATUAN
4
75,000.00
100,000.00
105,000.00
110,000.00
60,000.00
84,000.00
87,500.00
100,000.00
1.10
1.10
1.10
1.10
50,000.00
75,000.00
80,000.00
90,000.00
1.10
1.10
1.10
1.10
1.10
1.10
1.10
1.10
1.10
1.10
1.10
3,500,000.00
HARGA SATUAN
4
350,000.00
2,800.00
315,000.00
350,000.00
375,000.00
375,000.00
200,000.00
3,000,000.00
3,500,000.00
3,000,000.00
3,500,000.00
15,000.00
15,000.00
85,000.00
100,000.00
180,000.00
55,000.00
33,000.00
75,000.00
75,000.00
143,000.00
345,000.00
345,000.00
24,500.00
24,500.00
342,100.00
2,750.00
297,000.00
342,100.00
349,800.00
379,500.00
163,900.00
#REF!
#REF!
#REF!
#REF!
264,000.00
2,400.00
220,000.00
264,000.00
258,000.00
290,500.00
120,000.00
1.20
1.20
1.20
1.20
1.20
1.20
1.20
311,000.00
2,500.00
270,000.00
311,000.00
318,000.00
345,000.00
149,000.00
2,500,000.00
3,000,000.00
2,500,000.00
3,000,000.00
####
####
####
####
2,760,000.00
3,200,000.00
2,760,000.00
3,200,000.00
73,700.00
67,000.00
1.10
67,000.00
1.10
55,000.00
33,000.00
68,200.00
50,000.00
30,000.00
54,500.00
1.10
1.10
1.10
50,000.00
30,000.00
62,000.00
1.10
1.10
1.10
346,500.00
226,000.00
1.10
315,000.00
1.10
23,100.00
26,400.00
16,000.00
20,000.00
1.10
1.10
21,000.00
24,000.00
1.10
1.10
#REF!
#REF!
#REF!
#REF!
28,000.00
85,000.00
12,000.00
18,000.00
22,000.00
5,000.00
95,000.00
100,000.00
100,000.00
95,000.00
50,000.00
15,000.00
20,000.00
20,000.00
30,000.00
4,000.00
175,000.00
308,000.00
80,000.00
120,000.00
255,000.00
1,850,000.00
1,550,000.00
1,000,000.00
35,000.00
19,000.00
26,000.00
53,000.00
12,000.00
45,000.00
38,000.00
27,500.00
27,500.00
38,500.00
32,500.00
23,000.00
7,500.00
150,000.00
66,000.00
19,500.00
15,300.00
13,240.00
14,000.00
26,400.00
82,000.00
12,100.00
22,000.00
28,600.00
20,000.00
73,500.00
7,000.00
15,000.00
22,500.00
1.10
1.10
1.10
1.20
1.10
24,000.00
82,000.00
11,000.00
20,000.00
26,000.00
1.10
1.00
1.10
1.10
1.10
47,300.00
71,500.00
79,200.00
77,000.00
66,000.00
8,800.00
11,000.00
13,200.00
30,800.00
19,250.00
175,000.00
187,000.00
71,500.00
226,600.00
333,300.00
2,750,000.00
1,760,000.00
43,000.00
65,000.00
72,000.00
70,000.00
60,000.00
8,000.00
13,500.00
15,000.00
22,000.00
5,000.00
59,000.00
97,500.00
33,500.00
64,500.00
105,000.00
2,345,000.00
375,000.00
1.10
1.10
1.10
1.10
1.10
1.10
1.10
1.10
1.10
1.10
1.10
1.10
1.10
1.10
1.10
1.10
1.10
43,000.00
65,000.00
72,000.00
70,000.00
60,000.00
8,000.00
10,000.00
12,000.00
28,000.00
17,500.00
108,500.00
170,000.00
65,000.00
206,000.00
303,000.00
2,500,000.00
1,600,000.00
1.10
1.10
1.10
1.10
1.10
1.10
1.10
1.10
1.10
1.10
1.10
1.10
1.10
1.10
1.10
1.10
1.10
24,200.00
19,250.00
26,400.00
53,900.00
12,100.00
45,100.00
26,400.00
16,000.00
19,375.00
44,375.00
10,125.00
26,000.00
1.10
1.10
1.10
1.10
1.10
1.10
22,000.00
17,500.00
24,000.00
49,000.00
11,000.00
41,000.00
1.10
1.10
1.10
1.10
1.10
1.10
27,500.00
27,500.00
38,500.00
26,400.00
23,100.00
7,700.00
145,750.00
66,000.00
19,800.00
15,400.00
13,200.00
25,000.00
18,437.00
16,500.00
8,500.00
15,625.00
3,900.00
122,550.00
45,000.00
24,000.00
20,000.00
16,250.00
1.10
1.10
1.10
1.10
1.10
1.10
1.10
1.10
1.10
1.10
1.10
1.10
25,000.00
25,000.00
35,000.00
24,000.00
21,000.00
7,000.00
132,500.00
60,000.00
18,000.00
14,000.00
12,000.00
1.10
1.10
1.10
1.10
1.10
1.10
1.10
1.10
1.10
1.10
1.10
NO.
1
1
RSNI-T-12-2002
6.4.
URAIAN PEKERJAAN
HARGA SATUAN
(Rp)
2
3
PENGUKURAN & PEMASANGAN BOUWPLANK /M2
0.012 M3 Ky. matoa 5/7
3,000,000.00
0.007 M3 Papan ky. matoa
3,000,000.00
0.020 Kg
Paku campuran
24,500.00
0.100 OH Pekerja
75,000.00
0.100 OH Tukang
100,000.00
0.010 OH Kepala tukang
105,000.00
0.005 OH Mandor
110,000.00
0.750 OH
Pekerja
75,000.00
6.1.
0.025 OH
Mandor
110,000.00
SNI 2835:2008
6.2.
4
SNI 2835:2008
6.9.
5
SNI 2835:2008
6.15.
SNI 2835:2008
6.11.
2,750.00
59,000.00
59,000.00
67,500.00
4,950.00
72,450.00
72,450.00
18,750.00
916.67
19,666.67
19,666.67
18,750.00
2,750.00
21,500.00
261,500.00
22,500.00
1,100.00
23,600.00
401,600.00
58,500.00
39,000.00
4,095.00
4,290.00
105,885.00
661,965.00
112,500.00
75,000.00
7,875.00
8,250.00
203,625.00
1,082,725.00
75,000.00
110,000.00
75,000.00
110,000.00
200,000.00
75,000.00
110,000.00
240,000.00
315,000.00
75,000.00
110,000.00
378,000.00
378,000.00
7
SNI 2836:2008
6.9.
350,000.00
315,000.00
75,000.00
100,000.00
105,000.00
110,000.00
420,000.00
136,080.00
556,080.00
8
SNI 2836:2008
6.2.
350,000.00
350,000.00
85,000.00
75,000.00
100,000.00
105,000.00
110,000.00
420,000.00
182,000.00
277,100.00
879,100.00
9
76,590.00
56,250.00
240,000.00
6
7,500.00
10,000.00
1,050.00
550.00
19,100.00
SNI 2835:2008
36,000.00
21,000.00
490.00
57,490.00
2
TOTAL HARGA
(Rp)
An. PU.KOTA
2,750.00
82,000.00
459,250.00
234,520.00
0.4350
4.5000
1.5000
0.1500
0.2250
M3
OH
OH
OH
OH
Pasir pasang
Pekerja
Tukang
Kepala tukang
Mandor
340,000.00
75,000.00
100,000.00
105,000.00
110,000.00
147,900.00
841,670.00
10
SNI 2837:2008
6.2.
459,250.00
117,424.00
113,220.00
350,000.00
85,000.00
75,000.00
100,000.00
105,000.00
110,000.00
SNI 2837:2008
6.2.
350,000.00
85,000.00
75,000.00
100,000.00
105,000.00
110,000.00
SNI 7394:2008
6.4.
10
SNI 7394:2008
6.28.
11
SNI 7394:2008
6.29.
82,000.00
350,000.00
375,000.00
100.00
75,000.00
100,000.00
105,000.00
110,000.00
1,217,894.00
22,500.00
15,000.00
1,575.00
1,650.00
40,725.00
65,150.00
22,500.00
15,000.00
1,575.00
1,650.00
40,725.00
59,750.00
90,000.00
20,000.00
2,100.00
6,600.00
118,700.00
1,024,575.00
397,500.00
27,500.00
130,000.00
105,000.00
27,510.00
29,150.00
716,660.00
5,317,360.00
8,400.00
10,625.00
19,025.00
13
337,500.00
150,000.00
15,750.00
24,750.00
528,000.00
7,000.00
17,425.00
24,425.00
12
1,369,670.00
An. PU.KOTA
2,750.00
82,000.00
340,000.00
75,000.00
100,000.00
105,000.00
110,000.00
689,894.00
11
337,500.00
150,000.00
15,750.00
24,750.00
528,000.00
377,200.00
223,300.00
285,375.00
20,000.00
905,875.00
PONDASI BETON BERTULANG (150 KG BESI + BEGISTING) / M3
0.200 M3 Kayu matoa
3,000,000.00
600,000.00
1.500 Kg
Paku 5 cm - 12 cm
24,500.00
36,750.00
0.400 Ltr
Minyak begisting
5,000.00
2,000.00
157.500 Kg
Besi beton
18,000.00
2,835,000.00
2.250 Kg
Kawat ikat
22,000.00
49,500.00
6.720 Zak Semen PC
85,000.00
571,200.00
0.540 M3 Pasir beton
375,000.00
202,500.00
0.810 M3 Kerikil
375,000.00
303,750.00
5.300 OH Pekerja
75,000.00
0.275 OH Tukang batu
100,000.00
1.300 OH Tukang kayu
100,000.00
1.050 OH Tukang besi
100,000.00
0.262 OH Kepala tukang
105,000.00
0.265 OH Mandor
110,000.00
4,600,700.00
SLOOP BETON BERTULANG (200 KG BESI + BEGISTING) / M3
0.270 M3 Kayu matoa
3,000,000.00
810,000.00
2.000 Kg
Paku 5 cm - 12 cm
24,500.00
49,000.00
0.600 Ltr
Minyak begisting
5,000.00
3,000.00
210.000 Kg
Besi beton
18,000.00
3,780,000.00
3.000 Kg
Kawat ikat
22,000.00
66,000.00
6.720 Zak Semen PC
85,000.00
571,200.00
0.540
0.810
5.650
0.275
1.560
1.400
0.323
0.283
M3
M3
OH
OH
OH
OH
OH
OH
Pasir beton
Kerikil
Pekerja
Tukang batu
Tukang kayu
Tukang besi
Kepala tukang
Mandor
375,000.00
375,000.00
75,000.00
100,000.00
100,000.00
100,000.00
105,000.00
110,000.00
202,500.00
303,750.00
5,785,450.00
12
SNI 7394:2008
6.30.
SNI 7394:2008
6.35.
3,000,000.00
24,500.00
18,000.00
22,000.00
85,000.00
375,000.00
375,000.00
75,000.00
100,000.00
100,000.00
100,000.00
105,000.00
110,000.00
SNI 7394:2008
6.31.
15
SNI 7394:2008
6.32.
528,750.00
27,500.00
165,000.00
210,000.00
42,315.00
38,830.00
1,012,395.00
10,546,845.00
13,500.00
2,000.00
2,000.00
2,000.00
630.00
990.00
21,120.00
94,780.00
476,250.00
27,500.00
165,000.00
140,000.00
34,965.00
34,980.00
878,695.00
8,012,545.00
6,000.00
245.00
54,000.00
990.00
6,800.00
2,250.00
3,375.00
73,660.00
14
6,597,745.00
1,200,000.00
98,000.00
10,000.00
5,670,000.00
99,000.00
571,200.00
202,500.00
303,750.00
450,000.00
630,000.00
300,000.00
9,534,450.00
13
423,750.00
27,500.00
156,000.00
140,000.00
33,915.00
31,130.00
812,295.00
960,000.00
78,400.00
8,000.00
3,780,000.00
66,000.00
571,200.00
202,500.00
303,750.00
420,000.00
504,000.00
240,000.00
7,133,850.00
PLAT LANTAI BETON BERTULANG (150 KG BESI + BEGISTING) / M3
0.320 M3 Kayu matoa
3,000,000.00
960,000.00
3.200 Kg
Paku 5 cm - 12 cm
24,500.00
78,400.00
1.600
157.500
2.250
6.720
0.540
0.810
0.120
2.800
32.000
5.300
0.275
1.300
1.050
0.265
0.265
Ltr
Kg
Kg
Zak
M3
M3
M3
Lbr
Btg
OH
OH
OH
OH
OH
OH
Minyak begisting
Besi beton
Kawat ikat
Semen PC
Pasir beton
Kerikil
Balok ky. Matoa
Plywood 9 mm
Kayu dolken 8-10 cm
Pekerja
Tukang batu
Tukang kayu
Tukang besi
Kepala tukang
Mandor
5,000.00
18,000.00
22,000.00
85,000.00
375,000.00
375,000.00
3,000,000.00
180,000.00
15,000.00
75,000.00
100,000.00
100,000.00
100,000.00
105,000.00
110,000.00
8,000.00
2,835,000.00
49,500.00
571,200.00
202,500.00
303,750.00
360,000.00
504,000.00
480,000.00
6,352,350.00
16
SNI 7394:2008
6.36.
SNI 7395:2008
6.7.
100,000.00
350,000.00
85,000.00
12,000.00
75,000.00
100,000.00
105,000.00
110,000.00
SNI 7395:2008
6.36.
SNI 7395:2008
6.54.
SNI 3434:2008
6.1.
3,500,000.00
24,500.00
18,750.00
12,500.00
1,365.00
1,430.00
34,045.00
192,055.00
52,500.00
35,000.00
3,675.00
3,850.00
95,025.00
252,395.00
67,500.00
45,000.00
4,725.00
4,950.00
122,175.00
272,065.00
104,500.00
6,300.00
15,810.00
23,280.00
149,890.00
24
126,815.00
104,500.00
15,750.00
17,680.00
19,440.00
157,370.00
23
22,275.00
3,300.00
3,300.00
3,300.00
1,050.00
1,650.00
34,875.00
110,000.00
15,750.00
16,660.00
15,600.00
158,010.00
22
7,069,325.00
9,000.00
490.00
63,000.00
1,100.00
9,350.00
3,375.00
5,625.00
91,940.00
21
397,500.00
27,500.00
130,000.00
105,000.00
27,825.00
29,150.00
716,975.00
3,850,000.00
30,625.00
7.000
21.000
2.100
0.350
OH
OH
OH
OH
Pekerja
Tukang
Kepala tukang
Mandor
75,000.00
100,000.00
105,000.00
110,000.00
3,880,625.00
25
SNI 3434:2008
6.5.
3,500,000.00
38,000.00
75,000.00
100,000.00
105,000.00
110,000.00
SNI 3434:2008
6.6.
3,500,000.00
345,000.00
38,000.00
75,000.00
100,000.00
105,000.00
110,000.00
Pt-T-30-2000-C
Tbl.1.angka 3
345,000.00
75,000.00
100,000.00
105,000.00
110,000.00
SNI 3434:2008
6.13.
3,500,000.00
24,500.00
75,000.00
100,000.00
105,000.00
110,000.00
SNI 3434:2008
6.15.
3,000,000.00
24,500.00
75,000.00
100,000.00
105,000.00
110,000.00
SNI 3434:2008
6.22.
3,500,000.00
24,500.00
75,000.00
100,000.00
105,000.00
110,000.00
SNI 3434:2008
6.20.
3,000,000.00
23,000.00
75,000.00
100,000.00
105,000.00
110,000.00
SNI 2839:2008
6.5.
73,500.00
26,000.00
410,060.00
300,000.00
1,200,000.00
126,000.00
22,000.00
1,648,000.00
5,635,200.00
180,000.00
720,000.00
75,600.00
13,200.00
988,800.00
4,362,300.00
7,500.00
20,000.00
2,100.00
550.00
30,150.00
68,125.00
15,000.00
30,000.00
3,150.00
1,100.00
49,250.00
103,900.00
48,900.00
5,750.00
54,650.00
28
12,000.00
16,000.00
1,680.00
880.00
30,560.00
36,750.00
1,225.00
37,975.00
27
666,500.00
3,300,000.00
73,500.00
3,373,500.00
55
60,000.00
240,000.00
25,200.00
4,400.00
329,600.00
3,850,000.00
137,200.00
3,987,200.00
54
571,000.00
379,500.00
379,500.00
53
75,000.00
300,000.00
31,500.00
5,500.00
412,000.00
84,000.00
241,500.00
11,400.00
336,900.00
41
6,764,625.00
140,000.00
19,000.00
159,000.00
26
525,000.00
2,100,000.00
220,500.00
38,500.00
2,884,000.00
27,562.50
780.00
0.100
0.100
0.010
0.005
OH
OH
OH
OH
Pekerja
Tukang
Kepala tukang
Mandor
75,000.00
100,000.00
105,000.00
110,000.00
28,342.50
29
SNI 2839:2008
6.10.
15,000.00
26,000.00
75,000.00
100,000.00
105,000.00
110,000.00
75,000.00
28,000.00
75,000.00
100,000.00
105,000.00
110,000.00
An. PU
Jayapura
75,000.00
28,000.00
75,000.00
100,000.00
105,000.00
110,000.00
SNI 7393:2008
6.18.
75,000.00
24,500.00
75,000.00
100,000.00
105,000.00
110,000.00
Pt-T-30-2000-C
Tbl.1.1
150,000.00
100,000.00
105,000.00
Pt-T-30-2000-C
Tbl.1.4
66,000.00
100,000.00
105,000.00
Pt-T-30-2000-C
Tbl.1.5
19,500.00
100,000.00
105,000.00
Pt-T-30-2000-C
Tbl.1.8
15,300.00
100,000.00
105,000.00
Pt-T-30-2000-C
Tbl.1.14
13,240.00
84,000.00
87,500.00
Pt-T-30-2000-C
14,000.00
137,842.50
60,000.00
6,300.00
66,300.00
216,300.00
25,000.00
2,625.00
27,625.00
93,625.00
12,500.00
1,365.00
13,865.00
33,365.00
10,000.00
1,050.00
11,050.00
26,350.00
13,240.00
8,400.00
13,240.00
35
15,000.00
40,000.00
2,625.00
1,100.00
58,725.00
15,300.00
15,300.00
34
43,370.00
19,500.00
19,500.00
33
11,250.00
7,000.00
840.00
660.00
19,750.00
66,000.00
66,000.00
32
71,600.00
150,000.00
150,000.00
31
9,000.00
6,000.00
630.00
660.00
16,290.00
78,750.00
367.50
79,117.50
30
25,615.00
22,500.00
1,120.00
23,620.00
38
3,750.00
5,000.00
525.00
330.00
9,605.00
54,750.00
560.00
55,310.00
37
47,442.50
15,750.00
260.00
16,010.00
36
7,500.00
10,000.00
1,050.00
550.00
19,100.00
14,000.00
8,400.00
21,640.00
Tbl.1.9
0.100 OH
0.010 OH
Tukang
Kepala tukang
100,000.00
105,000.00
10,000.00
14,000.00
36
RSNI-T-15-2002
6.1.
1,850,000.00
1,850,000.00
75,000.00
100,000.00
105,000.00
110,000.00
RSNI-T-15-2002
6.5.
1,550,000.00
1,550,000.00
85,000.00
350,000.00
75,000.00
100,000.00
105,000.00
110,000.00
RSNI-T-15-2002
6.33.
RSNI-T-15-2002
6.32.
41
RSNI-T-15-2002
6.29.
42
RSNI-T-15-2002
6.31.
43
RSNI-T-15-2002
6.20.
44
RSNI-T-15-2002
6.21.
42,500.00
42,500.00
75,000.00
100,000.00
105,000.00
110,000.00
2,336,205.00
90,000.00
145,000.00
15,750.00
11,000.00
261,750.00
2,511,250.00
30,000.00
3,150.00
33,150.00
1,068,150.00
6,075.00
13,500.00
14,175.00
451.00
34,201.00
100,076.00
4,050.00
9,000.00
945.00
297.00
14,292.00
138,292.00
30,000.00
20,000.00
2,100.00
2,200.00
54,300.00
240,300.00
4,050.00
9,000.00
945.00
297.00
14,292.00
285,542.00
1,000,000.00
35,000.00
1,035,000.00
40
247,500.00
110,000.00
105.00
17,600.00
375,205.00
1,550,000.00
186,000.00
510,000.00
3,500.00
2,249,500.00
39
24,000.00
1,850,000.00
111,000.00
1,961,000.00
37
10,000.00
51,000.00
14,875.00
65,875.00
PIPA PVC 2" DARI WC WASTAFEL & WASHBAK KE PERESAPAN /M'
1.200 M'
Pipa PVC type AW 2"
80,000.00
96,000.00
0.350
Perlengkapan
80,000.00
28,000.00
0.054 OH Pekerja
75,000.00
0.090 OH Tukang
100,000.00
0.009 OH Kepala tukang
105,000.00
0.0027 OH Mandor
110,000.00
124,000.00
PIPA PVC 3" AIR HUJAN /M'
1.200 M'
Pipa PVC type AW 3"
120,000.00
144,000.00
0.350
Perlengkapan
120,000.00
42,000.00
0.400 OH Pekerja
75,000.00
0.200 OH Tukang
100,000.00
0.020 OH Kepala tukang
105,000.00
0.020 OH Mandor
110,000.00
186,000.00
PIPA GALVANIS UTK AIR BERSIH 3/4 " /M'
1.200 M'
Pipa galvanis 3/4"
175,000.00
210,000.00
0.350
Perlengkapan
175,000.00
61,250.00
0.054 OH Pekerja
75,000.00
0.090 OH Tukang
100,000.00
0.009 OH Kepala tukang
105,000.00
0.0027 OH Mandor
110,000.00
271,250.00
PIPA GALVANIS UTK AIR BERSIH 1/2 " /M'
1.200 M'
Pipa galvanis 1/2"
308,000.00
369,600.00
0.350
Perlengkapan
308,000.00
107,800.00
0.054 OH Pekerja
75,000.00
0.090 OH Tukang
100,000.00
4,050.00
9,000.00
0.009 OH
0.0027 OH
Kepala tukang
Mandor
105,000.00
110,000.00
477,400.00
45
RSNI-T-15-2002
6.35.
STOP KRAN / BH
1.000 Bh
Kran air 3/4"
0.100 OH Tukang
0.010 OH Kepala tukang
35,000.00
100,000.00
105,000.00
RSNI-T-15-2002
6.36.
19,000.00
100,000.00
105,000.00
Pt-T-38-2000-C1
26,000.00
27,500.00
7,500.00
26,000.00
75,000.00
100,000.00
105,000.00
110,000.00
Pt-T-38-2000-C1
53,000.00
27,500.00
75,000.00
100,000.00
105,000.00
110,000.00
23,000.00
12,000.00
12,000.00
7,500.00
75,000.00
100,000.00
105,000.00
110,000.00
Pt-T-38-2000-C1
23,000.00
12,000.00
7,500.00
75,000.00
100,000.00
105,000.00
110,000.00
120,000.00
4,000.00
20,000.00
75,000.00
100,000.00
105,000.00
110,000.00
50,000.00
4,000.00
20,000.00
15,000.00
40,060.00
11,250.00
15,000.00
1,575.00
880.00
28,705.00
50,105.00
4,500.00
6,000.00
630.00
330.00
11,460.00
24,350.00
6,000.00
8,000.00
420.00
330.00
14,750.00
26,440.00
56,250.00
50,000.00
5,250.00
2,750.00
114,250.00
278,250.00
120,000.00
24,000.00
20,000.00
164,000.00
51
5,625.00
11,000.00
1,155.00
440.00
18,220.00
2,300.00
5,640.00
3,750.00
11,690.00
58
30,050.00
2,300.00
1,200.00
5,640.00
3,750.00
12,890.00
64
10,000.00
1,050.00
11,050.00
15,900.00
5,500.00
21,400.00
63
46,050.00
4,420.00
5,500.00
7,500.00
4,420.00
21,840.00
62
10,000.00
1,050.00
11,050.00
19,000.00
19,000.00
61
491,692.00
35,000.00
35,000.00
46
945.00
297.00
14,292.00
50,000.00
24,000.00
10,000.00
15,000.00
0.5000
0.5000
0.0500
0.0250
Oh
Oh
Oh
Oh
Pekerja
Tukang
Kepala tukang
Mandor
75,000.00
100,000.00
105,000.00
110,000.00
99,000.00
52
30,000.00
4,000.00
75,000.00
100,000.00
105,000.00
110,000.00
3,500,000.00
23,000.00
75,000.00
84,000.00
87,500.00
110,000.00
55,000.00
28,000.00
3,000,000.00
3,000,000.00
75,000.00
149,500.00
60,000.00
6,720.00
24,500.00
1,540.00
92,760.00
165,060.00
89,100.00
4,480.00
31,500.00
14,400.00
56,250.00
0.8600 Oh
Tukang kayu
84,000.00
72,240.00
0.0200 Oh
87,500.00
1,750.00
0.0100 Oh
Mandor
110,000.00
139,480.00
58
37,500.00
50,000.00
5,250.00
2,750.00
95,500.00
70,000.00
2,300.00
72,300.00
57
194,500.00
30,000.00
24,000.00
54,000.00
56
37,500.00
50,000.00
5,250.00
2,750.00
95,500.00
1,100.00
131,340.00
33,000.00
66,000.00
0.0800 Kg
Paku atap
28,000.00
2,240.00
0.7500 Oh
Pekerja
75,000.00
56,250.00
0.6800 Oh
Tukang kayu
84,000.00
57,120.00
0.0200 Oh
87,500.00
1,750.00
0.0100 Oh
Mandor
110,000.00
1,100.00
270,820.00
68,240.00
59
60
0.7300 Lbr
68,000.00
49,640.00
0.1200 Kg
Paku campuran
23,000.00
2,760.00
0.3500 Oh
Pekerja
75,000.00
26,250.00
0.2500 Oh
Tukang kayu
84,000.00
21,000.00
0.0250 Oh
87,500.00
2,187.50
0.0150 Oh
Mandor
110,000.00
26,000.00
27,500.00
84,000.00
87,500.00
110,000.00
53,000.00
27,500.00
26,000.00
7,500.00
75,000.00
84,000.00
12,000.00
23,000.00
7,500.00
75,000.00
84,000.00
38,500.00
75,000.00
110,000.00
21,000.00
875.00
330.00
22,205.00
30,125.00
7,500.00
16,800.00
24,300.00
51,222.50
7,500.00
16,800.00
24,300.00
31,000.00
7,500.00
550.00
8,050.00
21,525.00
3,360.00
1,840.00
1,500.00
6,700.00
63
103,487.50
22,525.00
1,567.50
2,080.00
750.00
26,922.50
62
1,650.00
51,087.50
5,720.00
2,200.00
7,920.00
61
184,460.00
52,400.00
Pt-T-38-2000-C1
116,220.00
13,475.00
13,475.00
70,000.00
6363.636364
7,166.26
70,000.00 1 btg
1.13
An. A.1
Sloof 15/20
0.15
0.2
0.03
33.33
0.012
Sloof 20/30
0.2
0.3
0.06
16.67
0.012
0.3
0.3
0.55
0.55
0.165
0.165
1
1
6.06
6.06
0.019
0.012
12
2
0.3
0.5
0.15
6.67
0.016
12
0.3
0.5
0.15
6.67
0.012
0.25
0.4
0.1
10.00
0.016
0.25
0.4
0.1
10.00
0.012
Ringbalk 10/20
0.15
0.2
0.03
33.33
0.012
0.2
0.3
0.06
16.67
0.012
0.15
0.25
0.0375
26.67
0.012
Kolom 25/25
0.25
0.25
0.0625
16.00
0.012
Kolom 40/60
0.4
0.6
0.24
4.17
0.016
16
Kolom praktis10/10
0.1
0.1
0.01
100.00
0.1
Sloof 30/50
0.3
0.3
0.5
0.5
0.15
0.15
1
1
6.67
6.67
0.016
0.012
8
2
Sloof 25/40
pelat lantai
0.25
0.25
1
0.4
0.4
0.12
0.1
0.1
0.12
1
1
1
10.00
10.00
8.33
0.016
0.012
0.01
7
2
32
Pondasi titik
0.9
0.3
0.27
3.70
0.012
28.8
0.25
0.25
0.35
0.35
0.0875
0.0875
1
1
11.43
11.43
0.19
0.012
6
2
Kolom 20/40
0.2
0.4
0.08
12.50
0.016
0.08
0.08
12.50
0.1
13.333
An. A.1
An. A.18
An. G.2
G.32.h
UPAH : G.31.aSemen :
3.2572
pelat lantai 8 Cm
1,369,670.00
An. PU.KOTA
upah G.33.a
G.50.h
upah G.48
0.1428
G.50.q
upah G.47
0.13022
G.44
0.638
0.761
60
4.2364
Diameter
12
10
8
Berat/ M'
0.888
0.617
0.395
Pjg
11
11
11
Berat/ Btg
9.768 Kg
6.787 Kg
4.345 Kg
Harga/ Btg
84,000.00
54,000.00
36,000.00
1.0608
0.1960
An. Supplement 4
0.01 M3 perekat G.14
0.95
11.7504
upah 2 x G.69
0.2500
0.0250
0.5000
0.2500
0.01
0.01
0.0095
0.117504
2
2
2
2
0.5000
0.0500
1.0000
0.5000
0.186
An. F.26
0.2080
Harga/ Kg
8,599.51
7,956.39
8,285.39
10.0000
30.0000
3.0000
0.5000
0.666666667
0.666666667
0.666666667
0.666666667
6.6667
20.0000
2.0000
0.3333
An. F.31
0.666666667
0.666666667
0.666666667
0.666666667
2.000
6.000
0.600
0.100
PU KOTA
An. F.23
3/4 x F.22
24.0000
2.4000
8.0000
0.4000
0.75
0.75
0.75
0.75
18.0000
1.8000
6.0000
0.3000
An. F.18
0.1000
0.0100
0.0150
0.0075
An. F.21 = F.37
100
100
100
100
10.0000
1.0000
1.5000
0.7500
11.00
1 kg
9.768 Kg
7,166.26
3X5X6
3X9X13X14
0.888
118.40
0.008
0.55
0.888
88.80
0.008
0.008
0.90
0.90
0.15
0.2
2.230
0.888
162.18
10.76
0.01
0.01
1.52
1.52
1.580
126.40
0.01
1.52
11.84
0.01
1.52
94.80
0.01
1.30
0.888
17.76
0.01
1.30
0.2
0.888
118.40
0.008
0.008
0.65
0.65
0.2
0.008
0.008
0.85
0.85
0.2
0.008
0.008
0.65
0.65
0.2
0.008
0.008
0.85
0.85
0.2
0.01
2.00
2.00
0.888
1.580
0.888
0.888
0.888
1.580
88.80
142.08
113.66
105.33
0.20
0.395
36.21
0.10
1
1
10.000
6.666666667
0.395
0.395
29.63
19.75
0.10
1
1
11
6
0.620
0.620
31.41
17.13
0.10
11
0.620
34.55
0.620
18.85
11
0.620
44.33
0.620
24.18
0.20
1
1
5.000
5
0.395
0.395
21.40
21.40
0.15
1
1
6.667
5
0.395
0.395
18.65
13.99
0.15
1
1
6.667
5
0.395
0.395
22.82
17.12
0.15
1
1
6.667
5
0.395
0.395
17.91
13.43
0.620
0.620
7.44
13.64
0.2
0.10
0.2
0.10
1
1
6
11.00
0.20
5.000
0.395
65.18
0.617
246.80
0.008
0.33
1.580
0.888
84.27
11.84
0.01
0.01
1.60
1.60
0.1
0.15
1
1
11
7.666666667
0.620
0.620
10.91
25.35
1.580
0.888
0.617
110.60
17.76
164.53
0.01
0.01
0
1.60
1.60
-
0.1
0.15
0
1
1
1
11
7.666666667
0
0.620
0.620
0.620
10.91
38.03
-
0.888
94.72
0.01
0
0.38
-
0.2
0.2
1
1
0
0
0.620
0.620
2.230
0.888
152.91
20.30
0.01
0.01
1.52
1.52
0.10
0.2
1
1
11
6
0.620
0.620
59.24
32.31
1.580
158.00
0.01
1.42
0.10
11
0.620
60.53
0.617
102.83
0.620
1.2
1.2
1.2
70,000.00
45,000.00
30,000.00
7+15
154.61
138.18
221.49
191.64
181.07
161.19
121.44
182.02
145.00
126.41
311.98
132.37
177.30
164.53
94.72
264.76
218.53